Program : Penyelenggaraan Jalan
Kegiatan : Penyelenggaraan Jalan Provinsi
Pekerjaan : Pembangunan Jalan Rokan - Pendalian - Dusun Batas NO. KONTRAK : 620/SPHS-PUPRPKPP/BM-RPDB/73/2021
PROP / KAB : Prov. RIAU TANGGAL : 27 Juli 2021
KONSULTAN PENGAWAS : CV. ARYA TECHNO CONSULTANT NILAI KONTRAK : Rp 7.397.338.875,00
KONTRAKTOR PELAKSANA : CV. ADHIRA KARYA
BOBOT BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
% % 27-1 02-8 09-15 16-22 23-29 30-5 06-12 13-19 20-26 27-3 04-10 11-17 18-24 25-31 01-7 08-14 15-21 22-28 29-5 06-12 13-19 20-23
-
DIVISI 1. UMUM -
1.2 Mobilisasi Ls 1.00 0.76 1.00 0.76 0.08 0.11 - - - 0.11 - - - 0.11 0.15 0.08 0.08 0.04 - 0.76
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 0.50 1.00 0.50 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 - 0.50
1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 0.25 1.00 0.25 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - 0.25
- -
DIVISI 2 DRAINASE - -
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M
3
880.00 0.23 148.95 0.04 - - 0.01 0.01 0.01 - - - - 0.01 - 0.23
- -
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - -
3.1.(1) Galian Biasa M3
197.00 0.07 1,219.36 0.42 - - 0.07 - - - - - - 0.15 0.20 - 0.07
3.2.(1a) Timbunan Biasa dari sumber galian M
3
1,835.00 4.31 1,824.50 4.28 - - - 0.59 0.23 - - - - 2.25 1.21 - 4.31
3.2.(2a) Timbunan Pilihan dari sumber galian M
3
48.00 0.18 268.35 1.02 - - - 0.18 - - - - - 0.54 0.29 - 0.18
3.3.(1) Penyiapan Badan Jalan M
2
6,688.00 0.25 5,222.08 0.20 - - 0.20 - - - - - - - 0.25
- -
DIVISI 5. PERKERASAN BERBUTIR - -
5.1.(1) Lapis Pondasi Agregat Kelas A M
3
1,388.00 16.51 1,381.36 16.43 - - - - - - - - - 5.75 5.75 4.93 - 16.51
5.1.(2) Lapis Pondasi Agregat Kelas B M3
1,792.00 20.35 1,782.40 20.24 - - - - - 9.50 1.48 1.44 - 2.34 5.47 - 20.35
5.1.(3) Lapis Pondasi Agregat Kelas S M
3
504.00 5.11 501.30 5.08 - - - - - - - - - 2.80 2.29 - 5.11
- -
DIVISI 6. PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 6,720.00 1.53 6,455.63 1.47 - - - - - - - - - 0.73 0.73 - 1.53
6.1 (2a) Lapis Perekat - Aspal Cair Liter 1,428.00 0.32 1,438.52 0.33 - - - - - - - - - 0.16 0.16 - 0.32
6.3(5a) Laston Lapis Aus (AC-WC) Ton 728.00 16.13 734.61 16.27 - - - - - - - - - 8.14 8.14 - 16.13
6.3(6a) Laston Lapis Antara (AC-BC) Ton 927.00 19.56 925.53 19.52 - - - - - - - - - 9.76 9.76 - 19.56
- -
DIVISI 7. STRUKTUR - -
7.1 (7a) Beton strukur, fc’20 MPa M
3
20.00 0.57 18.01 0.51 - - - - 0.07 0.35 - 0.09 - - 0.57
7.1 (8) Beton , fc’15 Mpa M
3
336.00 6.89 346.70 7.11 - - - 0.15 0.98 1.05 0.49 1.39 1.27 1.77 - 6.89
7.1 (10) Beton, fc’10 Mpa M
3
1.00 0.02 1.00 0.02 - - 0.02 - - - - - - - 0.02
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 21,557.00 5.20 19,103.85 4.61 - - - 0.61 0.76 0.76 0.79 0.76 0.57 0.37 - 5.20
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1
960.00 0.44 200.00 0.09 - - - - - 0.09 - - - - 0.44
- -
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN - LAIN - -
9.2.(1) Marka Jalan Termoplastik M
2
379.00 0.82 388.92 0.84 - - - - - - - - - 0.84 - 0.82
- -
Jumlah 100.00 100.00
Rencana Pekerjaan Mingguan ( KONTRAK ) - 0.15 0.04 0.56 0.52 0.72 0.16 0.31 0.45 11.82 13.54 11.62 11.82 10.58 10.58 8.26 8.38 1.68 2.70 2.59 2.59 0.93 -
Rencana Pekerjaan Komulatif ( KONTRAK ) - 0.15 0.19 0.75 1.27 1.99 2.15 2.46 2.91 14.73 28.27 39.90 51.71 62.29 72.87 81.13 89.51 91.18 93.88 96.47 99.07 100.00 100.00
Rencana Pekerjaan Mingguan ( ADDENDUM - 01 ) 5.22 5.82 5.79 5.94 4.98 8.91 8.91 10.04 9.96 2.28 4.12 3.46 0.06
Rencana Pekerjaan Komulatif ( ADDENDUM - 01 ) - 24.53 29.74 35.56 41.35 47.29 52.27 61.18 70.08 80.12 90.08 92.37 96.48 99.94 100.00
Realisasi Kemajuan Kumulatif - 0.11 0.15 0.33 1.57 2.08 11.90 2.80 3.71 1.88
Realisasi Kemajuan Pekerjaan - 0.11 0.26 0.58 2.15 4.24 16.13 18.93 22.65 24.53 -
Deviasi (0.04) 0.07 (0.17) 0.89 2.25 13.99 16.47 19.74 9.80
Diketahui Oleh Diperiksa/ Disetujui Oleh : Dibuat Oleh :
PEJABAT PEMBUAT KOMITMEN ( PPK ) Konsultan Pengawas Penyedia Jasa
CV. ARYA TECHNO CONSULTANT CV. ADHIRA KARYA
MUH. ARIEF SETIAWAN, S.T., M.T. AROZA SYAKDES, S.T. AMDONI
NIP. 19721202 199903 1 007 Supervision Engineer Direktur
ADD - 1
SEPTEMBER OKTOBER NOVEMBER DESEMBER
KET
SCHEDULE ADD - 01
DIVISI URAIAN SAT
KUANTITAS KONTRAK ADD - 1 AGUSTUS
KUANTITAS
0
10
20
30
40
50
60
70
80
90
100
Kontrak
Realisasi
ADD - 01

More Related Content

Featured

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024Neil Kimberley
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)contently
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024Albert Qian
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsKurio // The Social Media Age(ncy)
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Search Engine Journal
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summarySpeakerHub
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next Tessa Mero
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentLily Ray
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best PracticesVit Horky
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project managementMindGenius
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...RachelPearson36
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Applitools
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at WorkGetSmarter
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...DevGAMM Conference
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationErica Santiago
 

Featured (20)

PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
Unlocking the Power of ChatGPT and AI in Testing - A Real-World Look, present...
 
12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work12 Ways to Increase Your Influence at Work
12 Ways to Increase Your Influence at Work
 
ChatGPT webinar slides
ChatGPT webinar slidesChatGPT webinar slides
ChatGPT webinar slides
 
More than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike RoutesMore than Just Lines on a Map: Best Practices for U.S Bike Routes
More than Just Lines on a Map: Best Practices for U.S Bike Routes
 
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
Ride the Storm: Navigating Through Unstable Periods / Katerina Rudko (Belka G...
 
Barbie - Brand Strategy Presentation
Barbie - Brand Strategy PresentationBarbie - Brand Strategy Presentation
Barbie - Brand Strategy Presentation
 

Schedulle ADD - 1.pdf

  • 1. Program : Penyelenggaraan Jalan Kegiatan : Penyelenggaraan Jalan Provinsi Pekerjaan : Pembangunan Jalan Rokan - Pendalian - Dusun Batas NO. KONTRAK : 620/SPHS-PUPRPKPP/BM-RPDB/73/2021 PROP / KAB : Prov. RIAU TANGGAL : 27 Juli 2021 KONSULTAN PENGAWAS : CV. ARYA TECHNO CONSULTANT NILAI KONTRAK : Rp 7.397.338.875,00 KONTRAKTOR PELAKSANA : CV. ADHIRA KARYA BOBOT BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 % % 27-1 02-8 09-15 16-22 23-29 30-5 06-12 13-19 20-26 27-3 04-10 11-17 18-24 25-31 01-7 08-14 15-21 22-28 29-5 06-12 13-19 20-23 - DIVISI 1. UMUM - 1.2 Mobilisasi Ls 1.00 0.76 1.00 0.76 0.08 0.11 - - - 0.11 - - - 0.11 0.15 0.08 0.08 0.04 - 0.76 1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1.00 0.50 1.00 0.50 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.01 - 0.50 1.19 Keselamatan dan Kesehatan Kerja Ls 1.00 0.25 1.00 0.25 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 - 0.25 - - DIVISI 2 DRAINASE - - 2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M 3 880.00 0.23 148.95 0.04 - - 0.01 0.01 0.01 - - - - 0.01 - 0.23 - - DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK - - 3.1.(1) Galian Biasa M3 197.00 0.07 1,219.36 0.42 - - 0.07 - - - - - - 0.15 0.20 - 0.07 3.2.(1a) Timbunan Biasa dari sumber galian M 3 1,835.00 4.31 1,824.50 4.28 - - - 0.59 0.23 - - - - 2.25 1.21 - 4.31 3.2.(2a) Timbunan Pilihan dari sumber galian M 3 48.00 0.18 268.35 1.02 - - - 0.18 - - - - - 0.54 0.29 - 0.18 3.3.(1) Penyiapan Badan Jalan M 2 6,688.00 0.25 5,222.08 0.20 - - 0.20 - - - - - - - 0.25 - - DIVISI 5. PERKERASAN BERBUTIR - - 5.1.(1) Lapis Pondasi Agregat Kelas A M 3 1,388.00 16.51 1,381.36 16.43 - - - - - - - - - 5.75 5.75 4.93 - 16.51 5.1.(2) Lapis Pondasi Agregat Kelas B M3 1,792.00 20.35 1,782.40 20.24 - - - - - 9.50 1.48 1.44 - 2.34 5.47 - 20.35 5.1.(3) Lapis Pondasi Agregat Kelas S M 3 504.00 5.11 501.30 5.08 - - - - - - - - - 2.80 2.29 - 5.11 - - DIVISI 6. PERKERASAN ASPAL - - 6.1 (1) Lapis Resap Pengikat - Aspal Cair Liter 6,720.00 1.53 6,455.63 1.47 - - - - - - - - - 0.73 0.73 - 1.53 6.1 (2a) Lapis Perekat - Aspal Cair Liter 1,428.00 0.32 1,438.52 0.33 - - - - - - - - - 0.16 0.16 - 0.32 6.3(5a) Laston Lapis Aus (AC-WC) Ton 728.00 16.13 734.61 16.27 - - - - - - - - - 8.14 8.14 - 16.13 6.3(6a) Laston Lapis Antara (AC-BC) Ton 927.00 19.56 925.53 19.52 - - - - - - - - - 9.76 9.76 - 19.56 - - DIVISI 7. STRUKTUR - - 7.1 (7a) Beton strukur, fc’20 MPa M 3 20.00 0.57 18.01 0.51 - - - - 0.07 0.35 - 0.09 - - 0.57 7.1 (8) Beton , fc’15 Mpa M 3 336.00 6.89 346.70 7.11 - - - 0.15 0.98 1.05 0.49 1.39 1.27 1.77 - 6.89 7.1 (10) Beton, fc’10 Mpa M 3 1.00 0.02 1.00 0.02 - - 0.02 - - - - - - - 0.02 7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 21,557.00 5.20 19,103.85 4.61 - - - 0.61 0.76 0.76 0.79 0.76 0.57 0.37 - 5.20 7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 960.00 0.44 200.00 0.09 - - - - - 0.09 - - - - 0.44 - - DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN - LAIN - - 9.2.(1) Marka Jalan Termoplastik M 2 379.00 0.82 388.92 0.84 - - - - - - - - - 0.84 - 0.82 - - Jumlah 100.00 100.00 Rencana Pekerjaan Mingguan ( KONTRAK ) - 0.15 0.04 0.56 0.52 0.72 0.16 0.31 0.45 11.82 13.54 11.62 11.82 10.58 10.58 8.26 8.38 1.68 2.70 2.59 2.59 0.93 - Rencana Pekerjaan Komulatif ( KONTRAK ) - 0.15 0.19 0.75 1.27 1.99 2.15 2.46 2.91 14.73 28.27 39.90 51.71 62.29 72.87 81.13 89.51 91.18 93.88 96.47 99.07 100.00 100.00 Rencana Pekerjaan Mingguan ( ADDENDUM - 01 ) 5.22 5.82 5.79 5.94 4.98 8.91 8.91 10.04 9.96 2.28 4.12 3.46 0.06 Rencana Pekerjaan Komulatif ( ADDENDUM - 01 ) - 24.53 29.74 35.56 41.35 47.29 52.27 61.18 70.08 80.12 90.08 92.37 96.48 99.94 100.00 Realisasi Kemajuan Kumulatif - 0.11 0.15 0.33 1.57 2.08 11.90 2.80 3.71 1.88 Realisasi Kemajuan Pekerjaan - 0.11 0.26 0.58 2.15 4.24 16.13 18.93 22.65 24.53 - Deviasi (0.04) 0.07 (0.17) 0.89 2.25 13.99 16.47 19.74 9.80 Diketahui Oleh Diperiksa/ Disetujui Oleh : Dibuat Oleh : PEJABAT PEMBUAT KOMITMEN ( PPK ) Konsultan Pengawas Penyedia Jasa CV. ARYA TECHNO CONSULTANT CV. ADHIRA KARYA MUH. ARIEF SETIAWAN, S.T., M.T. AROZA SYAKDES, S.T. AMDONI NIP. 19721202 199903 1 007 Supervision Engineer Direktur ADD - 1 SEPTEMBER OKTOBER NOVEMBER DESEMBER KET SCHEDULE ADD - 01 DIVISI URAIAN SAT KUANTITAS KONTRAK ADD - 1 AGUSTUS KUANTITAS 0 10 20 30 40 50 60 70 80 90 100 Kontrak Realisasi ADD - 01