TANA BALES SUGAR PROJECT
Arba Minch University, Water Resources and Irrigation Engineering
PROJECT-II ON SUGARCANE IRRIGATION SYSTEM AT TANA
BELES SUGAR DEVELOPMENT PROJECT
July,2021
Saturday, July 23, 2022
Saturday, July 23, 2022
INTRODUCTIO
N
DESCRIPTIONAND
LOCATIONof the
project
DESIGN
SPECIFICATION
OF IRRIGATION
SCHEMES
PROBLEM
IDENTIFICATIO
N
CONCLUSIONSAND
RECOMMENDATIONS
Content of presentation
 Sugar cane agriculture is the one share of Ethiopian agricultural economy.
As a result, the Ethiopian Sugar Corporation was established by
Government proclamation in the 2nd day of December 2010 to undertake
the responsibility of the entire Ethiopian Sugar sector development
 Accordingly Tana Beles Integrated Sugar Development Project is the one
among the new sugar development projects. According to the
government plan, the development of massive irrigation projects for
sugar production in different parts of the country is involved.
 Tana Beles Integrated Sugar Development Project is the one among the
new sugar development projects. According to the government plan, the
development of massive irrigation projects for sugar production in
different parts of the country is involved.
 Main Canal is approximately 30 Km and ends near Fendika Town from
where Trunk mains for Sprinkler Irrigation for Phase I & Phase II of Upper
Beles and Upper Ayma left side command areas, take off. 40% of its
length lies in rocky strata, 8.5% in filling and rest traverses through earth
Saturday, July 23, 2022
 The main canal is proposed to be lined, with concrete
bed and masonry sides with vertical water face, where
the rock is encountered and in the filled reaches. Where
the canal is in cutting in soils, trapezoidal sections with
1.2 mm thick HDPE film as geo membrane have been
adopted.
 The Primary canals will also be lined with 1.2 mm thick
HDPE film and masonry for gentle slope portion,
reinforced concrete where the canal section is chute
while the secondary canal is PVC pipe
 In case of Tana bales sugar projet irrigation system thare
are a lot of probems.
Saturday, July 23, 2022
 TanaBeles Integrated Sugar Development Project is located near Fandika Town, capitalof JawiWoreda,
which is 150km from capitalcity of Awi zone, Enjibara, 270km from capitalcity of Amhara National
Regional State Bahir dar.
 TanaBeles Integrated Sugar Development Project found in the western periphery of Amhara National
Regional State, and also found Benishangul Gumuz National Regional State, 60km from capitalcity of
metekel zone Gilgel Beles and300km from capitalcity of Benishangul Gumuz National Regional State
Asosa.
 The project activity started on the south from the weir site after 11.9km following the main canal for
Upper Beles and south eastern tip of Upper Ayma.
 Thesitehaslowtomediumreliefdifferenceswithan altituderangeof806to1242metersabovesealevel.
Saturday, July 23, 2022
Saturday, July 23, 2022
 Theproject area is located close to Pawe station, 30km from our project and canbe
characterized as warm humidclimate with mean annualhumidityreaching to 80 % .
 The maximum temperature fluctuating between 390C in April and 270C in July,while
the minimumtemperature variation is bounded between 160C (December) and 190C
(July).
 The mean annual rainfall around the irrigation scheme is represented by Pawi
station with mean annual rainfall of 1576mm (from 1986-2006)
Saturday, July 23, 2022
1. Design problem;
 Head work size (capacity) and stability
 Conveyance structures size, type and stability (Intake vs canal, geo membranecanal vslined canal)
 Study and design problem( land, air valves,)
 BOQ Lists problems (example: specification, hydraulic valve, drain valve,covers…
 Miss design of important works: (emergency spillway, drainage system, flow meter,
2. Constructionproblem
Common major constructionproblems ofTBISPare listed below:
◦ Inappropriate construction (below the design specification):
◦ Thedocument reality problem on the ground: (airvalve)
◦ Alignment problem
◦ Some valves on GRP pipe are without chamber block, these results after few
years the valve may damage because of water pressure and other animals,
flood etc
Saturday, July 23, 2022
Common major operational and Management problems of TBISP are listed below:
 care and maintenance gap( fittingdeficit, machinery, service etc
 Infieldwater managementgap ;
 servicingof materials(grease)and irrigationmonitoring problem(long time
irrigated)
 Crop growth stage(inall cane growth stages we use 24hr irrigationrotation
 Flushinggap of irrigationline
Saturday, July 23, 2022
Under sluice Gate: .
 TheMain Problems ofthis USG:
I. construction quality problem: it is constructed belowits concretegrade i.e. the recommendedcriteria is C-40
but for this case contractor only use C- 35, Nowa day this problem is solved. figure
II. Forthis undersluice there is noJip Crane for cleaning the gate
 Forthe case opening and closing activity it uses, metal rope Gate load capacity Below its load capacity
 All metals around the gate not painted anti rust
 At present time gates of under sluice can’t work properly because ofrust, this results siltation in canal.
HEAD REGULATOR:
This HR has also similar problem with under sluice
 corrosion problem Because ofthis problem,gates can notcontrol the water that enter into canal
Saturday, July 23, 2022
 Bar spacing problem
 Scouring problem
Saturday, July 23, 2022
The problemsofTBSDPMain canalarementionedbellow:
 Siltation problem
 Cutting of Geo-membrane problem
 Road problem near to the canal
Saturday, July 23, 2022
Infield managment problems
 applying water at uniform level irrespective of the soil, growth
stage, and growing month, It is not considered the system
actual water application and crop water requirement because of
no water measurement device
 Also there is problem of non-uniformity of water application,
Poor system operation, care and maintenance
 Water logging is the natural flooding and over irrigation that brings
water at underground levels to the surface. As a consequence,
displacement of the air occurs in the soil with corresponding changes
in soil processes and an accumulation of toxic substances that
impede plant groth.
 Field management is too poor and also irrigation material handling is
not good, i.e. at lateral line riser valve is not cover by precuts and
flexible hose not distributed properly
 The major Tana beles sugar project is no drainage networks.
Saturday, July 23, 2022
Saturday, July 23, 2022
The systemperformanceand sustainability isunder question:
 For Head workthe followingshould be fulfilled:
 steelropegate shouldbe changed by strongmetal
 Jeepcrean for USG
 the wholebody of HW SHOULDbe maintain
 For Main canalsthefollowingshouldbe fulfilled:
 canal cleaningscheduleshould beimplementedproperly (long rich escavator)
Road besidethe canal
Geomembrenecanal shouldbe changed to linedcanal
 For field sitethe followingshould be fulfilled:
Designand construct Drainagenetwork
Increase operationservice,careand maintenanceof the system
 The project should be give attention for the system leakage, breakage, hydrant valve clogging with debris and the lateral
elevationdifferencewhichcausepressurevariationalong lateral.
Saturday, July 23, 2022
o The current sprinkler irrigation scheduling under taken
by the project was not suit with the current actual water
application, also it is not considered the soil type,
growing month, stage of growth, Thus, improved
irrigation scheduling with respect to the soil, growing
month, stage of growth, and the existing actual water
application efficiency is very important
Saturday, July 23, 2022
Saturday, July 23, 2022

More Related Content

Similar to Solution of Irrigation problem.pptx

33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
Pablo Miguel Jurado
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
Sven Maedler
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site report
kalyani kadam
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
IESGATEWiz
 
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
Lloyd Farai Fende
 

Similar to Solution of Irrigation problem.pptx (20)

Yuhua 5-Year Master Plan (2016 -2020)
Yuhua 5-Year Master Plan (2016 -2020)Yuhua 5-Year Master Plan (2016 -2020)
Yuhua 5-Year Master Plan (2016 -2020)
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
PIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases IPIS Uyo - Ring Road Phases I
PIS Uyo - Ring Road Phases I
 
Pebbles II site report
Pebbles II site reportPebbles II site report
Pebbles II site report
 
Melamchi Water Supply Project
Melamchi Water Supply ProjectMelamchi Water Supply Project
Melamchi Water Supply Project
 
Final PPT.pptx
Final PPT.pptxFinal PPT.pptx
Final PPT.pptx
 
Quaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptxQuaid‑e‑Azam Solar Park 1.pptx
Quaid‑e‑Azam Solar Park 1.pptx
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptxFinal Compiled GM Presentation on 18.05.2022 Updated.pptx
Final Compiled GM Presentation on 18.05.2022 Updated.pptx
 
Deva and misgie454545
Deva and misgie454545Deva and misgie454545
Deva and misgie454545
 
Government project
Government projectGovernment project
Government project
 
Copia de case guri dam_venezuela (1)
Copia de case guri dam_venezuela (1)Copia de case guri dam_venezuela (1)
Copia de case guri dam_venezuela (1)
 
SV Ranganath's Lecture on Water Governance in Bangalore
SV Ranganath's Lecture on Water Governance in BangaloreSV Ranganath's Lecture on Water Governance in Bangalore
SV Ranganath's Lecture on Water Governance in Bangalore
 
Graham Port Plaza Emergency Repair
Graham Port Plaza Emergency RepairGraham Port Plaza Emergency Repair
Graham Port Plaza Emergency Repair
 
Graham Park Plaza Emergency Repair
Graham Park Plaza Emergency RepairGraham Park Plaza Emergency Repair
Graham Park Plaza Emergency Repair
 
Well completion and testing.pptx
Well completion and testing.pptxWell completion and testing.pptx
Well completion and testing.pptx
 
Slipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway DriveSlipline Replacement #2 - Waterway Drive
Slipline Replacement #2 - Waterway Drive
 
Life cycle of tarbella dam
Life cycle of tarbella dam Life cycle of tarbella dam
Life cycle of tarbella dam
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
15.PROJECT REPORT - UWSSRP1 - MASVINGO final draft
 

Recently uploaded

Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
PECB
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 

Recently uploaded (20)

Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 

Solution of Irrigation problem.pptx

  • 1. TANA BALES SUGAR PROJECT Arba Minch University, Water Resources and Irrigation Engineering PROJECT-II ON SUGARCANE IRRIGATION SYSTEM AT TANA BELES SUGAR DEVELOPMENT PROJECT July,2021 Saturday, July 23, 2022
  • 2. Saturday, July 23, 2022 INTRODUCTIO N DESCRIPTIONAND LOCATIONof the project DESIGN SPECIFICATION OF IRRIGATION SCHEMES PROBLEM IDENTIFICATIO N CONCLUSIONSAND RECOMMENDATIONS Content of presentation
  • 3.  Sugar cane agriculture is the one share of Ethiopian agricultural economy. As a result, the Ethiopian Sugar Corporation was established by Government proclamation in the 2nd day of December 2010 to undertake the responsibility of the entire Ethiopian Sugar sector development  Accordingly Tana Beles Integrated Sugar Development Project is the one among the new sugar development projects. According to the government plan, the development of massive irrigation projects for sugar production in different parts of the country is involved.  Tana Beles Integrated Sugar Development Project is the one among the new sugar development projects. According to the government plan, the development of massive irrigation projects for sugar production in different parts of the country is involved.  Main Canal is approximately 30 Km and ends near Fendika Town from where Trunk mains for Sprinkler Irrigation for Phase I & Phase II of Upper Beles and Upper Ayma left side command areas, take off. 40% of its length lies in rocky strata, 8.5% in filling and rest traverses through earth Saturday, July 23, 2022
  • 4.  The main canal is proposed to be lined, with concrete bed and masonry sides with vertical water face, where the rock is encountered and in the filled reaches. Where the canal is in cutting in soils, trapezoidal sections with 1.2 mm thick HDPE film as geo membrane have been adopted.  The Primary canals will also be lined with 1.2 mm thick HDPE film and masonry for gentle slope portion, reinforced concrete where the canal section is chute while the secondary canal is PVC pipe  In case of Tana bales sugar projet irrigation system thare are a lot of probems. Saturday, July 23, 2022
  • 5.  TanaBeles Integrated Sugar Development Project is located near Fandika Town, capitalof JawiWoreda, which is 150km from capitalcity of Awi zone, Enjibara, 270km from capitalcity of Amhara National Regional State Bahir dar.  TanaBeles Integrated Sugar Development Project found in the western periphery of Amhara National Regional State, and also found Benishangul Gumuz National Regional State, 60km from capitalcity of metekel zone Gilgel Beles and300km from capitalcity of Benishangul Gumuz National Regional State Asosa.  The project activity started on the south from the weir site after 11.9km following the main canal for Upper Beles and south eastern tip of Upper Ayma.  Thesitehaslowtomediumreliefdifferenceswithan altituderangeof806to1242metersabovesealevel. Saturday, July 23, 2022
  • 7.  Theproject area is located close to Pawe station, 30km from our project and canbe characterized as warm humidclimate with mean annualhumidityreaching to 80 % .  The maximum temperature fluctuating between 390C in April and 270C in July,while the minimumtemperature variation is bounded between 160C (December) and 190C (July).  The mean annual rainfall around the irrigation scheme is represented by Pawi station with mean annual rainfall of 1576mm (from 1986-2006) Saturday, July 23, 2022
  • 8. 1. Design problem;  Head work size (capacity) and stability  Conveyance structures size, type and stability (Intake vs canal, geo membranecanal vslined canal)  Study and design problem( land, air valves,)  BOQ Lists problems (example: specification, hydraulic valve, drain valve,covers…  Miss design of important works: (emergency spillway, drainage system, flow meter, 2. Constructionproblem Common major constructionproblems ofTBISPare listed below: ◦ Inappropriate construction (below the design specification): ◦ Thedocument reality problem on the ground: (airvalve) ◦ Alignment problem ◦ Some valves on GRP pipe are without chamber block, these results after few years the valve may damage because of water pressure and other animals, flood etc Saturday, July 23, 2022
  • 9. Common major operational and Management problems of TBISP are listed below:  care and maintenance gap( fittingdeficit, machinery, service etc  Infieldwater managementgap ;  servicingof materials(grease)and irrigationmonitoring problem(long time irrigated)  Crop growth stage(inall cane growth stages we use 24hr irrigationrotation  Flushinggap of irrigationline Saturday, July 23, 2022
  • 10. Under sluice Gate: .  TheMain Problems ofthis USG: I. construction quality problem: it is constructed belowits concretegrade i.e. the recommendedcriteria is C-40 but for this case contractor only use C- 35, Nowa day this problem is solved. figure II. Forthis undersluice there is noJip Crane for cleaning the gate  Forthe case opening and closing activity it uses, metal rope Gate load capacity Below its load capacity  All metals around the gate not painted anti rust  At present time gates of under sluice can’t work properly because ofrust, this results siltation in canal. HEAD REGULATOR: This HR has also similar problem with under sluice  corrosion problem Because ofthis problem,gates can notcontrol the water that enter into canal Saturday, July 23, 2022
  • 11.  Bar spacing problem  Scouring problem Saturday, July 23, 2022
  • 12. The problemsofTBSDPMain canalarementionedbellow:  Siltation problem  Cutting of Geo-membrane problem  Road problem near to the canal Saturday, July 23, 2022
  • 13. Infield managment problems  applying water at uniform level irrespective of the soil, growth stage, and growing month, It is not considered the system actual water application and crop water requirement because of no water measurement device  Also there is problem of non-uniformity of water application, Poor system operation, care and maintenance  Water logging is the natural flooding and over irrigation that brings water at underground levels to the surface. As a consequence, displacement of the air occurs in the soil with corresponding changes in soil processes and an accumulation of toxic substances that impede plant groth.  Field management is too poor and also irrigation material handling is not good, i.e. at lateral line riser valve is not cover by precuts and flexible hose not distributed properly  The major Tana beles sugar project is no drainage networks. Saturday, July 23, 2022
  • 15. The systemperformanceand sustainability isunder question:  For Head workthe followingshould be fulfilled:  steelropegate shouldbe changed by strongmetal  Jeepcrean for USG  the wholebody of HW SHOULDbe maintain  For Main canalsthefollowingshouldbe fulfilled:  canal cleaningscheduleshould beimplementedproperly (long rich escavator) Road besidethe canal Geomembrenecanal shouldbe changed to linedcanal  For field sitethe followingshould be fulfilled: Designand construct Drainagenetwork Increase operationservice,careand maintenanceof the system  The project should be give attention for the system leakage, breakage, hydrant valve clogging with debris and the lateral elevationdifferencewhichcausepressurevariationalong lateral. Saturday, July 23, 2022
  • 16. o The current sprinkler irrigation scheduling under taken by the project was not suit with the current actual water application, also it is not considered the soil type, growing month, stage of growth, Thus, improved irrigation scheduling with respect to the soil, growing month, stage of growth, and the existing actual water application efficiency is very important Saturday, July 23, 2022