Sunset Street
Property Highlights
Front Façade
Front Façade Before Front Façade After
• Fixed roofing, gutter, eve issues
• Painted exterior
• Repaired sprinkler system, including new control
box and head, restored front lawn
• Installed new beds, edging, mulch & plantings
• Installed new front door with leaded glass insert,
new door hardware and deadbolt lock
• Installed new light fixture
• Installed new door bell
Summary of Updates and Repairs
Backyard
Backyard Before Backyard After
• Painted exterior
• Painted shed to match
• Installed and painted new 9 pane glass door into
kitchen area
• Installed new door hardware
• Repaired existing sprinkler system
• Installed 4 additional sprinkler heads to ensure
adequate water coverage
• Installed new sod and trimmed trees
• Added landscape edging and mulch
Summary of Updates and Repairs
Main Level Living Room
Living Room Before Living Room After
• Removed old carpet
• Replaced subfloor patching with hardwood
where necessary
• Sanded, stained, sealed hardwood
• Installed new closet door and hardware
• Installed new door casings & baseboards
• Installed new ceiling fan with remote
• Repaired & painted walls and ceiling
Summary of Updates and Repairs
Main Level Kitchen
Kitchen Before Kitchen After
• Removed cabinetry & appliances
• Removed old flooring down to subfloor
• Replaced fluorescent lighting with designer
pendent lighting
• Repaired & painted walls and ceilings
• Installed new porcelain tile floor
• Installed new cabinetry including island
• Installed new cabinet door knobs & drawer pulls
• Installed granite and solid hickory countertops
• Installed new porcelain backsplash
• Installed new stainless steel sink and faucet
• Installed new door casings and baseboard
• Installed all new stainless steel appliances
Summary of Updates and Repairs
Main Level Family Room
Family Room Before Family Room After
• Removed dated cabinetry and shelves
• Removed old carpet
• Removed sliding door leading to sunroom
• Repaired & painted walls, ceiling & fireplace
• Sanded, stained & sealed hardwood
• Installed new door hardware and deadbolt
• Installed porcelain tile hearth
• Installed new door casings & baseboards
• Installed new ceiling fan with remote
Summary of Updates and Repairs
Main Level Sunroom
Sunroom Before Sunroom After
• Removed flooring down to the subfloor
• Repaired & painted walls, door, & ceiling
• Installed & finished new hardwood flooring
• Installed new energy efficient windows
• Installed new electric baseboard heater
• Installed new door casings and baseboards
• Installed new light fixture
• Installed new door handle and deadbolt
Summary of Updates and Repairs
Main Level Bathroom
Full Bathroom Before Full Bathroom After
• Removed vanity, toilet, and tub/shower tile
• Removed flooring down to the subfloor
• Repaired & painted walls and ceilings
• Installed new tile tub/shower surround with accent tile
& new faucet
• Installed new ceramic tile flooring
• Installed new door and door hardware
• Installed new wainscoting, door casings & baseboards
• Installed new light fixtures
• Installed new vanity/sink, faucet, toilet & mirror
• Installed new bath/hand towel bars & toilet paper
holder
Summary of Updates and Repairs
Main Level En Suite Bathroom
En Suite Bathroom Before En Suite Bathroom After
• Removed vanity, toilet, and shower
• Removed flooring down to the subfloor
• Repaired & painted walls and ceilings
• Installed new ceramic tile flooring
• Installed new vanity/sink, faucet, toilet, medicine
cabinet & mirror
• Installed new ceramic tile shower, accent tile, & faucet
• Installed new bath and hand towel holders, toilet
paper holder
• Installed new door and door hardware
• Installed new wainscoting, door casings & baseboards
• Installed new light fixture
Summary of Updates and Repairs
Main Level East Bedroom
East Bedroom Before East Bedroom After
• Removed old carpet
• Patched hardwood floor & refinished
• Repaired & painted walls & ceiling
• Installed new door casings & baseboards
• Installed new door, door hardware & closet doors
• Installed new ceiling fan & light fixture
• Installed new clothing rods in closet
Summary of Updates and Repairs
Main Level West Bedroom
West Bedroom Before West Bedroom After
• Removed old carpet
• Patched hardwood floor & refinished
• Repaired & painted walls and ceiling
• Installed new door casings & baseboards
• Installed new door, door hardware & closet doors
• Installed new ceiling fan & light fixture
• Installed new clothing rods in closet
Summary of Updates and Repairs
Lower Level Rec Room
Rec Room Before Rec Room After
• Repaired & painted walls
• Installed new carpet and pad
• Installed new energy efficient windows
• Installed new programmable thermostat
• Installed new door casings & baseboards
• Installed new light fixtures
Summary of Updates and Repairs
Lower Level Bathroom
Bathroom Before Bathroom After
• Removed vanity top, toilet & mirror
• Removed and installed new shower/faucet
• Repaired & painted walls and ceilings
• Refinished vanity & toilet topper
• Installed new vanity sink/faucet & mirror
• Installed new towel bar & toilet paper holder
• Installed new doors and door hardware
• Installed new wainscoting, door casings & baseboards
• Installed new light fixture
Summary of Updates and Repairs
Lower Level Laundry Room/Kitchen
Laundry Room/Kitchen Before Laundry Room/Kitchen After
• Removed damaged cabinetry & countertops
• Removed old appliances & flooring
• Refinished & replaced cabinetry
• Installed cabinet door knobs & drawer pulls
• Installed new countertops & stainless steal
sink/faucet
• Installed new stainless steel appliances
• Installed new vinyl flooring
• Installed new light fixture
• Installed new door casing and baseboards
• Installed new energy efficient window
Summary of Updates and Repairs
Lower Level East Bedroom
East Bedroom Before East Bedroom After
• Removed old carpet
• Repaired & painted walls & ceiling
• Refinished closet doors
• Installed new interior door and door hardware
• Installed new energy efficient egress window
• Installed new door casings & baseboards
• Installed new light fixture
Summary of Updates and Repairs
Lower Level West Bedroom
West Bedroom Before West Bedroom After
• Removed old carpet
• Repaired & painted walls & ceiling
• Refinished closet doors
• Installed new door and door hardware
• Installed new energy efficient egress window
• Installed new door casings & baseboards
• Installed new light fixture
Summary of Updates and Repairs
Lower Level Office
Office Before Office After
• Repaired & painted walls & ceiling
• Refinished closet doors
• Installed new door & door hardware
• Installed new door casings & baseboards
Summary of Updates and Repairs

Sunset Work Summay_LinkedIn

  • 1.
  • 2.
    Front Façade Front FaçadeBefore Front Façade After • Fixed roofing, gutter, eve issues • Painted exterior • Repaired sprinkler system, including new control box and head, restored front lawn • Installed new beds, edging, mulch & plantings • Installed new front door with leaded glass insert, new door hardware and deadbolt lock • Installed new light fixture • Installed new door bell Summary of Updates and Repairs
  • 3.
    Backyard Backyard Before BackyardAfter • Painted exterior • Painted shed to match • Installed and painted new 9 pane glass door into kitchen area • Installed new door hardware • Repaired existing sprinkler system • Installed 4 additional sprinkler heads to ensure adequate water coverage • Installed new sod and trimmed trees • Added landscape edging and mulch Summary of Updates and Repairs
  • 4.
    Main Level LivingRoom Living Room Before Living Room After • Removed old carpet • Replaced subfloor patching with hardwood where necessary • Sanded, stained, sealed hardwood • Installed new closet door and hardware • Installed new door casings & baseboards • Installed new ceiling fan with remote • Repaired & painted walls and ceiling Summary of Updates and Repairs
  • 5.
    Main Level Kitchen KitchenBefore Kitchen After • Removed cabinetry & appliances • Removed old flooring down to subfloor • Replaced fluorescent lighting with designer pendent lighting • Repaired & painted walls and ceilings • Installed new porcelain tile floor • Installed new cabinetry including island • Installed new cabinet door knobs & drawer pulls • Installed granite and solid hickory countertops • Installed new porcelain backsplash • Installed new stainless steel sink and faucet • Installed new door casings and baseboard • Installed all new stainless steel appliances Summary of Updates and Repairs
  • 6.
    Main Level FamilyRoom Family Room Before Family Room After • Removed dated cabinetry and shelves • Removed old carpet • Removed sliding door leading to sunroom • Repaired & painted walls, ceiling & fireplace • Sanded, stained & sealed hardwood • Installed new door hardware and deadbolt • Installed porcelain tile hearth • Installed new door casings & baseboards • Installed new ceiling fan with remote Summary of Updates and Repairs
  • 7.
    Main Level Sunroom SunroomBefore Sunroom After • Removed flooring down to the subfloor • Repaired & painted walls, door, & ceiling • Installed & finished new hardwood flooring • Installed new energy efficient windows • Installed new electric baseboard heater • Installed new door casings and baseboards • Installed new light fixture • Installed new door handle and deadbolt Summary of Updates and Repairs
  • 8.
    Main Level Bathroom FullBathroom Before Full Bathroom After • Removed vanity, toilet, and tub/shower tile • Removed flooring down to the subfloor • Repaired & painted walls and ceilings • Installed new tile tub/shower surround with accent tile & new faucet • Installed new ceramic tile flooring • Installed new door and door hardware • Installed new wainscoting, door casings & baseboards • Installed new light fixtures • Installed new vanity/sink, faucet, toilet & mirror • Installed new bath/hand towel bars & toilet paper holder Summary of Updates and Repairs
  • 9.
    Main Level EnSuite Bathroom En Suite Bathroom Before En Suite Bathroom After • Removed vanity, toilet, and shower • Removed flooring down to the subfloor • Repaired & painted walls and ceilings • Installed new ceramic tile flooring • Installed new vanity/sink, faucet, toilet, medicine cabinet & mirror • Installed new ceramic tile shower, accent tile, & faucet • Installed new bath and hand towel holders, toilet paper holder • Installed new door and door hardware • Installed new wainscoting, door casings & baseboards • Installed new light fixture Summary of Updates and Repairs
  • 10.
    Main Level EastBedroom East Bedroom Before East Bedroom After • Removed old carpet • Patched hardwood floor & refinished • Repaired & painted walls & ceiling • Installed new door casings & baseboards • Installed new door, door hardware & closet doors • Installed new ceiling fan & light fixture • Installed new clothing rods in closet Summary of Updates and Repairs
  • 11.
    Main Level WestBedroom West Bedroom Before West Bedroom After • Removed old carpet • Patched hardwood floor & refinished • Repaired & painted walls and ceiling • Installed new door casings & baseboards • Installed new door, door hardware & closet doors • Installed new ceiling fan & light fixture • Installed new clothing rods in closet Summary of Updates and Repairs
  • 12.
    Lower Level RecRoom Rec Room Before Rec Room After • Repaired & painted walls • Installed new carpet and pad • Installed new energy efficient windows • Installed new programmable thermostat • Installed new door casings & baseboards • Installed new light fixtures Summary of Updates and Repairs
  • 13.
    Lower Level Bathroom BathroomBefore Bathroom After • Removed vanity top, toilet & mirror • Removed and installed new shower/faucet • Repaired & painted walls and ceilings • Refinished vanity & toilet topper • Installed new vanity sink/faucet & mirror • Installed new towel bar & toilet paper holder • Installed new doors and door hardware • Installed new wainscoting, door casings & baseboards • Installed new light fixture Summary of Updates and Repairs
  • 14.
    Lower Level LaundryRoom/Kitchen Laundry Room/Kitchen Before Laundry Room/Kitchen After • Removed damaged cabinetry & countertops • Removed old appliances & flooring • Refinished & replaced cabinetry • Installed cabinet door knobs & drawer pulls • Installed new countertops & stainless steal sink/faucet • Installed new stainless steel appliances • Installed new vinyl flooring • Installed new light fixture • Installed new door casing and baseboards • Installed new energy efficient window Summary of Updates and Repairs
  • 15.
    Lower Level EastBedroom East Bedroom Before East Bedroom After • Removed old carpet • Repaired & painted walls & ceiling • Refinished closet doors • Installed new interior door and door hardware • Installed new energy efficient egress window • Installed new door casings & baseboards • Installed new light fixture Summary of Updates and Repairs
  • 16.
    Lower Level WestBedroom West Bedroom Before West Bedroom After • Removed old carpet • Repaired & painted walls & ceiling • Refinished closet doors • Installed new door and door hardware • Installed new energy efficient egress window • Installed new door casings & baseboards • Installed new light fixture Summary of Updates and Repairs
  • 17.
    Lower Level Office OfficeBefore Office After • Repaired & painted walls & ceiling • Refinished closet doors • Installed new door & door hardware • Installed new door casings & baseboards Summary of Updates and Repairs