Monday   Tuesday            Wednesday            Thursday              Friday   Saturday   Sunday

5th Dec                                                     Doing plan – Task
                                                            1




12th Dec            Start making       Start making mood    Make a mood
                    research for       boards and           board with my
                    Romeo and Juliet   planning ideas for   ideas and images
                    and HHSC.          my designs.          that relate to what
                                                            my idea of the
                                                            internet.
19th Dec




26th Dec




2nd Jan                                                     Finish making
                                                            mood board and
                                                            upload to blog.
9th Jan




16th Jan                           Get what artwork I
                                   want for my first
                                   image and put it
                                   together, layered
                                   how I want it on
                                   Photoshop.
24th Jan       Check my design     Paint over my          Upload to blog
               on Photoshop so I   images all             with snapshot
               still like it.      together to create     stages of what I
                                   the final piece        did to get to the
                                   taking snapshots       final piece.
                                   while working.
31st Jan                           Put together           Finish of my
                                   images I want for      second image
                                   my second image        taking snapshots
                                   in Photoshop then      then uploading the
                                   start to paint over    image and
                                   them in illustrator.   snapshots to the
                                                          blog with writing
                                                          on what I did.
7th February                       Gather images for      Upload my work to
                                   my third image         blog with
                                   and put them           sentences about
                                   together in            what I did in each
                                   Photoshop then         snapshot.
                                   paint over them in
                                   Illustrator taking
snapshots of my
                                      work.




14th February   Gather images         Mock up the            Upload final image
                together in a file    images in              to blog and
                for my fourth         Photoshop then         snapshots writing
                image so that I can   open the image         about what I did in
                drag them onto        into Illustrator and   each of them.
                Photoshop to          paint over them
                arrange them.         taking snapshots
                                      of the production
                                      process.
21st February                         Start thinking
                                      about my
                                      evaluation and
                                      writing notes on
                                      what I am up to.

28th February                         Gather images
                                      together in a file
                                      drag them onto
                                      Photoshop and
                                      mock them up to
                                      create image five.
6th March                             Paint over the         Upload image and
                                      image in Illustrator   snapshots onto
                                      that I mocked up       the blog and write
                                      in Photoshop,          about what I did in
                                      while taking           the stages.
                                      screenshots of
                                      what I’m doing.
13th March   Gather images in a   Drag the images in
             file for my final    Photoshop and
             sixth image.         mock up the image
                                  then using
                                  Illustrator paint
                                  over it taking
                                  snapshots in
                                  Illustrator and
                                  Photoshop.
20th March                        Upload final image
                                  six onto blog and
                                  write about what I
                                  did in each
                                  screenshot.

27th March                        Look back through
                                  work and look and
                                  write down my
                                  strengths and
                                  weaknesses for
                                  this project.
3rd April                         Write my             Carry on writing
                                  evaluation going     talking about what
                                  through each task    I could have
                                  and what I did.      improved.


10th April                        Finish Writing my
                                  evaluation and
                                  upload it onto my
                                  blog.

More Related Content

Similar to Second Updated Plan

Schedule
ScheduleSchedule
Updated Schedule
Updated ScheduleUpdated Schedule
Updated Schedule
Mystifyingproductions
 
Updated Schedule
Updated ScheduleUpdated Schedule
Updated Schedule
Mystifyingproductions
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheet
asmediag12
 
Shakespear production schedule1
Shakespear production schedule1Shakespear production schedule1
Shakespear production schedule1
snailguinproductions
 
Action planning sheet2
Action planning sheet2Action planning sheet2
Action planning sheet2
asmediaf12
 
Question 4
Question 4Question 4
Question 4
kieranwhite95
 
Production Schedule
Production ScheduleProduction Schedule
Production Schedule
Mystifyingproductions
 
Ashleigh darlington final major project production diary wb 08.04.13
Ashleigh darlington final major project production diary wb 08.04.13Ashleigh darlington final major project production diary wb 08.04.13
Ashleigh darlington final major project production diary wb 08.04.13
snailguinproductions
 
Ashleigh darlington final major project production diary wb 18.03.13
Ashleigh darlington final major project production diary wb 18.03.13Ashleigh darlington final major project production diary wb 18.03.13
Ashleigh darlington final major project production diary wb 18.03.13
snailguinproductions
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheet
asmediaf12
 
HA6 – E-Stings MOTION GRAPHIC Plan
HA6 – E-Stings MOTION GRAPHIC PlanHA6 – E-Stings MOTION GRAPHIC Plan
HA6 – E-Stings MOTION GRAPHIC Plan
Mystifyingproductions
 
Ashleigh darlington final major project production diary wb 01.04.13
Ashleigh darlington final major project production diary wb 01.04.13Ashleigh darlington final major project production diary wb 01.04.13
Ashleigh darlington final major project production diary wb 01.04.13
snailguinproductions
 
Action plan
Action planAction plan
Action plan
Landellr2
 

Similar to Second Updated Plan (14)

Schedule
ScheduleSchedule
Schedule
 
Updated Schedule
Updated ScheduleUpdated Schedule
Updated Schedule
 
Updated Schedule
Updated ScheduleUpdated Schedule
Updated Schedule
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheet
 
Shakespear production schedule1
Shakespear production schedule1Shakespear production schedule1
Shakespear production schedule1
 
Action planning sheet2
Action planning sheet2Action planning sheet2
Action planning sheet2
 
Question 4
Question 4Question 4
Question 4
 
Production Schedule
Production ScheduleProduction Schedule
Production Schedule
 
Ashleigh darlington final major project production diary wb 08.04.13
Ashleigh darlington final major project production diary wb 08.04.13Ashleigh darlington final major project production diary wb 08.04.13
Ashleigh darlington final major project production diary wb 08.04.13
 
Ashleigh darlington final major project production diary wb 18.03.13
Ashleigh darlington final major project production diary wb 18.03.13Ashleigh darlington final major project production diary wb 18.03.13
Ashleigh darlington final major project production diary wb 18.03.13
 
Action planning sheet
Action planning sheetAction planning sheet
Action planning sheet
 
HA6 – E-Stings MOTION GRAPHIC Plan
HA6 – E-Stings MOTION GRAPHIC PlanHA6 – E-Stings MOTION GRAPHIC Plan
HA6 – E-Stings MOTION GRAPHIC Plan
 
Ashleigh darlington final major project production diary wb 01.04.13
Ashleigh darlington final major project production diary wb 01.04.13Ashleigh darlington final major project production diary wb 01.04.13
Ashleigh darlington final major project production diary wb 01.04.13
 
Action plan
Action planAction plan
Action plan
 

More from Mystifyingproductions

Fourth recreation – toothpaste photo
Fourth recreation – toothpaste photoFourth recreation – toothpaste photo
Fourth recreation – toothpaste photo
Mystifyingproductions
 
Iron man
Iron manIron man
Emily Davis Production Log
Emily Davis Production LogEmily Davis Production Log
Emily Davis Production Log
Mystifyingproductions
 
Magazine Evaluation PowerPoint
Magazine Evaluation PowerPointMagazine Evaluation PowerPoint
Magazine Evaluation PowerPoint
Mystifyingproductions
 
Iron man 3 script
Iron man 3 scriptIron man 3 script
Iron man 3 script
Mystifyingproductions
 
Iron man 3
Iron man 3Iron man 3
Pitch
PitchPitch
Editing butlins photo
Editing butlins photoEditing butlins photo
Editing butlins photo
Mystifyingproductions
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
Mystifyingproductions
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
Mystifyingproductions
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
Mystifyingproductions
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
Mystifyingproductions
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
Mystifyingproductions
 
Second Recreation Editing Butlins Photo
Second Recreation Editing Butlins PhotoSecond Recreation Editing Butlins Photo
Second Recreation Editing Butlins Photo
Mystifyingproductions
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
Mystifyingproductions
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
Mystifyingproductions
 
Portrait Shoot PowerPoint
Portrait Shoot PowerPointPortrait Shoot PowerPoint
Portrait Shoot PowerPoint
Mystifyingproductions
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
Mystifyingproductions
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
Mystifyingproductions
 
Me and My Movies
Me and My MoviesMe and My Movies
Me and My Movies
Mystifyingproductions
 

More from Mystifyingproductions (20)

Fourth recreation – toothpaste photo
Fourth recreation – toothpaste photoFourth recreation – toothpaste photo
Fourth recreation – toothpaste photo
 
Iron man
Iron manIron man
Iron man
 
Emily Davis Production Log
Emily Davis Production LogEmily Davis Production Log
Emily Davis Production Log
 
Magazine Evaluation PowerPoint
Magazine Evaluation PowerPointMagazine Evaluation PowerPoint
Magazine Evaluation PowerPoint
 
Iron man 3 script
Iron man 3 scriptIron man 3 script
Iron man 3 script
 
Iron man 3
Iron man 3Iron man 3
Iron man 3
 
Pitch
PitchPitch
Pitch
 
Editing butlins photo
Editing butlins photoEditing butlins photo
Editing butlins photo
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Editing my pictures
Editing my picturesEditing my pictures
Editing my pictures
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Third recreation – black and white picture
Third recreation – black and white pictureThird recreation – black and white picture
Third recreation – black and white picture
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Second Recreation Editing Butlins Photo
Second Recreation Editing Butlins PhotoSecond Recreation Editing Butlins Photo
Second Recreation Editing Butlins Photo
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Wedding Picture Editing Process
Wedding Picture Editing Process Wedding Picture Editing Process
Wedding Picture Editing Process
 
Portrait Shoot PowerPoint
Portrait Shoot PowerPointPortrait Shoot PowerPoint
Portrait Shoot PowerPoint
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and my movies
Me and my moviesMe and my movies
Me and my movies
 
Me and My Movies
Me and My MoviesMe and My Movies
Me and My Movies
 

Second Updated Plan

  • 1. Monday Tuesday Wednesday Thursday Friday Saturday Sunday 5th Dec Doing plan – Task 1 12th Dec Start making Start making mood Make a mood research for boards and board with my Romeo and Juliet planning ideas for ideas and images and HHSC. my designs. that relate to what my idea of the internet. 19th Dec 26th Dec 2nd Jan Finish making mood board and upload to blog.
  • 2. 9th Jan 16th Jan Get what artwork I want for my first image and put it together, layered how I want it on Photoshop. 24th Jan Check my design Paint over my Upload to blog on Photoshop so I images all with snapshot still like it. together to create stages of what I the final piece did to get to the taking snapshots final piece. while working. 31st Jan Put together Finish of my images I want for second image my second image taking snapshots in Photoshop then then uploading the start to paint over image and them in illustrator. snapshots to the blog with writing on what I did. 7th February Gather images for Upload my work to my third image blog with and put them sentences about together in what I did in each Photoshop then snapshot. paint over them in Illustrator taking
  • 3. snapshots of my work. 14th February Gather images Mock up the Upload final image together in a file images in to blog and for my fourth Photoshop then snapshots writing image so that I can open the image about what I did in drag them onto into Illustrator and each of them. Photoshop to paint over them arrange them. taking snapshots of the production process. 21st February Start thinking about my evaluation and writing notes on what I am up to. 28th February Gather images together in a file drag them onto Photoshop and mock them up to create image five. 6th March Paint over the Upload image and image in Illustrator snapshots onto that I mocked up the blog and write in Photoshop, about what I did in while taking the stages. screenshots of what I’m doing.
  • 4. 13th March Gather images in a Drag the images in file for my final Photoshop and sixth image. mock up the image then using Illustrator paint over it taking snapshots in Illustrator and Photoshop. 20th March Upload final image six onto blog and write about what I did in each screenshot. 27th March Look back through work and look and write down my strengths and weaknesses for this project. 3rd April Write my Carry on writing evaluation going talking about what through each task I could have and what I did. improved. 10th April Finish Writing my evaluation and upload it onto my blog.