SlideShare a Scribd company logo
L3 CMP Games Design – Group 2
SIMS Concept Schedule


               Monday                   Tuesday             Wednesday                Thursday         Friday           Saturday         Sunday
               AM PM              EVE   AM      PM    EVE   AM PM              EVE   AM PM      EVE   AM PM      EVE   AM PM      EVE   AM PM    EVE
w/b 30.01.12        Start               Made the
                    Designing           Lightbot’s
                    Lightbot            head.
                    looked at
                    what the
                    Lightbot
                    looks like.
w/b 06.02.12        Made the            Made the
                    arm and             Lightbot’s
                    leg joints          Arms and
                    for the             Legs.
                    Lightbot.
w/b 13.02.12        Adjust the          Make the                 Start the
                    size of the         Hand of                  College
                    Joints or           the                      Modelling
                    the Arms            Lightbot.                Assignment.
                    and Legs to                                  Decided to
                    get them                                     Model the
                    into                                         college
                    proportion.                                  Foyer and
                                                                 the
                                                                 Canteen.
w/b 20.02.12
H/T
w/b 27.02.12        Making the          Get all the
                    Lightbot’s          pieces of
                    feet and            the
                    the Light           Lightbot
                    bulb that           into
                    goes in its         proportion,
                    head.               put all the
                                        pieces
                                        together
                                        and upload
                                        to Moodle.
w/b 05.03.12        Started             Started                                                          DL 01
                    Measuring           making the
                    up key              Foyer in
                    parts of            Modeler.
                    the Foyer.
w/b 12.03.12        Measured            Got
                    up things           everything
                    on the wall         into
                    and started         proportion.
                    developing
those.
w/b 19.03.12             Edit the            Finish the                         Start the                     Measure
                         Foyer               Foyer                              Canteen                       Everything
                                                                                                              in there.
w/b 26.03.12             Start               Continue                           Finish the                                           DL 02
                         Developing          on the                             Canteen.
                         the                 Canteen
                         Canteen


      Harry’s Sessions

      Self-Directed

      Other Sessions

Task 1 - Outline
Choose and commit to model two areas
Produce Schedule – include LightBot overrun and new Deadline.
List any problems you might have that you need to take into account – Modeller skills, time management etc.
Start production log.

Task 2 - Plan
Shoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word
document.
Schedule in review sessions.

Task3 - Respond
Build the two objects in stages – be careful not to focus on just one or parts of one.
Plan out the production carefully – break it up into chunks.

Task 4 - Review
Write an evaluation of your project. Leave enough time for this before the deadline.
You can’t fully evaluate the work until the project is finished and presented.
L3 CMP Games Design – Group 2
SIMS Concept Schedule


               Monday                   Tuesday             Wednesday                Thursday         Friday           Saturday         Sunday
               AM PM              EVE   AM      PM    EVE   AM PM              EVE   AM PM      EVE   AM PM      EVE   AM PM      EVE   AM PM    EVE
w/b 30.01.12        Start               Made the
                    Designing           Lightbot’s
                    Lightbot            head.
                    looked at
                    what the
                    Lightbot
                    looks like.
w/b 06.02.12        Made the            Made the
                    arm and             Lightbot’s
                    leg joints          Arms and
                    for the             Legs.
                    Lightbot.
w/b 13.02.12        Adjust the          Make the                 Start the
                    size of the         Hand of                  College
                    Joints or           the                      Modelling
                    the Arms            Lightbot.                Assignment.
                    and Legs to                                  Decided to
                    get them                                     Model the
                    into                                         college
                    proportion.                                  Foyer and
                                                                 the
                                                                 Canteen.
w/b 20.02.12
H/T
w/b 27.02.12        Making the          Get all the
                    Lightbot’s          pieces of
                    feet and            the
                    the Light           Lightbot
                    bulb that           into
                    goes in its         proportion,
                    head.               put all the
                                        pieces
                                        together
                                        and upload
                                        to Moodle.
w/b 05.03.12        Started             Started                                                          DL 01
                    Measuring           making the
                    up key              Foyer in
                    parts of            Modeler.
                    the Foyer.
w/b 12.03.12        Measured            Got
                    up things           everything
                    on the wall         into
                    and started         proportion.
                    developing
those.
w/b 19.03.12            Edit the     Finish the   Start the    Measure
                        Foyer        Foyer        Canteen      Everything
                                                               in there.
w/b 26.03.12            Start        Continue     Finish the                DL 02
                        Developing   on the       Canteen.
                        the          Canteen
                        Canteen


     Harry’s Sessions

     Self-Directed

     Other Sessions
L3 CMP Games Design – Group 2
SIMS Concept Schedule


               Monday                   Tuesday             Wednesday                Thursday         Friday           Saturday         Sunday
               AM PM              EVE   AM      PM    EVE   AM PM              EVE   AM PM      EVE   AM PM      EVE   AM PM      EVE   AM PM    EVE
w/b 30.01.12        Start               Made the
                    Designing           Lightbot’s
                    Lightbot            head.
                    looked at
                    what the
                    Lightbot
                    looks like.
w/b 06.02.12        Made the            Made the
                    arm and             Lightbot’s
                    leg joints          Arms and
                    for the             Legs.
                    Lightbot.
w/b 13.02.12        Adjust the          Make the                 Start the
                    size of the         Hand of                  College
                    Joints or           the                      Modelling
                    the Arms            Lightbot.                Assignment.
                    and Legs to                                  Decided to
                    get them                                     Model the
                    into                                         college
                    proportion.                                  Foyer and
                                                                 the
                                                                 Canteen.
w/b 20.02.12
H/T
w/b 27.02.12        Making the          Get all the
                    Lightbot’s          pieces of
                    feet and            the
                    the Light           Lightbot
                    bulb that           into
                    goes in its         proportion,
                    head.               put all the
                                        pieces
                                        together
                                        and upload
                                        to Moodle.
w/b 05.03.12        Started             Started                                                          DL 01
                    Measuring           making the
                    up key              Foyer in
                    parts of            Modeler.
                    the Foyer.
w/b 12.03.12        Measured            Got
                    up things           everything
                    on the wall         into
                    and started         proportion.
                    developing
those.
w/b 19.03.12            Edit the     Continue   Continue     Finish
                        Foyer        editing    editing      Foyer
                                     Foyer      Foyer.
                                                             Start
                                                             Measuring
                                                             the
                                                             Canteen.
w/b 26.03.12            Start        Continue   Finish the               DL 02
                        Developing   on the     Canteen.
                        the          Canteen
                        Canteen


     Harry’s Sessions

     Self-Directed

     Other Sessions
L3 CMP Games Design – Group 2
SIMS Concept Schedule


               Monday                   Tuesday             Wednesday                Thursday         Friday           Saturday         Sunday
               AM PM              EVE   AM      PM    EVE   AM PM              EVE   AM PM      EVE   AM PM      EVE   AM PM      EVE   AM PM    EVE
w/b 30.01.12        Start               Made the
                    Designing           Lightbot’s
                    Lightbot            head.
                    looked at
                    what the
                    Lightbot
                    looks like.
w/b 06.02.12        Made the            Made the
                    arm and             Lightbot’s
                    leg joints          Arms and
                    for the             Legs.
                    Lightbot.
w/b 13.02.12        Adjust the          Make the                 Start the
                    size of the         Hand of                  College
                    Joints or           the                      Modelling
                    the Arms            Lightbot.                Assignment.
                    and Legs to                                  Decided to
                    get them                                     Model the
                    into                                         college
                    proportion.                                  Foyer and
                                                                 the
                                                                 Canteen.
w/b 20.02.12
H/T
w/b 27.02.12        Making the          Get all the
                    Lightbot’s          pieces of
                    feet and            the
                    the Light           Lightbot
                    bulb that           into
                    goes in its         proportion,
                    head.               put all the
                                        pieces
                                        together
                                        and upload
                                        to Moodle.
w/b 05.03.12        Started             Started                                                          DL 01
                    Measuring           making the
                    up key              Foyer in
                    parts of            Modeler.
                    the Foyer.
w/b 12.03.12        Measured            Got
                    up things           everything
                    on the wall         into
                    and started         proportion.
                    developing
those.
w/b 19.03.12            Edit the     Continue   Continue   Finish
                        Foyer        editing    editing    Foyer
                                     Foyer      Foyer.
                                                           Start
                                                           Measuring
                                                           the
                                                           Canteen.
w/b 26.03.12            Start        Continue              Finish the   DL 02
                        Developing   on the                Canteen.
                        the          Canteen
                        Canteen


     Harry’s Sessions

     Self-Directed

     Other Sessions

More Related Content

Viewers also liked

Redesign of a Solar LED based Street Light
Redesign of a Solar LED based Street LightRedesign of a Solar LED based Street Light
Redesign of a Solar LED based Street Light
Vaibhav Bakhshi
 
Successful Disruption: how to be the disruptor not disrupted
Successful Disruption: how to be the disruptor not disruptedSuccessful Disruption: how to be the disruptor not disrupted
Successful Disruption: how to be the disruptor not disrupted
Andy Ng
 
Sultan C.V
Sultan C.VSultan C.V
Sultan C.V
SULTAN SAIF
 
20000 leagues under the sea
20000 leagues under the sea20000 leagues under the sea
20000 leagues under the sea
ani2208
 
National foods
National foodsNational foods
National foods
ivid1990
 
Sociology introduction
Sociology introductionSociology introduction
Sociology introduction
utpal sharma
 
Introduction to sociology
Introduction to sociologyIntroduction to sociology
Introduction to sociology
Amarveer Mehta
 
Directing
DirectingDirecting
6LoWPAN: An Open IoT Networking Protocol
6LoWPAN: An Open IoT Networking Protocol6LoWPAN: An Open IoT Networking Protocol
6LoWPAN: An Open IoT Networking Protocol
Samsung Open Source Group
 
Anterolateral Ligament (ALL)
Anterolateral Ligament (ALL)Anterolateral Ligament (ALL)
Anterolateral Ligament (ALL)
Alan M. Hirahara, M.D., FRCSC
 
Antigen antibody systems
Antigen antibody systemsAntigen antibody systems
Antigen antibody systems
Nabeela Basha
 
Presentation behavioral sciences
Presentation behavioral sciencesPresentation behavioral sciences
Presentation behavioral sciences
9.0 Niner Review Center
 
Week 4 Drug addiction, dopamine, and liking vs. wanting
Week 4 Drug addiction, dopamine, and liking vs. wantingWeek 4 Drug addiction, dopamine, and liking vs. wanting
Week 4 Drug addiction, dopamine, and liking vs. wanting
Ubaldo Niña
 

Viewers also liked (13)

Redesign of a Solar LED based Street Light
Redesign of a Solar LED based Street LightRedesign of a Solar LED based Street Light
Redesign of a Solar LED based Street Light
 
Successful Disruption: how to be the disruptor not disrupted
Successful Disruption: how to be the disruptor not disruptedSuccessful Disruption: how to be the disruptor not disrupted
Successful Disruption: how to be the disruptor not disrupted
 
Sultan C.V
Sultan C.VSultan C.V
Sultan C.V
 
20000 leagues under the sea
20000 leagues under the sea20000 leagues under the sea
20000 leagues under the sea
 
National foods
National foodsNational foods
National foods
 
Sociology introduction
Sociology introductionSociology introduction
Sociology introduction
 
Introduction to sociology
Introduction to sociologyIntroduction to sociology
Introduction to sociology
 
Directing
DirectingDirecting
Directing
 
6LoWPAN: An Open IoT Networking Protocol
6LoWPAN: An Open IoT Networking Protocol6LoWPAN: An Open IoT Networking Protocol
6LoWPAN: An Open IoT Networking Protocol
 
Anterolateral Ligament (ALL)
Anterolateral Ligament (ALL)Anterolateral Ligament (ALL)
Anterolateral Ligament (ALL)
 
Antigen antibody systems
Antigen antibody systemsAntigen antibody systems
Antigen antibody systems
 
Presentation behavioral sciences
Presentation behavioral sciencesPresentation behavioral sciences
Presentation behavioral sciences
 
Week 4 Drug addiction, dopamine, and liking vs. wanting
Week 4 Drug addiction, dopamine, and liking vs. wantingWeek 4 Drug addiction, dopamine, and liking vs. wanting
Week 4 Drug addiction, dopamine, and liking vs. wanting
 

Similar to Sims Schedule Sample

Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12
cassie_coyne
 
Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12
cassie_coyne
 
Task 1 powerpoint
Task 1 powerpointTask 1 powerpoint
Task 1 powerpoint
Cameron321
 
Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312
davidsharples11
 
Schedule 200312
Schedule 200312Schedule 200312
Schedule 200312
davidsharples11
 
Character Model schedule
Character Model scheduleCharacter Model schedule
Character Model schedule
AkiTenshi
 

Similar to Sims Schedule Sample (6)

Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12Sims schedule_sample group1_13/03/12
Sims schedule_sample group1_13/03/12
 
Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12Sims schedule_group1_13.03.12
Sims schedule_group1_13.03.12
 
Task 1 powerpoint
Task 1 powerpointTask 1 powerpoint
Task 1 powerpoint
 
Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312Sims schedule sample_completedgroup2_130312
Sims schedule sample_completedgroup2_130312
 
Schedule 200312
Schedule 200312Schedule 200312
Schedule 200312
 
Character Model schedule
Character Model scheduleCharacter Model schedule
Character Model schedule
 

More from Jason

Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013
Jason
 
Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013
Jason
 
Fmp production log_15th_may_2013
Fmp production log_15th_may_2013Fmp production log_15th_may_2013
Fmp production log_15th_may_2013
Jason
 
Fmp production log_8th_may_2013
Fmp production log_8th_may_2013Fmp production log_8th_may_2013
Fmp production log_8th_may_2013
Jason
 
Fmp production log_1st_may_2013
Fmp production log_1st_may_2013Fmp production log_1st_may_2013
Fmp production log_1st_may_2013
Jason
 
Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013
Jason
 
Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013
Jason
 
Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013
Jason
 
Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013
Jason
 
Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013
Jason
 
Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013
Jason
 
Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013
Jason
 
Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013
Jason
 
Final project schedule 22nd may 2013
Final project schedule 22nd may 2013Final project schedule 22nd may 2013
Final project schedule 22nd may 2013
Jason
 
Final project schedule 15th may 2013
Final project schedule 15th may 2013Final project schedule 15th may 2013
Final project schedule 15th may 2013
Jason
 
Final project schedule 8th may 2013
Final project schedule 8th may 2013Final project schedule 8th may 2013
Final project schedule 8th may 2013
Jason
 
Production log e6 9 november
Production log e6 9 novemberProduction log e6 9 november
Production log e6 9 november
Jason
 
Production log e6 7 december
Production log e6 7 decemberProduction log e6 7 december
Production log e6 7 december
Jason
 
Production log e6 30 november
Production log e6 30 novemberProduction log e6 30 november
Production log e6 30 november
Jason
 
Production log e6 26 october
Production log e6 26 octoberProduction log e6 26 october
Production log e6 26 october
Jason
 

More from Jason (20)

Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013Fmp production log_6th_mar_2013
Fmp production log_6th_mar_2013
 
Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013Fmp production log_22nd_may_2013
Fmp production log_22nd_may_2013
 
Fmp production log_15th_may_2013
Fmp production log_15th_may_2013Fmp production log_15th_may_2013
Fmp production log_15th_may_2013
 
Fmp production log_8th_may_2013
Fmp production log_8th_may_2013Fmp production log_8th_may_2013
Fmp production log_8th_may_2013
 
Fmp production log_1st_may_2013
Fmp production log_1st_may_2013Fmp production log_1st_may_2013
Fmp production log_1st_may_2013
 
Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013Fmp production log_24th_apr_2013
Fmp production log_24th_apr_2013
 
Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013Fmp production log_17th_apr_2013
Fmp production log_17th_apr_2013
 
Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013Fmp production log_10th_apr_2013
Fmp production log_10th_apr_2013
 
Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013Fmp production log_3rd_apr_2013
Fmp production log_3rd_apr_2013
 
Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013Fmp production log_27th_mar_2013
Fmp production log_27th_mar_2013
 
Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013Fmp production log_20th_mar_2013
Fmp production log_20th_mar_2013
 
Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013Fmp production log_13th_mar_2013
Fmp production log_13th_mar_2013
 
Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013Fmp production log_27th_feb_2013
Fmp production log_27th_feb_2013
 
Final project schedule 22nd may 2013
Final project schedule 22nd may 2013Final project schedule 22nd may 2013
Final project schedule 22nd may 2013
 
Final project schedule 15th may 2013
Final project schedule 15th may 2013Final project schedule 15th may 2013
Final project schedule 15th may 2013
 
Final project schedule 8th may 2013
Final project schedule 8th may 2013Final project schedule 8th may 2013
Final project schedule 8th may 2013
 
Production log e6 9 november
Production log e6 9 novemberProduction log e6 9 november
Production log e6 9 november
 
Production log e6 7 december
Production log e6 7 decemberProduction log e6 7 december
Production log e6 7 december
 
Production log e6 30 november
Production log e6 30 novemberProduction log e6 30 november
Production log e6 30 november
 
Production log e6 26 october
Production log e6 26 octoberProduction log e6 26 october
Production log e6 26 october
 

Recently uploaded

_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
_7 OTT App Builders to Support the Development of Your Video Applications_.pdf_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
Mega P
 
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
mul1kv5w
 
Authenticity in Motion Pictures: How Steve Greisen Retains Real Stories
Authenticity in Motion Pictures: How Steve Greisen Retains Real StoriesAuthenticity in Motion Pictures: How Steve Greisen Retains Real Stories
Authenticity in Motion Pictures: How Steve Greisen Retains Real Stories
Steve Greisen
 
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
9u08k0x
 
240529_Teleprotection Global Market Report 2024.pdf
240529_Teleprotection Global Market Report 2024.pdf240529_Teleprotection Global Market Report 2024.pdf
240529_Teleprotection Global Market Report 2024.pdf
Madhura TBRC
 
Young Tom Selleck: A Journey Through His Early Years and Rise to Stardom
Young Tom Selleck: A Journey Through His Early Years and Rise to StardomYoung Tom Selleck: A Journey Through His Early Years and Rise to Stardom
Young Tom Selleck: A Journey Through His Early Years and Rise to Stardom
greendigital
 
Snoopy boards the big bow wow musical __
Snoopy boards the big bow wow musical __Snoopy boards the big bow wow musical __
Snoopy boards the big bow wow musical __
catcabrera
 
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
0md20cgg
 
Barbie Movie Review - The Astras.pdfffff
Barbie Movie Review - The Astras.pdfffffBarbie Movie Review - The Astras.pdfffff
Barbie Movie Review - The Astras.pdfffff
theastras43
 
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
greendigital
 
Meet Dinah Mattingly – Larry Bird’s Partner in Life and Love
Meet Dinah Mattingly – Larry Bird’s Partner in Life and LoveMeet Dinah Mattingly – Larry Bird’s Partner in Life and Love
Meet Dinah Mattingly – Larry Bird’s Partner in Life and Love
get joys
 
This Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I MadeThis Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I Made
Aarush Ghate
 
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdfMatt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
Azura Everhart
 
DIGIDEVTV A New area of OTT Distribution
DIGIDEVTV  A New area of OTT DistributionDIGIDEVTV  A New area of OTT Distribution
DIGIDEVTV A New area of OTT Distribution
joeqsm
 
Modern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
Modern Radio Frequency Access Control Systems: The Key to Efficiency and SafetyModern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
Modern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
AITIX LLC
 
I Know Dino Trivia: Part 3. Test your dino knowledge
I Know Dino Trivia: Part 3. Test your dino knowledgeI Know Dino Trivia: Part 3. Test your dino knowledge
I Know Dino Trivia: Part 3. Test your dino knowledge
Sabrina Ricci
 
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
9u08k0x
 
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting SagaThe Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
greendigital
 
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptxFrom Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
Swing Street Radio
 
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docxThe Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
Xtreame HDTV
 

Recently uploaded (20)

_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
_7 OTT App Builders to Support the Development of Your Video Applications_.pdf_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
_7 OTT App Builders to Support the Development of Your Video Applications_.pdf
 
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
原版制作(Mercer毕业证书)摩斯大学毕业证在读证明一模一样
 
Authenticity in Motion Pictures: How Steve Greisen Retains Real Stories
Authenticity in Motion Pictures: How Steve Greisen Retains Real StoriesAuthenticity in Motion Pictures: How Steve Greisen Retains Real Stories
Authenticity in Motion Pictures: How Steve Greisen Retains Real Stories
 
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
高仿(nyu毕业证书)美国纽约大学毕业证文凭毕业证原版一模一样
 
240529_Teleprotection Global Market Report 2024.pdf
240529_Teleprotection Global Market Report 2024.pdf240529_Teleprotection Global Market Report 2024.pdf
240529_Teleprotection Global Market Report 2024.pdf
 
Young Tom Selleck: A Journey Through His Early Years and Rise to Stardom
Young Tom Selleck: A Journey Through His Early Years and Rise to StardomYoung Tom Selleck: A Journey Through His Early Years and Rise to Stardom
Young Tom Selleck: A Journey Through His Early Years and Rise to Stardom
 
Snoopy boards the big bow wow musical __
Snoopy boards the big bow wow musical __Snoopy boards the big bow wow musical __
Snoopy boards the big bow wow musical __
 
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
定制(uow毕业证书)卧龙岗大学毕业证文凭学位证书原版一模一样
 
Barbie Movie Review - The Astras.pdfffff
Barbie Movie Review - The Astras.pdfffffBarbie Movie Review - The Astras.pdfffff
Barbie Movie Review - The Astras.pdfffff
 
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
The Evolution of the Leonardo DiCaprio Haircut: A Journey Through Style and C...
 
Meet Dinah Mattingly – Larry Bird’s Partner in Life and Love
Meet Dinah Mattingly – Larry Bird’s Partner in Life and LoveMeet Dinah Mattingly – Larry Bird’s Partner in Life and Love
Meet Dinah Mattingly – Larry Bird’s Partner in Life and Love
 
This Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I MadeThis Is The First All Category Quiz That I Made
This Is The First All Category Quiz That I Made
 
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdfMatt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
Matt Rife Cancels Shows Due to Health Concerns, Reschedules Tour Dates.pdf
 
DIGIDEVTV A New area of OTT Distribution
DIGIDEVTV  A New area of OTT DistributionDIGIDEVTV  A New area of OTT Distribution
DIGIDEVTV A New area of OTT Distribution
 
Modern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
Modern Radio Frequency Access Control Systems: The Key to Efficiency and SafetyModern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
Modern Radio Frequency Access Control Systems: The Key to Efficiency and Safety
 
I Know Dino Trivia: Part 3. Test your dino knowledge
I Know Dino Trivia: Part 3. Test your dino knowledgeI Know Dino Trivia: Part 3. Test your dino knowledge
I Know Dino Trivia: Part 3. Test your dino knowledge
 
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
哪里买(osu毕业证书)美国俄勒冈州立大学毕业证双学位证书原版一模一样
 
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting SagaThe Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
The Unbelievable Tale of Dwayne Johnson Kidnapping: A Riveting Saga
 
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptxFrom Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
From Swing Music to Big Band Fame_ 5 Iconic Artists.pptx
 
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docxThe Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
The Ultimate Guide to Setting Up Eternal IPTV on Your Devices.docx
 

Sims Schedule Sample

  • 1. L3 CMP Games Design – Group 2 SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE w/b 30.01.12 Start Made the Designing Lightbot’s Lightbot head. looked at what the Lightbot looks like. w/b 06.02.12 Made the Made the arm and Lightbot’s leg joints Arms and for the Legs. Lightbot. w/b 13.02.12 Adjust the Make the Start the size of the Hand of College Joints or the Modelling the Arms Lightbot. Assignment. and Legs to Decided to get them Model the into college proportion. Foyer and the Canteen. w/b 20.02.12 H/T w/b 27.02.12 Making the Get all the Lightbot’s pieces of feet and the the Light Lightbot bulb that into goes in its proportion, head. put all the pieces together and upload to Moodle. w/b 05.03.12 Started Started DL 01 Measuring making the up key Foyer in parts of Modeler. the Foyer. w/b 12.03.12 Measured Got up things everything on the wall into and started proportion. developing
  • 2. those. w/b 19.03.12 Edit the Finish the Start the Measure Foyer Foyer Canteen Everything in there. w/b 26.03.12 Start Continue Finish the DL 02 Developing on the Canteen. the Canteen Canteen Harry’s Sessions Self-Directed Other Sessions Task 1 - Outline Choose and commit to model two areas Produce Schedule – include LightBot overrun and new Deadline. List any problems you might have that you need to take into account – Modeller skills, time management etc. Start production log. Task 2 - Plan Shoot reference imagery and textures, make measurements and draw diagrams – Include this in your production log – either directly blogged or within a PowerPoint presentation / Word document. Schedule in review sessions. Task3 - Respond Build the two objects in stages – be careful not to focus on just one or parts of one. Plan out the production carefully – break it up into chunks. Task 4 - Review Write an evaluation of your project. Leave enough time for this before the deadline. You can’t fully evaluate the work until the project is finished and presented.
  • 3. L3 CMP Games Design – Group 2 SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE w/b 30.01.12 Start Made the Designing Lightbot’s Lightbot head. looked at what the Lightbot looks like. w/b 06.02.12 Made the Made the arm and Lightbot’s leg joints Arms and for the Legs. Lightbot. w/b 13.02.12 Adjust the Make the Start the size of the Hand of College Joints or the Modelling the Arms Lightbot. Assignment. and Legs to Decided to get them Model the into college proportion. Foyer and the Canteen. w/b 20.02.12 H/T w/b 27.02.12 Making the Get all the Lightbot’s pieces of feet and the the Light Lightbot bulb that into goes in its proportion, head. put all the pieces together and upload to Moodle. w/b 05.03.12 Started Started DL 01 Measuring making the up key Foyer in parts of Modeler. the Foyer. w/b 12.03.12 Measured Got up things everything on the wall into and started proportion. developing
  • 4. those. w/b 19.03.12 Edit the Finish the Start the Measure Foyer Foyer Canteen Everything in there. w/b 26.03.12 Start Continue Finish the DL 02 Developing on the Canteen. the Canteen Canteen Harry’s Sessions Self-Directed Other Sessions
  • 5. L3 CMP Games Design – Group 2 SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE w/b 30.01.12 Start Made the Designing Lightbot’s Lightbot head. looked at what the Lightbot looks like. w/b 06.02.12 Made the Made the arm and Lightbot’s leg joints Arms and for the Legs. Lightbot. w/b 13.02.12 Adjust the Make the Start the size of the Hand of College Joints or the Modelling the Arms Lightbot. Assignment. and Legs to Decided to get them Model the into college proportion. Foyer and the Canteen. w/b 20.02.12 H/T w/b 27.02.12 Making the Get all the Lightbot’s pieces of feet and the the Light Lightbot bulb that into goes in its proportion, head. put all the pieces together and upload to Moodle. w/b 05.03.12 Started Started DL 01 Measuring making the up key Foyer in parts of Modeler. the Foyer. w/b 12.03.12 Measured Got up things everything on the wall into and started proportion. developing
  • 6. those. w/b 19.03.12 Edit the Continue Continue Finish Foyer editing editing Foyer Foyer Foyer. Start Measuring the Canteen. w/b 26.03.12 Start Continue Finish the DL 02 Developing on the Canteen. the Canteen Canteen Harry’s Sessions Self-Directed Other Sessions
  • 7. L3 CMP Games Design – Group 2 SIMS Concept Schedule Monday Tuesday Wednesday Thursday Friday Saturday Sunday AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE AM PM EVE w/b 30.01.12 Start Made the Designing Lightbot’s Lightbot head. looked at what the Lightbot looks like. w/b 06.02.12 Made the Made the arm and Lightbot’s leg joints Arms and for the Legs. Lightbot. w/b 13.02.12 Adjust the Make the Start the size of the Hand of College Joints or the Modelling the Arms Lightbot. Assignment. and Legs to Decided to get them Model the into college proportion. Foyer and the Canteen. w/b 20.02.12 H/T w/b 27.02.12 Making the Get all the Lightbot’s pieces of feet and the the Light Lightbot bulb that into goes in its proportion, head. put all the pieces together and upload to Moodle. w/b 05.03.12 Started Started DL 01 Measuring making the up key Foyer in parts of Modeler. the Foyer. w/b 12.03.12 Measured Got up things everything on the wall into and started proportion. developing
  • 8. those. w/b 19.03.12 Edit the Continue Continue Finish Foyer editing editing Foyer Foyer Foyer. Start Measuring the Canteen. w/b 26.03.12 Start Continue Finish the DL 02 Developing on the Canteen. the Canteen Canteen Harry’s Sessions Self-Directed Other Sessions