SO FAR
 We have discussed and worked with the Critical
Path Method
 In the critical path method you work backwards from
what you want to where you are now
 Each step in CPM makes sure that the step before it
and after it will connect seamlessly.
 We discovered the physical properties found on the
Moon.
 We researched what it would take to support life on
a long mission.
NOW
 We will be working on a conceptual design
 A conceptual design is a first idea of what you think
your project will look like.
 A conceptual design consists of drawings and short
descriptions of the final design
 This is sometimes called proof of concept: will it
work at least on paper
 This is your first step in designing the project for
this unit and will lead you to the final project for this
half of the course.
 Take this seriously and you will not have a problem
with the final project.

Unit 5 lesson 3 conceptual design

  • 1.
  • 2.
    SO FAR  Wehave discussed and worked with the Critical Path Method  In the critical path method you work backwards from what you want to where you are now  Each step in CPM makes sure that the step before it and after it will connect seamlessly.  We discovered the physical properties found on the Moon.  We researched what it would take to support life on a long mission.
  • 3.
    NOW  We willbe working on a conceptual design  A conceptual design is a first idea of what you think your project will look like.  A conceptual design consists of drawings and short descriptions of the final design  This is sometimes called proof of concept: will it work at least on paper  This is your first step in designing the project for this unit and will lead you to the final project for this half of the course.  Take this seriously and you will not have a problem with the final project.