IBM Power Systems




New tools for managing IBM i
IBM Systems Director Navigator for i




       Hernando Bedoya
       STG Lab Services Consultant

                                       © 2011 IBM Corporation
IBM Power Systems                  September 18–20, 2011 — Stockholm, Sweden


Agenda


         IBM Systems Director Navigator for i (IBM i 6.1 & 7.1)
           – What is it ?
           – How do you get it ?
           – What is/isn’t included ?
           – How does it work ?
           – Whats really included ?
              • New function for IBM i 7.1
           – How does it compare to System i Navigator ?




2                                                                                  © 2011 IBM Corporation
IBM Power Systems                                  September 18–20, 2011 — Stockholm, Sweden

What is it?
     IBM Systems Director Navigator is the strategic management console for IBM i
     New Web based console is included in the operating system beginning with IBM i
     6.1


     It uses the same Integrated Solutions Console (ISC) framework that the Web
     based IBM Systems Director uses


     It is considered a “Level 1” console, that is, it is used to manage just ‘this’ server


     It contains all the currently Web-enabled functions of System i Navigator (over
     300 tasks)

       o All Web enabled tasks are still URL addressable and can be accessed individually as servlets, or as
         portlets within the new Web console




3                                                                                                              © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

IBM Systems Director Navigator




4                                                                        © 2011 IBM Corporation
IBM Power Systems                               September 18–20, 2011 — Stockholm, Sweden

How do you get it ?
         IBM Systems Director Navigator for i is included as part of the base
         operating system option 3 (5761SS1/5770SS1 option 3). There is no
         extra charge required to get it.

         The following products must also be installed (these should already be
         on your system)

            IBM i 6.1
     IBM HTTP Server for i             5761DG1
     Qshell                            5761SS1 option 30
     Portable App Solutions Env (PASE) 5761SS1 option 33
     IBM Developer Kit for Java        5761JV1
     J2SE 5.0 32 bit                   5761JV1 option 8
     IBM Toolbox for Java              5761JC1
     Host Servers                      5761SS1 option 12
                                                                        IBM i 7.1
                                                           IBM HTTP Server for i               5770DG1
                                                           Qshell                              5760SS1 option 30
                                                           Portable App Solutions Env (PASE)   5760SS1 option 33
                                                           IBM Developer Kit for Java          5761JV1
                                                           J2SE 5.0 32 bit                     5761JV1 option 8
                                                           Host Servers                        5770SS1 option 12




5                                                                                                   © 2011 IBM Corporation
IBM Power Systems                                  September 18–20, 2011 — Stockholm, Sweden

What is included ?
        All web-enabled functions of System i Navigator, organized into 13
        different task categories (over 300 tasks total)

          o Jobs, messages, system values, database, users, file systems, security, performance …



        In addition, functions from the following for-purchase LPPs will be
        available in the console when the LPPs are installed:


                   IBM i 6.1
        iHASM (System i High Availability Solutions Manager)      5761HAS
        BRMS (Backup, Recovery, & Media Services)                 5761BR1
        IBM Performance Tools for i5/OS (DiskWatcher)             5761PT1
        IBM Performance Tools for i5/OS (JobWatcher)              5761PT1 option 3

                                                                        IBM i 7.1
                                       iHASM (System i High Availability Solutions Manager)   5770HAS
                                       BRMS (Backup, Recovery, & Media Services)              5770BR1
                                       IBM Performance Tools for i (DiskWatcher)              5770PT1
                                       IBM Performance Tools for i (JobWatcher)               5770PT1 option 3




6                                                                                                   © 2011 IBM Corporation
IBM Power Systems                          September 18–20, 2011 — Stockholm, Sweden

What isn’t included ?



         Management Central functions
           o Strategy is to use IBM Systems Director products for multi system tasks on the Web



         Database functions that involve graphics and charts
           o   SQL Scripts
           o   Visual Explain
           o   Database Navigator
           o   SQL Assist


         Disk Management – New support added in 7.1
           o Graphical View
           o Disk Unit Physical Location
           o Disk Unit/ASP Capacity chart




7                                                                                          © 2011 IBM Corporation
IBM Power Systems     September 18–20, 2011 — Stockholm, Sweden




Lets sort the confusion – Whats out there today?




8                                                                     © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

iSeries Navigator



    Management Server
     – Menu options
     – Toolbar options
     – Distributed & Direct
    Groups and Systems
     – By group content
     – Object tree view
    Tasks
     – Object based tasks
     – Customized tasks
     – Drag & Drop




9                                                                         © 2011 IBM Corporation
IBM Power Systems               September 18–20, 2011 — Stockholm, Sweden

Web based System i Navigator



     Servlet based interface


     Easily create URLs to allow
     direct access to your favorite
     function


     Initial offering had minimal
     function




10                                                                                © 2011 IBM Corporation
IBM Power Systems                                              September 18–20, 2011 — Stockholm, Sweden

IBM offers end-to-                                                                                                    Other Systems
                                                                                                                                                                                                                                       Enterprise Service
                                                                                                                 Management Software                                                                                                     Management
end management
                                          $$                 $$          $$         $$
                                                                                    $$             $$                      $$




                         Active Energy Manager




                                                                                           Service and Support
                                                 Image Management




                                                                                                                                                                                                                 Additional Plug-Ins
                                                                                                                                            Additional Plug-Ins
                                                                                                                  Additional Plug-Ins




                                                                                                                                                                     Additional Plug-Ins


                                                                                                                                                                                           Additional Plug-Ins
                                                                    TPMfOSD
                                                                                                                                                                                                                                           Advanced




                                                                                                 Manager
                                                                                  BOFM
                                                                                                                                                                                                                                           Managers
                                                                                                                                                                                                                                               &
                                                                                                                                                                  Configuration                                                         Priced Plug-Ins




                               Automation                                     Update                                                    System x & Blade Center
                                                                                                                                                                                                                                         Base Systems
                               Status                                         Remote Access                                             System z                                                                                       Director Managers
                                  Virtualization                                                                                        Power Systems                                                                                           &
                                                                              Core Director Services
                                                                                                                                                                                                                                            Hardware
                               Discovery                                      Configuration                                             Storage Configuration
                                                                                                                                                                                                                                       Platform Managers


                                                                                                                                                                                                                                           Resource
                                                                                                                                                                                                                                          Management


                                                                                                                                                                                                                                        Managed virtual
                                                                                                                                                                                                                                         and physical
                                                                                                                                                                                                                                         environments

                                                                                         Hardware
                                                                                                                                                                                                                                        IBM and non-IBM
                                                                                                                                                                                                                                           hardware



11                                                                                                                                                                                                                                     © 2011 IBM Corporation
IBM Power Systems                               September 18–20, 2011 — Stockholm, Sweden

IBM® Systems Director topology

                         IBM System Director Server
                                              Application Logic
                                                     Database                          Management
                                                                                        Console(s)
                                                                                          Web Interface




                   IBM Systems Director Agent
                              Managed Systems
             (Servers, Desktops, Laptops, SNMP devices, CIM devices)


                         Three-tiered architecture
                         Thousands of managed nodes
                         Upward Integration modules supporting
                         – Tivoli, Computer Associates, Hewlett Packard, Microsoft
12                                                                                               © 2011 IBM Corporation
IBM Power Systems                                    September 18–20, 2011 — Stockholm, Sweden

How does it work ?
      Ensure the HTTP Administration servers are running
        o These servers will be an auto start server beginning in IBM i 6.1 – starts with the TCP/IP servers




13                                                                                                             © 2011 IBM Corporation
IBM Power Systems                       September 18–20, 2011 — Stockholm, Sweden

How does it work ?
     In IBM i all Web based
     consoles run on the                               HTTP Web Admin GUI, LDAP,
     Integrated Web Application                        Web Navigator, IPP

     Admin servers.




                                                        IBM Systems Director Navigator,
                                                        Secure Perspective, Cluster
                                                        Services, HASM
                                  IBM Access for Web




14                                                                                        © 2011 IBM Corporation
IBM Power Systems                         September 18–20, 2011 — Stockholm, Sweden

How does it work ?
      Enter the following URL into a browser
        o http://system:2001




      Supports the following browsers:
                                                                                      Time to
           • Microsoft® Internet Explorer, 6.0 or later                               move off
                                                                                        IE6
           • Mozilla Firefox, 1.0 or later
15                                                                                         © 2011 IBM Corporation
IBM Power Systems                  September 18–20, 2011 — Stockholm, Sweden

How does it work ?
      Accept the certificate warnings
       o Consoles runs on SSL
                                                                 Firefox 2
             Internet Explorer 6




           Internet Explorer 7




16                                                                                  © 2011 IBM Corporation
IBM Power Systems                       September 18–20, 2011 — Stockholm, Sweden

How does it work ?
      URL will be re-routed to secure path
      Enter your IBM i user ID and password for this system




17                                                                                       © 2011 IBM Corporation
IBM Power Systems                       September 18–20, 2011 — Stockholm, Sweden

How does it work ?
     Web Console interface displays
       o Expand IBM i Management to view the task categories
       o Click on the desired task category to view the Welcome Page for that task
       o Click on a task on the Welcome Page, or, click on the Show All Tasks button to view
         all web enabled tasks for that category
       o Each selected task appears in a separate portlet, and a tab appears at the top of the
         work space




18                                                                                       © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

Where did the Task page go?




19                                                                        © 2011 IBM Corporation
IBM Power Systems            September 18–20, 2011 — Stockholm, Sweden

New controls overview

Left Navigation groups     New Tab for each view!
all the tasks in logical
compartments




                                                                        Help link!




                                                                         Most common
                                                                         functions
                                                                         included on
                                                                         each Welcome
                                                                         menu



                                                                       All functions
20                                                                            © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

New controls overview



     The ‘All Tasks’ view
     shows every task
     that is supported for
     this category in a
     tree view
     • open / close tree
     nodes
     • Click to open all
     the available task for
     the object. Click on
     the task to take that
     action.


21                                                                        © 2011 IBM Corporation
IBM Power Systems                 September 18–20, 2011 — Stockholm, Sweden

New controls overview                        Select from the available actions

     Fast path icons to Table tasks!              • Object tasks

     • Filters                                    • Category tasks

     • Sorts                                      • Table tasks

     • Entry selection                                  o Columns, Filters, Sorts




Select an entry
• Click on arrow
• Tasks for object




22                                                                                  © 2011 IBM Corporation
IBM Power Systems             September 18–20, 2011 — Stockholm, Sweden

New controls overview
                                         Operations are
                                         broken down to tasks
                                         with logical groupings




           Wizard like interfaces to
           organize values
23                                                                             © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

 New controls overview - Terms

Banner – Common image                 Page Bar – navigate
across all consoles                   between pages




 Navigation Tree –
 group tasks
                            Work area
 24                                                                          © 2011 IBM Corporation
IBM Power Systems               September 18–20, 2011 — Stockholm, Sweden

New controls overview – Portlet controls

              - allows you to edit settings for the portlet

               - return to the previous screen
               - displayed if help

               - minimize the module view; only the title bar is visible
               - maximize view, full portlet view is visible

               - close a portlet

               - console module can be refreshed without
                 reloading the console page

25                                                                               © 2011 IBM Corporation
IBM Power Systems                 September 18–20, 2011 — Stockholm, Sweden

What is ISC – Integrated Solutions Console?
• Provides the strategic ‘single console for administering IBM products and related
applications ‘
         • Used by - IBM Systems Director Web based products
                    o Virtualization Manager
                    o Active Energy Manager
                    o Plus more
               • WebSphere Application Server Administrative GUI
     • Portlet based infrastructure
          • Multi tasking; switch between active tasks
          • Partial refresh; refresh only the selected portlet
     • Manage Open pages
     • Startup pages
          • Specify pages to open every time you log in
                                                               Multi sign on
     • Single sign-on
                                                                 in 7.1 !!
          • Access all functions within the portlet view
          • A user can only sign in once (6.1)

26                                                                                  © 2011 IBM Corporation
IBM Power Systems                  September 18–20, 2011 — Stockholm, Sweden


Going Beyond the Basics
Director Navigator
     Multiple window support * New in 7.1




27                                                                                  © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

What is ISC - Manage Open Pages

      From far right drop down select
      the Manage Open Pages link


Manage large numbers
of open pages
      • View
      • Close
      • Navigate




28                                                                         © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

 My Startup pages
     Sign-in and specified pages are automatically opened
     Great for watching important System functions/activities




29                                                                          © 2011 IBM Corporation
IBM Power Systems            September 18–20, 2011 — Stockholm, Sweden

What is ISC - My Startup pages




Open desired page; In far right dropdown
Select ‘Add to My Startup Pages’




30                                                                            © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

My Startup pages




                         Click ‘OK’ on the confirmation screen




31                                                                          © 2011 IBM Corporation
IBM Power Systems                             September 18–20, 2011 — Stockholm, Sweden

What's included – Base functions
System                      Commonly used System tasks include viewing system status, messages, History Log,
                            disk status, 5250 Console and passwords

Basic Operations            Basic tasks to easily manage lists of messages, printer output, and printers

Work Management             Control the work performed on the system including support for interactive and batch
                            work. Distribute resources to ensure applications run well.

Configuration and Service   Functions to help you manage both hardware and software on your system, including
                            System values, Time management, and Disk units


Network                     Control TCP/IP configuration, Remote access services, networking servers, and IP
                            Policies

Integrated Server           Manage Servers hosted by IBM i, enroll and manage users and groups
Administration


Security                    Functions allow you to plan and implement security on your system, Authorization lists,
                            Object permissions, Cryptographic functions




32                                                                                                         © 2011 IBM Corporation
IBM Power Systems                           September 18–20, 2011 — Stockholm, Sweden

What's included – Base functions
Users and Groups          Display and a manage a complete list of the users & groups, create, delete, modify


Databases                 Graphical interface to perform many common admin database operations, access and
                          modify objects, work with performance monitors, as well as access the Health center


Journal Management        Work with journals and journal receivers



Performance               Collect performance data, view the collection to investigate potential performance issues


File Systems              Links to the most commonly used File Systems tasks, integrated file system, IBM i
                          NetServer, Network File System

Internet Configurations   i5/OS internet configuration tasks, HTTP Server, Digital Certificates, IBM IPP, Web-
                          based help server, Internet Setup wizard




33                                                                                                    © 2011 IBM Corporation
IBM Power Systems                               September 18–20, 2011 — Stockholm, Sweden

What's included – Additional LPPS
Backup, Recovery, and Media   Manage your most critical and complex backups, including online backups of Lotus
Services                      servers, simply and easily. You can also recover your system fully in the event of a
                              disaster or hardware failure.

Cluster Resource Services     Task-based approach for setting up and managing your high availability solution. Create
                              a customized high availability solution by separately creating each element of the high
                              availability solution. Create and manage clusters, cluster resource groups, device
                              domains, cluster administrative domains, and perform switchovers.


High Availability Solutions   Easy-to-use, guided approach to setting up high availability. This interface ensures and
Manager                       validates prerequisites, configures all necessary technologies for the selected solution,
                              and tests the set up. This management solution interface is best for smaller businesses
                              who want simpler solutions that require fewer resources.




Performance                   Browser-based performance tasks, manage performance data collections, graphical user
                              interface for collecting performance data, graphically view and analyze performance data
                              using Collection Services, Job Watcher, Disk Watcher




34                                                                                                         © 2011 IBM Corporation
IBM Power Systems                                         September 18–20, 2011 — Stockholm, Sweden

System Management
                                                                               New in 7.1
IBM i 6.1 – Only Local System
     User IDs
                                 Socket
                                Connection
 Work Management



      Network               IAS running L1C


        IFS                 Target SYSTEM =
                            Local




                                IBM i 7.1                                           IBM i 5.4
                         User IDs                                                              User IDs
                                                Socket
                                               Connection                         Socket       Work Management
                         Work Management
                                                                                 Connection

                          Network            IAS running L1C                                    Network

                              IFS            Target SYSTEM =                                        IFS
                                             V5R4



35                                                                                                               © 2011 IBM Corporation
IBM Power Systems                    September 18–20, 2011 — Stockholm, Sweden


Set Target System - *New IBM i 7.1

     Set Target System                                                Current system being
 – Specify the remote system you want to work with.                   managed!!!
 – Supports system at IBM i 5.4, IBM i 6.1 & IBM i 7.1


Supports
• 5.4
• 6.1



     Specify System Name
     User ID
     Password



36                                                                                     © 2011 IBM Corporation
IBM Power Systems   September 18–20, 2011 — Stockholm, Sweden

Welcome Pages - System




37                                                                   © 2011 IBM Corporation
IBM Power Systems      September 18–20, 2011 — Stockholm, Sweden


Going Beyond Command Definitions - 5250
Director Navigator - *New 7.1

                              Green Screen on the Web!




Signon to a full function
5250 screen
38                                                                      © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

 Customize functions/applications




     Select the Application
     Administration link


39                                                                         © 2011 IBM Corporation
IBM Power Systems           September 18–20, 2011 — Stockholm, Sweden

 Customize functions/applications
     -Open the tree node for the section
     - Select the desired task




      -Open the task menu
      - Select Customize
40                                                                           © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

 Customize functions/applications




     Specify the Users/groups
     that you either want to
     give access or restrict
     access to this function

41                                                                          © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Systems tab – Basic functions


                                             Disk Status



                                                           History Log




               System Status


42                                                                          © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Basic Operations




43                                                                         © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Basic Operations tab – Basic functions

     Common functions for the signed on user to work with
     their IBM i basic objects
                                        Printer output




        Send a System Message


44                                                                          © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Configuration and Service




45                                                                          © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Configuration and Service tab – Basic functions

     Disk Management GUI requires ‘SST’ user to be signed on

                                System Values




                Disk Management GUI


46                                                                          © 2011 IBM Corporation
IBM Power Systems    September 18–20, 2011 — Stockholm, Sweden

Welcome Pages - Network




47                                                                    © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Network tab – Basic functions


                         Create IPV4 & IPV6 interfaces




Manage TCP Servers




48                                                                          © 2011 IBM Corporation
IBM Power Systems           September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Integrated Server Administration




49                                                                           © 2011 IBM Corporation
IBM Power Systems     September 18–20, 2011 — Stockholm, Sweden

Welcome Pages - Security




50                                                                     © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Security tab – Basics

                                 Manage Authorization List




                                                            Change Object
                                                            Authority



     Create and Manage the
     System Cryptographic Keys




51                                                                           © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Users and Groups




52                                                                        © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Users and Groups tab - Basics



                                   Create and Manage User Profiles




Create and Manage Group
Profiles


53                                                                          © 2011 IBM Corporation
IBM Power Systems      September 18–20, 2011 — Stockholm, Sweden
Welcome Pages – Databases




54                                                                      © 2011 IBM Corporation
IBM Power Systems                September 18–20, 2011 — Stockholm, Sweden

Database tab - Basics


                                               Work with database


                                                                           Database
                                                                           Indexes




                         Database Health Center


55                                                                                © 2011 IBM Corporation
IBM Power Systems       September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Journal Management




56                                                                       © 2011 IBM Corporation
IBM Power Systems      September 18–20, 2011 — Stockholm, Sweden

Journal Management tab – Basics
***Significant enhancements for 7.1 – Now we have complete
solution for Journal Management!!


•Add Remote Journal
•Delete
•Permissions
•Change Receivers
•Properties
•Journal Receivers
•Show Journal Objects
•Remote Journals


57                                                                      © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden

Welcome Pages - Performance




58                                                                        © 2011 IBM Corporation
IBM Power Systems                     September 18–20, 2011 — Stockholm, Sweden


Performance Tasks
     “Performance” is a major function within this Web console


       – Investigate Data


       – Collections




       – All Performance Tasks
            • Active Jobs
            • Disk Status
            • System Status
            • Define, start, stop and
              manage performance data collectors


59                                                                                     © 2011 IBM Corporation
IBM Power Systems   September 18–20, 2011 — Stockholm, Sweden


Investigate Data                Perspectives are a logical
                                grouping of similar or related
                                views that benefit from being
                                rendered side-by-side for
                                reference or context.




                                               IBM Performance Tools –
                                                 Job Watcher feature




                                                    !
                                                 New

                                                 Performance Explorer and
60
                                                 Health Indicators2011 IBM Corporation
                                                                 ©
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

CPU Utilization and Waits Overview




61                                                                          © 2011 IBM Corporation
IBM Power Systems     September 18–20, 2011 — Stockholm, Sweden


Performance Explorer




The Profile Perspectives
provide function similar
to what Performance
Data Trace Visualizer
offers




62                                                                     © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden


Health Indicators



                         System Resource Health Indicators




63                                                                          © 2011 IBM Corporation
IBM Power Systems      September 18–20, 2011 — Stockholm, Sweden


Disk Response Time Charts




64                                                                      © 2011 IBM Corporation
IBM Power Systems   September 18–20, 2011 — Stockholm, Sweden


Java Perspectives




65                                                                   © 2011 IBM Corporation
IBM Power Systems        September 18–20, 2011 — Stockholm, Sweden


Job Watcher - CPU Utilization and Waits Overview




66                                                                        © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – File Systems




67                                                                         © 2011 IBM Corporation
IBM Power Systems      September 18–20, 2011 — Stockholm, Sweden

File Systems tab - Basics

                                    Work and manage the
                                    contents of the IFS




Create and manage
File Shares




68                                                                      © 2011 IBM Corporation
IBM Power Systems          September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Internet Configurations




69                                                                          © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Backup, Recovery and Media Services




70                                                                         © 2011 IBM Corporation
IBM Power Systems                  September 18–20, 2011 — Stockholm, Sweden

Additional Info – Backup, Recovery and Media Services


     LPPS IBM i 6.1
          • 5761BR1      *BASE Backup Recovery and Media Services
          • 5761BR1      1   BRMS - Network Feature
          • 5761BR1      2   BRMS - Advanced Feature

     LPPS IBM 7.1
          • 5770BR1      *BASE Backup Recovery and Media Services
          • 5770BR1      1   BRMS - Network Feature
          • 5770BR1      2   BRMS - Advanced Feature




71                                                                                  © 2011 IBM Corporation
IBM Power Systems         September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – Cluster Resource Services




72                                                                         © 2011 IBM Corporation
IBM Power Systems           September 18–20, 2011 — Stockholm, Sweden

Welcome Pages – High Availability Solutions Manager




73                                                                           © 2011 IBM Corporation
IBM Power Systems                 September 18–20, 2011 — Stockholm, Sweden

Additional Info – Cluster Resource Services
                    – High Availability Solutions Manager

     LPPS IBM i 6.1
          • 5761HAS      *BASE iHASM



     LPPS IBM i 7.1
          • 5770HAS      *BASE iHASM




74                                                                                 © 2011 IBM Corporation
IBM Power Systems                  September 18–20, 2011 — Stockholm, Sweden

Additional Info – Performance


     LPPS IBM i 6.1 - Group PTF SF99115 Level 15 or higher
          • 5761SS1      46   Performance Viewer Open Source Components
          • 5761PT1      *BASE IBM Performance Tools for i
          • 5761PT1      1   Performance Tools - Manager Feature
          • 5761PT1      2   Performance Tools - Agent Feature
          • 5761PT1      3   Performance Tools - Job Watcher


     LPPSIBM i 7.1 – Group PTF SF99368 Latest
          • 5761SS1      46   Performance Viewer Open Source Components
          • 5761PT1      *BASE IBM Performance Tools for i
          • 5761PT1      1   Performance Tools - Manager Feature
          • 5761PT1      2   Performance Tools - Agent Feature
          • 5761PT1      3   Performance Tools - Job Watcher



75                                                                                  © 2011 IBM Corporation
IBM Power Systems                       September 18–20, 2011 — Stockholm, Sweden

How does it compare to System i Navigator ?

          IBM Systems Director Navigator for i requires nothing to be installed on your PC
            o Is installed and available to use out-of-the-box in IBM i

          In IBM i 6.1, IBM Systems Director Navigator for i is not a complete replacement for
          System i Navigator
            o There is substantial function (over 300 web-enabled functions) that have been
              Web enabled as of IBM i 6.1

          IBM Systems Director Navigator for i provides management function not available in
          System i Navigator
            o Performance Data Investigator
            o High Availability Solutions Manager




76                                                                                       © 2011 IBM Corporation
IBM Power Systems                       September 18–20, 2011 — Stockholm, Sweden

How does it compare to System i Navigator ?

          IBM Systems Director Navigator for i is intended for management of only the server
          where you point your Web browser.
            o Management Central capabilities are not included
            o Use IBM Systems Director cross-platform products for mutli system management

          Both are built from same source code for consistent functionality. Panels look
          different when rendered on the Web Console
          Single user can only sign in to one Web Console either
            – IBM Systems Director Navigator or System i Navigator URL Advisor


          Both can have functions restricted
           – Systems i Navigator don’t install functions
           – Web Console restrict users from specific tasks




77                                                                                       © 2011 IBM Corporation
IBM Power Systems   September 18–20, 2011 — Stockholm, Sweden




     Questions




78                                                                    © 2011 IBM Corporation
IBM Power Systems   September 18–20, 2011 — Stockholm, Sweden

Questions?




79                                                                   © 2011 IBM Corporation
IBM Power Systems                    September 18–20, 2011 — Stockholm, Sweden

Systems Lab Services



     Use STG Lab Services
      – Resources from the IBM Rochester Lab
      – Experts in every aspect of technology on IBM i
      – Missioned to drive technology usage on IBM i
      – Billable, but affordable
      – Can work through IBM or through IBM Business Partners
     Utilize IBM STG Lab Services – web site
      – ibm.com/systems/services/labservices
     Contact
      – Luis Fierro
      – Hernando Bedoya         hbedoya@us.ibm.com




80                                                                                     © 2011 IBM Corporation
IBM Power Systems                                September 18–20, 2011 — Stockholm, Sweden


IBM Systems Lab Services and Training
                                                                                      Mainframe Systems

 Our Mission and Profile
     Support the IBM Systems Agenda and accelerate the adoption of new
                                                                                         Power Systems
     products and solutions
     Maximize performance of our clients’ existing IBM systems
     Deliver technical training, conferences, and other services tailored to        System x & Bladecenter
     meet client needs
     Team with IBM Service Providers to optimize the deployment of IBM
     solutions (GTS, GBS, SWG Lab Services and our IBM Business                         System Storage
     Partners)

 Our Competitive Advantage
                                                                                  IT Infrastructure Optimization
     Leverage relationships with the IBM development labs to build deep
     technical skills and exploit the expertise of our developers
     Combined expertise of Lab Services and the Training for Systems team
                                                                                      Data Center Services
     Skills can be deployed worldwide to assure all client needs can be met

                        Successful worldwide history:
                                                                                       Training Services
          17 years in Americas, 9 years in Europe/Middle East/Africa,
                            5 years in Asia Pacific


     www.ibm.com/systems/services/labservices          stgls@us.ibm.com
81                                                                                                 © 2011 IBM Corporation
IBM Power Systems                                       September 18–20, 2011 — Stockholm, Sweden

IBM Systems Lab Services and Training Power Services
 Key Offerings                                                              Americas, WW Contacts
       High Availability Services on Power Systems (including
       Advanced Copy Services for PowerHA™ on IBM i)
                                                                            Mark Even
                                                                            even@us.ibm.com, 507-253-1313
       Systems Director Services                                            IBM i

       PowerCare Services                                                   Frank Kriss
       Performance and Scalability services (including system,              kriss@us.ibm.com, 507-253-1354
       application, and database tuning)                                    IBM i, High Availability

       Virtualization Services for AIX® on Power Systems™                   Karen Anderson
       Application and database modernization consulting (SOA               kanders@us.ibm.com, 972-561-6337
       implementation)                                                      IBM i Vouchers

       Linux® on Power consulting, custom application                       Stephen Brandenburg
       development, implementation, and optimization services               sbranden@us.ibm.com, 301-803-6199
                                                                            PowerVouchers, Virtualization Program, AIX
       Security on Power consulting and implementation services
       System consolidation and migration service                           George Henningsen
                                                                            gehenni@us.ibm.com, 516-349-3530
       High Performance Computing consulting and
                                                                            SWOT/SWAT, AIX
       implementation services
       SAP® on IBM i consulting                                             Allen Johnston
                                                                            allenrj@us.ibm.com, 704-340-9165
       Power Blades on BladeCenter (including VIOS on i and                 PowerCare
       blades running IBM i implementation)
       Smart Analytics services (including DB2® Web Query                   Dawn May
       implementation and consulting)                                       dmmay@us.ibm.com, 507-253-2121
                                                                            Power Performance and Scalability Center
       Public, private, customized and self-paced virtual training
       Power Systems Technical University

82
     www.ibm.com/systems/services/labservices                 stgls@us.ibm.com                                  © 2011 IBM Corporation
IBM Power Systems                                                          September 18–20, 2011 — Stockholm, Sweden


Trademarks and Disclaimers
Adobe, Acrobat, PostScript and all Adobe-based trademarks are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States, other
countries, or both.
Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered
trademarks of Intel Corporation or its subsidiaries in the United States and other countries.
Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both.
Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both.
IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency which is now part of the Office of Government Commerce.
ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office.
UNIX is a registered trademark of The Open Group in the United States and other countries.
Cell Broadband Engine and Cell/B.E. are trademarks of Sony Computer Entertainment, Inc., in the United States, other countries, or both and are used under license
therefrom.
Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both.
Other company, product, or service names may be trademarks or service marks of others.
Information is provided "AS IS" without warranty of any kind.
The customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual
environmental costs and performance characteristics may vary by customer.
Information concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does
not constitute an endorsement of such products by IBM. Sources for non-IBM list prices and performance numbers are taken from publicly available information,
including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or
any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products.
All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only.
Some information addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance,
function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here
to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning.
Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any
user will experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage
configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements
equivalent to the ratios stated here.
Prices are suggested U.S. list prices and are subject to change without notice. Contact your IBM representative or Business Partner for the most current pricing in your
geography.


 83                                                                                                                                                         © 2011 IBM Corporation

[Uruguay] IBM Systems Director Navigator for i

  • 1.
    IBM Power Systems Newtools for managing IBM i IBM Systems Director Navigator for i Hernando Bedoya STG Lab Services Consultant © 2011 IBM Corporation
  • 2.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Agenda IBM Systems Director Navigator for i (IBM i 6.1 & 7.1) – What is it ? – How do you get it ? – What is/isn’t included ? – How does it work ? – Whats really included ? • New function for IBM i 7.1 – How does it compare to System i Navigator ? 2 © 2011 IBM Corporation
  • 3.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What is it? IBM Systems Director Navigator is the strategic management console for IBM i New Web based console is included in the operating system beginning with IBM i 6.1 It uses the same Integrated Solutions Console (ISC) framework that the Web based IBM Systems Director uses It is considered a “Level 1” console, that is, it is used to manage just ‘this’ server It contains all the currently Web-enabled functions of System i Navigator (over 300 tasks) o All Web enabled tasks are still URL addressable and can be accessed individually as servlets, or as portlets within the new Web console 3 © 2011 IBM Corporation
  • 4.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden IBM Systems Director Navigator 4 © 2011 IBM Corporation
  • 5.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How do you get it ? IBM Systems Director Navigator for i is included as part of the base operating system option 3 (5761SS1/5770SS1 option 3). There is no extra charge required to get it. The following products must also be installed (these should already be on your system) IBM i 6.1 IBM HTTP Server for i 5761DG1 Qshell 5761SS1 option 30 Portable App Solutions Env (PASE) 5761SS1 option 33 IBM Developer Kit for Java 5761JV1 J2SE 5.0 32 bit 5761JV1 option 8 IBM Toolbox for Java 5761JC1 Host Servers 5761SS1 option 12 IBM i 7.1 IBM HTTP Server for i 5770DG1 Qshell 5760SS1 option 30 Portable App Solutions Env (PASE) 5760SS1 option 33 IBM Developer Kit for Java 5761JV1 J2SE 5.0 32 bit 5761JV1 option 8 Host Servers 5770SS1 option 12 5 © 2011 IBM Corporation
  • 6.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What is included ? All web-enabled functions of System i Navigator, organized into 13 different task categories (over 300 tasks total) o Jobs, messages, system values, database, users, file systems, security, performance … In addition, functions from the following for-purchase LPPs will be available in the console when the LPPs are installed: IBM i 6.1 iHASM (System i High Availability Solutions Manager) 5761HAS BRMS (Backup, Recovery, & Media Services) 5761BR1 IBM Performance Tools for i5/OS (DiskWatcher) 5761PT1 IBM Performance Tools for i5/OS (JobWatcher) 5761PT1 option 3 IBM i 7.1 iHASM (System i High Availability Solutions Manager) 5770HAS BRMS (Backup, Recovery, & Media Services) 5770BR1 IBM Performance Tools for i (DiskWatcher) 5770PT1 IBM Performance Tools for i (JobWatcher) 5770PT1 option 3 6 © 2011 IBM Corporation
  • 7.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What isn’t included ? Management Central functions o Strategy is to use IBM Systems Director products for multi system tasks on the Web Database functions that involve graphics and charts o SQL Scripts o Visual Explain o Database Navigator o SQL Assist Disk Management – New support added in 7.1 o Graphical View o Disk Unit Physical Location o Disk Unit/ASP Capacity chart 7 © 2011 IBM Corporation
  • 8.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Lets sort the confusion – Whats out there today? 8 © 2011 IBM Corporation
  • 9.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden iSeries Navigator Management Server – Menu options – Toolbar options – Distributed & Direct Groups and Systems – By group content – Object tree view Tasks – Object based tasks – Customized tasks – Drag & Drop 9 © 2011 IBM Corporation
  • 10.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Web based System i Navigator Servlet based interface Easily create URLs to allow direct access to your favorite function Initial offering had minimal function 10 © 2011 IBM Corporation
  • 11.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden IBM offers end-to- Other Systems Enterprise Service Management Software Management end management $$ $$ $$ $$ $$ $$ $$ Active Energy Manager Service and Support Image Management Additional Plug-Ins Additional Plug-Ins Additional Plug-Ins Additional Plug-Ins Additional Plug-Ins TPMfOSD Advanced Manager BOFM Managers & Configuration Priced Plug-Ins Automation Update System x & Blade Center Base Systems Status Remote Access System z Director Managers Virtualization Power Systems & Core Director Services Hardware Discovery Configuration Storage Configuration Platform Managers Resource Management Managed virtual and physical environments Hardware IBM and non-IBM hardware 11 © 2011 IBM Corporation
  • 12.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden IBM® Systems Director topology IBM System Director Server Application Logic Database Management Console(s) Web Interface IBM Systems Director Agent Managed Systems (Servers, Desktops, Laptops, SNMP devices, CIM devices) Three-tiered architecture Thousands of managed nodes Upward Integration modules supporting – Tivoli, Computer Associates, Hewlett Packard, Microsoft 12 © 2011 IBM Corporation
  • 13.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? Ensure the HTTP Administration servers are running o These servers will be an auto start server beginning in IBM i 6.1 – starts with the TCP/IP servers 13 © 2011 IBM Corporation
  • 14.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? In IBM i all Web based consoles run on the HTTP Web Admin GUI, LDAP, Integrated Web Application Web Navigator, IPP Admin servers. IBM Systems Director Navigator, Secure Perspective, Cluster Services, HASM IBM Access for Web 14 © 2011 IBM Corporation
  • 15.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? Enter the following URL into a browser o http://system:2001 Supports the following browsers: Time to • Microsoft® Internet Explorer, 6.0 or later move off IE6 • Mozilla Firefox, 1.0 or later 15 © 2011 IBM Corporation
  • 16.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? Accept the certificate warnings o Consoles runs on SSL Firefox 2 Internet Explorer 6 Internet Explorer 7 16 © 2011 IBM Corporation
  • 17.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? URL will be re-routed to secure path Enter your IBM i user ID and password for this system 17 © 2011 IBM Corporation
  • 18.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it work ? Web Console interface displays o Expand IBM i Management to view the task categories o Click on the desired task category to view the Welcome Page for that task o Click on a task on the Welcome Page, or, click on the Show All Tasks button to view all web enabled tasks for that category o Each selected task appears in a separate portlet, and a tab appears at the top of the work space 18 © 2011 IBM Corporation
  • 19.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Where did the Task page go? 19 © 2011 IBM Corporation
  • 20.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview Left Navigation groups New Tab for each view! all the tasks in logical compartments Help link! Most common functions included on each Welcome menu All functions 20 © 2011 IBM Corporation
  • 21.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview The ‘All Tasks’ view shows every task that is supported for this category in a tree view • open / close tree nodes • Click to open all the available task for the object. Click on the task to take that action. 21 © 2011 IBM Corporation
  • 22.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview Select from the available actions Fast path icons to Table tasks! • Object tasks • Filters • Category tasks • Sorts • Table tasks • Entry selection o Columns, Filters, Sorts Select an entry • Click on arrow • Tasks for object 22 © 2011 IBM Corporation
  • 23.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview Operations are broken down to tasks with logical groupings Wizard like interfaces to organize values 23 © 2011 IBM Corporation
  • 24.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview - Terms Banner – Common image Page Bar – navigate across all consoles between pages Navigation Tree – group tasks Work area 24 © 2011 IBM Corporation
  • 25.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden New controls overview – Portlet controls - allows you to edit settings for the portlet - return to the previous screen - displayed if help - minimize the module view; only the title bar is visible - maximize view, full portlet view is visible - close a portlet - console module can be refreshed without reloading the console page 25 © 2011 IBM Corporation
  • 26.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What is ISC – Integrated Solutions Console? • Provides the strategic ‘single console for administering IBM products and related applications ‘ • Used by - IBM Systems Director Web based products o Virtualization Manager o Active Energy Manager o Plus more • WebSphere Application Server Administrative GUI • Portlet based infrastructure • Multi tasking; switch between active tasks • Partial refresh; refresh only the selected portlet • Manage Open pages • Startup pages • Specify pages to open every time you log in Multi sign on • Single sign-on in 7.1 !! • Access all functions within the portlet view • A user can only sign in once (6.1) 26 © 2011 IBM Corporation
  • 27.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Going Beyond the Basics Director Navigator Multiple window support * New in 7.1 27 © 2011 IBM Corporation
  • 28.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What is ISC - Manage Open Pages From far right drop down select the Manage Open Pages link Manage large numbers of open pages • View • Close • Navigate 28 © 2011 IBM Corporation
  • 29.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden My Startup pages Sign-in and specified pages are automatically opened Great for watching important System functions/activities 29 © 2011 IBM Corporation
  • 30.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What is ISC - My Startup pages Open desired page; In far right dropdown Select ‘Add to My Startup Pages’ 30 © 2011 IBM Corporation
  • 31.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden My Startup pages Click ‘OK’ on the confirmation screen 31 © 2011 IBM Corporation
  • 32.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What's included – Base functions System Commonly used System tasks include viewing system status, messages, History Log, disk status, 5250 Console and passwords Basic Operations Basic tasks to easily manage lists of messages, printer output, and printers Work Management Control the work performed on the system including support for interactive and batch work. Distribute resources to ensure applications run well. Configuration and Service Functions to help you manage both hardware and software on your system, including System values, Time management, and Disk units Network Control TCP/IP configuration, Remote access services, networking servers, and IP Policies Integrated Server Manage Servers hosted by IBM i, enroll and manage users and groups Administration Security Functions allow you to plan and implement security on your system, Authorization lists, Object permissions, Cryptographic functions 32 © 2011 IBM Corporation
  • 33.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What's included – Base functions Users and Groups Display and a manage a complete list of the users & groups, create, delete, modify Databases Graphical interface to perform many common admin database operations, access and modify objects, work with performance monitors, as well as access the Health center Journal Management Work with journals and journal receivers Performance Collect performance data, view the collection to investigate potential performance issues File Systems Links to the most commonly used File Systems tasks, integrated file system, IBM i NetServer, Network File System Internet Configurations i5/OS internet configuration tasks, HTTP Server, Digital Certificates, IBM IPP, Web- based help server, Internet Setup wizard 33 © 2011 IBM Corporation
  • 34.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden What's included – Additional LPPS Backup, Recovery, and Media Manage your most critical and complex backups, including online backups of Lotus Services servers, simply and easily. You can also recover your system fully in the event of a disaster or hardware failure. Cluster Resource Services Task-based approach for setting up and managing your high availability solution. Create a customized high availability solution by separately creating each element of the high availability solution. Create and manage clusters, cluster resource groups, device domains, cluster administrative domains, and perform switchovers. High Availability Solutions Easy-to-use, guided approach to setting up high availability. This interface ensures and Manager validates prerequisites, configures all necessary technologies for the selected solution, and tests the set up. This management solution interface is best for smaller businesses who want simpler solutions that require fewer resources. Performance Browser-based performance tasks, manage performance data collections, graphical user interface for collecting performance data, graphically view and analyze performance data using Collection Services, Job Watcher, Disk Watcher 34 © 2011 IBM Corporation
  • 35.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden System Management New in 7.1 IBM i 6.1 – Only Local System User IDs Socket Connection Work Management Network IAS running L1C IFS Target SYSTEM = Local IBM i 7.1 IBM i 5.4 User IDs User IDs Socket Connection Socket Work Management Work Management Connection Network IAS running L1C Network IFS Target SYSTEM = IFS V5R4 35 © 2011 IBM Corporation
  • 36.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Set Target System - *New IBM i 7.1 Set Target System Current system being – Specify the remote system you want to work with. managed!!! – Supports system at IBM i 5.4, IBM i 6.1 & IBM i 7.1 Supports • 5.4 • 6.1 Specify System Name User ID Password 36 © 2011 IBM Corporation
  • 37.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages - System 37 © 2011 IBM Corporation
  • 38.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Going Beyond Command Definitions - 5250 Director Navigator - *New 7.1 Green Screen on the Web! Signon to a full function 5250 screen 38 © 2011 IBM Corporation
  • 39.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Customize functions/applications Select the Application Administration link 39 © 2011 IBM Corporation
  • 40.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Customize functions/applications -Open the tree node for the section - Select the desired task -Open the task menu - Select Customize 40 © 2011 IBM Corporation
  • 41.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Customize functions/applications Specify the Users/groups that you either want to give access or restrict access to this function 41 © 2011 IBM Corporation
  • 42.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Systems tab – Basic functions Disk Status History Log System Status 42 © 2011 IBM Corporation
  • 43.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Basic Operations 43 © 2011 IBM Corporation
  • 44.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Basic Operations tab – Basic functions Common functions for the signed on user to work with their IBM i basic objects Printer output Send a System Message 44 © 2011 IBM Corporation
  • 45.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Configuration and Service 45 © 2011 IBM Corporation
  • 46.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Configuration and Service tab – Basic functions Disk Management GUI requires ‘SST’ user to be signed on System Values Disk Management GUI 46 © 2011 IBM Corporation
  • 47.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages - Network 47 © 2011 IBM Corporation
  • 48.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Network tab – Basic functions Create IPV4 & IPV6 interfaces Manage TCP Servers 48 © 2011 IBM Corporation
  • 49.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Integrated Server Administration 49 © 2011 IBM Corporation
  • 50.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages - Security 50 © 2011 IBM Corporation
  • 51.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Security tab – Basics Manage Authorization List Change Object Authority Create and Manage the System Cryptographic Keys 51 © 2011 IBM Corporation
  • 52.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Users and Groups 52 © 2011 IBM Corporation
  • 53.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Users and Groups tab - Basics Create and Manage User Profiles Create and Manage Group Profiles 53 © 2011 IBM Corporation
  • 54.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Databases 54 © 2011 IBM Corporation
  • 55.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Database tab - Basics Work with database Database Indexes Database Health Center 55 © 2011 IBM Corporation
  • 56.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Journal Management 56 © 2011 IBM Corporation
  • 57.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Journal Management tab – Basics ***Significant enhancements for 7.1 – Now we have complete solution for Journal Management!! •Add Remote Journal •Delete •Permissions •Change Receivers •Properties •Journal Receivers •Show Journal Objects •Remote Journals 57 © 2011 IBM Corporation
  • 58.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages - Performance 58 © 2011 IBM Corporation
  • 59.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Performance Tasks “Performance” is a major function within this Web console – Investigate Data – Collections – All Performance Tasks • Active Jobs • Disk Status • System Status • Define, start, stop and manage performance data collectors 59 © 2011 IBM Corporation
  • 60.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Investigate Data Perspectives are a logical grouping of similar or related views that benefit from being rendered side-by-side for reference or context. IBM Performance Tools – Job Watcher feature ! New Performance Explorer and 60 Health Indicators2011 IBM Corporation ©
  • 61.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden CPU Utilization and Waits Overview 61 © 2011 IBM Corporation
  • 62.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Performance Explorer The Profile Perspectives provide function similar to what Performance Data Trace Visualizer offers 62 © 2011 IBM Corporation
  • 63.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Health Indicators System Resource Health Indicators 63 © 2011 IBM Corporation
  • 64.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Disk Response Time Charts 64 © 2011 IBM Corporation
  • 65.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Java Perspectives 65 © 2011 IBM Corporation
  • 66.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Job Watcher - CPU Utilization and Waits Overview 66 © 2011 IBM Corporation
  • 67.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – File Systems 67 © 2011 IBM Corporation
  • 68.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden File Systems tab - Basics Work and manage the contents of the IFS Create and manage File Shares 68 © 2011 IBM Corporation
  • 69.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Internet Configurations 69 © 2011 IBM Corporation
  • 70.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Backup, Recovery and Media Services 70 © 2011 IBM Corporation
  • 71.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Additional Info – Backup, Recovery and Media Services LPPS IBM i 6.1 • 5761BR1 *BASE Backup Recovery and Media Services • 5761BR1 1 BRMS - Network Feature • 5761BR1 2 BRMS - Advanced Feature LPPS IBM 7.1 • 5770BR1 *BASE Backup Recovery and Media Services • 5770BR1 1 BRMS - Network Feature • 5770BR1 2 BRMS - Advanced Feature 71 © 2011 IBM Corporation
  • 72.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – Cluster Resource Services 72 © 2011 IBM Corporation
  • 73.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Welcome Pages – High Availability Solutions Manager 73 © 2011 IBM Corporation
  • 74.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Additional Info – Cluster Resource Services – High Availability Solutions Manager LPPS IBM i 6.1 • 5761HAS *BASE iHASM LPPS IBM i 7.1 • 5770HAS *BASE iHASM 74 © 2011 IBM Corporation
  • 75.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Additional Info – Performance LPPS IBM i 6.1 - Group PTF SF99115 Level 15 or higher • 5761SS1 46 Performance Viewer Open Source Components • 5761PT1 *BASE IBM Performance Tools for i • 5761PT1 1 Performance Tools - Manager Feature • 5761PT1 2 Performance Tools - Agent Feature • 5761PT1 3 Performance Tools - Job Watcher LPPSIBM i 7.1 – Group PTF SF99368 Latest • 5761SS1 46 Performance Viewer Open Source Components • 5761PT1 *BASE IBM Performance Tools for i • 5761PT1 1 Performance Tools - Manager Feature • 5761PT1 2 Performance Tools - Agent Feature • 5761PT1 3 Performance Tools - Job Watcher 75 © 2011 IBM Corporation
  • 76.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it compare to System i Navigator ? IBM Systems Director Navigator for i requires nothing to be installed on your PC o Is installed and available to use out-of-the-box in IBM i In IBM i 6.1, IBM Systems Director Navigator for i is not a complete replacement for System i Navigator o There is substantial function (over 300 web-enabled functions) that have been Web enabled as of IBM i 6.1 IBM Systems Director Navigator for i provides management function not available in System i Navigator o Performance Data Investigator o High Availability Solutions Manager 76 © 2011 IBM Corporation
  • 77.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden How does it compare to System i Navigator ? IBM Systems Director Navigator for i is intended for management of only the server where you point your Web browser. o Management Central capabilities are not included o Use IBM Systems Director cross-platform products for mutli system management Both are built from same source code for consistent functionality. Panels look different when rendered on the Web Console Single user can only sign in to one Web Console either – IBM Systems Director Navigator or System i Navigator URL Advisor Both can have functions restricted – Systems i Navigator don’t install functions – Web Console restrict users from specific tasks 77 © 2011 IBM Corporation
  • 78.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Questions 78 © 2011 IBM Corporation
  • 79.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Questions? 79 © 2011 IBM Corporation
  • 80.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Systems Lab Services Use STG Lab Services – Resources from the IBM Rochester Lab – Experts in every aspect of technology on IBM i – Missioned to drive technology usage on IBM i – Billable, but affordable – Can work through IBM or through IBM Business Partners Utilize IBM STG Lab Services – web site – ibm.com/systems/services/labservices Contact – Luis Fierro – Hernando Bedoya hbedoya@us.ibm.com 80 © 2011 IBM Corporation
  • 81.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden IBM Systems Lab Services and Training Mainframe Systems Our Mission and Profile Support the IBM Systems Agenda and accelerate the adoption of new Power Systems products and solutions Maximize performance of our clients’ existing IBM systems Deliver technical training, conferences, and other services tailored to System x & Bladecenter meet client needs Team with IBM Service Providers to optimize the deployment of IBM solutions (GTS, GBS, SWG Lab Services and our IBM Business System Storage Partners) Our Competitive Advantage IT Infrastructure Optimization Leverage relationships with the IBM development labs to build deep technical skills and exploit the expertise of our developers Combined expertise of Lab Services and the Training for Systems team Data Center Services Skills can be deployed worldwide to assure all client needs can be met Successful worldwide history: Training Services 17 years in Americas, 9 years in Europe/Middle East/Africa, 5 years in Asia Pacific www.ibm.com/systems/services/labservices stgls@us.ibm.com 81 © 2011 IBM Corporation
  • 82.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden IBM Systems Lab Services and Training Power Services Key Offerings Americas, WW Contacts High Availability Services on Power Systems (including Advanced Copy Services for PowerHA™ on IBM i) Mark Even even@us.ibm.com, 507-253-1313 Systems Director Services IBM i PowerCare Services Frank Kriss Performance and Scalability services (including system, kriss@us.ibm.com, 507-253-1354 application, and database tuning) IBM i, High Availability Virtualization Services for AIX® on Power Systems™ Karen Anderson Application and database modernization consulting (SOA kanders@us.ibm.com, 972-561-6337 implementation) IBM i Vouchers Linux® on Power consulting, custom application Stephen Brandenburg development, implementation, and optimization services sbranden@us.ibm.com, 301-803-6199 PowerVouchers, Virtualization Program, AIX Security on Power consulting and implementation services System consolidation and migration service George Henningsen gehenni@us.ibm.com, 516-349-3530 High Performance Computing consulting and SWOT/SWAT, AIX implementation services SAP® on IBM i consulting Allen Johnston allenrj@us.ibm.com, 704-340-9165 Power Blades on BladeCenter (including VIOS on i and PowerCare blades running IBM i implementation) Smart Analytics services (including DB2® Web Query Dawn May implementation and consulting) dmmay@us.ibm.com, 507-253-2121 Power Performance and Scalability Center Public, private, customized and self-paced virtual training Power Systems Technical University 82 www.ibm.com/systems/services/labservices stgls@us.ibm.com © 2011 IBM Corporation
  • 83.
    IBM Power Systems September 18–20, 2011 — Stockholm, Sweden Trademarks and Disclaimers Adobe, Acrobat, PostScript and all Adobe-based trademarks are either registered trademarks or trademarks of Adobe Systems Incorporated in the United States, other countries, or both. Intel, Intel logo, Intel Inside, Intel Inside logo, Intel Centrino, Intel Centrino logo, Celeron, Intel Xeon, Intel SpeedStep, Itanium, and Pentium are trademarks or registered trademarks of Intel Corporation or its subsidiaries in the United States and other countries. Linux is a registered trademark of Linus Torvalds in the United States, other countries, or both. Microsoft, Windows, Windows NT, and the Windows logo are trademarks of Microsoft Corporation in the United States, other countries, or both. IT Infrastructure Library is a registered trademark of the Central Computer and Telecommunications Agency which is now part of the Office of Government Commerce. ITIL is a registered trademark, and a registered community trademark of the Office of Government Commerce, and is registered in the U.S. Patent and Trademark Office. UNIX is a registered trademark of The Open Group in the United States and other countries. Cell Broadband Engine and Cell/B.E. are trademarks of Sony Computer Entertainment, Inc., in the United States, other countries, or both and are used under license therefrom. Java and all Java-based trademarks are trademarks of Sun Microsystems, Inc. in the United States, other countries, or both. Other company, product, or service names may be trademarks or service marks of others. Information is provided "AS IS" without warranty of any kind. The customer examples described are presented as illustrations of how those customers have used IBM products and the results they may have achieved. Actual environmental costs and performance characteristics may vary by customer. Information concerning non-IBM products was obtained from a supplier of these products, published announcement material, or other publicly available sources and does not constitute an endorsement of such products by IBM. Sources for non-IBM list prices and performance numbers are taken from publicly available information, including vendor announcements and vendor worldwide homepages. IBM has not tested these products and cannot confirm the accuracy of performance, capability, or any other claims related to non-IBM products. Questions on the capability of non-IBM products should be addressed to the supplier of those products. All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. Some information addresses anticipated future capabilities. Such information is not intended as a definitive statement of a commitment to specific levels of performance, function or delivery schedules with respect to any future products. Such commitments are only made in IBM product announcements. The information is presented here to communicate IBM's current investment and development activities as a good faith effort to help with our customers' future planning. Performance is based on measurements and projections using standard IBM benchmarks in a controlled environment. The actual throughput or performance that any user will experience will vary depending upon considerations such as the amount of multiprogramming in the user's job stream, the I/O configuration, the storage configuration, and the workload processed. Therefore, no assurance can be given that an individual user will achieve throughput or performance improvements equivalent to the ratios stated here. Prices are suggested U.S. list prices and are subject to change without notice. Contact your IBM representative or Business Partner for the most current pricing in your geography. 83 © 2011 IBM Corporation