Don’t adjust your TV – it really is a new chapter.
Last time, the Bradfords jumped on the stock market bandwagon; Cindy gave birth to Nicholas, the
generation 7 heir but struggled in her new role as mother, much to Marsha’s chagrin; the last of generation
6 headed off to college; Phily became the last woman standing of generation 4 with the passing of Katie;
Cindy gave up her singing career to be a mom after little Nicky stole her heart; the reality of Prohibition
coming to an end caused James to think about his future; generation 6 spare Cyrus got married after
confiding his fears in a sympathetic Cindy; Marsha found out the truth of what James did for a living; Taddy
and Calla and Sterling and Viola had daughters; and the bottom dropped out of the stock market, leaving
everyone to wonder what was next; and Cindy rallied her family with the knowledge that she was expecting
again.
Blanket warning about language, topics, adult situations, etc. James has only 1 nice point, and he likes to
swear like a sailor, and Cindy’s a Romance Sim, with some type of purple-hearted want in her panel at all
times.
Here you go: Chapter 24 of The Bradford Legacy.
The crash of the Simerican stock market hit the entire country hard. Simsfield and Portsimouth
Massimchusetts were no exception. As fall turned to winter that year, the repercussions from the economic
downturn became clearer.
One of the first victims was Pierce Phoenix, who had been the editor of a weekly magazine. As the general
public had less disposable income at their disposal, magazines were one of the first things that were cut
out of the family budgets. Pierce’s magazine went out of business, and he was unable to find a new
position. Add that to the losses that the family took from their investments, and the losses of their savings
when the Portsimouth Bank failed, and they found themselves to be in rough shape. If it hadn’t been for
the meager pension that the family patriarch Alonzo still received, they would not have been able to
survive.
The Pasangs, descendants of Jefferson’s Aunt Diana, had mortgaged their house to pay for their son’s
schooling. When Amos lost his job, they couldn’t keep up with the payments and lost it. Fortunately,
Orson offered them a place in his new home with his wife and daughter, but Kea was heartbroken to leave
the home she’d entered as a bride.
The Menons, parents of Taddy’s wife Calla, were in a similar fix. Jason had had the brilliant idea to
mortgage the house to invest in the market, and they lost their home to the bank when they couldn’t repay
it. The shock of the crash was too much for Jason to bear, and he succumbed to a heart attack not long
after he heard the news.
Esther had no other choice but to move in with her daughter Calla. She did her best to be helpful around
the house and teach little Rosalie, but her heart just wasn’t in it. She moved around the house as if a
shadow, and nothing her family did could draw her out of her misery.
Jason Seiff, Lizzie’s husband, lost his bid for reelection to the town council. He’d advocated for continuing
services in order to keep people employed, but with so many people out of work no one wanted the tax
increase that would accompany Jason’s plan. At his age, he had a hard time finding a new job, so he
decided the best thing to do would be to help Lizzie in her new endeavor to sell her excess produce to the
townspeople.
Viola too was feeling the effects of the market crash. Many of her patrons has lost their entire fortunes, and
could no longer purchase her paintings. It was a blow to her ego more than anything else, as Sterling and
George were busier than ever with their law practice and the family income had hardly been diminished.
Still, Viola worked at her easel every day, putting her paintings away in storage in the attic. She knew that
one day things would turn around, and her artwork would sell once again.
Cyrus, who had grand plans to build Portsimouth’s version of the Simpire State Building, was let go from
his architecture firm without warning. Though he tried, he was unable to secure another form of
employment. Instead, he worked on repairing the few cars in town for the lucky citizens who did have to
worry about getting to work.
His mechanic work brought in little money, but Cyrus couldn’t bear the thought of being supported by his
wife and her inheritance, though he would never admit it to Georgianna.
And then there were the Bradfords themselves. Though the family’s loss in the market was not as severe
as some of their friends and neighbors, it was still significant. Added to the loss they took when the
Simsfield Bank failed, and things were tight.
Marsha did her part by making sure the fall harvest was canned, pickled, or otherwise preserved to get
them through the winter. Cindy would have helped, but the smells from the kitchen made her morning
sickness worse. Instead, she used a portion of the money she’d put aside from her singing to purchase a
some chickens, so the family would have fresh eggs.
Jefferson and James were both putting in extra hours, for the increased income and to show their
respective bosses that they were willing to do whatever was necessary. When not at their offices, the men
spent their time in the forest cutting wood to burn in the fireplaces, so they wouldn’t have to purchase as
much coal to keep the house warm in the winter. They also spent a number of early morning fishing in the
small pond by the house. What they didn’t eat on the day caught Marsha salted and put away for the
months when the ice was too thick for the men to break.
There was another noticeable change at the Bradford farm. The billiards table, purchased all those years
ago for Elias, collapsed one day while James was playing to take his mind off of things. It was determined
that the table was too far gone to be worthy of a repair job. Sadly, the men salvaged what they could, and
the billiard room, as it had come to be known, stood empty and without purpose.
One day, after rooting around in the attic, Jefferson found something to put in the empty room.
“What is it?” Nicky asked, as he watched Cindy and Marsha wipe the large object down with damp cloths.
“It’s a sewing machine,” Jefferson said. “I don’t remember seeing it, so I’m guessing that it was my
grandmother’s. Mother must have had it put away.”
James nodded. “Yeah, I can’t see her sewing.”
“My mother always wanted one, but we never could afford it,” Cindy said. “It will come in handy, making
things for this little one.” She rested her hands on her expanding stomach with a small smile.
“I thought you hated sewing,” James commented. “You always sent your dresses out for alterations when
you sang at the club.”
“I do hate sewing,” Cindy said. “But I never had something like this to help me before. Maybe sewing with
a machine will be better than doing it by hand.”
Marsha smiled. “I hope it is for your sake, dear. And if Nicholas keeps shooting up the way he has, he’ll
be needing new pants every other week.”
Nicky’s face fell. “I’m sorry. I don’t mean to grow so fast.”
“Hey now,” James said. “You just take after your old man. Nothing wrong with that. We Bradford men are
all tall. Now, why don’t you go find something to amuse yourself with?”
Nicky turned to Jefferson. “You promised to show me how to play chess, Grandpa.”
“I did. Come on, then.”
Cindy followed Nicky out of the room with her eyes. She sighed softly. “He’s such a serious little boy. I
don’t know where he gets it from.”
James shrugged. “He may yet grow out of it. It’s too bad there aren’t more boys his age around for him to
play with.”
“I keep forgetting that he takes everything I say so literally. I can’t tease him as I used to do with you,”
Marsha said with a smile for James.
“Well, that’s a worry for another day. In the meantime, with the winter weather upon us, Nicky really needs
a good, warm coat. I don’t want him catching cold while he’s walking to or from school,” Cindy worried.
“Most of the affordable ones are gone from the stores,” James sighed. “I don’t really feel like spending a lot
of money on something he’s going to outgrow in a year, and probably mess up playing.”
Marsha leaned over and opened the chest of old clothes that Jefferson had brought down from the attic
along with the sewing machine.
“I don’t see why we can’t use your grandfather’s old overcoat for material for a new coat for Nicholas,” she
said. “The wool’s hardly worn, and it will keep the worst of the weather out.”
James smirked. “Grandfather would roll over in his grave at the idea of his fine clothes being cut up. Let’s
do it.”
“James,” Marsha chided.
The winter coat that Cindy made for Nicky wasn’t the fanciest, but it was warm. Nicky was grateful for it on
the walks to and from the schoolhouse that winter.
Not all of the children in town were so lucky, as Nicky soon found out. One day he was kept inside during
recess because of a slight case of the sniffles. He didn’t mind so much; he would much rather read a book
than pretend to enjoy playing with the other children. He was so engrossed in his book that he didn’t notice
that he wasn’t the only one in the classroom.
“Do you mind if I sit here?” a girl’s voice asked.
Nicky looked up to see a redheaded girl he didn’t recognize staring at him. “I guess not,” he said, his eyes
returning to the book in his hands.
“Thank you,” she said. “It’s so much warmer over here by the stove.”
“Uh huh,” Nicky said, not looking up from his reading.
“Why are you staying inside today?” she asked.
“I’ve got a stuffy nose,” he said, looking up from his book. “My mama didn’t want it to turn into anything
worse.”
She didn’t reply, and Nicky nearly turned back to his book. But then it occurred to him that it would be
rather rude not to talk to the girl, when she was clearly making an effort to talk to him.
“Why did you stay inside?”
“I don’t have a winter coat,” she said. “I just have a sweater that I wear on the walk to and from school. So
Teacher wouldn’t let me out.”
Nicky nodded. His parents had already explained that there were a lot of families who didn’t have the
money to buy things, because something big had crashed.
“But I don’t mind. It’s nice and warm in here. It’s one of the reasons I like coming to school.”
“I like staying inside, ‘cause then I can read my books,” Nicky replied. “I like reading. I learn about all kinds
of stuff that way.”
“That’s nice,” she said. “I’d like to read more, but I don’t have a lot of books at home. Just a few
cookbooks, and you can’t really read them.”
“Would you like to borrow one of my books?” he asked. “I have to ask my Papa if that’s okay first, but he
should say yes.”
“I’d like that a lot. Thank you…” she hesitated. “I’m sorry, I don’t know your name.”
Nicky smiled at her. I’m Nicholas Bradford, but everyone except my Grandma calls me Nicky.”
“I’m Alice Kalson,” she said, returning his smile.
“It’s nice to meet you, Alice.”
                                                     *****
The family was in the parlor when Jefferson arrived home. He did not call out a greeting to them as he
usually did; instead he hung his coat and hat on their hooks silently.
“Jefferson?” Marsha called. “Is everything all right?”
He drew in a bracing breath and joined them in the parlor.
“Not really. The company went bankrupt, and they let everyone go.”
There was a collective gasp from around the room. “But why?” Marsha asked.
“With things being the way they are, people don’t have extra money for frivolities like games,” Jefferson
said with a shrug as he sat down. “I suppose I should have seen it coming, but I was too short-sighted, I
guess.”
Nicky looked up from the floor where he was working on his homework. “Is that bad, Grandpa?”
Jefferson chuckled a little. “Well, it’s not good, Nicky. We were counting on me working for a little longer
to make up for the losses we took in the stock market. But now, I’m not sure what this means.”
“No pension, Pops?” James asked.
Jefferson shook his head. “I’m lucky I was able to get the few things out of my desk that were mine. They
hurried us out of the building pretty quickly after the announcement.”
The room fell quiet, the only sound the occasional squeak of Nicky’s pencil against his schoolwork.
Everyone was thinking about what Jefferson’s suddenly unemployed state meant for the family. They had
been counting on his extra income recoup some of the funds lost in the crash and the subsequent bank
failure. James knew that the rumblings of Prohibition ending were getting stronger, and he worried that the
family might lose their only source of income. He and Cindy had a silent conversation as she rubbed her
large belly. In her current condition, there was no way she could go anywhere and sing to supplement their
income.
“What are you going to do now, Grandpa?”
“I don’t know, Nicky. I really don’t know.”
“Nicky, why don’t you go finish your homework upstairs at your desk?” Cindy said.
“But it’s warmer down here,” he protested.
“Your mother told you to do something,” James said, a warning clearly in his voice. “Upstairs.”
“Yes, Papa,” he said. He got up from his spot in front of the fire, and looked at all of them. “You could
have just said you want to talk about grown-up stuff. I would have understood.”
They waited until they heard the click of Nicky’s door shutting. “Was I that bad when I was his age?”
James asked his parents.
Marsha smiled. “You mostly had the good sense not to sass because you knew it meant a tongue lashing
from your grandmother. But yes, you were.”
“Now what?” James asked, returning the discussion to the issue at hand. “I know we can live off of what
I’m earning – don’t make a face, Mama. I know you don’t like what I do, but it’s the only income we’ve got
now.”
“You’re right, James. I don’t like it, but I’m willing to accept the reality of the situation. We do need some
money coming in to pay the bills and the taxes. But what if Prohibition does get repealed? Where will we
be then?”
“There’s a ways to go before that happens, Mama,” James said. “Things will probably turn around before
then, and I’ll find something else to do.”
Jefferson nodded. “I’ll see if I can find something else as well, but I’m not getting my hopes up. I’m not
exactly at an age where people are rushing to hire me, even in the best of economic situations.”
“Are you just going to sit around all day?” Cindy asked.
“Well, if I still don’t have something come spring, I’ll help with the gardening and fishing and such. In the
mean time, I was thinking about trying my hand at making a few things so the children can have something
to open on Christmas morning.”
“I don’t know if the baby will be born by then, Jefferson,” Cindy interjected.
“Oh, I’m not just talking about your and James’ children. I’d like to make something for Viola’s daughter,
and Taddy’s as well. Poor little tykes deserve to believe in Santa Claus for a little longer.”
“What are you thinking about making?” Marsha asked. “And where will you do it?”
“I’m not sure what I want to make. Toys or games of some sort. And I was planning on setting up in the
old billiards room. I can keep you and Cindy company with your sewing. If things go well, I can even try
selling a few things.”
“I suppose that’s the only thing to do,” Marsha said. “But we shouldn’t plan on too much extra money from
your endeavors.”
“I wasn’t planning on that,” Jefferson replied. “Maybe a few dollars here and there for an unexpected
expense.”
Everyone fell silent again, until Cindy rose. “My back is aching really bad. I’m going to go soak in the tub
before supper. James, will you help me up the stairs? I’m so worried I’m going to lose my balance and fall
down them.”
“Of course,” he said, jumping up. “I’ll make sure that Nicky’s finished his homework while I’m up there.”
James followed Cindy into their bedroom, intending on helping her ready for her bath by removing her
shoes. But when they were in the room with the door closed firmly behind them, she rounded on him.
“You lied to your parents, you know. The repeal of Prohibition’s not that far off, and then where will we
be?”
“Hey!” he exclaimed, provoked by the unexpected attack. “You’re the one who said you’re not afraid to be
poor again. You just might get your wish.”
Cindy’s face fell. “James, I didn’t mean….”
“No, I’m the ass here,” he sighed. “I really need to learn to control my temper better.”
“And I should think before I open my mouth,” she said. “But I can’t help but worry. If I hadn’t decided I
wanted another baby…”
“Stop. This is not your fault. If I hadn’t encouraged my father to invest our money in the stock market…”
“We would have still lost it when the bank failed. James, face it. We’re stuck in a no-win situation. We just
have to do the best with what we have.”
He nodded. “And you need to stop worrying so much. It can’t be good for the little one.”
“It’s hard not to,” she admitted. “At least Nicky seems to be doing fine. All he talks about is his new friend
Alice and how much fun they have reading books together at recess. She’s all he talks about. If I were a
betting woman, I’d put money on the two of them making a match of it someday.”
James smirked. “He’s just a kid, Cindy. He’s going to meet lots of girls before he’s old enough to think
about getting married.”
“I know my son, James. He’s sweet on her, even if he doesn’t know it yet.”
“Tell you what. If you’re right and they do end up getting married, I’ll buy you a fancy new coat. Your
choice.”
“I’ll take you up on that wager, James. And if you’re right?”
“You, me, no kids, my parents cabin in the mountains for two weeks.”
“We’ll be too old for such things by then, James.”
“Doll, I’ll never be too old for that.”
When he was unable to find any work, Jefferson built himself a workbench which he placed in the old
billiards room. There, he taught himself how to make simpler versions of the fancy toys and games his
company had produced for years. Though it often took him several tries to produce something that was
worthy of putting in front of one of his grandchildren, he focused on the fact that he was making sure that
they had something to make their childhood as normal as possible, despite the grim circumstances in
which they were growing up.
Nicky had asked his father if he could loan Alice some of his books, but James was reluctant to do so, as
he didn’t know much about Alice or her family. Instead, he told Nicky that he could invite Alice over as
often as he wanted so she could read the books there. Alice had readily agreed, though she tended to do
so only on the warmer days, as she had a long walk home that felt longer in the thin garment that was all
she had to protect her from the winter weather.
Nicky taught her to play chess, and even though Alice didn’t really care for the game she was to nice to say
so.
During those games of chess, Nicky learned more about Alice and where she came from. Her parents had
a wheat farm in Simsas, and they’d sent her East to live with relatives because of the crop failure and
drought that their farm was facing. Alice, unlike her older siblings, wasn’t much help on the farm, and her
parents worried about the effects of the dust in the air on her health. Alice found herself liking the East,
especially the ocean, and she hoped that she’d be able to stay there even after the drought was over.
In return, Nicky told Alice all about the woods around the house, and promised to show them to her once
winter and its chill had passed. Alice had never climbed a tree before, and Nicky promised to teach her.
The family approved of Nicky’s friendship with Alice, mostly because she taught him games that took him
away from his constant obsession with books.
Marsha approved of her especially because she always acted like a little lady.
Marsha so approved of Alice that decided to do something to make it possible for the young girl to visit with
her grandson more often. She found an old child’s cloak in the chest of clothing Jefferson brought down
from the attic, and went to work.
One afternoon when Alice came over, there was something waiting for her on the sofa in the living room.
“Nicky, what’s this?”
“My Grandma made it for you. She took an old coat she found in the attic and reworked it. It’s not fancy or
anything, but it’s made of wool so it will be warm. And then you’ll have a warm coat so we can play outside
at recess, and you can come visit no matter what it’s like outside.”
“She didn’t have to do that.”
“No, but she wanted to. Grandma likes doing nice things for nice people.”
“I should thank her for such a nice present. Is she here?”
“No, she’s at my Aunt Vi’s visiting her and Shirley.”
Alice threw her arms around Nicky.
“Well, since she’s not here, I’ll give you a hug instead. You have to promise me that you’ll pass it on to her
when she comes home.”
Nicky, rather shocked by Alice’s sudden display of affection, could only reply “Okay,” as he returned the
hug.
“You’re family’s so nice, Nicky. I’m glad we’re friends.”
“Me too.”
After Alice had gone home to show off her new coat, James found his way into the living room.
“Well, did Alice like the coat?”
Nicky nodded. “She gave me a hug to pass on to Grandma, since she wasn’t here.”
James made a noise somewhere between a sigh and a groan. “Kid, you’re going to cost me a lot of money
if you keep that up.”
“Keep what up?”
“Being too damned cute for your own good.”
“I don’t know what you mean, Papa.”
“Nicky,” James said, realizing that he’d probably said too much, “I promised your Mama something, and I’m
starting to understand that I got suckered into a bet that I can’t win. You really are good friends with Alice.”
Nicky’s face lit up. “She’s one of my best friends, Papa. I think I might like her better even than Rosalie
and Shirley, but they’re family so I have to like them better.”
All James could do was smile at his son’s innocence. “It’s a good thing I like Alice.”
“How could you not like her, Papa? She’s so nice and she’s pretty smart and…”
James stopped Nicky’s singing of Alice’s praises by ruffling his hair. “I get it, kid. She’s your perfect
woman. Now, you’ve got spelling to learn before school tomorrow. Hop to it.”
                                                    *****
Over in Portsimouth, Phily Bradford Thayer, as she called herself, was resting before the big event of the
day. Her grandson, Asher, was getting married to Vivian McClellan, and she wanted to be able to
thoroughly enjoy the festivities. The winter’s day was warm as spring, and they’d elected to have the
ceremony in the rose garden as Victor and Jane had so many years ago.
I can’t believe I lived long enough to see one of my grandchildren get married, she marveled. Imagine how
happy Meadow would be if she were here today.
Meadow would have been happy, had she been there to watch Asher and Vivian exchange vows and rings.
The family who was there certainly was.
After the ceremony, Jane took to the piano so that the guests could enjoy a dance or two. After Asher had
dance with his bride, he gave her hand to his father so that Victor could have a turn around the dance floor
with the new Mrs. Hutchins. Asher then turned to Phily, and made a dashing bow as he extending his hand
in an invitation.
“Oh, Asher, I haven’t danced in ages,” she said. It was true. Phily, until her age had prevented it, had
always been the musician for parties.
“I’m sure you remember how to waltz,” the young man said. “You were the one who taught Mama how.”
“Oh, all right,” Phily said as she slowly rose from her comfortable seat with the assistance of Asher.
“I’m glad you were able to see this day, Grandma Phily,” Asher said as they waltzed at a pace slightly
slower than the music.
“So am I, Asher. I wish Meadow could have been here too.”
“Oh, I’m sure she’s watching us from wherever she is, and I’m sure she’s thrilled for us.”
Phily smiled at that thought, and how comforting it was. “You’re right, Asher. Those we love must still
know of our happiness, even when they’re not longer with us.”
It was that thought that stuck with Phily into the next day. Somehow, she realized that her time was up,
and that soon she would pass into the Great Beyond and be reunited with those she loved once more.
Jane had clung to her mother when Phily confided the news to her.
“It’s all right, Jane. You’ll see us again, and in the meantime you have your children and grandchildren to
look out for. Oh, I know there aren’t grandchildren yet, but there will be.”
Victor, never a man to show much emotion, simply asked Phily to tell his mother that he still missed her.
“I’m certain Henri knows that, Victor, but I’ll tell her anyway.”
It was at that moment that Asher came into the room, and his face fell when he realized what was going on.
“Are you certain, Grandma Phily?”
“Asher, I never understood until today how Henri knew that her time was up. When it comes for you, you
just know.”
“But…” he stuttered, “I had hoped that you’d get to meet your great-grandchild.”
“I would have liked that too. But it’s just not meant to be.”
And then, it was time.
Phily found herself oddly at peace as she slipped into the next world. Her family was not nearly as tranquil,
but did their best to remember that Phily was not really gone to them, and that they would see her again
when it was their time to pass into the Great Beyond.
Phily was laid to rest in the Portsimouth Cemetery next to her beloved Meadow, and near her brother Alex,
her dear friend Katie, and her sister Henri. Her passing marked the end of an era: the last of the fourth
generation of Bradfords in Simerica was gone.
                                                 *****
But where there are deaths and sadness, there are also happier events like birthdays. Rosalie Seiff
celebrated her transition into childhood.
Unlike her parents, Rosalie had an innate sense of propriety, and was a stickler for etiquette. She often
found it hard to make friends because there were so few children she felt she could associate with, and she
spent far too much time criticizing those she did chose to pass time with.
And little Shirley Alcott, Sterling and Viola’s daughter, celebrated her birthday as well.
Shirley was almost the complete opposite of her cousin, and she was a complete tomboy. She would
much rather spend her time playing ball with the boys or climbing trees, much to the distain of her cousin
Rosalie and the delight of Nicky, who relished his new playmate.
                                                  *****
James sat in the office that had once been Russ’ until he’d turned the management of the speakeasy over
to James. James had run it well, in his opinion. They’d always turned a good profit, and the police never
had reason to suspect the old block of stores was anything more than that.
All that would come to an end soon. Prohibition would soon be coming to an end. The 21st amendment
had been passed by Congress, and it was only a matter of time until the proper number of states ratified it.
When the proper number of states had ratified it, it would be law, though people would stop enforcing
Prohibition long before ratification. And that would be the end of his job.
There was a knock on the door, and it opened before James had the chance to invite the knocker in. It was
Russ. James hadn’t seen him recently, and he was shocked to see how much the man had aged.
“James, my boy. How are you?”
“Pretty good, sir,” James replied, rising from his seat. “Can I offer you something?”
“Still respectful. A glass of your finest whisky, if you don’t mind.”
James poured two glasses, and gestured for Russ to take a seat in the comfortable chairs in a corner of
the room.
The men each took a seat and a sip of their drinks. Russ set his down, and James followed suit.
“James, I’m sure you’ve been watching the news. The cushy little nest we’ve got here is about to be
obsolete.”
“I was just thinking that before you came in.”
“Pity the government figured out they could makes some money by taxing booze once they made it legal
again. But we’ve had a good run here, haven’t we?”
“I certainly can’t complain,” James admitted. “But it does make me worry about what comes next. I’ve
been the only breadwinner for my family for a while now, and I don’t relish the idea of the government
putting me out of a job.”
“Very true,” Russ said. “Which is why I’m here today. Now, I know you’ve made your position on my
business empire pretty clear in the past, but I’m wondering if your opinion has changed at all in light recent
developments.
James bought himself some time by taking another sip of his drink. He still didn’t believe in some of Russ’
business models, but with his father out of work, he needed to keep a paycheck coming into the family.
“To be honest, Russ, I still don’t agree with some of the ways you make money. However, you’re correct in
assuming that things have changed to a degree.”
“Meaning you’d agree to continue in my employ, but only if I give you something that you don’t object to
morally.”
“Correct,” James said. “I suppose I’m willing to venture into your gambling business, if that’s what it takes
to make sure my family has what it needs.”
Russ smiled in the way that always sent a chill running up and down James’ spine. “That’s very fortuitous,
since that’s what I’m planning to do with this place once the booze trade goes south. It won’t take much to
transform the place. The bar’ll stay – people get reckless with their money when they drink – but the
restaurant employees and musicians will go.”
“You’re just going to let them go?” James asked.
“I’ll offer them positions in the organization,” Russ replied with a shrug. “If they refuse, it’s not my problem.”
James didn’t like how heartless Russ was being about the whole matter. If this was how he treated those
in his employ for years, what would happen when he no longer had use for James himself?
“Of course,” James said aloud. “When will the transition take place?”
“Before the end of the month. Since everyone knows that booze will be legal soon, no one’s bothering to
stop people from selling it any longer. You can spread the word about the changes, and I’ll send people in
to start fixing the place up.”
James nodded, trying to keep his expression neutral.
Russ laughed. “Don’t look so glum, boy. Go home to your wife and things will look better in the morning.”
Russ got up and left without another word to James. The younger man shook his head; Russ was not a
man of many words. James picked up the empty glasses and left them outside the door to his office;
someone from the kitchen would come up to collect them for cleaning. He then grabbed his coat. It was
time for him to go home. He wasn’t sure what he was going to tell Cindy, let alone his parents. Though
Cindy would be supportive, his mother would likely not be.
Jefferson was still awake and reading the paper in the living room when James got home. He looked up
when James passed through the foyer. He saw the look of defeat on his son’s face, and put the paper
down.
“Come sit with me for a minute, James. You look exhausted.”
“Thank,” James said as he sank down onto the sofa next to his father.
“Anything good in that?” James asked after a pause, nodding his head in the direction of the newspaper.
“Of course not. People losing their homes, their jobs, and their lives. The only interesting piece was about
how Portsimouth has to keep the streetlights lit all the time now, with the dust blowing in from the plains.”
“It’s horrendous,” James sighed. “My mouth always has the taste of mud in it. Reminds me of the time that
Taddy dared me to eat a mud pie. Took me weeks to get rid of the grit between my teeth.”
Jefferson chuckled. “You look as if something’s on your mind, son. Anything you care to talk about with
me?”
James heaved a sigh as his shoulders slumped. “Have you ever had to do something that you didn’t want
to do, because you thought it was what was best for the family?”
“You know that I did, son. Rather, I almost did.”
James nodded. “Yeah, but you found an out just in time. I don’t think I’m going to be so lucky.”
“Does this have anything to do with impending repeal of Prohibition?”
“It has everything to do with that. Russ, the owner of the speakeasy, came in today. He’s closing the
speakeasy as it is, and turning it into a gambling hall.”
“Ah,” Jefferson said.
“And he offered me the chance to run it, which means keeping an income coming into the house. But it
also means that I’m taking money that could probably be used for something better than a hand or two of
poker.”
“What are you going to do, James?”
“I told him I’d take it, but now that I’ve thought about it for a while, I wish I’d said no. I only took it because I
knew we needed the money, but it just feels wrong. And if Mama hated me running a speakeasy, imagine
what she’d have to say about this.”
“James, you can’t live your life based on what your mother thinks about it. Trust me on this one. But you
do have to do what you can live with. Can you live with the repercussions of your job?”
James stared into the fireplace. “I don’t know what’s worse, Pops: the thought of taking money away from
other families who really need it, or the thought of not having the money to give my family the life and future
they deserve.”
Jefferson put his hand on James’ shoulder. “I can’t give you the answer to that son, as much as I’d like to.
Lots of people are being forced to make tough choices nowadays. Whatever you decide, I’ll understand.”
James managed a smile. “Can’t we go back to the days when our biggest worries were how late Taddy,
Sterling and I could stay out playing ball?”
Jefferson managed to return James’ smile. “I wish we could, son. I really wish we could.”
James’ smile melted back into the morose expression that he wore so often as of late. “As much as I hate
it, I have to put the needs of my family before those of a hypothetical one. I’ll see if I can find something
else, but I have to keep working for Russ for now.”
Jefferson nodded. “If that’s what you think you have to do, I’ll support you.”
“Thanks, Pops.”
They sat quietly for a few moments before Jefferson rose.
“I’m headed up to bed. You look tired, James. You should get some sleep yourself.”
“I will. I just need a few more minutes.”
“Good night, James.”
“Good night, Papa.”
After Jefferson headed upstairs, James rose and poked at the fireplace for a moment. He still wasn’t
completely happy with his decision, but there was some comfort in the fact that his father was supporting
him. He knew that Cindy would – she very rarely questioned anything he decided. But he knew that his
mother would be a different matter entirely. If she had thought his running the speakeasy was “immoral,
unethical, and illegal,” he could only imagine what she’d have to say about his running a gambling hall.
Her words from their argument echoed in his brain.
“How would you explain what you do to your son?”
He hoped that he’d never have to do that.
He leaned against the mantle and groaned. “What kind of a man am I?”
A small voice answered from behind him. “I think you’re a good man, Papa.”
James spun around to see Nicky standing in the doorway. James quickly rearranged his face to a more
pleasant expression and went to kneel before his son.
“Hey, you’re supposed to be tucked in bed, sound asleep.”
Nicky bit his lip, a nervous habit he’d picked up from his mother. “I was, but I heard you come home, and I
waited and waited for you to come up and kiss me goodnight. I didn’t feel like waiting anymore.”
James smiled and ruffled the hair on Nicky’s head. “I’m sorry. I was talking with Grandpa about some
grown up stuff, and I lost track of the time.”
“Why where you asking what kind of man you were, Papa?”
“Because, Nicky, I have to do something that I’m not proud of, and I don’t like it.”
Nicky’s eyes got a little bigger. “I thought being grown up meant you didn’t have to do things you didn’t
like.”
James suppressed the urge to laugh. “Unfortunately, little man, grownups have to do a lot of things they
don’t like.”
“Are you worried about money again, Papa?”
James raised an eyebrow. He’d done his best to keep his worries about money away from Nicky’s ears,
but the boy somehow always knew about things he shouldn’t.
“A little, but it’s not something you should think about.”
“But I want to help, Papa.”
“And I appreciate that, Nicky. But the best thing you can do to help me is to enjoy being a kid. You’ll have
to worry about the responsibilities of being a grown up soon enough.”
“But Papa…”
“No ‘buts’, young man; it’s way past your bedtime. Your mama will have my hide if she finds out I let you
stay up this late.”

“You’re going to tuck me in, right?”

“Of course I am. Now scoot upstairs. I just need to damp the fire down, and I’ll be right up.”
As James tucked his son into bed that night, he marveled at how kind a boy his son was. He’d certainly
gotten his temperament from his mother. The thought made James burst with pride. Perhaps Nicky’s
kindness would lead him into something that would make up for some of his sins.
                                                 *****
Midway through the winter season, Cindy awoke to the pains of labor. This time, however, something was
different.
“Marsha,” she grimaced between pains, “Something doesn’t feel right about this.”
“I‘ll ‘phone for the doctor and be right back for you, Cindy,” the older woman said.
Marsha had dialed the doctor’s office, and he would soon arrive. Cindy’s cries had caught Nicky’s
attention, and he came to see what all the commotion was about.
“Grandma? What’s wrong?”
“Oh, Nicholas! Thank goodness. I need you to do something very important for me. Your mama’s going
to have the baby, and I need you to go to the clearing in the woods and find your Papa and Grandpa, and
tell them. Make as much noise as you can, because I don’t want them to fall a tree on you by accident.”
Nicky’s eyes grew big when he realized the importance of the errand he was going on. “I’ll run as fast as I
can, Grandma,” he promised. He then hurried down the stairs, pausing only long enough to put on his coat
before he ran out the door.
James and Jefferson made it home just in time to see what all the fuss was about. The reason Cindy has
felt that something was different was very clear – she had given birth to twins, a girl and boy. Both children
had their mother’s eyes, and the girl who they named Dorothy, was fairer skinned than her brother, Daniel.
The real surprise was that both children had red hair, courtesy of the their great-grandmother Jan. Time
would only tell who their personalities favored, but everyone was thrilled with the new additions to the
family.
Dotty and Danny, as the two quickly became known as, were adorable but quite a handful. But with
Jefferson, Marsha, and Cindy all home, they managed, and James spent as much time with the babies as
he could. It was easier to forget he worries when he was blowing raspberries on a chubby baby belly.
This time around, Cindy could barely be dragged out of the nursery. There were still some things that she
was uncertain about; after all, she’d pretty much missed Nicky’s babyhood. But this time, she asked for
help, and Marsha, so pleased at Cindy’s willingness to learn, had answered questions kindly, and
encouraged her daughter-in-law. All in all, the nursery was the happiest room in the house.
Marsha had good reason to be happy that winter. In addition to Dotty and Danny, she also had Viola and
Sterling’s new son, Howard, to dote on. Howard had his parents’ brown hair and Marsha’s own green
eyes, and was the center of attention in the Alcott household.
And her youngest son, Cyrus, had become a father as well. He and his wife Georgianna had also
welcomed a son who they named Frederick. He had his father’s brown hair and his mother’s dark brown
eyes and fair skin.
To further add to the excitement, Taddy and Calla welcomed a blond-haired, blue-eyed son they named
Gilbert.
When you added the weddings of Raymond Hutchins and Mildred Langerak and William Eldon Bear and
Octavia Hutchins to the mix, it was easy to forget all the bad things going on in the world.
                                             *****
“Nicky, what are you doing?” Jefferson asked as he walked into the study.
“Well, Grandpa, I’ve read all the books on the shelves I can reach. I need something new to read.”
Jefferson quickly crossed the room, and picked his grandson off the sofa he was balancing on to reach the
upper shelves of the bookcase.
“Aw, Grandpa,” the boy whined. “I just wanted to find a new book.”
“Next time, please ask. Some of those books aren’t suitable for a boy your age, and there are others that
are very old and need to be handled carefully.”
“How old?”
“Over a hundred years. Some of them belonged to John Bradford, the man who built this house when he
came here from Simland.”
“Wow,” Nicky breathed. “Can I see one of them? I promise to be careful.”
“Alright,” Jefferson replied. “But you have to promise me not to touch these books without me or your
father present.”
Nicky’s head bobbed up and down quickly, and Jefferson pulled one of the books off the top shelf. He took
it over to the desk, and Nicky hurried over to the chair.
“Your great-grandfather was a doctor, Nicky, and this was one of his reference books. Now, I’m sure much
of the information in here is outdated, but I imagine John used this quite a bit.”
Nicky’s eyes grew bigger as Jefferson slowly turned the pages to reveal different diagrams and instructions
for dealing with maladies and injuries.
“Grandpa John must have been a very smart man to know all this,” he marveled.
“I suppose so,” Jefferson said. “He certainly was noted for being a hard worker. Back then, they didn’t
have a school for prospective doctors to go to like they do now. He apprenticed with someone in town until
he’d gained enough experience to go out on his own.”
Nicky studied one of the diagrams intently for a moment. “They have a special school for doctors?”
“Yes. In fact, one of them is attached to SimHarvard. It’s rather prestigious.”
“Do you think that maybe I could be a doctor, Grandpa?”
Jefferson looked at Nicky. “I don’t see why not, if you don’t mind studying hard and a few more years of
school after college.”
Nicky’s face grew serious. “But doctors help people, like the doctor helped Mama when the babies came.”
“Yes, they do. But it’s not all happiness, Nicky. Sometimes, even the best doctors can’t help people, and
they don’t make it.”
Nicky nodded. “But they have a better chance if they’ve got a good doctor to help them.”
“I can’t argue with that.”
Nicky’s blue eyes stared into Jefferson’s. “Then I’ve made my mind up. I’m going to be a doctor, just like
Grandpa John. I’m going to help lots and lots of people and make Papa and Mama real proud of me.”
“If that’s what you want, we’ll all help you achieve that goal. But remember that your parents will be proud
of you no matter what you do.”
“I know, Grandpa. But I think they’ll be even prouder of me when I’m Doctor Nicky Bradford.”
“You might want to go by Nick or Nicholas for that – it sounds much more professional.”
Nicky nodded. “Doctor Nicholas Bradford does sound better.”
And Jefferson could not disagree with his grandson.
                                                   *****
Sterling and James stepped out of the front door of the Simmont Hotel. Their lunch meeting had been
Sterling’s idea; he’s stopped by the old speakeasy-turned-gambling hall and pulled James away, claiming
that he needed a break. Bobby, one of the few employees still around after the changeover, had agreed to
keep an eye on things, and James had reluctantly followed his friend to one of the ritzier parts of the city.
Before the market crash, Sterling, Taddy and James had often lunched in the dining room of the upscale
hotel. But lately, James and Taddy hadn’t been able to afford it, and Sterling, like many of those who still
had money, pretended he didn’t. But today, he’d been willing to make an exception in the name of
cheering up his best friend.
As the Depression worsened, a new batch of criminals was gaining notoriety. Things were particularly bad
in the Midwestern portion in the country, and the bank robbers and kidnappers were as famous as the
Simmywood actors and actresses that graced the movie theater screens. Branded as “Public Enemies” by
the newly formed Federal Bureau of Investigation, the general population was intrigued by this new brand
of criminal. John Simlinger, George “Simmyface” Nelson, and Bonnie Simker and Clyde Barsim were all
over the newsreels and papers.
The specifically targeted the people and institutions that most people blamed for the current state of the
economy: the banks, and the wealthy. Consequently, most of those who still had money acted as if they
did not to protect themselves. So far, Portsimouth had avoided much of the violence, but everyone was on
edge, worried that it could start at any time.
“Thanks again for lunch, Sterling,” James said as he buttoned his coat against the cold. “I needed that.”
“I thought you did. That place is no good for you, James. You need to get out of it.”
“I would if I could, Sterling. But you know the situation I’m in.”
Sterling nodded glumly. “I’ll keep my eyes and ears open for you. Hopefully something comes up.”
“I appreciate it.”
As the crossed the plaza in front of the hotel, a somewhat disheveled looking man approached them.
“’Scuse me, misters. Spare some change for a man down on his luck?”
James reached into his pocket, but came out with nothing; he’d taken to not carrying any cash with him
when wandered around the city for just this reason. Sterling handed the man a few coins, but he had no
money with him either, as he’d had the bill for their lunch sent to his law offices as he always did.
“I’m sorry I don’t have more,” Sterling apologized.
The man glared at Sterling, his face twisting into a sneer.
“Sure you don’t,” he spat, throwing the coins back at Sterling. “None of you fat cats do. You spent it all on
your fancy cars and expensive clothes and big houses while the rest of us don’t have enough to feed our
families. Well screw you! I’ma get mine, one way or the other!”
The man reached into his coat, and James saw the flash of sunlight on metal. The fact that the metal was
a gun barely had time to register before he felt Sterling’s body collide into his, and the bang of the gun as it
went off.
The surrounding crowd let out screams and shouts as the two men tumbled to the ground. James slowly
pushed Sterling off of himself, and got up to see a police officer restraining them man with the assistance of
a bystander. A woman, who looked rather grey, was sitting on the edge of one of the fountains attended by
another man.
James rubbed his shoulder; it had been the first thing to connect with the paved stones on the plaza in the
front of the hotel.
“Good reaction time there, Sterling. I’m glad one of us still has our shortstop reaction time.”
Sterling didn’t reply, except to make a noise that could only be described as a groan.
James turned to see his best friend clutching at his chest. His hand was red, and that same red was slowly
spreading its way across Sterling’s jacket.
“Damn it! Help! I need some help here! He’s been shot!”
James leaned over and pressed his hands firmly on the wound, trying to stop the bleeding.
“Someone please help me!”
“James,” Sterling muttered, his voice weak and raspy, “Promise me…”
“Sterling Alcott, you listen to me because I’m only going to say this once. If you die on me here, I’m going
to drag you back from the great beyond and kill you myself. So no deathbed promises, you understand?”
A pair of well-shined shoes came into James’ line of sight. “I’m Officer Brady. Sir, we’ve got a police car
waiting to take your friend to the hospital. It’s not far at all, and we’ll get him there as quick as possible.
Are you okay to help me carry him?”
James nodded. “We should hurry; it looks like he’s losing a lot of blood. You hear that, Sterling? We’re
taking you to the hospital, and we’re going to get you fixed up. You hang in there. You hang in there.”
James sat in the corner of the small waiting area, running the events of the past few hours through his
head. Why hadn’t he seen it coming? He’d always been the one with the keen instincts. Why hadn’t that
man triggered them? If it hadn’t been for Sterling’s razor sharp reflexes, he might have been the one in the
surgical theater with a bullet in his chest. If anything happened to Sterling…well, James didn’t want to think
about that. It was bad enough to think about the possibility of losing his best friend; it was even worse to
think about the fact that his brother-in-law might be dying and his sister on the verge of becoming a widow.
The door opened and James turned his head just enough to see Victor Hutchins walk through it. For a
moment, James wondered what the older man was doing there; even though he was his godfather, first
cousin once removed, and the closest family he had in Portsimouth, there was no real reason for him to be
there. Then James remembered that Victor worked for the police department. He would have heard about
the shooting that way.
“Hey, Uncle Victor,” James said.
“Hello, James. Are you all right?”
James nodded as he gestured for Victor to take the chair next to him. “I thought you had retired,” James
said by way of making conversation.
“Well, that was the plan,” Victor chuckled. “But with the crime increase we’ve seen lately, the department
needed as much experience as they could get. I figure I’ll keep at this for a little while longer at least.
Now, I know you’ve already told one of the officers what happened, but I’d like to hear it from you
firsthand.”
James sighed. The last thing he wanted to do was relive the events of the afternoon. But as Victor was
high up in the department ranks, he really didn’t have a choice.
“We were coming out of the Simmont Hotel after lunch, and this man approached us, asking for money.
I’ve stopped carrying it; it’s easier to ignore the pleas when you know you don’t have anything in your
pocket. Sterling had the bill sent to his office, so he didn’t have money and just gave the fellow a few coins
he had. The guy snapped, yelled at us, and pulled a gun out of his coat. I’m not sure what happened from
there exactly. Sterling shoved me down, the gun went off, and I heard people screaming. When I got up, I
saw that Sterling had been shot. I yelled for help, and did my best to stop the bleeding. Then one of your
officers offered to take Sterling to the hospital, and we came here.”
Victor nodded. “It’s not uncommon for victims to forget details of a crime. Luckily, there were several
witnesses, and we have the man in custody. It looks like you boys were simply in the wrong place at the
wrong time.”
“Tell that to my sister or Sterling’s parents,” James muttered.
“James, this is not your fault. Crime is on the rise everywhere. There’s nothing you could have done.”
“It sure doesn’t feel that way.”
“He’s one of your best friends and your brother-in-law. Of course you feel responsible for him. Is there any
word on how he’s doing?”
James shook his head. “They took him right into the operating theater, and I haven’t heard anything since I
got here.”
“Did someone look at you?”
James nodded. “I’m going to have one hell of a bruise on my shoulder and hip tomorrow, but that’s the
worst of it.”
Victor chuckled. “Now James, don’t be mad at me, but when I heard what happened I ‘phoned your
parents, and asked them to break it to Viola and get her here.”
James let out a sigh of relief. “Thank you. I was dreading that. Vi…well, she’s got a bit of a temper.”
“I remember that,” Victor said. Now, I’ll sit here and wait with you for a while, at least until one of the
doctors comes out.”
“You don’t have to do that, Uncle Victor.”
“I know I don’t have to, James. But I want to.”
At that moment, the door to the hospital ward opened, and the doctor stepped out. “Are you folks waiting
for news on Sterling Alcott?”
James nodded, feeling his muscles tense in anticipation of what the doctor would say.
“He’s resting right now. The bullet went straight through him, and the wound was relatively clean. He’ll
need to stay overnight so we can keep an eye on him, but baring an infection he should be fine.”
“Are you sure? There was so much blood…” James said.
The doctor nodded. “Oh, he’ll need to take it easy for a few weeks until he’s fully healed, but I expect a
complete recovery.”
James and Victor sighed in relief, though James’ was much more audible. “Thank you.”
James had been pacing the small waiting room, waiting for his sister’s arrival. He kept repeating what the
doctor has said in his head: the wound was a clean one, and the doctors believed that barring an infection,
Sterling would be fine.
Viola burst through the door, her hat askew and her gloves missing. “Where is he?”
James took a step forward and rested his hands gently on her shoulders. “He’s resting. The doctors
patched him up, and he’ll be able to go home first thing in the morning.”
“How did it happen?”
“We were on our way out of the Simmont Hotel; we’d gone in for lunch, his treat.”
“Why in God’s name would you go there for lunch? You know that’s where all the people who still have
money go! That’s just asking for trouble.”
“It wasn’t my idea,” he snapped. “It was your husband’s.”
“You didn’t have to go along with it,” she retorted. “What happened from there?”
He raked his hand through his hair. “This guy stopped us, asked if we could spare something so he could
feed his family. I didn’t have any money on me, and Sterling just had a few coins. They guy got upset,
started yelling at us about how we millionaires had fouled up the country for folks like him. Then he
reached into his coat, pulled out a pistol, and said he was going to get his one way or another. I couldn’t
react fast enough. The gun went off, and Sterling fell to the ground. Luckily, there was a cop right around
the corner, and he came running before the gunman could think.”
He paused for breath, and she glared at him. “He could have been killed.”
“Yes, but he wasn’t. You should count your blessings.”
“What would I have done if he had? What would our children have done?”
“The family would have taken care of you, and the children. You know that.”
“Really? Seems to me that all you think about these days is yourself. I know about your job, and I know
how our parents feel about it.”
“I’m doing what I have to do to make sure I can feed my kids. As soon as things turn around, I’ll find honest
work.”
“And in the meantime, you’re exposing all of us to danger.”
“Hey! What happened today has nothing to do with what I do for a living. You know that violence is
increasing all across the country.”
“Violence against those who still have money, which you pretended to be by going to a ritzy hotel to eat.
Why would you do such a stupid thing?”
“I already told you. It was Sterling’s idea.”
“I don’t care! Your lifestyle is too dangerous now. I want you to stay away from my family.”
“But you’re my sister. You are my family! And Sterling’s one of my best friends. You have no right to keep
us apart.”
“I don’t want you anywhere near me, my husband, or my children. Is that clear?”
James’ shoulders dropped. Viola had always been like this when she was mad, and he knew from
experience that she would be more reasonable when she wasn’t in the middle of a fit of temper.
“Fine,” he agreed. “Are you okay to get home?”
She nodded stiffly. “Goodbye.”
He turned with a silent sigh and went through the door she had come through just moments before. He
hoped that he was right, and that once Viola calmed down, things would be right between them again. But
he couldn’t shake the nagging feeling that his sister would never be able to fully forgive him for being there
when Sterling had been shot.
As James crossed into the lobby, he saw his parents standing there, looking anxious.
“Is he…” Jefferson asked.
“He’s fine. I’m fine. You should go in and be with Viola.”
“You come with us, James,” Marsha said. “Viola needs her family.”
James snorted. “She made it very clear that she doesn’t want me near her or her family. I’m going home.
No,” he said, when Marsha made a movement like she was going to protest. “Ask her about it, Mama. I’m
going home.”
James had caught the train back to Simsfield, and walked from the station to his house. It was dark, and
there were few lights on in the house. He felt bad about Cindy being left alone with Nicky and the twins for
so long, and he quickened his step.
Cindy was sitting in the living room in her robe when James opened the door. She flew up from her seat
and threw her arms around James, nearly knocking him over in the process.
“Hey, it’s all right,” he said, as he felt her hot tears seep through the fabric of his shirt to burn his skin.
“I was so worried. I know Victor said that you were okay, but…”
“Shh,” he said, tightening his arms around her and gently rocking her as he did the twins. “Other than a
few bruises, I’m okay.”
They stood in the dark foyer, locked in each other’s arms until Cindy’s silent sobs slowed and ceased.
“I’m sorry,” she said, stepping back and wiping her eyes. “I’m usually not so emotional.”
He smoothed her hair. “It was a tough day all around. How are the kids?”
“They’re okay. Nicky was a huge help today. He kept the twins entertained while I finished supper. I tell
you James, that boy was born a grown up all ready.”
“What did you tell them?”
“That Uncle Sterling got hurt, and Grandma and Grandpa had to take Auntie Vi to see him.”
James sighed. “Vi’s pretty steamed with me.”
Cindy looked at James, puzzled.
“She blames me,” he said simply, answering her unspoken question.
“But that’s…”
“Doesn’t matter if it makes sense or not, doll. She needs someone to blame, and that someone’s me.”
James took Cindy’s hand and gently tugged her up the stairs.
“What does it mean?” she asked.
“Well, she told me to stay away from her family. I just hope that she doesn’t keep Shirley away from Nicky;
she, and the infamous Alice, are the only ones who can drag him away from his books.”
“I’m sure she’ll calm down after a while.”
James chuckled darkly. “See, that’s the big difference between Vi and me. My temper is explosive, but
once I’m done yelling everything’s fine. Hers burns low and slow and for a long time. Once she makes an
enemy…”
“You’re her brother, James; she’ll come around.”
“I hope you’re right, doll. I hope you’re right.”
                                                    *****
Nicky Bradford was puzzled. He’d bounded into school that morning, just barely ahead of the bell, and
hurried to find his seat before the teacher could mark him tardy. He’d waved to Alice, Rosalie and Shirley,
since he wasn’t able to say hi to them before school started as he usually did. Alice had returned the wave
heartily, while Rosalie had nodded with a slightly disapproving look at his overt enthusiasm. Shirley, on the
other hand, hadn’t acknowledged his greeting, which was very unusual for her. Of his cousins, Nicky spent
the most time with Shirley, because Rosalie loathed anything she deemed improper. Shirley, on the other
hand, was game for most things, and frequently her ideas were crazier than Nicky’s.
When school broke for morning recess, Nicky scooted over to Shirley’s desk.
“What’s wrong? Why didn’t you wave back this morning?”
Shirley tried to make herself as small in her chair as she possibly could. “Mama says I’m not supposed to
talk to you anymore, Nicky. I’m sorry.”
“Oh,” he said, not sure of what to say beyond that. “I’ll leave you alone, I guess. I don’t want you to get
into trouble.”
Nicky walked back to his desk, ignoring the sympathetic looks he was getting from Alice and Rose. He sat
quietly for the rest of the day, and didn’t even volunteer to answer questions as he usually did. At the end
of the day, he gathered up his things and headed straight home, instead of hanging around reading a book
with Alice as was the norm.
Cindy was the first to notice that Nicky was home earlier than usual. He plopped down on the floor in the
living room in front of the fire as he usually did and began working on his homework. Cindy found excuses
to wander in and out of the room at intervals, hoping that Nicky would say something to her.
When she went in on the pretense of winding the grandfather clock, Nicky glanced up.
“Mama, was I bad?”
“Not that I know of, Nicky. Why do you ask?”
He put his homework down and sighed. “Shirley said that her mama said that she’s not allowed to talk to
me anymore. I didn’t want to ask her why and get her in trouble for talking to me.”
Cindy suppressed the urge to sigh. “Nicky, trust me when I tell you that it has nothing to do with you.
Auntie Vi’s a little mad at your father right now, and I guess you and Shirley are getting caught in the middle
of it. I’m sorry about that.”
“Did Papa do something wrong?”
“Not really, but your Auntie Vi thinks he did.”
Nicky nodded. “So maybe Shirley will be able to talk to me again?”
“I hope so. Now, go upstairs and get washed up. Dinner will be ready soon.”
Nicky scurried away to do as he was told, and Cindy gently shook her head as she watched him do so.
She’d have to talk to James, and see if there was something he could do. Nicky had so few friends as it
was; she hated the thought of being kept away from one of them.
Later that night, James volunteered to take the blanket that Marsha had knitted for Frederick over to Cyrus
and Georgianna’s. He’d really done it because he wanted the chance to speak with his brother about the
situation with Viola.
Cyrus invited him inside, but didn’t offer to take his coat. Sensing that his window of opportunity was short,
James got right to the point.
“Cyrus, will you talk to Viola for me? I don’t mind if she’s mad at me, but when she tells Shirley to stay
away from Nicky I have to intervene somehow. They’re good friends, and it’s not fair to him.”
Cyrus rubbed the back of his neck. “James, it’s not my place to tell Viola how to raise her kids. She has
the right to say who they can and can’t take spend time with.”
“So you’re taking her side?”
“There’s not really sides, James. Whether or not they’re valid, Viola’s entitled to her opinions. Yes, I’m
sorry that Nicky’s getting caught in the middle of it, but it’s not my place.”
“So you agree with her that I’m too dangerous?”
“I didn’t say that. But you are involved with some dangerous people. I know what happened to Sterling
had nothing to do with what you do, but it feels like it was a warning of some sort. By doing what you do,
you’re inviting trouble.”
“It’s not really like I have a choice, Cyrus. I’m doing my job and making sure my family’s taken care of.”
Cyrus glared at James. “That’s hitting below the belt, brother.”
“Sorry. I forget sometimes...”
“Must be nice. Look, James. Let’s call this a draw for tonight, before we both say things we’ll regret.”
James sighed. “Fine. Just…if she starts to come around, keep her going, okay?”
Cyrus nodded. “Goodnight, James.”
“Night, Cyrus.”
Whether or not Cyrus did talk to Viola, her resolve that her family stay away from James’ did not waiver.
Shirley passed her days playing with Walter Gavigan, as she was too rambunctious for the likes of her
cousin Rosalie and the other girls. Nicky gravitated towards Alice, though he often looked at Shirley
wistfully.
“You miss playing with your cousin, don’t you?” Alice asked one afternoon when they were enjoying the
warm sunshine at recess.
“I like playing with you, Alice,” he replied.
“Just because you like playing with me doesn’t mean that you can’t miss playing with Shirley.”
Nicky nodded. “We were supposed to build a fort this spring. It just doesn’t seem fair that her mama’s
punishing me because she’s made at my papa. I didn’t do anything wrong.”
Nicky jumped off of the swing and began walking away, and Alice followed him.
“Nicky wait,” Alice called.
The boy paused so Alice could catch up with him.
“I know it’s not the same, but I’ll help you build your fort this spring. And we can play catch and stuff too,
‘cause I know you like it. I can’t take Shirley’s place, but we can do some of the stuff you guys used to do
together.”
“But you don’t really like a lot of that stuff,” he protested.
“But I like you. So as long as we still play quiet games and read books, we can do some more boyish
things too.”
Nicky’s face lit up. “Can we play catch now? I have a ball in my desk.”
Alice wasn’t very good at catch, but Nicky appreciated her willingness to fill the hole left when Shirley’s
friendship was taken away from him. Still, he hoped that Papa and Auntie Vi could make nice so that he
and Shirley could be playmates again.
                                                   *****
Things hadn’t changed by the time the twins were due to celebrate their toddler birthdays. Instead of a
large family affair, it was just the household that gathered. Cyrus and Georgianna had sent their regrets,
claiming that they couldn’t find anyone to watch Frederick, and Viola had sent the invitation back
unopened. Still, they tried to make the day as festive as possible, and Marsha had even splurged and
baked a cake for each of the babies, despite the extravagance.
James took charge of Danny, and Cindy held Dotty as they helped the twins blow out their candles.
Dotty turned out to have a personality exactly like her father’s: neat, active, and playful but with a temper
that resulted in epic tantrums. Danny was very similar, but he was not nearly as active and preferred sitting
in front of one of his toys to exploring the upstairs of the house with his sister.
Howard Alcott, Sterling and Viola’s son, celebrated his birthday too. Viola was still sticking to her resolve
that James and his family needed to stay away from hers, so she didn’t invite them, or even her parents.
Sterling had tried to sway her to at least invite Howard’s grandparents, but she remained firm. So the party
went on without them, though it certainly didn’t feel like a party.
Howard turned out to have his father’s nose and mouth. Personality wise, he was almost the exact
opposite of his sister, being messy, lazy, playful, and nice.
Gilbert Seiff celebrated his birthday as well, and he had a party that was attended by all of his extended
family.
Little Gilbert favored his father in features, with his nose and mouth. He was exactly like his sister: messy,
shy, active, and playful but with a mean streak.
And Frederick Bradford celebrated his birthday as well.
He grew up into a sturdy tot who favored his father in features. Personality wise, he was a mixed bag but
the most shocking aspects were how shy and temperamental he was. He was neat and playful like his
father, and active like his mother.
                                                  *****
The rather cryptic note had piqued James’ interest. It had arrived in the mail, addressed to him in block
letters, and asked him to go to the general store on Tuesday night at about 8 o’clock. James had no idea
who had written or sent it, but for some unknown reason, he decided to go.
He’d told the family that he was meeting Taddy for a drink at the tavern, not wanting to hear protests about
the potential stupidity of his true errand. It was a warm night for winter, but he still hurried his step.
Whatever he was walking into, he wanted to get it over with.
The store was dark, except for a faint glow from one of the upstairs windows. James knocked on the door,
waiting to see who would answer it.
A moment later, James smiled when the door opened.
“Sterling!”
“It’s good to see you too, James,” Sterling replied as James hugged him and repeatedly pounded on his
back. “Why don’t you come inside and we can talk.”
The two men went into the store and up the stairs to the space that served as storage and office. Sterling
sat down at the old fashioned desk, and James took the only other chair in the room. At first, they just
stared at each other, with stupid grins on their faces. James was the one to break the silence.
“Why meet here? I mean, your house is right over there. Aren’t you worried that Vi will see, or has she
relented yet?”
“This is my family’s store, James. It was given to my grandfather by his stepfather. And I’m not really
worried about what Viola says. She hasn’t changed her mind yet, but this has gone on long enough.”
“I forgot that. But you and your father are lawyers…”
“Yes. Papa couldn’t bear to sell the store, so since Grandpa passed we’ve hired someone to manage the
store. Unfortunately, I just had to fire the last man we employed. When I was reviewing the books, I
discovered that he was stealing from the store. Poor guy was just trying to support his family, and if he’d
asked I would have helped him. But I can’t tolerate thievery, so I had to fire him and turn him over to the
police. I’ve been helping out her for the past few weeks while I’ve been recovering, as it’s close to home.”
James nodded. “So, you’re okay?”
Sterling laughed. “Yes, I’m fine. I’ve got a pretty nifty looking scar on my shoulder, though. Viola was
pretty overbearing at first, insisting I stay in the hospital for a few extra days to make sure things were fine.
Then she had me on bed rest for what felt like a year.”
“I’m glad. I was really worried about you. I felt like it was all my fault.”
“It wasn’t. Blame the crazy guy who thought brandishing a gun would solve all his problems. I don’t blame
you.”
“Viola does.”
“Ah, Viola,” Sterling said. “That’s part of the reason I wanted to talk with you. I know she’s just worried
about her family, but she’s acting irrationally. No one can talk any sense into her about this.”
“I don’t mind so much that she’s steamed at me, but when she keeps Nicky and Shirley apart…”
“Yeah. Shirley’s feeling it too, though she’s too smart to complain. She’s been off the wall at home,
without Nicky to burn the excess energy off with. So I decided it’s time to do something about it.”
“And that is?”
“Simple. Viola’s main objection is that your work puts you in contact with dangerous people. You just need
a new job, and she loses all the footing for her argument.”
“Do you really think it’s that simple, Sterling? Do you realize that it’s nearly impossible to find work?
Something like a quarter of the country’s unemployed right now.”
Sterling had a grin on his face that boarderlined on a smirk. “Well, James, it just so happens that I’m in
need of a clerk for the store.”
James mouth gapped. “You want to hire me? Won’t that just set Vi off?”
“Probably. I’m sure I’ll be making good friends with the sofa in the study soon. But it all makes sense.
You need a safer job, and I need someone reliable to run the store. I know I can trust you to run things. I
don’t know if I can match what you’re making right now…”
James put up his hand. “Honestly, Sterling, I’d happily take a pay cut if it meant getting out of that
hellhole.”
Sterling nodded. “I figured as much. I saw how much that place was wearing on you.”
“So, when do you need me to start?”
“As soon as possible. Do you think you’ll have trouble leaving the old place?”
James shook his head. “Russ’ll just turn it over to someone else; people are interchangeable to him. I’ll let
him know I want to speak with him, and let him know Friday will be my last day.”
“Excellent. Provided things go as planned, you can start Monday. And James, thanks. This is a big
weight off my mind.”
“I’m the one who should be thanking you. I owe you one, Sterling.”
“Keep a bed in your house turned down for me, just in case Viola ends up being madder about this than I’m
anticipating.”
“You know our door’s always open for you.”
*************************************************************************************************************************
That brings us to the conclusion of Chapter 24. Goodbye, Phily. You’ll be greatly missed.
Next time, we have teenagers to look forward to, seeing Viola’s reaction to Sterling’s plan, and whether or
not Viola will ever stop being angry at her brother.
The Depression Era restrictions have certainly made things interesting, but not too hard. I’m looking
forward to seeing how they continue to play out over the next rotation and a half.
You can leave comments on the Bradford Legacy thread at Boolprop, on my Live Journal, or on my
Dreamwidth, whichever you prefer. Until next time!

The Bradford Legacy - Chapter 24

  • 1.
    Don’t adjust yourTV – it really is a new chapter. Last time, the Bradfords jumped on the stock market bandwagon; Cindy gave birth to Nicholas, the generation 7 heir but struggled in her new role as mother, much to Marsha’s chagrin; the last of generation 6 headed off to college; Phily became the last woman standing of generation 4 with the passing of Katie; Cindy gave up her singing career to be a mom after little Nicky stole her heart; the reality of Prohibition coming to an end caused James to think about his future; generation 6 spare Cyrus got married after confiding his fears in a sympathetic Cindy; Marsha found out the truth of what James did for a living; Taddy and Calla and Sterling and Viola had daughters; and the bottom dropped out of the stock market, leaving everyone to wonder what was next; and Cindy rallied her family with the knowledge that she was expecting again. Blanket warning about language, topics, adult situations, etc. James has only 1 nice point, and he likes to swear like a sailor, and Cindy’s a Romance Sim, with some type of purple-hearted want in her panel at all times. Here you go: Chapter 24 of The Bradford Legacy.
  • 2.
    The crash ofthe Simerican stock market hit the entire country hard. Simsfield and Portsimouth Massimchusetts were no exception. As fall turned to winter that year, the repercussions from the economic downturn became clearer.
  • 3.
    One of thefirst victims was Pierce Phoenix, who had been the editor of a weekly magazine. As the general public had less disposable income at their disposal, magazines were one of the first things that were cut out of the family budgets. Pierce’s magazine went out of business, and he was unable to find a new position. Add that to the losses that the family took from their investments, and the losses of their savings when the Portsimouth Bank failed, and they found themselves to be in rough shape. If it hadn’t been for the meager pension that the family patriarch Alonzo still received, they would not have been able to survive.
  • 4.
    The Pasangs, descendantsof Jefferson’s Aunt Diana, had mortgaged their house to pay for their son’s schooling. When Amos lost his job, they couldn’t keep up with the payments and lost it. Fortunately, Orson offered them a place in his new home with his wife and daughter, but Kea was heartbroken to leave the home she’d entered as a bride.
  • 5.
    The Menons, parentsof Taddy’s wife Calla, were in a similar fix. Jason had had the brilliant idea to mortgage the house to invest in the market, and they lost their home to the bank when they couldn’t repay it. The shock of the crash was too much for Jason to bear, and he succumbed to a heart attack not long after he heard the news.
  • 6.
    Esther had noother choice but to move in with her daughter Calla. She did her best to be helpful around the house and teach little Rosalie, but her heart just wasn’t in it. She moved around the house as if a shadow, and nothing her family did could draw her out of her misery.
  • 7.
    Jason Seiff, Lizzie’shusband, lost his bid for reelection to the town council. He’d advocated for continuing services in order to keep people employed, but with so many people out of work no one wanted the tax increase that would accompany Jason’s plan. At his age, he had a hard time finding a new job, so he decided the best thing to do would be to help Lizzie in her new endeavor to sell her excess produce to the townspeople.
  • 8.
    Viola too wasfeeling the effects of the market crash. Many of her patrons has lost their entire fortunes, and could no longer purchase her paintings. It was a blow to her ego more than anything else, as Sterling and George were busier than ever with their law practice and the family income had hardly been diminished. Still, Viola worked at her easel every day, putting her paintings away in storage in the attic. She knew that one day things would turn around, and her artwork would sell once again.
  • 9.
    Cyrus, who hadgrand plans to build Portsimouth’s version of the Simpire State Building, was let go from his architecture firm without warning. Though he tried, he was unable to secure another form of employment. Instead, he worked on repairing the few cars in town for the lucky citizens who did have to worry about getting to work. His mechanic work brought in little money, but Cyrus couldn’t bear the thought of being supported by his wife and her inheritance, though he would never admit it to Georgianna.
  • 10.
    And then therewere the Bradfords themselves. Though the family’s loss in the market was not as severe as some of their friends and neighbors, it was still significant. Added to the loss they took when the Simsfield Bank failed, and things were tight. Marsha did her part by making sure the fall harvest was canned, pickled, or otherwise preserved to get them through the winter. Cindy would have helped, but the smells from the kitchen made her morning sickness worse. Instead, she used a portion of the money she’d put aside from her singing to purchase a some chickens, so the family would have fresh eggs.
  • 11.
    Jefferson and Jameswere both putting in extra hours, for the increased income and to show their respective bosses that they were willing to do whatever was necessary. When not at their offices, the men spent their time in the forest cutting wood to burn in the fireplaces, so they wouldn’t have to purchase as much coal to keep the house warm in the winter. They also spent a number of early morning fishing in the small pond by the house. What they didn’t eat on the day caught Marsha salted and put away for the months when the ice was too thick for the men to break.
  • 12.
    There was anothernoticeable change at the Bradford farm. The billiards table, purchased all those years ago for Elias, collapsed one day while James was playing to take his mind off of things. It was determined that the table was too far gone to be worthy of a repair job. Sadly, the men salvaged what they could, and the billiard room, as it had come to be known, stood empty and without purpose.
  • 13.
    One day, afterrooting around in the attic, Jefferson found something to put in the empty room. “What is it?” Nicky asked, as he watched Cindy and Marsha wipe the large object down with damp cloths. “It’s a sewing machine,” Jefferson said. “I don’t remember seeing it, so I’m guessing that it was my grandmother’s. Mother must have had it put away.” James nodded. “Yeah, I can’t see her sewing.” “My mother always wanted one, but we never could afford it,” Cindy said. “It will come in handy, making things for this little one.” She rested her hands on her expanding stomach with a small smile.
  • 14.
    “I thought youhated sewing,” James commented. “You always sent your dresses out for alterations when you sang at the club.” “I do hate sewing,” Cindy said. “But I never had something like this to help me before. Maybe sewing with a machine will be better than doing it by hand.” Marsha smiled. “I hope it is for your sake, dear. And if Nicholas keeps shooting up the way he has, he’ll be needing new pants every other week.”
  • 15.
    Nicky’s face fell.“I’m sorry. I don’t mean to grow so fast.” “Hey now,” James said. “You just take after your old man. Nothing wrong with that. We Bradford men are all tall. Now, why don’t you go find something to amuse yourself with?” Nicky turned to Jefferson. “You promised to show me how to play chess, Grandpa.” “I did. Come on, then.”
  • 16.
    Cindy followed Nickyout of the room with her eyes. She sighed softly. “He’s such a serious little boy. I don’t know where he gets it from.” James shrugged. “He may yet grow out of it. It’s too bad there aren’t more boys his age around for him to play with.” “I keep forgetting that he takes everything I say so literally. I can’t tease him as I used to do with you,” Marsha said with a smile for James.
  • 17.
    “Well, that’s aworry for another day. In the meantime, with the winter weather upon us, Nicky really needs a good, warm coat. I don’t want him catching cold while he’s walking to or from school,” Cindy worried. “Most of the affordable ones are gone from the stores,” James sighed. “I don’t really feel like spending a lot of money on something he’s going to outgrow in a year, and probably mess up playing.” Marsha leaned over and opened the chest of old clothes that Jefferson had brought down from the attic along with the sewing machine. “I don’t see why we can’t use your grandfather’s old overcoat for material for a new coat for Nicholas,” she said. “The wool’s hardly worn, and it will keep the worst of the weather out.” James smirked. “Grandfather would roll over in his grave at the idea of his fine clothes being cut up. Let’s do it.” “James,” Marsha chided.
  • 18.
    The winter coatthat Cindy made for Nicky wasn’t the fanciest, but it was warm. Nicky was grateful for it on the walks to and from the schoolhouse that winter.
  • 19.
    Not all ofthe children in town were so lucky, as Nicky soon found out. One day he was kept inside during recess because of a slight case of the sniffles. He didn’t mind so much; he would much rather read a book than pretend to enjoy playing with the other children. He was so engrossed in his book that he didn’t notice that he wasn’t the only one in the classroom.
  • 20.
    “Do you mindif I sit here?” a girl’s voice asked. Nicky looked up to see a redheaded girl he didn’t recognize staring at him. “I guess not,” he said, his eyes returning to the book in his hands. “Thank you,” she said. “It’s so much warmer over here by the stove.” “Uh huh,” Nicky said, not looking up from his reading.
  • 21.
    “Why are youstaying inside today?” she asked. “I’ve got a stuffy nose,” he said, looking up from his book. “My mama didn’t want it to turn into anything worse.” She didn’t reply, and Nicky nearly turned back to his book. But then it occurred to him that it would be rather rude not to talk to the girl, when she was clearly making an effort to talk to him. “Why did you stay inside?” “I don’t have a winter coat,” she said. “I just have a sweater that I wear on the walk to and from school. So Teacher wouldn’t let me out.”
  • 22.
    Nicky nodded. Hisparents had already explained that there were a lot of families who didn’t have the money to buy things, because something big had crashed. “But I don’t mind. It’s nice and warm in here. It’s one of the reasons I like coming to school.” “I like staying inside, ‘cause then I can read my books,” Nicky replied. “I like reading. I learn about all kinds of stuff that way.” “That’s nice,” she said. “I’d like to read more, but I don’t have a lot of books at home. Just a few cookbooks, and you can’t really read them.” “Would you like to borrow one of my books?” he asked. “I have to ask my Papa if that’s okay first, but he should say yes.”
  • 23.
    “I’d like thata lot. Thank you…” she hesitated. “I’m sorry, I don’t know your name.” Nicky smiled at her. I’m Nicholas Bradford, but everyone except my Grandma calls me Nicky.” “I’m Alice Kalson,” she said, returning his smile. “It’s nice to meet you, Alice.” *****
  • 24.
    The family wasin the parlor when Jefferson arrived home. He did not call out a greeting to them as he usually did; instead he hung his coat and hat on their hooks silently. “Jefferson?” Marsha called. “Is everything all right?” He drew in a bracing breath and joined them in the parlor.
  • 25.
    “Not really. Thecompany went bankrupt, and they let everyone go.” There was a collective gasp from around the room. “But why?” Marsha asked. “With things being the way they are, people don’t have extra money for frivolities like games,” Jefferson said with a shrug as he sat down. “I suppose I should have seen it coming, but I was too short-sighted, I guess.”
  • 26.
    Nicky looked upfrom the floor where he was working on his homework. “Is that bad, Grandpa?” Jefferson chuckled a little. “Well, it’s not good, Nicky. We were counting on me working for a little longer to make up for the losses we took in the stock market. But now, I’m not sure what this means.” “No pension, Pops?” James asked. Jefferson shook his head. “I’m lucky I was able to get the few things out of my desk that were mine. They hurried us out of the building pretty quickly after the announcement.”
  • 27.
    The room fellquiet, the only sound the occasional squeak of Nicky’s pencil against his schoolwork. Everyone was thinking about what Jefferson’s suddenly unemployed state meant for the family. They had been counting on his extra income recoup some of the funds lost in the crash and the subsequent bank failure. James knew that the rumblings of Prohibition ending were getting stronger, and he worried that the family might lose their only source of income. He and Cindy had a silent conversation as she rubbed her large belly. In her current condition, there was no way she could go anywhere and sing to supplement their income. “What are you going to do now, Grandpa?” “I don’t know, Nicky. I really don’t know.”
  • 28.
    “Nicky, why don’tyou go finish your homework upstairs at your desk?” Cindy said. “But it’s warmer down here,” he protested. “Your mother told you to do something,” James said, a warning clearly in his voice. “Upstairs.” “Yes, Papa,” he said. He got up from his spot in front of the fire, and looked at all of them. “You could have just said you want to talk about grown-up stuff. I would have understood.”
  • 29.
    They waited untilthey heard the click of Nicky’s door shutting. “Was I that bad when I was his age?” James asked his parents. Marsha smiled. “You mostly had the good sense not to sass because you knew it meant a tongue lashing from your grandmother. But yes, you were.” “Now what?” James asked, returning the discussion to the issue at hand. “I know we can live off of what I’m earning – don’t make a face, Mama. I know you don’t like what I do, but it’s the only income we’ve got now.”
  • 30.
    “You’re right, James.I don’t like it, but I’m willing to accept the reality of the situation. We do need some money coming in to pay the bills and the taxes. But what if Prohibition does get repealed? Where will we be then?” “There’s a ways to go before that happens, Mama,” James said. “Things will probably turn around before then, and I’ll find something else to do.” Jefferson nodded. “I’ll see if I can find something else as well, but I’m not getting my hopes up. I’m not exactly at an age where people are rushing to hire me, even in the best of economic situations.”
  • 31.
    “Are you justgoing to sit around all day?” Cindy asked. “Well, if I still don’t have something come spring, I’ll help with the gardening and fishing and such. In the mean time, I was thinking about trying my hand at making a few things so the children can have something to open on Christmas morning.” “I don’t know if the baby will be born by then, Jefferson,” Cindy interjected. “Oh, I’m not just talking about your and James’ children. I’d like to make something for Viola’s daughter, and Taddy’s as well. Poor little tykes deserve to believe in Santa Claus for a little longer.”
  • 32.
    “What are youthinking about making?” Marsha asked. “And where will you do it?” “I’m not sure what I want to make. Toys or games of some sort. And I was planning on setting up in the old billiards room. I can keep you and Cindy company with your sewing. If things go well, I can even try selling a few things.” “I suppose that’s the only thing to do,” Marsha said. “But we shouldn’t plan on too much extra money from your endeavors.” “I wasn’t planning on that,” Jefferson replied. “Maybe a few dollars here and there for an unexpected expense.”
  • 33.
    Everyone fell silentagain, until Cindy rose. “My back is aching really bad. I’m going to go soak in the tub before supper. James, will you help me up the stairs? I’m so worried I’m going to lose my balance and fall down them.” “Of course,” he said, jumping up. “I’ll make sure that Nicky’s finished his homework while I’m up there.”
  • 34.
    James followed Cindyinto their bedroom, intending on helping her ready for her bath by removing her shoes. But when they were in the room with the door closed firmly behind them, she rounded on him. “You lied to your parents, you know. The repeal of Prohibition’s not that far off, and then where will we be?” “Hey!” he exclaimed, provoked by the unexpected attack. “You’re the one who said you’re not afraid to be poor again. You just might get your wish.” Cindy’s face fell. “James, I didn’t mean….” “No, I’m the ass here,” he sighed. “I really need to learn to control my temper better.”
  • 35.
    “And I shouldthink before I open my mouth,” she said. “But I can’t help but worry. If I hadn’t decided I wanted another baby…” “Stop. This is not your fault. If I hadn’t encouraged my father to invest our money in the stock market…” “We would have still lost it when the bank failed. James, face it. We’re stuck in a no-win situation. We just have to do the best with what we have.” He nodded. “And you need to stop worrying so much. It can’t be good for the little one.”
  • 36.
    “It’s hard notto,” she admitted. “At least Nicky seems to be doing fine. All he talks about is his new friend Alice and how much fun they have reading books together at recess. She’s all he talks about. If I were a betting woman, I’d put money on the two of them making a match of it someday.” James smirked. “He’s just a kid, Cindy. He’s going to meet lots of girls before he’s old enough to think about getting married.” “I know my son, James. He’s sweet on her, even if he doesn’t know it yet.”
  • 37.
    “Tell you what.If you’re right and they do end up getting married, I’ll buy you a fancy new coat. Your choice.” “I’ll take you up on that wager, James. And if you’re right?” “You, me, no kids, my parents cabin in the mountains for two weeks.” “We’ll be too old for such things by then, James.” “Doll, I’ll never be too old for that.”
  • 38.
    When he wasunable to find any work, Jefferson built himself a workbench which he placed in the old billiards room. There, he taught himself how to make simpler versions of the fancy toys and games his company had produced for years. Though it often took him several tries to produce something that was worthy of putting in front of one of his grandchildren, he focused on the fact that he was making sure that they had something to make their childhood as normal as possible, despite the grim circumstances in which they were growing up.
  • 39.
    Nicky had askedhis father if he could loan Alice some of his books, but James was reluctant to do so, as he didn’t know much about Alice or her family. Instead, he told Nicky that he could invite Alice over as often as he wanted so she could read the books there. Alice had readily agreed, though she tended to do so only on the warmer days, as she had a long walk home that felt longer in the thin garment that was all she had to protect her from the winter weather. Nicky taught her to play chess, and even though Alice didn’t really care for the game she was to nice to say so.
  • 40.
    During those gamesof chess, Nicky learned more about Alice and where she came from. Her parents had a wheat farm in Simsas, and they’d sent her East to live with relatives because of the crop failure and drought that their farm was facing. Alice, unlike her older siblings, wasn’t much help on the farm, and her parents worried about the effects of the dust in the air on her health. Alice found herself liking the East, especially the ocean, and she hoped that she’d be able to stay there even after the drought was over. In return, Nicky told Alice all about the woods around the house, and promised to show them to her once winter and its chill had passed. Alice had never climbed a tree before, and Nicky promised to teach her.
  • 41.
    The family approvedof Nicky’s friendship with Alice, mostly because she taught him games that took him away from his constant obsession with books.
  • 42.
    Marsha approved ofher especially because she always acted like a little lady.
  • 43.
    Marsha so approvedof Alice that decided to do something to make it possible for the young girl to visit with her grandson more often. She found an old child’s cloak in the chest of clothing Jefferson brought down from the attic, and went to work.
  • 44.
    One afternoon whenAlice came over, there was something waiting for her on the sofa in the living room. “Nicky, what’s this?” “My Grandma made it for you. She took an old coat she found in the attic and reworked it. It’s not fancy or anything, but it’s made of wool so it will be warm. And then you’ll have a warm coat so we can play outside at recess, and you can come visit no matter what it’s like outside.” “She didn’t have to do that.” “No, but she wanted to. Grandma likes doing nice things for nice people.” “I should thank her for such a nice present. Is she here?” “No, she’s at my Aunt Vi’s visiting her and Shirley.”
  • 45.
    Alice threw herarms around Nicky. “Well, since she’s not here, I’ll give you a hug instead. You have to promise me that you’ll pass it on to her when she comes home.” Nicky, rather shocked by Alice’s sudden display of affection, could only reply “Okay,” as he returned the hug. “You’re family’s so nice, Nicky. I’m glad we’re friends.” “Me too.”
  • 46.
    After Alice hadgone home to show off her new coat, James found his way into the living room. “Well, did Alice like the coat?” Nicky nodded. “She gave me a hug to pass on to Grandma, since she wasn’t here.” James made a noise somewhere between a sigh and a groan. “Kid, you’re going to cost me a lot of money if you keep that up.” “Keep what up?” “Being too damned cute for your own good.” “I don’t know what you mean, Papa.” “Nicky,” James said, realizing that he’d probably said too much, “I promised your Mama something, and I’m starting to understand that I got suckered into a bet that I can’t win. You really are good friends with Alice.”
  • 47.
    Nicky’s face litup. “She’s one of my best friends, Papa. I think I might like her better even than Rosalie and Shirley, but they’re family so I have to like them better.” All James could do was smile at his son’s innocence. “It’s a good thing I like Alice.” “How could you not like her, Papa? She’s so nice and she’s pretty smart and…” James stopped Nicky’s singing of Alice’s praises by ruffling his hair. “I get it, kid. She’s your perfect woman. Now, you’ve got spelling to learn before school tomorrow. Hop to it.” *****
  • 48.
    Over in Portsimouth,Phily Bradford Thayer, as she called herself, was resting before the big event of the day. Her grandson, Asher, was getting married to Vivian McClellan, and she wanted to be able to thoroughly enjoy the festivities. The winter’s day was warm as spring, and they’d elected to have the ceremony in the rose garden as Victor and Jane had so many years ago. I can’t believe I lived long enough to see one of my grandchildren get married, she marveled. Imagine how happy Meadow would be if she were here today.
  • 49.
    Meadow would havebeen happy, had she been there to watch Asher and Vivian exchange vows and rings. The family who was there certainly was.
  • 50.
    After the ceremony,Jane took to the piano so that the guests could enjoy a dance or two. After Asher had dance with his bride, he gave her hand to his father so that Victor could have a turn around the dance floor with the new Mrs. Hutchins. Asher then turned to Phily, and made a dashing bow as he extending his hand in an invitation. “Oh, Asher, I haven’t danced in ages,” she said. It was true. Phily, until her age had prevented it, had always been the musician for parties. “I’m sure you remember how to waltz,” the young man said. “You were the one who taught Mama how.” “Oh, all right,” Phily said as she slowly rose from her comfortable seat with the assistance of Asher.
  • 51.
    “I’m glad youwere able to see this day, Grandma Phily,” Asher said as they waltzed at a pace slightly slower than the music. “So am I, Asher. I wish Meadow could have been here too.” “Oh, I’m sure she’s watching us from wherever she is, and I’m sure she’s thrilled for us.” Phily smiled at that thought, and how comforting it was. “You’re right, Asher. Those we love must still know of our happiness, even when they’re not longer with us.”
  • 52.
    It was thatthought that stuck with Phily into the next day. Somehow, she realized that her time was up, and that soon she would pass into the Great Beyond and be reunited with those she loved once more. Jane had clung to her mother when Phily confided the news to her. “It’s all right, Jane. You’ll see us again, and in the meantime you have your children and grandchildren to look out for. Oh, I know there aren’t grandchildren yet, but there will be.”
  • 53.
    Victor, never aman to show much emotion, simply asked Phily to tell his mother that he still missed her. “I’m certain Henri knows that, Victor, but I’ll tell her anyway.” It was at that moment that Asher came into the room, and his face fell when he realized what was going on.
  • 54.
    “Are you certain,Grandma Phily?” “Asher, I never understood until today how Henri knew that her time was up. When it comes for you, you just know.” “But…” he stuttered, “I had hoped that you’d get to meet your great-grandchild.” “I would have liked that too. But it’s just not meant to be.”
  • 55.
    And then, itwas time.
  • 56.
    Phily found herselfoddly at peace as she slipped into the next world. Her family was not nearly as tranquil, but did their best to remember that Phily was not really gone to them, and that they would see her again when it was their time to pass into the Great Beyond.
  • 57.
    Phily was laidto rest in the Portsimouth Cemetery next to her beloved Meadow, and near her brother Alex, her dear friend Katie, and her sister Henri. Her passing marked the end of an era: the last of the fourth generation of Bradfords in Simerica was gone. *****
  • 58.
    But where thereare deaths and sadness, there are also happier events like birthdays. Rosalie Seiff celebrated her transition into childhood.
  • 59.
    Unlike her parents,Rosalie had an innate sense of propriety, and was a stickler for etiquette. She often found it hard to make friends because there were so few children she felt she could associate with, and she spent far too much time criticizing those she did chose to pass time with.
  • 60.
    And little ShirleyAlcott, Sterling and Viola’s daughter, celebrated her birthday as well.
  • 61.
    Shirley was almostthe complete opposite of her cousin, and she was a complete tomboy. She would much rather spend her time playing ball with the boys or climbing trees, much to the distain of her cousin Rosalie and the delight of Nicky, who relished his new playmate. *****
  • 62.
    James sat inthe office that had once been Russ’ until he’d turned the management of the speakeasy over to James. James had run it well, in his opinion. They’d always turned a good profit, and the police never had reason to suspect the old block of stores was anything more than that. All that would come to an end soon. Prohibition would soon be coming to an end. The 21st amendment had been passed by Congress, and it was only a matter of time until the proper number of states ratified it. When the proper number of states had ratified it, it would be law, though people would stop enforcing Prohibition long before ratification. And that would be the end of his job.
  • 63.
    There was aknock on the door, and it opened before James had the chance to invite the knocker in. It was Russ. James hadn’t seen him recently, and he was shocked to see how much the man had aged. “James, my boy. How are you?” “Pretty good, sir,” James replied, rising from his seat. “Can I offer you something?” “Still respectful. A glass of your finest whisky, if you don’t mind.” James poured two glasses, and gestured for Russ to take a seat in the comfortable chairs in a corner of the room.
  • 64.
    The men eachtook a seat and a sip of their drinks. Russ set his down, and James followed suit. “James, I’m sure you’ve been watching the news. The cushy little nest we’ve got here is about to be obsolete.” “I was just thinking that before you came in.” “Pity the government figured out they could makes some money by taxing booze once they made it legal again. But we’ve had a good run here, haven’t we?” “I certainly can’t complain,” James admitted. “But it does make me worry about what comes next. I’ve been the only breadwinner for my family for a while now, and I don’t relish the idea of the government putting me out of a job.”
  • 65.
    “Very true,” Russsaid. “Which is why I’m here today. Now, I know you’ve made your position on my business empire pretty clear in the past, but I’m wondering if your opinion has changed at all in light recent developments. James bought himself some time by taking another sip of his drink. He still didn’t believe in some of Russ’ business models, but with his father out of work, he needed to keep a paycheck coming into the family. “To be honest, Russ, I still don’t agree with some of the ways you make money. However, you’re correct in assuming that things have changed to a degree.” “Meaning you’d agree to continue in my employ, but only if I give you something that you don’t object to morally.”
  • 66.
    “Correct,” James said.“I suppose I’m willing to venture into your gambling business, if that’s what it takes to make sure my family has what it needs.” Russ smiled in the way that always sent a chill running up and down James’ spine. “That’s very fortuitous, since that’s what I’m planning to do with this place once the booze trade goes south. It won’t take much to transform the place. The bar’ll stay – people get reckless with their money when they drink – but the restaurant employees and musicians will go.” “You’re just going to let them go?” James asked. “I’ll offer them positions in the organization,” Russ replied with a shrug. “If they refuse, it’s not my problem.”
  • 67.
    James didn’t likehow heartless Russ was being about the whole matter. If this was how he treated those in his employ for years, what would happen when he no longer had use for James himself? “Of course,” James said aloud. “When will the transition take place?” “Before the end of the month. Since everyone knows that booze will be legal soon, no one’s bothering to stop people from selling it any longer. You can spread the word about the changes, and I’ll send people in to start fixing the place up.” James nodded, trying to keep his expression neutral. Russ laughed. “Don’t look so glum, boy. Go home to your wife and things will look better in the morning.”
  • 68.
    Russ got upand left without another word to James. The younger man shook his head; Russ was not a man of many words. James picked up the empty glasses and left them outside the door to his office; someone from the kitchen would come up to collect them for cleaning. He then grabbed his coat. It was time for him to go home. He wasn’t sure what he was going to tell Cindy, let alone his parents. Though Cindy would be supportive, his mother would likely not be.
  • 69.
    Jefferson was stillawake and reading the paper in the living room when James got home. He looked up when James passed through the foyer. He saw the look of defeat on his son’s face, and put the paper down. “Come sit with me for a minute, James. You look exhausted.” “Thank,” James said as he sank down onto the sofa next to his father.
  • 70.
    “Anything good inthat?” James asked after a pause, nodding his head in the direction of the newspaper. “Of course not. People losing their homes, their jobs, and their lives. The only interesting piece was about how Portsimouth has to keep the streetlights lit all the time now, with the dust blowing in from the plains.” “It’s horrendous,” James sighed. “My mouth always has the taste of mud in it. Reminds me of the time that Taddy dared me to eat a mud pie. Took me weeks to get rid of the grit between my teeth.”
  • 71.
    Jefferson chuckled. “Youlook as if something’s on your mind, son. Anything you care to talk about with me?” James heaved a sigh as his shoulders slumped. “Have you ever had to do something that you didn’t want to do, because you thought it was what was best for the family?” “You know that I did, son. Rather, I almost did.” James nodded. “Yeah, but you found an out just in time. I don’t think I’m going to be so lucky.”
  • 72.
    “Does this haveanything to do with impending repeal of Prohibition?” “It has everything to do with that. Russ, the owner of the speakeasy, came in today. He’s closing the speakeasy as it is, and turning it into a gambling hall.” “Ah,” Jefferson said. “And he offered me the chance to run it, which means keeping an income coming into the house. But it also means that I’m taking money that could probably be used for something better than a hand or two of poker.”
  • 73.
    “What are yougoing to do, James?” “I told him I’d take it, but now that I’ve thought about it for a while, I wish I’d said no. I only took it because I knew we needed the money, but it just feels wrong. And if Mama hated me running a speakeasy, imagine what she’d have to say about this.”
  • 74.
    “James, you can’tlive your life based on what your mother thinks about it. Trust me on this one. But you do have to do what you can live with. Can you live with the repercussions of your job?” James stared into the fireplace. “I don’t know what’s worse, Pops: the thought of taking money away from other families who really need it, or the thought of not having the money to give my family the life and future they deserve.” Jefferson put his hand on James’ shoulder. “I can’t give you the answer to that son, as much as I’d like to. Lots of people are being forced to make tough choices nowadays. Whatever you decide, I’ll understand.” James managed a smile. “Can’t we go back to the days when our biggest worries were how late Taddy, Sterling and I could stay out playing ball?”
  • 75.
    Jefferson managed toreturn James’ smile. “I wish we could, son. I really wish we could.” James’ smile melted back into the morose expression that he wore so often as of late. “As much as I hate it, I have to put the needs of my family before those of a hypothetical one. I’ll see if I can find something else, but I have to keep working for Russ for now.” Jefferson nodded. “If that’s what you think you have to do, I’ll support you.” “Thanks, Pops.”
  • 76.
    They sat quietlyfor a few moments before Jefferson rose. “I’m headed up to bed. You look tired, James. You should get some sleep yourself.” “I will. I just need a few more minutes.” “Good night, James.” “Good night, Papa.”
  • 77.
    After Jefferson headedupstairs, James rose and poked at the fireplace for a moment. He still wasn’t completely happy with his decision, but there was some comfort in the fact that his father was supporting him. He knew that Cindy would – she very rarely questioned anything he decided. But he knew that his mother would be a different matter entirely. If she had thought his running the speakeasy was “immoral, unethical, and illegal,” he could only imagine what she’d have to say about his running a gambling hall. Her words from their argument echoed in his brain. “How would you explain what you do to your son?” He hoped that he’d never have to do that. He leaned against the mantle and groaned. “What kind of a man am I?”
  • 78.
    A small voiceanswered from behind him. “I think you’re a good man, Papa.”
  • 79.
    James spun aroundto see Nicky standing in the doorway. James quickly rearranged his face to a more pleasant expression and went to kneel before his son. “Hey, you’re supposed to be tucked in bed, sound asleep.” Nicky bit his lip, a nervous habit he’d picked up from his mother. “I was, but I heard you come home, and I waited and waited for you to come up and kiss me goodnight. I didn’t feel like waiting anymore.”
  • 80.
    James smiled andruffled the hair on Nicky’s head. “I’m sorry. I was talking with Grandpa about some grown up stuff, and I lost track of the time.” “Why where you asking what kind of man you were, Papa?” “Because, Nicky, I have to do something that I’m not proud of, and I don’t like it.” Nicky’s eyes got a little bigger. “I thought being grown up meant you didn’t have to do things you didn’t like.” James suppressed the urge to laugh. “Unfortunately, little man, grownups have to do a lot of things they don’t like.”
  • 81.
    “Are you worriedabout money again, Papa?” James raised an eyebrow. He’d done his best to keep his worries about money away from Nicky’s ears, but the boy somehow always knew about things he shouldn’t. “A little, but it’s not something you should think about.” “But I want to help, Papa.” “And I appreciate that, Nicky. But the best thing you can do to help me is to enjoy being a kid. You’ll have to worry about the responsibilities of being a grown up soon enough.” “But Papa…”
  • 82.
    “No ‘buts’, youngman; it’s way past your bedtime. Your mama will have my hide if she finds out I let you stay up this late.” “You’re going to tuck me in, right?” “Of course I am. Now scoot upstairs. I just need to damp the fire down, and I’ll be right up.”
  • 83.
    As James tuckedhis son into bed that night, he marveled at how kind a boy his son was. He’d certainly gotten his temperament from his mother. The thought made James burst with pride. Perhaps Nicky’s kindness would lead him into something that would make up for some of his sins. *****
  • 84.
    Midway through thewinter season, Cindy awoke to the pains of labor. This time, however, something was different.
  • 85.
    “Marsha,” she grimacedbetween pains, “Something doesn’t feel right about this.” “I‘ll ‘phone for the doctor and be right back for you, Cindy,” the older woman said.
  • 86.
    Marsha had dialedthe doctor’s office, and he would soon arrive. Cindy’s cries had caught Nicky’s attention, and he came to see what all the commotion was about. “Grandma? What’s wrong?”
  • 87.
    “Oh, Nicholas! Thankgoodness. I need you to do something very important for me. Your mama’s going to have the baby, and I need you to go to the clearing in the woods and find your Papa and Grandpa, and tell them. Make as much noise as you can, because I don’t want them to fall a tree on you by accident.” Nicky’s eyes grew big when he realized the importance of the errand he was going on. “I’ll run as fast as I can, Grandma,” he promised. He then hurried down the stairs, pausing only long enough to put on his coat before he ran out the door.
  • 88.
    James and Jeffersonmade it home just in time to see what all the fuss was about. The reason Cindy has felt that something was different was very clear – she had given birth to twins, a girl and boy. Both children had their mother’s eyes, and the girl who they named Dorothy, was fairer skinned than her brother, Daniel. The real surprise was that both children had red hair, courtesy of the their great-grandmother Jan. Time would only tell who their personalities favored, but everyone was thrilled with the new additions to the family.
  • 89.
    Dotty and Danny,as the two quickly became known as, were adorable but quite a handful. But with Jefferson, Marsha, and Cindy all home, they managed, and James spent as much time with the babies as he could. It was easier to forget he worries when he was blowing raspberries on a chubby baby belly.
  • 90.
    This time around,Cindy could barely be dragged out of the nursery. There were still some things that she was uncertain about; after all, she’d pretty much missed Nicky’s babyhood. But this time, she asked for help, and Marsha, so pleased at Cindy’s willingness to learn, had answered questions kindly, and encouraged her daughter-in-law. All in all, the nursery was the happiest room in the house.
  • 91.
    Marsha had goodreason to be happy that winter. In addition to Dotty and Danny, she also had Viola and Sterling’s new son, Howard, to dote on. Howard had his parents’ brown hair and Marsha’s own green eyes, and was the center of attention in the Alcott household.
  • 92.
    And her youngestson, Cyrus, had become a father as well. He and his wife Georgianna had also welcomed a son who they named Frederick. He had his father’s brown hair and his mother’s dark brown eyes and fair skin.
  • 93.
    To further addto the excitement, Taddy and Calla welcomed a blond-haired, blue-eyed son they named Gilbert.
  • 94.
    When you addedthe weddings of Raymond Hutchins and Mildred Langerak and William Eldon Bear and Octavia Hutchins to the mix, it was easy to forget all the bad things going on in the world. *****
  • 95.
    “Nicky, what areyou doing?” Jefferson asked as he walked into the study. “Well, Grandpa, I’ve read all the books on the shelves I can reach. I need something new to read.” Jefferson quickly crossed the room, and picked his grandson off the sofa he was balancing on to reach the upper shelves of the bookcase.
  • 96.
    “Aw, Grandpa,” theboy whined. “I just wanted to find a new book.” “Next time, please ask. Some of those books aren’t suitable for a boy your age, and there are others that are very old and need to be handled carefully.” “How old?” “Over a hundred years. Some of them belonged to John Bradford, the man who built this house when he came here from Simland.” “Wow,” Nicky breathed. “Can I see one of them? I promise to be careful.”
  • 97.
    “Alright,” Jefferson replied.“But you have to promise me not to touch these books without me or your father present.” Nicky’s head bobbed up and down quickly, and Jefferson pulled one of the books off the top shelf. He took it over to the desk, and Nicky hurried over to the chair. “Your great-grandfather was a doctor, Nicky, and this was one of his reference books. Now, I’m sure much of the information in here is outdated, but I imagine John used this quite a bit.”
  • 98.
    Nicky’s eyes grewbigger as Jefferson slowly turned the pages to reveal different diagrams and instructions for dealing with maladies and injuries. “Grandpa John must have been a very smart man to know all this,” he marveled. “I suppose so,” Jefferson said. “He certainly was noted for being a hard worker. Back then, they didn’t have a school for prospective doctors to go to like they do now. He apprenticed with someone in town until he’d gained enough experience to go out on his own.”
  • 99.
    Nicky studied oneof the diagrams intently for a moment. “They have a special school for doctors?” “Yes. In fact, one of them is attached to SimHarvard. It’s rather prestigious.” “Do you think that maybe I could be a doctor, Grandpa?” Jefferson looked at Nicky. “I don’t see why not, if you don’t mind studying hard and a few more years of school after college.”
  • 100.
    Nicky’s face grewserious. “But doctors help people, like the doctor helped Mama when the babies came.” “Yes, they do. But it’s not all happiness, Nicky. Sometimes, even the best doctors can’t help people, and they don’t make it.” Nicky nodded. “But they have a better chance if they’ve got a good doctor to help them.” “I can’t argue with that.”
  • 101.
    Nicky’s blue eyesstared into Jefferson’s. “Then I’ve made my mind up. I’m going to be a doctor, just like Grandpa John. I’m going to help lots and lots of people and make Papa and Mama real proud of me.” “If that’s what you want, we’ll all help you achieve that goal. But remember that your parents will be proud of you no matter what you do.” “I know, Grandpa. But I think they’ll be even prouder of me when I’m Doctor Nicky Bradford.” “You might want to go by Nick or Nicholas for that – it sounds much more professional.” Nicky nodded. “Doctor Nicholas Bradford does sound better.” And Jefferson could not disagree with his grandson. *****
  • 102.
    Sterling and Jamesstepped out of the front door of the Simmont Hotel. Their lunch meeting had been Sterling’s idea; he’s stopped by the old speakeasy-turned-gambling hall and pulled James away, claiming that he needed a break. Bobby, one of the few employees still around after the changeover, had agreed to keep an eye on things, and James had reluctantly followed his friend to one of the ritzier parts of the city. Before the market crash, Sterling, Taddy and James had often lunched in the dining room of the upscale hotel. But lately, James and Taddy hadn’t been able to afford it, and Sterling, like many of those who still had money, pretended he didn’t. But today, he’d been willing to make an exception in the name of cheering up his best friend.
  • 103.
    As the Depressionworsened, a new batch of criminals was gaining notoriety. Things were particularly bad in the Midwestern portion in the country, and the bank robbers and kidnappers were as famous as the Simmywood actors and actresses that graced the movie theater screens. Branded as “Public Enemies” by the newly formed Federal Bureau of Investigation, the general population was intrigued by this new brand of criminal. John Simlinger, George “Simmyface” Nelson, and Bonnie Simker and Clyde Barsim were all over the newsreels and papers. The specifically targeted the people and institutions that most people blamed for the current state of the economy: the banks, and the wealthy. Consequently, most of those who still had money acted as if they did not to protect themselves. So far, Portsimouth had avoided much of the violence, but everyone was on edge, worried that it could start at any time.
  • 104.
    “Thanks again forlunch, Sterling,” James said as he buttoned his coat against the cold. “I needed that.” “I thought you did. That place is no good for you, James. You need to get out of it.” “I would if I could, Sterling. But you know the situation I’m in.” Sterling nodded glumly. “I’ll keep my eyes and ears open for you. Hopefully something comes up.” “I appreciate it.”
  • 105.
    As the crossedthe plaza in front of the hotel, a somewhat disheveled looking man approached them. “’Scuse me, misters. Spare some change for a man down on his luck?” James reached into his pocket, but came out with nothing; he’d taken to not carrying any cash with him when wandered around the city for just this reason. Sterling handed the man a few coins, but he had no money with him either, as he’d had the bill for their lunch sent to his law offices as he always did.
  • 106.
    “I’m sorry Idon’t have more,” Sterling apologized. The man glared at Sterling, his face twisting into a sneer. “Sure you don’t,” he spat, throwing the coins back at Sterling. “None of you fat cats do. You spent it all on your fancy cars and expensive clothes and big houses while the rest of us don’t have enough to feed our families. Well screw you! I’ma get mine, one way or the other!”
  • 107.
    The man reachedinto his coat, and James saw the flash of sunlight on metal. The fact that the metal was a gun barely had time to register before he felt Sterling’s body collide into his, and the bang of the gun as it went off.
  • 108.
    The surrounding crowdlet out screams and shouts as the two men tumbled to the ground. James slowly pushed Sterling off of himself, and got up to see a police officer restraining them man with the assistance of a bystander. A woman, who looked rather grey, was sitting on the edge of one of the fountains attended by another man. James rubbed his shoulder; it had been the first thing to connect with the paved stones on the plaza in the front of the hotel. “Good reaction time there, Sterling. I’m glad one of us still has our shortstop reaction time.” Sterling didn’t reply, except to make a noise that could only be described as a groan.
  • 109.
    James turned tosee his best friend clutching at his chest. His hand was red, and that same red was slowly spreading its way across Sterling’s jacket. “Damn it! Help! I need some help here! He’s been shot!”
  • 110.
    James leaned overand pressed his hands firmly on the wound, trying to stop the bleeding. “Someone please help me!” “James,” Sterling muttered, his voice weak and raspy, “Promise me…” “Sterling Alcott, you listen to me because I’m only going to say this once. If you die on me here, I’m going to drag you back from the great beyond and kill you myself. So no deathbed promises, you understand?”
  • 111.
    A pair ofwell-shined shoes came into James’ line of sight. “I’m Officer Brady. Sir, we’ve got a police car waiting to take your friend to the hospital. It’s not far at all, and we’ll get him there as quick as possible. Are you okay to help me carry him?” James nodded. “We should hurry; it looks like he’s losing a lot of blood. You hear that, Sterling? We’re taking you to the hospital, and we’re going to get you fixed up. You hang in there. You hang in there.”
  • 112.
    James sat inthe corner of the small waiting area, running the events of the past few hours through his head. Why hadn’t he seen it coming? He’d always been the one with the keen instincts. Why hadn’t that man triggered them? If it hadn’t been for Sterling’s razor sharp reflexes, he might have been the one in the surgical theater with a bullet in his chest. If anything happened to Sterling…well, James didn’t want to think about that. It was bad enough to think about the possibility of losing his best friend; it was even worse to think about the fact that his brother-in-law might be dying and his sister on the verge of becoming a widow.
  • 113.
    The door openedand James turned his head just enough to see Victor Hutchins walk through it. For a moment, James wondered what the older man was doing there; even though he was his godfather, first cousin once removed, and the closest family he had in Portsimouth, there was no real reason for him to be there. Then James remembered that Victor worked for the police department. He would have heard about the shooting that way. “Hey, Uncle Victor,” James said. “Hello, James. Are you all right?”
  • 114.
    James nodded ashe gestured for Victor to take the chair next to him. “I thought you had retired,” James said by way of making conversation. “Well, that was the plan,” Victor chuckled. “But with the crime increase we’ve seen lately, the department needed as much experience as they could get. I figure I’ll keep at this for a little while longer at least. Now, I know you’ve already told one of the officers what happened, but I’d like to hear it from you firsthand.”
  • 115.
    James sighed. Thelast thing he wanted to do was relive the events of the afternoon. But as Victor was high up in the department ranks, he really didn’t have a choice. “We were coming out of the Simmont Hotel after lunch, and this man approached us, asking for money. I’ve stopped carrying it; it’s easier to ignore the pleas when you know you don’t have anything in your pocket. Sterling had the bill sent to his office, so he didn’t have money and just gave the fellow a few coins he had. The guy snapped, yelled at us, and pulled a gun out of his coat. I’m not sure what happened from there exactly. Sterling shoved me down, the gun went off, and I heard people screaming. When I got up, I saw that Sterling had been shot. I yelled for help, and did my best to stop the bleeding. Then one of your officers offered to take Sterling to the hospital, and we came here.”
  • 116.
    Victor nodded. “It’snot uncommon for victims to forget details of a crime. Luckily, there were several witnesses, and we have the man in custody. It looks like you boys were simply in the wrong place at the wrong time.” “Tell that to my sister or Sterling’s parents,” James muttered. “James, this is not your fault. Crime is on the rise everywhere. There’s nothing you could have done.” “It sure doesn’t feel that way.”
  • 117.
    “He’s one ofyour best friends and your brother-in-law. Of course you feel responsible for him. Is there any word on how he’s doing?” James shook his head. “They took him right into the operating theater, and I haven’t heard anything since I got here.” “Did someone look at you?” James nodded. “I’m going to have one hell of a bruise on my shoulder and hip tomorrow, but that’s the worst of it.”
  • 118.
    Victor chuckled. “NowJames, don’t be mad at me, but when I heard what happened I ‘phoned your parents, and asked them to break it to Viola and get her here.” James let out a sigh of relief. “Thank you. I was dreading that. Vi…well, she’s got a bit of a temper.” “I remember that,” Victor said. Now, I’ll sit here and wait with you for a while, at least until one of the doctors comes out.” “You don’t have to do that, Uncle Victor.” “I know I don’t have to, James. But I want to.”
  • 119.
    At that moment,the door to the hospital ward opened, and the doctor stepped out. “Are you folks waiting for news on Sterling Alcott?” James nodded, feeling his muscles tense in anticipation of what the doctor would say.
  • 120.
    “He’s resting rightnow. The bullet went straight through him, and the wound was relatively clean. He’ll need to stay overnight so we can keep an eye on him, but baring an infection he should be fine.” “Are you sure? There was so much blood…” James said. The doctor nodded. “Oh, he’ll need to take it easy for a few weeks until he’s fully healed, but I expect a complete recovery.” James and Victor sighed in relief, though James’ was much more audible. “Thank you.”
  • 121.
    James had beenpacing the small waiting room, waiting for his sister’s arrival. He kept repeating what the doctor has said in his head: the wound was a clean one, and the doctors believed that barring an infection, Sterling would be fine. Viola burst through the door, her hat askew and her gloves missing. “Where is he?”
  • 122.
    James took astep forward and rested his hands gently on her shoulders. “He’s resting. The doctors patched him up, and he’ll be able to go home first thing in the morning.” “How did it happen?” “We were on our way out of the Simmont Hotel; we’d gone in for lunch, his treat.”
  • 123.
    “Why in God’sname would you go there for lunch? You know that’s where all the people who still have money go! That’s just asking for trouble.” “It wasn’t my idea,” he snapped. “It was your husband’s.” “You didn’t have to go along with it,” she retorted. “What happened from there?” He raked his hand through his hair. “This guy stopped us, asked if we could spare something so he could feed his family. I didn’t have any money on me, and Sterling just had a few coins. They guy got upset, started yelling at us about how we millionaires had fouled up the country for folks like him. Then he reached into his coat, pulled out a pistol, and said he was going to get his one way or another. I couldn’t react fast enough. The gun went off, and Sterling fell to the ground. Luckily, there was a cop right around the corner, and he came running before the gunman could think.”
  • 124.
    He paused forbreath, and she glared at him. “He could have been killed.” “Yes, but he wasn’t. You should count your blessings.” “What would I have done if he had? What would our children have done?” “The family would have taken care of you, and the children. You know that.” “Really? Seems to me that all you think about these days is yourself. I know about your job, and I know how our parents feel about it.”
  • 125.
    “I’m doing whatI have to do to make sure I can feed my kids. As soon as things turn around, I’ll find honest work.” “And in the meantime, you’re exposing all of us to danger.” “Hey! What happened today has nothing to do with what I do for a living. You know that violence is increasing all across the country.” “Violence against those who still have money, which you pretended to be by going to a ritzy hotel to eat. Why would you do such a stupid thing?” “I already told you. It was Sterling’s idea.”
  • 126.
    “I don’t care!Your lifestyle is too dangerous now. I want you to stay away from my family.” “But you’re my sister. You are my family! And Sterling’s one of my best friends. You have no right to keep us apart.” “I don’t want you anywhere near me, my husband, or my children. Is that clear?” James’ shoulders dropped. Viola had always been like this when she was mad, and he knew from experience that she would be more reasonable when she wasn’t in the middle of a fit of temper. “Fine,” he agreed. “Are you okay to get home?” She nodded stiffly. “Goodbye.”
  • 127.
    He turned witha silent sigh and went through the door she had come through just moments before. He hoped that he was right, and that once Viola calmed down, things would be right between them again. But he couldn’t shake the nagging feeling that his sister would never be able to fully forgive him for being there when Sterling had been shot.
  • 128.
    As James crossedinto the lobby, he saw his parents standing there, looking anxious. “Is he…” Jefferson asked. “He’s fine. I’m fine. You should go in and be with Viola.” “You come with us, James,” Marsha said. “Viola needs her family.” James snorted. “She made it very clear that she doesn’t want me near her or her family. I’m going home. No,” he said, when Marsha made a movement like she was going to protest. “Ask her about it, Mama. I’m going home.”
  • 129.
    James had caughtthe train back to Simsfield, and walked from the station to his house. It was dark, and there were few lights on in the house. He felt bad about Cindy being left alone with Nicky and the twins for so long, and he quickened his step.
  • 130.
    Cindy was sittingin the living room in her robe when James opened the door. She flew up from her seat and threw her arms around James, nearly knocking him over in the process.
  • 131.
    “Hey, it’s allright,” he said, as he felt her hot tears seep through the fabric of his shirt to burn his skin. “I was so worried. I know Victor said that you were okay, but…” “Shh,” he said, tightening his arms around her and gently rocking her as he did the twins. “Other than a few bruises, I’m okay.”
  • 132.
    They stood inthe dark foyer, locked in each other’s arms until Cindy’s silent sobs slowed and ceased. “I’m sorry,” she said, stepping back and wiping her eyes. “I’m usually not so emotional.” He smoothed her hair. “It was a tough day all around. How are the kids?” “They’re okay. Nicky was a huge help today. He kept the twins entertained while I finished supper. I tell you James, that boy was born a grown up all ready.” “What did you tell them?” “That Uncle Sterling got hurt, and Grandma and Grandpa had to take Auntie Vi to see him.”
  • 133.
    James sighed. “Vi’spretty steamed with me.” Cindy looked at James, puzzled. “She blames me,” he said simply, answering her unspoken question. “But that’s…” “Doesn’t matter if it makes sense or not, doll. She needs someone to blame, and that someone’s me.”
  • 134.
    James took Cindy’shand and gently tugged her up the stairs. “What does it mean?” she asked. “Well, she told me to stay away from her family. I just hope that she doesn’t keep Shirley away from Nicky; she, and the infamous Alice, are the only ones who can drag him away from his books.” “I’m sure she’ll calm down after a while.” James chuckled darkly. “See, that’s the big difference between Vi and me. My temper is explosive, but once I’m done yelling everything’s fine. Hers burns low and slow and for a long time. Once she makes an enemy…” “You’re her brother, James; she’ll come around.” “I hope you’re right, doll. I hope you’re right.” *****
  • 135.
    Nicky Bradford waspuzzled. He’d bounded into school that morning, just barely ahead of the bell, and hurried to find his seat before the teacher could mark him tardy. He’d waved to Alice, Rosalie and Shirley, since he wasn’t able to say hi to them before school started as he usually did. Alice had returned the wave heartily, while Rosalie had nodded with a slightly disapproving look at his overt enthusiasm. Shirley, on the other hand, hadn’t acknowledged his greeting, which was very unusual for her. Of his cousins, Nicky spent the most time with Shirley, because Rosalie loathed anything she deemed improper. Shirley, on the other hand, was game for most things, and frequently her ideas were crazier than Nicky’s.
  • 136.
    When school brokefor morning recess, Nicky scooted over to Shirley’s desk. “What’s wrong? Why didn’t you wave back this morning?” Shirley tried to make herself as small in her chair as she possibly could. “Mama says I’m not supposed to talk to you anymore, Nicky. I’m sorry.” “Oh,” he said, not sure of what to say beyond that. “I’ll leave you alone, I guess. I don’t want you to get into trouble.”
  • 137.
    Nicky walked backto his desk, ignoring the sympathetic looks he was getting from Alice and Rose. He sat quietly for the rest of the day, and didn’t even volunteer to answer questions as he usually did. At the end of the day, he gathered up his things and headed straight home, instead of hanging around reading a book with Alice as was the norm.
  • 138.
    Cindy was thefirst to notice that Nicky was home earlier than usual. He plopped down on the floor in the living room in front of the fire as he usually did and began working on his homework. Cindy found excuses to wander in and out of the room at intervals, hoping that Nicky would say something to her.
  • 139.
    When she wentin on the pretense of winding the grandfather clock, Nicky glanced up. “Mama, was I bad?” “Not that I know of, Nicky. Why do you ask?” He put his homework down and sighed. “Shirley said that her mama said that she’s not allowed to talk to me anymore. I didn’t want to ask her why and get her in trouble for talking to me.”
  • 140.
    Cindy suppressed theurge to sigh. “Nicky, trust me when I tell you that it has nothing to do with you. Auntie Vi’s a little mad at your father right now, and I guess you and Shirley are getting caught in the middle of it. I’m sorry about that.” “Did Papa do something wrong?” “Not really, but your Auntie Vi thinks he did.” Nicky nodded. “So maybe Shirley will be able to talk to me again?” “I hope so. Now, go upstairs and get washed up. Dinner will be ready soon.” Nicky scurried away to do as he was told, and Cindy gently shook her head as she watched him do so. She’d have to talk to James, and see if there was something he could do. Nicky had so few friends as it was; she hated the thought of being kept away from one of them.
  • 141.
    Later that night,James volunteered to take the blanket that Marsha had knitted for Frederick over to Cyrus and Georgianna’s. He’d really done it because he wanted the chance to speak with his brother about the situation with Viola. Cyrus invited him inside, but didn’t offer to take his coat. Sensing that his window of opportunity was short, James got right to the point.
  • 142.
    “Cyrus, will youtalk to Viola for me? I don’t mind if she’s mad at me, but when she tells Shirley to stay away from Nicky I have to intervene somehow. They’re good friends, and it’s not fair to him.” Cyrus rubbed the back of his neck. “James, it’s not my place to tell Viola how to raise her kids. She has the right to say who they can and can’t take spend time with.” “So you’re taking her side?”
  • 143.
    “There’s not reallysides, James. Whether or not they’re valid, Viola’s entitled to her opinions. Yes, I’m sorry that Nicky’s getting caught in the middle of it, but it’s not my place.” “So you agree with her that I’m too dangerous?” “I didn’t say that. But you are involved with some dangerous people. I know what happened to Sterling had nothing to do with what you do, but it feels like it was a warning of some sort. By doing what you do, you’re inviting trouble.”
  • 144.
    “It’s not reallylike I have a choice, Cyrus. I’m doing my job and making sure my family’s taken care of.” Cyrus glared at James. “That’s hitting below the belt, brother.” “Sorry. I forget sometimes...” “Must be nice. Look, James. Let’s call this a draw for tonight, before we both say things we’ll regret.” James sighed. “Fine. Just…if she starts to come around, keep her going, okay?” Cyrus nodded. “Goodnight, James.” “Night, Cyrus.”
  • 145.
    Whether or notCyrus did talk to Viola, her resolve that her family stay away from James’ did not waiver. Shirley passed her days playing with Walter Gavigan, as she was too rambunctious for the likes of her cousin Rosalie and the other girls. Nicky gravitated towards Alice, though he often looked at Shirley wistfully.
  • 146.
    “You miss playingwith your cousin, don’t you?” Alice asked one afternoon when they were enjoying the warm sunshine at recess. “I like playing with you, Alice,” he replied. “Just because you like playing with me doesn’t mean that you can’t miss playing with Shirley.” Nicky nodded. “We were supposed to build a fort this spring. It just doesn’t seem fair that her mama’s punishing me because she’s made at my papa. I didn’t do anything wrong.” Nicky jumped off of the swing and began walking away, and Alice followed him.
  • 147.
    “Nicky wait,” Alicecalled. The boy paused so Alice could catch up with him. “I know it’s not the same, but I’ll help you build your fort this spring. And we can play catch and stuff too, ‘cause I know you like it. I can’t take Shirley’s place, but we can do some of the stuff you guys used to do together.” “But you don’t really like a lot of that stuff,” he protested. “But I like you. So as long as we still play quiet games and read books, we can do some more boyish things too.” Nicky’s face lit up. “Can we play catch now? I have a ball in my desk.”
  • 148.
    Alice wasn’t verygood at catch, but Nicky appreciated her willingness to fill the hole left when Shirley’s friendship was taken away from him. Still, he hoped that Papa and Auntie Vi could make nice so that he and Shirley could be playmates again. *****
  • 149.
    Things hadn’t changedby the time the twins were due to celebrate their toddler birthdays. Instead of a large family affair, it was just the household that gathered. Cyrus and Georgianna had sent their regrets, claiming that they couldn’t find anyone to watch Frederick, and Viola had sent the invitation back unopened. Still, they tried to make the day as festive as possible, and Marsha had even splurged and baked a cake for each of the babies, despite the extravagance.
  • 150.
    James took chargeof Danny, and Cindy held Dotty as they helped the twins blow out their candles.
  • 151.
    Dotty turned outto have a personality exactly like her father’s: neat, active, and playful but with a temper that resulted in epic tantrums. Danny was very similar, but he was not nearly as active and preferred sitting in front of one of his toys to exploring the upstairs of the house with his sister.
  • 152.
    Howard Alcott, Sterlingand Viola’s son, celebrated his birthday too. Viola was still sticking to her resolve that James and his family needed to stay away from hers, so she didn’t invite them, or even her parents. Sterling had tried to sway her to at least invite Howard’s grandparents, but she remained firm. So the party went on without them, though it certainly didn’t feel like a party.
  • 153.
    Howard turned outto have his father’s nose and mouth. Personality wise, he was almost the exact opposite of his sister, being messy, lazy, playful, and nice.
  • 154.
    Gilbert Seiff celebratedhis birthday as well, and he had a party that was attended by all of his extended family.
  • 155.
    Little Gilbert favoredhis father in features, with his nose and mouth. He was exactly like his sister: messy, shy, active, and playful but with a mean streak.
  • 156.
    And Frederick Bradfordcelebrated his birthday as well.
  • 157.
    He grew upinto a sturdy tot who favored his father in features. Personality wise, he was a mixed bag but the most shocking aspects were how shy and temperamental he was. He was neat and playful like his father, and active like his mother. *****
  • 158.
    The rather crypticnote had piqued James’ interest. It had arrived in the mail, addressed to him in block letters, and asked him to go to the general store on Tuesday night at about 8 o’clock. James had no idea who had written or sent it, but for some unknown reason, he decided to go. He’d told the family that he was meeting Taddy for a drink at the tavern, not wanting to hear protests about the potential stupidity of his true errand. It was a warm night for winter, but he still hurried his step. Whatever he was walking into, he wanted to get it over with.
  • 159.
    The store wasdark, except for a faint glow from one of the upstairs windows. James knocked on the door, waiting to see who would answer it.
  • 160.
    A moment later,James smiled when the door opened. “Sterling!” “It’s good to see you too, James,” Sterling replied as James hugged him and repeatedly pounded on his back. “Why don’t you come inside and we can talk.”
  • 161.
    The two menwent into the store and up the stairs to the space that served as storage and office. Sterling sat down at the old fashioned desk, and James took the only other chair in the room. At first, they just stared at each other, with stupid grins on their faces. James was the one to break the silence. “Why meet here? I mean, your house is right over there. Aren’t you worried that Vi will see, or has she relented yet?” “This is my family’s store, James. It was given to my grandfather by his stepfather. And I’m not really worried about what Viola says. She hasn’t changed her mind yet, but this has gone on long enough.”
  • 162.
    “I forgot that.But you and your father are lawyers…” “Yes. Papa couldn’t bear to sell the store, so since Grandpa passed we’ve hired someone to manage the store. Unfortunately, I just had to fire the last man we employed. When I was reviewing the books, I discovered that he was stealing from the store. Poor guy was just trying to support his family, and if he’d asked I would have helped him. But I can’t tolerate thievery, so I had to fire him and turn him over to the police. I’ve been helping out her for the past few weeks while I’ve been recovering, as it’s close to home.” James nodded. “So, you’re okay?”
  • 163.
    Sterling laughed. “Yes,I’m fine. I’ve got a pretty nifty looking scar on my shoulder, though. Viola was pretty overbearing at first, insisting I stay in the hospital for a few extra days to make sure things were fine. Then she had me on bed rest for what felt like a year.” “I’m glad. I was really worried about you. I felt like it was all my fault.” “It wasn’t. Blame the crazy guy who thought brandishing a gun would solve all his problems. I don’t blame you.” “Viola does.”
  • 164.
    “Ah, Viola,” Sterlingsaid. “That’s part of the reason I wanted to talk with you. I know she’s just worried about her family, but she’s acting irrationally. No one can talk any sense into her about this.” “I don’t mind so much that she’s steamed at me, but when she keeps Nicky and Shirley apart…” “Yeah. Shirley’s feeling it too, though she’s too smart to complain. She’s been off the wall at home, without Nicky to burn the excess energy off with. So I decided it’s time to do something about it.” “And that is?”
  • 165.
    “Simple. Viola’s mainobjection is that your work puts you in contact with dangerous people. You just need a new job, and she loses all the footing for her argument.” “Do you really think it’s that simple, Sterling? Do you realize that it’s nearly impossible to find work? Something like a quarter of the country’s unemployed right now.” Sterling had a grin on his face that boarderlined on a smirk. “Well, James, it just so happens that I’m in need of a clerk for the store.”
  • 166.
    James mouth gapped.“You want to hire me? Won’t that just set Vi off?” “Probably. I’m sure I’ll be making good friends with the sofa in the study soon. But it all makes sense. You need a safer job, and I need someone reliable to run the store. I know I can trust you to run things. I don’t know if I can match what you’re making right now…” James put up his hand. “Honestly, Sterling, I’d happily take a pay cut if it meant getting out of that hellhole.” Sterling nodded. “I figured as much. I saw how much that place was wearing on you.”
  • 167.
    “So, when doyou need me to start?” “As soon as possible. Do you think you’ll have trouble leaving the old place?” James shook his head. “Russ’ll just turn it over to someone else; people are interchangeable to him. I’ll let him know I want to speak with him, and let him know Friday will be my last day.” “Excellent. Provided things go as planned, you can start Monday. And James, thanks. This is a big weight off my mind.” “I’m the one who should be thanking you. I owe you one, Sterling.” “Keep a bed in your house turned down for me, just in case Viola ends up being madder about this than I’m anticipating.” “You know our door’s always open for you.”
  • 168.
    ************************************************************************************************************************* That brings usto the conclusion of Chapter 24. Goodbye, Phily. You’ll be greatly missed. Next time, we have teenagers to look forward to, seeing Viola’s reaction to Sterling’s plan, and whether or not Viola will ever stop being angry at her brother. The Depression Era restrictions have certainly made things interesting, but not too hard. I’m looking forward to seeing how they continue to play out over the next rotation and a half. You can leave comments on the Bradford Legacy thread at Boolprop, on my Live Journal, or on my Dreamwidth, whichever you prefer. Until next time!