The document summarizes Svitlana Volkova's presentation on link prediction in social networks. The presentation covers: introducing link prediction and related studies; the methodology including mathematical representations and similarity measures; planned experiments crawling Facebook and using visualization tools; and conclusions on approaches to predicting previously unobserved links. Key approaches discussed are supervised vs. unsupervised methods, and similarity measures for node-wise link prediction.