SlideShare a Scribd company logo
1 of 5
Download to read offline
Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information
Researched & Developed By:
“The course provides understanding
and knowledge on FPSO design
covering all aspects of an FPSO Bruno
Ban is a very knowledgeable trainer.”
Petronas
“A very professionally conducted
training, Bruno Ban’s experience and
knowledge aspect was top notch. The
workbook (training material) is very
comprehensive and useful as a
resource reference.”
Honeywell Pte
“A great course that allowed me to
expand my knowledge about FPSO’s. I
especially thought the combination of
case studies and in-depth information
from the book really worked well. I am
confident it will help my career in the
oil and gas industry.”
Consultant @TOP
“The course has increased the level of
my awareness about the complexity of
an FPSO especially the importance of
interfaces and layouts. It was a real
eye opener. I recommend the course
to anyone in the industry to attend.”
Petrokon Bhd
“Bruno Ban has good knowledge of his
expertise, and translates in simple
language that a non-technical person
also understands. Excellent trainer”
SBM
About Your Expert Trainer
BRUNO BAN
Course Expert Trainer
Bruno Ban is an MSc electrical engineer and BSc maritime transport engineer, who
has over 35 years’ experience in the maritime, offshore oil and gas industry. His
wealth of knowledge, ranging from conceptual design, feasibility studies and front
end engineering through to detailed engineering, procurement, construction,
commissioning, decommissioning and training has contributed to many successful
projects worldwide. Past projects include a wide range of installations (mobile,
fixed and subsea), such as FPSOs, DP vessels, petrochemical plants, pipe layers and
subsea interfaces.
Bruno worked for major offshore oil and gas companies, in 2000 he set up his own
company BB Offshore & Marine consulting Ltd., to provide technical and
management support, consultancy and training to the industry. He has proven
ability in managing, coordinating and overseeing the entire project from
conception through completion on a timely and cost effective basis.
In recent years Bruno committed himself to the floating productions industry,
studying and analysing the industry’s behaviour, technical requirements,
developments and progress. He is the author of the book “FPSO Design and
Technology”, which is the product of his vast experience and knowledge and an
invaluable resource for understanding the technical value and complexity of FPSOs
and such installation. His next book on FLNGs will be published shortly.
Contributor to the Offshore, Marine, Energy and Environment (OMEE) involving
studies, concepts and practical execution.
Equip Global – Leading Offshore Engineering Training Provider
Testimonials from Past Attendees
6 – 8 May 2015, Busan | 10 – 12 June 2015, Kuala Lumpur
Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information
Course Overview
It is important for you to optimize your FPSO and FLNG topside design, layout and
processing. Adhering to best practices in areas such as process optimization,
modular construction, piping, electrical and structural designs will help to deliver
safe and operable FPSO and FLNG topsides that minimize capital and operating
expenditures.
Equip Global’s 3-day FPSO& FLNG Topsides Design, Layout & Processing training
workshop has been specially designed to help you walk through every stage of
the FPSO & FLNG topside design, engineering and layout process from concept to
operation. It will pin point key design issues and considerations taking in to
account aspects such as the operating environment, hull size, weight control,
layout planning, process optimization and impact of vessel motions.
Who Should Attend?
Recommended for Anyone Involved in FPSO and FLNG Topside Design,
Engineering & Operations from:
 Oil & Gas Companies
 FPSO & FLNG Operators
 Topsides Engineering & Design Companies
 EPC Contractors
 FPSO & FLNG Shipyards
 FPSO & FLNG Fabricators
 Process Equipment and Control Suppliers
Would you like to run this course in-house? (Save up to 15%)
This course can be presented exclusively for your organisation on an in-house
basis, tailored to meet your specific needs, at a place and time of your
convenience. If you have a team of 10 or more interested in this course, let’s
discuss how we can work together to meet your training needs. Please contact us
and we will be pleased to assist.
Program Schedule (Day1 to Day3)
08.00am Registration and welcome coffee
08.30am Morning session begins
10.20am – 10.40am Morning teas break
12.30am Lunch
13.30pm Afternoon session begins
15.20pm – 15.40pm Afternoon tea break
17.30pm End of Day/Course
Programme format
This unique, cutting edge
programme will be delivered in a
highly interactive and practical,
tutorial style format. Theory will
be supported and illustrated
through a combination of real-
world case studies and an
extended hypothetical scenario
that enables participants to easily
incorporate the programme
insights, techniques and
procedures into their own
organisations
Pre-course questionnaire
To ensure that you gain maximum
benefit from this event, a detailed
questionnaire will be sent to you
to establish exactly what your
course needs are. The completed
forms will be analysed by the
course facilitator. As a result, we
ensure the course is delivered at
an appropriate level and that
relevant issues will be addressed.
The comprehensive course
material will enable you to digest
the subject matter in your own
time.
Certificate
Upon completion of the course,
you will receive a Certificate of
Attendance bearing the signatures
of both the Trainer and the Course
Organizer. This Certificate will
testify to your professional
development and assist in your
advancement.
FPSO & FLNG Topsides Design, Layout and Processing
6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information
Training Agenda Day 1
Course Introduction and Objectives
 Round the room introductions
 Safety briefing
 Course objectives
 Summary of overall course content
Introduction to FPSO and FLNG Design and Technology
 What is an FPSO
 FLNG History
 Floating Production Market presentation by
geographical areas:
 Characteristics of geographical regions
 Typical field layouts
 Economic Drivers for Floating Production Projects
− World energy outlook
− LNG value chain
− Basic elements and cost structure
− Construction options (new built or conversion
 Types of floaters
Class and Regulatory Issues and Environmental
Considerations
 Applicable rules and regulations(National and
international rules and regulations, codes and
standards, guidelines and recommended practices,
and industry standards)
 Classification and regulations
 Flagging and Statutory (Coastal State) requirements
and flag state requirements
 Environmental requirements
Design Basis
 General Design Criteria
 Environmental design parameters
 Material selection philosophy
 Design Life
 Design and construction Verification
 Overall Facility Design
 Design Criteria
 HSSE and Integrity Assurance
Design and Environmental Effects on FPSO/FLNG
Projects
 Shipbuilding and offshore approach understanding the
consequences of different ways of approach
 Effects of motions on topsides layout
 Still water loads
 Weight control
 Stability
Topsides Scope of Work
 Understanding the engineering process and phases
− Concept design
− FEED
− Basic design
− Detailed engineering
− Fabrication engineering
− Design change control
 Project process time line
Q&A Session
Training Agenda Day 2
Optimizing Topside Modular Design, Layout &
Construction
 Key configurations decisions and impact on
FPSO/FLNG layout
 Topside facility overview
 Emissions (flare)
 Layout principles
 Topside equipment design
 Material selection (selection procedures and design
practice)
 Structural design (global analysis)
 Configuration of topsides supports
 Pre-assembled Units (PAU)
 Design considerations (Modularization)
 Detailed engineering, procurement and construction
for topside modules – best practices
 Standardisation of topsides
 Topside installation challenges and innovation
 Successful topside design
Interfaces
 Physical and functional interfaces
 Overview of key functional interface areas
 Internal and external interfaces
 Interfaces between vessel, topsides and turret
 Preventing interfaces resulting into problems
 Interface management
Interactive Exercise
FPSO & FLNG Topsides Design, Layout and Processing
6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information
FLNG Process System
 Liquefaction
− LNG properties and specifications
− Gas treatment
 Fractionation
 Acid gas removal
 Dehydration
 Mercury removal
 Heavy hydrocarbon removal
− Liquefaction requirements
− Liquefaction processes and technologies
− Selection of liquefaction equipment, technologies,
heat exchange and refrigeration
− Cooling water system
− Cargo storage – containment
− Cargo Offload
− Challenge of offshore LNG transfer
 Regasification
− LNG regasification requirements
− Regasification technologies (FRSU)
− Land based and offshore approach
 Liquefaction
 Regasification
− Typical LNG liquefaction plant
− Offshore generic LNG liquefaction
Safety in Design and Operation
 Safety philosophy
 Main process hazards
 Control of leaks and releases
 Control of ignition
Case Studies & Interactive Exercise
FLNGs versus FPSOs
 Design
 Technology
 Similarities and differences
 Pro and contra
Decommissioning
 Regulatory framework
 Technical feasibility issues
 Safety and health issues
 Environmental issues
 Cost issues
 Ship-shaped offshore installations
Current Floating Gas Projects
Q&A Session
Topsides Utility Design Requirements
 Electrical design including integration of new and
existing systems
 Instrumentation design
 Telecommunication
 Mechanical design and construction philosophy
 Understanding piping design and layouts
 Insulation and trace heating
 Corrosion monitoring and prevention
 Accommodation
 Material handling
Determining FPSO/FLNG Power Generation and
Heating
 Power requirements
 Vessel (conversion) - existing systems (steam boilers)
 Heating requirements
 Fuel gas requirements
 Environmental requirements
 Operational issues
 Heating system
Selection of Control and Safety Systems
 Centralized system and control philosophy (ICSS)
 Integrated automation systems
 Process control system
 Process shutdown
 Fire and gas system
 Emergency shutdown and blowdown system
 Subsea control system
Q&A Session
Training Agenda Day 3
FPSO Topside Process System
 Preparing the basic design of the separation system
 Gas and liquid separation
 Crude processing
 Oil storage and offload
 Gas handling system
 Gas processing requirements
 Dehydration
 Gas compression, recycle compression and export
compression
 Produced water treatment system and water injection
 Chemical injection
FPSO & FLNG Topsides Design, Layout and Processing
6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
TRANING COURSE PACKAGE PRICING STRUCTURE
TRAINING COURSE STANDARD PRICE Equip Global recognises the value of learning in teams
Group bookings at the same time from the same company
receive the following:
3 or more at 7% off
5 or more at 10% off
This offer is exclusive of the early bird discount. Call us for a
special discount rate for teams of 8 and above.
FPSO & FLNG Topsides Design, Layout &
Processing
6 – 8 May 2015, Busan
SGD 3999
FPSO & FLNG Topsides Design, Layout &
Processing
10 – 12 June 2015, Kuala Lumpur
SGD 3999
In-House Training: I would like to organise this training on-site and save on total course fees! For further information about On-site Solutions, please
+65 6376 0908 or email cherobelle@equip-global.com
DELEGATES REGISTRATION DETAILS
DELEGATE 1
Title:
Full Name
Job Title
Department
Contact Number
Email Address
DELEGATE 2
Title:
Full Name
Job Title
Department
Contact Number
Email Address
Company
Address
Country Postal Code
Approving
Manager Name
Email Address
Approving
Manager
Signature
Dates DD/MM/YY
I Agree to Equip Global’s
Payment Terms
If the invoice is to be addressed for the attention of a different person than
the delegates, please complete the details below:
Full Name
Email Address
Telephone
If you have not received an acknowledgement before the conference please call us at
+65 63760908 to confirm your booking
CONFERENCE DOCUMENTATION
I am registering as a delegate. Please send me an extra set of
conference documentation at SGD 199.
I cannot attend the event. Please send me a set of the conference
documentation at SGD 999.
PAYMENT METHODS
I WISH TO PAY BY CHECK: Made payable to Equip Global Singapore Pte Ltd
I WISH TO PAY BY CREDIT CARD: Please debit my credit card
Card Types
(Please Circle)
VISA MasterCard
American Express
Expiry Date MM/YYYY
Card Number
Name on Card CVC Code
Signature Date DD/MM/YYYY
BY DIRECT TRANSFER
Equip Global Bank
Details
Account Name: Equip Global Pte Ltd
Account Number: 630-824993-001 Swift Code: OCBCSGSG
Bank Address: Overseas-Chnese Banking Corporation Limited
65 Chulia Street, OCBC Centre, Singapore 049513
Tel: (65) 65381111 www.ocbc.com
Intermediary Bank: JP Morgan Chase Bank, New York, USA
Swift Code: CHASU33 Bank Code: 7339
All bank charges to be the payer. Please ensure that Equip Global receives the full invoiced amount.
PAYMENT TERMS & CONDITIONS
All 'Early Bird', 'Super Saver' Discounts or any discounts offered by Equip Global require payment at
time of registration and before the cut-off date in order to receive any discount. All discount offers
cannot be combined with any other offer. - 100% payment is required upon receipt of invoice and
includes lunches, refreshments and detailed conference materials. - Registration made within 14
working days of the conference/training must be paid by credit card. - No delegate will be allowed into
the conference or training unless all payments are received prior to the conference or training -
Discounts do not apply to workshop(s) only bookings. - Please note that credit card payments will incur
a paypal charge of 3.4% + SGD0.50. - Payment not made at the time of registration will be subject to a
SGD99 processing fee
Equip Global Payment, Cancellation, Substitution and Postponement Policy
•Substitution of delegate places is permitted, provided that Equip Global is given reasonable advance
notice in writing. •For any cancellations received in writing not less than fifteen (15) working days prior
to the Conference or Training, you will receive a 90% credit to be used at another Equip Global
conference which must occur within six months from the date of issuance of such credit. An
administration fee of 10% of the registration fee will be retained by Equip Global for all permitted
cancellations. No credit will be issued for any cancellations occurring within fourteen (14) working days
(inclusive) of the conference or training.•In the event that Equip Global postpones an event for any
reason and the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a
credit for 100% of the registration fee paid. You may use this credit for another Equip Global event to
be mutually agreed with Equip Global, which must occur within six months from the date of
postponement.•Except as specified above, no credits will be issued for cancellations. In any
circumstance, no refund will be made for cancellations. All cancellations must be made in writing.
• Equip Global is not responsible for any loss or damage as a result of a substitution, alteration or
cancellation/postponement of an event. Equip Global shall assume no liability whatsoever in the event
this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God,
unforeseen occurrence or any other event that renders performance of this conference impracticable,
illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to:
war, fire, labor strike, extreme weather or other emergency.• While speakers, topics and session
timings were confirmed at the time of publishing, circumstances beyond the control of the organizers
may necessitate substitutions, alterations or cancellations of the speakers and/or topics and/or session
timings. As such, Equip Global reserves the right to alter or modify the advertised speakers and/or
topics and/or session timings if necessary without any liability to you whatsoever. Any substitutions or
alterations will be updated on our web page and all marketing collaterals as soon as possible.
Please complete in BLOCK CAPITALS as
information is used to produce delegates
badges
Please photocopy for multiple bookings.
Your priority registration code is printed
below. Please quote it when registering –
Event Code: OG 10011.005

More Related Content

Similar to Topsides - Cherobelle

FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionWalter Lee
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions OperationspetroEDGE
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...petroEDGE
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)petroEDGE
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016Neto Manuel
 
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...petroEDGE
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing SystempetroEDGE
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)petroEDGE
 
PetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalspetroEDGE
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project DevelopmentWalter Lee
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync
 
postgraduate-diploma-naval-management-operations.pdf
postgraduate-diploma-naval-management-operations.pdfpostgraduate-diploma-naval-management-operations.pdf
postgraduate-diploma-naval-management-operations.pdfjeffreymacasero
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivespetroEDGE
 
Psm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferencesPsm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferencespsmuga9
 
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREJOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREninermike9M malaysia
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync
 
6th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 20176th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 2017Jaquilyn Nicole Dela Pena
 

Similar to Topsides - Cherobelle (20)

FLNG Course Brochure
FLNG Course BrochureFLNG Course Brochure
FLNG Course Brochure
 
FPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas ProductionFPSO / Floating Production Technology for Offshore Oil & Gas Production
FPSO / Floating Production Technology for Offshore Oil & Gas Production
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
PD219 Offshore & Marine Projects and Risk Management with Contractual Perspec...
 
Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)Introduction to Floating Storage & Regasification Unit (FSRU)
Introduction to Floating Storage & Regasification Unit (FSRU)
 
Manuel Neto- Resume 2016
Manuel Neto-  Resume 2016Manuel Neto-  Resume 2016
Manuel Neto- Resume 2016
 
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
 
PD184 - TopSide Processing System
PD184 - TopSide Processing SystemPD184 - TopSide Processing System
PD184 - TopSide Processing System
 
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)ADVANCED WELL ENGINEERING PROGRAM (AWEP)
ADVANCED WELL ENGINEERING PROGRAM (AWEP)
 
PetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing Technology
 
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
 
FSRU Technology & Project Development
FSRU Technology & Project DevelopmentFSRU Technology & Project Development
FSRU Technology & Project Development
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 
Cv (2). kh
Cv (2). kh Cv (2). kh
Cv (2). kh
 
postgraduate-diploma-naval-management-operations.pdf
postgraduate-diploma-naval-management-operations.pdfpostgraduate-diploma-naval-management-operations.pdf
postgraduate-diploma-naval-management-operations.pdf
 
Offshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual PerspectivesOffshore & Marine Projects and Risk Management with Contractual Perspectives
Offshore & Marine Projects and Risk Management with Contractual Perspectives
 
Psm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferencesPsm rubyricks oil and gas event and conferences
Psm rubyricks oil and gas event and conferences
 
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPOREJOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
JOB LISTING BOOKLET - AVIATION OPEN HOUSE CAREER FAIR 2019 - SINGAPORE
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
6th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 20176th Mobile Offshore Production Drilling Units call for papers 2017
6th Mobile Offshore Production Drilling Units call for papers 2017
 

Topsides - Cherobelle

  • 1. Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information Researched & Developed By: “The course provides understanding and knowledge on FPSO design covering all aspects of an FPSO Bruno Ban is a very knowledgeable trainer.” Petronas “A very professionally conducted training, Bruno Ban’s experience and knowledge aspect was top notch. The workbook (training material) is very comprehensive and useful as a resource reference.” Honeywell Pte “A great course that allowed me to expand my knowledge about FPSO’s. I especially thought the combination of case studies and in-depth information from the book really worked well. I am confident it will help my career in the oil and gas industry.” Consultant @TOP “The course has increased the level of my awareness about the complexity of an FPSO especially the importance of interfaces and layouts. It was a real eye opener. I recommend the course to anyone in the industry to attend.” Petrokon Bhd “Bruno Ban has good knowledge of his expertise, and translates in simple language that a non-technical person also understands. Excellent trainer” SBM About Your Expert Trainer BRUNO BAN Course Expert Trainer Bruno Ban is an MSc electrical engineer and BSc maritime transport engineer, who has over 35 years’ experience in the maritime, offshore oil and gas industry. His wealth of knowledge, ranging from conceptual design, feasibility studies and front end engineering through to detailed engineering, procurement, construction, commissioning, decommissioning and training has contributed to many successful projects worldwide. Past projects include a wide range of installations (mobile, fixed and subsea), such as FPSOs, DP vessels, petrochemical plants, pipe layers and subsea interfaces. Bruno worked for major offshore oil and gas companies, in 2000 he set up his own company BB Offshore & Marine consulting Ltd., to provide technical and management support, consultancy and training to the industry. He has proven ability in managing, coordinating and overseeing the entire project from conception through completion on a timely and cost effective basis. In recent years Bruno committed himself to the floating productions industry, studying and analysing the industry’s behaviour, technical requirements, developments and progress. He is the author of the book “FPSO Design and Technology”, which is the product of his vast experience and knowledge and an invaluable resource for understanding the technical value and complexity of FPSOs and such installation. His next book on FLNGs will be published shortly. Contributor to the Offshore, Marine, Energy and Environment (OMEE) involving studies, concepts and practical execution. Equip Global – Leading Offshore Engineering Training Provider Testimonials from Past Attendees 6 – 8 May 2015, Busan | 10 – 12 June 2015, Kuala Lumpur
  • 2. Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information Course Overview It is important for you to optimize your FPSO and FLNG topside design, layout and processing. Adhering to best practices in areas such as process optimization, modular construction, piping, electrical and structural designs will help to deliver safe and operable FPSO and FLNG topsides that minimize capital and operating expenditures. Equip Global’s 3-day FPSO& FLNG Topsides Design, Layout & Processing training workshop has been specially designed to help you walk through every stage of the FPSO & FLNG topside design, engineering and layout process from concept to operation. It will pin point key design issues and considerations taking in to account aspects such as the operating environment, hull size, weight control, layout planning, process optimization and impact of vessel motions. Who Should Attend? Recommended for Anyone Involved in FPSO and FLNG Topside Design, Engineering & Operations from:  Oil & Gas Companies  FPSO & FLNG Operators  Topsides Engineering & Design Companies  EPC Contractors  FPSO & FLNG Shipyards  FPSO & FLNG Fabricators  Process Equipment and Control Suppliers Would you like to run this course in-house? (Save up to 15%) This course can be presented exclusively for your organisation on an in-house basis, tailored to meet your specific needs, at a place and time of your convenience. If you have a team of 10 or more interested in this course, let’s discuss how we can work together to meet your training needs. Please contact us and we will be pleased to assist. Program Schedule (Day1 to Day3) 08.00am Registration and welcome coffee 08.30am Morning session begins 10.20am – 10.40am Morning teas break 12.30am Lunch 13.30pm Afternoon session begins 15.20pm – 15.40pm Afternoon tea break 17.30pm End of Day/Course Programme format This unique, cutting edge programme will be delivered in a highly interactive and practical, tutorial style format. Theory will be supported and illustrated through a combination of real- world case studies and an extended hypothetical scenario that enables participants to easily incorporate the programme insights, techniques and procedures into their own organisations Pre-course questionnaire To ensure that you gain maximum benefit from this event, a detailed questionnaire will be sent to you to establish exactly what your course needs are. The completed forms will be analysed by the course facilitator. As a result, we ensure the course is delivered at an appropriate level and that relevant issues will be addressed. The comprehensive course material will enable you to digest the subject matter in your own time. Certificate Upon completion of the course, you will receive a Certificate of Attendance bearing the signatures of both the Trainer and the Course Organizer. This Certificate will testify to your professional development and assist in your advancement. FPSO & FLNG Topsides Design, Layout and Processing 6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
  • 3. Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information Training Agenda Day 1 Course Introduction and Objectives  Round the room introductions  Safety briefing  Course objectives  Summary of overall course content Introduction to FPSO and FLNG Design and Technology  What is an FPSO  FLNG History  Floating Production Market presentation by geographical areas:  Characteristics of geographical regions  Typical field layouts  Economic Drivers for Floating Production Projects − World energy outlook − LNG value chain − Basic elements and cost structure − Construction options (new built or conversion  Types of floaters Class and Regulatory Issues and Environmental Considerations  Applicable rules and regulations(National and international rules and regulations, codes and standards, guidelines and recommended practices, and industry standards)  Classification and regulations  Flagging and Statutory (Coastal State) requirements and flag state requirements  Environmental requirements Design Basis  General Design Criteria  Environmental design parameters  Material selection philosophy  Design Life  Design and construction Verification  Overall Facility Design  Design Criteria  HSSE and Integrity Assurance Design and Environmental Effects on FPSO/FLNG Projects  Shipbuilding and offshore approach understanding the consequences of different ways of approach  Effects of motions on topsides layout  Still water loads  Weight control  Stability Topsides Scope of Work  Understanding the engineering process and phases − Concept design − FEED − Basic design − Detailed engineering − Fabrication engineering − Design change control  Project process time line Q&A Session Training Agenda Day 2 Optimizing Topside Modular Design, Layout & Construction  Key configurations decisions and impact on FPSO/FLNG layout  Topside facility overview  Emissions (flare)  Layout principles  Topside equipment design  Material selection (selection procedures and design practice)  Structural design (global analysis)  Configuration of topsides supports  Pre-assembled Units (PAU)  Design considerations (Modularization)  Detailed engineering, procurement and construction for topside modules – best practices  Standardisation of topsides  Topside installation challenges and innovation  Successful topside design Interfaces  Physical and functional interfaces  Overview of key functional interface areas  Internal and external interfaces  Interfaces between vessel, topsides and turret  Preventing interfaces resulting into problems  Interface management Interactive Exercise FPSO & FLNG Topsides Design, Layout and Processing 6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
  • 4. Email: cherobelle@equip-global.com | Tel: +65 6376 0968 | www.equip-global.com for more information FLNG Process System  Liquefaction − LNG properties and specifications − Gas treatment  Fractionation  Acid gas removal  Dehydration  Mercury removal  Heavy hydrocarbon removal − Liquefaction requirements − Liquefaction processes and technologies − Selection of liquefaction equipment, technologies, heat exchange and refrigeration − Cooling water system − Cargo storage – containment − Cargo Offload − Challenge of offshore LNG transfer  Regasification − LNG regasification requirements − Regasification technologies (FRSU) − Land based and offshore approach  Liquefaction  Regasification − Typical LNG liquefaction plant − Offshore generic LNG liquefaction Safety in Design and Operation  Safety philosophy  Main process hazards  Control of leaks and releases  Control of ignition Case Studies & Interactive Exercise FLNGs versus FPSOs  Design  Technology  Similarities and differences  Pro and contra Decommissioning  Regulatory framework  Technical feasibility issues  Safety and health issues  Environmental issues  Cost issues  Ship-shaped offshore installations Current Floating Gas Projects Q&A Session Topsides Utility Design Requirements  Electrical design including integration of new and existing systems  Instrumentation design  Telecommunication  Mechanical design and construction philosophy  Understanding piping design and layouts  Insulation and trace heating  Corrosion monitoring and prevention  Accommodation  Material handling Determining FPSO/FLNG Power Generation and Heating  Power requirements  Vessel (conversion) - existing systems (steam boilers)  Heating requirements  Fuel gas requirements  Environmental requirements  Operational issues  Heating system Selection of Control and Safety Systems  Centralized system and control philosophy (ICSS)  Integrated automation systems  Process control system  Process shutdown  Fire and gas system  Emergency shutdown and blowdown system  Subsea control system Q&A Session Training Agenda Day 3 FPSO Topside Process System  Preparing the basic design of the separation system  Gas and liquid separation  Crude processing  Oil storage and offload  Gas handling system  Gas processing requirements  Dehydration  Gas compression, recycle compression and export compression  Produced water treatment system and water injection  Chemical injection FPSO & FLNG Topsides Design, Layout and Processing 6 – 8 May 2015, Busan| 10 – 12 June 2015, Kuala Lumpur
  • 5. TRANING COURSE PACKAGE PRICING STRUCTURE TRAINING COURSE STANDARD PRICE Equip Global recognises the value of learning in teams Group bookings at the same time from the same company receive the following: 3 or more at 7% off 5 or more at 10% off This offer is exclusive of the early bird discount. Call us for a special discount rate for teams of 8 and above. FPSO & FLNG Topsides Design, Layout & Processing 6 – 8 May 2015, Busan SGD 3999 FPSO & FLNG Topsides Design, Layout & Processing 10 – 12 June 2015, Kuala Lumpur SGD 3999 In-House Training: I would like to organise this training on-site and save on total course fees! For further information about On-site Solutions, please +65 6376 0908 or email cherobelle@equip-global.com DELEGATES REGISTRATION DETAILS DELEGATE 1 Title: Full Name Job Title Department Contact Number Email Address DELEGATE 2 Title: Full Name Job Title Department Contact Number Email Address Company Address Country Postal Code Approving Manager Name Email Address Approving Manager Signature Dates DD/MM/YY I Agree to Equip Global’s Payment Terms If the invoice is to be addressed for the attention of a different person than the delegates, please complete the details below: Full Name Email Address Telephone If you have not received an acknowledgement before the conference please call us at +65 63760908 to confirm your booking CONFERENCE DOCUMENTATION I am registering as a delegate. Please send me an extra set of conference documentation at SGD 199. I cannot attend the event. Please send me a set of the conference documentation at SGD 999. PAYMENT METHODS I WISH TO PAY BY CHECK: Made payable to Equip Global Singapore Pte Ltd I WISH TO PAY BY CREDIT CARD: Please debit my credit card Card Types (Please Circle) VISA MasterCard American Express Expiry Date MM/YYYY Card Number Name on Card CVC Code Signature Date DD/MM/YYYY BY DIRECT TRANSFER Equip Global Bank Details Account Name: Equip Global Pte Ltd Account Number: 630-824993-001 Swift Code: OCBCSGSG Bank Address: Overseas-Chnese Banking Corporation Limited 65 Chulia Street, OCBC Centre, Singapore 049513 Tel: (65) 65381111 www.ocbc.com Intermediary Bank: JP Morgan Chase Bank, New York, USA Swift Code: CHASU33 Bank Code: 7339 All bank charges to be the payer. Please ensure that Equip Global receives the full invoiced amount. PAYMENT TERMS & CONDITIONS All 'Early Bird', 'Super Saver' Discounts or any discounts offered by Equip Global require payment at time of registration and before the cut-off date in order to receive any discount. All discount offers cannot be combined with any other offer. - 100% payment is required upon receipt of invoice and includes lunches, refreshments and detailed conference materials. - Registration made within 14 working days of the conference/training must be paid by credit card. - No delegate will be allowed into the conference or training unless all payments are received prior to the conference or training - Discounts do not apply to workshop(s) only bookings. - Please note that credit card payments will incur a paypal charge of 3.4% + SGD0.50. - Payment not made at the time of registration will be subject to a SGD99 processing fee Equip Global Payment, Cancellation, Substitution and Postponement Policy •Substitution of delegate places is permitted, provided that Equip Global is given reasonable advance notice in writing. •For any cancellations received in writing not less than fifteen (15) working days prior to the Conference or Training, you will receive a 90% credit to be used at another Equip Global conference which must occur within six months from the date of issuance of such credit. An administration fee of 10% of the registration fee will be retained by Equip Global for all permitted cancellations. No credit will be issued for any cancellations occurring within fourteen (14) working days (inclusive) of the conference or training.•In the event that Equip Global postpones an event for any reason and the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit for 100% of the registration fee paid. You may use this credit for another Equip Global event to be mutually agreed with Equip Global, which must occur within six months from the date of postponement.•Except as specified above, no credits will be issued for cancellations. In any circumstance, no refund will be made for cancellations. All cancellations must be made in writing. • Equip Global is not responsible for any loss or damage as a result of a substitution, alteration or cancellation/postponement of an event. Equip Global shall assume no liability whatsoever in the event this conference is cancelled, rescheduled or postponed due to a fortuitous event, Act of God, unforeseen occurrence or any other event that renders performance of this conference impracticable, illegal or impossible. For purposes of this clause, a fortuitous event shall include, but not be limited to: war, fire, labor strike, extreme weather or other emergency.• While speakers, topics and session timings were confirmed at the time of publishing, circumstances beyond the control of the organizers may necessitate substitutions, alterations or cancellations of the speakers and/or topics and/or session timings. As such, Equip Global reserves the right to alter or modify the advertised speakers and/or topics and/or session timings if necessary without any liability to you whatsoever. Any substitutions or alterations will be updated on our web page and all marketing collaterals as soon as possible. Please complete in BLOCK CAPITALS as information is used to produce delegates badges Please photocopy for multiple bookings. Your priority registration code is printed below. Please quote it when registering – Event Code: OG 10011.005