The document describes the time spent on manufacturing processes for the first prototype project including 120 minutes for cutting, 30 minutes for drilling, 60 minutes for hammering, and 60 minutes for assembly. It notes difficulties with the plywood being heavy and steel expanding when weighted with trash. Solutions proposed for the next prototype include following this model and increasing the scale of the pieces.