Spataro Engineering Presentation 1 
PRESENTATION 
Mechanical Engineering office: 
• Design and R&D, Project Management: 
Industrial automation and complex mechanical 
systems integrated with electro-pneumatic systems 
and fluid 
• Regulations consulting 
• Training courses 
New solutions with passion and creativity
Spataro Engineering Presentation 2 
CUSTOMERS 
• Automatic lines and bottling machineries Design and R&D, from 10 years: 
- Eurostar 
- Clifom 
- Fimer 
- Marmoinox : new body design and presentation http://youtu.be/Y-32wCf2DNI 
• Special industrial installations Design and Project Management, from 4 years: 
- Gruppo Autoequip 
- Gruppo Tozzi: solar panels cleaning system http://youtu.be/SUOC2Mg9EdA 
http://youtu.be/wSNjEQ4Nb_c 
• Study and analysis: 
- Dentistry University of Genova : prosthetic screws analysis http://youtu.be/CGPgKziSQbI
Spataro Engineering Presentation 3 
DESIGN AND R&D 
• Automatic lines and industrial machineries 
• Frames, bodies and cabins 
• Engines, handling and lifting systems 
• Rotating turrets, tanks, valves, distributions, etc.. Special machines and patents
Spataro Engineering Presentation 4 
PROJECT MANAGEMENT 
• Project feasibility study 
• Product cost analysis 
• WBS and Gant 
• Budget costs 
• PLOA: activities program and work organization with PROJECT
Spataro Engineering Presentation 5 
SOFTWARE 
• Solidworks 
• Proe e Creo 
• MsProject: projects / activities management in the contracts 
REGULATIONS 
• Machineries Directive 2006/42/CE: safe machine design, risks analysis 
• Eurocode 3: static and fatigue calculations, joints, welds, screws, prescriptions 
• Atex Directive 1999/92/CE: plants design in places with explosions risk 
TRAINING COURSE 
• Programs : https://www.dropbox.com/s/xfwx3axyg55yy8i/corsi_spat_eng.pdf?dl=0

Spataro Engineering Presentation

  • 1.
    Spataro Engineering Presentation1 PRESENTATION Mechanical Engineering office: • Design and R&D, Project Management: Industrial automation and complex mechanical systems integrated with electro-pneumatic systems and fluid • Regulations consulting • Training courses New solutions with passion and creativity
  • 2.
    Spataro Engineering Presentation2 CUSTOMERS • Automatic lines and bottling machineries Design and R&D, from 10 years: - Eurostar - Clifom - Fimer - Marmoinox : new body design and presentation http://youtu.be/Y-32wCf2DNI • Special industrial installations Design and Project Management, from 4 years: - Gruppo Autoequip - Gruppo Tozzi: solar panels cleaning system http://youtu.be/SUOC2Mg9EdA http://youtu.be/wSNjEQ4Nb_c • Study and analysis: - Dentistry University of Genova : prosthetic screws analysis http://youtu.be/CGPgKziSQbI
  • 3.
    Spataro Engineering Presentation3 DESIGN AND R&D • Automatic lines and industrial machineries • Frames, bodies and cabins • Engines, handling and lifting systems • Rotating turrets, tanks, valves, distributions, etc.. Special machines and patents
  • 4.
    Spataro Engineering Presentation4 PROJECT MANAGEMENT • Project feasibility study • Product cost analysis • WBS and Gant • Budget costs • PLOA: activities program and work organization with PROJECT
  • 5.
    Spataro Engineering Presentation5 SOFTWARE • Solidworks • Proe e Creo • MsProject: projects / activities management in the contracts REGULATIONS • Machineries Directive 2006/42/CE: safe machine design, risks analysis • Eurocode 3: static and fatigue calculations, joints, welds, screws, prescriptions • Atex Directive 1999/92/CE: plants design in places with explosions risk TRAINING COURSE • Programs : https://www.dropbox.com/s/xfwx3axyg55yy8i/corsi_spat_eng.pdf?dl=0