STRUCTURAL EXCAVATION AND
BACKFILL - Section 802
Earthwork forms a part of the installation procedures of box culverts, retaining walls,
foundations, and substructures. In order to ensure an adequate foundation for such
structures, backfill material must meet certain specifications and be compacted by
acceptable methods to adequate density. The use of poor soils as a bed for a structure
and the failure to adequately compact soils surrounding any foundation can lead to
premature failure.
Backfill shall be of acceptable quality, free from large or frozen lumps, wood or other
foreign material.
No backfill shall be placed against a concrete abutment, wing wall or reinforced concrete
box culvert until concrete has been in place at least 14 calendar days or until test
cylinders made in accordance with DOTD TR 226 and tested in accordance with DOTD
TR 230 have obtained a minimum compressive strength of 3000 psi.
The scope of this section is limited to the earthwork associated with the construction of
structures.
SHORING
The contractor shall adhere to all state and federal guidelines in providing protection
against the cave-in of any excavated area. The contractor shall not conduct operations
in the trench unless adequate shoring is in place, when needed, all safety provisions are
met, and all federal and state guidelines for protection are met. The safety of the
excavation depends on the characteristics of the material in which the excavation is
made, seepage, depth of excavation, and side slopes. Trenches shall be braced when
needed to prevent the sloughing of side or top material. The contractor shall take all
measures necessary to protect workers in the trench area and shall provide them with
safety equipment as needed. The design of shoring in no way affects the specification
density requirements for the full width and depth of the trench.
BOX CULVERTS
The contractor shall excavate the trench wide enough to allow for construction activity.
Generally, at least 18 inches on each side of the neat lines of the box will be adequate to
allow for normal construction activity. The bottom of the excavation must be graded to
match the flow line shown on the plans. The subgrade shall be compacted as necessary
when directed to provide a firm foundation for the box culvert.
When suitable foundation cannot be obtained, unstable soil below plan grade shall be
removed and the bottom of the excavation shall be reconstructed with specified soil
conforming to Specification Subsection 203.06. If bedding material is specified or
required, the excavation shall be excavated below grade and bedding material used to
achieve plan elevation. Even when bedding material is not specified, it may be
necessary when unstable or unsatisfactory material is encountered. Examples of
unsatisfactory or unstable material include excessive moisture content, high organic
content, water seepage, soft materials, and excessive P.I. When water seepage
occurs, bedding material will be required. A concrete seal may be permitted in
lieu of bedding material at no direct pay. Clay seals are not an acceptable
solution. Replacement material shall be compacted as directed to at least the density
of the surrounding soils.
Prior to the placement of forms or reinforcing steel in the box bottom, project personnel
will check the foundation will be checked for flow line. It will also be visually inspected
for uniformity of compaction, unstable areas, etc. the contractor shall correct
deficiencies prior to proceeding with box culvert construction.
BACKFILLING
Compaction of backfill material by flooding will not be permitted.
Box culverts shall be backfilled with selected soil conforming to Specification Subsection
203.06(b), flowable fill meeting the requirements of Specification Section 710, or
granular material conforming to Specification Subsection 1003.07. Plastic soil blanket
for all installations shall conform to the requirements of Specification Subsection 203.10.
All materials shall be tested and approved prior to use.
Before any construction equipment is allowed to cross the box culvert, at least 2 feet,
compacted thickness, of backfill shall be placed over the top. The backfill will help
prevent the equipment from damaging the culvert. If the final thickness of cover over the
installed box culvert is less than two feet, the contractor shall install the box culvert after
all heavy hauling has been completed. If it is not possible to install the box culvert after
it is no longer necessary to cross the box culvert with heavy equipment, with the
approval of the engineer, the contractor shall install the culvert and place excess
material over the installed culvert to a compacted depth of at least two feet. After all
heavy hauling has been completed, the contractor shall remove the excess material to
grade.
Backfill material shall be of uniform soil characteristics and moisture content and shall be
placed in lifts of uniform thicknesses. Lift thickness may require adjustment based on
soil characteristics, but shall not be increased above the specification requirements.
Project personnel will check the lift thickness during placement. Lift thickness shall be
uniform both vertically and horizontally and shall be correlated with compactive effort to
achieve specification density. The portion of lifts in excess of specification requirements
shall be removed and the lift recompacted.
SELECTED SOILS
Selected soils backfill shall be placed and compacted in lifts not to exceed six inches
compacted thickness. Optimum moisture will be determined in accordance with DOTD
TR 415 or TR 418. Each layer shall be compacted to at least 95% of maximum density
as determined in accordance with DOTD TR 415 or TR 418. Project personnel will
determine percent compaction in accordance with DOTD TR 401.
GRANULAR MATERIAL
Granular material backfill shall be placed and compacted in lifts not to exceed twelve
inches compacted thickness. Optimum moisture will be determined in accordance with
DOTDTR 415 or TR 41. Each layer shall be compacted to at least 95% of maximum
density as determined in accordance with DOTD TR 415 or TR 418. Project personnel
will determine percent compaction in accordance with DOTD TR 401.
COFFERDAMS AND CRIBS
Cribs and cofferdams shall be backfilled with soil, approved by the engineer, and
compacted as directed to the satisfaction of the engineer. The finished elevation of the
compacted backfill shall be that of the surrounding ground. Backfilling will continue to
the surface of the surrounding ground maintaining approximately equal elevations on
both sides of the structure.
FOOTINGS
Final excavation to grade shall not be performed until just before the placement of
reinforcing steel or concrete. When the bottom of the excavation is soil, the grade shall
not be disturbed prior to the placement of concrete. When the bottom of the excavation
is rock or other hard foundation material, it shall be cut to a firm surface as directed and
all loose material removed. Any open seams shall be cleaned and filled with concrete,
mortar or grout to the satisfaction of the engineer. Footing excavations shall be
dewatered and made as dry as possible prior to the placement of backfill. Backfill
material as specified shall be placed in lifts as directed and compacted as directed to the
satisfaction of the engineer.
OTHER STRUCTURES
Excavations shall be dewatered and made as dry as possible prior to the placement of
backfill. Backfill material, as specified, shall be placed in lifts not to exceed nine inches
loose thickness as directed and uniformly compacted as directed to the satisfaction of
the engineer.
No jetting of backfill behind abutments and wingwalls will be permitted.
QUALITY ASSURANCE
Quality Assurance, both QC and Inspection and Acceptance, shall be conducted in
accordance with Specification Section 701.

More Related Content

What's hot

Magnumstone retaining wall
Magnumstone retaining wallMagnumstone retaining wall
Magnumstone retaining wallNurafizah Hashim
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Babu Arumugam
 
soil nailing seminar report
soil nailing seminar reportsoil nailing seminar report
soil nailing seminar reporttp jayamohan
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Dr.Youssef Hammida
 
Soil Nailing
Soil NailingSoil Nailing
Soil NailingAshif AR
 
Reinforced earth wall and its design parameters
Reinforced earth wall and its design parametersReinforced earth wall and its design parameters
Reinforced earth wall and its design parametersAmir nazir paray
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILINGAn Up K
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsKing Angco
 
Soil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueSoil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueAnandu Aravind
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structuresUmer Farooq
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016Communications Branding
 
6 pavement quality concrete
6 pavement quality concrete6 pavement quality concrete
6 pavement quality concretethamand7
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningANURAG KASHYAP
 

What's hot (20)

Magnumstone retaining wall
Magnumstone retaining wallMagnumstone retaining wall
Magnumstone retaining wall
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
 
Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282Requirements of pdo sp 1279 & 1282
Requirements of pdo sp 1279 & 1282
 
soil nailing seminar report
soil nailing seminar reportsoil nailing seminar report
soil nailing seminar report
 
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
Soil Nails Reinforcement - Design nails soil stabilization --مسامير قضبان تسل...
 
Soil Nailing
Soil NailingSoil Nailing
Soil Nailing
 
Earth Retention Solutions
Earth Retention SolutionsEarth Retention Solutions
Earth Retention Solutions
 
Reinforced earth wall and its design parameters
Reinforced earth wall and its design parametersReinforced earth wall and its design parameters
Reinforced earth wall and its design parameters
 
SOIL NAILING
SOIL NAILINGSOIL NAILING
SOIL NAILING
 
Grp installation procedure
Grp installation procedureGrp installation procedure
Grp installation procedure
 
Item 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm DrainsItem 500 - Pipe Culverts and Storm Drains
Item 500 - Pipe Culverts and Storm Drains
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Soil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement TechniqueSoil nailing/Soil Reinforcement Technique
Soil nailing/Soil Reinforcement Technique
 
Reinforced earth structures
Reinforced earth structuresReinforced earth structures
Reinforced earth structures
 
Soil nailing
Soil nailingSoil nailing
Soil nailing
 
Method Statement D Wall
Method Statement D WallMethod Statement D Wall
Method Statement D Wall
 
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016MSE Walls & Geosynthetics - Design Basics Webinar April 2016
MSE Walls & Geosynthetics - Design Basics Webinar April 2016
 
6 pavement quality concrete
6 pavement quality concrete6 pavement quality concrete
6 pavement quality concrete
 
HMA joint construction
HMA joint constructionHMA joint construction
HMA joint construction
 
Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 

Similar to Structural excavation and backfill

presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)alamrintu
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation Prabhat chhirolya
 
detailed specification for cement concrete
detailed specification for cement concretedetailed specification for cement concrete
detailed specification for cement concretevivek gami
 
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800PRIYANSHU KUMAR
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxHirenThakkar31
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarDocumentStory
 
BUILDING SPECIFICATION 1.pptx
BUILDING SPECIFICATION 1.pptxBUILDING SPECIFICATION 1.pptx
BUILDING SPECIFICATION 1.pptxSanskritiJindal4
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
Roadway Ordinance
Roadway OrdinanceRoadway Ordinance
Roadway Ordinancegscplanning
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)Daphne Tan
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insituLingWei11
 
2 1 excavation_basementconstruction
2 1 excavation_basementconstruction2 1 excavation_basementconstruction
2 1 excavation_basementconstructionvietcgxd
 

Similar to Structural excavation and backfill (20)

presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Specifications of rcc foundation
Specifications of rcc foundation Specifications of rcc foundation
Specifications of rcc foundation
 
detailed specification for cement concrete
detailed specification for cement concretedetailed specification for cement concrete
detailed specification for cement concrete
 
Section 500
Section 500Section 500
Section 500
 
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
Methodology of Flexible road work report by PRIYANSHU kumar,9608684800
 
sample.pptx
sample.pptxsample.pptx
sample.pptx
 
Subgrade
SubgradeSubgrade
Subgrade
 
Yee s2&s2
Yee s2&s2Yee s2&s2
Yee s2&s2
 
GOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptxGOOD CONSTRUCTION PRACTICE.pptx
GOOD CONSTRUCTION PRACTICE.pptx
 
1008 caissons-specification
1008 caissons-specification1008 caissons-specification
1008 caissons-specification
 
A summer training at pwd b&r,hisar
A summer training at pwd b&r,hisarA summer training at pwd b&r,hisar
A summer training at pwd b&r,hisar
 
BUILDING SPECIFICATION 1.pptx
BUILDING SPECIFICATION 1.pptxBUILDING SPECIFICATION 1.pptx
BUILDING SPECIFICATION 1.pptx
 
earthwork.pptx
earthwork.pptxearthwork.pptx
earthwork.pptx
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
Roadway Ordinance
Roadway OrdinanceRoadway Ordinance
Roadway Ordinance
 
Unit 6..pptx
Unit 6..pptxUnit 6..pptx
Unit 6..pptx
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
 
Bored cast insitu
Bored cast insituBored cast insitu
Bored cast insitu
 
2 1 excavation_basementconstruction
2 1 excavation_basementconstruction2 1 excavation_basementconstruction
2 1 excavation_basementconstruction
 

Recently uploaded

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Structural excavation and backfill

  • 1. STRUCTURAL EXCAVATION AND BACKFILL - Section 802 Earthwork forms a part of the installation procedures of box culverts, retaining walls, foundations, and substructures. In order to ensure an adequate foundation for such structures, backfill material must meet certain specifications and be compacted by acceptable methods to adequate density. The use of poor soils as a bed for a structure and the failure to adequately compact soils surrounding any foundation can lead to premature failure. Backfill shall be of acceptable quality, free from large or frozen lumps, wood or other foreign material. No backfill shall be placed against a concrete abutment, wing wall or reinforced concrete box culvert until concrete has been in place at least 14 calendar days or until test cylinders made in accordance with DOTD TR 226 and tested in accordance with DOTD TR 230 have obtained a minimum compressive strength of 3000 psi. The scope of this section is limited to the earthwork associated with the construction of structures. SHORING The contractor shall adhere to all state and federal guidelines in providing protection against the cave-in of any excavated area. The contractor shall not conduct operations in the trench unless adequate shoring is in place, when needed, all safety provisions are met, and all federal and state guidelines for protection are met. The safety of the excavation depends on the characteristics of the material in which the excavation is made, seepage, depth of excavation, and side slopes. Trenches shall be braced when needed to prevent the sloughing of side or top material. The contractor shall take all measures necessary to protect workers in the trench area and shall provide them with safety equipment as needed. The design of shoring in no way affects the specification density requirements for the full width and depth of the trench. BOX CULVERTS The contractor shall excavate the trench wide enough to allow for construction activity. Generally, at least 18 inches on each side of the neat lines of the box will be adequate to allow for normal construction activity. The bottom of the excavation must be graded to match the flow line shown on the plans. The subgrade shall be compacted as necessary when directed to provide a firm foundation for the box culvert. When suitable foundation cannot be obtained, unstable soil below plan grade shall be removed and the bottom of the excavation shall be reconstructed with specified soil conforming to Specification Subsection 203.06. If bedding material is specified or required, the excavation shall be excavated below grade and bedding material used to achieve plan elevation. Even when bedding material is not specified, it may be necessary when unstable or unsatisfactory material is encountered. Examples of
  • 2. unsatisfactory or unstable material include excessive moisture content, high organic content, water seepage, soft materials, and excessive P.I. When water seepage occurs, bedding material will be required. A concrete seal may be permitted in lieu of bedding material at no direct pay. Clay seals are not an acceptable solution. Replacement material shall be compacted as directed to at least the density of the surrounding soils. Prior to the placement of forms or reinforcing steel in the box bottom, project personnel will check the foundation will be checked for flow line. It will also be visually inspected for uniformity of compaction, unstable areas, etc. the contractor shall correct deficiencies prior to proceeding with box culvert construction. BACKFILLING Compaction of backfill material by flooding will not be permitted. Box culverts shall be backfilled with selected soil conforming to Specification Subsection 203.06(b), flowable fill meeting the requirements of Specification Section 710, or granular material conforming to Specification Subsection 1003.07. Plastic soil blanket for all installations shall conform to the requirements of Specification Subsection 203.10. All materials shall be tested and approved prior to use. Before any construction equipment is allowed to cross the box culvert, at least 2 feet, compacted thickness, of backfill shall be placed over the top. The backfill will help prevent the equipment from damaging the culvert. If the final thickness of cover over the installed box culvert is less than two feet, the contractor shall install the box culvert after all heavy hauling has been completed. If it is not possible to install the box culvert after it is no longer necessary to cross the box culvert with heavy equipment, with the approval of the engineer, the contractor shall install the culvert and place excess material over the installed culvert to a compacted depth of at least two feet. After all heavy hauling has been completed, the contractor shall remove the excess material to grade. Backfill material shall be of uniform soil characteristics and moisture content and shall be placed in lifts of uniform thicknesses. Lift thickness may require adjustment based on soil characteristics, but shall not be increased above the specification requirements. Project personnel will check the lift thickness during placement. Lift thickness shall be uniform both vertically and horizontally and shall be correlated with compactive effort to achieve specification density. The portion of lifts in excess of specification requirements shall be removed and the lift recompacted. SELECTED SOILS Selected soils backfill shall be placed and compacted in lifts not to exceed six inches compacted thickness. Optimum moisture will be determined in accordance with DOTD TR 415 or TR 418. Each layer shall be compacted to at least 95% of maximum density as determined in accordance with DOTD TR 415 or TR 418. Project personnel will determine percent compaction in accordance with DOTD TR 401.
  • 3. GRANULAR MATERIAL Granular material backfill shall be placed and compacted in lifts not to exceed twelve inches compacted thickness. Optimum moisture will be determined in accordance with DOTDTR 415 or TR 41. Each layer shall be compacted to at least 95% of maximum density as determined in accordance with DOTD TR 415 or TR 418. Project personnel will determine percent compaction in accordance with DOTD TR 401. COFFERDAMS AND CRIBS Cribs and cofferdams shall be backfilled with soil, approved by the engineer, and compacted as directed to the satisfaction of the engineer. The finished elevation of the compacted backfill shall be that of the surrounding ground. Backfilling will continue to the surface of the surrounding ground maintaining approximately equal elevations on both sides of the structure. FOOTINGS Final excavation to grade shall not be performed until just before the placement of reinforcing steel or concrete. When the bottom of the excavation is soil, the grade shall not be disturbed prior to the placement of concrete. When the bottom of the excavation is rock or other hard foundation material, it shall be cut to a firm surface as directed and all loose material removed. Any open seams shall be cleaned and filled with concrete, mortar or grout to the satisfaction of the engineer. Footing excavations shall be dewatered and made as dry as possible prior to the placement of backfill. Backfill material as specified shall be placed in lifts as directed and compacted as directed to the satisfaction of the engineer. OTHER STRUCTURES Excavations shall be dewatered and made as dry as possible prior to the placement of backfill. Backfill material, as specified, shall be placed in lifts not to exceed nine inches loose thickness as directed and uniformly compacted as directed to the satisfaction of the engineer. No jetting of backfill behind abutments and wingwalls will be permitted. QUALITY ASSURANCE Quality Assurance, both QC and Inspection and Acceptance, shall be conducted in accordance with Specification Section 701.