SUMMARY
• Bilingual: (70%) English/Spanish, Eng. Mecatronica.
• Solid background in quality systems
(Production Parts Approval Process (PPAP), First Article Inspection Report (FAIR), Advanced Product Quality
Planning (APQP), Control Plan (CP))
• Strong systems background
(Microsoft Office, excel, power point, word, etc., / Visual Studio, CAM350 (PCB mfg), LABview, Solidwork,
Codewarrior, Minitab.)
• Strong Handly of Electrical & Mechanical Equipment’s
(Spectrum Analyzer, Oscilloscope, Digital multimeter, RF Signal Generators, Frequency Counter, ESD
Equipment’s, Optical Fiber Equipment’s, Caliper, pull tester, micrometer, Hipot Tester, etc.)
EDUCATION / TRAINING
• Eng. Mecatronica August, 2012
Universidad Tecnológica de Tijuana.
• TSU. Electrónica y Automatización August, 2010
Universidad Tecnológica de Tijuana.
• Mitutoyo (Aplicación ISO 17025 & ISO/TS16949) November , 2013
• Mitutoyo (Software Mcosmos CNC V3.2)
• Mitutoyo (Calibration of measuring devices implementing ISO 10012-1 E ISO 17025)
• CITEDI (Programming Freescale microcontroller language C)
• ISO 9001:2000 Analysis and Interpretation
• Lean Manufacturing
• Green Belt December 2015
PROFESSIONAL EXPERIENCE
• Gecko Alliance Apr 2014 ~ Up today
Tijuana, Mexico
o Quality Control Engineer
• Micro Precision Calibration Mexico September Oct 2013 ~ Apr 2014
Tijuana, Mexico
Quality Supervisor
• SMK Electrónica S.A. de C.V. October / 2003 ~ June / 2013
Tijuana, Mexico
o Quality Control Engineer Jr. April 2010 ~ June 2013
o Process Engineer Jr April 2008 ~ April 2010
o QC Auditors leader at SMT, Wave Solder Machine April 2005 ~ April 2008
And Through-hole Assembly
o Quality Control technician October 2003 ~ April 2005
• Circuitos Impresos del Noroeste S.A de C.V February / 2001 ~ September / 2003
Tijuana, México (Printed Circuit Board Mfg)
CNC Programmer Technician ~ ME JUNIOR ENGINEER (PCB Design)
• Besk Mexicana S.A. de C.V. August / 1998 ~ December / 2000
Tijuana, México (Printed Circuit Board Mfg)
CNC Programmer Technician
Activities:
• Introduction to MP following APQP System making sure the manufacturability of the product (Familiar with
ISO/TS16949)
• Validation of the process
Final Assembly, SMT Process, Through-hole, Wave Solder, Software and Hardware
• IPC610 Knowledge
• ESD control (Final Assembly, Wave Solder Machine, SMT Process, Incoming Inspection)
• Creation of Documents
Flowchart, PFMEA, Work Instruction, Gauge R&R, Jig Validation, Master Schedule / Gant chart,
ECR, PCR, DCR, Cell & Lines Layout, Line Balance, Corrective & Preventive Actions, Process
Control Plan
• Validation of the Products
Packing, Ultrasonic Welding, Shrink wrapping, Wave solder, Clean Cabin, Assembly
• Validation of the Product Test
Vibration, ESD, Drop Test, Dimensional, Current Test (Sleep & Operation), Environmental Test,
Functional test
• Budget Development for Quality Inspection (Equipment, Tools, Jigs)
• ECO Review
• Interdepartmental meetings in order to solve issues, SCAR, CAR, RMA’s, Customer Claim, SCRAP.
• 8D’s Methodology,7 Quality Tools, 5 W, CPK, SPC, Design of experiments, Analysis of mode effects and failure
• Internal and External Calibration System
• Interpretation of Drawings, Specifications and schematic
• Implementation of Poka-Yoke Systems
• Kaizen Activities
• 5S Activities
• Repair & maintenance of Equipment
• Design test equipment (Hardware & Software), Programmed in LabVIEW PC communication Ports
(Serial (RS232 &SPI), Parallel Port, USB and GPIB)
• PCB design (Eagle, Proteus, Multisim, CAM 350)
Accomplishments:
• Develop of Internal Calibration System (50 % of calibration are made internally)
• Introduction of QC in Process Inspection in order to improve the product quality and work team QC &
Production people
• ESD Control for SMT, Wave Solder Machine, Incoming Inspection and Final Assembly areas
• Develop a USB Data Acquisitions Card with Freescale Microcontroller 8/32 bits (Digital I/O and Analogical
Inputs), to use in automation fixtures
• Develop QC database in (MS Access, My SQL & MS Excel), in order to obtain quality data, (Lots
Accepted ratio, Calibration Master List, MPR process, CAR & SCAR’s)
• Process Automatic Electrical Test fixture (cost reduction & Customer Claim Reduction)
References:
Name Occupation Phone Extension
Eng. Fermín Del Rio QC Manager (SMK) (664) 625-9680 2221
Eng. Fernando Velazquez QC Eng (Turbo Tech) (044 664) 240-5494
Eng. Arturo Lopez Prod. Supervisor (044 664) 673 6916

VBaltazar CV

  • 1.
    Victor M. Baltazar UrbiVilla del Prado, Priv. Helecho 12635-37, Tijuana México Mobile: (044 664) 311-3506, vic.baltazar@hotmail.com SUMMARY • Bilingual: (70%) English/Spanish, Eng. Mecatronica. • Solid background in quality systems (Production Parts Approval Process (PPAP), First Article Inspection Report (FAIR), Advanced Product Quality Planning (APQP), Control Plan (CP)) • Strong systems background (Microsoft Office, excel, power point, word, etc., / Visual Studio, CAM350 (PCB mfg), LABview, Solidwork, Codewarrior, Minitab.) • Strong Handly of Electrical & Mechanical Equipment’s (Spectrum Analyzer, Oscilloscope, Digital multimeter, RF Signal Generators, Frequency Counter, ESD Equipment’s, Optical Fiber Equipment’s, Caliper, pull tester, micrometer, Hipot Tester, etc.) EDUCATION / TRAINING • Eng. Mecatronica August, 2012 Universidad Tecnológica de Tijuana. • TSU. Electrónica y Automatización August, 2010 Universidad Tecnológica de Tijuana. • Mitutoyo (Aplicación ISO 17025 & ISO/TS16949) November , 2013 • Mitutoyo (Software Mcosmos CNC V3.2) • Mitutoyo (Calibration of measuring devices implementing ISO 10012-1 E ISO 17025) • CITEDI (Programming Freescale microcontroller language C) • ISO 9001:2000 Analysis and Interpretation • Lean Manufacturing • Green Belt December 2015 PROFESSIONAL EXPERIENCE • Gecko Alliance Apr 2014 ~ Up today Tijuana, Mexico o Quality Control Engineer • Micro Precision Calibration Mexico September Oct 2013 ~ Apr 2014 Tijuana, Mexico Quality Supervisor • SMK Electrónica S.A. de C.V. October / 2003 ~ June / 2013 Tijuana, Mexico o Quality Control Engineer Jr. April 2010 ~ June 2013 o Process Engineer Jr April 2008 ~ April 2010 o QC Auditors leader at SMT, Wave Solder Machine April 2005 ~ April 2008 And Through-hole Assembly o Quality Control technician October 2003 ~ April 2005 • Circuitos Impresos del Noroeste S.A de C.V February / 2001 ~ September / 2003 Tijuana, México (Printed Circuit Board Mfg) CNC Programmer Technician ~ ME JUNIOR ENGINEER (PCB Design) • Besk Mexicana S.A. de C.V. August / 1998 ~ December / 2000 Tijuana, México (Printed Circuit Board Mfg)
  • 2.
    CNC Programmer Technician Activities: •Introduction to MP following APQP System making sure the manufacturability of the product (Familiar with ISO/TS16949) • Validation of the process Final Assembly, SMT Process, Through-hole, Wave Solder, Software and Hardware • IPC610 Knowledge • ESD control (Final Assembly, Wave Solder Machine, SMT Process, Incoming Inspection) • Creation of Documents Flowchart, PFMEA, Work Instruction, Gauge R&R, Jig Validation, Master Schedule / Gant chart, ECR, PCR, DCR, Cell & Lines Layout, Line Balance, Corrective & Preventive Actions, Process Control Plan • Validation of the Products Packing, Ultrasonic Welding, Shrink wrapping, Wave solder, Clean Cabin, Assembly • Validation of the Product Test Vibration, ESD, Drop Test, Dimensional, Current Test (Sleep & Operation), Environmental Test, Functional test • Budget Development for Quality Inspection (Equipment, Tools, Jigs) • ECO Review • Interdepartmental meetings in order to solve issues, SCAR, CAR, RMA’s, Customer Claim, SCRAP. • 8D’s Methodology,7 Quality Tools, 5 W, CPK, SPC, Design of experiments, Analysis of mode effects and failure • Internal and External Calibration System • Interpretation of Drawings, Specifications and schematic • Implementation of Poka-Yoke Systems • Kaizen Activities • 5S Activities • Repair & maintenance of Equipment • Design test equipment (Hardware & Software), Programmed in LabVIEW PC communication Ports (Serial (RS232 &SPI), Parallel Port, USB and GPIB) • PCB design (Eagle, Proteus, Multisim, CAM 350) Accomplishments: • Develop of Internal Calibration System (50 % of calibration are made internally) • Introduction of QC in Process Inspection in order to improve the product quality and work team QC & Production people • ESD Control for SMT, Wave Solder Machine, Incoming Inspection and Final Assembly areas • Develop a USB Data Acquisitions Card with Freescale Microcontroller 8/32 bits (Digital I/O and Analogical Inputs), to use in automation fixtures • Develop QC database in (MS Access, My SQL & MS Excel), in order to obtain quality data, (Lots Accepted ratio, Calibration Master List, MPR process, CAR & SCAR’s) • Process Automatic Electrical Test fixture (cost reduction & Customer Claim Reduction) References: Name Occupation Phone Extension Eng. Fermín Del Rio QC Manager (SMK) (664) 625-9680 2221 Eng. Fernando Velazquez QC Eng (Turbo Tech) (044 664) 240-5494 Eng. Arturo Lopez Prod. Supervisor (044 664) 673 6916