Q1. What are the stages in the lifecycle management of any machinery? 
Answer: 1. Development 
The development stage can be a protracted stage and will involve activities such as design, planning, 
costing, test marketing, etc. The costs are high, with no earned revenue (and thus it does not 
register as a stage on the diagram at Figure A1-1). Promotion for awareness may commence in 
advance of introduction of the product to the marketplace. 
2 Birth (or Introduction stage) 
This is the stage where a product will be introduced after initial decisions like selection, technology 
selection, location and layout design of 
Q2. Write short notes on: 
 Fault tree analysis for improving maintenance effectiveness 
Answer: For improving maintenance effectiveness one of the tools used is the fault tree analysis. In 
electrical and control systems, failures are linked to certain physical portions of the equipment. A 
fault tree is a network 
 Routine maintenance 
Answer: Simple, small-scale activities (usually requiring only minimal skills or training) associated 
with regular (daily, weekly, monthly, etc.) and general upkeep of a building, equipment, machine, 
plant, or system against normal wear and tear. Expenditures made for the regular upkeep of physical 
properties (i.e. Land
 Problems in maintenance scheduling 
Answer: The problem of scheduling o-line preventive maintenance of power generating units is 
of substantial interest to the electric power industry. A typical power plant consists of one or 
two dozen power generating units which can be individually scheduled for preventive 
maintenance. Both 
 Wrench Time 
Answer: Wrench time is a measure of crafts personnel at work, using tools, in front of jobs. 
Wrench time does not include obtaining parts, tools or instructions, or the travel associated 
with those tasks. It does not include traveling to or from jobs. It does not include time spent 
obtaining work assignments. Obviously, it does not include break time. These non-wrench 
time tasks are often necessary to get work done, but are not "wrench time." The 
craftsperson is in a 
Q3. Why detail analysis and use of different methods are essential requirements for taking 
suitable decisions on the equipment replacements? Explain briefly these methodologies used. 
Answer: Much research has been undertaken in equipment replacement optimization 
(ERO)including the Texas Department of Transportation’s (Tudor) ongoing equipment replacement 
optimization efforts. A detailed review of the state-of-the art and state of-the-practice literature of 
the ERO problem and commercial fleet management systems currently available worldwide can be 
seen and examined in a separate research paper (Fan et al. 2011). In summary, previous research 
efforts have been made to examine the ERO problem, which can be classified into and solved using 
three categories from the solution approach perspectives: 
1) Minimum Equivalent Annual Cost (EAC) 
Q4. Explain briefly the ABC classification and reasons behind recommending ABC and VED 
classifications for managing inventory of spare parts for maintenance? 
Answer: ABC classification is a ranking system for identifying and grouping items in terms of how 
useful they are for achieving business goals. 
The system requires grouping things into three categories: 
A - extremely important 
Q5. Explain briefly the universal principles used for improving productivity of the maintenance 
management 
Answer: Total Productive Maintenance (TPM) is a business process improvement method, 
developed from the perspective of maintenance management. TPM concentrates on productivity 
improvement, primarily by way of maximizing the availability of equipment.
To do that, small multidisciplinary teams improve step-by-step the Overall Equipment Effectiveness 
(OEE) of their machines or production lines. 
Q6. What is meant by ‘Overall Equipment Effectiveness (OEE)’? What are its constituents and 
objectives served? List the OEE Losses? 
Answer: Overall equipment effectiveness (OEE) is a hierarchy of metrics developed by Seiichi 
Nakajima in 1960's to evaluate how effectively a manufacturing operation is utilized. It is based on 
the Harrington Emerson way of thinking regarding labour efficiency. The result s are stated in a 
generic form which allows comparison between manufacturing units in differing industries. It is not 
however an absolute measure and is best used to identify scope for process performance 
improvement, and how to get the improvement. If for example the cycle time is reduced, the OEE 
can also reduce, even though more product is produced for less resource. 
OEE measurement is also commonly 
Dear students get fully solved assignments 
Send your semester & Specialization name to our mail id : 
“ help.mbaassignments@gmail.com ” 
or 
Call us at : 08263069601

More Related Content

What's hot

HR Team Presentation CityU MBA (Final)
HR Team Presentation  CityU MBA (Final)HR Team Presentation  CityU MBA (Final)
HR Team Presentation CityU MBA (Final)Plamen Petrov
 
Total Productive Maintenance (TPM) in TQM
Total Productive Maintenance (TPM) in TQMTotal Productive Maintenance (TPM) in TQM
Total Productive Maintenance (TPM) in TQMDr.Raja R
 
Benchmarking in Total Quality Management
Benchmarking in Total Quality ManagementBenchmarking in Total Quality Management
Benchmarking in Total Quality ManagementDr.Raja R
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations managementsmumbahelp
 
Application of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryApplication of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryVivek Singh
 
Types of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementTypes of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementDr.Raja R
 
Operation research complete
Operation research completeOperation research complete
Operation research completeRohit Mishra
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentationamrutrajbk
 
Sustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerSustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerMichael D'heur
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Controlsunilrajpawar
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentationjonschofield
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptmayank mulchandani
 
Cost control and cost reduction
Cost control and cost reductionCost control and cost reduction
Cost control and cost reductionMd Perwez
 
Standard costing - cost analysis
Standard costing - cost analysisStandard costing - cost analysis
Standard costing - cost analysisRahul Kumar
 
Impact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceImpact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceeSAT Journals
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringQuEST Global
 

What's hot (20)

HR Team Presentation CityU MBA (Final)
HR Team Presentation  CityU MBA (Final)HR Team Presentation  CityU MBA (Final)
HR Team Presentation CityU MBA (Final)
 
Midterm 05 06
Midterm 05 06Midterm 05 06
Midterm 05 06
 
Total Productive Maintenance (TPM) in TQM
Total Productive Maintenance (TPM) in TQMTotal Productive Maintenance (TPM) in TQM
Total Productive Maintenance (TPM) in TQM
 
Benchmarking in Total Quality Management
Benchmarking in Total Quality ManagementBenchmarking in Total Quality Management
Benchmarking in Total Quality Management
 
Kaizen-Whitepaper
Kaizen-WhitepaperKaizen-Whitepaper
Kaizen-Whitepaper
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations management
 
Om0013 advanced production and operations management
Om0013 advanced production and operations managementOm0013 advanced production and operations management
Om0013 advanced production and operations management
 
Application of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile IndustryApplication of VAVE in Cost reduction at Automobile Industry
Application of VAVE in Cost reduction at Automobile Industry
 
Types of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality ManagementTypes of Benchmarking in Total Quality Management
Types of Benchmarking in Total Quality Management
 
Operation research complete
Operation research completeOperation research complete
Operation research complete
 
Value engineering seminar presentation
Value engineering seminar presentationValue engineering seminar presentation
Value engineering seminar presentation
 
Sustainable Cost Reduction Primer
Sustainable Cost Reduction PrimerSustainable Cost Reduction Primer
Sustainable Cost Reduction Primer
 
Value analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost ControlValue analysis and Value Engineering in Cost Control
Value analysis and Value Engineering in Cost Control
 
Value Analysis
Value AnalysisValue Analysis
Value Analysis
 
VA/VE Presentation
VA/VE PresentationVA/VE Presentation
VA/VE Presentation
 
Cost Control & Cost Reduction ppt
Cost Control & Cost Reduction pptCost Control & Cost Reduction ppt
Cost Control & Cost Reduction ppt
 
Cost control and cost reduction
Cost control and cost reductionCost control and cost reduction
Cost control and cost reduction
 
Standard costing - cost analysis
Standard costing - cost analysisStandard costing - cost analysis
Standard costing - cost analysis
 
Impact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceImpact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performance
 
Cost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value EngineeringCost Reduction of a product through Value Analysis & Value Engineering
Cost Reduction of a product through Value Analysis & Value Engineering
 

Viewers also liked

7i solutions in short
7i solutions in short7i solutions in short
7i solutions in shortfho1962
 
Bba505 entrepreneurship management
Bba505   entrepreneurship managementBba505   entrepreneurship management
Bba505 entrepreneurship managementsmumbahelp
 
CIT Khan Academy workshop: teacher training presentation
CIT Khan Academy workshop: teacher training presentationCIT Khan Academy workshop: teacher training presentation
CIT Khan Academy workshop: teacher training presentationMATHletes Challenge
 
12205397 pss7
12205397 pss712205397 pss7
12205397 pss7jifrh85
 
Bbr 501 store operations and job knowledge
Bbr 501 store operations and job knowledgeBbr 501 store operations and job knowledge
Bbr 501 store operations and job knowledgesmumbahelp
 
Presentacion sase 2011
Presentacion sase 2011Presentacion sase 2011
Presentacion sase 2011laurarodrifer
 
INSTALLER MATH: CALCULATING VOLUME
INSTALLER MATH: CALCULATING VOLUMEINSTALLER MATH: CALCULATING VOLUME
INSTALLER MATH: CALCULATING VOLUMEKathie Sedwick
 
4.2.alteracion del nivel_de_conciencia
4.2.alteracion del nivel_de_conciencia4.2.alteracion del nivel_de_conciencia
4.2.alteracion del nivel_de_concienciadanipeleg
 
Listas de comunión 2013
Listas de comunión 2013Listas de comunión 2013
Listas de comunión 2013mercecxixon
 
Benchmark Writing Assessment
Benchmark Writing AssessmentBenchmark Writing Assessment
Benchmark Writing AssessmentYevone
 
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub Radulović
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub RadulovićL206 - Fizika - Zvezde - Jovana Savanović - Slavoljub Radulović
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub RadulovićNašaŠkola.Net
 
Øk Kunnskapen Din Om Mobilnett i Norge
Øk Kunnskapen Din Om Mobilnett i NorgeØk Kunnskapen Din Om Mobilnett i Norge
Øk Kunnskapen Din Om Mobilnett i NorgeCompareking.no
 
reffects of mobile base stations on human health
reffects of mobile base stations on human healthreffects of mobile base stations on human health
reffects of mobile base stations on human healthAhmed Latif
 

Viewers also liked (20)

7i solutions in short
7i solutions in short7i solutions in short
7i solutions in short
 
Bba505 entrepreneurship management
Bba505   entrepreneurship managementBba505   entrepreneurship management
Bba505 entrepreneurship management
 
CIT Khan Academy workshop: teacher training presentation
CIT Khan Academy workshop: teacher training presentationCIT Khan Academy workshop: teacher training presentation
CIT Khan Academy workshop: teacher training presentation
 
12205397 pss7
12205397 pss712205397 pss7
12205397 pss7
 
Lucky Star
Lucky StarLucky Star
Lucky Star
 
Diagnostico rapida
Diagnostico rapidaDiagnostico rapida
Diagnostico rapida
 
Bbr 501 store operations and job knowledge
Bbr 501 store operations and job knowledgeBbr 501 store operations and job knowledge
Bbr 501 store operations and job knowledge
 
Presentacion sase 2011
Presentacion sase 2011Presentacion sase 2011
Presentacion sase 2011
 
INSTALLER MATH: CALCULATING VOLUME
INSTALLER MATH: CALCULATING VOLUMEINSTALLER MATH: CALCULATING VOLUME
INSTALLER MATH: CALCULATING VOLUME
 
4.2.alteracion del nivel_de_conciencia
4.2.alteracion del nivel_de_conciencia4.2.alteracion del nivel_de_conciencia
4.2.alteracion del nivel_de_conciencia
 
Baudelaire par alessia et anna
Baudelaire par alessia et annaBaudelaire par alessia et anna
Baudelaire par alessia et anna
 
Listas de comunión 2013
Listas de comunión 2013Listas de comunión 2013
Listas de comunión 2013
 
Benchmark Writing Assessment
Benchmark Writing AssessmentBenchmark Writing Assessment
Benchmark Writing Assessment
 
Patentes
PatentesPatentes
Patentes
 
Nutritive value of food
Nutritive value of foodNutritive value of food
Nutritive value of food
 
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub Radulović
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub RadulovićL206 - Fizika - Zvezde - Jovana Savanović - Slavoljub Radulović
L206 - Fizika - Zvezde - Jovana Savanović - Slavoljub Radulović
 
Øk Kunnskapen Din Om Mobilnett i Norge
Øk Kunnskapen Din Om Mobilnett i NorgeØk Kunnskapen Din Om Mobilnett i Norge
Øk Kunnskapen Din Om Mobilnett i Norge
 
Transformation minicourse
Transformation minicourseTransformation minicourse
Transformation minicourse
 
reffects of mobile base stations on human health
reffects of mobile base stations on human healthreffects of mobile base stations on human health
reffects of mobile base stations on human health
 
Bloom
BloomBloom
Bloom
 

Similar to Om0015 maintenance management

Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementStudy Stuff
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..smumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance managementsmumbahelp
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance managementsmumbahelp
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance managementsmumbahelp
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniquessmumbahelp
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performanceYasmin AbdelAziz
 
Technical maintenance of world class increase the availability of equipment
Technical maintenance of world class increase the availability of equipmentTechnical maintenance of world class increase the availability of equipment
Technical maintenance of world class increase the availability of equipmentIAEME Publication
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Managementshrinivas kulkarni
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenvikymail
 

Similar to Om0015 maintenance management (20)

Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Om0015 – maintenance management
Om0015 – maintenance managementOm0015 – maintenance management
Om0015 – maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management..
Om0015   maintenance management..Om0015   maintenance management..
Om0015 maintenance management..
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om0015 maintenance management
Om0015   maintenance managementOm0015   maintenance management
Om0015 maintenance management
 
Om 0015 maintenance management
Om 0015   maintenance managementOm 0015   maintenance management
Om 0015 maintenance management
 
Om 0015 – maintenance management
Om 0015 – maintenance managementOm 0015 – maintenance management
Om 0015 – maintenance management
 
Qm0022 tqm tools and techniques
Qm0022 tqm tools and techniquesQm0022 tqm tools and techniques
Qm0022 tqm tools and techniques
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
 
Maintenance
MaintenanceMaintenance
Maintenance
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
 
Technical maintenance of world class increase the availability of equipment
Technical maintenance of world class increase the availability of equipmentTechnical maintenance of world class increase the availability of equipment
Technical maintenance of world class increase the availability of equipment
 
Om0015
Om0015Om0015
Om0015
 
Maintenance management- Production Management
Maintenance management- Production ManagementMaintenance management- Production Management
Maintenance management- Production Management
 
Report for COOP PUPR without fusion
Report for COOP PUPR without fusionReport for COOP PUPR without fusion
Report for COOP PUPR without fusion
 
Manual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizenManual%204%20 kobetsu kaizen
Manual%204%20 kobetsu kaizen
 

Om0015 maintenance management

  • 1. Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601 ASSINGMENT DRIVE FALL 2014 PROGRAM MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4)PGDOMN (SEM 2) SUBJECT CODE & NAME OM0015-MAINTENANCE MANAGEMENT BK ID B1340 CREDITS 4 MARKS 60 Q1. What are the stages in the lifecycle management of any machinery? Answer: 1. Development The development stage can be a protracted stage and will involve activities such as design, planning, costing, test marketing, etc. The costs are high, with no earned revenue (and thus it does not register as a stage on the diagram at Figure A1-1). Promotion for awareness may commence in advance of introduction of the product to the marketplace. 2 Birth (or Introduction stage) This is the stage where a product will be introduced after initial decisions like selection, technology selection, location and layout design of Q2. Write short notes on:  Fault tree analysis for improving maintenance effectiveness Answer: For improving maintenance effectiveness one of the tools used is the fault tree analysis. In electrical and control systems, failures are linked to certain physical portions of the equipment. A fault tree is a network  Routine maintenance Answer: Simple, small-scale activities (usually requiring only minimal skills or training) associated with regular (daily, weekly, monthly, etc.) and general upkeep of a building, equipment, machine, plant, or system against normal wear and tear. Expenditures made for the regular upkeep of physical properties (i.e. Land
  • 2.  Problems in maintenance scheduling Answer: The problem of scheduling o-line preventive maintenance of power generating units is of substantial interest to the electric power industry. A typical power plant consists of one or two dozen power generating units which can be individually scheduled for preventive maintenance. Both  Wrench Time Answer: Wrench time is a measure of crafts personnel at work, using tools, in front of jobs. Wrench time does not include obtaining parts, tools or instructions, or the travel associated with those tasks. It does not include traveling to or from jobs. It does not include time spent obtaining work assignments. Obviously, it does not include break time. These non-wrench time tasks are often necessary to get work done, but are not "wrench time." The craftsperson is in a Q3. Why detail analysis and use of different methods are essential requirements for taking suitable decisions on the equipment replacements? Explain briefly these methodologies used. Answer: Much research has been undertaken in equipment replacement optimization (ERO)including the Texas Department of Transportation’s (Tudor) ongoing equipment replacement optimization efforts. A detailed review of the state-of-the art and state of-the-practice literature of the ERO problem and commercial fleet management systems currently available worldwide can be seen and examined in a separate research paper (Fan et al. 2011). In summary, previous research efforts have been made to examine the ERO problem, which can be classified into and solved using three categories from the solution approach perspectives: 1) Minimum Equivalent Annual Cost (EAC) Q4. Explain briefly the ABC classification and reasons behind recommending ABC and VED classifications for managing inventory of spare parts for maintenance? Answer: ABC classification is a ranking system for identifying and grouping items in terms of how useful they are for achieving business goals. The system requires grouping things into three categories: A - extremely important Q5. Explain briefly the universal principles used for improving productivity of the maintenance management Answer: Total Productive Maintenance (TPM) is a business process improvement method, developed from the perspective of maintenance management. TPM concentrates on productivity improvement, primarily by way of maximizing the availability of equipment.
  • 3. To do that, small multidisciplinary teams improve step-by-step the Overall Equipment Effectiveness (OEE) of their machines or production lines. Q6. What is meant by ‘Overall Equipment Effectiveness (OEE)’? What are its constituents and objectives served? List the OEE Losses? Answer: Overall equipment effectiveness (OEE) is a hierarchy of metrics developed by Seiichi Nakajima in 1960's to evaluate how effectively a manufacturing operation is utilized. It is based on the Harrington Emerson way of thinking regarding labour efficiency. The result s are stated in a generic form which allows comparison between manufacturing units in differing industries. It is not however an absolute measure and is best used to identify scope for process performance improvement, and how to get the improvement. If for example the cycle time is reduced, the OEE can also reduce, even though more product is produced for less resource. OEE measurement is also commonly Dear students get fully solved assignments Send your semester & Specialization name to our mail id : “ help.mbaassignments@gmail.com ” or Call us at : 08263069601