Discovering High Grade Copper Deposits
    in Manitoba, Canada




    VMS:TSX.V
Explorer to Producer
   January, 2012
FORWARD-LOOKING
  STATEMENTS
NOTE:
Some of the statements contained herein may be forward-looking
statements which involve known and unknown risks and uncertainties.
Without limitation, statements regarding potential mineralization and
resources, exploration results, and future plans and objectives of the
Company are forward-looking statements that involve various risks. The
following are important factors that could cause the Company’s actual
results to differ materially from those expressed or implied by such
forward-looking statements: changes in the world wide price of mineral
commodities, general market conditions, risks inherent in mineral
exploration, risks associated with development, construction and mining
operations, the uncertainty of future profitability and the uncertainty of
access to additional capital. There can be no assurance that forward-looking
statements will prove to be accurate as actual results and future
events may differ materially from those anticipated in such statements.
VMS Ventures Inc. undertakes no obligation to update such forward-looking
statements if circumstances or management’s estimates or opinions
should change. The reader is cautioned not to place undue reliance on
such forward-looking statements.
Discovering High Grade Copper Deposits
                   in Manitoba, Canada



 Introduction to VMS Ventures Inc.
 HudBay Minerals JV and 4 Option Agreements
   • Reed Copper Deposit
   • Preliminary Economic Assessment
   • Additional targets…expanding resource
 Flin Flon – Snow Lake Belt - a World Class VMS
  Camp
 2011 Highlights/2012 Plan
 North American Nickel – 45% VMS ownership
VMS VENTURES INC.
              VMS - TSX.V           QUICK FACTS
                                     Well funded junior with approximately $9.8 M
                                      in the treasury.
                                     Discovered the Cu-rich Reed Lake Deposit
                                      in Manitoba in 2007.
                                        •   JV Partner HudBay Minerals (T.HBM) is
                                            project operator and financiers of Reed Lake
                                            development. Project ownership is 70%
                                            HBM & 30% VMS.

                                     Reed Copper deposit PEA announced in
CAPITAL STRUCTURE                     December 2011. Exploration budget for JV
(as at January, 2012)                 and Option areas $2.3 Million and AEP
                                      expenditures of $34.5 Million.
Issued & Outstanding: 123,523,955
Options:               10,183,850    Large, highly prospective land package in
Fully Diluted:        133,707,805    the prolific Flin Flon – Snow Lake
                                     Greenstone Belt of Manitoba.
Discovering High Grade Copper Deposits
                   in Manitoba, Canada



 Introduction to VMS Ventures Inc.
 HudBay Minerals JV and 4 Option Agreements
   • Reed Copper Deposit
   • Preliminary Economic Assessment
   • Additional targets…expanding resource
 Flin Flon – Snow Lake Belt - a World Class VMS
  Camp
 2011 Highlights/2012 Plan
 North American Nickel – 45% VMS ownership
VMS VENTURES – HUDBAY JV &
      OPTIONS PROJECTS
                                                          VMS-HudBay JV
                                                          • 30-70 joint venture, VMS
                                                            carried to production.
                                                          • Hudbay is operator.
                                                          • NI 43-101 Geological
                                                            Resourced April, 2011
                                                          • PEA announced
                                                            December, 2011
                                                          4 Option Agreements
                                                          • HudBay is operator.
                                                          • $2.6 M in cumulative
                                                            expenditures to earn 70%.
                                                          • Upon discovery VMS is
                                                            carried on first $50 million
                                                            of expenditures.
                                                          • Cumulative $2.8 M paid to
                                                            VMS in July, 2010.
2011 HIGHLIGHTS
43-101 indicated resource estimate completed (30% VMS)
Super Zone discovered (30% VMS)
Cowan River Zone discovered (100% VMS)
NI 43-101 INDICATED / INFERRED
              GEOLOGICAL RESOURCE
      Category    Tonnes        Au (g/t)   Flin Flon(%) Zn (%)
                                            Ag (g/t) Cu 115 km          Au (oz)       Ag (oz)       Cu (lbs)        Zn (lbs)




      Indicated     2,555,000          0.64     7.86   4.52      0.91        57,674      708,303      254,069,200 51,151,100




      Inferred        170,000          0.38     4.55   4.26      0.52         2,278        27,281      15,932,400      1,944,800
                                                                                        Snow Lake 75 km
Sectional View




                                                                                                          Planview
REED COPPER DEPOSIT - PEA
    Preliminary Economic Assessment – Announced December, 2011

•   Approximate daily ore production of 1,300 tonnes at Reed is expected by late
    2013, subject to receipt of required permits.

•   Average expected production grades of 3.78% copper, 0.45 g/t gold and 5.77 g/t silver.
•   Assumed metal recoveries in HudBay’s Flin Flon Concentrator of 94% copper, 58% gold
    and 62% silver.
•   Average production in concentrate of approximately 17,000 tonnes per year of copper
    metal.
•   Total operating costs estimated to average approximately $91 per tonne milled ($67 per
    tonne mining, $16 per tonne milling and $8 per tonne administration) over a five year
    mine life.
•   Sustaining capital expenditures are expected to total approximately $55 million over the
    five year mine life.
REED COPPER DEPOSIT - PEA
The high grade nature of the Reed Copper deposit gives the project substantial
leverage to copper prices. The following table outlines a copper price sensitivity
analysis based on the operating parameters set out in the PEA.
                                                    PEA                    3 Year Historical
                                                Base Case (1)            Average Price Case (2)          Cu = $3.50/lb USD (3)
     Price and Exchange Averages
               Copper (USS/lb)                                   $2.78                          $3.20                       $3.50
                 Gold (US$/oz)                               $1,059.00                   $1,235.00                      $1,235.00
                Silver (US$/oz)                                 $21.14                         $22.85                      $22.85
                     US$/CDN$                                     0.92                            0.94                       0.92
     Pre-tax
                     Cash Flow                            $112,283,000                $182,975,000                  $257,028,000
                        NPV 8%                             $64,917,000                $109,904,000                  $174,365,000
                            IRR                                 36.70%                         46.60%                     61.40%


     (1) PEA Base Case metal prices projections compiled by HudBay based on 11 well-known financial
     institutions.
     (2) Bloomberg three year historical average (December 1, 2008 to December 1,
     2011)
     (3) $3.50 copper price for perspective on valuation impact of copper price
REED COPPER DEPOSIT - PEA
REED COPPER DEPOSIT - PEA
                VMS-HudBay JV
                • Ramp development
                  proposed to the 260ml for
                  bulk sample.
                • Production scheduled with
                  60T ore trucks
                • Levels developed every 25
                  metres
                • 510ml the final production
                  level with the current
                  geological resource
                  boundaries
                • Mine plan 2.3MT at 3.78%
                  Cu, 0.45 g/t Au, 5.77 g/t Ag
MORE MINERALIZATION AT
            REED LAKE??
                           VMS-HudBay JV


                      • Borehole Pulse
                        Electromagnetic targets
                        indicate the deposit is open
                        at depth


                      • Large BHPEM plates exist
                        between the Reed Copper
                        Deposit and the historical
                        Highway zone – UNTESTED!!


                      • Winter 2012 drill target.

Open down plunge
REED NORTH DISCOVERY
         Multi-lenses, 2011 discovery with limited drilling

         RLE006 – 7.18m, 7.44% Cu, 0.23% Zn, 0.48 g/t Au, 7.57 g/t Ag
         RLE021 – 3.95m, 9.31% Cu, 1.87% Zn, 3.59 g/t Au, 35.53 g/t Ag




                                            BHPEM Plates




                                             Open Down
     Untested BHPEM                          Plunge
     Plates




Longitudinal View, Looking North                          Cross Sectional View, Looking West
ORE BODIES TEND TO GROW IN
    THE FLIN FLON BELT




   After K. Gilmore (Hudbay Minerals), 2007
Discovering High Grade Copper Deposits
                   in Manitoba, Canada



 Introduction to VMS Ventures Inc.
 HudBay Minerals JV and 4 Option Agreements
   • Reed Copper Deposit
   • Preliminary Economic Assessment
   • Additional targets…expanding resource
 Flin Flon – Snow Lake Belt - a World Class VMS
  Camp
 2011 Highlights/2012 Plan
 North American Nickel – 45% VMS ownership
FLIN FLON GREENSTONE BELT
A WORLD CLASS VMS CAMP
                          MAP AREA
                                     • Largest Proterozoic VMS
                                       District in the world.
                                     • Most prolific greenstone
         SNOW LAKE BELT                belt in Canada in terms
                                       of $ value of
                                       production/km2.
                                     • Continuous production
          Lalor Lake                   for past 80 years
          (Hudbay)                   • 183 million tonnes from
                                       27 mines.
                                     • VMS mines/deposits rich
                                       in copper, zinc, gold and
                                       silver.
                                     • Deposits typically occur
Reed Lake                              in clusters.
(VMS Ventures Inc.)                  • Gold mines/deposits
                                       throughout belt.
DISCOVERY PROGRESSION
• Early discoveries were
  made by prospecting.
• Recent discoveries
  made through a
  combination of
  geological and
  geophysical work in the
  exposed portion of the
  belt.
• VMS now employs
  state of the art airborne
  geophysics and high
  powered, Time-Domain
  Electromagnetic
  surveys (surface and
  borehole) to look
  deeper, under the
  Phanerozoic cover to
  refine the targeting of
  drill holes on
  mineralized zones.        After K. Gilmore (Hudbay Minerals), 2009
VMS LAND POSITION IN THE
             SNOW LAKE AREA
 DOMINANT LAND
  POSITION
   • More than
     108,000
     hectares of
     ground.
 RIGHT GEOLOGY
   • Focused on
     juvenile arc
     rocks (shown
     here in medium
     green), juvenile
     arc rocks host
     all the mined
     VMS deposits
     in the Flin Flon
     – Snow Lake
     camp.
VTEM COVERAGE OVER
         VMS VENTURES’ PROJECTS
• Many recent
  discoveries,
  including VMS’s
  Reed Lake
  Deposit, were
  made with VTEM
• VMS Ventures
  has flown over
  17,000 line-km of
  VTEM over its
  projects, majority
  flown at 100 m
  line spacing.
• 5 years and $13
  million in work –
  Targets ready to
  drill.
Discovering High Grade Copper Deposits
                   in Manitoba, Canada



 Introduction to VMS Ventures Inc.
 HudBay Minerals JV and 4 Option Agreements
   • Reed Copper Deposit
   • Preliminary Economic Assessment
   • Additional targets…expanding resource
 Flin Flon – Snow Lake Belt - a World Class VMS
  Camp
 2011 Highlights/2012 Plan
 North American Nickel – 45% VMS ownership
2011 HIGHLIGHTS
HudBay JV Option Properties
• NI 43-101 resource at Reed Copper deposit; PEA on Reed Copper deposit
• Reed North Discovery (Super Zone property)
      • 7.44% Copper over 7.18 metres discovered in hole RLE006
      • 5.94% Copper over 2.23 metres discovered in hole RLE007
• New targets on JV and option ground

VMS 100% Owned Properties
• Drilled 13,128 metres in 41 holes
• Flew 4,648 km of VTEM surveys
• 87 km of TDEM surveys
• Cowan River Copper Zone
      • 9.81% Copper over 1.37 metres within 6.59 metres of 2.25% Copper
      • 32 km TDEM Grid recently completed
• Sails Lake
      • 3D Induced Polarization Integrated with trench mapping and channel
          sampling at Sails Lake gold showing
2012 PLAN
HudBay JV Option Properties

•   4,000 m of drilling on JV
•   4,000 m of drilling on optioned properties
•   50 line km of TDEM

VMS 100% Owned Properties

     Manitoba Projects

        •   Morton, Puella Bay, Cowan River and McClarty projects scheduled for diamond
            drilling in Q1
     Sudbury Projects

        •   Golden Pine, Black Creek & Terra Incognita scheduled for prospecting/trenching
            in Q2, auger drilling and diamond drilling in Q3
North American Nickel
•   TEM Surveys and drilling in 2012
Discovering High Grade Copper Deposits
                   in Manitoba, Canada



 Introduction to VMS Ventures Inc.
 HudBay Minerals JV and 4 Option Agreements
   • Reed Copper Deposit
   • Preliminary Economic Assessment
   • Additional targets…expanding resource
 Flin Flon – Snow Lake Belt - a World Class VMS
  Camp
 2011 Highlights/2012 Plan
 North American Nickel – 45% VMS ownership
NORTH AMERICAN NICKEL INC.

VMS owns ~45% of
 North American
 Nickel.
 Dr. Mark Fedikow,
  President and
  COO.
 Camp-scale land
  position in the
  emerging Maniitsoq
  Nickel Belt,
  Greenland
 Major projects
  situated in
  Thompson and
  Sudbury, the two
  most productive
  mining camps in
  the world class
  Circum-Superior
  Nickel Belt.
TSX.V: NAN
MANIITSOQ PROJECT, GREENLAND




 Maniitsoq
 (looking east)

100% interest in a giant mineral
 exploration licence covering 4,841 km2
 covering the highly prospective, but
 underexplored Maniitsoq Nickel Belt.
Located on year-round, ice free tide
 water on the southwest coast of
 Greenland, near the village of
 Maniitsoq.
THE MANIITSOQ NICKEL BELT
- PLENTY OF ROOM FOR WORLD CLASS
            DEPOSIT(S)
                                            Belt is arcuate shaped, 75
                                             km long by 15 km wide
                                             and characterised by
                                             nickel-bearing noritic
                                             intrusions.
                                            Numerous significant
                                             nickel showings with
                                             consistently high nickel
                                             tenor.
                                  Voisey’s Bay Deposit
                                  at map scale.




                Plan view of the Voisey’s Bay intrusion (from Eckstrand & Hulbert, 2007)2007
                                                                 From Eckstrand & Hulbert,
MANIITSOQ PROJECT
2011 SKYTEM RESULTS
                Helicopter EM and
                 magnetic surveys by
                 NAN in 2011 over two
                 small areas (totaling
                 only 8% of the project
                 area) successfully
                 delineated new targets.
                Additional helicopter
                 EM surveys and drilling
                 planned for 2012.
                Historical Work
                Almost all showings
                 were discovered in the
                 1960’s and early 70’s.
                Average hole length
                 less than 50 meters.
VMS VENTURES INC.
              VMS - TSX.V           QUICK FACTS
                                     Well funded junior with approximately $9.8 M
                                      in the treasury.
                                     Discovered the Cu-rich Reed Lake Deposit
                                      in Manitoba in 2007.
                                        •   JV Partner HudBay Minerals (T.HBM) is
                                            project operator and financiers of Reed Lake
                                            development. Project ownership is 70%
                                            HBM & 30% VMS.

                                     Reed Copper deposit PEA announced in
CAPITAL STRUCTURE                     December 2011. Exploration budget for JV
(as at January, 2012)                 and Option areas $2.3 Million and AEP
                                      expenditures of $34.5 Million.
Issued & Outstanding: 123,523,955
Options:               10,183,850    Large, highly prospective land package in
Fully Diluted:        133,707,805    the prolific Flin Flon – Snow Lake
                                     Greenstone Belt of Manitoba.

Vms presentation january_2012_final

  • 1.
    Discovering High GradeCopper Deposits in Manitoba, Canada VMS:TSX.V Explorer to Producer January, 2012
  • 2.
    FORWARD-LOOKING STATEMENTS NOTE: Someof the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward-looking statements that involve various risks. The following are important factors that could cause the Company’s actual results to differ materially from those expressed or implied by such forward-looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. There can be no assurance that forward-looking statements will prove to be accurate as actual results and future events may differ materially from those anticipated in such statements. VMS Ventures Inc. undertakes no obligation to update such forward-looking statements if circumstances or management’s estimates or opinions should change. The reader is cautioned not to place undue reliance on such forward-looking statements.
  • 3.
    Discovering High GradeCopper Deposits in Manitoba, Canada  Introduction to VMS Ventures Inc.  HudBay Minerals JV and 4 Option Agreements • Reed Copper Deposit • Preliminary Economic Assessment • Additional targets…expanding resource  Flin Flon – Snow Lake Belt - a World Class VMS Camp  2011 Highlights/2012 Plan  North American Nickel – 45% VMS ownership
  • 4.
    VMS VENTURES INC. VMS - TSX.V QUICK FACTS  Well funded junior with approximately $9.8 M in the treasury.  Discovered the Cu-rich Reed Lake Deposit in Manitoba in 2007. • JV Partner HudBay Minerals (T.HBM) is project operator and financiers of Reed Lake development. Project ownership is 70% HBM & 30% VMS.  Reed Copper deposit PEA announced in CAPITAL STRUCTURE December 2011. Exploration budget for JV (as at January, 2012) and Option areas $2.3 Million and AEP expenditures of $34.5 Million. Issued & Outstanding: 123,523,955 Options: 10,183,850  Large, highly prospective land package in Fully Diluted: 133,707,805 the prolific Flin Flon – Snow Lake Greenstone Belt of Manitoba.
  • 5.
    Discovering High GradeCopper Deposits in Manitoba, Canada  Introduction to VMS Ventures Inc.  HudBay Minerals JV and 4 Option Agreements • Reed Copper Deposit • Preliminary Economic Assessment • Additional targets…expanding resource  Flin Flon – Snow Lake Belt - a World Class VMS Camp  2011 Highlights/2012 Plan  North American Nickel – 45% VMS ownership
  • 6.
    VMS VENTURES –HUDBAY JV & OPTIONS PROJECTS VMS-HudBay JV • 30-70 joint venture, VMS carried to production. • Hudbay is operator. • NI 43-101 Geological Resourced April, 2011 • PEA announced December, 2011 4 Option Agreements • HudBay is operator. • $2.6 M in cumulative expenditures to earn 70%. • Upon discovery VMS is carried on first $50 million of expenditures. • Cumulative $2.8 M paid to VMS in July, 2010. 2011 HIGHLIGHTS 43-101 indicated resource estimate completed (30% VMS) Super Zone discovered (30% VMS) Cowan River Zone discovered (100% VMS)
  • 7.
    NI 43-101 INDICATED/ INFERRED GEOLOGICAL RESOURCE Category Tonnes Au (g/t) Flin Flon(%) Zn (%) Ag (g/t) Cu 115 km Au (oz) Ag (oz) Cu (lbs) Zn (lbs) Indicated 2,555,000 0.64 7.86 4.52 0.91 57,674 708,303 254,069,200 51,151,100 Inferred 170,000 0.38 4.55 4.26 0.52 2,278 27,281 15,932,400 1,944,800 Snow Lake 75 km Sectional View Planview
  • 8.
    REED COPPER DEPOSIT- PEA Preliminary Economic Assessment – Announced December, 2011 • Approximate daily ore production of 1,300 tonnes at Reed is expected by late 2013, subject to receipt of required permits. • Average expected production grades of 3.78% copper, 0.45 g/t gold and 5.77 g/t silver. • Assumed metal recoveries in HudBay’s Flin Flon Concentrator of 94% copper, 58% gold and 62% silver. • Average production in concentrate of approximately 17,000 tonnes per year of copper metal. • Total operating costs estimated to average approximately $91 per tonne milled ($67 per tonne mining, $16 per tonne milling and $8 per tonne administration) over a five year mine life. • Sustaining capital expenditures are expected to total approximately $55 million over the five year mine life.
  • 9.
    REED COPPER DEPOSIT- PEA The high grade nature of the Reed Copper deposit gives the project substantial leverage to copper prices. The following table outlines a copper price sensitivity analysis based on the operating parameters set out in the PEA. PEA 3 Year Historical Base Case (1) Average Price Case (2) Cu = $3.50/lb USD (3) Price and Exchange Averages Copper (USS/lb) $2.78 $3.20 $3.50 Gold (US$/oz) $1,059.00 $1,235.00 $1,235.00 Silver (US$/oz) $21.14 $22.85 $22.85 US$/CDN$ 0.92 0.94 0.92 Pre-tax Cash Flow $112,283,000 $182,975,000 $257,028,000 NPV 8% $64,917,000 $109,904,000 $174,365,000 IRR 36.70% 46.60% 61.40% (1) PEA Base Case metal prices projections compiled by HudBay based on 11 well-known financial institutions. (2) Bloomberg three year historical average (December 1, 2008 to December 1, 2011) (3) $3.50 copper price for perspective on valuation impact of copper price
  • 10.
  • 11.
    REED COPPER DEPOSIT- PEA VMS-HudBay JV • Ramp development proposed to the 260ml for bulk sample. • Production scheduled with 60T ore trucks • Levels developed every 25 metres • 510ml the final production level with the current geological resource boundaries • Mine plan 2.3MT at 3.78% Cu, 0.45 g/t Au, 5.77 g/t Ag
  • 12.
    MORE MINERALIZATION AT REED LAKE?? VMS-HudBay JV • Borehole Pulse Electromagnetic targets indicate the deposit is open at depth • Large BHPEM plates exist between the Reed Copper Deposit and the historical Highway zone – UNTESTED!! • Winter 2012 drill target. Open down plunge
  • 13.
    REED NORTH DISCOVERY Multi-lenses, 2011 discovery with limited drilling RLE006 – 7.18m, 7.44% Cu, 0.23% Zn, 0.48 g/t Au, 7.57 g/t Ag RLE021 – 3.95m, 9.31% Cu, 1.87% Zn, 3.59 g/t Au, 35.53 g/t Ag BHPEM Plates Open Down Untested BHPEM Plunge Plates Longitudinal View, Looking North Cross Sectional View, Looking West
  • 14.
    ORE BODIES TENDTO GROW IN THE FLIN FLON BELT After K. Gilmore (Hudbay Minerals), 2007
  • 15.
    Discovering High GradeCopper Deposits in Manitoba, Canada  Introduction to VMS Ventures Inc.  HudBay Minerals JV and 4 Option Agreements • Reed Copper Deposit • Preliminary Economic Assessment • Additional targets…expanding resource  Flin Flon – Snow Lake Belt - a World Class VMS Camp  2011 Highlights/2012 Plan  North American Nickel – 45% VMS ownership
  • 16.
    FLIN FLON GREENSTONEBELT A WORLD CLASS VMS CAMP MAP AREA • Largest Proterozoic VMS District in the world. • Most prolific greenstone SNOW LAKE BELT belt in Canada in terms of $ value of production/km2. • Continuous production Lalor Lake for past 80 years (Hudbay) • 183 million tonnes from 27 mines. • VMS mines/deposits rich in copper, zinc, gold and silver. • Deposits typically occur Reed Lake in clusters. (VMS Ventures Inc.) • Gold mines/deposits throughout belt.
  • 17.
    DISCOVERY PROGRESSION • Earlydiscoveries were made by prospecting. • Recent discoveries made through a combination of geological and geophysical work in the exposed portion of the belt. • VMS now employs state of the art airborne geophysics and high powered, Time-Domain Electromagnetic surveys (surface and borehole) to look deeper, under the Phanerozoic cover to refine the targeting of drill holes on mineralized zones. After K. Gilmore (Hudbay Minerals), 2009
  • 18.
    VMS LAND POSITIONIN THE SNOW LAKE AREA  DOMINANT LAND POSITION • More than 108,000 hectares of ground.  RIGHT GEOLOGY • Focused on juvenile arc rocks (shown here in medium green), juvenile arc rocks host all the mined VMS deposits in the Flin Flon – Snow Lake camp.
  • 19.
    VTEM COVERAGE OVER VMS VENTURES’ PROJECTS • Many recent discoveries, including VMS’s Reed Lake Deposit, were made with VTEM • VMS Ventures has flown over 17,000 line-km of VTEM over its projects, majority flown at 100 m line spacing. • 5 years and $13 million in work – Targets ready to drill.
  • 20.
    Discovering High GradeCopper Deposits in Manitoba, Canada  Introduction to VMS Ventures Inc.  HudBay Minerals JV and 4 Option Agreements • Reed Copper Deposit • Preliminary Economic Assessment • Additional targets…expanding resource  Flin Flon – Snow Lake Belt - a World Class VMS Camp  2011 Highlights/2012 Plan  North American Nickel – 45% VMS ownership
  • 21.
    2011 HIGHLIGHTS HudBay JVOption Properties • NI 43-101 resource at Reed Copper deposit; PEA on Reed Copper deposit • Reed North Discovery (Super Zone property) • 7.44% Copper over 7.18 metres discovered in hole RLE006 • 5.94% Copper over 2.23 metres discovered in hole RLE007 • New targets on JV and option ground VMS 100% Owned Properties • Drilled 13,128 metres in 41 holes • Flew 4,648 km of VTEM surveys • 87 km of TDEM surveys • Cowan River Copper Zone • 9.81% Copper over 1.37 metres within 6.59 metres of 2.25% Copper • 32 km TDEM Grid recently completed • Sails Lake • 3D Induced Polarization Integrated with trench mapping and channel sampling at Sails Lake gold showing
  • 22.
    2012 PLAN HudBay JVOption Properties • 4,000 m of drilling on JV • 4,000 m of drilling on optioned properties • 50 line km of TDEM VMS 100% Owned Properties Manitoba Projects • Morton, Puella Bay, Cowan River and McClarty projects scheduled for diamond drilling in Q1 Sudbury Projects • Golden Pine, Black Creek & Terra Incognita scheduled for prospecting/trenching in Q2, auger drilling and diamond drilling in Q3 North American Nickel • TEM Surveys and drilling in 2012
  • 23.
    Discovering High GradeCopper Deposits in Manitoba, Canada  Introduction to VMS Ventures Inc.  HudBay Minerals JV and 4 Option Agreements • Reed Copper Deposit • Preliminary Economic Assessment • Additional targets…expanding resource  Flin Flon – Snow Lake Belt - a World Class VMS Camp  2011 Highlights/2012 Plan  North American Nickel – 45% VMS ownership
  • 24.
    NORTH AMERICAN NICKELINC. VMS owns ~45% of North American Nickel.  Dr. Mark Fedikow, President and COO.  Camp-scale land position in the emerging Maniitsoq Nickel Belt, Greenland  Major projects situated in Thompson and Sudbury, the two most productive mining camps in the world class Circum-Superior Nickel Belt. TSX.V: NAN
  • 25.
    MANIITSOQ PROJECT, GREENLAND Maniitsoq (looking east) 100% interest in a giant mineral exploration licence covering 4,841 km2 covering the highly prospective, but underexplored Maniitsoq Nickel Belt. Located on year-round, ice free tide water on the southwest coast of Greenland, near the village of Maniitsoq.
  • 26.
    THE MANIITSOQ NICKELBELT - PLENTY OF ROOM FOR WORLD CLASS DEPOSIT(S) Belt is arcuate shaped, 75 km long by 15 km wide and characterised by nickel-bearing noritic intrusions. Numerous significant nickel showings with consistently high nickel tenor. Voisey’s Bay Deposit at map scale. Plan view of the Voisey’s Bay intrusion (from Eckstrand & Hulbert, 2007)2007 From Eckstrand & Hulbert,
  • 27.
    MANIITSOQ PROJECT 2011 SKYTEMRESULTS Helicopter EM and magnetic surveys by NAN in 2011 over two small areas (totaling only 8% of the project area) successfully delineated new targets. Additional helicopter EM surveys and drilling planned for 2012. Historical Work Almost all showings were discovered in the 1960’s and early 70’s. Average hole length less than 50 meters.
  • 28.
    VMS VENTURES INC. VMS - TSX.V QUICK FACTS  Well funded junior with approximately $9.8 M in the treasury.  Discovered the Cu-rich Reed Lake Deposit in Manitoba in 2007. • JV Partner HudBay Minerals (T.HBM) is project operator and financiers of Reed Lake development. Project ownership is 70% HBM & 30% VMS.  Reed Copper deposit PEA announced in CAPITAL STRUCTURE December 2011. Exploration budget for JV (as at January, 2012) and Option areas $2.3 Million and AEP expenditures of $34.5 Million. Issued & Outstanding: 123,523,955 Options: 10,183,850  Large, highly prospective land package in Fully Diluted: 133,707,805 the prolific Flin Flon – Snow Lake Greenstone Belt of Manitoba.