1 | P a g e
COVER
LETTER
The HR Manager
Sub: Application for the post of “HVAC Site Engineer”.
Dear Sir,
With reference to the below subject , I avail this
opportunity to introduce myself. I am in a field where
creative and logical thinking is must and I am confident
that I can do justices to the work with my talent and
skills.
Being actively involved in the field of HVAC.I have gained
wide experience, which has benefited me professionally
and broadened my creative and logical thinking in the
HVAC field.
I am confident to Site, Design the Mechanical works
for commercial, Residential, Hospitalized & industrial
projects.
I’ m enclosing here my Curriculum Vitae for your kind
consideration of my candidature and hope that I may get
an opportunity to prove my worthiness.
Keeping in view of my qualification, knowledge and
experience, I am confident that I can full fill the above
mentioned assignment perfectly and live up to your
expectations
Hold a valid UAE Driving License.
Looking forward for a favourable response.
Withbestregards
Sheikh Mohammad Waseem
HVAC
SITE
ENGINEER
2 | P a g e
CURRICULUM VITAE
SHEIKH MOHAMMAD WASIM (B.E-Mechanical)
MECHANICAL ENGINEER (HVAC-PLUMBING),
E-mail: Shaikhmohdwasim1979@gmail.com,
M. No: 00971-552757400
Skype ID: shaikh wasim
Visa status: Visit Visa
CAREER OBJECTIVE :
Looking for a challenging and demanding position in MEP (HVAC, Plumbing, Fire Fighting) systems Site
drafting, in a growth oriented MEP / HVAC / contracting/ construction organizations where there is ample
scope for individual and organizational growth.
EDUCATION QUALIFICATION :
 Degree in Mechanical Engineering with 75.50% (Final Sem)
From Chhatrapati Shahu Ji Maharaj(CSJM) Kanpur University, Kanpur in the year 2004-2008.
 Diploma in Mechanical Engineering with 59.15%
From Maharashtra State Board of Technical Education, Mumbai in the year 2000-2003
 Higher Secondary Certificate Examination-Certificate with 65.45%
From Maharashtra State Board of Higher Secondary Education, Mumbai in the year 2004.
 Secondary Certificate Examination-Certificate with 53.71%
From Maharashtra State Board of Higher Secondary Education, PUNE.
 Advance Diploma in HVAC-MEP (Designing & Draughting) 6 month course
From Craft Institute Of Architectural & Civil Engineering, Hyderabad.
 Mechanical Engineers Society (ASC - IITM) Certificate of Achiebement in HVAC
Engineering course From Recognised By Government Of India.
 Advance Diploma in PLUMBING-MEP(Designing & Draughting) 6 month course
From Craft Institute Of Architectural & Civil Engineering, Hyderabad.
 Advance Diploma in Fire Fighting-MEP(Designing & Draughting) 6 month course
From Craft Institute Of Architectural & Civil Engineering, Hyderabad.
 Advance Diploma in Revit-MEP(Designing & Draughting) 6 month course
From Taiba Engineering Consultants, Hyderabad.
 MSCIT: Govt. Certificate course in computer operating (Windows,MS-Office,Internet).
 Advance in Navies Works 2014 course From Taiba Engineering Consultants,Hyderabad.
 Advance in Solid Works 2014 course From CADTECH Engineering Consultants, Amravati.
3 | P a g e
COMPUTER KNOWLEDGE:
Heat Load Software: Sizing Software:
HAP Mc-quay Duct Sizer
Elite Mc-quay Pipe Sizer
E-20 Form Beta Terminal Device Sizer
Expansion Tank Sizer
Psychometric Chart Analyser
Plumbing Software: Drafting Software:
Domestic water Demand
Calculator
Pipe Line Sizer AutoCAD 2000-2016
Flow Head, Expansion Vessel Selector Operating Systems:
Flow Advisor Windows 10, 8, 7, Vista, XP, 98.
Pump Selector Office Package:
Septic Tank sizer MS Office 2013, 2007 (Word, Excel, PowerPoint)
Total Experience : 7 year in U.A.E & 3 years in India
PROFFESSIONAL EXPERIENCE:-
Experience in India from November 2015 NOV to JUN 2016
“Worked for M/S Akshay Enterprises LTD, Sector 17 Samajigudha HYDERABAD,
India.” From 2015 to 2016 as a “MEP-Mechanical Engineer” for project of B+G+10; B+G+4; and
Luxury villas & commercial buildings.
U.A.E JAN 2008 -OCTOBER 2015
BETOMATIC MIDDLE EAST SHARJAH UAE.
Duration : From Dec 2007 to Oct. 2015
Position : Mechanical Engineer
Total Experience India 3 Years
Ramky Infrastructure LTD At Hi-Tech City,Kondapur,Hyderabad,India.
“RAMKY INFRASTRUCTUR LTD , HYDERABAD” From Novb-2004 to Novb-2007 as a
“Mechanical Engineer” for project of B+G+10; B+G+4; G+2; and Luxury villas & commercial
buildings.
COMPANY PROFILE:
Ramky Infrastructure LTD, Hyderabad is one of the leading Designers, Developers and Building Contractors
in TELANGANA, INDIA.
JOB PROFILE:
MY RESPONSIBILITIES :
 To Prepare HVAC drawings by using AutoCAD Roof, Riser and floor drawings, chilled water, pipe
drawings. Duct drawings with their sectional detail views.
4 | P a g e
 Reading of all civil drawings to carry out the installation as per approved drawings and
specifications.
 Preparing Duct Layout as per site survey and Duct Designing as per Heat Load and standards.
 Reporting progress reports to the Project Manager.
 Prepared materials take-off from drawings and ordered materials from Manufacturers and suppliers.
 Attending daily co-ordination meetings with consultant and other contractors.
 Prepare Compliance Statements.
 Prepare the request for information (RFI).
 Prepare ITP’s (Inspection and test plan), Method Statement and Risk Assessment as per project
requirement.
 Making bill of quantities, prepared material submittals and get approval.
 Instruct the team of technicians to carry out the regular maintenance of efficient working conditions.
 Implement corrective and preventive action, in Progress Plan.
 Installation of all HVAC/Plumbing/Fire Fighting equipment’s including AC units, Ducting, Grilles,
Chilled water piping, Fan Coil Units, Split AC units, Sanitary Wares, Fire water Line, Fire Hose Reel
Cabinet etc.
 Ensuring that the work to be completed with given standards of quality within the given time and in
coordination with sub-ordinates and other Engineering Discipline to avoid hindrance at work.
 Performing visual inspection, dimension check and identification of materials during the various step
of erection.
 Manpower allocation.
 Testing and Commissioning (Air Balancing, Functional Check of Equipment etc.).
 Attend appraisal meetings with the project engineers / managers / consultant in case of delay /
change in drawings / work / unavailability of material and suggest suitably.
NAME OF PROJECT # :
Residential Building
 (B+G+10F)
 Nagarjunh Apartments Hyderabad:
 (B+G+4F).
 Safa Villa Hyderabad:
TECHNICAL EXPERTISE :
HVAC JOB RESPONSIBILITIES :
 Heat Load calculations, Heat Loss calculations following ASHRAE Standards.
 Air Distribution System by Velocity Reduction Method, Equal Friction Method and Static Regain
Method following SMACNA Standards.
 ESP Calculations for Fans & Blowers.
 Evaporator cooling coil selection.
5 | P a g e
 Toilet & Kitchen Ventilation system Designing.
 Stairwell pressurization system Designing.
 Car Parking ventilation and fresh air system Designing.
 Head Loss calculation for Primary & Secondary Pump system.
 Chilled water pumps, condenser water Pumps Selection and power calculation.
 Selection of Chillers, AHU’S, FCU’S, Exhaust Fan, Blower, Window AC, Cooling Tower, Desert
Cooler and other Equipment’s.
PLUMBING JOB RESPONSIBILITIES :
 Water Supply Demand following UPC Standards.
 Underground reservoir, Elevated Roof Tank Sizing.
 Water Supply System and Foul Water Drainage System Calculation.
 Vertical Stack, Branch Drain pipe, Horizontal sewer Sizing.
 Manhole, Septic Tank, Soak away pit, Dispersion Trenches Calculation.
 Storm water drainage & External water supply Calculation.
 Garden water supply & fountain designing.
 Head loss Calculation for Water Pipe System.
 Water Pump, Booster Pump, Auto Pneumatic Tank, Fountain Pump Selection.
PERSONAL SKILLS :
 Maintain punctuality.
 Hardworking and Ambitious.
 Personal Strength Self Motivated, Self-Confidant & smart work.
 Ability to work in a team and individually in the task assigned.
 Positive attitude
PERSONAL DETAILS :
NAME : SHEIKH MOHAMMAD WASEEM
FATHER’S NAME : Abdul Rauf Sheikh
DATE OF BIRTH : 24-06-1979
MARITAL STATUS : Married.
PASSPORT NUMBER : N6915601
DATE ISSUE : 29-02-2016
DATE OF EXPIRY : 28-02-2026
PLACE OF ISSUE
:
U.A.E Drawing License
Indian License :
Nagpur
Valid UAE Driving License.(Car & Motor Bicker)
L.M.V & H.M.`V.
LANGUAGES KNOWN
Religion :
Joining Duty :
English, Arabic, Urdu, Hindi, Marathi, Panjabi,
Nepali, Bengali,Telugu & Ethiopian
Muslim ( Islam )
Immediately after receiving appointment letter
6 | P a g e
PERMANENT ADDRESS FOR
NnNCOMMUNICATION : Plot No 30-B, Amar Jyoti Colony Road,
Kohinoor Colony Amravati, Dist- Amravati.
Pin 444603 ,State Maharashtra ,India
E-mail : Shaikhmohdwasim1979@gmail.com
Telephone No. : 00971-552757400
Skype User ID : wasim_bit
Additional Information:
Fluent in English, Arabic, Marathi, Punjabi, Hindi and Urdu. I have a flexible approach to working hours and
ability to work on own initiatives and unsupervised. I am adept at problem solving, trouble shooting and quick
to implement solutions to such problems as they arise.
My keen interest in technology gives me a good knowledge and experience in a range of systems. It also allows
me to quickly acquaint myself with new software and systems.
I am a calm, controlled and collected professional, I work well under pressure. I have the ability and experience
to communicate with customers and work colleagues alike.
I am hard working and trustworthy and pride myself on the results I have achieved so far in my career. I
continually meet goals and targets that are required and set for me, often going beyond expectations.. I meet
challenges head on and bring out the best in the teams that I have worked with.
Declaration :
I hereby declare that above mentioned information is true & correct to the best of my knowledge and belief.
Being technically sound, young and enthusiastic I am confident that I can fulfill your esteemed organization’s
requirements. I wish and hope that I’ll get the privilege of serving your organization.
I hope to join your successful team . . . .
Date:16-07-2016 Sheikh Mohammad Wasim
Place: Dubai Mechanical Engineer, B.E
+971-552757400

Mechanical engr hvac site

  • 1.
    1 | Pa g e COVER LETTER The HR Manager Sub: Application for the post of “HVAC Site Engineer”. Dear Sir, With reference to the below subject , I avail this opportunity to introduce myself. I am in a field where creative and logical thinking is must and I am confident that I can do justices to the work with my talent and skills. Being actively involved in the field of HVAC.I have gained wide experience, which has benefited me professionally and broadened my creative and logical thinking in the HVAC field. I am confident to Site, Design the Mechanical works for commercial, Residential, Hospitalized & industrial projects. I’ m enclosing here my Curriculum Vitae for your kind consideration of my candidature and hope that I may get an opportunity to prove my worthiness. Keeping in view of my qualification, knowledge and experience, I am confident that I can full fill the above mentioned assignment perfectly and live up to your expectations Hold a valid UAE Driving License. Looking forward for a favourable response. Withbestregards Sheikh Mohammad Waseem HVAC SITE ENGINEER
  • 2.
    2 | Pa g e CURRICULUM VITAE SHEIKH MOHAMMAD WASIM (B.E-Mechanical) MECHANICAL ENGINEER (HVAC-PLUMBING), E-mail: Shaikhmohdwasim1979@gmail.com, M. No: 00971-552757400 Skype ID: shaikh wasim Visa status: Visit Visa CAREER OBJECTIVE : Looking for a challenging and demanding position in MEP (HVAC, Plumbing, Fire Fighting) systems Site drafting, in a growth oriented MEP / HVAC / contracting/ construction organizations where there is ample scope for individual and organizational growth. EDUCATION QUALIFICATION :  Degree in Mechanical Engineering with 75.50% (Final Sem) From Chhatrapati Shahu Ji Maharaj(CSJM) Kanpur University, Kanpur in the year 2004-2008.  Diploma in Mechanical Engineering with 59.15% From Maharashtra State Board of Technical Education, Mumbai in the year 2000-2003  Higher Secondary Certificate Examination-Certificate with 65.45% From Maharashtra State Board of Higher Secondary Education, Mumbai in the year 2004.  Secondary Certificate Examination-Certificate with 53.71% From Maharashtra State Board of Higher Secondary Education, PUNE.  Advance Diploma in HVAC-MEP (Designing & Draughting) 6 month course From Craft Institute Of Architectural & Civil Engineering, Hyderabad.  Mechanical Engineers Society (ASC - IITM) Certificate of Achiebement in HVAC Engineering course From Recognised By Government Of India.  Advance Diploma in PLUMBING-MEP(Designing & Draughting) 6 month course From Craft Institute Of Architectural & Civil Engineering, Hyderabad.  Advance Diploma in Fire Fighting-MEP(Designing & Draughting) 6 month course From Craft Institute Of Architectural & Civil Engineering, Hyderabad.  Advance Diploma in Revit-MEP(Designing & Draughting) 6 month course From Taiba Engineering Consultants, Hyderabad.  MSCIT: Govt. Certificate course in computer operating (Windows,MS-Office,Internet).  Advance in Navies Works 2014 course From Taiba Engineering Consultants,Hyderabad.  Advance in Solid Works 2014 course From CADTECH Engineering Consultants, Amravati.
  • 3.
    3 | Pa g e COMPUTER KNOWLEDGE: Heat Load Software: Sizing Software: HAP Mc-quay Duct Sizer Elite Mc-quay Pipe Sizer E-20 Form Beta Terminal Device Sizer Expansion Tank Sizer Psychometric Chart Analyser Plumbing Software: Drafting Software: Domestic water Demand Calculator Pipe Line Sizer AutoCAD 2000-2016 Flow Head, Expansion Vessel Selector Operating Systems: Flow Advisor Windows 10, 8, 7, Vista, XP, 98. Pump Selector Office Package: Septic Tank sizer MS Office 2013, 2007 (Word, Excel, PowerPoint) Total Experience : 7 year in U.A.E & 3 years in India PROFFESSIONAL EXPERIENCE:- Experience in India from November 2015 NOV to JUN 2016 “Worked for M/S Akshay Enterprises LTD, Sector 17 Samajigudha HYDERABAD, India.” From 2015 to 2016 as a “MEP-Mechanical Engineer” for project of B+G+10; B+G+4; and Luxury villas & commercial buildings. U.A.E JAN 2008 -OCTOBER 2015 BETOMATIC MIDDLE EAST SHARJAH UAE. Duration : From Dec 2007 to Oct. 2015 Position : Mechanical Engineer Total Experience India 3 Years Ramky Infrastructure LTD At Hi-Tech City,Kondapur,Hyderabad,India. “RAMKY INFRASTRUCTUR LTD , HYDERABAD” From Novb-2004 to Novb-2007 as a “Mechanical Engineer” for project of B+G+10; B+G+4; G+2; and Luxury villas & commercial buildings. COMPANY PROFILE: Ramky Infrastructure LTD, Hyderabad is one of the leading Designers, Developers and Building Contractors in TELANGANA, INDIA. JOB PROFILE: MY RESPONSIBILITIES :  To Prepare HVAC drawings by using AutoCAD Roof, Riser and floor drawings, chilled water, pipe drawings. Duct drawings with their sectional detail views.
  • 4.
    4 | Pa g e  Reading of all civil drawings to carry out the installation as per approved drawings and specifications.  Preparing Duct Layout as per site survey and Duct Designing as per Heat Load and standards.  Reporting progress reports to the Project Manager.  Prepared materials take-off from drawings and ordered materials from Manufacturers and suppliers.  Attending daily co-ordination meetings with consultant and other contractors.  Prepare Compliance Statements.  Prepare the request for information (RFI).  Prepare ITP’s (Inspection and test plan), Method Statement and Risk Assessment as per project requirement.  Making bill of quantities, prepared material submittals and get approval.  Instruct the team of technicians to carry out the regular maintenance of efficient working conditions.  Implement corrective and preventive action, in Progress Plan.  Installation of all HVAC/Plumbing/Fire Fighting equipment’s including AC units, Ducting, Grilles, Chilled water piping, Fan Coil Units, Split AC units, Sanitary Wares, Fire water Line, Fire Hose Reel Cabinet etc.  Ensuring that the work to be completed with given standards of quality within the given time and in coordination with sub-ordinates and other Engineering Discipline to avoid hindrance at work.  Performing visual inspection, dimension check and identification of materials during the various step of erection.  Manpower allocation.  Testing and Commissioning (Air Balancing, Functional Check of Equipment etc.).  Attend appraisal meetings with the project engineers / managers / consultant in case of delay / change in drawings / work / unavailability of material and suggest suitably. NAME OF PROJECT # : Residential Building  (B+G+10F)  Nagarjunh Apartments Hyderabad:  (B+G+4F).  Safa Villa Hyderabad: TECHNICAL EXPERTISE : HVAC JOB RESPONSIBILITIES :  Heat Load calculations, Heat Loss calculations following ASHRAE Standards.  Air Distribution System by Velocity Reduction Method, Equal Friction Method and Static Regain Method following SMACNA Standards.  ESP Calculations for Fans & Blowers.  Evaporator cooling coil selection.
  • 5.
    5 | Pa g e  Toilet & Kitchen Ventilation system Designing.  Stairwell pressurization system Designing.  Car Parking ventilation and fresh air system Designing.  Head Loss calculation for Primary & Secondary Pump system.  Chilled water pumps, condenser water Pumps Selection and power calculation.  Selection of Chillers, AHU’S, FCU’S, Exhaust Fan, Blower, Window AC, Cooling Tower, Desert Cooler and other Equipment’s. PLUMBING JOB RESPONSIBILITIES :  Water Supply Demand following UPC Standards.  Underground reservoir, Elevated Roof Tank Sizing.  Water Supply System and Foul Water Drainage System Calculation.  Vertical Stack, Branch Drain pipe, Horizontal sewer Sizing.  Manhole, Septic Tank, Soak away pit, Dispersion Trenches Calculation.  Storm water drainage & External water supply Calculation.  Garden water supply & fountain designing.  Head loss Calculation for Water Pipe System.  Water Pump, Booster Pump, Auto Pneumatic Tank, Fountain Pump Selection. PERSONAL SKILLS :  Maintain punctuality.  Hardworking and Ambitious.  Personal Strength Self Motivated, Self-Confidant & smart work.  Ability to work in a team and individually in the task assigned.  Positive attitude PERSONAL DETAILS : NAME : SHEIKH MOHAMMAD WASEEM FATHER’S NAME : Abdul Rauf Sheikh DATE OF BIRTH : 24-06-1979 MARITAL STATUS : Married. PASSPORT NUMBER : N6915601 DATE ISSUE : 29-02-2016 DATE OF EXPIRY : 28-02-2026 PLACE OF ISSUE : U.A.E Drawing License Indian License : Nagpur Valid UAE Driving License.(Car & Motor Bicker) L.M.V & H.M.`V. LANGUAGES KNOWN Religion : Joining Duty : English, Arabic, Urdu, Hindi, Marathi, Panjabi, Nepali, Bengali,Telugu & Ethiopian Muslim ( Islam ) Immediately after receiving appointment letter
  • 6.
    6 | Pa g e PERMANENT ADDRESS FOR NnNCOMMUNICATION : Plot No 30-B, Amar Jyoti Colony Road, Kohinoor Colony Amravati, Dist- Amravati. Pin 444603 ,State Maharashtra ,India E-mail : Shaikhmohdwasim1979@gmail.com Telephone No. : 00971-552757400 Skype User ID : wasim_bit Additional Information: Fluent in English, Arabic, Marathi, Punjabi, Hindi and Urdu. I have a flexible approach to working hours and ability to work on own initiatives and unsupervised. I am adept at problem solving, trouble shooting and quick to implement solutions to such problems as they arise. My keen interest in technology gives me a good knowledge and experience in a range of systems. It also allows me to quickly acquaint myself with new software and systems. I am a calm, controlled and collected professional, I work well under pressure. I have the ability and experience to communicate with customers and work colleagues alike. I am hard working and trustworthy and pride myself on the results I have achieved so far in my career. I continually meet goals and targets that are required and set for me, often going beyond expectations.. I meet challenges head on and bring out the best in the teams that I have worked with. Declaration : I hereby declare that above mentioned information is true & correct to the best of my knowledge and belief. Being technically sound, young and enthusiastic I am confident that I can fulfill your esteemed organization’s requirements. I wish and hope that I’ll get the privilege of serving your organization. I hope to join your successful team . . . . Date:16-07-2016 Sheikh Mohammad Wasim Place: Dubai Mechanical Engineer, B.E +971-552757400