The Riddle of the Standards
Rechtsanwalt Andreas Kaede
Lammstrasse 6
D-70839 Gerlingen
Germany
Tel. +49 7156 433 100-103
Cell: +49 173 928 70 20
Mail: andreas.kaede@t-online.de
Web: www/kanzlei-kaede.de
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 2
Disclaimer:
The following presentation sets out the personal
findings and opinions of the author. It is not intended
to provide (a) a comprehensive treatise on the subject,
or (b) legal advice in any manner.
The Riddle of the Standards
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 3
The Riddle of the Standards
2023 – the year of the ISA Exploitation Rules?
 Target: for the Draft Rules to be approved at least by the ISA Council in Summer 2023
 Status: batches of the main body of the Draft Rules (in all: 107 regulations, 10 annexes, 1
schedule  117 pp) under review at the Council, entailing substantial „redline“
 Extra challenge: some 40-50 Standards and Guidelines implementing or accompanying
the Rules are supposed to be in place at about the same time as the Rules.
Let‘s talk about this „extra challenge“ today.
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 4
The Riddle of the Standards
Overview:
1. 2023 – the year of the ISA Exploitation Rules?
2. Standards & Guidelines: Planned – drafted – pending
3. Plan and reality
4. Status of, and challenges for, S&G drafting
5. Future Scenarioes
6. Outlook
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 5
The Riddle of the Standards
Standards & Guidelines („S&G“) planned – drafted - pending
Legal Office (in
Secretariat)
(8 employees)
Legal and Technical Commission LTC
( 41 members )
Council (36 members)
Assembly (160+ members)
„The Authority“ or
„ISA“ (Section 4,
Arts. 156 et seq. of
UNCLOS)
Standards
Exploitation Rules Guidelines
issue
issue
Issue for
provisional
application
final issue
report
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 6
The Riddle of the Standards
2. Standards & Guidelines („S&G“) planned – drafted - pending
In general:
 Standard: usually a feature or property to be consistently found in a variety of things,
processes or situations. Standards may be factual or normative.
 Guideline: a statement by which to determine a course of action. Guidelines may be
mandatory or non-mandatory.
In the ISA Draft Rules:
 Draft Regulation 94 provides for the adoption of Standards (normative) mainly in the
fields of operational safety, resource conservation and environmental matters.
 Draft Regulation 95 provides for the issuance of Guidelines (non-mandatory, without
saying so) to support the implementation of the regulations of the Rules from an
administrative and technical perspective.
 Details of which organ of ISA is to approve either type of instrument, and the related
process, belong to the more contentious matters in the present Council debates on the
Draft Rules.
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 7
The Riddle of the Standards
2. Standards & Guidelines… (2)
Relevance of the S&G for the mining industry:
 The applicant for an exploitation license, or – once this is granted – the contractor, should
expect the following from the Rules in combination with S&G:
 The Rules to tell him on a more abstract level, what is required, e.g. „undertake an
Environmental Impact Assessment (EIA) and, based thereon, generate and submit an
Environmental Impact Statement (EIS)“
 The Standard to tell him what quality, properties, or values the required deliverable
(e.g. an EIS) or action (e.g. EIA) must fulfill
 The Guidelines to show him a recommended procedure for attaining those qualities,
properties, or values
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 8
The Riddle of the Standards
2. Standards & Guidelines… (2)
Example: Application for Approval of a Plan of Work: Formal requirements as per Draft
Regulation 7 of the actual Draft Rules
Main Document
with data,
commitments
and information
as for
exploration
Mining Workplan
Financial Plan
Environmental
Impact
Statement
Emergency
Response &
Contingency
Plan
Health & Safety
Plan
Training Plan
Environmental
Management &
Monitoring Plan
Closure Plan
G S&G S&G G G G
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 9
The Riddle of the Standards
2. Standards & Guidelines… (4)
Which S&G were planned, which are drafted by now, and which are pending? Concept: Issue in 3
batches („Phases“) according to relevance: Phase 1 along with issue of the Rules, Phase 2 before
receipt of 1st. Application for Exploitation license, Phase 3 at start of commercial mining. Reference for
what is planned: Outcome of Pretoria Workshop 2019. Phase 3 S&G (9 entries) not shown on these
slides.
Phase: 1
Status:
Green = issued
Yellow = before
Council
Red = unknown,
not yet seen
Topic Standard Guide-
line
Phase status Remarks
Application Plan of Work x 1
EIA process x x 1
EIS preparation x 1
Env Mgmt & Monitoring Plan prep x 2? transferred to 1
by LTC
Idem, corr 1 x 2?
Env. Mgmt System development & prep x x 1
Hazard Identif. & Risk Assessment tools x 1
Safe Operation Mining Vessels & Installations x x 2? transferred to 1
by LTC
Environmental Performance Guarantee x x 1
Baseline Environmental Data x 1
Emergency Response Plans x x 1
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 10
The Riddle of the Standards
2. Standards & Guidelines… (5)
Phase: 1 cont‘d
Status:
Green = issued
Yellow = before
Commission
Red = unknown,
not yet seen
Topic Standard Guide-
line
Phase status Remarks
Risk based approach generic thresholds & indicators x 1 Necessity to to
reconsider
Access to environmental data x 1
Stakeholder participation x 1 Separate policy?
Exploitation contract as security x 1
Application of good industry practice x 1 Depending on
definition in
Rules
Determination of date of commercial production x 1 idem
Insurance requirements and risk allocation x 1
Modification of plan of work & meaning of material
change
x 1
Transfer of rights & obligations under an
exploitation contract
x 1
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 11
The Riddle of the Standards
2. Standards & Guidelines… (6)
Phase: 2
Status:
Green = issued
Yellow = before
Commission
Red = unknown,
not yet seen
Topic Standard Guide-
line
Phase status Remarks
Health + safety management system x 2/1 Pretoria:
commission to
determine need.
Comm trans-
ferred 2 to
Phase 1
Safe operation x 2/1
Maritime security x 2
Mapping of seabed habitats + ressources x 2
Management + monitoring plans x 2/1 comm.
Transferred to
phase 1
Monitoring + result evaluation of environmental
effects
x 2
Preparation of closure plans x 2
Application of “reasonable regard” x 2 Pretoria:
Commission to
determine need
Health + safety management system x 2
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 12
The Riddle of the Standards
2. Standards & Guidelines… (7)
Phase: 2
Status:
Green = issued
Yellow = before
Commission
Red = unknown,
not yet seen
Topic Standard Guide-
line
Phase status Remarks
Application of “best available techniques” x 2 Pretoria: may be
covered by
improved
definitions
Best environmental practice x 2
Best available scientific evidence x 2
Change of control x 2
Application of “as much as reasonably practicable” x 2
Annual and other reporting under expl. Contract x 2
Review of activities under a plan of work x 2
Adoption of labour rules x 2 Pretoria: check
coverage by IMO
instruments
Formal safety assessment x 2
Performance assessment x 2
Adaptive management measures x 2
Notifiable events x 2
Royalty returns x 2
Enforcement and penalties x 2
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 13
The Riddle of the Standards
3. Plan and reality
Wherever there was a plan with respect to the preparation and adoption of S&G, this appears
to have changed over time. Several „roadmaps“ emerged over time, yet they mainly planned
meetings and subject matters, however no real targets.
 Draft of 8 Aug 2017, DR 80: First mentioning of „recommendations for the guidance of
contractors to assist in the implementation of the Rules“, to be issued „from time to time“
(ISBA/23/LTC/CRP.3) i.e. after entry into force of the Rules
 Draft of 30 April 2018, DRs 92, 93: corresponding, but „Standards“ added
(ISBA/24/LTC/WP.1)  remained in Draft before Council as DRs 94, 95 (ISBA/25/C/WP.1)
 Stakeholder Consultation 2019:  need to prepare S&G early, partly along with Rules
 Council 2019: prepare S&G in 3 phases (1) to issue with Rules, (2) to issue before receipt
of 1st. Application for exploitation license, (3) to issue at start of commercial mining
 Pretoria Workshop May 2019 with outcome: revised 3-phase-list, 50 + S&G
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 14
The Riddle of the Standards
3. Plan and reality (2)
 2020-2021:
 LTC concentrating on phase 1 S&G, incl. 2 Shareholder Consultation rounds.
Corona prevents/impedes regular live meetings for major parts of the time
 2021:
 June: Nauru notifies of intention to submit application for approval of a plan of
work for exploitation (= appl. for exploitation license)  Rules to be complete 9 July
2023 pursuant to Annex, Section 1 Art. 15 of the 1994 UNCLOS Amendment
 August: Council requests setup of 3 informal working groups to i.a. deal w/S&G
 November: ISA solicits external counsel support for preparation & finalization of
all Phase 2 S&G, plus harmonization thereof and of Phase 1 S&G with Rules, w/target
to have them ready (incl. iterations) at the planned issue date of the Rules mid 2023
 2022:
 Submission of first 10 Phase 1 S&G by LTC to Council in January; status unknown.
 2023:
 Inquiry on whether/how a review of a possible exploitation license application by
Nauru could be deferred
 LTC foresees another up to 5 years for the finalization of Phase 2, 3 S&G
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 15
The Riddle of the Standards
4. Status of, and challenges for, S&G drafting (2)
Status:
 Of the 39 S&G originally contemplated for phases 1 and 2, 10 are drafted and before the
Council. 5 of them come in a pair (Standard plus Guideline)
 Of the 10 drafted S&G documents,
 All, as we learned, will need alignment with the Rules text once that is „stable“
 Most might need intra-document review, by lawyers or comparable resource, in one or
more of the following aspects
 Putting „teeth“ to Standards by formulating unambiguous requirements
 Checking and possibly adjusting relationship between „Guideline-part“ and „Standard-
part in a S/G pair
 Concentrating Guidelines more on „how to do it“
 Removing overlapping language between Standard and Guideline in a S/G pair
 As said: Some of the listed, yet undrafted S&G await decision of LTC/Council as to whether they
will at all be required
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 16
The Riddle of the Standards
4. Status of, and challenges for, S&G drafting
Challenges:
 Corona (formerly) and multitude of statements in Council in the way of more systematic &
accelerated discussion of the Rules
  S&G (even phase 1) cannot be properly addressed in Council before Rules are more
stable
 Rush prompted by the Nauru initiative leads to unplanned „last minute action“ also affecting LTC
 Demand by Council to all ISA organs to find ways & means to defer review of possible
application for „plan of work“ approval
 Task from Council to LTC to develop new Standards on „environmental threshold values“
  hardly time & resource at LTC/Secretariat for creating new S&G (from the list)
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 17
The Riddle of the Standards
5. Future Scenarioes
With about two months to go until the „Nauru date“ (9 July 2023), and looking at the S&G drafting
status to-date, it may be allowed to ask: „what if?“ ---
1. The (phase 1) Standards issue too late?
2. The phase 1 Guidelines issue too late?
3. One or more phase 2 or 3 Guidelines issue too late or not at all?
4. One or more Standards or Guidelines are revoked?
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 18
The Riddle of the Standards
6. Outlook
The debate on Deepsea Mining is supposed to become more heated in the future:
 On the one hand, the recent finalization (pending lawyer‘s review, signatures, & ratifications) of
the BBNJ Convention, along with the intent expressed in the Montreal conference 2022 to make
30% of the planet environmental protected areas by 2030, is likely to increase critcism of
planned DSM activities.
 On the other hand, many raw materials also extractable from the seafloor face increasingly
severe shortage risks from their land based sources: wars, sanctions and export restrictions
already now lead to major supply chain problems. This – once again – directs the interest of
many States and mining companies to the seafloor.
 If the deadline triggered by Nauru expires with Rules / S&G pending effectiveness for some time
to come, and if no way is found to interpret the UNCLOS provision in a way allowing to defer
review of applications for exploitation licenses, then the rules governing first deepsea mining will
be quite basic at best. Setbacks this may cause for the preservation of the marine environment
may not only entail ecological damage, but also a potentially irreparable harm to the efforts to
establish a DSM system implementing in a balanced way all aspects of the concept of Common
Heritage of Mankind.
London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 19
The Riddle of the Standards
Thank you for your attention and
patience.
And have a safe voyage home!

More Related Content

Similar to THE RIDDLE OF THE STANDARDS – WHEN WILL THE ISA EXPLOITATION RULES BE COMPLETE?

documents for release
 documents for release documents for release
documents for releaseDarren Pauli
 
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdf
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdfDay 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdf
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdfHariPurnama9
 
J A N U A R Y 2 0 1 8 V O L . 6 1 N O . 1 .docx
J A N U A R Y  2 0 1 8      V O L .  6 1      N O .  1     .docxJ A N U A R Y  2 0 1 8      V O L .  6 1      N O .  1     .docx
J A N U A R Y 2 0 1 8 V O L . 6 1 N O . 1 .docxchristiandean12115
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development MechanismNayan Bhatia
 
Archiver 2nd_OMC event_Barcelona_Project Overview
Archiver 2nd_OMC event_Barcelona_Project OverviewArchiver 2nd_OMC event_Barcelona_Project Overview
Archiver 2nd_OMC event_Barcelona_Project OverviewArchiver
 
The Research Data Alliance ICT Technical Specifications
The Research Data AllianceICT Technical SpecificationsThe Research Data AllianceICT Technical Specifications
The Research Data Alliance ICT Technical SpecificationsResearch Data Alliance
 
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docxPetruVrlan
 
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...MVRPROJECTDESIGN
 
Framework for Industry's net-zero transition
Framework for Industry's net-zero transitionFramework for Industry's net-zero transition
Framework for Industry's net-zero transitionOECD Environment
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANDwarika Bhushan Sharma
 
1. european commission a2 j dublin elig ien
1. european commission a2 j dublin elig ien1. european commission a2 j dublin elig ien
1. european commission a2 j dublin elig ienELIGConference
 
OverviewoflegallandscapeFirstinterimreport
OverviewoflegallandscapeFirstinterimreportOverviewoflegallandscapeFirstinterimreport
OverviewoflegallandscapeFirstinterimreportAleksander Wiatrowski
 
International Environmental Health and Safety Protocol Sample
International Environmental Health and Safety Protocol SampleInternational Environmental Health and Safety Protocol Sample
International Environmental Health and Safety Protocol SampleSpecialty Technical Publishers
 
eurammon symposium unep teap tf report_kuijpers
eurammon symposium unep teap tf report_kuijperseurammon symposium unep teap tf report_kuijpers
eurammon symposium unep teap tf report_kuijpersLena Konopko
 
Stetter Certified Trading Chains Iin Mineral Production Standards
Stetter Certified Trading Chains Iin Mineral Production StandardsStetter Certified Trading Chains Iin Mineral Production Standards
Stetter Certified Trading Chains Iin Mineral Production StandardsEsther Petrilli-Massey
 
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...sahil bhutani
 
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...OECD Environment
 

Similar to THE RIDDLE OF THE STANDARDS – WHEN WILL THE ISA EXPLOITATION RULES BE COMPLETE? (20)

documents for release
 documents for release documents for release
documents for release
 
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdf
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdfDay 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdf
Day 1 Session 5 - PBSN 7 and 8 of 2020 Indonesian RIA Case Studies.pdf
 
J A N U A R Y 2 0 1 8 V O L . 6 1 N O . 1 .docx
J A N U A R Y  2 0 1 8      V O L .  6 1      N O .  1     .docxJ A N U A R Y  2 0 1 8      V O L .  6 1      N O .  1     .docx
J A N U A R Y 2 0 1 8 V O L . 6 1 N O . 1 .docx
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development Mechanism
 
Archiver 2nd_OMC event_Barcelona_Project Overview
Archiver 2nd_OMC event_Barcelona_Project OverviewArchiver 2nd_OMC event_Barcelona_Project Overview
Archiver 2nd_OMC event_Barcelona_Project Overview
 
The Research Data Alliance ICT Technical Specifications
The Research Data AllianceICT Technical SpecificationsThe Research Data AllianceICT Technical Specifications
The Research Data Alliance ICT Technical Specifications
 
Science Based Target Setting for Financial Institutions
Science Based Target Setting for Financial InstitutionsScience Based Target Setting for Financial Institutions
Science Based Target Setting for Financial Institutions
 
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx
04_a_CEPEJ(2021)5 EN - CEPEJ roadmap certification AI (1).docx
 
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...
vdocuments.net_nace-rp-0169-2002-control-of-external-corrosion-on-underground...
 
Framework for Industry's net-zero transition
Framework for Industry's net-zero transitionFramework for Industry's net-zero transition
Framework for Industry's net-zero transition
 
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLANPROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
 
1. european commission a2 j dublin elig ien
1. european commission a2 j dublin elig ien1. european commission a2 j dublin elig ien
1. european commission a2 j dublin elig ien
 
OverviewoflegallandscapeFirstinterimreport
OverviewoflegallandscapeFirstinterimreportOverviewoflegallandscapeFirstinterimreport
OverviewoflegallandscapeFirstinterimreport
 
International Environmental Health and Safety Protocol Sample
International Environmental Health and Safety Protocol SampleInternational Environmental Health and Safety Protocol Sample
International Environmental Health and Safety Protocol Sample
 
eurammon symposium unep teap tf report_kuijpers
eurammon symposium unep teap tf report_kuijperseurammon symposium unep teap tf report_kuijpers
eurammon symposium unep teap tf report_kuijpers
 
2009 10 03 Learning Unit Sdi
2009 10 03 Learning Unit Sdi2009 10 03 Learning Unit Sdi
2009 10 03 Learning Unit Sdi
 
Stetter Certified Trading Chains Iin Mineral Production Standards
Stetter Certified Trading Chains Iin Mineral Production StandardsStetter Certified Trading Chains Iin Mineral Production Standards
Stetter Certified Trading Chains Iin Mineral Production Standards
 
MEA 2017 ANSI Standards Update
MEA 2017   ANSI Standards UpdateMEA 2017   ANSI Standards Update
MEA 2017 ANSI Standards Update
 
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
OHS&E Legal and Other Requirements for Construction Project by Sahil Bhutani ...
 
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...
8th Strategic Dialogue of the CMP - Chanyaphak Wathanachinda and Patsarat Nai...
 

More from iQHub

ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESiQHub
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMiQHub
 
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSIONINNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSIONiQHub
 
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFT
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFTAN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFT
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFTiQHub
 
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?iQHub
 
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELS
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELSHYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELS
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELSiQHub
 
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCE
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCELAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCE
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCEiQHub
 
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTS
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTSADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTS
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTSiQHub
 
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?iQHub
 
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERS
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERSBIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERS
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERSiQHub
 
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTION
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTIONCLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTION
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTIONiQHub
 
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVES
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVESARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVES
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVESiQHub
 
BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...
 BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ... BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...
BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...iQHub
 
STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...
 STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS... STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...
STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...iQHub
 
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAY
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAYMAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAY
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAYiQHub
 
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMY
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMYECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMY
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMYiQHub
 
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVES
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVESSUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVES
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVESiQHub
 
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICS
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICSAUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICS
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICSiQHub
 
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEAN
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEANGLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEAN
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEANiQHub
 
UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...
 UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT... UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...
UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...iQHub
 

More from iQHub (20)

ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIESENABLING EVTOL WITH BREAKTHROUGH BATTERIES
ENABLING EVTOL WITH BREAKTHROUGH BATTERIES
 
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAMCONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
CONCEPT OF OPERATIONS: THE TRANSITION FROM CREWED TO UNCREWED UAM
 
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSIONINNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
INNOVATIVE SOLUTIONS FOR HIGH-POWER-DENSITY E-MOTORS FOR AEROSPACE PROPULSION
 
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFT
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFTAN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFT
AN ELECTRIC FUTURE - READYING AIRPORTS FOR ELECTRIC AIRCRAFT
 
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?
ELECTRIFICATION OF AVIATION: HYPE OR GAME-CHANGER?
 
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELS
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELSHYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELS
HYBRIDIZATION IS THE MISSING LINK BETWEEN ELECTRIFICATION AND SUSTAINABLE FUELS
 
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCE
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCELAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCE
LAUNCHING UAM SERVICES IN A LARGE CITY: THE ROME EXPERIENCE
 
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTS
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTSADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTS
ADVANCED BIO-CIRCULAR MATERIALS: HIGH-PERFORMANCE AND DURABLE PRODUCTS
 
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?
HOW TO CREATE A NET ZERO PLASTIC SOCIETY FROM THE CONVERTORS POINT OF VIEW?
 
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERS
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERSBIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERS
BIO-BASED ADDITIVES TO IMPROVE THE PERFORMANCE & PROCESSING OF BIOPOLYMERS
 
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTION
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTIONCLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTION
CLOSING THE LOOP ON MATERIALS COLLECTED AND SORTING: CURBSIDE COLLECTION
 
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVES
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVESARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVES
ARE "NATURAL" POLYMERS PLANT-DERIVED POLYMERS? - CONSUMERS PERSPECTIVES
 
BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...
 BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ... BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...
BIO-BASED ENGINEERING PLASTICS WITH SUSTAINABILITY, HIGH FUNCTIONALITY, AND ...
 
STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...
 STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS... STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...
STAGES OF SUSTAINABILITY: TRANSITION FROM BROAD TERMINOLOGY TO MARKET UNDERS...
 
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAY
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAYMAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAY
MAKING PLASTICS FULLY SUSTAINABLE, THE DECARBONIZED PLASTICS-TO-HYDROGEN PATHWAY
 
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMY
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMYECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMY
ECO-FRIENDLY AND SUSTAINABLE SOLUTIONS PROGRESSING CIRCULAR ECONOMY
 
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVES
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVESSUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVES
SUPPORTING SUSTAINABLE PLASTICS THROUGH ADDITIVES
 
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICS
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICSAUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICS
AUTOMATED VISCOMETERS FOR MEASURING THE DIVIDING LINES AMONG RECYCLED PLASTICS
 
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEAN
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEANGLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEAN
GLOBAL EXTENDED PRODUCERS' RESPONSIBILITY DEVELOPMENTS AND WHAT THEY MEAN
 
UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...
 UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT... UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...
UTILIZING AMI TO IDENTIFY LEAKS, IRRIGATION, AND EDUCATE CUSTOMERS ABOUT WAT...
 

Recently uploaded

Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756dollysharma2066
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxgeorgebrinton95
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncrdollysharma2066
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 

Recently uploaded (20)

Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
Lowrate Call Girls In Laxmi Nagar Delhi ❤️8860477959 Escorts 100% Genuine Ser...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
Call Girls In ⇛⇛Chhatarpur⇚⇚. Brings Offer Delhi Contact Us 8377877756
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptxBanana Powder Manufacturing Plant Project Report 2024 Edition.pptx
Banana Powder Manufacturing Plant Project Report 2024 Edition.pptx
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / NcrCall Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
Call Girls in DELHI Cantt, ( Call Me )-8377877756-Female Escort- In Delhi / Ncr
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 

THE RIDDLE OF THE STANDARDS – WHEN WILL THE ISA EXPLOITATION RULES BE COMPLETE?

  • 1. The Riddle of the Standards Rechtsanwalt Andreas Kaede Lammstrasse 6 D-70839 Gerlingen Germany Tel. +49 7156 433 100-103 Cell: +49 173 928 70 20 Mail: andreas.kaede@t-online.de Web: www/kanzlei-kaede.de
  • 2. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 2 Disclaimer: The following presentation sets out the personal findings and opinions of the author. It is not intended to provide (a) a comprehensive treatise on the subject, or (b) legal advice in any manner. The Riddle of the Standards
  • 3. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 3 The Riddle of the Standards 2023 – the year of the ISA Exploitation Rules?  Target: for the Draft Rules to be approved at least by the ISA Council in Summer 2023  Status: batches of the main body of the Draft Rules (in all: 107 regulations, 10 annexes, 1 schedule  117 pp) under review at the Council, entailing substantial „redline“  Extra challenge: some 40-50 Standards and Guidelines implementing or accompanying the Rules are supposed to be in place at about the same time as the Rules. Let‘s talk about this „extra challenge“ today.
  • 4. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 4 The Riddle of the Standards Overview: 1. 2023 – the year of the ISA Exploitation Rules? 2. Standards & Guidelines: Planned – drafted – pending 3. Plan and reality 4. Status of, and challenges for, S&G drafting 5. Future Scenarioes 6. Outlook
  • 5. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 5 The Riddle of the Standards Standards & Guidelines („S&G“) planned – drafted - pending Legal Office (in Secretariat) (8 employees) Legal and Technical Commission LTC ( 41 members ) Council (36 members) Assembly (160+ members) „The Authority“ or „ISA“ (Section 4, Arts. 156 et seq. of UNCLOS) Standards Exploitation Rules Guidelines issue issue Issue for provisional application final issue report
  • 6. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 6 The Riddle of the Standards 2. Standards & Guidelines („S&G“) planned – drafted - pending In general:  Standard: usually a feature or property to be consistently found in a variety of things, processes or situations. Standards may be factual or normative.  Guideline: a statement by which to determine a course of action. Guidelines may be mandatory or non-mandatory. In the ISA Draft Rules:  Draft Regulation 94 provides for the adoption of Standards (normative) mainly in the fields of operational safety, resource conservation and environmental matters.  Draft Regulation 95 provides for the issuance of Guidelines (non-mandatory, without saying so) to support the implementation of the regulations of the Rules from an administrative and technical perspective.  Details of which organ of ISA is to approve either type of instrument, and the related process, belong to the more contentious matters in the present Council debates on the Draft Rules.
  • 7. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 7 The Riddle of the Standards 2. Standards & Guidelines… (2) Relevance of the S&G for the mining industry:  The applicant for an exploitation license, or – once this is granted – the contractor, should expect the following from the Rules in combination with S&G:  The Rules to tell him on a more abstract level, what is required, e.g. „undertake an Environmental Impact Assessment (EIA) and, based thereon, generate and submit an Environmental Impact Statement (EIS)“  The Standard to tell him what quality, properties, or values the required deliverable (e.g. an EIS) or action (e.g. EIA) must fulfill  The Guidelines to show him a recommended procedure for attaining those qualities, properties, or values
  • 8. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 8 The Riddle of the Standards 2. Standards & Guidelines… (2) Example: Application for Approval of a Plan of Work: Formal requirements as per Draft Regulation 7 of the actual Draft Rules Main Document with data, commitments and information as for exploration Mining Workplan Financial Plan Environmental Impact Statement Emergency Response & Contingency Plan Health & Safety Plan Training Plan Environmental Management & Monitoring Plan Closure Plan G S&G S&G G G G
  • 9. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 9 The Riddle of the Standards 2. Standards & Guidelines… (4) Which S&G were planned, which are drafted by now, and which are pending? Concept: Issue in 3 batches („Phases“) according to relevance: Phase 1 along with issue of the Rules, Phase 2 before receipt of 1st. Application for Exploitation license, Phase 3 at start of commercial mining. Reference for what is planned: Outcome of Pretoria Workshop 2019. Phase 3 S&G (9 entries) not shown on these slides. Phase: 1 Status: Green = issued Yellow = before Council Red = unknown, not yet seen Topic Standard Guide- line Phase status Remarks Application Plan of Work x 1 EIA process x x 1 EIS preparation x 1 Env Mgmt & Monitoring Plan prep x 2? transferred to 1 by LTC Idem, corr 1 x 2? Env. Mgmt System development & prep x x 1 Hazard Identif. & Risk Assessment tools x 1 Safe Operation Mining Vessels & Installations x x 2? transferred to 1 by LTC Environmental Performance Guarantee x x 1 Baseline Environmental Data x 1 Emergency Response Plans x x 1
  • 10. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 10 The Riddle of the Standards 2. Standards & Guidelines… (5) Phase: 1 cont‘d Status: Green = issued Yellow = before Commission Red = unknown, not yet seen Topic Standard Guide- line Phase status Remarks Risk based approach generic thresholds & indicators x 1 Necessity to to reconsider Access to environmental data x 1 Stakeholder participation x 1 Separate policy? Exploitation contract as security x 1 Application of good industry practice x 1 Depending on definition in Rules Determination of date of commercial production x 1 idem Insurance requirements and risk allocation x 1 Modification of plan of work & meaning of material change x 1 Transfer of rights & obligations under an exploitation contract x 1
  • 11. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 11 The Riddle of the Standards 2. Standards & Guidelines… (6) Phase: 2 Status: Green = issued Yellow = before Commission Red = unknown, not yet seen Topic Standard Guide- line Phase status Remarks Health + safety management system x 2/1 Pretoria: commission to determine need. Comm trans- ferred 2 to Phase 1 Safe operation x 2/1 Maritime security x 2 Mapping of seabed habitats + ressources x 2 Management + monitoring plans x 2/1 comm. Transferred to phase 1 Monitoring + result evaluation of environmental effects x 2 Preparation of closure plans x 2 Application of “reasonable regard” x 2 Pretoria: Commission to determine need Health + safety management system x 2
  • 12. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 12 The Riddle of the Standards 2. Standards & Guidelines… (7) Phase: 2 Status: Green = issued Yellow = before Commission Red = unknown, not yet seen Topic Standard Guide- line Phase status Remarks Application of “best available techniques” x 2 Pretoria: may be covered by improved definitions Best environmental practice x 2 Best available scientific evidence x 2 Change of control x 2 Application of “as much as reasonably practicable” x 2 Annual and other reporting under expl. Contract x 2 Review of activities under a plan of work x 2 Adoption of labour rules x 2 Pretoria: check coverage by IMO instruments Formal safety assessment x 2 Performance assessment x 2 Adaptive management measures x 2 Notifiable events x 2 Royalty returns x 2 Enforcement and penalties x 2
  • 13. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 13 The Riddle of the Standards 3. Plan and reality Wherever there was a plan with respect to the preparation and adoption of S&G, this appears to have changed over time. Several „roadmaps“ emerged over time, yet they mainly planned meetings and subject matters, however no real targets.  Draft of 8 Aug 2017, DR 80: First mentioning of „recommendations for the guidance of contractors to assist in the implementation of the Rules“, to be issued „from time to time“ (ISBA/23/LTC/CRP.3) i.e. after entry into force of the Rules  Draft of 30 April 2018, DRs 92, 93: corresponding, but „Standards“ added (ISBA/24/LTC/WP.1)  remained in Draft before Council as DRs 94, 95 (ISBA/25/C/WP.1)  Stakeholder Consultation 2019:  need to prepare S&G early, partly along with Rules  Council 2019: prepare S&G in 3 phases (1) to issue with Rules, (2) to issue before receipt of 1st. Application for exploitation license, (3) to issue at start of commercial mining  Pretoria Workshop May 2019 with outcome: revised 3-phase-list, 50 + S&G
  • 14. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 14 The Riddle of the Standards 3. Plan and reality (2)  2020-2021:  LTC concentrating on phase 1 S&G, incl. 2 Shareholder Consultation rounds. Corona prevents/impedes regular live meetings for major parts of the time  2021:  June: Nauru notifies of intention to submit application for approval of a plan of work for exploitation (= appl. for exploitation license)  Rules to be complete 9 July 2023 pursuant to Annex, Section 1 Art. 15 of the 1994 UNCLOS Amendment  August: Council requests setup of 3 informal working groups to i.a. deal w/S&G  November: ISA solicits external counsel support for preparation & finalization of all Phase 2 S&G, plus harmonization thereof and of Phase 1 S&G with Rules, w/target to have them ready (incl. iterations) at the planned issue date of the Rules mid 2023  2022:  Submission of first 10 Phase 1 S&G by LTC to Council in January; status unknown.  2023:  Inquiry on whether/how a review of a possible exploitation license application by Nauru could be deferred  LTC foresees another up to 5 years for the finalization of Phase 2, 3 S&G
  • 15. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 15 The Riddle of the Standards 4. Status of, and challenges for, S&G drafting (2) Status:  Of the 39 S&G originally contemplated for phases 1 and 2, 10 are drafted and before the Council. 5 of them come in a pair (Standard plus Guideline)  Of the 10 drafted S&G documents,  All, as we learned, will need alignment with the Rules text once that is „stable“  Most might need intra-document review, by lawyers or comparable resource, in one or more of the following aspects  Putting „teeth“ to Standards by formulating unambiguous requirements  Checking and possibly adjusting relationship between „Guideline-part“ and „Standard- part in a S/G pair  Concentrating Guidelines more on „how to do it“  Removing overlapping language between Standard and Guideline in a S/G pair  As said: Some of the listed, yet undrafted S&G await decision of LTC/Council as to whether they will at all be required
  • 16. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 16 The Riddle of the Standards 4. Status of, and challenges for, S&G drafting Challenges:  Corona (formerly) and multitude of statements in Council in the way of more systematic & accelerated discussion of the Rules   S&G (even phase 1) cannot be properly addressed in Council before Rules are more stable  Rush prompted by the Nauru initiative leads to unplanned „last minute action“ also affecting LTC  Demand by Council to all ISA organs to find ways & means to defer review of possible application for „plan of work“ approval  Task from Council to LTC to develop new Standards on „environmental threshold values“   hardly time & resource at LTC/Secretariat for creating new S&G (from the list)
  • 17. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 17 The Riddle of the Standards 5. Future Scenarioes With about two months to go until the „Nauru date“ (9 July 2023), and looking at the S&G drafting status to-date, it may be allowed to ask: „what if?“ --- 1. The (phase 1) Standards issue too late? 2. The phase 1 Guidelines issue too late? 3. One or more phase 2 or 3 Guidelines issue too late or not at all? 4. One or more Standards or Guidelines are revoked?
  • 18. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 18 The Riddle of the Standards 6. Outlook The debate on Deepsea Mining is supposed to become more heated in the future:  On the one hand, the recent finalization (pending lawyer‘s review, signatures, & ratifications) of the BBNJ Convention, along with the intent expressed in the Montreal conference 2022 to make 30% of the planet environmental protected areas by 2030, is likely to increase critcism of planned DSM activities.  On the other hand, many raw materials also extractable from the seafloor face increasingly severe shortage risks from their land based sources: wars, sanctions and export restrictions already now lead to major supply chain problems. This – once again – directs the interest of many States and mining companies to the seafloor.  If the deadline triggered by Nauru expires with Rules / S&G pending effectiveness for some time to come, and if no way is found to interpret the UNCLOS provision in a way allowing to defer review of applications for exploitation licenses, then the rules governing first deepsea mining will be quite basic at best. Setbacks this may cause for the preservation of the marine environment may not only entail ecological damage, but also a potentially irreparable harm to the efforts to establish a DSM system implementing in a balanced way all aspects of the concept of Common Heritage of Mankind.
  • 19. London, May 4, 2023 ANDREAS KAEDE, ATTORNEY-AT-LAW 19 The Riddle of the Standards Thank you for your attention and patience. And have a safe voyage home!