WILLIAM MONTGOMERY, EIT 
 5518 Jona Way                                                                                              317.607.4542 
 Bargersville, IN  46106                                                                     billmontgomery76@gmail.com 
  
                                               SUMMARY OF QUALIFICATIONS 
  
 Versatile Transportation Engineer with  a broad base  of roadway design and planning experience and a well‐proven 
 dedication  to  accuracy  and  quality  of  work.  Recognized  for  flexibility  in  work  assignments  and  breadth  of  task 
 experience. Participated in a variety of project teams, from local two‐person assignments to large, virtual, multi‐office 
 plan  production  efforts;  met  aggressive  deadlines  on  Design‐Build  and  Federal  Government  projects.  Able  to  clearly 
 envision and work within the scope of a project from “big picture” perspective to detailed design stage. Offer 4‐years 
 hands‐on experience in the design and planning of both Design‐Build and Design‐Bid‐Build projects, including: 
           • Drainage • Estimating • Geometric Design • Pavement Design • QC/QA • Right‐of‐Way Analysis •  
                               • Signing & Striping • Traffic Analysis • Utility Coordination • 
  
                                                 TECHNOLOGY EXPERIENCE 
    Adobe Professional                        Autodesk AutoCAD 2006 / 2009               Bentley InRoads 8.9 
    Bentley MicroStation V8 / V8i             Bentley ProjectWise 2004 / V8i             ESRI ArcGIS 9.3 
    INDOT Estimator                           Jamar Petra                                McTrans HCS+ 
    Microsoft Office 2003 / 2007              Trafficware Synchro 7                      Transoft AutoTurn 5.1 
  
                                                PROFESSIONAL EXPERIENCE 
  
 HNTB CORPORATION, Indianapolis, IN                                                                           2006 – 2010 
 Engineer I                                                                                       2008 – 2010 
 Part of Surface Transportation team charged with the design and planning of both Design‐Build and Design‐Bid‐Build 
 roadway projects for state and local agencies. Additionally provided support to Construction Inspection Team.  
    Minimized construction costs and prevented delays in $500M Accelerate 465 program by coordinating utility 
     relocation for I‐465 reconstruction at I‐70 and Sam Jones Expressway interchanges. 
    Independently managed several short‐term federal stimulus projects from inception to completion including 
     design, quantity and cost estimating, plan production and submission, and contract document preparation, 
     delivering high quality results for the Town of Zionsville.  
    Improved quality of plans for $22M rehabilitation project by re‐designing ditches, driveways, and culverts after 
     uncovering errors in the original drainage design of a nearly 12‐mile section of SR 44. 
    Produced 50% signing and pavement markings plan set for the proposal phase of Indiana I‐65 Design‐Build Project. 
    Conducted construction inspection and survey on two roadway and bridge projects, ensuring safety and 
     compliance with construction plans, material specifications and safety regulations.  
    Conducted traffic volume forecasts and traffic signal warrant analyses providing data to the State of Indiana. 
  
 Engineer                                                                                          2006 – 2008 
 As entry‐level engineer, introduced to various facets of roadway design and plan production.  
    Calculated quantity takeoffs and cost estimates for multiple projects; ensured accuracy of construction costs.  
    Enhanced pavement life for mainline I‐465 by designing effective underdrain systems for both the 38th Street and I‐
     70/Sam Jones Expressway contracts as part of Accelerate 465. 
    Performed all aspects of right‐of‐way impact analyses on several projects, including the 26‐mile‐long section 6 
     corridor study for I‐69 Evansville to Indianapolis, providing recommendations for minimum‐impact alternatives.  
  
 HUNTINGTON LEARNING CENTER, Louisville, KY                                                              2004 – 2006 
 Teacher 
 Taught math skills one‐on‐one to students; curriculum ranged from early elementary through high school calculus. 
    Taught ACT / SAT preparation courses with math and science emphasis, helping students improve quality of results. 
WILLIAM MONTGOMERY, EIT 
PAGE TWO                                                                                              317.607.4542 
                                                                                       billmontgomery76@gmail.com 
 
                                               ADDITIONAL EXPERIENCE 
 
Held a variety of positions while attending school including 8 years as a Shift Coordinator with BURGER KING, directly 
managing both staff and operations and as a Youth Pastor with HOPEWELL BAPTIST CHURCH.   
 
                                            REGISTRATION / AFFILIATION 
                                   Engineer Intern: Indiana, 2007 (ET30708417) 
                            Member – Institute of Transportation Engineers, Indiana Section 
                                                            
                                                      EDUCATION 
            Master of Divinity in Theology (2003), The Southern Baptist Theological Seminary, Louisville, KY 
                Bachelor of Science in Civil Engineering (1998), Purdue University, West Lafayette, IN 
         Relevant coursework: Construction Management; Construction Scheduling; Construction Estimating; 
         Geotechnical Engineering; Hydraulics, Hydrology and Drainage; Surveying; Transportation Engineering 
                                                            
                                                PROJECT EXPERIENCE 
Roadway Design 
    Accelerate 465 (I‐465 West Leg Reconstruction), Indianapolis, IN 
    Street Repair Program, Zionsville, IN 
    US 231 New Construction, I‐64 to SR 56, Dubois County, IN 
    I‐65 Design‐Build, IN (Pursuit/Proposal Phase) 
    Margaret Avenue Phase III, Terre Haute, IN 
    Margaret Avenue Final Design Phase IV, Terre Haute, IN 
    SR 44 Reconstruction, Shelbyville, IN 
    Department of Homeland Security, Secure Border Initiative, Tucson Sector 
    Rail Runner Commuter Service Design‐Build, Albuquerque to Santa Fe, NM 
    16th Street Rehabilitation Project, DPW, Indianapolis, IN 
    Lincoln Street Road Reconstruction, Greensburg, IN 
    Rail Road Grade Separation, Anderson, IN  
Transportation Planning – Corridor Studies 
     US 52/US 231 Corridor Improvement Study, Tippecanoe County, IN 
     I‐69 Tier 2 Environmental and Engineering Study, Section 6, Marion, Johnson and Morgan Counties, IN 
     Vincennes Railroad Relocation Environmental Impact Study (EIS), Vincennes, IN 
Transportation Planning – Area Wide Studies 
     Indianapolis Transit Alternatives Analysis/Draft Environmental Impact Statement (AA/DEIS), Indianapolis, IN 
     Transportation Plan, Zionsville, IN 
     Rapid Transit Study to Improve Regional Mobility (DiRecTionS), Indianapolis, IN 
Construction Inspection 
    CR 625E over SR 25 & NS Railroad, Tippecanoe County, IN 
    Bridge #354, Jackson County, IN 
Right‐of‐Way Engineering and Land Acquisition Services 
     US 150, Floyd County, IN 

William Montgomery Resume

  • 1.
    WILLIAM MONTGOMERY, EIT  5518 Jona Way  317.607.4542  Bargersville, IN  46106  billmontgomery76@gmail.com    SUMMARY OF QUALIFICATIONS    Versatile Transportation Engineer with  a broad base  of roadway design and planning experience and a well‐proven  dedication  to  accuracy  and  quality  of  work.  Recognized  for  flexibility  in  work  assignments  and  breadth  of  task  experience. Participated in a variety of project teams, from local two‐person assignments to large, virtual, multi‐office  plan  production  efforts;  met  aggressive  deadlines  on  Design‐Build  and  Federal  Government  projects.  Able  to  clearly  envision and work within the scope of a project from “big picture” perspective to detailed design stage. Offer 4‐years  hands‐on experience in the design and planning of both Design‐Build and Design‐Bid‐Build projects, including:  • Drainage • Estimating • Geometric Design • Pavement Design • QC/QA • Right‐of‐Way Analysis •   • Signing & Striping • Traffic Analysis • Utility Coordination •    TECHNOLOGY EXPERIENCE   Adobe Professional   Autodesk AutoCAD 2006 / 2009   Bentley InRoads 8.9   Bentley MicroStation V8 / V8i   Bentley ProjectWise 2004 / V8i   ESRI ArcGIS 9.3   INDOT Estimator   Jamar Petra   McTrans HCS+   Microsoft Office 2003 / 2007   Trafficware Synchro 7   Transoft AutoTurn 5.1    PROFESSIONAL EXPERIENCE    HNTB CORPORATION, Indianapolis, IN  2006 – 2010  Engineer I   2008 – 2010  Part of Surface Transportation team charged with the design and planning of both Design‐Build and Design‐Bid‐Build  roadway projects for state and local agencies. Additionally provided support to Construction Inspection Team.    Minimized construction costs and prevented delays in $500M Accelerate 465 program by coordinating utility  relocation for I‐465 reconstruction at I‐70 and Sam Jones Expressway interchanges.   Independently managed several short‐term federal stimulus projects from inception to completion including  design, quantity and cost estimating, plan production and submission, and contract document preparation,  delivering high quality results for the Town of Zionsville.    Improved quality of plans for $22M rehabilitation project by re‐designing ditches, driveways, and culverts after  uncovering errors in the original drainage design of a nearly 12‐mile section of SR 44.   Produced 50% signing and pavement markings plan set for the proposal phase of Indiana I‐65 Design‐Build Project.   Conducted construction inspection and survey on two roadway and bridge projects, ensuring safety and  compliance with construction plans, material specifications and safety regulations.    Conducted traffic volume forecasts and traffic signal warrant analyses providing data to the State of Indiana.    Engineer   2006 – 2008  As entry‐level engineer, introduced to various facets of roadway design and plan production.    Calculated quantity takeoffs and cost estimates for multiple projects; ensured accuracy of construction costs.    Enhanced pavement life for mainline I‐465 by designing effective underdrain systems for both the 38th Street and I‐ 70/Sam Jones Expressway contracts as part of Accelerate 465.   Performed all aspects of right‐of‐way impact analyses on several projects, including the 26‐mile‐long section 6  corridor study for I‐69 Evansville to Indianapolis, providing recommendations for minimum‐impact alternatives.     HUNTINGTON LEARNING CENTER, Louisville, KY   2004 – 2006  Teacher  Taught math skills one‐on‐one to students; curriculum ranged from early elementary through high school calculus.   Taught ACT / SAT preparation courses with math and science emphasis, helping students improve quality of results. 
  • 2.
    WILLIAM MONTGOMERY, EIT  PAGE TWO  317.607.4542    billmontgomery76@gmail.com    ADDITIONAL EXPERIENCE    Held a variety of positions while attending school including 8 years as a Shift Coordinator with BURGER KING, directly  managing both staff and operations and as a Youth Pastor with HOPEWELL BAPTIST CHURCH.      REGISTRATION / AFFILIATION  Engineer Intern: Indiana, 2007 (ET30708417)  Member – Institute of Transportation Engineers, Indiana Section    EDUCATION  Master of Divinity in Theology (2003), The Southern Baptist Theological Seminary, Louisville, KY  Bachelor of Science in Civil Engineering (1998), Purdue University, West Lafayette, IN  Relevant coursework: Construction Management; Construction Scheduling; Construction Estimating;  Geotechnical Engineering; Hydraulics, Hydrology and Drainage; Surveying; Transportation Engineering    PROJECT EXPERIENCE  Roadway Design   Accelerate 465 (I‐465 West Leg Reconstruction), Indianapolis, IN   Street Repair Program, Zionsville, IN   US 231 New Construction, I‐64 to SR 56, Dubois County, IN   I‐65 Design‐Build, IN (Pursuit/Proposal Phase)   Margaret Avenue Phase III, Terre Haute, IN   Margaret Avenue Final Design Phase IV, Terre Haute, IN   SR 44 Reconstruction, Shelbyville, IN   Department of Homeland Security, Secure Border Initiative, Tucson Sector   Rail Runner Commuter Service Design‐Build, Albuquerque to Santa Fe, NM   16th Street Rehabilitation Project, DPW, Indianapolis, IN   Lincoln Street Road Reconstruction, Greensburg, IN   Rail Road Grade Separation, Anderson, IN   Transportation Planning – Corridor Studies   US 52/US 231 Corridor Improvement Study, Tippecanoe County, IN   I‐69 Tier 2 Environmental and Engineering Study, Section 6, Marion, Johnson and Morgan Counties, IN   Vincennes Railroad Relocation Environmental Impact Study (EIS), Vincennes, IN  Transportation Planning – Area Wide Studies   Indianapolis Transit Alternatives Analysis/Draft Environmental Impact Statement (AA/DEIS), Indianapolis, IN   Transportation Plan, Zionsville, IN   Rapid Transit Study to Improve Regional Mobility (DiRecTionS), Indianapolis, IN  Construction Inspection   CR 625E over SR 25 & NS Railroad, Tippecanoe County, IN   Bridge #354, Jackson County, IN  Right‐of‐Way Engineering and Land Acquisition Services   US 150, Floyd County, IN