1. Sudhir Vaidya Intimation of Disapproval (IOD)
14) Intimation of disapproval (IOD)
1.0 Stages prior to IOD:
1.1 In the first Special General Meeting, decision is taken by the members to do
Redevelopment of the building.
1.2 PMC is appointed to prepare feasibility report.
1.3 The feasibility report submitted by PMC is placed before the SGM and after considering
the suggestions given by the members; the same is revised & approved.
1.4 Then Tender is invited for appointment for of Developer.
1.5 After scrutiny of tenders, SGM is held for selection of the Developer. This meeting is
conducted by the representative of the Registrar.
1.6 Developer is appointed in the said SGM.
1.7 MOU & Development Agreement is executed with the developer.
2.0 Intimation of disapproval (IOD)
2.1 Intimation of disapproval is issued by MCGM after building plans are submitted giving
list of permissions & NOC’s to be obtained from various authorities.
2.2 IOD (meaning Intimation of Disapproval) is an essential permission given to the
developer by the municipal authorities to re-develop an old building / construct the
new building. The developer however cannot demolish the old building just on the basis
of IOD alone.
2.3 After Building Plans / Redevelopment plans are submitted to the Building Proposal
Department of MCGM, an IOD is issued, and under the terms and conditions of the
IOD, the developer is asked to comply with many requirements and obtain various
clearances like clearance from Environment Authorities, Tree Authorities, and Fire
Officer etc. After these clearances are obtained, the developer is entitled to obtain a
Commencement Certificate (CC). The demolition can commence legally only after
obtaining CC.
3.0 IOD – Flow Chart:
3.1 Purchase agreement of plot, Conveyance deed, Property Card, 7/12 th extract, Index II
are the basic documents to proceed further.
3.2 Permission from Revenue department will have to be obtained.
2. Sudhir Vaidya Intimation of Disapproval (IOD)2
3.3 PMC / Developer will prepare Building Plan and submit the same to MCGM Building
Proposal Office.
3.4 After payment of fees, File is forwarded to Survey Office and then to DP Department for
‘ DP Mark. ‘
3.5 The necessary fee also has to be paid to Pest Control department.
3.6 File is then returned to Building Proposal department.
3.7 Sub-Engineer will then visit the site and take the measurements. Other observations
such as approach road distance from the main road; stress on the infrastructure due to
redevelopment will also be noted.
4.0 Now the stage of seeking permissions would commence. The List is only illustrative.
4.1 NA Certificate: Payment of NA Tax. NA means Non agriculture land. Without this NA
certificate, building can not be constructed. The existing society would have this NA
Certificate.
4.2 Forest Department permission: How many trees exist on the plot? Whether they will
have to cut due to redevelopment? If yes, how replantation will be done?
4.3 Permission from Sewerage department: The society must have connected the drainage
line to MCGM’s drainage line on the main road. However the existing drainage line of
the society may not be adequate after redevelopment. MOEF may stipulate the condition
to change the Drainage pipe line in view of redevelopment.
Redevelopment Project should provide for STP. (Sewerage Treatment Plant) Thus the
waste water from the bathroom can be treated and reused for the toilet, garden, car
washing etc. In such scenario, drainage output quantity will greatly reduce and hence
the existing drainage pipeline may be sufficient. This will also ease water problem after
redevelopment.
4.4 Permission from Hydraulic department.
4.5 Permission from Environment department for disposal of debris.
4.6 NOC from Pollution Control Office.
4.7 In case of Heritage premises – Temples, NOC from Archeological department.
4.8 Permission from Air Port Authorities.
4.9 NOC from Traffic Department.
4.10 Permission from Fire Bridge Office: This certificate will be issued after confirming that
there will be open space around the building and approach road to sufficient for Fire
3. Sudhir Vaidya Intimation of Disapproval (IOD)3
Engines to reach the site in case of an outbreak of Fire.
4.11 Building plan approval by Structural Engineer of MCGM.
4.12 Report from MCGM’s Electricity department as regards extra demand for electricity,
capacity of the Transformer etc.
4.13 CRZ compliance certificate.
It would take about 18-24 months to complete the above formalities of getting IOD.
5.0 Commencement certificate (CC)
5.1 After getting the above permissions, Developer will apply for issue of Commencement
certificate.
5.2 Commencement certificate (CC) is issued up to plinth level and thereafter for few more
floors and finally for the entire structure. MCGM Officials are supposed to visit the site
for inspection & for confirmation that construction is being carried out as per the
sanctioned plan.
6.0 After obtaining IOD & CC:
6.1 After obtaining IOD & CC, Developer would execute individual agreement with the
members and request them to shift to temporary accommodation. He would pay Corpus
fund, Rent, Brokerage, shifting allowance etc. as agreed.
6.2 Once the members, handover the flat keys to the Developer, he would take steps to
surrender Electricity meter, Pipe Gas Meter et.
7.0 Tower Construction:
7.1 Existing building will be demolished and construction would start. The construction
time for the 10 storey tower would be at least 2 years (Pile Foundation would take good
time, time gap between two slabs of 21 days will have to be observed, further time for
plastering, electrification, piping etc.)
7.2 During this period, the developer would undertake the following activities.
i Bore well registration
ii Excavation payment.
iii Permission for water pipe line, electricity, Telephone, Lift installation, electrical sub
station, installation of Transformer.
4. Sudhir Vaidya Intimation of Disapproval (IOD)4
8.0 Occupation Certificate:
8.1 After completion of entire Building as per sanctioned Plan, the developer & PMC will
obtain occupation certificate.
8.2 The developer on receiving OC will procure water supply pipeline, electricity
connections, drainage etc.
8.3 Final inspection will be carried out by PMC – Architect – Structural Engineer and
Managing committee.
8.4 After satisfactory certification, the new flats will be handed over to existing members as
per individual agreement executed by him.
9.0 Sale of Additional Flats by Developer:
9.1 Additional Flats constructed as per Redevelopment Scheme will be sold by the
developer.
10.0 Admission of New Members:
10.1 New members will be admitted by the society only after shifting of all existing members
to new flats constructed by the developer.
11.0 Completion Certificate:
11.1 The Developer should obtain Completion Certificate from MCGM / MHADA /
Competent Authorities.
12.0 Disclaimer:
12.1 I do not claim that this is the exhaustive summary of IOD Flow Chart. PMC / Technical
Team appointed by the Society would be in a better position to explain the procedure of
obtaining IOD.