Special Conditions of Contract STANDARD BIDDING DOCUMENTS Procurement of Goods PART  3  –  Contract
Special Conditions of Contract GCC SCC GCC 1.1(j) The Purchaser’s country is:  [insert name of the Purchaser’s Country] GCC 1.1(k) The Purchaser is:  [Insert complete legal name of the Purchaser]   GCC 1.1 (q) The Project Site(s)/Final Destination(s) is/are:  [Insert name(s) and detailed information on the location(s) of the site(s)]  GCC 4.2 (a) The meaning of the trade terms shall be as prescribed by Incoterms. If the meaning of any trade term and the rights and obligations of the parties thereunder shall not be as prescribed by Incoterms, they shall be as prescribed by:  [exceptional; refer to other internationally accepted trade terms ] GCC 4.2 (b) The version edition of Incoterms shall be  [insert date of current edition] GCC 5.1 The language shall be:  [insert the name of the language]
Special Conditions of Contract GCC SCC GCC 8.1 For  notices , the Purchaser’s address shall be: Attention:  [ insert full name of person, if applicable] Street Address:  [insert street address and number] Floor/ Room number : [insert floor and room number, if applicable] City:  [insert name of city or town] ZIP Code:  [insert postal ZIP code, if applicable] Country:  [insert name of country] Telephone:  [include telephone number, including country and city codes] Facsimile number:  [insert facsimile number, including country and city codes] Electronic mail address : [insert e-mail address, if applicable]   GCC 9.1 The governing law shall be the law of :   [insert name of the country or state]
Special Conditions of Contract GCC SCC GCC 10.2 The rules of procedure for arbitration proceedings pursuant to GCC Clause 10.2 shall be as follows: [The bidding documents should contain one clause to be retained in the event of a Contract with a foreign Supplier and one clause to be retained in the event of a Contract with a Supplier who is a national of the Purchaser’s country.  At the time of finalizing the Contract, the respective applicable clause should be retained in the Contract.  The following explanatory note should therefore be inserted as a header to GCC 10.2 in the bidding document. “ Clause 10.2 (a) shall be retained in the case of a Contract with a foreign Supplier and clause 10.2 (b) shall be retained in the case of a Contract with a national of the Purchaser’s country.”]
Special Conditions of Contract GCC SCC GCC 10.2 (a) Contract with foreign Supplier: [For contracts entered into with foreign suppliers, International commercial arbitration may have practical advantages over other dispute settlement methods.  The World Bank should not be named as arbitrator, nor should it be asked to name an arbitrator.  Among the rules to govern the arbitration proceedings, the Purchaser may wish to consider the United Nations Commission on International Trade Law (UNCITRAL) Arbitration Rules of 1976, the Rules of Conciliation and Arbitration of the International Chamber of Commerce (ICC), the Rules of the London Court of International Arbitration or the Rules of Arbitration Institute of the Stockholm Chamber of Commerce.]
Special Conditions of Contract GCC SCC GCC 10.2 If the Purchaser chooses the UNCITRAL Arbitration Rules, the following sample clause should be inserted: GCC 10.2 (a)—Any dispute, controversy or claim arising out of or relating to this Contract, or breach, termination or invalidity thereof, shall be settled by arbitration in accordance with the UNCITRAL Arbitration Rules as at present in force. If the Purchaser chooses the Rules of ICC, the following sample clause should be inserted: GCC 10.2 (a)—All disputes arising in connection with the present Contract shall be finally settled under the Rules of Conciliation and Arbitration of the International Chamber of Commerce by one or more arbitrators appointed in accordance with said Rules.
Special Conditions of Contract GCC SCC GCC 10.2 If the Purchaser chooses the Rules of Arbitration Institute of Chamber of Commerce, the following sample clause should be inserted: GCC 10.2  (a)—Any dispute, controversy or claim arising out of or in connection with this Contract, or the breach termination or invalidity thereof, shall be settled by arbitration in accordance with the Rules of the Arbitration Institute of the Stockholm Chamber of Commerce. If the Purchaser chooses the Rules of the Court of International Arbitration, the following clause should be inserted: GCC 10.2 (a)—Any dispute arising out of or in connection with this Contract, including any question regarding its existence, validity or termination shall be referred to and finally resolved by arbitration under the Rules of the London Court of International Arbitration, which rules are deemed to be incorporated by reference to this clause.
Special Conditions of Contract GCC SCC GCC 10.2 (b) Contracts with Supplier national of the Purchaser’s country: In the case of a dispute between the Purchaser and a Supplier who is a national of the Purchaser’s country, the dispute shall be referred to adjudication or arbitration in accordance with the laws of the Purchaser’s country.
Special Conditions of Contract GCC SCC GCC 13.1 Details of Shipping and other Documents to be furnished by the Supplier are  [insert the required documents, such as a negotiable bill of lading, a non-negotiable sea way bill, an airway bill, a railway consignment note, a road consignment note, insurance certificate, Manufacturer’s or Supplier’s warranty certificate, inspection certificate issued by nominated inspection agency, Supplier’s factory shipping details   etc]. The above documents shall be received by the Purchaser before arrival of the Goods and, if not received, the Supplier will be responsible for any consequent expenses. GCC 15.1 The prices charged for the Goods supplied and the related Services performed  [insert “shall” or “shall not,” as appropriate]  be adjustable. If prices are adjustable, the following method shall be used to calculate the price adjustment  [see attachment to these SCC for a sample Price Adjustment Formula]
Special Conditions of Contract GCC SCC GCC 16.1 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Special Conditions of Contract GCC SCC GCC 16.1 ,[object Object],[object Object],[object Object],[object Object],[object Object]
Special Conditions of Contract GCC SCC GCC 16.1 (ii) On Delivery:  Eighty (80) percent of the Contract Price shall be paid on receipt of the Goods and upon submission of the documents specified in GCC Clause 13. (iii) On Acceptance:  The remaining ten (10) percent of the Contract Price shall be paid to the Supplier within thirty (30) days after the date of the acceptance certificate for the respective delivery issued by the Purchaser. GCC 16.5 The payment-delay period after which the Purchaser shall pay interest to the supplier shall be  [insert number]  days. The interest rate that shall be applied is  [insert number] %
Special Conditions of Contract GCC SCC GCC 18.1 A Performance Security  [ insert “shall” or “shall not” be required] [If a Performance Security is required, insert “the amount of the Performance Security shall be: [insert amount]  [The amount of the Performance Security is usually expressed as a percentage of the Contract Price. The percentage varies according to the Purchaser’s perceived risk and impact of non performance by the Supplier. A 10% percentage is used under normal circumstances]   GCC 18.3 If required, the Performance Security shall be in the form of :  [insert “a Bank  Guarantee” or ”a Performance Bond”] If required, the Performance security shall be denominated in  [insert “a freely convertible currency acceptable to the Purchaser” or “ the currencies of payment of the Contract, in accordance with their portions of the Contract Price”] GCC 18.4 Discharge of the Performance Security shall take place:  [ insert date if different from the one indicated in sub clause GCC18.4]
Special Conditions of Contract GCC SCC GCC 23.2 The packing, marking and documentation within and outside the packages shall be:  [insert in detail the type of packing required, the markings in the packing and all documentation required]  GCC 24.1 The insurance coverage shall be as specified in the Incoterms . If not in accordance with Incoterms, insurance shall be as follows: [insert specific insurance provisions agreed upon, including coverage, currency an amount] GCC 25.1 Responsibility for transportation of the Goods shall be as specified in the Incoterms.  If not in accordance with Incoterms, responsibility for transportations shall be as follows:  [insert “The Supplier is required under the Contract to transport the Goods to a specified place of final destination within the Purchaser’s country, defined as the Project Site, transport to such place of destination in the Purchaser’s country, including insurance and storage, as shall be specified in the Contract, shall be arranged by the Supplier, and related costs shall be included in the Contract Price”; or any other  agreed upon trade terms (specify the respective responsibilities of the Purchaser and the Supplier)]
Special Conditions of Contract GCC SCC GCC 26.1 The inspections and tests shall be:  [insert nature, frequency, procedures for carrying out the inspections and tests] GCC 26.2 The Inspections and tests shall be conducted at:  [insert name(s) of location(s)] GCC 27.1 The liquidated damage shall be: [ insert number] % per week GCC 27.1 The maximum amount of liquidated damages shall be:  [insert number] % GCC 28.3 The period of validity of the Warranty shall be:  [insert number]  days  For purposes of the Warranty, the place(s) of final destination(s) shall be: [insert name(s) of location(s)] GCC 28.5 The period for repair or replacement shall be:  [insert number(s)]  days.
 

More Related Content

What's hot

Cl compilation updated
Cl compilation updatedCl compilation updated
Cl compilation updated
Yong Sy
 
FINANCING AGREEMENT
FINANCING AGREEMENT FINANCING AGREEMENT
FINANCING AGREEMENT
Kanoon Ke Rakhwale India
 
JCT Dispute Adjudication Board 20221
JCT Dispute Adjudication  Board 20221JCT Dispute Adjudication  Board 20221
JCT Dispute Adjudication Board 20221
Sean Gibbs DipArb, FCIARB, FCIOB, FRICS, MICE
 
Exxon Mobil Contract Terms And Confidentiality Agreement
Exxon Mobil Contract Terms And Confidentiality AgreementExxon Mobil Contract Terms And Confidentiality Agreement
Exxon Mobil Contract Terms And Confidentiality Agreement
Richard (Ricky) Anderson
 
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
GLC
 
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
Tara Kissel, M.Ed
 
Ruggedized computers for police service bid requests
Ruggedized computers for police service bid requestsRuggedized computers for police service bid requests
Ruggedized computers for police service bid requests
Chuck Thompson
 
VENDOR AGREEMENT
VENDOR AGREEMENT VENDOR AGREEMENT
VENDOR AGREEMENT
Kanoon Ke Rakhwale India
 
Equipment Sales Agreement
Equipment Sales AgreementEquipment Sales Agreement
Equipment Sales Agreement
m3tro media
 
sample subsale agreement (company & company)
sample subsale agreement (company & company)sample subsale agreement (company & company)
sample subsale agreement (company & company)
aidanisa238
 
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
ALINA MATSENKO AND AJAY MISHRA ALINA AND AJAY
 
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
Chuck Thompson
 
E-Commerce Agreement
E-Commerce AgreementE-Commerce Agreement
E-Commerce Agreement
MidMarket Place
 
Kenneth combs ecks
Kenneth combs   ecksKenneth combs   ecks
Kenneth combs ecks
Kenney Combs
 
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
GLC
 
Recovery Of Commercial Debts
Recovery Of Commercial DebtsRecovery Of Commercial Debts
Recovery Of Commercial Debts
luketharrison
 
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
GLC
 
Ps d12 082 co-10343 new teacher center (original)
Ps d12 082 co-10343 new teacher center (original)Ps d12 082 co-10343 new teacher center (original)
Ps d12 082 co-10343 new teacher center (original)
Honolulu Civil Beat
 
Az Legal Contract Buyers/Sellers - 8/2019 current
Az Legal Contract Buyers/Sellers - 8/2019 currentAz Legal Contract Buyers/Sellers - 8/2019 current
Az Legal Contract Buyers/Sellers - 8/2019 current
Heather McClaren
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
RISHARD FAIS
 

What's hot (20)

Cl compilation updated
Cl compilation updatedCl compilation updated
Cl compilation updated
 
FINANCING AGREEMENT
FINANCING AGREEMENT FINANCING AGREEMENT
FINANCING AGREEMENT
 
JCT Dispute Adjudication Board 20221
JCT Dispute Adjudication  Board 20221JCT Dispute Adjudication  Board 20221
JCT Dispute Adjudication Board 20221
 
Exxon Mobil Contract Terms And Confidentiality Agreement
Exxon Mobil Contract Terms And Confidentiality AgreementExxon Mobil Contract Terms And Confidentiality Agreement
Exxon Mobil Contract Terms And Confidentiality Agreement
 
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
Adoption Agreement of Purchase and Supply Sample (Purchase this doc, Text: 08...
 
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
Chapter 21: Sales Contracts: Domestic & Global Aspects of Formation, Title, &...
 
Ruggedized computers for police service bid requests
Ruggedized computers for police service bid requestsRuggedized computers for police service bid requests
Ruggedized computers for police service bid requests
 
VENDOR AGREEMENT
VENDOR AGREEMENT VENDOR AGREEMENT
VENDOR AGREEMENT
 
Equipment Sales Agreement
Equipment Sales AgreementEquipment Sales Agreement
Equipment Sales Agreement
 
sample subsale agreement (company & company)
sample subsale agreement (company & company)sample subsale agreement (company & company)
sample subsale agreement (company & company)
 
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
Signed and dated_contract_by_landlord_-_ajay_mishra_for_ac_system_replacement...
 
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
Invitation For Bids, Gloucester, VA Government, Computers, Sept, 2014
 
E-Commerce Agreement
E-Commerce AgreementE-Commerce Agreement
E-Commerce Agreement
 
Kenneth combs ecks
Kenneth combs   ecksKenneth combs   ecks
Kenneth combs ecks
 
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
Wood Pellets Sales Agreement Sample (Purchase this doc, Text: 08118887270 (Wh...
 
Recovery Of Commercial Debts
Recovery Of Commercial DebtsRecovery Of Commercial Debts
Recovery Of Commercial Debts
 
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
Agreement for Production, Supply and Purchase of Compound Feeds (Purchase thi...
 
Ps d12 082 co-10343 new teacher center (original)
Ps d12 082 co-10343 new teacher center (original)Ps d12 082 co-10343 new teacher center (original)
Ps d12 082 co-10343 new teacher center (original)
 
Az Legal Contract Buyers/Sellers - 8/2019 current
Az Legal Contract Buyers/Sellers - 8/2019 currentAz Legal Contract Buyers/Sellers - 8/2019 current
Az Legal Contract Buyers/Sellers - 8/2019 current
 
Instructions to bidders
Instructions to biddersInstructions to bidders
Instructions to bidders
 

Viewers also liked

Can have to
Can   have toCan   have to
Passenger Terminal Amsterdam
Passenger Terminal AmsterdamPassenger Terminal Amsterdam
Passenger Terminal Amsterdamguest664fb
 
Ejercicios de óxidos e hidruros
Ejercicios de óxidos  e  hidrurosEjercicios de óxidos  e  hidruros
Ejercicios de óxidos e hidruros
Giuliana Tinoco
 
Guía de aplicación diagrama de cuerpo libre
Guía  de  aplicación diagrama  de  cuerpo  libreGuía  de  aplicación diagrama  de  cuerpo  libre
Guía de aplicación diagrama de cuerpo libre
Giuliana Tinoco
 
Present perfect vs past simple
Present perfect vs past simplePresent perfect vs past simple
Present perfect vs past simple
Anabel Milagros Montes Miranda
 
Guía de la gravedad
Guía de  la  gravedadGuía de  la  gravedad
Guía de la gravedad
Giuliana Tinoco
 
Phonetic sounds 1ero
Phonetic sounds  1eroPhonetic sounds  1ero
Phonetic sounds 1ero
Anabel Milagros Montes Miranda
 
Practica ciclo celular
Practica ciclo celularPractica ciclo celular
Practica ciclo celular
Giuliana Tinoco
 
Guía de estática 2
Guía  de  estática 2Guía  de  estática 2
Guía de estática 2
Giuliana Tinoco
 
Expressing preferences 4to (2)
Expressing preferences 4to (2)Expressing preferences 4to (2)
Expressing preferences 4to (2)
Anabel Milagros Montes Miranda
 

Viewers also liked (10)

Can have to
Can   have toCan   have to
Can have to
 
Passenger Terminal Amsterdam
Passenger Terminal AmsterdamPassenger Terminal Amsterdam
Passenger Terminal Amsterdam
 
Ejercicios de óxidos e hidruros
Ejercicios de óxidos  e  hidrurosEjercicios de óxidos  e  hidruros
Ejercicios de óxidos e hidruros
 
Guía de aplicación diagrama de cuerpo libre
Guía  de  aplicación diagrama  de  cuerpo  libreGuía  de  aplicación diagrama  de  cuerpo  libre
Guía de aplicación diagrama de cuerpo libre
 
Present perfect vs past simple
Present perfect vs past simplePresent perfect vs past simple
Present perfect vs past simple
 
Guía de la gravedad
Guía de  la  gravedadGuía de  la  gravedad
Guía de la gravedad
 
Phonetic sounds 1ero
Phonetic sounds  1eroPhonetic sounds  1ero
Phonetic sounds 1ero
 
Practica ciclo celular
Practica ciclo celularPractica ciclo celular
Practica ciclo celular
 
Guía de estática 2
Guía  de  estática 2Guía  de  estática 2
Guía de estática 2
 
Expressing preferences 4to (2)
Expressing preferences 4to (2)Expressing preferences 4to (2)
Expressing preferences 4to (2)
 

Similar to Sbd procurement of goods section vii special conditions

Contract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.docContract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.doc
MeneerGultom
 
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
GLC
 
3. Particular Conditions of Contract.pptx
3. Particular Conditions of Contract.pptx3. Particular Conditions of Contract.pptx
3. Particular Conditions of Contract.pptx
amitdasky
 
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
UnitedPac Saint Lucia (Conservative Movement)
 
Contract management , GFR Rules, Sampling and Testing.pptx
Contract management , GFR Rules, Sampling and Testing.pptxContract management , GFR Rules, Sampling and Testing.pptx
Contract management , GFR Rules, Sampling and Testing.pptx
sumitmmmecce
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Divyanshu Dayal
 
Adb procurement guidelines icb-b2
Adb procurement guidelines   icb-b2Adb procurement guidelines   icb-b2
Adb procurement guidelines icb-b2
Joy Irman
 
Annex X
Annex XAnnex X
Purchase contract
Purchase contractPurchase contract
Purchase contract
Medhat Saad Eldin
 
BLCO MARKETER
BLCO MARKETERBLCO MARKETER
BLCO MARKETER
seun akinsanya
 
LAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTSLAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTS
authors boards
 
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
Dr. Oliver Massmann
 
Brazil paulo victor agreement
Brazil paulo victor agreementBrazil paulo victor agreement
Brazil paulo victor agreement
7003632
 
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.comDistributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
GLC
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
abenyeung1
 
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docxCONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
MeneerGultom
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
International business transactions- Lectures notes part three part two
International business transactions- Lectures notes part three part twoInternational business transactions- Lectures notes part three part two
International business transactions- Lectures notes part three part two
getabelete
 
Mantenimiento y refaccion casa de justicia de riberalta (cubierta) beni
Mantenimiento y refaccion casa de justicia de riberalta (cubierta)   beniMantenimiento y refaccion casa de justicia de riberalta (cubierta)   beni
Mantenimiento y refaccion casa de justicia de riberalta (cubierta) beni
albertoescobar52
 
Contract for consultancy services time based - a form of contract
Contract for consultancy services   time based - a form of contractContract for consultancy services   time based - a form of contract
Contract for consultancy services time based - a form of contract
Joy Irman
 

Similar to Sbd procurement of goods section vii special conditions (20)

Contract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.docContract For Supply of debarking equipment_CLEAN DRAFT.doc
Contract For Supply of debarking equipment_CLEAN DRAFT.doc
 
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
KD Production and Technology Assistance Agreement (Purchase this doc, Text: 0...
 
3. Particular Conditions of Contract.pptx
3. Particular Conditions of Contract.pptx3. Particular Conditions of Contract.pptx
3. Particular Conditions of Contract.pptx
 
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
HEWANORRA INTERNATIONAL AIRPORT DEVELOPMENT ACT 7 of 2015
 
Contract management , GFR Rules, Sampling and Testing.pptx
Contract management , GFR Rules, Sampling and Testing.pptxContract management , GFR Rules, Sampling and Testing.pptx
Contract management , GFR Rules, Sampling and Testing.pptx
 
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
Clause 14.1 The Contract Price- Understanding Clauses in FIDIC ‘Conditions of...
 
Adb procurement guidelines icb-b2
Adb procurement guidelines   icb-b2Adb procurement guidelines   icb-b2
Adb procurement guidelines icb-b2
 
Annex X
Annex XAnnex X
Annex X
 
Purchase contract
Purchase contractPurchase contract
Purchase contract
 
BLCO MARKETER
BLCO MARKETERBLCO MARKETER
BLCO MARKETER
 
LAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTSLAW ON PUBLIC PROCUREMENT CONTRACTS
LAW ON PUBLIC PROCUREMENT CONTRACTS
 
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
VIETNAM – The World Bank is asking Duane Morris about Doing Business and Gove...
 
Brazil paulo victor agreement
Brazil paulo victor agreementBrazil paulo victor agreement
Brazil paulo victor agreement
 
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.comDistributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
Distributorship Agreement Sample, Purchase this doc, visit sdkpermit.com
 
Itt provision of wi fi network design and implementation services
Itt   provision of wi fi network design and implementation servicesItt   provision of wi fi network design and implementation services
Itt provision of wi fi network design and implementation services
 
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docxCONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
CONTRACT FOR PROJECT MANAGEMENT SERVICE (PMS)_CLEAN DRAFT.docx
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
International business transactions- Lectures notes part three part two
International business transactions- Lectures notes part three part twoInternational business transactions- Lectures notes part three part two
International business transactions- Lectures notes part three part two
 
Mantenimiento y refaccion casa de justicia de riberalta (cubierta) beni
Mantenimiento y refaccion casa de justicia de riberalta (cubierta)   beniMantenimiento y refaccion casa de justicia de riberalta (cubierta)   beni
Mantenimiento y refaccion casa de justicia de riberalta (cubierta) beni
 
Contract for consultancy services time based - a form of contract
Contract for consultancy services   time based - a form of contractContract for consultancy services   time based - a form of contract
Contract for consultancy services time based - a form of contract
 

More from Joy Irman

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Joy Irman
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Joy Irman
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - peroranganJoy Irman
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usahaJoy Irman
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
Joy Irman
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Joy Irman
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
Joy Irman
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Joy Irman
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
Joy Irman
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
Joy Irman
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
Joy Irman
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
Joy Irman
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
Joy Irman
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
Joy Irman
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
Joy Irman
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
Joy Irman
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
Joy Irman
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
Joy Irman
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
Joy Irman
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
Joy Irman
 

More from Joy Irman (20)

Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010Penjelasan atas peraturan presiden nomor 54 tahun 2010
Penjelasan atas peraturan presiden nomor 54 tahun 2010
 
Lampiran iv b jasa konsultansi - perorangan
Lampiran iv b   jasa konsultansi - peroranganLampiran iv b   jasa konsultansi - perorangan
Lampiran iv b jasa konsultansi - perorangan
 
Lampiran iv a jasa konsultansi - badan usaha
Lampiran iv a   jasa konsultansi - badan usahaLampiran iv a   jasa konsultansi - badan usaha
Lampiran iv a jasa konsultansi - badan usaha
 
Consulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development BankConsulting Services Operation Manual, Asian Development Bank
Consulting Services Operation Manual, Asian Development Bank
 
Guidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank FinancingGuidelines for the Use of Consultants under Islamic Development Bank Financing
Guidelines for the Use of Consultants under Islamic Development Bank Financing
 
Guidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA LoansGuidelines for the Employment of Consultants under Japanese ODA Loans
Guidelines for the Employment of Consultants under Japanese ODA Loans
 
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
Guidelines Selection and Employment of Consultants under IBRD Loans and IDA C...
 
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
10 pengadaan barang jasa yang dibiayai dengan dana pinjaman hibah luar negeri
 
12 konsep ramah lingkungan
12 konsep ramah lingkungan12 konsep ramah lingkungan
12 konsep ramah lingkungan
 
13 pengadaan secara elektronik
13 pengadaan secara elektronik13 pengadaan secara elektronik
13 pengadaan secara elektronik
 
6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan6 1 persiapan dan perencanaan pengadaan
6 1 persiapan dan perencanaan pengadaan
 
3 1 organisasi pengadaan
3 1 organisasi pengadaan3 1 organisasi pengadaan
3 1 organisasi pengadaan
 
4 rencana umum pengadaan barang
4 rencana umum pengadaan barang4 rencana umum pengadaan barang
4 rencana umum pengadaan barang
 
5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola5 2 pelaksanaan swakelola
5 2 pelaksanaan swakelola
 
5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola5 1 ketentuan umum swakelola
5 1 ketentuan umum swakelola
 
3 7 penyedia barang jasa
3 7 penyedia barang jasa3 7 penyedia barang jasa
3 7 penyedia barang jasa
 
3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan3 6 pejabat penerima hasil pekerjaan
3 6 pejabat penerima hasil pekerjaan
 
3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan3 5 ulp pejabat pengadaan
3 5 ulp pejabat pengadaan
 
3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen3 4 pejabat pembuat komitmen
3 4 pejabat pembuat komitmen
 

Recently uploaded

Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
Alexandra Fulford
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
Susan Laney
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
hartfordclub1
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
ssuser567e2d
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
my Pandit
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
thesiliconleaders
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
taqyea
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
my Pandit
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
Chandresh Chudasama
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
CLIVE MINCHIN
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
aragme
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 

Recently uploaded (20)

Business storytelling: key ingredients to a story
Business storytelling: key ingredients to a storyBusiness storytelling: key ingredients to a story
Business storytelling: key ingredients to a story
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
buy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accountsbuy old yahoo accounts buy yahoo accounts
buy old yahoo accounts buy yahoo accounts
 
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf2024-6-01-IMPACTSilver-Corp-Presentation.pdf
2024-6-01-IMPACTSilver-Corp-Presentation.pdf
 
Chapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .pptChapter 7 Final business management sciences .ppt
Chapter 7 Final business management sciences .ppt
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
Taurus Zodiac Sign: Unveiling the Traits, Dates, and Horoscope Insights of th...
 
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdfThe 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
The 10 Most Influential Leaders Guiding Corporate Evolution, 2024.pdf
 
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
一比一原版新西兰奥塔哥大学毕业证(otago毕业证)如何办理
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
Unveiling the Dynamic Personalities, Key Dates, and Horoscope Insights: Gemin...
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Structural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for BuildingsStructural Design Process: Step-by-Step Guide for Buildings
Structural Design Process: Step-by-Step Guide for Buildings
 
Best practices for project execution and delivery
Best practices for project execution and deliveryBest practices for project execution and delivery
Best practices for project execution and delivery
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
2022 Vintage Roman Numerals Men Rings
2022 Vintage Roman  Numerals  Men  Rings2022 Vintage Roman  Numerals  Men  Rings
2022 Vintage Roman Numerals Men Rings
 
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 

Sbd procurement of goods section vii special conditions

  • 1. Special Conditions of Contract STANDARD BIDDING DOCUMENTS Procurement of Goods PART 3 – Contract
  • 2. Special Conditions of Contract GCC SCC GCC 1.1(j) The Purchaser’s country is: [insert name of the Purchaser’s Country] GCC 1.1(k) The Purchaser is: [Insert complete legal name of the Purchaser] GCC 1.1 (q) The Project Site(s)/Final Destination(s) is/are: [Insert name(s) and detailed information on the location(s) of the site(s)] GCC 4.2 (a) The meaning of the trade terms shall be as prescribed by Incoterms. If the meaning of any trade term and the rights and obligations of the parties thereunder shall not be as prescribed by Incoterms, they shall be as prescribed by: [exceptional; refer to other internationally accepted trade terms ] GCC 4.2 (b) The version edition of Incoterms shall be [insert date of current edition] GCC 5.1 The language shall be: [insert the name of the language]
  • 3. Special Conditions of Contract GCC SCC GCC 8.1 For notices , the Purchaser’s address shall be: Attention: [ insert full name of person, if applicable] Street Address: [insert street address and number] Floor/ Room number : [insert floor and room number, if applicable] City: [insert name of city or town] ZIP Code: [insert postal ZIP code, if applicable] Country: [insert name of country] Telephone: [include telephone number, including country and city codes] Facsimile number: [insert facsimile number, including country and city codes] Electronic mail address : [insert e-mail address, if applicable] GCC 9.1 The governing law shall be the law of : [insert name of the country or state]
  • 4. Special Conditions of Contract GCC SCC GCC 10.2 The rules of procedure for arbitration proceedings pursuant to GCC Clause 10.2 shall be as follows: [The bidding documents should contain one clause to be retained in the event of a Contract with a foreign Supplier and one clause to be retained in the event of a Contract with a Supplier who is a national of the Purchaser’s country. At the time of finalizing the Contract, the respective applicable clause should be retained in the Contract. The following explanatory note should therefore be inserted as a header to GCC 10.2 in the bidding document. “ Clause 10.2 (a) shall be retained in the case of a Contract with a foreign Supplier and clause 10.2 (b) shall be retained in the case of a Contract with a national of the Purchaser’s country.”]
  • 5. Special Conditions of Contract GCC SCC GCC 10.2 (a) Contract with foreign Supplier: [For contracts entered into with foreign suppliers, International commercial arbitration may have practical advantages over other dispute settlement methods. The World Bank should not be named as arbitrator, nor should it be asked to name an arbitrator. Among the rules to govern the arbitration proceedings, the Purchaser may wish to consider the United Nations Commission on International Trade Law (UNCITRAL) Arbitration Rules of 1976, the Rules of Conciliation and Arbitration of the International Chamber of Commerce (ICC), the Rules of the London Court of International Arbitration or the Rules of Arbitration Institute of the Stockholm Chamber of Commerce.]
  • 6. Special Conditions of Contract GCC SCC GCC 10.2 If the Purchaser chooses the UNCITRAL Arbitration Rules, the following sample clause should be inserted: GCC 10.2 (a)—Any dispute, controversy or claim arising out of or relating to this Contract, or breach, termination or invalidity thereof, shall be settled by arbitration in accordance with the UNCITRAL Arbitration Rules as at present in force. If the Purchaser chooses the Rules of ICC, the following sample clause should be inserted: GCC 10.2 (a)—All disputes arising in connection with the present Contract shall be finally settled under the Rules of Conciliation and Arbitration of the International Chamber of Commerce by one or more arbitrators appointed in accordance with said Rules.
  • 7. Special Conditions of Contract GCC SCC GCC 10.2 If the Purchaser chooses the Rules of Arbitration Institute of Chamber of Commerce, the following sample clause should be inserted: GCC 10.2 (a)—Any dispute, controversy or claim arising out of or in connection with this Contract, or the breach termination or invalidity thereof, shall be settled by arbitration in accordance with the Rules of the Arbitration Institute of the Stockholm Chamber of Commerce. If the Purchaser chooses the Rules of the Court of International Arbitration, the following clause should be inserted: GCC 10.2 (a)—Any dispute arising out of or in connection with this Contract, including any question regarding its existence, validity or termination shall be referred to and finally resolved by arbitration under the Rules of the London Court of International Arbitration, which rules are deemed to be incorporated by reference to this clause.
  • 8. Special Conditions of Contract GCC SCC GCC 10.2 (b) Contracts with Supplier national of the Purchaser’s country: In the case of a dispute between the Purchaser and a Supplier who is a national of the Purchaser’s country, the dispute shall be referred to adjudication or arbitration in accordance with the laws of the Purchaser’s country.
  • 9. Special Conditions of Contract GCC SCC GCC 13.1 Details of Shipping and other Documents to be furnished by the Supplier are [insert the required documents, such as a negotiable bill of lading, a non-negotiable sea way bill, an airway bill, a railway consignment note, a road consignment note, insurance certificate, Manufacturer’s or Supplier’s warranty certificate, inspection certificate issued by nominated inspection agency, Supplier’s factory shipping details etc]. The above documents shall be received by the Purchaser before arrival of the Goods and, if not received, the Supplier will be responsible for any consequent expenses. GCC 15.1 The prices charged for the Goods supplied and the related Services performed [insert “shall” or “shall not,” as appropriate] be adjustable. If prices are adjustable, the following method shall be used to calculate the price adjustment [see attachment to these SCC for a sample Price Adjustment Formula]
  • 10.
  • 11.
  • 12. Special Conditions of Contract GCC SCC GCC 16.1 (ii) On Delivery: Eighty (80) percent of the Contract Price shall be paid on receipt of the Goods and upon submission of the documents specified in GCC Clause 13. (iii) On Acceptance: The remaining ten (10) percent of the Contract Price shall be paid to the Supplier within thirty (30) days after the date of the acceptance certificate for the respective delivery issued by the Purchaser. GCC 16.5 The payment-delay period after which the Purchaser shall pay interest to the supplier shall be [insert number] days. The interest rate that shall be applied is [insert number] %
  • 13. Special Conditions of Contract GCC SCC GCC 18.1 A Performance Security [ insert “shall” or “shall not” be required] [If a Performance Security is required, insert “the amount of the Performance Security shall be: [insert amount] [The amount of the Performance Security is usually expressed as a percentage of the Contract Price. The percentage varies according to the Purchaser’s perceived risk and impact of non performance by the Supplier. A 10% percentage is used under normal circumstances] GCC 18.3 If required, the Performance Security shall be in the form of : [insert “a Bank Guarantee” or ”a Performance Bond”] If required, the Performance security shall be denominated in [insert “a freely convertible currency acceptable to the Purchaser” or “ the currencies of payment of the Contract, in accordance with their portions of the Contract Price”] GCC 18.4 Discharge of the Performance Security shall take place: [ insert date if different from the one indicated in sub clause GCC18.4]
  • 14. Special Conditions of Contract GCC SCC GCC 23.2 The packing, marking and documentation within and outside the packages shall be: [insert in detail the type of packing required, the markings in the packing and all documentation required] GCC 24.1 The insurance coverage shall be as specified in the Incoterms . If not in accordance with Incoterms, insurance shall be as follows: [insert specific insurance provisions agreed upon, including coverage, currency an amount] GCC 25.1 Responsibility for transportation of the Goods shall be as specified in the Incoterms. If not in accordance with Incoterms, responsibility for transportations shall be as follows: [insert “The Supplier is required under the Contract to transport the Goods to a specified place of final destination within the Purchaser’s country, defined as the Project Site, transport to such place of destination in the Purchaser’s country, including insurance and storage, as shall be specified in the Contract, shall be arranged by the Supplier, and related costs shall be included in the Contract Price”; or any other agreed upon trade terms (specify the respective responsibilities of the Purchaser and the Supplier)]
  • 15. Special Conditions of Contract GCC SCC GCC 26.1 The inspections and tests shall be: [insert nature, frequency, procedures for carrying out the inspections and tests] GCC 26.2 The Inspections and tests shall be conducted at: [insert name(s) of location(s)] GCC 27.1 The liquidated damage shall be: [ insert number] % per week GCC 27.1 The maximum amount of liquidated damages shall be: [insert number] % GCC 28.3 The period of validity of the Warranty shall be: [insert number] days For purposes of the Warranty, the place(s) of final destination(s) shall be: [insert name(s) of location(s)] GCC 28.5 The period for repair or replacement shall be: [insert number(s)] days.