Stm2 tc3 tc4 scope of work part 5

  1. 1. Siam  Toyota  Manufacturing  Co.,  Ltd       Project  STM2  –  TC3  &  TC4     Scope  of  Work   PCMC  Engineering  Co.,  Ltd  
  2. 2. STM  2  :  Key  Mile  Stone   PCMC  Engineering  Co.,  Ltd   •  Award  and  Sign  Contract     •  Detail  Engineering  Design    (1  month)   – Material  Approval  and  Shop  Drawing  Approval     •  Procurement  Process  and  Material  Delivery     •  PreparaNon  and  FabricaNon  Work   •  InstallaNon   •  Test  and  Commissioning   •  FAT    
  3. 3. STM  2  :  1st  Material  Delivery     PCMC  Engineering  Co.,  Ltd   Material Vendor Source Leadtime PDU Saiver Maylasia 8-10 Weeks Hitemp-Exhaust Fan GreenHeck   12-15 Weeks Duct Silencer Mason Acoustic Local 6-8 Weeks Smoke Damper GreenHeck     Exhaust Extraction Local Local 8 Week N2 Cylinder LPG Spain 12-15 Weeks Diaphragm Pump Debem   8 Week Gas Detector     8 Week Galvanized Steel Pipe     Ex-Stock Valve Crane, TA Local Ex-Stock Insulation Aeroflex Local Ex-Stock
  4. 4. STM  2  :  PDU,  Piping,  Duct  InstallaNon   PCMC  Engineering  Co.,  Ltd  
  5. 5. STM  2  :  PDU  and  Piping  InstallaNon   PCMC  Engineering  Co.,  Ltd  
  6. 6. STM  2  :  PDU  and  Piping  InstallaNon   PCMC  Engineering  Co.,  Ltd  
  7. 7. STM  2  :  Cooling  Piping  Work   PCMC  Engineering  Co.,  Ltd  
  8. 8. STM  2  :  Cooling  Piping  Work   PCMC  Engineering  Co.,  Ltd   1.  Site  Survey     2.  Support  and  Piping  FabricaNon   3.  Start  InstallaNon  aher  finish  AVL     Engine  Base  InstallaNon  
  9. 9. STM  2  :  Chilled  Piping  Work   PCMC  Engineering  Co.,  Ltd  
  10. 10. STM  2  :  Air-­‐Compressor  Piping  Work   PCMC  Engineering  Co.,  Ltd  
  11. 11. STM  2  :  Exhaust  ExtracNon  Work   PCMC  Engineering  Co.,  Ltd  
  12. 12. STM  2  :  N2  InstallaNon   PCMC  Engineering  Co.,  Ltd  
  13. 13. STM  2  :  N2  InstallaNon   PCMC  Engineering  Co.,  Ltd  
  14. 14. STM  2  :  Modify  APC-­‐03  and  04   PCMC  Engineering  Co.,  Ltd  

×