The Financial Management Module incorporates Financial Accounting, Accounts Receivable, Accounts
Payable and Management Reporting.
Salient Features
Integrated General Ledger, Accounts Receivable, Accounts Payable and MIS Reporting. l
Multi Company and Multi Departmental Accounting and consolidation at company level. l
Trial Balance, Balance Sheet, Profit & Loss Account at unit level as well as company level. l
Analysis reports by Department. l
Multi currency system enables maintenance of Accounts in foreign currency. l
Post-Dated Cheques Management. l
User-definable summary and detailed formats for Balance Sheet and Profit & Loss Statements. l
Flexible Chart of Account Coding Structure. l
Balance sheet and Profit & Loss Account
classifications are independent of the Account
Codes. This facilitates the shifting of Balance Sheet
or Profit & Loss account heads from one group to
another, without re-coding the main accounts, and
losing the General Ledger history of that account.
Allows for user defined accounting periods. l
l Generalized transaction entry screens to simplify
data entry procedures.
Option of batch posting of transactions. l
VAT and Sales Tax handling. l
Un-posted statistics. l
l Ledger Interface for Purchase & Sales
transactions.
Ratio Analysis. l
Bank Reconciliation statement
APEX ERP is an ERP/accounting System Brought to you by POSmart Systems Ltd(www.posmart.co.ke. It was initially released by Cybrosys in India. It includes all ERP Feature Finance, Accounting, Inventory, Payroll. Its suitable for Micro, Small and Medium business. We have the customized the system for Kenyan businesses.
Roadmap ERP is an end-to-end business solution that can integrate all functions of a business including manufacturing, finance, distribution, and more. It allows for real-time access and visibility across departments. Roadmap ERP is designed to increase business values through process integration, transformation, cost reduction and process re-engineering. The system can be customized to meet industry or company-specific needs without limiting upgrades.
BizzTrax Pro - Enterprise Resource Planning Software - Pakistan's Best ERPEfroTech
18 Years of Business Applications experience; with Over 1,000 Clients; in 21 different Industry Verticals; having Implementations in 30+ Countries; and Resellers in 15+ Countries; recognition through Winner Trophies at P@SHA ICT Award 2013 and Nomination for BizzTrax ERP (http://www.BizzTrax.com) at APICTA 2013 in Hong Kong; for 3 products, PROUDLY MADE IN PAKISTAN!
FACT ERP.NG is a next generation ERP software that provides:
- Integrated management of all company departments on a single platform with real-time updating of transactions.
- Robust security features including user rights management and audit trails.
- Over 2,000 reports and powerful analytics capabilities including custom report building.
- Flexible customization options like custom fields, invoice designs, and report filtering.
This document provides an overview of Sage Evolution, an integrated business management software solution. It offers accounting, CRM, inventory management, payroll, and other modules. Key features highlighted include fully integrated modules, lowest total cost of ownership, easy to use interface, specialized industry modules, simplified reporting, and support infrastructure. The core Sage Evolution system and additional modules that can be purchased are described.
This document provides an overview of the Sage Evolution ERP software solution. It describes Sage Evolution as a fully integrated business management application that brings together financials, CRM, inventory, and other operations. The document outlines key features of the core Sage Evolution system including accounting, sales, purchasing, inventory, and reporting. It also lists numerous add-on modules that can expand the functionality of the system for specific industries or business needs. Customer testimonials praise how Sage Evolution has improved operations and efficiency.
The document provides a professional summary for Dileep Rai that outlines his 6+ years of experience in Oracle EBS applications including Oracle SCM, ASCP, Dmantra, package consulting, and business analysis. It details his roles and responsibilities in various IT roles at companies like The Boeing Company, Ingersoll Rand, and Last Calendar Date where he performed tasks like Oracle EBS setup, custom report development, production support, and gathering business requirements. The summary highlights his technical skills in Oracle PL/SQL, Java, C/C++, and tools like PLSQL Developer and Toad.
APEX ERP is an ERP/accounting System Brought to you by POSmart Systems Ltd(www.posmart.co.ke. It was initially released by Cybrosys in India. It includes all ERP Feature Finance, Accounting, Inventory, Payroll. Its suitable for Micro, Small and Medium business. We have the customized the system for Kenyan businesses.
Roadmap ERP is an end-to-end business solution that can integrate all functions of a business including manufacturing, finance, distribution, and more. It allows for real-time access and visibility across departments. Roadmap ERP is designed to increase business values through process integration, transformation, cost reduction and process re-engineering. The system can be customized to meet industry or company-specific needs without limiting upgrades.
BizzTrax Pro - Enterprise Resource Planning Software - Pakistan's Best ERPEfroTech
18 Years of Business Applications experience; with Over 1,000 Clients; in 21 different Industry Verticals; having Implementations in 30+ Countries; and Resellers in 15+ Countries; recognition through Winner Trophies at P@SHA ICT Award 2013 and Nomination for BizzTrax ERP (http://www.BizzTrax.com) at APICTA 2013 in Hong Kong; for 3 products, PROUDLY MADE IN PAKISTAN!
FACT ERP.NG is a next generation ERP software that provides:
- Integrated management of all company departments on a single platform with real-time updating of transactions.
- Robust security features including user rights management and audit trails.
- Over 2,000 reports and powerful analytics capabilities including custom report building.
- Flexible customization options like custom fields, invoice designs, and report filtering.
This document provides an overview of Sage Evolution, an integrated business management software solution. It offers accounting, CRM, inventory management, payroll, and other modules. Key features highlighted include fully integrated modules, lowest total cost of ownership, easy to use interface, specialized industry modules, simplified reporting, and support infrastructure. The core Sage Evolution system and additional modules that can be purchased are described.
This document provides an overview of the Sage Evolution ERP software solution. It describes Sage Evolution as a fully integrated business management application that brings together financials, CRM, inventory, and other operations. The document outlines key features of the core Sage Evolution system including accounting, sales, purchasing, inventory, and reporting. It also lists numerous add-on modules that can expand the functionality of the system for specific industries or business needs. Customer testimonials praise how Sage Evolution has improved operations and efficiency.
The document provides a professional summary for Dileep Rai that outlines his 6+ years of experience in Oracle EBS applications including Oracle SCM, ASCP, Dmantra, package consulting, and business analysis. It details his roles and responsibilities in various IT roles at companies like The Boeing Company, Ingersoll Rand, and Last Calendar Date where he performed tasks like Oracle EBS setup, custom report development, production support, and gathering business requirements. The summary highlights his technical skills in Oracle PL/SQL, Java, C/C++, and tools like PLSQL Developer and Toad.
Kranthi Kumar Gandavaram is an ABAP Developer with over 4 years of experience working with SAP modules like SD, MM, PP, HR, and FI. He currently works as an Executive for SAP Technical Operations at Mylan Laboratories Limited in Hyderabad, India. Kranthi has extensive experience developing reports, forms, and workflows in ABAP and coordinating support projects. He is proficient in ABAP, SQL, and web technologies and has knowledge of the SAP development lifecycle.
BIS Solutions DMCC provides a customized cloud ERP solution called Econex for organizations of various sizes, with a focus on construction, trading, and hospitality. Econex integrates departments and provides real-time information to users on any device. It streamlines workflows to enable better decision making and more efficient data handling. The document then describes key features and modules of Econex such as inventory management, sales, procurement, project management, finance and accounting, HR and payroll, and more.
FRIENDSHIP is a network
that needs:
no recharge!
no charging!
No roaming!
no validity!
no activation!
no signal problems!
just don't switch off your HEART !
Enterprise Resource Planning
Enterprise resource planning (ERP) software integrates various business functions and departments into a single system. ERP modules mimic major functional areas and include production planning, purchasing, inventory control, sales, finance, accounting, and human resources. When implemented together, the modules streamline processes across departments and provide executives with integrated reports.
ReportStream is a service that provides users access to critical organizational data from their Agresso system through meaningful, timely, and correctly formatted reports delivered at a fixed monthly cost. It offers unlimited reports on demand with quick turnaround. New reports can be built online in real time. All reports are publication-quality formatted with an organization's branding. ReportStream solves long-standing reporting problems at a lower cost than traditional tools.
Tally.ERP 9 is accounting software developed by Tally Solutions in 1986 that provides flexible and easy to use business solutions. It is one of the first accounting software packages to introduce no-code configurations and multilingual capabilities. With over 2 million users, Tally.ERP 9 offers integrated inventory management, financial reporting, receivables/payables management, and other tools to help businesses control costs and enhance productivity, management decision making, and business value.
SAP FICO Interview Questions By Garudatrainingspiyushchawala
SAP FICO is a core SAP module that covers the financial and reporting segments of a business.
It consists of the interrelated component modules-FI (Financials) and CO (Controlling) with an
extensive set of sub-modules that cover every aspect of the financial and managerial accounting
for both external and internal reporting. Skilled FICO Technical and Functional Consultants are in
very high demand as enterprises world over have been moving to SAP as a single solution for their
business needs. As financial management forms the very basis for any business, SAP FICO has seen
a consistent increase in its implementation with a very high demand for FICO professionals. Garuda
Trainings has come out with a comprehensive online training course in SAP FICO to give our students
the much needed advantage in this highly competitive and sought after segment of the ERP industry.
Online SAP FICO Course Contents: FICO is an integration of two modules FI and CO and the below
curriculum has been segmented accordingly.
Contents:
1) An Introduction to SAP
2) The FI module and its architecture
3) General Ledger Accounting
4) Fixed Assets sub-module
5) The Account Receivables sub-module
6) The Accounts Payable sub-module
7) Integration with other SAP modules and business implementation and deployment
8) The CO module and its architecture, interaction with the FI and other SAP modules
9) Cost centres and profit centres accounting
10) Internal orders and profitability
11) Product costing and activity based costing
For More Info: http://garudatrainings.com/sap-fico-online-training/
Why Choose Us: Our online course in SAP FICO gives you a perfect flexibility of pursing the
course within your existing schedule as you can opt from weekend or weekday batches as per
your convenience. The training resources are prepared by experts with rich experience in SAP
implementations. All modules are led by trainers and are interactive with a recording ability for
future use and access. We offer a 24/7 access to training resources and technical support and give
you a perfect quality training course with an extra emphasis on practical exposure to real-time
implementation scenarios and live projects.
The Complete Advantage: We endeavour to give you a perfect career as a SAP FICO consultant and
our online training course also includes the advantage of placement assistance through our industry
network. To help our users easily clear the interview evaluation, we offer an extensive collection of
in-depth interview questionnaires along with tips of effectively writing resumes. Choose us to get
the perfect advantage in your career as an SAP FICO consultant.
Register For Free Demo:
www.Garudatrainings.com
Email Us:garudatrainings@gmail.com
Ph No:+1-508-841-6144
Vinoth kumar ravi sap abap technical consultantVinoth Kumar
This document contains a summary of Vinoth Kumar Ravi's professional experience and qualifications. He has over 4 years of experience as an SAP ABAP Technical Consultant, with extensive expertise in ABAP programming, interfaces, reporting, and system implementations. Some of his project experiences include roles as an SAP Business Analyst for Allianz Global Corporate & Specialty in Germany and as an ABAP Consultant for various clients in industries such as textiles, steel manufacturing, and petroleum.
The document discusses Orion ERP, an enterprise resource planning software by 3i Infotech. It highlights key features of Orion ERP including industry-specific solutions for manufacturing, trading, retail and distribution, and contracting industries. The summary provides overviews of modules for procurement, inventory, sales, finance and their associated benefits. Mobility, security, analytics and other features that differentiate Orion ERP from other solutions are also summarized.
The document discusses an ERP solution provider that offers various ERP modules including HR & payroll, bookkeeping, inventory, quality assurance, and sales & distribution. It highlights key features of each module and benefits of their solutions such as increased efficiency, real-time data access across locations, and customizable solutions. The company has 20 years of experience and 38,000 clients worldwide.
Accounting is the process of recording, classifying, summarizing, and interpreting financial transactions. The key aspects of accounting include recording transactions, classifying them, summarizing them to produce financial statements, and interpreting the results. Accounting standards provide guidelines for preparing financial statements and disclosures. Payroll involves accurately paying employees for their work by calculating earnings, making statutory deductions, and ensuring employer contributions are made correctly. Service tax is an indirect tax collected in India on the supply of taxable services.
This document is a resume for a SAP FICO consultant with over 4 years of experience implementing and supporting SAP FI, CO, MM, and SD modules. It outlines 3 SAP implementation projects the consultant worked on for companies in various industries. The responsibilities included configuration, testing, issue resolution, and user training. It also lists the consultant's technical skills and education background.
LiveSku is a secondary sales management software developed by Brainwave Applications. Implemented at FMCG majors and Manufacturing industry verticals, the product aims to give a complete view of sales data across all sales channels including super stockist, stockist or distributors and retailers. Integrated with SAP ECC and Tally. Has powerful features including sales target creation, recording dispatch primary sales data from SAP, managing distributor's collections and credit and real time inventory update across all sales channel. Integration ready with a variety of mobile touch points.
This document provides a summary of an individual's work experience and qualifications. It details their 5+ years of experience as a SQL Server Developer in the banking domain. Key skills include SQL Server, SSIS, SSRS and experience with tools like DataStage, Control-M and Teradata. Major projects summarized are an IMIS project involving ETL from various sources to a data warehouse, an LMP project for liquidity management reporting, and regulatory reporting projects using tools like OneSumX. The individual is seeking a challenging position to utilize their technical and business skills.
Rex Introduction - Accounting was never so EASY.Rex-Solutions
This document provides an overview and description of the REX ERP application. It describes what ERP is, the significance of ERP in today's competition, key features of the REX ERP application, modules and business scenarios the application supports, and how to get started with the application. The application is a cloud-based ERP solution that allows for integrated management of business processes including accounting, inventory, sales, and reporting. It provides functionality for accounts payable, accounts receivable, general ledger, treasury management and robust reporting capabilities.
Kumaravel Sugumar has over 1.7 years of experience as an SAP ABAP technical consultant. He has worked on projects for clients like Onninen and MaheshValue Group, developing reports, forms, conversions between legacy and SAP systems, and notification programs. He is proficient in ABAP, SQL, and various SAP modules like SD, MM, and FICO. Kumaravel holds an M.E. in VLSI Design and a B.E. in Electronics and Communication.
This document provides a summary of Amit Kumar Rajora's work experience and skills in SAP ABAP. It details over 8 years of experience in IT and the SAP ABAP domain. Key experiences include developing reports, interfaces, enhancements, custom forms and tables, and data migration tools. Technical skills listed include ABAP programming, SQL, object-oriented design, and SAP modules like FI, CO, MM, and SD.
Kranthi Kumar Gandavaram is an ABAP Developer with over 4 years of experience working with SAP modules like SD, MM, PP, HR, and FI. He currently works as an Executive for SAP Technical Operations at Mylan Laboratories Limited in Hyderabad, India. Kranthi has extensive experience developing reports, forms, and workflows in ABAP and coordinating support projects. He is proficient in ABAP, SQL, and web technologies and has knowledge of the SAP development lifecycle.
BIS Solutions DMCC provides a customized cloud ERP solution called Econex for organizations of various sizes, with a focus on construction, trading, and hospitality. Econex integrates departments and provides real-time information to users on any device. It streamlines workflows to enable better decision making and more efficient data handling. The document then describes key features and modules of Econex such as inventory management, sales, procurement, project management, finance and accounting, HR and payroll, and more.
FRIENDSHIP is a network
that needs:
no recharge!
no charging!
No roaming!
no validity!
no activation!
no signal problems!
just don't switch off your HEART !
Enterprise Resource Planning
Enterprise resource planning (ERP) software integrates various business functions and departments into a single system. ERP modules mimic major functional areas and include production planning, purchasing, inventory control, sales, finance, accounting, and human resources. When implemented together, the modules streamline processes across departments and provide executives with integrated reports.
ReportStream is a service that provides users access to critical organizational data from their Agresso system through meaningful, timely, and correctly formatted reports delivered at a fixed monthly cost. It offers unlimited reports on demand with quick turnaround. New reports can be built online in real time. All reports are publication-quality formatted with an organization's branding. ReportStream solves long-standing reporting problems at a lower cost than traditional tools.
Tally.ERP 9 is accounting software developed by Tally Solutions in 1986 that provides flexible and easy to use business solutions. It is one of the first accounting software packages to introduce no-code configurations and multilingual capabilities. With over 2 million users, Tally.ERP 9 offers integrated inventory management, financial reporting, receivables/payables management, and other tools to help businesses control costs and enhance productivity, management decision making, and business value.
SAP FICO Interview Questions By Garudatrainingspiyushchawala
SAP FICO is a core SAP module that covers the financial and reporting segments of a business.
It consists of the interrelated component modules-FI (Financials) and CO (Controlling) with an
extensive set of sub-modules that cover every aspect of the financial and managerial accounting
for both external and internal reporting. Skilled FICO Technical and Functional Consultants are in
very high demand as enterprises world over have been moving to SAP as a single solution for their
business needs. As financial management forms the very basis for any business, SAP FICO has seen
a consistent increase in its implementation with a very high demand for FICO professionals. Garuda
Trainings has come out with a comprehensive online training course in SAP FICO to give our students
the much needed advantage in this highly competitive and sought after segment of the ERP industry.
Online SAP FICO Course Contents: FICO is an integration of two modules FI and CO and the below
curriculum has been segmented accordingly.
Contents:
1) An Introduction to SAP
2) The FI module and its architecture
3) General Ledger Accounting
4) Fixed Assets sub-module
5) The Account Receivables sub-module
6) The Accounts Payable sub-module
7) Integration with other SAP modules and business implementation and deployment
8) The CO module and its architecture, interaction with the FI and other SAP modules
9) Cost centres and profit centres accounting
10) Internal orders and profitability
11) Product costing and activity based costing
For More Info: http://garudatrainings.com/sap-fico-online-training/
Why Choose Us: Our online course in SAP FICO gives you a perfect flexibility of pursing the
course within your existing schedule as you can opt from weekend or weekday batches as per
your convenience. The training resources are prepared by experts with rich experience in SAP
implementations. All modules are led by trainers and are interactive with a recording ability for
future use and access. We offer a 24/7 access to training resources and technical support and give
you a perfect quality training course with an extra emphasis on practical exposure to real-time
implementation scenarios and live projects.
The Complete Advantage: We endeavour to give you a perfect career as a SAP FICO consultant and
our online training course also includes the advantage of placement assistance through our industry
network. To help our users easily clear the interview evaluation, we offer an extensive collection of
in-depth interview questionnaires along with tips of effectively writing resumes. Choose us to get
the perfect advantage in your career as an SAP FICO consultant.
Register For Free Demo:
www.Garudatrainings.com
Email Us:garudatrainings@gmail.com
Ph No:+1-508-841-6144
Vinoth kumar ravi sap abap technical consultantVinoth Kumar
This document contains a summary of Vinoth Kumar Ravi's professional experience and qualifications. He has over 4 years of experience as an SAP ABAP Technical Consultant, with extensive expertise in ABAP programming, interfaces, reporting, and system implementations. Some of his project experiences include roles as an SAP Business Analyst for Allianz Global Corporate & Specialty in Germany and as an ABAP Consultant for various clients in industries such as textiles, steel manufacturing, and petroleum.
The document discusses Orion ERP, an enterprise resource planning software by 3i Infotech. It highlights key features of Orion ERP including industry-specific solutions for manufacturing, trading, retail and distribution, and contracting industries. The summary provides overviews of modules for procurement, inventory, sales, finance and their associated benefits. Mobility, security, analytics and other features that differentiate Orion ERP from other solutions are also summarized.
The document discusses an ERP solution provider that offers various ERP modules including HR & payroll, bookkeeping, inventory, quality assurance, and sales & distribution. It highlights key features of each module and benefits of their solutions such as increased efficiency, real-time data access across locations, and customizable solutions. The company has 20 years of experience and 38,000 clients worldwide.
Accounting is the process of recording, classifying, summarizing, and interpreting financial transactions. The key aspects of accounting include recording transactions, classifying them, summarizing them to produce financial statements, and interpreting the results. Accounting standards provide guidelines for preparing financial statements and disclosures. Payroll involves accurately paying employees for their work by calculating earnings, making statutory deductions, and ensuring employer contributions are made correctly. Service tax is an indirect tax collected in India on the supply of taxable services.
This document is a resume for a SAP FICO consultant with over 4 years of experience implementing and supporting SAP FI, CO, MM, and SD modules. It outlines 3 SAP implementation projects the consultant worked on for companies in various industries. The responsibilities included configuration, testing, issue resolution, and user training. It also lists the consultant's technical skills and education background.
LiveSku is a secondary sales management software developed by Brainwave Applications. Implemented at FMCG majors and Manufacturing industry verticals, the product aims to give a complete view of sales data across all sales channels including super stockist, stockist or distributors and retailers. Integrated with SAP ECC and Tally. Has powerful features including sales target creation, recording dispatch primary sales data from SAP, managing distributor's collections and credit and real time inventory update across all sales channel. Integration ready with a variety of mobile touch points.
This document provides a summary of an individual's work experience and qualifications. It details their 5+ years of experience as a SQL Server Developer in the banking domain. Key skills include SQL Server, SSIS, SSRS and experience with tools like DataStage, Control-M and Teradata. Major projects summarized are an IMIS project involving ETL from various sources to a data warehouse, an LMP project for liquidity management reporting, and regulatory reporting projects using tools like OneSumX. The individual is seeking a challenging position to utilize their technical and business skills.
Rex Introduction - Accounting was never so EASY.Rex-Solutions
This document provides an overview and description of the REX ERP application. It describes what ERP is, the significance of ERP in today's competition, key features of the REX ERP application, modules and business scenarios the application supports, and how to get started with the application. The application is a cloud-based ERP solution that allows for integrated management of business processes including accounting, inventory, sales, and reporting. It provides functionality for accounts payable, accounts receivable, general ledger, treasury management and robust reporting capabilities.
Kumaravel Sugumar has over 1.7 years of experience as an SAP ABAP technical consultant. He has worked on projects for clients like Onninen and MaheshValue Group, developing reports, forms, conversions between legacy and SAP systems, and notification programs. He is proficient in ABAP, SQL, and various SAP modules like SD, MM, and FICO. Kumaravel holds an M.E. in VLSI Design and a B.E. in Electronics and Communication.
This document provides a summary of Amit Kumar Rajora's work experience and skills in SAP ABAP. It details over 8 years of experience in IT and the SAP ABAP domain. Key experiences include developing reports, interfaces, enhancements, custom forms and tables, and data migration tools. Technical skills listed include ABAP programming, SQL, object-oriented design, and SAP modules like FI, CO, MM, and SD.
Profiles of Iconic Fashion Personalities.pdfTTop Threads
The fashion industry is dynamic and ever-changing, continuously sculpted by trailblazing visionaries who challenge norms and redefine beauty. This document delves into the profiles of some of the most iconic fashion personalities whose impact has left a lasting impression on the industry. From timeless designers to modern-day influencers, each individual has uniquely woven their thread into the rich fabric of fashion history, contributing to its ongoing evolution.
How are Lilac French Bulldogs Beauty Charming the World and Capturing Hearts....Lacey Max
“After being the most listed dog breed in the United States for 31
years in a row, the Labrador Retriever has dropped to second place
in the American Kennel Club's annual survey of the country's most
popular canines. The French Bulldog is the new top dog in the
United States as of 2022. The stylish puppy has ascended the
rankings in rapid time despite having health concerns and limited
color choices.”
Best practices for project execution and deliveryCLIVE MINCHIN
A select set of project management best practices to keep your project on-track, on-cost and aligned to scope. Many firms have don't have the necessary skills, diligence, methods and oversight of their projects; this leads to slippage, higher costs and longer timeframes. Often firms have a history of projects that simply failed to move the needle. These best practices will help your firm avoid these pitfalls but they require fortitude to apply.
NIMA2024 | De toegevoegde waarde van DEI en ESG in campagnes | Nathalie Lam |...BBPMedia1
Nathalie zal delen hoe DEI en ESG een fundamentele rol kunnen spelen in je merkstrategie en je de juiste aansluiting kan creëren met je doelgroep. Door middel van voorbeelden en simpele handvatten toont ze hoe dit in jouw organisatie toegepast kan worden.
The Most Inspiring Entrepreneurs to Follow in 2024.pdfthesiliconleaders
In a world where the potential of youth innovation remains vastly untouched, there emerges a guiding light in the form of Norm Goldstein, the Founder and CEO of EduNetwork Partners. His dedication to this cause has earned him recognition as a Congressional Leadership Award recipient.
Garments ERP Software in Bangladesh _ Pridesys IT Ltd.pdfPridesys IT Ltd.
Pridesys Garments ERP is one of the leading ERP solution provider, especially for Garments industries which is integrated with
different modules that cover all the aspects of your Garments Business. This solution supports multi-currency and multi-location
based operations. It aims at keeping track of all the activities including receiving an order from buyer, costing of order, resource
planning, procurement of raw materials, production management, inventory management, import-export process, order
reconciliation process etc. It’s also integrated with other modules of Pridesys ERP including finance, accounts, HR, supply-chain etc.
With this automated solution you can easily track your business activities and entire operations of your garments manufacturing
proces
Storytelling is an incredibly valuable tool to share data and information. To get the most impact from stories there are a number of key ingredients. These are based on science and human nature. Using these elements in a story you can deliver information impactfully, ensure action and drive change.
𝐔𝐧𝐯𝐞𝐢𝐥 𝐭𝐡𝐞 𝐅𝐮𝐭𝐮𝐫𝐞 𝐨𝐟 𝐄𝐧𝐞𝐫𝐠𝐲 𝐄𝐟𝐟𝐢𝐜𝐢𝐞𝐧𝐜𝐲 𝐰𝐢𝐭𝐡 𝐍𝐄𝐖𝐍𝐓𝐈𝐃𝐄’𝐬 𝐋𝐚𝐭𝐞𝐬𝐭 𝐎𝐟𝐟𝐞𝐫𝐢𝐧𝐠𝐬
Explore the details in our newly released product manual, which showcases NEWNTIDE's advanced heat pump technologies. Delve into our energy-efficient and eco-friendly solutions tailored for diverse global markets.
Dive into this presentation and learn about the ways in which you can buy an engagement ring. This guide will help you choose the perfect engagement rings for women.
HR search is critical to a company's success because it ensures the correct people are in place. HR search integrates workforce capabilities with company goals by painstakingly identifying, screening, and employing qualified candidates, supporting innovation, productivity, and growth. Efficient talent acquisition improves teamwork while encouraging collaboration. Also, it reduces turnover, saves money, and ensures consistency. Furthermore, HR search discovers and develops leadership potential, resulting in a strong pipeline of future leaders. Finally, this strategic approach to recruitment enables businesses to respond to market changes, beat competitors, and achieve long-term success.
Industrial Tech SW: Category Renewal and CreationChristian Dahlen
Every industrial revolution has created a new set of categories and a new set of players.
Multiple new technologies have emerged, but Samsara and C3.ai are only two companies which have gone public so far.
Manufacturing startups constitute the largest pipeline share of unicorns and IPO candidates in the SF Bay Area, and software startups dominate in Germany.
2. Introducing pow ERPro™
Need for pow ERPro™
In the SME segment manufacturers and jobs shops had only two software alternatives:
a) Invest in a mid-range or high-end ERP manufacturing package.
b) Operate with a generic accounting system.
Most mid-range and high-end ERP manufacturing software packages do a great job for big companies, but
for smaller companies they are complex, costly, and difficult to learn and use. Most generic accounting
packages do a great job on the financial side, but fail to address bottom-line manufacturing issues such as
production planning, scheduling, and job costing.
powERP ro™ bridges the gap between these two alternatives by offering you a low-risk, practical solution that
meets the needs of the vast majority of manufacturers and job shops.
powERP ro™ has been developed in VB & Interbase RDBMS environment and can be implemented on wide
range of hardware and operating systems. Interbase ensures that your investment in time and money on
the application software is secure.
powERP ro™ incorporates the following:
Financial Analysis & Management
P
General Ledger
P
Accounts Receivables
P
Accounts Payables
P
Inventory Control
P
Sales & Distribution
P
Purchase Management
P
Manufacturing
P
Plant Maintenance
P
Quality
P
Human Capital Management
P
Salient Features
Fully integrated software covering the core functionalities of any organization viz. Sales, Purchase,
Inventory, Manufacturing and Finance.
Software made on the business process models used by MRP/ERP software's with 15 years experience of
handling wide range of users.
Special efforts made in designing to make the software user friendly. Uses widely accepted software
platform Visual Basic ,which allows it the flexibility of upgrading to higher end platforms
Simplicity: It is one of the most simple and complete business solutions available. With this, organizations
of small sizes can deploy enterprise wide applications that are modular, scalable and reliable. It makes data
available across the enterprise.
Speed: User can get any repor ts instantaneously for any date / period and can toggle between reports,
1
3. either accounting or inventory or even from
one unit to another unit instantaneously.
Power: It has the power to generate
management information, which would
help the management in taking correct and
quick decisions resulting in faster growth of
business.
Flexibility:It is very flexible to use and can
adapt to any business needs rather than
the user trying to change the way his
business is run to adapt to the package.
Birds eye View/ Drill Down Display:
Allows users to Drill Down from any report
to lower levels.
Real-Time :Updates all reports (from day
book to Balance sheets) as and when the
transactions are entered and does not
need any back end or day/period end
process to be done.
Data Reliability & Security Level: The
backend is on Borland Interbase. Security
levels are available with roles and
privileges well defined.
Transfer of Data: Master Data transfer
from one unit to another unit.
Print Preview: Any user would ideally like to view format of reports / Invoices / Vouchers before printing the
same.
Multi-User Support: The software can be installed on a network working with different operating systems.
Simple and Rapid Installation: This has a simple installation procedure and at the time of installation the
user can opt to install the program files on any drive (i.e. if the hard disk has partitions) as well as specify the
directory names where the program files are to be installed.
Online Help: Provides user-friendly context sensitive online help for the user. First time pow ERP ro™ user
can start using the application with minimum training and it also helps the user to do the configuration.
powERP ro™ allows extensive parameterization to define input behavior to suit operational needs.
Database: The RDBMS used is Borland’s Interbase.
Operating System Supported: Windows NT/2000/2003/XP.
2
4. FINANCIAL ANALYSIS AND MANAGEMENT
The Financial Management Module incorporates Financial Accounting, Accounts Receivable, Accounts
Payable and Management Reporting.
Salient Features
Integrated General Ledger, Accounts Receivable, Accounts Payable and MIS Reporting.
l
Multi Company and Multi Departmental Accounting and consolidation at company level.
l
Trial Balance, Balance Sheet, Profit & Loss Account at unit level as well as company level.
l
Analysis reports by Department.
l
Multi currency system enables maintenance of Accounts in foreign currency.
l
Post-Dated Cheques Management.
l
User-definable summary and detailed formats for Balance Sheet and Profit & Loss Statements.
l
Flexible Chart of Account Coding Structure.
l
Balance sheet and Profit & Loss Account
classifications are independent of the Account
Codes. This facilitates the shifting of Balance Sheet
or Profit & Loss account heads from one group to
another, without re-coding the main accounts, and
losing the General Ledger history of that account.
Allows for user defined accounting periods.
l
Generalized transaction entry screens to simplify
l
data entry procedures.
Option of batch posting of transactions.
l
VAT and Sales Tax handling.
l
Un-posted statistics.
l
Ledger Interface for Purchase & Sales
l
transactions.
Ratio Analysis.
l
Bank Reconciliation statement.
l
Reports & Queries
powERP ro™ provides for exhaustive querying and reporting in the financial module to take care of daily
Financial Reporting, Ledgers, Statistical reports and MIS.
On-Line Queries
Transaction Enquiry.
Account Enquiry.
User Defined Query Builder.
General Ledger Reports
Voucher Printing.
Bank Book.
Cash Book.
Bank Position Report.
Cash Position Report.
Daybooks.
General Ledger Listing.
Trial Balances with Drill Down Option.
Bank Reconciliation.
3
5. TDS Registers.
VAT reports.
Accounts Payable Reports
Purchase Register.
Supplier Ledger.
Balance Confirmation.
Accounts Receivable Reports
Customer Ledger.
Debtors Aged Analysis.
Sales Register.
Debtor Statement.
Balance Confirmation.
Final Accounts
Profit & Loss Account (Standard/User defined).
Balance Sheet (Standard/User defined).
MIS Report
Budgeted Profit & Loss.
Transaction Analysis.
Budget Variance Analysis.
R
Cash Flow Statement.
Cash Flow Projections.
R
Expense Analysis.
Ratio Analysis.
R
4
6. PURCHASE MANAGEMENT
Purchase Management unlocks the value of your purchase process by significantly enhancing the
productivity of your quotations, forecast orders and shipping related functions.
Salient Features
Purchase Requisition.
l
Purchase Requisition approval process.
l
Pending purchase requisitions.
l
Supply quotation entry & quotation comparison
l
Vendor ship to, bill to information.
l
Vendor part number & account number entry.
l
Purchase Order approval process.
l
Subcontract management.
l
Pending delivery follow-up.
l
Purchase Order pre-closure.
l
Landed Cost simulation.
l
Automatic posting of receipt of inventory (perpetual inventory).
l
Rejection returns to supplier.
l
Vendor analysis for quantity & delivery.
l
Support for par tial deliveries.
l
VAT / Sales tax Calculation.
l
Auto generation of Raw material required based on the work order.
l
Interface to accounts payable.
l
Reports Generated:
Pending Purchase requisitions by PR Type + PR number.
Pending Order By Vendor.
Pending Order By item.
Receipt transaction checklist.
GRN by Vendor.
GRN by Item.
Item Inquiry Order & GRN.
Supplier Enquiry.
Material Requirement Enquiry.
Quotation Comparative Statement.
5
7. INVENTORY MANAGEMENT
Inventory Control System is a comprehensive solution that unlocks the value of your inventory control
processes through better controls on receipts, storage movement and analysis of stocks.
Salient Features
Multiple line description for each item.
l
Lead-time, order quantity, maximum/ minimum limit control.
l
Quantity on hand, on order, shortage.
l
Material issue system moving weighted average.
l
Receipt issue check list.
l
Stock adjustments.
l
Material transfer transaction logging & reporting.
l
Material return notes for rejected deliveries.
l
Month wise analysis of receipts and issues.
l
Stock level enquiry.
l
Monthly stock statements.
l
Moving weighted average / standard valuation.
l
Outstanding orders, invoices & shipments.
l
Expiry Date Revalidation.
l
Perpetual Stock Taking.
l
Reports Generated:
Stock Ledger.
Landed Cost for Goods Receipt.
Adjustments During a Period.
Stock Transfers.
Store wise Item Stock Valuation.
Item Stock Movement.
Stock Aged Analysis.
Analysis of stock by Consumption.
6
8. Stock Status by quantity and value.
Store wise / Product wise Stock Status.
Stock Above Maximum Level.
Stock Below Minimum.
Inventory Listing.
ABC Analysis.
Slow moving / Non-moving Items.
Sub-contractor inventory.
Stock Order listing.
Pending Material Requisition Department wise.
Daily Stock List.
Transaction checklist.
Batch wise Stock Statement.
Physical Stock Variance report.
7
9. Sales & Distribution Management
Sales Order Processing unlocks the value of your sales processes by
significantly enhancing the productivity of your quotations, forecast orders and
shipping related functions.
Salient Features
Sales Forecast.
l
Sales Enquiry Tracking.
l
Quotation.
l
Separate due dates for each item on Sales Orders.
l
Standard Orders (regular scheduled shipment).
l
Volume discounts.
l
Sales Order Processing.
l
Sales Order pre-closure.
l
Invoice generation.
l
Complete or partial shipments with separate invoices.
l
Allows goods or services on the same order or otherwise.
l
VAT / Sales tax Calculation.
l
Sales Returns.
l
Interface to accounts receivable.
l
Reports Generated:
Sales Invoice Register.
Cash Sales Register.
Quotation Status.
Price List.
Pending Delivery Note.
8
10. Client wise / Product wise Order Report.
Average Sales (Consumption).
Profit margin report.
Sales Order listing.
Sales Graph.
Sales Analysis.
Forecast vs. Actual.
Manufacturing
Manufacturing module unlocks the
value of your planning processes by
providing information that is required
to make realistic and balanced
production plans, measure progress in
meeting plans, highlight significant
deviations to initiate timely corrective
action or develop alternate course of
action.
Salient Features
Comprehensive BOM system with multilevel explosions.
l
Generates procurement plans based on requirement.
l
Recommends direct purchase, shop floor or Sub-contract job orders for Production Plan considering
l
stock on hand & pending Purchase Orders.
Effective Purchase Management System comprising system recommended Purchase Orders, Automatic
l
Rate Checks & follow up reports fully.
Shop floor & Subcontract Management monitors work orders, material consumption & Scrap receipts.
l
Informs WIP at shop Floor & Sub-contractor stocks on-line.
l
Updates conversion charges of shop floor & Sub contractors.
l
9
11. Automatic stock updating of raw material at
l
shop floor & finished goods at stores, using
BOM.
Flexible product costing.
l
Production batch controls with expiry date.
l
Multiple stock rooms & bin Location,
l
Warehouses.
Material transfer transaction Logging &
l
Reporting.
Material return notes for rejected deliveries.
l
Concept of Work center and Assemblies.
l
Exception reporting and analysis.
l
Work Order generation.
l
Automatic work order generation for lower
l
level BOM items.
Work Order status reporting.
l
Reports Generated:
Work Order summary.
Job Order summary.
Work Order progress.
Material requirement consolidate and detail.
BOM revision report.
BOM explosion report.
Cost cards.
Transaction listing.
10
12. Quality Module
powERP ro™ quality module is a pro-active tool that unlocks the value of your inspection, calibration, testing
and deviation management functions through better analysis and triggering of corrective actions.
Quality Management functions influence all processes within a company and all the phases of a product life
cycle.
powERP ro™ links the tasks of Quality Management with those of the other applications, such as Materials
Management, Production and Sales.
Salient Features
Material Management (Purchase, Inventory Management, Material Requirement Planning).
l
Production (Work Scheduling, Shop Floor Control).
l
Incoming, In-process & Final Assembly inspections.
l
Calibration schedule & execution.
l
If any item does not require quality check to be done, the user needs to specify the
same in the item master. Similarly, if the supplier does not need to undergo
quality process for the materials sent by him, the user can specify the
same in supplier master with a tag 'Quality check No'. These
supplier transactions do not require quality check.
Reports Generated:
Rejection analysis.
Vendor rating.
Pending inspection analysis.
Warranty rejection.
Customer complaint analysis.
Defect analysis.
11
13. Plant Maintenance
powERP ro™ Plant Maintenance ensures long-term and continued availability of the production resources.
Effective maintenance planning not only prevents system breakdown, and it reduces costs due to repairs or
system replacement and production loss.
powERP ro™ Plant Maintenance enables organizations to achieve optimum capacity utilization by means of
planned maintenance of
equipments. It is capable of
keeping track of various kinds of
maintenance activities such as
Preventive Maintenance,
Breakdown Maintenance and
provides timely initiation of
decision suppor t information for
plant managers.
This module also logs all
activities pertaining to plant
maintenance and keeps
historical data of plant and
machinery.
Salient Features
Preventive maintenance
l
schedule generation.
Planning & execution.
l
Breakdown logging &
l
rectification.
Annual maintenance contract
l
handling.
Spares & Consumables consumption analysis.
l
12
14. Human Capital Management
powERP ro™ HRMS is a management tool that unlocks the value of your payroll management functions
through better mapping of skills.
powERP ro™ HRMS meets all the human resource management needs of an SME organization.
It also has a very powerful user defined query builder.
Payroll management.
Flexible payments/deduction/benefits.
l
User defined pay slips & pay registers
l
Unlimited employees
l
Leave data entry
l
All training details such as requirement, faculty etc
l
Salary amendments
l
Arrear calculation
l
Pay slip printing
l
Salary breakup
l
Birthday reports
l
Progress report
l
PF Register
l
ESI Register
l
Professional Tax report
l
Gratuity report
l
System Features
A key aspect of powERPro™ is getting the right information to
the right person at the right time. With its high degree of
flexibility in granting user access to various parts of the system, the biggest problem in companies - the
information bottleneck, is solved. Drawing from a common database, users are assured of consistent and
reliable information.
SECURITY
Login name and encrypted password protection.
l
Manages multiple users access and prevent potential data corruption using record locking capability.
l
Grant/restrict user access to various parts of the system individually.
l
DATABASE MANAGEMENT
Concise screen formats for accurate data input.
l
One stop data entry and maintenance.
l
An enterprise-wide relational database management system that generates compatible, consistent data
l
quickly and efficiently.
Auto reference numbering system for financial, production, material and sales.
l
User defined Calendar year for finance and business operation.
l
DOCUMENTATION
Complete on-line reference guide.
l
Powerful search capability simple and advanced search.
l
Screen shots - including an explanation of each field.
l
13
15. VISESH INFOTECNICS LTD.
(An ISO 9001: 2000 Company)
www.viseshinfo.com
Background
Visesh Infotecnics Ltd was established in the year 1989 with the objective of becoming a leading ERP
solution provider to the Indian industry. Over the years it has built up a sizeable customer base for its ERP
products in India and also across the globe. Visesh Infotecnics Ltd through its commitment and quality work
has created a niche for itself in the Software Industry.
Visesh Infotecnics Ltd has its operations across the country and offices in the three major metros viz.
Delhi, Bangalore and Mumbai apart from its
overseas office at Thailand.
The company is engaged in providing the
following services:
Enterprise business applications & related
l
services
Client server based applications
l
E-com, m-com and web based applications
l
Network integration
l
Security solutions
l
Hardware supply & maintenance
l
Software implementation & maintenance
l
Technology & systems consultancy
l
Visesh Infotecnics Ltd is a fast growing
company committed to providing reliable and
cost-effective software solutions to organizations globally. In the highly competitive and dynamic
software business, the key to success lies in improving software quality, enhancing efficiencies and
reducing costs on a continuous basis. Visesh is focused on these key factors in order to achieve
mission-critical business goals. Exceeding our customer expectations is an ongoing activity. The need
of the hour is to strive hard towards providing our customers with defect-free solutions and deficiency-
free services.
Emphasis on quality, world-class human resource and leading edge solutions drive our commitment.
Visesh has a state-of-the-art software development facility at Gurgaon. The facility recruits and nurtures
software talent through rigorous training programs.
The company has under its fold, over 175 highly skilled and experienced professionals from system
analysts, system designers, programmers, system integrators, Engineers, MBA's and MCA's to
Cost Accountants, Chartered Accountants and Marketing professionals, with tremendous domain
expertise in their own fields of specialization. Our Software Engineers have their expertise on
platforms like Visual Basic, VC++, Oracle/Developer 2000, SQL Server, ASP, Java, EJB, JSP, C, C++,
Cobol, Corba, COM, DCOM, Rational Rose, UML, Java Beans, WebLogic and IBM Web Sphere
application server.
We constantly enhance our quality standards to be at par with the best in the world. With a successful track
record of serving the most demanding customers, Visesh can bring you the benefits of working with a
partner with software skills, project management expertise and domain knowledge in every aspect of
Information Technology.
14
16. Our software development processes & skills have earned us an ISO 9001:2000 cer tification. We have
been ranked 167 among all I.T. companies in the first 250 of the Deloitte Touche Tohmatsu Asia Pacific
Technology Fast 500; and our ability to meet customer commitments .
The company has a for midable client list of more than 1000 large and medium size corporate houses
including MNCs and has to its credit over 900 installation of our flagship ERP Businessoft and
Businesspro. The company has a comprehensive industry-wise client list with its software being used
successfully in almost all the industries, such as chemical, automobile, sugar, pharmaceutical,
communication or consumer durables etc.
Some of our clients for Businessoft & Businesspro are: British Telecom (Worldwide), Honda Siel
Cars India Ltd.(HSCI), Kalyani Brakes (Robert Bosch group), Tata Honeywell Limited, JCT Limited,
Rico Auto Ind. Ltd, Galaxy Surfactants, K.M. Sugar Mills Ltd., Allergan India Limited, Verifone
Software Systems Limited, Bombay Oil Industries, National Panasonic Limited, Indian
Technological Products Ltd. (ITPL), Landmark Group of Companies - ALJ Group (Saudi Arabia ) etc.
15
17. VISESH INFOTECNICS LTD.
(AN ISO9001:2000 Company)
Explore a new world of ERPossibilities
REGISTERED OFFICE : 508, Arunachal Building 19 Barakhamba Connaught Place, New Delhi 110001 India.
Tel# +91 - 11 - 47613300 Fax#+91 - 11 - 47613399. e-mail: delhi@viseshinfo.com
REGIONAL OFFICE: S-209, South Block,Manipal Centre,Dickenson Road, Bangalore 560 042 India.
Tel: +91-80-56984747/48, Fax: +91-80-527 4426.
e-mail: bangalore@viseshinfo.com
REGIONAL OFFICE
: 3085, Oberoi Tower Estate, Chandivli, Andheri (E), Mumbai 400 072, India .
e-mail: mumbai@viseshinfo.com
OVERSEAS OFFICE: 8/5, Sukhumvit 28 Klongton, Klongtoey Bangkok 10110, Thailand.
Tel: (662) 261-6321 to 24, Fax: (662) 261-6325. e-mail: bangkok@viseshinfo.com
Visit us at : www.pow ERP
ERP ro.co.in