This document summarizes work done by Team 5 from April 10-12, 2014 on Study Area C. It includes measurements of existing dry weather flows in the area. The team identified potential community amenities for the site such as ponds, trails, and public art. Diagrams of the proposed site plan are included, showing features like cascading pools, waterfalls, and retention areas along Renziehausen Run. The total proposed retention capacity is 118,800 cubic feet.