The Legacy of Breton In A New Age by Master Terrance Lindall
Editor's Notes
This hole is in the cafeteria and goes all the way thru the wall
Same hole from the outside
Outdated lab tables, and open shower plumbing
Multi level building
Foundation shifting – crack in wall above door to classroom
This door to class room will not close any further than this due to foundation shifting
This is the same crack as above – just under 2 inches wide – someone has put hot wheels car in crack
Cracks in wall
Crack in foundation outside wall
Cracks in outside wall
Mildew/mold keeps coming back after washing wall
Lights will not fit due to shifting of foundation
More cracks in inside wall
Exterior doors not possible to secure properly due to shifting of foundation
Water leaking in class room
Old style bulletin boards cannot be removed and replace due to possible asbestos behind boards
One of the water fountains in middle school
Inadequate electrical wiring for new technology. Teachers have to work around problems
Wood ramps were added with wool handrails to assist ada students and others
Cracks in hall way walls
Electrical plugs added to class room – plugs have to be ran outside of wall due to type of construction
Old boiler room door. Due to below ground level this room floods with heavy rains.
Boiler room – water marks on ply wood wall show level of water that comes in during heavy rains
Asbestos Danger sign on plywood wall surrounding old boiler
With new technology come new problems. Computer rooms have to have computers facing wall due to electrical and data wiring
Work around solutions due to inadequate wiring
More Cracks in class room walls
Another computer class room
Plaster type ceiling with water damage – to repair properly ceiling will have to be removed and then replaced
More cracks in class room walls
Water damage in class room ceiling and old piping
Multi level building with wooden add on ramps for ada compliance
More ceiling damage due to water leakage
Water damage to wall due to water seeping thru and down walls.
These students were asked if and who would like to see a new middle school built. Notice all raised their hands.
This is a class room that is being used. Size of room is smaller than some peoples bedrooms
Cracks in outside building walls
Cracks, holes and mold and mildew on building walls
Entrances to buildings have multiple levels. Students with crutches or wheelchairs have to go different routes to classes. Sometimes in inclement wather.
Urinal in boys restrooms.
More class room ceiling damage
Multiple offices thru out school, not centralized for effenciency
Mold and mildew on walls
Paved area used for common area for students waiting on bus pickup
Old electrical panels cannot be secured
Flooring in girls gym change house.
Girls dressing room
Girls dressing room
Cracks in exterior wall
One of many a/c and heating ducts that leak and have rusted