SlideShare a Scribd company logo
MECHANICAL ENGINEER
Resume
VAISAKH E V
Mob no: +971 564595009
:+971 556380316
vaisakhemman@gmail.com
Educational Qualification : B.Tech. (Mechanical)
Nationality : Indian
Date of Birth : 30-04-1991
Work Experience : Total 3 Years
Objective:
Seeking for a job in an MEP company, which provides an opportunity for continuous
learning, job satisfaction and self-development through which I can achieve my personal as
well as the organizational goals.
Experience:
1) Currently working as a mechanical Engineer at Al Insaf Fire Equip. Tools and Fire protect
Fix. , Sharjah, UAE from March 2015 to till date.
Project Handled –
 Fire Fighting work at Oriental tower Ajman
 Fire fighting work of Mall area at Al Rayyan complex Al Nahda
 Fire fighting & Fire Alarmwork of Warehouse at Dynatrade Service center
2) Worked as a project Engineer at PLUSTECH SYSTEMS & SOLUTIONS (P) Ltd, Pune,
Maharashtra, India. From Feb 2014 to March 2015.
Plustech Systems and Solutions Pvt. Ltd. is in the business of industrial finishing with core
competency in design, engineering, supply, installation and commissioning of surface finish
systems. We are the right business partner for small & medium scale requirement of
surface finishing Plants.
Project Handled –
 Bajaj 3 Wheeler Phosphate Tank Modification
 New Paint shop For Badve Engineering Ltd. Pithampur
 Touch Booth For Mahindra And Mahindra Ltd. Zaheerabad
 Paint Shop Maintenance at Metalman auto Ltd. Aurangabad.
JOB PROFILE AT PLUSTECH SYSTEMS & SOLUTIONS PVT. LTD (PUNE):
 To prepare the BOQ as per drawing by using ERP software.
 To check the BOQ as per our drawing.
 Procurement of materials as per site condition and requirement.
 Workmen mobilization at site.
 Monitoring the daily activities at site.
 Ensure the customer satisfaction in our work quality.
 Analyze the work schedule and supervise our work till achieve.
 To be solve any problem at site itself.
 Paint Shop Maintenance.
3) I had worked as a mechanical engineering trainee at The Western India Ply woods limited,
Baliapatam, Kannur from 1st
March 2013 to 31st
August 2013.
 Production Planning and control
 Operation and maintenance of RO and DM plant
The Western India Ply woods Limited (WIP), the largest wood processing complex in the
country, produce high quality different grades of Electrical insulation pre- compressed press
boards and components.
Strength:
 Ability to work in a team and urge to learn new concepts.
 Loyal at any circumstances.
 Hard working and result oriented person.
 Positive thinking.
 Good inter personal relations & communication skills.
JOB PROFILE AT Al Insaf Fire Equip. Tools and Fire protect Fix. , Sharjah, UAE:
 Studying of shop drawings and project specifications
 Ensuring that work is executed in accordance with the approved shop drawings &
Specification, agreed procedures & method statements.
 Supervision of site activities
 Inspection and testing and commissioning.
 visual inspection and making reports
 Attending priority works
 Measurement checking
 Maintaining the site files and records.
 Execution & monitoring of project on daily, weekly & monthly basis.
 Coordination with different services agencies, Clients & civil department.
 Monitor progress of work as per program and inform in writing to the Main
Contractor for any delay in Civil works, which is affecting MEP Progress.
 Inform Main Contractorof any variation work in any scope of original MEP Contract
through confirmation of verbal instruction. Any variation work should be done only
after written approval as a variation instruction from the Main contractor/consultant
and after consulting your Project coordinator.
 Submit weekly progress report in the format to Planning Manager in HO on weekly
basis.
 Attend all internal site coordination meetings and External meetings with Main
contractor/Consultant/Client.
QUALITY OF WORKS:
 Check quality of work at site on a daily basis and report any defective
work/incomplete work to your Project Coordinator and also for Foreman for further
action.
SAFETY OF WORKS:
 Make sure that all our workman wear PPE and they do not carry out any unsafe acts
at site.
 Report any unsafe practices by any of our worker to Project coordinator/Safety
Officer.
 Make sure that Tool Box Talks are conducted for our workers through Foreman/Site
Safety Supervisor/Safety Officer at least thrice a week.
TESTING & COMMISSIONING:
 Prepare testing & commissioning check list as per standard formats and make sure
all defects are attended to immediately and check list are signed by all concerned.
 Prepare As built drawings and Operation & Maintenance Manuals for our respective
work at site and submit to Project Coordinator for onward submission to Main
Contractor/consultant.
Software’s known:
 Auto CAD
 ERP (Enterprise Resource planning)
 Pro E
 CATIA
Computer Proficiency:
 MS OFFICE
 C, C++
Declaration:
I hereby declare that all the statements made above are true and correct to the best of my knowledge.
Place: VAISAKH.E.V
Date:

More Related Content

What's hot

Resume-Abdul (1) (1)
Resume-Abdul (1) (1)Resume-Abdul (1) (1)
Resume-Abdul (1) (1)ABDUL JABAR
 
Project Support Team
Project Support TeamProject Support Team
Project Support Team
PT. IRAWAN PRIMA UTAMA
 
Project Scheduler
Project SchedulerProject Scheduler
Project Scheduler
PT. IRAWAN PRIMA UTAMA
 
AVINASH SINGH new cv
AVINASH SINGH new cvAVINASH SINGH new cv
AVINASH SINGH new cvAvinash Singh
 
MR AUNG new cv.pdf 20170104
MR  AUNG new cv.pdf   20170104MR  AUNG new cv.pdf   20170104
MR AUNG new cv.pdf 20170104Aung than htay
 
Joyson andrade
Joyson andradeJoyson andrade
Joyson andrade
JOYSONANDRADE
 
1434344793278Resume_Aakash
1434344793278Resume_Aakash1434344793278Resume_Aakash
1434344793278Resume_AakashAakash Verma
 
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
G P SUDHAKARA BABU
 
PRASAD RESUME_10 years.....
PRASAD RESUME_10 years.....PRASAD RESUME_10 years.....
PRASAD RESUME_10 years.....prasad durga
 
Project Coordinator
Project CoordinatorProject Coordinator
Project Coordinator
PT. IRAWAN PRIMA UTAMA
 
QA engineer
QA engineerQA engineer
QA engineer
Abala Mech
 

What's hot (18)

Resume-Abdul (1) (1)
Resume-Abdul (1) (1)Resume-Abdul (1) (1)
Resume-Abdul (1) (1)
 
Project Support Team
Project Support TeamProject Support Team
Project Support Team
 
Project Scheduler
Project SchedulerProject Scheduler
Project Scheduler
 
Project Bangladesh
Project BangladeshProject Bangladesh
Project Bangladesh
 
Mohammad Yunus-Resume
Mohammad Yunus-ResumeMohammad Yunus-Resume
Mohammad Yunus-Resume
 
AVINASH SINGH new cv
AVINASH SINGH new cvAVINASH SINGH new cv
AVINASH SINGH new cv
 
MR AUNG new cv.pdf 20170104
MR  AUNG new cv.pdf   20170104MR  AUNG new cv.pdf   20170104
MR AUNG new cv.pdf 20170104
 
Ravi form
Ravi formRavi form
Ravi form
 
Joyson andrade
Joyson andradeJoyson andrade
Joyson andrade
 
1434344793278Resume_Aakash
1434344793278Resume_Aakash1434344793278Resume_Aakash
1434344793278Resume_Aakash
 
Resume (1)
Resume (1)Resume (1)
Resume (1)
 
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
WALK INTERVIEW FOR BE in Mechanical/Electrical Engineers
 
PRASAD RESUME_10 years.....
PRASAD RESUME_10 years.....PRASAD RESUME_10 years.....
PRASAD RESUME_10 years.....
 
Project Coordinator
Project CoordinatorProject Coordinator
Project Coordinator
 
sudheer3 modified
sudheer3 modifiedsudheer3 modified
sudheer3 modified
 
Resume
ResumeResume
Resume
 
QA engineer
QA engineerQA engineer
QA engineer
 
Resume
ResumeResume
Resume
 

Viewers also liked

Vijay Jadav Resume
Vijay Jadav ResumeVijay Jadav Resume
Vijay Jadav Resumevijay jadhav
 
Resume (2) (1)
Resume (2) (1)Resume (2) (1)
Resume (2) (1)
Sudarshan Mitkari
 
Production Engineer
Production EngineerProduction Engineer
Production Engineer
dinesh SP
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez El sayed sami
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Justin Mathew
 
Resume-Mechanical Engineer
Resume-Mechanical EngineerResume-Mechanical Engineer
Resume-Mechanical Engineertiju thomas
 

Viewers also liked (9)

Vijay Jadav Resume
Vijay Jadav ResumeVijay Jadav Resume
Vijay Jadav Resume
 
Resume (2) (1)
Resume (2) (1)Resume (2) (1)
Resume (2) (1)
 
Production Engineer
Production EngineerProduction Engineer
Production Engineer
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)ramez_el_sayed_sami_ahmmed_(1) (2)
ramez_el_sayed_sami_ahmmed_(1) (2)
 
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
Resume Justin mathew - Mechanical Test - Trails - Commissioning engineer - ma...
 
RESUME VICTOR
RESUME VICTORRESUME VICTOR
RESUME VICTOR
 
resume
resumeresume
resume
 
Resume-Mechanical Engineer
Resume-Mechanical EngineerResume-Mechanical Engineer
Resume-Mechanical Engineer
 

Similar to VAISAKH- Resume

Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim
 
Nithisha shetty - CV (1)
Nithisha shetty - CV (1)Nithisha shetty - CV (1)
Nithisha shetty - CV (1)Nithish Shetty
 
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Janardhanan Murukesh
 
Hvac mep engg
Hvac mep enggHvac mep engg
Hvac mep engg
Md Mukhtar khan
 
Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar
Muhammed Shahar
 
Project Engineer- Abdullah Javed
Project Engineer- Abdullah JavedProject Engineer- Abdullah Javed
Project Engineer- Abdullah JavedAbdullah Javed
 
Mechanical engr hvac site
Mechanical engr hvac siteMechanical engr hvac site
Mechanical engr hvac site
shaikh mohd wasim
 
Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)
shaikh mohd wasim
 

Similar to VAISAKH- Resume (20)

Mohammed Ameenuddin
Mohammed AmeenuddinMohammed Ameenuddin
Mohammed Ameenuddin
 
Akash Updated cv
Akash Updated cvAkash Updated cv
Akash Updated cv
 
Mohammad Ibrahim - CV final
Mohammad Ibrahim - CV finalMohammad Ibrahim - CV final
Mohammad Ibrahim - CV final
 
Mohd Imran CV
Mohd Imran CVMohd Imran CV
Mohd Imran CV
 
Cv
CvCv
Cv
 
vivek kashyap.2
vivek kashyap.2vivek kashyap.2
vivek kashyap.2
 
Nithisha shetty - CV (1)
Nithisha shetty - CV (1)Nithisha shetty - CV (1)
Nithisha shetty - CV (1)
 
cp civil (1)
cp civil (1)cp civil (1)
cp civil (1)
 
Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)Murukesh_resume_(_Supervisor_strl_) (1)
Murukesh_resume_(_Supervisor_strl_) (1)
 
mech engg cv
mech engg cvmech engg cv
mech engg cv
 
Nikhil resume (1)
Nikhil resume (1)Nikhil resume (1)
Nikhil resume (1)
 
Dipesh pawar CV
Dipesh pawar CVDipesh pawar CV
Dipesh pawar CV
 
CV shamsheer
CV shamsheerCV shamsheer
CV shamsheer
 
Hvac mep engg
Hvac mep enggHvac mep engg
Hvac mep engg
 
Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar Updated cv of lead hse m.shahar
Updated cv of lead hse m.shahar
 
Killedar Resume
Killedar ResumeKilledar Resume
Killedar Resume
 
Project Engineer- Abdullah Javed
Project Engineer- Abdullah JavedProject Engineer- Abdullah Javed
Project Engineer- Abdullah Javed
 
Mechanical engr hvac site
Mechanical engr hvac siteMechanical engr hvac site
Mechanical engr hvac site
 
Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)Mechanical engr hvac site(12years)
Mechanical engr hvac site(12years)
 
Mech eng cv may 2015
Mech eng cv may 2015Mech eng cv may 2015
Mech eng cv may 2015
 

VAISAKH- Resume

  • 1. MECHANICAL ENGINEER Resume VAISAKH E V Mob no: +971 564595009 :+971 556380316 vaisakhemman@gmail.com Educational Qualification : B.Tech. (Mechanical) Nationality : Indian Date of Birth : 30-04-1991 Work Experience : Total 3 Years Objective: Seeking for a job in an MEP company, which provides an opportunity for continuous learning, job satisfaction and self-development through which I can achieve my personal as well as the organizational goals. Experience: 1) Currently working as a mechanical Engineer at Al Insaf Fire Equip. Tools and Fire protect Fix. , Sharjah, UAE from March 2015 to till date. Project Handled –  Fire Fighting work at Oriental tower Ajman  Fire fighting work of Mall area at Al Rayyan complex Al Nahda  Fire fighting & Fire Alarmwork of Warehouse at Dynatrade Service center 2) Worked as a project Engineer at PLUSTECH SYSTEMS & SOLUTIONS (P) Ltd, Pune, Maharashtra, India. From Feb 2014 to March 2015. Plustech Systems and Solutions Pvt. Ltd. is in the business of industrial finishing with core competency in design, engineering, supply, installation and commissioning of surface finish systems. We are the right business partner for small & medium scale requirement of surface finishing Plants. Project Handled –  Bajaj 3 Wheeler Phosphate Tank Modification  New Paint shop For Badve Engineering Ltd. Pithampur
  • 2.  Touch Booth For Mahindra And Mahindra Ltd. Zaheerabad  Paint Shop Maintenance at Metalman auto Ltd. Aurangabad. JOB PROFILE AT PLUSTECH SYSTEMS & SOLUTIONS PVT. LTD (PUNE):  To prepare the BOQ as per drawing by using ERP software.  To check the BOQ as per our drawing.  Procurement of materials as per site condition and requirement.  Workmen mobilization at site.  Monitoring the daily activities at site.  Ensure the customer satisfaction in our work quality.  Analyze the work schedule and supervise our work till achieve.  To be solve any problem at site itself.  Paint Shop Maintenance. 3) I had worked as a mechanical engineering trainee at The Western India Ply woods limited, Baliapatam, Kannur from 1st March 2013 to 31st August 2013.  Production Planning and control  Operation and maintenance of RO and DM plant The Western India Ply woods Limited (WIP), the largest wood processing complex in the country, produce high quality different grades of Electrical insulation pre- compressed press boards and components. Strength:  Ability to work in a team and urge to learn new concepts.  Loyal at any circumstances.  Hard working and result oriented person.  Positive thinking.  Good inter personal relations & communication skills. JOB PROFILE AT Al Insaf Fire Equip. Tools and Fire protect Fix. , Sharjah, UAE:  Studying of shop drawings and project specifications  Ensuring that work is executed in accordance with the approved shop drawings & Specification, agreed procedures & method statements.  Supervision of site activities  Inspection and testing and commissioning.  visual inspection and making reports  Attending priority works  Measurement checking  Maintaining the site files and records.  Execution & monitoring of project on daily, weekly & monthly basis.  Coordination with different services agencies, Clients & civil department.  Monitor progress of work as per program and inform in writing to the Main Contractor for any delay in Civil works, which is affecting MEP Progress.
  • 3.  Inform Main Contractorof any variation work in any scope of original MEP Contract through confirmation of verbal instruction. Any variation work should be done only after written approval as a variation instruction from the Main contractor/consultant and after consulting your Project coordinator.  Submit weekly progress report in the format to Planning Manager in HO on weekly basis.  Attend all internal site coordination meetings and External meetings with Main contractor/Consultant/Client. QUALITY OF WORKS:  Check quality of work at site on a daily basis and report any defective work/incomplete work to your Project Coordinator and also for Foreman for further action. SAFETY OF WORKS:  Make sure that all our workman wear PPE and they do not carry out any unsafe acts at site.  Report any unsafe practices by any of our worker to Project coordinator/Safety Officer.  Make sure that Tool Box Talks are conducted for our workers through Foreman/Site Safety Supervisor/Safety Officer at least thrice a week. TESTING & COMMISSIONING:  Prepare testing & commissioning check list as per standard formats and make sure all defects are attended to immediately and check list are signed by all concerned.  Prepare As built drawings and Operation & Maintenance Manuals for our respective work at site and submit to Project Coordinator for onward submission to Main Contractor/consultant. Software’s known:  Auto CAD  ERP (Enterprise Resource planning)  Pro E  CATIA Computer Proficiency:  MS OFFICE  C, C++ Declaration: I hereby declare that all the statements made above are true and correct to the best of my knowledge. Place: VAISAKH.E.V Date: