SlideShare a Scribd company logo
Tammy Blunt
343 Shadow Creek Lane
Anderson,SC 29621
(864) 634-1540
TammyBlunt315@gmail.com
Experience Borg Warner / Production Planner
December 2013 - PRESENT, Seneca, SC
● Managed daily procurement of 300+ raw materials from 25+
suppliers.
● Developed level scheduling process for subassembly manufacturing
areas.
● Mentored 3 co-op students.
● Worked with 3rd party logistics company to drive inbound freight
optimization.
● Led Production Planning Module for SAP conversion project.
Parker Hannifin-Hydraulics / Industrial Engineering Intern
May 2012 - August 2012, Otsego, MI
● Created CAD drawings for press fixtures on new assembly line.
● Coordinated Lean training on Overall Equipment Effectiveness.
● Championed Kaizen event in high velocity manufacturing cell.
● Established standards formaintaining raw material cleanliness.
● Completed construction of equipment for new assembly line.
Glen Raven / Process Engineering Intern
August 2011 - May 2012, Anderson, SC
● Conducted time studies for various bottleneck processes.
● Compiled plant wide report for cost per operation.
● Collaborated in improvement projects for bottleneck processes.
Robert Bosch LLC / Customer Logistics Co-op
May 2010 - July 2011, Charleston, SC
● Generated daily reports for PFEP used by planners.
● Initiated cost savings project yielding $30,000 cost savings.
● Improved aftermarket customer rating by closing gap in backlog
orders.
● Advanced process for planning adjustable use raw materials.
ㅡ
Education Clemson University / B.S. Industrial Engineering
August 2008 - May 2013
● 3.3 GPA
● Capstone Design Project for Milliken and Company
ㅡ
Skills & Abilities
ㅡ
References
Experienced in SAP
Proficient in Microsoft Suite
Technical Writing
Articulate and professional speaking abilities
Strong problem solving and analytical skills
Lisa McClain
Production Control Supervisor, Exedy America
(865) 804-2814
Katrina Hubbard
Blue Ridge Orthopedics
(864) 918-1257
Katie Bailey
Stewardship Director, NewSpring Church
(864) 642-7821

More Related Content

What's hot

Sean_Hickey
Sean_HickeySean_Hickey
Sean_Hickey
Sean Hickey
 
bob-manuel--anthony-karibi-resume-1st-draft
bob-manuel--anthony-karibi-resume-1st-draftbob-manuel--anthony-karibi-resume-1st-draft
bob-manuel--anthony-karibi-resume-1st-draft
Tony Bob-Manuel
 
2017 Resume'
2017 Resume'2017 Resume'
2017 Resume'
Patricia Graham
 
Anand B S - CV
Anand B S - CVAnand B S - CV
Anand B S - CV
Sumanth Vasista
 
HarrisonP_Resume
HarrisonP_ResumeHarrisonP_Resume
HarrisonP_Resume
Harrison Pressman
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr
 
SamarKantiBarua
SamarKantiBaruaSamarKantiBarua
SamarKantiBarua
Samar Barua
 
Resume
ResumeResume
Resume
Yuzhe Gao
 
Russell Weeks Resume 2016
Russell Weeks Resume 2016 Russell Weeks Resume 2016
Russell Weeks Resume 2016
Russell Weeks
 
Choudhary Divyang Resume
Choudhary Divyang ResumeChoudhary Divyang Resume
Choudhary Divyang Resume
Divyang Choudhary
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailing
Gaurav Kumar
 
Colby A. Murphy's Resume
Colby A. Murphy's ResumeColby A. Murphy's Resume
Colby A. Murphy's Resume
Colby murphy
 
cv avik
cv avikcv avik
cv avik
Avik Sen
 
Choudhary Divyang resume
Choudhary Divyang resumeChoudhary Divyang resume
Choudhary Divyang resume
Divyang Choudhary
 
Resume_Nilanjan_Kundu
Resume_Nilanjan_KunduResume_Nilanjan_Kundu
Resume_Nilanjan_Kundu
Nilanjan Kundu
 
JordanWeibelsResume
JordanWeibelsResumeJordanWeibelsResume
JordanWeibelsResume
Jordan Weibel
 
JoshuaWernerResume
JoshuaWernerResumeJoshuaWernerResume
JoshuaWernerResume
Joshua Werner
 
findley-steve BME professional
findley-steve BME professionalfindley-steve BME professional
findley-steve BME professional
Steve Findley
 
Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09
siddiqaa
 
Ahmed Rezk
Ahmed RezkAhmed Rezk
Ahmed Rezk
Ahmed Rezk
 

What's hot (20)

Sean_Hickey
Sean_HickeySean_Hickey
Sean_Hickey
 
bob-manuel--anthony-karibi-resume-1st-draft
bob-manuel--anthony-karibi-resume-1st-draftbob-manuel--anthony-karibi-resume-1st-draft
bob-manuel--anthony-karibi-resume-1st-draft
 
2017 Resume'
2017 Resume'2017 Resume'
2017 Resume'
 
Anand B S - CV
Anand B S - CVAnand B S - CV
Anand B S - CV
 
HarrisonP_Resume
HarrisonP_ResumeHarrisonP_Resume
HarrisonP_Resume
 
Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)Kirk Doerr CB&I Resume (Updated 7/25/2017)
Kirk Doerr CB&I Resume (Updated 7/25/2017)
 
SamarKantiBarua
SamarKantiBaruaSamarKantiBarua
SamarKantiBarua
 
Resume
ResumeResume
Resume
 
Russell Weeks Resume 2016
Russell Weeks Resume 2016 Russell Weeks Resume 2016
Russell Weeks Resume 2016
 
Choudhary Divyang Resume
Choudhary Divyang ResumeChoudhary Divyang Resume
Choudhary Divyang Resume
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailing
 
Colby A. Murphy's Resume
Colby A. Murphy's ResumeColby A. Murphy's Resume
Colby A. Murphy's Resume
 
cv avik
cv avikcv avik
cv avik
 
Choudhary Divyang resume
Choudhary Divyang resumeChoudhary Divyang resume
Choudhary Divyang resume
 
Resume_Nilanjan_Kundu
Resume_Nilanjan_KunduResume_Nilanjan_Kundu
Resume_Nilanjan_Kundu
 
JordanWeibelsResume
JordanWeibelsResumeJordanWeibelsResume
JordanWeibelsResume
 
JoshuaWernerResume
JoshuaWernerResumeJoshuaWernerResume
JoshuaWernerResume
 
findley-steve BME professional
findley-steve BME professionalfindley-steve BME professional
findley-steve BME professional
 
Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09Chem Cad And ConcepSys Integration - AiChE Spring 09
Chem Cad And ConcepSys Integration - AiChE Spring 09
 
Ahmed Rezk
Ahmed RezkAhmed Rezk
Ahmed Rezk
 

Similar to Tammy Blunt Resume

Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan Resume
Wesley Yan
 
Technology project manager
Technology project managerTechnology project manager
Technology project manager
Rena Cummings MSPM, MSTM
 
Business analysis project management
Business analysis project managementBusiness analysis project management
Business analysis project management
Rena Cummings MSPM, MSTM
 
Joel_Warren_Resume_REVE
Joel_Warren_Resume_REVEJoel_Warren_Resume_REVE
Joel_Warren_Resume_REVE
Joel Warren
 
Resume
ResumeResume
Darby_Spiegel Resume
Darby_Spiegel ResumeDarby_Spiegel Resume
Darby_Spiegel Resume
Darby Spiegel
 
Ruban-Profile updated
Ruban-Profile updatedRuban-Profile updated
Ruban-Profile updated
Ruban raja
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
Sanchit S Bhadoria
 
GB_LinkedinResumeFY15
GB_LinkedinResumeFY15GB_LinkedinResumeFY15
GB_LinkedinResumeFY15
Grant Bessac
 
Resume_Ling_Nie
Resume_Ling_NieResume_Ling_Nie
Resume_Ling_Nie
Ling Nie
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
Joana Erika Buenrostro
 
JameelFareedAbdulrazzaqnewresume(1)
JameelFareedAbdulrazzaqnewresume(1)JameelFareedAbdulrazzaqnewresume(1)
JameelFareedAbdulrazzaqnewresume(1)
Jameel Abdulrazzaq
 
Update Resume 12-4
Update Resume 12-4Update Resume 12-4
Update Resume 12-4
Trevor Sanders
 
Amy_Luxemberg_Resume
Amy_Luxemberg_ResumeAmy_Luxemberg_Resume
Amy_Luxemberg_Resume
Amy Luxemberg
 
DiAndre Nixon Resume
DiAndre Nixon ResumeDiAndre Nixon Resume
DiAndre Nixon Resume
DiAndre Nixon
 
PeterBurkeResume.docx (1)
PeterBurkeResume.docx (1)PeterBurkeResume.docx (1)
PeterBurkeResume.docx (1)
Peter Burke
 
Copy of resume veera (2)
Copy of resume veera (2)Copy of resume veera (2)
Copy of resume veera (2)
VEERA PRATAP REDDY
 
resume-niheer
resume-niheerresume-niheer
resume-niheer
Niheer Shah
 
Ermias e lemma resume 5 17-15
Ermias e lemma resume 5 17-15Ermias e lemma resume 5 17-15
Ermias e lemma resume 5 17-15
Ermias Lemma
 
Manish shakya
Manish shakyaManish shakya
Manish shakya
Manish kumar
 

Similar to Tammy Blunt Resume (20)

Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan Resume
 
Technology project manager
Technology project managerTechnology project manager
Technology project manager
 
Business analysis project management
Business analysis project managementBusiness analysis project management
Business analysis project management
 
Joel_Warren_Resume_REVE
Joel_Warren_Resume_REVEJoel_Warren_Resume_REVE
Joel_Warren_Resume_REVE
 
Resume
ResumeResume
Resume
 
Darby_Spiegel Resume
Darby_Spiegel ResumeDarby_Spiegel Resume
Darby_Spiegel Resume
 
Ruban-Profile updated
Ruban-Profile updatedRuban-Profile updated
Ruban-Profile updated
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
 
GB_LinkedinResumeFY15
GB_LinkedinResumeFY15GB_LinkedinResumeFY15
GB_LinkedinResumeFY15
 
Resume_Ling_Nie
Resume_Ling_NieResume_Ling_Nie
Resume_Ling_Nie
 
Resume_Buenrostro
Resume_BuenrostroResume_Buenrostro
Resume_Buenrostro
 
JameelFareedAbdulrazzaqnewresume(1)
JameelFareedAbdulrazzaqnewresume(1)JameelFareedAbdulrazzaqnewresume(1)
JameelFareedAbdulrazzaqnewresume(1)
 
Update Resume 12-4
Update Resume 12-4Update Resume 12-4
Update Resume 12-4
 
Amy_Luxemberg_Resume
Amy_Luxemberg_ResumeAmy_Luxemberg_Resume
Amy_Luxemberg_Resume
 
DiAndre Nixon Resume
DiAndre Nixon ResumeDiAndre Nixon Resume
DiAndre Nixon Resume
 
PeterBurkeResume.docx (1)
PeterBurkeResume.docx (1)PeterBurkeResume.docx (1)
PeterBurkeResume.docx (1)
 
Copy of resume veera (2)
Copy of resume veera (2)Copy of resume veera (2)
Copy of resume veera (2)
 
resume-niheer
resume-niheerresume-niheer
resume-niheer
 
Ermias e lemma resume 5 17-15
Ermias e lemma resume 5 17-15Ermias e lemma resume 5 17-15
Ermias e lemma resume 5 17-15
 
Manish shakya
Manish shakyaManish shakya
Manish shakya
 

Tammy Blunt Resume

  • 1. Tammy Blunt 343 Shadow Creek Lane Anderson,SC 29621 (864) 634-1540 TammyBlunt315@gmail.com Experience Borg Warner / Production Planner December 2013 - PRESENT, Seneca, SC ● Managed daily procurement of 300+ raw materials from 25+ suppliers. ● Developed level scheduling process for subassembly manufacturing areas. ● Mentored 3 co-op students. ● Worked with 3rd party logistics company to drive inbound freight optimization. ● Led Production Planning Module for SAP conversion project. Parker Hannifin-Hydraulics / Industrial Engineering Intern May 2012 - August 2012, Otsego, MI ● Created CAD drawings for press fixtures on new assembly line. ● Coordinated Lean training on Overall Equipment Effectiveness. ● Championed Kaizen event in high velocity manufacturing cell. ● Established standards formaintaining raw material cleanliness. ● Completed construction of equipment for new assembly line. Glen Raven / Process Engineering Intern August 2011 - May 2012, Anderson, SC ● Conducted time studies for various bottleneck processes. ● Compiled plant wide report for cost per operation. ● Collaborated in improvement projects for bottleneck processes. Robert Bosch LLC / Customer Logistics Co-op May 2010 - July 2011, Charleston, SC ● Generated daily reports for PFEP used by planners. ● Initiated cost savings project yielding $30,000 cost savings. ● Improved aftermarket customer rating by closing gap in backlog orders. ● Advanced process for planning adjustable use raw materials. ㅡ Education Clemson University / B.S. Industrial Engineering August 2008 - May 2013 ● 3.3 GPA ● Capstone Design Project for Milliken and Company ㅡ
  • 2. Skills & Abilities ㅡ References Experienced in SAP Proficient in Microsoft Suite Technical Writing Articulate and professional speaking abilities Strong problem solving and analytical skills Lisa McClain Production Control Supervisor, Exedy America (865) 804-2814 Katrina Hubbard Blue Ridge Orthopedics (864) 918-1257 Katie Bailey Stewardship Director, NewSpring Church (864) 642-7821