Abstract
Benefits Management (BM) or Benefits Realisation Management (BRM) is discussed in
different industries for its implications in the field of project portfolio management. Even
though the development of BM is relatively new, it is becoming a managerial concept that
is widely used in strategic change initiatives. BM gives the opportunity to consider various
benefits (tangible-intangible) in a defined strategic change case to link the strategic
objectives and particular projects undertaken. Even though there are limitations in the
tracking of benefits realisation due to measurement, BM is promising for companies in
emergent environments implementing change initiatives by introducing projects and
programmes. This paper examines the existing efforts in BM as a managerial concept with
a greater focus on its role in strategic alignment and realisation process (benefits tracking
and monitoring). As a research method a case study is used to show the practical implications
of BM in a global organisation. The case study proves the usefulness of BM in change
initiatives and presents BM implementations in a global organisation that is similar to the
existing literature.
KEYWORDS: Programme and portfolio management; benefits management; benefit
realisation; strategic change.
Introduction
Benefits management is a process that enables management to ensure the expected outcomes
of a change initiative to be realized (Breese et al. 2015; Bradley 2006). The literature on BM
focuses mainly on cases with IT-enabled change initiatives (Breese et al. 2015). Even though
IT-enabled change initiatives are good examples to observe how BM can be implemented,
the definition of BM should be broader and not limited with IT projects in companies. BM
is a broader concept of value creation and BM should be seen as a tool for managing and
2 C11SP Strategic Project Management 2015/16
developing portfolios and programmes where the expected outcomes of different
stakeholders can be realized (Thorp 2003; Bradley 2006; Breese et al. 2015).
Benefits Management is a relatively new concept in the area of project portfolio management
and its history is linked to the emergence of programme management and portfolio
management studies carried out by scholars and practitioners (Thorp 2003). Benefits can be
tangible or intangible performance improvements recognized by the stakeholders. Benefits
can be either financial improvements or non-financial improvements and therefore it may be
hard to quantify or measure. It is also important to emphasize that different stakeholders will
perceive the created value and realized benefits in a different way (Sanchez & Robert 2010;
Bradley 2006; Breese et al. 2015).
Benefits management contribute to programmes and projects success and add value by
reducing costs and realizing expected outcomes that are of importance for different
stakeholders. Therefore, this paper argues that strategic change initiatives should be carried
out using benefits management to ensure the alignment of the strategy with
projects/programmes using benefits realisation methods either qualitative or quantitative
depending on benefit classification. This argument will then be supported by a business case
of IBM Ukraine. IBM has developed a new portfolio in Ukraine in line with their global
strategy, utilising their resources and expertise with the objective of diversifying this
portfolio. The case will show how IBM implemented the principles of benefits management
to ensure the success of the change initiative.
LiteratureReview
Benefits Management as a managerial concept
The term ‘benefits management’ was used in the late 1980s (Barbara Farbey 1999). Later,
BM became a vital part of the development of project management in the late of twentieth
and early twenty-first century (Winter et al. 2006). It is suggested that there has been a
paradigm shift from traditional benefits realization principles to new benefits realization
principles (Sapountzis et al. 2008; Tillmann et al. 2010). This paradigm shift is towards a
more flexible, emergent and proactive approach to benefits (Sapountzis et al. 2008).
This paper suggests that BM should not be limited with programme and project management,
but also should be accepted as a specific managerial concept. BM is defined as the process
of organising and managing, so that potential benefits, arising from investment in change,
are actually achieved (Bradley 2006). APM defines BM as a ‘strategic business skill for all
seasons
centred on using benefits management to align the journey from business strategy
to delivery to the embedding of change within organisations’ (APM 2009). Some scholars
focus on the value creation aspect of BM and define BM as the promotion of ‘a different
mindset, based on an approach that manages value on an active basis’ (Jenner
2009). Thereby, benefits management is a way to align the strategy to projects so that the
deliverables are connected to the expected benefits. Benefits management is therefore a
3 C11SP Strategic Project Management 2015/16
managerial concept which does not only serve for the delivery of a programme and related
projects on time, on budget at a certain quality but also taking it to a step further ensuring
the expected outcomes to be realized.
Benefits management: A bridge between strategy and projects, programmes,
portfolios
Companies have their vision, mission and objectives defined at a strategic level. Projects or
a set of projects are governed together (programmes) are created to achieve the strategic
goals defined (Thiry 2002). Any kind of strategic change is implemented or achieved by
means of different projects or programmes which have their defined goals and targets.
Typically, project management success is being measured in terms of cost/budget/quality
mostly in short term period, what does not show correlation with strategic level targets. At
the same time, project deliverables and benefits overall success measures (what really
contributes in strategy) are more complex and usually defined in long term period. That
causes most project managers on practice to concentrate mostly on fulfilling project
management itself, which is what they are usually expected to do (Wateridge, 1995).
Nevertheless, many scholars admit that successfully implemented projects do not guarantee
realizing strategic goals even if projects were finished in given cost/time/quality frames
which caused many researchers to focus on adjusting strategic goals of the organizations
with project outcomes (Cooke-Davis et al. 2009) and alignment of projects, programmes,
portfolios with strategy found to be crucial (Cooke-Davis et al. 2009). Benefits Management
serves as the main “bridge” between designing the strategy and its implementation, making
sure the targets are met (Serra & Kunc 2015).
To sum up, organisational success or success of a change initiative depends on the project
management success and the strategic alignment between strategy and portfolio/programme
and projects.
Benefits Realisation Process
Benefits realisation management is a process of organising and managing so that these
benefits tangible or intangible perceived by the stakeholders are realised in a programme or
a portfolio (Bradley 2006). This process includes identifying these benefits and linking to
the organisational strategy which created the strategic alignment, planning and tracking as
well as reviewing and monitoring the realisation of benefits (Sapountzis et al. 2008; Yates
et al. 2009; Bradley 2006). Figure 1 explains the OGC Gateway Framework (Tjernstrom
2008) approach to benefits realisation management as a process.
4 C11SP Strategic Project Management 2015/16
Figure 1: Benefits Management Process. Source: (Tjernstrom 2008)
Moreover, some scholars propose that BM process itself creates the value as more focus on
benefits tracking helps to increase productivity (Bradley 2010). Therefore, BM may
considerably decrease the risk of projects failure or investment mistakes by making sure that
the benefits are identified, planned, monitored, measured and realized.
Benefits Classification and Qualitative/Quantitative Models in Benefits
Realisation and Tracking
Benefits can be classified according to the value they create and therefore can be classified
as tangible and intangible (Too & Weaver 2013; Yates et al. 2009). Tangible benefits are
defined as benefits that have financial implications that can be quantified, whereas intangible
benefits are the benefits where the value is subject to discussion and therefore hard to
quantify due to the perception of stakeholders and subjectivity (Sanchez & Robert 2010),
which is why intangible benefits are called as soft benefits and tangible benefits are also
called as hard benefits in literature (Sapountzis et al. 2008).
Benefits realisation tracking can be done by qualitative or quantitative methods (Tjernstrom
2008). Qualitative methods suggests frameworks to track both tangible and intangible
benefits. However, quantitative methods focus on the quantification of benefits that are
tangible and usually financial.
Different qualitative frameworks can be found on the literature developed or used for
different cases such as IT projects (Ashurst & Hodges n.d.; Doherty et al. 2005) or area
regeneration projects (Breese 2012). These frameworks usually focus on linking the vision
to helpful mechanisms such as organisational capability, organisational structure or skills as
well as conceptualising the benefits realisation process and focusing on the strategic
5 C11SP Strategic Project Management 2015/16
alignment (Thorp 2003). “The Result Chain” can be given as an example to measurement
approaches to benefits realisation in Figure 2 (Thorp 2003).
Figure 2: Result Chain Approach as an Example. Source: (Thorp 2003)
The studies that focus on the quantitative evaluation of benefits usually focus on profit
maximisation or cost reduction benefits from a shareholder point of view, using cost-benefit
ratio, ROI or key performance indicators (Lappe & Spang 2014). In practice, some project
and programme managers would use KPIs for measurement and track the benefits and
monitor if they are realized according to these KPIs, however researchers also acknowledged
that KPIs may not be a common practice for all project/programme managers (Bennington,
Peter; Baccarini 2004).
It may be easier to measure deliverables in a project level. However, at a programme
portfolio level where organization is making a strategic move the perceived value of
stakeholders would vary. Even though some scholars are striving to measure and quantify
benefits (Lange et al. 2012; Thomson et al. 2011; Sanchez & Robert 2010), strategic changes
usually consist many stakeholders, many intangible outcomes with a varying time to realize
these benefits which complicates measurement or quantification.
There are also hybrid models including both qualitative such as employee satisfaction,
customer satisfaction, transparency and quantitative measures of benefits such as
organisational and project costs (Lappe & Spang 2014). This paper argues that tracking of
benefits is crucial in benefits realisation process, and companies use and must use both
qualitative and quantitative methods to evaluate their benefits realisation. Table 3 presents
some models that are used in benefits realisation tracking and measuring.
6 C11SP Strategic Project Management 2015/16
Sources SuggestedModel Advantages of the Model
Sources for Qualitative Models
(Ashurst &
Hodges n.d.)
Maturity Model of
Competencies within the
Black-Box of
organisation.
Focuses on the benefits realization capability
and suggests different drivers of change may
require different competencies.
(Lange et al.
2012)
Enterprise Architecture
(EA)Benefits Realisation
Model
Defines organisational and project benefits
with regards to efficiency, effectiveness and
flexibility to test the benefits realisation of EA.
(Doherty et al.
2005)
Benefits Dependency
Network
Focuses on enablers, business changes,
benefits and investment objects in the model to
ensure the enablers are there to satisfy
objectives.
(Breese 2012) Benefits Hierarchy Links vision, objectives, outcomes, outputs
and activities.
Sources for Hybrid Models
(Lappe &
Spang 2014)
Components of ROI of
PM
Defines the qualitative and quantitative
components to be considered in benefits
realisation
(Thorp 2003) The Results Chain Linking time, people, reach a balanced score
card approach is suggested to measuring
benefits realisation. Not only focuses on the
finances, also focuses on organisational
capabilities, softer benefits and links to
strategy.
Sources for Quantitative Methods
(Sanchez &
Robert 2010)
Developing KPIs for
Project Portfolios
Considering a Strategic
Perspective
Setting of portfolio objectives, validating key
benefits, linking key benefits, objectives and
projects, visualizing the streams, determining
the project contribution to the achievement of
portfolio objectives, setting the thresholds for
the portfolio with regards to the KPI measured
(Mir &
Pinnington
2014)
Linking Project
Management
Performance and Project
Success
Long term organisational benefits and short
term project benefits are identified statistically
and valued by taking into consideration
different stakeholders to achieve overall
success
Table 3: Benefits measurement models.
7 C11SP Strategic Project Management 2015/16
The Case
Introduction to IBM Global and Benefits Management at IBM
International Business Machines Corporation (IBM) is a multinational technology and
consulting corporation, with headquarters in Armonk, New York. IBM manufactures and
sells computer hardware, middleware and software, and offers infrastructure, hosting and
consulting services in areas ranging from mainframe computers to nanotechnology. IBM
operates in three global areas: software development, hardware manufacturing and IT
outsourcing services. IBM has more than 379 000 employees and operates in 170 countries,
continuously expanding their business, 5th most valuable brand and 2nd in the IT Services
industry according to Forbes in 2014.
IBM delivers internal and external projects supported by Project Management Center of
Excellence of IBM. This methodology is based on the PMI recommendations and designed
to satisfy specific needs of the company due to its structure and strategy. IBM project
portfolio management methodology is critical to the IBM operations, as it is used by 22,703
project managers (1Q15, IBM PM Center of Excellence). IBM’s own methodology -
Worldwide Project Management Method (WWPMM) defines how IBM manages
programmes and projects by assessing risk and performance in a service project and
improving efficiency by defining clear tasks for project managers. WWPMM also defines
BM as “a practice which describes the process, activities, techniques and work products used
to manage program benefits”. WWPMM recognizes strategic alignment of vision,
objectives, programmes and projects which is why they try to eliminate major pitfalls like
poorly documented business plans, lack of mission and goals, or a poor understanding of
stakeholder concerns.
IBM recognizes the importance of tangible and intangible benefits of programmes or
projects and use both qualitative and quantitative approaches to realize benefits.
Figure 4&5 Explains the WWPMM guidelines with regards to the BM approach accepted
and used in the IBM organization (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget,
Fahad Osmani, Jonas Zahn 2013).
8 C11SP Strategic Project Management 2015/16
Program
Manager
Determine
organization
strategy
Program
roadmap
Conduct
environmental
assessments
Program Chapter
Program
Roadmap
Define major
milestones
Program
Roadmap
Business Case
Figure 4: WWPMM Strategic Alignment Activity - programs are often initiated to deliver
benefits that are part of an organization’s long-term strategic plan. Source: (Kerzner &
Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013)
Program
Manager
Establish
Benefits
Realization Plan
Benefit
Realization Plan
Define and
prioritize
program projects
Program
Roadmap
Define key
performance
indicators and
associated metrics
Key Performance
Indicators (KPIs)
Business Case
Establish
performance
baseline
Program
Financial
Framework
Review and
update
performance
measurements
Program
Management
System
Summary
Figure 5: WWPMM Activities in order to analyze, develop and plan benefits. Source:
(Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013)
The Programme Business Case is the key document which provides detailed identification,
quantification and timing of expected financial and other business benefits (justifications)
9 C11SP Strategic Project Management 2015/16
derived from implementing the transformation project, and to formally document those. The
Business Case also identifies costs and assumptions used in the calculations, so as to provide
the true understanding of the benefits. It also should provide the record and road map
enabling personnel to claim all of the identified benefits and for the management team to
track actual versus planned benefits. The Business Case is the source for the
final presentation when gaining senior management or Board of Directors approval to
proceed with the transformation project.
Moreover, the Business Case outlines how actual benefits or results can be measured,
compared to existing metrics and benefits claimed, as recommendations associated with each
business process or function are implemented.
WWPMM recognizes:
 "hard" or quantifiable benefits with a presentation of measurements, such as total
project benefits ($), total project expenditures ($), internal rate of return (%), net present
value ($), discounted payback period (years) and/or other meaningful selected
measurements. May also include high-level cash flow analysis for 5-10 years ($/year).
 suggested "soft" benefits which are difficult to quantify,
 "Quick Hit" benefits to the client that can be identified and claimed based on the project,
which may or may not be solely due to the implementation of the recommendation
Examples of benefits realization measures are also whether or not benefits exceed their input
costs and whether they are delivered in a timely manner. This includes the dimensions of the
benefit (e.g., the date when realization must start) and a quantification of the benefit (e.g.,
hours saved, profit increased, market share increased, competitor strength reduced, or
incremental productivity improvements) and costs.
In order to make BM process controlled WWPMM focuses mostly on quantitative methods
like calculating and tracking Benefit Realization - includes Key Perfomance Indicators (KPI)
such as Return on Investment (ROI), Internal rate of return (IRR), Payback period, Cost
Analysis, Risk Analysis (add other financial analysis techniques based upon client and
project environment.
Figure 6 as below shows major processes within WWPMM which are recognized by IBM
as a part of the overall BM approach and must be conducted in scope of any programme
(Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013).
10 C11SP Strategic Project Management 2015/16
Figure 6: WWPMM processes with regards to the BM approach. Source: (Kerzner &
Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013)
11 C11SP Strategic Project Management 2015/16
IBM CASE STUDY IN UKRANIAN MARKET: STRATEGIC CHANGE IN IBM
ORGANISATION DUE TO PORTFOLIO DEVELOPMMENT– HOW DID IBM
ENSURED BENEFITS REALISATION
History of Retail Banking and IT Services in Ukraine
Early 2000s Ukrainian IT outsourcing market grew dramatically due to the international
influence and demand for IT software engineering services and IT support. Therefore, new
companies were established to satisfy this external demand and some international players
entered the Ukranian IT market (EPAM, Global Logic, Luxof, Ciklum). Most of these
companies diversified their portfolio by offering software development services both for
international and local businesses. Banking sector was one of the most attractive market for
these companies. Ukrainian banks were trying to reduce their operational costs for IT support
mostly as the number of banking branches were increasing from less than 8000 in year 2000
to more than 16000 in 2008 (Bank.gov.ua 2008). Other changes in banking area like new
legislation requirements and new technologies were pushing banks to outsource IT functions
as keeping internal staff for this purposes was becoming more and more expensive. Due to
the opportunistic market and high demand, more companies entered the market offering not
only software design services, but some infrastructure solutions (De Nova 2009). However,
none of these companies who offer outsourcing opportunities for IT systems for the banks
were able to offer the whole IT landscape support with a broader portfolio. After 2014, due
to unstable political environment in Ukraine, centralized IT activities or outsourcing IT
services became an urgent strategic matter of cost reduction, even though not all the
providers had heavy investments in the infrastructure and cannot offer a broader solution.
IBM Ukraine and UniCredit Bank
IBM started its operation in Ukraine in 1992 and by September 2006 became a fully
established operating subsidiary. Until 2011 IBM Ukraine mostly concentrated on hardware
supplies. After 2011, as the market opportunities were clear and IBM had the infrastructure,
IBM Ukraine started to offer consulting services in two major areas (traditional for the
company on global market) as well: global technology services and global business services.
PJSC Ukrsotsbank is one of the largest banks in Ukraine, providing retail, business,
corporate and private banking services. It has a network of nearly 400 branches and provides
services to over 2 million customers across Ukraine. In 2008 the bank became part of
UniCredit Group, one of the largest financial networks in the world.
12 C11SP Strategic Project Management 2015/16
Portfolio Development: Strategic Business Change in IBM with UniCredit
Partnership
IBM Global has a strategy of expanding its business operations in the Commonwealth of
Independent States (CIS). IBM Ukraine is one of these strategic business units and linked to
this expansion strategy (IBM 2015).
In the beginning of 2011 IBM Ukraine management decided to conduct a strategic change
which would allow IBM enter Ukrainian IT outsourcing services market and offer much
broader services than competitors as IBM provides the whole range. IBM therefore invested
on developing a new portfolio in Ukraine and the first contract was signed with UniCredit
Bank. This strategic move demonstrated IBM's momentum in growth and signaled its
readiness to expand its presence in Ukraine. This contract valued approximately USD$200M
and has a duration for 10 years. In terms of contract IBM took responsibility for the
development and support of UniCredit’s information systems and applications as well as the
management of the whole bank's IT infrastructure.
"This is the first instance of full outsourcing in the region and marks a new era in the IT
delivery model and in the development of Ukraine's financial services sector. Banks across
growing markets are currently under enormous pressure to reduce costs and manage
operational complexities whilst improving the customer experience. Unicredit has turned to
IBM for its unrivalled experience in the banking sector and to ensure that its customers
benefit from the very best technologies and business processes" said Joseph Benaroya, vice
president, IBM Global Technology Services (UniCredit Bank 2011).
Structural Changes: Creation of IT Innovations Ukraine
IBM did not have enough qualified staff to take over the management and maintenance of
Unicredit's IT landscape in Ukraine. IBM either needed to hire local staff and go through
HR selection processes or engage the IBM experts from knowledge centers in other
European countries. IBM needed to start serving UniCredit immediately, and the contract
allowed the existing IT staff of UniCredit bank to move to IBM organization to enable a
smoother transaction and gave opportunity to IBM to leverage the internal knowledge of
UniCredit. Figure 7 and 8 shows the structural change after the contract in IBM Ukraine and
UniCredit. This change was conducted as a global project for a new account (contract)
creation and a general coordination performed by the IBM Europe PMO. The transformation
was made clear by establishing the new structure (both with local and external staff) and
creating rules, policies and procedures and communicating the changes with stakeholders
involved.
13 C11SP Strategic Project Management 2015/16
Figure 7: Sequence of major transformational structural steps.
As a result of transformational changes Limited Liability Company IT Innovations Ukraine
(ITIU) was created which is a 100% subsidiary of IBM in order to ensure delivery of
strategic outsourcing (SO Delivery) project. However ITIU is a new portfolio developed not
only to serve UniCredit but also to gain other accounts and add programmes to the new
portfolio using the existing knowledge and experience. ITIU is designed to deliver
professional IT & consulting services to customers, including optimization and utilization
of IT systems, IT cost reduction and risk management especially to retail banking and
financial services industry through expertise in building innovative solutions and capabilities
for unlocking value in business performance. All activities of ITIU are executed in
compliance with IBM values and IBM quality policy and framework and especially
WWPMM guidelines for project and portfolio management.
14 C11SP Strategic Project Management 2015/16
UniCredit
Top Management
Business line 1
UniCredt Bank - Head Office
Business line 2
Supporting
divisions
Branch 1 Branch 2 Branch 3
IT Division
Sales network
control division
Logistics
UniCredt Bank - - Regional sales network
Local IT
support
Local IT
support
Local IT
support
IBM Ukraine
Hardware
Sales
Delivery and
support
IBM Ukraine
Hardware
Sales
Delivery and
support
IT outsourcing
services
IT Innovations
(IBM Subsidiary)
Global Technology
Services
Global Business
Services
PMO
IT architects
Hardware
Networks
IBM European
centers of
competence
IBM Ukraine after 2011
IBM Ukraine before 2011
Subcontractor –
regional support
Figure 8: Structural changes in scope of the agreement between IBM Ukraine and
UniCredit. Sequence of major transformational structural steps.
As a result of changes described above, at the end of 2011 IBM Ukraine managed to create
subsidiary structure with more than 150 qualified IT professionals (local and from
knowledge centers in other European countries). This structure is a unique combination of
global IBM knowledge in all the IT areas (both hardware and software) and is able to resolve
IT related task of any difficulty. This is currently a unique offering and a business model in
Ukrainian market that creates a strong competitive advantage.
Benefits Identification and Mapping during Structural Change
By outsourcing from ITIU, UniCredit planned to improve customer service, increase
performance efficiency and lower operational risk across its country-wide network of nearly
400 branches. Francesco Pusateri, head of UniCredit's Global Banking Services Division
(UniCredit Bank 2011) explained their benefits:
“By outsourcing our information technology activities to IBM we are able to focus on our
core business priorities while ensuring the best possible service to our customers. Leveraging
IBM's technology assets and industry experience we are able to transform the way we work
15 C11SP Strategic Project Management 2015/16
and run our operations. This step is an important enhancement of UniCredit Group's strategy
of concentrating on core business and cost optimization."
Table 9 & Table 10 identifies the expected benefits for IBM and UniCredit from this strategic
change.
Tangible Benefits of IBM Tangible Benefits of UniCredit
Increased profit – new log-term contract
contract for 200M USD.
Reduced operational costs (no need to keep
idle expensive staff in periods of low
activity),
New market expansion, increased market
share
Guaranteed SLAs from IBM for IT services
support – financial safety for the UniCredit
Increased efficiency of the IT infrastructure
– increased customers satisfaction
Table 9: Expected Tangible Benefits of IBM & UniCredit.
Intangible Benefits of IBM Intangible Benefits of UniCredit
Strong competitive advantage – no equal
rivals on the market
Expertise from IBM Europe knowledge
centers
New possibilities for cross selling (Supply
own hardware + offer own IT support
services + offer own IT outsourcing
services).
Direct access to IBM technology and
hardware support services
Increased internal capability for other
contracts
More mature PM approach (using IBM
methodology) – guarantee of relevant
projects execution and strategic programs
alignment
New powerful replicable oursourcing
model created that can be 'exported' to other
UniCredit businesses.
Table 10: Expected Intangible Benefits of IBM & UniCredit.
Figure 11 presents an alignment of IBM strategy and expected outcomes of the conducted
strategic change.
16 C11SP Strategic Project Management 2015/16
IBM Global
Objectives
IBM Ukraine
Objectives
Business ChangeEnablers
Expansion in CIS
Market
Reduced
Competitor
Strength
Increased Profits
about 200 million
USD
Increased Employee
Utilisation
Long Term
Contractual
Relationship
with UniCredit
Transferring
IBM
Methologies in
PM to ITIU
Rotation of IBM
Global experts
to ITIU
Creation of ITIU
as a local center
to serve IT
outsourcing
Embedded
knowledge in IBM
Global of IT
outsourcing
Demand for IT
Support Services for
IT infrastructure
Demand for
Hardware(Server-
Equipment)
produced by IBM
Demand for big
data and cloud
based service in
Ukraine
Demand for IT
Outsourcing
services in banking
industry of Ukraine
Benefits
Launched New
Projects for
UniCredit
Increased internal
capability for other
contracts
Increased customer
satisfaction of
UniCredit
Reduced
Operational Costs
Qualified and
experience staff of
UniCredit to serve
banks for IT
outsourcing
Increased trust in IT
outsourcing
recognized by
banking industry
Develop a new
portfolio- Enter IT
Outsourcing Market
Leverage IBM Global
Knowledge &
Resources
Increase market share
in IT industry in
Ukraine
IBM Global Vision
Create and Sell the
Best computer
hardware, software
and IT services in
the world
Keep- increase
market share in USA
market
Keep-increase share
in European Market
Exploit the external
environment in
Ukraine
Figure 11: The alignment of IBM strategy and expected outcomes of the conducted strategic change.
17 C11SP Strategic Project Management 2015/16
Analysis
From the business case described we can see that IBM implemented benefits management
approach to manage the change at a strategic level and managed the related projects linking to the
general strategy using benefits management ideology.
The strategic change undertaken by IBM is supported by the fact that Unicredit's agreement with
IBM represents a major milestone for outsourcing within the Commonwealth of Independent
States region. It sets a new gold standard and a reference point for major Ukrainian and Russian
financial enterprises seeking a more effective way of running large and expensive IT
infrastructures under challenging economic conditions. IDC believes that “This important
initiative will start a wider uptake of outsourcing services in the market," said Andrew Golovnykh,
senior research analyst, IDC Ukraine (UniCredit Bank 2011).
IBM also listed their expected benefits from this strategic change. IBM expected to enter a new
market with a new offering in accordance with their global expansion strategy and took advantage
of lack of competition in the market leveraging their existing knowledge in their global
infrastructure. This move gave opportunities for cross selling as well for supply their own hardware
and IT support at the same time. IBM also increased the utilization of their human resources by
rotating their experts to transfer knowledge. ITIU offers a package that can serve to other banks
like UniCredit and IBM is getting prepared to expand their portfolio by gaining new customers to
serve under ITIU subsidiary. Since June 2015 IBM is also negotiating with Credit Agricole Group
which can join ITIU portfolio.
Also, IBM’s focus on its core big data and cloud-based services is one more strong competitive
advantage on the background of the current political and economic situation in Ukraine.
IBM’s internal guidelines (WWPMM) are in line with the literature of BM, as it provides a general
managerial approach trying to achieve the strategic alignment of goals, managing the change
process and creating a plan to ensure the benefit realization.
Therefore, on the basis of the business case presented and the literature analysis, it is suggested
that BM should be considered as a managerial concept which is concentrated mostly on achieving
companies targets by aligning strategy and activities on programs and projects level. It is done
through building sets of processes which help companies to identify benefits and organize planning
and executing processes in order to deliver expected outcomes from projects and realize benefits.
In this way, BM focuses not on operational management of a particular project, but on the
identification of right benefits and realization of them by these pre-defined processes.
Moreover, BM activities itself help to create the value as through strategic alignment of the
programs and projects new opportunities are revealed and more focus on benefits tracking helps
to increase productivity. Tracking of benefits is crucial in benefits realisation process, and
companies use both qualitative and quantitative models to evaluate their benefits realisation
depending on benefits classification.
18 C11SP Strategic Project Management 2015/16
Conclusion
Benefits management process and benefits realisation monitoring and tracking is still being
discussed by scholars and practitioners. This paper argued that a strategic change must be
undertaken using benefits management as it helps the strategic alignment and tracks the realisatio n
of benefits defined by different stakeholders.
The case study from IBM Ukraine shows a structural strategic change in a global company. IBM
methodology places great emphasis on Benefits Management, as a managerial concept. Therefore,
during this specific change, IBM used their WWPMM guidelines with regards to the BM and
tracked their benefits. It is clear that IBM classified their benefits and as their WWPMM guidelines
suggested they used KPIs to track their tangible benefits. However, they also gave importance to
intangible benefits and used frameworks and stakeholder approach to track intangible benefits and
their realisation. This proves that companies that have structured guidelines and methodologies
about project and programme management like IBM are already practising BM. This case also
proves that benefits maps, hierarchies or dependency networks visualizes the strategic alignment
during a change initiative and gives importance to the realisation of both intangible and tangible
benefits.
The evaluation process of benefits is complicated due to the variety of stakeholders involved and
the difficulty of measurement when it comes to intangible benefits. Therefore “measurement” of
intangible benefits is a limitation and should be researched and discussed further. The complex
nature of benefits set a limit to quantify it. Defining the benefits according to stakeholders but not
only according to the shareholders increases the complexity of intangible benefits. ‘Business as
usual’ can discuss that quantifying benefits from shareholders’ point of view (focusing only on
cost reduction and profit increase) is a simpler solution. However changing dynamics in the
worlds’ economy and ecology prove that change initiatives require stronger stakeholder
engagement and therefore more research on linking benefits management and stakeholder
engagement is required, not only for non- profit but also for-profit organisations such as IBM.
The economy in developing countries require an emergent approach to strategic change, and
companies face strong external forces. These forces can also create opportunistic environment,
like it created for IBM in Ukraine and companies in those cases need a process to handle the change
and link it to the global vision. Benefits realisation is a process that could be beneficial for those
companies that are in emerging environments and its use is expected to become wider as it allows
to link the change initiative with vision, objectives and related project management activities.
19 C11SP Strategic Project Management 2015/16
References
APM, 2009. Association for Project Management | The professional body for project management.
Benefits Management. Available at: https://www.apm.org.uk/ [Accessed October 30, 2015].
Ashurst, C. & Hodges, J., Exploring Business Transformation: The Challenges of Developing a
Benefits Realization Capability.
Bank.gov.ua, 2008. National Bank of Ukraine. Available at:
http://www.bank.gov.ua/control/en/index [Accessed October 29, 2015].
Barbara Farbey, F.L. and D.T., 1999. The moving staircase - Problems of appraisal and evaluation
in a turbulent environment. Information Technology & People, 12(3), pp.238–252. Available
at:
http://proquest.umi.com/pqdweb?did=116356330&Fmt=7&clientId=65345&RQT=309&V
Name=PQDnhttp://sfx.cranfield.ac.uk/cranfield?url_ver=Z39.88-
2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Aabiglo
bal&atitle=The+moving+staircase+-+.
Bennington, Peter; Baccarini, D., 2004. Project benefits management in IT projects: An Australian
perspective. Project Management Journal, 35(1), pp.20–30.
Bradley, G., 2010. Benefit realisation management 1st ed., Farnham, Surrey, England: Gower Pub.
Bradley, G., 2006. Benefit realisation management: A practical guide for achieving benefits
through change, Aldershot, England; Burlington, VT: Gower.
Breese, R. et al., 2015. Benefits management: Lost or found in translation.
Breese, R., 2012. Benefits realisation management: Panacea or false dawn? International Journal
of Project Management, 30(3), pp.341–351. Available at:
http://www.sciencedirect.com/science/article/pii/S0263786311001128.
Cooke-Davis, T., Crawford, L. & Lechler, T., 2009. Project management systems: Moving project
managment from an operational to a strategic discipline. Project Management Journal, 40(1),
pp.110–123. Available at: http://www.gowerpublishing.com/isbn/9780566088674.
Doherty, N.F. et al., 2005. Towards an Integrated Approach to Benefits Realisation Management
– Reflections from the Development of a Clinical Trials Support System. Electronic Journal
of Information Systems Evaluation, 11(2), pp.83 – 90.
IBM, 2015. IBM - United Kingdom. Available at: http://www.ibm.com/uk-en/ [Accessed October
29, 2015].
Jenner, S., 2009. Realising benefits from government ICT investment 1st ed., Reading, UK:
20 C11SP Strategic Project Management 2015/16
Academic Pub. International.
Kerzner, H.R. & Learning, I.I. for, 2010. Project Management - Best Practices: Achieving Global
Excellence, John Wiley & Sons. Available at:
https://books.google.com/books?id=EcxO4CbHxJ8C&pgis=1 [Accessed October 28, 2015].
Lange, M., Mendling, J. & Recker, J., 2012. Realizing Benefits From Enterprise Architecture : a
Measurement Model. Ecis 2012.
Lappe, M. & Spang, K., 2014. Investments in project management are profitable: A case study-
based analysis of the relationship between the costs and benefits of project management.
JPMA, 32, pp.603–612.
Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn, I.R., 2013. Creating a BPM Center of
Excellence (CoE). IBM Redbooks. Available at:
https://books.google.co.uk/books?vid=ISBN:9780738450872&redir_esc=y [Accessed
October 28, 2015].
Mir, F.A. & Pinnington, A.H., 2014. Exploring the value of project management: Linking Project
Management Performance and Project Success.
De Nova, 2009. De Novo (De Novo) - IT company, the national cloud services provider| Denovo
| Kyiv | Ukraine. Available at: http://www.de-novo.biz/en/about-us/ [Accessed October 29,
2015].
Sanchez, H. & Robert, B., 2010. Measuring Portfolio Strategic Performance Using Key
Performance Indicators. Project Management Journal, 41(5), pp.64–73.
Sapountzis, S., Harris, K. & Kagioglou, M., 2008. Benefits Management and Benefits Realisation.
, pp.1–73.
Serra, C.E.M. & Kunc, M., 2015. Benefits Realisation Management and its influence on project
success and on the execution of business strategies. JPMA, 33, pp.53–66.
Thiry, M., 2002. Combining value and project management into an effective programme
management model. International Journal of Project Management, 20(3), pp.221–227.
Thomson, D.S. et al., 2011. The benefits quantification method: a practical approach to engaging
stakeholders in the judgement of benefits realisation. 4th Annual Conference of the Health
and Care Infrastructure Research and Innovation Centre, pp.224–243. Available at:
https://dspace.lboro.ac.uk/dspace-jspui/handle/2134/9689.
Thorp, J., 2003. The Information Paradox, Realizing the Bussiness Benefits of Information
Technology. , p.191.
21 C11SP Strategic Project Management 2015/16
Tillmann, P. a, Tzortzopoulos, P. & Formoso, C.T., 2010. Analysing Benefits Realisation From a
Theoretical Perspective and Its Contribution To Value Generation. 18th Annual Conference
of the International Group for Lean Construction, pp.73–82.
Tjernstrom, K., 2008. Benefits Management and its applicability in practice. IT -University of
Goteborg, p.71.
Too, E.G. & Weaver, P., 2013. The management of project management: A conceptual framework
for project governance. International Journal of Project Management, 32(8), pp.1382–1394.
UniCredit Bank, 2011. UniCredit Bank - PJSC «Ukrsotsbank» | IBM and Ukrsotsbank Ukraine
Sign 10-year Services Agreement. Available at: https://en.unicredit.ua/news/view/350/
[Accessed October 29, 2015].
Wateridge, J., 1995. IT projects: a basis for success. International Journal of Project Management,
13(3), pp.169–172. Available at:
http://www.sciencedirect.com/science/article/pii/026378639500020Q.
Winter, M. et al., 2006. Directions for future research in project management: The main findings
of a UK government-funded research network. International Journal of Project Management,
24(8), pp.638–649. Available at:
http://linkinghub.elsevier.com/retrieve/pii/S0263786306001268.
Yates, K. et al., 2009. BeReal benefits realisation model integrated approach: The built
environment lifecycle and organisational views. HaCIRIC10, p.110. Available at: http://xn--
2012-
ue6f785ch13g.com/departments/cv/docs/HaCIRIC09_conf_proceedings.pdf#page=111.

More Related Content

What's hot

Benefits management and transformational change, 10 January 2017 - Southampton
Benefits management and transformational change, 10 January 2017 - SouthamptonBenefits management and transformational change, 10 January 2017 - Southampton
Benefits management and transformational change, 10 January 2017 - SouthamptonAssociation for Project Management
 
Benefit Management; How to fill multi gaps with only one bridge?
Benefit Management; How to fill multi gaps with only one bridge?Benefit Management; How to fill multi gaps with only one bridge?
Benefit Management; How to fill multi gaps with only one bridge?Imad Alsadeq
 
Business policy 2 hierarchy of strategic intent
Business policy 2  hierarchy of strategic intentBusiness policy 2  hierarchy of strategic intent
Business policy 2 hierarchy of strategic intentMuhammad Khan
 
strategic management-Concepts
strategic management-Conceptsstrategic management-Concepts
strategic management-ConceptsDr. Gauri Dhingra
 
Strategic management
Strategic managementStrategic management
Strategic managementCitibank N.A.
 
Strategic+management+2
Strategic+management+2Strategic+management+2
Strategic+management+2Sampath
 
Evolution of the strategic management
Evolution of the strategic managementEvolution of the strategic management
Evolution of the strategic managementvarsha nihanth lade
 
Implementing Strategies ( Part 1 )
Implementing Strategies ( Part 1 )Implementing Strategies ( Part 1 )
Implementing Strategies ( Part 1 )Noel Buensuceso
 
Chapter i introduction to strategic management
Chapter i  introduction  to strategic managementChapter i  introduction  to strategic management
Chapter i introduction to strategic managementSuzana Vaidya
 
An overview of strategic management.ppsx11
An overview of strategic management.ppsx11An overview of strategic management.ppsx11
An overview of strategic management.ppsx11richamandla
 
Strategic management full notes
Strategic management full notesStrategic management full notes
Strategic management full notesKiruthika Ruthi
 
Role of Strategic Manager
Role of Strategic ManagerRole of Strategic Manager
Role of Strategic ManagerDhrumil Shah
 
Chapter 7 strategic management
Chapter 7 strategic management Chapter 7 strategic management
Chapter 7 strategic management Kalsoom Fatima
 
Strategic Management ICSI Professional
Strategic Management ICSI ProfessionalStrategic Management ICSI Professional
Strategic Management ICSI ProfessionalGOVIND KUMAR MISHRA
 
Managing strategy, strategic planning
Managing strategy, strategic planningManaging strategy, strategic planning
Managing strategy, strategic planningViktoria Kachaluba
 
Strategic Management Module 1
Strategic Management Module 1Strategic Management Module 1
Strategic Management Module 1Anujith KR
 

What's hot (20)

Benefits management and transformational change, 10 January 2017 - Southampton
Benefits management and transformational change, 10 January 2017 - SouthamptonBenefits management and transformational change, 10 January 2017 - Southampton
Benefits management and transformational change, 10 January 2017 - Southampton
 
Benefit Management; How to fill multi gaps with only one bridge?
Benefit Management; How to fill multi gaps with only one bridge?Benefit Management; How to fill multi gaps with only one bridge?
Benefit Management; How to fill multi gaps with only one bridge?
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Business policy 2 hierarchy of strategic intent
Business policy 2  hierarchy of strategic intentBusiness policy 2  hierarchy of strategic intent
Business policy 2 hierarchy of strategic intent
 
strategic management-Concepts
strategic management-Conceptsstrategic management-Concepts
strategic management-Concepts
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Strategic+management+2
Strategic+management+2Strategic+management+2
Strategic+management+2
 
Evolution of the strategic management
Evolution of the strategic managementEvolution of the strategic management
Evolution of the strategic management
 
Implementing Strategies ( Part 1 )
Implementing Strategies ( Part 1 )Implementing Strategies ( Part 1 )
Implementing Strategies ( Part 1 )
 
Chapter i introduction to strategic management
Chapter i  introduction  to strategic managementChapter i  introduction  to strategic management
Chapter i introduction to strategic management
 
An overview of strategic management.ppsx11
An overview of strategic management.ppsx11An overview of strategic management.ppsx11
An overview of strategic management.ppsx11
 
Strategic management full notes
Strategic management full notesStrategic management full notes
Strategic management full notes
 
Workshop A: Pragmatic benefits realisation management
Workshop A: Pragmatic benefits realisation managementWorkshop A: Pragmatic benefits realisation management
Workshop A: Pragmatic benefits realisation management
 
Role of Strategic Manager
Role of Strategic ManagerRole of Strategic Manager
Role of Strategic Manager
 
Chapter 7 strategic management
Chapter 7 strategic management Chapter 7 strategic management
Chapter 7 strategic management
 
Strategic Management ICSI Professional
Strategic Management ICSI ProfessionalStrategic Management ICSI Professional
Strategic Management ICSI Professional
 
Strategic Management Unit I&II
Strategic Management Unit I&IIStrategic Management Unit I&II
Strategic Management Unit I&II
 
Managing strategy, strategic planning
Managing strategy, strategic planningManaging strategy, strategic planning
Managing strategy, strategic planning
 
Strategic Management Module 1
Strategic Management Module 1Strategic Management Module 1
Strategic Management Module 1
 
Strategic management
Strategic managementStrategic management
Strategic management
 

Viewers also liked

Strategic management
Strategic managementStrategic management
Strategic managementHarsh Arora
 
Nature of sm ppt
Nature of sm pptNature of sm ppt
Nature of sm pptDr.Meera Uday
 
Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures CTSI at UCSF
 
The Nature of Strategic Management
The Nature of Strategic ManagementThe Nature of Strategic Management
The Nature of Strategic ManagementNoel Buensuceso
 
Ebook it's all about strategy execution - new edition
Ebook it's all about strategy execution - new editionEbook it's all about strategy execution - new edition
Ebook it's all about strategy execution - new editionJeroen De Flander
 
Social Responsibilities of business & business ethics
Social Responsibilities of business & business ethicsSocial Responsibilities of business & business ethics
Social Responsibilities of business & business ethicsVarsha Dubey
 
Social Responsibility & Business Ethics
Social Responsibility & Business EthicsSocial Responsibility & Business Ethics
Social Responsibility & Business EthicsKhalid Nasr
 
Business Ethics and Social Responsibility
Business Ethics and Social Responsibility Business Ethics and Social Responsibility
Business Ethics and Social Responsibility Sanjay Mishra
 
Strategic management
Strategic managementStrategic management
Strategic managementapverma01
 
Social responsibility of business
Social responsibility of businessSocial responsibility of business
Social responsibility of businessFlex
 
Ethical issues in business
Ethical issues in businessEthical issues in business
Ethical issues in businessDanish Musthafa
 

Viewers also liked (11)

Strategic management
Strategic managementStrategic management
Strategic management
 
Nature of sm ppt
Nature of sm pptNature of sm ppt
Nature of sm ppt
 
Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures Developing Effective Standard Operating Procedures
Developing Effective Standard Operating Procedures
 
The Nature of Strategic Management
The Nature of Strategic ManagementThe Nature of Strategic Management
The Nature of Strategic Management
 
Ebook it's all about strategy execution - new edition
Ebook it's all about strategy execution - new editionEbook it's all about strategy execution - new edition
Ebook it's all about strategy execution - new edition
 
Social Responsibilities of business & business ethics
Social Responsibilities of business & business ethicsSocial Responsibilities of business & business ethics
Social Responsibilities of business & business ethics
 
Social Responsibility & Business Ethics
Social Responsibility & Business EthicsSocial Responsibility & Business Ethics
Social Responsibility & Business Ethics
 
Business Ethics and Social Responsibility
Business Ethics and Social Responsibility Business Ethics and Social Responsibility
Business Ethics and Social Responsibility
 
Strategic management
Strategic managementStrategic management
Strategic management
 
Social responsibility of business
Social responsibility of businessSocial responsibility of business
Social responsibility of business
 
Ethical issues in business
Ethical issues in businessEthical issues in business
Ethical issues in business
 

Similar to Importance of Benefits Management in Strategic Change Initiatives

10 tips manuscript portfolio management
10 tips manuscript   portfolio management10 tips manuscript   portfolio management
10 tips manuscript portfolio managementJames Groh, MBA
 
Results-based-Management.pdf
Results-based-Management.pdfResults-based-Management.pdf
Results-based-Management.pdfpophius
 
A framework to establish a project management office
A framework to establish a project management officeA framework to establish a project management office
A framework to establish a project management officeAlexander Decker
 
A framework to establish a project management office
A framework to establish a project management officeA framework to establish a project management office
A framework to establish a project management officeAlexander Decker
 
A Framework To Establish A Project Management Office
A Framework To Establish A Project Management OfficeA Framework To Establish A Project Management Office
A Framework To Establish A Project Management OfficeCynthia King
 
F325356
F325356F325356
F325356aijbm
 
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Ricardo Viana Vargas
 
Running Head PROJECT MANAGEMENT 5Progress Results and F.docx
Running Head PROJECT MANAGEMENT 5Progress Results and F.docxRunning Head PROJECT MANAGEMENT 5Progress Results and F.docx
Running Head PROJECT MANAGEMENT 5Progress Results and F.docxjeanettehully
 
Continuous Alignment
Continuous AlignmentContinuous Alignment
Continuous AlignmentBob Prieto
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01PMI_IREP_TP
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavanPMI2011
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...IOSR Journals
 
A fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleA fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleDonnie MacNicol
 
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...Association for Project Management
 
Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Michelle Singh
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxwrite30
 

Similar to Importance of Benefits Management in Strategic Change Initiatives (20)

10 tips manuscript portfolio management
10 tips manuscript   portfolio management10 tips manuscript   portfolio management
10 tips manuscript portfolio management
 
icpak journal
icpak journalicpak journal
icpak journal
 
Results-based-Management.pdf
Results-based-Management.pdfResults-based-Management.pdf
Results-based-Management.pdf
 
A framework to establish a project management office
A framework to establish a project management officeA framework to establish a project management office
A framework to establish a project management office
 
A framework to establish a project management office
A framework to establish a project management officeA framework to establish a project management office
A framework to establish a project management office
 
A Framework To Establish A Project Management Office
A Framework To Establish A Project Management OfficeA Framework To Establish A Project Management Office
A Framework To Establish A Project Management Office
 
F325356
F325356F325356
F325356
 
EPMO: Putting the pieces together as true game changer!
EPMO: Putting the pieces together as true game  changer!EPMO: Putting the pieces together as true game  changer!
EPMO: Putting the pieces together as true game changer!
 
Making sense of value - APM blog series, Michel Thiry
Making sense of value - APM blog series, Michel ThiryMaking sense of value - APM blog series, Michel Thiry
Making sense of value - APM blog series, Michel Thiry
 
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
Determining the Mathematical ROI of a Project Management Office (PMO) Impleme...
 
Running Head PROJECT MANAGEMENT 5Progress Results and F.docx
Running Head PROJECT MANAGEMENT 5Progress Results and F.docxRunning Head PROJECT MANAGEMENT 5Progress Results and F.docx
Running Head PROJECT MANAGEMENT 5Progress Results and F.docx
 
Continuous Alignment
Continuous AlignmentContinuous Alignment
Continuous Alignment
 
Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01Srinivasadesikanraghavan 131008015759-phpapp01
Srinivasadesikanraghavan 131008015759-phpapp01
 
Srinivasa desikanraghavan
Srinivasa desikanraghavanSrinivasa desikanraghavan
Srinivasa desikanraghavan
 
Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...Project and Change Management Success Factors from Malaysian Government Depar...
Project and Change Management Success Factors from Malaysian Government Depar...
 
A fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS ArticleA fresh project management perspective - from 2011 - RICS Article
A fresh project management perspective - from 2011 - RICS Article
 
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
Introduction to Programme Management book launch 2nd edition, Birmingham, 2 F...
 
Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...Is The Budget Has Outlived Its Usefulness On The 21St...
Is The Budget Has Outlived Its Usefulness On The 21St...
 
Budget Management and Organizational Effectiveness in Nigeria
Budget Management and Organizational Effectiveness in NigeriaBudget Management and Organizational Effectiveness in Nigeria
Budget Management and Organizational Effectiveness in Nigeria
 
ACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docxACT College Arlington Project Management and Company Performance Paper.docx
ACT College Arlington Project Management and Company Performance Paper.docx
 

Recently uploaded

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxAbhayThakur200703
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 

Recently uploaded (20)

The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc.../:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...
/:Call Girls In Jaypee Siddharth - 5 Star Hotel New Delhi ➄9990211544 Top Esc...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Non Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptxNon Text Magic Studio Magic Design for Presentations L&P.pptx
Non Text Magic Studio Magic Design for Presentations L&P.pptx
 
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Mehrauli Delhi 💯Call Us 🔝8264348440🔝
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❀8860477959_Russian 100% Genuine Escorts I...
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 

Importance of Benefits Management in Strategic Change Initiatives

  • 1. 1 C11SP Strategic Project Management 2015/16 IMPORTANCE OF BENEFITS MANAGEMENT IN STRATEGIC CHANGE INIATIVES: A CASE STUDY OF PORTFOLIO DEVELOPMENT AND CHANGE MANAGEMENT IN IBM UKRAINE USING BENEFITS MANAGEMENT Tulin Dzhengiz H00232784 Oleksii Pominovskyi H00214911 Shy-Nien Koong H00214525 Nursultan Zhakas H00227733 Oybek Nasirov H00213985 Abstract Benefits Management (BM) or Benefits Realisation Management (BRM) is discussed in different industries for its implications in the field of project portfolio management. Even though the development of BM is relatively new, it is becoming a managerial concept that is widely used in strategic change initiatives. BM gives the opportunity to consider various benefits (tangible-intangible) in a defined strategic change case to link the strategic objectives and particular projects undertaken. Even though there are limitations in the tracking of benefits realisation due to measurement, BM is promising for companies in emergent environments implementing change initiatives by introducing projects and programmes. This paper examines the existing efforts in BM as a managerial concept with a greater focus on its role in strategic alignment and realisation process (benefits tracking and monitoring). As a research method a case study is used to show the practical implications of BM in a global organisation. The case study proves the usefulness of BM in change initiatives and presents BM implementations in a global organisation that is similar to the existing literature. KEYWORDS: Programme and portfolio management; benefits management; benefit realisation; strategic change. Introduction Benefits management is a process that enables management to ensure the expected outcomes of a change initiative to be realized (Breese et al. 2015; Bradley 2006). The literature on BM focuses mainly on cases with IT-enabled change initiatives (Breese et al. 2015). Even though IT-enabled change initiatives are good examples to observe how BM can be implemented, the definition of BM should be broader and not limited with IT projects in companies. BM is a broader concept of value creation and BM should be seen as a tool for managing and
  • 2. 2 C11SP Strategic Project Management 2015/16 developing portfolios and programmes where the expected outcomes of different stakeholders can be realized (Thorp 2003; Bradley 2006; Breese et al. 2015). Benefits Management is a relatively new concept in the area of project portfolio management and its history is linked to the emergence of programme management and portfolio management studies carried out by scholars and practitioners (Thorp 2003). Benefits can be tangible or intangible performance improvements recognized by the stakeholders. Benefits can be either financial improvements or non-financial improvements and therefore it may be hard to quantify or measure. It is also important to emphasize that different stakeholders will perceive the created value and realized benefits in a different way (Sanchez & Robert 2010; Bradley 2006; Breese et al. 2015). Benefits management contribute to programmes and projects success and add value by reducing costs and realizing expected outcomes that are of importance for different stakeholders. Therefore, this paper argues that strategic change initiatives should be carried out using benefits management to ensure the alignment of the strategy with projects/programmes using benefits realisation methods either qualitative or quantitative depending on benefit classification. This argument will then be supported by a business case of IBM Ukraine. IBM has developed a new portfolio in Ukraine in line with their global strategy, utilising their resources and expertise with the objective of diversifying this portfolio. The case will show how IBM implemented the principles of benefits management to ensure the success of the change initiative. LiteratureReview Benefits Management as a managerial concept The term ‘benefits management’ was used in the late 1980s (Barbara Farbey 1999). Later, BM became a vital part of the development of project management in the late of twentieth and early twenty-first century (Winter et al. 2006). It is suggested that there has been a paradigm shift from traditional benefits realization principles to new benefits realization principles (Sapountzis et al. 2008; Tillmann et al. 2010). This paradigm shift is towards a more flexible, emergent and proactive approach to benefits (Sapountzis et al. 2008). This paper suggests that BM should not be limited with programme and project management, but also should be accepted as a specific managerial concept. BM is defined as the process of organising and managing, so that potential benefits, arising from investment in change, are actually achieved (Bradley 2006). APM defines BM as a ‘strategic business skill for all seasons
centred on using benefits management to align the journey from business strategy to delivery to the embedding of change within organisations’ (APM 2009). Some scholars focus on the value creation aspect of BM and define BM as the promotion of ‘a different mindset, based on an approach that manages value on an active basis’ (Jenner 2009). Thereby, benefits management is a way to align the strategy to projects so that the deliverables are connected to the expected benefits. Benefits management is therefore a
  • 3. 3 C11SP Strategic Project Management 2015/16 managerial concept which does not only serve for the delivery of a programme and related projects on time, on budget at a certain quality but also taking it to a step further ensuring the expected outcomes to be realized. Benefits management: A bridge between strategy and projects, programmes, portfolios Companies have their vision, mission and objectives defined at a strategic level. Projects or a set of projects are governed together (programmes) are created to achieve the strategic goals defined (Thiry 2002). Any kind of strategic change is implemented or achieved by means of different projects or programmes which have their defined goals and targets. Typically, project management success is being measured in terms of cost/budget/quality mostly in short term period, what does not show correlation with strategic level targets. At the same time, project deliverables and benefits overall success measures (what really contributes in strategy) are more complex and usually defined in long term period. That causes most project managers on practice to concentrate mostly on fulfilling project management itself, which is what they are usually expected to do (Wateridge, 1995). Nevertheless, many scholars admit that successfully implemented projects do not guarantee realizing strategic goals even if projects were finished in given cost/time/quality frames which caused many researchers to focus on adjusting strategic goals of the organizations with project outcomes (Cooke-Davis et al. 2009) and alignment of projects, programmes, portfolios with strategy found to be crucial (Cooke-Davis et al. 2009). Benefits Management serves as the main “bridge” between designing the strategy and its implementation, making sure the targets are met (Serra & Kunc 2015). To sum up, organisational success or success of a change initiative depends on the project management success and the strategic alignment between strategy and portfolio/programme and projects. Benefits Realisation Process Benefits realisation management is a process of organising and managing so that these benefits tangible or intangible perceived by the stakeholders are realised in a programme or a portfolio (Bradley 2006). This process includes identifying these benefits and linking to the organisational strategy which created the strategic alignment, planning and tracking as well as reviewing and monitoring the realisation of benefits (Sapountzis et al. 2008; Yates et al. 2009; Bradley 2006). Figure 1 explains the OGC Gateway Framework (Tjernstrom 2008) approach to benefits realisation management as a process.
  • 4. 4 C11SP Strategic Project Management 2015/16 Figure 1: Benefits Management Process. Source: (Tjernstrom 2008) Moreover, some scholars propose that BM process itself creates the value as more focus on benefits tracking helps to increase productivity (Bradley 2010). Therefore, BM may considerably decrease the risk of projects failure or investment mistakes by making sure that the benefits are identified, planned, monitored, measured and realized. Benefits Classification and Qualitative/Quantitative Models in Benefits Realisation and Tracking Benefits can be classified according to the value they create and therefore can be classified as tangible and intangible (Too & Weaver 2013; Yates et al. 2009). Tangible benefits are defined as benefits that have financial implications that can be quantified, whereas intangible benefits are the benefits where the value is subject to discussion and therefore hard to quantify due to the perception of stakeholders and subjectivity (Sanchez & Robert 2010), which is why intangible benefits are called as soft benefits and tangible benefits are also called as hard benefits in literature (Sapountzis et al. 2008). Benefits realisation tracking can be done by qualitative or quantitative methods (Tjernstrom 2008). Qualitative methods suggests frameworks to track both tangible and intangible benefits. However, quantitative methods focus on the quantification of benefits that are tangible and usually financial. Different qualitative frameworks can be found on the literature developed or used for different cases such as IT projects (Ashurst & Hodges n.d.; Doherty et al. 2005) or area regeneration projects (Breese 2012). These frameworks usually focus on linking the vision to helpful mechanisms such as organisational capability, organisational structure or skills as well as conceptualising the benefits realisation process and focusing on the strategic
  • 5. 5 C11SP Strategic Project Management 2015/16 alignment (Thorp 2003). “The Result Chain” can be given as an example to measurement approaches to benefits realisation in Figure 2 (Thorp 2003). Figure 2: Result Chain Approach as an Example. Source: (Thorp 2003) The studies that focus on the quantitative evaluation of benefits usually focus on profit maximisation or cost reduction benefits from a shareholder point of view, using cost-benefit ratio, ROI or key performance indicators (Lappe & Spang 2014). In practice, some project and programme managers would use KPIs for measurement and track the benefits and monitor if they are realized according to these KPIs, however researchers also acknowledged that KPIs may not be a common practice for all project/programme managers (Bennington, Peter; Baccarini 2004). It may be easier to measure deliverables in a project level. However, at a programme portfolio level where organization is making a strategic move the perceived value of stakeholders would vary. Even though some scholars are striving to measure and quantify benefits (Lange et al. 2012; Thomson et al. 2011; Sanchez & Robert 2010), strategic changes usually consist many stakeholders, many intangible outcomes with a varying time to realize these benefits which complicates measurement or quantification. There are also hybrid models including both qualitative such as employee satisfaction, customer satisfaction, transparency and quantitative measures of benefits such as organisational and project costs (Lappe & Spang 2014). This paper argues that tracking of benefits is crucial in benefits realisation process, and companies use and must use both qualitative and quantitative methods to evaluate their benefits realisation. Table 3 presents some models that are used in benefits realisation tracking and measuring.
  • 6. 6 C11SP Strategic Project Management 2015/16 Sources SuggestedModel Advantages of the Model Sources for Qualitative Models (Ashurst & Hodges n.d.) Maturity Model of Competencies within the Black-Box of organisation. Focuses on the benefits realization capability and suggests different drivers of change may require different competencies. (Lange et al. 2012) Enterprise Architecture (EA)Benefits Realisation Model Defines organisational and project benefits with regards to efficiency, effectiveness and flexibility to test the benefits realisation of EA. (Doherty et al. 2005) Benefits Dependency Network Focuses on enablers, business changes, benefits and investment objects in the model to ensure the enablers are there to satisfy objectives. (Breese 2012) Benefits Hierarchy Links vision, objectives, outcomes, outputs and activities. Sources for Hybrid Models (Lappe & Spang 2014) Components of ROI of PM Defines the qualitative and quantitative components to be considered in benefits realisation (Thorp 2003) The Results Chain Linking time, people, reach a balanced score card approach is suggested to measuring benefits realisation. Not only focuses on the finances, also focuses on organisational capabilities, softer benefits and links to strategy. Sources for Quantitative Methods (Sanchez & Robert 2010) Developing KPIs for Project Portfolios Considering a Strategic Perspective Setting of portfolio objectives, validating key benefits, linking key benefits, objectives and projects, visualizing the streams, determining the project contribution to the achievement of portfolio objectives, setting the thresholds for the portfolio with regards to the KPI measured (Mir & Pinnington 2014) Linking Project Management Performance and Project Success Long term organisational benefits and short term project benefits are identified statistically and valued by taking into consideration different stakeholders to achieve overall success Table 3: Benefits measurement models.
  • 7. 7 C11SP Strategic Project Management 2015/16 The Case Introduction to IBM Global and Benefits Management at IBM International Business Machines Corporation (IBM) is a multinational technology and consulting corporation, with headquarters in Armonk, New York. IBM manufactures and sells computer hardware, middleware and software, and offers infrastructure, hosting and consulting services in areas ranging from mainframe computers to nanotechnology. IBM operates in three global areas: software development, hardware manufacturing and IT outsourcing services. IBM has more than 379 000 employees and operates in 170 countries, continuously expanding their business, 5th most valuable brand and 2nd in the IT Services industry according to Forbes in 2014. IBM delivers internal and external projects supported by Project Management Center of Excellence of IBM. This methodology is based on the PMI recommendations and designed to satisfy specific needs of the company due to its structure and strategy. IBM project portfolio management methodology is critical to the IBM operations, as it is used by 22,703 project managers (1Q15, IBM PM Center of Excellence). IBM’s own methodology - Worldwide Project Management Method (WWPMM) defines how IBM manages programmes and projects by assessing risk and performance in a service project and improving efficiency by defining clear tasks for project managers. WWPMM also defines BM as “a practice which describes the process, activities, techniques and work products used to manage program benefits”. WWPMM recognizes strategic alignment of vision, objectives, programmes and projects which is why they try to eliminate major pitfalls like poorly documented business plans, lack of mission and goals, or a poor understanding of stakeholder concerns. IBM recognizes the importance of tangible and intangible benefits of programmes or projects and use both qualitative and quantitative approaches to realize benefits. Figure 4&5 Explains the WWPMM guidelines with regards to the BM approach accepted and used in the IBM organization (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013).
  • 8. 8 C11SP Strategic Project Management 2015/16 Program Manager Determine organization strategy Program roadmap Conduct environmental assessments Program Chapter Program Roadmap Define major milestones Program Roadmap Business Case Figure 4: WWPMM Strategic Alignment Activity - programs are often initiated to deliver benefits that are part of an organization’s long-term strategic plan. Source: (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013) Program Manager Establish Benefits Realization Plan Benefit Realization Plan Define and prioritize program projects Program Roadmap Define key performance indicators and associated metrics Key Performance Indicators (KPIs) Business Case Establish performance baseline Program Financial Framework Review and update performance measurements Program Management System Summary Figure 5: WWPMM Activities in order to analyze, develop and plan benefits. Source: (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013) The Programme Business Case is the key document which provides detailed identification, quantification and timing of expected financial and other business benefits (justifications)
  • 9. 9 C11SP Strategic Project Management 2015/16 derived from implementing the transformation project, and to formally document those. The Business Case also identifies costs and assumptions used in the calculations, so as to provide the true understanding of the benefits. It also should provide the record and road map enabling personnel to claim all of the identified benefits and for the management team to track actual versus planned benefits. The Business Case is the source for the final presentation when gaining senior management or Board of Directors approval to proceed with the transformation project. Moreover, the Business Case outlines how actual benefits or results can be measured, compared to existing metrics and benefits claimed, as recommendations associated with each business process or function are implemented. WWPMM recognizes:  "hard" or quantifiable benefits with a presentation of measurements, such as total project benefits ($), total project expenditures ($), internal rate of return (%), net present value ($), discounted payback period (years) and/or other meaningful selected measurements. May also include high-level cash flow analysis for 5-10 years ($/year).  suggested "soft" benefits which are difficult to quantify,  "Quick Hit" benefits to the client that can be identified and claimed based on the project, which may or may not be solely due to the implementation of the recommendation Examples of benefits realization measures are also whether or not benefits exceed their input costs and whether they are delivered in a timely manner. This includes the dimensions of the benefit (e.g., the date when realization must start) and a quantification of the benefit (e.g., hours saved, profit increased, market share increased, competitor strength reduced, or incremental productivity improvements) and costs. In order to make BM process controlled WWPMM focuses mostly on quantitative methods like calculating and tracking Benefit Realization - includes Key Perfomance Indicators (KPI) such as Return on Investment (ROI), Internal rate of return (IRR), Payback period, Cost Analysis, Risk Analysis (add other financial analysis techniques based upon client and project environment. Figure 6 as below shows major processes within WWPMM which are recognized by IBM as a part of the overall BM approach and must be conducted in scope of any programme (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013).
  • 10. 10 C11SP Strategic Project Management 2015/16 Figure 6: WWPMM processes with regards to the BM approach. Source: (Kerzner & Learning 2010; Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn 2013)
  • 11. 11 C11SP Strategic Project Management 2015/16 IBM CASE STUDY IN UKRANIAN MARKET: STRATEGIC CHANGE IN IBM ORGANISATION DUE TO PORTFOLIO DEVELOPMMENT– HOW DID IBM ENSURED BENEFITS REALISATION History of Retail Banking and IT Services in Ukraine Early 2000s Ukrainian IT outsourcing market grew dramatically due to the international influence and demand for IT software engineering services and IT support. Therefore, new companies were established to satisfy this external demand and some international players entered the Ukranian IT market (EPAM, Global Logic, Luxof, Ciklum). Most of these companies diversified their portfolio by offering software development services both for international and local businesses. Banking sector was one of the most attractive market for these companies. Ukrainian banks were trying to reduce their operational costs for IT support mostly as the number of banking branches were increasing from less than 8000 in year 2000 to more than 16000 in 2008 (Bank.gov.ua 2008). Other changes in banking area like new legislation requirements and new technologies were pushing banks to outsource IT functions as keeping internal staff for this purposes was becoming more and more expensive. Due to the opportunistic market and high demand, more companies entered the market offering not only software design services, but some infrastructure solutions (De Nova 2009). However, none of these companies who offer outsourcing opportunities for IT systems for the banks were able to offer the whole IT landscape support with a broader portfolio. After 2014, due to unstable political environment in Ukraine, centralized IT activities or outsourcing IT services became an urgent strategic matter of cost reduction, even though not all the providers had heavy investments in the infrastructure and cannot offer a broader solution. IBM Ukraine and UniCredit Bank IBM started its operation in Ukraine in 1992 and by September 2006 became a fully established operating subsidiary. Until 2011 IBM Ukraine mostly concentrated on hardware supplies. After 2011, as the market opportunities were clear and IBM had the infrastructure, IBM Ukraine started to offer consulting services in two major areas (traditional for the company on global market) as well: global technology services and global business services. PJSC Ukrsotsbank is one of the largest banks in Ukraine, providing retail, business, corporate and private banking services. It has a network of nearly 400 branches and provides services to over 2 million customers across Ukraine. In 2008 the bank became part of UniCredit Group, one of the largest financial networks in the world.
  • 12. 12 C11SP Strategic Project Management 2015/16 Portfolio Development: Strategic Business Change in IBM with UniCredit Partnership IBM Global has a strategy of expanding its business operations in the Commonwealth of Independent States (CIS). IBM Ukraine is one of these strategic business units and linked to this expansion strategy (IBM 2015). In the beginning of 2011 IBM Ukraine management decided to conduct a strategic change which would allow IBM enter Ukrainian IT outsourcing services market and offer much broader services than competitors as IBM provides the whole range. IBM therefore invested on developing a new portfolio in Ukraine and the first contract was signed with UniCredit Bank. This strategic move demonstrated IBM's momentum in growth and signaled its readiness to expand its presence in Ukraine. This contract valued approximately USD$200M and has a duration for 10 years. In terms of contract IBM took responsibility for the development and support of UniCredit’s information systems and applications as well as the management of the whole bank's IT infrastructure. "This is the first instance of full outsourcing in the region and marks a new era in the IT delivery model and in the development of Ukraine's financial services sector. Banks across growing markets are currently under enormous pressure to reduce costs and manage operational complexities whilst improving the customer experience. Unicredit has turned to IBM for its unrivalled experience in the banking sector and to ensure that its customers benefit from the very best technologies and business processes" said Joseph Benaroya, vice president, IBM Global Technology Services (UniCredit Bank 2011). Structural Changes: Creation of IT Innovations Ukraine IBM did not have enough qualified staff to take over the management and maintenance of Unicredit's IT landscape in Ukraine. IBM either needed to hire local staff and go through HR selection processes or engage the IBM experts from knowledge centers in other European countries. IBM needed to start serving UniCredit immediately, and the contract allowed the existing IT staff of UniCredit bank to move to IBM organization to enable a smoother transaction and gave opportunity to IBM to leverage the internal knowledge of UniCredit. Figure 7 and 8 shows the structural change after the contract in IBM Ukraine and UniCredit. This change was conducted as a global project for a new account (contract) creation and a general coordination performed by the IBM Europe PMO. The transformation was made clear by establishing the new structure (both with local and external staff) and creating rules, policies and procedures and communicating the changes with stakeholders involved.
  • 13. 13 C11SP Strategic Project Management 2015/16 Figure 7: Sequence of major transformational structural steps. As a result of transformational changes Limited Liability Company IT Innovations Ukraine (ITIU) was created which is a 100% subsidiary of IBM in order to ensure delivery of strategic outsourcing (SO Delivery) project. However ITIU is a new portfolio developed not only to serve UniCredit but also to gain other accounts and add programmes to the new portfolio using the existing knowledge and experience. ITIU is designed to deliver professional IT & consulting services to customers, including optimization and utilization of IT systems, IT cost reduction and risk management especially to retail banking and financial services industry through expertise in building innovative solutions and capabilities for unlocking value in business performance. All activities of ITIU are executed in compliance with IBM values and IBM quality policy and framework and especially WWPMM guidelines for project and portfolio management.
  • 14. 14 C11SP Strategic Project Management 2015/16 UniCredit Top Management Business line 1 UniCredt Bank - Head Office Business line 2 Supporting divisions Branch 1 Branch 2 Branch 3 IT Division Sales network control division Logistics UniCredt Bank - - Regional sales network Local IT support Local IT support Local IT support IBM Ukraine Hardware Sales Delivery and support IBM Ukraine Hardware Sales Delivery and support IT outsourcing services IT Innovations (IBM Subsidiary) Global Technology Services Global Business Services PMO IT architects Hardware Networks IBM European centers of competence IBM Ukraine after 2011 IBM Ukraine before 2011 Subcontractor – regional support Figure 8: Structural changes in scope of the agreement between IBM Ukraine and UniCredit. Sequence of major transformational structural steps. As a result of changes described above, at the end of 2011 IBM Ukraine managed to create subsidiary structure with more than 150 qualified IT professionals (local and from knowledge centers in other European countries). This structure is a unique combination of global IBM knowledge in all the IT areas (both hardware and software) and is able to resolve IT related task of any difficulty. This is currently a unique offering and a business model in Ukrainian market that creates a strong competitive advantage. Benefits Identification and Mapping during Structural Change By outsourcing from ITIU, UniCredit planned to improve customer service, increase performance efficiency and lower operational risk across its country-wide network of nearly 400 branches. Francesco Pusateri, head of UniCredit's Global Banking Services Division (UniCredit Bank 2011) explained their benefits: “By outsourcing our information technology activities to IBM we are able to focus on our core business priorities while ensuring the best possible service to our customers. Leveraging IBM's technology assets and industry experience we are able to transform the way we work
  • 15. 15 C11SP Strategic Project Management 2015/16 and run our operations. This step is an important enhancement of UniCredit Group's strategy of concentrating on core business and cost optimization." Table 9 & Table 10 identifies the expected benefits for IBM and UniCredit from this strategic change. Tangible Benefits of IBM Tangible Benefits of UniCredit Increased profit – new log-term contract contract for 200M USD. Reduced operational costs (no need to keep idle expensive staff in periods of low activity), New market expansion, increased market share Guaranteed SLAs from IBM for IT services support – financial safety for the UniCredit Increased efficiency of the IT infrastructure – increased customers satisfaction Table 9: Expected Tangible Benefits of IBM & UniCredit. Intangible Benefits of IBM Intangible Benefits of UniCredit Strong competitive advantage – no equal rivals on the market Expertise from IBM Europe knowledge centers New possibilities for cross selling (Supply own hardware + offer own IT support services + offer own IT outsourcing services). Direct access to IBM technology and hardware support services Increased internal capability for other contracts More mature PM approach (using IBM methodology) – guarantee of relevant projects execution and strategic programs alignment New powerful replicable oursourcing model created that can be 'exported' to other UniCredit businesses. Table 10: Expected Intangible Benefits of IBM & UniCredit. Figure 11 presents an alignment of IBM strategy and expected outcomes of the conducted strategic change.
  • 16. 16 C11SP Strategic Project Management 2015/16 IBM Global Objectives IBM Ukraine Objectives Business ChangeEnablers Expansion in CIS Market Reduced Competitor Strength Increased Profits about 200 million USD Increased Employee Utilisation Long Term Contractual Relationship with UniCredit Transferring IBM Methologies in PM to ITIU Rotation of IBM Global experts to ITIU Creation of ITIU as a local center to serve IT outsourcing Embedded knowledge in IBM Global of IT outsourcing Demand for IT Support Services for IT infrastructure Demand for Hardware(Server- Equipment) produced by IBM Demand for big data and cloud based service in Ukraine Demand for IT Outsourcing services in banking industry of Ukraine Benefits Launched New Projects for UniCredit Increased internal capability for other contracts Increased customer satisfaction of UniCredit Reduced Operational Costs Qualified and experience staff of UniCredit to serve banks for IT outsourcing Increased trust in IT outsourcing recognized by banking industry Develop a new portfolio- Enter IT Outsourcing Market Leverage IBM Global Knowledge & Resources Increase market share in IT industry in Ukraine IBM Global Vision Create and Sell the Best computer hardware, software and IT services in the world Keep- increase market share in USA market Keep-increase share in European Market Exploit the external environment in Ukraine Figure 11: The alignment of IBM strategy and expected outcomes of the conducted strategic change.
  • 17. 17 C11SP Strategic Project Management 2015/16 Analysis From the business case described we can see that IBM implemented benefits management approach to manage the change at a strategic level and managed the related projects linking to the general strategy using benefits management ideology. The strategic change undertaken by IBM is supported by the fact that Unicredit's agreement with IBM represents a major milestone for outsourcing within the Commonwealth of Independent States region. It sets a new gold standard and a reference point for major Ukrainian and Russian financial enterprises seeking a more effective way of running large and expensive IT infrastructures under challenging economic conditions. IDC believes that “This important initiative will start a wider uptake of outsourcing services in the market," said Andrew Golovnykh, senior research analyst, IDC Ukraine (UniCredit Bank 2011). IBM also listed their expected benefits from this strategic change. IBM expected to enter a new market with a new offering in accordance with their global expansion strategy and took advantage of lack of competition in the market leveraging their existing knowledge in their global infrastructure. This move gave opportunities for cross selling as well for supply their own hardware and IT support at the same time. IBM also increased the utilization of their human resources by rotating their experts to transfer knowledge. ITIU offers a package that can serve to other banks like UniCredit and IBM is getting prepared to expand their portfolio by gaining new customers to serve under ITIU subsidiary. Since June 2015 IBM is also negotiating with Credit Agricole Group which can join ITIU portfolio. Also, IBM’s focus on its core big data and cloud-based services is one more strong competitive advantage on the background of the current political and economic situation in Ukraine. IBM’s internal guidelines (WWPMM) are in line with the literature of BM, as it provides a general managerial approach trying to achieve the strategic alignment of goals, managing the change process and creating a plan to ensure the benefit realization. Therefore, on the basis of the business case presented and the literature analysis, it is suggested that BM should be considered as a managerial concept which is concentrated mostly on achieving companies targets by aligning strategy and activities on programs and projects level. It is done through building sets of processes which help companies to identify benefits and organize planning and executing processes in order to deliver expected outcomes from projects and realize benefits. In this way, BM focuses not on operational management of a particular project, but on the identification of right benefits and realization of them by these pre-defined processes. Moreover, BM activities itself help to create the value as through strategic alignment of the programs and projects new opportunities are revealed and more focus on benefits tracking helps to increase productivity. Tracking of benefits is crucial in benefits realisation process, and companies use both qualitative and quantitative models to evaluate their benefits realisation depending on benefits classification.
  • 18. 18 C11SP Strategic Project Management 2015/16 Conclusion Benefits management process and benefits realisation monitoring and tracking is still being discussed by scholars and practitioners. This paper argued that a strategic change must be undertaken using benefits management as it helps the strategic alignment and tracks the realisatio n of benefits defined by different stakeholders. The case study from IBM Ukraine shows a structural strategic change in a global company. IBM methodology places great emphasis on Benefits Management, as a managerial concept. Therefore, during this specific change, IBM used their WWPMM guidelines with regards to the BM and tracked their benefits. It is clear that IBM classified their benefits and as their WWPMM guidelines suggested they used KPIs to track their tangible benefits. However, they also gave importance to intangible benefits and used frameworks and stakeholder approach to track intangible benefits and their realisation. This proves that companies that have structured guidelines and methodologies about project and programme management like IBM are already practising BM. This case also proves that benefits maps, hierarchies or dependency networks visualizes the strategic alignment during a change initiative and gives importance to the realisation of both intangible and tangible benefits. The evaluation process of benefits is complicated due to the variety of stakeholders involved and the difficulty of measurement when it comes to intangible benefits. Therefore “measurement” of intangible benefits is a limitation and should be researched and discussed further. The complex nature of benefits set a limit to quantify it. Defining the benefits according to stakeholders but not only according to the shareholders increases the complexity of intangible benefits. ‘Business as usual’ can discuss that quantifying benefits from shareholders’ point of view (focusing only on cost reduction and profit increase) is a simpler solution. However changing dynamics in the worlds’ economy and ecology prove that change initiatives require stronger stakeholder engagement and therefore more research on linking benefits management and stakeholder engagement is required, not only for non- profit but also for-profit organisations such as IBM. The economy in developing countries require an emergent approach to strategic change, and companies face strong external forces. These forces can also create opportunistic environment, like it created for IBM in Ukraine and companies in those cases need a process to handle the change and link it to the global vision. Benefits realisation is a process that could be beneficial for those companies that are in emerging environments and its use is expected to become wider as it allows to link the change initiative with vision, objectives and related project management activities.
  • 19. 19 C11SP Strategic Project Management 2015/16 References APM, 2009. Association for Project Management | The professional body for project management. Benefits Management. Available at: https://www.apm.org.uk/ [Accessed October 30, 2015]. Ashurst, C. & Hodges, J., Exploring Business Transformation: The Challenges of Developing a Benefits Realization Capability. Bank.gov.ua, 2008. National Bank of Ukraine. Available at: http://www.bank.gov.ua/control/en/index [Accessed October 29, 2015]. Barbara Farbey, F.L. and D.T., 1999. The moving staircase - Problems of appraisal and evaluation in a turbulent environment. Information Technology & People, 12(3), pp.238–252. Available at: http://proquest.umi.com/pqdweb?did=116356330&Fmt=7&clientId=65345&RQT=309&V Name=PQDnhttp://sfx.cranfield.ac.uk/cranfield?url_ver=Z39.88- 2004&rft_val_fmt=info:ofi/fmt:kev:mtx:journal&genre=article&sid=ProQ:ProQ%3Aabiglo bal&atitle=The+moving+staircase+-+. Bennington, Peter; Baccarini, D., 2004. Project benefits management in IT projects: An Australian perspective. Project Management Journal, 35(1), pp.20–30. Bradley, G., 2010. Benefit realisation management 1st ed., Farnham, Surrey, England: Gower Pub. Bradley, G., 2006. Benefit realisation management: A practical guide for achieving benefits through change, Aldershot, England; Burlington, VT: Gower. Breese, R. et al., 2015. Benefits management: Lost or found in translation. Breese, R., 2012. Benefits realisation management: Panacea or false dawn? International Journal of Project Management, 30(3), pp.341–351. Available at: http://www.sciencedirect.com/science/article/pii/S0263786311001128. Cooke-Davis, T., Crawford, L. & Lechler, T., 2009. Project management systems: Moving project managment from an operational to a strategic discipline. Project Management Journal, 40(1), pp.110–123. Available at: http://www.gowerpublishing.com/isbn/9780566088674. Doherty, N.F. et al., 2005. Towards an Integrated Approach to Benefits Realisation Management – Reflections from the Development of a Clinical Trials Support System. Electronic Journal of Information Systems Evaluation, 11(2), pp.83 – 90. IBM, 2015. IBM - United Kingdom. Available at: http://www.ibm.com/uk-en/ [Accessed October 29, 2015]. Jenner, S., 2009. Realising benefits from government ICT investment 1st ed., Reading, UK:
  • 20. 20 C11SP Strategic Project Management 2015/16 Academic Pub. International. Kerzner, H.R. & Learning, I.I. for, 2010. Project Management - Best Practices: Achieving Global Excellence, John Wiley & Sons. Available at: https://books.google.com/books?id=EcxO4CbHxJ8C&pgis=1 [Accessed October 28, 2015]. Lange, M., Mendling, J. & Recker, J., 2012. Realizing Benefits From Enterprise Architecture : a Measurement Model. Ecis 2012. Lappe, M. & Spang, K., 2014. Investments in project management are profitable: A case study- based analysis of the relationship between the costs and benefits of project management. JPMA, 32, pp.603–612. Lisa Dyer, Andrew Forget, Fahad Osmani, Jonas Zahn, I.R., 2013. Creating a BPM Center of Excellence (CoE). IBM Redbooks. Available at: https://books.google.co.uk/books?vid=ISBN:9780738450872&redir_esc=y [Accessed October 28, 2015]. Mir, F.A. & Pinnington, A.H., 2014. Exploring the value of project management: Linking Project Management Performance and Project Success. De Nova, 2009. De Novo (De Novo) - IT company, the national cloud services provider| Denovo | Kyiv | Ukraine. Available at: http://www.de-novo.biz/en/about-us/ [Accessed October 29, 2015]. Sanchez, H. & Robert, B., 2010. Measuring Portfolio Strategic Performance Using Key Performance Indicators. Project Management Journal, 41(5), pp.64–73. Sapountzis, S., Harris, K. & Kagioglou, M., 2008. Benefits Management and Benefits Realisation. , pp.1–73. Serra, C.E.M. & Kunc, M., 2015. Benefits Realisation Management and its influence on project success and on the execution of business strategies. JPMA, 33, pp.53–66. Thiry, M., 2002. Combining value and project management into an effective programme management model. International Journal of Project Management, 20(3), pp.221–227. Thomson, D.S. et al., 2011. The benefits quantification method: a practical approach to engaging stakeholders in the judgement of benefits realisation. 4th Annual Conference of the Health and Care Infrastructure Research and Innovation Centre, pp.224–243. Available at: https://dspace.lboro.ac.uk/dspace-jspui/handle/2134/9689. Thorp, J., 2003. The Information Paradox, Realizing the Bussiness Benefits of Information Technology. , p.191.
  • 21. 21 C11SP Strategic Project Management 2015/16 Tillmann, P. a, Tzortzopoulos, P. & Formoso, C.T., 2010. Analysing Benefits Realisation From a Theoretical Perspective and Its Contribution To Value Generation. 18th Annual Conference of the International Group for Lean Construction, pp.73–82. Tjernstrom, K., 2008. Benefits Management and its applicability in practice. IT -University of Goteborg, p.71. Too, E.G. & Weaver, P., 2013. The management of project management: A conceptual framework for project governance. International Journal of Project Management, 32(8), pp.1382–1394. UniCredit Bank, 2011. UniCredit Bank - PJSC «Ukrsotsbank» | IBM and Ukrsotsbank Ukraine Sign 10-year Services Agreement. Available at: https://en.unicredit.ua/news/view/350/ [Accessed October 29, 2015]. Wateridge, J., 1995. IT projects: a basis for success. International Journal of Project Management, 13(3), pp.169–172. Available at: http://www.sciencedirect.com/science/article/pii/026378639500020Q. Winter, M. et al., 2006. Directions for future research in project management: The main findings of a UK government-funded research network. International Journal of Project Management, 24(8), pp.638–649. Available at: http://linkinghub.elsevier.com/retrieve/pii/S0263786306001268. Yates, K. et al., 2009. BeReal benefits realisation model integrated approach: The built environment lifecycle and organisational views. HaCIRIC10, p.110. Available at: http://xn-- 2012- ue6f785ch13g.com/departments/cv/docs/HaCIRIC09_conf_proceedings.pdf#page=111.