SlideShare a Scribd company logo
888-867-2360 www.tmpservices.com
Installation Manual
Steel-Over 30” Design
Proudly Made in the USA
2
Installation Guide
Tools Required:
Generator (or power from building)
” Drill (heavy duty)
Abrasive Saw (hot saw)
4 ” Grinder
Dry Wall Screw Gun for Self Tapping Screws
Combination Wrench and Socket Set 9/16”
4’ or 6’ Level (preferably smart level)
C-Clamp (preferably locking type)
3/8” and 5/16” Magnet Drive Hex Bit Attachment
7/16” Drill Bit
Measuring Tape
String Line (if using optional offset)
View Packing List:
Each ramp system is shipped with a packing list, TMP layout of the site
design, and sales order. Be sure to check that all items are on hand prior to
beginning the installation.
3
Table of Contents
Getting Started Page 4-5
Installing First Landing Section Page 6-10
Installing First Ramp Section Page 11
Installing Toe Section Page 12
Installing Guardrails Page 13
Drilling Guardrails Page 14
Installing Angle Bracing Page 15-16
Touch Up and Completion Page 17
Options Page 18-27
4
Getting Started
A. Unpack ramp. All handrails and hardware are packaged in between ramp and
landing sections.
Figure A
B. Measure from grade to door threshold. This will give you the approximate ramp
length.
Please Note: Maximum slope is per 1:12 code.
Figure B
C. Now measure the end of the building in the direction of the ramp, grade to where
door threshold would be if door were in that location.
Figure C
5
D. If measurement is less than original door threshold measurement, you are gaining
grade; your ramp length will be the difference in the two measurements shorter.
Example: Grade to threshold is 30”, grade at end of building to threshold
is 24”, and ramp length will now be approximately 24’. If the reverse is
true, grade to threshold is 30”, grade at end of building to threshold is 36”,
and ramp length will now be approximately 36’. (Note: Per code, in a
1:12 slope, any ramp with the length of 30’ of more, must have
intermediate resting stop, this would make ramp length 42’.)
E. Lay out landing and ramp sections, as they will approximately be installed.
Figure D
F. Lay out legs in groups of same length. You want to use the longer legs at
landings and first ramp sections and sleeve through pockets. Shorter legs for
inside leg pockets that do not sleeve through and towards the end of the ramp.
Legs with half pads are used for the toe section of the ramp.
Figure E
6
Installing First Landing Section
A. It is important that you get the first landing and the first ramp section set level at
connection, as all other sections will follow the same line.
B. Stand landing section on its side and place the longest legs through the welded
pockets (in all four corners). Adjust legs to door threshold measurement. Hand-
tighten set screws. Measure from center legs.
Figure F
C. Place landing with legs attached under threshold. Re-adjust legs to level landing.
Make sure door swings over landing section smoothly.
Figure G
7
D. Make sure the placement of the landing at threshold leaves a 42” diagonal from
the door to the center of the intersection of landing and first ramp section.
(Please see TMP drawings that show the typical filler detail. Or refer to Figure I
and Figure I-1).
Figure H
Figure I
Figure I-1
Please Note: Landing must maintain a 60” inside dimension.
8
E. Also, when legs sleeve through welded pockets, they must sleeve a minimum of
18” above top of landing deck.
Figure J
F. Measure for center legs. Measure from top of center leg pockets to grade, and
subtract 2” for play. Cut your center legs.
Figure K
G. Insert your center legs, and hand-tighten screws.
Figure L
9
H. Place landing under threshold again, re-level by loosening and tightening
setscrews.
Please Note: Place 1/8” shim under level to provide drainage, which will give you
” drainage in 6’ way from door.
Figure M
I. Attach (1) angle clip under the landing on each side of door using (2) each ”x4”
lags. Use self-tapping screws to 1 ” steel landing members.
Figure N
J. Make sure all leg plates are firmly on the ground. Using ” drill with 7/16” drill
bit, drill through predrilled holes of all legs underneath landing.
Figure O
10
K. Now insert guardrails through legs. For the landing, all guardrails will be plumb
straight up and down.
Please Note: If you have common landing sections, you will only sleeve
(2) out of (3) legs as you are sharing legs at connections.
Figure P
L. When guardrails are in correctly, bottom of guardrail attachment will be flush
with deck at bottom, and top of guardrails will be flush with adjacent guardrail. It
is important that top is flush to make continuous guardrail.
Figure Q
M. Drill through pre-drilled holes and legs directly above and below landing surface.
Use 2 ” bolts and nuts for single legs, and 4” bolts and nuts for two leg
connections. Bolt top hole. There should be a total of three holes to be bolted per
each vertical. (2) bottom holes must be drilled through legs.
11
Installing First Ramp Section:
A. Clean ramp connector pockets of debris.
Figure R
B. Using smart level, measure grade drop for 1:12, or approximate 6” drop (ramp
section is 6’ long). Place legs through welded pockets adjusting for smart level
measurement or 6” if approximating. Tighten setscrews.
Please Note: You have only 4 legs per ramp section, as you share a leg at
top with the landing.
C. Place ramp section in connecting pockets, and slide ramp section in over
approximately 1 ”, enough to clear when guardrail is assembled.
Figures S
D. Using smart level, measure 1:12 and adjust legs with setscrews. Be sure to level
across ramp.
Figure T
E. Continue with all ramp sections using steps A-D, until the toe ramp section is
reached.
12
Installing Toe Section
A. The last section to be installed is the toe section. This is basically the same as a
ramp section, except the last welded pocket is flush with the bottom-framing
member.
Figure U
B. Measure and complete the same as a ramp section. However, since you are at or
close to grade, you can only screw in self-tapping screws through welded pocket
into legs.
Please Note: 6’ clearance required at end transition, end transition by
others.
Figure V
Figure W
13
Installing Guardrails
A. Slide guardrails over bottom and center legs. Put in all handrails down the same
row and complete the opposite side as well. Make sure all guardrails are flush.
Now you are ready to drill.
Please Note: At the top of every ramp section, there is no leg as it is
shared with the bottom leg of the section above.
B. The guardrail that you use for the toe section will have the 12” return attached.
Please Note: Per code, 12” extension required past end transition of ramp.
Figure X
Figure Y
14
Drilling Guardrails
A. Drill in (2) locations as you did in the landing section and bolt in (3) locations.
Start with the pre-drilled hole below the deck surface and drill through the
inserted legs. Slide in bolt and tighten with nut.
B. You need to remove the next guardrail in line to drill the center hole. Remove
and drill. Replace and add bolt and nut. Add the upper bolt through the pre-
drilled holes and tighten.
Figure Z
C. Continue the same procedure until you put in the last guardrail section. Because
the last section (or toe section) is sitting on the ground, you can only secure the
bottom leg to guardrail with self-tapping screws.
Figure AA
15
Installing Angle Bracing
A. Angle bracing is required when landing or ramp decking is 24” or over. Bracing
is required at the corner of each landing and 6’ o.c. under the landing. Each ramp
section takes (2) outside braces and 6’ o.c. under the ramp, since they share legs
with either a landing or a ramp. Once the landing surface falls below 24”, angle
bracing is not required.
Angle Bracing Installing Angle Bracing
Figures BB
B. Attach to legs on the inside of landing, so angle support does not stick past the
edge of landing, thus allowing for optional skirting.
Side View of Landing Front View of Ramp
Figures CC
16
Side View of Landing
Figures DD
Front View of Ramp
Figure EE
C. Use (2) self-tapping screws, (1) in top and (1) in bottom of each support.
17
Touch Up and Completion
A. You should have completed the ramp. Check handrails for burrs. Run your hands
along the handrails. If there are any burrs, take grinder and grind until smooth.
Use touch-up paint (98% zinc solution) and touch up areas void of galvanized
coating.
Please Note: Touch up paint not included.
Figures FF
18
Options
Optional Off Set:
A. Move first ramp section inward 2” from outside landing.
B. Using string line, attach to top of landing surface, and run to grade at length of
ramp sections provided. Attach string line to grade. This will be the slop you set
your ramp sections to.
For Example: If threshold height is anywhere from 24” to 30”, 30’ of
ramp is provided, measure your string line out 30’.
C. When you have the correct slope matching the string line, follow A-G on
installing ramp sections.
Figures GG
D. At the top of landing, install 2”x2” angle at the offset guardrail verticals using
self-tapping screws.
19
Optional Switchback Landing:
A. Stand both 4’x6’ level section on its sides. Slide legs through welded pockets and
adjust to level all (4) corners.
Figure HH
B. Clamp 6” spacer to top edge of (1) 4’x6’ level landing and use self-tapping screws
in pre-drilled holes in spacer.
Please Note: Make sure spacer is flush to top of landing surface.
Figure II
20
C. Flip landing over to the topside and connect into existing ramp pockets, recheck
for level. Clamp spacer to the second 4’x6’ level landing and use self-tapping
screws in pre-drilled holes in spacer.
Please Note: Make sure spacer is flush to top of landing surface.
Figure JJ
D. Continue following steps A-G on installing ramp sections.
Figure KK
21
Optional Level Landing:
A. Stand 4’x6’ level section on its side. Slide legs through welded pockets and
adjust to level all (4) corners.
Figure LL
B. Flip landing over to the topside and connect into existing ramp pockets, recheck
for level.
C. Continue follow steps A-G on installing ramp sections.
Figure MM
22
Optional Grab-Rail Attachment:
A. Start at the top with the landing. You either have (1) straight handrail extension
and (1) wrap-around handrail extension or (2) wrap-around handrail extensions,
depending on the design of the landing.
Figures NN
B. Insert posts to end of 1 ” guardrails at top of landing where handrail extensions
or wrap-around occur, this makes inside handrail continuous. Drill and bolt.
Figures OO
C. You will attach handrail brackets first. At each post where 6’ guardrails connect
you will add (1) handrail bracket.
Figure PP
23
D. When the 1 3/16” tubing is attached on top of that bracket, the top of the tubing-
handrail must be between 34” to 38” above the deck surface. Wherever you
measure, you must be consistent all the way down. Measure and mark your
locations for each bracket, attach with (2) self-tapping screws.
Figure QQ
E. Handrail pipe is 6’ long to fit perfectly between sections. At the top, the
extension is attached that either loops down or wraps around. For straight
extension loop has a down slope, and at the bottom of the ramp the loops have an
up slope. These extensions require extra brackets to attach to the bottom portion
of loop.
Figure RR
24
F. The wrap-around loop is attached with a bracket and plate that fits between round
4” on center pickets.
Figure SS
G. Secure top pipe-handrail to brackets starting at top wrap-around or straight loops,
with self-tapping screws through bracket into pipe. End of pipe should fit
halfway on to bracket, with the internal sleeve placed to accept front end of next
pipe section. Use self-tapping screws to secure all the way down, and on both
sides. Bottom ramp loops will have two brackets, one at the top and one at the
bottom.
25
Optional Step Attachment:
A. Install landing per instructions on Installing First Landing Section.
B. Measure outside edge of landing from finished floor to top surface of landing, this
will determine your measurement of your step height.
C. Flip step on side and proceed to sleeve legs in 4 corners of step.
Please Note: One leg with half pad will need to be installed in top sleeve,
where is will butt up against outside of landing.
Figure TT
D. Start at top of step rise and measure to end of base pad on let, measurement
should be the same as your landing height.
E. Flip step over on its stop side and butt again landing. Make sure top of step rise is
flush against top surface of landing.
Please Note: Leg with half pad will sit on top of leg with full pad.
Figure UU
F. Proceed to adjust bottom legs so they are level.
26
G. Sleeve in step guardrail over legs.
Figure VV
H. Sleeve wrap-around loop and straight extension into inner handrails of step at top
of landing, secure with back-plate between round 4” on center pickets.
Straight Extension Wrap-Around Loop
Figures WW
Please Note: If entire grab rails are to be attached, please refer to the
Optional Grab Rail Attachment instructions.
27
I. After guardrails are installed, screw in self-tapping screws 12” on center at top of
step riser.
Figure XX
J. Follow Up Touch Up Procedures.
Figure YY

More Related Content

Similar to Steel Staircase Manufacturers

Installation Manual Aluminum
Installation Manual AluminumInstallation Manual Aluminum
Installation Manual Aluminum
tmpservices01
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
Installation Manuals - Southwest Solutions Group
 
Concerto Monitor Arm Manual
Concerto Monitor Arm ManualConcerto Monitor Arm Manual
Concerto Monitor Arm Manual
iMovR
 
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsXtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
iMovR
 
iMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm ManualiMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm Manual
iMovR
 
Xtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - AssemblyXtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - Assembly
iMovR
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualGiller Doit
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed
icreatablesseo
 
iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15
iMovR
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
Trần Khánh
 
Cantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work PlatformCantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work Platform
Janine O
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
icreatablesseo
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60
Domain CabinetsDirect
 
How to assemble a sink base vanity
How to assemble a sink base vanityHow to assemble a sink base vanity
How to assemble a sink base vanity
Domain CabinetsDirect
 
8. How to install trim on the storage shed
8. How to install trim on the storage shed8. How to install trim on the storage shed
8. How to install trim on the storage shed
icreatablesseo
 
7. How to build shed roof
7. How to build shed roof7. How to build shed roof
7. How to build shed roof
icreatablesseo
 
Staircase
StaircaseStaircase
Staircase
BIRLA BABU
 
EVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install GuideEVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX Aftermarket Tesla Accessories
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
dteich
 

Similar to Steel Staircase Manufacturers (20)

Installation Manual Aluminum
Installation Manual AluminumInstallation Manual Aluminum
Installation Manual Aluminum
 
Mobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation InstructionsMobile Wire Shelving Installation Instructions
Mobile Wire Shelving Installation Instructions
 
Concerto Monitor Arm Manual
Concerto Monitor Arm ManualConcerto Monitor Arm Manual
Concerto Monitor Arm Manual
 
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly InstructionsXtend Dual Screen Crossbar Monitor Arm Assembly Instructions
Xtend Dual Screen Crossbar Monitor Arm Assembly Instructions
 
iMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm ManualiMovR Xtend Monitor Arm Manual
iMovR Xtend Monitor Arm Manual
 
Xtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - AssemblyXtend Dual Screen Crossbar Monitor Arm - Assembly
Xtend Dual Screen Crossbar Monitor Arm - Assembly
 
Vignola Gazebo Assembly Manual
Vignola Gazebo Assembly ManualVignola Gazebo Assembly Manual
Vignola Gazebo Assembly Manual
 
9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed9. How to install asphalt roofing on a shed
9. How to install asphalt roofing on a shed
 
iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15iMovr Omega Olympus Manual 12 24-15
iMovr Omega Olympus Manual 12 24-15
 
thi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compactthi cong vach ngan ve sinh compact
thi cong vach ngan ve sinh compact
 
Cantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work PlatformCantilever Heavy Duty Ladder plus Work Platform
Cantilever Heavy Duty Ladder plus Work Platform
 
4. How to build shed roof rafters
4. How to build shed roof rafters4. How to build shed roof rafters
4. How to build shed roof rafters
 
How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60How to assemble a sink base vanity 48 60
How to assemble a sink base vanity 48 60
 
How to assemble a sink base vanity
How to assemble a sink base vanityHow to assemble a sink base vanity
How to assemble a sink base vanity
 
8. How to install trim on the storage shed
8. How to install trim on the storage shed8. How to install trim on the storage shed
8. How to install trim on the storage shed
 
7. How to build shed roof
7. How to build shed roof7. How to build shed roof
7. How to build shed roof
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Staircase
StaircaseStaircase
Staircase
 
EVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install GuideEVANNEX EcoHitch for Tesla Model S Install Guide
EVANNEX EcoHitch for Tesla Model S Install Guide
 
Ms200 Install Asphalt
Ms200 Install AsphaltMs200 Install Asphalt
Ms200 Install Asphalt
 

Recently uploaded

What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
PaulBryant58
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
Naaraayani Minerals Pvt.Ltd
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
BBPMedia1
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
awaisafdar
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Lviv Startup Club
 

Recently uploaded (20)

What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
Accpac to QuickBooks Conversion Navigating the Transition with Online Account...
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
Role of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in MiningRole of Remote Sensing and Monitoring in Mining
Role of Remote Sensing and Monitoring in Mining
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
RMD24 | Debunking the non-endemic revenue myth Marvin Vacquier Droop | First ...
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...The Parable of the Pipeline a book every new businessman or business student ...
The Parable of the Pipeline a book every new businessman or business student ...
 
Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)Maksym Vyshnivetskyi: PMO Quality Management (UA)
Maksym Vyshnivetskyi: PMO Quality Management (UA)
 

Steel Staircase Manufacturers

  • 2. 2 Installation Guide Tools Required: Generator (or power from building) ” Drill (heavy duty) Abrasive Saw (hot saw) 4 ” Grinder Dry Wall Screw Gun for Self Tapping Screws Combination Wrench and Socket Set 9/16” 4’ or 6’ Level (preferably smart level) C-Clamp (preferably locking type) 3/8” and 5/16” Magnet Drive Hex Bit Attachment 7/16” Drill Bit Measuring Tape String Line (if using optional offset) View Packing List: Each ramp system is shipped with a packing list, TMP layout of the site design, and sales order. Be sure to check that all items are on hand prior to beginning the installation.
  • 3. 3 Table of Contents Getting Started Page 4-5 Installing First Landing Section Page 6-10 Installing First Ramp Section Page 11 Installing Toe Section Page 12 Installing Guardrails Page 13 Drilling Guardrails Page 14 Installing Angle Bracing Page 15-16 Touch Up and Completion Page 17 Options Page 18-27
  • 4. 4 Getting Started A. Unpack ramp. All handrails and hardware are packaged in between ramp and landing sections. Figure A B. Measure from grade to door threshold. This will give you the approximate ramp length. Please Note: Maximum slope is per 1:12 code. Figure B C. Now measure the end of the building in the direction of the ramp, grade to where door threshold would be if door were in that location. Figure C
  • 5. 5 D. If measurement is less than original door threshold measurement, you are gaining grade; your ramp length will be the difference in the two measurements shorter. Example: Grade to threshold is 30”, grade at end of building to threshold is 24”, and ramp length will now be approximately 24’. If the reverse is true, grade to threshold is 30”, grade at end of building to threshold is 36”, and ramp length will now be approximately 36’. (Note: Per code, in a 1:12 slope, any ramp with the length of 30’ of more, must have intermediate resting stop, this would make ramp length 42’.) E. Lay out landing and ramp sections, as they will approximately be installed. Figure D F. Lay out legs in groups of same length. You want to use the longer legs at landings and first ramp sections and sleeve through pockets. Shorter legs for inside leg pockets that do not sleeve through and towards the end of the ramp. Legs with half pads are used for the toe section of the ramp. Figure E
  • 6. 6 Installing First Landing Section A. It is important that you get the first landing and the first ramp section set level at connection, as all other sections will follow the same line. B. Stand landing section on its side and place the longest legs through the welded pockets (in all four corners). Adjust legs to door threshold measurement. Hand- tighten set screws. Measure from center legs. Figure F C. Place landing with legs attached under threshold. Re-adjust legs to level landing. Make sure door swings over landing section smoothly. Figure G
  • 7. 7 D. Make sure the placement of the landing at threshold leaves a 42” diagonal from the door to the center of the intersection of landing and first ramp section. (Please see TMP drawings that show the typical filler detail. Or refer to Figure I and Figure I-1). Figure H Figure I Figure I-1 Please Note: Landing must maintain a 60” inside dimension.
  • 8. 8 E. Also, when legs sleeve through welded pockets, they must sleeve a minimum of 18” above top of landing deck. Figure J F. Measure for center legs. Measure from top of center leg pockets to grade, and subtract 2” for play. Cut your center legs. Figure K G. Insert your center legs, and hand-tighten screws. Figure L
  • 9. 9 H. Place landing under threshold again, re-level by loosening and tightening setscrews. Please Note: Place 1/8” shim under level to provide drainage, which will give you ” drainage in 6’ way from door. Figure M I. Attach (1) angle clip under the landing on each side of door using (2) each ”x4” lags. Use self-tapping screws to 1 ” steel landing members. Figure N J. Make sure all leg plates are firmly on the ground. Using ” drill with 7/16” drill bit, drill through predrilled holes of all legs underneath landing. Figure O
  • 10. 10 K. Now insert guardrails through legs. For the landing, all guardrails will be plumb straight up and down. Please Note: If you have common landing sections, you will only sleeve (2) out of (3) legs as you are sharing legs at connections. Figure P L. When guardrails are in correctly, bottom of guardrail attachment will be flush with deck at bottom, and top of guardrails will be flush with adjacent guardrail. It is important that top is flush to make continuous guardrail. Figure Q M. Drill through pre-drilled holes and legs directly above and below landing surface. Use 2 ” bolts and nuts for single legs, and 4” bolts and nuts for two leg connections. Bolt top hole. There should be a total of three holes to be bolted per each vertical. (2) bottom holes must be drilled through legs.
  • 11. 11 Installing First Ramp Section: A. Clean ramp connector pockets of debris. Figure R B. Using smart level, measure grade drop for 1:12, or approximate 6” drop (ramp section is 6’ long). Place legs through welded pockets adjusting for smart level measurement or 6” if approximating. Tighten setscrews. Please Note: You have only 4 legs per ramp section, as you share a leg at top with the landing. C. Place ramp section in connecting pockets, and slide ramp section in over approximately 1 ”, enough to clear when guardrail is assembled. Figures S D. Using smart level, measure 1:12 and adjust legs with setscrews. Be sure to level across ramp. Figure T E. Continue with all ramp sections using steps A-D, until the toe ramp section is reached.
  • 12. 12 Installing Toe Section A. The last section to be installed is the toe section. This is basically the same as a ramp section, except the last welded pocket is flush with the bottom-framing member. Figure U B. Measure and complete the same as a ramp section. However, since you are at or close to grade, you can only screw in self-tapping screws through welded pocket into legs. Please Note: 6’ clearance required at end transition, end transition by others. Figure V Figure W
  • 13. 13 Installing Guardrails A. Slide guardrails over bottom and center legs. Put in all handrails down the same row and complete the opposite side as well. Make sure all guardrails are flush. Now you are ready to drill. Please Note: At the top of every ramp section, there is no leg as it is shared with the bottom leg of the section above. B. The guardrail that you use for the toe section will have the 12” return attached. Please Note: Per code, 12” extension required past end transition of ramp. Figure X Figure Y
  • 14. 14 Drilling Guardrails A. Drill in (2) locations as you did in the landing section and bolt in (3) locations. Start with the pre-drilled hole below the deck surface and drill through the inserted legs. Slide in bolt and tighten with nut. B. You need to remove the next guardrail in line to drill the center hole. Remove and drill. Replace and add bolt and nut. Add the upper bolt through the pre- drilled holes and tighten. Figure Z C. Continue the same procedure until you put in the last guardrail section. Because the last section (or toe section) is sitting on the ground, you can only secure the bottom leg to guardrail with self-tapping screws. Figure AA
  • 15. 15 Installing Angle Bracing A. Angle bracing is required when landing or ramp decking is 24” or over. Bracing is required at the corner of each landing and 6’ o.c. under the landing. Each ramp section takes (2) outside braces and 6’ o.c. under the ramp, since they share legs with either a landing or a ramp. Once the landing surface falls below 24”, angle bracing is not required. Angle Bracing Installing Angle Bracing Figures BB B. Attach to legs on the inside of landing, so angle support does not stick past the edge of landing, thus allowing for optional skirting. Side View of Landing Front View of Ramp Figures CC
  • 16. 16 Side View of Landing Figures DD Front View of Ramp Figure EE C. Use (2) self-tapping screws, (1) in top and (1) in bottom of each support.
  • 17. 17 Touch Up and Completion A. You should have completed the ramp. Check handrails for burrs. Run your hands along the handrails. If there are any burrs, take grinder and grind until smooth. Use touch-up paint (98% zinc solution) and touch up areas void of galvanized coating. Please Note: Touch up paint not included. Figures FF
  • 18. 18 Options Optional Off Set: A. Move first ramp section inward 2” from outside landing. B. Using string line, attach to top of landing surface, and run to grade at length of ramp sections provided. Attach string line to grade. This will be the slop you set your ramp sections to. For Example: If threshold height is anywhere from 24” to 30”, 30’ of ramp is provided, measure your string line out 30’. C. When you have the correct slope matching the string line, follow A-G on installing ramp sections. Figures GG D. At the top of landing, install 2”x2” angle at the offset guardrail verticals using self-tapping screws.
  • 19. 19 Optional Switchback Landing: A. Stand both 4’x6’ level section on its sides. Slide legs through welded pockets and adjust to level all (4) corners. Figure HH B. Clamp 6” spacer to top edge of (1) 4’x6’ level landing and use self-tapping screws in pre-drilled holes in spacer. Please Note: Make sure spacer is flush to top of landing surface. Figure II
  • 20. 20 C. Flip landing over to the topside and connect into existing ramp pockets, recheck for level. Clamp spacer to the second 4’x6’ level landing and use self-tapping screws in pre-drilled holes in spacer. Please Note: Make sure spacer is flush to top of landing surface. Figure JJ D. Continue following steps A-G on installing ramp sections. Figure KK
  • 21. 21 Optional Level Landing: A. Stand 4’x6’ level section on its side. Slide legs through welded pockets and adjust to level all (4) corners. Figure LL B. Flip landing over to the topside and connect into existing ramp pockets, recheck for level. C. Continue follow steps A-G on installing ramp sections. Figure MM
  • 22. 22 Optional Grab-Rail Attachment: A. Start at the top with the landing. You either have (1) straight handrail extension and (1) wrap-around handrail extension or (2) wrap-around handrail extensions, depending on the design of the landing. Figures NN B. Insert posts to end of 1 ” guardrails at top of landing where handrail extensions or wrap-around occur, this makes inside handrail continuous. Drill and bolt. Figures OO C. You will attach handrail brackets first. At each post where 6’ guardrails connect you will add (1) handrail bracket. Figure PP
  • 23. 23 D. When the 1 3/16” tubing is attached on top of that bracket, the top of the tubing- handrail must be between 34” to 38” above the deck surface. Wherever you measure, you must be consistent all the way down. Measure and mark your locations for each bracket, attach with (2) self-tapping screws. Figure QQ E. Handrail pipe is 6’ long to fit perfectly between sections. At the top, the extension is attached that either loops down or wraps around. For straight extension loop has a down slope, and at the bottom of the ramp the loops have an up slope. These extensions require extra brackets to attach to the bottom portion of loop. Figure RR
  • 24. 24 F. The wrap-around loop is attached with a bracket and plate that fits between round 4” on center pickets. Figure SS G. Secure top pipe-handrail to brackets starting at top wrap-around or straight loops, with self-tapping screws through bracket into pipe. End of pipe should fit halfway on to bracket, with the internal sleeve placed to accept front end of next pipe section. Use self-tapping screws to secure all the way down, and on both sides. Bottom ramp loops will have two brackets, one at the top and one at the bottom.
  • 25. 25 Optional Step Attachment: A. Install landing per instructions on Installing First Landing Section. B. Measure outside edge of landing from finished floor to top surface of landing, this will determine your measurement of your step height. C. Flip step on side and proceed to sleeve legs in 4 corners of step. Please Note: One leg with half pad will need to be installed in top sleeve, where is will butt up against outside of landing. Figure TT D. Start at top of step rise and measure to end of base pad on let, measurement should be the same as your landing height. E. Flip step over on its stop side and butt again landing. Make sure top of step rise is flush against top surface of landing. Please Note: Leg with half pad will sit on top of leg with full pad. Figure UU F. Proceed to adjust bottom legs so they are level.
  • 26. 26 G. Sleeve in step guardrail over legs. Figure VV H. Sleeve wrap-around loop and straight extension into inner handrails of step at top of landing, secure with back-plate between round 4” on center pickets. Straight Extension Wrap-Around Loop Figures WW Please Note: If entire grab rails are to be attached, please refer to the Optional Grab Rail Attachment instructions.
  • 27. 27 I. After guardrails are installed, screw in self-tapping screws 12” on center at top of step riser. Figure XX J. Follow Up Touch Up Procedures. Figure YY