Waterford Institute of Technology
Introduction       WIT Campus      Schools     Collaboration   Research

Waterford Institute of Technology
         The largest IOT in the country outside of Dublin
         6,998 full time (of which 464 are sub-degree level) & 1,509 part-
          time students (2010/’11)
         More than 2200 graduates each year
         More than 60% students on honours degree level programmes
         Annual Revenue EUR 90 million
         1087 full time staff (academic, research, admin, managerial,
          technical & support)
         480 full-time academic staff
         6 Schools (Business, Education, Engineering, Health Science,
          Humanities, Science)
         16 Academic Departments
Introduction     WIT Campus       Schools               Collaboration       Research

Fulltime Student Enrollments by School for 2010/’11
                                                                       School of Business
                                 1,103         1,339
                                                                       School of Education

                                                        119            School of Engineering

                                                                       School of Health
                                                       1,304           Sciences
                         2,168
                                                                       School of Humanities

                                                                       School of Science
                                         965

       14 Higher Certificate programmes
       23 Ordinary Degree programmes
       60 Honours Degree programmes
       25 Taught Masters programmes
       178 Students registered on Research Masters & PhD Programmes
Introduction            WIT Campus               Schools           Collaboration          Research

School of Business
   Research Areas:
        Business Education & Teaching Research
        Enterprise Development & Regional Economy
        Healthcare & Healthcare Economics
        Finance Research
        Rural Development Studies
        Marketing Studies

   Doctorate in Business Administration (DBA)

   Taught Masters Programmes:
         Master of Business Administration,
         MBS Management of Change,
         Master of Business in Accounting,
         Master of Business in Internationalisation,
         Master of Business Studies ( Economics & Finance, Management, HRM, Marketing, Corporate Admin)
         MSc in Business, Entrepreneurship, Innovation and Technology,
         Postgraduate Diploma in Business in Enterprise Development,
         Higher Diploma in Business in Farm Financial Management, Higher Diploma in Business in
         Management,

   1339 students (Undergraduate & Postgraduate) (2010/’11), 94 Staff (2009/’10)
Introduction          WIT Campus            Schools         Collaboration       Research

    School of Science
   Research Areas:
        Telecommunications Software & Systems
        Pharmaceutical & Molecular Biotechnology
        Eco-Innovation
        Health Informatics Research
        Macular Pigment Research
        Optics Research
        Automotive Control
        eLearning Technologies Research
        Biomedical Research
        Information Systems and Technoculture

   Taught Masters Programmes:
     MSc in Computing (Communications Software), MSc in Computing (Information Systems
        Processes), MSc in Computing (Multimedia and eLearning), Higher Diploma in Science in
        Applied Computing, Higher Diploma in Science in Business Systems Analysis, Postgraduate
        Diploma in Analytical Science with Quality Management, MSc in Analytical Science with Quality
        Management, Postgraduate Diploma in Quality Management, MSc in Quality Management

   1,103 Students (Undergraduate & Postgraduate) (2010/’11), 118 staff
    (2009/’10)
Introduction        WIT Campus         Schools         Collaboration   Research

    School of Engineering
   Research Areas:
        South Eastern Applied Materials Research
        Advanced Automotive Electronic Control
        Advanced Manufacturing Technology
        Construction Industry Research & Knowledge
        Materials Characterisation & Processing
        Microelectronics and Systems Research
        Nanotechnology Research
        Wireless Communications & Large Scale Simulation

   Taught Masters Programme
     MSc in International Construction Management (MScICM), MSc in Construction Project
        Management (MScCPM), M. Eng in Electronic Engineering, MSc in Innovative
        Technology Engineering, MSc in Sustainable Energy Engineering


   1,304 Students (Undergraduate & Postgraduate) (2010/’11), 113 Staff
    (2008)
Introduction        WIT Campus         Schools      Collaboration     Research

School of Health Science
   Research Areas:
       Health Behaviour Research
       Sport and Exercise Psychology
       Biomedical Research
       Nursing


   Taught Masters Programmes:
    MA in Sport Psychology, Postgraduate Diploma in Nursing, MSc in Nursing, Higher
      Diploma in Social, Personal & Health Education (SPHE), MA in Social, Personal
      & Health Education (SPHE)


   965 Students (Undergraduate & Postgraduate) (2010/’11), 68
    Staff (2009/’10)
Introduction        WIT Campus          Schools     Collaboration    Research

School of Humanities
   Research Areas:
        Art, Design Theory & Practice
        Content & Language Integrated Learning
        Creative Writing and Research
        Creativity & Culture Research
        New Music
        Newfoundland and Labrador Studies
        Research, Creativity & Innovation in Tourism
        Social and Family Research

   Taught Masters Programmes:
     MA in Second Language Learning & Teaching (Part-time), MA in Arts & Heritage
       Management, MA in Social Studies, Higher Diploma in Arts in Television
       Production, Higher Diploma in Arts in International Hotel Management

   2,168 students (Undergraduate & Postgraduate) (2010/’11), 152
    Staff (2010/’11)
Introduction        WIT Campus          Schools       Collaboration    Research


    School of Education
   Research Areas:
        Continuing Professional Development of Teachers
        Literacy Development


   Taught Master Programmes:
        Postgraduate Diploma in Arts in Teaching and Learning in Higher Education, MA
         Teaching and Learning in Higher Education, MA in Management in Education,
         Postgraduate Diploma in Science Education (Primary Science), MSc in Science
         Education (Primary Science)


   1,509 Part-time Students, 119 Full-time Students (2010/’11)

   29 Staff (2008/’09)
Introduction             WIT Campus          Schools   Collaboration   Research


    International Education at WIT
   Over 880 international students
   WIT has over 120 academic partners
   5 full-time members of staff in International Office
   Involvement in programmes which provide financial support for
    international developments and students (e.g. Erasmus Mundus and Asia
    link)

             School                        Students

             Business                                        220

             Humanities                                      200

             Engineering                                      60

             Science                                          62

             Health Science                                   60

             Education                                        10
Introduction                WIT Campus       Schools            Collaboration             Research


   International Student Profile
                  0.55% 0.00% 0.55%
        0.28%
                          4.14%                              Asia I - China, India, Pakistan
                  5.52%
          6.91%
                                                             Asia ii -
                                                             Korea, Japan, Malaysia, Thailan
                                                             d, Kazakhstan, Sri Lanka
                                                             Asia iii -
                                                             Vietnam, Indonesia, Nepal, Phill
                                                             ipines
                                                             North America
                                          82.87%

                                                             Latin America


                                                             Middle East


      Current International Students                         Europe
(excluding CAO applicants and exchanges)
                                                             Africa
Introduction    WIT Campus    Schools    Collaboration   Research

 Research Funding 2000/01 – 2009/10
€25,000,000
                                                                    Research
                                                                    Expenditure
€20,000,000
                                                                    Research
                                                                    Awards
€15,000,000


€10,000,000


 €5,000,000


        €0
              2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
Introduction        WIT Campus       Schools      Collaboration   Research

Telecommunications Software
Research Priority Area
              TSSG positioned itself as Ireland’s leading software ICT research
               Centre securing more than €57 million in research funding (1996-
               2010)

              TSSG leading player in Europe in the area of the Future Internet
               through its funded research programme and its participation in EU
               Technology Platforms

              Main thematic Research Areas:
                      Network Management
                      Integrated Services Infrastructure Management
                      Financial Information Systems
                      Data Mining & Social Computing
                      Security
Introduction      WIT Campus        Schools     Collaboration       Research

     Telecommunications Software
     Research Priority Area

   The Team:
       130 full-time contract researchers
       28 MSc (research), 5 PhD graduated; 21 PhD enrolled
       Approx 50 peer reviewed publications annually
       Strong Commercialisation culture

   Funded partnerships with IBM, Ericsson, Cisco, Alcatel-
    Lucent, O2, Telefonica, Vodafone, BT, Eircom, Oracle/BEA

   60 jobs created in 14 ‘Spin-Out’ and ‘Spin-In’ companies linked to
    TSSG (since 2001)
Introduction     WIT Campus             Schools       Collaboration      Research
Pharmaceutical and Molecular Biotechnology
Research Priority Area

                            Research Focus
                                     Polymeric drug delivery technologies
                                     Novel process technologies
                                     Separation Science
                                     Molecular Biotechnology (biotransformations and
                                      therapeutic molecules)

                            Team
                                       20 academic staff
                                       6 postdoctoral researchers
                                       16 registered postgraduates
                                       4 PhD graduates ‘08
                                       Circa €5m research funding ‘07/’08

                            Applied research centre with active collaborations with
                             pharmaceutical companies in the South East –
                             Genzyme, Eirgen
Introduction      WIT Campus        Schools      Collaboration   Research

    Eco – Innovation Research
    Emerging Research Area


   Research activities at the EIRC focus on the innovative
    development of ‘high value- added products / processes from
    natural resources’ and ‘low environmental impact processing /
    growth methods’.

   Four thematic areas
       Estuarine research
       Molecular ecology
       Forestry – biofuels / wood energy management
       Sustainable agriculture

   Funding primarily from Environmental Protection Agency, Marine
    Institute, Coillte, Department of Agriculture, IRCSET, Strand 1 & 3
Introduction        WIT Campus          Schools       Collaboration     Research

South Eastern Applied Materials (SEAM) Research
Centre
Emerging Research Area
   Provides technical and scientific support to industries on process and product
    development related issues
   Possess niche technologies (X-ray microtomography, Finite Element modelling &
    Microwave processing) and materials research capabilities

Typical examples of Industrial Projects

Project 1: Understanding the sticking behaviour of contact lenses in the anterior mould
Client:   Bausch & Lomb
Impact: (i) Assist in process improvement
         (ii) Minimised waste leading to increased cost savings

Project 2: Determining the root cause for frostiness exhibited by silicone rubber used in
medical device industries
Client:   Boston Scientific Ireland Limited
Impact: (i) Assist in resolving a production issue
         (ii)Assist in new product design and development through better understanding of
         raw materials
Introduction     WIT Campus      Schools    Collaboration   Research
South Eastern Applied Materials (SEAM) Research Centre
Typical sector wise key clients of SEAM
 Medical Devices
                                            Industrial Technologies
   Boston Scientific Ireland
                                              Mincon
   Abbot Vascular
                                              Honeywell Turbo
   Bausch and Lomb
                                              Honeywell Engines
   BD component
                                              REXAM
   Nypro Ireland
   Renishaw
                                            Electronics
   Lake region Medical
                                              Betatherm
 Orthopaedics                                 Beru Borgwarner
   Stryker orthopaedics                      Western Automation
   Stryker Instruments
                                            Precision Engineering
 Pharmaceuticals                              Guehring
   Genzyme                                   Schivo Group
   Teva                                      Allied turned parts
   Pfizer
Introduction          WIT Campus       Schools     Collaboration       Research

Building Capacity Through Clustering &
Collaboration
                                 Communications /         Marketing / Tourism /
     Health related
                                   engineering           Enterprise Development
• Macular pigment             • Advanced Materials       • Marketing
  research
                              • Optics                   • Entrepreneurship
• Population health
                              • Wireless                 • Social Care
• Healthcare economics          communications
                                                         • Tourism
• Biomedical research         • Advanced
                                manufacturing
• Mental health                 technology

• Health informatics
Introduction     WIT Campus   Schools      Collaboration   Research

Collaboration based on innovation and
excellence


                                            Bausch & Lomb
                                            Cisco
Cambridge University                        Eirgen
Cardiff University                          Ericsson
Chinese National Academy                    Genzyme
 of Science                                 IBM
Imperial College London                     Intel
Memorial University                         Merck, Sharp & Dohme
North Western University                    Motorola
Paris VI                                    Teagasc
Technical University of Berlin              Waterford Regional Hospital
Introduction        WIT Campus   Schools   Collaboration   Research


For further information please contact:
International office
Waterford Institute of Technology
Cork Road
Waterford
Ireland
Email: international@wit.ie
Tel: 00353 51 302000
Fax: 00353 51 302486

Wateford Institute of Technology 2012

  • 1.
  • 2.
    Introduction WIT Campus Schools Collaboration Research Waterford Institute of Technology  The largest IOT in the country outside of Dublin  6,998 full time (of which 464 are sub-degree level) & 1,509 part- time students (2010/’11)  More than 2200 graduates each year  More than 60% students on honours degree level programmes  Annual Revenue EUR 90 million  1087 full time staff (academic, research, admin, managerial, technical & support)  480 full-time academic staff  6 Schools (Business, Education, Engineering, Health Science, Humanities, Science)  16 Academic Departments
  • 3.
    Introduction WIT Campus Schools Collaboration Research Fulltime Student Enrollments by School for 2010/’11 School of Business 1,103 1,339 School of Education 119 School of Engineering School of Health 1,304 Sciences 2,168 School of Humanities School of Science 965  14 Higher Certificate programmes  23 Ordinary Degree programmes  60 Honours Degree programmes  25 Taught Masters programmes  178 Students registered on Research Masters & PhD Programmes
  • 4.
    Introduction WIT Campus Schools Collaboration Research School of Business  Research Areas:  Business Education & Teaching Research  Enterprise Development & Regional Economy  Healthcare & Healthcare Economics  Finance Research  Rural Development Studies  Marketing Studies  Doctorate in Business Administration (DBA)  Taught Masters Programmes: Master of Business Administration, MBS Management of Change, Master of Business in Accounting, Master of Business in Internationalisation, Master of Business Studies ( Economics & Finance, Management, HRM, Marketing, Corporate Admin) MSc in Business, Entrepreneurship, Innovation and Technology, Postgraduate Diploma in Business in Enterprise Development, Higher Diploma in Business in Farm Financial Management, Higher Diploma in Business in Management,  1339 students (Undergraduate & Postgraduate) (2010/’11), 94 Staff (2009/’10)
  • 5.
    Introduction WIT Campus Schools Collaboration Research School of Science  Research Areas:  Telecommunications Software & Systems  Pharmaceutical & Molecular Biotechnology  Eco-Innovation  Health Informatics Research  Macular Pigment Research  Optics Research  Automotive Control  eLearning Technologies Research  Biomedical Research  Information Systems and Technoculture  Taught Masters Programmes: MSc in Computing (Communications Software), MSc in Computing (Information Systems Processes), MSc in Computing (Multimedia and eLearning), Higher Diploma in Science in Applied Computing, Higher Diploma in Science in Business Systems Analysis, Postgraduate Diploma in Analytical Science with Quality Management, MSc in Analytical Science with Quality Management, Postgraduate Diploma in Quality Management, MSc in Quality Management  1,103 Students (Undergraduate & Postgraduate) (2010/’11), 118 staff (2009/’10)
  • 6.
    Introduction WIT Campus Schools Collaboration Research School of Engineering  Research Areas:  South Eastern Applied Materials Research  Advanced Automotive Electronic Control  Advanced Manufacturing Technology  Construction Industry Research & Knowledge  Materials Characterisation & Processing  Microelectronics and Systems Research  Nanotechnology Research  Wireless Communications & Large Scale Simulation  Taught Masters Programme MSc in International Construction Management (MScICM), MSc in Construction Project Management (MScCPM), M. Eng in Electronic Engineering, MSc in Innovative Technology Engineering, MSc in Sustainable Energy Engineering  1,304 Students (Undergraduate & Postgraduate) (2010/’11), 113 Staff (2008)
  • 7.
    Introduction WIT Campus Schools Collaboration Research School of Health Science  Research Areas:  Health Behaviour Research  Sport and Exercise Psychology  Biomedical Research  Nursing  Taught Masters Programmes: MA in Sport Psychology, Postgraduate Diploma in Nursing, MSc in Nursing, Higher Diploma in Social, Personal & Health Education (SPHE), MA in Social, Personal & Health Education (SPHE)  965 Students (Undergraduate & Postgraduate) (2010/’11), 68 Staff (2009/’10)
  • 8.
    Introduction WIT Campus Schools Collaboration Research School of Humanities  Research Areas:  Art, Design Theory & Practice  Content & Language Integrated Learning  Creative Writing and Research  Creativity & Culture Research  New Music  Newfoundland and Labrador Studies  Research, Creativity & Innovation in Tourism  Social and Family Research  Taught Masters Programmes: MA in Second Language Learning & Teaching (Part-time), MA in Arts & Heritage Management, MA in Social Studies, Higher Diploma in Arts in Television Production, Higher Diploma in Arts in International Hotel Management  2,168 students (Undergraduate & Postgraduate) (2010/’11), 152 Staff (2010/’11)
  • 9.
    Introduction WIT Campus Schools Collaboration Research School of Education  Research Areas:  Continuing Professional Development of Teachers  Literacy Development  Taught Master Programmes:  Postgraduate Diploma in Arts in Teaching and Learning in Higher Education, MA Teaching and Learning in Higher Education, MA in Management in Education, Postgraduate Diploma in Science Education (Primary Science), MSc in Science Education (Primary Science)  1,509 Part-time Students, 119 Full-time Students (2010/’11)  29 Staff (2008/’09)
  • 10.
    Introduction WIT Campus Schools Collaboration Research International Education at WIT  Over 880 international students  WIT has over 120 academic partners  5 full-time members of staff in International Office  Involvement in programmes which provide financial support for international developments and students (e.g. Erasmus Mundus and Asia link) School Students Business 220 Humanities 200 Engineering 60 Science 62 Health Science 60 Education 10
  • 11.
    Introduction WIT Campus Schools Collaboration Research International Student Profile 0.55% 0.00% 0.55% 0.28% 4.14% Asia I - China, India, Pakistan 5.52% 6.91% Asia ii - Korea, Japan, Malaysia, Thailan d, Kazakhstan, Sri Lanka Asia iii - Vietnam, Indonesia, Nepal, Phill ipines North America 82.87% Latin America Middle East Current International Students Europe (excluding CAO applicants and exchanges) Africa
  • 12.
    Introduction WIT Campus Schools Collaboration Research Research Funding 2000/01 – 2009/10 €25,000,000 Research Expenditure €20,000,000 Research Awards €15,000,000 €10,000,000 €5,000,000 €0 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010
  • 13.
    Introduction WIT Campus Schools Collaboration Research Telecommunications Software Research Priority Area  TSSG positioned itself as Ireland’s leading software ICT research Centre securing more than €57 million in research funding (1996- 2010)  TSSG leading player in Europe in the area of the Future Internet through its funded research programme and its participation in EU Technology Platforms  Main thematic Research Areas:  Network Management  Integrated Services Infrastructure Management  Financial Information Systems  Data Mining & Social Computing  Security
  • 14.
    Introduction WIT Campus Schools Collaboration Research Telecommunications Software Research Priority Area  The Team:  130 full-time contract researchers  28 MSc (research), 5 PhD graduated; 21 PhD enrolled  Approx 50 peer reviewed publications annually  Strong Commercialisation culture  Funded partnerships with IBM, Ericsson, Cisco, Alcatel- Lucent, O2, Telefonica, Vodafone, BT, Eircom, Oracle/BEA  60 jobs created in 14 ‘Spin-Out’ and ‘Spin-In’ companies linked to TSSG (since 2001)
  • 15.
    Introduction WIT Campus Schools Collaboration Research Pharmaceutical and Molecular Biotechnology Research Priority Area  Research Focus  Polymeric drug delivery technologies  Novel process technologies  Separation Science  Molecular Biotechnology (biotransformations and therapeutic molecules)  Team  20 academic staff  6 postdoctoral researchers  16 registered postgraduates  4 PhD graduates ‘08  Circa €5m research funding ‘07/’08  Applied research centre with active collaborations with pharmaceutical companies in the South East – Genzyme, Eirgen
  • 16.
    Introduction WIT Campus Schools Collaboration Research Eco – Innovation Research Emerging Research Area  Research activities at the EIRC focus on the innovative development of ‘high value- added products / processes from natural resources’ and ‘low environmental impact processing / growth methods’.  Four thematic areas  Estuarine research  Molecular ecology  Forestry – biofuels / wood energy management  Sustainable agriculture  Funding primarily from Environmental Protection Agency, Marine Institute, Coillte, Department of Agriculture, IRCSET, Strand 1 & 3
  • 17.
    Introduction WIT Campus Schools Collaboration Research South Eastern Applied Materials (SEAM) Research Centre Emerging Research Area  Provides technical and scientific support to industries on process and product development related issues  Possess niche technologies (X-ray microtomography, Finite Element modelling & Microwave processing) and materials research capabilities Typical examples of Industrial Projects Project 1: Understanding the sticking behaviour of contact lenses in the anterior mould Client: Bausch & Lomb Impact: (i) Assist in process improvement (ii) Minimised waste leading to increased cost savings Project 2: Determining the root cause for frostiness exhibited by silicone rubber used in medical device industries Client: Boston Scientific Ireland Limited Impact: (i) Assist in resolving a production issue (ii)Assist in new product design and development through better understanding of raw materials
  • 18.
    Introduction WIT Campus Schools Collaboration Research South Eastern Applied Materials (SEAM) Research Centre Typical sector wise key clients of SEAM Medical Devices Industrial Technologies  Boston Scientific Ireland  Mincon  Abbot Vascular  Honeywell Turbo  Bausch and Lomb  Honeywell Engines  BD component  REXAM  Nypro Ireland  Renishaw Electronics  Lake region Medical  Betatherm Orthopaedics  Beru Borgwarner  Stryker orthopaedics  Western Automation  Stryker Instruments Precision Engineering Pharmaceuticals  Guehring  Genzyme  Schivo Group  Teva  Allied turned parts  Pfizer
  • 19.
    Introduction WIT Campus Schools Collaboration Research Building Capacity Through Clustering & Collaboration Communications / Marketing / Tourism / Health related engineering Enterprise Development • Macular pigment • Advanced Materials • Marketing research • Optics • Entrepreneurship • Population health • Wireless • Social Care • Healthcare economics communications • Tourism • Biomedical research • Advanced manufacturing • Mental health technology • Health informatics
  • 20.
    Introduction WIT Campus Schools Collaboration Research Collaboration based on innovation and excellence Bausch & Lomb Cisco Cambridge University Eirgen Cardiff University Ericsson Chinese National Academy Genzyme of Science IBM Imperial College London Intel Memorial University Merck, Sharp & Dohme North Western University Motorola Paris VI Teagasc Technical University of Berlin Waterford Regional Hospital
  • 21.
    Introduction WIT Campus Schools Collaboration Research For further information please contact: International office Waterford Institute of Technology Cork Road Waterford Ireland Email: international@wit.ie Tel: 00353 51 302000 Fax: 00353 51 302486

Editor's Notes

  • #5 School of Business has: 1,782 full and part-time learners897 academic staff7 administrative staff3 depts – Accountancy and Economics, Management & Organisation & Graduate Business