STATIC ANALYSIS OF XYZ
WELLHEAD PLATFORM
BASED ON API RP2A WSD
Kristoforus Satya Anggara
Depok, 2021
Introducing
XYZ
WELLHEAD
PLATFORM
MAIN DATA
General Criteria Description
Recommended practice API RP2A WSD, AISC ASD
Material structure ASTM
Platform type Wellhead
Platform type 4
Water depth (LWS) - feet 115
Platform orientation +32,50
Deck Design Criteria Description
Number of deck 2
Cellar deck area 1400 ft2
Main deck area 1200 ft2
Cellar deck live load operating condition 100 psf
Main deck live load operating condition 100 psf
MAIN DATA (cont.)
Deck Design Criteria Description
Cellar deck live load operating condition 75 psf
Main deck live load operating condition 75 psf
Crane vertical load operating condition 155 kips
Crane moment load operating condition 220 kips.in
Crane vertical load storm condition 72,5 kips
Crane moment load storm condition 0 kips.in
Wind load operating condition 40 mph
Wind load storm condition 120 mph
Pipe load main deck 35 psf
Pipe load cellar deck 35 psf
Helicopter Boeing Boeing BO-105C
Helideck codes API RP2L
MAIN DATA (cont.)
Wind & Current Operating Condition
Significant wave height 8 ft
Wave period 9,5 s
Tide 4,8ft
Current speed (surface) 2 ft/s
Current speed (seabed) 0 ft/s
Wind & Current Storm Condition
Significant wave height 24 ft
Wave period 9,5 s
Tide 4,8 ft
Current speed (surface) 3 ft/s
Current speed (seabed) 0,8 ft/s
Storm surge 0,5 ft
MAIN DATA (cont.)
Jacket Design Criteria Description
Marine growth 2 inch
Scouring effect tolerance 3 feet
Number of conductor 6
Conductor OD 24 inch
Conductor thickness 0,625 inch
Soil type A
Batter 1/8
CELLAR DECK EQUIPMENT
No. Description Number
Weight
(kip)
SIZE
Length Width Height
ft inch ft inch ft inch
1 Emergency generator 1 20,16 22 9 10 11
2 Maintenance building 1 44,80 12 3 6 4 8
3 Switch gear 1 7,84 5 2 2 8 10
4 Switch gear building 1 6,72 7 18 13 6
5 Diesel fuel tank 1 58,24 10 10 10
6 Transformer-2 1 12,00 9 5 6 9
No. Description Number
Weight
(Kip)
SIZE
Length Width Height
ft inch ft inch ft inch
1 Instrument storage 1 5,60 8 6 8 6 6
2 Fresh water tank 1 7,09 11 6 8 10
3 Mechanical storage 1 7,84 8 2 8 1 8 9
4 Communication tower 1 17,92 10 5 10 5 100
5 Power instrument storage 1 4,44 8 2 8 2 9
6 Toilet 1 2,24 5 4 8
MAIN DECK EQUIPMENT
DECK SIZE
The size of the cellar and main deck is the same.
Length = 40 ft
Width = 40 ft
Area = 1600 ft2
ELEVATION
No. Name Descriptions
Value Elevation (ft) Elevation (ft)
(ft) (from Seabed) (from MSL)
1
Cellar Deck
(Top of Steel
Plate)
Water Depth
(LWL)
115
142 27
Tide at Storm 4,8
Storm Surge 0,5
Storm Wave
Amplitude
12
Air Gap
(Chakrabarti)
5
Plate Thickness 0,38
Main Girder
Depth
3,43
27
2
Main Deck
(Top of Steel
Plate)
Highest
Equipment on
Cellar
13,50
164 49
Clearance 5
Plate Thickness 0,38
Main Girder
Depth
3,43
Cellar Deck
Elevation
141,10
23
ELEVATION
(cont.)
23
3
Heli Deck
(Top of Steel
Plate)
Power instrument
storage
9
183 68
Clearance 6
Plate Thickness 1
Main Girder
Depth
3,04
Main Deck
Elevation
163,40
20
4
Jacket Elevation
(1st Level)
Water Depth 115
121 6
Tide at Storm 4,8
Strom Surge 0,5
10% Pasang
Surut
0,48
5
Working Point
Elevation
1st Level 121
124 9
Clearance (3 ft) 3
6 Pile Connection
Work point
Elevation
9 124 8
7 (2nd Level)
1st Level 121
91 -24,3
Span 30
8 (3rd Level)
2nd Level 90,8
61 -54,5
Span 30
ELEVATION
(cont.)
4
Jacket Elevation
(1st Level)
Water Depth 115
121 6
Tide at Storm 4,8
Strom Surge 0,5
10% Pasang
Surut
0,48
5
Working Point
Elevation
1st Level 121
124 9
Clearance (3 ft) 3
6 Pile Connection
Work point
Elevation
9 124 8
7 (2nd Level)
1st Level 121
91 -24,3
Span 30
8 (3rd Level)
2nd Level 90,8
61 -54,5
Span 30
9 (4th Level)
3rd Level 60,5
30 -84,8
Span 30
10
Mudline
Elevation
Water Depth 115 0 -115
11 Leg Extension
Water Depth 115
-3 -118
Scouring 3
12 Pile Stub 175,00
PRELIMINARY DESIGN SUMMARY
Deck
Profil Girder
Main Girder Secondary Girder
Cellar Deck W 24 x 68 W 33 x 130
Main Deck W 24 x 68 W 33 x 130
Heli Deck W 8 x 40 W 36 x 194
Tubular Member
Diameter
(in)
Ketebalan
(in)
Heli Deck Leg 21 0,5
Main Deck Leg 24 0,875
Cellar Deck Leg 35 0,875
Jacket Leg 45 0,875
Jacket Brace 15 0,625
Pile 35 0,625
Conductor 24 0,625
Conductor
Support Top
15 0,625
Conductor
Support Bottom
21 0,875
REDESIGN
There are several members which must be redesigned because it has UC > 1 when running by SACS
Name Descriptions OD (in) t (in) Di (in)
CDL Cellar deck leg 35 1 33
MDL Main deck leg 35 1 33
HDL Heli deck leg 35 1 33
CSU Conductor support 15 0,625 13,75
BRC Jacket brace 21 0,875 19,3
PLE Pile 38 0,875 36,3
MGH Main girder heli deck W 24 x 68
REDESIGN (cont.)
On the cellar deck and main deck, need to be added 2 main girders for support conductor because at
preliminary design, conductor does not count.
LOADING
• Because of the four legs, it is used 8 directions of enviromental attack for simulating the most critical
condition.
• That is 0o, 45o, 90o, 135o , 180o, 225o, 270o, 315o.
Load Case WSD
Operating Condition 0,6R = D + L +W
Normalized Value R = 1,67D + 1,67L + 1,67W
Storm Condition 0,8R = D + L +W
Normalized Value R = 1,25D +1,25L + 1,25W
GRAVITY LOAD ID
Load Condition Load ID Description
SW SW Self weight structure
EQMD EQMD Equipment main deck
EQCD EQCD Equipment cellar deck
BP
BPMD Pipe main deck
BPCD Pipe cellar deck
BCKO BCKO Crane at operating condition
BCKB BCKB Crane at the storm condition
BHKO
BHOMD Main deck life load at operating condition
BHOCD Cellar deck life load at operating condition
BHKB
BHBMD Main deck life load at storm condition
BHBCD Cellar deck life load at storm condition
BHLI
BHHD Heli deck life load
HELIWGHT Heli weigth
ENVIRONTMENT LOAD ID
Load Condition Load ID Description
ENO1 ENO1 Environmental load direction 0o at operating condition
ENO2 ENO2 Environmental load direction 45o at operating condition
ENO3 ENO3 Environmental load direction 90o at operating condition
ENO4 ENO4 Environmental load direction 135o at operating condition
ENO5 ENO5 Environmental load direction 180o at operating condition
ENO6 ENO6 Environmental load direction 225o at operating condition
ENO7 ENO7 Environmental load direction 270o at operating condition
ENO8 ENO8 Environmental load direction 315o at operating condition
ENB1 ENB1 Environmental load direction 0o at storm condition
ENB2 ENB2 Environmental load direction 45o at storm condition
ENB3 ENB3 Environmental load direction 90o at storm condition
ENB4 ENB4 Environmental load direction 135o at storm condition
ENB5 ENB5 Environmental load direction 180o at storm condition
ENB6 ENB6 Environmental load direction 225o at storm condition
ENB7 ENB7 Environmental load direction 270o at storm condition
ENB8 ENB8 Environmental load direction 315o at storm condition
OPERATING CONDITION
LOAD COMBINATION
Degre 0 45 90 135 180 225 270 315
Load Combination CO01 CO02 CO03 CO04 CO05 CO06 CO07 CO08
L
O
A
D
C
O
N
D
I
T
I
O
N
SW 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
EQMD 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
EQCD 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
BP 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
BCKO 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
BHKO 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
BHLI 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67
ENO1 1,67
ENO2 1,67
ENO3 1,67
ENO4 1,67
ENO5 1,67
ENO6 1,67
ENO7 1,67
ENO8 1,67
STORM CONDITION
LOAD COMBINATION
Degre 0 45 90 135 180 225 270 315
Load Combination CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08
L
O
A
D
C
O
N
D
I
T
I
O
N
SW 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
EQMD 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
EQCD 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
BP 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
BCKB 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
BHKB 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
BHLI 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25
ENB1 1,25
ENB2 1,25
ENB3 1,25
ENB4 1,25
ENB5 1,25
ENB6 1,25
ENB7 1,25
ENB8 1,25
RESULTS
MEMBER STRESS UC
Group ID Description
Maximum UC
Operating Storm
MGM Main deck main girder 0,466 0,782
MGC Cellar deck main girder 0,435 0,388
MGH Heli deck main girder 0,481 0,168
SGM Main deck secondary girder 0,334 0,417
SGC Cellar deck secondary girder 0,254 0,363
SGH Heli deck secondary girder 1,042 0,271
DLC Main deck leg - 0,402
DLH Cellar deck leg 0,151 -
DLM Heli deck leg 0,416 0,298
MEMBER STRESS UC (cont.)
Group ID Description
Nilai UC Maksimum
Operating Storm
L1A, L2A, L1B, L2B Jacket leg 0,428 0,433
BR 1-4 & XB A,B,1,2 Jacket brace 0,487 0,239
P1A, P2A, P1B, P2B Pile 0,274 0,477
CON Conductor 0,391 1,136
CST Conductor support top 0,4 0,412
CSU Conductor support bottom 1,054 0,289
Operating
Condition
Storm
Condition
MORE INFORMATION
+You can access my paper in
https://its.academia.edu/KristoforusSatyaAnggara
+You can also email me in kristoforussatya1997@gmail.com

More Related Content

Similar to Static analysis xyz wellhead platform portofolio

Tindall_Utilities_Catalog_ Updated_7:7:2011_TAP
Tindall_Utilities_Catalog_ Updated_7:7:2011_TAPTindall_Utilities_Catalog_ Updated_7:7:2011_TAP
Tindall_Utilities_Catalog_ Updated_7:7:2011_TAPPatrick Dickerson
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc DRP Joint
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)nguyen_uptorcem
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationSteven Polowy
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)coderweb
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisKristoforusAnggara
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API BasedVijay Sarathy
 
Viking motor-speed-pumps
Viking motor-speed-pumpsViking motor-speed-pumps
Viking motor-speed-pumpsCarotek
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide PresentationNick Picone
 
Design and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfDesign and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfssuserbd5784
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement opsamrhaggag
 
FYP presentation
FYP presentationFYP presentation
FYP presentationOsama Ahmed
 
Pao 71690-v1-en
Pao 71690-v1-enPao 71690-v1-en
Pao 71690-v1-enjtcool74
 
2013 Coachmen Freelander Class C Motorhome
2013 Coachmen Freelander Class C Motorhome 2013 Coachmen Freelander Class C Motorhome
2013 Coachmen Freelander Class C Motorhome Dave Arbogast RV
 
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011abughaws
 
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2jandamd
 

Similar to Static analysis xyz wellhead platform portofolio (20)

Tindall_Utilities_Catalog_ Updated_7:7:2011_TAP
Tindall_Utilities_Catalog_ Updated_7:7:2011_TAPTindall_Utilities_Catalog_ Updated_7:7:2011_TAP
Tindall_Utilities_Catalog_ Updated_7:7:2011_TAP
 
ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc ship_catalog on home w_0 watermark etc
ship_catalog on home w_0 watermark etc
 
Estimated Civil & Structural Quantities
Estimated Civil & Structural QuantitiesEstimated Civil & Structural Quantities
Estimated Civil & Structural Quantities
 
Basic whp presentation(1)
Basic whp presentation(1)Basic whp presentation(1)
Basic whp presentation(1)
 
Operations ETI-DLH
Operations ETI-DLHOperations ETI-DLH
Operations ETI-DLH
 
Atlas Senior Deisgn Presentation
Atlas Senior Deisgn PresentationAtlas Senior Deisgn Presentation
Atlas Senior Deisgn Presentation
 
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
AT SUBSEA VESSEL OPERATIONS CONFERENCE, OSLO (YEAR 2013)
 
Portofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysisPortofolio jacket platform dynamic analysis
Portofolio jacket platform dynamic analysis
 
254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf254815797-PLANOS-Estandares.pdf
254815797-PLANOS-Estandares.pdf
 
PSV Sizing - API Based
PSV Sizing - API BasedPSV Sizing - API Based
PSV Sizing - API Based
 
Viking motor-speed-pumps
Viking motor-speed-pumpsViking motor-speed-pumps
Viking motor-speed-pumps
 
CME Slide Presentation
CME Slide PresentationCME Slide Presentation
CME Slide Presentation
 
Design and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdfDesign and Footprint of LH2 Supplied Refueling.pdf
Design and Footprint of LH2 Supplied Refueling.pdf
 
444 e
444 e444 e
444 e
 
Deepwater rig improvement ops
Deepwater rig improvement opsDeepwater rig improvement ops
Deepwater rig improvement ops
 
FYP presentation
FYP presentationFYP presentation
FYP presentation
 
Pao 71690-v1-en
Pao 71690-v1-enPao 71690-v1-en
Pao 71690-v1-en
 
2013 Coachmen Freelander Class C Motorhome
2013 Coachmen Freelander Class C Motorhome 2013 Coachmen Freelander Class C Motorhome
2013 Coachmen Freelander Class C Motorhome
 
EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011EPC-4 Package Status Update September 16-09-2011
EPC-4 Package Status Update September 16-09-2011
 
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
ALTERNATE FUEL SOURCE TRAINER; AVIRIDIS H2
 

Recently uploaded

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Recently uploaded (20)

UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 

Static analysis xyz wellhead platform portofolio

  • 1. STATIC ANALYSIS OF XYZ WELLHEAD PLATFORM BASED ON API RP2A WSD Kristoforus Satya Anggara Depok, 2021
  • 3.
  • 4.
  • 5. MAIN DATA General Criteria Description Recommended practice API RP2A WSD, AISC ASD Material structure ASTM Platform type Wellhead Platform type 4 Water depth (LWS) - feet 115 Platform orientation +32,50 Deck Design Criteria Description Number of deck 2 Cellar deck area 1400 ft2 Main deck area 1200 ft2 Cellar deck live load operating condition 100 psf Main deck live load operating condition 100 psf
  • 6. MAIN DATA (cont.) Deck Design Criteria Description Cellar deck live load operating condition 75 psf Main deck live load operating condition 75 psf Crane vertical load operating condition 155 kips Crane moment load operating condition 220 kips.in Crane vertical load storm condition 72,5 kips Crane moment load storm condition 0 kips.in Wind load operating condition 40 mph Wind load storm condition 120 mph Pipe load main deck 35 psf Pipe load cellar deck 35 psf Helicopter Boeing Boeing BO-105C Helideck codes API RP2L
  • 7. MAIN DATA (cont.) Wind & Current Operating Condition Significant wave height 8 ft Wave period 9,5 s Tide 4,8ft Current speed (surface) 2 ft/s Current speed (seabed) 0 ft/s Wind & Current Storm Condition Significant wave height 24 ft Wave period 9,5 s Tide 4,8 ft Current speed (surface) 3 ft/s Current speed (seabed) 0,8 ft/s Storm surge 0,5 ft
  • 8. MAIN DATA (cont.) Jacket Design Criteria Description Marine growth 2 inch Scouring effect tolerance 3 feet Number of conductor 6 Conductor OD 24 inch Conductor thickness 0,625 inch Soil type A Batter 1/8
  • 9. CELLAR DECK EQUIPMENT No. Description Number Weight (kip) SIZE Length Width Height ft inch ft inch ft inch 1 Emergency generator 1 20,16 22 9 10 11 2 Maintenance building 1 44,80 12 3 6 4 8 3 Switch gear 1 7,84 5 2 2 8 10 4 Switch gear building 1 6,72 7 18 13 6 5 Diesel fuel tank 1 58,24 10 10 10 6 Transformer-2 1 12,00 9 5 6 9
  • 10. No. Description Number Weight (Kip) SIZE Length Width Height ft inch ft inch ft inch 1 Instrument storage 1 5,60 8 6 8 6 6 2 Fresh water tank 1 7,09 11 6 8 10 3 Mechanical storage 1 7,84 8 2 8 1 8 9 4 Communication tower 1 17,92 10 5 10 5 100 5 Power instrument storage 1 4,44 8 2 8 2 9 6 Toilet 1 2,24 5 4 8 MAIN DECK EQUIPMENT
  • 11. DECK SIZE The size of the cellar and main deck is the same. Length = 40 ft Width = 40 ft Area = 1600 ft2
  • 12. ELEVATION No. Name Descriptions Value Elevation (ft) Elevation (ft) (ft) (from Seabed) (from MSL) 1 Cellar Deck (Top of Steel Plate) Water Depth (LWL) 115 142 27 Tide at Storm 4,8 Storm Surge 0,5 Storm Wave Amplitude 12 Air Gap (Chakrabarti) 5 Plate Thickness 0,38 Main Girder Depth 3,43 27 2 Main Deck (Top of Steel Plate) Highest Equipment on Cellar 13,50 164 49 Clearance 5 Plate Thickness 0,38 Main Girder Depth 3,43 Cellar Deck Elevation 141,10 23
  • 13. ELEVATION (cont.) 23 3 Heli Deck (Top of Steel Plate) Power instrument storage 9 183 68 Clearance 6 Plate Thickness 1 Main Girder Depth 3,04 Main Deck Elevation 163,40 20 4 Jacket Elevation (1st Level) Water Depth 115 121 6 Tide at Storm 4,8 Strom Surge 0,5 10% Pasang Surut 0,48 5 Working Point Elevation 1st Level 121 124 9 Clearance (3 ft) 3 6 Pile Connection Work point Elevation 9 124 8 7 (2nd Level) 1st Level 121 91 -24,3 Span 30 8 (3rd Level) 2nd Level 90,8 61 -54,5 Span 30
  • 14. ELEVATION (cont.) 4 Jacket Elevation (1st Level) Water Depth 115 121 6 Tide at Storm 4,8 Strom Surge 0,5 10% Pasang Surut 0,48 5 Working Point Elevation 1st Level 121 124 9 Clearance (3 ft) 3 6 Pile Connection Work point Elevation 9 124 8 7 (2nd Level) 1st Level 121 91 -24,3 Span 30 8 (3rd Level) 2nd Level 90,8 61 -54,5 Span 30 9 (4th Level) 3rd Level 60,5 30 -84,8 Span 30 10 Mudline Elevation Water Depth 115 0 -115 11 Leg Extension Water Depth 115 -3 -118 Scouring 3 12 Pile Stub 175,00
  • 15. PRELIMINARY DESIGN SUMMARY Deck Profil Girder Main Girder Secondary Girder Cellar Deck W 24 x 68 W 33 x 130 Main Deck W 24 x 68 W 33 x 130 Heli Deck W 8 x 40 W 36 x 194 Tubular Member Diameter (in) Ketebalan (in) Heli Deck Leg 21 0,5 Main Deck Leg 24 0,875 Cellar Deck Leg 35 0,875 Jacket Leg 45 0,875 Jacket Brace 15 0,625 Pile 35 0,625 Conductor 24 0,625 Conductor Support Top 15 0,625 Conductor Support Bottom 21 0,875
  • 16. REDESIGN There are several members which must be redesigned because it has UC > 1 when running by SACS Name Descriptions OD (in) t (in) Di (in) CDL Cellar deck leg 35 1 33 MDL Main deck leg 35 1 33 HDL Heli deck leg 35 1 33 CSU Conductor support 15 0,625 13,75 BRC Jacket brace 21 0,875 19,3 PLE Pile 38 0,875 36,3 MGH Main girder heli deck W 24 x 68
  • 17. REDESIGN (cont.) On the cellar deck and main deck, need to be added 2 main girders for support conductor because at preliminary design, conductor does not count.
  • 18. LOADING • Because of the four legs, it is used 8 directions of enviromental attack for simulating the most critical condition. • That is 0o, 45o, 90o, 135o , 180o, 225o, 270o, 315o. Load Case WSD Operating Condition 0,6R = D + L +W Normalized Value R = 1,67D + 1,67L + 1,67W Storm Condition 0,8R = D + L +W Normalized Value R = 1,25D +1,25L + 1,25W
  • 19. GRAVITY LOAD ID Load Condition Load ID Description SW SW Self weight structure EQMD EQMD Equipment main deck EQCD EQCD Equipment cellar deck BP BPMD Pipe main deck BPCD Pipe cellar deck BCKO BCKO Crane at operating condition BCKB BCKB Crane at the storm condition BHKO BHOMD Main deck life load at operating condition BHOCD Cellar deck life load at operating condition BHKB BHBMD Main deck life load at storm condition BHBCD Cellar deck life load at storm condition BHLI BHHD Heli deck life load HELIWGHT Heli weigth
  • 20. ENVIRONTMENT LOAD ID Load Condition Load ID Description ENO1 ENO1 Environmental load direction 0o at operating condition ENO2 ENO2 Environmental load direction 45o at operating condition ENO3 ENO3 Environmental load direction 90o at operating condition ENO4 ENO4 Environmental load direction 135o at operating condition ENO5 ENO5 Environmental load direction 180o at operating condition ENO6 ENO6 Environmental load direction 225o at operating condition ENO7 ENO7 Environmental load direction 270o at operating condition ENO8 ENO8 Environmental load direction 315o at operating condition ENB1 ENB1 Environmental load direction 0o at storm condition ENB2 ENB2 Environmental load direction 45o at storm condition ENB3 ENB3 Environmental load direction 90o at storm condition ENB4 ENB4 Environmental load direction 135o at storm condition ENB5 ENB5 Environmental load direction 180o at storm condition ENB6 ENB6 Environmental load direction 225o at storm condition ENB7 ENB7 Environmental load direction 270o at storm condition ENB8 ENB8 Environmental load direction 315o at storm condition
  • 21. OPERATING CONDITION LOAD COMBINATION Degre 0 45 90 135 180 225 270 315 Load Combination CO01 CO02 CO03 CO04 CO05 CO06 CO07 CO08 L O A D C O N D I T I O N SW 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 EQMD 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 EQCD 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 BP 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 BCKO 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 BHKO 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 BHLI 1,67 1,67 1,67 1,67 1,67 1,67 1,67 1,67 ENO1 1,67 ENO2 1,67 ENO3 1,67 ENO4 1,67 ENO5 1,67 ENO6 1,67 ENO7 1,67 ENO8 1,67
  • 22. STORM CONDITION LOAD COMBINATION Degre 0 45 90 135 180 225 270 315 Load Combination CB01 CB02 CB03 CB04 CB05 CB06 CB07 CB08 L O A D C O N D I T I O N SW 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 EQMD 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 EQCD 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 BP 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 BCKB 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 BHKB 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 BHLI 1,25 1,25 1,25 1,25 1,25 1,25 1,25 1,25 ENB1 1,25 ENB2 1,25 ENB3 1,25 ENB4 1,25 ENB5 1,25 ENB6 1,25 ENB7 1,25 ENB8 1,25
  • 24. MEMBER STRESS UC Group ID Description Maximum UC Operating Storm MGM Main deck main girder 0,466 0,782 MGC Cellar deck main girder 0,435 0,388 MGH Heli deck main girder 0,481 0,168 SGM Main deck secondary girder 0,334 0,417 SGC Cellar deck secondary girder 0,254 0,363 SGH Heli deck secondary girder 1,042 0,271 DLC Main deck leg - 0,402 DLH Cellar deck leg 0,151 - DLM Heli deck leg 0,416 0,298
  • 25. MEMBER STRESS UC (cont.) Group ID Description Nilai UC Maksimum Operating Storm L1A, L2A, L1B, L2B Jacket leg 0,428 0,433 BR 1-4 & XB A,B,1,2 Jacket brace 0,487 0,239 P1A, P2A, P1B, P2B Pile 0,274 0,477 CON Conductor 0,391 1,136 CST Conductor support top 0,4 0,412 CSU Conductor support bottom 1,054 0,289