SlideShare a Scribd company logo
1 of 3
Download to read offline
444E LOADER i I
-I
(
ENGINE PERFORMANCE
f
50137
hp I kW
100 175w
::;)
0
a:
~
Ii;Z
90167
a:
80160 ~0
D..
70152 Ii;
z
60145
--'w
::;)
LL
1000 1800 22001400
ENGINE SPEED-RPM
"Depending on operating variables
Model shown may include options
FEATURES
95 SAEnet hp (71 kW)John Deere
turbocharged diesel engine
Four-wheel drive
ADD VERSATILITYWITH:
Auxiliary bucket skid shoes
Coupler system
Bucket teeth
Bolt-on bucket cutting edge
Side-dump bucket
Snow plows
Forks
Bucket capacities to 2.38 cu. yd. (1.8 m')
Operating weights to 21,729 lb. (9854 kg)
Hi-LaPower Shift transmission with variable
speed hydrostatics
Power steering. Articulated frame
Four-wheel wet-disk power brakes and parking
brake
Special buckets
Inboard planetary final drives
Single-lever or optional two-lever loader
control with automatic return-to-dig and boom
height control
NoSPINfront differential
Manual or optional hydraulic Quik-TatchTII
coupler
Vandal protection
Rollover protective structure (ROPS) with
canopy. Meets criteria of SAEJ394a, SAE
J1040 APR88, OSHA 1926.1001and ISO3471.
Also meets FOPS (famrogobject protective
structure) criteria SAEJ231JAN81and ISO
3449
45
Nm Ib-II
407 300
I I
380 280 - lOROUE
....
"'I ""
353 260
/' '"
325 240 I-- POWER/
"
298 220 /
'Uh gallh
j FUELCONSUMPTION
22.5 6
I FULLLOAD-=t--
15 4 I
I ..
,;M;}tJft?
t--
7.5 2
TYPICAL"
I
444E LOADER OPERATING INFORMATION
.Allied equipment ordered through John Deere dealer.
Loader operating information is based on machine with all standard equipment, 17.5-25, 12 PR, L2 tires with one rear counterweight,
ROPS cab, full fuel tank and 175 lb. (80 kg) operator. Operating information is affected by tire size, ballast and attachments. For selected
items, add or subtract the following:
Adjustments to operating weights and tipping loads for 1.75 cu. yd. (1.4 m3)excavating bucket
I
~
,l
I
I
I
..Not to be used with CaCl,
47
Bucket Type
OPERATING Excavating wI Stockpiling wI
INFORMATION Excavating Bolt-on Edge Stockpiling Bolt-on Edge .Multipurpose
Capacity, heaped, SAE 1.75cu. yd. 1.75cu. yd. 2.25 cu. yd. 2.38 cu. yd. 1.63cu. yd.
(1.4 m') (1.4 m') (1.7m') (1.8m') (1.2 m')
Capacity, struck, SAE 1.53 cu. yd. 1.62 cu. yd. 1.91cu. yd. 2.00 cu. yd. 1.35cu. yd.
(1.17m') (1.24 m') (1.46 m') (1.53 m') (1.03 m')
Bucket width 95.3 in. 95.3 in. 95.3 in. 95.3 in. 95.3 in.
(2.42 m) (2.42 m) (2.42 m) (2.42 m) (2.42 m)
Breakout force, 18,298 lb. 17,283lb. 15,900lb. 15,082lb. 18,670lb.
SAEJ732C (81.4 kN) (76.9 kN) (70.7 kN) (67.1kN) (83.0 kN)
(8300 kg) (7838 kg) (7211kg) (6840 kg) (8467 kg)
Tipping load, straight 14,487 14,129 14,242 13,862 13,336
(6570) (6408) (6459) (6287) (6048)
Tipping load, 40-deg. 12,582 12,245 12,351 12,009 11,475
full turn, SAE (5706) (5553) (5601) (5446) (5204)
Reach at 45-deg. dump, 54.0 in. 53.9 in. 55.9 in. 55.7 in. 49.8 in.
7 ft. (2.13 m) clearance (1371 mm) (1368 mm) (1420mm) (1415mm) (1264mm)
Reach at 45-deg. dump, 33.4 in. 34.2 in. 37.0 in. 37.8 in. 29.7 in.
full height (848 mm) (868 mm) (940 mm) (960 mm) (755 mm)
Dump clearance at 45-deg. 110.0in. 109.4in. 107.9in. 106.3in. 110.1in.
dump, full height (2820 mm) (2778 mm) (2740 mm) (2701mm) (2796 mm)
Overall length 20 ft. 9.5 in. 20 ft. 11.8 in. 21 ft. 2 in. 21 ft. 4.7 in. 20 ft. 8 in.
(6.34 m) (6.40 m) (6.46 m) (6.52m) (6.30 m)
Loader clearance circle, 34 ft. 6 in. 34 ft. 8 in. 34 ft. 9 in. 34 ft. 10in. 34 ft. 5.5 in.
bucket in carry position (10.52 m) (10.56 m) (10.59m) (10.63m) (10.50m)
Operating weight 18,871 lb. 19,061 lb. 19,025lb. 19,216lb. 19,884lb.
(8558 kg) (8644 kg) (8628 kg) (8715kg) (9018kg)
Add ( + ) or deduct ( -) lb. (kg) Loader Tipping Tipping Load
as indicated for loaders Operating Load 40° Full
with: Weight Straight Turn, SAE
15.5-25, 10 PR, L2 without CaCI. - 352 lb. - 256 lb. -.227 lb.
(160 kg) (116 kg) (103 kg)
15.5-25, 10 PR, L2 with CaCI. + 587 lb. + 1111lb. + 981 lb.
(266 kg) (504 kg) (445 kg)
17.5-25, 12 PR, L2 with CaCI. + 1180 lb. + 1717 lb. + 1517 lb.
(535 kg) (779 kg) (688 kg)
ROPS canopy in lieu of ROPS cab - 265 lb. -245 lb. - 232 lb.
(120 kg) (111 kg) (105 kg)
Bucket teeth + 135 lb. - 163 lb. -161 lb.
(61 kg) (74 kg) (73 kg)
Deduct one rear counterweight - 617 lb. - 1437 lb. - 1204 lb.
(280 kg) (652 kg) (546 kg)
..Add second rear counterweight + 530 lb. + 1249 lb. + 1052 lb.
(240 kg) (566 kg) (477 kg)
444E LOADERDIMENSIONS AND SPECIFICATIONS
E 2.75
---: (2.1)1J,
>-
:; 2.5
'( (1.9)-w
N 2.25
en (1.7)
~
w
G 2.0
::>(1.5)
CD
Key:
444E BUCKET SELECTION GUIDE *
Spec loader 'This guide, representing buckets not necessarily manufactured by Deere will
help you in selecting proper bucket size for material density and loader
configurations. However, specific bucket size should only be determined
after adding or subtracting all the tipping load changes due to specifications.
- - - - - Spec loader wi17.5.25. 12 PR, L2 tires w/CaCI2
-8-8-8 -Spec loader w/o CaCI" no counterweight and ROPS In lieu at ROPS cab
3.25
(2.5)
3.0
(2.3)
1.75
(1.3)
1.5
(1.2) 0
Ib/yd' ~
0
0
'<t
~
0
0
CO
~
0
0
CO
CJ
0
0
co
CJ
MATERIAL (Loose weight)
Caliche 2100
Cinders 1000
Clay. natural bed 2800
Clay. dry 2500
Clay. wet 2800
Clay and gravei, dry 2400
Clay and gravel. wet 2600
Coal. anthracite, broken 1850
Coal. bituminous. broken 1400
Earth. dry. packed 2550
Earth. wet. excavated 2700
Earth. loam 2100
Gramte. broken or large crushed 2800
Gravel. dry 2550
Gravel. pit run (graveled sand) 3250
Gravel. dry, 'I,' to 2" (13 to 50 10m) 2850
Gravel. wet. '12' to 2" (13 to 50 10m) 3400
Gypsum. crushed 2700
limestone. broken or crushed 2600
Magnetite. iron are 4700
Pyrite. iron are 4350
Phosphate rock 2160
Sand. dry 2400
Sand. wet 3100
Sand and gravel. dry 2900
Sand and gravel. wet 3400
Sandstone. broken 2550
Shale 2100
Slag. broken 2950
Stone. crushed 2700
Top soil 1600
Q
0
U')
CJ
Ib/yd' kg/m'
1250
590
1600
1480
1660
1420
1540
1100
830
1510
1600
1250
1660
1510
1930
1690
2020
1600
1540
2790
2580
1280
1420
1840
1720
2020
1510
1250
1750
1600
950
I
I
I
II
444E LOADER
48
0
0
CO
0
0
CJ
CJ
0
0
'<t
CJ
0
0
0
CJ
EE
r-- CD~ a
d-d-
.5 .5
LO ~
~ ~
~ ~
104.3 in. (2.65 m)
.-
... SEE OPERATING INFORMATION
Treadwidth.......................................
15,5-25
72.83 in.
(1850 mm)
88.35 in.
(2244 mm)
- 1.58 in.
(40 mm)
Widthovertires....................................
Change in vertical height ............................
.
E
CD
LO
d-
.5
0>
~
~
~
TIRES
17,5-25
72.83 in.
(1850 mm)
90.35 in.
(2295 mm)
0

More Related Content

Viewers also liked

BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK IEEE PROJECTS IN POND...
BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK   IEEE PROJECTS IN POND...BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK   IEEE PROJECTS IN POND...
BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK IEEE PROJECTS IN POND...nexgentechnology
 
Dstu b v.2 7-159-2008
Dstu b v.2 7-159-2008Dstu b v.2 7-159-2008
Dstu b v.2 7-159-2008braga william
 
unssc_ar_2014_draft_19_sd_webed2
unssc_ar_2014_draft_19_sd_webed2unssc_ar_2014_draft_19_sd_webed2
unssc_ar_2014_draft_19_sd_webed2Haley Horan
 
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...AnastasiyaF
 
00. Основные тенденции после Второй мировой войны
00. Основные тенденции после Второй мировой войны00. Основные тенденции после Второй мировой войны
00. Основные тенденции после Второй мировой войныAnastasiyaF
 
alarming signs of aged insulation
alarming signs of aged insulationalarming signs of aged insulation
alarming signs of aged insulationlee shin
 
اللقطة المعلوماتية
اللقطة المعلوماتيةاللقطة المعلوماتية
اللقطة المعلوماتيةNour Elbader
 
tareas del mundo real
tareas del mundo realtareas del mundo real
tareas del mundo realVane Muñoz
 
Corporate Presentation January 2016 B
Corporate Presentation January 2016 BCorporate Presentation January 2016 B
Corporate Presentation January 2016 BSandeep Wanchoo
 
The Making of Production Company
The Making of Production Company  The Making of Production Company
The Making of Production Company DIDI1998sdf
 
Дата Центры нового поколения
Дата Центры нового поколенияДата Центры нового поколения
Дата Центры нового поколенияIncom
 

Viewers also liked (17)

BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK IEEE PROJECTS IN POND...
BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK   IEEE PROJECTS IN POND...BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK   IEEE PROJECTS IN POND...
BULK IEEE PROJECTS,BULK IEEE PROJECTS IN CHENNAI,BULK IEEE PROJECTS IN POND...
 
rizza resume-2
rizza resume-2rizza resume-2
rizza resume-2
 
Dstu b v.2 7-159-2008
Dstu b v.2 7-159-2008Dstu b v.2 7-159-2008
Dstu b v.2 7-159-2008
 
unssc_ar_2014_draft_19_sd_webed2
unssc_ar_2014_draft_19_sd_webed2unssc_ar_2014_draft_19_sd_webed2
unssc_ar_2014_draft_19_sd_webed2
 
Doc1
Doc1Doc1
Doc1
 
Updated resume copy
Updated resume   copyUpdated resume   copy
Updated resume copy
 
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...
09. Cтанаўленне і развіццё Рэспублікі Беларусь. Станаўленне дзяржаўнага сувер...
 
00. Основные тенденции после Второй мировой войны
00. Основные тенденции после Второй мировой войны00. Основные тенденции после Второй мировой войны
00. Основные тенденции после Второй мировой войны
 
alarming signs of aged insulation
alarming signs of aged insulationalarming signs of aged insulation
alarming signs of aged insulation
 
الفجر 238
الفجر 238الفجر 238
الفجر 238
 
الفجر236
الفجر236الفجر236
الفجر236
 
اللقطة المعلوماتية
اللقطة المعلوماتيةاللقطة المعلوماتية
اللقطة المعلوماتية
 
tareas del mundo real
tareas del mundo realtareas del mundo real
tareas del mundo real
 
Corporate Presentation January 2016 B
Corporate Presentation January 2016 BCorporate Presentation January 2016 B
Corporate Presentation January 2016 B
 
The Making of Production Company
The Making of Production Company  The Making of Production Company
The Making of Production Company
 
Garrapatas
GarrapatasGarrapatas
Garrapatas
 
Дата Центры нового поколения
Дата Центры нового поколенияДата Центры нового поколения
Дата Центры нового поколения
 

Similar to 444 e

Igo50-Product-Guide.pdf
Igo50-Product-Guide.pdfIgo50-Product-Guide.pdf
Igo50-Product-Guide.pdfkredis1
 
Igo50 Self Erecting Tower Cranes Product-Guide.pdf
Igo50 Self Erecting Tower Cranes Product-Guide.pdfIgo50 Self Erecting Tower Cranes Product-Guide.pdf
Igo50 Self Erecting Tower Cranes Product-Guide.pdfCompass Equipment
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualfjsjekkmdmme
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualfjsekkdmme
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualfusjejfskekemm
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualufjjsjekkekmem
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualfusjfjskekmem
 
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...fjjsekkmdmes
 
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...fjjskekdmnsme
 

Similar to 444 e (10)

huyndai 170W-9
huyndai 170W-9huyndai 170W-9
huyndai 170W-9
 
Igo50-Product-Guide.pdf
Igo50-Product-Guide.pdfIgo50-Product-Guide.pdf
Igo50-Product-Guide.pdf
 
Igo50 Self Erecting Tower Cranes Product-Guide.pdf
Igo50 Self Erecting Tower Cranes Product-Guide.pdfIgo50 Self Erecting Tower Cranes Product-Guide.pdf
Igo50 Self Erecting Tower Cranes Product-Guide.pdf
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manual
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manual
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manual
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manual
 
Hyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manualHyster a217 (n30 fr) forklift service repair manual
Hyster a217 (n30 fr) forklift service repair manual
 
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
 
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
Caterpillar cat ec20 k ec25k forklift lift trucks service repair manual sna3e...
 

Recently uploaded

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxhariprasad279825
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024Stephanie Beckett
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostZilliz
 

Recently uploaded (20)

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Artificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptxArtificial intelligence in cctv survelliance.pptx
Artificial intelligence in cctv survelliance.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024What's New in Teams Calling, Meetings and Devices March 2024
What's New in Teams Calling, Meetings and Devices March 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage CostLeverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
Leverage Zilliz Serverless - Up to 50X Saving for Your Vector Storage Cost
 

444 e

  • 1. 444E LOADER i I -I ( ENGINE PERFORMANCE f 50137 hp I kW 100 175w ::;) 0 a: ~ Ii;Z 90167 a: 80160 ~0 D.. 70152 Ii; z 60145 --'w ::;) LL 1000 1800 22001400 ENGINE SPEED-RPM "Depending on operating variables Model shown may include options FEATURES 95 SAEnet hp (71 kW)John Deere turbocharged diesel engine Four-wheel drive ADD VERSATILITYWITH: Auxiliary bucket skid shoes Coupler system Bucket teeth Bolt-on bucket cutting edge Side-dump bucket Snow plows Forks Bucket capacities to 2.38 cu. yd. (1.8 m') Operating weights to 21,729 lb. (9854 kg) Hi-LaPower Shift transmission with variable speed hydrostatics Power steering. Articulated frame Four-wheel wet-disk power brakes and parking brake Special buckets Inboard planetary final drives Single-lever or optional two-lever loader control with automatic return-to-dig and boom height control NoSPINfront differential Manual or optional hydraulic Quik-TatchTII coupler Vandal protection Rollover protective structure (ROPS) with canopy. Meets criteria of SAEJ394a, SAE J1040 APR88, OSHA 1926.1001and ISO3471. Also meets FOPS (famrogobject protective structure) criteria SAEJ231JAN81and ISO 3449 45 Nm Ib-II 407 300 I I 380 280 - lOROUE .... "'I "" 353 260 /' '" 325 240 I-- POWER/ " 298 220 / 'Uh gallh j FUELCONSUMPTION 22.5 6 I FULLLOAD-=t-- 15 4 I I .. ,;M;}tJft? t-- 7.5 2 TYPICAL"
  • 2. I 444E LOADER OPERATING INFORMATION .Allied equipment ordered through John Deere dealer. Loader operating information is based on machine with all standard equipment, 17.5-25, 12 PR, L2 tires with one rear counterweight, ROPS cab, full fuel tank and 175 lb. (80 kg) operator. Operating information is affected by tire size, ballast and attachments. For selected items, add or subtract the following: Adjustments to operating weights and tipping loads for 1.75 cu. yd. (1.4 m3)excavating bucket I ~ ,l I I I ..Not to be used with CaCl, 47 Bucket Type OPERATING Excavating wI Stockpiling wI INFORMATION Excavating Bolt-on Edge Stockpiling Bolt-on Edge .Multipurpose Capacity, heaped, SAE 1.75cu. yd. 1.75cu. yd. 2.25 cu. yd. 2.38 cu. yd. 1.63cu. yd. (1.4 m') (1.4 m') (1.7m') (1.8m') (1.2 m') Capacity, struck, SAE 1.53 cu. yd. 1.62 cu. yd. 1.91cu. yd. 2.00 cu. yd. 1.35cu. yd. (1.17m') (1.24 m') (1.46 m') (1.53 m') (1.03 m') Bucket width 95.3 in. 95.3 in. 95.3 in. 95.3 in. 95.3 in. (2.42 m) (2.42 m) (2.42 m) (2.42 m) (2.42 m) Breakout force, 18,298 lb. 17,283lb. 15,900lb. 15,082lb. 18,670lb. SAEJ732C (81.4 kN) (76.9 kN) (70.7 kN) (67.1kN) (83.0 kN) (8300 kg) (7838 kg) (7211kg) (6840 kg) (8467 kg) Tipping load, straight 14,487 14,129 14,242 13,862 13,336 (6570) (6408) (6459) (6287) (6048) Tipping load, 40-deg. 12,582 12,245 12,351 12,009 11,475 full turn, SAE (5706) (5553) (5601) (5446) (5204) Reach at 45-deg. dump, 54.0 in. 53.9 in. 55.9 in. 55.7 in. 49.8 in. 7 ft. (2.13 m) clearance (1371 mm) (1368 mm) (1420mm) (1415mm) (1264mm) Reach at 45-deg. dump, 33.4 in. 34.2 in. 37.0 in. 37.8 in. 29.7 in. full height (848 mm) (868 mm) (940 mm) (960 mm) (755 mm) Dump clearance at 45-deg. 110.0in. 109.4in. 107.9in. 106.3in. 110.1in. dump, full height (2820 mm) (2778 mm) (2740 mm) (2701mm) (2796 mm) Overall length 20 ft. 9.5 in. 20 ft. 11.8 in. 21 ft. 2 in. 21 ft. 4.7 in. 20 ft. 8 in. (6.34 m) (6.40 m) (6.46 m) (6.52m) (6.30 m) Loader clearance circle, 34 ft. 6 in. 34 ft. 8 in. 34 ft. 9 in. 34 ft. 10in. 34 ft. 5.5 in. bucket in carry position (10.52 m) (10.56 m) (10.59m) (10.63m) (10.50m) Operating weight 18,871 lb. 19,061 lb. 19,025lb. 19,216lb. 19,884lb. (8558 kg) (8644 kg) (8628 kg) (8715kg) (9018kg) Add ( + ) or deduct ( -) lb. (kg) Loader Tipping Tipping Load as indicated for loaders Operating Load 40° Full with: Weight Straight Turn, SAE 15.5-25, 10 PR, L2 without CaCI. - 352 lb. - 256 lb. -.227 lb. (160 kg) (116 kg) (103 kg) 15.5-25, 10 PR, L2 with CaCI. + 587 lb. + 1111lb. + 981 lb. (266 kg) (504 kg) (445 kg) 17.5-25, 12 PR, L2 with CaCI. + 1180 lb. + 1717 lb. + 1517 lb. (535 kg) (779 kg) (688 kg) ROPS canopy in lieu of ROPS cab - 265 lb. -245 lb. - 232 lb. (120 kg) (111 kg) (105 kg) Bucket teeth + 135 lb. - 163 lb. -161 lb. (61 kg) (74 kg) (73 kg) Deduct one rear counterweight - 617 lb. - 1437 lb. - 1204 lb. (280 kg) (652 kg) (546 kg) ..Add second rear counterweight + 530 lb. + 1249 lb. + 1052 lb. (240 kg) (566 kg) (477 kg)
  • 3. 444E LOADERDIMENSIONS AND SPECIFICATIONS E 2.75 ---: (2.1)1J, >- :; 2.5 '( (1.9)-w N 2.25 en (1.7) ~ w G 2.0 ::>(1.5) CD Key: 444E BUCKET SELECTION GUIDE * Spec loader 'This guide, representing buckets not necessarily manufactured by Deere will help you in selecting proper bucket size for material density and loader configurations. However, specific bucket size should only be determined after adding or subtracting all the tipping load changes due to specifications. - - - - - Spec loader wi17.5.25. 12 PR, L2 tires w/CaCI2 -8-8-8 -Spec loader w/o CaCI" no counterweight and ROPS In lieu at ROPS cab 3.25 (2.5) 3.0 (2.3) 1.75 (1.3) 1.5 (1.2) 0 Ib/yd' ~ 0 0 '<t ~ 0 0 CO ~ 0 0 CO CJ 0 0 co CJ MATERIAL (Loose weight) Caliche 2100 Cinders 1000 Clay. natural bed 2800 Clay. dry 2500 Clay. wet 2800 Clay and gravei, dry 2400 Clay and gravel. wet 2600 Coal. anthracite, broken 1850 Coal. bituminous. broken 1400 Earth. dry. packed 2550 Earth. wet. excavated 2700 Earth. loam 2100 Gramte. broken or large crushed 2800 Gravel. dry 2550 Gravel. pit run (graveled sand) 3250 Gravel. dry, 'I,' to 2" (13 to 50 10m) 2850 Gravel. wet. '12' to 2" (13 to 50 10m) 3400 Gypsum. crushed 2700 limestone. broken or crushed 2600 Magnetite. iron are 4700 Pyrite. iron are 4350 Phosphate rock 2160 Sand. dry 2400 Sand. wet 3100 Sand and gravel. dry 2900 Sand and gravel. wet 3400 Sandstone. broken 2550 Shale 2100 Slag. broken 2950 Stone. crushed 2700 Top soil 1600 Q 0 U') CJ Ib/yd' kg/m' 1250 590 1600 1480 1660 1420 1540 1100 830 1510 1600 1250 1660 1510 1930 1690 2020 1600 1540 2790 2580 1280 1420 1840 1720 2020 1510 1250 1750 1600 950 I I I II 444E LOADER 48 0 0 CO 0 0 CJ CJ 0 0 '<t CJ 0 0 0 CJ EE r-- CD~ a d-d- .5 .5 LO ~ ~ ~ ~ ~ 104.3 in. (2.65 m) .- ... SEE OPERATING INFORMATION Treadwidth....................................... 15,5-25 72.83 in. (1850 mm) 88.35 in. (2244 mm) - 1.58 in. (40 mm) Widthovertires.................................... Change in vertical height ............................ . E CD LO d- .5 0> ~ ~ ~ TIRES 17,5-25 72.83 in. (1850 mm) 90.35 in. (2295 mm) 0