ABSTRACT
• About 60% of all buildings in Mumbai are 50-60 years old and are in a
dilapidated state. Redevelopment becomes necessary for such societies and
sometimes inevitable due to BMC directions on Structural Safety and repairs
of old buildings.
• Over the last decade, it has been seen that redevelopment projects often face
problems; out of approximately 6,000 society buildings where redevelopment
is feasible, more than 70 per cent are stuck because of some unscrupulous
builders.
• To avoid such problem, one solution is Self-redevelopment, where the society
members take charge of the project, with the help of a project management
consultant.
DILAPIDATED STRUCTURE
DEMOLITION
REDEVELOPED
PROBLEM STATEMENT
• Most societies prefer to redevelop their buildings through the Builders so
that they can get temporary accommodation, corpus and peaceful and timely
possession. But the time has shown that said route possesses the following
problems :
1
• Builder selection and negotiation is time consuming.
2
• The best offer providing developers will not necessarily be a well financed and timely
executor.
3
• Allegations of Corrupt practices and underhand dealings.
4
• Builders take liberty and change Building Plans, for their vested interests.
5
• Original members remain at the mercy of Builders for completing their Building and
possession only stays a dream.
6
• Builders tend to usurp and sell common spaces like parking, terrace, etc.
7
• Sometimes the builders also stop paying rents to the tenants and quality of construction
is often substandard.
PROBLEM STATEMENT
• There were no Laid
down guidelines and /or
Firm procedures
declared.
• Builders took advantage
of the situation offering
unrealistic schemes.
• Many have lost precious
life time savings.
• Being Penny Wise and
Pound Foolish.
WHAT IS SELF – REDEVELOPMENT?
• Self Redevelopment is a redevelopment done by society itself. In opting for
self-redevelopment, housing societies can apply for loans from banks to
finance the redevelopment of their homes and then, they can appoint an
independent contractor to carry out the work to their specifications.
• This effectively cuts out developers from the process, thereby ensuring that the
profits remain within the society and they are able to track the pace and quality
of construction closely.
• Self-Redevelopment of Society buildings can
be conducted easily & successfully, with proper
planning and strategy, after keeping confidence
and by taking help of experienced and relevant
Professional Consultants of the field.
ADVANTAGES OF SELF - REDEVELOPMENT
1 • Permanent "Corpus Fund" in the Balance Sheet of a Society.
2 • Extra corpus also lowers down maintenance bills of the society members.
3 • Surplus sale area can be generated for sale in open market.
4 • Free Sale Flats can be purchased by the original members on actual cost.
5 • Merging of flats is possible if members want so.
6 • The building Plans will be as per members requirement and will not be changed.
7 • Issue of Free Parking spaces can be solved.
8 • Members may use their discretion to install in house facilities & amenities.
9 • Common Spaces cannot be sold and under-hand dealings can be avoided.
CHALLENGES OF SELF - REDEVELOPMENT
1
• Issue of Finance, for Construction Cost for Self-Redevelopment.
2
• Society need to deal with many departments.
3
• Needs Time, Inclination, Money & Energy (T.I.M.E.)
4
• Needs “24 x 7 x 365” Professional Back-up.
5
• Not all society members have the necessary expertise or the adequate time
to go and approach various agencies and appoint various consultants.
ROLE OF A PMC
• As a CHS initiates the process of redevelopment of its property, the first legal
requirement it needs to fulfill in terms of the relevant circular of the
department of co-operation (circular 79(a)) is the appointment of a PMC.
1
• Carrying out structural audit
2
• Preparation of financial feasibility report.
3
• Preparation of tender to invite offers from contractors.
4
• Preparation of comparative chart of contractors.
5
• Finalization of contractor on the basis evaluation of bids with the help
of society members
6
• Preparation of development agreement
ROLE OF A PMC
7
• Finalization of building plans as per members requirement
8
• Arranging for the funds from the Bank/ NBFC’S
9
• Vacating the building after the contractor obtains the necessary
permission.
10
• Supervision of demolition and reconstruction of the new building.
11
• Possession and occupation of the new building.
12
• Obtain as built drawings & original documents and hand it over to the
society
13
• Project closure and repayment of funds
• Mumbai District Central CO-OP Bank will provide funds and required
deposit amount to the flat owners.
• Loan sanctioned by Mumbai bank is 85% of the total project cost or
maximum 50 CR or as per techno economic viability.
• The financial participation of the society shall be necessary up to 15% of the
project cost.
• The project cost = cost of TDR, construction cost, architect, BMC, PMC fees,
rent payable, rent relocation charges, cost of fungible FSI, and reimbursement
of expenses required for various permissions from the government authorities,
interest amount of project loan calculated on the basis of cash flow, expenses
towards rainwater harvesting, installation of solar system, CCTV camera and
other costs related to the project.
• Interest rate of the loan is minimum 12.5% per annum further decided after
carrying out the risk assessment of the project.
SCHEME OF SELF REDEVELOPMENT IN MAHARASHTRA
• It shall be necessary for the society to execute English mortgage of all the
assets/properties, building, premises and the expenditure require for the same
shall be incurred by the society.
• For this reason, MHADA and BMC officials will form a single-window
system which will speed up the process of getting permissions & approvals.
• The flat owners can choose any architect, consultant & contractors as per their
choice.
• After doing compliance of documents regarding the loan after loan approval
as well as after mortgaging society property in the name of bank through
registered documents the Mumbai bank shall release the loan.
• The total tenure of the loan that the society takes from Mumbai bank shall be
for 7 years out of which 2 years shall be moratorium period.
• It is not mandatory to pay interest during the moratorium period.
Review by society, Economic analysis for rate of return,
Payback period, capital recovery
Society’s request for
further study of project
Society authorizes project, selects project delivery
method and appoints various consultants
Society abandons
project
Society’s need for redevelopment
Appoint PMC and request for project study
Conceptual configurations and alternatives for technical feasibility.
Development of cost and schedule for each alternative
Final design of project. Detailed drawing, written
specifications and preparation of contract document
Approvals, premiums and deposits.
Obtain IOD, C.C and register the project under RERA
PROCESS OF SELF REDEVELOPMENT
Procurement of bulk materials, special
equipment, construction contracts
Construction contractors administration
of contracts for physical work in place
Project closeout, quality testing, inspection,
as built drawings
Assisting society in encashment of sale flats
Repayment of funds borrowed
Obtaining finances for Self-redevelopment
Approvals, premiums and deposits.
Obtain IOD, C.C and register the project under RERA
THANK YOU
Ar. Kirti Jain, M.Arch (Project Management)
Email Id. ar.kirtijain@gmail.com / kirtijain3010@gmail.com

More Related Content

What's hot

SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA
SLUM REDEVELOPMENT PROCESS MUMBAI  MAHARASHTRA INDIA ASIA SLUM REDEVELOPMENT PROCESS MUMBAI  MAHARASHTRA INDIA ASIA
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA
sunil seth kakkad
 
Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973
Ar Vikram Singh
 
Building redevelopment referencer 27-09-2015-protected
Building redevelopment referencer   27-09-2015-protectedBuilding redevelopment referencer   27-09-2015-protected
Building redevelopment referencer 27-09-2015-protected
spandane
 
13 development agreement - precautions to be taken by the society
13   development agreement - precautions to be taken by the society13   development agreement - precautions to be taken by the society
13 development agreement - precautions to be taken by the society
spandane
 
Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)
Piyali Parashari
 
Presentation on Redevelopment
Presentation on RedevelopmentPresentation on Redevelopment
Presentation on Redevelopment
Nuzrul Islam Nahid
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
Aditya Sanyal
 
Building bye laws, acts, rules and regulations
Building bye  laws, acts, rules and regulationsBuilding bye  laws, acts, rules and regulations
Building bye laws, acts, rules and regulations
Abhishek kumar maurya
 
Architects professional liability
Architects professional liabilityArchitects professional liability
Architects professional liability
Aditi Garg
 
06 formation of redevelopment committee
06   formation of redevelopment committee06   formation of redevelopment committee
06 formation of redevelopment committee
spandane
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
IOSR Journals
 
Rera ppt
Rera pptRera ppt
The architects act, 1972
The architects act, 1972The architects act, 1972
The architects act, 1972
Pranay Kumar Tode
 
Professional practise
Professional practiseProfessional practise
Professional practise
Anupama Krishnan
 
Types of contract
Types of contractTypes of contract
Types of contract
HarshalNarkhede7
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in India
Krittika Walia
 
Rera act 2016 ppt final
Rera act 2016 ppt finalRera act 2016 ppt final
Rera act 2016 ppt final
Manoj Pandit
 
Valuation - professional prractice and valuation
Valuation - professional prractice and valuationValuation - professional prractice and valuation
Valuation - professional prractice and valuation
Kavin Raval
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
Yash Patel
 
3.2 Maharashtra regional town planning act
3.2 Maharashtra regional town planning act3.2 Maharashtra regional town planning act
3.2 Maharashtra regional town planning act
Sachin PatiL
 

What's hot (20)

SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA
SLUM REDEVELOPMENT PROCESS MUMBAI  MAHARASHTRA INDIA ASIA SLUM REDEVELOPMENT PROCESS MUMBAI  MAHARASHTRA INDIA ASIA
SLUM REDEVELOPMENT PROCESS MUMBAI MAHARASHTRA INDIA ASIA
 
Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973Uttar Pradesh Urban Planning and Development Act- 1973
Uttar Pradesh Urban Planning and Development Act- 1973
 
Building redevelopment referencer 27-09-2015-protected
Building redevelopment referencer   27-09-2015-protectedBuilding redevelopment referencer   27-09-2015-protected
Building redevelopment referencer 27-09-2015-protected
 
13 development agreement - precautions to be taken by the society
13   development agreement - precautions to be taken by the society13   development agreement - precautions to be taken by the society
13 development agreement - precautions to be taken by the society
 
Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)Real Estate Regulation Act, India (RERA)
Real Estate Regulation Act, India (RERA)
 
Presentation on Redevelopment
Presentation on RedevelopmentPresentation on Redevelopment
Presentation on Redevelopment
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Building bye laws, acts, rules and regulations
Building bye  laws, acts, rules and regulationsBuilding bye  laws, acts, rules and regulations
Building bye laws, acts, rules and regulations
 
Architects professional liability
Architects professional liabilityArchitects professional liability
Architects professional liability
 
06 formation of redevelopment committee
06   formation of redevelopment committee06   formation of redevelopment committee
06 formation of redevelopment committee
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
Rera ppt
Rera pptRera ppt
Rera ppt
 
The architects act, 1972
The architects act, 1972The architects act, 1972
The architects act, 1972
 
Professional practise
Professional practiseProfessional practise
Professional practise
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Role of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in IndiaRole of Indian Institute of Architects as a professional body in India
Role of Indian Institute of Architects as a professional body in India
 
Rera act 2016 ppt final
Rera act 2016 ppt finalRera act 2016 ppt final
Rera act 2016 ppt final
 
Valuation - professional prractice and valuation
Valuation - professional prractice and valuationValuation - professional prractice and valuation
Valuation - professional prractice and valuation
 
Fidic contract
Fidic contract Fidic contract
Fidic contract
 
3.2 Maharashtra regional town planning act
3.2 Maharashtra regional town planning act3.2 Maharashtra regional town planning act
3.2 Maharashtra regional town planning act
 

Similar to Self Redevelopment of Housing Society

Add on Project.pptx
Add on Project.pptxAdd on Project.pptx
Add on Project.pptx
KartikS19
 
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Loay Ghazaleh MBA, BSc Civil Eng.
 
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
Saurabh
 
UC Real Estate Professional Development: Financing Tools
UC Real Estate Professional Development: Financing ToolsUC Real Estate Professional Development: Financing Tools
UC Real Estate Professional Development: Financing Tools
The Port
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
Axay Sharma
 
Introduction to soft landings 2
Introduction to soft landings 2Introduction to soft landings 2
Introduction to soft landings 2
Marie Orritt
 
15 Annual General Meeting
15 Annual General Meeting15 Annual General Meeting
15 Annual General Meeting
Namgay Tshering
 
Financing Small Mixed Use Projects
Financing Small Mixed Use ProjectsFinancing Small Mixed Use Projects
Financing Small Mixed Use Projects
Angela Vincent, AICP
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
Timun Loh
 
1. Introduction to Project Finance.pptx
1. Introduction to Project Finance.pptx1. Introduction to Project Finance.pptx
1. Introduction to Project Finance.pptx
VbsReddy2
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methods
Nitin Kumar
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
R.R.G.S Bandara
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in ppp
ChhabiYadav2
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
Abadit Tadesse
 
Business banking unit6
Business banking unit6Business banking unit6
Business banking unit6
UNBFS
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
Water Design-Build Council
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
ssuser5fc1e7
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projects
Dr Naim R Kidwai
 
C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie baker
Housing Assistance Council
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
Lisa Cooley, LEED AP
 

Similar to Self Redevelopment of Housing Society (20)

Add on Project.pptx
Add on Project.pptxAdd on Project.pptx
Add on Project.pptx
 
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
Answer to Soft Economy – Mega Developments Phasing & Sustainability Issue...
 
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
WealthZap Research Services-NBCC Ltd MultiBagger Recommendation for March-2017
 
UC Real Estate Professional Development: Financing Tools
UC Real Estate Professional Development: Financing ToolsUC Real Estate Professional Development: Financing Tools
UC Real Estate Professional Development: Financing Tools
 
Bolt(build own lease transfer) model
Bolt(build own lease transfer) modelBolt(build own lease transfer) model
Bolt(build own lease transfer) model
 
Introduction to soft landings 2
Introduction to soft landings 2Introduction to soft landings 2
Introduction to soft landings 2
 
15 Annual General Meeting
15 Annual General Meeting15 Annual General Meeting
15 Annual General Meeting
 
Financing Small Mixed Use Projects
Financing Small Mixed Use ProjectsFinancing Small Mixed Use Projects
Financing Small Mixed Use Projects
 
Pp1 seminar
Pp1 seminarPp1 seminar
Pp1 seminar
 
1. Introduction to Project Finance.pptx
1. Introduction to Project Finance.pptx1. Introduction to Project Finance.pptx
1. Introduction to Project Finance.pptx
 
Construction project delivery methods
Construction project delivery methodsConstruction project delivery methods
Construction project delivery methods
 
Preparation of boq
Preparation of boqPreparation of boq
Preparation of boq
 
Infrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in pppInfrastructure Projects and Construction contracts in ppp
Infrastructure Projects and Construction contracts in ppp
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
Business banking unit6
Business banking unit6Business banking unit6
Business banking unit6
 
Design-Build Operate and Finance
Design-Build Operate and FinanceDesign-Build Operate and Finance
Design-Build Operate and Finance
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 
financing infrastructure projects
financing infrastructure projectsfinancing infrastructure projects
financing infrastructure projects
 
C8 financing affordable rental projects p pt - obie baker
C8 financing affordable rental projects   p pt - obie bakerC8 financing affordable rental projects   p pt - obie baker
C8 financing affordable rental projects p pt - obie baker
 
project-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptxproject-delivery-methods-final-for-presentation.pptx
project-delivery-methods-final-for-presentation.pptx
 

Recently uploaded

制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
Listing Turkey
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
House Construction Cost in Haldwani
House Construction Cost in Haldwani House Construction Cost in Haldwani
House Construction Cost in Haldwani
Geomatrix
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
hawifitumaed
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 
Best Construction Company in Haldwani UK
Best Construction Company in Haldwani UKBest Construction Company in Haldwani UK
Best Construction Company in Haldwani UK
Geomatrix
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
Listing Turkey
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
leonardmichael1
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
VickyAulakh1
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop AG
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
Listing Turkey
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
a7xjm8n4
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
SVN International Corp.
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
anothershaneroberts
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
jwhrsngh23
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
Farmland Bazaar
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 

Recently uploaded (20)

制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
The KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing TurkeyThe KA Housing - Catalogue - Listing Turkey
The KA Housing - Catalogue - Listing Turkey
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
House Construction Cost in Haldwani
House Construction Cost in Haldwani House Construction Cost in Haldwani
House Construction Cost in Haldwani
 
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdfAddis Bleaching Mixed use Apartment- Documentation 6.pdf
Addis Bleaching Mixed use Apartment- Documentation 6.pdf
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 
Best Construction Company in Haldwani UK
Best Construction Company in Haldwani UKBest Construction Company in Haldwani UK
Best Construction Company in Haldwani UK
 
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing TurkeyAVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
AVRUPA KONUTLARI ESENTEPE - ENGLISH - Listing Turkey
 
GT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.pptGT234 CADASTRAL SURVEYING gggggggggg.ppt
GT234 CADASTRAL SURVEYING gggggggggg.ppt
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDFVictory by Maskeen Group Surrey Floor plans June 2024 PDF
Victory by Maskeen Group Surrey Floor plans June 2024 PDF
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
 
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
原版制作(Greenwich毕业证书)格林威治大学毕业证PDF成绩单一模一样
 
SVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property BroadcastSVN Live 6.10.24 Weekly Property Broadcast
SVN Live 6.10.24 Weekly Property Broadcast
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Gurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdfGurgaon Industrial Business Association.pdf
Gurgaon Industrial Business Association.pdf
 
Recent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in IndiaRecent Trends Fueling The Surge in Farmhouse Demand in India
Recent Trends Fueling The Surge in Farmhouse Demand in India
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 

Self Redevelopment of Housing Society

  • 1. - Ar. Kirti Jain M.Arch (Project Management)
  • 2. ABSTRACT • About 60% of all buildings in Mumbai are 50-60 years old and are in a dilapidated state. Redevelopment becomes necessary for such societies and sometimes inevitable due to BMC directions on Structural Safety and repairs of old buildings. • Over the last decade, it has been seen that redevelopment projects often face problems; out of approximately 6,000 society buildings where redevelopment is feasible, more than 70 per cent are stuck because of some unscrupulous builders. • To avoid such problem, one solution is Self-redevelopment, where the society members take charge of the project, with the help of a project management consultant. DILAPIDATED STRUCTURE DEMOLITION REDEVELOPED
  • 3. PROBLEM STATEMENT • Most societies prefer to redevelop their buildings through the Builders so that they can get temporary accommodation, corpus and peaceful and timely possession. But the time has shown that said route possesses the following problems : 1 • Builder selection and negotiation is time consuming. 2 • The best offer providing developers will not necessarily be a well financed and timely executor. 3 • Allegations of Corrupt practices and underhand dealings. 4 • Builders take liberty and change Building Plans, for their vested interests. 5 • Original members remain at the mercy of Builders for completing their Building and possession only stays a dream. 6 • Builders tend to usurp and sell common spaces like parking, terrace, etc. 7 • Sometimes the builders also stop paying rents to the tenants and quality of construction is often substandard.
  • 4. PROBLEM STATEMENT • There were no Laid down guidelines and /or Firm procedures declared. • Builders took advantage of the situation offering unrealistic schemes. • Many have lost precious life time savings. • Being Penny Wise and Pound Foolish.
  • 5. WHAT IS SELF – REDEVELOPMENT? • Self Redevelopment is a redevelopment done by society itself. In opting for self-redevelopment, housing societies can apply for loans from banks to finance the redevelopment of their homes and then, they can appoint an independent contractor to carry out the work to their specifications. • This effectively cuts out developers from the process, thereby ensuring that the profits remain within the society and they are able to track the pace and quality of construction closely. • Self-Redevelopment of Society buildings can be conducted easily & successfully, with proper planning and strategy, after keeping confidence and by taking help of experienced and relevant Professional Consultants of the field.
  • 6. ADVANTAGES OF SELF - REDEVELOPMENT 1 • Permanent "Corpus Fund" in the Balance Sheet of a Society. 2 • Extra corpus also lowers down maintenance bills of the society members. 3 • Surplus sale area can be generated for sale in open market. 4 • Free Sale Flats can be purchased by the original members on actual cost. 5 • Merging of flats is possible if members want so. 6 • The building Plans will be as per members requirement and will not be changed. 7 • Issue of Free Parking spaces can be solved. 8 • Members may use their discretion to install in house facilities & amenities. 9 • Common Spaces cannot be sold and under-hand dealings can be avoided.
  • 7. CHALLENGES OF SELF - REDEVELOPMENT 1 • Issue of Finance, for Construction Cost for Self-Redevelopment. 2 • Society need to deal with many departments. 3 • Needs Time, Inclination, Money & Energy (T.I.M.E.) 4 • Needs “24 x 7 x 365” Professional Back-up. 5 • Not all society members have the necessary expertise or the adequate time to go and approach various agencies and appoint various consultants.
  • 8. ROLE OF A PMC • As a CHS initiates the process of redevelopment of its property, the first legal requirement it needs to fulfill in terms of the relevant circular of the department of co-operation (circular 79(a)) is the appointment of a PMC. 1 • Carrying out structural audit 2 • Preparation of financial feasibility report. 3 • Preparation of tender to invite offers from contractors. 4 • Preparation of comparative chart of contractors. 5 • Finalization of contractor on the basis evaluation of bids with the help of society members 6 • Preparation of development agreement
  • 9. ROLE OF A PMC 7 • Finalization of building plans as per members requirement 8 • Arranging for the funds from the Bank/ NBFC’S 9 • Vacating the building after the contractor obtains the necessary permission. 10 • Supervision of demolition and reconstruction of the new building. 11 • Possession and occupation of the new building. 12 • Obtain as built drawings & original documents and hand it over to the society 13 • Project closure and repayment of funds
  • 10. • Mumbai District Central CO-OP Bank will provide funds and required deposit amount to the flat owners. • Loan sanctioned by Mumbai bank is 85% of the total project cost or maximum 50 CR or as per techno economic viability. • The financial participation of the society shall be necessary up to 15% of the project cost. • The project cost = cost of TDR, construction cost, architect, BMC, PMC fees, rent payable, rent relocation charges, cost of fungible FSI, and reimbursement of expenses required for various permissions from the government authorities, interest amount of project loan calculated on the basis of cash flow, expenses towards rainwater harvesting, installation of solar system, CCTV camera and other costs related to the project. • Interest rate of the loan is minimum 12.5% per annum further decided after carrying out the risk assessment of the project. SCHEME OF SELF REDEVELOPMENT IN MAHARASHTRA
  • 11. • It shall be necessary for the society to execute English mortgage of all the assets/properties, building, premises and the expenditure require for the same shall be incurred by the society. • For this reason, MHADA and BMC officials will form a single-window system which will speed up the process of getting permissions & approvals. • The flat owners can choose any architect, consultant & contractors as per their choice. • After doing compliance of documents regarding the loan after loan approval as well as after mortgaging society property in the name of bank through registered documents the Mumbai bank shall release the loan. • The total tenure of the loan that the society takes from Mumbai bank shall be for 7 years out of which 2 years shall be moratorium period. • It is not mandatory to pay interest during the moratorium period.
  • 12. Review by society, Economic analysis for rate of return, Payback period, capital recovery Society’s request for further study of project Society authorizes project, selects project delivery method and appoints various consultants Society abandons project Society’s need for redevelopment Appoint PMC and request for project study Conceptual configurations and alternatives for technical feasibility. Development of cost and schedule for each alternative Final design of project. Detailed drawing, written specifications and preparation of contract document Approvals, premiums and deposits. Obtain IOD, C.C and register the project under RERA PROCESS OF SELF REDEVELOPMENT
  • 13. Procurement of bulk materials, special equipment, construction contracts Construction contractors administration of contracts for physical work in place Project closeout, quality testing, inspection, as built drawings Assisting society in encashment of sale flats Repayment of funds borrowed Obtaining finances for Self-redevelopment Approvals, premiums and deposits. Obtain IOD, C.C and register the project under RERA