SAP Document
Management
System Inte g ration
with Content
Ser ver s
Session- ULM211
Agenda


John Walls
   Sr. Consultant, Verbella CMG, LLC




Breck Whitten
   Lead Application Analyst, Halliburton




                         © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
Learning Objectives


As a result of this workshop, you will be able to:
  Understanding of the SAP Content Server and how it fits into
   the SAP Architecture.


  Basic DMS background, and how it can be used within the SAP
   system


  Understanding of the Knowledge Provider (KPro) in SAP and
   DMS


  How this systems can be integrated to handle your document
   imaging needs




                         © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
SAP Content Server – Typical Configuration


                                                                         SAP R/3


           Archive Server
           OnBase, IXOS
          IBM, FileNet, etc



                               CAS Storage
                                 Centera
Jukebox

                                  Server
                        Clients




                     Scanner
                                                          Retrieval of documents done from the
              Scan Client                                 SAP GUI

                                  © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Typical Configuration


                                                    SAP R/3

SAP Content Server
  File system or data base
                              HTTP                                                           SAP Cache
 (No optical Media support)                                                           HTTP     Server



                              HTTP


                                                                                             HTTP

No Scanner Interface for
SAP Content Server
Third party document
capture vendors like Kofax
would have to be used.
                                 Retrieval of documents done from the
                                 SAP GUI using the ECL Viewer

                                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – What is It?


 Software for storing structured data (ADK files) and
  unstructured documents in repositories.
 Product of SAP Web Application Server
 Administration from within SAP, CSADMIN, CCMS-
  RZ20, & OACO
 Communication through the ArchiveLink HTTP
  protocol.
 Multi-OS support including
   – Windows
   – Various Unix systems (New as of 6.30)
 Does not support optical Media no direct scanning
  interface

                         © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Background & Integration


Background
 “The SAP Content Server is the server at the core of
  SAP’s document storage and management concept. It
  provides the technical infrastructure for all document-
  centric applications and business scenarios that do
  not require long-term document archiving”


SAP Integration points
 SAP applications-SAP Business Workplace,
  ArchiveLink, SAP Document Management system
  (DMS), and SAP Knowledge Warehouse.



                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Features


 Ability to create file system and database repositories.
 Support for security certificates (secure key).
 Ability to lock down the files on the content
  repositories.
 Images can be displayed using the ECL viewer or
  desktop applications via Internet Explore.
 Database is limited to 64 Terabytes, Then additional
  Database has to be installed.




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Availability


 Product of SAP AG.
 Current version is 6.40 is now available (since May 1,
  2006.)
 With all the features of 6.30 the new version now
  supports additional UNIX platforms. This version can
  now be installed with Apache 2.0 on UNIX.*
 License is included in mySAP license.
 Supports open source web-server (Apache) and
  database (MaxDB) server platforms.
 Installed using graphical user interface of SAPInst
  (requires Java Runtime Environment).
 Integration tested with leading applications running
  on SAP NetWeaver.
      *Please refer http://service.sap.com/pam for platform availability of the new version.

                                       © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Administration


 The Content Server can be administrated directly from the SAP
 system. Special tools have been developed for monitoring and
 administrating the SAP DB underlying the SAP Content Server.


Use transaction
CSADMIN to go to           SAP.ContentServer.com

the Content Server
and Cache Server
Administration
screen.




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server - Summary

Advantages of the SAP Content Server

The SAP Content Server provides a flexible and scalable architecture. You
can enhance the capacity and performance of the SAP Content Server even
further by using a number of servers and by decoupling the database server
from the HTTP server.

The database is much better suited than a file system to the administration
of large amounts of data. Internally at SAP, the SAP Content Server has
been used for several release cycles to administrate all documentation and
training content.

The SAP DB version is independent of the SAP release. SAP DB version 7.2
is included in the SAP release 4.6C package. This version of the SAP DB
has a capacity of 64 terabytes (maximum). In the unlikely event of this
space being used up, another database can be installed.

Easy-to-use and stable SAP DB administration tools are shipped with the
SAP Content Server. These can be used to make automatic backups, for
example.



                             © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Content Server – Summary Continued


Knowledge Provider is a component of SAP Web Application Server
and provides the general infrastructure for storing and
administrating documents in the SAP Content Server.

Both the SAP database, which serves as a Content Server, and the
Content Server itself are provided with every SAP system
installation. This provides the required technical infrastructure for
all document-oriented applications and business scenarios that do
not require long-term archiving.

SAP Content Server is integrated via the HTTP interface, the actual
storage medium used is transparent to the SAP applications.

The Content Server and the Cache Server are server components
that interact with the Knowledge Provider.




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
SAP DMS - Document Info Record (DIR)


DIR is a term used to describe the document Master
Record. The DIR stores both the actual document and
contains all the Meta data about the document.

Structure of the DIR contains
 Data that is descriptive in character
 Data with a control function such as the document status
 Original application file data
 Data that the system automatically copies

DIR consists of four 4 key fields
 Document number
 Document type
 Document part
 Document version

                         © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Info Record Example


  DMS Record CV02N




                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Info Record Example




DMS Info Record-
Contains
Information about
the record such as
Document status




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – DIR Functions


DMS- DIR Document Info Record

Functions for the document info record
 Number assignment
 Version management
 Classification
 Document hierarchy
 Content versions for original application files
 Find document (Also via Internet / Intranet)
 Document distribution




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Internal Interfaces


Interfaces to internal systems
 Link to other R/3 objects, such as:
   – Materials
   – Equipment
   – Customer
   – WBS Element
   – Batch
   – Layout area
   – Functional location
 Engineering change management with integrated workflow
 SAP Business Workflow
 Document Structures
 Internet application functions


                             © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Internal Interfaces Example




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Internal Interfaces Example



                                     To archive the DIR using CV_DVS
                                      all of the Object Links need to be
                                      removed and the DIR needs to be
                                      flagged for deletion.




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – External Interfaces


Interfaces to external systems

Any workstation application
 CAD systems via SAP-CAD interface
 Archiving using R/3 ArchiveLink or Knowledge Provider




                          © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Number

                                                         The Document Number is the
                                                         main part of the Document Key

                                                         Alphanumeric field up to 25
                                                         characters in Length

                                                         Supports both Internal and Mix
                                                         Number Assignment

                                                         The following three special
                                                         characters are not supported:
                                                         "&", "*" and ",".


    Documents   Document Type              Document part                              Version
    DOC-01-AA   DRW                                                               0             1
    DOC-01-AA   DRW                                                               0             2
    DOC-02-AA   DRW                                                               0             1
    DOC-01-AA   L01                                                               0             1
    DOC-01-AA   L01                                                               0             2



                            © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Type


Document Type is used to categorize documents
according to their distinguishing features

It’s a 3 Character field, such as DRW, L01 or DRM

Internal Document Types include EBR, D01, Q01, Q02
 These Can not be changed, since they are used internally with in
  SAP Applications.

Document Types Control
   Type of number assignment and number range
   Version increment
   Field selection
   Additional fields
   Status processing
   Storage using Knowledge Provider


                         © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Part


The Document Part is used to further sub-divide the document

Common uses

       To differentiate between different types of drawings- for
example electrical and the mechanical drawing or a drawing in
English vs a drawing in Spanish



It’s a three character alphanumeric field

These three special characters are not supported: "&", "*" and ",".




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP DMS – Document Versions


Document versions are used to represent the different change or
delivery statuses of a document.

The Document version is an alphanumeric field in which you can
enter up to two characters.

The default value is ’00’ and is Assigned Automatically or Manually

Engineering change management can be integrated into the
document management functions to give the document version a
reference to time, or assign it an effective period. The version can
also be linked to a particular change that may also affect other R/3
objects




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
SAP Knowledge Provider – Overview (KPro)


SAP Knowledge Provider (KPro) is the central service in SAP Basis
for administrating and storing any kind of documents and
document-like objects.

As a document infrastructure, KPro rarely appears on the SAP
system interface, with the exception of a small number of key
administration and Customizing transactions.

Application-independence is a central characteristic of KPro.
Because KPro is application-independent, it can provide a wide
range of different, and in some cases optional, services that can be
used by different R/3 applications.




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – Service Layers


The Knowledge Provider consists of 3 major
parts:

      DMS Document Management Service

      CMS Content Management Service

      IMS Index Management Service



            Each part has special tasks and its own view
            onto documents



                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – Components

KPro Clients
  Knowledge
  Warehouse        DMS                               BDS                          Others



KPro Services
  Document        Content                     Index
 Management                                                                      Document
                Management                 Management
   Service                                                                        Retrieval
                  Service                    Service



KPro Server Integration
   Content        Cache                           Index                             Web
   Server         Server                          Server                           Server



                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – Service Layers


Provider has two layers: Document Management Service and
Content Management Service

Document Management Service (DMS)

DMS is the KPro service that is the closest to the application level.
The goal of the DMS is to provide an application programming
interface (API) that allows the application to efficiently administrate
documents without having to concern itself with the specific details
of the physical repository.
 The DMS also provides what is known as a “document model”. The DMS
  ensures that the rules set down in the document model are adhered to.
  The Document Modeling Service is part of the DMS, and allows the user
  to create application-specific document models.

It lies on top on the KPro Content Management Service.



                            © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – Service Layers


Content Management Service (CMS)

The CMS layer handles the technical details of the repository and
administration functions. These details include creating document
versions, document retrieval, and administrating the server
containing the repositories.

An Application can run directly on the CMS and leave out the DMS
services altogether




                          © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – General Information (KPro)


More general information....

The release level of the KPRO Components are not depending on
the R/3 system release level
 e.g. 4.6D KPro Components will work with a 4.6b R/3 System since the
  HTTP Interface is the same (HTTP 4.6 Protocol)
 Note: The R/3 KPro service is available since 4.6b!




                             © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Knowledge Provider – KPro verses ArchiveLink


   ArchiveLink                                            KPro
Is supported by all R/3 versions                      Is supported only by 4.6C and higher

With one DIR you can handle                           KPro has no limitation!
2 originals
99 Additional files

Caching is not possible!                              Caching is possible!
Not possible                                          Possibility to use a searching engine, e.g.
                                                      T-Rex.

                                                      Fulltext search is done by CMS (Content
                                                      Management Service).

                                                      Supported formats in the SAP-Standard:
                                                      DOC, EXL, PPT, PDF, plain html, plain text

ArchiveLink is using the Link tables TOA0x            Is not using Link tables TOA0X.

Can use RFC protocol or HTTP Protocol                 Only uses HTTP Protocol



                                   © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
Integration of the SAP CS and DMS – Overview



                     SAP Knowledge Provider Services and Clients




                         Development




                                              Management
         Warehouse
         Knowledge




                                                                                          Workplace
                                               Document




                                                                    Workflow
                                                                    Business




                                                                                          Business
                           Archive




                                                                                                          Others
                             Kit
               SAP Knowledge Provider clients: SAP solutions and components


                                        DMWB                      Document Management Service


                                         Content Management Service

                                       SAP Knowledge Provider services


         Index server             Cache server                   Content server                  KPro web server

                             SAP Knowledge Provider server integration




                                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Integration of the SAP CS and DMS – Overview 4.6C



       DMS            CRM                   DMWB                             Knowledge
      (DVS)          (BDN)                                                   Warehouse

                     BDS                                          KW Framework

                       KPRO Model Layer
Archive Link
                                            DMS                                KPRO

                             CMS                                                IMS
R
            H
                 H                                                               R
 SAP Content Server &                                                         Search-
Third-Party Repositories                                                      engine
                       © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
SAP Basic Customizing DMS – Document Types




                    © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing DMS – Document Types




                    © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing DMS – Document Types




                    © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing DMS – Linking DIR to R/3 Objects



                                                                            Document type
                                                                            controls which SAP
                                                                            objects the DIR can
                                                                            be linked to

                                                                            Maintenance of the
                                                                            Object link can be
                                                                            done from either
                                                                            the document or
                                                                            the Object




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing DMS – Data Carrier Types




                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing DMS – Define Server paths




             This is where you define the temporary storage of
             file attachments.




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing Storage – Content Repository



                                              OAC0- Creation of the SAP
                                              Content Repository
                                              ArchiveLink 45
                                              HTTP Content Server

                                              2 repositories were created one
                                              with a Document Area of Archive
                                              Link and another with a document
                                              area of DMS.

                                              SRM will use the Content
                                              Repository with the DMS
                                              document area.




                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing Storage – Storage Categories



                                                       The storage category links the
                                                       storage category with a
                                                       content repository.

                                                       SRM will reference the storage
                                                       category and from this
                                                       configuration determine the
                                                       storage location as a content
                                                       repository.




                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SAP Basic Customizing Define workstation applications




This is where you define the specifics about the applications
associated with the DMS document types. The applications are
linked to the Data carrier type and provide the necessary
configuration to allow DMS to launch the application to display the
linked object.




                            © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
Halliburton Case Study

 KBR division went live on R/3 Enterprise 4.7
 Also implemented SRM

 The Imaging Requirements
 KBR needed to bring attachments from SRM and link these attachments
  to the purchase order created in R/3.
 The process needed to bring the SRM attachments and create the DMS
  Info Record and archive the attachments with the DIR into a third party
  content repository.
 KBR also wanted to store PO versions in the form of a PDF file to show
  the progression of changes to the PO.




                             © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
PO linked to DMS Info Record

                       When you display the purchase
                       order you can see the attachment
                       to the DMS Info Record by clicking
                       on the attachment button.

                       When you double click on the
                       linked document it will display the
                       DMS info record.




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
SRM Attachment linked to DMS Info Record




                                                                This shows a linked excel
                                                                spreadsheet and its
                                                                association with the
                                                                purchase order line Item.
                                                                If you double click on the
                                                                excel document it will
                                                                display it from the archive.



                     © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
PO Versioning example




                        © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Overview of the SAP Content Server
Overview of the SAP DMS
Overview of the Knowledge Provider
Integration of the Content Server and DMS
Basic Customizing
Customer Case Study
Wrap up & Questions
Summary

   DMS can use either ArchiveLink or KPro to store documents on
    the Content Server or other third party content servers.

   A single DMS record can be assigned to multiple SAP objects

   DMS projects can be complex, since DMS is a whole module

   Content Server is a viable solution in many cases.




                           © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Further Information

   Public Web:
    www.sap.com
    www.sdn.sap.com

   Americas’ SAP Users’ Group (ASUG)
    www.asug.com

   Related Workshops/Lectures at SAP TechEd ’06




                      © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
THANK YOU FOR YOUR
                ATTENTION !


QUESTIONS   –   SUGGESTIONS                                   –         DISCUSSION




                  © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
Feedback
          Please complete your session evaluation.

           Be courteous — deposit your trash,
  and do not take the handouts for the following session.

                         Thank You !
John Walls                                     Breck Whitten
John.Walls@VerbellaCMG                         Breck.Whitten@Halliburton.com
484-888-2199
                            © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211

SAP Document Management System Integration with Content Servers

  • 1.
    SAP Document Management System Integ ration with Content Ser ver s Session- ULM211
  • 2.
    Agenda John Walls Sr. Consultant, Verbella CMG, LLC Breck Whitten Lead Application Analyst, Halliburton © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 3.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 4.
    Learning Objectives As aresult of this workshop, you will be able to:  Understanding of the SAP Content Server and how it fits into the SAP Architecture.  Basic DMS background, and how it can be used within the SAP system  Understanding of the Knowledge Provider (KPro) in SAP and DMS  How this systems can be integrated to handle your document imaging needs © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 5.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 6.
    SAP Content Server– Typical Configuration SAP R/3 Archive Server OnBase, IXOS IBM, FileNet, etc CAS Storage Centera Jukebox Server Clients Scanner Retrieval of documents done from the Scan Client SAP GUI © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 7.
    SAP Content Server– Typical Configuration SAP R/3 SAP Content Server File system or data base HTTP SAP Cache (No optical Media support) HTTP Server HTTP HTTP No Scanner Interface for SAP Content Server Third party document capture vendors like Kofax would have to be used. Retrieval of documents done from the SAP GUI using the ECL Viewer © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 8.
    SAP Content Server– What is It?  Software for storing structured data (ADK files) and unstructured documents in repositories.  Product of SAP Web Application Server  Administration from within SAP, CSADMIN, CCMS- RZ20, & OACO  Communication through the ArchiveLink HTTP protocol.  Multi-OS support including – Windows – Various Unix systems (New as of 6.30)  Does not support optical Media no direct scanning interface © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 9.
    SAP Content Server– Background & Integration Background  “The SAP Content Server is the server at the core of SAP’s document storage and management concept. It provides the technical infrastructure for all document- centric applications and business scenarios that do not require long-term document archiving” SAP Integration points  SAP applications-SAP Business Workplace, ArchiveLink, SAP Document Management system (DMS), and SAP Knowledge Warehouse. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 10.
    SAP Content Server– Features  Ability to create file system and database repositories.  Support for security certificates (secure key).  Ability to lock down the files on the content repositories.  Images can be displayed using the ECL viewer or desktop applications via Internet Explore.  Database is limited to 64 Terabytes, Then additional Database has to be installed. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 11.
    SAP Content Server– Availability  Product of SAP AG.  Current version is 6.40 is now available (since May 1, 2006.)  With all the features of 6.30 the new version now supports additional UNIX platforms. This version can now be installed with Apache 2.0 on UNIX.*  License is included in mySAP license.  Supports open source web-server (Apache) and database (MaxDB) server platforms.  Installed using graphical user interface of SAPInst (requires Java Runtime Environment).  Integration tested with leading applications running on SAP NetWeaver. *Please refer http://service.sap.com/pam for platform availability of the new version. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 12.
    SAP Content Server– Administration The Content Server can be administrated directly from the SAP system. Special tools have been developed for monitoring and administrating the SAP DB underlying the SAP Content Server. Use transaction CSADMIN to go to SAP.ContentServer.com the Content Server and Cache Server Administration screen. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 13.
    SAP Content Server- Summary Advantages of the SAP Content Server The SAP Content Server provides a flexible and scalable architecture. You can enhance the capacity and performance of the SAP Content Server even further by using a number of servers and by decoupling the database server from the HTTP server. The database is much better suited than a file system to the administration of large amounts of data. Internally at SAP, the SAP Content Server has been used for several release cycles to administrate all documentation and training content. The SAP DB version is independent of the SAP release. SAP DB version 7.2 is included in the SAP release 4.6C package. This version of the SAP DB has a capacity of 64 terabytes (maximum). In the unlikely event of this space being used up, another database can be installed. Easy-to-use and stable SAP DB administration tools are shipped with the SAP Content Server. These can be used to make automatic backups, for example. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 14.
    SAP Content Server– Summary Continued Knowledge Provider is a component of SAP Web Application Server and provides the general infrastructure for storing and administrating documents in the SAP Content Server. Both the SAP database, which serves as a Content Server, and the Content Server itself are provided with every SAP system installation. This provides the required technical infrastructure for all document-oriented applications and business scenarios that do not require long-term archiving. SAP Content Server is integrated via the HTTP interface, the actual storage medium used is transparent to the SAP applications. The Content Server and the Cache Server are server components that interact with the Knowledge Provider. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 15.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 16.
    SAP DMS -Document Info Record (DIR) DIR is a term used to describe the document Master Record. The DIR stores both the actual document and contains all the Meta data about the document. Structure of the DIR contains  Data that is descriptive in character  Data with a control function such as the document status  Original application file data  Data that the system automatically copies DIR consists of four 4 key fields  Document number  Document type  Document part  Document version © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 17.
    SAP DMS –Document Info Record Example DMS Record CV02N © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 18.
    SAP DMS –Document Info Record Example DMS Info Record- Contains Information about the record such as Document status © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 19.
    SAP DMS –DIR Functions DMS- DIR Document Info Record Functions for the document info record  Number assignment  Version management  Classification  Document hierarchy  Content versions for original application files  Find document (Also via Internet / Intranet)  Document distribution © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 20.
    SAP DMS –Internal Interfaces Interfaces to internal systems  Link to other R/3 objects, such as: – Materials – Equipment – Customer – WBS Element – Batch – Layout area – Functional location  Engineering change management with integrated workflow  SAP Business Workflow  Document Structures  Internet application functions © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 21.
    SAP DMS –Internal Interfaces Example © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 22.
    SAP DMS –Internal Interfaces Example  To archive the DIR using CV_DVS all of the Object Links need to be removed and the DIR needs to be flagged for deletion. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 23.
    SAP DMS –External Interfaces Interfaces to external systems Any workstation application  CAD systems via SAP-CAD interface  Archiving using R/3 ArchiveLink or Knowledge Provider © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 24.
    SAP DMS –Document Number The Document Number is the main part of the Document Key Alphanumeric field up to 25 characters in Length Supports both Internal and Mix Number Assignment The following three special characters are not supported: "&", "*" and ",". Documents Document Type Document part Version DOC-01-AA DRW 0 1 DOC-01-AA DRW 0 2 DOC-02-AA DRW 0 1 DOC-01-AA L01 0 1 DOC-01-AA L01 0 2 © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 25.
    SAP DMS –Document Type Document Type is used to categorize documents according to their distinguishing features It’s a 3 Character field, such as DRW, L01 or DRM Internal Document Types include EBR, D01, Q01, Q02  These Can not be changed, since they are used internally with in SAP Applications. Document Types Control  Type of number assignment and number range  Version increment  Field selection  Additional fields  Status processing  Storage using Knowledge Provider © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 26.
    SAP DMS –Document Part The Document Part is used to further sub-divide the document Common uses To differentiate between different types of drawings- for example electrical and the mechanical drawing or a drawing in English vs a drawing in Spanish It’s a three character alphanumeric field These three special characters are not supported: "&", "*" and ",". © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 27.
    SAP DMS –Document Versions Document versions are used to represent the different change or delivery statuses of a document. The Document version is an alphanumeric field in which you can enter up to two characters. The default value is ’00’ and is Assigned Automatically or Manually Engineering change management can be integrated into the document management functions to give the document version a reference to time, or assign it an effective period. The version can also be linked to a particular change that may also affect other R/3 objects © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 28.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 29.
    SAP Knowledge Provider– Overview (KPro) SAP Knowledge Provider (KPro) is the central service in SAP Basis for administrating and storing any kind of documents and document-like objects. As a document infrastructure, KPro rarely appears on the SAP system interface, with the exception of a small number of key administration and Customizing transactions. Application-independence is a central characteristic of KPro. Because KPro is application-independent, it can provide a wide range of different, and in some cases optional, services that can be used by different R/3 applications. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 30.
    SAP Knowledge Provider– Service Layers The Knowledge Provider consists of 3 major parts: DMS Document Management Service  CMS Content Management Service  IMS Index Management Service Each part has special tasks and its own view onto documents © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 31.
    SAP Knowledge Provider– Components KPro Clients Knowledge Warehouse DMS BDS Others KPro Services Document Content Index Management Document Management Management Service Retrieval Service Service KPro Server Integration Content Cache Index Web Server Server Server Server © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 32.
    SAP Knowledge Provider– Service Layers Provider has two layers: Document Management Service and Content Management Service Document Management Service (DMS) DMS is the KPro service that is the closest to the application level. The goal of the DMS is to provide an application programming interface (API) that allows the application to efficiently administrate documents without having to concern itself with the specific details of the physical repository.  The DMS also provides what is known as a “document model”. The DMS ensures that the rules set down in the document model are adhered to. The Document Modeling Service is part of the DMS, and allows the user to create application-specific document models. It lies on top on the KPro Content Management Service. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 33.
    SAP Knowledge Provider– Service Layers Content Management Service (CMS) The CMS layer handles the technical details of the repository and administration functions. These details include creating document versions, document retrieval, and administrating the server containing the repositories. An Application can run directly on the CMS and leave out the DMS services altogether © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 34.
    SAP Knowledge Provider– General Information (KPro) More general information.... The release level of the KPRO Components are not depending on the R/3 system release level  e.g. 4.6D KPro Components will work with a 4.6b R/3 System since the HTTP Interface is the same (HTTP 4.6 Protocol)  Note: The R/3 KPro service is available since 4.6b! © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 35.
    SAP Knowledge Provider– KPro verses ArchiveLink ArchiveLink KPro Is supported by all R/3 versions Is supported only by 4.6C and higher With one DIR you can handle KPro has no limitation! 2 originals 99 Additional files Caching is not possible! Caching is possible! Not possible Possibility to use a searching engine, e.g. T-Rex. Fulltext search is done by CMS (Content Management Service). Supported formats in the SAP-Standard: DOC, EXL, PPT, PDF, plain html, plain text ArchiveLink is using the Link tables TOA0x Is not using Link tables TOA0X. Can use RFC protocol or HTTP Protocol Only uses HTTP Protocol © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 36.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 37.
    Integration of theSAP CS and DMS – Overview SAP Knowledge Provider Services and Clients Development Management Warehouse Knowledge Workplace Document Workflow Business Business Archive Others Kit SAP Knowledge Provider clients: SAP solutions and components DMWB Document Management Service Content Management Service SAP Knowledge Provider services Index server Cache server Content server KPro web server SAP Knowledge Provider server integration © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 38.
    Integration of theSAP CS and DMS – Overview 4.6C DMS CRM DMWB Knowledge (DVS) (BDN) Warehouse BDS KW Framework KPRO Model Layer Archive Link DMS KPRO CMS IMS R H H R SAP Content Server & Search- Third-Party Repositories engine © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 39.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 40.
    SAP Basic CustomizingDMS – Document Types © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 41.
    SAP Basic CustomizingDMS – Document Types © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 42.
    SAP Basic CustomizingDMS – Document Types © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 43.
    SAP Basic CustomizingDMS – Linking DIR to R/3 Objects Document type controls which SAP objects the DIR can be linked to Maintenance of the Object link can be done from either the document or the Object © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 44.
    SAP Basic CustomizingDMS – Data Carrier Types © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 45.
    SAP Basic CustomizingDMS – Define Server paths This is where you define the temporary storage of file attachments. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 46.
    SAP Basic CustomizingStorage – Content Repository OAC0- Creation of the SAP Content Repository ArchiveLink 45 HTTP Content Server 2 repositories were created one with a Document Area of Archive Link and another with a document area of DMS. SRM will use the Content Repository with the DMS document area. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 47.
    SAP Basic CustomizingStorage – Storage Categories The storage category links the storage category with a content repository. SRM will reference the storage category and from this configuration determine the storage location as a content repository. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 48.
    SAP Basic CustomizingDefine workstation applications This is where you define the specifics about the applications associated with the DMS document types. The applications are linked to the Data carrier type and provide the necessary configuration to allow DMS to launch the application to display the linked object. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 49.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 50.
    Halliburton Case Study KBR division went live on R/3 Enterprise 4.7  Also implemented SRM  The Imaging Requirements  KBR needed to bring attachments from SRM and link these attachments to the purchase order created in R/3.  The process needed to bring the SRM attachments and create the DMS Info Record and archive the attachments with the DIR into a third party content repository.  KBR also wanted to store PO versions in the form of a PDF file to show the progression of changes to the PO. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 51.
    PO linked toDMS Info Record When you display the purchase order you can see the attachment to the DMS Info Record by clicking on the attachment button. When you double click on the linked document it will display the DMS info record. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 52.
    SRM Attachment linkedto DMS Info Record This shows a linked excel spreadsheet and its association with the purchase order line Item. If you double click on the excel document it will display it from the archive. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 53.
    PO Versioning example © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 54.
    Overview of theSAP Content Server Overview of the SAP DMS Overview of the Knowledge Provider Integration of the Content Server and DMS Basic Customizing Customer Case Study Wrap up & Questions
  • 55.
    Summary  DMS can use either ArchiveLink or KPro to store documents on the Content Server or other third party content servers.  A single DMS record can be assigned to multiple SAP objects  DMS projects can be complex, since DMS is a whole module  Content Server is a viable solution in many cases. © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 56.
    Further Information  Public Web: www.sap.com www.sdn.sap.com  Americas’ SAP Users’ Group (ASUG) www.asug.com  Related Workshops/Lectures at SAP TechEd ’06 © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 57.
    THANK YOU FORYOUR ATTENTION ! QUESTIONS – SUGGESTIONS – DISCUSSION © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211
  • 58.
    Feedback Please complete your session evaluation. Be courteous — deposit your trash, and do not take the handouts for the following session. Thank You ! John Walls Breck Whitten John.Walls@VerbellaCMG Breck.Whitten@Halliburton.com 484-888-2199 © SAP AG 2006, SAP TechEd ’06 / Session ID / ULM211