SlideShare a Scribd company logo
1 of 8
Candidate Name Srinivasan Rajagopal CSC Emp ID 11501584
Contact # +919444235795 Mail Id Srajagopal26@csc.com
Passport # Z2387305 Location Chennai
ETES ID Last Updated on 14.06.2016
Comments From CSC India
Total Experience (Months) 18.8 CSC Experience (Months) 0
Summary
 Worked on 3 Implementation Project
Oman Gas Company – Oman as Project Lead & PM consultant, ( 1 year 3 months )
Integral Coach Factory – Chennai India as Project Lead & PM consultant,( 1 year 10 months )
L&T Power ltd Surat India as PM consultant. – ( 11 months )
 Worked on 6 Support Projects – ( 2 years 2 months)
Wooside Energy – Australia as PM Consultant
BlueScope Steel – Australia as PM Consultant.
Oman Gas Company – Oman as Project Lead & PM consultant,
Oman Cement Company - Oman as PM consultant
Sahara Petrochemicals – Saudi as PM consultant
UBIS Support - Sudan as PM consultant
 Having sound knowledge in Manufacturing, oil and gas domains
 Having excellent team handling, co-ordination, and communication skills.
Visa Information
Country Visa Type Valid Till
Domain Expertise: (State NA, if Not Applicable)
NAME: Srinivasan Rajagopal
Domain Specific Area in Domain
Experience
(Months)
Manufacturing Automobile 11.5
Technical Expertise
Technology / Classification SAP Plant maintenance
Primary Skills
Experience
(Months)
Secondary Skills
Experience
(Months)
SAP Plant Maintenance 88 88
Additional Skills
Education
Degree Qualification College / University / Institution
Year of
Passing
B.Tech Information technology Anna University 2003
Diploma
Electronics and
communication
State Board of Tamil Nadu
1993
Professional Activities, Certifications & Training attended
Page 2
NAME: Srinivasan Rajagopal
Course / Certification Name Institution Year Duration
Solution Consultant –Plant
Maintenance
SAP 2008
Page 3
NAME: Srinivasan Rajagopal
Engagement Overview
Project Name Wooside Support Start Date Mar 2016
Client Wooside Support End Date Current
Project Location Chennai –Offshore support
Team Size
handled (If
applicable)
Project Description:
Role / Responsibilities PM Consultant
Contribution:
• Taken KT from Business Process owners in Australia for 2 months
• Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter
suggesting solutions to resolve it.
• Maintaining SLA with the clients tickets
• Attending & resolving issues related to ticket
• Rendering application support to end users
• Attending client meetings (weekly basis) and discussing about ticket status
Environment:
Operating System: Windows /ECC 6.0 / Solution Manager
Project Name BlueScope Steel Support Start Date May 2015
Client BlueScope Steel End Date Current
Project Location Chennai –Offshore support Team Size handled (If applicable)
Project Description:
Role / Responsibilities PM Consultant
Contribution:
• Taken KT from Business Process owners in Australia for 2 months
• Prepared KT document reviewed by business undergone Test and successfully completed.
• Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter
suggesting solutions to resolve it.
• Preparing functional specification documents for various ongoing development activities, Knowledge
of developing Functional design document according to custom specific requirement.
Page 4
NAME: Srinivasan Rajagopal
• Development of test scenarios, test scripts and test data for unit testing and integration testing
• Uploading of Master data as requested by Users like Equipments,Functional Location, Task list
,Maintenance Plan ,Maintenance Item ,Document creation and attachment to technical objects.
• Maintaining SLA with the clients tickets
• Attending & resolving issues related to ticket
• Rendering application support to end users
• Attending client meetings (weekly basis) and discussing about ticket status
Environment:
Operating System: Windows /ECC 6.0 / Solution Manager
Project Name Oman Gas Company Support / Sahara Petro /UBIS Start Date April 2013
Client Oman Gas Company /Sahara Petro chemicals /UBIS End Date April 2015
Project Location Chennai –Offshore support Team Size handled (If applicable) 15
Project Description:
Role / Responsibilities Project Lead / PM Consultant
Contribution:
• Functioning as Project Lead and administering entire support Project for Oman Gas Company
• Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter
suggesting solutions to resolve it.
• Maintaining SLA with the clients tickets
• Attending & resolving issues related to ticket
• Rendering application support to end users
• Organizing weekly meeting with Support Consultant and updating status issues and methods of resolving
the same
• Attending client meetings (weekly basis) and discussing about ticket status
• Taking required support from the client management representative
• Imparting training to end user as well as prepares end user training material
Environment:
Operating System: Windows /ECC 6.0 / Solution Manager
Page 5
NAME: Srinivasan Rajagopal
Project Name Oman Gas Company - SAP Implementation Start Date April 2012
Client Oman Gas Company End Date July 2013
Project Location Oman Team Size handled (If applicable) 15
Project Description:
Role / Responsibilities Onsite Consultant & Project Lead - SAP PM End to End Implementation
Contribution:
• Served as Project Lead and administered implementation of Phase 2 for 5 modules
• Accountable for requirement gathering and finalization of AS-IS, blue print process and gap analysis
• Planned & monitored implementation of PM module
• Handled configuration of SAP solution to meet client’s requirements
• Discussed issues related to FAT & UAT and suggested resolutions for the same
• Developed required LSMW programs and guided core team in data uploading of all masters
• Mentored team & helped them in reaching milestones and timely completion of all phases
• Acted as Module Lead and interacted with other modules for integration issues
• Rendered support to PP, MM & QM Team
• Shouldered additional responsibility of handling Document Management System
• Looked after maintenance of master data for all modules
• Collaborated with:
• Customer and Project Team to ensure delivery
• Quality Lead to ensure timely documentation
• Signed off PM module deliverable for all business process, reports and SAP fleet management
Environment:
Operating System: Windows /ECC 6.0 / Solution Manager
Page 6
NAME: Srinivasan Rajagopal
Project Name Integral Coach Factory - Start Date April 2010
Client Indian Railways End Date
February
2012
Project Location Chennai Team Size handled (If applicable)
Project Description:
Role / Responsibilities Onsite Consultant & PM Functional lead - SAP PM End to End
Implementation
Contribution:
• Configured SAP solution to meet client’s requirements
• Coordinated with touch screen KIOSK’s, PDA (Front end and Backend Team) for what please provide
details
• Developed required LSMW programs and guided the core team in uploading master data
• Acted as Module Lead and interacted with other modules for integration issues
• Rendered support to PP, MM & QM Team
• Mentored team & helped them in reaching milestones and timely completion of all phases
• Accountable for requirement gathering and finalization of AS-IS, blue print process and gap analysis
• Planned & monitored implementation of PM module
• Looked after maintenance of master data for all modules
• Shouldered additional responsibility of handling Document Management System
• Collaborated with:
• Customer and Project Team to ensure delivery
• Quality Lead to ensure timely documentation
• Signed off PM module deliverable for business process, reports, PDA & kiosk applications and SAP fleet
management
Environment:
Operating System: Linux /ECC 6.0 / Solution Manager
Page 7
NAME: Srinivasan Rajagopal
Project Name Shakthi Start Date
Client L&T Power Limited End Date
Project Location Team Size handled (If applicable)
Project Description:
Role / Responsibilities Onsite Consultant & Team Member- SAP PM End to End Implementation
Contribution:
• Requirement gathering and finalizing AS-IS, Blue print Process, Gap Analysis
• Identified 11 business process and provided solutions on breakdown, preventive, predictive, capital
investment, maintenance spare planning, maintenance budget, refurbishment process and equipment
phase in & out of utilities
• Developed reports as per the user requirement
• Carried out unit and integration testing after formulating solution test plan
• Configured SAP solution to meet client’s requirements
• Coordinated with other consultants and solved integration issues
• Imparted training to core team on Plant maintenance Business process
Environment:
Operating System: Windows /ECC 6.0 / Solution Manager
Employment History
Company Name Designation Start date End Date
L&T Infotech Project Manager 06.03.2009 28.04.2015
Hyundai Motor India Ltd Senior Engineer 1.10.1997 26.02.2009
Foreign Languages Known
Page 8

More Related Content

What's hot (7)

Resume_Chandrima_Project Manager
Resume_Chandrima_Project ManagerResume_Chandrima_Project Manager
Resume_Chandrima_Project Manager
 
sai cv
sai cvsai cv
sai cv
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resume
 
Shanmuganathan
ShanmuganathanShanmuganathan
Shanmuganathan
 
Rishu Roshan_PM_CV
Rishu Roshan_PM_CVRishu Roshan_PM_CV
Rishu Roshan_PM_CV
 
Primavera P6 Online Training
Primavera  P6 Online TrainingPrimavera  P6 Online Training
Primavera P6 Online Training
 
Senthil karuppanan t24_resume
Senthil karuppanan t24_resumeSenthil karuppanan t24_resume
Senthil karuppanan t24_resume
 

Viewers also liked

Respiratory Therapists
Respiratory TherapistsRespiratory Therapists
Respiratory Therapistsbreanna01
 
People of colonial america
People of colonial americaPeople of colonial america
People of colonial americaEricJames7
 
The Arcane #1: Comic Book Review
The Arcane #1: Comic Book ReviewThe Arcane #1: Comic Book Review
The Arcane #1: Comic Book ReviewTitanium Comics
 
Entrenamiento para entrenadores T4T
Entrenamiento para entrenadores T4TEntrenamiento para entrenadores T4T
Entrenamiento para entrenadores T4TUNAH CUROC
 
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERY
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERYPOST OPERATIVE CARE : MAXILLO-FACIAL SURGERY
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERYAbhishek PT
 
Hands On Fractions- Using Manipulatives in Math Instruction
Hands On Fractions- Using Manipulatives in Math InstructionHands On Fractions- Using Manipulatives in Math Instruction
Hands On Fractions- Using Manipulatives in Math InstructionJamie Carberry, MEd
 

Viewers also liked (12)

Respiratory Therapists
Respiratory TherapistsRespiratory Therapists
Respiratory Therapists
 
ALMA LLANERA
ALMA LLANERAALMA LLANERA
ALMA LLANERA
 
InTech-Article_Stats_June2016
InTech-Article_Stats_June2016InTech-Article_Stats_June2016
InTech-Article_Stats_June2016
 
People of colonial america
People of colonial americaPeople of colonial america
People of colonial america
 
HIS 400 Paper- Hessler
HIS 400 Paper- HesslerHIS 400 Paper- Hessler
HIS 400 Paper- Hessler
 
The Arcane #1: Comic Book Review
The Arcane #1: Comic Book ReviewThe Arcane #1: Comic Book Review
The Arcane #1: Comic Book Review
 
Entrenamiento para entrenadores T4T
Entrenamiento para entrenadores T4TEntrenamiento para entrenadores T4T
Entrenamiento para entrenadores T4T
 
Eureka Hunt 080728
Eureka Hunt 080728Eureka Hunt 080728
Eureka Hunt 080728
 
AMLIT2131: De Las Casas
AMLIT2131: De Las CasasAMLIT2131: De Las Casas
AMLIT2131: De Las Casas
 
Osteomyelitis
OsteomyelitisOsteomyelitis
Osteomyelitis
 
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERY
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERYPOST OPERATIVE CARE : MAXILLO-FACIAL SURGERY
POST OPERATIVE CARE : MAXILLO-FACIAL SURGERY
 
Hands On Fractions- Using Manipulatives in Math Instruction
Hands On Fractions- Using Manipulatives in Math InstructionHands On Fractions- Using Manipulatives in Math Instruction
Hands On Fractions- Using Manipulatives in Math Instruction
 

Similar to CSC Candidate Srinivasan Rajagopal Profile

Similar to CSC Candidate Srinivasan Rajagopal Profile (20)

PS_PM_DMS_Utkarsh
PS_PM_DMS_UtkarshPS_PM_DMS_Utkarsh
PS_PM_DMS_Utkarsh
 
Abel_Missier_Business Analyst_Cards
Abel_Missier_Business Analyst_CardsAbel_Missier_Business Analyst_Cards
Abel_Missier_Business Analyst_Cards
 
Resume-wathunyoo
Resume-wathunyooResume-wathunyoo
Resume-wathunyoo
 
Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0Karith_Rungwattana_Resume 201603 v 1.0
Karith_Rungwattana_Resume 201603 v 1.0
 
Profile Seema Wadhwa
Profile Seema WadhwaProfile Seema Wadhwa
Profile Seema Wadhwa
 
Resume_Dinesh_HCM_New
Resume_Dinesh_HCM_NewResume_Dinesh_HCM_New
Resume_Dinesh_HCM_New
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
Tanaya_Resume 16032016
Tanaya_Resume 16032016Tanaya_Resume 16032016
Tanaya_Resume 16032016
 
Hrishikesh_Resume
Hrishikesh_ResumeHrishikesh_Resume
Hrishikesh_Resume
 
Resume-Venkatesh KRISHNAMOORTHY_V2
Resume-Venkatesh KRISHNAMOORTHY_V2Resume-Venkatesh KRISHNAMOORTHY_V2
Resume-Venkatesh KRISHNAMOORTHY_V2
 
PRABHU Resume
PRABHU ResumePRABHU Resume
PRABHU Resume
 
PRABHU Resume
PRABHU ResumePRABHU Resume
PRABHU Resume
 
Kajari_Resume
Kajari_ResumeKajari_Resume
Kajari_Resume
 
Arghadeep_BWBI_Resume
Arghadeep_BWBI_ResumeArghadeep_BWBI_Resume
Arghadeep_BWBI_Resume
 
VENKATESH.RESUME
VENKATESH.RESUMEVENKATESH.RESUME
VENKATESH.RESUME
 
VENKATESH.RESUME
VENKATESH.RESUMEVENKATESH.RESUME
VENKATESH.RESUME
 
Profile
ProfileProfile
Profile
 
Shree_Resume
Shree_ResumeShree_Resume
Shree_Resume
 
Shivani_CV
Shivani_CVShivani_CV
Shivani_CV
 
Resume-Anupam Phanse
Resume-Anupam PhanseResume-Anupam Phanse
Resume-Anupam Phanse
 

CSC Candidate Srinivasan Rajagopal Profile

  • 1. Candidate Name Srinivasan Rajagopal CSC Emp ID 11501584 Contact # +919444235795 Mail Id Srajagopal26@csc.com Passport # Z2387305 Location Chennai ETES ID Last Updated on 14.06.2016 Comments From CSC India Total Experience (Months) 18.8 CSC Experience (Months) 0 Summary  Worked on 3 Implementation Project Oman Gas Company – Oman as Project Lead & PM consultant, ( 1 year 3 months ) Integral Coach Factory – Chennai India as Project Lead & PM consultant,( 1 year 10 months ) L&T Power ltd Surat India as PM consultant. – ( 11 months )  Worked on 6 Support Projects – ( 2 years 2 months) Wooside Energy – Australia as PM Consultant BlueScope Steel – Australia as PM Consultant. Oman Gas Company – Oman as Project Lead & PM consultant, Oman Cement Company - Oman as PM consultant Sahara Petrochemicals – Saudi as PM consultant UBIS Support - Sudan as PM consultant  Having sound knowledge in Manufacturing, oil and gas domains  Having excellent team handling, co-ordination, and communication skills. Visa Information Country Visa Type Valid Till Domain Expertise: (State NA, if Not Applicable)
  • 2. NAME: Srinivasan Rajagopal Domain Specific Area in Domain Experience (Months) Manufacturing Automobile 11.5 Technical Expertise Technology / Classification SAP Plant maintenance Primary Skills Experience (Months) Secondary Skills Experience (Months) SAP Plant Maintenance 88 88 Additional Skills Education Degree Qualification College / University / Institution Year of Passing B.Tech Information technology Anna University 2003 Diploma Electronics and communication State Board of Tamil Nadu 1993 Professional Activities, Certifications & Training attended Page 2
  • 3. NAME: Srinivasan Rajagopal Course / Certification Name Institution Year Duration Solution Consultant –Plant Maintenance SAP 2008 Page 3
  • 4. NAME: Srinivasan Rajagopal Engagement Overview Project Name Wooside Support Start Date Mar 2016 Client Wooside Support End Date Current Project Location Chennai –Offshore support Team Size handled (If applicable) Project Description: Role / Responsibilities PM Consultant Contribution: • Taken KT from Business Process owners in Australia for 2 months • Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter suggesting solutions to resolve it. • Maintaining SLA with the clients tickets • Attending & resolving issues related to ticket • Rendering application support to end users • Attending client meetings (weekly basis) and discussing about ticket status Environment: Operating System: Windows /ECC 6.0 / Solution Manager Project Name BlueScope Steel Support Start Date May 2015 Client BlueScope Steel End Date Current Project Location Chennai –Offshore support Team Size handled (If applicable) Project Description: Role / Responsibilities PM Consultant Contribution: • Taken KT from Business Process owners in Australia for 2 months • Prepared KT document reviewed by business undergone Test and successfully completed. • Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter suggesting solutions to resolve it. • Preparing functional specification documents for various ongoing development activities, Knowledge of developing Functional design document according to custom specific requirement. Page 4
  • 5. NAME: Srinivasan Rajagopal • Development of test scenarios, test scripts and test data for unit testing and integration testing • Uploading of Master data as requested by Users like Equipments,Functional Location, Task list ,Maintenance Plan ,Maintenance Item ,Document creation and attachment to technical objects. • Maintaining SLA with the clients tickets • Attending & resolving issues related to ticket • Rendering application support to end users • Attending client meetings (weekly basis) and discussing about ticket status Environment: Operating System: Windows /ECC 6.0 / Solution Manager Project Name Oman Gas Company Support / Sahara Petro /UBIS Start Date April 2013 Client Oman Gas Company /Sahara Petro chemicals /UBIS End Date April 2015 Project Location Chennai –Offshore support Team Size handled (If applicable) 15 Project Description: Role / Responsibilities Project Lead / PM Consultant Contribution: • Functioning as Project Lead and administering entire support Project for Oman Gas Company • Performing ticket analysis and categorizing ticket check with business to understand issue and thereafter suggesting solutions to resolve it. • Maintaining SLA with the clients tickets • Attending & resolving issues related to ticket • Rendering application support to end users • Organizing weekly meeting with Support Consultant and updating status issues and methods of resolving the same • Attending client meetings (weekly basis) and discussing about ticket status • Taking required support from the client management representative • Imparting training to end user as well as prepares end user training material Environment: Operating System: Windows /ECC 6.0 / Solution Manager Page 5
  • 6. NAME: Srinivasan Rajagopal Project Name Oman Gas Company - SAP Implementation Start Date April 2012 Client Oman Gas Company End Date July 2013 Project Location Oman Team Size handled (If applicable) 15 Project Description: Role / Responsibilities Onsite Consultant & Project Lead - SAP PM End to End Implementation Contribution: • Served as Project Lead and administered implementation of Phase 2 for 5 modules • Accountable for requirement gathering and finalization of AS-IS, blue print process and gap analysis • Planned & monitored implementation of PM module • Handled configuration of SAP solution to meet client’s requirements • Discussed issues related to FAT & UAT and suggested resolutions for the same • Developed required LSMW programs and guided core team in data uploading of all masters • Mentored team & helped them in reaching milestones and timely completion of all phases • Acted as Module Lead and interacted with other modules for integration issues • Rendered support to PP, MM & QM Team • Shouldered additional responsibility of handling Document Management System • Looked after maintenance of master data for all modules • Collaborated with: • Customer and Project Team to ensure delivery • Quality Lead to ensure timely documentation • Signed off PM module deliverable for all business process, reports and SAP fleet management Environment: Operating System: Windows /ECC 6.0 / Solution Manager Page 6
  • 7. NAME: Srinivasan Rajagopal Project Name Integral Coach Factory - Start Date April 2010 Client Indian Railways End Date February 2012 Project Location Chennai Team Size handled (If applicable) Project Description: Role / Responsibilities Onsite Consultant & PM Functional lead - SAP PM End to End Implementation Contribution: • Configured SAP solution to meet client’s requirements • Coordinated with touch screen KIOSK’s, PDA (Front end and Backend Team) for what please provide details • Developed required LSMW programs and guided the core team in uploading master data • Acted as Module Lead and interacted with other modules for integration issues • Rendered support to PP, MM & QM Team • Mentored team & helped them in reaching milestones and timely completion of all phases • Accountable for requirement gathering and finalization of AS-IS, blue print process and gap analysis • Planned & monitored implementation of PM module • Looked after maintenance of master data for all modules • Shouldered additional responsibility of handling Document Management System • Collaborated with: • Customer and Project Team to ensure delivery • Quality Lead to ensure timely documentation • Signed off PM module deliverable for business process, reports, PDA & kiosk applications and SAP fleet management Environment: Operating System: Linux /ECC 6.0 / Solution Manager Page 7
  • 8. NAME: Srinivasan Rajagopal Project Name Shakthi Start Date Client L&T Power Limited End Date Project Location Team Size handled (If applicable) Project Description: Role / Responsibilities Onsite Consultant & Team Member- SAP PM End to End Implementation Contribution: • Requirement gathering and finalizing AS-IS, Blue print Process, Gap Analysis • Identified 11 business process and provided solutions on breakdown, preventive, predictive, capital investment, maintenance spare planning, maintenance budget, refurbishment process and equipment phase in & out of utilities • Developed reports as per the user requirement • Carried out unit and integration testing after formulating solution test plan • Configured SAP solution to meet client’s requirements • Coordinated with other consultants and solved integration issues • Imparted training to core team on Plant maintenance Business process Environment: Operating System: Windows /ECC 6.0 / Solution Manager Employment History Company Name Designation Start date End Date L&T Infotech Project Manager 06.03.2009 28.04.2015 Hyundai Motor India Ltd Senior Engineer 1.10.1997 26.02.2009 Foreign Languages Known Page 8