STRONGER CHRISTCHURCH
INFRASTRUCTURE REBUILD TEAM
(SCIRT)
April 2013
Canterbur
y
Earthquak
e
Recovery
FILE :
DRAFTING CHECKED
DRAWN
APPROVED
FIG. No. REV.PROJECT No.
APPROX. SCALE (AT A3 SIZE)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Land Damage Map
NTS
0
.
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Land Damage After 4 September 2010
!
Approx Scale 1:50,000
0 500 1000 1500 2000 2500 (m)
Legend
Areas of observed
liquefaction
Port Hills area
Canterbur
y
Earthquak
e
Recovery
FILE :
DRAFTING CHECKED
DRAWN
APPROVED
FIG. No. REV.PROJECT No.
APPROX. SCALE (AT A3 SIZE)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Land Damage Map
Aggregated Land Damage After 22 February 2011NTS
0
.
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
!
Approx Scale 1:50,000
0 500 1000 1500 2000 2500 (m)
Legend
Areas of observed
liquefaction
Port Hills area
Canterbur
y
Earthquak
e
Recovery
FILE :
DRAFTING CHECKED
DRAWN
APPROVED
FIG. No. REV.PROJECT No.
APPROX. SCALE (AT A3 SIZE)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Aggregated Building Damage Map
Building Damage After 4 September 2010NTS
0
.
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley,
MAS, Tower and Vero
!
Approx Scale 1:50,000
0 500 1000 1500 2000 2500 (m)
Legend
Repairs > $100k (houses which had
significant damage but could be
economically repaired
Rebuilds (houses which are beyond
economic repair)
Legend
Repairs > $100k (houses which had
significant damage but could be
economically repaired
Rebuilds (houses which are beyond
economic repair)
Confirmed rebuilds (houses which
were confirmed to be beyond
economic repair)
Canterbur
y
Earthquak
e
Recovery
FILE :
DRAFTING CHECKED
DRAWN
APPROVED
FIG. No. REV.PROJECT No.
APPROX. SCALE (AT A3 SIZE)
CERA
CANTERBURY EARTHQUAKE RECOVERY
Aggregated Building Damage After 22 February 2011NTS
0
.
Notes:
Low-resolution aerial photos sourced from Google Earth (Copyright: 2009).
High-resolution aerials provided by New Zealand Aerial Mapping (February 2011)
Property boundaries provided by Christchurch City Council
Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley,
MAS, Tower and Vero
!
Approx Scale 1:50,000
0 500 1000 1500 2000 2500 (m)
Aggregated Building Damage Map
Legend
Building Damage Ratio
(Repair cost estimate / replacement cost)
0% - 20%
20% - 40%
40% - 60%
60% - 80%
80% - 100%
100% (rebuild because it is
uneconomic to repair the building)
Legend
Building Damage Ratio
(Repair cost estimate / replacement cost)
0% - 20%
20% - 40%
40% - 60%
60% - 80%
80% - 100%
100% (rebuild because it is
uneconomic to repair the building)
WHY DOES SCIRT EXIST?
Creating resilient infrastructure
that gives people security
and confidence
in the future of Christchurch
Who is SCIRT?
• Delivery vehicle for the rebuild of the Horizontal infrastructure of
Christchurch
• Local and central government bodies:
– Christchurch City Council (CCC)
– Canterbury Earthquake Recovery Authority (CERA)
– New Zealand Transport Authority (NZTA)
• Private sector head contractor representatives –
City Care, Downer, Fletcher, Fulton Hogan and MacDow
• SCIRT also includes all other Consultants, Contractors and
Suppliers involved
Organisation Structure
City
Care
Downer Fletcher
Fulton
Hogan
MacDow
Delivery
Teams
Integrated Services Team (IST)
Management Team
People of Christchurch and New Zealand
Board
City Care
Downer
Fletchers
Fulton Hogan
McConnell Dowell
Consultants
Design
CCC
CCC CERA NZTA
Value for Money
I.E. T.O.C
Scope of Damage
Unit Replacement/Repair
Water Reticulation Km 51
Sewers Km 528
Sewer Pump Stations No 100
Storm water Km 196
Roading - residential Km 1,021
Foot Bridges No 45
Road Bridges No 18
End-To-End Process
Progress – March 2013
179
Projects valued at $976 million currently being
designed
109
Projects valued at $384 million currently being
constructed
185
Projects valued at $97 million currently being
handed back to the asset owners
36 Projects valued at $194 million being estimated
Progress – March 2013
Total
Network Damage Repaired
% Repair
complete Network
11,761,807
m2
1,320,375
m2
164,372
m2
14% Road pavement
1,613 km 659 km 144 km 22% Wastewater pipe
2,843 km 69 km 22 km 32% Fresh water pipe
329 km 26 km 9 km 35% Storm water pipe
WHAT WE’RE HERE FOR :
Creating resilient infrastructure
that gives people security
and confidence
in the future of Christchurch

More Related Content

Similar to Stronger Christchurch Infrastructure Rebuild Team (SCIRT)

Christchurch Rebuild project Sandown briefing presentation 25.02.14
Christchurch Rebuild project Sandown briefing presentation 25.02.14Christchurch Rebuild project Sandown briefing presentation 25.02.14
Christchurch Rebuild project Sandown briefing presentation 25.02.14
Industry Network
 
Assessment and Prioritisation of the RW rebuild in Chch after the EQs
Assessment and Prioritisation of the RW rebuild in Chch after the EQsAssessment and Prioritisation of the RW rebuild in Chch after the EQs
Assessment and Prioritisation of the RW rebuild in Chch after the EQs
Phil Wilkins
 
GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008
Stonnington
 
New zealand and the christchurch earthquake 2
New zealand and the christchurch earthquake 2New zealand and the christchurch earthquake 2
New zealand and the christchurch earthquake 2
lavenderbongo
 
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
Australian Civil-Military Centre
 
06 Earth_ Quake_ Tips.pdf
06 Earth_ Quake_ Tips.pdf06 Earth_ Quake_ Tips.pdf
06 Earth_ Quake_ Tips.pdf
shivi702191
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
Fairfax County
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Kevin Lovell, PMP
 
SEISMIC EVALUATION
SEISMIC EVALUATIONSEISMIC EVALUATION
SEISMIC EVALUATION
JKIB93
 
Intro to Confined Masonry
Intro to Confined MasonryIntro to Confined Masonry
Intro to Confined Masonry
EERI
 
Helena Inniss-King (Annual reserves certification)
Helena Inniss-King (Annual reserves certification)Helena Inniss-King (Annual reserves certification)
Helena Inniss-King (Annual reserves certification)
kaotic1986
 
Steel Design
Steel DesignSteel Design
Steel Design
Jessica Carmosino
 
The hard realities of earthquake recovery for seattle
The hard realities of earthquake recovery for seattleThe hard realities of earthquake recovery for seattle
The hard realities of earthquake recovery for seattle
haemmerle-consulting
 
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
glennmcgillivray
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement Project
Fairfax County
 
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادىAdvanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Egyptian Engineers Association
 
Plandescil – Surveying
Plandescil – SurveyingPlandescil – Surveying
Plandescil – Surveying
plandescil
 
HATS 2A
HATS 2AHATS 2A
HATS 2A
Desmond Yuen
 
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
IRJET Journal
 
Kashmir earthquake 2005 Report
Kashmir earthquake 2005  ReportKashmir earthquake 2005  Report
Kashmir earthquake 2005 Report
JunaidAshraf31
 

Similar to Stronger Christchurch Infrastructure Rebuild Team (SCIRT) (20)

Christchurch Rebuild project Sandown briefing presentation 25.02.14
Christchurch Rebuild project Sandown briefing presentation 25.02.14Christchurch Rebuild project Sandown briefing presentation 25.02.14
Christchurch Rebuild project Sandown briefing presentation 25.02.14
 
Assessment and Prioritisation of the RW rebuild in Chch after the EQs
Assessment and Prioritisation of the RW rebuild in Chch after the EQsAssessment and Prioritisation of the RW rebuild in Chch after the EQs
Assessment and Prioritisation of the RW rebuild in Chch after the EQs
 
GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008GHD Flood Mapping Review City of Stonnington 2008
GHD Flood Mapping Review City of Stonnington 2008
 
New zealand and the christchurch earthquake 2
New zealand and the christchurch earthquake 2New zealand and the christchurch earthquake 2
New zealand and the christchurch earthquake 2
 
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
ACMC Working Paper 01/2012 Disaster response: lessons from Christchurch
 
06 Earth_ Quake_ Tips.pdf
06 Earth_ Quake_ Tips.pdf06 Earth_ Quake_ Tips.pdf
06 Earth_ Quake_ Tips.pdf
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_ForumTunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum
 
SEISMIC EVALUATION
SEISMIC EVALUATIONSEISMIC EVALUATION
SEISMIC EVALUATION
 
Intro to Confined Masonry
Intro to Confined MasonryIntro to Confined Masonry
Intro to Confined Masonry
 
Helena Inniss-King (Annual reserves certification)
Helena Inniss-King (Annual reserves certification)Helena Inniss-King (Annual reserves certification)
Helena Inniss-King (Annual reserves certification)
 
Steel Design
Steel DesignSteel Design
Steel Design
 
The hard realities of earthquake recovery for seattle
The hard realities of earthquake recovery for seattleThe hard realities of earthquake recovery for seattle
The hard realities of earthquake recovery for seattle
 
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
ICLR Friday Forum: Reducing the risk of fire following earthquake in B.C. (No...
 
Evermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement ProjectEvermay Sec. 7b Underground Detention Facility Replacement Project
Evermay Sec. 7b Underground Detention Facility Replacement Project
 
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادىAdvanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
 
Plandescil – Surveying
Plandescil – SurveyingPlandescil – Surveying
Plandescil – Surveying
 
HATS 2A
HATS 2AHATS 2A
HATS 2A
 
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
IRJET- Comparative Analysis of NBC 105:1994 and IS 1893:2016 Seismic Codes wi...
 
Kashmir earthquake 2005 Report
Kashmir earthquake 2005  ReportKashmir earthquake 2005  Report
Kashmir earthquake 2005 Report
 

Recently uploaded

Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
Top Forex Brokers Review
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
ecamare2
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
Christian Dahlen
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
FelixPerez547899
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
Adnet Communications
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
CA Dr. Prithvi Ranjan Parhi
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
SEOSMMEARTH
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
ABHILASH DUTTA
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 

Recently uploaded (20)

Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024Best Forex Brokers Comparison in INDIA 2024
Best Forex Brokers Comparison in INDIA 2024
 
Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431Observation Lab PowerPoint Assignment for TEM 431
Observation Lab PowerPoint Assignment for TEM 431
 
Industrial Tech SW: Category Renewal and Creation
Industrial Tech SW:  Category Renewal and CreationIndustrial Tech SW:  Category Renewal and Creation
Industrial Tech SW: Category Renewal and Creation
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024Company Valuation webinar series - Tuesday, 4 June 2024
Company Valuation webinar series - Tuesday, 4 June 2024
 
Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024Lundin Gold Corporate Presentation - June 2024
Lundin Gold Corporate Presentation - June 2024
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
Income Tax exemption for Start up : Section 80 IAC
Income Tax  exemption for Start up : Section 80 IACIncome Tax  exemption for Start up : Section 80 IAC
Income Tax exemption for Start up : Section 80 IAC
 
3 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 20243 Simple Steps To Buy Verified Payoneer Account In 2024
3 Simple Steps To Buy Verified Payoneer Account In 2024
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
The Evolution and Impact of OTT Platforms: A Deep Dive into the Future of Ent...
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 

Stronger Christchurch Infrastructure Rebuild Team (SCIRT)

  • 2. Canterbur y Earthquak e Recovery FILE : DRAFTING CHECKED DRAWN APPROVED FIG. No. REV.PROJECT No. APPROX. SCALE (AT A3 SIZE) CERA CANTERBURY EARTHQUAKE RECOVERY Land Damage Map NTS 0 . Notes: Low-resolution aerial photos sourced from Google Earth (Copyright: 2009). High-resolution aerials provided by New Zealand Aerial Mapping (February 2011) Property boundaries provided by Christchurch City Council Land Damage After 4 September 2010 ! Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Legend Areas of observed liquefaction Port Hills area
  • 3. Canterbur y Earthquak e Recovery FILE : DRAFTING CHECKED DRAWN APPROVED FIG. No. REV.PROJECT No. APPROX. SCALE (AT A3 SIZE) CERA CANTERBURY EARTHQUAKE RECOVERY Land Damage Map Aggregated Land Damage After 22 February 2011NTS 0 . Notes: Low-resolution aerial photos sourced from Google Earth (Copyright: 2009). High-resolution aerials provided by New Zealand Aerial Mapping (February 2011) Property boundaries provided by Christchurch City Council ! Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Legend Areas of observed liquefaction Port Hills area
  • 4. Canterbur y Earthquak e Recovery FILE : DRAFTING CHECKED DRAWN APPROVED FIG. No. REV.PROJECT No. APPROX. SCALE (AT A3 SIZE) CERA CANTERBURY EARTHQUAKE RECOVERY Aggregated Building Damage Map Building Damage After 4 September 2010NTS 0 . Notes: Low-resolution aerial photos sourced from Google Earth (Copyright: 2009). High-resolution aerials provided by New Zealand Aerial Mapping (February 2011) Property boundaries provided by Christchurch City Council Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley, MAS, Tower and Vero ! Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Legend Repairs > $100k (houses which had significant damage but could be economically repaired Rebuilds (houses which are beyond economic repair) Legend Repairs > $100k (houses which had significant damage but could be economically repaired Rebuilds (houses which are beyond economic repair) Confirmed rebuilds (houses which were confirmed to be beyond economic repair)
  • 5. Canterbur y Earthquak e Recovery FILE : DRAFTING CHECKED DRAWN APPROVED FIG. No. REV.PROJECT No. APPROX. SCALE (AT A3 SIZE) CERA CANTERBURY EARTHQUAKE RECOVERY Aggregated Building Damage After 22 February 2011NTS 0 . Notes: Low-resolution aerial photos sourced from Google Earth (Copyright: 2009). High-resolution aerials provided by New Zealand Aerial Mapping (February 2011) Property boundaries provided by Christchurch City Council Building damage based on data provided by AMI, Ansvar, EQC, FMG, Housing New Zealand, IAG, Lumley, MAS, Tower and Vero ! Approx Scale 1:50,000 0 500 1000 1500 2000 2500 (m) Aggregated Building Damage Map Legend Building Damage Ratio (Repair cost estimate / replacement cost) 0% - 20% 20% - 40% 40% - 60% 60% - 80% 80% - 100% 100% (rebuild because it is uneconomic to repair the building) Legend Building Damage Ratio (Repair cost estimate / replacement cost) 0% - 20% 20% - 40% 40% - 60% 60% - 80% 80% - 100% 100% (rebuild because it is uneconomic to repair the building)
  • 6. WHY DOES SCIRT EXIST? Creating resilient infrastructure that gives people security and confidence in the future of Christchurch
  • 7. Who is SCIRT? • Delivery vehicle for the rebuild of the Horizontal infrastructure of Christchurch • Local and central government bodies: – Christchurch City Council (CCC) – Canterbury Earthquake Recovery Authority (CERA) – New Zealand Transport Authority (NZTA) • Private sector head contractor representatives – City Care, Downer, Fletcher, Fulton Hogan and MacDow • SCIRT also includes all other Consultants, Contractors and Suppliers involved
  • 8. Organisation Structure City Care Downer Fletcher Fulton Hogan MacDow Delivery Teams Integrated Services Team (IST) Management Team People of Christchurch and New Zealand Board City Care Downer Fletchers Fulton Hogan McConnell Dowell Consultants Design CCC CCC CERA NZTA Value for Money I.E. T.O.C
  • 9. Scope of Damage Unit Replacement/Repair Water Reticulation Km 51 Sewers Km 528 Sewer Pump Stations No 100 Storm water Km 196 Roading - residential Km 1,021 Foot Bridges No 45 Road Bridges No 18
  • 11. Progress – March 2013 179 Projects valued at $976 million currently being designed 109 Projects valued at $384 million currently being constructed 185 Projects valued at $97 million currently being handed back to the asset owners 36 Projects valued at $194 million being estimated
  • 12. Progress – March 2013 Total Network Damage Repaired % Repair complete Network 11,761,807 m2 1,320,375 m2 164,372 m2 14% Road pavement 1,613 km 659 km 144 km 22% Wastewater pipe 2,843 km 69 km 22 km 32% Fresh water pipe 329 km 26 km 9 km 35% Storm water pipe
  • 13. WHAT WE’RE HERE FOR : Creating resilient infrastructure that gives people security and confidence in the future of Christchurch