SlideShare a Scribd company logo
Discovering High Grade Copper Deposits
         in Manitoba, Canada




         VMS:TSX.V
     Explorer to Producer
         NAN: TSX.V
 The World’s Next Nickel Belt
John Tumazos Very Independent
     Research Conference
      October 2-3, 2012
FORWARD-LOOKING
  STATEMENTS
NOTE:
Some of the statements contained herein may be forward-looking
statements which involve known and unknown risks and uncertainties.
Without limitation, statements regarding potential mineralization and
resources, exploration results, and future plans and objectives of the
Company are forward-looking statements that involve various risks. The
following are important factors that could cause the Company’s actual
results to differ materially from those expressed or implied by such
forward-looking statements: changes in the world wide price of mineral
commodities, general market conditions, risks inherent in mineral
exploration, risks associated with development, construction and mining
operations, the uncertainty of future profitability and the uncertainty of
access to additional capital. There can be no assurance that forward-looking
statements will prove to be accurate as actual results and future
events may differ materially from those anticipated in such statements.
VMS Ventures Inc. undertakes no obligation to update such forward-looking
statements if circumstances or management’s estimates or opinions
should change. The reader is cautioned not to place undue reliance on
such forward-looking statements.
VMS VENTURES INC.
               VMS - TSX.V          QUICK FACTS
                                     Well funded junior with approximately
                                      $10.5M in the treasury.
                                     Discovered the copper rich Reed Copper
                                      deposit in Manitoba in 2007.
                                         •   JV Partner HudBay Minerals (T.HBM) is
                                             project operator; VMS costs carried to
                                             production. Project ownership is 70% HBM
                                             & 30% VMS.
                                     Reed Copper deposit Prefeasbility
                                      announced in April 2012. Indicated
CAPITAL STRUCTURE                     Reserve: 2.2M Tonnes of 3.83% Cu, 0.48
(as at September, 2012)               g/t Au, 6.02 g/t Ag
Issued & Outstanding: 129,668,399    Large, highly prospective land package in
Warrants:                 163,333    the prolific Flin Flon – Snow Lake
Options:                7,484,850
                                     Greenstone Belt of Manitoba
Fully Diluted:        137,316,582
                                     VMS owns ~27M sharesof North American
                                      Nickel
VMS/NAN MANAGEMENT
Rick Mark, M.Ed (Admin) CEO & Chairman VMS & NAN: Rick has over 25 years experience in the public market
place. He is also CEO & Chairman of Harvest Gold Corporation (HVG-TSX.V), a December 2005 "spin off" from
VMS, and is the President and CEO of Pancontinental Uranium Corp. (PUC-TSX.V).


Neil Richardson P. Geo. COO, VMS& NAN: Neil has a long history of mineral exploration and mining experience
with HudBay Minerals and others. As the COO of both companies, Neil is responsible for developing and
implementing exploration programs .


Mark Fedikow, HBSc., M.Sc., Ph.D., P.Eng., P. Geo., C.P.G. : President & Director NAN, VP Exploration VMS:
Mark has 35 years of industry and government experience including Chief Geologist of the Mineral Deposits Section
in Manitoba. He is a recipient of the Canadian national award for outstanding geoscientific achievement.


John Roozendaal B.Sc, President of VMS, Director of NAN: John was the founding director of VMS Ventures Inc.
He has 20 years of Mineral Exploration experience and was directly involved in the Reed Copper discovery.


John Pattison, P. Geo., B.Sc. Chief Geologist VMS and NAN: John worked with Falconbridge Limited and
associated companies for 19 years managing base metal, PGE and gold exploration projects throughout Canada and
southern Africa. He is the lead project geologist for the Maniitsoq, Greenland nickel project.




                                                                                        4
INDEPENDENT DIRECTORS &
             ADVISORY BOARD                    Independent Directors:

Don Whalen, Director & Audit Committee Chair, VMS: Don was Executive Chairman and Director of High River Gold
Mines. Before joining High River, he held numerous marketing, technical and management positions over a 29 year career
with IBM Canada Ltd.


Jim Clucas, Director & Audit Committee Member, NAN: Jim was Chief Financial Officer of Inco’s Canadian operations
and has been involved in the development of several mineral deposits, including the Snow Lake Mine (High River Gold
Mines), Montana Tunnels (Pegasus Mining) and the Fenix Project in Guatemala. He was the founder of International
Nickel Ventures Inc. which acquired and developed the Santa Fe/Ipora Nickel Laterite deposit in Brazil. Jim is currently
President and CEO of Search Minerals
                                                   Advisory Board
Cashel Meagher B.Sc. P. Geo.: Cashel is currently Vice President South America Business Unit of Hudbay Minerals. He
has worked with the technical and management teams at VMS Ventures and North American Nickel through the Reed
Lake joint venture with VMS. Prior to joining Hudbay, Cashel held management positions with Vale Inco in exploration,
technical services, and mine operations.


Mike Muzylowski: Mike has played key roles in the discovery of 15 Canadian mines, 13 in Manitoba, during his
distinguished career as a geologist, geophysicist and senior mining executive.

James M. Patterson B.A. D.I.C. Ph.D. P. Geo.: Jim a former VP Exploration for FNX Mining Company, has over 40 years
experience in mineral exploration with major and junior exploration companies, government and international development
agencies.



                                                                                           5
REED MINE RIBBON CUTTING
 CEREMONY, AUGUST 2012
REED COPPER DEPOSIT
                          VMS-HudBay JV

                      • VMS owns 30% and is
                        carried to production
                      • Prefeasibility report
                        indicates 2,157,000 tonnes of
                        3.83% Cu, 0.59% Zn and 0.48
                        g/t Au
                      • NPV 8% @ $3.75 Cu =
                        $191,361,000; IRR 68.40%
                      • Borehole Pulse
                        Electromagnetic targets
                        indicate the deposit is open
                        at depth

Open down plunge
ORE BODIES TEND TO GROW IN
    THE FLIN FLON BELT




   After K. Gilmore (Hudbay Minerals), 2007
REED COPPER DEPOSIT:
               CASH FLOW WITHIN SIGHT
The high grade nature of the Reed Copper deposit gives the project strong leverage to copper prices.

The following table shows a copper price sensitivity analysis based on the operating parameters set
out in the prefeasibility.            Prefeasibility          3 Year Historical
                                             Base Case (1)            Average Price Case (2)     Cu = $3.75/lb USD (3)
   Price and Exchange Averages
                    Copper
                   (USS/lb)                                   $2.95                      $3.20                   $3.75
              Gold (US$/oz)                             $1,269.00                   $1,235.00               $1,235.00
             Silver (US$/oz)                                 $24.78                    $22.85                  $22.85
                 US$/CDN$                                      0.95                       0.94                    0.92
   Pre-tax
                 Cash Flow                          $102,426,000                 $182,975,000            $300,964,000
                  NPV 8%                             $57,443,000                 $109,904,000            $191,361,000
                        IRR                               34.70%                       46.60%                  68.40%

   (1) Prefeasibility Base Case metal prices projections compiled by HudBay based on 11 well-
   known financial institutions.
   (2) Bloomberg three year historical average (December 1, 2008 to December 1,
   2011)
   (3) $3.75 copper price for perspective on valuation impact of copper price
VMS VENTURES – HUDBAY JV &
      OPTIONS PROJECTS
                                                            VMS-Hudbay JV
                                   Reed North zone
                                                            • 30-70 joint venture, VMS
                                                              carried to production.
                                                            • Hudbay is operator.
                                                            • NI 43-101 Geological
                                                              Resourced April, 2011
                                                            • Prefeasibility announced
                                                              April 2012
 Reed Copper deposit
                                                            • Reed Copper Deposit
                                                              opening Ceremony
                                                              August 2012
                                                            • Production slated to begin
                                                              in Q4 2013
                                                            4 Option Agreements
                                                            • HudBay is operator.
                                                            • $2.6 M in cumulative
                                                              expenditures to earn 70%.
2012 HIGHLIGHTS
Prefeasibility study completed on Reed Copper project
Bulk sample and underground development permits in place
Reed Copper Deposit Opening Ceremony, August 2012
VTEM COVERAGE OVER
      VMS’ 100% OWNED PROJECTS
• Many recent
  discoveries,
  including VMS’s
  Reed Lake
  Deposit, were
  made with VTEM
• VMS Ventures
  has flown over
  17,000 line-km of
  VTEM over its
  projects, majority
  flown at 100 m
  line spacing.
• 5 years and $13
  million in work –
  Targets ready to
  drill.
VMS 2012 ACTIVITIES
HudBay JV: The Reed deposit, Manitoba’s next copper mine

      •   Prefeasibility report announced April 2, 2012
      •   Mine Portal entrance established
      •   Reed Copper Deposit opening ceremony August 14, 2012
      •   Production commences Q4 - 2013

VMS 100% Owned Properties
      Manitoba Projects
      • Recently acquired Reed/East West project has eight new targets for drilling in
         winter 2012.
      Sudbury Projects
      • Golden Pine, Black Creek & Terra Incognita scheduled for prospecting/trenching
         in Q2, auger drilling and diamond drilling in Q3 – Q4

North American Nickel (VMS owns ~27M shares)

     Maniitsoq project is being drilled; own VMS or NAN for discovery upside
NORTH AMERICAN NICKEL INC.

                NAN - TSX.V        QUICK FACTS
                                    Acquired the large, prospective Maniitsoq
                                     property in Greenland in August, 2011
                                    High-grade nickel intercepts in historic drill
                                     holes:
                                        9.85 m at 2.67% Ni and 60% Cu at
                                     Imiak Hill
                                        12.89 m averaging 2.24% Ni and 0.63%
                                        Cu at Fossilik
                                    Drill program underway at Maniitsoq. Approx.
                                     2,000 m of diamond drilling planned.

CAPITAL STRUCTURE                   Over 3,500 line kilometres flown in a VTEM
(as at September, 2012)              Plus survey in July.

Issued & Outstanding: 77,230,193    Sudbury Ontario land position includes the
Warrants:             39,733,950     Post Creek, Halcyon and Wahnapitae
Options:               7,633,000     properties.
Fully Diluted:       124,597,143
                                    VMS owns ~27M shares.
                                                                        Slide 13
MANIITSOQ PROJECT, GREENLAND




 Maniitsoq (looking east towards the project area)

100% interest in a giant property
 covering 4,983 km2 of the highly
 prospective, but underexplored,
 Greenland Norite Belt.
Located on tide water (navigable year-
 round) on the southwest coast of
 Greenland, near the village of
 Maniitsoq.
Maniitsoq Project
              A World Class Nickel Camp?
•   Underexplored (previous hole lengths averaged < 60 m) but lots of
    high-grade historical assays (e.g. 9.85 m @ 2.67% Ni and 0.60%
    Cu).
•   Strong evidence of a large-scale, long lived mafic igneous event.
•   Major, deep seated structures that were active from the Archean
    through to the Mesozoic.
•   Intrusions hosting the mineralization appear to have been part of a
    dynamic magma conduit system.
•   Proof that modern helicopter geophysical technology is significantly
    more effective in this rugged terrain than techniques used in the
    past.
•   Over 70 conductive zones identified to date across the entire 75 km
    Greenland Norite Belt.
                                                                   Slide 15
Maniitsoq Project Location
            • Situated in a safe, stable,
              mining-friendly jurisdiction.
            • Close to tide water that is
              navigable year-round.
            • Straight forward permitting
              process.
            • No land claims issues.
            • Mine development activities
              nearby including road and deep
              water port construction (London
              Mining’s Isua Iron project).

                                        Slide 16
Regional Setting
Property Geology
   GREENLAND     • Abundant Ni-Cu sulphide showings
   NORITE BELT
                   associated with noritic intrusions.
                 • Norites are concentrated in, but not
                   restricted to, a J-shaped belt 75 km
                   long by up to 15 km wide that wraps
                   around the Finnefjeld Gneiss
                   Complex.
                 • Intrusion of nickeliferous norites over
                   a period of time spanning at least
                   one complete geomagnetic reversal.




                                                  Slide 17
Many Ni-Cu Setting
  Regional Showings
          • 14 significant Ni-Cu showings. Most are
            concentrated in the Greenland Norite Belt
            (GNB) outlined here by purple dashed lines.
          • All showings were discovered by
            Kyrolitselskabet Øresund A/S (KØ) between
            1962 and 1972 through surface prospecting.
          • KØ made numerous intersections including:
             9.85 meters averaging 2.67% Ni and
             0.60% Cu at Imiak Hill
             12.89 meters averaging 2.24% Ni and
             0.63% Cu at the Fossilik showing.
          • KØ drilled 119 holes totalling 6,287 m (i.e.
            average hole <55 m long) to test outcropping
            norites, exposed sulphide mineralization and
            shallow electromagnetic (EM) anomalies
            directly associated with exposed
            mineralization. This was the only drilling
            for nickel in the GNB.


                                           Slide 18
Deposit Model
VERTICAL SECTION                    Deposition of Ni-Sulphides in a
                                      Magma Conduit System
                 PRESENT DAY        •   Superheated noritic magma flows
                EROSION LEVEL           through gneiss and paragneiss in an
                                        open system.
                                    •   Gneiss is assimilated by the hot
                                        magma and triggers sulphide
                                        saturation.
                                    •   Ni + Cu ± PGE sulphides are
                                        deposited in zones of lower velocity
                                        within the magmatic plumbing
                                        system.
                                    •   Continual magma flow upgrades
                                        nickel tenor of sulphide.

Modified after Maier et al., 2001                                  Slide 19
Consistently High Nickel
                Tenor
                                           Ni vs. S for Historical GNB Drill Core
• GNB sulphides have
  a relatively consistent                  Typical 100% sulphide mixture
                                           of Po+Cp+Pn contains 35.7% S
  nickel tenor of 6 to                                        Kerr, 2003
  8% Ni recalculated to
  100% sulphide.


                            Nickel wt. %
• Presence of pyrite
  means there is more
  S for a given amount                                                          DRILL CORE
  of sulphide than in
  typical magmatic
  sulphide deposits
  consisting mainly of
  pyrrhotite-pentlandite
  and chalcopyrite.
                                                                                After Shore, 2000
                                                        Sulphur wt. %      (Falconbridge Limited)
                                                                                   Slide 20
Previous Exploration Stymied by
  Lack of Conductive Targets

                Cominco 1995 – 1996
                • 20,446 line-km of airborne GeoTEM EM and
                  magnetic surveying.
                    – Lines 200-400 m apart oriented 080° (i.e.
                      subparallel to orientation of norites resulting
                      in poor coupling).
                    – Large fixed wing aircraft had difficulty hugging
                      the rugged terrain resulting in noisy data.
                    – Very few anomalies associated with norites.
                    – Ground follow-up prospecting, minor surface
                      geophysics (<30 line-km) but no drilling.


                Falconbridge 1993 & 2000
                • 100 line-km of UTEM over Imiak Hill and part
                  of Fossilik.
                    – Lines 200 to 400 m apart.
                    – No conductors detected and no drilling
                      done.




                                                         Slide 21
Now Many Targets Thanks to Modern
    Regional Setting
     Helicopter Geophysics
                 • SkyTEM and VTEM helicopter-borne TEM
                   surveys flown by NAN in 2011 and 2012
                   have detected over 75 conductive zones
                   (circled in red on the adjacent map).
                 • This technology was not available to
                   previous explorers in the belt.
                 • NAN has flown the areas outlined in
                   green, which total 860 km2 and cover a
                   major portion of the GNB.
                 • Interpretation of the 2012 data is in
                   progress. To date over 75 conductive
                   zones have been identified (circled in red
                   on map).




                                                  Slide 22
Slide 23
3D EM Modeling Target B1-J
TARGET B1-J (IMIAK HILL): 3D VIEW LOOKING WEST
                                                 • 170 m long by 16 m wide conductor that comes to
                                                   surface and is directly coincident with the Imiak Hill
                                                   showing.
                                                 • The model shows that the mineralization strikes parallel
                                                   to most of the historical drilling and therefore has not
                                                   been properly tested.
                                                 • The model has very limited dip extent (21 m) but the
                                                   best intersection on the showing (9.85 m averaging
                  9.85m @ 2.67% Ni, 0.60% Cu       2.67% Ni and 0.60% Cu) occurs 130 m below surface
                                                   indicating that strong mineralization at surface is
                                 FO OTWALL         masking the EM response from mineralization at depth.
                                 CONTACT
                                 OF N ORITE


                                                                                        E
                                                                                   STRIK




                                                                                      9.85m @ 2.67% Ni, 0.60% Cu




                                                                                                 Slide 24
Target B1-J Down hole 3D
         Model




                       Slide 25
3D EM Modeling Target B1-L
   TARGET B1-L (SPOTTY HILL): 3D VIEW LOOKING NORTH   • Modeled as a 330 x 100 m
                                                        flat-lying conductor located
                                                        160 m below surface within a
                                                        norite intrusion.
                  ~ 160 m BELOW SURFACE
                  (i.e. 100 m BENEATH
                                                      • The conductor is untested but
                  PREVIOUS DRILLING)                    past shallow drilling 100 m
                                                        above intersected weakly
        330
              m
                  100 m
                                                        disseminated, nickeliferous
                                                        sulphides grading up to
                                                        0.52% Ni and 0.26% Cu over
                                                        12.94 m.
                                                      • Clearly, mineralizing
                                                        processes were at work in the
                                                        intrusion as indicated by the
                                                        disseminated near-surface
                                                        mineralization and the most
                                                        logical location to look for
                                                        massive sulphides is at
                                                        depth.

                                                                          Slide 26
Investor Risk Mitigation
 100% ownership; Camp-sized land package (Sudbury)
 Public Co management/financing experience
 Technical team is deep
 Secure political jurisdiction
 Regional setting; year round exploration
 Historic exploration data is remarkable ($10M plus)
 Geology
    Abundance of Ni-Cu occurrences at surface & in drilling
    Undeformed norite host rocks
    Mineralization: inclusion-bearing sulphides
    Nickel Tenor – consistent and economic grade
 New technologies in “old” camp work
   – 25 EM targets in 8% of land package
                                                               Slide 27
Plans for 2012 & Beyond
            2012 – Immediate Priority
            • 3,000 line-km of helicopter TEM over
              prospective norites in southern part of the
              norite belt.
            • Ground truth conductive target zones among
              75 identified by SkyTEM and VTEM Plus
              surveys
            • Minimum 2,000 m of drilling.
            • Prospecting outside of main norite belt looking
              for new showings and norites.
            • Estimated cost $3.0 million


            2013
            • Minimum 6,000 m of follow-up drilling on
              targets derived from 2012 work
            • 2,000 line-km of helicopter TEM
            • Estimated cost $ 7.5 million.




                                                   Slide 28
Discovering High Grade Copper Deposits
         in Manitoba, Canada




         VMS:TSX.V
     Explorer to Producer
         NAN: TSX.V
 The World’s Next Nickel Belt
John Tumazos Very Independent
     Research Conference
      October 2-3, 2012

More Related Content

What's hot

Agm institutional presentation aug 29 2011
Agm institutional presentation aug 29 2011Agm institutional presentation aug 29 2011
Agm institutional presentation aug 29 2011aldridgeminerals
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDetourGold
 
Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
Rocky Mountain Rare Metal Belt
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011shosein2011
 
Esperanza Corporate Presentation
Esperanza Corporate PresentationEsperanza Corporate Presentation
Esperanza Corporate Presentation
Company Spotlight
 
Why invest in zinc
Why invest in zincWhy invest in zinc
Why invest in zinc
Elena Ivanova
 
Pdac march corporate presentation
Pdac march corporate presentationPdac march corporate presentation
Pdac march corporate presentation
VMS Ventures
 
AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011aldridgeminerals
 
Andromeda Resources Inc. Corporate Presentation
Andromeda Resources Inc. Corporate PresentationAndromeda Resources Inc. Corporate Presentation
Andromeda Resources Inc. Corporate PresentationAndromedaInc
 
Esperanza Resources Corp. January 2013 Corporate Presentation
Esperanza Resources Corp. January 2013 Corporate PresentationEsperanza Resources Corp. January 2013 Corporate Presentation
Esperanza Resources Corp. January 2013 Corporate Presentation
EsperanzaResources
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011aldridgeminerals
 
newmont mining 2007_Annual_Report
newmont mining 2007_Annual_Reportnewmont mining 2007_Annual_Report
newmont mining 2007_Annual_Reportfinance37
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011shosein2011
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)QMX Gold Corporation
 
North American Nickel - June 2012
North American Nickel - June 2012North American Nickel - June 2012
North American Nickel - June 2012
VMS Ventures
 
June 2011 IR presentation
June 2011 IR presentationJune 2011 IR presentation
June 2011 IR presentationPENTA
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltd
Symposium
 
Dgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDetourGold
 

What's hot (20)

Agm institutional presentation aug 29 2011
Agm institutional presentation aug 29 2011Agm institutional presentation aug 29 2011
Agm institutional presentation aug 29 2011
 
Dgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forumDgc 13 04_16-18_european gold forum
Dgc 13 04_16-18_european gold forum
 
Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)Presentation: Taseko Mines (April 2011)
Presentation: Taseko Mines (April 2011)
 
Why Invest in Claude Resources Inc.
Why Invest in Claude Resources Inc.Why Invest in Claude Resources Inc.
Why Invest in Claude Resources Inc.
 
Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011Champion Minerals Corporate Presentation December 20, 2011
Champion Minerals Corporate Presentation December 20, 2011
 
Esperanza Corporate Presentation
Esperanza Corporate PresentationEsperanza Corporate Presentation
Esperanza Corporate Presentation
 
Why invest in zinc
Why invest in zincWhy invest in zinc
Why invest in zinc
 
Pdac march corporate presentation
Pdac march corporate presentationPdac march corporate presentation
Pdac march corporate presentation
 
AGM Presentation June 2011
AGM Presentation June 2011AGM Presentation June 2011
AGM Presentation June 2011
 
Andromeda Resources Inc. Corporate Presentation
Andromeda Resources Inc. Corporate PresentationAndromeda Resources Inc. Corporate Presentation
Andromeda Resources Inc. Corporate Presentation
 
Esperanza Resources Corp. January 2013 Corporate Presentation
Esperanza Resources Corp. January 2013 Corporate PresentationEsperanza Resources Corp. January 2013 Corporate Presentation
Esperanza Resources Corp. January 2013 Corporate Presentation
 
AGM Presentation June 27, 2011
AGM Presentation June 27, 2011AGM Presentation June 27, 2011
AGM Presentation June 27, 2011
 
newmont mining 2007_Annual_Report
newmont mining 2007_Annual_Reportnewmont mining 2007_Annual_Report
newmont mining 2007_Annual_Report
 
Champion Minerals Corporate Presentation November 21, 2011
Champion Minerals Corporate  Presentation November 21, 2011Champion Minerals Corporate  Presentation November 21, 2011
Champion Minerals Corporate Presentation November 21, 2011
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
 
North American Nickel - June 2012
North American Nickel - June 2012North American Nickel - June 2012
North American Nickel - June 2012
 
Nan june 2012
Nan june 2012Nan june 2012
Nan june 2012
 
June 2011 IR presentation
June 2011 IR presentationJune 2011 IR presentation
June 2011 IR presentation
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltd
 
Dgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conferenceDgc 13 02_24-27_bmo metals and mining conference
Dgc 13 02_24-27_bmo metals and mining conference
 

Viewers also liked

Ifc investor presentation november 2011
Ifc investor presentation november 2011Ifc investor presentation november 2011
Ifc investor presentation november 2011VMS Ventures
 
Vms presentation march 2012
Vms presentation march 2012Vms presentation march 2012
Vms presentation march 2012VMS Ventures
 
Nyc hard assets_conference_pdf_with_nan_symbol
Nyc hard assets_conference_pdf_with_nan_symbolNyc hard assets_conference_pdf_with_nan_symbol
Nyc hard assets_conference_pdf_with_nan_symbolVMS Ventures
 
New york and_orlando_february_2011
New york and_orlando_february_2011New york and_orlando_february_2011
New york and_orlando_february_2011VMS Ventures
 
Vms presentation nov 2015
Vms presentation nov 2015Vms presentation nov 2015
Vms presentation nov 2015
VMS Ventures
 
VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures
 
Vms april-corporate-presentation-website
Vms april-corporate-presentation-websiteVms april-corporate-presentation-website
Vms april-corporate-presentation-website
VMS Ventures
 
VMS Corporate Presentation July 2015
VMS Corporate Presentation July 2015VMS Corporate Presentation July 2015
VMS Corporate Presentation July 2015
VMS Ventures
 
VMS November Presentation
VMS November PresentationVMS November Presentation
VMS November PresentationVMS Ventures
 
Vms corporate presentation july final website
Vms corporate presentation july final websiteVms corporate presentation july final website
Vms corporate presentation july final website
VMS Ventures
 
La réalité virtuelle en cours de démocratisation
La réalité virtuelle en cours de démocratisationLa réalité virtuelle en cours de démocratisation
La réalité virtuelle en cours de démocratisation
Antoine Wintrebert
 
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
Hani sami joga
 

Viewers also liked (14)

Ifc investor presentation november 2011
Ifc investor presentation november 2011Ifc investor presentation november 2011
Ifc investor presentation november 2011
 
Vms presentation march 2012
Vms presentation march 2012Vms presentation march 2012
Vms presentation march 2012
 
Nyc hard assets_conference_pdf_with_nan_symbol
Nyc hard assets_conference_pdf_with_nan_symbolNyc hard assets_conference_pdf_with_nan_symbol
Nyc hard assets_conference_pdf_with_nan_symbol
 
New york and_orlando_february_2011
New york and_orlando_february_2011New york and_orlando_february_2011
New york and_orlando_february_2011
 
Vms presentation nov 2015
Vms presentation nov 2015Vms presentation nov 2015
Vms presentation nov 2015
 
VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010VMS Ventures - Investor Presentation - September 2010
VMS Ventures - Investor Presentation - September 2010
 
Vms april-corporate-presentation-website
Vms april-corporate-presentation-websiteVms april-corporate-presentation-website
Vms april-corporate-presentation-website
 
VMS Corporate Presentation July 2015
VMS Corporate Presentation July 2015VMS Corporate Presentation July 2015
VMS Corporate Presentation July 2015
 
VMS November Presentation
VMS November PresentationVMS November Presentation
VMS November Presentation
 
Vms corporate presentation july final website
Vms corporate presentation july final websiteVms corporate presentation july final website
Vms corporate presentation july final website
 
La réalité virtuelle en cours de démocratisation
La réalité virtuelle en cours de démocratisationLa réalité virtuelle en cours de démocratisation
La réalité virtuelle en cours de démocratisation
 
VIEWLEX # 08
VIEWLEX # 08VIEWLEX # 08
VIEWLEX # 08
 
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
Cours pour organisation et gestion de chantier télécharger : http://goo.gl/M2...
 
VIEWLEX # 04
VIEWLEX # 04VIEWLEX # 04
VIEWLEX # 04
 

Similar to Vms nan jtvir october 2012

Agm presentation feb 7 2012
Agm presentation feb 7 2012Agm presentation feb 7 2012
Agm presentation feb 7 2012aldridgeminerals
 
North American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN PresentationNorth American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN Presentation
Freeform Communications Inc.
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfaldridgeminerals
 
November updated 2011 nan vms combined shortened version
November updated 2011 nan vms combined shortened versionNovember updated 2011 nan vms combined shortened version
November updated 2011 nan vms combined shortened versionVMS Ventures
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Gold Corporation
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Gold Corporation
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013QMX Gold Corporation
 
AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012aldridgeminerals
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
QMX Gold Corporation
 
November 2012 Corporate Presentation
November 2012 Corporate PresentationNovember 2012 Corporate Presentation
November 2012 Corporate Presentation
QMX Gold Corporation
 
Agm presentation dec_12__2011
Agm presentation dec_12__2011Agm presentation dec_12__2011
Agm presentation dec_12__2011aldridgeminerals
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
QMX Gold Corporation
 
QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX Gold Corporation
 
QMX Gold Corporate Presentation Aug 2012
QMX Gold Corporate Presentation Aug 2012QMX Gold Corporate Presentation Aug 2012
QMX Gold Corporate Presentation Aug 2012QMX Gold Corporation
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013
QMX Gold Corporation
 
Agm presentation march 22 2012
Agm presentation march 22 2012Agm presentation march 22 2012
Agm presentation march 22 2012aldridgeminerals
 

Similar to Vms nan jtvir october 2012 (20)

Agm presentation feb 7 2012
Agm presentation feb 7 2012Agm presentation feb 7 2012
Agm presentation feb 7 2012
 
North American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN PresentationNorth American Nickel TSXV NAN Presentation
North American Nickel TSXV NAN Presentation
 
Nan aug 2012
Nan aug 2012Nan aug 2012
Nan aug 2012
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdf
 
November updated 2011 nan vms combined shortened version
November updated 2011 nan vms combined shortened versionNovember updated 2011 nan vms combined shortened version
November updated 2011 nan vms combined shortened version
 
Nan june 2012
Nan june 2012Nan june 2012
Nan june 2012
 
QMX Gold Corporate Presentation
QMX Gold Corporate PresentationQMX Gold Corporate Presentation
QMX Gold Corporate Presentation
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013
 
AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
November 2012 Corporate Presentation
November 2012 Corporate PresentationNovember 2012 Corporate Presentation
November 2012 Corporate Presentation
 
Agm presentation dec_12__2011
Agm presentation dec_12__2011Agm presentation dec_12__2011
Agm presentation dec_12__2011
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX marketing presentation September 2012
QMX marketing presentation September 2012
 
QMX Gold Corporate Presentation Aug 2012
QMX Gold Corporate Presentation Aug 2012QMX Gold Corporate Presentation Aug 2012
QMX Gold Corporate Presentation Aug 2012
 
QMX Gold Corporate Presentation
QMX Gold Corporate PresentationQMX Gold Corporate Presentation
QMX Gold Corporate Presentation
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013
 
Agm presentation march 22 2012
Agm presentation march 22 2012Agm presentation march 22 2012
Agm presentation march 22 2012
 

Recently uploaded

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
Ben Wann
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
Kumar Satyam
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 

Recently uploaded (20)

FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Improving profitability for small business
Improving profitability for small businessImproving profitability for small business
Improving profitability for small business
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
India Orthopedic Devices Market: Unlocking Growth Secrets, Trends and Develop...
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 

Vms nan jtvir october 2012

  • 1. Discovering High Grade Copper Deposits in Manitoba, Canada VMS:TSX.V Explorer to Producer NAN: TSX.V The World’s Next Nickel Belt John Tumazos Very Independent Research Conference October 2-3, 2012
  • 2. FORWARD-LOOKING STATEMENTS NOTE: Some of the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward-looking statements that involve various risks. The following are important factors that could cause the Company’s actual results to differ materially from those expressed or implied by such forward-looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. There can be no assurance that forward-looking statements will prove to be accurate as actual results and future events may differ materially from those anticipated in such statements. VMS Ventures Inc. undertakes no obligation to update such forward-looking statements if circumstances or management’s estimates or opinions should change. The reader is cautioned not to place undue reliance on such forward-looking statements.
  • 3. VMS VENTURES INC. VMS - TSX.V QUICK FACTS  Well funded junior with approximately $10.5M in the treasury.  Discovered the copper rich Reed Copper deposit in Manitoba in 2007. • JV Partner HudBay Minerals (T.HBM) is project operator; VMS costs carried to production. Project ownership is 70% HBM & 30% VMS.  Reed Copper deposit Prefeasbility announced in April 2012. Indicated CAPITAL STRUCTURE Reserve: 2.2M Tonnes of 3.83% Cu, 0.48 (as at September, 2012) g/t Au, 6.02 g/t Ag Issued & Outstanding: 129,668,399  Large, highly prospective land package in Warrants: 163,333 the prolific Flin Flon – Snow Lake Options: 7,484,850 Greenstone Belt of Manitoba Fully Diluted: 137,316,582  VMS owns ~27M sharesof North American Nickel
  • 4. VMS/NAN MANAGEMENT Rick Mark, M.Ed (Admin) CEO & Chairman VMS & NAN: Rick has over 25 years experience in the public market place. He is also CEO & Chairman of Harvest Gold Corporation (HVG-TSX.V), a December 2005 "spin off" from VMS, and is the President and CEO of Pancontinental Uranium Corp. (PUC-TSX.V). Neil Richardson P. Geo. COO, VMS& NAN: Neil has a long history of mineral exploration and mining experience with HudBay Minerals and others. As the COO of both companies, Neil is responsible for developing and implementing exploration programs . Mark Fedikow, HBSc., M.Sc., Ph.D., P.Eng., P. Geo., C.P.G. : President & Director NAN, VP Exploration VMS: Mark has 35 years of industry and government experience including Chief Geologist of the Mineral Deposits Section in Manitoba. He is a recipient of the Canadian national award for outstanding geoscientific achievement. John Roozendaal B.Sc, President of VMS, Director of NAN: John was the founding director of VMS Ventures Inc. He has 20 years of Mineral Exploration experience and was directly involved in the Reed Copper discovery. John Pattison, P. Geo., B.Sc. Chief Geologist VMS and NAN: John worked with Falconbridge Limited and associated companies for 19 years managing base metal, PGE and gold exploration projects throughout Canada and southern Africa. He is the lead project geologist for the Maniitsoq, Greenland nickel project. 4
  • 5. INDEPENDENT DIRECTORS & ADVISORY BOARD Independent Directors: Don Whalen, Director & Audit Committee Chair, VMS: Don was Executive Chairman and Director of High River Gold Mines. Before joining High River, he held numerous marketing, technical and management positions over a 29 year career with IBM Canada Ltd. Jim Clucas, Director & Audit Committee Member, NAN: Jim was Chief Financial Officer of Inco’s Canadian operations and has been involved in the development of several mineral deposits, including the Snow Lake Mine (High River Gold Mines), Montana Tunnels (Pegasus Mining) and the Fenix Project in Guatemala. He was the founder of International Nickel Ventures Inc. which acquired and developed the Santa Fe/Ipora Nickel Laterite deposit in Brazil. Jim is currently President and CEO of Search Minerals Advisory Board Cashel Meagher B.Sc. P. Geo.: Cashel is currently Vice President South America Business Unit of Hudbay Minerals. He has worked with the technical and management teams at VMS Ventures and North American Nickel through the Reed Lake joint venture with VMS. Prior to joining Hudbay, Cashel held management positions with Vale Inco in exploration, technical services, and mine operations. Mike Muzylowski: Mike has played key roles in the discovery of 15 Canadian mines, 13 in Manitoba, during his distinguished career as a geologist, geophysicist and senior mining executive. James M. Patterson B.A. D.I.C. Ph.D. P. Geo.: Jim a former VP Exploration for FNX Mining Company, has over 40 years experience in mineral exploration with major and junior exploration companies, government and international development agencies. 5
  • 6. REED MINE RIBBON CUTTING CEREMONY, AUGUST 2012
  • 7. REED COPPER DEPOSIT VMS-HudBay JV • VMS owns 30% and is carried to production • Prefeasibility report indicates 2,157,000 tonnes of 3.83% Cu, 0.59% Zn and 0.48 g/t Au • NPV 8% @ $3.75 Cu = $191,361,000; IRR 68.40% • Borehole Pulse Electromagnetic targets indicate the deposit is open at depth Open down plunge
  • 8. ORE BODIES TEND TO GROW IN THE FLIN FLON BELT After K. Gilmore (Hudbay Minerals), 2007
  • 9. REED COPPER DEPOSIT: CASH FLOW WITHIN SIGHT The high grade nature of the Reed Copper deposit gives the project strong leverage to copper prices. The following table shows a copper price sensitivity analysis based on the operating parameters set out in the prefeasibility. Prefeasibility 3 Year Historical Base Case (1) Average Price Case (2) Cu = $3.75/lb USD (3) Price and Exchange Averages Copper (USS/lb) $2.95 $3.20 $3.75 Gold (US$/oz) $1,269.00 $1,235.00 $1,235.00 Silver (US$/oz) $24.78 $22.85 $22.85 US$/CDN$ 0.95 0.94 0.92 Pre-tax Cash Flow $102,426,000 $182,975,000 $300,964,000 NPV 8% $57,443,000 $109,904,000 $191,361,000 IRR 34.70% 46.60% 68.40% (1) Prefeasibility Base Case metal prices projections compiled by HudBay based on 11 well- known financial institutions. (2) Bloomberg three year historical average (December 1, 2008 to December 1, 2011) (3) $3.75 copper price for perspective on valuation impact of copper price
  • 10. VMS VENTURES – HUDBAY JV & OPTIONS PROJECTS VMS-Hudbay JV Reed North zone • 30-70 joint venture, VMS carried to production. • Hudbay is operator. • NI 43-101 Geological Resourced April, 2011 • Prefeasibility announced April 2012 Reed Copper deposit • Reed Copper Deposit opening Ceremony August 2012 • Production slated to begin in Q4 2013 4 Option Agreements • HudBay is operator. • $2.6 M in cumulative expenditures to earn 70%. 2012 HIGHLIGHTS Prefeasibility study completed on Reed Copper project Bulk sample and underground development permits in place Reed Copper Deposit Opening Ceremony, August 2012
  • 11. VTEM COVERAGE OVER VMS’ 100% OWNED PROJECTS • Many recent discoveries, including VMS’s Reed Lake Deposit, were made with VTEM • VMS Ventures has flown over 17,000 line-km of VTEM over its projects, majority flown at 100 m line spacing. • 5 years and $13 million in work – Targets ready to drill.
  • 12. VMS 2012 ACTIVITIES HudBay JV: The Reed deposit, Manitoba’s next copper mine • Prefeasibility report announced April 2, 2012 • Mine Portal entrance established • Reed Copper Deposit opening ceremony August 14, 2012 • Production commences Q4 - 2013 VMS 100% Owned Properties Manitoba Projects • Recently acquired Reed/East West project has eight new targets for drilling in winter 2012. Sudbury Projects • Golden Pine, Black Creek & Terra Incognita scheduled for prospecting/trenching in Q2, auger drilling and diamond drilling in Q3 – Q4 North American Nickel (VMS owns ~27M shares) Maniitsoq project is being drilled; own VMS or NAN for discovery upside
  • 13. NORTH AMERICAN NICKEL INC. NAN - TSX.V QUICK FACTS  Acquired the large, prospective Maniitsoq property in Greenland in August, 2011  High-grade nickel intercepts in historic drill holes: 9.85 m at 2.67% Ni and 60% Cu at Imiak Hill 12.89 m averaging 2.24% Ni and 0.63% Cu at Fossilik  Drill program underway at Maniitsoq. Approx. 2,000 m of diamond drilling planned. CAPITAL STRUCTURE  Over 3,500 line kilometres flown in a VTEM (as at September, 2012) Plus survey in July. Issued & Outstanding: 77,230,193  Sudbury Ontario land position includes the Warrants: 39,733,950 Post Creek, Halcyon and Wahnapitae Options: 7,633,000 properties. Fully Diluted: 124,597,143  VMS owns ~27M shares. Slide 13
  • 14. MANIITSOQ PROJECT, GREENLAND Maniitsoq (looking east towards the project area) 100% interest in a giant property covering 4,983 km2 of the highly prospective, but underexplored, Greenland Norite Belt. Located on tide water (navigable year- round) on the southwest coast of Greenland, near the village of Maniitsoq.
  • 15. Maniitsoq Project A World Class Nickel Camp? • Underexplored (previous hole lengths averaged < 60 m) but lots of high-grade historical assays (e.g. 9.85 m @ 2.67% Ni and 0.60% Cu). • Strong evidence of a large-scale, long lived mafic igneous event. • Major, deep seated structures that were active from the Archean through to the Mesozoic. • Intrusions hosting the mineralization appear to have been part of a dynamic magma conduit system. • Proof that modern helicopter geophysical technology is significantly more effective in this rugged terrain than techniques used in the past. • Over 70 conductive zones identified to date across the entire 75 km Greenland Norite Belt. Slide 15
  • 16. Maniitsoq Project Location • Situated in a safe, stable, mining-friendly jurisdiction. • Close to tide water that is navigable year-round. • Straight forward permitting process. • No land claims issues. • Mine development activities nearby including road and deep water port construction (London Mining’s Isua Iron project). Slide 16
  • 17. Regional Setting Property Geology GREENLAND • Abundant Ni-Cu sulphide showings NORITE BELT associated with noritic intrusions. • Norites are concentrated in, but not restricted to, a J-shaped belt 75 km long by up to 15 km wide that wraps around the Finnefjeld Gneiss Complex. • Intrusion of nickeliferous norites over a period of time spanning at least one complete geomagnetic reversal. Slide 17
  • 18. Many Ni-Cu Setting Regional Showings • 14 significant Ni-Cu showings. Most are concentrated in the Greenland Norite Belt (GNB) outlined here by purple dashed lines. • All showings were discovered by Kyrolitselskabet Øresund A/S (KØ) between 1962 and 1972 through surface prospecting. • KØ made numerous intersections including: 9.85 meters averaging 2.67% Ni and 0.60% Cu at Imiak Hill 12.89 meters averaging 2.24% Ni and 0.63% Cu at the Fossilik showing. • KØ drilled 119 holes totalling 6,287 m (i.e. average hole <55 m long) to test outcropping norites, exposed sulphide mineralization and shallow electromagnetic (EM) anomalies directly associated with exposed mineralization. This was the only drilling for nickel in the GNB. Slide 18
  • 19. Deposit Model VERTICAL SECTION Deposition of Ni-Sulphides in a Magma Conduit System PRESENT DAY • Superheated noritic magma flows EROSION LEVEL through gneiss and paragneiss in an open system. • Gneiss is assimilated by the hot magma and triggers sulphide saturation. • Ni + Cu ± PGE sulphides are deposited in zones of lower velocity within the magmatic plumbing system. • Continual magma flow upgrades nickel tenor of sulphide. Modified after Maier et al., 2001 Slide 19
  • 20. Consistently High Nickel Tenor Ni vs. S for Historical GNB Drill Core • GNB sulphides have a relatively consistent Typical 100% sulphide mixture of Po+Cp+Pn contains 35.7% S nickel tenor of 6 to Kerr, 2003 8% Ni recalculated to 100% sulphide. Nickel wt. % • Presence of pyrite means there is more S for a given amount DRILL CORE of sulphide than in typical magmatic sulphide deposits consisting mainly of pyrrhotite-pentlandite and chalcopyrite. After Shore, 2000 Sulphur wt. % (Falconbridge Limited) Slide 20
  • 21. Previous Exploration Stymied by Lack of Conductive Targets Cominco 1995 – 1996 • 20,446 line-km of airborne GeoTEM EM and magnetic surveying. – Lines 200-400 m apart oriented 080° (i.e. subparallel to orientation of norites resulting in poor coupling). – Large fixed wing aircraft had difficulty hugging the rugged terrain resulting in noisy data. – Very few anomalies associated with norites. – Ground follow-up prospecting, minor surface geophysics (<30 line-km) but no drilling. Falconbridge 1993 & 2000 • 100 line-km of UTEM over Imiak Hill and part of Fossilik. – Lines 200 to 400 m apart. – No conductors detected and no drilling done. Slide 21
  • 22. Now Many Targets Thanks to Modern Regional Setting Helicopter Geophysics • SkyTEM and VTEM helicopter-borne TEM surveys flown by NAN in 2011 and 2012 have detected over 75 conductive zones (circled in red on the adjacent map). • This technology was not available to previous explorers in the belt. • NAN has flown the areas outlined in green, which total 860 km2 and cover a major portion of the GNB. • Interpretation of the 2012 data is in progress. To date over 75 conductive zones have been identified (circled in red on map). Slide 22
  • 24. 3D EM Modeling Target B1-J TARGET B1-J (IMIAK HILL): 3D VIEW LOOKING WEST • 170 m long by 16 m wide conductor that comes to surface and is directly coincident with the Imiak Hill showing. • The model shows that the mineralization strikes parallel to most of the historical drilling and therefore has not been properly tested. • The model has very limited dip extent (21 m) but the best intersection on the showing (9.85 m averaging 9.85m @ 2.67% Ni, 0.60% Cu 2.67% Ni and 0.60% Cu) occurs 130 m below surface indicating that strong mineralization at surface is FO OTWALL masking the EM response from mineralization at depth. CONTACT OF N ORITE E STRIK 9.85m @ 2.67% Ni, 0.60% Cu Slide 24
  • 25. Target B1-J Down hole 3D Model Slide 25
  • 26. 3D EM Modeling Target B1-L TARGET B1-L (SPOTTY HILL): 3D VIEW LOOKING NORTH • Modeled as a 330 x 100 m flat-lying conductor located 160 m below surface within a norite intrusion. ~ 160 m BELOW SURFACE (i.e. 100 m BENEATH • The conductor is untested but PREVIOUS DRILLING) past shallow drilling 100 m above intersected weakly 330 m 100 m disseminated, nickeliferous sulphides grading up to 0.52% Ni and 0.26% Cu over 12.94 m. • Clearly, mineralizing processes were at work in the intrusion as indicated by the disseminated near-surface mineralization and the most logical location to look for massive sulphides is at depth. Slide 26
  • 27. Investor Risk Mitigation  100% ownership; Camp-sized land package (Sudbury)  Public Co management/financing experience  Technical team is deep  Secure political jurisdiction  Regional setting; year round exploration  Historic exploration data is remarkable ($10M plus)  Geology  Abundance of Ni-Cu occurrences at surface & in drilling  Undeformed norite host rocks  Mineralization: inclusion-bearing sulphides  Nickel Tenor – consistent and economic grade  New technologies in “old” camp work – 25 EM targets in 8% of land package Slide 27
  • 28. Plans for 2012 & Beyond 2012 – Immediate Priority • 3,000 line-km of helicopter TEM over prospective norites in southern part of the norite belt. • Ground truth conductive target zones among 75 identified by SkyTEM and VTEM Plus surveys • Minimum 2,000 m of drilling. • Prospecting outside of main norite belt looking for new showings and norites. • Estimated cost $3.0 million 2013 • Minimum 6,000 m of follow-up drilling on targets derived from 2012 work • 2,000 line-km of helicopter TEM • Estimated cost $ 7.5 million. Slide 28
  • 29. Discovering High Grade Copper Deposits in Manitoba, Canada VMS:TSX.V Explorer to Producer NAN: TSX.V The World’s Next Nickel Belt John Tumazos Very Independent Research Conference October 2-3, 2012