The document summarizes the reconstruction and maintenance of Spurr Road over 6 years from 1995 to 2001. The 3.5km road was reconstructed in October 1995 with gravel and stabilized with claycrete. It received little maintenance for the first 2 years. Nuclear density testing showed that after 6 years of use, the road structure and running surface were not diminished and there were no corrugations, demonstrating the durability of the reconstruction method.