The project involves the construction of two commercial towers, Tower A with 3 basement levels and 22 floors and Tower B with 3 basement levels and 18 floors, in Doha, Qatar between 2011-2012. Amenities for the 107,000 square meter development include meeting areas, a health club, swimming pool, and restaurants. As the site architect, my role was to prepare technical documentation for construction, including drawings for detailed design and bills of quantities for architectural and civil works, and supervise landscape and interior design.