style guide



                      x




x
2

                      x

                          x
                      x   2

                  x
                  2




           1
style guide




Contents




the logo	                  page	 3
brand mark and branding	   page	 4
the brand mark	            page	 5 – 7
branding	                  page	 8 – 14
the claim	                 page	 15
colors and color system	   page	 16 – 18
fonts and typography	      page	 19 – 24
photos and images	         page	 25 – 30
examples	                  page	 31 – 36
information and contact	   page	 37




                                           2
Evolving markets and an exhibition that serves as a unique indicator: productronica 2013
is the world of innovative electronics manufacturing. It showcases the entire value-added
chain including exciting new products and applications, focused technology forums, the
latest hot topics and first-rate events.

The logo for productronica 2013 symbolizes the fair’s core elements, i.e. component-mount
technology, automation and assembly manufacturing.

The logo stands for dynamism, precision, diversity and drive. The shape ensures distinc-
tiveness and transports the fair’s primary message, i.e. innovation all along the line.




                                                                  3
brand mark and branding




The logotype for productronica 2013 consists of a brand-mark symbol and a word mark.
It represents the trade show and symbolizes our commitment to provide our customers
superior-quality service.
Handling and maintaining the logotype and using it correctly in print media and in new
media is essential for proper brand management that is specific to productronica. This
manual explains the guidelines for using the logo.




                                                                4
the brand mark
 	 basics
   	 colors




The predominant communicative idea behind the logo is the matrix. The
idea of the matrix ultimately gave rise to the primary design grid,
which makes it possible to define any point in space in two and three-
dimensional terms.

The shape of the stable, sturdy and technically oriented square, which
when used multiple times creates a flat surface in space, was selected
as the smallest element in the brand mark.
The special layout of the “solid” squares creates a clearly defined
shape which, although stable on its own, also appears to be lifting
from the surface.




                                                                  5
the brand mark
 	 basics
   	 colors




The productronica brand mark requires a sufficient clear space. Its dimensions are propor-
tional to the symbol itself. The use of other design elements of any kind whatsoever in this
clear space (protection zone) is not permitted.




                                                                                           x




                                                                                               x




     x




The brand-mark symbol is used together with the word mark.




                                                                   6
the brand mark
 	 basics
 	 colors




The productronica brand-mark must always be reproduced in the right shape and using the right colors. Additions
and modifications or distortions of any kind are not permitted.
When incorporating the logo into interactive or animated media, specific parameters for use should remain within the
limits of what is feasible and reasonable. Using the logo in 3D and in space is not covered in the manual.




Offset printing
Full color
or two colors




                          productronica orange

                          Special colors:         Euroscale:             Web:                    Hex:
                          HKS 6 K                 C:	 0 %                R:	255                  #FF8C00
                                                  M:	 45 %               G:	140
                          Pantone 130 U           Y:	 100 %              B:	0
                                                  K:	 0 %




Offset printing in b/w                                  When printing the logo in black and white, a gray value
                                                        of 35 % should be used for the orange portions of the
                                                        original symbol.




                                                        When printing the logo in color, the colors stipulated above
                                                        are mandatory.When using ink plots and specially coated
                                                        papers that cause color discrepancies, coordinating the colors
                                                        is the responsibility of the project manager.




                                                                  7
branding
 	 basics
   	 sizes
     	 colors




Combining the brand mark and the word mark




  x                                                                                                                           x




                                   x




  x                                                                                                                           x




                                       Typographically, the word mark consists of two elements: the word “productronica” in the
                                       font Frutiger (Linotype) bold, followed by the year in Frutiger light.
                                       The space between the word and the number is defined by the width of the letter “N” in
                                                                                                                            x
                                       Frutiger light. The letter height of both elements is visually (!) adjusted.

                                       The word mark always appears to the right of the brand mark. The height “x” is determined
                                       by extending horizontally the corners of the middle diamond on the right side of the brand-
                                       mark symbol. This defines the vertical position of the work mark.

                                       The clear zones (protection zone) to be maintained around the combined word/brand mark
                                       are an extension of the dimensions stipulated for the brand mark. Using the same value (x)
                                       on all sides creates a homogeneous overall image.




                                                           8
branding
 	 basics
   	 sizes
     	 colors




Using the claim with the logotype




  x                                                                                                                                x




                                    x




          x
          2

  x                                 x                                                                                              x




                                        If the claim is used with the logotype, the clear zone (protection zone) to be maintained
                                        below the mark increases by half of x. The letters in the claim are half as high as the letters
                                        in the word mark. Together, the claim and the word mark form a flush typographic block.

                                        The claim should always appear in productronica orange.




                                                             9
branding
 	 basics
   	 sizes
     	 colors




The caption in German and English




The caption that goes with the logo is clearly defined in English and
German.

It should appear in Neue Helvetica 53 Extended, letter spacing 40, and
be flush with the left of the word mark.




                                                                         20. internationale leitmesse für
                                                                         innovative elektronikfertigung




                                                                         20th international trade fair for
                                                                         innovative electronics production


                                                                 10
branding
 	 basics
   	 sizes
     	 colors




The sizes of the brand mark apply internationally. The file formats stipulated for the various sizes are optimized.
General guidelines for professional use with conventional printing techniques and new media must be observed
at all time.




Use of logo in DIN A4 format




                                           128.25 mm


The recommended logotype size for the classic A4 format (210 mm x 297 mm) on front covers
is 128.25 mm wide. As a rule, the claim should always be included.




                                 99.6 mm



On the back pages of publications in A4 format, the logotype should be 99.6 mm wide.




                 36 mm
                                                                                                                      ∞
The logotype must be at least 36 mm wide (for offset printing). Maximum width is infinity.


                                                                   11
branding
 	 basics
   	 sizes
     	 colors




Logotype colors




                       As a rule, the work mark is always black.
                       All colors in the productronica color family may be used as
                       background colors for both the color and the black-and-
                       white versions of the logo. Black and dark-gray tones may
                       not be used as background colors. The logo works better
                       on lighter color tones.
                       The logo works best against white, neutral background,
                       something that should always be taken into account when
                       the layout permits.

                       The logo should only be used against a photographic back-
                       ground if recognition is guaranteed. As a rule, the symbol
                       should not appear on high-contrast photographs. Instead,
                       it should be positioned outside the photograph.The “in-
                       verted” version of the logo should only be used with the
                       color orange.

                       These color guidelines also apply to the Internet, animated
                       sequences and motion pictures, although the 3D effect and
                       contrasting of the logo when moving must be taken into
                       account for special moods, backgrounds, etc.




                       The layout recommendations on the left should be used for
                       single-color applications such as having the logo printed on
                       advertising merchandize.




                  12
branding
 	 basics
   	 sizes
     	 colors




Using the mark against color backgrounds




Correct use                                        All of the colors in the productronica color
                                                   system may be used as background colors
                                                   for the logo. The only exceptions are black
                                                   and dark gray tones.
                                                   The logo works better against light color
                                                   shades.

                                                   The brand works best against a white,
                                                   neutral background, something that should
                                                   always be taken into account when the
                                                   layout permits.

                                                   The logo should only be used against a
                                                   photographic background if recognition is
                                                   guaranteed.

                                                   As a rule, the logo should not appear on
                                                   high-contrast photographs. Instead, it should
                                                   be positioned outside the photograph.
                   Inverted special version
                                                   These color guidelines also apply to the
                                                   Internet, animated sequences and motion
                                                   pictures, although the 3D effect and con-
                                                   trasting of the logo when moving must be
                                                   taken into account for special moods, back-
Use                                                grounds, etc.
not permitted




                                              13
branding
  basics
  sizes
  colors




Data service




All logos are available in all formats and may be downloaded from the Messe München media database:
www.productronica.com PRESS PHOTOS  LOGOS




                                                             14
the claim
  basics
  sizes
  colors




The productronica 2013 claim




The productronica claim defines the fair’s orientation.

It should always appear in Neue Helvitica 63 Medium Extended.
If at all possible, the claim should always be accentuated using
productronica orange.




innovation all along the line




                                                               15
colors and color system




When it comes to the productronica design and the effect that it
has, colors are an important tool that can be used to encode infor-
mation and make the overall picture more dynamic.
productronica’s colors have been coordinated to optimize their effect
on the areas where they are used and to make sure that they
harmonize with one another and form a logical color system. The
number of colors has been limited to make sure that they are used
more consciously.The colors that are introduced here are basic
colors and are only part of the complete color system.




                                                                    16
colors and color system




productronica’s primary colors




productronica’s basic colors are orange, white and black. These colors are primary colors.

productronica’s orange is the main brand characteristic. It is one of the colors in the brand mark, but is also used a
great deal for other design elements to ensure that it is easily recognized.

Since white is the color of unprinted paper, it is not considered a color in the print area. In the case of productronica,
white is used frequently and intentionally as a design element to ensure that the clear zone has the desired effect.

Black is the primary dark color in the print area, and not really a design color in the classical sense. In the case of
productronica, black is also a bridge that serves as a foundation for orange and white.




                                                productronica orange

                                                Special colors:          Euroscale:              Web:                     Hex:
                                                HKS 6 K                  C:	 0 %                 R:	255                   #FF8C00
                                                                         M:	 45 %                G:	140
                                                Pantone 130 U            Y:	 100 %               B:	0
                                                                         K:	 0 %




                                                black

                                                Euroscale:
                                                C:	 0 %
                                                M:	0 %
                                                Y:	 0 %
                                                K:	 100 %




                                                white

                                                Euroscale:
                                                C:	 0 %
                                                M:	0 %
                                                Y:	 0 %
                                                K:	 0 %



                                                                     17
colors and color system




productronica’s secondary colors




To characterize productronica as concisely as possible, we have intentionally done without a wide range of decorative
colors. The entire range of gray tones from 0% to 100 % black is available to the designer. Gray tones should also be
used for transparent elements in the layout.
Silver can be used as a finishing color, as can the palette of Pantone Cool Gray special colors.
In some cases, printing varnish or dummy stampings may be used for finishing. Photographs are used to make
products more colorful.




                                              productronica silver

                                              Special color:

                                              Pantone 877




 gray_K: 5 %                                    gray_K: 10 %                                   gray_K: 15 %




 gray_K: 20 %                                   gray_K: 25 %                                   gray_K: 30 %




 gray_K: 35 %                                   gray_K: 40 %                                   gray_K: 45 %




 gray_K: 50 %                                   gray_K: 55 %                                   gray_K: 60 %




 gray_K: 65 %                                   gray_K: 70 %                                   gray_K: 75%




 gray_K: 80 %                                   gray_K: 85 %                                   gray_K: 90 %




                                                                  18
fonts and typography




The family of fonts used for productronica clearly reflects the
exhibition’s image and supports the branding concept. The viewer’s
perception is influenced by the choice of font and its formal qualities.

The choice of font, typographic principles and their influence on
readability and optimum communication of sector-specific infor-
mation will be discussed and explained on the following pages.




                                                                       19
fonts and typography




The productronica font family




The productronica font is Neue Helvetica.
“Normal” Helvetica celebrated its 50 th anniversary in 2007 and, among other things, was the subject of a motion-picture documentary.
In addition, the New York Museum of Modern Art hosted an exhibition dedicated to the font, and a book about how it was created was
also published.
In 1983, D. Stempel AG developed the Neue Helvetica font family for Linotype AG. As part of that process, some of the fonts that had
grown historically and did not always go well with one another were redesigned and better coordinated. The post-scrip version of the
typeface family now consists of 51 fonts.

Neue Helvetica is a san-serif Linear Antiqua font family with a classicistic character.
Its appeal lies in its functional clarity and straightforward style, which is why it suits productronica’s design needs perfectly. The preferred
fonts 43 Light Extended, 63 Medium Extended, 45 Light, 65 Medium, 75 Bold and 53 Extended can be used to solve any design task.
Although Neue Helvetica is very widely used, the interplay of these special font faces in the Neue Helvetica family makes them particu-
larly suitable for productronica’s special and distinct style.

Generally speaking, if necessary other fonts may also be used for elements at the secondary typographic level (such as diagrams, etc.).

Helvetica (or Arial) should be used for the Internet.




                                                                     20
fonts and typography




The productronica font family




Use one of the following fonts for headlines:



neue helvetica
43 light extended

neue helvetica
63 medium extended

Use one of the following fonts for regular copy.




Neue Helvetica 45 light

Neue Helvetica 65 medium

Neue Helvetica 75 bold

For specifications and highlighted copy:




neue helvetica 53 extended
                                                   21
fonts and typography




Standard sizes in Neue Helvetica




The standard-sized fonts that are specified below can be used for design tasks
in all formats.



Title pages:


exhibitor factsheet
Sample headline, Neue Helvetica 63 Medium Extended
20 pt, pitch 25 pt, spacing 20



Inside pages:


innovations start at productronica
Sample headline, Neue Helvetica 43 Light Extended
20 pt, pitch 25 pt, spacing 0



Copy text normal Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core dolorpero
odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio con henibh enit

Copy text normal, Neue Helvetica 45 Light, 8.5 pt, pitch 12 pt, spacing 20, justified



Copy text bold Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core dolor-
pero odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio

Copy text bold, Neue Helvetica 75 Bold, 8.5 pt, pitch 12 pt, spacing 20, justified



Copy text medium Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core do-
lorpero odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio

Copy text medium, Neue Helvetica 65 Medium, 8.5 pt, pitch 14 pt, spacing 20, justified



Lorem ipsum dolor sit amet, consetetur sadipscing

Sublines, Neue Helvetica 43 Light Extended, 11.5 pt, pitch 13.8 pt, spacing 20



                                                                    22
fonts and typography




Example of typography in use:




Lorem ipsum dolor sit amet
                                                                                      Headline, Neue Helvetica 43 Light Extended
                                                                                      20 pt, pitch 25 pt, spacing 0



Future, growth, highlight: Cuptas dis voluptam quam sequo modic tem faccus            Copy text, Neue Helvetica 65 Medium,
ducienim as aut laboriam volo blat.Offic totatium idi dit optatur. Parcipi duciunto   8.5 pt, pitch 14 pt, spacing 20, justified
dolorit re porit laboria nonsenihicid magnim eum cus arit quis dolendi cuscia quam
voluptatem faccabore vendendel et alic to int quam.
Sinveriant volore cumet delesed moditat as remporestem conem quiatem porehent
qui nectinv ellente core dissunt apelicias expero vellor alignim repraerum quis aut
dolupit aut in con explabore eium quae.




Lorem ipsum dolor sit amet                                                            Subline, Neue Helvetica 43 Light Extended,
consetetur sadipscing elitr                                                           11.5 pt, pitch 13,8 pt, spacing 20, justified

Verio tessit faceptas illuptat laceruptae magnam imust atiberem                       Copy text normal, Neue Helvetica 45 Light,
vollabo. Et molorehendae sim re escienis sed ulparunditi sumqui                       8.5 pt, pitch 12 pt, spacing 20, justified
idebis estis et liciumquae dolessi molectur as nest que renim sum
ium re, quatis dernat volorrum fugiam, sam volore ni natureperunt
lantiae est, nonecus animill oriosant hicium dolesed ut ulla aut eos
apedipid et evel et quiatium reptat ero bea vendita doluptassim
rem at undae rero et invenda eruptam as ea v



Documented success in 2011

                                                                                      Background surfaces
    68 	Exhibitors
                                                                                      in gray or orange
    7.234 	 Visitors (19% of all visitors)
    	       (New as of 2011)




                                                                       23
fonts and typography




The productronica font family for special Internet applications




In addition to the regular extended font faces in Neue Helvetica used for printing purposes, normal faces
in Arial should be used for the Internet. Letter spacing should also be modified accordingly.
However, higher-level sections and general information should be incorporated as graphics to ensure
a uniform look.




Example Online Newsletter

                                                            24
photos and images




In productronica layouts, the term image refers to any material that contains more than just
text information. That includes photographs, pictograms, illustrations, diagrams, tables and
any other type of graphics.

Clearly depicting content using shape and color and giving an image an emotional slant are
the formal basic criteria for use. In productonica’s basic design, images are used to convey
information in a succinct, objective and precise manner, i.e. to complement convincing typo-
graphy, and as elements that contribute to the brand’s image.




                                                                25
photos and images




Basic graphic elements




During layout, secondary graphic design elements are used that characterize, round out and complement productronica’s design style.
These design elements may be used in all advertising materials.




Bent line with ring at the end—
the “line element”

Can be used to accentuate headlines or be
used in conjunction with other elements.




Bent line with full bleed




Divided into two areas—
optional, e.g. for use on covers and in ads




                                                               26
photos and images




Basic graphic elements




The “on” button.




The “background element”—
may be used as a whole or in part.




                                     27
photos and images




Quality of visual imagery




Images, image content and figures have a clear-cut function to perform in the productronica design. They are a visual expression of the
brand’s personality. They warm the viewer up to topics, accompany copy and convey content. That is why the distribution of roles between
image and copy must always be clearly defined. The image supports copy content and has a clear connection to the topic at hand. The
imagery for this international trade fair must be of superior quality, and when photographic materials are used, colors must be carefully
coordinated to ensure that the overall impression is harmonious, holistic and elegant.




                                                                 28
photos and images




Quality of visual imagery




                            29
photos and images




Quality of visual imagery




                            30
examples




General factsheet 2013 (excerpt)




                                                                                exhibitor factsheet




 messe münchen
                                                                                20th international trade fair for
 november 12–15, 2013
 www.productronica.com                                                          innovative electronics production




    innovations begin at productronica                                                                                                           pcb community area
    International, innovative, unrivalled: productronica is the only event of its kind to show-                                                  Prominent, direct, networked: productronica is the central gathering for the entire European
    case the entire value chain in electronics production—from technologies and components                                                       PCB industry. Established especially for productronica, the PCB Community Area gives you
    to software and services. Present your company at productronica 2013 and profit from                                                         a prominent platform that not only ensures you business success, but strengthens the entire
    its unique surroundings.                                                                                                                     market in the long term. The innovative hall design with the PCB Marketplace as a central
                                                                                                                                                 communications gathering guides your customers directly to your stand and allows you to
                                                                                                                                                 network at the heart of the industry.




            PCB and other circuit-                        Component manufacturing                          Cable manufacturing
            carrier manufacturing
                                                          Semiconductor and display                        Technologies for
            Base materials                                manufacturing                                    cable processing and
            Tools, machines for                           Photovoltaic manufacturing                       connectors
            PCB manufacturing                             micronano production                             Coilware manufacturing,
                                                          Hybrid-component                                 LED manufacturing and
            See also:                                     manufacturing                                    discrete components
            “PCB Community Area”                          Organic and printed electronics
                                                          Manufacturing techniques for
                                                          batteries and electrical energy
                                                          storage



                                                       Manufacturing software
                                                                                                                                                  94% of the visitors in the PCB Community Area
                                                                                                                                                  gave the area a rating of good to excellent.



                                                                                                                                                  Successful statistics in 2011
             Module production/                            Test and measurement,                           Production equipment
             assembly                                      quality assurance
                                                                                                           Electronic Manufacturing
                                                                                                                                                     214        Exhibitors
             Production subsystems                         Inspection and image                            Services (EMS)                            13,325     Visitors (35% of all visitors)
             Component mount technology                    processing                                      Production logistics and                  33%        More visitors than in 2009
             Soldering technology and                      Measuring and testing systems                   material-flow technology
             joining                                       Laboratory/test-station                         Operating equipment/
             Material processing                           equipment                                       materials, environmental and
             Product finishing                                                                             clean-room technology
                                                                                                           Services


                                                                                                                                                                                                                         The PCB Community Area enjoys the support of strong
                                                                                                                                                                                                                         association partners and leading companies.
                                                       Manufacturing software


                                                                        Value chain
                                                                        productronica is the only event of its kind that gives you such
                                                                        a comprehensive overview of the entire sector for electronics
    Advantages for exhibitors                                           manufacturing. That makes it possible for your company to be
                                                                                                                                                                                                                             Advantages for exhibitors
                                                                        placed precisely in your area of expertise. Showcasing the entire
    • Secure and strengthen market position                             value chain at a single location makes it more attractive for visitors                                                                               • Unites the entire industry in Hall B 1
    • Recruit domestic and international customers                      and gives exhibitors a diverse range of business potential.                                                                                          • PCB Marketplace: Networking at the heart of the industry
    • Profit from future-oriented technologies                                                                                                                                                                               • Speakers’ Corner for the latest hot topics
    • Discover new sales markets                                        Additional information:                                                  Additional information about the PCB Community Area:                        • Support from strong partners
                                                                        www.productronica.com/exhibitionfields                                   www.productronica.com/pcb



 02                                                                                                                                                                                                                                                                                03




                                                                                                                                                                                                        31
examples




General factsheet 2013 (excerpt)




  2013’s highlight segments in the spotlight                                                                                                   the fair at a glance
  Future, growth, highlights: Each productronica focuses on and emphasizes specific                                                                                                                                           Visitor ratings
  segments. Selecting those segments is based on current and future industry growth, the
                                                                                                                                                  38,072    Trade visitors from 95 countries                                  93%    Appreciate productronica a leading trade fair
  increasing role and significance in the manufacturing process and the need to depict new                                                         1,189    Exhibitors from 39 countries                                      93%    Gave the fair a rating of good to excellent for
  markets. Companies that exhibit in the highlight segments receive support from strong                                                             33%     Increase in number of visitors (compared to 2009)                        the presence of market leaders
  partners. They also profit from promotional activities within the target group and from having                                                     8%     Increase in number of exhibitors (compared to 2009)               93%    Gave the fair a rating of good to excellent for
  their own forum, which is the perfect place to discuss and present the latest hot topics.                                                         97%     Share of trade visitors                                                  the share of international visitors
                                                                                                                                                    48%     Visitors from abroad                                              96%    Gave the fair a rating of good to excellent for
                                                                                                                                                    40%     Exhibitors from abroad                                                   the comprehensive range of exhibits
                                                                                                                                                    97%     Visitors and                                                      98%    Of visitors plan to recommend productronica to others
                                                                                                                                                    89%     Exhibitors who gave productronica an overall rating
  Technologies for cable processing and                                  Efficient production management                                                    of good to excellent
  connectors                                                                                                                                   77,000 m2    Exhibition space

  The technical and economic significance of products in the wire        Whether it comes to optimized process control, automation or
  and cable industry is immense because they are in strong demand        intelligent resource planning—the use of software solutions in
  in countless branches of industry. The most important force            electronics manufacturing is diverse. Demand at productronica         Exhibitor ratings                                                              Visitors’ areas of responsibility (excerpt)
  driving growth remains the development of threshold markets,           has increased significantly during the past few years, and for good
                                                                                                                                               83%     Appreciate productronica as a leading trade fair                      23%     Business/company/plant management
  which facilitates long-term sales opportunities. productronica does    reason: Production-related systems such as MES (Manufacturing
                                                                                                                                               92%     Gave the fair a rating of good to excellent for the quality           22%     Production
  more than take this trend into account and actively supports its       Execution Systems) and ERP (Enterprise Resource Planning)
                                                                                                                                                       of its visitors                                                       17%     Research  Development
  exhibitors in reaching their objectives.                               increasingly play a key role in electronics production because they
                                                                                                                                               87%     Gave the fair a rating of good to excellent for the share             12%     Electronics development/design
                                                                         improve the transparency of all functions and processes that are
                                                                                                                                                       of international visitors                                             11%     Sales/marketing/advertising/PR
                                                                         critical to the production process.
                                                                                                                                               78%     Of exhibitors are “definitely” or “probably” planning to              10%     Students
  Successful statistics in 2011                                          Successful statistics in 2011                                                 participate in the next productronica                                  9%     Production planning
                                                                                                                                               88%     Gave the fair a rating of good to excellent for the quality            9%     Engineering
      97         Exhibitors                                                  68        Exhibitors                                                      of its exhibitor services                                              9%     Quality assurance/control/testing
      7,995      Visitors (21% of all visitors)                              7,234     Visitors (19% of all visitors)                          85%     Gave the fair a rating of good to excellent for its related-
      22%        More visitors than in 2009                                            (New in 2011)                                                   events program                                                        Statements from participants at productronica 2011 are
                                                                                                                                                                                                                             available here: www.productronica.com/statements


  Coilware production, LED production and                                Electronic Manufacturing Services
  discrete devices
  The rapid development of electromobility has given rise to             The booming EMS industry will have a larger exhibition sector at
  increased demand for electrical components such as inductors           this year’s productronica. Outsourcing in times of expected
  and transformers. In this sector, innovative solutions will also be    bottlenecks and promising new branches of industry are resulting
  needed in the future. Together with the segment for energy-storage     in sustained growth. Look forward to leading international com-
  manufacturing, productronica is the perfect platform for your          panies, the latest industry topics and the presentation of well-
  solutions.                                                             known awards.

  Successful statistics in 2011                                          Successful statistics in 2011

      45         Exhibitors                                                  79        Exhibitors
      6,572      Visitors (17% of all visitors)                              9,137     Visitors (24% of all visitors)
      47%        More visitors than in 2009                                  18%       More visitors than in 2009




  Advantages for exhibitors

  • Special and additional promotion of your segment prior to the fair
                                                                                                                                               Top 15 visitor countries
  • Address potential visitors directly                                                                                                           Germany         Italy   Switzerland   Austria   Czech Republic      Great Britain and Northern Ireland   France   Poland   Hungary
  • Separate highlight forum                                                                                                                         Russian Federation        Sweden     Slovenia   Israel   Netherlands    Spain
  • Support from strong partners                                         Additional information about the highlight segments:
                                                                                                                                                  Visitors from another 80 countries
                                                                         www.productronica.com/highlight-topics



 04                                                                                                                                                                                                                                                                                           05




  related events that guarantee you an edge                                                                                                    strong services for a strong exhibit
  Present, inform, have a say: Thanks to its forums, the Speakers’ Corner in the PCB Com-                                                      Success, sales, profits: Optimize and make your exhibit more professional and take
  munity Area, the CEO Roundtable and hands-on sessions, productronica features a diverse                                                      advantage of our experience during every phase—during planning, during the fair itself, and
  range of sound ideas and possibilities for the industry, which make it much more than a                                                      during follow-up. We and our more than 90 service partners would be pleased to support
  mere information platform. And because you are an exhibitor, the program of related events                                                   you in any way possible. After all, the success of your exhibit is just as important to us
  offers you a number of advantages and opportunities.                                                                                         as it is to you.




  Forums                                                                 Hands-on sessions                                                                                                                                   Matchmaking
  Whether it comes to the productronica Forum, the Innovations           Are you giving live presentations of your product and solutions at                                                                                  The objective of any exhibitor is to make new contacts and hold
  Forum or the Speakers’ Corner, this is the perfect place to present    productronica? Then take advantage of the “Hands-on sessions”                                                                                       successful discussions. You can rely on our full support in the
  your products and services. In 2011, there were more than              category in our event database to call attention to your company                                                                                    process. At productronica, matchmaking means bringing you
  110 lectures, discussions and workshops on current and future          among interested visitors. Doing so will make your company more                                                                                     together with potential customers in your target sectors before
  technology and industry topics. Forums are a veritable “visitor        attractive and increase the number of visitors at your stand.                                                                                       the fair even begins and giving you a chance to make concrete
  magnet”: 4,500 visitors in 2011 send a clear message. And the          Find out more at: www.productronica.com/hands-on                                                                                                    appointments to meet at the fair.
  related-events program made an extremely positive impression:
  92% of visitors and 85% of exhibitors gave it a rating of good
  to excellent.                                                                                                                                                                                                              Trade Fair Success Initiative
                                                                                                                                                                                                                             The name says it all: As part of our “success initiative” we have
  Exhibitor database                                                     Strong partners on board                                                                                                                            a number of different training offers such as a handbook to help
                                                                                                                                                                                                                             you plan for the fair as well as templates, checklists, and our
  A list of the exhibitors that participated in productronica 2011 is    productronica’s overwhelming quality is also the result of our                                                                                      extensive trade-fair know-how. We also support you with a prac-
  available here: www.productronica.com/exhibitor-database               strong allies and cooperation partners. Besides VDMA Productronic,                                                                                  tical package of helpful tools and services that will help you to
                                                                         our technical and conceptual sponsors include EIPC, IET, IPC,                                                                                       implement important steps as you prepare for, participate in and
                                                                         OE-A, SMTA and ZVEI partners, which play an active role in shaping                                                                                  follow up on the fair.
                                                                         productronica.                                                        Additional information about our exhibitor services:
                                                                                                                                               www.productronica.com/exhibitorservices
                                                                                                                                                                                                                             Vouchers for admission tickets
                                                                         Additional information about the related-events program:
                                                                         www.productronica.com/supporting-program                                                                                                            We will provide you an unlimited number of free vouchers for
                                                                                                                                                                                                                             one-day tickets—at no additional cost to you. You can integrate
                                                                                                                                                                                                                             printed or online vouchers into your mailings to actively invite
                                                                                                                                                                                                                             customers to your exhibition stand. This service is an effective
                                                                                                                                                                                                                             way to activate new and existing customers and initiate profitable
                                                                                                                                                                                                                             discussions with them before the fair even begins.




  Advantages for exhibitors                                                                                                                                                                                                               Advantages for exhibitors

  • Diverse range of presentation platforms                                                                                                                                                                                              • Address specific visitors prior to the fair
  • Lively customer dialog and exchange of information                                                                                                                                                                                   • Make concrete appointments in advance
  • Perfect opportunity for networking                                                                                                                                                                                                   • Increase the number of visitors at your stand
  • Insights into sound expert knowledge                                                                                                                                                                                                 • Plan the success of your exhibit ahead of time




 06                                                                                                                                                                                                                                                                                           07




                                                                                                                                                                                                               32
examples




Segment flyer 2013 (excerpt)




                                                                                   efficient
                                                                    production management
                                                                                                                  Highlight Segment 2013




 messe münchen
                                                                                20th international trade fair for
 november 12–15, 2013
 www.productronica.com                                                          innovative electronics production




    an excellent concept for your success                                                                                                        ratings
    The highlight is you: productronica puts your company in the limelight when you exhibit                                                      Why do exhibitors and visitors keep coming and coming again? We do everything we can
    in the segment for Efficient Production Management.                                                                                           to ensure that productronica is a commercial success for your company. That is why we
                                                                                                                                                 are placing special emphasis on your segment. To get you a broad-based audience of
    As a result, you profit from the fair’s unique concept, which consists of the exhibition, a                                                   interested professionals. After all, instead of resting on the laurels of our past success,
    separate highlight forum, the support of strong partners and special advertising on the                                                      we always strive to be better than ever.
    part of productronica itself.


                                                                                                                                                 Exhibitors in the sector for Efficient
    Efficient Production Management:                                        Efficient Production Management                                        Production Management gave it
    a complete success                                                     Highlight Forum:                                                      a rating of good to excellent for

    Strong presence:
                                                                           outstanding innovation platform                                       100%   Quality of visitors
    68 companies successfully showcased themselves in the segment          The perfect platform for presenting the latest trends and future       80%   Share of international visitors
    for Efficient Production Management in 2011.                           developments. 4,500 forum visitors in 2011 sends a clear message.      84%   Visitor target groups reached
                                                                                                                                                  74%   Fair’s leading role in the industry
    Great acceptance:                                                      The related-events program clearly received positive ratings:          87%   Reaching objectives for participating in fair
    7,234 visitors, or 19% of all productronica visitors, were in your     92% of visitors and
    segment.                                                               85% of exhibitors gave it a rating of good to excellent

    High satisfaction:                                                                                                                           Visitors in the sector for Efficient
    Exhibitors’ expectations were met in 2011, and the fair received       Addresses a targeted group of visitors                                Production Management have
    outstanding ratings.
                                                                           We will promote your highlight segment before the fair even begins,   a high opinion about the following:
                                                                           address your target group using various channels and invite them
                                                                           to productronica.                                                     98% gave productronica a rating of good to excellent for the presence
    Strong partners                                                                                                                                  of market leaders
    Leading companies and trade associations support productronica         Additional information about the highlight segment:                   98% gave productronica a rating of good to excellent for its character
    in your segment—so you meet the right visitors and your exhibit is a   www.productronica.com/highlight-topics                                    as a leading exhibition
    complete success.                                                                                                                            97% gave the segment for Efficient Production Management a rating of
                                                                                                                                                     good to excellent
                                                                                                                                                 90% feel that productronica gives them a moderate to quite considerable
                                                                                                                                                     advantage compared to other events




    Advantages for exhibitors                                                                                                                                                                                                   Advantages for exhibitors
    • Presence of leading companies                                                                                                                                                                                            • Highly qualified visitors from around the world
    • Strong appeal among visitors leads to successful contacts                                                                                                                                                                • Firmly established segment
    • Ideal presentation platform makes room for your topics                                                                                                                                                                   • Highly satisfied exhibitors and visitors




 02                                                                                                                                                                                                                                                                                03




                                                                                                                                                                                                        33
examples




Segment flyers, various covers, 2013




                                 Technologies
                         for cable processing
                              and connectors                                                                                                                        coilware and
                                          Highlight Segment 2013                                                                                                  LED production
                                                                                                                                                                            Highlight Segment 2013




                                                                      electronic
                                                                      manufacturing
                                                                      services
                                                                      Highlight Segment 2013




 messe münchen                                                     messe münchen                                                    messe münchen
                          20th international trade fair for                                     20th international trade fair for                           20th international trade fair for
 november 12–15, 2013                                              november 12–15, 2013                                             november 12–15, 2013
 www.productronica.com    innovative electronics production        www.productronica.com        innovative electronics production   www.productronica.com   innovative electronics production




                                                                                               34
examples




Price list 2013 (excerpt)




                                                                        offers
                                                                        Participation alternatives
                                                                        and stand prices




                         your exhibition stand—stand design and concepts
                         Stand concepts including stand space: Put construction of your stand into the hands of
                         professionals and profit from affordable and attractive solutions for your exhibition stand.




 messe münchen
                                               20th international trade fair for
 november 12–15, 2013
 www.productronica.com                         innovative electronics production


                          Includes                                                                      All-Inclusive         (20 m2)                      Start-Up        (12 m2)          Includes                                                                     Column       (20–36 m2)

                          Stand setup and dismantling (incl. stand space)                                                                                                                   Stand setup and dismantling (incl. stand space)

                          Stand cleaning                                                                                                                                                    Stand cleaning

                          Carpeting (color of choice)                                                                                                               Orange                  Carpeting (color of choice)
                                                                                                                                                                                                                                                                                                          All-Inclusive Package
                          3 KW electrical connection incl. consumption                                                                                                                      3 KW electrical connection incl. consumption

                          Lighting (1 spotlight per 3 m2), 2 outlets                                                                                                                        Lighting (1 spotlight per 3 m2), 2 outlets

                          1 closet with lockable door and hanger rail                                                                                                                       1 closet with lockable door and hanger rail

                          1 info desk, open, with 1 barstool                                                                                                                                1 info desk, open, with 1 barstool

                          1 table (70 x 70 cm) with 4 chairs                                                                                                                                1 table (70 x 70 cm) with 4 chairs

                          1 brochure holder                                                                                                                                                 1 brochure holder
                                                                                                                                                                                                                                                                                                          Start-Up Package
                          1 wastebasket                                                                                                                                                     1 wastebasket

                          1 built-in display (50 x 50 x 250 cm, partial glass)                                                                                                              1 built-in display (50 x 50 x 250 cm, partial glass)

                          Signboard lettering, max. 15 letters (Helvetica)                                                                                                                  Signboard lettering, max. 15 letters (Helvetica)

                          1 press compartment                                                                                                                                               1 press compartment

                          2 press releases and 2 photos posted on Internet                                                                                                                  2 press releases and 2 photos posted on Internet

                          AUMA fee                                                                                                                                                          AUMA fee
                                                                                                                                                                                                                                                                                                          Column Package
                          Basic company entry incl. 2 entries in product/                                                                                                                   Basic company entry incl. 2 entries in product/

                          service directory worth € 435.                                                                                                                                    service directory worth € 435.

                          The basic entry appears in the online exhibitor database,                                                                                                         The basic entry appears in the online exhibitor database,

                          the productronica App, the Visitor Guide and                                                                                                                      the productronica App, the Visitor Guide and

                          the official catalog.                                                                                                                                             the official catalog.


                                                                                              Aluminum construction, plastic-coated            Aluminum construction, plastic-coated                                                                         Aluminum construction, plastic-coated

                                                                                              white walls, 2.5 m high, beech wall elements     white walls, 2.5 m high, total height 3 m,                                                                    white walls, 2.5 m high, total height 4 m,
                          Type of construction                                                                                                                                              Type of construction
                                                                                              facing aisle, total height 3 m, only available   only available as row stand.                                                                                  only available as row or corner stand with

                                                                                              as row stand.                                                                                                                                                  20–36 m2.



                          Alle Beteiligungspreise zzgl. der gesetzlichen Mehrwertsteuer.
                          Price                                                               € 8,580                                          € 5,680                                      Alle Beteiligungspreise zzgl. der gesetzlichen Mehrwertsteuer.
                                                                                                                                                                                            Price                                                            Row stand: € 339/m2
                          All participation fees are subject to VAT.                                                                                                                        All participation fees are subject to VAT.                       Corner stand: € 364/m2




                                                                                                                                                                                                                                                                 Additional information: www.productronica.com/exhibitorservices




                                                                                                                                                                           35
examples




Full-page ad motifs (excerpt)




                                                                                                      for electronic manufacturing
                          for electronic manufacturing




 messe münchen                                                               messe münchen
                                         20th international trade fair for                                             20th international trade fair for
 november 12 – 15, 2013                                                      november 12 – 15, 2013
 www.productronica.com                   innovative electronics production   www.productronica.com                     innovative electronics production




                          for electronic manufacturing
                                                                                      for electronic manufacturing




 messe münchen                                                               messe münchen
                                         20th international trade fair for                                             20th international trade fair for
 november 12 – 15, 2013                                                      november 12 – 15, 2013
 www.productronica.com                   innovative electronics production   www.productronica.com                     innovative electronics production




                                                                                  36
style guide




productronica design fundamentals. For internal use and as a basis for briefing external
users only. Subject to change without notice.

If you have any questions, please contact: design@productronica.com




productronica 2013
October 2012

Styleguide English

  • 1.
    style guide x x 2 x x x 2 x 2 1
  • 2.
    style guide Contents the logo page 3 brand mark and branding page 4 the brand mark page 5 – 7 branding page 8 – 14 the claim page 15 colors and color system page 16 – 18 fonts and typography page 19 – 24 photos and images page 25 – 30 examples page 31 – 36 information and contact page 37 2
  • 3.
    Evolving markets andan exhibition that serves as a unique indicator: productronica 2013 is the world of innovative electronics manufacturing. It showcases the entire value-added chain including exciting new products and applications, focused technology forums, the latest hot topics and first-rate events. The logo for productronica 2013 symbolizes the fair’s core elements, i.e. component-mount technology, automation and assembly manufacturing. The logo stands for dynamism, precision, diversity and drive. The shape ensures distinc- tiveness and transports the fair’s primary message, i.e. innovation all along the line. 3
  • 4.
    brand mark andbranding The logotype for productronica 2013 consists of a brand-mark symbol and a word mark. It represents the trade show and symbolizes our commitment to provide our customers superior-quality service. Handling and maintaining the logotype and using it correctly in print media and in new media is essential for proper brand management that is specific to productronica. This manual explains the guidelines for using the logo. 4
  • 5.
    the brand mark basics colors The predominant communicative idea behind the logo is the matrix. The idea of the matrix ultimately gave rise to the primary design grid, which makes it possible to define any point in space in two and three- dimensional terms. The shape of the stable, sturdy and technically oriented square, which when used multiple times creates a flat surface in space, was selected as the smallest element in the brand mark. The special layout of the “solid” squares creates a clearly defined shape which, although stable on its own, also appears to be lifting from the surface. 5
  • 6.
    the brand mark basics colors The productronica brand mark requires a sufficient clear space. Its dimensions are propor- tional to the symbol itself. The use of other design elements of any kind whatsoever in this clear space (protection zone) is not permitted. x x x The brand-mark symbol is used together with the word mark. 6
  • 7.
    the brand mark basics colors The productronica brand-mark must always be reproduced in the right shape and using the right colors. Additions and modifications or distortions of any kind are not permitted. When incorporating the logo into interactive or animated media, specific parameters for use should remain within the limits of what is feasible and reasonable. Using the logo in 3D and in space is not covered in the manual. Offset printing Full color or two colors productronica orange Special colors: Euroscale: Web: Hex: HKS 6 K C: 0 % R: 255 #FF8C00 M: 45 % G: 140 Pantone 130 U Y: 100 % B: 0 K: 0 % Offset printing in b/w When printing the logo in black and white, a gray value of 35 % should be used for the orange portions of the original symbol. When printing the logo in color, the colors stipulated above are mandatory.When using ink plots and specially coated papers that cause color discrepancies, coordinating the colors is the responsibility of the project manager. 7
  • 8.
    branding basics sizes colors Combining the brand mark and the word mark x x x x x Typographically, the word mark consists of two elements: the word “productronica” in the font Frutiger (Linotype) bold, followed by the year in Frutiger light. The space between the word and the number is defined by the width of the letter “N” in x Frutiger light. The letter height of both elements is visually (!) adjusted. The word mark always appears to the right of the brand mark. The height “x” is determined by extending horizontally the corners of the middle diamond on the right side of the brand- mark symbol. This defines the vertical position of the work mark. The clear zones (protection zone) to be maintained around the combined word/brand mark are an extension of the dimensions stipulated for the brand mark. Using the same value (x) on all sides creates a homogeneous overall image. 8
  • 9.
    branding basics sizes colors Using the claim with the logotype x x x x 2 x x x If the claim is used with the logotype, the clear zone (protection zone) to be maintained below the mark increases by half of x. The letters in the claim are half as high as the letters in the word mark. Together, the claim and the word mark form a flush typographic block. The claim should always appear in productronica orange. 9
  • 10.
    branding basics sizes colors The caption in German and English The caption that goes with the logo is clearly defined in English and German. It should appear in Neue Helvetica 53 Extended, letter spacing 40, and be flush with the left of the word mark. 20. internationale leitmesse für innovative elektronikfertigung 20th international trade fair for innovative electronics production 10
  • 11.
    branding basics sizes colors The sizes of the brand mark apply internationally. The file formats stipulated for the various sizes are optimized. General guidelines for professional use with conventional printing techniques and new media must be observed at all time. Use of logo in DIN A4 format 128.25 mm The recommended logotype size for the classic A4 format (210 mm x 297 mm) on front covers is 128.25 mm wide. As a rule, the claim should always be included. 99.6 mm On the back pages of publications in A4 format, the logotype should be 99.6 mm wide. 36 mm ∞ The logotype must be at least 36 mm wide (for offset printing). Maximum width is infinity. 11
  • 12.
    branding basics sizes colors Logotype colors As a rule, the work mark is always black. All colors in the productronica color family may be used as background colors for both the color and the black-and- white versions of the logo. Black and dark-gray tones may not be used as background colors. The logo works better on lighter color tones. The logo works best against white, neutral background, something that should always be taken into account when the layout permits. The logo should only be used against a photographic back- ground if recognition is guaranteed. As a rule, the symbol should not appear on high-contrast photographs. Instead, it should be positioned outside the photograph.The “in- verted” version of the logo should only be used with the color orange. These color guidelines also apply to the Internet, animated sequences and motion pictures, although the 3D effect and contrasting of the logo when moving must be taken into account for special moods, backgrounds, etc. The layout recommendations on the left should be used for single-color applications such as having the logo printed on advertising merchandize. 12
  • 13.
    branding basics sizes colors Using the mark against color backgrounds Correct use All of the colors in the productronica color system may be used as background colors for the logo. The only exceptions are black and dark gray tones. The logo works better against light color shades. The brand works best against a white, neutral background, something that should always be taken into account when the layout permits. The logo should only be used against a photographic background if recognition is guaranteed. As a rule, the logo should not appear on high-contrast photographs. Instead, it should be positioned outside the photograph. Inverted special version These color guidelines also apply to the Internet, animated sequences and motion pictures, although the 3D effect and con- trasting of the logo when moving must be taken into account for special moods, back- Use grounds, etc. not permitted 13
  • 14.
    branding basics sizes colors Data service All logos are available in all formats and may be downloaded from the Messe München media database: www.productronica.com PRESS PHOTOS LOGOS 14
  • 15.
    the claim basics sizes colors The productronica 2013 claim The productronica claim defines the fair’s orientation. It should always appear in Neue Helvitica 63 Medium Extended. If at all possible, the claim should always be accentuated using productronica orange. innovation all along the line 15
  • 16.
    colors and colorsystem When it comes to the productronica design and the effect that it has, colors are an important tool that can be used to encode infor- mation and make the overall picture more dynamic. productronica’s colors have been coordinated to optimize their effect on the areas where they are used and to make sure that they harmonize with one another and form a logical color system. The number of colors has been limited to make sure that they are used more consciously.The colors that are introduced here are basic colors and are only part of the complete color system. 16
  • 17.
    colors and colorsystem productronica’s primary colors productronica’s basic colors are orange, white and black. These colors are primary colors. productronica’s orange is the main brand characteristic. It is one of the colors in the brand mark, but is also used a great deal for other design elements to ensure that it is easily recognized. Since white is the color of unprinted paper, it is not considered a color in the print area. In the case of productronica, white is used frequently and intentionally as a design element to ensure that the clear zone has the desired effect. Black is the primary dark color in the print area, and not really a design color in the classical sense. In the case of productronica, black is also a bridge that serves as a foundation for orange and white. productronica orange Special colors: Euroscale: Web: Hex: HKS 6 K C: 0 % R: 255 #FF8C00 M: 45 % G: 140 Pantone 130 U Y: 100 % B: 0 K: 0 % black Euroscale: C: 0 % M: 0 % Y: 0 % K: 100 % white Euroscale: C: 0 % M: 0 % Y: 0 % K: 0 % 17
  • 18.
    colors and colorsystem productronica’s secondary colors To characterize productronica as concisely as possible, we have intentionally done without a wide range of decorative colors. The entire range of gray tones from 0% to 100 % black is available to the designer. Gray tones should also be used for transparent elements in the layout. Silver can be used as a finishing color, as can the palette of Pantone Cool Gray special colors. In some cases, printing varnish or dummy stampings may be used for finishing. Photographs are used to make products more colorful. productronica silver Special color: Pantone 877 gray_K: 5 % gray_K: 10 % gray_K: 15 % gray_K: 20 % gray_K: 25 % gray_K: 30 % gray_K: 35 % gray_K: 40 % gray_K: 45 % gray_K: 50 % gray_K: 55 % gray_K: 60 % gray_K: 65 % gray_K: 70 % gray_K: 75% gray_K: 80 % gray_K: 85 % gray_K: 90 % 18
  • 19.
    fonts and typography Thefamily of fonts used for productronica clearly reflects the exhibition’s image and supports the branding concept. The viewer’s perception is influenced by the choice of font and its formal qualities. The choice of font, typographic principles and their influence on readability and optimum communication of sector-specific infor- mation will be discussed and explained on the following pages. 19
  • 20.
    fonts and typography Theproductronica font family The productronica font is Neue Helvetica. “Normal” Helvetica celebrated its 50 th anniversary in 2007 and, among other things, was the subject of a motion-picture documentary. In addition, the New York Museum of Modern Art hosted an exhibition dedicated to the font, and a book about how it was created was also published. In 1983, D. Stempel AG developed the Neue Helvetica font family for Linotype AG. As part of that process, some of the fonts that had grown historically and did not always go well with one another were redesigned and better coordinated. The post-scrip version of the typeface family now consists of 51 fonts. Neue Helvetica is a san-serif Linear Antiqua font family with a classicistic character. Its appeal lies in its functional clarity and straightforward style, which is why it suits productronica’s design needs perfectly. The preferred fonts 43 Light Extended, 63 Medium Extended, 45 Light, 65 Medium, 75 Bold and 53 Extended can be used to solve any design task. Although Neue Helvetica is very widely used, the interplay of these special font faces in the Neue Helvetica family makes them particu- larly suitable for productronica’s special and distinct style. Generally speaking, if necessary other fonts may also be used for elements at the secondary typographic level (such as diagrams, etc.). Helvetica (or Arial) should be used for the Internet. 20
  • 21.
    fonts and typography Theproductronica font family Use one of the following fonts for headlines: neue helvetica 43 light extended neue helvetica 63 medium extended Use one of the following fonts for regular copy. Neue Helvetica 45 light Neue Helvetica 65 medium Neue Helvetica 75 bold For specifications and highlighted copy: neue helvetica 53 extended 21
  • 22.
    fonts and typography Standardsizes in Neue Helvetica The standard-sized fonts that are specified below can be used for design tasks in all formats. Title pages: exhibitor factsheet Sample headline, Neue Helvetica 63 Medium Extended 20 pt, pitch 25 pt, spacing 20 Inside pages: innovations start at productronica Sample headline, Neue Helvetica 43 Light Extended 20 pt, pitch 25 pt, spacing 0 Copy text normal Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core dolorpero odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio con henibh enit Copy text normal, Neue Helvetica 45 Light, 8.5 pt, pitch 12 pt, spacing 20, justified Copy text bold Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core dolor- pero odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio Copy text bold, Neue Helvetica 75 Bold, 8.5 pt, pitch 12 pt, spacing 20, justified Copy text medium Eliquip el dolorper ipisi blan veraessisim dit aci tat, susto core do- lorpero odolorp eriure vulputat. Ut augiamet, sent am incing er adip estrud esequatio Copy text medium, Neue Helvetica 65 Medium, 8.5 pt, pitch 14 pt, spacing 20, justified Lorem ipsum dolor sit amet, consetetur sadipscing Sublines, Neue Helvetica 43 Light Extended, 11.5 pt, pitch 13.8 pt, spacing 20 22
  • 23.
    fonts and typography Exampleof typography in use: Lorem ipsum dolor sit amet Headline, Neue Helvetica 43 Light Extended 20 pt, pitch 25 pt, spacing 0 Future, growth, highlight: Cuptas dis voluptam quam sequo modic tem faccus Copy text, Neue Helvetica 65 Medium, ducienim as aut laboriam volo blat.Offic totatium idi dit optatur. Parcipi duciunto 8.5 pt, pitch 14 pt, spacing 20, justified dolorit re porit laboria nonsenihicid magnim eum cus arit quis dolendi cuscia quam voluptatem faccabore vendendel et alic to int quam. Sinveriant volore cumet delesed moditat as remporestem conem quiatem porehent qui nectinv ellente core dissunt apelicias expero vellor alignim repraerum quis aut dolupit aut in con explabore eium quae. Lorem ipsum dolor sit amet Subline, Neue Helvetica 43 Light Extended, consetetur sadipscing elitr 11.5 pt, pitch 13,8 pt, spacing 20, justified Verio tessit faceptas illuptat laceruptae magnam imust atiberem Copy text normal, Neue Helvetica 45 Light, vollabo. Et molorehendae sim re escienis sed ulparunditi sumqui 8.5 pt, pitch 12 pt, spacing 20, justified idebis estis et liciumquae dolessi molectur as nest que renim sum ium re, quatis dernat volorrum fugiam, sam volore ni natureperunt lantiae est, nonecus animill oriosant hicium dolesed ut ulla aut eos apedipid et evel et quiatium reptat ero bea vendita doluptassim rem at undae rero et invenda eruptam as ea v Documented success in 2011 Background surfaces 68 Exhibitors in gray or orange 7.234 Visitors (19% of all visitors) (New as of 2011) 23
  • 24.
    fonts and typography Theproductronica font family for special Internet applications In addition to the regular extended font faces in Neue Helvetica used for printing purposes, normal faces in Arial should be used for the Internet. Letter spacing should also be modified accordingly. However, higher-level sections and general information should be incorporated as graphics to ensure a uniform look. Example Online Newsletter 24
  • 25.
    photos and images Inproductronica layouts, the term image refers to any material that contains more than just text information. That includes photographs, pictograms, illustrations, diagrams, tables and any other type of graphics. Clearly depicting content using shape and color and giving an image an emotional slant are the formal basic criteria for use. In productonica’s basic design, images are used to convey information in a succinct, objective and precise manner, i.e. to complement convincing typo- graphy, and as elements that contribute to the brand’s image. 25
  • 26.
    photos and images Basicgraphic elements During layout, secondary graphic design elements are used that characterize, round out and complement productronica’s design style. These design elements may be used in all advertising materials. Bent line with ring at the end— the “line element” Can be used to accentuate headlines or be used in conjunction with other elements. Bent line with full bleed Divided into two areas— optional, e.g. for use on covers and in ads 26
  • 27.
    photos and images Basicgraphic elements The “on” button. The “background element”— may be used as a whole or in part. 27
  • 28.
    photos and images Qualityof visual imagery Images, image content and figures have a clear-cut function to perform in the productronica design. They are a visual expression of the brand’s personality. They warm the viewer up to topics, accompany copy and convey content. That is why the distribution of roles between image and copy must always be clearly defined. The image supports copy content and has a clear connection to the topic at hand. The imagery for this international trade fair must be of superior quality, and when photographic materials are used, colors must be carefully coordinated to ensure that the overall impression is harmonious, holistic and elegant. 28
  • 29.
    photos and images Qualityof visual imagery 29
  • 30.
    photos and images Qualityof visual imagery 30
  • 31.
    examples General factsheet 2013(excerpt) exhibitor factsheet messe münchen 20th international trade fair for november 12–15, 2013 www.productronica.com innovative electronics production innovations begin at productronica pcb community area International, innovative, unrivalled: productronica is the only event of its kind to show- Prominent, direct, networked: productronica is the central gathering for the entire European case the entire value chain in electronics production—from technologies and components PCB industry. Established especially for productronica, the PCB Community Area gives you to software and services. Present your company at productronica 2013 and profit from a prominent platform that not only ensures you business success, but strengthens the entire its unique surroundings. market in the long term. The innovative hall design with the PCB Marketplace as a central communications gathering guides your customers directly to your stand and allows you to network at the heart of the industry. PCB and other circuit- Component manufacturing Cable manufacturing carrier manufacturing Semiconductor and display Technologies for Base materials manufacturing cable processing and Tools, machines for Photovoltaic manufacturing connectors PCB manufacturing micronano production Coilware manufacturing, Hybrid-component LED manufacturing and See also: manufacturing discrete components “PCB Community Area” Organic and printed electronics Manufacturing techniques for batteries and electrical energy storage Manufacturing software 94% of the visitors in the PCB Community Area gave the area a rating of good to excellent. Successful statistics in 2011 Module production/ Test and measurement, Production equipment assembly quality assurance Electronic Manufacturing 214 Exhibitors Production subsystems Inspection and image Services (EMS) 13,325 Visitors (35% of all visitors) Component mount technology processing Production logistics and 33% More visitors than in 2009 Soldering technology and Measuring and testing systems material-flow technology joining Laboratory/test-station Operating equipment/ Material processing equipment materials, environmental and Product finishing clean-room technology Services The PCB Community Area enjoys the support of strong association partners and leading companies. Manufacturing software Value chain productronica is the only event of its kind that gives you such a comprehensive overview of the entire sector for electronics Advantages for exhibitors manufacturing. That makes it possible for your company to be Advantages for exhibitors placed precisely in your area of expertise. Showcasing the entire • Secure and strengthen market position value chain at a single location makes it more attractive for visitors • Unites the entire industry in Hall B 1 • Recruit domestic and international customers and gives exhibitors a diverse range of business potential. • PCB Marketplace: Networking at the heart of the industry • Profit from future-oriented technologies • Speakers’ Corner for the latest hot topics • Discover new sales markets Additional information: Additional information about the PCB Community Area: • Support from strong partners www.productronica.com/exhibitionfields www.productronica.com/pcb 02 03 31
  • 32.
    examples General factsheet 2013(excerpt) 2013’s highlight segments in the spotlight the fair at a glance Future, growth, highlights: Each productronica focuses on and emphasizes specific Visitor ratings segments. Selecting those segments is based on current and future industry growth, the 38,072 Trade visitors from 95 countries 93% Appreciate productronica a leading trade fair increasing role and significance in the manufacturing process and the need to depict new 1,189 Exhibitors from 39 countries 93% Gave the fair a rating of good to excellent for markets. Companies that exhibit in the highlight segments receive support from strong 33% Increase in number of visitors (compared to 2009) the presence of market leaders partners. They also profit from promotional activities within the target group and from having 8% Increase in number of exhibitors (compared to 2009) 93% Gave the fair a rating of good to excellent for their own forum, which is the perfect place to discuss and present the latest hot topics. 97% Share of trade visitors the share of international visitors 48% Visitors from abroad 96% Gave the fair a rating of good to excellent for 40% Exhibitors from abroad the comprehensive range of exhibits 97% Visitors and 98% Of visitors plan to recommend productronica to others 89% Exhibitors who gave productronica an overall rating Technologies for cable processing and Efficient production management of good to excellent connectors 77,000 m2 Exhibition space The technical and economic significance of products in the wire Whether it comes to optimized process control, automation or and cable industry is immense because they are in strong demand intelligent resource planning—the use of software solutions in in countless branches of industry. The most important force electronics manufacturing is diverse. Demand at productronica Exhibitor ratings Visitors’ areas of responsibility (excerpt) driving growth remains the development of threshold markets, has increased significantly during the past few years, and for good 83% Appreciate productronica as a leading trade fair 23% Business/company/plant management which facilitates long-term sales opportunities. productronica does reason: Production-related systems such as MES (Manufacturing 92% Gave the fair a rating of good to excellent for the quality 22% Production more than take this trend into account and actively supports its Execution Systems) and ERP (Enterprise Resource Planning) of its visitors 17% Research Development exhibitors in reaching their objectives. increasingly play a key role in electronics production because they 87% Gave the fair a rating of good to excellent for the share 12% Electronics development/design improve the transparency of all functions and processes that are of international visitors 11% Sales/marketing/advertising/PR critical to the production process. 78% Of exhibitors are “definitely” or “probably” planning to 10% Students Successful statistics in 2011 Successful statistics in 2011 participate in the next productronica 9% Production planning 88% Gave the fair a rating of good to excellent for the quality 9% Engineering 97 Exhibitors 68 Exhibitors of its exhibitor services 9% Quality assurance/control/testing 7,995 Visitors (21% of all visitors) 7,234 Visitors (19% of all visitors) 85% Gave the fair a rating of good to excellent for its related- 22% More visitors than in 2009 (New in 2011) events program Statements from participants at productronica 2011 are available here: www.productronica.com/statements Coilware production, LED production and Electronic Manufacturing Services discrete devices The rapid development of electromobility has given rise to The booming EMS industry will have a larger exhibition sector at increased demand for electrical components such as inductors this year’s productronica. Outsourcing in times of expected and transformers. In this sector, innovative solutions will also be bottlenecks and promising new branches of industry are resulting needed in the future. Together with the segment for energy-storage in sustained growth. Look forward to leading international com- manufacturing, productronica is the perfect platform for your panies, the latest industry topics and the presentation of well- solutions. known awards. Successful statistics in 2011 Successful statistics in 2011 45 Exhibitors 79 Exhibitors 6,572 Visitors (17% of all visitors) 9,137 Visitors (24% of all visitors) 47% More visitors than in 2009 18% More visitors than in 2009 Advantages for exhibitors • Special and additional promotion of your segment prior to the fair Top 15 visitor countries • Address potential visitors directly Germany Italy Switzerland Austria Czech Republic Great Britain and Northern Ireland France Poland Hungary • Separate highlight forum Russian Federation Sweden Slovenia Israel Netherlands Spain • Support from strong partners Additional information about the highlight segments: Visitors from another 80 countries www.productronica.com/highlight-topics 04 05 related events that guarantee you an edge strong services for a strong exhibit Present, inform, have a say: Thanks to its forums, the Speakers’ Corner in the PCB Com- Success, sales, profits: Optimize and make your exhibit more professional and take munity Area, the CEO Roundtable and hands-on sessions, productronica features a diverse advantage of our experience during every phase—during planning, during the fair itself, and range of sound ideas and possibilities for the industry, which make it much more than a during follow-up. We and our more than 90 service partners would be pleased to support mere information platform. And because you are an exhibitor, the program of related events you in any way possible. After all, the success of your exhibit is just as important to us offers you a number of advantages and opportunities. as it is to you. Forums Hands-on sessions Matchmaking Whether it comes to the productronica Forum, the Innovations Are you giving live presentations of your product and solutions at The objective of any exhibitor is to make new contacts and hold Forum or the Speakers’ Corner, this is the perfect place to present productronica? Then take advantage of the “Hands-on sessions” successful discussions. You can rely on our full support in the your products and services. In 2011, there were more than category in our event database to call attention to your company process. At productronica, matchmaking means bringing you 110 lectures, discussions and workshops on current and future among interested visitors. Doing so will make your company more together with potential customers in your target sectors before technology and industry topics. Forums are a veritable “visitor attractive and increase the number of visitors at your stand. the fair even begins and giving you a chance to make concrete magnet”: 4,500 visitors in 2011 send a clear message. And the Find out more at: www.productronica.com/hands-on appointments to meet at the fair. related-events program made an extremely positive impression: 92% of visitors and 85% of exhibitors gave it a rating of good to excellent. Trade Fair Success Initiative The name says it all: As part of our “success initiative” we have Exhibitor database Strong partners on board a number of different training offers such as a handbook to help you plan for the fair as well as templates, checklists, and our A list of the exhibitors that participated in productronica 2011 is productronica’s overwhelming quality is also the result of our extensive trade-fair know-how. We also support you with a prac- available here: www.productronica.com/exhibitor-database strong allies and cooperation partners. Besides VDMA Productronic, tical package of helpful tools and services that will help you to our technical and conceptual sponsors include EIPC, IET, IPC, implement important steps as you prepare for, participate in and OE-A, SMTA and ZVEI partners, which play an active role in shaping follow up on the fair. productronica. Additional information about our exhibitor services: www.productronica.com/exhibitorservices Vouchers for admission tickets Additional information about the related-events program: www.productronica.com/supporting-program We will provide you an unlimited number of free vouchers for one-day tickets—at no additional cost to you. You can integrate printed or online vouchers into your mailings to actively invite customers to your exhibition stand. This service is an effective way to activate new and existing customers and initiate profitable discussions with them before the fair even begins. Advantages for exhibitors Advantages for exhibitors • Diverse range of presentation platforms • Address specific visitors prior to the fair • Lively customer dialog and exchange of information • Make concrete appointments in advance • Perfect opportunity for networking • Increase the number of visitors at your stand • Insights into sound expert knowledge • Plan the success of your exhibit ahead of time 06 07 32
  • 33.
    examples Segment flyer 2013(excerpt) efficient production management Highlight Segment 2013 messe münchen 20th international trade fair for november 12–15, 2013 www.productronica.com innovative electronics production an excellent concept for your success ratings The highlight is you: productronica puts your company in the limelight when you exhibit Why do exhibitors and visitors keep coming and coming again? We do everything we can in the segment for Efficient Production Management. to ensure that productronica is a commercial success for your company. That is why we are placing special emphasis on your segment. To get you a broad-based audience of As a result, you profit from the fair’s unique concept, which consists of the exhibition, a interested professionals. After all, instead of resting on the laurels of our past success, separate highlight forum, the support of strong partners and special advertising on the we always strive to be better than ever. part of productronica itself. Exhibitors in the sector for Efficient Efficient Production Management: Efficient Production Management Production Management gave it a complete success Highlight Forum: a rating of good to excellent for Strong presence: outstanding innovation platform 100% Quality of visitors 68 companies successfully showcased themselves in the segment The perfect platform for presenting the latest trends and future 80% Share of international visitors for Efficient Production Management in 2011. developments. 4,500 forum visitors in 2011 sends a clear message. 84% Visitor target groups reached 74% Fair’s leading role in the industry Great acceptance: The related-events program clearly received positive ratings: 87% Reaching objectives for participating in fair 7,234 visitors, or 19% of all productronica visitors, were in your 92% of visitors and segment. 85% of exhibitors gave it a rating of good to excellent High satisfaction: Visitors in the sector for Efficient Exhibitors’ expectations were met in 2011, and the fair received Addresses a targeted group of visitors Production Management have outstanding ratings. We will promote your highlight segment before the fair even begins, a high opinion about the following: address your target group using various channels and invite them to productronica. 98% gave productronica a rating of good to excellent for the presence Strong partners of market leaders Leading companies and trade associations support productronica Additional information about the highlight segment: 98% gave productronica a rating of good to excellent for its character in your segment—so you meet the right visitors and your exhibit is a www.productronica.com/highlight-topics as a leading exhibition complete success. 97% gave the segment for Efficient Production Management a rating of good to excellent 90% feel that productronica gives them a moderate to quite considerable advantage compared to other events Advantages for exhibitors Advantages for exhibitors • Presence of leading companies • Highly qualified visitors from around the world • Strong appeal among visitors leads to successful contacts • Firmly established segment • Ideal presentation platform makes room for your topics • Highly satisfied exhibitors and visitors 02 03 33
  • 34.
    examples Segment flyers, variouscovers, 2013 Technologies for cable processing and connectors coilware and Highlight Segment 2013 LED production Highlight Segment 2013 electronic manufacturing services Highlight Segment 2013 messe münchen messe münchen messe münchen 20th international trade fair for 20th international trade fair for 20th international trade fair for november 12–15, 2013 november 12–15, 2013 november 12–15, 2013 www.productronica.com innovative electronics production www.productronica.com innovative electronics production www.productronica.com innovative electronics production 34
  • 35.
    examples Price list 2013(excerpt) offers Participation alternatives and stand prices your exhibition stand—stand design and concepts Stand concepts including stand space: Put construction of your stand into the hands of professionals and profit from affordable and attractive solutions for your exhibition stand. messe münchen 20th international trade fair for november 12–15, 2013 www.productronica.com innovative electronics production Includes All-Inclusive (20 m2) Start-Up (12 m2) Includes Column (20–36 m2) Stand setup and dismantling (incl. stand space) Stand setup and dismantling (incl. stand space) Stand cleaning Stand cleaning Carpeting (color of choice) Orange Carpeting (color of choice) All-Inclusive Package 3 KW electrical connection incl. consumption 3 KW electrical connection incl. consumption Lighting (1 spotlight per 3 m2), 2 outlets Lighting (1 spotlight per 3 m2), 2 outlets 1 closet with lockable door and hanger rail 1 closet with lockable door and hanger rail 1 info desk, open, with 1 barstool 1 info desk, open, with 1 barstool 1 table (70 x 70 cm) with 4 chairs 1 table (70 x 70 cm) with 4 chairs 1 brochure holder 1 brochure holder Start-Up Package 1 wastebasket 1 wastebasket 1 built-in display (50 x 50 x 250 cm, partial glass) 1 built-in display (50 x 50 x 250 cm, partial glass) Signboard lettering, max. 15 letters (Helvetica) Signboard lettering, max. 15 letters (Helvetica) 1 press compartment 1 press compartment 2 press releases and 2 photos posted on Internet 2 press releases and 2 photos posted on Internet AUMA fee AUMA fee Column Package Basic company entry incl. 2 entries in product/ Basic company entry incl. 2 entries in product/ service directory worth € 435. service directory worth € 435. The basic entry appears in the online exhibitor database, The basic entry appears in the online exhibitor database, the productronica App, the Visitor Guide and the productronica App, the Visitor Guide and the official catalog. the official catalog. Aluminum construction, plastic-coated Aluminum construction, plastic-coated Aluminum construction, plastic-coated white walls, 2.5 m high, beech wall elements white walls, 2.5 m high, total height 3 m, white walls, 2.5 m high, total height 4 m, Type of construction Type of construction facing aisle, total height 3 m, only available only available as row stand. only available as row or corner stand with as row stand. 20–36 m2. Alle Beteiligungspreise zzgl. der gesetzlichen Mehrwertsteuer. Price € 8,580 € 5,680 Alle Beteiligungspreise zzgl. der gesetzlichen Mehrwertsteuer. Price Row stand: € 339/m2 All participation fees are subject to VAT. All participation fees are subject to VAT. Corner stand: € 364/m2 Additional information: www.productronica.com/exhibitorservices 35
  • 36.
    examples Full-page ad motifs(excerpt) for electronic manufacturing for electronic manufacturing messe münchen messe münchen 20th international trade fair for 20th international trade fair for november 12 – 15, 2013 november 12 – 15, 2013 www.productronica.com innovative electronics production www.productronica.com innovative electronics production for electronic manufacturing for electronic manufacturing messe münchen messe münchen 20th international trade fair for 20th international trade fair for november 12 – 15, 2013 november 12 – 15, 2013 www.productronica.com innovative electronics production www.productronica.com innovative electronics production 36
  • 37.
    style guide productronica designfundamentals. For internal use and as a basis for briefing external users only. Subject to change without notice. If you have any questions, please contact: design@productronica.com productronica 2013 October 2012