Project Second Prototype


           SATO Group
Provide the problems that need to be solved
based on the first prototype.
• Trash is heavy. it use pedal
  force the very heavy
• Trash does not close
  completely to make the
  smell o
• Pedal bin is small. The pedal
  hard.f garbage.
Improve the
following aspects
 of your products
Quality
• We think there are better quality than
  a week ago.

Weight
• Reduce the size of the trash. by
  changing the type of plywood to be
  thin the parts on the side area of the
  trash to be weigh less.
Ease of use
• The pedal to be longer and more
  will cause force in the pedal
  down.
• Therefore ,trash broader and
  change black bag can change
  easily.
Manufacturing time
• Take the time to do just 3 hours
  30 minutes from 4 hours 30
  minutes.


Manufacturing cost

• The manufacturing cost is same as
  last week
Compare the second prototype with
 the CAD model

• We use prototype
  dimension and
  function are the
  same
Thank you
  for your
 attention

Week9

  • 1.
  • 2.
    Provide the problemsthat need to be solved based on the first prototype.
  • 3.
    • Trash isheavy. it use pedal force the very heavy • Trash does not close completely to make the smell o • Pedal bin is small. The pedal hard.f garbage.
  • 4.
  • 5.
    Quality • We thinkthere are better quality than a week ago. Weight • Reduce the size of the trash. by changing the type of plywood to be thin the parts on the side area of the trash to be weigh less.
  • 6.
    Ease of use •The pedal to be longer and more will cause force in the pedal down. • Therefore ,trash broader and change black bag can change easily.
  • 7.
    Manufacturing time • Takethe time to do just 3 hours 30 minutes from 4 hours 30 minutes. Manufacturing cost • The manufacturing cost is same as last week
  • 8.
    Compare the secondprototype with the CAD model • We use prototype dimension and function are the same
  • 9.
    Thank you for your attention