The University of Kansas:
Changing for Excellence
November 12, 2012
Presenters

                                                        Jeffrey S. Vitter
                                                        Provost and Executive Vice Chancellor
                                                        The University of Kansas
                                                        jsv@ku.edu




                                                        John R. Curry
                                                        Managing Director
                                                        Huron Consulting Group
                                                        jcurry@huronconsultinggroup.com




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                 2
Agenda

   • Perspective on University Cost Reduction
   • KU’s Rationale
   • Bold Aspirations – KU’s Path Forward
   • Project Team Organization
   • Business Case Relationship Map
   • Areas of Focus

               •       Facilities
               •       Procurement
               •       IT
               •       All Funds Budgeting
               •       Shared Service Centers

   • Keys to Success
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.   3
Perspective on University Cost Reduction
    AN EVOLUTIONARY PROCESS

In the face of unprecedented budget challenges, large public and private research universities have
implemented or are considering a range of approaches to cost reduction.

                       Immediate                                                       Incremental                       Transformational
•    Across the board budget cuts                                           • More across the board cuts          • Comprehensive operational and
•    Delayed deferred maintenance                                           • Large tuition increases               program reviews
•    Capital project delay                                                  • Procurement strategies              • Organizational rationalization
•    Furloughs                                                              • Cuts to low priority services and   • Shared services
•    Hiring freezes                                                           programs                            • Outsourcing
•    Early retirements                                                      • Sale of non-critical assets         • Process standardization,
                                                                                                                    workflow optimization
                                                                                                                  • Procure-to-Pay transformation
                                                                                                                  • Budget process redesign
        Short-term / Temporary                                                                                         Longer-term / Structural
         Easier to implement                                                                                               More complex


          Transformational approaches, while more difficult to implement, can secure sustainable gains in efficiency and
                                                          performance.

© 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                      4
KU’s Rationale
   PROACTIVE APPROACH - STRATEGIC INVESTMENT

The University leadership launched Changing for Excellence to identify strategies to become more
effective, reduce costs and increase revenues in service and program areas.



                                     Reduction in                                    Bold Aspirations           Competition from
                                     State Support                                    Strategic Plan            Other Universities




      KU considered multiple approaches for more effective and strategic management of resources

                            assure administrative                                 redesign budgeting and       focus on enrollment
                           functions are maximally                                 planning capabilities to   management as many
                                   efficient                                      orient all funds towards     state universities are
                                                                                      strategic priorities    aggressively recruiting



© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                         5
Bold Aspirations – KU’s Path Forward
   ADMINISTRATIVE SAVINGS WILL FUND THE STRATEGIC PLAN


                                                                         Our aspirations are bold: to be recognized as a top-tier
                                                                         public international research university.

                                                                         Our plan is organized around six goals to achieve our goal:
                                                                         1.       Energizing the Educational Environment
                                                                         2.       Elevating Doctoral Education
                                                                         3.       Driving Discovery and Innovation
                                                                         4.       Engaging Scholarship for Public Impact
                                                                         5.       Developing Excellence in People
                                                                         6.       Developing Infrastructure and Resources


                                                                             The primary goal of administrative transformation is to
                                                                                    create savings to fund the strategic plan.
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                        6
Project Team Organization
   PHASES 1, 2, AND 3




                                Executive                                                                        Project Delivery       Project
                                Committee                                                                        1 team/campus        Leadership

                            • Chancellor,                                                                        • Consultants      • John Curry,
Phase 1
Opportunity                   Provosts                                                                                                Managing
Identification                                                                                                   • Functional         Director
                            • “Decision                                                                            Specialists
                              makers”                                  Advisory        Opportunity                                  • Mike Phillips,
                                                                                        Opportunity
                                                                                          Opportunity
                                                                      Committee        WorkWork Groups
                                                                                            Groups               • Subject            Senior
                                                                                        Work Groups
                                                                                         Work Groups
                            • Meets                                                                                Matter             Director
Phase 2
Business Case
                              monthly                             • Cross-              TBD “Champion”
                                                                                            •
                                                                                      • • TBD                      Advisors          day to day
                                                                                            TBD
                                                                                          • • Key                                    project
Development                                                         campus
                                                                    stakeholders              stakeholders                           management

                                                                  • Represented:         Opportunity
                                                                                           Opportunity
                                                                    faculty,                 Opportunity
                                                                                             Implementation       Opportunity
                                                                                        Work Groups
                                                                                          Work Groups             Implementation
 Phase 3                                                            operational             WorkTeams
                                                                                                  Groups          Work Groups
                                                                                                                  Support Teams
 Implementation                                                                             Including project
                                                                    leaders, staff,     TBD
                                                                                      • • TBD                      Select areas
                                                                    students              • TBDchampion &       • TBD only
                                                                                              ambassadors
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                        7
Business Case Relationship Map
 SYNERGIES AMONG WORK STREAMS

There is a high level of connection among the KU business cases.




                                                                                  Key




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.         8
Facilities – Overview (1 of 2)
   CONSOLIDATING OPERATIONS TO ACHIEVE SAVINGS FROM ECONOMIES OF SCALE


                                                                                           Goals
      Reduce costs by consolidating operations, improving workforce morale and enhancing worker productivity,
      improving customer service, and implementing a preventive model to reduce deferred maintenance backlog
      over time.


                                                                                  Implementation Objectives
      • Consolidate Student Housing and central facilities operations reducing total FTEs and capitalizing on
        economies of scale
      • Implement a zone maintenance program focusing on preventive maintenance and customer satisfaction
      • Implement mobile technologies to optimize the work order system
      • Implement energy conservation and sustainability initiatives




              KEY CHALLENGE: Achieving cost savings required organizational and operational changes, with little initial
                        support among facilities leadership or the workforce to undertake these changes.
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                            9
Facilities – Overview (2 of 2)
   CONSOLIDATING OPERATIONS TO ACHIEVE SAVINGS FROM ECONOMIES OF SCALE


                                                                       Estimated Annual Financial Opportunity
                                Estimated Annual Saving                                                     Savings To Date

                                                     $2.6M                                                      $1.4M

                                                                           Cumulative Cost Saving Projections




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                               10
Facilities – Three Phased Approach
   WORKFORCE INVOLVEMENT ENABLED BUY-IN AND CHANGE

Benchmarks, business cases, and extensive stakeholder and workforce involvement throughout
the project were the three keys to success.

                          Phase I                                                           Phase II                         Phase III

        Identified High Level Trends                                               Created Detailed Business
                                                                                                                       Implemented Changes
             and Opportunities                                                      Case Recommendations


      • Maintenance labor costs                                                   • Consolidate maintenance         • Consolidated Housing and
        nearly twice as high per                                                    and custodial operations into     Central Facilities
        GSF than peers                                                              zone maintenance program        • Implemented zone
      • Campus operating three                                                    • Increase span of control to       maintenance and eliminated
        separate maintenance and                                                    align with peers                  supervisory layers
        custodial units                                                           • Design performance metrics      • Refocused organization on
      • Travel time, due to                                                         to evaluate service and           preventive maintenance
        geographic dispersion,                                                      performance                     • Rolled out mobile
        consumed one hour per day                                                 • Leverage work-order software      application using iPod/iPad
        per employee                                                              • Implement energy                  devices
      • Primary focus on services                                                   conservation program            • Implemented energy
        billable to units                                                                                             initiatives
      • High energy costs vs. peers
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                     11
Facilities – Implementation Outcomes
   WORKFORCE INVOLVEMENT CREATES BUY-IN AND ENABLES CHANGE

The consolidation of multiple operating units and separation of the construction function resulted in
$1.4M in immediate personnel savings with the potential to achieve $2.6M/year moving forward.


     Consolidated Housing and                                                     Reduced management FTE’s by 30 resulting in $1.4M in first year,
    Central Facilities Operations                                                                with $2.6M per year expected


     Implemented Contemporary                                                     Lowered maintenance response times, improved customer service,
     Zone Maintenance Program                                                       focused the organization on PM, increased worker productivity


          Employee Morale and
                                                                                    Utilized employee climate surveys and focus groups to engage
          Workforce Productivity
                                                                                  staff in the change process and develop work place improvements
                Initiatives



        Energy Conservation and                                                      Involved stakeholders from across campus to develop integrated
         Sustainability Initiatives                                               behavioral change campaign to reduce energy costs 3% – 7% annually




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                        12
Facilities – Key Challenges (1 of 2)
   PROACTIVELY ADDRESSING CHALLENGES IS KEY TO EARLY SUCCESS

Leadership actively engaged the workforce, key stakeholders, and customers early on in the
implementation effort as challenges confronted the management team.


                      Challenge 1: Initiating Change


                     • Existing workforce and supervisors had little input into the management and direction
                       of the central Facilities organization
                     • Apprehension on the part of Student Housing with respect to consolidating operations’
                       impact to customer service


                      Challenge 2: Determining the right organizational structure and operating
                      model

                     • Organization was focused on construction and large, re-billable projects
                     • Little preventive maintenance and growing deferred maintenance backlog
                     • Centralized shops and storeroom led to significant ‘windshield’ time and reduced worker
                       productivity

© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                  13
Facilities – Key Challenges (2 of 2)
   PROACTIVELY ADDRESSING CHALLENGES IS KEY TO EARLY SUCCESS




                     Challenge 3: Obtaining Buy-in from Workforce and Customers

                     • Low workforce morale and disenfranchisement needed to be overcome
                     • Campus customers resistant to change and feared reduction in service levels




                         Challenge 4: Maintaining Change Momentum

                     • Breaking old habits and practices difficult post-implementation with respect to billing
                       practices and customer service
                     • Workforce and supervisors have tendency to confront operational challenges in new
                       model with old ways of thinking about service delivery




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                  14
Facilities – Key Success Strategies (1 of 2)
   LEADERSHIP AND STAKEHOLDER COMMITMENT IS REQUIRED FOR CHANGE

Addressing workforce concerns and early communications efforts with stakeholders, along with
removing resistant leadership were key strategies for successful implementation.

      Leadership Commitment & Making the Case to Stakeholders
      1. Replaced facilities leaders who were not committed to change
      2. Continually communicated commitment of leadership to change and to improving the organization for
         employees and customers
      3. Included Student Housing in design of future state from the beginning


      Focused the Organization on a Preventive Maintenance Model
      1. Separated construction function from the maintenance organization
      2. Organized maintenance work into campus zones to improve productivity and to create a sense of
         ownership of buildings and systems
      3. Utilized work-order software and mobile technologies to enhance new operating model




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                              15
Facilities – Key Success Strategies (2 of 2)
   LEADERSHIP AND STAKEHOLDER COMMITMENT IS REQUIRED FOR CHANGE




       Involved Stakeholders & Employees in Creating Change
       1. Created workgroups composed of mostly front-line employees, stakeholders, and customers from
          across campus to design future state operating and organizational models
       2. Focused early on addressing employee morale concerns and create buy-in


       Aligned Performance Objectives with the New Operating Model
       1. Made new leadership and supervisors accountable to new model
       2. Developed organizational and operating KPI’s to align with new model
       3. Continued involvement of workforce post-implementation in new change initiatives and continued focus on
          improving employee morale and welfare




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                     16
Procurement – Overview (1 of 2)
   FINANCIAL SAVINGS, IMPROVED OPERATIONAL EFFICIENCIES


                                                                                            Goals
      • Focus purchasing staff on commodity management and strategic sourcing
      • Optimize technology and operations to address the drivers behind the low utilization
      • Implement procurement/payables technology to automate processes and routine transactions


                                                                                  Findings and Opportunities
      • Develop strategic sourcing program as part of ongoing operations and shift focus to commodity
        management
      • Implement an eProcurement solution to
         • channel spend to University contracts
         • streamline the approval and settlement process
         • address the low utilization and efficiencies of procure to pay technologies
      • Merge procurement organizations, resulting in additional resources for commodity management expertise
        and strategic sourcing activities


       KEY CHALLENGE: Organizational resistance is substantial due to a failed eProcurement attempt several years ago.


© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                          17
Procurement – Overview (2 of 2)
   FINANCIAL SAVINGS, IMPROVED OPERATIONAL EFFICIENCIES


                                                                                      Annual Financial Opportunity
                           Work Stream                                                        Estimated Annual Saving                                                  Achieved 1st Year Savings
                       Strategic Sourcing                                                                     $2.1-3.3M                                                                $3.9 – $4.3M
                           eProcurement                                                   $750K, after implementation                                                                    In Process

                                                                                  Cumulative Cost Savings
                                                 $9.0
                                      Millions




                                                              Procure to Pay Optimization                                                                                                      $7.8
                                                 $8.0
                                                                                                                                                                                       $7.4
                                                                                                                                                                               $6.9
                                                 $7.0         Sourcing Rebate Revenue
                                                                                                                                                                       $6.4
                                                                                                                                                               $5.9
                                                 $6.0
                                                              Sourcing Cost Savings                                                                    $5.4
                                                                                                                                               $5.0
                                                 $5.0                                                                                  $4.5
                                                              Sourcing One Time Incentives                                     $4.0
                                                 $4.0                                                                  $3.5
                                                                                                               $3.0
                                                 $3.0         Cumulative Project Savings
                                                                                                       $2.6
                                                                                               $2.1
                                                 $2.0                                  $1.7
                                                                               $1.2
                                                               $0.7    $0.8
                                                 $1.0


                                                 $0.0
                                                     Dec-11   Jun-12          Dec-12          Jun-13          Dec-13          Jun-14          Dec-14          Jun-15          Dec-15          Jun-16


© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                                                        18
Strategic Sourcing – Approach
   NEGOTIATED SAVINGS AND KNOWLEDGE TRANSFER

After negotiating six commodity areas, Huron provided training and guidance for the KU
sourcing team, using the Express Shipping commodity area.
    Before conducting the sourcing training, Huron negotiated contracts in six areas:
    • Scientific Supplies                                • IT Distributors
    • Office Related Products                            • Maintenance, Repair & Operations Products
    • Computer Hardware                                  • Multifunctional Devices
                                                                                                                                                  Negotiations,
                                                                                                                                                  Compliance
                                                                                                                            Presentation          and Audit
                                                                                                                            and Action            • Ongoing Huron
                                                                                                       Business Case        • Finalize business     remote support,
                                                                                                       • Develop industry     case                  as needed
                                                                                  Data Analysis          and internal       • Present to
                                                                                  • Contract             perspectives         stakeholders
                                           Data Gathering                           review/summary     • Build business     • Determine
                                           and Contract                           • Pricing analysis     case                 implementation
    Strategic                              Review                                 • Benchmarking       • Summarize            strategy
    Sourcing                                                                      • Estimate savings     savings
                                           • Identify target
    Overview                                 suppliers                              opportunities      • Develop recs
    • Classroom style                      • Supplier data
      training                               request
                                           • Market/industry
                                             research


© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                       19
Procure to Pay – Approach
   SYSTEM AND PROCESS UPGRADES, USER TRAINING

Wave 2 will deliver P2P transformation both centrally and across campus. The transformation
includes process, technology, and organization changes.
            Task / Timeframe                          Campus Impact               Jan   Feb   Mar   Apr   May   Jun   Jul   Aug   Sept   Oct   Nov   Dec
    Wave I
    KUPPS Optimization integration


    Wave 1                                          All Business Suppliers
    Supplier Data Collection                          Available in KUPPS
                                                    P2P Organizational
    Wave 2
                                                  Changes and Centralized
    Transformation
                                                        Invoicing
    Wave 2                                         Streamlined Settlement
    Design                                             and Approvals
                                                          Workflow
    Wave 2                                         Systems Integrations with
    Build                                            KUPPS, PeopleSoft,
                                                    DEMIS and ImageNow
    Wave 2                                           Wave 2 Central and
    Conference Room Pilots                        Department CRP Sessions

    Wave 2                                             Wave 2 Testing and
    Testing and Validation                                Validation


© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                            20
Information Technology – Overview (1 of 2)
   REDUCED COSTS, SEAMLESS COLLABORATION


                                                                                  Goals
      • Centralize and virtualize servers maintained remotely across campus to reduce institutional IT costs while
        providing improved service and data integrity
      • Reorganize departmental IT staff to provide broader coverage and more standardized service
      • Increase the use of multi-function devices (MFD) to reduce total costs of campus printing
      • Centralize identity management and network management solutions for all KU campuses
      • Leverage combined buying power of all campuses to negotiate more favorable deals with software
        vendors
                                        Findings and Opportunities
      • High level of decentralized hardware, software, and IT staff managed by departments
      • Poorly defined role of local IT staff, leading to inconsistent expectations and levels of service across campus
      • Perception among campus users that IT implementations and projects are not fully supported by University
        leadership, causing many efforts to “fizzle out” mid-stream or shortly after completion
      • Each campus has developed unique technical infrastructures to support most administrative areas

       KEY CHALLENGE: Many of the IT initiatives require buy-in and support of decentralized campus leaders, including
                                 collaborative infrastructure design across campuses.
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                           21
Information Technology – Overview (2 of 2)
   REDUCED COSTS, SEAMLESS COLLABORATION


                                                                                  Estimated Financial Opportunity
                                  Estimated Annual Saving                                                                     Saving To Date
                                       $6.7M - $9.5M                                                                             $1.19M*
                                                                                                   * Includes estimates to end of current fiscal year


                                                                                  Cumulative Cost Savings




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                         22
IT – Optimization (1 of 2)
   REDUCING OPERATIONS AND TECHNOLOGY COSTS

Initiatives are underway to maximize efficiency in a number of IT areas across KU.


               Redefine & Reorganize                                         •     Identify Director for IT Support Services
               Decentralized IT Staff
                                                                             •     Change reporting lines of Technology Liaisons to Central IT
                                                                             •     Complete assessment of additional IT responsibilities and customer needs
                                                                             •     Evaluate and standardize workstation support job description and salary bands
                                                                             •     Reorganize and rationalize workstation support



        Co-locate & Virtualize Servers
                                                                         •        Identify and register all devices acting as servers on the KUL network
              Completed as a
              prerequisite to
                                                                         •        Develop policy regarding decentralized servers and other IT devices
              implementation
                                                                                  Purchase and install necessary IT infrastructure to support future state
                     Shared Servers
                                                                         •
                         Virtualized Servers
                                                                         •        Work with units and departments to set up intake list and systematically transition
                    Co-located Physical Servers
                                                                                  decentralized servers



© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                         23
IT – Optimization (2 of 2)
   REDUCING OPERATIONS AND TECHNOLOGY COSTS




          Leverage Software Purchasing                                            • KU will employ an annual “software call” to help identify planned software

        KU Lawrence               KUMC                 Others                      purchases by schools and departments
       • Central IT          • Central IT        • General
                                                   Counsel
                                                                                  • Software Review Board with representation from across the University will be
       • Tech Liaisons       • Research
                                                 • Endowment
       • User
         Communities
                             • User
                               Communities                                         established to identify opportunities for cross-campus collaboration on software
       • Research            • Purchasing
       • Purchasing                                                                procurement




                                     Early Success in Cross-Campus Initiatives

                                     • Dual initiatives to upgrade separate installations of the HR information system were integrated into
                                       one, resulting in one-time savings for the University of $640K and projected recurring annual savings
                                       of $750K.
                                     • This set a precedence for cross-campus collaboration in the IT arena going forward.




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                       24
IT – Enabling Collaboration
     COST SAVINGS ARE ONLY PART OF THE BENEFIT OF IT OPTIMIZATION

 Pursuing Single Identity Management and Network Optimization initiatives across campuses will
 increase opportunities for collaborative research while reducing costs.

                                 Single ID Management                                                                  Network Optimization
Illustrative
                                                                                      Direct Login
                                                                                      Workarounds




                                                                                                                                                          Centrally manage one
                                                                                                                                     Network Operations




                                                                                                                                                                                 Optimize Network
                                                                                                                                     Expand Central




                                                                                                                                                                                 Management
                             KUL                                                     KUMC




                                                                                                                                                          KU network
Current
                           Students,                                                Students,
 State                     Faculty &                                                Faculty &




                                                                                                                                     Center
                             Staff                                                    Staff




                                                                                                                     Enabling Collaboration
                                                                                                     Single Identity Management and Network Optimization
                                                     KU                                              provide seamless collaboration across the campuses:
               Future State
                                                  Students,                                          • Collaborative research
                                                  Faculty &                                          • Electronic libraries and resources for students
                                                    Staff                                            • Reduced operational costs



  © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                                                   25
Budgeting – Overview (1 of 2)
   ALL FUNDS BUDGETING AND GREATER TRANSPARENCY


                                                                                            Goals
      Redesign the annual budget allocation process to encompass all sources of funding; enable comprehensive
      budget understanding and budget transparency for all stakeholders, and manage fund balance growth.



                                                                                  Findings and Opportunities
      • Unexpended endowment distributions have been growing by a CAGR of 6.36% over the past 5
        years,--from $76M in 2006 to $101M in 2011.
      • Carryforward balances have been growing by a CAGR of 11.9% over the past 5 years--from $60M in
        2006 to $106M in 2011.
      • Unit budgets have been based on the previous year’s allocation and do not take into account cost
        drivers such as enrollment and research
      • Recent years’ budget allocations have not included funding for strategic priorities




       KEY CHALLENGE: Implementing an all funds budgeting model requires increased communication and coordination
          to analyze multiple data sources from the central offices, schools and units, and the University Endowment

© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                        26
Budgeting – Overview (2 of 2)
   ALL FUNDS BUDGETING AND GREATER TRANSPARENCY


                                                                       Estimated Annual Financial Opportunity
                        Estimated Annual Flow Available                                                   Utilized To Date

                                                    $4.5M                                                       N/A

                                                        Cumulative “Newly Available Resources” Projections




© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                              27
Budgeting – Approach
   CHANGING THE BUDGET CYCLE

Transformation of KU’s budget model, from an incremental approach to an incentive-based system
will be phased in over several years.

                                                                   New budget report                                      Full integration of
                                                                                            Refined budget report,
         Prior budgeting model                                    format integrating all                                 budget process and
                                                                                            incorporate incentives
                                                                          funds                                           strategic planning


                FY2012                                                 FY2013                    FY2014                      FY2015
            Budgeting Model                                         Budgeting Model           Budgeting Model          End State Budgeting
              and Process                                            and Process               and Process              Model and Process


       A “base plus allocation                               Budget model and reports          Redesigned model        Budgeting and resource
          plus adjustments                                      align with financial       allows an all funds view    management integrated
         incremental model”                                  statements and enhance          of each area, reveals    into the strategic planning
              that did not                                     understanding of cost            key drivers and           processes; budget
       incorporate all sources                                structure at the school         metrics, and aligns     prioritization aligns with
          of funding—out of                                   and administrative unit         incentives between               strategy
          sight, out of mind                                           level                each area and KU as a
                                                                                                     whole



© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                     28
Shared Service Centers – Overview (1 of 2)
   IMPROVED SERVICE, FINANCIAL SAVINGS


                                                                                            Goals
      Increase customer service and reduce costs by creating shared service centers (SSCs) across campus to
      organize staff around job functions and increase training effectiveness for business processes



                                                                                  Findings and Opportunities
      • SSCs are service-driven, using periodic assessments of customer service and metrics to ensure high
        performance.
      • Improved performance of administrative functions will free up funds for strategic initiatives.
      • Unorganized demands on staff time are replaced by balanced, focused workloads, allowing staff to
        have backup during leave time and to develop new skills and expertise.
      • SSCs build teams of staff with common experience and goals, bolstering camaraderie, knowledge sharing
        and fostering a professional and experienced work environment.



                            KEY CHALLENGE: SSCs represent a substantial cultural shift for both faculty and staff.
                      Gaining buy-in for the change requires persistent, focused effort with stakeholders across campus.
© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                            29
Shared Service Centers – Overview (2 of 2)
   IMPROVED SERVICE, FINANCIAL SAVINGS


                                                                       Estimated Annual Financial Opportunity
                                Estimated Annual Saving                                                                Saving To Date

                                           $1.97M - $2.9M                                                                     N/A


                                                                           Cumulative Cost Saving Projections
                                                      $8
                                           Millions




                                                      $7                          Administrative SSCs
                                                                                  Research SSCs
                                                      $6
                                                                                  Academic SSCs
                                                      $5                          HR Pilot Site

                                                      $4                          Cumulative Project Savings

                                                      $3

                                                      $2

                                                      $1

                                                       $0
                                                         2011         2012          2013          2014   2015   2016   2017         2018
                                                      -$1

© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                            30
Shared Service Centers – Approach
   A PHASED IMPLEMENTATION BUILDS UNIVERSITY SUPPORT

Our approach integrates cross-over work with separate Procurement, Research Administration and HR
work streams.


                                                                                                                          Deploy
                                                                                                                          • Execute Deployment
                                                                                             Develop/Build                  Plan
                                                                                                                          • Conduct Training –
                                                                                             • Build Processes              Customers and Staff
                                                                  Design                     • Recruit and Staff SSC      • Execute Workforce
                                                                                               Organization                 Transition Plan
                                                                  • Design Processes         • Finalize Governance        • Implement Processes
          Assess                                                  • Design Organization        Model
                                                                  • Develop Training and     • Create SLA’s / Funding
          • Determine Baseline                                      Knowledge Transfer
          • Assess Current State                                                               Model
                                                                    Plan                     • Complete Deployment
          • Develop Future State                                  • Develop Recruitment
            Service Delivery Model                                                             Planning
                                                                    and Staffing Plan
            (High-Level)                                          • Develop Facilities and
          • Develop Business                                        Logistics Plan            • HR Process Redesign: PS 9.1 upgrade
            Case and                                              • Develop Governance
            Implementation                                                                    • Procurement and Sourcing: system upgrade and
                                                                    Model                       business practice redesign
            Roadmap
          • Finalize and                                                                      • Research Admin: improved PS functionality and
            Communicate Strategy                                                                central office process redesign

© 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                   31
Shared Service Centers – Communication
       STAKEHOLDER INVOLVEMENT

    The shared service center implementation is dependent on several committees comprised of staff from
    all facets of the University.

                                                                  Changing for Excellence Executive Steering
These committees involve                                                         Committee
the highest levels of
University leadership



                         Design Review                                                Assistant Vice Provost                                 Project Manager
                          Committee                                                   for Business Services                                       (temp)




              Communication                                                                                                                            Business Process
                                                                                                                  SSC Project Manager                  Support – 2 (temp)
               Ambassadors




Broad campus                             Process Improvement                            Transition Planning and                                       Communication and
stakeholders (150+)                                                                                                 SSC Steering Committee
                                             and Training                                        Space                                                Change Management




                                                                    Research                                                            These committees involve thought
                                                HR                                         Finance
                                                                     Admin                                                              leaders and decision makers

                                                                                                           These committees involve staff currently doing the
                                                                                                           work, as well as central office functional experts
    © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                                                                                         32
Steady-State Phase III Financial Benefits
EXPECTED STEADY-STATE ANNUAL FINANCIAL BENEFITS




                          Annual benefit at FY2016 = $24M

                                                            33
Combined Phase III Financial Benefits
CUMULATIVE COST SAVINGS FY12 TO FY16 – DETAIL BY PROJECT




 The five projects included here represent a cumulative financial opportunity of over $99M by the end of calendar year 2016.

                                                                                                                               34
Key Success Factors (1 of 2)
   It is critical that the approach produces specific, actionable recommendations, creates stakeholder
   buy-in, and has unwavering public support from University leadership.

                                                                      Keys to Success / Lessons Learned
• Clearly articulating campus and leadership initiative objectives and desired end-goals at the start –
  and reiterating often – builds agreement among stakeholders, even those directly impacted by the
  change: at KU, administrative efficiencies in support of BOLD academic ASPIRATIONS
• Understanding the University’s appetite for change and capacity to change based on available
  resources
• Engaging faculty, process owners, and key campus stakeholders at every stage of the process
• Utilizing data-driven business cases and objective measures to depersonalize and depoliticize
  change
• Pursuing opportunities for enhanced enterprise-wide resource management
• Using the budget process to sustain efficiency gains




© 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                           35
Key Success Factors (2 of 2)
   It is critical that the approach produces specific, actionable recommendations, creates stakeholder
   buy-in, and has unwavering public support from University leadership.

                                                                      Keys to Success / Lessons Learned
• Identifying “quick win” opportunities to demonstrate success and transformational opportunities
  to affect significant and sustainable change
• Establishing methods for measuring savings achieved and tracking progress following
  implementation
• Seamlessly transitioning from assessment to implementation to ensure forward momentum is
  maintained
• Demonstrating results to the University community through both internal communications and
  public, third-party media reinforces the reasons for and commitment to change
• Blocking pathways to the old ways to re-enforce commitments to change



 Above all, University leadership must show a clear and consistent commitment to change and
   an intolerance for the organizational inertia which can sabotage transformational efforts.
© 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential.                           36
37
The University of Kansas: Changing for Excellence

More Related Content

What's hot

Advocacy Excellence: Optimizing Group Structure & Operations Report Summary
Advocacy Excellence: Optimizing Group Structure & Operations Report SummaryAdvocacy Excellence: Optimizing Group Structure & Operations Report Summary
Advocacy Excellence: Optimizing Group Structure & Operations Report SummaryBest Practices
 
Organizational presentation community building
Organizational presentation community buildingOrganizational presentation community building
Organizational presentation community buildingJoseph Hudson
 
2d Strategy and supporting policies are communicated, implemented, and monitored
2d Strategy and supporting policies are communicated, implemented, and monitored2d Strategy and supporting policies are communicated, implemented, and monitored
2d Strategy and supporting policies are communicated, implemented, and monitoredpludoni GmbH
 
Rackley mike
Rackley mikeRackley mike
Rackley mikeNASAPMC
 
Change mgmt april-2011
Change mgmt april-2011Change mgmt april-2011
Change mgmt april-2011Jorge Boria
 
DOOR UK - Change Management Academy
DOOR UK - Change Management AcademyDOOR UK - Change Management Academy
DOOR UK - Change Management AcademyCraig Hiles
 
Elliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.bElliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.bNASAPMC
 
Presentation implementation challenge Twynstra Gudde Business Improvers
Presentation implementation challenge  Twynstra Gudde Business ImproversPresentation implementation challenge  Twynstra Gudde Business Improvers
Presentation implementation challenge Twynstra Gudde Business ImproversMichiel Beijer
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel daveNASAPMC
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting CapabilitiesQuinn Harry
 
Strategy grand-tour-20096
Strategy grand-tour-20096Strategy grand-tour-20096
Strategy grand-tour-20096Zorita Hinton
 
Alt c 2010 poster 0048 #dcb09v2
Alt c 2010 poster 0048 #dcb09v2Alt c 2010 poster 0048 #dcb09v2
Alt c 2010 poster 0048 #dcb09v2Claire Eustance
 
Journey to Agility - Beyond Agile 2012
Journey to Agility - Beyond Agile 2012Journey to Agility - Beyond Agile 2012
Journey to Agility - Beyond Agile 2012skipangel
 
Executive4sights Leadership Framework
Executive4sights Leadership FrameworkExecutive4sights Leadership Framework
Executive4sights Leadership FrameworkRGBeauchemin
 

What's hot (20)

Advocacy Excellence: Optimizing Group Structure & Operations Report Summary
Advocacy Excellence: Optimizing Group Structure & Operations Report SummaryAdvocacy Excellence: Optimizing Group Structure & Operations Report Summary
Advocacy Excellence: Optimizing Group Structure & Operations Report Summary
 
Trn 06
Trn 06Trn 06
Trn 06
 
Organizational presentation community building
Organizational presentation community buildingOrganizational presentation community building
Organizational presentation community building
 
2d Strategy and supporting policies are communicated, implemented, and monitored
2d Strategy and supporting policies are communicated, implemented, and monitored2d Strategy and supporting policies are communicated, implemented, and monitored
2d Strategy and supporting policies are communicated, implemented, and monitored
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Trn 11
Trn 11Trn 11
Trn 11
 
Change mgmt april-2011
Change mgmt april-2011Change mgmt april-2011
Change mgmt april-2011
 
DOOR UK - Change Management Academy
DOOR UK - Change Management AcademyDOOR UK - Change Management Academy
DOOR UK - Change Management Academy
 
Elliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.bElliott.k.liang.a.sauser.b
Elliott.k.liang.a.sauser.b
 
Presentation implementation challenge Twynstra Gudde Business Improvers
Presentation implementation challenge  Twynstra Gudde Business ImproversPresentation implementation challenge  Twynstra Gudde Business Improvers
Presentation implementation challenge Twynstra Gudde Business Improvers
 
Adela Giral
Adela GiralAdela Giral
Adela Giral
 
Lengyel dave
Lengyel daveLengyel dave
Lengyel dave
 
QFH Consulting Capabilities
QFH Consulting CapabilitiesQFH Consulting Capabilities
QFH Consulting Capabilities
 
Strategy grand-tour-20096
Strategy grand-tour-20096Strategy grand-tour-20096
Strategy grand-tour-20096
 
Alt c 2010 poster 0048 #dcb09v2
Alt c 2010 poster 0048 #dcb09v2Alt c 2010 poster 0048 #dcb09v2
Alt c 2010 poster 0048 #dcb09v2
 
Journey to Agility - Beyond Agile 2012
Journey to Agility - Beyond Agile 2012Journey to Agility - Beyond Agile 2012
Journey to Agility - Beyond Agile 2012
 
Tl grid
Tl gridTl grid
Tl grid
 
Az net presentation 5.2.12
Az net presentation 5.2.12Az net presentation 5.2.12
Az net presentation 5.2.12
 
Executive4sights Leadership Framework
Executive4sights Leadership FrameworkExecutive4sights Leadership Framework
Executive4sights Leadership Framework
 
Leap
LeapLeap
Leap
 

Similar to The University of Kansas: Changing for Excellence

Mobilisation gsw
Mobilisation gswMobilisation gsw
Mobilisation gswwoznite65
 
How To Rescue A High Visibility Program
How To Rescue A High Visibility ProgramHow To Rescue A High Visibility Program
How To Rescue A High Visibility ProgramDavid Tennant
 
01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar SlidesJohn Hall
 
Ospmi Chapter Presentation
Ospmi Chapter PresentationOspmi Chapter Presentation
Ospmi Chapter PresentationDennis Bolles
 
Building capability through the creation of a methodology 1.0
Building capability through the creation of a methodology 1.0Building capability through the creation of a methodology 1.0
Building capability through the creation of a methodology 1.0Maven
 
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts:  Workforce Planning for a Turbulent EconomyLink - Fasten Your Seatbelts:  Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent EconomyHR Florida State Council, Inc.
 
Outcomes management prelude to a portfolio oct 20,2010 ottawa
Outcomes management   prelude to a portfolio oct 20,2010 ottawaOutcomes management   prelude to a portfolio oct 20,2010 ottawa
Outcomes management prelude to a portfolio oct 20,2010 ottawaAdaptiveOrg Inc.
 
Leadershipinprojectmanagement 100122164337-phpapp01
Leadershipinprojectmanagement 100122164337-phpapp01Leadershipinprojectmanagement 100122164337-phpapp01
Leadershipinprojectmanagement 100122164337-phpapp01IT
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMOSyed Raashid
 
Beyond Budgeting Vs Traditional Budgeting
Beyond Budgeting Vs Traditional BudgetingBeyond Budgeting Vs Traditional Budgeting
Beyond Budgeting Vs Traditional BudgetingKavee Rajiah
 
Elementz Company Profile
Elementz   Company ProfileElementz   Company Profile
Elementz Company ProfileRahoul Joshii
 
Why Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachWhy Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachSccharron
 
A tailored, collaborative strategy to develop capacity and facilitate evidenc...
A tailored, collaborative strategy to develop capacity and facilitate evidenc...A tailored, collaborative strategy to develop capacity and facilitate evidenc...
A tailored, collaborative strategy to develop capacity and facilitate evidenc...Health Evidence™
 
Cisco Data Sheet Change Management
Cisco Data Sheet Change ManagementCisco Data Sheet Change Management
Cisco Data Sheet Change ManagementContent Rules, Inc.
 
LMBR Vision
LMBR VisionLMBR Vision
LMBR VisionDERNSW
 

Similar to The University of Kansas: Changing for Excellence (20)

Lean Deployment Models - Perspect Management Consulting
Lean Deployment Models - Perspect Management ConsultingLean Deployment Models - Perspect Management Consulting
Lean Deployment Models - Perspect Management Consulting
 
Mobilisation gsw
Mobilisation gswMobilisation gsw
Mobilisation gsw
 
How To Rescue A High Visibility Program
How To Rescue A High Visibility ProgramHow To Rescue A High Visibility Program
How To Rescue A High Visibility Program
 
01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides01020 6 Ppde Webinar Slides
01020 6 Ppde Webinar Slides
 
Ospmi Chapter Presentation
Ospmi Chapter PresentationOspmi Chapter Presentation
Ospmi Chapter Presentation
 
Building capability through the creation of a methodology 1.0
Building capability through the creation of a methodology 1.0Building capability through the creation of a methodology 1.0
Building capability through the creation of a methodology 1.0
 
Ch2
Ch2Ch2
Ch2
 
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts:  Workforce Planning for a Turbulent EconomyLink - Fasten Your Seatbelts:  Workforce Planning for a Turbulent Economy
Link - Fasten Your Seatbelts: Workforce Planning for a Turbulent Economy
 
Strategy deployment
Strategy deploymentStrategy deployment
Strategy deployment
 
Stanford apm ashish v0.1
Stanford apm   ashish v0.1Stanford apm   ashish v0.1
Stanford apm ashish v0.1
 
Cf Wi Vision
Cf Wi VisionCf Wi Vision
Cf Wi Vision
 
Outcomes management prelude to a portfolio oct 20,2010 ottawa
Outcomes management   prelude to a portfolio oct 20,2010 ottawaOutcomes management   prelude to a portfolio oct 20,2010 ottawa
Outcomes management prelude to a portfolio oct 20,2010 ottawa
 
Leadershipinprojectmanagement 100122164337-phpapp01
Leadershipinprojectmanagement 100122164337-phpapp01Leadershipinprojectmanagement 100122164337-phpapp01
Leadershipinprojectmanagement 100122164337-phpapp01
 
Creating & Maturing a PMO
Creating & Maturing a PMOCreating & Maturing a PMO
Creating & Maturing a PMO
 
Beyond Budgeting Vs Traditional Budgeting
Beyond Budgeting Vs Traditional BudgetingBeyond Budgeting Vs Traditional Budgeting
Beyond Budgeting Vs Traditional Budgeting
 
Elementz Company Profile
Elementz   Company ProfileElementz   Company Profile
Elementz Company Profile
 
Why Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management ApproachWhy Symphini? The Symphini Change Management Approach
Why Symphini? The Symphini Change Management Approach
 
A tailored, collaborative strategy to develop capacity and facilitate evidenc...
A tailored, collaborative strategy to develop capacity and facilitate evidenc...A tailored, collaborative strategy to develop capacity and facilitate evidenc...
A tailored, collaborative strategy to develop capacity and facilitate evidenc...
 
Cisco Data Sheet Change Management
Cisco Data Sheet Change ManagementCisco Data Sheet Change Management
Cisco Data Sheet Change Management
 
LMBR Vision
LMBR VisionLMBR Vision
LMBR Vision
 

More from Huron Consulting Group

Leading the Journey: Cultivating Success in Healthcare
Leading the Journey: Cultivating Success in HealthcareLeading the Journey: Cultivating Success in Healthcare
Leading the Journey: Cultivating Success in HealthcareHuron Consulting Group
 
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...Huron Consulting Group
 
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...Huron Consulting Group
 
How Much Change Can a University Absorb at Once?
How Much Change Can a University Absorb at Once?How Much Change Can a University Absorb at Once?
How Much Change Can a University Absorb at Once?Huron Consulting Group
 
Key Findings from the Applicant Survey
Key Findings from the Applicant SurveyKey Findings from the Applicant Survey
Key Findings from the Applicant SurveyHuron Consulting Group
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessHuron Consulting Group
 
The Fully Funded PeopleSoft Project : Funding your ERP Project with Non-Labo...
The Fully Funded PeopleSoft Project  : Funding your ERP Project with Non-Labo...The Fully Funded PeopleSoft Project  : Funding your ERP Project with Non-Labo...
The Fully Funded PeopleSoft Project : Funding your ERP Project with Non-Labo...Huron Consulting Group
 
Operationalizing Clinical Excellence: Lessons Learned
Operationalizing Clinical Excellence: Lessons LearnedOperationalizing Clinical Excellence: Lessons Learned
Operationalizing Clinical Excellence: Lessons LearnedHuron Consulting Group
 
Creating a Cohesive Physician Culture: Action Plans for Accountability
Creating a Cohesive Physician Culture:  Action Plans for AccountabilityCreating a Cohesive Physician Culture:  Action Plans for Accountability
Creating a Cohesive Physician Culture: Action Plans for AccountabilityHuron Consulting Group
 
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...Huron Consulting Group
 
Preparing for Healthcare Professional Transparency
Preparing for Healthcare Professional TransparencyPreparing for Healthcare Professional Transparency
Preparing for Healthcare Professional TransparencyHuron Consulting Group
 
Webinar: Improving Hospital and Health System Performance by 20% to 40%
Webinar: Improving Hospital and Health System Performance by 20% to 40%Webinar: Improving Hospital and Health System Performance by 20% to 40%
Webinar: Improving Hospital and Health System Performance by 20% to 40%Huron Consulting Group
 
Current Practice Alignment Strategies to Ensure Long Term Survival
Current Practice Alignment Strategies to Ensure Long Term SurvivalCurrent Practice Alignment Strategies to Ensure Long Term Survival
Current Practice Alignment Strategies to Ensure Long Term SurvivalHuron Consulting Group
 
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...Huron Consulting Group
 
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...Huron Consulting Group
 
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...Huron Consulting Group
 
Understanding the financial performance of the research enterprise webinar
Understanding the financial performance of the research enterprise webinarUnderstanding the financial performance of the research enterprise webinar
Understanding the financial performance of the research enterprise webinarHuron Consulting Group
 
Education Innovation Insights: Industry-insider Perspectives
Education Innovation Insights: Industry-insider PerspectivesEducation Innovation Insights: Industry-insider Perspectives
Education Innovation Insights: Industry-insider PerspectivesHuron Consulting Group
 

More from Huron Consulting Group (20)

Leading the Journey: Cultivating Success in Healthcare
Leading the Journey: Cultivating Success in HealthcareLeading the Journey: Cultivating Success in Healthcare
Leading the Journey: Cultivating Success in Healthcare
 
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...
WEBINAR: Performance Improvement for Children’s Hospitals – Key Steps in Deve...
 
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...
Webinar: Transforming Operational Throughput – The Journey Toward Value-Based...
 
How Much Change Can a University Absorb at Once?
How Much Change Can a University Absorb at Once?How Much Change Can a University Absorb at Once?
How Much Change Can a University Absorb at Once?
 
Key Findings from the Applicant Survey
Key Findings from the Applicant SurveyKey Findings from the Applicant Survey
Key Findings from the Applicant Survey
 
Our 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = SuccessOur 9.2 Upgrade: How Transformation + Technology = Success
Our 9.2 Upgrade: How Transformation + Technology = Success
 
The Fully Funded PeopleSoft Project : Funding your ERP Project with Non-Labo...
The Fully Funded PeopleSoft Project  : Funding your ERP Project with Non-Labo...The Fully Funded PeopleSoft Project  : Funding your ERP Project with Non-Labo...
The Fully Funded PeopleSoft Project : Funding your ERP Project with Non-Labo...
 
Operationalizing Clinical Excellence: Lessons Learned
Operationalizing Clinical Excellence: Lessons LearnedOperationalizing Clinical Excellence: Lessons Learned
Operationalizing Clinical Excellence: Lessons Learned
 
Creating a Cohesive Physician Culture: Action Plans for Accountability
Creating a Cohesive Physician Culture:  Action Plans for AccountabilityCreating a Cohesive Physician Culture:  Action Plans for Accountability
Creating a Cohesive Physician Culture: Action Plans for Accountability
 
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...
Achieving Asset Optimization: A Strategic Approach To Aligning Assets With Mi...
 
Preparing for Healthcare Professional Transparency
Preparing for Healthcare Professional TransparencyPreparing for Healthcare Professional Transparency
Preparing for Healthcare Professional Transparency
 
Webinar: Improving Hospital and Health System Performance by 20% to 40%
Webinar: Improving Hospital and Health System Performance by 20% to 40%Webinar: Improving Hospital and Health System Performance by 20% to 40%
Webinar: Improving Hospital and Health System Performance by 20% to 40%
 
Creating a Value-Based Medical Group
Creating a Value-Based Medical GroupCreating a Value-Based Medical Group
Creating a Value-Based Medical Group
 
Current Practice Alignment Strategies to Ensure Long Term Survival
Current Practice Alignment Strategies to Ensure Long Term SurvivalCurrent Practice Alignment Strategies to Ensure Long Term Survival
Current Practice Alignment Strategies to Ensure Long Term Survival
 
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...
Delivering on the Vision: Keys to Achieving Breakthrough Operational Performa...
 
Clinical Data Capture
Clinical Data CaptureClinical Data Capture
Clinical Data Capture
 
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...
Clinical Transformation: Fundamentally Changing Clinical Processes to Achieve...
 
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...
Huron Education Survey Documents Increasing Use of Social Media in Higher Edu...
 
Understanding the financial performance of the research enterprise webinar
Understanding the financial performance of the research enterprise webinarUnderstanding the financial performance of the research enterprise webinar
Understanding the financial performance of the research enterprise webinar
 
Education Innovation Insights: Industry-insider Perspectives
Education Innovation Insights: Industry-insider PerspectivesEducation Innovation Insights: Industry-insider Perspectives
Education Innovation Insights: Industry-insider Perspectives
 

The University of Kansas: Changing for Excellence

  • 1. The University of Kansas: Changing for Excellence November 12, 2012
  • 2. Presenters Jeffrey S. Vitter Provost and Executive Vice Chancellor The University of Kansas jsv@ku.edu John R. Curry Managing Director Huron Consulting Group jcurry@huronconsultinggroup.com © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 2
  • 3. Agenda • Perspective on University Cost Reduction • KU’s Rationale • Bold Aspirations – KU’s Path Forward • Project Team Organization • Business Case Relationship Map • Areas of Focus • Facilities • Procurement • IT • All Funds Budgeting • Shared Service Centers • Keys to Success © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 3
  • 4. Perspective on University Cost Reduction AN EVOLUTIONARY PROCESS In the face of unprecedented budget challenges, large public and private research universities have implemented or are considering a range of approaches to cost reduction. Immediate Incremental Transformational • Across the board budget cuts • More across the board cuts • Comprehensive operational and • Delayed deferred maintenance • Large tuition increases program reviews • Capital project delay • Procurement strategies • Organizational rationalization • Furloughs • Cuts to low priority services and • Shared services • Hiring freezes programs • Outsourcing • Early retirements • Sale of non-critical assets • Process standardization, workflow optimization • Procure-to-Pay transformation • Budget process redesign Short-term / Temporary Longer-term / Structural Easier to implement More complex Transformational approaches, while more difficult to implement, can secure sustainable gains in efficiency and performance. © 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 4
  • 5. KU’s Rationale PROACTIVE APPROACH - STRATEGIC INVESTMENT The University leadership launched Changing for Excellence to identify strategies to become more effective, reduce costs and increase revenues in service and program areas. Reduction in Bold Aspirations Competition from State Support Strategic Plan Other Universities KU considered multiple approaches for more effective and strategic management of resources assure administrative redesign budgeting and focus on enrollment functions are maximally planning capabilities to management as many efficient orient all funds towards state universities are strategic priorities aggressively recruiting © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 5
  • 6. Bold Aspirations – KU’s Path Forward ADMINISTRATIVE SAVINGS WILL FUND THE STRATEGIC PLAN Our aspirations are bold: to be recognized as a top-tier public international research university. Our plan is organized around six goals to achieve our goal: 1. Energizing the Educational Environment 2. Elevating Doctoral Education 3. Driving Discovery and Innovation 4. Engaging Scholarship for Public Impact 5. Developing Excellence in People 6. Developing Infrastructure and Resources The primary goal of administrative transformation is to create savings to fund the strategic plan. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 6
  • 7. Project Team Organization PHASES 1, 2, AND 3 Executive Project Delivery Project Committee 1 team/campus Leadership • Chancellor, • Consultants • John Curry, Phase 1 Opportunity Provosts Managing Identification • Functional Director • “Decision Specialists makers” Advisory Opportunity • Mike Phillips, Opportunity Opportunity Committee WorkWork Groups Groups • Subject Senior Work Groups Work Groups • Meets Matter Director Phase 2 Business Case monthly • Cross- TBD “Champion” • • • TBD Advisors day to day TBD • • Key project Development campus stakeholders stakeholders management • Represented: Opportunity Opportunity faculty, Opportunity Implementation Opportunity Work Groups Work Groups Implementation Phase 3 operational WorkTeams Groups Work Groups Support Teams Implementation Including project leaders, staff, TBD • • TBD Select areas students • TBDchampion & • TBD only ambassadors © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 7
  • 8. Business Case Relationship Map SYNERGIES AMONG WORK STREAMS There is a high level of connection among the KU business cases. Key © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 8
  • 9. Facilities – Overview (1 of 2) CONSOLIDATING OPERATIONS TO ACHIEVE SAVINGS FROM ECONOMIES OF SCALE Goals Reduce costs by consolidating operations, improving workforce morale and enhancing worker productivity, improving customer service, and implementing a preventive model to reduce deferred maintenance backlog over time. Implementation Objectives • Consolidate Student Housing and central facilities operations reducing total FTEs and capitalizing on economies of scale • Implement a zone maintenance program focusing on preventive maintenance and customer satisfaction • Implement mobile technologies to optimize the work order system • Implement energy conservation and sustainability initiatives KEY CHALLENGE: Achieving cost savings required organizational and operational changes, with little initial support among facilities leadership or the workforce to undertake these changes. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 9
  • 10. Facilities – Overview (2 of 2) CONSOLIDATING OPERATIONS TO ACHIEVE SAVINGS FROM ECONOMIES OF SCALE Estimated Annual Financial Opportunity Estimated Annual Saving Savings To Date $2.6M $1.4M Cumulative Cost Saving Projections © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 10
  • 11. Facilities – Three Phased Approach WORKFORCE INVOLVEMENT ENABLED BUY-IN AND CHANGE Benchmarks, business cases, and extensive stakeholder and workforce involvement throughout the project were the three keys to success. Phase I Phase II Phase III Identified High Level Trends Created Detailed Business Implemented Changes and Opportunities Case Recommendations • Maintenance labor costs • Consolidate maintenance • Consolidated Housing and nearly twice as high per and custodial operations into Central Facilities GSF than peers zone maintenance program • Implemented zone • Campus operating three • Increase span of control to maintenance and eliminated separate maintenance and align with peers supervisory layers custodial units • Design performance metrics • Refocused organization on • Travel time, due to to evaluate service and preventive maintenance geographic dispersion, performance • Rolled out mobile consumed one hour per day • Leverage work-order software application using iPod/iPad per employee • Implement energy devices • Primary focus on services conservation program • Implemented energy billable to units initiatives • High energy costs vs. peers © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 11
  • 12. Facilities – Implementation Outcomes WORKFORCE INVOLVEMENT CREATES BUY-IN AND ENABLES CHANGE The consolidation of multiple operating units and separation of the construction function resulted in $1.4M in immediate personnel savings with the potential to achieve $2.6M/year moving forward. Consolidated Housing and Reduced management FTE’s by 30 resulting in $1.4M in first year, Central Facilities Operations with $2.6M per year expected Implemented Contemporary Lowered maintenance response times, improved customer service, Zone Maintenance Program focused the organization on PM, increased worker productivity Employee Morale and Utilized employee climate surveys and focus groups to engage Workforce Productivity staff in the change process and develop work place improvements Initiatives Energy Conservation and Involved stakeholders from across campus to develop integrated Sustainability Initiatives behavioral change campaign to reduce energy costs 3% – 7% annually © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 12
  • 13. Facilities – Key Challenges (1 of 2) PROACTIVELY ADDRESSING CHALLENGES IS KEY TO EARLY SUCCESS Leadership actively engaged the workforce, key stakeholders, and customers early on in the implementation effort as challenges confronted the management team. Challenge 1: Initiating Change • Existing workforce and supervisors had little input into the management and direction of the central Facilities organization • Apprehension on the part of Student Housing with respect to consolidating operations’ impact to customer service Challenge 2: Determining the right organizational structure and operating model • Organization was focused on construction and large, re-billable projects • Little preventive maintenance and growing deferred maintenance backlog • Centralized shops and storeroom led to significant ‘windshield’ time and reduced worker productivity © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 13
  • 14. Facilities – Key Challenges (2 of 2) PROACTIVELY ADDRESSING CHALLENGES IS KEY TO EARLY SUCCESS Challenge 3: Obtaining Buy-in from Workforce and Customers • Low workforce morale and disenfranchisement needed to be overcome • Campus customers resistant to change and feared reduction in service levels Challenge 4: Maintaining Change Momentum • Breaking old habits and practices difficult post-implementation with respect to billing practices and customer service • Workforce and supervisors have tendency to confront operational challenges in new model with old ways of thinking about service delivery © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 14
  • 15. Facilities – Key Success Strategies (1 of 2) LEADERSHIP AND STAKEHOLDER COMMITMENT IS REQUIRED FOR CHANGE Addressing workforce concerns and early communications efforts with stakeholders, along with removing resistant leadership were key strategies for successful implementation. Leadership Commitment & Making the Case to Stakeholders 1. Replaced facilities leaders who were not committed to change 2. Continually communicated commitment of leadership to change and to improving the organization for employees and customers 3. Included Student Housing in design of future state from the beginning Focused the Organization on a Preventive Maintenance Model 1. Separated construction function from the maintenance organization 2. Organized maintenance work into campus zones to improve productivity and to create a sense of ownership of buildings and systems 3. Utilized work-order software and mobile technologies to enhance new operating model © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 15
  • 16. Facilities – Key Success Strategies (2 of 2) LEADERSHIP AND STAKEHOLDER COMMITMENT IS REQUIRED FOR CHANGE Involved Stakeholders & Employees in Creating Change 1. Created workgroups composed of mostly front-line employees, stakeholders, and customers from across campus to design future state operating and organizational models 2. Focused early on addressing employee morale concerns and create buy-in Aligned Performance Objectives with the New Operating Model 1. Made new leadership and supervisors accountable to new model 2. Developed organizational and operating KPI’s to align with new model 3. Continued involvement of workforce post-implementation in new change initiatives and continued focus on improving employee morale and welfare © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 16
  • 17. Procurement – Overview (1 of 2) FINANCIAL SAVINGS, IMPROVED OPERATIONAL EFFICIENCIES Goals • Focus purchasing staff on commodity management and strategic sourcing • Optimize technology and operations to address the drivers behind the low utilization • Implement procurement/payables technology to automate processes and routine transactions Findings and Opportunities • Develop strategic sourcing program as part of ongoing operations and shift focus to commodity management • Implement an eProcurement solution to • channel spend to University contracts • streamline the approval and settlement process • address the low utilization and efficiencies of procure to pay technologies • Merge procurement organizations, resulting in additional resources for commodity management expertise and strategic sourcing activities KEY CHALLENGE: Organizational resistance is substantial due to a failed eProcurement attempt several years ago. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 17
  • 18. Procurement – Overview (2 of 2) FINANCIAL SAVINGS, IMPROVED OPERATIONAL EFFICIENCIES Annual Financial Opportunity Work Stream Estimated Annual Saving Achieved 1st Year Savings Strategic Sourcing $2.1-3.3M $3.9 – $4.3M eProcurement $750K, after implementation In Process Cumulative Cost Savings $9.0 Millions Procure to Pay Optimization $7.8 $8.0 $7.4 $6.9 $7.0 Sourcing Rebate Revenue $6.4 $5.9 $6.0 Sourcing Cost Savings $5.4 $5.0 $5.0 $4.5 Sourcing One Time Incentives $4.0 $4.0 $3.5 $3.0 $3.0 Cumulative Project Savings $2.6 $2.1 $2.0 $1.7 $1.2 $0.7 $0.8 $1.0 $0.0 Dec-11 Jun-12 Dec-12 Jun-13 Dec-13 Jun-14 Dec-14 Jun-15 Dec-15 Jun-16 © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 18
  • 19. Strategic Sourcing – Approach NEGOTIATED SAVINGS AND KNOWLEDGE TRANSFER After negotiating six commodity areas, Huron provided training and guidance for the KU sourcing team, using the Express Shipping commodity area. Before conducting the sourcing training, Huron negotiated contracts in six areas: • Scientific Supplies • IT Distributors • Office Related Products • Maintenance, Repair & Operations Products • Computer Hardware • Multifunctional Devices Negotiations, Compliance Presentation and Audit and Action • Ongoing Huron Business Case • Finalize business remote support, • Develop industry case as needed Data Analysis and internal • Present to • Contract perspectives stakeholders Data Gathering review/summary • Build business • Determine and Contract • Pricing analysis case implementation Strategic Review • Benchmarking • Summarize strategy Sourcing • Estimate savings savings • Identify target Overview suppliers opportunities • Develop recs • Classroom style • Supplier data training request • Market/industry research © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 19
  • 20. Procure to Pay – Approach SYSTEM AND PROCESS UPGRADES, USER TRAINING Wave 2 will deliver P2P transformation both centrally and across campus. The transformation includes process, technology, and organization changes. Task / Timeframe Campus Impact Jan Feb Mar Apr May Jun Jul Aug Sept Oct Nov Dec Wave I KUPPS Optimization integration Wave 1 All Business Suppliers Supplier Data Collection Available in KUPPS P2P Organizational Wave 2 Changes and Centralized Transformation Invoicing Wave 2 Streamlined Settlement Design and Approvals Workflow Wave 2 Systems Integrations with Build KUPPS, PeopleSoft, DEMIS and ImageNow Wave 2 Wave 2 Central and Conference Room Pilots Department CRP Sessions Wave 2 Wave 2 Testing and Testing and Validation Validation © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 20
  • 21. Information Technology – Overview (1 of 2) REDUCED COSTS, SEAMLESS COLLABORATION Goals • Centralize and virtualize servers maintained remotely across campus to reduce institutional IT costs while providing improved service and data integrity • Reorganize departmental IT staff to provide broader coverage and more standardized service • Increase the use of multi-function devices (MFD) to reduce total costs of campus printing • Centralize identity management and network management solutions for all KU campuses • Leverage combined buying power of all campuses to negotiate more favorable deals with software vendors Findings and Opportunities • High level of decentralized hardware, software, and IT staff managed by departments • Poorly defined role of local IT staff, leading to inconsistent expectations and levels of service across campus • Perception among campus users that IT implementations and projects are not fully supported by University leadership, causing many efforts to “fizzle out” mid-stream or shortly after completion • Each campus has developed unique technical infrastructures to support most administrative areas KEY CHALLENGE: Many of the IT initiatives require buy-in and support of decentralized campus leaders, including collaborative infrastructure design across campuses. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 21
  • 22. Information Technology – Overview (2 of 2) REDUCED COSTS, SEAMLESS COLLABORATION Estimated Financial Opportunity Estimated Annual Saving Saving To Date $6.7M - $9.5M $1.19M* * Includes estimates to end of current fiscal year Cumulative Cost Savings © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 22
  • 23. IT – Optimization (1 of 2) REDUCING OPERATIONS AND TECHNOLOGY COSTS Initiatives are underway to maximize efficiency in a number of IT areas across KU. Redefine & Reorganize • Identify Director for IT Support Services Decentralized IT Staff • Change reporting lines of Technology Liaisons to Central IT • Complete assessment of additional IT responsibilities and customer needs • Evaluate and standardize workstation support job description and salary bands • Reorganize and rationalize workstation support Co-locate & Virtualize Servers • Identify and register all devices acting as servers on the KUL network Completed as a prerequisite to • Develop policy regarding decentralized servers and other IT devices implementation Purchase and install necessary IT infrastructure to support future state Shared Servers • Virtualized Servers • Work with units and departments to set up intake list and systematically transition Co-located Physical Servers decentralized servers © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 23
  • 24. IT – Optimization (2 of 2) REDUCING OPERATIONS AND TECHNOLOGY COSTS Leverage Software Purchasing • KU will employ an annual “software call” to help identify planned software KU Lawrence KUMC Others purchases by schools and departments • Central IT • Central IT • General Counsel • Software Review Board with representation from across the University will be • Tech Liaisons • Research • Endowment • User Communities • User Communities established to identify opportunities for cross-campus collaboration on software • Research • Purchasing • Purchasing procurement Early Success in Cross-Campus Initiatives • Dual initiatives to upgrade separate installations of the HR information system were integrated into one, resulting in one-time savings for the University of $640K and projected recurring annual savings of $750K. • This set a precedence for cross-campus collaboration in the IT arena going forward. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 24
  • 25. IT – Enabling Collaboration COST SAVINGS ARE ONLY PART OF THE BENEFIT OF IT OPTIMIZATION Pursuing Single Identity Management and Network Optimization initiatives across campuses will increase opportunities for collaborative research while reducing costs. Single ID Management Network Optimization Illustrative Direct Login Workarounds Centrally manage one Network Operations Optimize Network Expand Central Management KUL KUMC KU network Current Students, Students, State Faculty & Faculty & Center Staff Staff Enabling Collaboration Single Identity Management and Network Optimization KU provide seamless collaboration across the campuses: Future State Students, • Collaborative research Faculty & • Electronic libraries and resources for students Staff • Reduced operational costs © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 25
  • 26. Budgeting – Overview (1 of 2) ALL FUNDS BUDGETING AND GREATER TRANSPARENCY Goals Redesign the annual budget allocation process to encompass all sources of funding; enable comprehensive budget understanding and budget transparency for all stakeholders, and manage fund balance growth. Findings and Opportunities • Unexpended endowment distributions have been growing by a CAGR of 6.36% over the past 5 years,--from $76M in 2006 to $101M in 2011. • Carryforward balances have been growing by a CAGR of 11.9% over the past 5 years--from $60M in 2006 to $106M in 2011. • Unit budgets have been based on the previous year’s allocation and do not take into account cost drivers such as enrollment and research • Recent years’ budget allocations have not included funding for strategic priorities KEY CHALLENGE: Implementing an all funds budgeting model requires increased communication and coordination to analyze multiple data sources from the central offices, schools and units, and the University Endowment © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 26
  • 27. Budgeting – Overview (2 of 2) ALL FUNDS BUDGETING AND GREATER TRANSPARENCY Estimated Annual Financial Opportunity Estimated Annual Flow Available Utilized To Date $4.5M N/A Cumulative “Newly Available Resources” Projections © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 27
  • 28. Budgeting – Approach CHANGING THE BUDGET CYCLE Transformation of KU’s budget model, from an incremental approach to an incentive-based system will be phased in over several years. New budget report Full integration of Refined budget report, Prior budgeting model format integrating all budget process and incorporate incentives funds strategic planning FY2012 FY2013 FY2014 FY2015 Budgeting Model Budgeting Model Budgeting Model End State Budgeting and Process and Process and Process Model and Process A “base plus allocation Budget model and reports Redesigned model Budgeting and resource plus adjustments align with financial allows an all funds view management integrated incremental model” statements and enhance of each area, reveals into the strategic planning that did not understanding of cost key drivers and processes; budget incorporate all sources structure at the school metrics, and aligns prioritization aligns with of funding—out of and administrative unit incentives between strategy sight, out of mind level each area and KU as a whole © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 28
  • 29. Shared Service Centers – Overview (1 of 2) IMPROVED SERVICE, FINANCIAL SAVINGS Goals Increase customer service and reduce costs by creating shared service centers (SSCs) across campus to organize staff around job functions and increase training effectiveness for business processes Findings and Opportunities • SSCs are service-driven, using periodic assessments of customer service and metrics to ensure high performance. • Improved performance of administrative functions will free up funds for strategic initiatives. • Unorganized demands on staff time are replaced by balanced, focused workloads, allowing staff to have backup during leave time and to develop new skills and expertise. • SSCs build teams of staff with common experience and goals, bolstering camaraderie, knowledge sharing and fostering a professional and experienced work environment. KEY CHALLENGE: SSCs represent a substantial cultural shift for both faculty and staff. Gaining buy-in for the change requires persistent, focused effort with stakeholders across campus. © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 29
  • 30. Shared Service Centers – Overview (2 of 2) IMPROVED SERVICE, FINANCIAL SAVINGS Estimated Annual Financial Opportunity Estimated Annual Saving Saving To Date $1.97M - $2.9M N/A Cumulative Cost Saving Projections $8 Millions $7 Administrative SSCs Research SSCs $6 Academic SSCs $5 HR Pilot Site $4 Cumulative Project Savings $3 $2 $1 $0 2011 2012 2013 2014 2015 2016 2017 2018 -$1 © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 30
  • 31. Shared Service Centers – Approach A PHASED IMPLEMENTATION BUILDS UNIVERSITY SUPPORT Our approach integrates cross-over work with separate Procurement, Research Administration and HR work streams. Deploy • Execute Deployment Develop/Build Plan • Conduct Training – • Build Processes Customers and Staff Design • Recruit and Staff SSC • Execute Workforce Organization Transition Plan • Design Processes • Finalize Governance • Implement Processes Assess • Design Organization Model • Develop Training and • Create SLA’s / Funding • Determine Baseline Knowledge Transfer • Assess Current State Model Plan • Complete Deployment • Develop Future State • Develop Recruitment Service Delivery Model Planning and Staffing Plan (High-Level) • Develop Facilities and • Develop Business Logistics Plan • HR Process Redesign: PS 9.1 upgrade Case and • Develop Governance Implementation • Procurement and Sourcing: system upgrade and Model business practice redesign Roadmap • Finalize and • Research Admin: improved PS functionality and Communicate Strategy central office process redesign © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 31
  • 32. Shared Service Centers – Communication STAKEHOLDER INVOLVEMENT The shared service center implementation is dependent on several committees comprised of staff from all facets of the University. Changing for Excellence Executive Steering These committees involve Committee the highest levels of University leadership Design Review Assistant Vice Provost Project Manager Committee for Business Services (temp) Communication Business Process SSC Project Manager Support – 2 (temp) Ambassadors Broad campus Process Improvement Transition Planning and Communication and stakeholders (150+) SSC Steering Committee and Training Space Change Management Research These committees involve thought HR Finance Admin leaders and decision makers These committees involve staff currently doing the work, as well as central office functional experts © 2012 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 32
  • 33. Steady-State Phase III Financial Benefits EXPECTED STEADY-STATE ANNUAL FINANCIAL BENEFITS Annual benefit at FY2016 = $24M 33
  • 34. Combined Phase III Financial Benefits CUMULATIVE COST SAVINGS FY12 TO FY16 – DETAIL BY PROJECT The five projects included here represent a cumulative financial opportunity of over $99M by the end of calendar year 2016. 34
  • 35. Key Success Factors (1 of 2) It is critical that the approach produces specific, actionable recommendations, creates stakeholder buy-in, and has unwavering public support from University leadership. Keys to Success / Lessons Learned • Clearly articulating campus and leadership initiative objectives and desired end-goals at the start – and reiterating often – builds agreement among stakeholders, even those directly impacted by the change: at KU, administrative efficiencies in support of BOLD academic ASPIRATIONS • Understanding the University’s appetite for change and capacity to change based on available resources • Engaging faculty, process owners, and key campus stakeholders at every stage of the process • Utilizing data-driven business cases and objective measures to depersonalize and depoliticize change • Pursuing opportunities for enhanced enterprise-wide resource management • Using the budget process to sustain efficiency gains © 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 35
  • 36. Key Success Factors (2 of 2) It is critical that the approach produces specific, actionable recommendations, creates stakeholder buy-in, and has unwavering public support from University leadership. Keys to Success / Lessons Learned • Identifying “quick win” opportunities to demonstrate success and transformational opportunities to affect significant and sustainable change • Establishing methods for measuring savings achieved and tracking progress following implementation • Seamlessly transitioning from assessment to implementation to ensure forward momentum is maintained • Demonstrating results to the University community through both internal communications and public, third-party media reinforces the reasons for and commitment to change • Blocking pathways to the old ways to re-enforce commitments to change Above all, University leadership must show a clear and consistent commitment to change and an intolerance for the organizational inertia which can sabotage transformational efforts. © 2011 Huron Consulting Group. All Rights Reserved. Proprietary & Confidential. 36
  • 37. 37