SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
Objective:
 Seeking challenging role in the field of Quality/Design and Configuration Management, where I can
utilize effectively my acquired knowledge and experience for the development of an organization and
also enhance my expertise.
Professional Summary
• An active professional, with 5+ years of experience in Aerospace domain. Currently working as
SENIOR MECHANICAL ENGINEER in Safran Engineering Services India Pvt. Ltd.
• Trained, certified and experienced on PDMLINK SSCI and ENOVIA VPM.
• Experience of CAD and PLM tools with proficiency in CATIA V5 and ENOVIA VPM (3D COM
PCE).
• Excellent Leadership, analytical, planning & organizational skills.
• Worked on Green Belt Projects for cycle time reduction and process improvement.
• Experience in design of aircraft structures in concept phase and definition phase.
• Well versed in PDM/VPM concepts like Configuration Management, Bill of Material and Release
Process.
Qualification:
Bachelor’s Degree in Mechanical engineering, KVGCE, SULLIA, Karnataka.
Vishveshwaraya Technological University, Belgaum-Karnataka
Software Skills:
Designing/Application Tools : CATIA V5
PLM Tools : ENOVIA VPM (3D COM PCE), PDM Link SSCI
Operating Systems : Windows
CAD Packages : AutoCAD and SolidWorks
Work Experience:
Employer : Safran Engineering Services India Pvt. Ltd.
Current Designation : Senior Mechanical Engineer
Duration : July 2011 - Till date
Job profile and projects:
1) Project: A350-XWB-900/1000-STRUCTURES(Current)
• Tools : CATIA V5, ENOVIA VPM, PDM Link SSCI
• Client : Airbus-F, Aerolia, Labinal-France
• Role : Senior Mechanical Engineer / Quality & Delivery Responsible
SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
• Duration : Nov 2013-Till Date
Description of the Project:
This project involves designing and detailing of new and modifying the existing primary and
secondary structural parts and brackets for aircraft A350-XWB-900/1000, nose fuselage (Section 11) and
central fuselage (Section12-15) in CATIA V5 with adaptation to the Environment (Geometrical Reference
Mockup) available in VPM.
Part/Assembly/Installation Drawings are Checked-In to the ENOVIA VPM in the corresponding
cabinet. Bill of Material (BOM) is created in PDM LINK and released for manufacturing. Engineering change
note (ECN) and Design Query Note (DQN) are implemented according to the customer requirement on
various parts and assemblies.
As a Senior Mechanical engineer involved in
• Project Planning
• Process implementation for Execution of the project
• Technical Support
• Co-ordination with Client
• Working on components and taking decisions in various designs of structural parts for aircraft with
usage of VPM
• On-Time Delivery and Responsible for the quality of the project
2) Project: A350 -XWB-900-Structures- MSN 17
• Tools : CATIA V5, Enovia VPM, PDM Link SSCI
• Client : Airbus-F, Aerolia, Labinal-France.
• Role : Mechanical Engineer
• Duration : Jun 2013-Oct 2013
Description of the Project:
• This work basically consists of weight reduction (MSN17).
• Involved in Modification of the parts from the Floor region and also the window region.
• Involved in creation of new parts from an existing part with adaptation of ENV.
• Proactively suggested different shape of brackets to optimize the material used.
• Involved in conversion of the parts from Machined to sheet metal and vice versa.
3) Project: A350-XWB-900-Secondary Brackets
• Tools : CATIA V5, CADint, PDM Link SSCI
• Client : Airbus-F, Airbus-GMBH
• Role : Mechanical Engineer
SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
• Duration : Jan 2013-May 2013
Description of the Project:
• Involved in creation of brackets and ramps which are used mainly for harness support.
• Created drawings for the equipped brackets and assemblies of brackets and BOM through PDMLink
SSCI.
• Involved in implementation of ECN on various parts and assemblies.
• Involved in the quality check of the parts designed by the junior engineers.
4) Project: A350 -XWB-900-Structures- FIXED BRACKET ACTIVITY
• Tools : CATIA V5, Enovia VPM, PDM Link SSCI
• Client : Airbus-F, Aerolia, Labinal-France.
• Role : Mechanical Engineer
• Duration : July 2012-Dec 2012
Description of the Project:
• Involved in creation of brackets from basic inputs like the fixations and IPs and taking care of
surrounding parts for interference - Carried out the work through VPM for better visibility.
• Involved in creation of complex sheet metal and machined brackets and tried to optimize the design
following the inputs from stress.
• Tried to reduce the number of parts by designing brackets which could fit in different places by
maintaining minimum deviations.
• Explored various options on the sheet metal work bench to optimize the time taken and shared the
lessons learnt /best practices with the team- resulting in higher efficiency of the team.
• Created BOM through PDMLink SSCI.
5) Project: A350-Flight Test Installation for WING
• Tools : CATIA V5, Enovia VPM, PDM Link SSCI
• Client : Safran Engineering Services UK, UK
• Role : Mechanical Engineer
• Duration : Mar 2012-Jun 2012
Description of the Project:
• Work basically consists of creating a detailed drawing for showing the brackets and supports for FTI
equipments and its description in trailing edge(Sec 25) and leading edge(Sec 22) of A350 Wing.
• Involved in detailing of harness routing and its protection.
• Creation of brackets and supports new parts with adaptation of ENVIRONMENT.
• Experienced in creation of BOM through PDM Link SSCI.
6) Project: A350-XWB-900-STRUCTURES
SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
• Tools : CATIA V5, ENOVIA VPM, PDM Link SSCI, CAD Int.
• Client : Airbus-F, Aerolia, Labinal-France.
• Role : Mechanical Engineer
• Duration : Jul 2011-Feb 2012
Description of the Project:
• Involved in creation structural parts- Viz. Stringers, stringer splices, Cleats, fittings etc. using the
references in the GRM(Geometrical Reference Mockup).
• Machining concepts used - 2.5 axis milling and 5 axis milling.
• Sheet Metal brackets are created as per the requirement.
• Responsible for creation of parts totally in accordance with the AIRBUS methodologies.
• Involved in creation of large assemblies of structural parts and drafting the same.
• Involved in creating the fastener concepts - using HnF tools and proficient with the usage of the
same under different conditions.
• Experienced in creation of BOM through PDMLInk SSCI.
• Involved in implementation of ECN, DQN on various parts and assemblies.
Work Experience:
Employer : MEC Concepts India Pvt Ltd(Deputed to SESI)
Designation : Design Engineer
Duration : Novembor 2010 – Jun 2011
Project: A350 -XWB-900-Structures-Design Principles and Frontier Drawings
• Tools : CATIA V5, PDM Link SSCI, CAD Int
• Client : Airbus-F, Aerolia, Labinal-France.
• Role : Design Engineer
• Duration : Novembor 2010 – Jun 2011
Description of the Project:
• Got trained on the structural parts from experienced designers through on job training.
• Involved in updating of design principles and SAM parts; Few parts were modified according to the
ENV and involved largely in updating of the impacted design principles due to changes from the
SAM.
• Involved in creation and updating of frontier drawings; Mostly involved in creation and updating of
the Frontier drawings with importance given to the tolerances involved and analyze the KC notes.
Trainings undergone and Certification:
• ENOVIA VPM(3D COM PCE) from AIRBUS
• CATIA V5 from MEC
SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
Personal Details:
Father Name Venkatramana Nayak R
Mother Name Jayalaxmi
Date of Birth 04th
Aug 1987
Languages English, Kannada, Hindi.
Other Interests Sports and Music
Present address #50, 4th
cross, 16th
main JP Nagar 2nd
Phase
Bangalore - 560078
I hereby declare that the information furnished above is true to the best of my knowledge.
PLACE: Bangalore.
Date :
SATHEESHCHANDRA R
Mobile: +91 8197374357 | Mail: sathi.nayak87@gmail.com
Personal Details:
Father Name Venkatramana Nayak R
Mother Name Jayalaxmi
Date of Birth 04th
Aug 1987
Languages English, Kannada, Hindi.
Other Interests Sports and Music
Present address #50, 4th
cross, 16th
main JP Nagar 2nd
Phase
Bangalore - 560078
I hereby declare that the information furnished above is true to the best of my knowledge.
PLACE: Bangalore.
Date :

Satheeshchandra R

  • 1.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com Objective:  Seeking challenging role in the field of Quality/Design and Configuration Management, where I can utilize effectively my acquired knowledge and experience for the development of an organization and also enhance my expertise. Professional Summary • An active professional, with 5+ years of experience in Aerospace domain. Currently working as SENIOR MECHANICAL ENGINEER in Safran Engineering Services India Pvt. Ltd. • Trained, certified and experienced on PDMLINK SSCI and ENOVIA VPM. • Experience of CAD and PLM tools with proficiency in CATIA V5 and ENOVIA VPM (3D COM PCE). • Excellent Leadership, analytical, planning & organizational skills. • Worked on Green Belt Projects for cycle time reduction and process improvement. • Experience in design of aircraft structures in concept phase and definition phase. • Well versed in PDM/VPM concepts like Configuration Management, Bill of Material and Release Process. Qualification: Bachelor’s Degree in Mechanical engineering, KVGCE, SULLIA, Karnataka. Vishveshwaraya Technological University, Belgaum-Karnataka Software Skills: Designing/Application Tools : CATIA V5 PLM Tools : ENOVIA VPM (3D COM PCE), PDM Link SSCI Operating Systems : Windows CAD Packages : AutoCAD and SolidWorks Work Experience: Employer : Safran Engineering Services India Pvt. Ltd. Current Designation : Senior Mechanical Engineer Duration : July 2011 - Till date Job profile and projects: 1) Project: A350-XWB-900/1000-STRUCTURES(Current) • Tools : CATIA V5, ENOVIA VPM, PDM Link SSCI • Client : Airbus-F, Aerolia, Labinal-France • Role : Senior Mechanical Engineer / Quality & Delivery Responsible
  • 2.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com • Duration : Nov 2013-Till Date Description of the Project: This project involves designing and detailing of new and modifying the existing primary and secondary structural parts and brackets for aircraft A350-XWB-900/1000, nose fuselage (Section 11) and central fuselage (Section12-15) in CATIA V5 with adaptation to the Environment (Geometrical Reference Mockup) available in VPM. Part/Assembly/Installation Drawings are Checked-In to the ENOVIA VPM in the corresponding cabinet. Bill of Material (BOM) is created in PDM LINK and released for manufacturing. Engineering change note (ECN) and Design Query Note (DQN) are implemented according to the customer requirement on various parts and assemblies. As a Senior Mechanical engineer involved in • Project Planning • Process implementation for Execution of the project • Technical Support • Co-ordination with Client • Working on components and taking decisions in various designs of structural parts for aircraft with usage of VPM • On-Time Delivery and Responsible for the quality of the project 2) Project: A350 -XWB-900-Structures- MSN 17 • Tools : CATIA V5, Enovia VPM, PDM Link SSCI • Client : Airbus-F, Aerolia, Labinal-France. • Role : Mechanical Engineer • Duration : Jun 2013-Oct 2013 Description of the Project: • This work basically consists of weight reduction (MSN17). • Involved in Modification of the parts from the Floor region and also the window region. • Involved in creation of new parts from an existing part with adaptation of ENV. • Proactively suggested different shape of brackets to optimize the material used. • Involved in conversion of the parts from Machined to sheet metal and vice versa. 3) Project: A350-XWB-900-Secondary Brackets • Tools : CATIA V5, CADint, PDM Link SSCI • Client : Airbus-F, Airbus-GMBH • Role : Mechanical Engineer
  • 3.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com • Duration : Jan 2013-May 2013 Description of the Project: • Involved in creation of brackets and ramps which are used mainly for harness support. • Created drawings for the equipped brackets and assemblies of brackets and BOM through PDMLink SSCI. • Involved in implementation of ECN on various parts and assemblies. • Involved in the quality check of the parts designed by the junior engineers. 4) Project: A350 -XWB-900-Structures- FIXED BRACKET ACTIVITY • Tools : CATIA V5, Enovia VPM, PDM Link SSCI • Client : Airbus-F, Aerolia, Labinal-France. • Role : Mechanical Engineer • Duration : July 2012-Dec 2012 Description of the Project: • Involved in creation of brackets from basic inputs like the fixations and IPs and taking care of surrounding parts for interference - Carried out the work through VPM for better visibility. • Involved in creation of complex sheet metal and machined brackets and tried to optimize the design following the inputs from stress. • Tried to reduce the number of parts by designing brackets which could fit in different places by maintaining minimum deviations. • Explored various options on the sheet metal work bench to optimize the time taken and shared the lessons learnt /best practices with the team- resulting in higher efficiency of the team. • Created BOM through PDMLink SSCI. 5) Project: A350-Flight Test Installation for WING • Tools : CATIA V5, Enovia VPM, PDM Link SSCI • Client : Safran Engineering Services UK, UK • Role : Mechanical Engineer • Duration : Mar 2012-Jun 2012 Description of the Project: • Work basically consists of creating a detailed drawing for showing the brackets and supports for FTI equipments and its description in trailing edge(Sec 25) and leading edge(Sec 22) of A350 Wing. • Involved in detailing of harness routing and its protection. • Creation of brackets and supports new parts with adaptation of ENVIRONMENT. • Experienced in creation of BOM through PDM Link SSCI. 6) Project: A350-XWB-900-STRUCTURES
  • 4.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com • Tools : CATIA V5, ENOVIA VPM, PDM Link SSCI, CAD Int. • Client : Airbus-F, Aerolia, Labinal-France. • Role : Mechanical Engineer • Duration : Jul 2011-Feb 2012 Description of the Project: • Involved in creation structural parts- Viz. Stringers, stringer splices, Cleats, fittings etc. using the references in the GRM(Geometrical Reference Mockup). • Machining concepts used - 2.5 axis milling and 5 axis milling. • Sheet Metal brackets are created as per the requirement. • Responsible for creation of parts totally in accordance with the AIRBUS methodologies. • Involved in creation of large assemblies of structural parts and drafting the same. • Involved in creating the fastener concepts - using HnF tools and proficient with the usage of the same under different conditions. • Experienced in creation of BOM through PDMLInk SSCI. • Involved in implementation of ECN, DQN on various parts and assemblies. Work Experience: Employer : MEC Concepts India Pvt Ltd(Deputed to SESI) Designation : Design Engineer Duration : Novembor 2010 – Jun 2011 Project: A350 -XWB-900-Structures-Design Principles and Frontier Drawings • Tools : CATIA V5, PDM Link SSCI, CAD Int • Client : Airbus-F, Aerolia, Labinal-France. • Role : Design Engineer • Duration : Novembor 2010 – Jun 2011 Description of the Project: • Got trained on the structural parts from experienced designers through on job training. • Involved in updating of design principles and SAM parts; Few parts were modified according to the ENV and involved largely in updating of the impacted design principles due to changes from the SAM. • Involved in creation and updating of frontier drawings; Mostly involved in creation and updating of the Frontier drawings with importance given to the tolerances involved and analyze the KC notes. Trainings undergone and Certification: • ENOVIA VPM(3D COM PCE) from AIRBUS • CATIA V5 from MEC
  • 5.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com Personal Details: Father Name Venkatramana Nayak R Mother Name Jayalaxmi Date of Birth 04th Aug 1987 Languages English, Kannada, Hindi. Other Interests Sports and Music Present address #50, 4th cross, 16th main JP Nagar 2nd Phase Bangalore - 560078 I hereby declare that the information furnished above is true to the best of my knowledge. PLACE: Bangalore. Date :
  • 6.
    SATHEESHCHANDRA R Mobile: +918197374357 | Mail: sathi.nayak87@gmail.com Personal Details: Father Name Venkatramana Nayak R Mother Name Jayalaxmi Date of Birth 04th Aug 1987 Languages English, Kannada, Hindi. Other Interests Sports and Music Present address #50, 4th cross, 16th main JP Nagar 2nd Phase Bangalore - 560078 I hereby declare that the information furnished above is true to the best of my knowledge. PLACE: Bangalore. Date :