Vinod Gupta School of Management
Placement Brochure 2012-13
The School                                            2

           Mission                                               2

           A Business School on its way up                       2

           The MBA Programme                                     2

           The EMBA Programme                                    2

           MBA Admission Process                                 3
Contents



           Facilities@Campus                                     3

           MBA Curriculum                                        4

           EMBA Curriculum                                       5

           Options for Electives at VGSOM                        6

           Batch Profile                                         7-46

           Life @ Campus                                         47

           Campus Events                                         47

           Saamanjasya                                           47

           Madison Avenue                                        47

           Shraddha                                              48

           VPL - VGSOM Premiere League                           48

           Kshitij                                               48

           SpringFest                                            48

           Clubs & Committees                                    49

           Corporate Interaction (Guest Lectures)                50

           Faculty Profiles                                      51-53

           Placements                                            54

           Recruiter Speak                                       55

           Contact Details of Placement Committee Coordinators   56
Vinod Gupta School of Management



     The School
     Vinod Gupta School of Management established in 1993, was the first school of management to be setup within the IIT system.
     It was initiated by a distinguished alumnus and a life time fellow of the Institute, Mr. Vinod Gupta.

     Mission
     "To develop outstanding management professionals and future CEOs, who will lead organizations especially in technology-
     driven and knowledge-based industries, in the service of the nation and community."


     A Business School on its way up
     VGSOM synergizes the latest management education while leveraging the technical competence of IIT Khargapur. The
     founders of IIT Kharagpur felt the need to utilize competencies and resources possessed by the institute to impart superior
     quality of management education. VGSOM has contributed significantly towards management education in India over the
     last two decades.

     The school offers both full-time MBA as well as a special EMBA programme for working executives. Apart from these, VGSOM
     runs one of the largest doctoral programmes in management and conducts MDPs which are short duration programmes
     for practicing managers in various functional areas.




      The MBA Programme                                                The EMBA Programme
      The flagship programme of the School leads to the                Over the years the school has moved beyond the sphere
                                                                       of regular MBA programme. The school has two
      degree of Master of Business Administration from IIT
                                                                       programmes for working executives - EMBA at the Kolkata
      Kharagpur. This is a full-time four-semester (2 year)            and Bhubaneswar campuses of IIT Kharagpur which
      residential programme for graduate engineers and                 leads to the degree of Master of Business Administration
      Masters' degree holders in science, economics and                from IIT Kharagpur. With the ever increasing pace of
                                                                       knowledge creation and knowledge obsolescence, a
      commerce, intending to pursue management careers in
                                                                       professional can no longer presume to be a high achiever
      India or abroad.                                                 over his entire career banking upon his initial professional
      The MBA curriculum has evolved to be among the best              qualification. There is growing need for high quality
                                                                       Executive MBA Programs that is recognized worldwide.
      in the country combining the traditional strengths of IIT
                                                                       The 3 Years EMBA programme enables working
      in technical education with modern management
                                                                       executives to upgrade their managerial knowledge and
      philosophy. Teaching techniques include a judicious mix          skill while continuing to be employed. This rigorous fully
      of lectures, case-studies, group projects and workshops.         classroom based programme is held during weekends.
      A two-month summer internship in industry exposes                The participants bring in their wide experiences into the
                                                                       classroom and work on regular individual and group
      students to practical management problems. The core
                                                                       projects. Throughout the programme, the participants
      of the programme includes compulsory courses in Human            practice the concepts learnt in classrooms at their
      Resource Management, Production & Operations,                    workplace. This parallel learning and implementation
      Marketing, Finance, Information Systems Management,              process is very fundamental to this programme.
      Organizational Behavior, Economics, Strategic                    This 12 trimester programme has been conceived
                                                                       benchmarking similar offerings by leading B-schools in
      Management, Legal Aspects of Business, Business Ethics,
                                                                       India and the world; for content, mode of delivery,
      Quantitative Methods and Business Communication. A               curricula design and course structure. It consists of a
      large number of electives from across several IIT                compulsory set of core subjects and a variety of elective
      departments are available for a student to pursue his/her        subjects - similar offerings as in the full time MBA
      individual interests in greater depth. In addition, all          programme. An international immersion in a foreign
                                                                       country exposes students to a different macroeconomic
      peripheral administrative functions in the school are
                                                                       environment and culture. In the last three terms, the
      managed by students in team mode to inculcate team               participants engage themselves in individual projects
      orientation in them.                                             where they attend to a real life problem.


02
www.som.iitkgp.ernet.in




MBA Admission Process                                           Facilities@Campus
VGSOM admits students on the basis of the Common                Students and faculty of VGSOM have access to cutting edge
Admission Test (CAT), which is also used by the IIMs, IITs      infrastructure. They have access to the central library which
and other top B- schools in India. However, unlike other B-     has an online avatar too. The school's computer laboratory
schools a candidate must have a first class Bachelor's degree   is equipped with the most up to date hardware and software
in Engineering/Technology or a first class Masters' degree      technology. The school provides on-campus residential
in Science (with Mathematics or Statistics and bachelor's       accommodation facility to all its students as well as faculty
level), Economics or Commerce to be admitted in VGSOM.          which are equipped with high speed wireless connectivity.
Eligible candidates are called for group discussion and
personal interview based on their CAT percentile, academic
consistency and quality of work experience. The school
selects students who have the necessary aptitude and the
right attitude for a career in management.
A typical class has enough diversity of gender, disciplines,
experience, region and language so as to contribute diverse
perspectives to any discussion which is considered essential
in management learning.




                                                                                                                                03
Vinod Gupta School of Management



     MBA Curriculum

                                                First Semester

      FINANCIAL         ORGANIZATION          COST &                  ECONOMICS FOR       HUMAN BEHAVIOR
      ACCOUNTING &      DESIGN, CHANGE &      MANAGEMENT              MANAGEMENT          & MANAGEMENT
      REPORTING         TRANSFORMATION        ACCOUNTING



      STATISTICAL       MATHEMATICAL          MANAGEMENT              MARKETING I         ORAL BUSINESS
      METHODS FOR       MODELS FOR            INFORMATION                                 COMMUNICATION
      MANAGEMENT        MANAGEMENT            SYSTEMS
                        DECISIONS


                                              Second Semester

      CORPORATE         BUSINESS RESEARCH     BUSINESS, GOVERNMENT & INTERNATIONAL        STRATEGIC
      FINANCE           METHODS               ECONOMIC ENVIRONMENT                        MANAGEMENT




      HUMAN             PRODUCTION &          IT & BUSINESS           MARKETING II        WRITTEN BUSINESS
      RESOURCE          OPERATION             APPLICATIONS                                COMMUNICATION
      MANAGEMENT        MANAGEMENT            LABORATORY



      Summer Internship Project at Leading Corporations for a duration of 2 months (Month of May -July)

                                               Third Semester

       BUSINESS LAW FOR MANAGERS            TECHNOLOGY MANAGEMENT             APPLIED MANAGEMENT RESEARCH
                                                                                        PROJECT

                                       Plus a choice of seven electives

                                              Fourth Semester

       ORGANIZATIONAL              BUSINESS ETHICS            COMPREHENSIVE VIVA      APPLIED MANAGEMENT
       LEADERSHIP                                                                     RESEARCH PROJECT



                                       Plus a choice of seven electives



                                    Entire Course Duration is of 24 Months




         MBA in Finance, Marketing, Operations, Systems, General Management and Human Resource


04
www.som.iitkgp.ernet.in



EMBA Curriculum
                                               First Trimester
STATISTICAL METHODS FOR        ECONOMICS FOR                     MARKETING I              BUSINESS
      MANAGEMENT                MANAGEMENT                                              COMMUNICATION

                                           Second Trimester
MATHEMATICAL MODELS FOR IT & BUSINESS APPLICATIONS         HUMAN RESOURCE          FINANCIAL ACCOUNTING &
 MANAGEMENT DECISIONS          LABORATORY                    MANAGEMENT                  REPORTING

                                               Third Trimester
BUSINESS, GOVERNMENT &           STRATEGIC                       CORPORATE               MARKETING II
INTERNATIONAL ECONOMIC          MANAGEMENT                        FINANCE
     ENVIRONMENT

                                           Fourth Trimester
    BUSINESS LAW FOR         BUSINESS RESEARCH             HUMAN RESOURCE             PRODUCTIONS AND
       MANAGERS                   METHODS                    MANAGEMENT            OPERATIONS MANAGEMENT

                                               Fifth Trimester
  COST & MANAGEMENT             SUPPLY CHAIN                 TECHNOLOGY                   ELECTIVE I
     ACCOUNTING                 MANAGEMENT                   MANAGEMENT

                                               Sixth Trimester
MANAGEMENT INFORMATION     MARKETING OF INDUSTRIAL               ELECTIVE II              ELECTIVE III
       SYSTEMS              AND HITECH PRODUCTS

                                           Seventh Trimester
    ORGANIZATIONAL               ELECTIVE IV                     ELECTIVE V               ELECTIVE VI
      LEADERSHIP

                                           Eighth Trimester
    BUSINESS ETHICS            INTERNATIONAL                     ELECTIVE VII            ELECTIVE VIII
                                MANAGEMENT

                                               Ninth Trimester
          MANAGEMENT                              PROJECT                            ELECTIVE IX
            GAMES                               MANAGEMENT

                          INTERNATIONAL IMMERSION TO A FOREIGN COUNTRY
                                Tenth, Eleventh and Twelfth Trimester
                                       MANAGEMENT PROJECT



                                 Entire Course Duration is of 36 Months




    MBA in Finance, Marketing, Operations, Systems, General Management and Human Resource


                                                                                                            05
Vinod Gupta School of Management



     Options for Electives at VGSOM
       Electives of 3rd semester                  Electives of 4th semester

       INTERNATIONAL MANAGEMENT                   PURCHASING AND OUTSOURCING

       ENTREPRENEURSHIP & NEW VENTURES            INTERNATIONAL ECONOMICS

       FINANCIAL MARKETS & INSTITUTIONS           CORPORATE GOVERNANCE

       SECURITY ANALYSIS & PORTFOLIO MANAGEMENT   IT FOR BUSINESS INTELLIGENCE

       COMMERCIAL BANKING                         MANUFACTURING STRATEGY

       ENTERPRISE RESOURSE PLANNING               SOFTWARE PROJECT MANAGEMENT

       INFORMATION SYSTEM STARTEGY                BUSINESS TO BUSINESS MARKETING

       SUPPLY CHAIN MANAGEMENT                    ECONOMETRIC AND BUSINESS FORECASTING

       SERVICES MANAGEMENT                        ECONOMETRIC MODELING

       RISK MANAGEMENT                            E-COMMERCE TECHNOLOGY & APPLICATION

       MARKETING RESEARCH                         INFORMATION SECURITY & RISK MANAGEMENT

       MARKETING STRATEGY                         COMMODITY DERIVATIVES & RISK MANAGEMENT

       INDUSTRIAL RELATION & LABOUR LAWS          CONSUMER BEHAVIOUR ANALYSIS

       PROJECT MANAGEMENT                         SALES & DISTRIBUTION MANAGEMENT

       ECONOMETRIC AND BUSINESS FORECASTING       SERVICES MARKETING

       COMMODITY DERIVATIVES & RISK MANAGEMENT    RETAIL MARKETING

       HUMAN RESOURCE DEVELOPMENT                 MARKETING ENGINEERING

       ORGANIZATIONAL DEVELOPMENT                 SIX SIGMA

                                                  DERIVATIVES & RISK MANAGEMENT

                                                  MERGERS, ACQUISITION & CORPORATE RESTRUCTURING

                                                  INTERNATIONAL FINANCIAL MANAGEMENT

                                                  FINANCIAL MODELING

                                                  INFRASTRUCTURE & PROJECT FINANCE

                                                  HR AUDIT

                                                  INTERCULTURAL COMMUNICATION COMPETENCE




06
BATCH PROFILE 2011-2013




        Vinod Gupta School of Management
VGSOM       Dream    Dare   Deliver

MBA Batch Profile 2011-2013




                     Experience Wise Breakup of 2011-2013 Batch




                     Stream Wise Breakup of 2011-2013 Batch




                                                                  07
Vinod Gupta School of Management



     Experience (0-11 Months)




      ABHINAV GUPTA                            ABHINAV M                              ABHISHEK MONDAL

     B.Tech, Biotechnology                    B.E, Electronics and Instrumentation   B.Tech, Electrical Engineering
     Udaya School of Engineering, Anna        Engineering                            Haldia Institute of Technology, WBUT
     University                               St. Joseph's College of Engineering,   Work Experience: Bonti Corporate
     Summer Internship: Supply Chain          Anna University                        services Pvt. Ltd. (4 months)
     Analytics (Multi-Modal Order Splitting   Work Experience: Cognizant             Summer Internship: Sales and
     Algorithm) at HP.                        Technology Solutions (11 months)       Marketing of Lead Generation at
                                              Summer Internship: Market              Omnitech Global
                                              Research in the field of tractor
                                              finance at Sundaram Finance Limited.




      GARIMA NAGAR                             KUNAL VERMA                            MADHVI AGARWAL

     B.Tech, Computer Science and             B.Tech, Computer Science and           B.Tech, Computer Science and
     Engineering                              Engineering                            Engineering
     YMCA Institute of Engineering,           IEC-CET, GBTU                          Amity School of Engineering and
     Faridabad, Mahrshi Dayanand              Summer Internship: Credit gap          Technology, Amity University
     University, Rohtak                       calculation using gender baseline      Summer Internship: Wastage
     Summer Internship: Analysis of           survey for Risk Advisory Services at   Control on Coconut Oil Packaging
     Demand of Steel in Cold Storage at       Ernst & Young.                         Chain at Dabur India Ltd.
     JSW Steel Limited.




08
BATCH PROFILE 2011-2013




 MRIDUL BORGOHAIN                        POOJA GUPTA                              RUCHA VISHNU PUNDLE

B.Tech, Electronics and                 B.Tech, Electronics and                  B.E, Electronics Engineering
Communication Engineering               Communication Engineering                Vishwakarma Institute of Technology,
Tezpur University                       St. Thomas' College of Engineering       Pune University
Work Experience: HCL Technologies       & Technology, WBUT                       Work Experience: Persistent
(6 months)                              Summer Internship: Market                Systems Ltd. (6 months)
Summer Internship: Comprehensive        Development and Value Generation         Summer Internship: Incorporation
study on MAK HMO- Tea Spray Oil at      of Residues at Vedanta- Hindustan        of Project Financials in CSI Project
BPCL.                                   Zinc Limited.                            Governance System at Ericsson India
                                                                                 Global Services Pvt. Ltd.




 SOUMITRA SAHU                           SOURABH RATHORE                          SRINIVASAN M

B.Tech, Mechanical Engineering          B.E, Computer Science and                B.E, Electronics and Communication
C. V. Raman College of Engineering,     Engineering                              Engineering
Biju Patnaik University of Technology   LaxmiNarain College of Technology,       Birla Institute of Technology, Mesra
Work Experience: J. K. Paper Ltd.       Bhopal, Rajiv Gandhi Proudyokigi         Summer Internship: Sales Planning
(2 Months)                              Vishwavidyalaya                          and generation at Advatech
Summer Internship: Improve the          Work Experience: Tata Consultancy        Healthcare Pvt. Ltd.
market penetration by enhancing the     Services (9 months)
marketing activities thereby            Summer Internship: Benchmarking
improving the visibility of Omnitech    of UBC and its financial implications;
Global among its prospects.             Minimization of transportation cost;
                                        benchmarking of wheeling charges
                                        of electricity in Malco at Vedanta
                                        Aluminium Ltd.


                                                                                                                        09
Vinod Gupta School of Management




      VIVEK KUMAR

     B.Tech, Information Technology
     Galgotias College of Engineering and
     Technology, Uttar Pradesh Technical
     University
     Summer Internship: Manpower
     optimization at BPCL.




     Experience (12-23 Months)




      AMANPREET SINGH ARORA                  AMBILI PRABHAKARAN                     ANKIT VADHERA

     B.Tech, Computer Science and           B.Tech, Information Technology         B.Tech, Electronics and
     Engineering                            LBS College of Engineering,            Communication Engineering
     Jaypee University of Information       Kasaragod Kerala, Kannur University    BhartiVidyapeeth's College of
     Technology, Solan                      Work Experience: State Bank of         Engineering, New Delhi, Guru Gobind
     Work Experience: Accenture             Travancore (21 months)                 Singh Indraprastha University
     Services Pvt. Ltd. (12 months)         Summer Internship: Six sigma           Work Experience: Aricent
     Summer Internship: Formulation of      project on Rang De social investors'   (18 Months)
     Internet Marketing Strategy and        redemption request process and         Summer Internship: Gender
     Business Development at Asclepius      analysis of Rang De field partner      baseline SME data analysis for
     Consulting                             performance.                           International Finance Corporation at
                                                                                   Ernst and Young.




10
BATCH PROFILE 2011-2013




                                                                              BHARATHI CHELLAKKANNAN
ANKUR BANGA                              ASHWIN VARIYAR
                                                                              ALAGAPPAN
B.E, Electronics and Communication      B.Tech, Information Technology       B.E, Electronics Engineering
Engineering                             Indian Institute of Information      K.J.SOMAIYA College of Engineering,
Punjab Engineering College,             Technology Allahabad                 Mumbai University
Chandigarh (Deemed University)
                                        Work Experience: Advanced            Work Experience: Atos Origin India
Work Experience: Accenture
                                        Technologies (India) (12 months)     Pvt. Ltd. (22 months)
Services Pvt. Ltd. (19 months)
                                        Summer Internship: Marketing         Summer Internship: Data Analytics
Summer Internship: Determinants
of US Dollar Interest Rate Swap Rates   Strategy and Selection of Online     of Business proposals funded by
/ Determinants of Forward Premia in     Platform Partner at Elite Academy.   NSDC &Website design and
Indian Forex Market / CRR & SLR                                              development for UDAAN project
Maintenance process documentation
at ING Financial Markets.




 BINEET KUMAR CHATURVEDI                 DINESH KUMAR T                       KRISHNA MOHAN M

B.E, Mechanical Engineering             B.E, Electronics and Communication   B.Tech, Telecommunication
SIR MVIT, VTU                           Engineering                          Engineering
Work Experience: Cummins India          Institute of Road and Transport      Vellore Institute of Technology, VIT
Limited (22 months)                     Technology, Anna University          University
Summer Internship: Strategic            Work Experience: Cognizant           Work Experience: Tata Consultancy
opportunities for services industries   Technology Solutions (19 months)     Services (7 months)
in North American Shale gas market      Summer Internship: Equity research   Zigma Solutions (11 months)
at Frost & Sullivan.                    and analysis at TVS Capital.         Summer Internship: New
                                                                             Technology Trends impacting
                                                                             business in LEs and SMEs: CIO Survey
                                                                             at Deloitte




                                                                                                                    11
Vinod Gupta School of Management




      MANISH GUPTA                         MOULI GHATAK                             MUNMUN BISWAS

     B.E, Information Technology          B.Tech, Information Technology           B.Tech, Information Technology
     Compucom Institute of Information    Institute of Engineering and             National Institute of Technology
     Technology and Management,           Technology, Lucknow, UP                  Durgapur
     University of Rajasthan              TechnicalUniversity                      Work Experience: Tata Consultancy
     Work Experience: Norvech Coxeta      Work Experience: Tata Consultancy        Services (20 months)
     Technologies Inc. (9 months)         Services (20 months)                     Summer Internship: Creation of
     SVA Consortium (India) Pvt. Ltd.     Summer Internship: Sales Planning        B2B/B2C marketing and distribution
     (10 months)                          and Generation at Advatech               channel for Online and BOP
     Summer Internship: Credit Analysis   Healthcare Ltd.                          institutions at Swabhimaanya.
     of Small and Medium Enterprises at
     Punjab National Bank.




     SAGAR NAVEEN ZALAVADIYA               SAUVIK SEKHAR SEAL                       SHASHWATH R RAO

     B.Tech, Computer Science and         B.Tech, Information Technology           B.E, Electronics and Communication
     Engineering                          B.P.Poddar Institute of Management       Engineering
     National Institute of Technology     & Technology, WBUT                       Canara Engineering College, VTU
     Hamirpur                             Work Experience: Tech Mahindra           Work Experience: Infosys
     Work Experience: Sapient             Ltd. (16 months)                         Technologies Limited
     (12 months)                          IBC Systems (2 months)                   (20 months)
     Summer Internship: Negotiation       Summer Internship: A POC for             Summer Internship: Branding &
     and Execution of Third Party         Mobility Applications in the Insurance   Positioning of Ramco ERP Products
     Contracts and Establishment of a     Industry at Deloitte                     at Ramco Systems.
     BPO for CRM Activities at Titan
     Industries Limited.




12
BATCH PROFILE 2011-2013




 SIVA KUMAR PEDHAPATI                  SOURABH CHATURVEDI                      YASH MEHTA

B.Tech, Civil Engineering             B.Tech, Mechanical Engineering          B.E, Electronics and Communication
College of Engineering, Jawaharlal    Sikkim Manipal Institute of             Engineering
Nehru Technological University,       Technology, Sikkim Manipal University   L.D. College of Engineering, Gujarat
Kakinada                              Work Experience: Infosys Limited        University
Work Experience: Tata Consultancy     (20 Months)                             Work Experience: Infosys Limited
Services (14 months)                  Summer Internship: ATM Operation        (20 months)
Summer Internship: Market             Management (Process Optimization        Summer Internship: Business
research and Conceptualization of     and Standardization) at FIS.            Research at Triton - Identification of
new products for kids segment at                                              products that company should start
Titan Industries                                                              supplying by assessing frozen
                                                                              seafood market size in Mumbai.

Experience (24-35 Months)




 AAYUSH NANGRU                         ABHINAV VOHRA                           ABHISHEK AWASTHI

B.E, Information Technology           B.Tech, Computer Science                B.Tech Mechanical Engineering
University Institute of Engineering   Engineering                             Raj Kumar Goel Institute of
and Technology, Panjab University     Maharaja Agrasen Institute of           Technology, Ghaziabad, UPTU
Work Experience: Infosys Limited      Technology, Guru Gobind Singh           Work Experience: Permaweld Pvt.
(24 months)                           Indraprastha University                 Ltd. (12 months)
Summer Internship: Healthcare         Work Experience: Tata Consultancy       Reliance Industries Ltd. (22 months)
Dashboards at Deloitte.               Services Ltd. (32 months)               Summer Internship: Brand
                                      Summer Internship: Analysed the         Positioning Analysis &
                                      flavored tobacco market and             Communication Strategy at PEBS
                                      developed a launch strategy for         Pennar.
                                      Flavored Cigarettes (where the
                                      flavors were based on popular
                                      Hookah Flavors), as part of New
                                      Product Offering, Marketing, at
                                      Godfrey Phillips India Ltd.
                                                                                                                       13
Vinod Gupta School of Management




      ABHISEKH RANJAN                           ABISHEK THAMPAN P                      AKHIL SOOD

     B.Tech, Mining Engineering                B.Tech, Computer Science and           B.Tech, Electronics and
     IT BHU, Banaras Hindu University          Engineering                            Telecommunication Engineering
     Work Experience: Tata Steel Ltd.          College of Engineering, Trivandrum,    College Of Engineering Roorkee,
     (24 months)                               Kerala University                      Roorkee, U.P. Technical University

     Summer Internship: Process                Work Experience: Computer              Work Experience: Infosys
     Efficiency Improvement relates to         Sciences Corporation                   Technologies Limited, Pune
     Production and Utilities at Heinz India   (35 months)                            (25 months)
     Ltd.                                      Summer Internship: Profitability and   Summer Internship: Improving
                                               efficiency enhancement of Analytics    Supply Chain Visibility by creating
                                               products at Redwood Associates.        dashboards. Supplier valuation/rating
                                                                                      for the client at Deloitte




      ANASWARA K R                              ANIRBAN DATTA                          ARUN KABRA

     B.Tech, Electronics and                   B.Tech, Electronics and                B.E, Electronics Engineering
     Communication Engineering                 Communication Engineering              Vishwakarma Institute of technology,
     College of Engineering, Trivandrum,       St. Thomas' College Of Engineering     Pune University
     Kerala University                         and Technology, WBUT                   Work Experience: Cognizant
     Work Experience: State Bank of            Work Experience: Cognizant             Technology Solutions (30 months)
     India (24 months)                         Technology Solutions                   Summer Internship: Process
     Summer Internship: Comparative            (31 months)                            Optimization of Monitoring Activities
     Analysis of Investments in Mutual         Summer Internship: Market Analysis     at National Skill Development
     Funds and Life Insurance Products         & Sales of the medical ERP,"Charak"    Corporation
     at Bank of Baroda.                        at Asclepius Consulting &
                                               Technologies.




14
BATCH PROFILE 2011-2013




 ASHAF FARAZ KHAN                         ASHISH MEHTA                            AVEEK MUKHOPADHYAY

B.Tech, Computer Science and             B.Tech, Electrical Engineering          B.E, Computer Science and
Engineering                              National Institute Of Technology,       Engineering
Vellore Institute of Technology, VIT     Kurukshetra                             Jadavpur University
University
                                         Work Experience: Tata Power             Work Experience: Tata Consultancy
Work Experience: Bank of America         (TPDDL) (25 months)
- Global Markets Research and                                                    Services (33 months)
Technology (24 months)                   Summer Internship: Supply Chain
                                                                                 Summer Internship: Market
Dewan P.N Chopra and Co-Chartered        configuration by Procurement &
                                         Retail Sourcing of new brands in        Research, Competitor Analysis and
Accountants (4 months)
                                         existing categories & new category      Pricing Strategy for Relaso Social
Summer Internship: Deal Sourcing
of Potential Investment Opportunities    addition for e-retail at Valyoo         CRM at Taragana Inc.
and Deal Flow Analysis at Indian         Technologies(Watchkart|Lenskart|B
Angel Networks.                          agskart|Jewelskart|.com(s)).




 AVIJIT PAL                               BALAJEE RAO                             BIJU K. VARUGHESE

B.Tech, Mechanical Engineering           B.E, Electrical Engineering             B.Tech, Electronics and
National Institute of Technology         Birla Institute of Technology, Mesra,   Communication Engineering
Durgapur                                 Ranchi                                  College of Engineering, Adoor, Cochin
Work Experience: Tata Consultancy        Work Experience: Tata Consultancy       University of Science and Technology
Services (18 months)                     Services, Hyderabad (16 months)         Work Experience: Honeywell
Indian Space Research Organization       AbhyaasEdu Corp, Hyderabad              Technology Solutions Lab (6 months)
(17 months)                              (12 months)                             Infosys Technologies Limited
Summer Internship: Sector analysis       Summer Internship: Market mapping       (26 months)
followed by compilation of               of fraud management solutions in the    Summer Internship: 'Business and
prospective unlisted companies in        Indian market and a study on the        Technology opportunities in the
that sector and tracking listed market   adoption of banking channels at         Indian Food Industry' at Strategy and
action relevant for the portfolio        Fidelity Information Services.          Collaborations Team, Siemens India
companies at TVS Capital


                                                                                                                         15
Vinod Gupta School of Management




      CH VENKAT RAMAN MURTY                  ESHITA JHA                              GAURAV WIDHANI

     B.Tech, Electronics and                B.Tech, Civil Engineering               B.Tech, Electronics and
     Telecommunication Engineering          National Institute of Technology        Communication Engineering
     Institute of Technical Education And   Karnataka, Surathkal                    BhartiVidyapeeth's College of
     research, Bijupatnaik University of                                            Engineering, New Delhi, Guru Gobind
                                            Work Experience: Oracle India Pvt.
     Technology                                                                     Singh Indraprastha University
                                            Ltd. (34 months)
     Work Experience: Tata Consultancy                                              Work Experience: Tata Consultancy
     Services (25 months)                   Summer Internship: Automation of        Services (33 months)
                                            processes in Citibank Collections
     Summer Internship: Tele                                                        Summer Internship: Business
     communication Consulting in New        Division at Citibank India.             Development and Assessment of
     Generation VAS and Enterprise                                                  market potential of pbSecure
     Mobility at Ericsson India Global                                              (product to be launched) at Pitney
     Services Pvt. Ltd.                                                             Bowes India Pvt. Ltd.




     HARPREET KAUR                           JAYA PRAKASH JAIN                       KONARK JOSHI

     B.Tech, Computer Science and           B.Tech, Applied Electronics and         B.Tech, Computer Science and
     Engineering                            Instrumentation Engineering             Engineering
     YMCA Institute of Engineering,         Krupajal Engineering College,           Jaypee Institute of Information
     Faridabad, Maharishi Dayanand          Bhubaneswar, Biju Pattnaik University   Technology
     University, Rohtak                     of Technology                           Work Experience: Infosys
     Work Experience: Tata Consultancy      Work Experience: Tata Consultancy       Technologies Limited (24 months)
     Services (20 months) NIIT Karnal       Services (29 months)                    Summer Internship: Analysis of
     (4 months)                             Summer Internship: Business             Media and Entertainment Industry at
     Talents Karnal (2 months)              Process Analysis - Automation of        Zee News Ltd.
     Summer Internship: Average             estimation process and quality
     handling time rightsizing for          process at Pinnacle Infotech
     Citiphone South at Citibank India.     Solutions.




16
BATCH PROFILE 2011-2013




 PARTHA PRATIM                        PRANAY VERMA                           PRITAM DATTA

B.Sc. (Engineering), Mechanical      B.Tech, Production Engineering and     B.E, Production Engineering
Engineering                          Management                             Jadavpur University
B.I.T. Sindri, Dhanbad, VBU          National Institute of Technology,      Work Experience: Tata Consultancy
Hazaribagh                           Jamshedpur                             Services (35 months)
Work Experience: Tata Consultancy    Work Experience: John Deere India      Summer Internship: Yield
Services (27 months)                 Pvt. Ltd. (24 months)                  Bottleneck Analysis for Automotive
Summer Internship: Role based        Summer Internship: Study of small      Grade Steels at JSW Steel.
Dashboard Governance and SAP-SCM     press shop for automation
re-implementation at Triton Group.   opportunities at Tega Industries.




 PRIYANKA                             RAGHURAM VASIREDDY                     RAHUL BAJAJ

B.E, Electronics and                 B.E, Electronics and Communication     B.Tech, Computer Science and
Telecommunication Engineering        Engineering                            Engineering
MKSSS Cummins College of             Chaitanya Bharathi Institute of        Sardar Vallabhbhai National Institute
Engineering, Pune University         Technology, Osmania University         of Technology, Surat
Work Experience: Infosys             Work Experience: Infosys               Work Experience: Infosys
Technologies Limited (33 months)     Technologies Limited (34 months)       Technologies Limited (34 months)
Summer Internship: Analysis of SME   Summer Internship: Understanding       Summer Internship: Analysis of
products at Axis Bank.               and Impacting the Dynamics of the      online promotions at Valyoo
                                     Retail channel - BOP at Danone Foods   Technologies.
                                     and Beverages India Ltd.




                                                                                                                    17
Vinod Gupta School of Management




      RAHUL GUPTA                           RANA VISHAL SINGH                      RANJEET KUMAR SINGH

     B.E, Computer Science and             B.E, Computer Science and              B.Tech, Oil Technology
     Engineering                           Engineering                            Harcourt Butler Technological
     DCRUST Murthal, MDU Rohtak            Walchand College of Engineering,       Institute, Kanpur, Uttar Pradesh
     Work Experience: Headstrong India     Sangli, Shivaji University             Technical University
     Pvt. Ltd. (35 months)                 Work Experience: Tata Consultancy      Work Experience: Wipro Technology
     Summer Internship: Benchmarking       Services (34 months)                   (26 months)
     (Price - Value Analysis) and
     examination of market channels for    Summer Internship: Benchmarking        Summer Internship: Study &
     tools and consumer electronics.       of B2B marketing practices &           Analysis of Smart City at Wipro
     Followed with orchestrating product   development of a strategic marketing   Technologies.
     launch in modern retail at Stanley    plan for FIS, India.
     Black & Decker.




      S KAMALA KANNAN                       SANJAY KUMAR                           SARAVANAN M

     B.E, Electronics and Communication    B.Tech, Electronics and Electrical     B.E, Production Engineering
     Engineering                           Engineering                            St Peters Engineering College, Anna
     MEPCO Schlenk Engineering College,    Silicon Institute of Technology,       University
     Anna University                       Bhubaneswar, Biju Patnaik University   Work Experience: Infosys
     Work Experience: Cognizant            of Technology                          Technologies Limited (33 months)
     Technology Solutions (24 months)      Work Experience: Mahindra Satyam       Summer Internship: Framework for
     Summer Internship: Business Risk      (32 months)                            Project Manager Maturity
     Assessment and Development of a       Summer Internship: Business            Assessment and Project Assignment
     Business Continuity Framework at      Development & Marketing Research       at Ericsson India Global Services Pvt.
     Reckitt Benkiser.                     at BATOI Systems Private Limited.      Ltd.




18
BATCH PROFILE 2011-2013




 SHILPA TANEJA                         SOVAN NAYAK                            SRINJOY SAHA

B.Tech, Information Technology        B.Tech, Computer Science and           B.Tech, Computer Science and
                                      Engineering                            Engineering
YMCA Institute of Engineering,
Faridabad, MDU Rohtak                 Institute of Technical Education and   Institute of Engineering and
                                      Research, Biju Patnaik University of   Management, WBUT
Work Experience: Angel Realty India   Technology
(5 months)                                                                   Work Experience: Infosys
                                      Work Experience: Infosys
Tata Consultancy Services                                                    Technologies Limited (24 months)
                                      Technologies Limited (25 months)
(19 months)                           Summer Internship: Analysis of the     Summer Internship: Hyperion
Summer Internship: Equity             Benefits and Stabilization of          Financial Management- Financial
                                      ‘Integrated Milk Information and       Consolidation at Deloitte.
Research Analyst at TVS Capital
                                      Collection System’ (IMICS) at Heinz
Funds Private Limited.
                                      India Limited.




 SUMIT PAL SINGH                       SUSHRUT CHOUBEY                        VARUN KUMAR CHOUDHARY

B.Tech, Information Technology        B.Tech, Electronics and Electrical     B.E, Mining Engineering
University School of Information      Engineering                            MBM Engineering College, Jodhpur,
Technology, Guru Gobind Singh         MAIT GGSIPU                            Jainarayan Vyas University
Indraprastha University               Work Experience: Infosys               Work Experience: Vedanta
Work Experience: Adobe Systems        Technologies Limited (33 months)       Resources Limited (34 months)
India Pvt. Ltd. (24 months)           Summer Internship: Understanding       Summer Internship: Market
Summer Internship: Assessment of      and impacting the dynamics of the      Research on natural gas as an
Competition in the Indian cement      Direct to consumer channel for         alternate fuel for electricity
Industry at Competition Commission    bottom of the pyramid at Danone        generation in India at NTPC Ltd.
of India.                             Foods and Beverages India Ltd.




                                                                                                                 19
Vinod Gupta School of Management



     Experience (36 Months and above)




     ABHIJITHSIMHA VANGIPURAM              ABHISHEK RANJAN                         AKASH KRISHNATRY

     B.Tech, Civil Engineering            B.Tech, Electronics and Electrical      B.Tech, Electronics and
     National Institute of Technology     Engineering                             Communication Engineering
     Warangal                             SASTRA, Thanjavur, SASTRA Deemed        National Institute of Technology
     Work Experience: Broadridge          University                              Kurukshetra
     Financial Solutions (13 months)
     IBM India Pvt. Ltd. (23 months)      Work Experience: Infosys                Work Experience: CSC India Ltd.
     Summer Internship: Quantifying the   Technologies Limited (56 months)        (48 months)
     Opening trend of Nifty & USD INR     Summer Internship: study of the         Summer Internship: Business
     Based On Global Cues/ Determinants   Examination module of the ERP           Development Plan for expansion of
     of Forward Premia in Indian Forex
     Market/ CRR & SLR Maintenance        product "Greycells" at Kalingasoft.     Pinnacle in Australia at Pinnacle
     process documentation at ING                                                 Infotech Solutions.
     Financial Markets.




     ALKA KATIYAR                          ASHISH KHATTRY                          BALANATHAN B

     B.Tech, Information Technology       B.Tech, Electronics and                 B.E, Production Engineering
     KNIT Sultanpur, UPTU                 Communication Engineering               Government College of Technology,
     Work Experience: HCL Technologies    National Institute of Technology        Coimbatore, Anna University
     (43 Months)                          Durgapur                                Work Experience: Infosys
     UCO Bank (17 months)                 Work Experience: ABB Ltd.               Technologies Limited (47 months)
     Summer Internship: ATM Managed       (37 months)                             Summer Internship: Market study
     Services (Project Management Team)   Summer Internship: "Market &            on rural telecommunication in India,
     at FIS.                              Technology Landscape for Industrial     Market study on IPTV and DTH in
                                          Automation in India" at Strategy and    India at Frost and Sullivan.
                                          Collaborations Team - Siemens, India.




20
BATCH PROFILE 2011-2013




                                         CHANDRA VEER
 BRAJESH KUMAR                                                                    DEEPIKA AHUJA
                                         SINGH DULAWAT
B.E, Computer Science and               B.Tech, Electronics and                  B.E, Electrical Engineering
Engineering                             Communication Engineering                Punjab Engineering College,
Birla Institute of Technology, Mesra,   Amrita School of Engineering,            Chandigarh, Deemed University
Ranchi                                  Coimbatore, Amrita Vishwa                Work Experience: Reliance
Work Experience: Tata Consultancy       Vidyapeetham                             Infrastructure Ltd. (37 months)
Services (36 months)                    Work Experience: Infosys                 Summer Internship: Supply Chain
Summer Internship: Idle freight         Technologies Limited (36 months)         Analytics (Multi-Modal Order Splitting
minimization for Concorde & Jumbo       Summer Internship: Business Plan         Algorithm) at HP.
rakes at JSW Steel Limited.             for Expansion of Pinnacle in United
                                        Kingdom at Pinnacle Infotech
                                        Solutions.




 MAJOR (Retd.)
                                         DIWAKAR SHUKLA                           FAIYAZ ABBAS HUSAINI
 SHITAL DESHMUKH
B.E, Computer Science and               B.Tech, Electronics Engineering          B.Tech, Mechanical Engineering
Engineering                             KNIT Sultanpur, U.P. Technical           Zakir Husain College of Engineering
MGM College of Engineering, Nanded,     University                               and Technology, Aligarh Muslim
Swami Ramanand Teerth University        Work Experience: Wipro                   University
Work Experience: Badwal & Tapdiya       Technologies (41 months)                 Work Experience: Volvo India Pvt.
Ltd., Thane (6 Months),                 Summer Internship: Processes and         Ltd. (37 months)
Indira Gandhi College of Engg, Navi     Inventory at BGB Installation at BPCL.   Tata Motors (7 months)
Mumbai (12 Months)                                                               Summer Internship: Multi Industry
Defence (Army) (96 Months)                                                       analysis, SCM trend and opportunities
Summer Internship: Employee                                                      at JDA Softwares.
Engagement at Tata Metaliks Limited.




                                                                                                                          21
Vinod Gupta School of Management




      GYAN PRAKASH                           HARSH KUMAR SRIVASTAVA                 ISHITA ADITYA

     B.E, Computer Science and              B.Tech, Chemical Engineering           B.Tech, Electronics and
     Engineering                            HBTI Kanpur, UPTU Lucknow              Communication Engineering
     B.I.T. MESRA RANCHI                    Work Experience: Aditya Birla Nuvo     JalpaiguriGoverment Engineering
     Work Experience: Wipro                 Group (32 Months)                      College, West Bengal University of
     Technologies (36months)                GE Energy (4 Months)                   Technology
     Summer Internship: Operations and      Summer Internship: Finding             Work Experience: Tata Consultancy
     Strategy at Akosha.                    synergistic opportunities and          Services (57 months)
                                            developing strategy to enter US Wind   Summer Internship: Production
                                            Energy EAM/ERP market at Ramco         process analysis at Pinnacle Infotech
                                            Systems.                               Solutions.




     JISHNU ROYCHAUDHURI                     KUSHAL BHARDWAJ                        LEELARAM TENNETI

     B.E, Information Technology            B.E, Electronics and Communication     B.E, Electronics and Electrical
     Bengal Engineering & Science           Engineering                            Engineering
     University, Shibpur                    BIT Mesra, Ranchi                      Sathyabama University
     Work Experience: CSG International     Work Experience: Tata Consultancy      Work Experience: Wipro
     (Earlier known as INTEC) (36 months)   Services (36 Months)                   Technologies (48 months)
     Summer Internship: Developing a        Summer Internship: Project             Summer Internship: An Analysis and
     'Hunting Strategy' and a 'Framework'   Appraisal and Investment Decisions     POC of Mobility in Insurance Industry
     for B2B segmentation of prospective    of Start-up Ventures at Indian Angel   at Deloitte.
     accounts form the Media and            Network.
     Communication industry at Wipro
     Technologies.




22
BATCH PROFILE 2011-2013




 LOKENDRA GAYAKWAD                     MRINAL VARSHNEY                       NEELESH KHATTAR

B.E, Electronics and                  B.Tech, Electronics Engineering       B.Tech, Mechanical Engineering
Telecommunication Engineering
                                      Zakir Husain College of Engineering   College of Engineering and
Govt .Engineering College Bilaspur,
Guru Ghasidas University Bilaspur     & Technology, Aligarh Muslim          Technology, Bhubaneswar,
                                      University                            BijuPattanaik University of
Work Experience: Indian Telephone
Industries Bangalore (12 months).     Work Experience: Tejas Networks       Technology
Tata Communication (Formerly VSNL)    Ltd. (36months)                       Work Experience: Infosys
(6 months). Mindtree Consulting (8
months). Hewlett Packard (40          Summer Internship: Understanding      Technologies Ltd. (60 Months)
months).                              & Impacting the dynamics of the       Summer Internship: Financial
Summer Internship: Market             Retail Channel - BOP, at Danone       Management Information System at
Research and deciding pricing
strategy for Customer Relation        Foods and Beverages India.            FIS.
Software at Taragana Inc.




 PRASENJIT BARIK                       PRATIUSH TYAGI                        RAHUL RAVI

B.Tech, Electronics and               B.E, Production Engineering           B.Tech, Metallurgical Engineering
Communication Engineering             Punjab Engineering College,           IIT BHU,Varanasi (formerly IT BHU)
National Institute of Technology      Chandigarh (Deemed University)        Work Experience: TATA
Durgapur                              Work Experience: Maruti Suzuki        Technologies (13 months)
Work Experience: Tata Consultancy     India Limited (37 months)             IBM (32 months)
Services (36 months)                  Summer Internship: Study of the       Summer Internship: Cost Benefit
Summer Internship: Marketing          Inventory Management Process at       Analysis of API Grade Steel at JSW
research,gap analysis of Xtrapower    VOLTAS, Thane plant to identify the   Steel.
fleet card and recommendations to     opportunities for improvement.
increase the market share of
Xtrapower fleet card at Indian Oil
Corporation Ltd.




                                                                                                                 23
Vinod Gupta School of Management




      RANJANI RAMANUJAM                   ROHAN KUMAR PATTNAIK                    ROHIT SHARMA

     B.E, Computer Science and           B.Tech, Computer Science and            B.Tech, Computer Science and
     Engineering                         Engineering                             Engineering
                                                                                 Amity School of Engineering and
     Birla Institute of Technology and   NIT Rourkela                            Technology, Guru Gobind Singh
     Science, Goa Campus, BITS Pilani    Work Experience: CSC India Pvt.         Indraprastha University
     Work Experience: IBM (36 Months)    Ltd. (61 months)                        Work Experience: Strategic Brand
                                                                                 Consultants (12 months)
     Summer Internship: Enterprise       Summer Internship: Framework for        SAP Labs India Pvt. Ltd. (On Payroll
     Value mapping; Data modeling;       Market Intelligence at Triton Groups.   of Vault Information Technologies
     Vendor Evaluation at Deloitte.                                              Pvt. Ltd.) (17 months). SAP Labs India
                                                                                 Pvt. Ltd. (9 months)
                                                                                 Summer Internship: RNAM
                                                                                 Consulting Project at Ericsson India
                                                                                 Global Services Pvt. Ltd.




      SAGAR KAPOOR                        SAIYAM CHHABRA                          SHIVANI

     B.Tech, Computer Science and        B.E, Electrical Engineering             B.E, Biotechnology
     Engineering                         Punjab Engineering College,             University Institute of Engineering &
     Jaypee Institute of Information     Chandigarh (Deemed University)          Technology Chandigarh, Panjab
     Technology University, Noida        Work Experience: Reliance               University Chandigarh
     Work Experience: Infosys            Infrastructure Ltd. (36 months)         Work Experience: Infosys
     Technologies Limited (13 months)    Summer Internship: Process              Technologies Ltd. (36 Months)
     Adobe Systems India Pvt. Ltd.       Improvement for Exports Business        Summer Internship: Market
     (30 months)                         & Setting of Forecasting process for    Research and launch of Complex
     Summer Internship: Equity           Industrial Automotive Repair Business   Event Processing in Financial
     Research Analyst at TVS Capital     at Stanley Black and Decker.            Services sector at Wipro
     Funds Private Limited.                                                      Technologies.




24
BATCH PROFILE 2011-2013




 SOHINI BANERJEE                          SOUMYA SARKAR

B.E, Information Technology              B.E, Computer Science and
Jadavpur University                      Engineering
Work Experience: Pricewaterhouse         University of Burdwan
Coopers Pvt. Ltd. (36 months)            Work Experience: IBM India Pvt. Ltd.
IBM India Pvt. Ltd. (12 months)          (44 Months)
Summer Internship: Assessment of         Summer Internship: Analysis of
Interest Rate Risk for a Kolkata based   Cable and Satellite(C&S) Industry
bank and the Allocation of Regulatory    trends and formulating Go to Market
Capital under IRR as per BASEL II        Strategy for Wipro C&S Practice, with
Norms at Reserve Bank of India (RBI)     special focus on potential
                                         Partnerships and Acquisitions.




                                                                                                           25
Vinod Gupta School of Management




                                   Vinod Gupta School of Management
                     VGSOM              Dream     Dare    Deliver

                       MBA Batch Profile 2012-2014




                                                Experience Wise breakup of 2012-2014 Batch




                                                Stream Wise Break Up of 2012-2014 Batch




26
BATCH PROFILE 2012-2014



Experience (0-11 Months)




                                   KARKHANAWALA SHEHZAD
 PRASHANTH P                                                             ASHWINI KUMAR RAO
                                   MOSES
B.Tech (Information technology)   B.E. (Electronics and Communication   B.Tech (Computer Science and
Pondicherry Engineering College   Engineering)                          Engineering)
Pondicherry University            L.D. College of Engineering           J.S.S.Academy of Technical Education
                                  Gujarat Technological University      GautamBuddhaTechnicalUniversity
                                                                        (Formerly UPTU)




 MEGHANA VAIDYA                    ADITYA DHATRAK                        B. SRITHA

B.Tech (Electronics and           B.E. (Electronics and Communication   B.Tech (Electronics and
Communication Engineering)        Engineering)                          Communication Engineering)
Nirma Institute of Technology     Vishwakarma Institute of Technology   Keshav Memorial Institute of
Nirma University                  Pune University                       Technology
                                                                        JNTU




                                                                                                               27
Vinod Gupta School of Management




      HITARTH SAINI                       NIKHIL PADAVALA                     ANAKSHI DHAMA

     B.Tech (Computer Science and        B.Tech (Electrical Engineering)     B.E. (Information technology)
     Engineering)                        Jntu University Kakinada            SardarVallabhbhai Patel Institute of
     Institute of Technology                                                 Technology
     Nirma University                                                        Gujarat University




      DEEPTI ANAND                        DEEPAN LOGANATHAN                   HAPPY GARG

     B.Tech (Electronics and             B.E. (Computer Science and          B.Tech (Computer Science and
     Communication Engineering)          Engineering)                        Engineering)
     Amrita School of Engineering        RMD Engineering College             Swami Keshvananda Institute of
     Amrita Vishwa Vidyapeetham          Anna University                     Technology
                                         Work Experience: Tata Consultancy   Rajasthan Technical University
                                         Services (7 Months)                 Work Experience: Tata Consultancy
                                                                             Services (8 Months)




28
BATCH PROFILE 2012-2014




 ATISHA RAY

B.Tech (Applied Electronics and
instrumentation Engineering)
Institute of TechnicalEducation and
Research
SOA University
Work Experience: L&T IES
(9 Months)




Experience (12-23 Months)




                                                                         LOITONGBAM
 B VAISHNAVI                           DIVIJ SHARMA
                                                                         ATHOUBA MEETEI
B.E (Mechanical Engineering)          B.Tech (Information technology)   B.E(Mechanical Engineering)
University College of Engineering     Vellore Institute of Technology   Jorhat Engineering College
Osmania University                    Vit University                    Dibrugarh University
Work Experience: Accenture            Work Experience: McKinsey         Work Experience: Cognizant
Services Pvt. Ltd. (12 Months)        Knowledge Center (13 Months)      Technology Solutions (14 Months)




                                                                                                           29
Vinod Gupta School of Management




      RACHABATTUNI K KEERTHI                 SINJANA GHOSH                          MANAS GHOSE

     B.E. (Computer Science and             B.Tech (Information technology)        B.Tech (Mechanical Engineering)
     Engineering)                           Institute of Technology & Marine       National Institute of Technology
     Bapatla Engineering College            Engineering                            Durgapur
     Acharya Nagarjuna University           West Bengal University of Technology   Work Experience: New Holland FIAT
     Work Experience: Tata Consultancy      Work Experience: Tata Consultancy      (India) Pvt. Ltd. (18 Months)
     Services (14 Months)                   Services (17 Months)




     GAURAV BHATTACHARYA                     NEMALIPURI SATISH                     DEV KARAN SINGH MALETIA

     B.Tech (Electronics and                B.E. (Electronics and Communication    B.Tech (Bio Medical and
     Communication Engineering)             Engineering)                           Instrumentation)
     Bengal Institute of Technology         Vasavi College of Engineering          SRM Institute of Science and
     West Bengal University of Technology   Osmania University                     Technology
     Work Experience: Mahindra Satyam       Work Experience: Infosys Ltd.          SRM University
     (18 Months)                            (20 Months)                            Work Experience: Tata Consultancy
                                                                                   Services (21 Months)




30
BATCH PROFILE 2012-2014




 SIDDHARTH HIMAKAR                    MONIKA SAHU                            AKHIL KRISHNA GUPTA

B.E. (Electrical and Electronics     B.E. (Electronics and Communication    B.Tech (Manufacturing Technology)
Engineering)                         Engineering)                           JSS Academy of Technical Education
St.Joseph's College of Engineering   Institute of Engineering and           Gautam Buddha Technical University
Anna University                      Management                             Work Experience: Infosys Ltd.
                                     West Bengal University of Technology   (22 Months)
Work Experience: Cognizant
Technology Solutions (21 Months)     Work Experience: Tata Consultancy
                                     Services (21 Months)




 SANDEEP KATAKOL                      LAKSHMI PRIYA VIJAY                    DEBJYOTI MITRA

B.E. (Computer Science and           B.Tech (Electrical Engineering)        B.Tech (Electrical Engineering)
Engineering)                         T K M College of Engineering           National Institute of Technology
SDM College of engineering           University of Kerala                   Durgapur
technology                           Work Experience: Robert Bosch          Work Experience: TVS motor
VTU Belgaum                          Engineering and Business Solutions     Company Ltd. (5 Months)
Work Experience: Accenture           Ltd. (22 Months)                       JSW Steel Ltd. (17 Months)
Services Pvt. Ltd. (22 Months)




                                                                                                                 31
Vinod Gupta School of Management




      SNEHIL SINGH                           ANIKET SARKAR

     M.Sc(Tech.) Information Systems        B.E. (Electrical Engineering)
     B.I.T.S Pilani                         Jadavpur University
     Work Experience: Fiorano Software      Work Experience: TATA Power
     Technologies Pvt. Ltd. (23 Months)     (23 Months)




     Experience (24-35 Months)




      ARITRO GHOSH                           LOKIREDDY RAVITEJA                   T VEDHA

     B.Tech (Power Engineering)             B.E. (Information technology)        B.Tech (Mechanical Engineering)
     National Power Training Institute      Gandhi Institute of Technology and   Pondicherry Engineering College
     West Bengal University of Technology   Management                           Pondicherry University
                                            Andhra University                    Work Experience: E.I.D Parry (I)
     Work Experience: Jindal Steel &
     Power Ltd. (24 Months)                 Work Experience: MAQ Software        Ltd.Murugappa Group (24 Months)
                                            (24 Months)




32
BATCH PROFILE 2012-2014




BHARAT REDDY KUNDURU                      RAJIB LAYEK                           N.V. BHARGAVA G

B.Tech (Electronics and                  B.E. (Electronics and Communication   B.Tech (Computer Science and
Communication Engineering)               Engineering)                          Engineering)
SASTRA University                        Jadavpur University                   Kakatiya Institute of Technology and
Work Experience: Wipro                   Work Experience: Cognizant            Science
Technologies (25 Months)                 Technology Solutions (28 Months)      Kakatiya University
                                                                               Work Experience: Tata Consultancy
                                                                               Services (28 Months)




 MRUGATRISHNA ROUTRAY                     RAKESH RAJENDRAN M                    KOYEL DUTTA

B.Tech (Electronics and                  B.Tech (Electronics and               B.Tech (Computer Science and
Communication Engineering)               Communication Engineering)            Engineering)
Silicon Institute Of Technology          Amrita School of Engineering          Heritage Institute of Technology
Biju Pattnaik University Of Technology   Amrita VishwaVidyapeetham             West Bengal University of Technology
Work Experience: Nokia Siemens           Work Experience: Infosys Ltd.         Work Experience: Infosys Ltd.
Networks (29 Months)                     (29 Months)                           (29 Months)




                                                                                                                      33
Vinod Gupta School of Management




      REECHA SINHA                            VINEETH IYPE MATHAI                   ANU SINGH

     B.Tech (Computer Science and            B.E. (Electronics and Communication   B.Tech (Computer Science and
     Engineering)                            Engineering)                          Engineering)
     KIIT School of Technology               JSSATE                                Raj Kumar Goel Institute of
     KIIT Bhubaneswar                        Visvesvaraya Technological            Technology
     Work Experience: Tata Consultancy       University                            Uttar Pradesh Technical University
     Services (30 Months)                    Work Experience: Cognizant            Work Experience: InfosysLtd.
                                             Technology Solutions (31 Months)      (31 Months)




      VENKATESH S                             M.PRAKASH                             ABHITOSH DAW

     B.E. (Mechanical Engineering)           B.E. (Electronics and Communication   B.Tech (Electronics and
     Sir M Visveswariah Institute of         Engineering)                          Communication Engineering)
     Technology                              Jaya Engineering College              Institute of Engineering &
     Visvesvaraya technological University   Anna University                       Management
     Work Experience: Cummins India                                                West Bengal University of Technology
                                             Work Experience: Infosys Ltd.
     Ltd. (31 Months)                        (31 Months)                           Work Experience: Infosys Ltd.
                                                                                   (32 Months)




34
BATCH PROFILE 2012-2014




 ARUN KUMAR KOTA                       S. SUBRAMANIAN                  TRIPTI SRIVASTAVA

B.E. (Electronics and Communication   B.Tech (Electronics and         B.Tech (Electronics and
Engineering)                          Communication Engineering)      Communication Engineering)
Vasavi College of Engineering         Mar Athanasius College of       Ajay Kumar Garg Engineering College
Osmania University                    Engineering                     Uttar Pradesh Technical University
Work Experience: Zensar               Mahatma Gandhi University       Work Experience: Infosys Ltd.
Technologies Ltd. (32 Months)         Work Experience: Infosys Ltd.   (33 Months)
                                      (32 Months)




 SARAT CHANDRA MANTHENA

B.Tech (Information technology)
Anil Neerukonda Institute of
technology and science
Andhra University
Work Experience: Infosys Ltd.
(35 Months)




                                                                                                            35
Vinod Gupta School of Management



     Experience (36 Months and above)




      JOSHI ROHIT DILIP                    HIMA VARSHA CHEKUMUKI            SAYAN MAJUMDAR

     B.Tech (Mechanical Engineering)      B.Tech (Chemical engineering)    B.Tech (Electrical Engineering)
     Dr. Babasaheb Ambedkar               Andhra university college of     National Institute of Technology
     Technological University             engineering                      Durgapur
     Work Experience: Va Tech Wabag       Andhra University                Work Experience: Crompton
     Ltd. (36 months)                     Work Experience: Vedanta         Greaves Ltd. (36 Months)
                                          Resources plc. (36 Months)




      RASHMI                               SUMAN KUMAR                      SUBHASIS BARMAN

     B.E. (Electrical Engineering)        B.Sc. Engineering (Information   B.E. (Computer Science &
     B.I.T Sindri                         Technology)                      Technology)
     Vinoba Bhave University              B.I.T Sindri                     The Bengal Engg. & Science
     Work Experience: Tata Consultancy    Vinoba Bhave University          University, Shibpur
     Services (36 Months)                 Work Experience: Infosys Ltd.    Work Experience: DRDO (7 Months)
                                          (36 Months)                      Mindtree Pvt. Ltd. (21 Months)
                                                                           Misys Pvt. Ltd. (11 Months)




36
BATCH PROFILE 2012-2014




 PIYUSH JAISWAL                          MURALIDHARAN U                       PRASHANT KUMAR SINGH

B.E. (BioMedical Engineering)           B.E. (Mechanical Engineering)        B. Sc. Engineering
SGSITS Indore                           College of Engineering-Guindy        B.I.T. Sindri
RGPV Bhopal                             Anna University                      Vinoba Bhave University Hazaribagh
Work Experience: Cognizant              Work Experience: Wipro (28 Months)   Work Experience: Tata Consultancy
Technology Solution (27 Months)         Aricent (11 Months)                  Services (3 Months)
L&T Infotech (11 Months)                                                     Bharat Electronics Ltd. (37 Months)




 NIKHIL MEHROTRA                         RAHUL MALI                          DEBARGHYA CHAKRABORTY

B.Tech (Information technology)         B.Tech (Electronics and              B.Tech (Computer Science and
Greater Noida Institute of Technology   Communication Engineering)           Engineering)
Uttar Pradesh Technical University      SGGSIE & Tech                        Institute of Engineering and
Work Experience: Infosys Ltd.           SRTMU Nanded                         Management
(33 Months)                             Work Experience: Tata Consultancy    West Bengal University of Technology
Accenture Services Pvt. Ltd.            Services (43 Months)                 Work Experience: Tata Consultancy
(8 Months)                                                                   Services (44 Months)




                                                                                                                    37
Vinod Gupta School of Management




      AMIT GYANANI                              BHANU JUNEJA                            KAMYA SHARMA

     B.E. (Computer Science and                B.Tech (Electronics & Communication     B.Tech (Electrical Engineering)
     Engineering)                              Engineering)                            NIT Surat
     Maharashtra Institute of Technology       Chitkara Institute of Engineering and   Work Experience: Reliance
     Pune University                           Technology                              Infrastructure Ltd. (46 Months)
     Work Experience: Infosys Ltd.             Punjab Technical University
     (32 Months)                               Work Experience: Infosys Ltd.
     Xpanxion International Pvt. Ltd.          (37 Months)
     (13 Months)                               Oracle India Pvt. Ltd. (8 Months)




      NEERAJ KUMAR                              ARINDAM ROUTH                           DHILEEBAN K M

     B.E. (Electronics and Communication       B.Tech (Electronics and                 B.E. (Electronics and Electrical
     Engineering)                              Communication Engineering)              Engineering)
     Birla Institute of Technology Mesra       National Institute of Technology        Government College of technology
     Ranchi                                    Durgapur                                Anna University
     Work Experience: Reliance                 Work Experience: Reliance Energy        Work Experience: Tata Consultancy
     Infrastructure Ltd. (29 Months)           (47 Months)                             Services (47 Months)
     Reliance Utility Engineers Private Ltd.
     (16 Months)




38
BATCH PROFILE 2012-2014




 ARUN KUMAR BACHU                         GAURAV JOHRI                          SYED MOHD KASHIF

B.E. (Mechanical Engineering)            B.Tech (Metallurgical and Materials   B.Tech (Electrical Engineering)
Vasavi College of Engineering            Engineering)                          Zakir Hussain College of Engineering
Osmania University                       National Institute of Technology      & Technology
Work Experience: Infosys Ltd.            Nagpur                                Aligarh Muslim University
(27 Months)                              Work Experience: Oracle               Work Experience: Computer
Broadridge Financial Solutions (India)   (48 Months)                           Sciences Corporation (59 Months)
Private Ltd. (21 Months)




                                                                                                                      39
Vinod Gupta School of Management




                                   Vinod Gupta School of Management
                     VGSOM              Dream     Dare     Deliver

                      EMBA Batch Profile 2010-2013




                                                Industry Wise Breakup of 2010-2013 Batch




                                                Experience Wise Breakup of 2010-2013 Batch




                                                Note: Mean Experience - 10 Years




40
BATCH PROFILE 2010-2013



Experience < 8 Years




  AMRITENDU MUKHERJEE                                                                        ANANT KUMAR

B.E. in Electrical Engineering                                                   M.Com. in Advance Business Economics
Bengal Engineering and Science University, Shibpur                                                    Faizabad University
Professional Engagement (6 Years 11 Months)                               Professional Engagement (7 Years 3 Months)
QA Consultant, Lexmark India, Imaging Solutions and Services        Asst. Manager Commercial, KEC International Limited
Division, Research & Development Senior Consultant, PWC                                                    (RPG Group)
India, Independent Validation &Verification, Performance
                                                               Area of Expertise: Indirect Taxation, Material Management,
Improvement Team Lead, Infosys Technologies Ltd.,
                                                               Procurement, HR and Administration, Vendor development,
Independent Validation Solutions
                                                                                           Accounts Payable / Receivable
Area of Expertise: Six Sigma Black Belt, Project Management,
Process Improvement, Quality & Risk Management                 Area of Interest: Project Finance, Supply Chain Management,
                                                                                                      Contract Negotiation
Area of Interest: Supply Chain Management, Information
Systems, Macro Economic Environment & Public Policy,
Statistical Analysis




     AYAN KHASNABIS                                                                         DIGBIJAYA SINGH

B. Tech. in Computer Science & Engineering                                       B.E. in Electronics & Telecommunication
Institute of Engineering & Management, Kolkata                                                    Utkal University, Odisha
Professional Engagement (6 Years 2 Months)                                         Professional Engagement (6 Years)
Assistant Manager - Business Consulting, Strategic Analysis              Senior Research Fellow, NIRADD ERP Consultant
& Portfolio Management Team HSBC Analytics                           Area of Expertise: Survey & digitization of medical
Module Lead, Pre Sales Solutions Team, Banking & Capital          manuscripts, Publication & commercialization process,
Markets Infosys Technologies Ltd.                                 Coordination of survey including Govt. legal process &
Area of Expertise: Portfolio Management, Project               people management, ERP Design & Implementation in the
                                                                                          area of Materials Management
Management, Balancing Credit Risk & Profit, Data Driven
Analytics, Statistical and Quantitative Modeling,                Area of Interest: Optimization of operational efficiency,
Mentoring & Coaching                                                        People Management, Operations, Purchasing
Area of Interest: Valuation, Corporate Finance, Pricing,
Supply Chain Management, Qualitative Modeling


                                                                                                                             41
Vinod Gupta School of Management




         ROSHAN BASUDUTTA
                                                                                                       SAUMIT MANDAL
             ROUTRAY
     B.Tech. in Electronics & Telecommunication                                       B. Tech. in Computer Science & Engineering
     BPUT, Odisha                                                           Meghnad Saha Institute of Technology, WBUT, Kolkata
     Professional Engagement (5 Years)                                            Professional Engagement (6 Years 11 Months)
     Network Transmission Planner, Vodafone Spacetel Ltd.                  Solution Architect & Technical Consultant, Lexmark Inc.
     Deputy Manager Transmission Planning, Reliance                                (India), Imaging Solutions and Services Division,
     Communication                                                                                        Research & Development
     Area of Expertise: Telecom Network Planning, Project               Area of Expertise: Technical and Functional Solution, Project
     Management & Optimization, Vendor Management, BOQ                     Estimation& Budgeting, Project and Risk Management,
     finalization, Budgeting & Handling regulatory related activities               Competitive Analysis of Products & Solutions
     Area of Interest: Supply Chain Management, Strategic                     Area of Interest: ERP & Supply Chain Management,
     planning for service industry, Enterprise solution                                  Information Systems, Corporate Finance




       SITANSU SEKHAR SWAIN                                                                            SMITAHAS DAS

     B.E.in Electronics &Telecommunications Engineering                                             B.E. in Mechanical Engineering
     University College Of Engineering, Burla                                           National Institute of Technology, Durgapur
     Professional Engagement (6 Years 6 Months)                                   Professional Engagement (6 Years 1 Month)
     QA Lead, TCS Senior QA Analyst, L&T Infotech                        Deputy Manager (Methods) at HAL, Barrackpore Division
                                                                                   Senior Engineer (Planning), L&T ECC Division
     Area of Expertise: Process Re-engineering, Quality
     Management and Consulting, Project Management                       Area of Expertise: Project Planning, Internal Auditor for
                                                                           AS9100C QMS, Cost Estimation, Annual Capital Budget
     Area of Interest: Enterprise Solution, Statistical Analysis,                              Preparation, UT Level II Inspector
     Supply Chain Management, Credit Assessment and
                                                                             Area of Interest: ERP & Supply Chain Management,
     Risk Management
                                                                        Marketing of High Tech Products, Project Management for
                                                                                                          Manufacturing Industry




42
BATCH PROFILE 2010-2013




      SRIMOYEE MISRA                                                                           SUDIPTA DUTTA

B.Tech. in Civil Engineering                                                               B.E. in Metallurgical Engineering
Kalinga Institute of Industrial Technology, Odisha                     Bengal Engineering and Science University, Shibpur
Professional Engagement (6 Years 2 Months):                                Professional Engagement (6 Years 11 Months):
Assistant Manager, Retail Banking & Wealth Management                 Bid Project Manager - Business Segment Iron Making
Global Information Team HSBC Analytics                                          SIEMENS VAI Metals Technologies Pvt. Ltd.
Module Lead, Energy and Utilities Vertical, Wipro Technologies          Assistant Manager - Operation Melting Department
Area of Expertise: Project Management, Technical and                                       Tata Metaliks Kubota Pipes Ltd.
Functional Business Solution, Process Improvement                    Area of Expertise: Bid Project Development, Project
Area of Interest: Information Systems, Supply Chain                Acquisition, Bid Preparation, Contract Negotiation, Gold
                                                                    Standard Assessor in Tata Business Excellence Model,
management, Data Mining and Analytics
                                                                                      Manufacturing process improvement
                                                                 Area of Interest: Marketing of High Tech Products, Market
                                                                           Entry Strategy Formulation, Business Excellence




       SUVANKAR ROY                                                                      SWADHIN KUMAR TRIPATHY

B.E. in Electronics and Communications Engineering                                      B.E. in Instrumentation Engineering
University Institute of Technology, The University of Burdwan             Visweswaraih Technological University, Karnataka
Professional Engagement (6 Years 9 Months):                                 Professional Engagement (7 Years 4 Months):
Team Lead, TCS Financial Services                                Assistant Manager - Learning and New Business Acquisition,
Senior Data Modeler and Data Analyst, TCS Financial Services                                    Agency Team, TATA AIA Life
Area of Expertise: Data Modeling and Analysis, Data                             Business Development Manager, HDFC Life
Warehousing, Business Intelligence, OLAP                         Area of Expertise: Business Development, Team Building
Area of Interest: Business Analytics, Data Mining, Enterprise    and Team Productivity Development, Contest design, Training,
Reporting, Predictive Analytics                                                Strategic Planning and Sales Enhancement
                                                                   Area of Interest: Commercial Banking and International
                                                                 Finance, Supply Chain Management, Security Analysis and
                                                                      Portfolio Management, Corporate Finance, Marketing



                                                                                                                                43
Vinod Gupta School of Management



     Experience 8 - 10 Years




       GIRIJA PRASAD NANDA                                                                           NILANJAN GOSWAMI

     B.E. in Computer Science & Engineering                                              PGDIT & MS in Information Technology, SKU
     Utkal University                                                                                        PGDBM, ICFAI University
                                                                                Bachelors of Computer Science Technology, WBUT
     Professional Engagement (10 Years 2 Months):                                    Professional Engagement (8 Years 9 Months):
     Team Lead, Infosys Ltd.                                                                   Sr. Manager, Global Quality & Services,
     Area of Expertise: IT program management, Client                                                     Capgemini Consulting India
                                                                         Sr. Manager, Corporate Quality, Essar (Aegis Eng SCM) Ltd.
     relationship management, Technology Consulting,                        Manager, Quality & Service Excellence, First Source Ltd.
     Evangelizing employees on new Microsoft Technologies                             Asst Manager - Service Quality, IBM India (TBU)
     Area of Interest: Supply Chain Management, Business               Wipro Ltd - Master Quality Analyst (Active Support Group PSG)
     intelligence, Data Analysis                                       Area of Expertise: Deployment QMS, BPMS, PMS, BPM, Lean
                                                                       6 Sigma , ITIL, Project Planning & Reengineering, B2B Support
                                                                           across domains - Financial Services, Retail, SCM, Telco &
                                                                                                                  Integrated Systems
                                                                       Area of Interest: Business Research Methodology, Quantitative
                                                                                                          Modeling, Market Research




            PALLAB DATTA                                                                           SUBHANKAR PANIGRAHI

     B.E. in Information Technology                                            B.E. in Electronics and Communications Engineering
     Jadavpur University, Kolkata                                                                                     OEC, Odisha
     Professional Engagement (8 Years):                                           Professional Engagement (8 Years 10 Months):
     Solution Architect, PreSales, Tata Consultancy Services                                                Project Manager, TCS
     Technical Leader - IBM India Pvt. Ltd.                                            Project Leader, Satyam Computer Services
     Technical Leader - Infosys Technologies Ltd.                       Area of Expertise: IT project Delivery in BFS domain, Project
     Area of Expertise: Technical and Functional Solution,              Management, Resource Management, Team Building, Process
     Customer Relationship management, Project Budgeting,                              Definition, Client Relationship Management
     Project and Risk management                                                      Area of Interest: Financial solution Products,
     Area of Interest: Statistical Analysis, Business Intelligence                                             Challenging Projects
     and Data Analytics, Quantitative Marketing, Financial Products,
     Derivatives and Indexes, Financial Compliance



44
BATCH PROFILE 2010-2013



Experience > 10 Years




AMBIKADAS BHATTACHARYA                                                                         BISWAJIT KAR

B.E. in Electronics and Communication                                                     B.E. in Mechanical Engineering
National Institute of Technology, Durgapur                                                                    OEC, Odisha
Professional Engagement (18 Years):                                               Professional Engagement (19 Years):
Head of Product Quality Assurance (Group Lead PQA), Orga        Manager Operations, Globogramme learning services Ltd.
Systems India Private Limited                                    Senior Manager- Product Support, Hyderabad industries
Senior Technical Consultant, RS Software                                                          Ltd. Heavy Engineering
Associate Consultant, Siemens Information Systems limited
                                                                        Senior Engineer - After Sales, Sipani Automobiles
Area of Expertise: Project Management, Test Management,
                                                                  Area of Expertise: Training, Strategic planning & sales
Strategic Management, Test automation and Test Framework
creation, Product Quality Management                            presentation, Managing consultancy, training and people,
Area of Interest: Product Quality Management, Quality                     Project Management, Design and development
Process Improvement, Technical and Functional Solution,                                              of training materials
Customer Relationship Management, Project Budgeting,                       Area of Interest: Supply Chain Management,
Project and Risk Management                                                                       Inventory Management




  DEBAJYOTI MAHAPATRA                                                                       DILLIP KUMAR DAS

B.E. in Computer Science & Engineering                                                      M.Com.Berhampur University
Utkal University                                                              MS in Consultancy Management, BITS Pilani
Professional Engagement (10 Years 6 Months):                                      Professional Engagement (15 Years):
Business Development Manager, Energy & Utility Vertical,        Business Development Manager, Laxmi Publication Pvt. Ltd.
TCS                                                                             Lecturer, KK College of Science and Arts
Area of Expertise: Business Development, Relationship           Area of Expertise: Sales Training, Business Development,
Building, Identifying Prospects, Bid Management, Change          Breaking New Avenues, Driving Sales Growth through the
Request Management, Project Management                                                                      Training Team
Area of Interest: Strategic Business Planning for sustainable    Area of Interest: Strategic Planning, Sales & Distribution
growth in services industry globally                                                              Management, Marketing




                                                                                                                              45
Vinod Gupta School of Management




         PARTHO PROTIM DAS                                                                      RAM KUMAR KAPAR

     B.E. in Mechanical Engineering                                                               B.E. in Electrical Engineering
     The Institution of Engineers (India)                                                   The Institution of Engineers (India)
     Professional Engagement (15 Years):                                                 Professional Engagement (13 Years):
     Six Sigma Black Belt (Full time), Cross Functional Process
                                                                      Project Coordinator (WOT), Quality Assurance, Department
     Improvement Projects
     Territory Manager, Product Marketing & Sales, SKF India                                 Regulator, Maintenance In Charge
     Deputy Manager, Sales & Marketing, TIDC INDIA, Murugappa          Area of Expertise: Project Management, Team Building,
     Area of Expertise: B2B Marketing, Sales and Distribution                     Quality Management, Materials Management
     management, Team management, Mentoring & Coaching,
                                                                          Area of Interest: Supply Chain Management, Process
     Global Economic Scenario Analysis, Statistical & Data Driven
     Analysis, Pricing                                                                                          Management
     Area of Interest: Mergers and Acquisitions, Corporate
     Finance, Derivatives and Hedging, Strategic business portfolio
     analysis, Competitor Analysis, Supply Chain Strategy,
     Marketing Research, Forecasting Techniques




           SOMNATH DUTTA

     B.E. in Civil Engineering
     M.Tech, Ph.D in Structural Engineering
     Bengal Engineering & Science University, Shibpur
     Professional Engagement (22 Years):
     Hub Project Head for Infrastructure Projects, Reliance ADAG
     Group, Deputy General Manager, Reliance Industries Ltd.
     (Retail Business)
     Area of Expertise: Project management for high-rise
     buildings, Resourcing, Project Planning Design & Engineering,
     Project Co-ordination, Optimization in structural design,
     Time bound delivery of distribution centers & retail outlets
     Area of Interest: Structural Analysis of FEM packages,
     Retrofitting of structures, Organizational Leadership, Supply
     Chain Management

46
www.som.iitkgp.ernet.in




  Life @ Campus




Campus Events
Saamanjasya
http://www.saamanjasya.com/
Saamanjasya is a unique endeavor pioneered by the students of VGSOM. It is the first and only social event of IIT Kharagpur.
Started with a vision of becoming Asia's largest movement for social and environmental sustainability in 2010, Saamanjasya
has come a long way. Saamanjasya has been organized with the aim of bringing together Corporates, NGOs, and academicians
on a common platform to ensure inclusive growth and inculcate a culture of giving back to the society in our aspiring and
educated youth. It seeks to highlight the importance of a symbiotic corporate-NGO- academic relationship.Names of some
of the innovative events at Saamanjasya are - Kalakaar Vikaas, Vichaar, Parishram, Wired and Samaaj.


Madison Avenue
http://madinvgsom.com/
MADison Avenue is the annual flagship Marketing event of VGSOM. It hosts a plethora of different competitions, guest-lectures
(GL), workshops and panel-discussions for B-school students across the country. The event is organized by MAD Club (Marketing
and Advertising Club of VGSOM) and is supported by a number of corporate-houses like Toyota, SAIL, Steris, MTSSpykar,
Business Standard, Airtel, Chronon Technologies, Woodland, naukri.com, Tata Bearings, JWT, Travels4u, pagalguy.com, and
Dare2compete.
In 2011, MADison Avenue has grown even bigger and better. There was an innovative blend of eight sub-events namely:
Quizzard, AdZap, Leaders Challenge, El Vigor, Quizzical, Wiral Marketing, Blind Date (Ad-Mire) and Mobile Turns Social. The
event was conducted over a period of 2 days and had seen the presence of more than 25 premiere B-schools from all over
the country and has been graced by the presence of the who's-who of the top ad-firms, academia and corporate India.




                                                                                                                                47
Vinod Gupta School of Management


                               Shraddha
                               Driven by the mantra, "Dedication is not what others expect of you, it is what you give
                               to the others", Shradhha is an entity formed and run by the students of VGSOM. VGSOM
                               is dedicated not just to impart managerial education but also to create a value system
                               that helps the budding managers to be socially responsible and empower them to do
                               business under a sustainable environment. With this vision, the genesis of Shraddha
                               took place.Sharddha aims at bringing about a positive change in the lives of
                               underprivileged children living in nearby towns through collaboration with a local NGO
                               called DishaSeema that runs a school within the campus. Time and again the VGSOMites
                               have come up with novel ideas of raising funds for this school. Whether it be Springfest,
                               the annual cultural fest at IIT, where VGSOM students, sold T-shirts painted by the
                               students of DishaSeema during the fest or initiating donation drives within the campus.
                               The revenue generated from these efforts went to DishaSeema for the infrastructure
                               and education development.


                               VPL - VGSOM Premiere League
                               VGSOM Premier League (VPL) - a cricketing league based on the famous IPL was
                               unveiled in 2011. VPL has ensured massive participation by students in the roles of
                               team managements for franchisees and as players. The "Auction Hour" was conducted
                               where virtual bidding was conducted among the franchisees for the players. The
                               league matches between the various teams are under process and VPL has for once
                               and all transformed the sporting culture at VGSOM. Sports Committee also gave an
                               opportunity to all students to be a part of VPL by introducing the Super Selector
                               fantasy game as well.


                               Kshitij
                               "If you can dream it, you can do it", said Walt Disney. Similar was the vision of bringing
                               the best of the lot from the youth on a single platform when we started our quest by
                               the name of Kshitij in 2004. The budding engineers, entrepreneurs and management
                               moguls shared the same scope of opportunity we provided to produce path breaking
                               technological and business outputs. Kshitij, the Annual Techno-Management festival
                               of IIT Kharagpur has been leading the light of instilling a culture of science, technology
                               and innovation among the youth of the nation. With more than 40 events covering all
                               genres of technology and management, Kshitij brings some of the best solutions for
                               the mankind to the fore. The huge amount of prize money is just another epitome of
                               the heights we have scaled in the last eight years. VGSOM takes pride in being
                               associated with ASIA's largest techno-managerial fest and plays a pivotal role in its
                               success by organizing several business events.


                               Spring Fest
                               Over the course of its glorious history, if there is any one thing about IIT Kharagpur
                               that is so defining, so enchanting and so eagerly awaited, it is its annual social and
                               cultural extravaganza, Spring Fest. Held in the third week of January every year, what
                               started out as an inter-hostel cultural event has grown steadily during its 52 years to
                               become one of the biggest fests of its kind in the country.
                               Spring Fest is a celebration that recognizes no difference, a celebration for a cause.
                               The three hands of the logo signify the culmination of people of different cultures and
                               background at one place for one cause to celebrate the spirit of youth.




48
www.som.iitkgp.ernet.in



Clubs & Committees




VGSOM boasts of a strong student community and almost all the important activities that are essential for a management
institute are student driven, here at VGSOM. VGSOM has seven functional committees taking care of various processes like
placements, admission, alumni relation etc. and seven different focus clubs, each cultivating different facets of managerial
domains

The committees are listed as follows:
t Placement Committee - In charge of all placement related activities at VGSOM. Also responsible for publishing the annual
  summer and final placement report (VANTAGE).
t Alumni Committee - In charge of maintaining alumni relationships, publishing the annual alumni newsletter - SCUZZY and
  organizing the annual alumni meet - CONNECT.
t Admissions Committee - In charge of co-coordinating the whole admissions process and facilitating aspirants and new
  entrants.
t Corporate & Media Interaction Cell - In charge for all types of communications with the media and corporate world. It is
  also responsible for arranging and coordinating guest lectures by industry stalwarts.
t Sports Committee - In charge of arranging various sports and recreational activities for the students of VGSOM.
t Cultural Committee - In charge of managing all the cultural events at VGSOM. Is also responsible for organizing fresher's
  party and farewell for incoming and outgoing batches respectively.
t Saamanjasya - In charge of designing and organizing the annual event Saamanjasya.
t SpringFest and Kshitij Committee - In charge of designing and managing events during the annual SpringFest and during
  the techno managerial fest Kshitij.

The seven focus clubs are:
t MAD - The Marketing Club
t Finterest - The Finance Club
t Mantradharin - The Consulting Club
t Scope - The Supply Chain and Operations Club
t VGSOM Quiz Club
t Shraddha - A club for social causes
t E-Cell - The Entrepreneurial Cell of VGSOM




                                                                                                                               49
Vinod Gupta School of Management



     Corporate Interaction (Guest Lectures)
     Over the last one year, VGSOM was privileged to have a gamut of senior industry executives and leaders on the campus as
     a part of its guest lecture programme. The intriguing and insightful sessions with our distinguished guests helped the students
     to sync up with the latest trends and happenings in the corporate world.


      Guest Name                      Designation                    Company                     Topic of the Lecture
      Sanjeev Dassani                 Creative Director              RK Swamy BBDO               Creative Ideation Process and
                                                                                                 Branding
      Mr. Joydeep Ganguly             CMO                            Uninor                      Growth prospects in Telecom
                                                                                                 Market in India
      Mr. Subrata Dutta               CIO                            SREI Infrastructure         Managing IT as Business
      Mr. Pramod Dwivedi              Head-Marketing at              Ambuja Realty               Marketing Challenges in Real Estate
      Ms.Sudeshna Mukhopadhyay Director, Marketing, Lighting Philips Electronics                 Lighting as a Marketing Tool
                                                             India Ltd.
      Mr. Jaspreet Bindra             Regional Director              Microsoft                   How Microsoft built the gaming
                                                                                                 category in India with XBOX!!!
      Mr. Suranjan Bhattacheryay      Credit Head                    SREI-BNP Paribas            Credit Risk Assessment
      Mr. Kumar S. Krishnaswamy       HRD, Group Head                Fortis Group, India.        Talent Management & Performance
                                                                                                 Management in Service Sector
      Mr. Srikrishna Rupanagunta      Vertical Head, Retail Sector   Mu Sigma                    Trends in Analytics
      Mr. Amandeep Kochar             Director, Media, Publishing    HCL, America                How to develop your personal
                                      and Entertainment                                          brand
      Mr. Sandeep Kar                 Executive VP & RBL -           YES Bank Ltd                Risk Management
                                      C & IB (East)
      Mr. Divyesh Lapsiwala           Director, Indirect tax         Ernst and Young             Implementation of Goods and
                                                                                                 Services Tax
      Mr. Bipin Chandra Pendyala      VP                             Computer Associates         Corporate governance
      Mr. Dayanidhi M. G.             Managing Director-             Digital Chocolate           Organizational Development
                                      Asia Pacific
      Deepa Thomas                    Head - Corporate               E-bay                       eCommerce
                                      Comunications
      Abraham Koshy                   Marketing Prof. at IIM-A &     IIMA                        Myths of Marketing
                                      Co-author of Marketing
                                      Management by Kotler
      Mayank Saksena                  MD East                        Jones Lang Lasalle          Consulting in Real Estate
      Saugata Gupta                   CEO                            Marico                      Leadership lessons on how to
                                                                                                 succeed as a manager
      Abdul Rahim                     Chief Knowledge Officer        IPE Global                  India's Development Dilemma
      Manosh Mukherjee                Group COO & CFO                TBWA India                 world of Advertising
      Mr. Manas Agarwal               CEO & Co-Founder               Affine Analytics            Analytics
      Sankarson Banerjee              CIO                            India Infoline Ltd.         Technology Management
      Sanjoy Sen                      Div CIO                        ITC India Ltd.              Managing IT in ITC
      Gagan Bakshi                    Director M&A                   Interglobe Enterprises      Insights into M&A and I-Banking
                                                                     (Indigo Airlines, Hotels,
                                                                     Technologies, etc.)




50
www.som.iitkgp.ernet.in



Faculty Profiles
Anand Teltumbde                                                 Ashutosh Sarkar
B. E. (VNIT), P.G.D.M (IIM, A), Ph. D. (Mumbai)                 B.E. (Guwahati Univ.), M.Tech., Ph.D. (IIT Kharagpur)
Specialization: Project Management, Production &                Specialization: Operations Management
                                                                Dr. Sarkar teaches operations management, supply chain
Operations Management, Corporate Strategy, Information          management and service operations management at VGSOM.
Systems                                                         He earned his M.Tech and PhD in Industrial Engineering &
Prof Teltumbde has worked for more than 35 years in the         Management from IIT Kharagpur. He has done many
Oil Industry encompassing entire value chain. He has headed     consultancy and training assignments for various
many functions such as Corporate Planning, Engineering &        organizations in India. His research interests supply chain
Projects, Supply & Distribution and Information Systems and     coordination, supplier relationship management and supply
many new strategic initiatives. He pioneered many innovative    chain risk management. His research works have appeared
systems and was awarded numerous awards for spreading           in many reputed international journals including
                                                                Transportation Research Part E, IJPE, C&IE, and JPSM which
IT in the country. He also worked on various industry
                                                                have been highly cited by researchers across the world. He
committees and was a member of the first Study Group for
                                                                has visited Center for Logistics & Supply Chain Management,
deregulation of oil industry in 1994-1995. He also worked
                                                                Faculty of Business, Economics and Statistics, University of
as Managing Director, National Oil & Chemical Company
                                                                Vienna as a researcher. He was also selected for the
(NOLCHEM), Lagos (Nigeria) for post-privatization turnaround;   prestigious BOYSCAST Fellowship (2008-2009) by
and Consultant cum Project Manager, Kenya Pipeline              Department of Science & Technology, Government of India.
Company, Nairobi (Kenya) and also as consultant with CNPC,      He is a life member of Indian Institute of Industrial Engineering
China. He had been teaching as a guest/ visiting faculty to     and Society of Operations Management.
various business schools in Mumbai and IIM, Ahmedabad
                                                                Barnali Nag
over the last 25 years and has published 25 research papers.
Before joining VGSOM, he was Managing Director & CEO of         M.A (JNU), PG Diploma (Development Policy), PhD (Economics)
Petronet India Limited, Mumbai and Director on the Board        Dr. Barnali Nag is an M.A. in Economics from JNU, New Delhi
of a few other companies.                                       and PG Diploma (Development Policy) and PhD (Economics)
                                                                from IGIDR, Mumbai - an advanced Research Institute by
Aradhna Malik                                                   Reserve Bank of India. She has been a faculty at RIS, New
M.Sc. (Panjab University), Ph.D. (University of Denver, USA)    Delhi (a think tank of the Ministry of External Affairs, GoI).
                                                                Later she joined the Indian School of Business, Hyderabad
Specialization: Communication Studies
                                                                as Business Research Fellow, from where she went to
Dr. Aradhna Malik has been working with VGSoM, IIT              Wharton Business School, University of Pennsylvania as
Kharagpur, as an Assistant Professor since July 2008. She       Visiting Scholar. Dr. Barnali has been the Associate Editor
has about 14 years of experience in a diversity of roles and    of South Asia Economic Journal, which is a peer reviewed
organizations in India and abroad. Dr. Malik has been trained   international journal, published by SAGE, for around four
in grant-writing from the Grants Institute, USA. Her work       years. She is also a reviewer for reputed international journals
includes research on developmental communication,               like Energy-The International Journal, Energy Policy,
management of social welfare organizations, competence          International Journal of Environ-mental Technology and
in intercultural communication, and the social impact of        Management and International Journal of Environment and
technology. Dr. Malik is currently serving as the Associate     Waste Management. Dr. Barnali's current research interest
Copy Editor of Asian English as a Foreign Language (AEFL)       includes economics and business implications of climate
Journal.                                                        change, policy imperatives for carbon base-line
                                                                determination and quantitative modeling and research on
Arun Kumar Misra                                                productivity and efficiency in the Indian manufacturing
M. Phil. and Ph.D. (IIT Mumbai)                                 sector.

Specialization: Banking, Finance and Financial Markets          Biplab Datta
Dr. Arun Kumar Misra's teaching and research activities         B. Arch. (IIT Kharagpur), M.B.E.M., Ph.D. (IIT Delhi)
relate to Economics and Finance mainly in the fields of         Specialization: Marketing Management, Quality Management,
Financial Markets, Risk Management, Commercial Banking          Leadership and Team work
and Investment Banking. Before joining VGSOM, he was            Prof. Datta's research interests include Marketing
working as Senior Manager in a leading public sector bank.      Management, leadership and teamwork, Service Quality
As a professional Banker, Dr. Misra has extensive experience    Management and Customer Relationship Management. He
in the areas of capital market, risk management, Basel-II       was awarded Silver Medal in Architecture by IIT Kharagpur
implementation in banks, assets-liabilities management and      in the year 1992. He has received ISO 9000 Lead Auditor
profit and profitability management in banks. He has several    Certificate from DNV, U.K. He has several research papers
publications primarily in the areas of financial markets        published in national and international journals. He has also
integration and risk management. He is an associate fellow      organized a number of Management Development
of Indian Institute of Bankers.                                 Programmes for executives and also for faculty members
                                                                of other management institutes.

                                                                                                                                    51
Vinod Gupta School of Management


                                                                       chapter), member of executive committee of National
     Chandra Shekhar Mishra                                            Academy of Psychology, India. His current consulting and
                                                                       research expertise are in the area of Strategic Human
     M.Com., Ph.D. (Utkal University)
                                                                       Resource Management, Organizational Culture, Leadership,
     Specialization: Finance, Accounting
                                                                       Emotional Intelligence, and Knowledge Management,
     Prof. Mishra has been working with VGSOM, IIT Kharagpur           Psychology of well-being, CSR and Corporate Affairs.
     as an Assistant Professor since 2007. Prior to joining VGSOM
     he was working as a faculty member at IMT Ghaziabad and           Kalyan Kumar Guin
     has more than twelve years of teaching and research               B.Tech., Fellow (IIM Bangalore)
     experience. His research interests include valuation, mergers     Specialization: Marketing, Operations Management,
     & acquisitions and financial reporting. He has published          Statistical method of Management
     several articles in various national and international referred   Prof. Kalyan Kumar has a special interest in Quantitative
     journals. He is also a life time member of Indian Accounting      Modeling of Strategic Issues in management. He worked as
     Association.                                                      an executive in ONGC for two and half years, before
     Damodar Suar                                                      embarking onto an academic career. Prof. Guin actively
                                                                       participates in real life problem solving in business
     M.A. (Psychology), Ph.D. (IIT Kharagpur)
                                                                       environment through consultancy work. Presently, he is
     Specialization: Social and Organizational Psychology,             carrying out an international study of developing a model
     Neuropsychology                                                   to maximize benefits of bilateral aids to the recipient
     Prof. Suar is a professor at IIT Kharagpur. He has more than      companies belonging to developing countries.
     25 years of teaching experience. He is an associate editor
                                                                       Prabina Rajib
     of the journal Psychological Studies. His research focuses
     on contemporary social issues. He has authored three books,       MBA (VGSOM), PhD (IIT Kharagpur)
     over 70 scientific/professional articles including book           Professor (Finance & Accounts) with Vinod Gupta School of
     chapters. He has handled more than 30 research/consultancy        Management IIT Kharagpur, Dr. Rajib has been a Fulbright
     projects, and co-ordinated more than 15 training                  Pre-doctoral Fellow at Purdue University. She has been
     programmes.                                                       bestowed with a PhD in International Finance by IIT Kharagpur
                                                                       apart from her Masters in Business Management majoring
     Jitendra Mahakud                                                  in Finance at the same institute. A renowned author on the
     M.A., M.Phil. (Hyderabad University), Ph.D. (IIT Bombay)          subject of valuation particularly on derivates and option
     Specialization: Financial Economics, Corporate Finance,           she has expertise in nitty grities of Security Analysis, Financial
     Investment Management                                             Markets & Institutions and Derivatives Pricing & Valuation.
     Prof. Jitendra Mahakud has more than eight years of teaching      Parama Barai
     andresearch experience in the area of finance at IMT              B.E. (Civil) NIT Durgapur, MS IISC Banglore, PhD Finance
     Ghaziabad, ISB Hyderabad, Nirma Institute of Management,          Strategy (XLRI Jamshedpur)
     Ahmedabad and Narsee Monjee Institute of Management
                                                                       She has joined VGSOM as a full time faculty since January
     Studies, Mumbai. He has published more than 20 research
                                                                       2012. She had worked with Tata Steel Jamshedpur as a
     papers in leading national and international Journals. He
                                                                       manager design for six years before pursuing her PhD from
     has co-authored a text book titled "Financial Institutions
                                                                       XLRI.
     and Markets" published by Tata McGraw-Hill.
                                                                       Prithwis Mukerjee
     K.B.L. Srivastava
                                                                       B.Tech (IIT Kharagpur), PhD (University of Texas at Dallas)
     M.A., Ph.D. (IIT Kanpur)
                                                                       Prithwis Mukerjee is an engineer by education, a programmer
     Specialization: Human Resource Management and
                                                                       by passion and an imagineer by intention. A B.Tech from IIT
     Development, Organizational Behaviour
                                                                       Kharagpur, he has done his MS and PhD from the University
     Prof. K.B.L. Srivastava has more than 18 years of teaching,       of Texas at Dallas, USA and has spent 18 years in the
     research and training experience. He has taught earlier at        Indian sof tware business working in Tata Steel,
     BITS Pilani, and T.A. Pai Management Institute, Manipal, and      PricewaterhouseCoopers and IBM. He has a passion for all
     also served as visiting faculty at XLRI Jamshedpur (2002)         things digital but his current interests are in the area of Web
     and Asian Institute of Technology, Bangkok (2005). He has         2.0 and database technology. He has written two books and
     published more than 40 papers in national and international       has been featured in print, online and electronic media. To
     journals and contributed 20 chapters in edited books. He          know more about Prithwis, please visit his personal portal
     has supervised 7 Ph.D. theses in the area of Human Resource       http://www.yantrajaal.com.
     Development, Knowledge Management, HR issues in
     Mergers/Acquisitions, Emotional Intelligence and
                                                                       Rudra Prakash Pradhan
     organizational culture. He has conducted management               M.A., Ph.D. (IIT Kharagpur)
     development programmes in areas of behavioural/soft skills        Specialization: Econometric Modelling & Business
     and human resource management and development. He is              Forecasting
     board member of Academy of International Business (Indian
                                                                       Prof. Pradhan has been working with VGSOM IIT Kharagpur

52
www.som.iitkgp.ernet.in


as anAssistant Professor since 2007. Prior to joining VGSOM        graduate fellowship for completing his doctoral studies from
he was working as a faculty member at BITS Pilani and has          University at Albany, SUNY. He has also received an
more than six years of teaching and research experience.           excellence in teaching award and an excellence in research
His research interests include infrastructure finance, foreign     award from university at Albany, SUNY in 2010. Moreover,
direct investments and econometric modeling. He has                he was also awarded a special fellowship for his doctoral
published several articles in various national and international   dissertation in 2010 from University at Albany, SUNY. Before
referred journals.                                                 pursuing his graduate studies abroad, he was a research
                                                                   assistant in Centre for Studies in Social Sciences, Calcutta
S. Srinivasan
                                                                   (CSSSC).
B.E., M.Tech., Ph.D. (IIT Kharagpur)
                                                                   Sudeep Mallick
Specialization: Strategic Management, Finance
                                                                   B.Tech (IT-BHU), Fellow (IIM, Bangalore)
Prof. Srinavasan has been working with VGSOM IIT Kharagpur
as Professor since 1978. He is also joint faculty in the           Specialization: Operations Management & Decision Sciences
Department of Industrial Engineering & Management, IIT             Dr. Sudeep Mallick has over 13 years industry experience
Kharagpur. Prof. Srinivasan has received Fulbright research        in manufacturing and IT sector. He was a Principal Research
grants during 1984-85 and 1997-98 and has conducted                Scientist with Infosys Technologies Ltd. Bangalore and has
research at Wharton School and Creighton School in U.S.A.          widely published in international conferences and industry
His research interests include financial engineering. He has       journals in the area of IT Management, Diffusion of IT,
published several articles in various national and international   Enterprise Systems and Analytical Modeling of Enterprise
referred journals He is life member of the American Finance        systems. He has also worked as Project Manager in Business
Association.                                                       Transformation Projects for Fortune 500 companies. He is
                                                                   the author of a book on Enterprise IT Architecture which
Sadhan K. De
                                                                   was jointly published by Infosys Technology and John Wiley
M.Tech., M.Sc. (Tech.) (Loughborough), Ph.D. (Manchester)          and has also been featured in the Marquis Who's Who in
Specialization: Information Technology and Systems                 the World (2007) for his contribution to the field of IT.
Management
                                                                   Sujoy Bhattacharya
Prof. Sadhan K. De has special interest in Strategic Information
                                                                   MBA, Ph.D. (IITM, Gwalior)
Systems, Management of Technology and Technological
Innovation, Enterprise Resource Planning, Global                   Specialization: Marketing Management
Competitiveness on which he has published a lot of papers.         Sujoy Bhattacharya has nine years of Teaching and Research
Prior to joining VGSOM, he served as the Senior Divisional         experience. He has taught at Mudra Institute of
Manager at Tata Steel and Nagarjuna Fertilizers.                   Communications, Ahmedabad, Goa Institute of Management,
                                                                   Goa and S P Jain Institute of Management, Singapore Campus.
Sangeeta Sahney
                                                                   He has been a trainer for the Border Security Force
B.A. (Hons.) (Calcutta University), MBA (Bundelkhand               (Takenpur) at the 'Chanakya' tactical training wing at the
University), Ph.D. (IIT Delhi)                                     senior command (DIG) level. He has conducted doctoral
Specialization: Marketing Management                               workshops at DOMS, IIT Madras and DOMS, IIT Roorkee. He
Dr. Sahney has been working with VGSOM, IIT Kharagpur as           teaches Retail Management, Marketing Strategy and Core
an Assistant Professor since 2005. A Gold Medalist MBA             Marketing courses. His research interests are Qualitative
(Bundelkhand University), followed by a UGC-NET and a PhD          Methodologies, SEM, Mixed Method Research and Panel
(IIT Delhi), she has served as a facultymember at U.P Technical    Data Analysis in Marketing.
University and IIT Roorkee. She has also served as a faculty       Susmita Mukhopadhyay
under Secondment (MHRD) at the School of Management,
                                                                   M.Sc. (Applied Psychology), PGDHRM, Ph.D. (Research Fellow
Asian Institute of Technology, Bangkok in 2009 for 4 months.
                                                                   PRU, ISI, Kolkata-degree awarded by Calcutta University)
With a specialization in Marketing, she teaches Marketing
Management, Consumer Behavior Analysisand sales                    Specialization: Human Resource Management & Industrial
Management. Her research interests include studies in              Relationship, Business Value and Ethics, Organizational
Consumer Behavior, Organizational Behavior and Quality             Behaviour
Management in Education. She has several publications to           Prof. Mukhopadhyay, First Class First in M.Sc., winner of the
her credit in both national and international journals, and        Young Scientist Award and Search of Excellence Award, has
has also awards in a few of them. She is also on the               several papers in national and international journals to her
editorialboard of a number of journals.                            credit. Her research interests include Organizational Health,
                                                                   Women Studies, Consumer Behaviour, Infrastructure
S Chattopadhyay
                                                                   management, Quantitative Techniques and Microfinance.
Ph.D. (Univ. at Albany, SUNY)                                      She is a Fellow at Microfinance Research Alliance Programme,
Prof. Siddhartha Chattopadhyay is an M.A. in economics             Centre for Microfinance, Institute of Financial Management
from Delhi School of Economics and a Ph.D. in economics            & Research, Chennai.
from University at Albany, SUNY with specialization in
macroeconomics and econometrics. He has received a


                                                                                                                                   53
Vinod Gupta School of Management



     Placements
                                        2010-2012 Batch : Final Placement Statistics
     Total Number of students participating in placement process                       83
     Number of Companies Visited                                                       35
     Number of Offers made                                                             102
     Highest Salaries Offered                                                          16.5 Lakh per annum
     Average Salaries Offered                                                          11.32 Lakh per annum




                                      2011-2013 Batch : Summer Placement Statistics
     Number of students who participated in placement process                          104
     Number of Companies that visited campus                                           76
     Highest Summer Internship Stipend Offered                                         1,00,000
     Average Summer Internship Stipend Offered                                         40000




54
www.som.iitkgp.ernet.in



Recruiter Speak


        "We have found the students to be very able, especially in the areas on operations & supply
        chain management" - Ramesh Devairajan, General Manager, Tata Motors




            "We were able to find the candidates with the right mix of business acumen & technical bent
            of mind that we were looking for" - Raghav Chandran, Senior Manager, Accenture Management
            Consulting


                    "VGSoM has traditionally been a happy hunting ground for us. The participation and
                   enthusiasm shown by the students was a delight. We are also impressed by the
                   infrastructure and facilities provided. We feel that VGSoM will go a long way in enabling
                   their students to be future managers. Hoping that most of them would choose to start
                   their career with us "- Savit Anand, Vice President HR, HSBC


        "What impressed me most about students at VGSoM is how they were able to articulate and put
        words to their thoughts. I can say without a doubt that this is one of the best pools of talent I
        have interviewed over the past year." - Nupur Chaudhuri, General Manager, Ericsson India Global
        Services


                     "The students were technically sound in most of the marketing concepts, the
                     spontaneity shown by the students was refreshing. We would like to come back
                     again nex t year." - Krishnamur thi, HR Manager, Titan Industries.


              "We found that VGSoM has a very good academic program taught by very able faculty.
              This made the students well rounded and industry ready." - Rajesh Palwankar, Partner,
              Deloitte Touche Tohmatsu India Pvt. Ltd.


                     "IIT Kharagpur has been the pioneer in introducing management education to the
                     technical institutes in India. The school lives up to the reputation set by its parent
                     institution. I was impressed by the financial acumen the students possess. I must
                     admit I was pleasantly surprised." - Mr. Awadesh Krishna, Senior Derivatives Dealer,
                     Nomura Holdings Pvt. Ltd.


                "The quality of intake is good, the faculty is excellent and the environment is just right
                for development. This school has all the ingredients for being labeled as a dream
                destination for both students and recruiters" - Peeyush Upadhyay, Vice President HR,
                Infosys.




                                                                                                               55
Vinod Gupta School of Management



     Contact Details of Placement Committee Coordinators

     Please get in touch with the placement committee coordinators in case of any query.




     MBA Coordinators
      Name                                    Mobile Number                                Email Id
      Abhijith Vangipuram                     91-9564441097                                abhijithsimha@gmail.com
      Abishek Thampan                         91-9564441026                                abishek.tp@gmail.com
      Harsh Kumar Srivastava                  91-9002319991                                harsh.che@gmail.com
      Kamal Kannan                            91-9564278011                                Kamal_Kannan@outlook.com
      Pooja Gupta                             91-9903467750                                poojag30@gmail.com
      Pratiush Tyagi                          91-9564441026                                pratiush.tyagi@gmail.com
      Sourabh Chaturvedi                      91-7407048785                                sourabh17287@gmail.com
      Sushrut Choubey                         91-9564279026                                sushrutchoubey@gmail.com



     EMBA Coordinators
      Name                                    Mobile Number                                Email Id
      AyanKhasnabis                           91-9433236524                                ayank.iitkgp@gmail.com
      PallabDatta                             91-9051514646                                pallabd.iitkgp@gmail.com
      Girija Prasad Nanda                     91-9861049665                                girijan.iitkgp@gmail.com




56
How to reach IIT Kharagpur




Situated about 120 km west of Kolkata, Kharagpur can be reached in about 2 hours by train from
Howrah railway station (Kolkata) or 3 hours by car from Kolkata Airport. Kharagpur is also connected
by direct train services to most major cities of the country. The Institute is about 10 minutes' drive
(5 km) from the Kharagpur railway station. Private taxi, auto-rickshaw or cycle-rickshaw can be hired
to reach the Institute.
For any further details please contact:
Career Development and Placement
VGSOM, IIT Kharagpur
Prof. Anand Teltumbde
Chairman, Placements & Corporate Contact
anand@vgsom.iitkgp.ernet.in
+91-9475368435
+91-3222-281996
placements@vgsom.iitkgp.ernet.in
placements.vgsom.iitkgp@gmail.com
http://www.som.iitkgp.ernet.in

Vgsom placement brochure 2012 13 final

  • 1.
    Vinod Gupta Schoolof Management Placement Brochure 2012-13
  • 3.
    The School 2 Mission 2 A Business School on its way up 2 The MBA Programme 2 The EMBA Programme 2 MBA Admission Process 3 Contents Facilities@Campus 3 MBA Curriculum 4 EMBA Curriculum 5 Options for Electives at VGSOM 6 Batch Profile 7-46 Life @ Campus 47 Campus Events 47 Saamanjasya 47 Madison Avenue 47 Shraddha 48 VPL - VGSOM Premiere League 48 Kshitij 48 SpringFest 48 Clubs & Committees 49 Corporate Interaction (Guest Lectures) 50 Faculty Profiles 51-53 Placements 54 Recruiter Speak 55 Contact Details of Placement Committee Coordinators 56
  • 4.
    Vinod Gupta Schoolof Management The School Vinod Gupta School of Management established in 1993, was the first school of management to be setup within the IIT system. It was initiated by a distinguished alumnus and a life time fellow of the Institute, Mr. Vinod Gupta. Mission "To develop outstanding management professionals and future CEOs, who will lead organizations especially in technology- driven and knowledge-based industries, in the service of the nation and community." A Business School on its way up VGSOM synergizes the latest management education while leveraging the technical competence of IIT Khargapur. The founders of IIT Kharagpur felt the need to utilize competencies and resources possessed by the institute to impart superior quality of management education. VGSOM has contributed significantly towards management education in India over the last two decades. The school offers both full-time MBA as well as a special EMBA programme for working executives. Apart from these, VGSOM runs one of the largest doctoral programmes in management and conducts MDPs which are short duration programmes for practicing managers in various functional areas. The MBA Programme The EMBA Programme The flagship programme of the School leads to the Over the years the school has moved beyond the sphere of regular MBA programme. The school has two degree of Master of Business Administration from IIT programmes for working executives - EMBA at the Kolkata Kharagpur. This is a full-time four-semester (2 year) and Bhubaneswar campuses of IIT Kharagpur which residential programme for graduate engineers and leads to the degree of Master of Business Administration Masters' degree holders in science, economics and from IIT Kharagpur. With the ever increasing pace of knowledge creation and knowledge obsolescence, a commerce, intending to pursue management careers in professional can no longer presume to be a high achiever India or abroad. over his entire career banking upon his initial professional The MBA curriculum has evolved to be among the best qualification. There is growing need for high quality Executive MBA Programs that is recognized worldwide. in the country combining the traditional strengths of IIT The 3 Years EMBA programme enables working in technical education with modern management executives to upgrade their managerial knowledge and philosophy. Teaching techniques include a judicious mix skill while continuing to be employed. This rigorous fully of lectures, case-studies, group projects and workshops. classroom based programme is held during weekends. A two-month summer internship in industry exposes The participants bring in their wide experiences into the classroom and work on regular individual and group students to practical management problems. The core projects. Throughout the programme, the participants of the programme includes compulsory courses in Human practice the concepts learnt in classrooms at their Resource Management, Production & Operations, workplace. This parallel learning and implementation Marketing, Finance, Information Systems Management, process is very fundamental to this programme. Organizational Behavior, Economics, Strategic This 12 trimester programme has been conceived benchmarking similar offerings by leading B-schools in Management, Legal Aspects of Business, Business Ethics, India and the world; for content, mode of delivery, Quantitative Methods and Business Communication. A curricula design and course structure. It consists of a large number of electives from across several IIT compulsory set of core subjects and a variety of elective departments are available for a student to pursue his/her subjects - similar offerings as in the full time MBA individual interests in greater depth. In addition, all programme. An international immersion in a foreign country exposes students to a different macroeconomic peripheral administrative functions in the school are environment and culture. In the last three terms, the managed by students in team mode to inculcate team participants engage themselves in individual projects orientation in them. where they attend to a real life problem. 02
  • 5.
    www.som.iitkgp.ernet.in MBA Admission Process Facilities@Campus VGSOM admits students on the basis of the Common Students and faculty of VGSOM have access to cutting edge Admission Test (CAT), which is also used by the IIMs, IITs infrastructure. They have access to the central library which and other top B- schools in India. However, unlike other B- has an online avatar too. The school's computer laboratory schools a candidate must have a first class Bachelor's degree is equipped with the most up to date hardware and software in Engineering/Technology or a first class Masters' degree technology. The school provides on-campus residential in Science (with Mathematics or Statistics and bachelor's accommodation facility to all its students as well as faculty level), Economics or Commerce to be admitted in VGSOM. which are equipped with high speed wireless connectivity. Eligible candidates are called for group discussion and personal interview based on their CAT percentile, academic consistency and quality of work experience. The school selects students who have the necessary aptitude and the right attitude for a career in management. A typical class has enough diversity of gender, disciplines, experience, region and language so as to contribute diverse perspectives to any discussion which is considered essential in management learning. 03
  • 6.
    Vinod Gupta Schoolof Management MBA Curriculum First Semester FINANCIAL ORGANIZATION COST & ECONOMICS FOR HUMAN BEHAVIOR ACCOUNTING & DESIGN, CHANGE & MANAGEMENT MANAGEMENT & MANAGEMENT REPORTING TRANSFORMATION ACCOUNTING STATISTICAL MATHEMATICAL MANAGEMENT MARKETING I ORAL BUSINESS METHODS FOR MODELS FOR INFORMATION COMMUNICATION MANAGEMENT MANAGEMENT SYSTEMS DECISIONS Second Semester CORPORATE BUSINESS RESEARCH BUSINESS, GOVERNMENT & INTERNATIONAL STRATEGIC FINANCE METHODS ECONOMIC ENVIRONMENT MANAGEMENT HUMAN PRODUCTION & IT & BUSINESS MARKETING II WRITTEN BUSINESS RESOURCE OPERATION APPLICATIONS COMMUNICATION MANAGEMENT MANAGEMENT LABORATORY Summer Internship Project at Leading Corporations for a duration of 2 months (Month of May -July) Third Semester BUSINESS LAW FOR MANAGERS TECHNOLOGY MANAGEMENT APPLIED MANAGEMENT RESEARCH PROJECT Plus a choice of seven electives Fourth Semester ORGANIZATIONAL BUSINESS ETHICS COMPREHENSIVE VIVA APPLIED MANAGEMENT LEADERSHIP RESEARCH PROJECT Plus a choice of seven electives Entire Course Duration is of 24 Months MBA in Finance, Marketing, Operations, Systems, General Management and Human Resource 04
  • 7.
    www.som.iitkgp.ernet.in EMBA Curriculum First Trimester STATISTICAL METHODS FOR ECONOMICS FOR MARKETING I BUSINESS MANAGEMENT MANAGEMENT COMMUNICATION Second Trimester MATHEMATICAL MODELS FOR IT & BUSINESS APPLICATIONS HUMAN RESOURCE FINANCIAL ACCOUNTING & MANAGEMENT DECISIONS LABORATORY MANAGEMENT REPORTING Third Trimester BUSINESS, GOVERNMENT & STRATEGIC CORPORATE MARKETING II INTERNATIONAL ECONOMIC MANAGEMENT FINANCE ENVIRONMENT Fourth Trimester BUSINESS LAW FOR BUSINESS RESEARCH HUMAN RESOURCE PRODUCTIONS AND MANAGERS METHODS MANAGEMENT OPERATIONS MANAGEMENT Fifth Trimester COST & MANAGEMENT SUPPLY CHAIN TECHNOLOGY ELECTIVE I ACCOUNTING MANAGEMENT MANAGEMENT Sixth Trimester MANAGEMENT INFORMATION MARKETING OF INDUSTRIAL ELECTIVE II ELECTIVE III SYSTEMS AND HITECH PRODUCTS Seventh Trimester ORGANIZATIONAL ELECTIVE IV ELECTIVE V ELECTIVE VI LEADERSHIP Eighth Trimester BUSINESS ETHICS INTERNATIONAL ELECTIVE VII ELECTIVE VIII MANAGEMENT Ninth Trimester MANAGEMENT PROJECT ELECTIVE IX GAMES MANAGEMENT INTERNATIONAL IMMERSION TO A FOREIGN COUNTRY Tenth, Eleventh and Twelfth Trimester MANAGEMENT PROJECT Entire Course Duration is of 36 Months MBA in Finance, Marketing, Operations, Systems, General Management and Human Resource 05
  • 8.
    Vinod Gupta Schoolof Management Options for Electives at VGSOM Electives of 3rd semester Electives of 4th semester INTERNATIONAL MANAGEMENT PURCHASING AND OUTSOURCING ENTREPRENEURSHIP & NEW VENTURES INTERNATIONAL ECONOMICS FINANCIAL MARKETS & INSTITUTIONS CORPORATE GOVERNANCE SECURITY ANALYSIS & PORTFOLIO MANAGEMENT IT FOR BUSINESS INTELLIGENCE COMMERCIAL BANKING MANUFACTURING STRATEGY ENTERPRISE RESOURSE PLANNING SOFTWARE PROJECT MANAGEMENT INFORMATION SYSTEM STARTEGY BUSINESS TO BUSINESS MARKETING SUPPLY CHAIN MANAGEMENT ECONOMETRIC AND BUSINESS FORECASTING SERVICES MANAGEMENT ECONOMETRIC MODELING RISK MANAGEMENT E-COMMERCE TECHNOLOGY & APPLICATION MARKETING RESEARCH INFORMATION SECURITY & RISK MANAGEMENT MARKETING STRATEGY COMMODITY DERIVATIVES & RISK MANAGEMENT INDUSTRIAL RELATION & LABOUR LAWS CONSUMER BEHAVIOUR ANALYSIS PROJECT MANAGEMENT SALES & DISTRIBUTION MANAGEMENT ECONOMETRIC AND BUSINESS FORECASTING SERVICES MARKETING COMMODITY DERIVATIVES & RISK MANAGEMENT RETAIL MARKETING HUMAN RESOURCE DEVELOPMENT MARKETING ENGINEERING ORGANIZATIONAL DEVELOPMENT SIX SIGMA DERIVATIVES & RISK MANAGEMENT MERGERS, ACQUISITION & CORPORATE RESTRUCTURING INTERNATIONAL FINANCIAL MANAGEMENT FINANCIAL MODELING INFRASTRUCTURE & PROJECT FINANCE HR AUDIT INTERCULTURAL COMMUNICATION COMPETENCE 06
  • 9.
    BATCH PROFILE 2011-2013 Vinod Gupta School of Management VGSOM Dream Dare Deliver MBA Batch Profile 2011-2013 Experience Wise Breakup of 2011-2013 Batch Stream Wise Breakup of 2011-2013 Batch 07
  • 10.
    Vinod Gupta Schoolof Management Experience (0-11 Months) ABHINAV GUPTA ABHINAV M ABHISHEK MONDAL B.Tech, Biotechnology B.E, Electronics and Instrumentation B.Tech, Electrical Engineering Udaya School of Engineering, Anna Engineering Haldia Institute of Technology, WBUT University St. Joseph's College of Engineering, Work Experience: Bonti Corporate Summer Internship: Supply Chain Anna University services Pvt. Ltd. (4 months) Analytics (Multi-Modal Order Splitting Work Experience: Cognizant Summer Internship: Sales and Algorithm) at HP. Technology Solutions (11 months) Marketing of Lead Generation at Summer Internship: Market Omnitech Global Research in the field of tractor finance at Sundaram Finance Limited. GARIMA NAGAR KUNAL VERMA MADHVI AGARWAL B.Tech, Computer Science and B.Tech, Computer Science and B.Tech, Computer Science and Engineering Engineering Engineering YMCA Institute of Engineering, IEC-CET, GBTU Amity School of Engineering and Faridabad, Mahrshi Dayanand Summer Internship: Credit gap Technology, Amity University University, Rohtak calculation using gender baseline Summer Internship: Wastage Summer Internship: Analysis of survey for Risk Advisory Services at Control on Coconut Oil Packaging Demand of Steel in Cold Storage at Ernst & Young. Chain at Dabur India Ltd. JSW Steel Limited. 08
  • 11.
    BATCH PROFILE 2011-2013 MRIDUL BORGOHAIN POOJA GUPTA RUCHA VISHNU PUNDLE B.Tech, Electronics and B.Tech, Electronics and B.E, Electronics Engineering Communication Engineering Communication Engineering Vishwakarma Institute of Technology, Tezpur University St. Thomas' College of Engineering Pune University Work Experience: HCL Technologies & Technology, WBUT Work Experience: Persistent (6 months) Summer Internship: Market Systems Ltd. (6 months) Summer Internship: Comprehensive Development and Value Generation Summer Internship: Incorporation study on MAK HMO- Tea Spray Oil at of Residues at Vedanta- Hindustan of Project Financials in CSI Project BPCL. Zinc Limited. Governance System at Ericsson India Global Services Pvt. Ltd. SOUMITRA SAHU SOURABH RATHORE SRINIVASAN M B.Tech, Mechanical Engineering B.E, Computer Science and B.E, Electronics and Communication C. V. Raman College of Engineering, Engineering Engineering Biju Patnaik University of Technology LaxmiNarain College of Technology, Birla Institute of Technology, Mesra Work Experience: J. K. Paper Ltd. Bhopal, Rajiv Gandhi Proudyokigi Summer Internship: Sales Planning (2 Months) Vishwavidyalaya and generation at Advatech Summer Internship: Improve the Work Experience: Tata Consultancy Healthcare Pvt. Ltd. market penetration by enhancing the Services (9 months) marketing activities thereby Summer Internship: Benchmarking improving the visibility of Omnitech of UBC and its financial implications; Global among its prospects. Minimization of transportation cost; benchmarking of wheeling charges of electricity in Malco at Vedanta Aluminium Ltd. 09
  • 12.
    Vinod Gupta Schoolof Management VIVEK KUMAR B.Tech, Information Technology Galgotias College of Engineering and Technology, Uttar Pradesh Technical University Summer Internship: Manpower optimization at BPCL. Experience (12-23 Months) AMANPREET SINGH ARORA AMBILI PRABHAKARAN ANKIT VADHERA B.Tech, Computer Science and B.Tech, Information Technology B.Tech, Electronics and Engineering LBS College of Engineering, Communication Engineering Jaypee University of Information Kasaragod Kerala, Kannur University BhartiVidyapeeth's College of Technology, Solan Work Experience: State Bank of Engineering, New Delhi, Guru Gobind Work Experience: Accenture Travancore (21 months) Singh Indraprastha University Services Pvt. Ltd. (12 months) Summer Internship: Six sigma Work Experience: Aricent Summer Internship: Formulation of project on Rang De social investors' (18 Months) Internet Marketing Strategy and redemption request process and Summer Internship: Gender Business Development at Asclepius analysis of Rang De field partner baseline SME data analysis for Consulting performance. International Finance Corporation at Ernst and Young. 10
  • 13.
    BATCH PROFILE 2011-2013 BHARATHI CHELLAKKANNAN ANKUR BANGA ASHWIN VARIYAR ALAGAPPAN B.E, Electronics and Communication B.Tech, Information Technology B.E, Electronics Engineering Engineering Indian Institute of Information K.J.SOMAIYA College of Engineering, Punjab Engineering College, Technology Allahabad Mumbai University Chandigarh (Deemed University) Work Experience: Advanced Work Experience: Atos Origin India Work Experience: Accenture Technologies (India) (12 months) Pvt. Ltd. (22 months) Services Pvt. Ltd. (19 months) Summer Internship: Marketing Summer Internship: Data Analytics Summer Internship: Determinants of US Dollar Interest Rate Swap Rates Strategy and Selection of Online of Business proposals funded by / Determinants of Forward Premia in Platform Partner at Elite Academy. NSDC &Website design and Indian Forex Market / CRR & SLR development for UDAAN project Maintenance process documentation at ING Financial Markets. BINEET KUMAR CHATURVEDI DINESH KUMAR T KRISHNA MOHAN M B.E, Mechanical Engineering B.E, Electronics and Communication B.Tech, Telecommunication SIR MVIT, VTU Engineering Engineering Work Experience: Cummins India Institute of Road and Transport Vellore Institute of Technology, VIT Limited (22 months) Technology, Anna University University Summer Internship: Strategic Work Experience: Cognizant Work Experience: Tata Consultancy opportunities for services industries Technology Solutions (19 months) Services (7 months) in North American Shale gas market Summer Internship: Equity research Zigma Solutions (11 months) at Frost & Sullivan. and analysis at TVS Capital. Summer Internship: New Technology Trends impacting business in LEs and SMEs: CIO Survey at Deloitte 11
  • 14.
    Vinod Gupta Schoolof Management MANISH GUPTA MOULI GHATAK MUNMUN BISWAS B.E, Information Technology B.Tech, Information Technology B.Tech, Information Technology Compucom Institute of Information Institute of Engineering and National Institute of Technology Technology and Management, Technology, Lucknow, UP Durgapur University of Rajasthan TechnicalUniversity Work Experience: Tata Consultancy Work Experience: Norvech Coxeta Work Experience: Tata Consultancy Services (20 months) Technologies Inc. (9 months) Services (20 months) Summer Internship: Creation of SVA Consortium (India) Pvt. Ltd. Summer Internship: Sales Planning B2B/B2C marketing and distribution (10 months) and Generation at Advatech channel for Online and BOP Summer Internship: Credit Analysis Healthcare Ltd. institutions at Swabhimaanya. of Small and Medium Enterprises at Punjab National Bank. SAGAR NAVEEN ZALAVADIYA SAUVIK SEKHAR SEAL SHASHWATH R RAO B.Tech, Computer Science and B.Tech, Information Technology B.E, Electronics and Communication Engineering B.P.Poddar Institute of Management Engineering National Institute of Technology & Technology, WBUT Canara Engineering College, VTU Hamirpur Work Experience: Tech Mahindra Work Experience: Infosys Work Experience: Sapient Ltd. (16 months) Technologies Limited (12 months) IBC Systems (2 months) (20 months) Summer Internship: Negotiation Summer Internship: A POC for Summer Internship: Branding & and Execution of Third Party Mobility Applications in the Insurance Positioning of Ramco ERP Products Contracts and Establishment of a Industry at Deloitte at Ramco Systems. BPO for CRM Activities at Titan Industries Limited. 12
  • 15.
    BATCH PROFILE 2011-2013 SIVA KUMAR PEDHAPATI SOURABH CHATURVEDI YASH MEHTA B.Tech, Civil Engineering B.Tech, Mechanical Engineering B.E, Electronics and Communication College of Engineering, Jawaharlal Sikkim Manipal Institute of Engineering Nehru Technological University, Technology, Sikkim Manipal University L.D. College of Engineering, Gujarat Kakinada Work Experience: Infosys Limited University Work Experience: Tata Consultancy (20 Months) Work Experience: Infosys Limited Services (14 months) Summer Internship: ATM Operation (20 months) Summer Internship: Market Management (Process Optimization Summer Internship: Business research and Conceptualization of and Standardization) at FIS. Research at Triton - Identification of new products for kids segment at products that company should start Titan Industries supplying by assessing frozen seafood market size in Mumbai. Experience (24-35 Months) AAYUSH NANGRU ABHINAV VOHRA ABHISHEK AWASTHI B.E, Information Technology B.Tech, Computer Science B.Tech Mechanical Engineering University Institute of Engineering Engineering Raj Kumar Goel Institute of and Technology, Panjab University Maharaja Agrasen Institute of Technology, Ghaziabad, UPTU Work Experience: Infosys Limited Technology, Guru Gobind Singh Work Experience: Permaweld Pvt. (24 months) Indraprastha University Ltd. (12 months) Summer Internship: Healthcare Work Experience: Tata Consultancy Reliance Industries Ltd. (22 months) Dashboards at Deloitte. Services Ltd. (32 months) Summer Internship: Brand Summer Internship: Analysed the Positioning Analysis & flavored tobacco market and Communication Strategy at PEBS developed a launch strategy for Pennar. Flavored Cigarettes (where the flavors were based on popular Hookah Flavors), as part of New Product Offering, Marketing, at Godfrey Phillips India Ltd. 13
  • 16.
    Vinod Gupta Schoolof Management ABHISEKH RANJAN ABISHEK THAMPAN P AKHIL SOOD B.Tech, Mining Engineering B.Tech, Computer Science and B.Tech, Electronics and IT BHU, Banaras Hindu University Engineering Telecommunication Engineering Work Experience: Tata Steel Ltd. College of Engineering, Trivandrum, College Of Engineering Roorkee, (24 months) Kerala University Roorkee, U.P. Technical University Summer Internship: Process Work Experience: Computer Work Experience: Infosys Efficiency Improvement relates to Sciences Corporation Technologies Limited, Pune Production and Utilities at Heinz India (35 months) (25 months) Ltd. Summer Internship: Profitability and Summer Internship: Improving efficiency enhancement of Analytics Supply Chain Visibility by creating products at Redwood Associates. dashboards. Supplier valuation/rating for the client at Deloitte ANASWARA K R ANIRBAN DATTA ARUN KABRA B.Tech, Electronics and B.Tech, Electronics and B.E, Electronics Engineering Communication Engineering Communication Engineering Vishwakarma Institute of technology, College of Engineering, Trivandrum, St. Thomas' College Of Engineering Pune University Kerala University and Technology, WBUT Work Experience: Cognizant Work Experience: State Bank of Work Experience: Cognizant Technology Solutions (30 months) India (24 months) Technology Solutions Summer Internship: Process Summer Internship: Comparative (31 months) Optimization of Monitoring Activities Analysis of Investments in Mutual Summer Internship: Market Analysis at National Skill Development Funds and Life Insurance Products & Sales of the medical ERP,"Charak" Corporation at Bank of Baroda. at Asclepius Consulting & Technologies. 14
  • 17.
    BATCH PROFILE 2011-2013 ASHAF FARAZ KHAN ASHISH MEHTA AVEEK MUKHOPADHYAY B.Tech, Computer Science and B.Tech, Electrical Engineering B.E, Computer Science and Engineering National Institute Of Technology, Engineering Vellore Institute of Technology, VIT Kurukshetra Jadavpur University University Work Experience: Tata Power Work Experience: Tata Consultancy Work Experience: Bank of America (TPDDL) (25 months) - Global Markets Research and Services (33 months) Technology (24 months) Summer Internship: Supply Chain Summer Internship: Market Dewan P.N Chopra and Co-Chartered configuration by Procurement & Retail Sourcing of new brands in Research, Competitor Analysis and Accountants (4 months) existing categories & new category Pricing Strategy for Relaso Social Summer Internship: Deal Sourcing of Potential Investment Opportunities addition for e-retail at Valyoo CRM at Taragana Inc. and Deal Flow Analysis at Indian Technologies(Watchkart|Lenskart|B Angel Networks. agskart|Jewelskart|.com(s)). AVIJIT PAL BALAJEE RAO BIJU K. VARUGHESE B.Tech, Mechanical Engineering B.E, Electrical Engineering B.Tech, Electronics and National Institute of Technology Birla Institute of Technology, Mesra, Communication Engineering Durgapur Ranchi College of Engineering, Adoor, Cochin Work Experience: Tata Consultancy Work Experience: Tata Consultancy University of Science and Technology Services (18 months) Services, Hyderabad (16 months) Work Experience: Honeywell Indian Space Research Organization AbhyaasEdu Corp, Hyderabad Technology Solutions Lab (6 months) (17 months) (12 months) Infosys Technologies Limited Summer Internship: Sector analysis Summer Internship: Market mapping (26 months) followed by compilation of of fraud management solutions in the Summer Internship: 'Business and prospective unlisted companies in Indian market and a study on the Technology opportunities in the that sector and tracking listed market adoption of banking channels at Indian Food Industry' at Strategy and action relevant for the portfolio Fidelity Information Services. Collaborations Team, Siemens India companies at TVS Capital 15
  • 18.
    Vinod Gupta Schoolof Management CH VENKAT RAMAN MURTY ESHITA JHA GAURAV WIDHANI B.Tech, Electronics and B.Tech, Civil Engineering B.Tech, Electronics and Telecommunication Engineering National Institute of Technology Communication Engineering Institute of Technical Education And Karnataka, Surathkal BhartiVidyapeeth's College of research, Bijupatnaik University of Engineering, New Delhi, Guru Gobind Work Experience: Oracle India Pvt. Technology Singh Indraprastha University Ltd. (34 months) Work Experience: Tata Consultancy Work Experience: Tata Consultancy Services (25 months) Summer Internship: Automation of Services (33 months) processes in Citibank Collections Summer Internship: Tele Summer Internship: Business communication Consulting in New Division at Citibank India. Development and Assessment of Generation VAS and Enterprise market potential of pbSecure Mobility at Ericsson India Global (product to be launched) at Pitney Services Pvt. Ltd. Bowes India Pvt. Ltd. HARPREET KAUR JAYA PRAKASH JAIN KONARK JOSHI B.Tech, Computer Science and B.Tech, Applied Electronics and B.Tech, Computer Science and Engineering Instrumentation Engineering Engineering YMCA Institute of Engineering, Krupajal Engineering College, Jaypee Institute of Information Faridabad, Maharishi Dayanand Bhubaneswar, Biju Pattnaik University Technology University, Rohtak of Technology Work Experience: Infosys Work Experience: Tata Consultancy Work Experience: Tata Consultancy Technologies Limited (24 months) Services (20 months) NIIT Karnal Services (29 months) Summer Internship: Analysis of (4 months) Summer Internship: Business Media and Entertainment Industry at Talents Karnal (2 months) Process Analysis - Automation of Zee News Ltd. Summer Internship: Average estimation process and quality handling time rightsizing for process at Pinnacle Infotech Citiphone South at Citibank India. Solutions. 16
  • 19.
    BATCH PROFILE 2011-2013 PARTHA PRATIM PRANAY VERMA PRITAM DATTA B.Sc. (Engineering), Mechanical B.Tech, Production Engineering and B.E, Production Engineering Engineering Management Jadavpur University B.I.T. Sindri, Dhanbad, VBU National Institute of Technology, Work Experience: Tata Consultancy Hazaribagh Jamshedpur Services (35 months) Work Experience: Tata Consultancy Work Experience: John Deere India Summer Internship: Yield Services (27 months) Pvt. Ltd. (24 months) Bottleneck Analysis for Automotive Summer Internship: Role based Summer Internship: Study of small Grade Steels at JSW Steel. Dashboard Governance and SAP-SCM press shop for automation re-implementation at Triton Group. opportunities at Tega Industries. PRIYANKA RAGHURAM VASIREDDY RAHUL BAJAJ B.E, Electronics and B.E, Electronics and Communication B.Tech, Computer Science and Telecommunication Engineering Engineering Engineering MKSSS Cummins College of Chaitanya Bharathi Institute of Sardar Vallabhbhai National Institute Engineering, Pune University Technology, Osmania University of Technology, Surat Work Experience: Infosys Work Experience: Infosys Work Experience: Infosys Technologies Limited (33 months) Technologies Limited (34 months) Technologies Limited (34 months) Summer Internship: Analysis of SME Summer Internship: Understanding Summer Internship: Analysis of products at Axis Bank. and Impacting the Dynamics of the online promotions at Valyoo Retail channel - BOP at Danone Foods Technologies. and Beverages India Ltd. 17
  • 20.
    Vinod Gupta Schoolof Management RAHUL GUPTA RANA VISHAL SINGH RANJEET KUMAR SINGH B.E, Computer Science and B.E, Computer Science and B.Tech, Oil Technology Engineering Engineering Harcourt Butler Technological DCRUST Murthal, MDU Rohtak Walchand College of Engineering, Institute, Kanpur, Uttar Pradesh Work Experience: Headstrong India Sangli, Shivaji University Technical University Pvt. Ltd. (35 months) Work Experience: Tata Consultancy Work Experience: Wipro Technology Summer Internship: Benchmarking Services (34 months) (26 months) (Price - Value Analysis) and examination of market channels for Summer Internship: Benchmarking Summer Internship: Study & tools and consumer electronics. of B2B marketing practices & Analysis of Smart City at Wipro Followed with orchestrating product development of a strategic marketing Technologies. launch in modern retail at Stanley plan for FIS, India. Black & Decker. S KAMALA KANNAN SANJAY KUMAR SARAVANAN M B.E, Electronics and Communication B.Tech, Electronics and Electrical B.E, Production Engineering Engineering Engineering St Peters Engineering College, Anna MEPCO Schlenk Engineering College, Silicon Institute of Technology, University Anna University Bhubaneswar, Biju Patnaik University Work Experience: Infosys Work Experience: Cognizant of Technology Technologies Limited (33 months) Technology Solutions (24 months) Work Experience: Mahindra Satyam Summer Internship: Framework for Summer Internship: Business Risk (32 months) Project Manager Maturity Assessment and Development of a Summer Internship: Business Assessment and Project Assignment Business Continuity Framework at Development & Marketing Research at Ericsson India Global Services Pvt. Reckitt Benkiser. at BATOI Systems Private Limited. Ltd. 18
  • 21.
    BATCH PROFILE 2011-2013 SHILPA TANEJA SOVAN NAYAK SRINJOY SAHA B.Tech, Information Technology B.Tech, Computer Science and B.Tech, Computer Science and Engineering Engineering YMCA Institute of Engineering, Faridabad, MDU Rohtak Institute of Technical Education and Institute of Engineering and Research, Biju Patnaik University of Management, WBUT Work Experience: Angel Realty India Technology (5 months) Work Experience: Infosys Work Experience: Infosys Tata Consultancy Services Technologies Limited (24 months) Technologies Limited (25 months) (19 months) Summer Internship: Analysis of the Summer Internship: Hyperion Summer Internship: Equity Benefits and Stabilization of Financial Management- Financial ‘Integrated Milk Information and Consolidation at Deloitte. Research Analyst at TVS Capital Collection System’ (IMICS) at Heinz Funds Private Limited. India Limited. SUMIT PAL SINGH SUSHRUT CHOUBEY VARUN KUMAR CHOUDHARY B.Tech, Information Technology B.Tech, Electronics and Electrical B.E, Mining Engineering University School of Information Engineering MBM Engineering College, Jodhpur, Technology, Guru Gobind Singh MAIT GGSIPU Jainarayan Vyas University Indraprastha University Work Experience: Infosys Work Experience: Vedanta Work Experience: Adobe Systems Technologies Limited (33 months) Resources Limited (34 months) India Pvt. Ltd. (24 months) Summer Internship: Understanding Summer Internship: Market Summer Internship: Assessment of and impacting the dynamics of the Research on natural gas as an Competition in the Indian cement Direct to consumer channel for alternate fuel for electricity Industry at Competition Commission bottom of the pyramid at Danone generation in India at NTPC Ltd. of India. Foods and Beverages India Ltd. 19
  • 22.
    Vinod Gupta Schoolof Management Experience (36 Months and above) ABHIJITHSIMHA VANGIPURAM ABHISHEK RANJAN AKASH KRISHNATRY B.Tech, Civil Engineering B.Tech, Electronics and Electrical B.Tech, Electronics and National Institute of Technology Engineering Communication Engineering Warangal SASTRA, Thanjavur, SASTRA Deemed National Institute of Technology Work Experience: Broadridge University Kurukshetra Financial Solutions (13 months) IBM India Pvt. Ltd. (23 months) Work Experience: Infosys Work Experience: CSC India Ltd. Summer Internship: Quantifying the Technologies Limited (56 months) (48 months) Opening trend of Nifty & USD INR Summer Internship: study of the Summer Internship: Business Based On Global Cues/ Determinants Examination module of the ERP Development Plan for expansion of of Forward Premia in Indian Forex Market/ CRR & SLR Maintenance product "Greycells" at Kalingasoft. Pinnacle in Australia at Pinnacle process documentation at ING Infotech Solutions. Financial Markets. ALKA KATIYAR ASHISH KHATTRY BALANATHAN B B.Tech, Information Technology B.Tech, Electronics and B.E, Production Engineering KNIT Sultanpur, UPTU Communication Engineering Government College of Technology, Work Experience: HCL Technologies National Institute of Technology Coimbatore, Anna University (43 Months) Durgapur Work Experience: Infosys UCO Bank (17 months) Work Experience: ABB Ltd. Technologies Limited (47 months) Summer Internship: ATM Managed (37 months) Summer Internship: Market study Services (Project Management Team) Summer Internship: "Market & on rural telecommunication in India, at FIS. Technology Landscape for Industrial Market study on IPTV and DTH in Automation in India" at Strategy and India at Frost and Sullivan. Collaborations Team - Siemens, India. 20
  • 23.
    BATCH PROFILE 2011-2013 CHANDRA VEER BRAJESH KUMAR DEEPIKA AHUJA SINGH DULAWAT B.E, Computer Science and B.Tech, Electronics and B.E, Electrical Engineering Engineering Communication Engineering Punjab Engineering College, Birla Institute of Technology, Mesra, Amrita School of Engineering, Chandigarh, Deemed University Ranchi Coimbatore, Amrita Vishwa Work Experience: Reliance Work Experience: Tata Consultancy Vidyapeetham Infrastructure Ltd. (37 months) Services (36 months) Work Experience: Infosys Summer Internship: Supply Chain Summer Internship: Idle freight Technologies Limited (36 months) Analytics (Multi-Modal Order Splitting minimization for Concorde & Jumbo Summer Internship: Business Plan Algorithm) at HP. rakes at JSW Steel Limited. for Expansion of Pinnacle in United Kingdom at Pinnacle Infotech Solutions. MAJOR (Retd.) DIWAKAR SHUKLA FAIYAZ ABBAS HUSAINI SHITAL DESHMUKH B.E, Computer Science and B.Tech, Electronics Engineering B.Tech, Mechanical Engineering Engineering KNIT Sultanpur, U.P. Technical Zakir Husain College of Engineering MGM College of Engineering, Nanded, University and Technology, Aligarh Muslim Swami Ramanand Teerth University Work Experience: Wipro University Work Experience: Badwal & Tapdiya Technologies (41 months) Work Experience: Volvo India Pvt. Ltd., Thane (6 Months), Summer Internship: Processes and Ltd. (37 months) Indira Gandhi College of Engg, Navi Inventory at BGB Installation at BPCL. Tata Motors (7 months) Mumbai (12 Months) Summer Internship: Multi Industry Defence (Army) (96 Months) analysis, SCM trend and opportunities Summer Internship: Employee at JDA Softwares. Engagement at Tata Metaliks Limited. 21
  • 24.
    Vinod Gupta Schoolof Management GYAN PRAKASH HARSH KUMAR SRIVASTAVA ISHITA ADITYA B.E, Computer Science and B.Tech, Chemical Engineering B.Tech, Electronics and Engineering HBTI Kanpur, UPTU Lucknow Communication Engineering B.I.T. MESRA RANCHI Work Experience: Aditya Birla Nuvo JalpaiguriGoverment Engineering Work Experience: Wipro Group (32 Months) College, West Bengal University of Technologies (36months) GE Energy (4 Months) Technology Summer Internship: Operations and Summer Internship: Finding Work Experience: Tata Consultancy Strategy at Akosha. synergistic opportunities and Services (57 months) developing strategy to enter US Wind Summer Internship: Production Energy EAM/ERP market at Ramco process analysis at Pinnacle Infotech Systems. Solutions. JISHNU ROYCHAUDHURI KUSHAL BHARDWAJ LEELARAM TENNETI B.E, Information Technology B.E, Electronics and Communication B.E, Electronics and Electrical Bengal Engineering & Science Engineering Engineering University, Shibpur BIT Mesra, Ranchi Sathyabama University Work Experience: CSG International Work Experience: Tata Consultancy Work Experience: Wipro (Earlier known as INTEC) (36 months) Services (36 Months) Technologies (48 months) Summer Internship: Developing a Summer Internship: Project Summer Internship: An Analysis and 'Hunting Strategy' and a 'Framework' Appraisal and Investment Decisions POC of Mobility in Insurance Industry for B2B segmentation of prospective of Start-up Ventures at Indian Angel at Deloitte. accounts form the Media and Network. Communication industry at Wipro Technologies. 22
  • 25.
    BATCH PROFILE 2011-2013 LOKENDRA GAYAKWAD MRINAL VARSHNEY NEELESH KHATTAR B.E, Electronics and B.Tech, Electronics Engineering B.Tech, Mechanical Engineering Telecommunication Engineering Zakir Husain College of Engineering College of Engineering and Govt .Engineering College Bilaspur, Guru Ghasidas University Bilaspur & Technology, Aligarh Muslim Technology, Bhubaneswar, University BijuPattanaik University of Work Experience: Indian Telephone Industries Bangalore (12 months). Work Experience: Tejas Networks Technology Tata Communication (Formerly VSNL) Ltd. (36months) Work Experience: Infosys (6 months). Mindtree Consulting (8 months). Hewlett Packard (40 Summer Internship: Understanding Technologies Ltd. (60 Months) months). & Impacting the dynamics of the Summer Internship: Financial Summer Internship: Market Retail Channel - BOP, at Danone Management Information System at Research and deciding pricing strategy for Customer Relation Foods and Beverages India. FIS. Software at Taragana Inc. PRASENJIT BARIK PRATIUSH TYAGI RAHUL RAVI B.Tech, Electronics and B.E, Production Engineering B.Tech, Metallurgical Engineering Communication Engineering Punjab Engineering College, IIT BHU,Varanasi (formerly IT BHU) National Institute of Technology Chandigarh (Deemed University) Work Experience: TATA Durgapur Work Experience: Maruti Suzuki Technologies (13 months) Work Experience: Tata Consultancy India Limited (37 months) IBM (32 months) Services (36 months) Summer Internship: Study of the Summer Internship: Cost Benefit Summer Internship: Marketing Inventory Management Process at Analysis of API Grade Steel at JSW research,gap analysis of Xtrapower VOLTAS, Thane plant to identify the Steel. fleet card and recommendations to opportunities for improvement. increase the market share of Xtrapower fleet card at Indian Oil Corporation Ltd. 23
  • 26.
    Vinod Gupta Schoolof Management RANJANI RAMANUJAM ROHAN KUMAR PATTNAIK ROHIT SHARMA B.E, Computer Science and B.Tech, Computer Science and B.Tech, Computer Science and Engineering Engineering Engineering Amity School of Engineering and Birla Institute of Technology and NIT Rourkela Technology, Guru Gobind Singh Science, Goa Campus, BITS Pilani Work Experience: CSC India Pvt. Indraprastha University Work Experience: IBM (36 Months) Ltd. (61 months) Work Experience: Strategic Brand Consultants (12 months) Summer Internship: Enterprise Summer Internship: Framework for SAP Labs India Pvt. Ltd. (On Payroll Value mapping; Data modeling; Market Intelligence at Triton Groups. of Vault Information Technologies Vendor Evaluation at Deloitte. Pvt. Ltd.) (17 months). SAP Labs India Pvt. Ltd. (9 months) Summer Internship: RNAM Consulting Project at Ericsson India Global Services Pvt. Ltd. SAGAR KAPOOR SAIYAM CHHABRA SHIVANI B.Tech, Computer Science and B.E, Electrical Engineering B.E, Biotechnology Engineering Punjab Engineering College, University Institute of Engineering & Jaypee Institute of Information Chandigarh (Deemed University) Technology Chandigarh, Panjab Technology University, Noida Work Experience: Reliance University Chandigarh Work Experience: Infosys Infrastructure Ltd. (36 months) Work Experience: Infosys Technologies Limited (13 months) Summer Internship: Process Technologies Ltd. (36 Months) Adobe Systems India Pvt. Ltd. Improvement for Exports Business Summer Internship: Market (30 months) & Setting of Forecasting process for Research and launch of Complex Summer Internship: Equity Industrial Automotive Repair Business Event Processing in Financial Research Analyst at TVS Capital at Stanley Black and Decker. Services sector at Wipro Funds Private Limited. Technologies. 24
  • 27.
    BATCH PROFILE 2011-2013 SOHINI BANERJEE SOUMYA SARKAR B.E, Information Technology B.E, Computer Science and Jadavpur University Engineering Work Experience: Pricewaterhouse University of Burdwan Coopers Pvt. Ltd. (36 months) Work Experience: IBM India Pvt. Ltd. IBM India Pvt. Ltd. (12 months) (44 Months) Summer Internship: Assessment of Summer Internship: Analysis of Interest Rate Risk for a Kolkata based Cable and Satellite(C&S) Industry bank and the Allocation of Regulatory trends and formulating Go to Market Capital under IRR as per BASEL II Strategy for Wipro C&S Practice, with Norms at Reserve Bank of India (RBI) special focus on potential Partnerships and Acquisitions. 25
  • 28.
    Vinod Gupta Schoolof Management Vinod Gupta School of Management VGSOM Dream Dare Deliver MBA Batch Profile 2012-2014 Experience Wise breakup of 2012-2014 Batch Stream Wise Break Up of 2012-2014 Batch 26
  • 29.
    BATCH PROFILE 2012-2014 Experience(0-11 Months) KARKHANAWALA SHEHZAD PRASHANTH P ASHWINI KUMAR RAO MOSES B.Tech (Information technology) B.E. (Electronics and Communication B.Tech (Computer Science and Pondicherry Engineering College Engineering) Engineering) Pondicherry University L.D. College of Engineering J.S.S.Academy of Technical Education Gujarat Technological University GautamBuddhaTechnicalUniversity (Formerly UPTU) MEGHANA VAIDYA ADITYA DHATRAK B. SRITHA B.Tech (Electronics and B.E. (Electronics and Communication B.Tech (Electronics and Communication Engineering) Engineering) Communication Engineering) Nirma Institute of Technology Vishwakarma Institute of Technology Keshav Memorial Institute of Nirma University Pune University Technology JNTU 27
  • 30.
    Vinod Gupta Schoolof Management HITARTH SAINI NIKHIL PADAVALA ANAKSHI DHAMA B.Tech (Computer Science and B.Tech (Electrical Engineering) B.E. (Information technology) Engineering) Jntu University Kakinada SardarVallabhbhai Patel Institute of Institute of Technology Technology Nirma University Gujarat University DEEPTI ANAND DEEPAN LOGANATHAN HAPPY GARG B.Tech (Electronics and B.E. (Computer Science and B.Tech (Computer Science and Communication Engineering) Engineering) Engineering) Amrita School of Engineering RMD Engineering College Swami Keshvananda Institute of Amrita Vishwa Vidyapeetham Anna University Technology Work Experience: Tata Consultancy Rajasthan Technical University Services (7 Months) Work Experience: Tata Consultancy Services (8 Months) 28
  • 31.
    BATCH PROFILE 2012-2014 ATISHA RAY B.Tech (Applied Electronics and instrumentation Engineering) Institute of TechnicalEducation and Research SOA University Work Experience: L&T IES (9 Months) Experience (12-23 Months) LOITONGBAM B VAISHNAVI DIVIJ SHARMA ATHOUBA MEETEI B.E (Mechanical Engineering) B.Tech (Information technology) B.E(Mechanical Engineering) University College of Engineering Vellore Institute of Technology Jorhat Engineering College Osmania University Vit University Dibrugarh University Work Experience: Accenture Work Experience: McKinsey Work Experience: Cognizant Services Pvt. Ltd. (12 Months) Knowledge Center (13 Months) Technology Solutions (14 Months) 29
  • 32.
    Vinod Gupta Schoolof Management RACHABATTUNI K KEERTHI SINJANA GHOSH MANAS GHOSE B.E. (Computer Science and B.Tech (Information technology) B.Tech (Mechanical Engineering) Engineering) Institute of Technology & Marine National Institute of Technology Bapatla Engineering College Engineering Durgapur Acharya Nagarjuna University West Bengal University of Technology Work Experience: New Holland FIAT Work Experience: Tata Consultancy Work Experience: Tata Consultancy (India) Pvt. Ltd. (18 Months) Services (14 Months) Services (17 Months) GAURAV BHATTACHARYA NEMALIPURI SATISH DEV KARAN SINGH MALETIA B.Tech (Electronics and B.E. (Electronics and Communication B.Tech (Bio Medical and Communication Engineering) Engineering) Instrumentation) Bengal Institute of Technology Vasavi College of Engineering SRM Institute of Science and West Bengal University of Technology Osmania University Technology Work Experience: Mahindra Satyam Work Experience: Infosys Ltd. SRM University (18 Months) (20 Months) Work Experience: Tata Consultancy Services (21 Months) 30
  • 33.
    BATCH PROFILE 2012-2014 SIDDHARTH HIMAKAR MONIKA SAHU AKHIL KRISHNA GUPTA B.E. (Electrical and Electronics B.E. (Electronics and Communication B.Tech (Manufacturing Technology) Engineering) Engineering) JSS Academy of Technical Education St.Joseph's College of Engineering Institute of Engineering and Gautam Buddha Technical University Anna University Management Work Experience: Infosys Ltd. West Bengal University of Technology (22 Months) Work Experience: Cognizant Technology Solutions (21 Months) Work Experience: Tata Consultancy Services (21 Months) SANDEEP KATAKOL LAKSHMI PRIYA VIJAY DEBJYOTI MITRA B.E. (Computer Science and B.Tech (Electrical Engineering) B.Tech (Electrical Engineering) Engineering) T K M College of Engineering National Institute of Technology SDM College of engineering University of Kerala Durgapur technology Work Experience: Robert Bosch Work Experience: TVS motor VTU Belgaum Engineering and Business Solutions Company Ltd. (5 Months) Work Experience: Accenture Ltd. (22 Months) JSW Steel Ltd. (17 Months) Services Pvt. Ltd. (22 Months) 31
  • 34.
    Vinod Gupta Schoolof Management SNEHIL SINGH ANIKET SARKAR M.Sc(Tech.) Information Systems B.E. (Electrical Engineering) B.I.T.S Pilani Jadavpur University Work Experience: Fiorano Software Work Experience: TATA Power Technologies Pvt. Ltd. (23 Months) (23 Months) Experience (24-35 Months) ARITRO GHOSH LOKIREDDY RAVITEJA T VEDHA B.Tech (Power Engineering) B.E. (Information technology) B.Tech (Mechanical Engineering) National Power Training Institute Gandhi Institute of Technology and Pondicherry Engineering College West Bengal University of Technology Management Pondicherry University Andhra University Work Experience: E.I.D Parry (I) Work Experience: Jindal Steel & Power Ltd. (24 Months) Work Experience: MAQ Software Ltd.Murugappa Group (24 Months) (24 Months) 32
  • 35.
    BATCH PROFILE 2012-2014 BHARATREDDY KUNDURU RAJIB LAYEK N.V. BHARGAVA G B.Tech (Electronics and B.E. (Electronics and Communication B.Tech (Computer Science and Communication Engineering) Engineering) Engineering) SASTRA University Jadavpur University Kakatiya Institute of Technology and Work Experience: Wipro Work Experience: Cognizant Science Technologies (25 Months) Technology Solutions (28 Months) Kakatiya University Work Experience: Tata Consultancy Services (28 Months) MRUGATRISHNA ROUTRAY RAKESH RAJENDRAN M KOYEL DUTTA B.Tech (Electronics and B.Tech (Electronics and B.Tech (Computer Science and Communication Engineering) Communication Engineering) Engineering) Silicon Institute Of Technology Amrita School of Engineering Heritage Institute of Technology Biju Pattnaik University Of Technology Amrita VishwaVidyapeetham West Bengal University of Technology Work Experience: Nokia Siemens Work Experience: Infosys Ltd. Work Experience: Infosys Ltd. Networks (29 Months) (29 Months) (29 Months) 33
  • 36.
    Vinod Gupta Schoolof Management REECHA SINHA VINEETH IYPE MATHAI ANU SINGH B.Tech (Computer Science and B.E. (Electronics and Communication B.Tech (Computer Science and Engineering) Engineering) Engineering) KIIT School of Technology JSSATE Raj Kumar Goel Institute of KIIT Bhubaneswar Visvesvaraya Technological Technology Work Experience: Tata Consultancy University Uttar Pradesh Technical University Services (30 Months) Work Experience: Cognizant Work Experience: InfosysLtd. Technology Solutions (31 Months) (31 Months) VENKATESH S M.PRAKASH ABHITOSH DAW B.E. (Mechanical Engineering) B.E. (Electronics and Communication B.Tech (Electronics and Sir M Visveswariah Institute of Engineering) Communication Engineering) Technology Jaya Engineering College Institute of Engineering & Visvesvaraya technological University Anna University Management Work Experience: Cummins India West Bengal University of Technology Work Experience: Infosys Ltd. Ltd. (31 Months) (31 Months) Work Experience: Infosys Ltd. (32 Months) 34
  • 37.
    BATCH PROFILE 2012-2014 ARUN KUMAR KOTA S. SUBRAMANIAN TRIPTI SRIVASTAVA B.E. (Electronics and Communication B.Tech (Electronics and B.Tech (Electronics and Engineering) Communication Engineering) Communication Engineering) Vasavi College of Engineering Mar Athanasius College of Ajay Kumar Garg Engineering College Osmania University Engineering Uttar Pradesh Technical University Work Experience: Zensar Mahatma Gandhi University Work Experience: Infosys Ltd. Technologies Ltd. (32 Months) Work Experience: Infosys Ltd. (33 Months) (32 Months) SARAT CHANDRA MANTHENA B.Tech (Information technology) Anil Neerukonda Institute of technology and science Andhra University Work Experience: Infosys Ltd. (35 Months) 35
  • 38.
    Vinod Gupta Schoolof Management Experience (36 Months and above) JOSHI ROHIT DILIP HIMA VARSHA CHEKUMUKI SAYAN MAJUMDAR B.Tech (Mechanical Engineering) B.Tech (Chemical engineering) B.Tech (Electrical Engineering) Dr. Babasaheb Ambedkar Andhra university college of National Institute of Technology Technological University engineering Durgapur Work Experience: Va Tech Wabag Andhra University Work Experience: Crompton Ltd. (36 months) Work Experience: Vedanta Greaves Ltd. (36 Months) Resources plc. (36 Months) RASHMI SUMAN KUMAR SUBHASIS BARMAN B.E. (Electrical Engineering) B.Sc. Engineering (Information B.E. (Computer Science & B.I.T Sindri Technology) Technology) Vinoba Bhave University B.I.T Sindri The Bengal Engg. & Science Work Experience: Tata Consultancy Vinoba Bhave University University, Shibpur Services (36 Months) Work Experience: Infosys Ltd. Work Experience: DRDO (7 Months) (36 Months) Mindtree Pvt. Ltd. (21 Months) Misys Pvt. Ltd. (11 Months) 36
  • 39.
    BATCH PROFILE 2012-2014 PIYUSH JAISWAL MURALIDHARAN U PRASHANT KUMAR SINGH B.E. (BioMedical Engineering) B.E. (Mechanical Engineering) B. Sc. Engineering SGSITS Indore College of Engineering-Guindy B.I.T. Sindri RGPV Bhopal Anna University Vinoba Bhave University Hazaribagh Work Experience: Cognizant Work Experience: Wipro (28 Months) Work Experience: Tata Consultancy Technology Solution (27 Months) Aricent (11 Months) Services (3 Months) L&T Infotech (11 Months) Bharat Electronics Ltd. (37 Months) NIKHIL MEHROTRA RAHUL MALI DEBARGHYA CHAKRABORTY B.Tech (Information technology) B.Tech (Electronics and B.Tech (Computer Science and Greater Noida Institute of Technology Communication Engineering) Engineering) Uttar Pradesh Technical University SGGSIE & Tech Institute of Engineering and Work Experience: Infosys Ltd. SRTMU Nanded Management (33 Months) Work Experience: Tata Consultancy West Bengal University of Technology Accenture Services Pvt. Ltd. Services (43 Months) Work Experience: Tata Consultancy (8 Months) Services (44 Months) 37
  • 40.
    Vinod Gupta Schoolof Management AMIT GYANANI BHANU JUNEJA KAMYA SHARMA B.E. (Computer Science and B.Tech (Electronics & Communication B.Tech (Electrical Engineering) Engineering) Engineering) NIT Surat Maharashtra Institute of Technology Chitkara Institute of Engineering and Work Experience: Reliance Pune University Technology Infrastructure Ltd. (46 Months) Work Experience: Infosys Ltd. Punjab Technical University (32 Months) Work Experience: Infosys Ltd. Xpanxion International Pvt. Ltd. (37 Months) (13 Months) Oracle India Pvt. Ltd. (8 Months) NEERAJ KUMAR ARINDAM ROUTH DHILEEBAN K M B.E. (Electronics and Communication B.Tech (Electronics and B.E. (Electronics and Electrical Engineering) Communication Engineering) Engineering) Birla Institute of Technology Mesra National Institute of Technology Government College of technology Ranchi Durgapur Anna University Work Experience: Reliance Work Experience: Reliance Energy Work Experience: Tata Consultancy Infrastructure Ltd. (29 Months) (47 Months) Services (47 Months) Reliance Utility Engineers Private Ltd. (16 Months) 38
  • 41.
    BATCH PROFILE 2012-2014 ARUN KUMAR BACHU GAURAV JOHRI SYED MOHD KASHIF B.E. (Mechanical Engineering) B.Tech (Metallurgical and Materials B.Tech (Electrical Engineering) Vasavi College of Engineering Engineering) Zakir Hussain College of Engineering Osmania University National Institute of Technology & Technology Work Experience: Infosys Ltd. Nagpur Aligarh Muslim University (27 Months) Work Experience: Oracle Work Experience: Computer Broadridge Financial Solutions (India) (48 Months) Sciences Corporation (59 Months) Private Ltd. (21 Months) 39
  • 42.
    Vinod Gupta Schoolof Management Vinod Gupta School of Management VGSOM Dream Dare Deliver EMBA Batch Profile 2010-2013 Industry Wise Breakup of 2010-2013 Batch Experience Wise Breakup of 2010-2013 Batch Note: Mean Experience - 10 Years 40
  • 43.
    BATCH PROFILE 2010-2013 Experience< 8 Years AMRITENDU MUKHERJEE ANANT KUMAR B.E. in Electrical Engineering M.Com. in Advance Business Economics Bengal Engineering and Science University, Shibpur Faizabad University Professional Engagement (6 Years 11 Months) Professional Engagement (7 Years 3 Months) QA Consultant, Lexmark India, Imaging Solutions and Services Asst. Manager Commercial, KEC International Limited Division, Research & Development Senior Consultant, PWC (RPG Group) India, Independent Validation &Verification, Performance Area of Expertise: Indirect Taxation, Material Management, Improvement Team Lead, Infosys Technologies Ltd., Procurement, HR and Administration, Vendor development, Independent Validation Solutions Accounts Payable / Receivable Area of Expertise: Six Sigma Black Belt, Project Management, Process Improvement, Quality & Risk Management Area of Interest: Project Finance, Supply Chain Management, Contract Negotiation Area of Interest: Supply Chain Management, Information Systems, Macro Economic Environment & Public Policy, Statistical Analysis AYAN KHASNABIS DIGBIJAYA SINGH B. Tech. in Computer Science & Engineering B.E. in Electronics & Telecommunication Institute of Engineering & Management, Kolkata Utkal University, Odisha Professional Engagement (6 Years 2 Months) Professional Engagement (6 Years) Assistant Manager - Business Consulting, Strategic Analysis Senior Research Fellow, NIRADD ERP Consultant & Portfolio Management Team HSBC Analytics Area of Expertise: Survey & digitization of medical Module Lead, Pre Sales Solutions Team, Banking & Capital manuscripts, Publication & commercialization process, Markets Infosys Technologies Ltd. Coordination of survey including Govt. legal process & Area of Expertise: Portfolio Management, Project people management, ERP Design & Implementation in the area of Materials Management Management, Balancing Credit Risk & Profit, Data Driven Analytics, Statistical and Quantitative Modeling, Area of Interest: Optimization of operational efficiency, Mentoring & Coaching People Management, Operations, Purchasing Area of Interest: Valuation, Corporate Finance, Pricing, Supply Chain Management, Qualitative Modeling 41
  • 44.
    Vinod Gupta Schoolof Management ROSHAN BASUDUTTA SAUMIT MANDAL ROUTRAY B.Tech. in Electronics & Telecommunication B. Tech. in Computer Science & Engineering BPUT, Odisha Meghnad Saha Institute of Technology, WBUT, Kolkata Professional Engagement (5 Years) Professional Engagement (6 Years 11 Months) Network Transmission Planner, Vodafone Spacetel Ltd. Solution Architect & Technical Consultant, Lexmark Inc. Deputy Manager Transmission Planning, Reliance (India), Imaging Solutions and Services Division, Communication Research & Development Area of Expertise: Telecom Network Planning, Project Area of Expertise: Technical and Functional Solution, Project Management & Optimization, Vendor Management, BOQ Estimation& Budgeting, Project and Risk Management, finalization, Budgeting & Handling regulatory related activities Competitive Analysis of Products & Solutions Area of Interest: Supply Chain Management, Strategic Area of Interest: ERP & Supply Chain Management, planning for service industry, Enterprise solution Information Systems, Corporate Finance SITANSU SEKHAR SWAIN SMITAHAS DAS B.E.in Electronics &Telecommunications Engineering B.E. in Mechanical Engineering University College Of Engineering, Burla National Institute of Technology, Durgapur Professional Engagement (6 Years 6 Months) Professional Engagement (6 Years 1 Month) QA Lead, TCS Senior QA Analyst, L&T Infotech Deputy Manager (Methods) at HAL, Barrackpore Division Senior Engineer (Planning), L&T ECC Division Area of Expertise: Process Re-engineering, Quality Management and Consulting, Project Management Area of Expertise: Project Planning, Internal Auditor for AS9100C QMS, Cost Estimation, Annual Capital Budget Area of Interest: Enterprise Solution, Statistical Analysis, Preparation, UT Level II Inspector Supply Chain Management, Credit Assessment and Area of Interest: ERP & Supply Chain Management, Risk Management Marketing of High Tech Products, Project Management for Manufacturing Industry 42
  • 45.
    BATCH PROFILE 2010-2013 SRIMOYEE MISRA SUDIPTA DUTTA B.Tech. in Civil Engineering B.E. in Metallurgical Engineering Kalinga Institute of Industrial Technology, Odisha Bengal Engineering and Science University, Shibpur Professional Engagement (6 Years 2 Months): Professional Engagement (6 Years 11 Months): Assistant Manager, Retail Banking & Wealth Management Bid Project Manager - Business Segment Iron Making Global Information Team HSBC Analytics SIEMENS VAI Metals Technologies Pvt. Ltd. Module Lead, Energy and Utilities Vertical, Wipro Technologies Assistant Manager - Operation Melting Department Area of Expertise: Project Management, Technical and Tata Metaliks Kubota Pipes Ltd. Functional Business Solution, Process Improvement Area of Expertise: Bid Project Development, Project Area of Interest: Information Systems, Supply Chain Acquisition, Bid Preparation, Contract Negotiation, Gold Standard Assessor in Tata Business Excellence Model, management, Data Mining and Analytics Manufacturing process improvement Area of Interest: Marketing of High Tech Products, Market Entry Strategy Formulation, Business Excellence SUVANKAR ROY SWADHIN KUMAR TRIPATHY B.E. in Electronics and Communications Engineering B.E. in Instrumentation Engineering University Institute of Technology, The University of Burdwan Visweswaraih Technological University, Karnataka Professional Engagement (6 Years 9 Months): Professional Engagement (7 Years 4 Months): Team Lead, TCS Financial Services Assistant Manager - Learning and New Business Acquisition, Senior Data Modeler and Data Analyst, TCS Financial Services Agency Team, TATA AIA Life Area of Expertise: Data Modeling and Analysis, Data Business Development Manager, HDFC Life Warehousing, Business Intelligence, OLAP Area of Expertise: Business Development, Team Building Area of Interest: Business Analytics, Data Mining, Enterprise and Team Productivity Development, Contest design, Training, Reporting, Predictive Analytics Strategic Planning and Sales Enhancement Area of Interest: Commercial Banking and International Finance, Supply Chain Management, Security Analysis and Portfolio Management, Corporate Finance, Marketing 43
  • 46.
    Vinod Gupta Schoolof Management Experience 8 - 10 Years GIRIJA PRASAD NANDA NILANJAN GOSWAMI B.E. in Computer Science & Engineering PGDIT & MS in Information Technology, SKU Utkal University PGDBM, ICFAI University Bachelors of Computer Science Technology, WBUT Professional Engagement (10 Years 2 Months): Professional Engagement (8 Years 9 Months): Team Lead, Infosys Ltd. Sr. Manager, Global Quality & Services, Area of Expertise: IT program management, Client Capgemini Consulting India Sr. Manager, Corporate Quality, Essar (Aegis Eng SCM) Ltd. relationship management, Technology Consulting, Manager, Quality & Service Excellence, First Source Ltd. Evangelizing employees on new Microsoft Technologies Asst Manager - Service Quality, IBM India (TBU) Area of Interest: Supply Chain Management, Business Wipro Ltd - Master Quality Analyst (Active Support Group PSG) intelligence, Data Analysis Area of Expertise: Deployment QMS, BPMS, PMS, BPM, Lean 6 Sigma , ITIL, Project Planning & Reengineering, B2B Support across domains - Financial Services, Retail, SCM, Telco & Integrated Systems Area of Interest: Business Research Methodology, Quantitative Modeling, Market Research PALLAB DATTA SUBHANKAR PANIGRAHI B.E. in Information Technology B.E. in Electronics and Communications Engineering Jadavpur University, Kolkata OEC, Odisha Professional Engagement (8 Years): Professional Engagement (8 Years 10 Months): Solution Architect, PreSales, Tata Consultancy Services Project Manager, TCS Technical Leader - IBM India Pvt. Ltd. Project Leader, Satyam Computer Services Technical Leader - Infosys Technologies Ltd. Area of Expertise: IT project Delivery in BFS domain, Project Area of Expertise: Technical and Functional Solution, Management, Resource Management, Team Building, Process Customer Relationship management, Project Budgeting, Definition, Client Relationship Management Project and Risk management Area of Interest: Financial solution Products, Area of Interest: Statistical Analysis, Business Intelligence Challenging Projects and Data Analytics, Quantitative Marketing, Financial Products, Derivatives and Indexes, Financial Compliance 44
  • 47.
    BATCH PROFILE 2010-2013 Experience> 10 Years AMBIKADAS BHATTACHARYA BISWAJIT KAR B.E. in Electronics and Communication B.E. in Mechanical Engineering National Institute of Technology, Durgapur OEC, Odisha Professional Engagement (18 Years): Professional Engagement (19 Years): Head of Product Quality Assurance (Group Lead PQA), Orga Manager Operations, Globogramme learning services Ltd. Systems India Private Limited Senior Manager- Product Support, Hyderabad industries Senior Technical Consultant, RS Software Ltd. Heavy Engineering Associate Consultant, Siemens Information Systems limited Senior Engineer - After Sales, Sipani Automobiles Area of Expertise: Project Management, Test Management, Area of Expertise: Training, Strategic planning & sales Strategic Management, Test automation and Test Framework creation, Product Quality Management presentation, Managing consultancy, training and people, Area of Interest: Product Quality Management, Quality Project Management, Design and development Process Improvement, Technical and Functional Solution, of training materials Customer Relationship Management, Project Budgeting, Area of Interest: Supply Chain Management, Project and Risk Management Inventory Management DEBAJYOTI MAHAPATRA DILLIP KUMAR DAS B.E. in Computer Science & Engineering M.Com.Berhampur University Utkal University MS in Consultancy Management, BITS Pilani Professional Engagement (10 Years 6 Months): Professional Engagement (15 Years): Business Development Manager, Energy & Utility Vertical, Business Development Manager, Laxmi Publication Pvt. Ltd. TCS Lecturer, KK College of Science and Arts Area of Expertise: Business Development, Relationship Area of Expertise: Sales Training, Business Development, Building, Identifying Prospects, Bid Management, Change Breaking New Avenues, Driving Sales Growth through the Request Management, Project Management Training Team Area of Interest: Strategic Business Planning for sustainable Area of Interest: Strategic Planning, Sales & Distribution growth in services industry globally Management, Marketing 45
  • 48.
    Vinod Gupta Schoolof Management PARTHO PROTIM DAS RAM KUMAR KAPAR B.E. in Mechanical Engineering B.E. in Electrical Engineering The Institution of Engineers (India) The Institution of Engineers (India) Professional Engagement (15 Years): Professional Engagement (13 Years): Six Sigma Black Belt (Full time), Cross Functional Process Project Coordinator (WOT), Quality Assurance, Department Improvement Projects Territory Manager, Product Marketing & Sales, SKF India Regulator, Maintenance In Charge Deputy Manager, Sales & Marketing, TIDC INDIA, Murugappa Area of Expertise: Project Management, Team Building, Area of Expertise: B2B Marketing, Sales and Distribution Quality Management, Materials Management management, Team management, Mentoring & Coaching, Area of Interest: Supply Chain Management, Process Global Economic Scenario Analysis, Statistical & Data Driven Analysis, Pricing Management Area of Interest: Mergers and Acquisitions, Corporate Finance, Derivatives and Hedging, Strategic business portfolio analysis, Competitor Analysis, Supply Chain Strategy, Marketing Research, Forecasting Techniques SOMNATH DUTTA B.E. in Civil Engineering M.Tech, Ph.D in Structural Engineering Bengal Engineering & Science University, Shibpur Professional Engagement (22 Years): Hub Project Head for Infrastructure Projects, Reliance ADAG Group, Deputy General Manager, Reliance Industries Ltd. (Retail Business) Area of Expertise: Project management for high-rise buildings, Resourcing, Project Planning Design & Engineering, Project Co-ordination, Optimization in structural design, Time bound delivery of distribution centers & retail outlets Area of Interest: Structural Analysis of FEM packages, Retrofitting of structures, Organizational Leadership, Supply Chain Management 46
  • 49.
    www.som.iitkgp.ernet.in Life@ Campus Campus Events Saamanjasya http://www.saamanjasya.com/ Saamanjasya is a unique endeavor pioneered by the students of VGSOM. It is the first and only social event of IIT Kharagpur. Started with a vision of becoming Asia's largest movement for social and environmental sustainability in 2010, Saamanjasya has come a long way. Saamanjasya has been organized with the aim of bringing together Corporates, NGOs, and academicians on a common platform to ensure inclusive growth and inculcate a culture of giving back to the society in our aspiring and educated youth. It seeks to highlight the importance of a symbiotic corporate-NGO- academic relationship.Names of some of the innovative events at Saamanjasya are - Kalakaar Vikaas, Vichaar, Parishram, Wired and Samaaj. Madison Avenue http://madinvgsom.com/ MADison Avenue is the annual flagship Marketing event of VGSOM. It hosts a plethora of different competitions, guest-lectures (GL), workshops and panel-discussions for B-school students across the country. The event is organized by MAD Club (Marketing and Advertising Club of VGSOM) and is supported by a number of corporate-houses like Toyota, SAIL, Steris, MTSSpykar, Business Standard, Airtel, Chronon Technologies, Woodland, naukri.com, Tata Bearings, JWT, Travels4u, pagalguy.com, and Dare2compete. In 2011, MADison Avenue has grown even bigger and better. There was an innovative blend of eight sub-events namely: Quizzard, AdZap, Leaders Challenge, El Vigor, Quizzical, Wiral Marketing, Blind Date (Ad-Mire) and Mobile Turns Social. The event was conducted over a period of 2 days and had seen the presence of more than 25 premiere B-schools from all over the country and has been graced by the presence of the who's-who of the top ad-firms, academia and corporate India. 47
  • 50.
    Vinod Gupta Schoolof Management Shraddha Driven by the mantra, "Dedication is not what others expect of you, it is what you give to the others", Shradhha is an entity formed and run by the students of VGSOM. VGSOM is dedicated not just to impart managerial education but also to create a value system that helps the budding managers to be socially responsible and empower them to do business under a sustainable environment. With this vision, the genesis of Shraddha took place.Sharddha aims at bringing about a positive change in the lives of underprivileged children living in nearby towns through collaboration with a local NGO called DishaSeema that runs a school within the campus. Time and again the VGSOMites have come up with novel ideas of raising funds for this school. Whether it be Springfest, the annual cultural fest at IIT, where VGSOM students, sold T-shirts painted by the students of DishaSeema during the fest or initiating donation drives within the campus. The revenue generated from these efforts went to DishaSeema for the infrastructure and education development. VPL - VGSOM Premiere League VGSOM Premier League (VPL) - a cricketing league based on the famous IPL was unveiled in 2011. VPL has ensured massive participation by students in the roles of team managements for franchisees and as players. The "Auction Hour" was conducted where virtual bidding was conducted among the franchisees for the players. The league matches between the various teams are under process and VPL has for once and all transformed the sporting culture at VGSOM. Sports Committee also gave an opportunity to all students to be a part of VPL by introducing the Super Selector fantasy game as well. Kshitij "If you can dream it, you can do it", said Walt Disney. Similar was the vision of bringing the best of the lot from the youth on a single platform when we started our quest by the name of Kshitij in 2004. The budding engineers, entrepreneurs and management moguls shared the same scope of opportunity we provided to produce path breaking technological and business outputs. Kshitij, the Annual Techno-Management festival of IIT Kharagpur has been leading the light of instilling a culture of science, technology and innovation among the youth of the nation. With more than 40 events covering all genres of technology and management, Kshitij brings some of the best solutions for the mankind to the fore. The huge amount of prize money is just another epitome of the heights we have scaled in the last eight years. VGSOM takes pride in being associated with ASIA's largest techno-managerial fest and plays a pivotal role in its success by organizing several business events. Spring Fest Over the course of its glorious history, if there is any one thing about IIT Kharagpur that is so defining, so enchanting and so eagerly awaited, it is its annual social and cultural extravaganza, Spring Fest. Held in the third week of January every year, what started out as an inter-hostel cultural event has grown steadily during its 52 years to become one of the biggest fests of its kind in the country. Spring Fest is a celebration that recognizes no difference, a celebration for a cause. The three hands of the logo signify the culmination of people of different cultures and background at one place for one cause to celebrate the spirit of youth. 48
  • 51.
    www.som.iitkgp.ernet.in Clubs & Committees VGSOMboasts of a strong student community and almost all the important activities that are essential for a management institute are student driven, here at VGSOM. VGSOM has seven functional committees taking care of various processes like placements, admission, alumni relation etc. and seven different focus clubs, each cultivating different facets of managerial domains The committees are listed as follows: t Placement Committee - In charge of all placement related activities at VGSOM. Also responsible for publishing the annual summer and final placement report (VANTAGE). t Alumni Committee - In charge of maintaining alumni relationships, publishing the annual alumni newsletter - SCUZZY and organizing the annual alumni meet - CONNECT. t Admissions Committee - In charge of co-coordinating the whole admissions process and facilitating aspirants and new entrants. t Corporate & Media Interaction Cell - In charge for all types of communications with the media and corporate world. It is also responsible for arranging and coordinating guest lectures by industry stalwarts. t Sports Committee - In charge of arranging various sports and recreational activities for the students of VGSOM. t Cultural Committee - In charge of managing all the cultural events at VGSOM. Is also responsible for organizing fresher's party and farewell for incoming and outgoing batches respectively. t Saamanjasya - In charge of designing and organizing the annual event Saamanjasya. t SpringFest and Kshitij Committee - In charge of designing and managing events during the annual SpringFest and during the techno managerial fest Kshitij. The seven focus clubs are: t MAD - The Marketing Club t Finterest - The Finance Club t Mantradharin - The Consulting Club t Scope - The Supply Chain and Operations Club t VGSOM Quiz Club t Shraddha - A club for social causes t E-Cell - The Entrepreneurial Cell of VGSOM 49
  • 52.
    Vinod Gupta Schoolof Management Corporate Interaction (Guest Lectures) Over the last one year, VGSOM was privileged to have a gamut of senior industry executives and leaders on the campus as a part of its guest lecture programme. The intriguing and insightful sessions with our distinguished guests helped the students to sync up with the latest trends and happenings in the corporate world. Guest Name Designation Company Topic of the Lecture Sanjeev Dassani Creative Director RK Swamy BBDO Creative Ideation Process and Branding Mr. Joydeep Ganguly CMO Uninor Growth prospects in Telecom Market in India Mr. Subrata Dutta CIO SREI Infrastructure Managing IT as Business Mr. Pramod Dwivedi Head-Marketing at Ambuja Realty Marketing Challenges in Real Estate Ms.Sudeshna Mukhopadhyay Director, Marketing, Lighting Philips Electronics Lighting as a Marketing Tool India Ltd. Mr. Jaspreet Bindra Regional Director Microsoft How Microsoft built the gaming category in India with XBOX!!! Mr. Suranjan Bhattacheryay Credit Head SREI-BNP Paribas Credit Risk Assessment Mr. Kumar S. Krishnaswamy HRD, Group Head Fortis Group, India. Talent Management & Performance Management in Service Sector Mr. Srikrishna Rupanagunta Vertical Head, Retail Sector Mu Sigma Trends in Analytics Mr. Amandeep Kochar Director, Media, Publishing HCL, America How to develop your personal and Entertainment brand Mr. Sandeep Kar Executive VP & RBL - YES Bank Ltd Risk Management C & IB (East) Mr. Divyesh Lapsiwala Director, Indirect tax Ernst and Young Implementation of Goods and Services Tax Mr. Bipin Chandra Pendyala VP Computer Associates Corporate governance Mr. Dayanidhi M. G. Managing Director- Digital Chocolate Organizational Development Asia Pacific Deepa Thomas Head - Corporate E-bay eCommerce Comunications Abraham Koshy Marketing Prof. at IIM-A & IIMA Myths of Marketing Co-author of Marketing Management by Kotler Mayank Saksena MD East Jones Lang Lasalle Consulting in Real Estate Saugata Gupta CEO Marico Leadership lessons on how to succeed as a manager Abdul Rahim Chief Knowledge Officer IPE Global India's Development Dilemma Manosh Mukherjee Group COO & CFO TBWA India world of Advertising Mr. Manas Agarwal CEO & Co-Founder Affine Analytics Analytics Sankarson Banerjee CIO India Infoline Ltd. Technology Management Sanjoy Sen Div CIO ITC India Ltd. Managing IT in ITC Gagan Bakshi Director M&A Interglobe Enterprises Insights into M&A and I-Banking (Indigo Airlines, Hotels, Technologies, etc.) 50
  • 53.
    www.som.iitkgp.ernet.in Faculty Profiles Anand Teltumbde Ashutosh Sarkar B. E. (VNIT), P.G.D.M (IIM, A), Ph. D. (Mumbai) B.E. (Guwahati Univ.), M.Tech., Ph.D. (IIT Kharagpur) Specialization: Project Management, Production & Specialization: Operations Management Dr. Sarkar teaches operations management, supply chain Operations Management, Corporate Strategy, Information management and service operations management at VGSOM. Systems He earned his M.Tech and PhD in Industrial Engineering & Prof Teltumbde has worked for more than 35 years in the Management from IIT Kharagpur. He has done many Oil Industry encompassing entire value chain. He has headed consultancy and training assignments for various many functions such as Corporate Planning, Engineering & organizations in India. His research interests supply chain Projects, Supply & Distribution and Information Systems and coordination, supplier relationship management and supply many new strategic initiatives. He pioneered many innovative chain risk management. His research works have appeared systems and was awarded numerous awards for spreading in many reputed international journals including Transportation Research Part E, IJPE, C&IE, and JPSM which IT in the country. He also worked on various industry have been highly cited by researchers across the world. He committees and was a member of the first Study Group for has visited Center for Logistics & Supply Chain Management, deregulation of oil industry in 1994-1995. He also worked Faculty of Business, Economics and Statistics, University of as Managing Director, National Oil & Chemical Company Vienna as a researcher. He was also selected for the (NOLCHEM), Lagos (Nigeria) for post-privatization turnaround; prestigious BOYSCAST Fellowship (2008-2009) by and Consultant cum Project Manager, Kenya Pipeline Department of Science & Technology, Government of India. Company, Nairobi (Kenya) and also as consultant with CNPC, He is a life member of Indian Institute of Industrial Engineering China. He had been teaching as a guest/ visiting faculty to and Society of Operations Management. various business schools in Mumbai and IIM, Ahmedabad Barnali Nag over the last 25 years and has published 25 research papers. Before joining VGSOM, he was Managing Director & CEO of M.A (JNU), PG Diploma (Development Policy), PhD (Economics) Petronet India Limited, Mumbai and Director on the Board Dr. Barnali Nag is an M.A. in Economics from JNU, New Delhi of a few other companies. and PG Diploma (Development Policy) and PhD (Economics) from IGIDR, Mumbai - an advanced Research Institute by Aradhna Malik Reserve Bank of India. She has been a faculty at RIS, New M.Sc. (Panjab University), Ph.D. (University of Denver, USA) Delhi (a think tank of the Ministry of External Affairs, GoI). Later she joined the Indian School of Business, Hyderabad Specialization: Communication Studies as Business Research Fellow, from where she went to Dr. Aradhna Malik has been working with VGSoM, IIT Wharton Business School, University of Pennsylvania as Kharagpur, as an Assistant Professor since July 2008. She Visiting Scholar. Dr. Barnali has been the Associate Editor has about 14 years of experience in a diversity of roles and of South Asia Economic Journal, which is a peer reviewed organizations in India and abroad. Dr. Malik has been trained international journal, published by SAGE, for around four in grant-writing from the Grants Institute, USA. Her work years. She is also a reviewer for reputed international journals includes research on developmental communication, like Energy-The International Journal, Energy Policy, management of social welfare organizations, competence International Journal of Environ-mental Technology and in intercultural communication, and the social impact of Management and International Journal of Environment and technology. Dr. Malik is currently serving as the Associate Waste Management. Dr. Barnali's current research interest Copy Editor of Asian English as a Foreign Language (AEFL) includes economics and business implications of climate Journal. change, policy imperatives for carbon base-line determination and quantitative modeling and research on Arun Kumar Misra productivity and efficiency in the Indian manufacturing M. Phil. and Ph.D. (IIT Mumbai) sector. Specialization: Banking, Finance and Financial Markets Biplab Datta Dr. Arun Kumar Misra's teaching and research activities B. Arch. (IIT Kharagpur), M.B.E.M., Ph.D. (IIT Delhi) relate to Economics and Finance mainly in the fields of Specialization: Marketing Management, Quality Management, Financial Markets, Risk Management, Commercial Banking Leadership and Team work and Investment Banking. Before joining VGSOM, he was Prof. Datta's research interests include Marketing working as Senior Manager in a leading public sector bank. Management, leadership and teamwork, Service Quality As a professional Banker, Dr. Misra has extensive experience Management and Customer Relationship Management. He in the areas of capital market, risk management, Basel-II was awarded Silver Medal in Architecture by IIT Kharagpur implementation in banks, assets-liabilities management and in the year 1992. He has received ISO 9000 Lead Auditor profit and profitability management in banks. He has several Certificate from DNV, U.K. He has several research papers publications primarily in the areas of financial markets published in national and international journals. He has also integration and risk management. He is an associate fellow organized a number of Management Development of Indian Institute of Bankers. Programmes for executives and also for faculty members of other management institutes. 51
  • 54.
    Vinod Gupta Schoolof Management chapter), member of executive committee of National Chandra Shekhar Mishra Academy of Psychology, India. His current consulting and research expertise are in the area of Strategic Human M.Com., Ph.D. (Utkal University) Resource Management, Organizational Culture, Leadership, Specialization: Finance, Accounting Emotional Intelligence, and Knowledge Management, Prof. Mishra has been working with VGSOM, IIT Kharagpur Psychology of well-being, CSR and Corporate Affairs. as an Assistant Professor since 2007. Prior to joining VGSOM he was working as a faculty member at IMT Ghaziabad and Kalyan Kumar Guin has more than twelve years of teaching and research B.Tech., Fellow (IIM Bangalore) experience. His research interests include valuation, mergers Specialization: Marketing, Operations Management, & acquisitions and financial reporting. He has published Statistical method of Management several articles in various national and international referred Prof. Kalyan Kumar has a special interest in Quantitative journals. He is also a life time member of Indian Accounting Modeling of Strategic Issues in management. He worked as Association. an executive in ONGC for two and half years, before Damodar Suar embarking onto an academic career. Prof. Guin actively participates in real life problem solving in business M.A. (Psychology), Ph.D. (IIT Kharagpur) environment through consultancy work. Presently, he is Specialization: Social and Organizational Psychology, carrying out an international study of developing a model Neuropsychology to maximize benefits of bilateral aids to the recipient Prof. Suar is a professor at IIT Kharagpur. He has more than companies belonging to developing countries. 25 years of teaching experience. He is an associate editor Prabina Rajib of the journal Psychological Studies. His research focuses on contemporary social issues. He has authored three books, MBA (VGSOM), PhD (IIT Kharagpur) over 70 scientific/professional articles including book Professor (Finance & Accounts) with Vinod Gupta School of chapters. He has handled more than 30 research/consultancy Management IIT Kharagpur, Dr. Rajib has been a Fulbright projects, and co-ordinated more than 15 training Pre-doctoral Fellow at Purdue University. She has been programmes. bestowed with a PhD in International Finance by IIT Kharagpur apart from her Masters in Business Management majoring Jitendra Mahakud in Finance at the same institute. A renowned author on the M.A., M.Phil. (Hyderabad University), Ph.D. (IIT Bombay) subject of valuation particularly on derivates and option Specialization: Financial Economics, Corporate Finance, she has expertise in nitty grities of Security Analysis, Financial Investment Management Markets & Institutions and Derivatives Pricing & Valuation. Prof. Jitendra Mahakud has more than eight years of teaching Parama Barai andresearch experience in the area of finance at IMT B.E. (Civil) NIT Durgapur, MS IISC Banglore, PhD Finance Ghaziabad, ISB Hyderabad, Nirma Institute of Management, Strategy (XLRI Jamshedpur) Ahmedabad and Narsee Monjee Institute of Management She has joined VGSOM as a full time faculty since January Studies, Mumbai. He has published more than 20 research 2012. She had worked with Tata Steel Jamshedpur as a papers in leading national and international Journals. He manager design for six years before pursuing her PhD from has co-authored a text book titled "Financial Institutions XLRI. and Markets" published by Tata McGraw-Hill. Prithwis Mukerjee K.B.L. Srivastava B.Tech (IIT Kharagpur), PhD (University of Texas at Dallas) M.A., Ph.D. (IIT Kanpur) Prithwis Mukerjee is an engineer by education, a programmer Specialization: Human Resource Management and by passion and an imagineer by intention. A B.Tech from IIT Development, Organizational Behaviour Kharagpur, he has done his MS and PhD from the University Prof. K.B.L. Srivastava has more than 18 years of teaching, of Texas at Dallas, USA and has spent 18 years in the research and training experience. He has taught earlier at Indian sof tware business working in Tata Steel, BITS Pilani, and T.A. Pai Management Institute, Manipal, and PricewaterhouseCoopers and IBM. He has a passion for all also served as visiting faculty at XLRI Jamshedpur (2002) things digital but his current interests are in the area of Web and Asian Institute of Technology, Bangkok (2005). He has 2.0 and database technology. He has written two books and published more than 40 papers in national and international has been featured in print, online and electronic media. To journals and contributed 20 chapters in edited books. He know more about Prithwis, please visit his personal portal has supervised 7 Ph.D. theses in the area of Human Resource http://www.yantrajaal.com. Development, Knowledge Management, HR issues in Mergers/Acquisitions, Emotional Intelligence and Rudra Prakash Pradhan organizational culture. He has conducted management M.A., Ph.D. (IIT Kharagpur) development programmes in areas of behavioural/soft skills Specialization: Econometric Modelling & Business and human resource management and development. He is Forecasting board member of Academy of International Business (Indian Prof. Pradhan has been working with VGSOM IIT Kharagpur 52
  • 55.
    www.som.iitkgp.ernet.in as anAssistant Professorsince 2007. Prior to joining VGSOM graduate fellowship for completing his doctoral studies from he was working as a faculty member at BITS Pilani and has University at Albany, SUNY. He has also received an more than six years of teaching and research experience. excellence in teaching award and an excellence in research His research interests include infrastructure finance, foreign award from university at Albany, SUNY in 2010. Moreover, direct investments and econometric modeling. He has he was also awarded a special fellowship for his doctoral published several articles in various national and international dissertation in 2010 from University at Albany, SUNY. Before referred journals. pursuing his graduate studies abroad, he was a research assistant in Centre for Studies in Social Sciences, Calcutta S. Srinivasan (CSSSC). B.E., M.Tech., Ph.D. (IIT Kharagpur) Sudeep Mallick Specialization: Strategic Management, Finance B.Tech (IT-BHU), Fellow (IIM, Bangalore) Prof. Srinavasan has been working with VGSOM IIT Kharagpur as Professor since 1978. He is also joint faculty in the Specialization: Operations Management & Decision Sciences Department of Industrial Engineering & Management, IIT Dr. Sudeep Mallick has over 13 years industry experience Kharagpur. Prof. Srinivasan has received Fulbright research in manufacturing and IT sector. He was a Principal Research grants during 1984-85 and 1997-98 and has conducted Scientist with Infosys Technologies Ltd. Bangalore and has research at Wharton School and Creighton School in U.S.A. widely published in international conferences and industry His research interests include financial engineering. He has journals in the area of IT Management, Diffusion of IT, published several articles in various national and international Enterprise Systems and Analytical Modeling of Enterprise referred journals He is life member of the American Finance systems. He has also worked as Project Manager in Business Association. Transformation Projects for Fortune 500 companies. He is the author of a book on Enterprise IT Architecture which Sadhan K. De was jointly published by Infosys Technology and John Wiley M.Tech., M.Sc. (Tech.) (Loughborough), Ph.D. (Manchester) and has also been featured in the Marquis Who's Who in Specialization: Information Technology and Systems the World (2007) for his contribution to the field of IT. Management Sujoy Bhattacharya Prof. Sadhan K. De has special interest in Strategic Information MBA, Ph.D. (IITM, Gwalior) Systems, Management of Technology and Technological Innovation, Enterprise Resource Planning, Global Specialization: Marketing Management Competitiveness on which he has published a lot of papers. Sujoy Bhattacharya has nine years of Teaching and Research Prior to joining VGSOM, he served as the Senior Divisional experience. He has taught at Mudra Institute of Manager at Tata Steel and Nagarjuna Fertilizers. Communications, Ahmedabad, Goa Institute of Management, Goa and S P Jain Institute of Management, Singapore Campus. Sangeeta Sahney He has been a trainer for the Border Security Force B.A. (Hons.) (Calcutta University), MBA (Bundelkhand (Takenpur) at the 'Chanakya' tactical training wing at the University), Ph.D. (IIT Delhi) senior command (DIG) level. He has conducted doctoral Specialization: Marketing Management workshops at DOMS, IIT Madras and DOMS, IIT Roorkee. He Dr. Sahney has been working with VGSOM, IIT Kharagpur as teaches Retail Management, Marketing Strategy and Core an Assistant Professor since 2005. A Gold Medalist MBA Marketing courses. His research interests are Qualitative (Bundelkhand University), followed by a UGC-NET and a PhD Methodologies, SEM, Mixed Method Research and Panel (IIT Delhi), she has served as a facultymember at U.P Technical Data Analysis in Marketing. University and IIT Roorkee. She has also served as a faculty Susmita Mukhopadhyay under Secondment (MHRD) at the School of Management, M.Sc. (Applied Psychology), PGDHRM, Ph.D. (Research Fellow Asian Institute of Technology, Bangkok in 2009 for 4 months. PRU, ISI, Kolkata-degree awarded by Calcutta University) With a specialization in Marketing, she teaches Marketing Management, Consumer Behavior Analysisand sales Specialization: Human Resource Management & Industrial Management. Her research interests include studies in Relationship, Business Value and Ethics, Organizational Consumer Behavior, Organizational Behavior and Quality Behaviour Management in Education. She has several publications to Prof. Mukhopadhyay, First Class First in M.Sc., winner of the her credit in both national and international journals, and Young Scientist Award and Search of Excellence Award, has has also awards in a few of them. She is also on the several papers in national and international journals to her editorialboard of a number of journals. credit. Her research interests include Organizational Health, Women Studies, Consumer Behaviour, Infrastructure S Chattopadhyay management, Quantitative Techniques and Microfinance. Ph.D. (Univ. at Albany, SUNY) She is a Fellow at Microfinance Research Alliance Programme, Prof. Siddhartha Chattopadhyay is an M.A. in economics Centre for Microfinance, Institute of Financial Management from Delhi School of Economics and a Ph.D. in economics & Research, Chennai. from University at Albany, SUNY with specialization in macroeconomics and econometrics. He has received a 53
  • 56.
    Vinod Gupta Schoolof Management Placements 2010-2012 Batch : Final Placement Statistics Total Number of students participating in placement process 83 Number of Companies Visited 35 Number of Offers made 102 Highest Salaries Offered 16.5 Lakh per annum Average Salaries Offered 11.32 Lakh per annum 2011-2013 Batch : Summer Placement Statistics Number of students who participated in placement process 104 Number of Companies that visited campus 76 Highest Summer Internship Stipend Offered 1,00,000 Average Summer Internship Stipend Offered 40000 54
  • 57.
    www.som.iitkgp.ernet.in Recruiter Speak "We have found the students to be very able, especially in the areas on operations & supply chain management" - Ramesh Devairajan, General Manager, Tata Motors "We were able to find the candidates with the right mix of business acumen & technical bent of mind that we were looking for" - Raghav Chandran, Senior Manager, Accenture Management Consulting "VGSoM has traditionally been a happy hunting ground for us. The participation and enthusiasm shown by the students was a delight. We are also impressed by the infrastructure and facilities provided. We feel that VGSoM will go a long way in enabling their students to be future managers. Hoping that most of them would choose to start their career with us "- Savit Anand, Vice President HR, HSBC "What impressed me most about students at VGSoM is how they were able to articulate and put words to their thoughts. I can say without a doubt that this is one of the best pools of talent I have interviewed over the past year." - Nupur Chaudhuri, General Manager, Ericsson India Global Services "The students were technically sound in most of the marketing concepts, the spontaneity shown by the students was refreshing. We would like to come back again nex t year." - Krishnamur thi, HR Manager, Titan Industries. "We found that VGSoM has a very good academic program taught by very able faculty. This made the students well rounded and industry ready." - Rajesh Palwankar, Partner, Deloitte Touche Tohmatsu India Pvt. Ltd. "IIT Kharagpur has been the pioneer in introducing management education to the technical institutes in India. The school lives up to the reputation set by its parent institution. I was impressed by the financial acumen the students possess. I must admit I was pleasantly surprised." - Mr. Awadesh Krishna, Senior Derivatives Dealer, Nomura Holdings Pvt. Ltd. "The quality of intake is good, the faculty is excellent and the environment is just right for development. This school has all the ingredients for being labeled as a dream destination for both students and recruiters" - Peeyush Upadhyay, Vice President HR, Infosys. 55
  • 58.
    Vinod Gupta Schoolof Management Contact Details of Placement Committee Coordinators Please get in touch with the placement committee coordinators in case of any query. MBA Coordinators Name Mobile Number Email Id Abhijith Vangipuram 91-9564441097 abhijithsimha@gmail.com Abishek Thampan 91-9564441026 abishek.tp@gmail.com Harsh Kumar Srivastava 91-9002319991 harsh.che@gmail.com Kamal Kannan 91-9564278011 Kamal_Kannan@outlook.com Pooja Gupta 91-9903467750 poojag30@gmail.com Pratiush Tyagi 91-9564441026 pratiush.tyagi@gmail.com Sourabh Chaturvedi 91-7407048785 sourabh17287@gmail.com Sushrut Choubey 91-9564279026 sushrutchoubey@gmail.com EMBA Coordinators Name Mobile Number Email Id AyanKhasnabis 91-9433236524 ayank.iitkgp@gmail.com PallabDatta 91-9051514646 pallabd.iitkgp@gmail.com Girija Prasad Nanda 91-9861049665 girijan.iitkgp@gmail.com 56
  • 59.
    How to reachIIT Kharagpur Situated about 120 km west of Kolkata, Kharagpur can be reached in about 2 hours by train from Howrah railway station (Kolkata) or 3 hours by car from Kolkata Airport. Kharagpur is also connected by direct train services to most major cities of the country. The Institute is about 10 minutes' drive (5 km) from the Kharagpur railway station. Private taxi, auto-rickshaw or cycle-rickshaw can be hired to reach the Institute.
  • 60.
    For any furtherdetails please contact: Career Development and Placement VGSOM, IIT Kharagpur Prof. Anand Teltumbde Chairman, Placements & Corporate Contact anand@vgsom.iitkgp.ernet.in +91-9475368435 +91-3222-281996 placements@vgsom.iitkgp.ernet.in placements.vgsom.iitkgp@gmail.com http://www.som.iitkgp.ernet.in