SlideShare a Scribd company logo
SMART Story


SMART’s collaboration solutions enable 02
to work better, connected.
                                           The challenge                            The solution

                                           O2’s business case is built around       O2 decided to investigate interactive
                                           realising efficiencies, improving time   technologies The decision was
                                           to market and reducing costs for the     taken to trial SMART Technologies’
                                           business. The company has multiple       collaboration solutions and five
                                           offices throughout the UK and            SMART Board™ interactive
                                           headquarters in Slough where it also     whiteboards were installed across
                                           has two other offices. With frequent     the Leeds and Slough sites. The
                                           travel between the Slough and Leeds      SMART Boards network using
                                           locations, the company realised the      Bridgit™ conferencing software,
                                           setup had to change.                     allowing people in any location to
                                                                                    join a data conference, use touch
                                           “We decided to amalgamate the            screen commands, write in digital ink
                                           three Slough offices into one location   over any application, generate and
“We can set up a conference                accommodating 2,200 people,”             integrate data, share desktops and
 in less than three minutes and            explains Alan Parkin, programme          write and save notes immediately.
 SMART’s collaboration technology          manager, infrastructure design and
 fits perfectly with our mantras           delivery. “We recognised that uniting    “We can set up a conference in less
 of “walk up and use” and “three           disparate teams and improving inter-     than three minutes and SMART’s
 touches and go. It really is that         departmental collaboration was           collaboration technology fits perfectly
 simple.”                                  central to delivering an outstanding     with our mantras of “walk up and
                                           customer experience. And the             use” and “three touches and go,”
Alan Parkin, programme manager,            infrastructure to support this would     says Alan. “It really is that simple.”
infrastructure design and delivery, O2     be critical to success.”
                                                                                    The pilot was so successful that
With 29,000 employees across               Previously, all meeting rooms            almost all of the 47 meeting rooms
the group servicing 45.8 million           contained a conference phone and         in the new Slough office will have a
fixed and mobile customers across          flip chart, but projectors had to be     SMART Board and the boardroom
Europe, O2 combines sophisticated          booked through reception and a           will have two SMART Podiums
voice and data products that help          great deal of time was wasted simply     (formerly the Sympodium interactive
people get more out of their lives.        ‘setting up’. With only 47 meeting       pen display). Every floor will also
SMART’s collaboration technology           rooms - half the number previously       have one or more SMART Boards
provides O2 with much the same             available - the new Slough site          in ‘Our Space’ areas for impromptu
benefit, translating into more time,       demanded a more productive and           meetings. Road shows are planned
less travel and reduced costs. Uniting     collaborative working environment.       to demonstrate the capabilities of the
disparate teams and enabling them          A smooth and timely transition           technology and designated “shapers”
to collaborate effectively regardless of   between meetings would be essential      from each directorate will cascade
location, SMART’s technology wholly        to ensure that the new office has the    output from monthly meetings.
supports O2’s ethos that “we’re            meeting room capacity to support         Supported by user-guide booklets, a
better, connected.”                        operational needs.                       self-help intranet portal has also been
                                                                                    developed to help users get the most
                                                                                    from the new technology.
also enabling the team to complete
                                                                                                                   the project three months ahead of
                                                                                                                   schedule.

                                                                                                                   The future

                                                                                                                   “The impact of SMART’s collaboration
                                                                                                                   technology has been so significant
                                                                                                                   that we plan to install SMART Boards
                                                                                                                   in our Leeds, Bury, Preston Brook
                                                                                                                   and Glasgow call centres, as well
                                                                                                                   as rolling it out to offices across the
                                                                                                                   UK,” concludes Alan. “Our training
                                                                                                                   department also recognises the
                                                                                                                   potential to train staff using the
                                                                                                                   SMART Boards, reducing travel and
                                                                                                                   costs whilst improving productivity.
                                                                                                                   I have no doubt that embracing
                                                                                                                   SMART’s technology to drive change
                                                                                                                   in our meeting and training culture
                                                                                                                   will prove transformational for the O2
                                                                                                                   business.”



                                                                                                                  “The reduction in travel, time
                                                                                                                   and associated costs is quite
                                                                                                                   staggering. The senior team has
                                                                                                                   gained a day a month in time and,
The results                                                                                                        as no one has to travel, the overall
                                                                                                                   productivity of the team is greatly
It has been estimated that if 25% of                     “The reduction in travel, time and                        enhanced. It’s a win-win situation
O2 staff used SMART solutions to                         associated costs is quite staggering,”                    for everyone.”
conduct meetings, the company could                      says Alan. “The senior team has
save up to £15,000 a week. The                           gained a day a month in time and,                         Alan Parkin, programme manager,
savings would be realised through                        as no one has to travel, the overall                      infrastructure design and delivery, O2
reduced travel between their Leeds                       productivity of the team is greatly
and Slough offices.                                      enhanced. It’s a win-win situation for
                                                         everyone.”
Alan’s own infrastructure design
and delivery team of more than 30                        Location is no longer a barrier to
people use the SMART technology to                       collaboration and a similar pattern is
generate significant efficiencies from                   being adopted by teams across the
their monthly meetings. Previously,                      O2 business. For three weeks, one
the meeting had to take place on two                     project team of eight people had
separate days - one in the North and                     been trying to meet to approve a
one in the South - with presenters                       design spec but diaries simply would                      Steljes Ltd
travelling to both meetings and team                     not coordinate. Using the SMART                           exclusive UK and Ireland distributor for
members to their respective areas.                       solutions to collaborate between                          SMART Technologies
This meeting is now conducted on                         Leeds and Slough, the work was                            info@steljes.co.uk
one day, involving the entire team                       completed within half an hour, not                        08450 724 800
simultaneously via the SMART Board.                      only saving time and money but                            www.steljes.co.uk/solutions/corporate




Copyright 2009 Steljes Limited. All rights reserved. No part of this publication may be reproduced without prior permission. E&OE. Prices correct at time of going to
press and exclude VAT and delivery. All trademarks and copyrights and herein acknowledged. SJ/27071

More Related Content

Similar to SMART Case Study - O2

SMART o2 case study
SMART o2 case studySMART o2 case study
SMART o2 case study
Steljes
 
IBSECAD case study
IBSECAD case studyIBSECAD case study
IBSECAD case study
Steljes
 
SMART Kensington and Chelsea case study
SMART Kensington and Chelsea case studySMART Kensington and Chelsea case study
SMART Kensington and Chelsea case study
Steljes
 
Workplace-of-the-Future
Workplace-of-the-FutureWorkplace-of-the-Future
Workplace-of-the-Future
Oscar Kessen
 
CAME Group Spa
CAME Group SpaCAME Group Spa
CAME Group Spa
Cisco Case Studies
 
Knowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case StudyKnowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case Study
Manal Rayess
 
Modernizing Our Data Platform
Modernizing Our Data PlatformModernizing Our Data Platform
Modernizing Our Data Platform
accenture
 
Cloud computing
Cloud computingCloud computing
Making a Pain-free Migration to Unified Communications
Making a Pain-free Migration to Unified CommunicationsMaking a Pain-free Migration to Unified Communications
Making a Pain-free Migration to Unified Communications
ReadWrite
 
The Technology Enabled Workplace_White Paper
The Technology Enabled Workplace_White PaperThe Technology Enabled Workplace_White Paper
The Technology Enabled Workplace_White Paper
JBrisk
 
Estuate helps major wireless telecom save tens of millions
Estuate helps major wireless telecom save tens of millionsEstuate helps major wireless telecom save tens of millions
Estuate helps major wireless telecom save tens of millions
Estuate, Inc.
 
Software ag gts case study
Software ag gts case studySoftware ag gts case study
Software ag gts case study
GTS_Central_Europe
 
Shrebo Case Study
Shrebo Case StudyShrebo Case Study
Shrebo Case Study
VMware Tanzu
 
Uc&C First Tuesday Bergen Apr 2009 Final
Uc&C First Tuesday Bergen Apr 2009 FinalUc&C First Tuesday Bergen Apr 2009 Final
Uc&C First Tuesday Bergen Apr 2009 Final
Lars Sverre Gjølme
 
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
Microsoft Private Cloud
 
Boon Edam
Boon EdamBoon Edam
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
Task Train
 
Oracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrysOracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrys
Satya Harish
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubro
Shray Jali
 
Modernizing our data platform
Modernizing our data platformModernizing our data platform
Modernizing our data platform
accenture
 

Similar to SMART Case Study - O2 (20)

SMART o2 case study
SMART o2 case studySMART o2 case study
SMART o2 case study
 
IBSECAD case study
IBSECAD case studyIBSECAD case study
IBSECAD case study
 
SMART Kensington and Chelsea case study
SMART Kensington and Chelsea case studySMART Kensington and Chelsea case study
SMART Kensington and Chelsea case study
 
Workplace-of-the-Future
Workplace-of-the-FutureWorkplace-of-the-Future
Workplace-of-the-Future
 
CAME Group Spa
CAME Group SpaCAME Group Spa
CAME Group Spa
 
Knowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case StudyKnowledge Management in Organizations: Case Study
Knowledge Management in Organizations: Case Study
 
Modernizing Our Data Platform
Modernizing Our Data PlatformModernizing Our Data Platform
Modernizing Our Data Platform
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 
Making a Pain-free Migration to Unified Communications
Making a Pain-free Migration to Unified CommunicationsMaking a Pain-free Migration to Unified Communications
Making a Pain-free Migration to Unified Communications
 
The Technology Enabled Workplace_White Paper
The Technology Enabled Workplace_White PaperThe Technology Enabled Workplace_White Paper
The Technology Enabled Workplace_White Paper
 
Estuate helps major wireless telecom save tens of millions
Estuate helps major wireless telecom save tens of millionsEstuate helps major wireless telecom save tens of millions
Estuate helps major wireless telecom save tens of millions
 
Software ag gts case study
Software ag gts case studySoftware ag gts case study
Software ag gts case study
 
Shrebo Case Study
Shrebo Case StudyShrebo Case Study
Shrebo Case Study
 
Uc&C First Tuesday Bergen Apr 2009 Final
Uc&C First Tuesday Bergen Apr 2009 FinalUc&C First Tuesday Bergen Apr 2009 Final
Uc&C First Tuesday Bergen Apr 2009 Final
 
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
Microsoft Windows Azure - Archetype a Professional Services Company Conserves...
 
Boon Edam
Boon EdamBoon Edam
Boon Edam
 
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
Remote Work Revolutionized_ TaskTrain's Role in Maximizing Virtual Team Advan...
 
Oracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrysOracle EBS Ss technology transformation_energizes_integrys
Oracle EBS Ss technology transformation_energizes_integrys
 
Larsen & toubro
Larsen & toubroLarsen & toubro
Larsen & toubro
 
Modernizing our data platform
Modernizing our data platformModernizing our data platform
Modernizing our data platform
 

SMART Case Study - O2

  • 1. SMART Story SMART’s collaboration solutions enable 02 to work better, connected. The challenge The solution O2’s business case is built around O2 decided to investigate interactive realising efficiencies, improving time technologies The decision was to market and reducing costs for the taken to trial SMART Technologies’ business. The company has multiple collaboration solutions and five offices throughout the UK and SMART Board™ interactive headquarters in Slough where it also whiteboards were installed across has two other offices. With frequent the Leeds and Slough sites. The travel between the Slough and Leeds SMART Boards network using locations, the company realised the Bridgit™ conferencing software, setup had to change. allowing people in any location to join a data conference, use touch “We decided to amalgamate the screen commands, write in digital ink three Slough offices into one location over any application, generate and “We can set up a conference accommodating 2,200 people,” integrate data, share desktops and in less than three minutes and explains Alan Parkin, programme write and save notes immediately. SMART’s collaboration technology manager, infrastructure design and fits perfectly with our mantras delivery. “We recognised that uniting “We can set up a conference in less of “walk up and use” and “three disparate teams and improving inter- than three minutes and SMART’s touches and go. It really is that departmental collaboration was collaboration technology fits perfectly simple.” central to delivering an outstanding with our mantras of “walk up and customer experience. And the use” and “three touches and go,” Alan Parkin, programme manager, infrastructure to support this would says Alan. “It really is that simple.” infrastructure design and delivery, O2 be critical to success.” The pilot was so successful that With 29,000 employees across Previously, all meeting rooms almost all of the 47 meeting rooms the group servicing 45.8 million contained a conference phone and in the new Slough office will have a fixed and mobile customers across flip chart, but projectors had to be SMART Board and the boardroom Europe, O2 combines sophisticated booked through reception and a will have two SMART Podiums voice and data products that help great deal of time was wasted simply (formerly the Sympodium interactive people get more out of their lives. ‘setting up’. With only 47 meeting pen display). Every floor will also SMART’s collaboration technology rooms - half the number previously have one or more SMART Boards provides O2 with much the same available - the new Slough site in ‘Our Space’ areas for impromptu benefit, translating into more time, demanded a more productive and meetings. Road shows are planned less travel and reduced costs. Uniting collaborative working environment. to demonstrate the capabilities of the disparate teams and enabling them A smooth and timely transition technology and designated “shapers” to collaborate effectively regardless of between meetings would be essential from each directorate will cascade location, SMART’s technology wholly to ensure that the new office has the output from monthly meetings. supports O2’s ethos that “we’re meeting room capacity to support Supported by user-guide booklets, a better, connected.” operational needs. self-help intranet portal has also been developed to help users get the most from the new technology.
  • 2. also enabling the team to complete the project three months ahead of schedule. The future “The impact of SMART’s collaboration technology has been so significant that we plan to install SMART Boards in our Leeds, Bury, Preston Brook and Glasgow call centres, as well as rolling it out to offices across the UK,” concludes Alan. “Our training department also recognises the potential to train staff using the SMART Boards, reducing travel and costs whilst improving productivity. I have no doubt that embracing SMART’s technology to drive change in our meeting and training culture will prove transformational for the O2 business.” “The reduction in travel, time and associated costs is quite staggering. The senior team has gained a day a month in time and, The results as no one has to travel, the overall productivity of the team is greatly It has been estimated that if 25% of “The reduction in travel, time and enhanced. It’s a win-win situation O2 staff used SMART solutions to associated costs is quite staggering,” for everyone.” conduct meetings, the company could says Alan. “The senior team has save up to £15,000 a week. The gained a day a month in time and, Alan Parkin, programme manager, savings would be realised through as no one has to travel, the overall infrastructure design and delivery, O2 reduced travel between their Leeds productivity of the team is greatly and Slough offices. enhanced. It’s a win-win situation for everyone.” Alan’s own infrastructure design and delivery team of more than 30 Location is no longer a barrier to people use the SMART technology to collaboration and a similar pattern is generate significant efficiencies from being adopted by teams across the their monthly meetings. Previously, O2 business. For three weeks, one the meeting had to take place on two project team of eight people had separate days - one in the North and been trying to meet to approve a one in the South - with presenters design spec but diaries simply would Steljes Ltd travelling to both meetings and team not coordinate. Using the SMART exclusive UK and Ireland distributor for members to their respective areas. solutions to collaborate between SMART Technologies This meeting is now conducted on Leeds and Slough, the work was info@steljes.co.uk one day, involving the entire team completed within half an hour, not 08450 724 800 simultaneously via the SMART Board. only saving time and money but www.steljes.co.uk/solutions/corporate Copyright 2009 Steljes Limited. All rights reserved. No part of this publication may be reproduced without prior permission. E&OE. Prices correct at time of going to press and exclude VAT and delivery. All trademarks and copyrights and herein acknowledged. SJ/27071