Program Evaluation Plan (Part 3)
Goals of Evaluation
Evaluation refers to the act of checking various things
thoroughly in order to characterize their worth or value, with
reference to a certain context. In the field of education, the
amount of success in a person’s aims can only be determined
through evaluation. Therefore, there is a very close relationship
between various aims and evaluation. The main goals of
evaluation in schools are as discussed below. The first goal of
evaluation in the field of education is to create an educational
program ("Evaluation in Teaching and Learning Process |
Education", 2020). Through evaluation, evaluators and the
school management can build a given program of learning
among the students. This is after gathering and checking various
factors in order to find what program will fit and make a
positive impact in the school. This involves consulting all the
stakeholders of the program and developing strategies that will
ensure the development of a good program.
The second goal of evaluation is assessing the effectiveness of
the program. Evaluation ensures that the developed program is
up to standards and serves the purpose that it was intended to. It
helps the evaluators to check if the teaching strategies and
techniques are being applied properly. The third goal of
evaluation is to ensure improvement of the program. Through
evaluation, evaluators can gauge the impact of the program on
the school and learners. They can also identify various things
that can make the program more effective. It acts as an in-built
monitor in the program in order to review the progress of the
program from time to time. It also gives feedback regarding the
design and the implementation of a given program. Through
such assessments, the school management can know where to
work on, and what they need in order to enhance effective
programs in teaching and learning.
For instance, in our case, evaluators can comfortably tell
whether or not the program is helping girls become more
superior in math. If not they can suggest better or other
strategies that will make positive impact.
Cultural Issues Affecting the Program
Culture can influence how different people view things. An
individual’s culture and upbringing can affect their way of
processing information. Among the cultural issues that might be
faced in the evaluation plan include cultural stereotypes. Some
students believe that they cannot perform as expected in school
or in a particular subject due to lack of preparation from their
home environment. This makes them believe they do not have
enough potential to do well in a given subject when they get to
school. For instance, some students may not have calculators
and revision materials for mathematics at home. This makes
them poor in calculations and solving complex problems due to
poor practice (Gelb, 2020). As a result, some students get to
school lacking various basics and lag behind due to deficiencies
in their homes. This also makes them to have shortcomings in
knowledge and skills that lead to poor performances. However,
this can be corrected by using time wisely while in school and
utilizing the resources in the school premises properly to
improve their skills by doing regular practice.
Another cultural issue is assumption and poor treatment of
learners by teachers. Some teachers expect very less from
learners from specific cultural backgrounds. When teachers
have the mentality of students performing poorly for whatever
reason, their teaching approaches align with their low
expectation levels. This may affect the program negatively
because no matter how much girls try to improve in math, their
teachers have already formed a negative perspective. The
teachers may not find it important to motivate the students to do
well in math because they do not believe they have that
potential.
This can be solved by helping teachers and students change
mentalities that have been developed and associated with their
cultures. Different people have different capabilities and can
handle things their own way if properly directed.
Another issue that may affect the evaluation program is cultural
differences between students. Some students believe that only
people from a certain background can perform better in a
certain subject. People from various cultural traditions may
have different education approaches that differ from the
approaches in American schools ("Current Issues in Education",
2020). It is important for the teachers to note such things and
encourage students to work hard in all areas despite their
differences in cultural beliefs. Students should not feel inferior
because of being associated with various cultures. They should
acknowledge they have what it takes and the ability to perform
better in all areas. Teachers should understand the cultures of
every student, and their students at an individual level. Teachers
should treat all students the same despite their gender, racial or
cultural backgrounds, and have high expectations for everyone
in order to enable them to strive and reach their full potential.
Data Analysis and Assessment
The evaluation plan will be carried out using stratified random
sampling. This sampling technique involves diving the study
population into meaningful similar groups based on a specific
characteristic called strata. Thereafter, a random sample is
selected from every group. This type of sampling ensures proper
representativeness on a trait of interest in the population.
Through this sampling method, a wider range of population can
be well studied without a large sample size.
The evaluation plan will use three methods of assessment which
are formative, summative and process assessment. We will
begin the program with process assessment. Process assessment
identifies the milestone of the project, activities to be done,
products to be expected, and the costs that are likely to be
incurred in order to achieve the goals. Formative assessment is
whereby the results are used to form and revise the process of
an education plan. In case the plan needs any improvement or
ways of strengthening it, formative assessment will help us
identify that. Summative assessment helps in documenting
outcomes and value judgment. Through summative assessment,
we will have the necessary feedback about the quality of the
plan. The initiation and implementation of the program will take
three to four weeks. Evaluation will begin after three to four
months through data collection and proper assessment.
Tasks, Costs Personnel, and Questions Involved in the Plan
TASKS
COSTS
QUESTIONS FOR THE INTERVIEW
PERSONNEL
· Data analysis costs
· What were the former grades for the selected population?
· Teachers
· Data Analysis
· Salaries for the Evaluators
· What were the expected grades?
· Evaluators
· Presentation of the outcome
· Transportation costs
· What did you achieve?
· Students
· How was it competing with boys for the first time?
· Did the program motivate you?
· Do you have a different perspective on Math after the
program?
Evaluation Timeline
Project Goal
Activity
Activity
Expected Completion Date
Continue conducting process evaluation for the program on
gender equity for girls in Math
Monitoring the operations of the evaluation program
Conduct visits to review program operations
May-20
Continue conducting evaluation of the outcome
Complete data collection for the group under study
work with the female students for the program success
May-20
Finalize collecting data procedures for the control group
collect data on culture and personal perspectives
Jun-20
Access the information sources for data collection follow up on
the measures of outcome for the experimental groups
Extract data
Jun-20
Sample case tracking and interviewing
Extract data
Jul-20
Build and implement data analysis and reporting initial plans
Conduct data analysis and reports
Jul-20
Release the final outcome
Give a final report about the program
Organize the reports for final presentation
Aug-20
Expected Costs
The expected costs for the project include:
$ 20,000 for data collection
$ 10,000 for data analysis
$ 50,000 for paying evaluators
$ 30, 000 for transport
$ 10,000 miscellaneous
The total cost of the plan will be $ 120, 000.
Cost benefit analysis is a method used in comparing the total
costs of a program with its benefits ("Cost Benefit Analysis: An
Expert Guide | Smartsheet", 2020). It helps in the calculation of
the benefit associated with the program. In this case, we might
not be able to account for the benefit in terms of cash because
the entire program is based on services. However, there will be
cost reduction methods through assistance given by the teachers
and the study population. The school will highly benefit from
the program by acknowledging the importance of gender equity
for girls in Math. They will realize the potential that girls have
with regards to Math subject. This will help them improve their
performance and start empowering fair competition among the
learners.
References
Cost Benefit Analysis: An Expert Guide | Smartsheet. (2020).
Retrieved 20 February 2020, from
https://www.smartsheet.com/expert-guide-cost-benefit-analysis
Current Issues in Education. (2020). Retrieved 20 February
2020, from https://www.cliffsnotes.com/study-
guides/sociology/education/current-issues-in-education
Evaluation in Teaching and Learning Process | Education.
(2020). Retrieved 20 February 2020, from
http://www.yourarticlelibrary.com/statistics-2/evaluation-in-
teaching-and-learning-process-education/92476
Gelb, C. (2020). Cultural Issues in the Higher Education
Classroom. Retrieved 20 February 2020, from
http://www.inquiriesjournal.com/articles/661/cultural-issues-in-
the-higher-education-classroom
Information Technology
and Organizational
Learning
Managing Behavioral Change
in the Digital Age
Third Edition
http://taylorandfrancis.com
Information Technology
and Organizational
Learning
Managing Behavioral Change
in the Digital Age
Third Edition
Arthur M. Langer
CRC Press
Taylor & Francis Group
6000 Broken Sound Parkway NW, Suite 300
Boca Raton, FL 33487-2742
© 2018 by Taylor & Francis Group, LLC
CRC Press is an imprint of Taylor & Francis Group, an Informa
business
No claim to original U.S. Government works
Printed on acid-free paper
International Standard Book Number-13: 978-1-4987-7575-5
(Paperback)
International Standard Book Number-13: 978-1-138-23858-9
(Hardback)
This book contains information obtained from authentic and
highly regarded sources. Reasonable
efforts have been made to publish reliable data and information,
but the author and publisher cannot
assume responsibility for the validity of all materials or the
consequences of their use. The authors and
publishers have attempted to trace the copyright holders of all
material reproduced in this publication
and apologize to copyright holders if permission to publish in
this form has not been obtained. If any
copyright material has not been acknowledged please write and
let us know so we may rectify in any
future reprint.
Except as permitted under U.S. Copyright Law, no part of this
book may be reprinted, reproduced,
transmitted, or utilized in any form by any electronic,
mechanical, or other means, now known or
hereafter invented, including photocopying, microfilming, and
recording, or in any information stor-
age or retrieval system, without written permission from the
publishers.
For permission to photocopy or use material electronically from
this work, please access www.copy-
right.com (http://www.copyright.com/) or contact the Copyright
Clearance Center, Inc. (CCC), 222
Rosewood Drive, Danvers, MA 01923, 978-750-8400. CCC is a
not-for-profit organization that
provides licenses and registration for a variety of users. For
organizations that have been granted a
photocopy license by the CCC, a separate system of payment
has been arranged.
Trademark Notice: Product or corporate names may be
trademarks or registered trademarks, and are
used only for identification and explanation without intent to
infringe.
Visit the Taylor & Francis Web site at
http://www.taylorandfrancis.com
and the CRC Press Web site at
http://www.crcpress.com
v
Contents
Foreword xi
Acknowledgments xiii
Author xv
IntroductIon xvii
chApter 1 the “rAvell” corporAtIon 1
Introduction 1
A New Approach 3
The Blueprint for Integration 5
Enlisting Support 6
Assessing Progress 7
Resistance in the Ranks 8
Line Management to the Rescue 8
IT Begins to Reflect 9
Defining an Identity for Information Technology 10
Implementing the Integration: A Move toward Trust and
Reflection 12
Key Lessons 14
Defining Reflection and Learning for an Organization 14
Working toward a Clear Goal 15
Commitment to Quality 15
Teaching Staff “Not to Know” 16
Transformation of Culture 16
Alignment with Administrative Departments 17
Conclusion 19
vi Contents
chApter 2 the It dIlemmA 21
Introduction 21
Recent Background 23
IT in the Organizational Context 24
IT and Organizational Structure 24
The Role of IT in Business Strategy 25
Ways of Evaluating IT 27
Executive Knowledge and Management of IT 28
IT: A View from the Top 29
Section 1: Chief Executive Perception of the Role of IT 32
Section 2: Management and Strategic Issues 34
Section 3: Measuring IT Performance and Activities 35
General Results 36
Defining the IT Dilemma 36
Recent Developments in Operational Excellence 38
chApter 3 technology As A vArIAble And responsIve
orgAnIzAtIonAl dynAmIsm 41
Introduction 41
Technological Dynamism 41
Responsive Organizational Dynamism 42
Strategic Integration 43
Summary 48
Cultural Assimilation 48
IT Organization Communications with “ Others” 49
Movement of Traditional IT Staff 49
Summary 51
Technology Business Cycle 52
Feasibility 53
Measurement 53
Planning 54
Implementation 55
Evolution 57
Drivers and Supporters 58
Santander versus Citibank 60
Information Technology Roles and Responsibilities 60
Replacement or Outsource 61
chApter 4 orgAnIzAtIonAl leArnIng theorIes And
technology 63
Introduction 63
Learning Organizations 72
Communities of Practice 75
Learning Preferences and Experiential Learning 83
Social Discourse and the Use of Language 89
Identity 91
Skills 92
viiContents
Emotion 92
Linear Development in Learning Approaches 96
chApter 5 mAnAgIng orgAnIzAtIonAl leArnIng And
technology 109
The Role of Line Management 109
Line Managers 111
First-Line Managers 111
Supervisor 111
Management Vectors 112
Knowledge Management 116
Ch ange Management 120
Change Management for IT Organizations 123
Social Networks and Information Technology 134
chApter 6 orgAnIzAtIonAl trAnsFormAtIon And the
bAlAnced scorecArd 139
Introduction 139
Methods of Ongoing Evaluation 146
Balanced Scorecards and Discourse 156
Knowledge Creation, Culture, and Strategy 158
chApter 7 vIrtuAl teAms And outsourcIng 163
Introduction 163
Status of Virtual Teams 165
Management Considerations 166
Dealing with Multiple Locations 166
Externalization 169
Internalization 171
Combination 171
Socialization 172
Externalization Dynamism 172
Internalization Dynamism 173
Combination Dynamism 173
Socialization Dynamism 173
Dealing with Multiple Locations and Outsourcing 177
Revisiting Social Discourse 178
Identity 179
Skills 180
Emotion 181
chApter 8 synergIstIc unIon oF It And
orgAnIzAtIonAl leArnIng 187
Introduction 187
Siemens AG 187
Aftermath 202
ICAP 203
viii Contents
Five Years Later 224
HTC 225
IT History at HTC 226
Interactions of the CEO 227
The Process 228
Transformation from the Transition 229
Five Years Later 231
Summary 233
chApter 9 FormIng A cyber securIty culture 239
Introduction 239
History 239
Talking to the Board 241
Establishing a Security Culture 241
Understanding What It Means to be Compromised 242
Cyber Security Dynamism and Responsive Organizational
Dynamism 242
Cyber Strategic Integration 243
Cyber Cultural Assimilation 245
Summary 246
Organizational Learning and Application Development 246
Cyber Security Risk 247
Risk Responsibility 248
Driver /Supporter Implications 250
chApter 10 dIgItAl trAnsFormAtIon And chAnges In
consumer behAvIor 251
Introduction 251
Requirements without Users and without Input 254
Concepts of the S-Curve and Digital Transformation
Analysis and Design 258
Organizational Learning and the S-Curve 260
Communities of Practice 261
The IT Leader in the Digital Transformation Era 262
How Technology Disrupts Firms and Industries 264
Dynamism and Digital Disruption 264
Critical Components of “ Digital” Organization 265
Assimilating Digital Technology Operationally and Culturally
267
Conclusion 268
chApter 11 IntegrAtIng generAtIon y employees to
AccelerAte competItIve AdvAntAge 269
Introduction 269
The Employment Challenge in the Digital Era 270
Gen Y Population Attributes 272
Advantages of Employing Millennials to Support Digital
Transformation 272
Integration of Gen Y with Baby Boomers and Gen X 273
ixContents
Designing the Digital Enterprise 274
Assimilating Gen Y Talent from Underserved and Socially
Excluded Populations 276
Langer Workforce Maturity Arc 277
Theoretical Constructs of the LWMA 278
The LWMA and Action Research 281
Implications for New Pathways for Digital Talent 282
Demographic Shifts in Talent Resources 282
Economic Sustainability 283
Integration and Trust 283
Global Implications for Sources of Talent 284
Conclusion 284
chApter 12 towArd best prActIces 287
Introduction 287
Chief IT Executive 288
Definitions of Maturity Stages and Dimension Variables in
the Chief IT Executive Best Practices Arc 297
Maturity Stages 297
Performance Dimensions 298
Chief Executive Officer 299
CIO Direct Reporting to the CEO 305
Outsourcing 306
Centralization versus Decentralization of IT 306
CIO Needs Advanced Degrees 307
Need for Standards 307
Risk Management 307
The CEO Best Practices Technology Arc 313
Definitions of Maturity Stages and Dimension Variables in
the CEO Technology Best Practices Arc 314
Maturity Stages 314
Performance Dimensions 315
Middle Management 316
The Middle Management Best Practices Technology Arc 323
Definitions of Maturity Stages and Dimension Variables in
the Middle Manager Best Practices Arc 325
Maturity Stages 325
Performance Dimensions 326
Summary 327
Ethics and Maturity 333
chApter 13 conclusIons 339
Introduction 339
glossAry 357
reFerences 363
Index 373
http://taylorandfrancis.com
xi
Foreword
Digital technologies are transforming the global economy.
Increasingly,
firms and other organizations are assessing their opportunities,
develop-
ing and delivering products and services, and interacting with
custom-
ers and other stakeholders digitally. Established companies
recognize
that digital technologies can help them operate their businesses
with
greater speed and lower costs and, in many cases, offer their
custom-
ers opportunities to co-design and co-produce products and
services.
Many start-up companies use digital technologies to develop
new prod-
ucts and business models that disrupt the present way of doing
busi-
ness, taking customers away from firms that cannot change and
adapt.
In recent years, digital technology and new business models
have dis-
rupted one industry after another, and these developments are
rapidly
transforming how people communicate, learn, and work.
Against this backdrop, the third edition of Arthur Langer’ s
Information Technology and Organizational Learning is most
welcome.
For decades, Langer has been studying how firms adapt to new
or
changing conditions by increasing their ability to incorporate
and use
advanced information technologies. Most organizations do not
adopt
new technology easily or readily. Organizational inertia and
embed-
ded legacy systems are powerful forces working against the
adoption
of new technology, even when the advantages of improved
technology
are recognized. Investing in new technology is costly, and it
requires
xii Foreword
aligning technology with business strategies and transforming
cor-
porate cultures so that organization members use the technology
to
become more productive.
Information Technology and Organizational Learning addresses
these
important issues— and much more. There are four features of
the new
edition that I would like to draw attention to that, I believe,
make
this a valuable book. First, Langer adopts a behavioral
perspective
rather than a technical perspective. Instead of simply offering
norma-
tive advice about technology adoption, he shows how sound
learn-
ing theory and principles can be used to incorporate technology
into
the organization. His discussion ranges across the dynamic
learning
organization, knowledge management, change management,
com-
munities of practice, and virtual teams. Second, he shows how
an
organization can move beyond technology alignment to true
technol-
ogy integration. Part of this process involves redefining the
traditional
support role of the IT department to a leadership role in which
IT
helps to drive business strategy through a technology-based
learn-
ing organization. Third, the book contains case studies that
make the
material come alive. The book begins with a comprehensive
real-life
case that sets the stage for the issues to be resolved, and smaller
case
illustrations are sprinkled throughout the chapters, to make
concepts
and techniques easily understandable. Lastly, Langer has a
wealth of
experience that he brings to his book. He spent more than 25
years
as an IT consultant and is the founder of the Center for
Technology
Management at Columbia University, where he directs
certificate and
executive programs on various aspects of technology innovation
and
management. He has organized a vast professional network of
tech-
nology executives whose companies serve as learning
laboratories for
his students and research. When you read the book, the
knowledge
and insight gained from these experiences is readily apparent.
If you are an IT professional, Information Technology and
Organi-
zational Learning should be required reading. However, anyone
who
is part of a firm or agency that wants to capitalize on the
opportunities
provided by digital technology will benefit from reading the
book.
Charles C. Snow
Professor Emeritus, Penn State University
Co-Editor, Journal of Organization Design
xiii
Acknowledgments
Many colleagues and clients have provided significant support
during
the development of the third edition of Information Technology
and
Organizational Learning.
I owe much to my colleagues at Teachers College, namely,
Professor
Victoria Marsick and Lyle Yorks, who guided me on many of
the the-
ories on organizational learning, and Professor Lee Knefelkamp,
for
her ongoing mentorship on adult learning and developmental
theo-
ries. Professor David Thomas from the Harvard Business School
also
provided valuable direction on the complex issues surrounding
diver-
sity, and its importance in workforce development.
I appreciate the corporate executives who agreed to participate
in the studies that allowed me to apply learning theories to
actual
organizational practices. Stephen McDermott from ICAP
provided
invaluable input on how chief executive officers (CEOs) can
success-
fully learn to manage emerging technologies. Dana Deasy, now
global
chief information officer (CIO) of JP Morgan Chase,
contributed
enormous information on how corporate CIOs can integrate
tech-
nology into business strategy. Lynn O’ Connor Vos, CEO of
Grey
Healthcare, also showed me how technology can produce direct
mon-
etary returns, especially when the CEO is actively involved.
And, of course, thank you to my wonderful students at
Columbia
University. They continue to be at the core of my inspiration
and love
for writing, teaching, and scholarly research.
http://taylorandfrancis.com
xv
Author
Arthur M. Langer, EdD, is professor of professional practice
of management and the director of the Center for Technology
Management at Columbia University. He is the academic direc-
tor of the Executive Masters of Science program in Technology
Management, vice chair of faculty and executive advisor to the
dean
at the School of Professional Studies and is on the faculty of the
Department of Organization and Leadership at the Graduate
School
of Education (Teachers College). He has also served as a
member of
the Columbia University Faculty Senate. Dr. Langer is the
author
of Guide to Software Development: Designing & Managing the
Life
Cycle. 2nd Edition (2016), Strategic IT: Best Practices for
Managers
and Executives (2013 with Lyle Yorks), Information
Technology and
Organizational Learning (2011), Analysis and Design of
Information
Systems (2007), Applied Ecommerce (2002), and The Art of
Analysis
(1997), and has numerous published articles and papers, relating
to digital transformation, service learning for underserved
popula-
tions, IT organizational integration, mentoring, and staff
develop-
ment. Dr. Langer consults with corporations and universities on
information technology, cyber security, staff development, man-
agement transformation, and curriculum development around the
Globe. Dr. Langer is also the chairman and founder of
Workforce
Opportunity Services (www.wforce.org), a non-profit social
venture
xvi Author
that provides scholarships and careers to underserved
populations
around the world.
Dr. Langer earned a BA in computer science, an MBA in
accounting/finance, and a Doctorate of Education from
Columbia
University.
xvii
Introduction
Background
Information technology (IT) has become a more significant part
of
workplace operations, and as a result, information systems
person-
nel are key to the success of corporate enterprises, especially
with
the recent effects of the digital revolution on every aspect of
business
and social life (Bradley & Nolan, 1998; Langer, 1997, 2011;
Lipman-
Blumen, 1996). This digital revolution is defined as a form of “
dis-
ruption.” Indeed, the big question facing many enterprises
today is,
How can executives anticipate the unexpected threats brought
on by
technological advances that could devastate their business? This
book
focuses on the vital role that information and digital technology
orga-
nizations need to play in the course of organizational
development
and learning, and on the growing need to integrate technology
fully
into the processes of workplace organizational learning.
Technology
personnel have long been criticized for their inability to
function as
part of the business, and they are often seen as a group outside
the
corporate norm (Schein, 1992). This is a problem of cultural
assimila-
tion, and it represents one of the two major fronts that
organizations
now face in their efforts to gain a grip on the new, growing
power of
technology, and to be competitive in a global world. The other
major
xviii IntroduCtIon
front concerns the strategic integration of new digital
technologies
into business line management.
Because technology continues to change at such a rapid pace,
the
ability of organizations to operate within a new paradigm of
dynamic
change emphasizes the need to employ action learning as a way
to
build competitive learning organizations in the twenty-first
century.
Information Technology and Organizational Learning integrates
some
of the fundamental issues bearing on IT today with concepts
from
organizational learning theory, providing comprehensive
guidance,
based on real-life business experiences and concrete research.
This book also focuses on another aspect of what IT can mean
to
an organization. IT represents a broadening dimension of
business life
that affects everything we do inside an organization. This new
reality is
shaped by the increasing and irreversible dissemination of
technology.
To maximize the usefulness of its encroaching presence in
everyday
business affairs, organizations will require an optimal
understanding
of how to integrate technology into everything they do. To this
end,
this book seeks to break new ground on how to approach and
concep-
tualize this salient issue— that is, that the optimization of
information
and digital technologies is best pursued with a synchronous
imple-
mentation of organizational learning concepts. Furthermore,
these
concepts cannot be implemented without utilizing theories of
strategic
learning. Therefore, this book takes the position that technology
liter-
acy requires individual and group strategic learning if it is to
transform
a business into a technology-based learning organization.
Technology-
based organizations are defined as those that have implemented
a means
of successfully integrating technology into their process of
organiza-
tional learning. Such organizations recognize and experience
the real-
ity of technology as part of their everyday business function. It
is what
many organizations are calling “ being digital.”
This book will also examine some of the many existing organi-
zational learning theories, and the historical problems that have
occurred with companies that have used them, or that have
failed
to use them. Thus, the introduction of technology into
organizations
actually provides an opportunity to reassess and reapply many
of the
past concepts, theories, and practices that have been used to
support
the importance of organizational learning. It is important,
however,
not to confuse this message with a reason for promoting
organizational
xixIntroduCtIon
learning, but rather, to understand the seamless nature of the
relation-
ship between IT and organizational learning. Each needs the
other to
succeed. Indeed, technology has only served to expose problems
that
have existed in organizations for decades, e.g., the inability to
drive
down responsibilities to the operational levels of the
organization, and
to be more agile with their consumers.
This book is designed to help businesses and individual manag-
ers understand and cope with the many issues involved in
developing
organizational learning programs, and in integrating an
important
component: their IT and digital organizations. It aims to provide
a
combination of research case studies, together with existing
theories
on organizational learning in the workplace. The goal is also to
pro-
vide researchers and corporate practitioners with a book that
allows
them to incorporate a growing IT infrastructure with their exist-
ing workforce culture. Professional organizations need to
integrate
IT into their organizational processes to compete effectively in
the
technology-driven business climate of today. This book
responds to
the complex and various dilemmas faced by many human
resource
managers and corporate executives regarding how to actually
deal
with many marginalized technology personnel who somehow
always
operate outside the normal flow of the core business.
While the history of IT, as a marginalized organization, is rela-
tively short, in comparison to that of other professions, the
problems
of IT have been consistent since its insertion into business
organiza-
tions in the early 1960s. Indeed, while technology has changed,
the
position and valuation of IT have continued to challenge how
execu-
tives manage it, account for it, and, most important, ultimately
value
its contributions to the organization. Technology personnel
continue
to be criticized for their inability to function as part of the
business,
and they are often seen as outside the business norm. IT
employees
are frequently stereotyped as “ techies,” and are segregated in
such a
way that they become isolated from the organization. This book
pro-
vides a method for integrating IT, and redefining its role in
organiza-
tions, especially as a partner in formulating and implementing
key
business strategies that are crucial for the survival of many
companies
in the new digital age. Rather than provide a long and extensive
list of
common issues, I have decided it best to uncover the challenges
of IT
integration and performance through the case study approach.
xx IntroduCtIon
IT continues to be one of the most important yet least
understood
departments in an organization. It has also become one of the
most
significant components for competing in the global markets of
today.
IT is now an integral part of the way companies become
successful,
and is now being referred to as the digital arm of the business.
This
is true across all industries. The role of IT has grown
enormously in
companies throughout the world, and it has a mission to provide
stra-
tegic solutions that can make companies more competitive.
Indeed,
the success of IT, and its ability to operate as part of the
learning
organization, can mean the difference between the success and
failure
of entire companies. However, IT must be careful that it is not
seen as
just a factory of support personnel, and does not lose its
justification
as driving competitive advantage. We see in many organizations
that
other digital-based departments are being created, due to
frustration
with the traditional IT culture, or because they simply do not
see IT
as meeting the current needs for operating in a digital economy.
This book provides answers to other important questions that
have
challenged many organizations for decades. First, how can
manag-
ers master emerging digital technologies, sustain a relationship
with
organizational learning, and link it to strategy and performance?
Second, what is the process by which to determine the value of
using
technology, and how does it relate to traditional ways of
calculating
return on investment, and establishing risk models? Third, what
are
the cyber security implications of technology-based products
and
services? Fourth, what are the roles and responsibilities of the
IT
executive, and the department in general? To answer these
questions,
managers need to focus on the following objectives:
• Address the operational weaknesses in organizations, in
terms of how to deal with new technologies, and how to bet-
ter realize business benefits.
• Provide a mechanism that both enables organizations to deal
with accelerated change caused by technological innovations,
and integrates them into a new cycle of processing, and han-
dling of change.
• Provide a strategic learning framework, by which every new
technology variable adds to organizational knowledge and
can develop a risk and security culture.
xxiIntroduCtIon
• Establish an integrated approach that ties technology account-
ability to other measurable outcomes, using organizational
learning techniques and theories.
To realize these objectives, organizations must be able to
• create dynamic internal processes that can deal, on a daily
basis, with understanding the potential fit of new technologies
and their overall value within the structure of the business;
• provide the discourse to bridge the gaps between IT- and non-
IT-related investments, and uses, into one integrated system;
• monitor investments and determine modifications to the life
cycle;
• implement various organizational learning practices, includ-
ing learning organization, knowledge management, change
management, and communities of practice, all of which help
foster strategic thinking, and learning, and can be linked to
performance (Gephardt & Marsick, 2003).
The strengths of this book are that it integrates theory and
practice
and provides answers to the four common questions mentioned.
Many
of the answers provided in these pages are founded on theory
and
research and are supported by practical experience. Thus,
evidence of
the performance of the theories is presented via case studies,
which
are designed to assist the readers in determining how such
theories
and proven practices can be applied to their specific
organization.
A common theme in this book involves three important terms:
dynamic , unpredictable , and acceleration . Dynamic is a term
that rep-
resents spontaneous and vibrant things— a motive force.
Technology
behaves with such a force and requires organizations to deal
with its
capabilities. Glasmeier (1997) postulates that technology
evolution,
innovation, and change are dynamic processes. The force then is
tech-
nology, and it carries many motives, as we shall see throughout
this
book. Unpredictable suggests that we cannot plan what will
happen
or will be needed. Many organizational individuals, including
execu-
tives, have attempted to predict when, how, or why technology
will
affect their organization. Throughout our recent history,
especially
during the “ digital disruption” era, we have found that it is
difficult,
if not impossible, to predict how technology will ultimately
benefit or
xxii IntroduCtIon
hurt organizational growth and competitive advantage. I believe
that
technology is volatile and erratic at times. Indeed, harnessing
tech-
nology is not at all an exact science; certainly not in the ways in
which
it can and should be used in today’ s modern organization.
Finally, I
use the term acceleration to convey the way technology is
speeding up
our lives. Not only have emerging technologies created this
unpre-
dictable environment of change, but they also continue to
change it
rapidly— even from the demise of the dot-com era decades ago.
Thus,
what becomes important is the need to respond quickly to
technology.
The inability to be responsive to change brought about by
technologi-
cal innovations can result in significant competitive
disadvantages for
organizations.
This new edition shows why this is a fact especially when
examining
the shrinking S-Curve. So, we look at these three words—
dynamic,
unpredictable, and acceleration— as a way to define how
technology
affects organizations; that is, technology is an accelerating
motive
force that occurs irregularly. These words name the challenges
that
organizations need to address if they are to manage
technological
innovations and integrate them with business strategy and
competi-
tive advantage. It only makes sense that the challenge of
integrating
technology into business requires us first to understand its
potential
impact, determine how it occurs, and see what is likely to
follow.
There are no quick remedies to dealing with emerging
technologies,
just common practices and sustained processes that must be
adopted
for organizations to survive in the future.
I had four goals in mind in writing this book. First, I am inter-
ested in writing about the challenges of using digital
technologies
strategically. What particularly concerns me is the lack of
literature
that truly addresses this issue. What is also troublesome is the
lack
of reliable techniques for the evaluation of IT, especially since
IT
is used in almost every aspect of business life. So, as we
increase
our use and dependency on technology, we seem to understand
less
about how to measure and validate its outcomes. I also want to
convey my thoughts about the importance of embracing
nonmon-
etary methods for evaluating technology, particularly as they
relate
to determining return on investment. Indeed, indirect and non-
monetary benefits need to be part of the process of assessing
and
approving IT projects.
xxiiiIntroduCtIon
Second, I want to apply organizational learning theory to the
field
of IT and use proven learning models to help transform IT staff
into
becoming better members of their organizations. Everyone
seems to
know about the inability of IT people to integrate with other
depart-
ments, yet no one has really created a solution to the problem. I
find
that organizational learning techniques are an effective way of
coach-
ing IT staff to operate more consistently with the goals of the
busi-
nesses that they support.
Third, I want to present cogent theories about IT and organiza-
tional learning; theories that establish new ways for
organizations to
adapt new technologies. I want to share my experiences and
those of
other professionals who have found approaches that can provide
posi-
tive outcomes from technology investments.
Fourth, I have decided to express my concerns about the valid-
ity and reliability of organizational learning theories and
practices as
they apply to the field of IT. I find that most of these models
need to
be enhanced to better fit the unique aspects of the digital age.
These
modified models enable the original learning techniques to
address
IT-specific issues. In this way, the organization can develop a
more
holistic approach toward a common goal for using technology.
Certainly, the balance of how technology ties in with strategy is
essential. However, there has been much debate over whether
tech-
nology should drive business strategy or vice versa. We will
find that
the answer to this is “ yes.” Yes, in the sense that technology
can affect
the way organizations determine their missions and business
strate-
gies; but “ no” in that technology should not be the only
component
for determining mission and strategy. Many managers have
realized
that business is still business, meaning that technology is not a
“ sil-
ver bullet.” The challenge, then, is to determine how best to fit
tech-
nology into the process of creating and supporting business
strategy.
Few would doubt today that technology is, indeed, the most
signifi-
cant variable affecting business strategy. However, the most
viable
approach is to incorporate technology into the process of
determin-
ing business strategy. I have found that many businesses still
formu-
late their strategies first, and then look at technology, as a
means to
efficiently implement objectives and goals. Executives need to
better
understand the unique and important role that technology
provides
us; it can drive business strategy, and support it, at the same
time.
xxiv IntroduCtIon
Managers should not solely focus their attention on generating
breakthrough innovations that will create spectacular results.
Most
good uses of technology are much subtler, and longer-lasting.
For this
reason, this book discusses and defines new technology life
cycles
that blend business strategy and strategic learning. Building on
this
theme, I introduce the idea of responsive organizational
dynamism as
the core theory of this book. Responsive organizational
dynamism
defines an environment that can respond to the three important
terms (dynamic, unpredictable, and acceleration). Indeed,
technology
requires organizations that can sustain a system, in which
individu-
als can deal with dynamic, unpredictable, and accelerated
change, as
part of their regular process of production. The basis of this
concept
is that organizations must create and sustain such an
environment to
be competitive in a global technologically-driven economy. I
further
analyze responsive organizational dynamism in its two
subcompo-
nents: strategic integration and cultural assimilation, which
address
how technology needs to be measured as it relates to business
strategy,
and what related social– structural changes are needed,
respectively.
Change is an important principle of this book. I talk about the
importance of how to change, how to manage such change, and
why
emerging technologies are a significant agent of change. I
support
the need for change, as an opportunity to use many of the
learning
theories that have been historically difficult to implement. That
is,
implementing change brought on by technological innovation is
an
opportunity to make the organization more “ change ready” or,
as we
define it today, more “ agile.” However, we also know that
little is
known about how organizations should actually go about
modifying
existing processes to adapt to new technologies and become
digital
entities— and to be accustomed to doing this regularly.
Managing
through such periods of change requires that we develop a
model that
can deal with dynamic, unpredictable, and accelerated change.
This is
what responsive organizational dynamism is designed to do.
We know that over 20% of IT projects still fail to be completed.
Another 54% fail to meet their projected completion date. We
now sit
at the forefront of another technological spurt of innovations
that will
necessitate major renovations to existing legacy systems,
requiring that
they be linked to sophisticated e-business systems. These e-
business
systems will continue to utilize the Internet, and emerging
mobile
xxvIntroduCtIon
technologies. While we tend to focus primarily on what
technology
generically does, organizations need urgently to prepare
themselves
for the next generation of advances, by forming structures that
can
deal with continued, accelerated change, as the norm of daily
opera-
tions. For this edition, I have added new sections and chapters
that
address the digital transformation, ways of dealing with
changing
consumer behavior, the need to form evolving cyber security
cultures,
and the importance of integrating Gen Y employees to
accelerate
competitive advantage.
This book provides answers to a number of dilemmas but
ultimately
offers an imbricate cure for the problem of latency in
performance and
quality afflicting many technologically-based projects.
Traditionally,
management has attempted to improve IT performance by
increasing
technical skills and project manager expertise through new
processes.
While there has been an effort to educate IT managers to
become
more interested and participative in business issues, their
involvement
continues to be based more on service than on strategy. Yet, at
the
heart of the issue is the entirety of the organization. It is my
belief that
many of the programmatic efforts conducted in traditional ways
and
attempting to mature and integrate IT with the rest of the
organiza-
tion will continue to deliver disappointing results.
My personal experience goes well beyond research; it draws
from
living and breathing the IT experience for the past 35 years, and
from an understanding of the dynamics of what occurs inside
and
outside the IT department in most organizations. With such
experi-
ence, I can offer a path that engages the participation of the
entire
management team and operations staff of the organization.
While
my vision for this kind of digital transformation is different
from
other approaches, it is consistent with organizational learning
theo-
ries that promote the integration of individuals, communities,
and
senior management to participate in more democratic and
vision-
ary forms of thinking, reflection, and learning. It is my belief
that
many of the dilemmas presented by IT have existed in other
parts of
organizations for years, and that the Internet revolution only
served
to expose them. If we believe this to be true, then we must
begin
the process of integrating technology into strategic thinking and
stop depending on IT to provide magical answers, and
inappropriate
expectations of performance.
xxvi IntroduCtIon
Technology is not the responsibility of any one person or
depart-
ment; rather, it is part of the responsibility of every employee.
Thus,
the challenge is to allow organizations to understand how to
modify
their processes, and the roles and responsibilities of their
employees,
to incorporate digital technologies as part of normal workplace
activi-
ties. Technology then becomes more a subject and a component
of
discourse. IT staff members need to emerge as specialists who
par-
ticipate in decision making, development, and sustained support
of
business evolution. There are also technology-based topics that
do
not require the typical expertise that IT personnel provide. This
is
a literacy issue that requires different ways of thinking and
learning
during the everyday part of operations. For example, using
desktop
tools, communicating via e-mail, and saving files and data, are
inte-
gral to everyday operations. These activities affect projects, yet
they
are not really part of the responsibilities of IT departments.
Given
the knowledge that technology is everywhere, we must change
the
approach that we take to be successful. Another way of looking
at this
phenomenon is to define technology more as a commodity,
readily
available to all individuals. This means that the notion of
technology
as organizationally segregated into separate cubes of expertise
is prob-
lematic, particularly on a global front.
Thus, the overall aim of this book is to promote organizational
learning that disseminates the uses of technology throughout a
busi-
ness, so that IT departments are a partner in its use, as opposed
to
being its sole owner. The cure to IT project failure, then, is to
engage
the business in technology decisions in such a way that
individuals
and business units are fundamentally involved in the process.
Such
processes need to be designed to dynamically respond to
technology
opportunities and thus should not be overly bureaucratic. There
is a
balance between establishing organizations that can readily deal
with
technology versus those that become too complex and
inefficient.
This balance can only be attained using organizational learning
techniques as the method to grow and reach technology
maturation.
Overview of the Chapters
Chapter 1 provides an important case study of the Ravell
Corporation
(a pseudonym), where I was retained for over five years.
During this
xxviiIntroduCtIon
period, I applied numerous organizational learning methods
toward
the integration of the IT department with the rest of the
organiza-
tion. The chapter allows readers to understand how the theories
of
organizational learning can be applied in actual practice, and
how
those theories are particularly beneficial to the IT community.
The
chapter also shows the practical side of how learning techniques
can
be linked to measurable outcomes, and ultimately related to
business
strategy. This concept will become the basis of integrating
learning
with strategy (i.e., “ strategic learning” ). The Ravell case study
also
sets the tone of what I call the IT dilemma, which represents the
core problem faced by organizations today. Furthermore, the
Ravell
case study becomes the cornerstone example throughout the
book and
is used to relate many of the theories of learning and their
practical
applicability in organizations. The Ravell case has also been
updated
in this second edition to include recent results that support the
impor-
tance of alignment with the human resources department.
Chapter 2 presents the details of the IT dilemma. This chapter
addresses issues such as isolation of IT staff, which results in
their
marginalization from the rest of the organization. I explain that
while
executives want technology to be an important part of business
strat-
egy, few understand how to accomplish it. In general, I show
that
individuals have a lack of knowledge about how technology and
busi-
ness strategy can, and should, be linked, to form common
business
objectives. The chapter provides the results of a three-year
study of
how chief executives link the role of technology with business
strat-
egy. The study captures information relating to how chief
executives
perceive the role of IT, how they manage it, and use it
strategically,
and the way they measure IT performance and activities.
Chapter 3 focuses on defining how organizations need to
respond
to the challenges posed by technology. I analyze technological
dyna-
mism in its core components so that readers understand the
different
facets that comprise its many applications. I begin by presenting
tech-
nology as a dynamic variable that is capable of affecting
organizations
in a unique way. I specifically emphasize the unpredictability of
tech-
nology, and its capacity to accelerate change— ultimately
concluding
that technology, as an independent variable, has a dynamic
effect on
organizational development. This chapter also introduces my
theory
of responsive organizational dynamism, defined as a disposition
in
xxviii IntroduCtIon
organizational behavior that can respond to the demands of
tech-
nology as a dynamic variable. I establish two core components
of
responsive organizational dynamism: strategic integration and
cultural
assimilation . Each of these components is designed to tackle a
specific
problem introduced by technology. Strategic integration
addresses the
way in which organizations determine how to use technology as
part
of business strategy. Cultural assimilation, on the other hand,
seeks
to answer how the organization, both structurally and culturally,
will
accommodate the actual human resources of an IT staff and
depart-
ment within the process of implementing new technologies.
Thus,
strategic integration will require organizational changes in
terms of
cultural assimilation. The chapter also provides a perspective of
the
technology life cycle so that readers can see how responsive
organi-
zational dynamism is applied, on an IT project basis. Finally, I
define
the driver and supporter functions of IT and how these
contribute to
managing technology life cycles.
Chapter 4 introduces theories on organizational learning, and
applies them specifically to responsive organizational
dynamism. I
emphasize that organizational learning must result in individual,
and
organizational transformation, that leads to measurable
performance
outcomes. The chapter defines a number of organizational
learning
theories, such as reflective practices, learning organization,
communi-
ties of practice, learning preferences and experiential learning,
social
discourse, and the use of language. These techniques and
approaches
to promoting organizational learning are then configured into
various
models that can be used to assess individual and organizational
devel-
opment. Two important models are designed to be used in
responsive
organizational dynamism: the applied individual learning wheel
and
the technology maturity arc. These models lay the foundation
for my
position that learning maturation involves a steady linear
progression
from an individual focus toward a system or organizational
perspec-
tive. The chapter also addresses implementation issues—
political
challenges that can get in the way of successful application of
the
learning theories.
Chapter 5 explores the role of management in creating and
sustain-
ing responsive organizational dynamism. I define the tiers of
middle
management in relation to various theories of management
partici-
pation in organizational learning. The complex issues of
whether
xxixIntroduCtIon
organizational learning needs to be managed from the top down,
bottom up, or middle-top-down are discussed and applied to a
model
that operates in responsive organizational dynamism. This
chapter
takes into account the common three-tier structure in which
most
organizations operate: executive, middle, and operations. The
execu-
tive level includes the chief executive officer (CEO), president,
and
senior vice presidents. The middle is the most complex, ranging
from
vice president/director to supervisory roles. Operations covers
what is
commonly known as “ staff,” including clerical functions. The
knowl-
edge that I convey suggests that all of these tiers need to
participate in
management, including operations personnel, via a self-
development
model. The chapter also presents the notion that knowledge
manage-
ment is necessary to optimize competitive advantage,
particularly as
it involves transforming tacit knowledge into explicit
knowledge. I
view the existing theories on knowledge management, create a
hybrid
model that embraces technology issues, and map them to
responsive
organizational dynamism. Discussions on change management
are
included as a method of addressing the unique ways that
technol-
ogy affects product development. Essentially, I tie together
respon-
sive organizational dynamism with organizational change
theory, by
offering modifications to generally accepted theories. There is
also a
specific model created for IT organizations, that maps onto
organi-
zational-level concepts. Although I have used technology as the
basis
for the need for responsive organizational dynamism, I show
that the
needs for its existence can be attributed to any variable that
requires
dynamic change. As such, I suggest that readers begin to think
about
the next “ technology” or variable that can cause the same
needs to
occur inside organizations. The chapter has been extended to
address
the impact of social networking and the leadership opportunities
it
provides to technology executives.
Chapter 6 examines how organizational transformation occurs.
The primary focus of the chapter is to integrate transformation
theory
with responsive organizational dynamism. The position taken is
that
organizational learning techniques must inevitably result in
orga-
nizational transformation. Discussions on transformation are
often
addressed at organizational level, as opposed to focusing on
individual
development. As in other sections of the book, I extend a
number
of theories so that they can operate under the auspices of
responsive
xxx IntroduCtIon
organizational dynamism, specifically, the works of Yorks and
Marsick
(2000) and Aldrich (2001). I expand organizational
transformation
to include ongoing assessment within technology deliverables.
This
is accomplished through the use of a modified Balanced
Scorecard
originally developed by Kaplan and Norton (2001). The
Balanced
Scorecard becomes the vehicle for establishing a strategy-
focused and
technology-based organization.
Chapter 7 deals with the many business transformation projects
that require outsource arrangements and virtual team
management.
This chapter provides an understanding of when and how to
consider
outsourcing and the intricacies of considerations once operating
with
virtual teams. I cover such issues as management considerations
and
the challenges of dealing in multiple locations. The chapter
extends the
models discussed in previous chapters so that they can be
aligned with
operating in a virtual team environment. Specifically, this
includes
communities of practice, social discourse, self-development,
knowl-
edge management, and, of course, responsive organizational
dyna-
mism and its corresponding maturity arcs. Furthermore, I
expand the
conversation to include IT and non-IT personnel, and the
arguments
for the further support needed to integrate all functions across
the
organization.
Chapter 8 presents updated case studies that demonstrate how
my
organizational learning techniques are actually applied in
practice.
Three case studies are presented: Siemens AG, ICAP, and HTC.
Siemens AG is a diverse international company with 20 discrete
businesses in over 190 countries. The case study offers a
perspec-
tive of how a corporate chief information officer (CIO)
introduced
e- business strategy. ICAP is a leading international money and
secu-
rity broker. This case study follows the activities of the
electronic trad-
ing community (ETC) entity, and how the CEO transformed the
organization and used organizational learning methods to
improve
competitive advantage. HTC (a pseudonym) provides an
example of
why the chief IT executive should report to the CEO, and how a
CEO can champion specific projects to help transform
organizational
norms and behaviors. This case study also maps the
transformation of
the company to actual examples of strategic advantage.
Chapter 9 focuses on the challenges of forming a “ cyber
security”
culture. The growing challenges of protecting companies from
outside
xxxiIntroduCtIon
attacks have established the need to create a cyber security
culture.
This chapter addresses the ways in which information
technology
organizations must further integrate with business operations,
so
that their firms are better equipped to protect against outside
threats.
Since the general consensus is that no system can be 100%
protected,
and that most system compromises occur as a result of internal
expo-
sures, information technology leaders must educate employees
on
best practices to limit cyberattacks. Furthermore, while
prevention is
the objective, organizations must be internally prepared to deal
with
attacks and thus have processes in place should a system
become pen-
etrated by third-party agents.
Chapter 10 explores the effects of the digital global economy
on
the ways in which organizations need to respond to the
consumeriza-
tion of products and services. From this perspective, digital
transfor-
mation involves a type of social reengineering that affects the
ways in
which organizations communicate internally, and how they
consider
restructuring departments. Digital transformation also affects
the
risks that organizations must take in what has become an
accelerated
changing consumer market.
Chapter 11 provides conclusions and focuses on Gen Y employ-
ees who are known as “ digital natives” and represent the new
supply
chain of talent. Gen Y employees possess the attributes to assist
com-
panies to transform their workforce to meet the accelerated
change in
the competitive landscape. Most executives across industries
recog-
nize that digital technologies are the most powerful variable to
main-
taining and expanding company markets. Gen Y employees
provide a
natural fit for dealing with emerging digital technologies.
However,
success with integrating Gen Y employees is contingent upon
Baby
Boomer and Gen X management adopting new leadership
philoso-
phies and procedures suited to meet the expectations and needs
of
these new workers. Ignoring the unique needs of Gen Y
employees
will likely result in an incongruent organization that suffers
high
turnover of young employees who will ultimately seek a more
entre-
preneurial environment.
Chapter 12 seeks to define best practices to implement and sus-
tain responsive organizational dynamism. The chapter sets forth
a
model that creates separate, yet linked, best practices and
maturity
arcs that can be used to assess stages of the learning
development
xxxii IntroduCtIon
of the chief IT executive, the CEO, and the middle management.
I
discuss the concept of common threads , by which each best
practices
arc links through common objectives and outcomes to the
responsive
organizational dynamism maturity arc presented in Chapter 4.
Thus,
these arcs represent an integrated and hierarchical view of how
each
component of the organization contributes to overall best
practices. A
new section has been added that links ethics to technology
leadership
and maturity.
Chapter 13 summarizes the many aspects of how IT and organi-
zational learning operate together to support the responsive
organi-
zational dynamism environment. The chapter emphasizes the
specific
key themes developed in the book, such as evolution versus
revolu-
tion; control and empowerment; driver and supporter
operations; and
responsive organizational dynamism and self-generating
organiza-
tions. Finally, I provide an overarching framework for “
organizing”
reflection and integrate it with the best practices arcs.
As a final note, I need to clarify my use of the words
information
technology, digital technology, and technology. In many parts
of the book,
they are used interchangeably, although there is a defined
difference.
Of course, not all technology is related to information or
digital; some
is based on machinery or the like. For the purposes of this book,
the
reader should assume that IT and digital technology are the
primary
variables that I am addressing. However, the theories and
processes
that I offer can be scaled to all types of technological
innovation.
1
1
The “Ravell” CoRpoRaTion
Introduction
Launching into an explanation of information technology (IT),
organizational learning, and the practical relationship into
which I
propose to bring them is a challenging topic to undertake. I
choose,
therefore, to begin this discussion by presenting an actual case
study
that exemplifies many key issues pertaining to organizational
learn-
ing, and how it can be used to improve the performance of an IT
department. Specifically, this chapter summarizes a case study
of
the IT department at the Ravell Corporation (a pseudonym) in
New
York City. I was retained as a consultant at the company to
improve
the performance of the department and to solve a mounting
politi-
cal problem involving IT and its relation to other departments.
The
case offers an example of how the growth of a company as a
“learn-
ing organization”—one in which employees are constantly
learning
during the normal workday (Argyris, 1993; Watkins & Marsick,
1993)— utilized reflective practices to help it achieve the
practical stra-
tegic goals it sought. Individuals in learning organizations
integrate
processes of learning into their work. Therefore, a learning
organiza-
tion must advocate a system that allows its employees to
interact, ask
questions, and provide insight to the business. The learning
organiza-
tion will ultimately promote systematic thinking, and the
building
of organizational memory (Watkins & Marsick, 1993). A
learning
organization (discussed more fully in Chapter 4) is a
component of
the larger topic of organizational learning.
The Ravell Corporation is a firm with over 500 employees who,
over the years, had become dependent on the use of technology
to
run its business. Its IT department, like that of many other
compa-
nies, was isolated from the rest of the business and was
regarded as
a peripheral entity whose purpose was simply to provide
technical
support. This was accompanied by actual physical isolation—IT
was
2 INFORMATION TECHNOLOGY
placed in a contained and secure location away from mainstream
operations. As a result, IT staff rarely engaged in active
discourse
with other staff members unless specific meetings were called
relat-
ing to a particular project. The Ravell IT department, therefore,
was
not part of the community of organizational learning—it did not
have the opportunity to learn along with the rest of the
organiza-
tion, and it was never asked to provide guidance in matters of
gen-
eral relevance to the business as a whole. This marginalized
status
resulted in an us-versus-them attitude on the part of IT and non-
IT
personnel alike.
Much has been written about the negative impact of marginal-
ization on individuals who are part of communities. Schlossberg
(1989) researched adults in various settings and how marginal-
ization affected their work and self-efficacy. Her theory on mar-
ginalization and mattering is applied to this case study because
of
its relevance and similarity to her prior research. For example,
IT
represents similar characteristics to a separate group on a
college
campus or in a workplace environment. Its physical isolation
can
also be related to how marginalized groups move away from the
majority population and function without contact. The IT direc-
tor, in particular, had cultivated an adversarial relationship with
his
peers. The director had shaped a department that fueled his view
of
separation. This had the effect of further marginalizing the posi-
tion of IT within the organization. Hand in hand with this form
of
separatism came a sense of actual dislike on the part of IT
personnel
for other employees. IT staff members were quick to point
fingers
at others and were often noncommunicative with members of
other
departments within the organization. As a result of this kind of
behavior, many departments lost confidence in the ability of IT
to
provide support; indeed, the quality of support that IT furnished
had begun to deteriorate. Many departments at Ravell began to
hire
their own IT support personnel and were determined to create
their
own information systems subdepartments. This situation
eventually
became unacceptable to management, and the IT director was
ter-
minated. An initiative was begun to refocus the department and
its
position within the organization. I was retained to bring about
this
change and to act as the IT director until a structural
transforma-
tion of the department was complete.
3the “rAvell” CorporAtIon
A New Approach
My mandate at Ravell was initially unclear—I was to “fix” the
problem; the specific solution was left up to me to design and
imple-
ment. My goal became one of finding a way to integrate IT fully
into
the organizational culture at Ravell. Without such integration,
IT
would remain isolated, and no amount of “fixing” around this
issue
would address the persistence of what was, as well, a cultural
prob-
lem. Unless IT became a true part of the organization as a
whole,
the entire IT staff could be replaced without any real change
having
occurred from the organization’s perspective. That is, just
replacing
the entire IT staff was an acceptable solution to senior
management.
The fact that this was acceptable suggested to me that the
knowledge
and value contained in the IT department did not exist or was
mis-
understood by the senior management of the firm. In my
opinion,
just eliminating a marginalized group was not a solution
because I
expected that such knowledge and value did exist, and that it
needed
to be investigated properly. Thus, I rejected management’s
option and
began to formulate a plan to better understand the contributions
that
could be made by the IT department. The challenge was
threefold: to
improve the work quality of the IT department (a matter of
perfor-
mance), to help the department begin to feel itself a part of the
orga-
nization as a whole and vice versa (a matter of cultural
assimilation),
and to persuade the rest of the organization to accept the IT
staff as
equals who could contribute to the overall direction and growth
of the
organization (a fundamental matter of strategic integration).
My first step was to gather information. On my assignment to
the
position of IT director, I quickly arranged a meeting with the IT
department to determine the status and attitudes of its
personnel.
The IT staff meeting included the chief financial officer (CFO),
to
whom IT reported. At this meeting, I explained the reasons
behind
the changes occurring in IT management. Few questions were
asked;
as a result, I immediately began scheduling individual meetings
with
each of the IT employees. These employees varied in terms of
their
position within the corporate hierarchy, in terms of salary, and
in
terms of technical expertise. The purpose of the private
meetings was
to allow IT staff members to speak openly, and to enable me to
hear
their concerns. I drew on the principles of action science,
pioneered
4 INFORMATION TECHNOLOGY
by Argyris and Schö n (1996), designed to promote individual
self-
reflection regarding behavior patterns, and to encourage a
produc-
tive exchange among individuals. Action science encompasses a
range
of methods to help individuals learn how to be reflective about
their
actions. By reflecting, individuals can better understand the
outcomes
of their actions and, especially, how they are seen by others.
This was
an important approach because I felt learning had to start at the
indi-
vidual level as opposed to attempting group learning activities.
It was
my hope that the discussions I orchestrated would lead the IT
staff to
a better understanding than they had previously shown, not only
of
the learning process itself, but also of the significance of that
process.
I pursued these objectives by guiding them to detect problem
areas in
their work and to undertake a joint effort to correct them
(Argyris,
1993; Arnett, 1992).
Important components of reflective learning are single-loop and
double-loop learning. Single-loop learning requires individuals
to
reflect on a prior action or habit that needs to be changed in the
future
but does not require individuals to change their operational
proce-
dures with regard to values and norms. Double-loop learning, on
the
other hand, does require both change in behavior and change in
oper-
ational procedures. For example, people who engage in double-
loop
learning may need to adjust how they perform their job, as
opposed to
just the way they communicate with others, or, as Argyris and
Schö n
(1996, p. 22) state, “the correction of error requires inquiry
through
which organizational values and norms themselves are
modified.”
Despite my efforts and intentions, not all of the exchanges were
destined to be successful. Many of the IT staff members felt
that the
IT director had been forced out, and that there was consequently
no support for the IT function in the organization. There was
also
clear evidence of internal political division within the IT
department;
members openly criticized each other. Still other interviews
resulted
in little communication. This initial response from IT staff was
disap-
pointing, and I must admit I began to doubt whether these
learning
methods would be an antidote for the department. Replacing
people
began to seem more attractive, and I now understood why many
man-
agers prefer to replace staff, as opposed to investing in their
transfor-
mation. However, I also knew that learning is a gradual process
and
that it would take time and trust to see results.
5the “rAvell” CorporAtIon
I realized that the task ahead called for nothing short of a total
cul-
tural transformation of the IT organization at Ravell. Members
of the
IT staff had to become flexible and open if they were to become
more
trusting of one another and more reflective as a group (Garvin,
2000;
Schein, 1992). Furthermore, they had to have an awareness of
their
history, and they had to be willing to institute a vision of
partnering
with the user community. An important part of the process for
me
was to accept the fact that the IT staff were not habitually
inclined to
be reflective. My goal then was to create an environment that
would
foster reflective learning, which would in turn enable a change
in
individual and organizational values and norms (Senge, 1990).
The Blueprint for Integration
Based on information drawn from the interviews, I developed a
pre-
liminary plan to begin to integrate IT into the day-to-day
operations
at Ravell, and to bring IT personnel into regular contact with
other
staff members. According to Senge (1990), the most productive
learn-
ing occurs when skills are combined in the activities of
advocacy and
inquiry. My hope was to encourage both among the staff at
Ravell. The
plan for integration and assimilation involved assigning IT
resources
to each department; that is, following the logic of the self-
dissemina-
tion of technology, each department would have its own
dedicated IT
person to support it. However, just assigning a person was not
enough,
so I added the commitment to actually relocate an IT person
into each
physical area. This way, rather than clustering together in an
area of
their own, IT people would be embedded throughout the
organiza-
tion, getting first-hand exposure to what other departments did,
and
learning how to make an immediate contribution to the
productiv-
ity of these departments. The on-site IT person in each
department
would have the opportunity to observe problems when they
arose—
and hence, to seek ways to prevent them—and, significantly, to
share
in the sense of accomplishment when things went well. To
reinforce
their commitment to their respective areas, I specified that IT
person-
nel were to report not only to me but also to the line manager in
their
respective departments. In addition, these line managers were to
have
input on the evaluation of IT staff. I saw that making IT staff
offi-
cially accountable to the departments they worked with was a
tangible
6 INFORMATION TECHNOLOGY
way to raise their level of commitment to the organization. I
hoped
that putting line managers in a supervisory position, would help
build
a sense of teamwork between IT and non-IT personnel.
Ultimately,
the focus of this approach was to foster the creation of a
tolerant and
supportive cultural climate for IT within the various
departments; an
important corollary goal here was also to allow reflective
reviews of
performance to flourish (Garvin, 1993).
Enlisting Support
Support for this plan had to be mustered quickly if I was to
create an
environment of trust. I had to reestablish the need for the IT
func-
tion within the company, show that it was critical for the
company’s
business operations, and show that its integration posed a
unique
challenge to the company. However, it was not enough just for
me
to claim this. I also had to enlist key managers to claim it.
Indeed,
employees will cooperate only if they believe that self-
assessment and
critical thinking are valued by management (Garvin, 2000). I
decided
to embark on a process of arranging meetings with specific line
man-
agers in the organization. I selected individuals who would
represent
the day-to-day management of the key departments. If I could
get
their commitment to work with IT, I felt it could provide the
stimulus
we needed. Some line managers were initially suspicious of the
effort
because of their prior experiences with IT. However, they
generally
liked the idea of integration and assimilation that was presented
to
them, and agreed to support it, at least on a trial basis.
Predictably, the IT staff were less enthusiastic about the idea.
Many
of them felt threatened, fearing that they were about to lose
their
independence or lose the mutual support that comes from being
in a
cohesive group. I had hoped that holding a series of meetings
would
help me gain support for the restructuring concept. I had to be
care-
ful to ensure that the staff members would feel that they also
had an
opportunity to develop a plan, that they were confident would
work.
During a number of group sessions, we discussed various
scenarios of
how such a plan might work. I emphasized the concepts of
integra-
tion and assimilation, and that a program of their
implementation
would be experimental. Without realizing it, I had engaged IT
staff
members in a process of self-governance. Thus, I empowered
them
7the “rAvell” CorporAtIon
to feel comfortable with voicing new ideas, without being
concerned
that they might be openly criticized by me if I did not agree.
This pro-
cess also encouraged individuals to begin thinking more as a
group.
Indeed, by directing the practice of constructive criticism
among
the IT staff, I had hoped to elicit a higher degree of reflective
action
among the group and to show them that they had the ability to
learn
from one another as well as the ability to design their own roles
in the
organization (Argyris, 1993). Their acceptance of physical
integration
and, hence, cultural assimilation became a necessary condition
for
the ability of the IT group, to engage in greater reflective
behavior
(Argyris & Schö n, 1996).
Assessing Progress
The next issue concerned individual feedback. How was I to let
each
person know how he or she was doing? I decided first, to get
feedback
from the larger organizational community. This was
accomplished
by meeting with the line managers and obtaining whatever feed-
back was available from them. I was surprised at the large
quantity
of information they were willing to offer. The line managers
were not
shy about participating, and their input allowed me to complete
two
objectives: (1) to understand how the IT staff was being
perceived in
its new assignment and (2) to create a social and reflective
relation-
ship between IT individuals and the line managers. The latter
objec-
tive was significant, for if we were to be successful, the line
managers
would have to assist us in the effort to integrate and assimilate
IT
functions within their community.
After the discussions with managers were completed, individual
meetings were held with each IT staff member to discuss the
feedback.
I chose not to attribute the feedback to specific line managers
but rather
to address particular issues by conveying the general consensus
about
them. Mixed feelings were also disclosed by the IT staff. After
convey-
ing the information, I listened attentively to the responses of IT
staff
members. Not surprisingly, many of them responded to the
feedback
negatively and defensively. Some, for example, felt that many
technology
users were unreasonable in their expectations of IT. It was
important for
me as facilitator not to find blame among them, particularly if I
was to
be a participant in the learning organization (Argyris & Schö n,
1996).
8 INFORMATION TECHNOLOGY
Resistance in the Ranks
Any major organizational transformation is bound to elicit
resistance
from some employees. The initiative at Ravell proved to be no
excep-
tion. Employees are not always sincere, and some individuals
will
engage in political behavior that can be detrimental to any
organiza-
tional learning effort. Simply put, they are not interested in
partici-
pating, or, as Marsick (1998) states, “It would be naï ve to
expect that
everyone is willing to play on an even field (i.e., fairly).” Early
in the
process, the IT department became concerned that its members
spent
much of their time trying to figure out how best to position
themselves
for the future instead of attending to matters at hand. I heard
from
other employees that the IT staff felt that they would live
through my
tenure; that is, just survive until a permanent IT director was
hired. It
became difficult at times to elicit the truth from some members
of the
IT staff. These individuals would skirt around issues and deny
making
statements that were reported by other employees rather than
con-
front problems head on. Some IT staff members would criticize
me in
front of other groups and use the criticism as proof that the plan
for
a general integration was bound to fail. I realized in a most
tangible
sense that pursuing change through reflective practice does not
come
without resistance, and that this resistance needs to be factored
into
the planning of any such organizationally transformative
initiative.
Line Management to the Rescue
At the time that we were still working through the resistance
within
IT, the plan to establish a relationship with line management
began
to work. A number of events occurred that allowed me to be
directly
involved in helping certain groups solve their IT problems.
Word
spread quickly that there was a new direction in IT that could be
trusted. Line management support is critical for success in such
trans-
formational situations. First, line management is typically
comprised
of people from the ranks of supervisors and middle managers,
who are
responsible for the daily operations of their department.
Assuming
they do their jobs, senior management will cater to their needs
and
listen to their feedback. The line management of any organiza-
tion, necessarily engaged to some degree in the process of
learning
9the “rAvell” CorporAtIon
(a “learning organization”), is key to its staff. Specifically, line
manag-
ers are responsible for operations personnel; at the same time,
they
must answer to senior management. Thus, they understand both
exec-
utive and operations perspectives of the business (Garvin,
2000). They
are often former staff members themselves and usually have a
high
level of technical knowledge. Upper management, while
important
for financial support, has little effect at the day-to-day level,
yet this is
the level at which the critical work of integration and the
building of
a single learning community must be done.
Interestingly, the line management organization had previously
had no shortage of IT-related problems. Many of these line
managers
had been committed to developing their own IT staffs; however,
they
quickly realized that the exercise was beyond their expertise,
and that
they needed guidance and leadership. Their participation in IT
staff
meetings had begun to foster a new trust in the IT department,
and
they began to see the possibilities of working closely with IT to
solve
their problems. Their support began to turn toward what
Watkins and
Marsick (1993, p. 117) call “creating alignment by placing the
vision
in the hands of autonomous, cross-functional synergetic teams.”
The
combination of IT and non-IT teams began to foster a synergy
among
the communities, which established new ideas about how best to
use
technology.
IT Begins to Reflect
Although it was initially difficult for some staff members to
accept,
they soon realized that providing feedback opened the door to
the
process of self-reflection within IT. We undertook a number of
exer-
cises, to help IT personnel understand how non-IT personnel
per-
ceived them, and how their own behavior may have contributed
to
these perceptions. To foster self-reflection, I adopted a
technique
developed by Argyris called “the left-hand column.” In this
technique,
individuals use the right-hand column of a piece of paper to
transcribe
dialogues that they felt had not resulted in effective
communication.
In the left-hand column of the same page, participants are to
write
what they were really thinking at the time of the dialogue but
did not
say. This exercise is designed to reveal underlying assumptions
that
speakers may not be aware of during their exchanges and that
may be
10 INFORMATION TECHNOLOGY
impeding their communication with others by giving others a
wrong
impression. The exercise was extremely useful in helping IT
personnel
understand how others in the organization perceived them.
Most important, the development of reflective skills, according
to
Schö n (1983), starts with an individual’s ability to recognize
“leaps
of abstraction”—the unconscious and often inaccurate
generalizations
people make about others based on incomplete information. In
the
case of Ravell, such generalizations were deeply entrenched
among its
various personnel sectors. Managers tended to assume that IT
staffers
were “ just techies,” and that they therefore held fundamentally
differ-
ent values and had little interest in the organization as a whole.
For
their part, the IT personnel were quick to assume that non-IT
people
did not understand or appreciate the work they did. Exposing
these
“leaps of abstraction” was key to removing the roadblocks that
pre-
vented Ravell from functioning as an integrated learning
organization.
Defining an Identity for Information Technology
It was now time to start the process of publicly defining the
identity
of IT. Who were we, and what was our purpose? Prior to this
time,
IT had no explicit mission. Instead, its members had worked on
an
ad hoc basis, putting out fires and never fully feeling that their
work
had contributed to the growth or development of the
organization as
a whole. This sense of isolation made it difficult for IT
members to
begin to reflect on what their mission should or could be. I
organized
a series of meetings to begin exploring the question of a
mission, and I
offered support by sharing exemplary IT mission statements that
were
being implemented in other organizations. The focus of the
meetings
was not on convincing them to accept any particular idea but
rather to
facilitate a reflective exercise with a group that was undertaking
such
a task for the first time (Senge, 1990).
The identity that emerged for the IT department at Ravell was
dif-
ferent from the one implicit in their past role. Our new mission
would
be to provide technical support and technical direction to the
organi-
zation. Of necessity, IT personnel would remain specialists, but
they
were to be specialists who could provide guidance to other
depart-
ments in addition to helping them solve and prevent problems.
As
they became more intimately familiar with what different
departments
11the “rAvell” CorporAtIon
did—and how these departments contributed to the organization
as a
whole—IT professionals would be able to make better informed
rec-
ommendations. The vision was that IT people would grow from
being
staff who fixed things into team members who offered their
expertise
to help shape the strategic direction of the organization and, in
the
process, participate fully in organizational growth and learning.
To begin to bring this vision to life, I invited line managers to
attend our meetings. I had several goals in mind with this
invita-
tion. Of course, I wanted to increase contact between IT and
non-IT
people; beyond this, I wanted to give IT staff an incentive to
change
by making them feel a part of the organization as a whole. I also
got
a commitment from IT staff that we would not cover up our
prob-
lems during the sessions, but would deal with all issues with
trust
and honesty. I also believed that the line managers would
reciprocate
and allow us to attend their staff meetings. A number of IT indi-
viduals were concerned that my approach would only further
expose
our problems with regard to quality performance, but the group
as
a whole felt compelled to stick with the beliefs that honesty
would
always prevail over politics. Having gained insight into how the
rest of
the organization perceived them, IT staff members had to learn
how
to deal with disagreement and how to build consensus to move
an
agenda forward. Only then could reflection and action be
intimately
intertwined so that after-the-fact reviews could be replaced with
peri-
ods of learning and doing (Garvin, 2000).
The meetings were constructive, not only in terms of content
issues
handled in the discussions, but also in terms of the number of
line
managers who attended them. Their attendance sent a strong
message
that the IT function was important to them, and that they under-
stood that they also had to participate in the new direction that
IT
was taking. The sessions also served as a vehicle to demonstrate
how
IT could become socially assimilated within all the functions of
the
community while maintaining its own identity.
The meetings were also designed as a venue for group members
to
be critical of themselves. The initial meetings were not
successful in
this regard; at first, IT staff members spent more time blaming
oth-
ers than reflecting on their own behaviors and attitudes. These
ses-
sions were difficult in that I would have to raise unpopular
questions
and ask whether the staff had truly “looked in the mirror”
concerning
12 INFORMATION TECHNOLOGY
some of the problems at hand. For example, one IT employee
found
it difficult to understand why a manager from another
department
was angry about the time it took to get a problem resolved with
his
computer. The problem had been identified and fixed within an
hour,
a time frame that most IT professionals would consider very
respon-
sive. As we looked into the reasons why the manager could have
been
justified in his anger, it emerged that the manager had a tight
deadline
to meet. In this situation, being without his computer for an
hour was
a serious problem.
Although under normal circumstances a response time of one
hour
is good, the IT employee had failed to ask about the manager’s
par-
ticular circumstance. On reflection, the IT employee realized
that
putting himself in the position of the people he was trying to
support
would enable him to do his job better. In this particular
instance, had
the IT employee only understood the position of the manager,
there
were alternative ways of resolving the problem that could have
been
implemented much more quickly.
Implementing the Integration: A Move toward Trust and
Reflection
As communication became more open, a certain synergy began
to
develop in the IT organization. Specifically, there was a
palpable rise
in the level of cooperation and agreement, with regard to the
over-
all goals set during these meetings. This is not to suggest that
there
were no disagreements but rather that discussions tended to be
more
constructive in helping the group realize its objective of
providing
outstanding technology support to the organization. The IT staff
also felt freer to be self-reflective by openly discussing their
ideas and
their mistakes. The involvement of the departmental line
manag-
ers also gave IT staff members the support they needed to carry
out
the change. Slowly, there developed a shift in behavior in which
the
objectives of the group sharpened its focus on the
transformation of
the department, on its acknowledgment of successes and
failures, and
on acquiring new knowledge, to advance the integration of IT
into
the core business units.
Around this time, an event presented itself that I felt would
allow
the IT department to establish its new credibility and authority
to
the other departments: the physical move of the organization to
a
13the “rAvell” CorporAtIon
new location. The move was to be a major event, not only
because
it represented the relocation of over 500 people and the
technologi-
cal infrastructure they used on a day-to-day basis, but also
because
the move was to include the transition of the media
communications
systems of the company, to digital technology. The move
required
tremendous technological work, and the organization decided to
perform a “technology acceleration,” meaning that new
technology
would be introduced more quickly because of the opportunity
pre-
sented by the move. The entire moving process was to take a
year, and
I was immediately summoned to work with the other
departments in
determining the best plan to accomplish the transition.
For me, the move became an emblematic event for the IT group
at
Ravell. It would provide the means by which to test the creation
of,
and the transitioning into, a learning organization. It was also to
pro-
vide a catalyst for the complete integration and assimilation of
IT into
the organization as a whole. The move represented the
introduction
of unfamiliar processes in which “conscious reflection
is … necessary
if lessons are to be learned” (Garvin, 2000, p. 100). I
temporarily
reorganized IT employees into “SWAT” teams (subgroups
formed
to deal with defined problems in high-pressure environments),
so
that they could be eminently consumed in the needs of their
com-
munity partners. Dealing with many crisis situations helped the
IT
department change the existing culture by showing users how to
bet-
ter deal with technology issues in their everyday work
environment.
Indeed, because of the importance of technology in the new
location,
the core business had an opportunity to embrace our knowledge
and
to learn from us.
The move presented new challenges every day, and demanded
openness and flexibility from everyone. Some problems
required that
IT listen intently to understand and meet the needs of its
commu-
nity partners. Other situations put IT in the role of teaching;
assess-
ing needs and explaining to other departments what was
technically
possible, and then helping them to work out compromises based
on
technical limitations. Suggestions for IT improvement began to
come
from all parts of the organization. Ideas from others were
embraced
by IT, demonstrating that employees throughout the
organization
were learning together. IT staff behaved assertively and without
fear
of failure, suggesting that, perhaps for the first time, their role
had
14 INFORMATION TECHNOLOGY
extended beyond that of fixing what was broken to one of
helping
to guide the organization forward into the future. Indeed, the
move
established the kind of “special problem” that provided an
opportunity
for growth in personal awareness through reflection
(Moon, 1999).
The move had proved an ideal laboratory for implementing the
IT integration and assimilation plan. It provided real and
important
opportunities for IT to work hand in hand with other
departments—
all focusing on shared goals. The move fostered tremendous
cama-
raderie within the organization and became an excellent catalyst
for
teaching reflective behavior. It was, if you will, an ideal project
in
which to show how reflection in action can allow an entire
organiza-
tion to share in the successful attainment of a common goal.
Because
it was a unique event, everyone—IT and non-IT personnel
alike—
made mistakes, but this time, there was virtually no finger-
pointing.
People accepted responsibility collectively and cooperated in
finding
solutions. When the company recommenced operations from its
new
location—on time and according to schedule—no single group
could
claim credit for the success; it was universally recognized that
success
had been the result of an integrated effort.
Key Lessons
The experience of the reorganization of the IT department at
Ravell
can teach us some key lessons with respect to the cultural
transforma-
tion and change of marginalized technical departments,
generally.
Defining Reflection and Learning for an Organization
IT personnel tend to view learning as a vocational event. They
gener-
ally look to increase their own “technical” knowledge by
attending
special training sessions and programs. However, as Kegan
(1998)
reminds us, there must be more: “Training is really insufficient
as a
sole diet of education—it is, in reality a subset of education.”
True
education involves transformation, and transformation,
according to
Kegan, is the willingness to take risks, to “get out of the
bedroom of
our comfortable world.” In my work at Ravell, I tried to
augment this
“diet” by embarking on a project that delivered both vocational
train-
ing and education through reflection. Each IT staff person was
given
15the “rAvell” CorporAtIon
one week of technical training per year to provide vocational
develop-
ment. But beyond this, I instituted weekly learning sessions in
which
IT personnel would meet without me and produce a weekly
memo of
“reflection.” The goal of this practice was to promote dialogue,
in the
hope that IT would develop a way to deal with its fears and
mistakes
on its own. Without knowing it, I had begun the process of
creating
a discursive community in which social interactions could act as
insti-
gators of reflective behavior leading to change.
Working toward a Clear Goal
The presence of clearly defined, measurable, short-term
objectives
can greatly accelerate the process of developing a “learning
organiza-
tion” through reflective practice. At Ravell, the move into new
physi-
cal quarters provided a common organizational goal toward
which
all participants could work. This goal fostered cooperation
among IT
and non-IT employees and provided an incentive for everyone
to work
and, consequently, learn together. Like an athletic team before
an
important game, or even an army before battle, the IT staff at
Ravell
rallied around a cause and were able to use reflective practices
to help
meet their goals. The move also represented what has been
termed an
“eye-opening event,” one that can trigger a better understanding
of a
culture whose differences challenge one’s presuppositions
(Mezirow,
1990). It is important to note, though, that while the move
accelerated
the development of the learning organization as such, the move
itself
would not have been enough to guarantee the successes that
followed
it. Simply setting a deadline is no substitute for undergoing the
kind
of transformation necessary for a consummately reflective
process.
Only as the culmination of a process of analysis, socialization,
and
trust building, can an event like this speed the growth of a
learning
organization.
Commitment to Quality
Apart from the social challenges it faced in merging into the
core
business, the IT group also had problems with the quality of its
out-
put. Often, work was not performed in a professional manner.
IT
organizations often suffer from an inability to deliver on
schedule,
16 INFORMATION TECHNOLOGY
and Ravell was no exception. The first step in addressing the
qual-
ity problem, was to develop IT’s awareness of the importance of
the
problem, not only in my estimation but in that of the entire
company.
The IT staff needed to understand how technology affected the
day-
to-day operations of the entire company. One way to start the
dia-
logue on quality is to first initiate one about failures. If
something was
late, for instance, I asked why. Rather than addressing the
problems
from a destructive perspective (Argyris & Schö n, 1996; Schein,
1992;
Senge, 1990), the focus was on encouraging IT personnel to
under-
stand the impact of their actions—or lack of action—on the
company.
Through self-reflection and recognition of their important role
in the
organization, the IT staff became more motivated than before to
per-
form higher quality work.
Teaching Staff “Not to Know”
One of the most important factors that developed out of the
process
of integrating IT was the willingness of the IT staff “not to
know.”
The phenomenology of “not knowing” or “knowing less”
became the
facilitator of listening; that is, by listening, we as individuals
are better
able to reflect. This sense of not knowing also “allows the
individual
to learn an important lesson: the acceptance of what is, without
our
attempts to control, manipulate, or judge” (Halifax, 1999, p.
177). The
IT staff improved their learning abilities by suggesting and
adopting
new solutions to problems. An example of this was the creation
of a
two-shift help desk that provided user support during both day
and
evening. The learning process allowed IT to contribute new
ideas to
the community. More important, their contributions did not
dramat-
ically change the community; instead, they created gradual
adjust-
ments that led to the growth of a new hybrid culture. The key to
this new culture was its ability to share ideas, accept error as a
reality
(Marsick, 1998), and admit to knowing less (Halifax, 1999).
Transformation of Culture
Cultural changes are often slow to develop, and they occur in
small
intervals. Furthermore, small cultural changes may even go
unnoticed
or may be attributed to factors other than their actual causes.
This
17the “rAvell” CorporAtIon
raises the issue of the importance of cultural awareness and our
ability
to measure individual and group performance. The history of the
IT
problems at Ravell made it easy for me to make management
aware of
what we were newly attempting to accomplish and of our
reasons for
creating dialogues about our successes and failures.
Measurement and
evaluation of IT performance are challenging because of the
intrica-
cies involved in determining what represents success. I feel that
one
form of measurement can be found in the behavioral patterns of
an
organization. When it came time for employee evaluations,
reviews
were held with each IT staff member. Discussions at evaluation
reviews focused on the individuals’ perceptions of their role,
and how
they felt about their job as a whole. The feedback from these
review
meetings suggested that the IT staff had become more devoted,
and
more willing to reflect on their role in the organization, and,
gen-
erally, seemed happier at their jobs than ever before.
Interestingly,
and significantly, they also appeared to be having fun at their
jobs.
This happiness propagated into the community and influenced
other
supporting departments to create similar infrastructures that
could
reproduce our type of successes. This interest was made evident
by
frequent inquiries I received from other departments about how
the
transformation of IT was accomplished, and how it might be
trans-
lated to create similar changes in staff behavior elsewhere in the
com-
pany. I also noticed that there were fewer complaints and a
renewed
ability for the staff to work with our consultants.
Alignment with Administrative Departments
Ravell provided an excellent lesson about the penalties of not
align-
ing properly with other strategic and operational partners in a
firm.
Sometimes, we become insistent on forcing change, especially
when
placed in positions that afford a manager power—the power to
get
results quickly and through force. The example of Ravell
teaches us
that an approach of power will not ultimately accomplish
transforma-
tion of the organization. While senior management can
authorize and
mandate change, change usually occurs much more slowly than
they
wish, if it occurs at all. The management ranks can still push
back
and cause problems, if not sooner, then later. While I aligned
with
the line units, I failed to align with important operational
partners,
18 INFORMATION TECHNOLOGY
particularly human resources (HR). HR in my mind at that time
was impeding my ability to accomplish change. I was frustrated
and
determined to get things done by pushing my agenda. This
approach
worked early on, but I later discovered that the HR management
was
bitter and devoted to stopping my efforts. The problems I
encountered
at Ravell are not unusual for IT organizations. The historical
issues
that affect the relationship between HR and IT are as follows:
• IT has unusual staff roles and job descriptions that can be
inconsistent with the rest of the organization.
• IT tends to have complex working hours and needs.
• IT has unique career paths that do not “fit” with HR standards.
• IT salary structures shift more dynamically and are very sen-
sitive to market conditions.
• IT tends to operate in silos.
The challenge, then, to overcome these impediments requires IT
to
• reduce silos and IT staff marginalization
• achieve better organization-wide alignment
• develop shared leadership
• define and create an HR/IT governance model
The success of IT/HR alignment should follow practices similar
to those I instituted with the line managers at Ravell,
specifically the
following:
• Successful HR/IT integration requires organizational learn-
ing techniques.
• Alignment requires an understanding of the relationship
between IT investments and business strategy.
• An integration of IT can create new organizational cultures
and structures.
• HR/IT alignment will likely continue to be dynamic in
nature, and evolve at an accelerated pace.
The oversight of not integrating better with HR cost IT dearly at
Ravell. HR became an undisclosed enemy—that is, a negative
force
against the entire integration. I discovered this problem only
later, and
was never able to bring the HR department into the fold.
Without
HR being part of the learning organization, IT staff continued to
19the “rAvell” CorporAtIon
struggle with aligning their professional positions with those of
the
other departments. Fortunately, within two years the HR vice
presi-
dent retired, which inevitably opened the doors for a new start.
In large IT organizations, it is not unusual to have an HR
member
assigned to focus specifically on IT needs. Typically, it is a
joint position
in which the HR individual in essence works for the IT
executive. This
is an effective alternative in that the HR person becomes versed
in IT
needs and can properly represent IT in the area of head count
needs and
specific titles. Furthermore, the unique aspect of IT
organizations is in
the hybrid nature of their staff. Typically, a number of IT staff
members
are consultants, a situation that presents problems similar to the
one I
encountered at Ravell—that is, the resentment of not really
being part
of the organization. Another issue is that many IT staff
members are
outsourced across the globe, a situation that brings its own set
of chal-
lenges. In addition, the role of HR usually involves ensuring
compliance
with various regulations. For example, in many organizations, a
con-
sultant is permitted to work on site for only one year before
U.S. gov-
ernment regulations force the company to hire them as
employees. The
HR function must work closely with IT to enforce these
regulations.
Yet another important component of IT and HR collaboration is
talent
management. That is, HR must work closely with IT to
understand new
roles and responsibilities as they develop in the organization.
Another
challenge is the integration of technology into the day-to-day
business
of a company, and the question of where IT talent should be
dispersed
throughout the organization. Given this complex set of
challenges, IT
alone cannot facilitate or properly represent itself, unless it
aligns with
the HR departments. This becomes further complex with the
prolifera-
tion of IT virtual teams across the globe that create complex
structures
that often have different HR ramifications, both legally and
culturally.
Virtual team management is discussed further in the book.
Conclusion
This case study shows that strategic integration of technical
resources
into core business units can be accomplished, by using those
aspects of
organizational learning that promote reflection in action. This
kind of
integration also requires something of a concomitant form of
assimila-
tion, on the cultural level (see Chapter 3). Reflective thinking
fosters the
20 INFORMATION TECHNOLOGY
development of a learning organization, which in turn allows
for the
integration of the “other” in its various organizational
manifestations.
The experience of this case study also shows that the success of
organi-
zational learning will depend on the degree of cross fertilization
achiev-
able in terms of individual values and on the ability of the
community
to combine new concepts and beliefs, to form a hybrid culture.
Such a
new culture prospers with the use of organizational learning
strategies
to enable it to share ideas, accept mistakes, and learn to know
less as a
regular part their discourse and practice in their day-to-day
operations.
Another important conclusion from the Ravell experience is that
time is an important factor to the success of organizational
learning
approaches. One way of dealing with the problem of time is
with
patience—something that many organizations do not have.
Another
element of success came in the acceleration of events (such as
the relo-
cation at Ravell), which can foster a quicker learning cycle and
helps
us see results faster. Unfortunately, impatience with using
organiza-
tional learning methods is not an acceptable approach because it
will
not render results that change individual and organizational
behavior.
Indeed, I almost changed my approach when I did not get the
results
I had hoped for early in the Ravell engagement. Nevertheless,
my per-
sistence paid off. Finally, the belief that replacing the staff, as
opposed
to investing in its knowledge, results from a faulty
generalization. I
found that most of the IT staff had much to contribute to the
orga-
nization and, ultimately, to help transform the culture.
Subsequent
chapters of this book build on the Ravell experience and discuss
spe-
cific methods for integrating organizational learning and IT in
ways
that can improve competitive advantage.
Another recent perception, which I discuss further in Chapter
4,
is the commitment to “complete” integration. Simply put, IT
cannot
select which departments to work with, or choose to participate
only
with line managers; as they say, it is “all or nothing at all.”
Furthermore,
as Friedman (2007, p. 8) states “The world is flat.” Certainly,
part of
the “flattening” of the world has been initiated by technology,
but it
has also created overwhelming challenges for seamless
integration of
technology within all operations. The flattening of the world
has cre-
ated yet another opportunity for IT to better integrate itself into
what
is now an everyday challenge for all organizations.
21
2
The iT Dilemma
Introduction
We have seen much discussion in recent writing about how
informa-
tion technology has become an increasingly significant
component of
corporate business strategy and organizational structure
(Bradley &
Nolan, 1998; Levine et al., 2000; Siebel, 1999). But, do we
know
about the ways in which this significance takes shape?
Specifically,
what are the perceptions and realities regarding the importance
of
technology from organization leaders, business managers, and
core
operations personnel? Furthermore, what forms of participation
should IT assume within the rest of the organization?
The isolation of IT professionals within their companies often
pre-
vents them from becoming active participants in the
organization.
Technology personnel have long been criticized for their
inability to
function as part of the business and are often seen as a group
falling
outside business cultural norms (Schein, 1992). They are
frequently
stereotyped as “techies” and segregated into areas of the
business
where they become marginalized and isolated from the rest of
the
organization. It is my experience, based on case studies such as
the
one reviewed in Chapter 1 (the Ravell Corporation), that if an
orga-
nization wishes to absorb its IT department into its core culture,
and
if it wishes to do so successfully, the company as a whole must
be pre-
pared to consider structural changes and to seriously consider
using
organizational learning approaches.
The assimilation of technical people into an organization
presents
a special challenge in the development of true organizational
learning
practices (developed more fully in Chapter 3). This challenge
stems
from the historical separation of a special group that is seen as
stand-
ing outside the everyday concerns of the business. IT is
generally
acknowledged as having a key support function in the
organization as
a whole. However, empirical studies have shown that it is a
challenging
22 InForMAtIon teChnoloGY
endeavor to successfully integrate IT personnel into the learning
fold
and to do so in such a way that they not only are accepted, but
also
understood to be an important part of the social and cultural
struc-
ture of the business (Allen & Morton, 1994; Cassidy, 1998;
Langer,
2007; Schein, 1992; Yourdon, 1998).
In his book In Over Our Heads, Kegan (1994) discusses the
chal-
lenges of dealing with individual difference. IT personnel have
been
consistently regarded as “different” fixtures; as outsiders who
do not
quite fit easily into the mainstream organization. Perhaps,
because
of their technical practices, which may at times seem “foreign,”
or
because of perceived differences in their values, IT personnel
can
become marginalized; imagined as outside the core social
structures
of business. As in any social structure, marginalization can
result in
the withdrawal of the individual from the community
(Schlossberg,
1989). As a result, many organizations are choosing to
outsource their
IT services rather than confront and address the issues of
cultural
absorption and organizational learning. The outsourcing
alternative
tends to further distance the IT function from the core organiza-
tion, thus increasing the effects of marginalization. Not only
does the
outsourcing of IT personnel separate them further from their
peers,
but it also invariably robs the organization of a potentially
important
contributor to the social growth and organizational learning of
the
business. For example, technology personnel should be able to
offer
insight into how technology can support further growth and
learning
within the organization. In addition, IT personnel are usually
trained
to take a logical approach to problem solving; as a result, they
should
be able to offer a complementary focus on learning. Hence, the
inte-
gration of IT staff members into the larger business culture can
offer
significant benefits to an organization in terms of learning and
orga-
nizational growth.
Some organizations have attempted to improve communications
between IT and non-IT personnel through the use of an
intermedi-
ary who can communicate easily with both groups. This
intermediary
is known in many organizations as the business analyst.
Typically, the
business analyst will take responsibility for the interface
between IT
and the larger business community. Although a business analyst
may
help facilitate communication between IT and non-IT personnel,
this arrangement cannot help but carry the implication that
different
23the It dIleMMA
“languages” are spoken by these two groups and, by extension,
that
direct communication is not possible. Therefore, the use of such
an
intermediary suffers the danger of failing to promote integration
between IT and the rest of the organization; in fact, it may serve
to
keep the two camps separate. True integration, in the form of
direct
contact between IT and non-IT personnel, represents a greater
chal-
lenge for an organization than this remedy would suggest.
Recent Background
Since the 1990s, IT has been seen as a kind of variable that
possesses
the great potential to reinvent business. Aspects of this promise
affected
many of the core business rules used by successful chief
executives and
business managers. While organizations have used IT for the
process-
ing of information, decision-support processing, and order
processing,
the impact of the Internet and e-commerce systems has initiated
revolutionary responses in every business sector. This
economic phe-
nomenon became especially self-evident with the formation of
dot-coms
in the mid- and late 1990s. The advent of this phenomenon
stressed
the need to challenge fundamental business concepts. Many
financial
wizards surmised that new technologies were indeed changing
the very
infrastructure of business, affecting how businesses would
operate and
compete in the new millennium. Much of this hoopla seemed
justified
by the extraordinary potential that technology offered,
particularly with
respect to the revolutionizing of old-line marketing principles,
for it
was technology that came to violate what was previously
thought to be
protected market conditions and sectors. Technology came to
reinvent
these business markets and to allow new competitors to cross
market in
sectors they otherwise could not have entered.
With this new excitement also came fear— fear that fostered
unnat-
ural and accelerated entry into technology because any delay
might
sacrifice important new market opportunities. Violating some of
their
traditional principles, many firms invested in creating new
organi-
zations that would “incubate” and eventually, capture large
market
segments using the Internet as the delivery vehicle. By 2000,
many of
these dot-coms were in trouble, and it became clear that their
notion
of new business models based on the Internet contained
significant
flaws and shortfalls. As a result of this crisis, the role and
valuation
24 InForMAtIon teChnoloGY
of IT is again going through a transformation and once more we
are
skeptical about the value IT can provide a business and about
the way
to measure the contributions of IT.
IT in the Organizational Context
Technology not only plays a significant role in workplace
operations,
but also continues to increase its relevance among other
traditional
components of any business, such as operations, accounting,
and
marketing (Earl, 1996b; Langer, 2001a; Schein, 1992). Given
this
increasing relevance, IT gains significance in relation to
1. The impact it bears on organizational structure
2. The role it can assume in business strategy
3. The ways in which it can be evaluated
4. The extent to which chief executives feel the need to manage
operational knowledge and thus to manage IT effectively
IT and Organizational Structure
Sampler’s (1996) research explores the relationship between IT
and
organizational structure. His study indicated that there is no
clear-cut
relationship that has been established between the two.
However, he
concluded that there are five principal positions that IT can take
in
this relationship:
1. IT can lead to centralization of organizational control.
2. Conversely, IT can lead to decentralization of organizational
control.
3. IT can bear no impact on organizational control, its signifi-
cance being based on other factors.
4. Organizations and IT can interact in an unpredictable
manner.
5. IT can enable new organizational arrangements, such as net-
worked or virtual organizations.
According to Sampler (1996), the pursuit of explanatory models
for
the relationship between IT and organizational structure
continues
to be a challenge, especially since IT plays dual roles. On the
one
25the It dIleMMA
hand, it enhances and constrains the capabilities of workers
within
the organization, and because of this, it also possesses the
ability
to create a unique cultural component. While both roles are
active,
their impact on the organization cannot be predicted; instead,
they
evolve as unique social norms within the organization. Because
IT
has changed so dramatically over the past decades, it continues
to be
difficult to compare prior research on the relationship between
IT and
organizational structure.
Earl (1996a) studied the effects of applying business process
reen-
gineering (BPR) to organizations. BPR is a process that
organizations
undertake to determine how best to use technology, to improve
busi-
ness performance. Earl concludes that BPR is “an unfortunate
title: it
does not reflect the complex nature of either the distinctive
underpin-
ning concept of BPR [i.e., to reevaluate methods and rules of
business
operations] or the essential practical challenges to make it
happen
[i.e., the reality of how one goes about doing that]” (p. 54).
In my 2001 study of the Ravell Corporation (“Fixing Bad
Habits,”
Langer, 2001b), I found that BPR efforts require buy-in from
business
line managers, and that such efforts inevitably require the
adaptation
by individuals of different cultural norms and practices.
Schein (1992) recognizes that IT culture represents a subculture
in
collision with many others within an organization. He concludes
that if
organizations are to be successful in using new technologies in
a global
context, they must cope with ceaseless flows of information to
ensure
organizational health and effectiveness. His research indicates
that chief
executive officers (CEOs) have been reluctant to implement a
new sys-
tem of technology unless their organizations felt comfortable
with it and
were ready to use it. While many CEOs were aware of cost and
effi-
ciency implications in using IT, few were aware of the potential
impact
on organizational structure that could result from “adopting an
IT view
of their organizations” (p. 293). Such results suggest that CEOs
need
to be more active and more cognizant than they have been of
potential
shifts in organizational structure when adopting IT
opportunities.
The Role of IT in Business Strategy
While many chief executives recognize the importance of IT in
the day-to-day operations of their business, their experience
with
26 InForMAtIon teChnoloGY
attempting to utilize IT as a strategic business tool, has been
frustrat-
ing. Typical executive complaints about IT, according to
Bensaou and
Earl (1998), fall into five problem areas:
1. A lack of correspondence between IT investments and busi-
ness strategy
2. Inadequate payoff from IT investments
3. The perception of too much “technology for technology’s
sake”
4. Poor relations between IT specialists and users
5. The creation of system designs that fail to incorporate users’
preferences and work habits
McFarlan created a strategic grid (as presented in Applegate et
al.,
2003) designed to assess the impact of IT on operations and
strategy.
The grid shows that IT has maximum value when it affects both
oper-
ations and core business objectives. Based on McFarlan’s
hypothesis,
Applegate et al. established five key questions about IT that
may be
used by executives to guide strategic decision making:
1. Can IT be used to reengineer core value activities, and
change
the basis of competition?
2. Can IT change the nature of the relationship, and the balance
of power, between buyers and sellers?
3. Can IT build or reduce barriers to entry?
4. Can IT increase or decrease switching costs?
5. Can IT add value to existing products and services, or create
new ones?
The research and analysis conducted by McFarlan and
Applegate,
respectively, suggest that when operational strategy and its
results
are maximized, IT is given its highest valuation as a tool that
can
transform the organization. It then receives the maximum focus
from senior management and board members. However,
Applegate
et al. (2003) also focus on the risks of using technology. These
risks
increase when executives have a poor understanding of
competitive
dynamics, when they fail to understand the long-term
implications
of a strategic system that they have launched, or when they fail
to
account for the time, effort, and cost required to ensure user
adop-
tion, assimilation, and effective utilization. Applegate’s
conclusion
27the It dIleMMA
underscores the need for IT management to educate senior man-
agement, so that the latter will understand the appropriate indi-
cators for what can maximize or minimize their investments in
technology.
Szulanski and Amin (2000) claim that while emerging
technologies
shrink the window in which any given strategy can be
implemented,
if the strategy is well thought out, it can remain viable.
Mintzberg’s
(1987) research suggests that it would be useful to think of
strategy as
an art, not a science. This perspective is especially true in
situations
of uncertainty. The rapidly changing pace of emerging
technologies,
we know, puts a strain on established approaches to strategy—
that is
to say, it becomes increasingly difficult to find comfortable
implemen-
tation of technological strategies in such times of fast-moving
envi-
ronments, requiring sophisticated organizational infrastructure
and
capabilities.
Ways of Evaluating IT
Firms have been challenged to find a way to best evaluate IT,
particularly using traditional return on investment (ROI)
approaches.
Unfortunately, in this regard, many components of IT do not
generate
direct returns. Cost allocations based on overhead formulas
(e.g., costs
of IT as a percentage of revenues) are not applicable to most IT
spend-
ing needs. Lucas (1999) established nonmonetary methods for
evalu-
ating IT. His concept of conversion effectiveness places value
on the
ability of IT to complete its projects on time and within its
budgets.
This alone is a sufficient factor for providing ROI, assuming
that the
project was approved for valid business reasons. He called this
overall
process for evaluation the “garbage can” model. It allows
organizations
to present IT needs through a funneling pipeline of conversion
effec-
tiveness that filters out poor technology plans and that can
determine
which projects will render direct and indirect benefits to the
organiza-
tion. Indirect returns, according to Lucas, are those that do not
pro-
vide directly measurable monetary returns but do provide
significant
value that can be measured using his IT investment
opportunities
matrix. Utilizing statistical probabilities of returns, the
opportunities
matrix provides an effective tool for evaluating the impact of
indirect
returns.
28 InForMAtIon teChnoloGY
Executive Knowledge and Management of IT
While much literature and research have been produced on how
IT
needs to participate in and bring value to an organization, there
has
been relatively little analysis conducted on what non-IT chief
execu-
tives need to know about technology. Applegate et al. (2003)
suggest
that non-IT executives need to understand how to differentiate
new
technologies from older ones, and how to gauge the expected
impact
of these technologies on the businesses, in which the firm
competes
for market share. This is to say that technology can change the
rela-
tionship between customer and vendor, and thus, should be
examined
as a potential for providing competitive advantage. The authors
state
that non-IT business executives must become more comfortable
with
technology by actively participating in technology decisions
rather than
delegating them to others. They need to question experts as they
would
in the financial areas of their businesses. Lou Gerstner, former
CEO
of IBM , is a good example of a non-IT chief executive who
acquired
sufficient knowledge and understanding of a technology firm.
He was
then able to form a team of executives who better understood
how to
develop the products, services, and overall business strategy of
the firm.
Allen and Percival (2000) also investigate the importance of
non-
IT executive knowledge and participation with IT: “If the firm
lacks
the necessary vision, insights, skills, or core competencies, it
may be
unwise to invest in the hottest [IT] growth market” (p. 295).
The
authors point out that success in using emerging technologies is
dif-
ferent from success in other traditional areas of business. They
con-
cluded that non-IT managers need to carefully consider
expected
synergies to determine whether an IT investment can be realized
and,
especially, whether it is efficient to earn cost of capital.
Recent studies have focused on four important components in
the
linking of technology and business: its relationship to
organizational
structure, its role in business strategy, the means of its
evaluation, and
the extent of non-IT executive knowledge in technology. The
chal-
lenge in determining the best organizational structure for IT is
posed
by the accelerating technological advances since the 1970s and
by the
difficulty in comparing organizational models to consistent
business
cases. Consequently, there is no single organizational structure
that
has been adopted by businesses.
29the It dIleMMA
While most chief executives understand the importance of using
technology as part of their business strategy, they express
frustra-
tion in determining how to effectively implement a technology-
based
strategic approach. This frustration results from difficulties in
under-
standing how IT investments relate to other strategic business
issues,
from difficulty in assessing payoff and performance of IT
generally
and from perceived poor relations between IT and other
departments.
Because most IT projects do not render direct monetary returns,
exec-
utives find themselves challenged to understand technology
investments.
They have difficulty measuring value since traditional ROI
formulas are
not applicable. Thus, executives would do better to focus on
valuing tech-
nology investments by using methods that can determine
payback based
on a matrix of indirect returns, which do not always include
monetary
sources. There is a lack of research on the question of what
general knowl-
edge non-IT executives need to have to effectively manage the
strategic
use of technology within their firms. Non-IT chief executives
are often
not engaged in day-to-day IT activities, and they often delegate
dealing
with strategic technology issues to other managers. The
remainder of this
chapter examines the issues raised by the IT dilemma in its
various guises
especially as they become relevant to, and are confronted from,
the top
management or chief executive point of view.
IT: A View from the Top
To investigate further the critical issues facing IT, I conducted
a study
in which I personally interviewed over 40 chief executives in
vari-
ous industries, including finance/investment, publishing,
insurance,
wholesale/retail, and hotel management. Executives interviewed
were either the CEO or president of their respective
corporations. I
canvassed a population of New York-based midsize
corporations for
this interview study. Midsize firms, in our case, comprise
businesses
of between 200 and 500 employees. Face-to-face interviews
were
conducted, to allow participants the opportunity to articulate
their
responses, in contrast to answering printed survey questions;
execu-
tives were therefore allowed to expand, and clarify, their
responses to
questions. An interview guide (see questions in Tables 2.1
through
2.3) was designed to raise issues relevant to the challenges of
using
technology, as reported in the recent research literature, and to
30 InForMAtIon teChnoloGY
consider significant phenomena, that could affect changes in the
uses
of technology, such as the Internet. The interview discussions
focused
on three sections: (1) chief executive perception of the role of
IT, (2)
management and strategic issues, and (3) measuring IT
performance
and activities. The results of the interviews are summarized
next.
Table 2.1 Perception and Role of IT
QUESTION ANALYSIS
1. How do you define the role and the
mission of IT in your firm?
Fifty-seven percent responded that their IT
organizations were reactive and did not really have a
mission. Twenty-eight percent had an IT mission that
was market driven; that is, their IT departments were
responsible for actively participating in marketing
and strategic processes.
2. What impact has the Internet had
on your business strategy?
Twenty-eight percent felt the impact was insignificant,
while 24% felt it was critical. The remaining 48% felt
that the impact of the Internet was significant to daily
transactions.
3. Does the firm have its own internal
software development activity? Do
you develop your own in-house
software or use software
packages?
Seventy-six percent had an internal development
organization. Eighty-one percent had internally
developed software.
4. What is your opinion of
outsourcing? Do you have the need
to outsource technology? If so, how
is this accomplished?
Sixty-two percent had outsourced certain aspects of
their technology needs.
5. Do you use consultants to help
formulate the role of IT? If yes,
what specific roles do they play? If
not, why?
Sixty-two percent of the participants used consultants
to assist them in formulating the role of IT.
6. Do you feel that IT will become
more important to the strategy of
the business? If yes, why?
Eighty-five percent felt that IT had recently become
more important to the strategic planning of the
business.
7. How is the IT department viewed
by other departments? Is the IT
department liked, or is it
marginalized?
Twenty-nine percent felt that IT was still marginalized.
Another 29% felt it was not very integrated. Thirty-eight
percent felt IT was sufficiently integrated within the
organization, but only one chief executive felt that IT
was very integrated with the culture of his firm.
8. Do you feel there is too much
“ hype” about the importance and
role of technology?
Fifty-three percent felt that there was no hype. However,
32% felt that there were levels of hype attributed to the
role of technology; 10% felt it was “ all hype.”
9. Have the role and the uses of
technology in the firm significantly
changed over the last 5 years? If
so, what are the salient changes?
Fourteen percent felt little had changed, whereas 43%
stated that there were moderate changes. Thirty-eight
percent stated there was significant change.
31the It dIleMMA
Table 2.2 Management and Strategic Issues
QUESTION ANALYSIS
1. What is the most senior title held
by someone in IT? Where does
this person rank on the
organization hierarchy?
Sixty-six percent called the highest position chief
information officer (CIO). Ten percent used managing
director, while 24% used director as the highest title.
2. Does IT management ultimately
report to you?
Fifty percent of IT leaders reported directly to the chief
executive (CEO). The other half reported to either the
chief financial officer (CFO) or the chief operating
officer (COO).
3. How active are you in working
with IT issues?
Fifty-seven percent stated that they are very active— on
a weekly basis. Thirty-eight percent were less active or
inconsistently involved, usually stepping in when an
issue becomes problematic.
4. Do you discuss IT strategy with
your peers from other firms?
Eighty-one percent did not communicate with peers at
all. Only 10% actively engaged in peer-to-peer
communication about IT strategy.
5. Do IT issues get raised at board,
marketing, and/or strategy
meetings?
Eighty-six percent confirmed that IT issues were
regularly discussed at board meetings. However, only
57% acknowledged IT discussion during marketing
meetings, and only 38% confirmed like discussions at
strategic sessions.
6. How critical is IT to the
day-to-day business?
Eighty-two percent of the chief executives felt it was very
significant or critical to the business.
Table 2.3 Measuring IT Performance and Activities
QUESTION ANALYSIS
1. Do you have any view of how IT
should be measured and
accounted for?
Sixty-two percent stated that they had a view on
measurement; however, there was significant
variation in how executives defined measurement.
2. Are you satisfied with IT
performance in the firm?
There was significant variation in IT satisfaction. Only
19% were very satisfied. Thirty-three percent were
satisfied, another 33% were less satisfied, and 14%
were dissatisfied.
3. How do you budget IT costs? Is it
based on a percentage of gross
revenues?
Fifty-seven percent stated that they did not use gross
revenues in their budgeting methodologies.
4. To what extent do you perceive
technology as a means of
increasing marketing or
productivity or both?
Seventy-one percent felt that technology was a
significant means of increasing both marketing and
productivity in their firms.
5. Are Internet/Web marketing
activities part of the IT function?
Only 24% stated that Internet/Web marketing efforts
reported directly to the IT organization.
32 InForMAtIon teChnoloGY
Section 1: Chief Executive Perception of the Role of IT
This section of the interview focuses on chief executive
perceptions of
the role of IT within the firm. For the first question, about the
role
and mission of IT, over half of the interviewees responded in
ways
that suggested their IT organizations were reactive, without a
strate-
gic mission. One executive admitted, “IT is not really defined. I
guess
its mission is to meet our strategic goals and increase
profitability.”
Another response betrays a narrowly construed understanding of
its
potential: “The mission is that things must work— zero
tolerance for
failure.” These two responses typify the vague and generalized
percep-
tion that IT “has no explicit mission” except to advance the
important
overall mission of the business itself. Little over a quarter of
respon-
dents could confirm a market-driven role for IT; that is, actively
par-
ticipating in marketing and strategic processes. Question 2,
regarding
the impact of the Internet on business strategy, drew mixed
responses.
Some of these revealed the deeply reflective challenges posed
by the
Internet: “I feel the Internet forces us to take a longer-term
view and a
sharper focus to our business.” Others emphasized its
transformative
potential: “The Internet is key to decentralization of our offices
and
business strategy.”
Questions 3 and 4 focused on the extent to which firms have
their own
software development staffs, whether they use internally
developed or
packaged software, and whether they outsource IT services.
Control over
internal development of systems and applications remained
important to
the majority of chief executives: “I do not like outsourcing—
surrender
control, and it’s hard to bring back.” Almost two-thirds of the
partici-
pants employed consultants to assist them in formulating the
role of IT
within their firms but not always without reservation:
“Whenever we
have a significant design issue we bring in consultants to help
us— but
not to do actual development work.” Only a few were downright
skepti-
cal: “I try to avoid consultants— what is their motivation?” The
percep-
tion of outsourcing is still low in midsize firms, as compared to
the recent
increase in IT outsourcing abroad. The lower use could be
related to the
initial costs and management overheads that are required to
properly
implement outsource operations in foreign countries.
A great majority of chief executives recognized some form of
the
strategic importance of IT to business planning: “More of our
business
33the It dIleMMA
is related to technology and therefore I believe IT is more
important
to strategic planning.” Still, this sense of importance remained
some-
what intuitive: “I cannot quantify how IT will become more
strategic
to the business planning— but I sense that job functions will be
dra-
matically altered.” In terms of how IT is viewed by other
departments
within the firm, responses were varied. A little over a third of
respon-
dents felt IT was reasonably integrated within the organization:
“The
IT department is vitally important— but rarely noticed.” The
major-
ity of respondents, however, recognized a need for greater
integra-
tion: “IT was marginalized— but it is changing. While IT drives
the
system— it needs to drive more of the business.” Some
articulated
clearly the perceived problems: “IT needs to be more
proactive— they
do not seem to have good interpersonal skills and do not
understand
corporate politics.” A few expressed a sense of misgiving (“IT
people
are strange— personality is an issue”) and even a sense of
hopeless-
ness: “People hate IT— particularly over the sensitivity of the
data. IT
sometimes is viewed as misfits and incompetent.”
Question eight asked participants whether they felt there was
too
much “hype” attributed to the importance of technology in
business.
Over half responded in the negative, although not without
reserva-
tion: “I do not think there is too much hype— but I am
disappointed.
I had hoped that technology at this point would have reduced
paper,
decreased cost— it just has not happened.” Others felt that there
is
indeed some degree of sensationalism: “I definitely think there
is too
much hype— everyone wants the latest and greatest.” Hype in
many
cases can be related to a function of evaluation, as in this
exclama-
tion: “The hype with IT relates more to when will we actually
see
the value!” The last question in this section asks whether the
uses of
technology within the firm had significantly changed over the
last
five years. A majority agreed that it had: “The role of IT has
changed
significantly in the last five years—we need to stay up-to-date
because
we want to carry the image that we are ‘ on the ball’.” Many of
these
stressed the importance of informational flows: “I find the ‘ I’
[infor-
mation] part to be more and more important and the ‘ T’
[technol-
ogy] to be diminishing in importance.” Some actively
downplayed the
significance: “I believe in minimizing the amount of technology
we
use—people get carried away.”
34 InForMAtIon teChnoloGY
Section 2: Management and Strategic Issues
This section focuses on questions pertaining to executive and
man-
agement organizational concerns. The first and second questions
asked executives about the most senior title held by an IT
officer
and about the reporting structure for IT. Two-thirds of the par-
ticipants ranked their top IT officer as a chief information
officer
(CIO). In terms of organizational hierarchy, half of the IT
leaders
were at the second tier, reporting directly to the CEO or presi-
dent, while the other half were at the third tier, reporting either
to the chief financial officer (CFO) or to the chief operating
offi-
cer (COO). As one CEO stated, “Most of my activity with IT is
through the COO. We have a monthly meeting, and IT is always
on the agenda.”
The third question asked executives to consider their level of
involvement with IT matters. Over half claimed a highly active
rela-
tionship, engaging on a weekly basis: “I like to have IT people
close
and in one-on-one interactions. It is not good to have artificial
barri-
ers.” For some, levels of involvement may be limited: “I am
active with
IT issues in the sense of setting goals.” A third of participants
claimed
less activity, usually becoming active when difficulties arose.
Question
four asked whether executives spoke to their peers at other
firms about
technology issues. A high majority managed to skip this
potential for
communication with their peers. Only one in 10 actively
pursued this
matter of engagement.
Question 5 asked about the extent to which IT issues were
discussed at board meetings, marketing meetings, and business
strategy sessions. Here, a great majority confirmed that there
was
regular discussion regarding IT concerns, especially at board
meet-
ings. A smaller majority attested to IT discussions during
market-
ing meetings. Over a third reported that IT issues maintained a
presence at strategic sessions. The higher incidence at board
meet-
ings may still be attributable to the effects of Year 2000 (Y2K)
preparations. The final question in this section concerned the
level
of criticality for IT in the day-to-day operations of the business.
A
high majority of executives responded affirmatively in this
regard:
“IT is critical to our survival, and its impact on economies of
scale
is significant.”
35the It dIleMMA
Section 3: Measuring IT Performance and Activities
This section is concerned with how chief executives measured
IT per-
formance and activities within their firms. The first question of
this
section asked whether executives had a view about how IT
performance
should be measured. Almost two-thirds affirmed having some
formal
or informal way of measuring performance: “We have no formal
pro-
cess of measuring IT other than predefined goals, cost
constraints, and
deadlines.” Their responses demonstrated great variation,
sometimes
leaning on cynicism: “I measure IT by the number of complaints
I
get.” Many were still grappling with this challenge: “Measuring
IT is
unqualified at this time. I have learned that hours worked is not
the way
to measure IT— it needs to be more goal- oriented.” Most chief
execu-
tives expressed some degree of quandary: “We do not feel we
know
enough about how IT should be measured.” Question two asked
execu-
tives to rate their satisfaction with IT performance. Here, also,
there
was significant variation. A little more than half expressed
some degree
of satisfaction: “Since 9/11 IT has gained a lot of credibility
because of
the support that was needed during a difficult time.” Slightly
fewer than
half revealed a degree of dissatisfaction: “We had to overhaul
our IT
department to make it more customer-service oriented.”
Question three concerned budgeting; that is, whether or not
chief
executives budgeted IT costs as a percentage of gross revenues.
Over
half denied using gross revenues in their budgeting method:
“When
handling IT projects we look at it on a request-by-request
basis.”
The last two questions asked chief executives to assess the
impact of
technology on marketing and productivity. Almost three
quarters of
the participants felt that technology represented a significant
means of
enhancing both marketing and productivity. Some maintained a
cer-
tainty of objective: “We try to get IT closer to the customer—
having
them understand the business better.” Still, many had a less-
defined
sense of direction: “I have a fear of being left behind, so I do
think IT
will become more important to the business.” And others
remained
caught in uncertainty: “I do not fully understand how to use
technol-
ogy in marketing— but I believe it’s there.” Chief executive
certainty,
in this matter, also found expression in the opposite direction:
“IT
will become less important— it will be assumed as a capability
and a
service that companies provide to their customers.” Of the
Internet/
36 InForMAtIon teChnoloGY
Web marketing initiatives, only one quarter of these reported
directly
to the IT organization: “IT does not drive the Web activities
because
they do not understand the business.” Often, these two were
seen as
separate or competing entities of technology: “Having Web
develop-
ment report to IT would hinder the Internet business’s growth
poten-
tial.” Yet, some might be willing to explore a synergistic
potential:
“We are still in the early stages of understanding how the
Internet
relates to our business strategy and how it will affect our
product line.”
General Results
Section 1 revealed that the matter of defining a mission for the
IT
organization remains as unresolved as finding a way to reckon
with the
potential impact of IT on business strategy. Executives still
seemed to
be at a loss on the question of how to integrate IT into the
workplace— a
human resource as well as a strategic issue. There was
uncertainty regard-
ing the dependability of the technology information received.
Most
agreed, however, in their need for software development
departments to
support their internally developed software, in their need to
outsource
certain parts of technology, and in their use of outside
consultants to
help them formulate the future activities of their IT
departments.
Section 2 showed that while the amount of time that executives
spent
on IT issues varied, there was a positive correlation between a
structure in
which IT managers reported directly to the chief executive and
the degree
of activity that executives stated they had with IT matters.
Section 3
showed that chief executives understood the potential value that
technol-
ogy can bring to the marketing and productivity of their firms.
They did
not believe, however, that technology can go unmeasured; there
needs
to be some rationale for allotting a spending figure in the
budget. For
most of the firms in this study, the use of the Internet as a
technological
vehicle for future business was not determined by IT. This
suggests that
IT does not manage the marketing aspects of technology, and
that it has
not achieved significant integration in strategic planning.
Defining the IT Dilemma
The variations found in this study in terms of where IT reports,
how
it is measured, and how its mission is defined were consistent
with
37the It dIleMMA
existing research. But, the wide-ranging inconsistencies and
uncer-
tainties among executives described here left many of them
wonder-
ing whether they should be using IT as part of their business
strategy
and operations. While this quandary does not in itself suggest
an
inadequacy, it does point to an absence of a “best practices”
guideline
for using technology strategically. Hence, most businesses
lacked a
clear plan on how to evolve IT contributions toward business
develop-
ment. Although a majority of respondents felt that IT was
critical to
the survival of their businesses, the degree of IT assimilation
within
the core culture of organizations still varied. This suggests that
the
effects of cultural assimilation lag behind the actual
involvement of
IT in the strategic direction of the company.
While Sampler (1996) attributes many operational
inconsistencies to
the changing landscape of technology, the findings of this study
suggest
that there is also a lack in professional procedures, rules, and
established
governance, that could support the creation of best practices for
the
profession. Bensaou and Earl (1998), on the one hand, have
addressed
this concern by taking a pro-Japanese perspective in
extrapolating from
five “Western” problems five “general” principles, presumably
not cul-
ture bound, and thence a set of “best principles” for managing
IT. But,
Earl et al. (1995), on the other hand, have sidestepped any
attempt to
incorporate Earl’s own inductive approach discussed here;
instead, they
favor a market management approach, based on a supply-and-
demand
model to “balance” IT management. Of course, best practices
already
embody the implicit notion of best principles; however, the
problems
confronting executives— the need for practical guidelines—
remain. For
instance, this study shows that IT performance is measured in
many
different ways. It is this type of practical inconsistency that
leaves chief
executives with the difficult challenge of understanding how
technol-
ogy decisions can be managed.
On a follow-up call related to this study, for example, a CEO
informed me of a practical yet significant difference she had
instituted
since our interview. She stated:
The change in reporting has allowed IT to become part of the
main-
stream vision of the business. It now is a fundamental
component of all
discussions with human resources, sales and marketing, and
accounting.
The change in reporting has allowed for the creation of a
critical system,
38 InForMAtIon teChnoloGY
which has generated significant direct revenues for the business.
I attri-
bute this to my decision to move the reporting of technology
directly
to me and to my active participation in the uses of technology in
our
business.
This is an example of an executive whom Schein (1994) would
call a “change agent”— someone who employs “cognitive
redefinition
through scanning,” in this case to elicit the strategic potential of
IT.
We might also call this activity reflective thinking (Langer,
2001b).
Schein’s change agents, however, go on to “acknowledge that
future
generations of CEOs will have been educated much more
thoroughly
in the possibilities of the computer and IT, thus enabling them
to take
a hands-on adopter stance” (p. 343). This insight implies a
distanc-
ing (“future”) of present learning responsibilities among current
chief
executives. The nearer future of this insight may instead be seen
in
the development of organizational learning.* These are two
areas of
contemporary research that begin to offer useful models in the
pursuit
of a best practices approach to the understanding and managing
of IT.
If the focus of this latter study was geared toward the evaluation
of
IT based on the view of the chief executive, it was, indeed,
because
their views necessarily shape the very direction for the
organizations
that they manage. Subsequent chapters of this book examine
how
the various dilemmas surrounding IT that I have discussed here
are
affecting organizations and how organizational learning
practices can
help answer many of the issues of today as raised by executives,
man-
agers, and operations personnel.
Recent Developments in Operational Excellence
The decline in financial markets in 2009, and the continued
increase
in mergers and acquisitions due to global competition have
created an
interesting opportunity for IT that reinforces the need for
integration
via organizational learning. During difficult economic periods,
IT
has traditionally been viewed as a cost center and had its
operations
* My case study “Fixing Bad Habits” (Langer, 2001b) has
shown that integrating
the practices of reflective thinking, to support the development
of organizational
learning, has greatly enhanced the adaptation of new
technologies, their strategic
valuation to the firm, and their assimilation into the social
norms of the business.
39the It dIleMMA
reduced (I discuss this further in Chapter 3, in which I
introduce
the concept of drivers and supporters). However, with the
growth in
the role of technology, IT management has now been asked to
help
improve efficiency through the use of technology across
departments.
That is, IT is emerging as an agent for business transformation
in a
much stronger capacity than ever before. This phenomenon has
placed
tremendous pressure on the technology executive to align with
his or
her fellow executives in other departments and to get them to
partici-
pate in cost reductions by implementing more technology.
Naturally,
using technology to facilitate cuts to the workforce is often
unpopular,
and there has been much bitter fallout from such cross-
department
reductions. Technology executives thus face the challenge of
position-
ing themselves as the agents of a necessary change. However,
opera-
tional excellence is broader than just cutting costs and changing
the
way things operate; it is about doing things efficiently and with
qual-
ity measures across corporate operations. Now that technology
affects
every aspect of operations, it makes sense to charge technology
execu-
tives with a major responsibility to get it accomplished.
The assimilation of technology as a core part of the entire orga-
nization is now paramount for survival, and the technology
execu-
tive of today and certainly tomorrow will be one who
understands
that operational excellence through efficiency must be
accomplished
by educating business units in self-managing the process. The
IT
executive, then, supports the activity as a leader, not as a cost
cut-
ter who invades the business. The two approaches are very
different,
and adopting the former can result in significant long-term
results in
strategic alignment.
My interviews with CEOs supported this notion: The CEO does
not want to be the negotiator; change must be evolutionary
within the
business units themselves. While taking this kind of role in
organiza-
tional change presents a new dilemma for IT, it can also be an
oppor-
tunity for IT to position itself successfully within the
organization.
http://taylorandfrancis.com
41
3
TeChnology as a
vaRiable anD Responsive
oRganizaTional Dynamism
Introduction
This chapter focuses on defining the components of technology
and
how they affect corporate organizations. In other words, if we
step
back momentarily from the specific challenges that information
tech-
nology (IT) poses, we might ask the following: What are the
generic
aspects of technology that have made it an integral part of
strategic and
competitive advantage for many organizations? How do
organizations
respond to these generic aspects as catalysts of change?
Furthermore,
how do we objectively view the role of technology in this
context, and
how should organizations adjust to its short- and long-term
impacts?
Technological Dynamism
To begin, technology can be regarded as a variable, independent
of others, that contributes to the life of a business operation. It
is
capable of producing an overall, totalizing, yet distinctive,
effect on
organizations— it has the unique capacity to create
accelerations of
corporate events in an unpredictable way. Technology, in its
aspect of
unpredictability, is necessarily a variable, and in its capacity as
accel-
erator— its tendency to produce change or advance— it is
dynamic.
My contention is that, as a dynamic kind of variable,
technology, via
responsive handling or management, can be tapped to play a
special
role in organizational development. It can be pressed into
service as
the dynamic catalyst that helps bring organizations to maturity
in
dealing not only with new technological quandaries, but also
with
other agents of change. Change generates new knowledge,
which in
turn requires a structure of learning that should, if managed
properly,
42 INFORMATION TECHNOLOGY
result in transformative behavior, supporting the continued
evolution
of organizational culture. Specifically, technology speeds up
events,
such as the expectation of getting a response to an e-mail, and
requires
organizations to respond to them in ever-quickening time
frames.
Such events are not as predictable as those experienced by
individuals
in organizations prior to the advent of new technologies—
particu-
larly with the meteoric advance of the Internet. In viewing
technology
then as a dynamic variable, and one that requires systemic and
cul-
tural organizational change, we may regard it as an inherent,
internal
driving force— a form of technological dynamism.
Dynamism is defined as a process or mechanism responsible for
the
development or motion of a system. Technological dynamism
charac-
terizes the unpredictable and accelerated ways in which
technology,
specifically, can change strategic planning and organizational
behav-
ior/culture. This change is based on the acceleration of events
and
interactions within organizations, which in turn create the need
to
better empower individuals and departments. Another way of
under-
standing technological dynamism is to think of it as an internal
drive
recognized by the symptoms it produces. The new events and
interac-
tions brought about by technology are symptoms of the
dynamism
that technology manifests. The next section discusses how
organiza-
tions can begin to make this inherent dynamism work in their
favor
on different levels.
Responsive Organizational Dynamism
The technological dynamism at work in organizations has the
power
to disrupt any antecedent sense of comfortable equilibrium or an
unwelcome sense of stasis. It also upsets the balance among the
vari-
ous factors and relationships that pertain to the question of how
we
might integrate new technologies into the business— a question
of
what we will call strategic integration— and how we assimilate
the cul-
tural changes they bring about organizationally— a question of
what
we call cultural assimilation. Managing the dynamism,
therefore, is a
way of managing the effects of technology. I propose that these
orga-
nizational ripples, these precipitous events and interactions, can
be
addressed in specific ways at the organizational management
level.
The set of integrative responses to the challenges raised by
technology
43teChnoloGY As A vArIAble And responsIve
is what I am calling responsive organizational dynamism,
which will
also receive further explication in the next few chapters. For
now, we
need to elaborate the two distinct categories that present
themselves
in response to technological dynamism: strategic integration and
cul-
tural assimilation. Figure 3.1 diagrams the relationships.
Strategic Integration
Strategic integration is a process that addresses the business-
strategic
impact of technology on organizational processes. That is, the
business-strategic impact of technology requires immediate
orga-
nizational responses and in some instances zero latency.
Strategic
integration recognizes the need to scale resources across
traditional
business– geographic boundaries, to redefine the value chain in
the
life cycle of a product or service line, and generally to foster
more
agile business processes (Murphy, 2002). Strategic integration,
then,
Technology as an
independent
variable
Creates
Organizational
dynamism
Acceleration of events that
require different
infrastructures and
organizational processes
Requires
Strategic
integration
Cultural
assimilation
Symptoms and
implications
Figure 3.1 Responsive organizational dynamism.
44 INFORMATION TECHNOLOGY
is a way to address the changing requirements of business
processes
caused by the sharp increases in uses of technology. Evolving
tech-
nologies have become catalysts for competitive initiatives that
create
new and different ways to determine successful business
investment.
Thus, there is a dynamic business variable that drives the need
for
technology infrastructures capable of greater flexibility and of
exhib-
iting greater integration with all business operations.
Historically, organizational experiences with IT investment
have
resulted in two phases of measured returns. The first phase
often
shows negative or declining productivity as a result of the
investment;
in the second phase, we often see a lagging of, although
eventual
return to, productivity. The lack of returns in the first phase has
been
attributed to the nature of the early stages of technology
exploration
and experimentation, which tend to slow the process of
organizational
adaptation to technology. The production phase then lags behind
the ability of the organization to integrate new technologies
with
its existing processes. Another complication posed by
technological
dynamism via the process of strategic integration is a
phenomenon we
can call factors of multiplicity — essentially, what happens
when several
new technology opportunities overlap and create myriad
projects that
are in various phases of their developmental life cycle.
Furthermore,
the problem is compounded by lagging returns in productivity,
which
are complicated to track and to represent to management. Thus,
it is
important that organizations find ways to shorten the period
between
investment and technology’ s effective deployment. Murphy
(2002)
identifies several factors that are critical to bridging this delta:
1. Identifying the processes that can provide acceptable
business
returns from new technological investments
2. Establishing methodologies that can determine these
processes
3. Finding ways to actually perform and realize expected
benefits
4. Integrating IT projects with other projects
5. Adjusting project objectives when changes in the business
require them
Technology complicates these actions, making them more
difficult
to resolve; hence the need to manage the complications. To
tackle
these compounded concerns, strategic integration can shorten
life
cycle maturation by focusing on the following integrating
factors:
45teChnoloGY As A vArIAble And responsIve
• Addressing the weaknesses in management organizations in
terms of how to deal with new technologies, and how to bet-
ter realize business benefits
• Providing a mechanism that both enables organizations to
deal with accelerated change caused by technological innova-
tions and integrates them into a new cycle of processing and
handling change
• Providing a strategic learning framework by which every new
technology variable adds to organizational knowledge, par-
ticularly using reflective practices (see Chapter 4)
• Establishing an integrated approach that ties technology
accountability to other measurable outcomes using organiza-
tional learning techniques and theories
To realize these objectives, organizations must be able to
• Create dynamic internal processes that can function on a
daily basis to deal with understanding the potential fit of new
technologies and their overall value to the business
• Provide the discourse to bridge the gaps between IT- and
non-IT-related investments and uses into an integrated system
• Monitor investments and determine modifications to the life
cycle
• Implement various organizational learning practices, includ-
ing learning organization, knowledge management, change
management, and communities of practice, all of which help
foster strategic thinking and learning that can be linked to
performance (Gephardt & Marsick, 2003)
Another important aspect of strategic integration is what
Murphy
(2002) calls “ consequential interoperability,” in which “ the
conse-
quences of a business process” are understood to “ dynamically
trigger
integration” (p. 31). This integration occurs in what he calls
the five
pillars of benefits realization:
1. Strategic alignment: The alignment of IT strategically with
business goals and objectives.
2. Business process impact: The impact on the need for the
organi-
zation to redesign business processes and integrate them with
new technologies.
46 INFORMATION TECHNOLOGY
3. Architecture: The actual technological integration of appli-
cations, databases, and networks to facilitate and support
implementation.
4. Payback: The basis for computing return on investment
(ROI)
from both direct and indirect perspectives.
5. Risk: Identifying the exposure for underachievement or fail-
ure in the technology investment.
Murphy’ s (2002) pillars are useful in helping us understand
how
technology can engender the need for responsive organizational
dyna-
mism (ROD), especially as it bears on issues of strategic
integration.
They also help us understand what becomes the strategic
integration
component of ROD. His theory on strategic alignment and
business
process impact supports the notion that IT will increasingly
serve as an
undergirding force, one that will drive enterprise growth by
identify-
ing the initiators (such as e-business on the Internet) that best
fit busi-
ness goals. Many of these initiators will be accelerated by the
growing
use of e-business, which becomes the very driver of many new
market
realignments. This e-business realignment will require the
ongoing
involvement of executives, business managers, and IT
managers. In
fact, the Gartner Group forecasted that 70% of new software
applica-
tion investments and 5% of new infrastructure expenditures by
2005
would be driven by e-business. Indeed, this has occurred and
contin-
ues to expand.
The combination of evolving business drivers with accelerated
and
changing customer demands has created a business revolution
that
best defines the imperative of the strategic integration
component of
ROD. The changing and accelerated way businesses deal with
their
customers and vendors requires a new strategic integration to
become
a reality rather than remain a concept discussed but affecting
little
action. Without action directed toward new strategic
integration,
organizations would lose competitive advantage, which would
affect
profits. Most experts see e-business as the mechanism that will
ulti-
mately require the integrated business processes to be realigned,
thus
providing value to customers and modifying the customer–
vendor
relationship. The driving force behind this realignment
emanates from
the Internet, which serves as the principle accelerator of the
change
in transactions across all businesses. The general need to
optimize
47teChnoloGY As A vArIAble And responsIve
resources forces organizations to rethink and to realign business
pro-
cesses to gain access to new business markets.
Murphy’ s (2002) pillar of architecture brings out yet another
aspect
of ROD. By architecture we mean the focus on the effects that
technol-
ogy has on existing computer applications or legacy systems
(old exist-
ing systems). Technology requires existing IT systems to be
modified
or replacement systems to be created that will mirror the new
busi-
ness realignments. These changes respond to the forces of
strategic
integration and require business process reengineering (BPR)
activi-
ties, which represent the reevaluation of existing systems based
on
changing business requirements. It is important to keep in mind
the
acceleration factors of technology and to recognize the amount
of
organizational effort and time that such projects take to
complete. We
must ask the following question: How might organizations
respond to
these continual requirements to modify existing processes? I
discuss
in other chapters how ROD represents the answer to this
question.
Murphy’ s (2002) pillar of direct return is somewhat limited and
nar-
row because not all IT value can be associated with direct
returns, but
it is important to discuss. Technology acceleration is forcing
organiza-
tions to deal with broader issues surrounding what represents a
return
from an investment. The value of strategic integration relies
heavily on
the ability of technology to encapsulate itself within other
departments
where it ultimately provides the value. We show in Chapter 4
that
this issue also has significance in organizational formation.
What this
means is simply that value can be best determined within
individual
business units at the microlevel and that these appropriate-level
busi-
ness units also need to make the case for why certain
investments need
to be pursued. There are also paybacks that are indirect; for
example,
Lucas (1999) demonstrates that many technology investments
are non-
monetary. The IT department (among others) becomes
susceptible to
great scrutiny and subject to budgetary cutbacks during
economically
difficult times. This does not suggest that IT “ hide” itself but
rather
that its investment be integrated within the unit where it
provides the
most benefit. Notwithstanding the challenge to map IT
expenditures
to their related unit, there are always expenses that are central
to all
departments, such as e-mail and network infrastructure. These
types
of expenses can rarely provide direct returns and are typically
allocated
across departments as a cost of doing business.
48 INFORMATION TECHNOLOGY
Because of the increased number of technology opportuni-
ties, Murphy’ s (2002) risk pillar must be a key part of strategic
integration. The concept of risk assessment is not new to an
organiza-
tion; however, it is somewhat misunderstood as it relates to
technology
assessment. Technology assessment, because of the acceleration
factor,
must be embedded within the strategic decision-making process.
This
can only be accomplished by having an understanding of how to
align
technology opportunities for business change and by
understanding
the cost of forgoing the opportunity as well as the cost of delays
in
delivery. Many organizations use risk assessment in an
unstructured
way, which does not provide a consistent framework to
dynamically
deal with emerging technologies. Furthermore, such assessment
needs
to be managed at all levels in the organization as opposed to
being an
event-driven activity controlled only by executives.
Summary
Strategic integration represents the objective of dealing with
emerg-
ing technologies on a regular basis. It is an outcome of ROD,
and it
requires organizations to deal with a variable, that forces
acceleration
of decisions in an unpredictable fashion. Strategic integration
would
require businesses to realign the ways in which they include
technol-
ogy in strategic decision making.
Cultural Assimilation
Cultural assimilation is a process that focuses on the
organizational
aspects of how technology is internally organized, including the
role
of the IT department, and how it is assimilated within the
organiza-
tion as a whole. The inherent, contemporary reality of
technologi-
cal dynamism requires not only strategic but also cultural
change.
This reality demands that IT organizations connect to all aspects
of
the business. Such affiliation would foster a more interactive
culture
rather than one that is regimented and linear, as is too often the
case.
An interactive culture is one that can respond to emerging
technology
decisions in an optimally informed way, and one that
understands the
impact on business performance.
49teChnoloGY As A vArIAble And responsIve
The kind of cultural assimilation elicited by technological dyna-
mism and formalized in ROD is divided into two subcategories:
the
study of how the IT organization relates and communicates with
“ others,” and the actual displacement or movement of
traditional
IT staff from an isolated “ core” structure to a firm-wide,
integrated
framework.
IT Organization Communications with “ Others”
The Ravell case study shows us the limitations and
consequences of
an isolated IT department operating within an organization. The
case
study shows that the isolation of a group can lead to
marginalization,
which results in the kind of organization in which not all
individuals
can participate in decision making and implementation, even
though
such individuals have important knowledge and value.
Technological
dynamism is forcing IT departments to rethink their strategic
posi-
tion within the organizational structure of their firm. No longer
can
IT be a stand-alone unit designed just to service outside
departments
while maintaining its separate identity. The acceleration factors
of
technology require more dynamic activity within and among
depart-
ments, which cannot be accomplished through discrete
communica-
tions between groups. Instead, the need for diverse groups to
engage
in more integrated discourse, and to share varying levels of
techno-
logical knowledge, as well as business-end perspectives,
requires new
organizational structures that will of necessity give birth to a
new
and evolving business— social culture. Indeed, the need to
assimilate
technology creates a transformative effect on organizational
cultures,
the way they are formed and re-formed, and what they will need
from
IT personnel.
Movement of Traditional IT Staff
To facilitate cultural assimilation from an IT perspective, IT
must
become better integrated with non-IT personnel. This form of
inte-
gration can require the actual movement of IT staff into other
depart-
ments, which begins the process of a true assimilation of
resources
among business units. While this may seem like the elimination
of
50 INFORMATION TECHNOLOGY
the integrity or identity of IT, such a loss is far from the case.
The
elimination of the IT department is not at all what is called for
here;
on the contrary, the IT department is critical to the function of
cul-
tural assimilation. However, the IT department may need to be
struc-
tured differently from the way it has been so that it can deal
primarily
with generic infrastructure and support issues, such as e-mail,
net-
work architecture, and security. IT personnel who focus on
business-
specific issues need to become closely aligned with the
appropriate
units so that ROD can be successfully implemented.
Furthermore, we must acknowledge that, given the wide range
of
available knowledge about technology, not all technological
knowl-
edge emanates from the IT department. The question becomes
one of finding the best structure to support a broad assimilation
of
knowledge about any given technology; then, we should ask
how that
knowledge can best be utilized by the organization. There is a
pitfall
in attempting to find a “ standard” IT organizational structure
that
will address the cultural assimilation of technology. Sampler’ s
(1996)
research, and my recent research with chief executives,
confirms that
no such standard structure exists. It is my position that
organizations
must find their own unique blend, using organizational learning
con-
structs. This simply means that the cultural assimilation of IT
may
be unique to the organization. What is then more important for
the
success of organizational development is the process of
assimilation as
opposed to the transplanting of the structure itself.
Today, many departments still operate within “ silos” where
they
are unable to meet the requirements of the dynamic and
unpredictable
nature of technology in the business environment. Traditional
orga-
nizations do not often support the necessary communications
needed
to implement cultural assimilation across business units.
However,
business managers can no longer make decisions without
considering
technology; they will find themselves needing to include IT
staff in
their decision-making processes. On the other hand, IT
departments
can no longer make technology-based decisions without
concerted
efforts toward assimilation (in contrast to occasional partnering
or
project-driven participation) with other business units. This
assimi-
lation becomes mature when new cultures evolve synergistically
as
opposed to just having multiple cultures that attempt to work in
con-
junction with each other. The important lesson from Ravell to
keep
51teChnoloGY As A vArIAble And responsIve
in mind here is that the process of assimilating IT can create
new
cultures that in turn evolve to better support the requirements
estab-
lished by the dynamism of technology.
Eventually, these new cultural formations will not perceive
them-
selves as functioning within an IT or non-IT decision
framework
but rather as operating within a more central business operation
that
understands how to incorporate varying degrees of IT
involvement
as necessary. Thus, organizational cultures will need to fuse
together
to respond to new business opportunities and requirements
brought
about by the ongoing acceleration of technological innovation.
This
was also best evidenced by subsequent events at Ravell. Three
years
after the original case study, it became necessary at Ravell to
inte-
grate one of its business operations with a particular group of
IT staff
members. The IT personnel actually transferred to the business
unit
to maximize the benefits of merging both business and technical
cul-
tures. Interestingly, this business unit is currently undergoing
cultural
assimilation and is developing its own behavioral norms
influenced by
the new IT staff. However, technology decisions within such
groups
are not limited to the IT transferred personnel. IT and non-IT
staff
need to formulate decisions using various organizational
learning
techniques. These techniques are discussed in the next chapter.
Summary
Without appropriate cultural assimilation, organizations tend to
have
staff that “ take shortcuts, [then] the loudest voice will win the
day, ad
hoc decisions will be made, accountabilities lost, and lessons
from suc-
cesses and failures will not become part of ... wisdom”
(Murphy, 2002,
p. 152). As in the case of Ravell Corporation, it is essential,
then, to
provide for consistent governance that fits the profile of the
existing cul-
ture or can establish the need for a new culture. While many
scholars
and managers suggest the need to have a specific entity
responsible for
IT governance, one that is to be placed within the operating
structure
of the organization, such an approach creates a fundamental
problem.
It does not allow staff and managers the opportunity to
assimilate tech-
nologically driven change and understand how to design a
culture that
can operate under ROD. In other words, the issue of governance
is
misinterpreted as a problem of structural positioning or
hierarchy when
52 INFORMATION TECHNOLOGY
it is really one of cultural assimilation. As a result, many
business solu-
tions to technology issues often lean toward the prescriptive,
instead of
the analytical, in addressing the real problem.
Murphy’ s (2002) risk pillar theory offers us another important
component relevant to cultural assimilation. This approach
addresses
the concerns that relate to the creation of risk cultures formed
to deal
with the impact of new systems. New technologies can actually
cause
changes in cultural assimilation by establishing the need to
make cer-
tain changes in job descriptions, power structures, career
prospects,
degree of job security, departmental influence, or ownership of
data.
Each of these potential risks needs to be factored in as an
important
part of considering how best to organize and assimilate
technology
through ROD.
Technology Business Cycle
To better understand technology dynamism, or how technology
acts as
a dynamic variable, it is necessary to define the specific steps
that occur
during its evolution in an organization. The evolution or
business cycle
depicts the sequential steps during the maturation of a new
technology
from feasibility to implementation and through subsequent
evolution.
Table 3.1 shows the five components that comprise the cycle:
feasibil-
ity, measurement, planning, implementation, and evolution.
Table 3.1 Technology Business Cycle
CYCLE COMPONENT COMPONENT DESCRIPTION
Feasibility Understanding how to view and evaluate emerging
technologies, from a
technical and business perspective.
Measurement Dealing with both the direct monetary returns and
indirect nonmonetary
returns; establishing driver and support life cycles.
Planning Understanding how to set up projects, establishing
participation across
multiple layers of management, including operations and
departments.
Implementation Working with the realities of project
management; operating with political
factions, constraints; meeting milestones; dealing with
setbacks; having
the ability to go live with new systems.
Evolution Understanding how acceptance of new technologies
affects cultural
change, and how uses of technology will change as individuals
and
organizations become more knowledgeable about technology,
and
generate new ideas about how it can be used; objective is
established
through organizational dynamism, creating new knowledge and
an
evolving organization.
53teChnoloGY As A vArIAble And responsIve
Feasibility
The stage of feasibility focuses on a number of issues
surrounding
the practicality of implementing a specific technology.
Feasibility
addresses the ability to deliver a product when it is needed in
com-
parison to the time it takes to develop it. Risk also plays a role
in
feasibility assessment; of specific concern is the question of
whether
it is possible or probable that the product will become obsolete
before
completion. Cost is certainly a huge factor, but viewed at a “
high
level” (i.e., at a general cost range), and it is usually geared
toward
meeting the expected ROI of a firm. The feasibility process
must be
one that incorporates individuals in a way that allows them to
respond
to the accelerated and dynamic process brought forth by
technological
innovations.
Measurement
Measurement is the process of understanding how an investment
in
technology is calculated, particularly in relation to the ROI of
an
organization. The complication with technology and
measurement
is that it is simply not that easy to determine how to calculate
such
a return. This problem comes up in many of the issues discussed
by
Lucas (1999) in his book Information Technology and the
Productivity
Paradox. His work addresses many comprehensive issues,
surround-
ing both monetary and nonmonetary ROI, as well as direct ver-
sus indirect allocation of IT costs. Aside from these issues,
there
is the fact that for many investments in technology the attempt
to
compute ROI may be an inappropriate approach. As stated,
Lucas
offered a “ garbage can” model that advocates trust in the
operational
management of the business and the formation of IT
representatives
into productive teams that can assess new technologies as a
regu-
lar part of business operations. The garbage can is an abstract
con-
cept for allowing individuals a place to suggest innovations
brought
about by technology. The inventory of technology opportunities
needs regular evaluation. Lucas does not really offer an
explana-
tion of exactly how this process should work internally. ROD,
how-
ever, provides the strategic processes and organizational–
cultural
needs that can provide the infrastructure to better understand
and
54 INFORMATION TECHNOLOGY
evaluate the potential benefits from technological innovations
using
the garbage can model. The graphic depiction of the model is
shown
in Figure 3.2.
Planning
Planning requires a defined team of user and IT representatives.
This
appears to be a simple task, but it is more challenging to
understand
how such teams should operate, from whom they need support,
and
what resources they require. Let me be specific. There are a
number
of varying types of “ users” of technology. They typically exist
in three
tiers: executives, business line managers, and operations users.
Each
of these individuals offers valuable yet different views of the
benefits
of technology (Langer, 2002). I define these user tiers as
follows:
1. Executives: These individuals are often referred to as execu-
tive sponsors. Their role is twofold. First, they provide input
into the system, specifically from the perspective of pro-
ductivity, ROI, and competitive edge. Second, and per-
haps more important, their responsibility is to ensure that
users are participating in the requisite manner (i.e., made
Garbage can
model of IT value
Failed systems
Direct
benefits
Indirect
benefits
User
needs, etc.
C
on
ve
rs
io
n
eff
ec
tiv
en
es
s �e IT value pipeline
Figure 3.2 Garbage can model of IT value. (From Lucas,
H.C., Information Technology and the
Productivity Paradox. Oxford University Press, New York,
1999.)
55teChnoloGY As A vArIAble And responsIve
to be available, in the right place, etc.). This area can be
problematic because internal users are typically busy doing
their jobs and sometimes neglect to provide input or to
attend project meetings. Furthermore, executive sponsors
can help control political agendas that can hurt the success
of the project.
2. Business line managers: This interface provides the most
information from a business unit perspective. These indi-
viduals are responsible for two aspects of management.
First, they are responsible for the day-to-day productivity
of their unit; therefore, they understand the importance
of productive teams, and how software can assist in this
endeavor. Second, they are responsible for their staff. Thus,
line managers need to know how software will affect their
operational staff.
3. Functional users: These are the individuals in the trenches
who
understand exactly how processing needs to get done. While
their purview of the benefits of the system is relatively nar-
rower than that of the executives and managers, they provide
the concrete information that is required to create the feature/
functions that make the system usable.
The planning process becomes challenging when attempting to
get the three user communities to integrate their needs and “
agree to
agree” on how a technology project needs to be designed and
managed.
Implementation
Implementation is the process of actually using a technology.
Implementation of technology systems requires wider
integration
within the various departments than other systems in an
organization
because usually multiple business units are affected.
Implementation
must combine traditional methods of IT processes of
development
yet integrate them within the constraints, assumptions, and
cultural
(perhaps political) environments of different departments.
Cultural
assimilation is therefore required at this stage because it delves
into
the structure of the internal organization and requires individual
participation in every phase of the development and
implementation
56 INFORMATION TECHNOLOGY
cycle. The following are some of the unique challenges facing
the
implementation of technological projects:
1. Project managers as complex managers: Technology projects
require multiple interfaces that often lie outside the traditional
user community. They can include interfacing with writers,
editors, marketing personnel, customers, and consumers, all
of whom are stakeholders in the success of the system.
2. Shorter and dynamic development schedules: Due to the
dynamic
nature of technology, its process of development is less lin-
ear than that of others. Because there is less experience in
the general user community, and there are more stakeholders,
there is a tendency by those in IT, and executives, to underes-
timate the time and cost to complete the project.
3. New untested technologies: There is so much new technol-
ogy offered to organizations that there is a tendency by IT
organizations to implement technologies that have not yet
matured— that are not yet the best products they will eventu-
ally be.
4. Degree of scope changes: Technology, because of its
dynamic
nature, tends to be prone to scope creed — the scope of the
orig-
inal project expanding during development.
5. Project management: Project managers need to work closely
with internal users, customers, and consumers to advise
them on the impact of changes to the project schedule.
Unfortunately, scope changes that are influenced by changes
in market trends may not be avoidable. Thus, part of a good
strategy is to manage scope changes rather than attempt to
stop them, which might not be realistic.
6. Estimating completion time: IT has always had difficulties in
knowing how long it will take to implement a technology.
Application systems are even more difficult because of the
number of variables and unknowns.
7. Lack of standards: The technology industry continues to be a
profession that does not have a governing body. Thus, it is
impossible to have real enforced standards that other pro-
fessions enjoy. While there are suggestions for best prac-
tices, many of them are unproven and not kept current with
57teChnoloGY As A vArIAble And responsIve
changing developments. Because of the lack of successful
application projects, there are few success stories to create new
and better sets of best practices.
8. Less-specialized roles and responsibilities: The IT team
tends to
have staff members who have varying responsibilities. Unlike
traditional new technology-driven projects, separation of roles
and responsibilities is more difficult when operating in more
dynamic environments. The reality is that many roles have not
been formalized and integrated using something like ROD.
9. Broad project management responsibilities: Project
management
responsibilities need to go beyond those of the traditional IT
manager. Project managers are required to provide manage-
ment services outside the traditional software staff. They need
to interact more with internal and external individuals, as well
as with non-traditional members of the development team,
such as Web text and content staff. Therefore, there are many
more obstacles that can cause implementation problems.
Evolution
The many ways to form a technological organization with a
natural
capacity to evolve have been discussed from an IT perspective
in this
chapter. However, another important factor is the changing
nature
of application systems, particularly those that involve e-
businesses.
E-business systems are those that utilize the Internet and engage
in e-commerce activities among vendors, clients, and internal
users
in the organization. The ways in which e-business systems are
built
and deployed suggest that they are evolving systems. This
means
that they have a long life cycle involving ongoing maintenance
and
enhancement. They are, if you will, “ living systems” that
evolve
in a manner similar to organizational cultures. So, the
traditional
beginning-to-end life cycle does not apply to an e-business proj-
ect that must be implemented in inherently ongoing and
evolving
phases. The important focus is that technology and
organizational
development have parallel evolutionary processes that need to
be in
balance with each other. This philosophy is developed further in
the
next chapter.
58 INFORMATION TECHNOLOGY
Drivers and Supporters
There are essentially two types of generic functions performed
by
departments in organizations: driver functions and supporter
func-
tions. These functions relate to the essential behavior and nature
of
what a department contributes to the goals of the organization. I
first encountered the concept of drivers and supporters at
Coopers
& Lybrand, which was at that time a Big 8* accounting firm. I
stud-
ied the formulation of driver versus supporter as it related to the
role
of our electronic data processing (EDP) department. The firm
was
attempting to categorize the EDP department as either a driver
or a
supporter.
Drivers were defined in this instance as those units that
engaged
in frontline or direct revenue-generating activities. Supporters
were
units that did not generate obvious direct revenues but rather
were
designed to support frontline activities. For example, operations
such
as internal accounting, purchasing, or office management were
all
classified as supporter departments. Supporter departments, due
to
their nature, were evaluated on their effectiveness and
efficiency or
economies of scale. In contrast, driver organizations were
expected to
generate direct revenues and other ROI value for the firm. What
was
also interesting to me at the time was that drivers were expected
to
be more daring— since they must inevitably generate returns for
the
business. As such, drivers engaged in what Bradley and Nolan
(1998)
coined “ sense and respond” behaviors and activities. Let me
explain.
Marketing departments often generate new business by
investing
or “ sensing” an opportunity quickly because of competitive
forces
in the marketplace. Thus, they must sense an opportunity and be
allowed to respond to it in a timely fashion. The process of
sensing
opportunity, and responding with competitive products or
services,
is a stage in the cycle that organizations need to support.
Failures in
the cycles of sense and respond are expected. Take, for
example, the
* The original “ Big 8” consisted of the eight large accounting
and management con-
sulting firms— Coopers & Lybrand, Arthur Anderson, Touche
Ross, Deloitte
Haskins & Sells, Arthur Young, Price Waterhouse, Pete
Marwick Mitchell, and
Ernst and Whinney— until the late 1980s, when these firms
began to merge. Today,
there are four: Price Waterhouse Coopers, Deloitte & Touche,
Ernst & Young, and
KPMG (Pete Marwick and others).
59teChnoloGY As A vArIAble And responsIve
launching of new fall television shows. Each of the major
stations
goes through a process of sensing which shows might be
interesting to
the viewing audience. They respond, after research and review,
with a
number of new shows. Inevitably, only a few of these selected
shows
are actually successful; some fail almost immediately. While
relatively
few shows succeed, the process is acceptable and is seen by
manage-
ment as the consequence of an appropriate set of steps for
competing
effectively— even though the percentage of successful new
shows is
low. Therefore, it is safe to say that driver organizations are
expected
to engage in high-risk operations, of which many will fail, for
the sake
of creating ultimately successful products or services.
The preceding example raises two questions: (1) How does
sense
and respond relate to the world of IT? and (2) Why is it
important?
IT is unique in that it is both a driver and a supporter. The latter
is the
generally accepted norm in most firms. Indeed, most IT
functions are
established to support myriad internal functions, such as
• Accounting and finance
• Data center infrastructure (e-mail, desktop, etc.)
• Enterprise-level application (enterprise resource planning,
ERP)
• Customer support (customer relationship management, CRM)
• Web and e-commerce activities
As one would expect, these IT functions are viewed as overhead
related, as somewhat of a commodity, and thus are constantly
man-
aged on an economy-of-scale basis— that is, how can we make
this
operation more efficient, with a particular focus on cost
containment?
So, what then are IT driver functions? By definition, they are
those
that engage in direct revenues and identifiable ROI. How do we
define
such functions in IT because most activities are sheltered under
the
umbrella of marketing organization domains? (Excluding, of
course,
software application development firms that engage in
marketing for
their actual application products.) I define IT driver functions
as those
projects that, if delivered, would change the relationship
between the
organization and its customers; that is, those activities that
directly
affect the classic definition of a market: forces of supply and
demand,
which are governed by the customer (demand) and the vendor
(sup-
plier) relationship. This concept can be shown in the case
example that
follows.
60 INFORMATION TECHNOLOGY
Santander versus Citibank
Santander Bank, the major bank of Spain, had enjoyed a
dominant
market share in its home country. Citibank had attempted for
years to
penetrate Santander’ s dominance using traditional approaches
(open-
ing more branch offices, marketing, etc.) without success, until,
that
is, they tried online banking. Using technology as a driver,
Citibank
made significant penetration into the market share of Santander
because it changed the customer– vendor relationship. Online
bank-
ing, in general, has had a significant impact on how the banking
industry has established new markets, by changing this
relationship.
What is also interesting about this case is the way in which
Citibank
accounted for its investment in online banking; it knows little
about
its total investment and essentially does not care about its direct
pay-
back. Rather, Citibank sees its ROI in a similar way that depicts
driver/marketing behavior; the payback is seen in broader terms
to
affect not only revenue generation, but also customer support
and
quality recognition.
Information Technology Roles and Responsibilities
The preceding section focuses on how IT can be divided into
two dis-
tinct kinds of business operations. As such, the roles and
responsibili-
ties within IT need to change accordingly and be designed under
the
auspices of driver and supporter theory. Most traditional IT
depart-
ments are designed to be supporters, so that they have a close-
knit
organization that is secure from outside intervention and geared
to
respond to user needs based on requests. While in many
instances
this type of formation is acceptable, it is limited in providing
the IT
department with the proper understanding of the kind of
business
objectives that require driver-type activities. This was certainly
the
experience in the Ravell case study. In that instance, I found
that
making the effort to get IT support personnel “ out from their
com-
fortable shells” made a huge difference in providing better
service
to the organization at large. Because more and more technology
is
becoming driver essential, this development will require of IT
per-
sonnel an increasing ability to communicate to managers and
execu-
tives and to assimilate within other departments.
61teChnoloGY As A vArIAble And responsIve
The Ravell case, however, also brought to light the huge
vacuum of
IT presence in driver activities. The subsequent chief executive
inter-
view study also confirmed that most marketing IT-oriented
activities,
such as e-business, do not fall under the purview of IT in most
orga-
nizations. The reasons for this separation are correlated with the
lack
of IT executive presence within the management team.
Another aspect of driver and supporter functions is the concept
of
a life cycle. A life cycle, in this respect, refers to the stages that
occur
before a product or service becomes obsolete. Technology
products
have a life cycle of value just as any other product or service. It
is
important not to confuse this life cycle with processes during
devel-
opment as discussed elsewhere in this chapter.
Many technical products are adopted because they are able to
deliver
value that is typically determined based on ROI calculations.
However,
as products mature within an organization, they tend to become
more of
a commodity, and as they are normalized, they tend to become
support-
oriented. Once they reach the stage of support, the rules of
economies
of scale become more important and relevant to evaluation. As a
prod-
uct enters the support stage, replacement based on economies of
scale
can be maximized by outsourcing to an outside vendor who can
provide
the service cheaper. New technologies then can be expected to
follow
this kind of life cycle, by which their initial investment requires
some
level of risk to provide returns to the business. This initial
investment
is accomplished in ROD using strategic integration. Once the
evalua-
tions are completed, driver activities will prevail during the
maturation
process of the technology, which will also require cultural
assimilation.
Inevitably, technology will change organizational behavior and
struc-
ture. However, once the technology is assimilated and
organizational
behavior and structures are normalized, individuals will use it
as a per-
manent part of their day-to-day operations. Thus, driver
activities give
way to those of supporters. Senior managers become less
involved, and
line managers then become the more important group that
completes
the transition from driver to supporter.
Replacement or Outsource
After the technology is absorbed into operations, executives
will seek
to maximize the benefit by increased efficiency and
effectiveness.
62 INFORMATION TECHNOLOGY
Certain product enhancements may be pursued during this
phase; they
can create “ mini-loops” of driver-to-supporter activities.
Ultimately, a
technology, viewed in terms of its economies of scale and
longevity,
is considered for replacement or outsourcing. Figure 3.3
graphically
shows the cycle.
The final stage of maturity of an evolving driver therefore
includes
becoming a supporter, at which time it becomes a commodity
and,
finally, an entity with potential for replacement or outsourcing.
The
next chapter explores how organizational learning theories can
be
used to address many of the issues and challenges brought forth
in
this chapter.
Mini loop technology enhancementsTechnology
driver
Evaluation
cycle
Driver
maturation
Support
status
Replacement or
outsource
Economies
of scale
Figure 3.3 Driver-to-supporter life cycle.
63
4
oRganizaTional leaRning
TheoRies anD TeChnology
Introduction
The purpose of this chapter is to provide readers with an under-
standing of organizational theory. The chapter covers some
aspects
of the history and context of organizational learning. It also
defines
and explains various learning protocols, and how they can be
used to
promote organizational learning. The overall objective of
organiza-
tional learning is to support a process that guides individuals,
groups,
and entire communities through transformation. Indeed,
evidence of
organizational transformation provides the very proof that
learning
has occurred, and that changes in behavior are occurring. What
is
important in this regard is that transformation remains internal
to
the organization so that it can evolve in a progressive manner
while
maintaining the valuable knowledge base that is contained
within
the personnel of an organization. Thus, the purpose of organiza-
tional learning is to foster evolutionary transformation that will
lead
to change in behaviors and that is geared toward improving
strategic
performance.
Approaches to organizational learning typically address how
indi-
viduals, groups, and organizations “notice and interpret
information
and use it to alter their fit with their environments” (Aldrich,
2001,
p. 57). As such, however, organizational learning does not
direct itself
toward, and therefore has not been able to show, an inherent
link to
success—which is a critical concern for executive management.
There
are two perspectives on organizational learning theory. On the
one
hand, the adoptive approach, pioneered by Cyert and March
(1963),
treats organizations as goal-oriented activity systems. These
systems
generate learning when repeating experiences that have either
suc-
ceeded or failed, discarding, of course, processes that have
failed.
64 INFORMATION TECHNOLOGY
Knowledge development, on the other hand, treats organizations
as
sets of interdependent members with shared patterns of
cognition and
belief (Argyris & Schö n, 1996). Knowledge development
empha-
sizes that learning is not limited to simple trial and error, or
direct
experience. Instead, learning is understood also to be inferential
and
vicarious; organizations can generate new knowledge through
experi-
mentation and creativity. It is the knowledge development
perspec-
tive that fits conceptually and empirically with work on
technological
evolution and organizational knowledge creation and
deployment
(Tushman & Anderson, 1986).
There is a complication in the field of organizational learning
over
whether it is a technical or social process. Scholars disagree on
this
point. From the technical perspective, organizational learning is
about the effective processing of, interpretation of, and
response to
information both inside and outside the organization. “An
organiza-
tion is assumed to learn if any of its units acquires knowledge
that it
recognizes as potentially useful to the organization” (Huber,
1991,
p. 89). From the social perspective, on the other hand, comes
the con-
cept that learning is “something that takes place not with the
heads of
individuals, but in the interaction between people” (Easterby-
Smith
et al., 1999, p. 6). The social approach draws from the notion
that
patterns of behavior are developed, via patterns of socialization,
by
evolving tacit knowledge and skills. There is, regrettably, a lack
of
ongoing empirical investigation in the area of organizational
learning
pertaining, for example, to in-depth case studies, to
micropractices
within organizational settings, and to processes that lead to
outcomes.
Indeed, measuring learning is a difficult process, which is why
there
is a lack of research that focuses on outputs. As Prange (1999,
p. 24)
notes: “The multitude of ways in which organizational learning
has
been classified and used purports an ‘organizational learning
jungle,’
which is becoming progressively dense and impenetrable.”
Mackenzie
(1994, p. 251) laments that what the “scientific community
devoted
to organizational learning has not produced discernable
intellectual
progress.”
Ultimately, organizational learning must provide transformation
that links to performance. Most organizations seeking improved
per-
formance expect changes that will support new outcomes. The
study of
organizational learning needs an overarching framework under
which
65orGAnIzAtIonAl leArnInG theorIes
an inquiry into the pivotal issues surrounding organizational
change
can be organized. Frameworks that support organizational
learning,
whether their orientation is on individuals, groups, or
infrastructure,
need to allow for natural evolution within acceptable time
frames for
the organization. This is the problem of organizational learning
the-
ory. It lacks a method of producing measurable results that
executives
can link to performance. While scholars seek outcomes through
stra-
tegic learning, there must be tangible evidence of individual and
orga-
nizational performance to ensure future investments in the
concepts
of learning. Technology, we should remember, represents the
oppor-
tunity to provide outcomes through strategic learning that
addresses
transitions and transformations over a specific life cycle.
We saw this opportunity occur in the Ravell case study; the
information technology (IT) department used organizational
learn-
ing. Specifically, individual reflective practices were used to
provide
measurable outcomes for the organization. In this case, the out-
comes related to a specific event, the physical move of the
business
to a different location. Another lesson we can derive (with
hindsight)
from the Ravell experience is that learning was converted to
strategic
benefit for the organization. The concept of converting learning
to
strategic benefit was pioneered by Pietersen (2002). He
established a
strategic learning cycle composed of four component processes
that he
identified with the action verbs learn, focus, align, and execute.
These
are stages in the learning cycle, as follows:
1. Learn: Conduct a situation analysis to generate insights into
the competitive environment and into the realities of the
company.
2. Focus: Translate insights into a winning proposition that
out-
lines key priorities for success.
3. Align: Align the organization and energize the people behind
the new strategic focus.
4. Execute: Implement strategy and experiment with new con-
cepts. Interpret results and continue the cycle.
At Ravell, technology assisted in driving the learning cycle
because,
by its dynamic nature, it mandated the acceleration of the cycle
that
Pietersen (2002) describes in his stage strategy of
implementation.
Thus, Ravell required the process Pietersen outlined to occur
within
66 INFORMATION TECHNOLOGY
6 months, and therein established the opportunity to provide
outcomes.
It also altered the culture of the organization (i.e., the evolution
in cul-
ture was tangible because the transformation was concrete).
We see from the Ravell case that technology represents the best
opportunity to apply organizational learning techniques because
the
use of it requires forms of evolutionary-related change.
Organizations
are continually seeking to improve their operations and
competi-
tive advantage through efficiency and effective processes. As I
have
discussed in previous chapters, today’s businesses are
experiencing
technological dynamism (defined as causing accelerated and
dynamic
transformations), and this is due to the advent of
technologically driven
processes. That is, organizations are experiencing more pressure
to
change and compete as a result of the accelerations that
technology
has brought about. Things happen quicker, and more
unpredictably,
than before. This situation requires organizations to sense the
need for
change and execute that change. The solution I propose is to tie
orga-
nizational theory to technological implementation. Another way
of
defining this issue is to provide an overarching framework that
orga-
nizes an inquiry into the issues surrounding organizational
change.
Another dimension of organizational learning is political.
Argyris
(1993) and Senge (1990) argue that politics gets “in the way of
good
learning.” In my view, however, the political dimension is very
much
part of learning. It seems naï ve to assume that politics can be
elimi-
nated from the daily commerce of organizational
communication.
Instead, it needs to be incorporated as a factor in organizational
learn-
ing theory rather than attempting to disavow or eliminate it,
which is
not realistic. Ravell also revealed that political factors are
simply part
of the learning process. Recall that during my initial efforts to
create
a learning organization there were IT staff members who
deliberately
refused to cooperate, assuming that they could “outlast” me in
my
interim tenure as IT director. But politics, of course, is not
limited to
internal department negotiations; it was also a factor at Ravell
with,
and among, departments outside IT. These interdepartmental
rela-
tionships applied especially to line managers, who became
essential
advocates for establishing and sustaining necessary forms of
learning
at the organizational level. But, not all line managers responded
with
the same enthusiasm, and a number of them did not display a
sense of
authentically caring about facilitating synergies across
departments.
67orGAnIzAtIonAl leArnInG theorIes
The irrepressible existence of politics in social organizations,
however,
must not in itself deter us from implementing organizational
learn-
ing practices; it simply means that that we must factor it in as
part
of the equation. At Ravell, I had to work within the constraints
of
both internal and external politics. Nevertheless, in the end I
was able
to accomplish the creation of a learning organization. Another
way
one might look at the road bumps of politics is to assume that
they
will temporarily delay or slow the implementation of
organizational
learning initiatives. But, let us make no mistake about the
potentially
disruptive nature of politics because, as we know, in its extreme
cases
of inflexibility, it can be damaging.
I have always equated politics with the dilemma of blood
cholesterol.
We know that there are two types of cholesterol: “good”
cholesterol
and “bad” cholesterol. We all know that bad cholesterol in your
blood
can cause heart disease, among other life-threatening
conditions.
However, good cholesterol is essential to the body. My point is
simple;
the general word politics can have damaging perceptions. When
most
people discuss the topic of cholesterol, they focus on the bad
type, not
the good. Such is the same with politics—that is, most
individuals dis-
cuss the bad type, which often corresponds with their personal
expe-
riences. My colleague Professor Lyle Yorks, at Columbia
University,
often lectures on the importance of politics and its positive
aspects for
establishing strategic advocacy, defined as the ability to
establish per-
sonal and functional influence through cultivating alliances
through
defining opportunities for the adding value to either the top or
bottom
line (Langer & Yorks, 2013). Thus, politics can add value for
indi-
viduals by allowing them to initiate and influence relationships
and
conversations with other leaders. This, then, is “good” politics!
North American cultural norms account for much of what goes
into organizational learning theory, such as individualism, an
empha-
sis on rationality, and the importance of explicit, empirical
informa-
tion. IT, on the other hand, has a broadening, globalizing effect
on
organizational learning because of the sheer increase in the
number of
multicultural organizations created through the expansion of
global
firms. Thus, technology also affects the social aspects of
organizational
learning, particularly as it relates to the cultural evolution of
commu-
nities. Furthermore, technology has shown us that what works in
one
culture may not work in another. Dana Deasy, the former CIO
of the
68 INFORMATION TECHNOLOGY
Americas region/sector for Siemens AG, experienced the
difficulties
and challenges of introducing technology standards on a global
scale.
He quickly learned that what worked in North America did not
oper-
ate with the same expectations in Asia or South America. I
discuss
Siemens AG as a case study in Chapter 8.
It is my contention, however, that technology can be used as an
intervention that can actually increase organizational learning.
In
effect, the implementation of organizational learning has lacked
and
has needed concrete systemic processes that show results. A
solution
to this need can be found, as I have found it, in the
incorporation of
IT itself into the process of true organizational learning. The
prob-
lem with IT is that we keep trying to simplify it—trying to
reduce
its complexity. However, dealing with the what, when, and how
of
working with technology is complex. Organizations need a kind
of
mechanism that can provide a way to absorb and learn all of the
com-
plex pieces of technology.
It is my position that organizational change often follows learn-
ing, which to some extent should be expected. What controls
whether
change is radical or evolutionary depends on the basis on which
new processes are created (Argyris & Schö n, 1996; Senge,
1990;
Swieringa & Wierdsma, 1992). Indeed, at Ravell the learning
fol-
lowed the Argyris and Schö n approach: that radical change
occurs
when there are major events that support the need for
accelerated
change. In other words, critical events become catalysts that
promote
change, through reflection. On the other hand, there can be non-
event-related learning, that is not so much radical in nature, as
it is
evolutionary. Thus, evolutionary learning is characterized as an
ongo-
ing process that slowly establishes the need for change over
time. This
evolutionary learning process compares to what Senge (1990, p.
15)
describes as “learning in wholes as opposed to pieces.”
This concept of learning is different from an event-driven
perspec-
tive, and it supports the natural tendency that groups and
organiza-
tions have to protect themselves from open confrontation and
critique.
However, technology provides an interesting variable in this
regard.
It is generally accepted as an agent of change that must be
addressed
by the organization. I believe that this agency can be seized as
an
opportunity to promote such change because it establishes a
reason
why organizations need to deal with the inevitable transitions
brought
69orGAnIzAtIonAl leArnInG theorIes
about by technology. Furthermore, as Huysman (1999) points
out, the
history of organizational learning has not often created
measurable
improvement, particularly because implementing the theories
has not
always been efficient or effective. Much of the impetus for
implement-
ing a new technology, however, is based on the premise that its
use
will result in such benefits. Therefore, technology provides
compelling
reasons for why organizational learning is important: to
understand
how to deal with agents of change, and to provide ongoing
changes in
the processes that improve competitive advantage.
There is another intrinsic issue here. Uses of technology have
not
always resulted in efficient and effective outcomes, particularly
as
they relate to a firm’s expected ROI. In fact, IT projects often
cost
more than expected and tend to be delivered late. Indeed,
research
performed by the Gartner Group and CIO Magazine (Koch,
1999)
reports that 54% of IT projects are late and that 22% are never
com-
pleted. In May 2009, McGraw reported similar trends, so
industry
performance has not materially improved. This is certainly a
disturb-
ing statistic for a dynamic variable of change that promises
outcomes
of improved efficiency and effectiveness. The question then is
why is
this occurring? Many scholars might consider the answer to this
ques-
tion as complex. It is my claim, however, based on my own
research,
that the lack of organizational learning, both within IT and
within
other departments, poses, perhaps, the most significant barrier
to the
success of these projects in terms of timeliness and completion.
Langer
(2001b) suggests that the inability of IT organizations to
understand
how to deal with larger communities within the organization
and to
establish realistic and measurable outcomes are relevant both to
many
of the core values of organizational learning and to its
importance in
attaining results. What better opportunity is there to combine
the
strengths and weaknesses of each of IT and organizational
learning?
Perhaps what is most interesting—and, in many ways, lacking
within the literature on organizational learning—is the actual
way
individuals learn. To address organizational learning, I believe
it is
imperative to address the learning styles of individuals within
the
organization. One fundamental consideration to take into
account
is that of individual turnover within departments. Thus, methods
to measure or understand organizational learning must
incorporate
the individual; how the individual learns, and what occurs when
70 INFORMATION TECHNOLOGY
individuals change positions or leave, as opposed to solely
focusing
on the event-driven aspect of evolutionary learning. There are
two
sociological positions about how individual learning occurs.
The first
suggests that individual action derives from determining
influences
in the social system, and the other suggests that it emanates
from
individual action. The former proposition supports the concept
that
learning occurs at the organizational, or group level, and the
lat-
ter supports it at the individual level of action and experience.
The
“system” argument focuses on learning within the organization
as a
whole and claims that individual action functions within its
boundar-
ies. The “individual” argument claims that learning emanates
from
the individual first and affects the system as a result of
outcomes from
individual actions. Determining a balance between individual
and
organizational learning is an issue debated by scholars and an
impor-
tant one that this book must address.
Why is this issue relevant to the topic of IT and organizational
learning? Simply put, understanding the nature of evolving
technolo-
gies requires that learning—and subsequent learning
outcomes—will
be heavily affected by the processes in which it is delivered.
Therefore,
without understanding the dynamics of how individuals and
organi-
zations learn, new technologies may be difficult to assimilate
because
of a lack of process that can determine how they can be best
used in
the business. What is most important to recognize is the way in
which
responsive organizational dynamism (ROD) needs both the
system
and individual approaches. Huysman (1999) suggests (and I
agree)
that organizational versus individual belief systems are not
mutually
exclusive pairs but dualities. In this way, organizational
processes are
not seen as just top-down or bottom-up affairs, but as
accumulations
of history, assimilated in organizational memory, which
structures
and positions the agency or capacity for learning. In a similar
way,
organizational learning can be seen as occurring through the
actions
of individuals, even when they are constrained by institutional
forces.
The strategic integration component of ROD lends itself to the
system
model of learning to the extent that it almost mandates change—
change that, if not addressed, will inevitably affect the
competitive
advantage of the organization. On the other hand, the cultural
assim-
ilation component of ROD is also involved because of its effect
on
individual behavior. Thus, the ROD model needs to be expanded
to
71orGAnIzAtIonAl leArnInG theorIes
show the relationship between individual and organizational
learning
as shown in Figure 4.1.
An essential challenge to technology comes from the fact that
organizations are not sure about how to handle its overall
potential.
Thus, in a paradoxical way, this quandary provides a
springboard to
learning by utilizing organizational learning theories and
concepts to
create new knowledge, by learning from experience, and
ultimately by
linking technology to learning and performance. This
perspective can
be promoted from within the organization because chief
executives
are generally open to investing in learning as long as core
business
principles are not violated. This position is supported by my
research
with chief executives that I discussed in Chapter 2.
Organizational
dynamism
Acceleration of events that
require different
infrastructures and
organizational processes
Requires
Strategic
integration
Cultural
assimilation
Organization
structures
(system)
Individual
actions
Renegotiation of
relationship
Organizational learning techniques
Symptoms and
implications
Technology
Figure 4.1 ROD and organizational learning.
72 INFORMATION TECHNOLOGY
Organizational learning can also assist in the adoption of
technologies by providing a mechanism to help individuals
manage
change. This notion is consistent with Aldrich (2001), who
observes
that many organizations reject technology-driven changes or
“pio-
neering ventures,” which he called competence-destroying
ventures
because they threaten existing norms and processes.
Organizations
would do well to understand the value of technology,
particularly for
those who adopt it early (early adopters), and how it can lead to
com-
petitive advantages. Thus, organizations that position
themselves to
evolve, to learn, and to create new knowledge are better
prepared to
foster the handling, absorption, and acceptance of technology-
driven
change than those that are not. Another way to view this ethic is
to
recognize that organizations need to be “ready” to deal with
change—
change that is accelerated by technology innovations. Although
Aldrich (2001) notes that organizational learning has not been
tied
to performance and success, I believe it will be the technology
revolu-
tion that establishes the catalyst that can tie organizational
learning
to performance.
The following sections of this chapter expand on the core
concept
that the success of ROD is dependent on the uses of
organizational
learning techniques. In each section, I correlate this concept to
many
of the organizational learning theories and show how they can
be
tailored and used to provide important outcomes that assist the
pro-
motion of both technological innovation and organizational
learning.
Learning Organizations
Business strategists have realized that the ability of an
organization
to learn faster, or “better,” than its competitors may indeed be
the key
to long-term business success (Collis, 1994; Dodgson, 1993;
Grant,
1996; Jones, 1975). A learning organization is defined as a
form of
organization that enables, in an active sense, the learning of its
mem-
bers in such a way that it creates positive outcomes, such as
innovation,
efficiency, improved alignment with the environment, and
competi-
tive advantage. As such, a learning organization is one that
acquires
knowledge from within. Its evolution, then, is primarily driven
by
itself without the need for interference from outside forces. In
this
sense, it is a self-perpetuating and self-evolving system of
individual
73orGAnIzAtIonAl leArnInG theorIes
and organizational transformations integrated into the daily
processes
of the organization. It should be, in effect, a part of normal
organiza-
tional behavior. The focus of organizational learning is not so
much
on the process of learning but more on the conditions that allow
suc-
cessful outcomes to flourish. Learning organization literature
draws
from organizational learning theory, particularly as it relates to
inter-
ventions based on outcomes. This provides an alternative to
social
approaches.
In reviewing these descriptions of what a learning organization
does, and why it is important, we can begin to see that
technology may
be one of the few agents that can actually show what learning
organi-
zations purport to do. Indeed, Ravell created an evolving
population
that became capable of dealing with environmental changes
brought
on by technological innovation. The adaptation of these changes
created those positive outcomes and improved efficiencies.
Without
organizational learning, specifically the creation of a learning
organi-
zation, many innovations brought about by technology could
produce
chaos and instability. Organizations generally tend to suffer
from, and
spend too much time reflecting on, their past dilemmas.
However,
given the recent phenomenon of rapid changes in technology,
orga-
nizations can no longer afford the luxury of claiming that there
is
simply too much else to do to be constantly worrying about
technol-
ogy. Indeed, Lounamaa and March (1987) state that
organizations
can no longer support the claim that too-frequent changes will
inhibit
learning. The fact is that such changes must be taken as
evolutionary,
and as a part of the daily challenges facing any organization.
Because
a learning organization is one that creates structure and
strategies, it
is positioned to facilitate the learning of all its members, during
the
ongoing infiltration of technology-driven agents of change.
Boland
et al. (1994) show that information systems based on
multimedia
technologies may enhance the appreciation of diverse
interpretations
within organizations and, as such, support learning
organizations.
Since learning organizations are deliberately created to
facilitate the
learning of their members, understanding the urgency of
technologi-
cal changes can provide the stimulus to support planned
learning.
Many of the techniques used in the Ravell case study were
based
on the use of learning organizational techniques, many of which
were
pioneered by Argyris and Schö n (1996). Their work focuses on
using
74 INFORMATION TECHNOLOGY
“action science” methods to create and maintain learning
organiza-
tions. A key component of action science is the use of reflective
prac-
tices—including what is commonly known among researchers
and
practitioners as reflection in action and reflection on action.
Reflection
with action is the term I use as a rubric for these various
methods,
involving reflection in relation to activity. Reflection has
received
a number of definitions, from different sources in the literature.
Depending on the emphasis, whether on theory or practice,
defini-
tions vary from philosophical articulation (Dewey, 1933;
Habermas,
1998), to practice-based formulations, such as Kolb’s (1984b)
use of
reflection in the experiential learning cycle. Specifically,
reflection
with action carries the resonance of Schö n’s (1983) twin
constructs:
reflection on action and reflection in action, which emphasize
reflec-
tion in retrospect, and reflection to determine which actions to
take
in the present or immediate future, respectively. Dewey (1933)
and
Hullfish and Smith (1978) also suggest that the use of reflection
sup-
ports an implied purpose: individuals reflect for a purpose that
leads
to the processing of a useful outcome. This formulation
suggests the
possibility of reflection that is future oriented—what we might
call
“reflection to action.” These are methodological orientations
covered
by the rubric.
Reflective practices are integral to ROD because so many
technology-based projects are event driven and require
individu-
als to reflect before, during, and after actions. Most important
to
this process is that these reflections are individually driven and
that
technology projects tend to accelerate the need for rapid
decisions.
In other words, there are more dynamic decisions to be made in
less
time. Without operating in the kind of formation that is a
learning
organization, IT departments cannot maintain the requisite
infra-
structure to develop products timely on time and support
business
units—something that clearly is not happening if we look at the
existing lateness of IT projects. With respect to the role of
reflec-
tion in general, the process can be individual or organizational.
While groups can reflect, it is in being reflective that
individuals
bring about “an orientation to their everyday lives,” according
to
Moon (1999). “For others reflection comes about when
conditions
in the learning environment are appropriate” (p. 186). However,
IT departments have long suffered from not having the
conditions
75orGAnIzAtIonAl leArnInG theorIes
to support such an individual learning environment. This is why
implementing a learning organization is so appealing as a
remedy
for a chronic problem.
Communities of Practice
Communities of practice are based on the assumption that
learning
starts with engagement in social practice and that this practice
is the
fundamental construct by which individuals learn (Wenger,
1998).
Thus, communities of practice are formed to get things done by
using
a shared way of pursuing interest. For individuals, this means
that
learning is a way of engaging in, and contributing to, the
practices
of their communities. For specific communities, on the other
hand,
it means that learning is a way of refining their distinctive
practices
and ensuring new generations of members. For entire
organizations,
it means that learning is an issue of sustaining interconnected
com-
munities of practice, which define what an organization knows
and
contributes to the business. The notion of communities of
practice
supports the idea that learning is an “inevitable part of
participat-
ing in social life and practice” (Elkjaer, 1999, p. 75).
Communities of
practice also include assisting members of the community, with
the
particular focus on improving their skills. This is also known as
situ-
ated learning. Thus, communities of practice are very much a
social
learning theory, as opposed to one that is based solely on the
indi-
vidual. Communities of practice have been called learning in
working,
in which learning is an inevitable part of working together in a
social
setting. Much of this concept implies that learning, in some
form or
other will occur, and that it is accomplished within a framework
of
social participation, not solely or simply in the individual mind.
In a
world that is changing significantly due to technological
innovations,
we should recognize the need for organizations, communities,
and
individuals to embrace the complexities of being interconnected
at an
accelerated pace.
There is much that is useful in the theory of communities of
practice
and that justifies its use in ROD. While so much of learning
technol-
ogy is event driven and individually learned, it would be
shortsighted
to believe that it is the only way learning can occur in an
organization.
Furthermore, the enormity and complexity of technology
requires a
76 INFORMATION TECHNOLOGY
community focus. This would be especially useful within the
confines of
specific departments that are in need of understanding how to
deal with
technological dynamism. That is, preparation for using new
technolo-
gies cannot be accomplished by waiting for an event to occur.
Instead,
preparation can be accomplished by creating a community that
can
assess technologies as a part of the normal activities of an
organization.
Specifically, this means that, through the infrastructure of a
commu-
nity, individuals can determine how they will organize
themselves to
operate with emerging technologies, what education they will
need, and
what potential strategic integration they will need to prepare for
changes
brought on by technology. Action in this context can be viewed
as a
continuous process, much in the same way that I have presented
technol-
ogy as an ongoing accelerating variable. However, Elkjaer
(1999) argues
that the continuous process cannot exist without individual
interaction.
As he states: “Both individual and collective activities are
grounded in
the past, the present, and the future. Actions and interactions
take place
between and among group members and should not be viewed
merely as
the actions and interactions of individuals” (p. 82).
Based on this perspective, technology can be handled by the
actions (community) and interactions (individuals) of the
organiza-
tion as shown in Figure 4.2.
Communities of practice:
Social actions of how to
deal with technology
Allows groups to engage in
discourse and examine the
ongoing effects on the
department/unit, including
short/long-term education
requirements, skills transfer
and development,
organizational issues,
relationships with other
departments and customers
�e individual interacts with
others and determines new
methods of utilizing
technology within his/her
specific business objectives.
Individuals use reflection as
the basis of transformative
learning.
Event-driven individual-
based learning
Figure 4.2 Technology relationship between communities and
individuals.
77orGAnIzAtIonAl leArnInG theorIes
It seems logical that communities of practice provide the
mecha-
nism to assist, particularly, with the cultural assimilation
component
of ROD. Indeed, cultural assimilation targets the behavior of the
community, and its need to consider what new organizational
struc-
tures can better support emerging technologies. I have, in many
ways,
already established and presented the challenge of what should
be
called the “community of IT practice” and its need to
understand how
to restructure to meet the needs of the organization. This is the
kind
of issue that does not lend itself to event-driven, individual
learning,
but rather to a more community-based process that can deal with
the
realignment of departmental relationships.
Essentially, communities of IT practice must allow for the con-
tinuous evolution of learning based on emergent strategies.
Emergent
strategies acknowledge unplanned action. Such strategies are
defined
as patterns that develop in the absence of intentions (Mintzberg
&
Waters, 1985). Emergent strategies can be used to gather groups
that
can focus on issues not based on previous plans. These
strategies can
be thought of as creative approaches to proactive actions.
Indeed, a
frustrating aspect of technology is its uncertainty. Ideas and
concepts
borrowed from communities of practice can help departments
deal
with the evolutionary aspects of technological dynamism.
The relationship, then, between communities of practice and
tech-
nology is significant. Many of the projects involving IT have
been tra-
ditionally based on informal processes of learning. While there
have
been a number of attempts to computerize knowledge using
various
information databases, they have had mixed results. A
“structured”
approach to creating knowledge reporting is typically difficult
to estab-
lish and maintain. Many IT departments have utilized
International
Organization for Standardization (ISO) 9000 concepts. The ISO
is
a worldwide organization that defines quality processes through
for-
mal structures. It attempts to take knowledge-based information
and
transfer it into specific and documented steps that can be
evaluated as
they occur. Unfortunately, the ISO 9000 approach, even if
realized,
is challenging when such knowledge and procedures are
undergoing
constant and unpredictable change. Technological dynamism
cre-
ates too many uncertainties to be handled by the extant
discourses on
how organizations have dealt with change variables.
Communities of
practice provide an umbrella of discourses that are necessary to
deal
78 INFORMATION TECHNOLOGY
with ongoing and unpredictable interactions established by
emerging
technologies.
Support for this position is found in the fact that technology
requires
accumulative collective learning that needs to be tied to social
prac-
tices; this way, project plans can be based on learning as a
participatory
act. One of the major advantages of communities of practice is
that
they can integrate key competencies into the very fabric of the
organi-
zation (Lesser et al., 2000). The typical disadvantage of IT is
that its
staff needs to serve multiple organizational structures
simultaneously.
This requires that priorities be set by the organization.
Unfortunately,
it is difficult, if not impossible, for IT departments to establish
such
priorities without engaging in concepts of communities of
practice that
allow for a more integrated process of negotiation and
determination.
Much of the process of communities of practice would be
initiated by
strategic integration and result in many cultural assimilation
changes;
that is, the process of implementing communities of practice
will
necessitate changes in cultural behavior and organization
processes.
As stated, communities-of-practice activities can be initiated
via
the strategic integration component of ROD. According to
Lesser et
al. (2000), a knowledge strategy based on communities of
practice
consists of seven basic steps (Table 4.1).
Lesser and Wenger (2000) suggest that communities of practice
are heavily reliant on innovation: “Some strategies rely more on
inno-
vation than others for their success. … Once dependence on
innova-
tion needs have been clarified, you can work to create new
knowledge
where innovation matters” (p. 8). Indeed, electronic
communities of
practice are different from physical communities. IT provides
another
dimension to how technology affects organizational learning. It
does
so by creating new ways in which communities of practice
operate. In
the complexity of ways that it affects us, technology has a
dichoto-
mous relationship with communities of practice. That is, there is
a
two-sided issue: (1) the need for communities of practice to
imple-
ment IT projects and integrate them better into learning
organiza-
tions, and (2) the expansion of electronic communities of
practice
invoked by technology, which can, in turn, assist in
organizational
learning, globally and culturally.
The latter issue establishes the fact that a person can now
readily
be a member of many electronic communities, and in many
different
79orGAnIzAtIonAl leArnInG theorIes
capacities. Electronic communities are different, in that they
can
have memberships that are short-lived and transient, forming
and
re-forming according to interest, particular tasks, or
commonality of
issue. Communities of practice themselves are utilizing
technologies
to form multiple and simultaneous relationships. Furthermore,
the
growth of international communities resulting from ever-
expanding
global economies has created further complexities and
dilemmas.
Thus far, I have presented communities of practice as an infra-
structure that can foster the development of organizational
learn-
ing to support the existence of technological dynamism. Most of
what I presented has an impact on the cultural assimilation com-
ponent of ROD—that is, affecting organizational structure and
the
Table 4.1 Extended Seven Steps of Community of Practice
Strategy
STEP COMMUNITIES-OF-PRACTICE STEP TECHNOLOGY
EXTENSION
1 Understanding strategic knowledge
needs: What knowledge is critical
to success.
Understanding how technology affects strategic
knowledge, and what specific technological
knowledge is critical to success.
2 Engaging practice domains: People
form communities of practice to
engage in and identify with.
Technology identifies groups, based on
business-related benefits; requires domains to
work together toward measurable results.
3 Developing communities: How to
help key communities reach their
full potential.
Technologies have life cycles that require
communities to continue; treats the life cycle
as a supporter for attaining maturation and
full potential.
4 Working the boundaries: How to link
communities to form broader
learning systems.
Technology life cycles require new boundaries to
be formed. This will link other communities
that were previously outside discussions and
thus, expand input into technology
innovations.
5 Fostering a sense of belonging: How
to engage people’s identities and
sense of belonging.
The process of integrating communities: IT and
other organizational units will create new
evolving cultures that foster belonging as well
as new social identities.
6 Running the business: How to
integrate communities of practice
into running the business of the
organization.
Cultural assimilation provides new
organizational structures that are necessary to
operate communities of practice and to
support new technological innovations.
7 Applying, assessing, reflecting,
renewing: How to deploy knowledge
strategy through waves of
organizational transformation.
The active process of dealing with multiple new
technologies that accelerates the deployment
of knowledge strategy. Emerging technologies
increase the need for organizational
transformation.
80 INFORMATION TECHNOLOGY
way things need to be done. However, technology, particularly
the
strategic integration component of ROD, fosters a more
expanded
vision of what can represent a community of practice. What
does
this mean? Communities of practice, through the advent of
strate-
gic integration, have expanded to include electronic
communities.
While technology can provide organizations with vast electronic
libraries that end up as storehouses of information, they are
only
valuable if they are allowed to be shared within the community.
Although IT has led many companies to imagine a new world of
leveraged knowledge, communities have discovered that just
storing
information does not provide for effective and efficient use of
knowl-
edge. As a result, many companies have created these
“electronic”
communities so that knowledge can be leveraged, especially
across
cultures and geographic boundaries. These electronic
communities
are predictably more dynamic as a result of what technology
pro-
vides to them. The following are examples of what these
communi-
ties provide to organizations:
• Transcending boundaries and exchanging knowledge with
internal and external communities. In this circumstance,
communities are extending not only across business units,
but also into communities among various clients—as we
see developing in advanced e-business strategies. Using the
Internet and intranets, communities can foster dynamic inte-
gration of the client, an important participant in competitive
advantage. However, the expansion of an external commu-
nity, due to emergent electronics, creates yet another need for
the implementation of ROD.
• Creating “Internet” or electronic communities as sources
of knowledge (Teigland, 2000), particularly for technical-
oriented employees. These employees are said to form “com-
munities of techies”: technical participants, composed largely
of the IT staff, who have accelerated means to come into con-
tact with business-related issues. In the case of Ravell, I cre-
ated small communities by moving IT staff to allow them to
experience the user’s need; this move is directly related to the
larger, and expanded, ability of using electronic communities
of practice.
81orGAnIzAtIonAl leArnInG theorIes
• Connecting social and workplace communities through
sophisticated networks. This issue links well to the entire
expansion of issues surrounding organizational learning, in
particular, learning organization formation. It enfolds both
the process and the social dialectic issues so important to cre-
ating well-balanced communities of practice that deal with
organizational-level and individual development.
• Integrating teleworkers and non-teleworkers, including the
study of gender and cultural differences. The growth of dis-
tance workers will most likely increase with the maturation of
technological connectivity. Videoconferencing and improved
media interaction through expanded broadband will support
further developments in virtual workplaces. Gender and cul-
ture will continue to become important issues in the expan-
sion of existing models that are currently limited to specific
types of workplace issues. Thus, technology allows for the
“globalization” of organizational learning needs, especially
due to the effects of technological dynamism.
• Assisting in computer-mediated communities. Such media-
tion allows for the management of interaction among com-
munities, of who mediates their communications criteria, and
of who is ultimately responsible for the mediation of issues.
Mature communities of practice will pursue self-mediation.
• Creating “flame” communities. A flame is defined as a
lengthy,
often personally insulting, debate in an electronic commu-
nity that provides both positive and negative consequences.
Difference can be linked to strengthening the identification
of common values within a community but requires organiza-
tional maturation that relies more on computerized commu-
nication to improve interpersonal and social factors to avoid
miscommunications (Franco et al., 2000).
• Storing collective knowledge in large-scale libraries and
databases. As Einstein stated: “Knowledge is experience.
Everything else is just information.” Repositories of informa-
tion are not knowledge, and they often inhibit organizations
from sharing important knowledge building blocks that affect
technical, social, managerial, and personal developments that
are critical for learning organizations (McDermott, 2000).
82 INFORMATION TECHNOLOGY
Ultimately, these communities of practice are forming new
social
networks, which have established the cornerstone of “global
connectiv-
ity, virtual communities, and computer-supported cooperative
work”
(Wellman et al., 2000, p. 179). These social networks are
creating
new cultural assimilation issues, changing the very nature of the
way
organizations deal with and use technology to change how
knowledge
develops and is used via communities of practice. It is not,
therefore,
that communities of practice are new infrastructure or social
forces;
rather, the difference is in the way they communicate. Strategic
inte-
gration forces new networks of communication to occur (the IT
effect
on communities of practice), and the cultural assimilation
component
requires communities of practice to focus on how emerging
technolo-
gies are to be adopted and used within the organization.
In sum, what we are finding is that technology creates the need
for new organizations that establish communities of practice.
New
members enter the community and help shape its cognitive
schemata.
Aldrich (2001) defines cognitive schemata as the “structure
that repre-
sents organized knowledge about persons, roles, and events”
(p. 148).
This is a significant construct in that it promotes the importance
of a
balanced evolutionary behavior among these three areas. Rapid
learn-
ing, or organizational knowledge, brought on by technological
inno-
vations can actually lessen progress because it can produce
premature
closure (March, 1991). Thus, members emerge out of
communities of
practice that develop around organizational tasks. They are
driven by
technological innovation and need constructs to avoid premature
clo-
sure, as well as ongoing evaluation of perceived versus actual
realities.
As Brown and Duguid (1991, p. 40) state:
The complex of contradictory forces that put an organization’s
assump-
tions and core beliefs in direct conflict with members’ working,
learn-
ing, and innovating arises from a thorough misunderstanding of
what
working, learning, and innovating are. As a result of such
misunder-
standings, many modern processes and technologies,
particularly those
designed to downskill, threaten the robust working, learning,
and inno-
vating communities and practice of the workplace.
This perspective can be historically justified. We have seen
time
and time again how a technology’s original intention is not
realized
83orGAnIzAtIonAl leArnInG theorIes
yet still productive. For instance, many uses of e-mail by
individuals
were hard to predict. It may be indeed difficult, if not
impossible,
to predict the eventual impact of a technology on an
organization
and provide competitive advantages. However, based on
evolutionary
theories, it may be beneficial to allow technologies to progress
from
driver-to-supporter activity. Specifically, this means that
communi-
ties of practice can provide the infrastructure to support growth
from
individual-centered learning; that is, to a less event-driven
process
that can foster systems thinking, especially at the management
levels
of the organization. As organizations evolve into what Aldrich
(2001)
call “bounded entities,” interaction behind boundaries heightens
the
salience of cultural difference. Aldrich’s analysis of knowledge
cre-
ation is consistent with what he called an “adaptive
organization”—one
that is goal oriented and learns from trial and error (individual-
based
learning)—and a “knowledge development” organization
(system-
level learning). The latter consists of a set of interdependent
members
who share patterns of belief. Such an organization uses
inferential and
vicarious learning and generates new knowledge from both
experi-
mentation and creativity. Specifically, learning involves sense
mak-
ing and builds on the knowledge development of its members.
This
becomes critical to ROD, especially in dealing with change
driven
by technological innovations. The advantages and challenges of
vir-
tual teams and communities of practice are expanded in Chapter
7, in
which I integrate the discussion with the complexities of
outsourcing
teams.
Learning Preferences and Experiential Learning
The previous sections of this chapter focused on organizational
learn-
ing, particularly two component theories and methods: learning
organizations and communities of practice. Within these two
meth-
ods, I also addressed the approaches to learning; that is,
learning that
occurs on the individual and the organizational levels. I
advocated
the position that both system and individual learning need to be
part
of the equation that allows a firm to attain ROD.
Notwithstanding
how and when system and individual learning occurs, the
investi-
gation of how individuals learn must be a fundamental part of
any
theory-to-practice effort, such as the present one. Indeed,
whether
84 INFORMATION TECHNOLOGY
one favors a view of learning as occurring on the organizational
or
on the individual level (and it occurs on both), we have to
recog-
nize that individuals are, ultimately, those who must continue to
learn. Dewey (1933) first explored the concepts and values of
what
he called “experiential learning.” This type of learning comes
from
the experiences that adults have accrued over the course of their
individual lives. These experiences provide rich and valuable
forms
of “literacy,” which must be recognized as important
components
to overall learning development. Kolb (1984a) furthered
Dewey’s
research and developed an instrument that measures individual
preferences or styles in which adults learn, and how they
respond
to day-to-day scenarios and concepts. Kolb’s (1999) Learning
Style
Inventory (LSI) instrument allows adults to better understand
how
they learn. It helps them understand how to solve problems,
work in
teams, manage conflicts, make better career choices, and
negotiate
personal and professional relationships. Kolb’s research
provided a
basis for comprehending the different ways in which adults
prefer to
learn, and it elaborated the distinct advantages of becoming a
bal-
anced learner.
The instrument schematizes learning preferences and styles into
four quadrants: concrete experience , reflective observation ,
abstract con-
ceptualization , and active experimentation . Adults who prefer
to learn
through concrete experience are those who need to learn
through
actual experience, or compare a situation with reality. In
reflective
observation, adults prefer to learn by observing others, the
world
around them, and what they read. These individuals excel in
group
discussions and can effectively reflect on what they see and
read.
Abstract conceptualization refers to learning, based on the
assimila-
tion of facts and information presented, and read. Those who
prefer
to learn by active experimentation do so through a process of
evaluat-
ing consequences; they learn by examining the impact of
experimen-
tal situations. For any individual, these learning styles often
work in
combinations. After classifying an individual’s responses to
questions,
Kolb’s instrument determines the nature of these combinations.
For
example, an individual can have a learning style in which he or
she
prefers to learn from concrete experiences using reflective
observation
as opposed to actually “doing” the activity. Figure 4.3 shows
Kolb’s
model in the form of a “learning wheel.” The wheel graphically
shows
85orGAnIzAtIonAl leArnInG theorIes
an individual’s learning style inventory, reflecting a person’s
strengths
and weaknesses with respect to each learning style.
Kolb’s research suggests that learners who are less constrained
by
learning preferences within a distinct style are more balanced
and are
better learners because they have available to them more
dimensions
in which to learn. This is a significant concept; it suggests that
adults
who have strong preferences may not be able to learn when
faced with
learning environments that do not fit their specific preference.
For
example, an adult who prefers group discussion and enjoys
reflective
conversation with others may feel uncomfortable in a less
interper-
sonal, traditional teaching environment. The importance of
Kolb’s
LSI is that it helps adults become aware that such preferences
exist.
McCarthy’s (1999) research furthers Kolb’s work by
investigating
the relationship between learning preferences and curriculum
devel-
opment. Her Learning Type Measure (4Mat) instrument mirrors
and extends the Kolb style quadrants by expressing preferences
from
an individual’s perspective on how to best achieve learning.
Another
important contribution in McCarthy’s extension of Kolb’s work
is the
inclusion of brain function considerations, particularly in terms
of
hemisphericity. McCarthy focuses on the cognitive functions
asso-
ciated with the right hemisphere (perception) and left
hemisphere
(process) of the brain. Her 4Mat system shows how adults, in
each
Concrete experience
Abstract
conceptualization
Learns from
hands-on
experience
Observes
concrete
situation and
reflects on its
meaning
Seeks to find
practical uses
for ideas and
theories
Interested in
abstract ideas
and concepts
Active
experimentation
Reflective
observation
Figure 4.3 Kolb’s Learning Style Inventory.
86 INFORMATION TECHNOLOGY
style quadrant, perceive learning with the left hemisphere of the
brain and how it is related to processing in the right
hemisphere.
For example, for Type 1 learners (concrete experience and
reflective
observation), adults perceive in a concrete way and process in a
reflec-
tive way. In other words, these adults prefer to learn by actually
doing
a task and then processing the experience by reflecting on what
they
experienced during the task. Type 2 learners (reflective
observation
and abstract conceptualization), however, perceive a task by
abstract
thinking and process it by developing concepts and theories
from
their initial ideas. Figure 4.4 shows McCarthy’s rendition of
the
Kolb learning wheel.
The practical claim to make here is that practitioners who
acquire
an understanding of the concepts of the experiential learning
mod-
els will be better able to assist individuals in understanding how
they learn, how to use their learning preferences during times of
Meaning
Co
nc
ep
tsW
ha
t?
Skills
How?
W
hy?
Ad
apt
ati
on
s
If?
Integrate
QIV
QIII
QI
QII
Try Define
Refine Examine
ImageExtend
Counsel
Figure 4.4 McCarthy rendition of the Kolb Learning Wheel.
87orGAnIzAtIonAl leArnInG theorIes
transition, and the importance of developing other dimensions
of
learning. The last is particularly useful in developing expertise
in
learning from individual reflective practices, learning as a
group
in communities of practice, and participating in both individual
transformative learning, and organizational transformations.
How,
then, does experiential learning operate within the framework of
organizational learning and technology? This is shown Figure
4.5
in a combined wheel, called the applied individual learning for
tech-
nology model, which creates a conceptual framework for
linking the
technology life cycle with organizational learning and
experiential
learning constructs.
Figure 4.5 expands the wheel into two other dimensions. The
first quadrant (QI) represents the feasibility stage of
technology. It
requires communities to work together, to ascertain why a
particular
technology might be attractive to the organization. This
quadrant is
Engaging in the
technology process
Co
nc
ep
tua
liz
e d
riv
er
an
d s
up
po
rte
r
life
cy
cle
sMe
asu
rem
en
t a
nd
an
aly
sis
–W
ha
t?
Exploring technology opportunities
Planning and
design–How?
Feasibility–W
hy?
Im
ple
me
nti
ng
te
ch
no
log
y
Cr
eat
ion
–W
ha
t If
?
Action
learning
QIV
QIII
QI
QII
Knowledge
management
Transformative
learning
Communities
of practice
Figure 4.5 Combined applied learning wheel.
88 INFORMATION TECHNOLOGY
best represented by individuals who engage in group discussions
to
make better connections from their own experiences. The
process
of determining whether a technology is feasible requires
integrated
discourse among affected communities, who then can make
better
decisions, as opposed to centralized or individual and
predetermined
decisions on whether to use a specific technology. During this
phase,
individuals need to operate in communities of practice, as the
infra-
structure with which to support a democratic process of
consensus
building.
The second quadrant (QII) corresponds to measurement and
analy-
sis. This operation requires individuals to engage in specific
details
to determine and conceptualize driver and supporter life cycles
ana-
lytically. Individuals need to examine the specific details to
under-
stand “ what” the technology can do, and to reflect on what it
means to
them, and their business unit. This analysis is measured with
respect
to what the ROI will be, and which driver and supporter
functions
will be used. This process requires transformation theory that
allows
individuals to perceive and conceptualize which components of
the
technology can transform the organization.
Quadrant 3 (QIII), design and planning, defines the “how”
component of the technology life cycle. This process involves
explor-
ing technology opportunities after measurement and analysis
have
been completed. The process of determining potential uses for
technology requires knowledge of the organization.
Specifically, it
needs the abstract concepts developed in QII to be integrated
with
tacit knowledge, to then determine possible applications where
the
technology can succeed. Thus, knowledge management becomes
the
predominant mechanism for translating what has been
conceptual-
ized into something explicit (discussed further in Chapter 5).
Quadrant 4 (QIV) represents the implementation-and-creation
step in the technology life cycle. It addresses the hypothetical
ques-
tion of “What if?” This process represents the actual
implementation
of the technology. Individuals need to engage in action learning
tech-
niques, particularly those of reflective practices. The
implementation
step in the technology life cycle is heavily dependent on the
indi-
vidual. Although there are levels of project management, the
essential
aspects of what goes on inside the project very much relies on
the
individual performances of the workers.
89orGAnIzAtIonAl leArnInG theorIes
Social Discourse and the Use of Language
The successful implementation of communities of practice
fosters
heavy dependence on social structures. Indeed, without
understand-
ing how social discourse and language behave, creating and
sustaining
the internal interactions within and among communities of
practice
are not possible. In taking individuals as the central component
for
continued learning and change in organizations, it becomes
impor-
tant to work with development theories that can measure and
support
individual growth and can promote maturation with the
promotion
of organizational/system thinking (Watkins & Marsick, 1993).
Thus,
the basis for establishing a technology-driven world requires the
inclu-
sion of linear and circular ways of promoting learning. While
there
is much that we will use from reflective action concepts
designed by
Argyris and Schö n (1996), it is also crucial to incorporate other
theo-
ries, such as marginality, transitions, and individual
development.
Senge (1990) also compares learning organizations with
engineer-
ing innovation; he calls these engineering innovations
“technologies.”
However, he also relates innovation to human behavior and
distin-
guishes it as a “discipline.” He defines discipline as “a body of
theory
and technique that must be studied and mastered to be put into
prac-
tice, as opposed to an enforced order or means of punishment”
(p. 10).
A discipline, according to Senge, is a developmental path for
acquir-
ing certain skills or competencies. He maintains the concept
that cer-
tain individuals have an innate “gift”; however, anyone can
develop
proficiency through practice. To practice a discipline is a
lifelong
learning process—in contrast to the work of a learning
organization.
Practicing a discipline is different from emulating a model. This
book
attempts to bring the arenas of discipline and technology into
some
form of harmony. What technology offers is a way of addressing
the
differences that Senge proclaims in his work. Perhaps this is
what is
so interesting and challenging about attempting to apply and
under-
stand the complexities of how technology, as an engineering
innova-
tion, affects the learning organization discipline—and thereby
creates
a new genre of practices. After all, I am not sure that one can
master
technology as either an engineering component, or a discipline.
Technology dynamism and ROD expand the context of the glo-
balizing forces that have added to the complexity of analyzing
“the
90 INFORMATION TECHNOLOGY
language and symbolic media we employ to describe, represent,
interpret, and theorize what we take to be the facticity of
organi-
zational life” (Grant et al., 1998, p. 1). ROD needs to create
what
I call the “language of technology.” How do we then
incorporate
technology in the process of organizing discourse, or how has
tech-
nology affected that process? We know that the concept of dis-
course includes language, talk, stories, and conversations, as
well
as the very heart of social life, in general. Organizational
discourse
goes beyond what is just spoken; it includes written text and
other
informal ways of communication. Unfortunately, the study of
dis-
course is seen as being less valuable than action. Indeed,
discourse
is seen as a passive activity, while “doing” is seen as supporting
more tangible outcomes. However, technology has increased the
importance of sensemaking media as a means of constructing
and
understanding organizational identities. In particular,
technology,
specifically the use of e-mail, has added to the instability of
lan-
guage, and the ambiguities associated with metaphorical
analysis—
that is, meaning making from language as it affects
organizational
behavior. Another way of looking at this issue is to study the
meta-
phor, as well as the discourse, of technology. Technology is
actually
less understood today, a situation that creates even greater
reason
than before for understanding its metaphorical status in
organiza-
tional discourse—particularly with respect to how technology
uses
are interpreted by communities of practice. This is best shown
using
the schema of Grant et al. of the relationship between content
and
activity and how, through identity, skills, and emotion, it leads
to
action (Figure 4.6).
To best understand Figure 4.4 and its application to
technology,
it is necessary to understand the links between talk and action.
It
is the activity and content of conversations that discursively
produce
identities, skills, and emotions, which in turn lead to action.
Talk,
in respect to conversation and content, implies both oral and
writ-
ten forms of communications, discourse, and language. The
written
aspect can obviously include technologically fostered
communications
over the Internet. It is then important to examine the unique
condi-
tions that technology brings to talk and its corresponding
actions.
91orGAnIzAtIonAl leArnInG theorIes
Identity
Individual identities are established in collaborations on a team,
or
in being a member of some business committee. Much of the
theory
of identity development is related to how individuals see
themselves,
particularly within the community in which they operate. Thus,
how
active or inactive we are within our communities, shapes how
we see
ourselves and how we deal with conversational activity and
content.
Empowerment is also an important part of identity. Indeed,
being
excluded or unsupported within a community establishes a
different
identity from other members of the group and often leads to
margin-
ality (Schlossberg, 1989).
Identities are not only individual but also collective, which to
a large extent contributes to cultures of practice within
organiza-
tional factions. It is through common membership that a collec-
tive identity can emerge. Identity with the group is critical
during
discussions regarding emerging technologies and determining
how
they affect the organization. The empowerment of individuals,
and
the creation of a collective identity, are therefore important in
fos-
tering timely actions that have a consensus among the involved
community.
Skills
Identity
Emotions
Action
Conversational
activity
Conversational
content
Figure 4.6 Grant’s schema— relationship between content and
activity.
92 INFORMATION TECHNOLOGY
Skills
According to Hardy et al. (1998, p. 71), conversations are
“arenas in
which particular skills are invested with meaning.” Watson
(1995)
suggests that conversations not only help individuals acquire
“techni-
cal skills” but also help develop other skills, such as being
persuasive.
Conversations that are about technology can often be skewed
toward
the recognition of those individuals who are most
“technologically
talented.” This can be a problem when discourse is limited to
who
has the best “credentials” and can often lead to the undervaluing
of
social production of valued skills, which can affect decisions
that lead
to actions.
Emotion
Given that technology is viewed as a logical and rational field,
the
application of emotion is not often considered a factor of action.
Fineman (1996) defines emotion as “personal displays of
affected, or
‘moved’ and ‘agitated’ states—such as joy, love, fear, anger,
sadness,
shame, embarrassment,”—and points out that these states are
socially
constructed phenomena. There is a positive contribution from
emo-
tional energy as well as a negative one. The consideration of
positive
emotion in the organizational context is important because it
drives
action (Hardy et al., 1998). Indeed, action is more emotion than
ratio-
nal calculation. Unfortunately, the study of emotions often
focuses on
its negative aspects. Emotion, however, is an important part of
how
action is established and carried out, and therefore warrants
attention
in ROD.
Identity, skills, and emotion are important factors in how talk
actu-
ally leads to action. Theories that foster discourse, and its use
in orga-
nizations, on the other hand, are built on linear paths of talk and
action. That is, talk can lead to action in a number of predefined
paths.
Indeed, talk is typically viewed as “cheap” without action or, as
is often
said, “action is valued,” or “action speaks louder than words.”
Talk,
from this perspective, constitutes the dynamism of what must
occur
with action science, communities of practice, transformative
learn-
ing, and, eventually, knowledge creation and management.
Action,
by contrast, can be viewed as the measurable outcomes that
have been
93orGAnIzAtIonAl leArnInG theorIes
eluding organizational learning scholars. However, not all
actions
lead to measurable outcomes. Marshak (1998) established three
types
of talk that lead to action: tool-talk , frame-talk , and
mythopoetic-talk :
1. Tool­talk includes “instrumental communities required to:
discuss, conclude, act, and evaluate outcomes” (p. 82). What
is most important in its application is that tool-talk be used to
deal with specific issues for an identified purpose.
2. Frame-talk focuses on interpretation to evaluate the mean-
ings of talk. Using frame-talk results in enabling implicit and
explicit assessments, which include symbolic, conscious, pre-
conscious, and contextually subjective dimensions.
3. Mythopoetic-talk communicates ideogenic ideas and images
(i.e., myths and cosmologies) that can be used to communicate
the nature of how to apply tool-talk and frame-talk within the
particular culture or society. This type of talk allows for con-
cepts of intuition and ideas for concrete application.
Furthermore, it has been shown that organizational members
experience a difficult and ambiguous relationship, between
discourse
that makes sense, and non-sense—what is also known as “the
struggle
with sense” (Grant et al., 1998). There are two parts that
comprise
non-sense: The first is in the difficulties that individuals
experience in
understanding why things occur in organizations, particularly
when
their actions “make no sense.” Much of this difficulty can be
cor-
related with political issues that create “nonlearning”
organizations.
However, the second condition of non-sense is more applicable,
and
more important, to the study of ROD than the first—that is,
non-
sense associated with acceleration in the organizational change
pro-
cess. This area comes from the taken-for-granted assumptions
about
the realities of how the organization operates, as opposed to
how it can
operate. Studies performed by Wallemacq and Sims (1998)
provide
examples of how organizational interventions can decompose
stories
about non-sense and replace them with new stories that better
address
a new situation and can make sense of why change is needed.
This
phenomenon is critical to changes established, or responded to,
by the
advent of new technologies. Indeed, technology has many
nonsensi-
cal or false generalizations regarding how long it takes to
implement
a product, what might be the expected outcomes, and so on.
Given
94 INFORMATION TECHNOLOGY
the need for ROD—due to the advent of technology—there is a
con-
comitant need to reexamine “old stories” so that the necessary
change
agents can be assessed and put into practice. Ultimately, the
challenge
set forth by Wallemacq and Sims is especially relevant, and
critical,
since the very definition of ROD suggests that communities
need
to accelerate the creation of new stories—stories that will occur
at
unpredictable intervals. Thus, the link between discourse,
organiza-
tional learning, and technology is critical to providing ways in
which
to deal with individuals and organizations facing the challenge
of
changing and evolving.
Grant’s (1996) research shows that sense making using media
and
stories provided effective ways of constructing and
understanding
organizational identities. Technology affects discourse in a
similar
way that it affects communities of practice; that is, it is a
variable that
affects the way discourse is used for organizational evolution. It
also
provides new vehicles on how such discourse can occur.
However, it is
important not to limit discourse analysis to merely being about
“texts,”
emotion, stories, or conversations in organizations. Discourse
analysis
examines “the constructing, situating, facilitating, and
communicat-
ing of diverse cultural, instrumental, political, and socio-
economic
parameters of ‘organizational being’” (Grant, 1996, p. 12).
Hence,
discourse is the essential component of every organizational
learn-
ing effort. Technology accelerates the need for such discourse,
and
language, in becoming a more important part of the learning
matura-
tion process, especially in relation to “system” thinking and
learning.
I propose then, as part of a move toward ROD, that discourse
theories
must be integrated with technological innovation and be part of
the
maturation in technology and in organizational learning.
The overarching question is how to apply these theories of dis-
course and language to learning within the ROD framework and
par-
adigm. First, let us consider the containers of types of talk
discussed
by Marshak (1998) as shown in Figure 4.7.
These types of talk can be mapped onto the technology wheel,
so that
the most appropriate oral and written behaviors can be set forth
within
each quadrant, and development life cycle, as shown in Figure
4.8.
Mythopoetic-talk is most appropriate in Quadrant 1 (QI), where
the fundamental ideas and issues can be discussed in
communities of
practice. These technological ideas and concepts, deemed
feasible, are
95orGAnIzAtIonAl leArnInG theorIes
then analyzed through frame-talk, by which the technology can
be
evaluated in terms of how it meets the fundamental premises
estab-
lished in QI. Frame-talk also reinforces the conceptual
legitimacy
of how technology will transform the organization while provid-
ing appropriate ROI. Tool-talk represents the process of
identifying
applications and actually implementing them. For this reason,
tool-
talk exists in both QIII and QIV. The former quadrant
represents
Mythopoetic-talk: Ideogenic
Frame-talk: Interpretive
Tool-talk: Instrumental
Figure 4.7 Marshak’s type of talk containers.
Planning and design–How?
Im
ple
me
nta
tio
n–
W
ha
t If
?
Tool-talk: Doing
using reflective
practices
QIV
QIII
QI
QII
Tool-talk:
Discuss-decide:
Knowledge
management
Frame-talk:
Transformative
Mythopoetic-
talk: Ground
ideas using
communities of
practice
Feasibility–W
hy?
Me
asu
rem
en
t a
nd
an
aly
sis
–W
ha
t?
Figure 4.8 Marshak’s model mapped to the technology
learning wheel.
96 INFORMATION TECHNOLOGY
the discussion-to-decision portion, and the latter represents the
actual
doing and completion of the project itself. In QIII, table-talk
requires
knowledge management to transition technology concepts into
real
options. QIV transforms these real options into actual projects,
in
which, reflecting on actual practices during implementation,
provides
an opportunity for individual- and organizational-level learning.
Marshak’s (1998) concept of containers and cycles of talk and
action are adapted and integrated with cyclical and linear matu-
rity models of learning. However, discourse and language must
be linked to performance, which is why it needs to be part of
the
discourse and language-learning wheel. By integrating discourse
and language into the wheel, individual and group activities can
use discourse and language as part of ref lective practices to
create
an environment that can foster action that leads to measurable
outcomes. This process, as explained throughout this book, is of
paramount importance in understanding how discourse operates
with ROD in the information age.
Linear Development in Learning Approaches
Focusing only on the role of the individual in the company is an
incom-
plete approach to formulating an effective learning program.
There is
another dimension to consider that is based on learning
maturation.
That is, where in the life cycle of learning are the individuals
and the
organization? The best explanation of this concept is the
learning mat-
uration experience at Ravell. During my initial consultation at
Ravell,
the organization was at a very early stage of organizational
learning.
This was evidenced by the dependence of the organization on
event-
driven and individual reflective practice learning. Technology
acted
as an accelerator of learning—it required IT to design a new
network
during the relocation of the company. Specifically, the
acceleration,
operationalized by a physical move, required IT to establish
new rela-
tionships with line management. The initial case study
concluded that
there was a cultural change as a result of these new
relationships—
cultural assimilation started to occur using organizational
learning
techniques, specifically reflective practices.
After I left Ravell, another phase in the evolution of the
company
took place. A new IT director was hired in my stead, who
attempted
97orGAnIzAtIonAl leArnInG theorIes
to reinstate the old culture: centralized infrastructure, stated
opera-
tional boundaries, and separations that mandated anti-learning
orga-
nizational behaviors. After six months, the line managers,
faced with
having to revert back to a former operating culture, revolted and
demanded the removal of the IT director. This outcome,
regrettable
as it may be, is critical in proving the conclusion of the original
study
that the culture at Ravell had indeed evolved from its state, at
the time
of my arrival. The following are two concrete examples that
support
this notion:
1. The attempt of the new IT director to “roll back” the process
to a former cultural state was unsuccessful, showing that a
new evolving culture had indeed occurred.
2. Line managers came together from the established learning
organization to deliver a concerted message to the execu-
tive team. Much of their learning had now shifted to a social
organization level that was based less on events and was
more holistic with respect to the goals and objectives of the
organization.
Thus, we see a shift from an individual-based learning process
to one that is based more on the social and organizational issues
to
stimulate transformation. This transformation in learning
method
occurred within the same management team, suggesting that
changes
in learning do occur over time and from experience. Another
way of
viewing the phenomenon is to see Ravell as reaching the next
level of
organizational learning or maturation with learning. Consistent
with
the conclusion of the original study, technology served to
accelerate
the process of change or accelerate the maturation process of
organi-
zational learning.
Another phase (Phase II) of Ravell transpired after I returned
to the company. I determined at that time that the IT department
needed to be integrated with another technology-based part of
the
business—the unit responsible for media and engineering
services
(as opposed to IT). While I had suggested this combination
eight
months earlier, the organization had not reached the learning
matu-
ration to understand why such a combination was beneficial.
Much
of the reason it did not occur earlier, can also be attributed to
the
organization’s inability to manage ROD, which, if implemented,
98 INFORMATION TECHNOLOGY
would have made the integration more obvious. The initial
Ravell
study served to bring forth the challenges of cultural
assimilation,
to the extent that the organization needed to reorganize itself
and
change its behavior. In phase II, the learning process matured
by
accelerating the need for structural change in the actual
reporting
processes of IT.
A year later, yet another learning maturation phase (phase III)
occurred. In Ravell, Phase III, the next stage of learning
matura-
tion, allowed the firm to better manage ROD. After completing
the merger of the two technically related business units
discussed
(phase II), it became necessary to move a core database depart-
ment completely out of the combined technology department,
and
to integrate it with a business unit. The reason for this change
was
compelling and brought to light a shortfall in my conclusions
from
the initial study. It appears that as organizational learning
matures
within ROD, there is an increasing need to educate the
executive
management team of the organization. This was not the case
during
the early stages of the case study. The limitation of my work,
then,
was that I predominantly interfaced with line management and
neglected to include executives in the learning. During that
time,
results were encouraging, so there was little reason for me to
include
executives in event-driven issues, as discussed. Unfortunately,
lack-
ing their participation fostered a disconnection with the
strategic
integration component of ROD. Not participating in ROD
created
executive ignorance of the importance that IT had on the
strategy of
the business. Their lack of knowledge resulted in chronic
problems
with understanding the relationship and value of IT on the
business
units of the organization. This shortcoming resulted in
continued
conflicts over investments in the IT organization. It ultimately
left
IT with the inability to defend many of its cost requirements. As
stated, during times of economic downturns, firms tend to
reduce
support organizations. In other words, executive management
did
not understand the driver component of IT.
After the move of the cohort of database developers to a formal
business line unit, the driver components of the group provided
the dialogue and support necessary to educate executives.
However,
this education did not occur based on events, but rather, on
using
the social and group dynamics of organizational learning. We
see
99orGAnIzAtIonAl leArnInG theorIes
here another aspect of how organizational and individual
learning
methods work together, but evolve in a specific way, as
summarized
in Table 4.2.
Another way of representing the relationship between individual
and organizational learning over time is to chart a “maturity”
arc
to illustrate the evolutionary life cycle of technology and
organiza-
tional learning. I call this arc the ROD arc. The arc is designed
to
assess individual development in four distinct sectors of ROD,
each
in relation to five developmental stages of organizational
learning.
Thus, each sector of ROD can be measured in a linear and inte-
grated way. Each stage in the course of the learning
development
Table 4.2 Analysis of Ravell’s Maturation with Technology
LEARNING PHASE I PHASE II PHASE III
Type of learning Individual reflective
practices used to
establish
operations and
line management.
Line managers
defend new culture
and participate in
less event-driven
learning.
Movement away from holistic
formation of IT, into
separate driver and
supporter attributes.
Learning approaches are
integrated using both
individual and
organizational methods, and
are based on functionality
as opposed to being
organizationally specific.
Learning
outcomes
Early stage of
learning
organization
development.
Combination of
event-driven and
early-stage social
organizational
learning
formation.
Movement toward social-
based organizational
decision making, relative to
the different uses of
technology.
Responsive
organizational
dynamism:
cultural
assimilation.
Established new
culture; no change
in organizational
structure.
Cultural
assimilation
stability with
existing structures;
early phase of IT
organizational
integration with
similar groups.
Mature use of cultural
assimilation, based on IT
behaviors (drivers and
supporters).
Responsive
organizational
dynamism:
Strategic
integration.
Limited integration
due to lack of
executive
involvement.
Early stages of
value/needs based
on similar
strategic
alignment.
Social structures emphasize
strategic integration based
on business needs.
100 INFORMATION TECHNOLOGY
of an organization reflects an underlying principle that guides
the
process of ROD norms and behaviors; specifically, it guides
orga-
nizations in how they view and use the ROD components
available
to them.
The arc is a classificatory scheme that identifies progressive
stages in the assimilated uses of ROD. It reflects the
perspective—
paralleling Knefelkamp’s (1999) research—that individuals in
an
organization are able to move through complex levels of
thinking,
and to develop independence of thought and judgment, as their
careers progress within the management structures available to
them. Indeed, assimilation to learning at specific levels of
opera-
tions and management are not necessarily an achievable end but
one that fits into the psychological perspective of what
productive
employees can be taught about ROD adaptability. Figure 4.9
illus-
trates the two axes of the arc.
The profile of an individual who assimilates the norms of ROD
can be characterized in five developmental stages (vertical axis)
along four sectors of literacy (horizontal axis). The arc
character-
izes an individual at a specific level in the organization. At each
level, the arc identifies individual maturity with ROD,
specifically
strategic integration, cultural assimilation, and the type of
learning
process (i.e., individual vs. organizational). The arc shows how
each
tier integrates with another, what types of organizational
learning
theory best apply, and who needs to be the primary driver
within
the organization. Thus, the arc provides an organizational
schema
for how each conceptual component of organizational learning
applies to each sector of ROD. It also identifies and constructs a
path for those individuals who want to advance in
organizational
rank; that is, it can be used to ascertain an individual’s ability
to
cope with ROD requirements as a precursor for advancement in
management. Each position within a sector, or cell, represents a
specific stage of development within ROD. Each cell contains
spe-
cific definitions that can be used to identify developmental
stages
of ROD and organizational learning maturation. Figure 4.10
rep-
resents the ROD arc with its cell definitions. The five stages of
the
arc are outlined as follows:
101orGAnIzAtIonAl leArnInG theorIes
St
ra
te
gi
c
in
te
gr
at
io
n
Se
ct
or
s o
f r
es
po
ns
iv
e
or
ga
ni
za
tio
na
l d
yn
am
ism
O
pe
ra
tio
na
l
kn
ow
le
dg
e
D
ep
ar
tm
en
t/
un
it
vi
ew
a
s o
th
er
In
te
gr
at
ed
di
sp
os
iti
on
St
ab
le
o
pe
ra
tio
ns
O
rg
an
iz
at
io
na
l
le
ad
er
sh
ip
O
rg
an
iz
at
io
na
l l
ea
rn
in
g
co
ns
tr
uc
ts
M
an
ag
em
en
t l
ev
el
C
ul
tu
ra
l a
ss
im
ila
tio
n
Fi
gu
re
4
.9
Re
fle
ct
iv
e
or
ga
ni
za
tio
na
l d
yn
am
is
m
a
rc
m
od
el
.
102 INFORMATION TECHNOLOGY
Se
ct
or
v
ar
ia
bl
e
O
pe
ra
tio
na
l
kn
ow
le
dg
e
D
ep
ar
tm
en
t/
un
it
vi
ew
as
o
th
er
In
te
gr
at
ed
d
isp
os
iti
on
St
ab
le
o
pe
ra
tio
ns
O
rg
an
iz
at
io
na
l
le
ad
er
sh
ip
St
ra
te
gi
c
in
te
gr
at
io
n
O
pe
ra
tio
ns
p
er
so
nn
el
un
de
rs
ta
nd
th
at
te
ch
no
lo
gy
h
as
a
n
im
pa
ct
o
n
st
ra
te
gi
c
de
ve
lo
pm
en
t,
pa
rt
ic
ul
ar
ly
o
n
ex
ist
in
g
pr
oc
es
se
s
Vi
ew
th
at
te
ch
no
lo
gy
ca
n
an
d
w
ill
a
ffe
ct
th
e
w
ay
th
e
or
ga
ni
za
tio
n
op
er
at
es
a
nd
th
at
it
ca
n
aff
ec
t r
ol
es
a
nd
re
sp
on
sib
ili
tie
s
C
ha
ng
es
b
ro
ug
ht
fo
rt
h
by
te
ch
no
lo
gy
n
ee
d
to
b
e
as
sim
ila
te
d
in
to
de
pa
rt
m
en
ts
a
nd
a
re
de
pe
nd
en
t o
n
ho
w
o
th
er
s
pa
rt
ic
ip
at
e
U
nd
er
st
an
ds
n
ee
d
fo
r
or
ga
ni
za
tio
na
l c
ha
ng
es
;
di
ffe
re
nt
c
ul
tu
ra
l
be
ha
vi
or
n
ew
st
ru
ct
ur
es
ar
e
se
en
a
s v
ia
bl
e
so
lu
tio
ns
O
rg
an
iz
at
io
na
l c
ha
ng
es
ar
e
co
m
pl
et
ed
a
nd
in
op
er
at
io
n;
e
xi
st
en
ce
o
f
ne
w
o
r m
od
ifi
ed
em
pl
oy
ee
p
os
iti
on
s
D
ep
ar
tm
en
t-
le
ve
l
or
ga
ni
za
tio
na
l c
ha
ng
es
an
d
cu
ltu
ra
l e
vo
lu
tio
n
ar
e
in
te
gr
at
ed
w
ith
or
ga
ni
za
tio
n-
w
id
e
fu
nc
tio
ns
a
nd
c
ul
tu
re
s
In
di
vi
du
al
b
el
ie
fs
o
f
st
ra
te
gi
c
im
pa
ct
a
re
in
co
m
pl
et
e;
in
di
vi
du
al
ne
ed
s t
o
in
co
rp
or
at
e
ot
he
r v
ie
w
s w
ith
in
th
e
de
pa
rt
m
en
t o
r b
us
in
es
s
un
it
Re
co
gn
iti
on
th
at
in
di
vi
du
al
an
d
de
pa
rt
m
en
t v
ie
w
s
m
us
t b
e
in
te
gr
at
ed
to
b
e
co
m
pl
et
e
an
d
st
ra
te
gi
ca
lly
p
ro
du
ct
iv
e
fo
r t
he
d
ep
ar
tm
en
t/
un
it
C
ha
ng
es
m
ad
e
to
pr
oc
es
se
s a
t t
he
de
pa
rt
m
en
t/
un
it
le
ve
l
fo
rm
al
ly
in
co
rp
or
at
e
em
er
gi
ng
te
ch
no
lo
gi
es
D
ep
ar
tm
en
ta
l s
tr
at
eg
ie
s
ar
e
pr
op
ag
at
ed
a
nd
in
te
gr
at
ed
a
t
or
ga
ni
za
tio
n
le
ve
l
C
ul
tu
ra
l
as
sim
ila
tio
n
O
rg
an
iz
at
io
na
l
le
ar
ni
ng
c
on
st
ru
ct
s
In
di
vi
du
al
-b
as
ed
re
fle
ct
iv
e
pr
ac
tic
e
Sm
al
l g
ro
up
-b
as
ed
re
fle
ct
iv
e
pr
ac
tic
es
In
te
ra
ct
iv
e
w
ith
b
ot
h
in
di
vi
du
al
a
nd
m
id
dl
e
m
an
ag
em
en
t u
sin
g
co
m
m
un
iti
es
o
f p
ra
ct
ic
e
In
te
ra
ct
iv
e
be
tw
ee
n
m
id
dl
e
m
an
ag
em
en
t a
nd
ex
ec
ut
iv
es
u
sin
g
so
ci
al
di
sc
ou
rs
e
m
et
ho
ds
to
pr
om
ot
e
tr
an
sf
or
m
at
io
n
O
rg
an
iz
at
io
na
l l
ea
rn
in
g
at
ex
ec
ut
iv
e
le
ve
l u
sin
g
kn
ow
le
dg
e
m
an
ag
em
en
t
M
an
ag
em
en
t l
ev
el
O
pe
ra
tio
ns
O
pe
ra
tio
n
an
d
m
id
dl
e
m
an
ag
em
en
t
M
id
dl
e
m
an
ag
em
en
t
M
id
dl
e
m
an
ag
em
en
t a
nd
ex
ec
ut
iv
e
Ex
ec
ut
iv
e
Fi
gu
re
4
.1
0
Re
sp
on
si
ve
o
rg
an
iza
tio
na
l d
yn
am
is
m
a
rc
.
103orGAnIzAtIonAl leArnInG theorIes
1. Operational knowledge: Represents the capacity to learn,
con-
ceptualize, and articulate key issues relating to how technology
can have an impact on existing processes and organizational
structure. Organizational learning is accomplished through
individual learning actions, particularly reflective practices.
This stage typically is the focus for operations personnel, who
are usually focused on their personal perspectives of how
technology affects their daily activities.
2. Department/unit view as other : Indicates the ability to inte-
grate points of view about using technology from diverse indi-
viduals within the department or business unit. Using these
new perspectives, the individual is in position to augment
his or her understanding of technology and relate it to others
within the unit. Operations personnel participate in small-
group learning activities, using reflective practices. Lower
levels of middle managers participate in organizational learn-
ing that is in transition, from purely individual to group-level
thinking.
3. Integrated disposition : Recognizes that individual and
depart-
mental views on using technology need to be integrated to
form effective business unit objectives. Understanding that
organizational and cultural shifts need to include all mem-
ber perspectives, before formulating departmental decisions,
organizational learning is integrated with middle managers,
using communities of practice at the department level.
4. Stable operations : Develops in relation to competence in
sec-
tors of ROD appropriate for performing job duties for emerg-
ing technologies, not merely adequately, but competitively,
with peers and higher-ranking employees in the organization.
Organizational learning occurs at the organizational level
and uses forms of social discourse to support organizational
transformation.
5. Organizational leadership : Ability to apply sectors of ROD
to
multiple aspects of the organization. Department concepts
can be propagated to organizational levels, including strate-
gic and cultural shifts, relating to technology opportunities.
Organizational learning occurs using methods of knowledge
management with executive support. Individuals use their
104 INFORMATION TECHNOLOGY
technology knowledge for creative purposes. They are will-
ing to take risks using critical discernment and what Heath
(1968) calls “freed” decision making.
The ROD arc addresses both individual and organizational
learning. There are aspects of Senge’s (1990) “organizational”
approach that are important and applicable to this model. I
have mentioned its appropriateness in regard to the level of the
manager— suggesting that the more senior manager is better
posi-
tioned to deal with nonevent learning practices. However, there
is
yet another dimension within each stage of matured learning.
This
dimension pertains to timing. The timing dimension focuses on
a multiple-phase approach to maturing individual and organiza-
tional learning approaches. The multiple phasing of this
approach
suggests a maturing or evolutionary learning cycle that occurs
over time, in which individual learning fosters the need and the
acceptance of organizational learning methods. This process can
be applied within multiple tiers of management and across
differ-
ent business units.
The ROD arc can also be integrated with the applied individual
learning wheel. The combined models show the individual’s
cycle of
learning along a path of maturation. This can be graphically
shown
to reflect how the wheel turns and moves along the continuum
of the
arc (Figure 4.11).
Figure 4.11 shows that an experienced technology learner can
maximize learning by utilizing all four quadrants in each of the
maturity stages. It should be clear that certain quadrants of indi-
vidual learning are more important to specific stages on the arc.
However, movement through the arc is usually not symmetrical;
that is, individuals do not move equally from stage to stage,
within
the dimensions of learning (Langer, 2003). This integrated and
multiphase method uses the applied individual learning wheel
with the arc. At each stage of the arc, an individual will need
to draw on the different types of learning that are available in
the learning wheel. Figure 4.12 provides an example of this
con-
cept, which Knefelkamp calls “multiple and simultaneous”
(1999),
meaning that learning can take on multiple meanings across dif-
ferent sectors simultaneously.
105orGAnIzAtIonAl leArnInG theorIes
Figure 4.12 shows that the dimension variables are not
necessarily
parallel in their linear maturation. This phenomenon is not
unusual
with linear models, and in fact, is quite normal. However, it
also reflects
the complexity of how variables mature, and the importance of
having
the capability and infrastructure to determine how to measure
such
levels of maturation within dimensions. There are both
qualitative
and quantitative approaches to this analysis. Qualitative
approaches
typically include interviewing, ethnographic-type experiences
over
Engaging in the
technology process
Co
nc
ep
tua
liz
e d
riv
er
an
d s
up
po
rte
r
life
cy
cle
sMe
asu
rem
en
t a
nd
an
aly
sis
–W
ha
t?
Exploring technology opportunities
Planning and
design–How?
Feasibility–W
hy?
Im
ple
me
nti
ng
te
ch
no
log
y
Cr
eat
ion
–W
ha
t If
?
Action
learning
QIV
QIII
QI
QII
Opera
tional
know
ledge
Depar
tment
/unit
view a
s othe
r
Integr
ated
dispo
sition
Incre
ased l
evels
of ma
turity
with
organ
izatio
nal dy
namis
m
Stable
opera
tions
Organ
izatio
nal
leader
ship
Knowledge
management
Transformative
learning
Communities
of practice
Figure 4.11 ROD arc with applied individual learning wheel.
106 INFORMATION TECHNOLOGY
D
im
en
si
on
v
ar
ia
bl
e
O
pe
ra
tio
na
l
kn
ow
le
dg
e
D
ep
ar
tm
en
t/
un
it
vi
ew
a
s o
th
er
In
te
gr
at
ed
di
sp
os
iti
on
St
ab
le
o
pe
ra
tio
ns
O
rg
an
iz
at
io
na
l
le
ad
er
sh
ip
St
ra
te
gi
c
in
te
gr
at
io
n
C
ul
tu
ra
l a
ss
im
ila
tio
n
O
rg
an
iz
at
io
na
l l
ea
rn
in
g
co
ns
tr
uc
ts
M
an
ag
em
en
t l
ev
el
Fi
gu
re
4
.1
2
Sa
m
pl
e
RO
D
ar
c.
107orGAnIzAtIonAl leArnInG theorIes
some predetermined time period, individual journals or diaries,
group
meetings, and focus groups. Quantitative measures involve the
cre-
ation of survey-type measures; they are based on statistical
results
from answering questions that identify the level of maturation
of the
individual.
The learning models that I elaborate in this chapter are
suggestive
of the rich complexities surrounding the learning process for
indi-
viduals, groups, and entire organizations. This chapter
establishes a
procedure for applying these learning models to technology-
specific
situations. It demonstrates how to use different phases of the
learning
process to further mature the ability of an organization to
integrate
technology strategically and culturally.
http://taylorandfrancis.com
109
5
managing oRganizaTional
leaRning anD TeChnology
The Role of Line Management
In Chapter 1, the results of the Ravell case study demonstrated
the
importance of the role that line managers have, for the success
of imple-
menting organizational learning, particularly in the objective of
inte-
grating the information technology (IT) department. There has
been
much debate related to the use of event-driven learning. In
particular,
there is Senge’s (1990) work from his book, The Fifth
Discipline. While
overall, I agree with his theories, I believe that there is a need
to critique
some of his core concepts and beliefs. That is, Senge tends to
make
broad generalizations about the limits of event-driven education
and
learning in organizations. He believes that there is a limitation
of learn-
ing from experience because it can create limitations to learning
based
on actions—as he asks: “What happens when we can no longer
observe
the consequences of our actions?” (Senge, 1990, p. 23).
My research has found that event-driven learning is essential to
most workers who have yet to learn through other means. I
agree with
Senge that not all learning can be obtained through event-
oriented
thinking, but I feel that much of what occurs at this horizon
pertains
more to the senior levels than to what many line managers have
to deal
with as part of their functions in business. Senge’s concern with
learn-
ing methods that focus too much on the individual, perhaps, is
more
powerful, if we see the learning organization as starting at the
top and
then working its way down. The position, however, particularly
with
respect to the integration of technology, is that too much
dependence
on executive-driven programs to establish and sustain
organizational
learning, is dangerous. Rather, the line management—or middle
managers who fundamentally run the business—is best
positioned
to make the difference. My hypothesis here is that both top-
down
and bottom-up approaches to organizational learning are riddled
with
110 INFORMATION TECHNOLOGY
problems, especially in their ability to sustain outcomes. We
cannot
be naï ve—even our senior executives must drive results to
maintain
their positions. As such, middle managers, as the key business
drivers,
must operate in an event- and results-driven world—let us not
under-
estimate the value of producing measurable outcomes, as part of
the
ongoing growth of the organizational learning practicum.
To explore the role of middle managers further, I draw on the
inter-
esting research done by Nonaka and Takeuchi (1995). These
research-
ers examined how Japanese companies manage knowledge
creation,
by using an approach that they call “middle-up-down.” Nonaka
and
Takeuchi found that middle managers “best communicate the
contin-
uous iterative process by which knowledge is created” (p. 127).
These
middle managers are often seen as leaders of a team, or task, in
which
a “spiral conversion process” operates and that requires both
executive
and operations management personnel. Peters and Waterman
(1982),
among others, often have attacked middle managers as
representing a
layer of management that creates communication problems and
inef-
ficiencies in business processes that resulted in leaving U.S.
workers
trailing behind their international competitors during the
automobile
crisis in the 1970s. They advocate a “flattening” of the never-
ending
levels of bureaucracy responsible for inefficient operations.
However,
executives often are not aware of details within their operating
depart-
ments and may not have the ability or time to acquire those
details.
Operating personnel, on the other hand, do not possess the
vision
and business aptitudes necessary to establish the kind of
knowledge
creation that fosters strategic learning.
Middle managers, or what I prefer to identify as line managers
(Langer, 2001b), possess an effective combination of skills that
can pro-
vide positive strategic learning infrastructures. Line managers
under-
stand the core issues of productivity in relation to competitive
operations
and return on investment, and they are much closer to the day-
to-day
activities that bring forth the realities of how, and when, new
strategic
processes can be effectively implemented. While many
researchers, such
as Peters and Waterman, find them to be synonymous with
backward-
ness, stagnation, and resistance to change, middle managers are
the
core group that can provide the basis for continuous innovation
through
strategic learning. It is my perspective that the difference of
opinion
regarding the positive or negative significance middle managers
have
111MAnAGInG orGAnIzAtIonAl leArnInG
in relation to organizational learning has to do with the wide-
ranging
variety of employees who fall into the category of “middle.” It
strikes
me that Peters and Waterman were somewhat on target with
respect to
a certain population of middle managers, although I would not
char-
acterize them as line managers. To justify this position, it is
important
to clearly establish the differences. Line managers should be
defined as
pre-executive employees who have reached a position of
managing a
business unit that contains some degree of return on investment
for the
business. In effect, I am suggesting that focusing on “middle”
manag-
ers, as an identifiable group, is too broad. Thus, there is a need
to further
delineate the different levels of what comprises middle
managers, and
their roles in the organization.
Line Managers
These individuals usually manage an entire business unit and
have
“return-on-investment” responsibilities. Line managers should
be
categorized as those who have middle managers reporting to
them;
they are, in effect, managers of managers, or, as in some
organiza-
tions, they serve a “directorial” function. Such individuals are,
in
many ways, considered future executives and perform many
low-end
executive tasks. They are, if you will, executives in training.
What
is significant about this managerial level is the knowledge it
carries
about operations. However, line managers are still involved in
daily
operations and maintain their own technical capabilities.
First-Line Managers
First-line individuals manage nonmanagers but can have
supervisory
employees who report to them. They do not carry the
responsibility
for a budget line unit but for a department within the unit.
These
managers have specific goals that can be tied to their
performance and
to the department’s productivity.
Supervisor
A supervisor is the lowest-level middle manager. These
individu-
als manage operational personnel within the department. Their
112 INFORMATION TECHNOLOGY
management activities are typically seen as “functions,” as
opposed
to managing an entire operation. These middle managers do not
have
other supervisors or management-level personnel reporting to
them.
We should remember that definitions typically used to
character-
ize the middle sectors of management, as described by
researchers
like Peters, Nonaka, and others, do not come from exact
science. The
point must be made that middle managers cannot be categorized
by a
single definition. The category requires distinctive definitions
within
each level of stratification presented. Therefore, being more
specific
about the level of the middle manager can help us determine the
man-
ager’s role in the strategic learning process. Given that Nonaka
and
Takeuchi (1995) provide the concept of middle-up-down as it
related
to knowledge management, I wish to broaden it into a larger
sub-
ject of strategic learning, as a method of evolving changes in
culture
and organizational thinking. Furthermore, responsive
organizational
dynamism (ROD), unlike other organizational studies,
represents
both situational learning and ongoing evolutionary learning
require-
ments. Evolutionary learning provides a difficult challenge to
organi-
zational learning concepts. Evolutionary learning requires
significant
contribution from middle managers. To understand the
complexity of
the middle manager, all levels of the organization must be taken
into
consideration. I call this process management vectors.
Management Vectors
Senge’s (1990) work addresses some aspects of how technology
might
affect organizational behavior: “The central message of the
Fifth
Discipline is more radical than ‘ radical organization
redesign’—
namely that our organizations work the way they work,
ultimately
because of how we think and how we interact” (p. xiv).
Technology
aspires to be a new variable or catalyst that can change
everyday
approaches to things—to be the radical change element that
forces
us to reexamine norms no longer applicable to business
operations.
On the other hand, technology can be dangerous if perceived
unre-
alistically as a power that possesses new answers to
organizational
performance and efficiency. In the late 1990s, we experienced
the
“bust” of the dot-com explosion, an explosion that challenged
conven-
tional norms of how businesses operate. Dot-coms sold the
concepts
113MAnAGInG orGAnIzAtIonAl leArnInG
that brick-and-mortar operations could no longer compete with
new
technology-driven businesses and that “older” workers could
not be
transformed in time to make dot-com organizations competitive.
Dot-coms allowed us to depart from our commitment to
knowledge
workers and learning organizations, which is still true today.
For example, in 2003, IBM at its corporate office in Armonk,
New
York, laid off 1,000 workers who possessed skills that were no
lon-
ger perceived as needed or competitive. Rather than retrain
work-
ers, IBM determined that hiring new employees to replace them
was simply more economically feasible and easier in terms of
trans-
forming their organization behaviors. However, in my interview
with Stephen McDermott, chief executive officer (CEO) of
ICAP
Electronic Trading Community (ETC), it became apparent that
many of the mystiques of managing technology were incorrect.
As he
stated, “Managing a technology company is no different from
manag-
ing other types of businesses.” While the technical skills of the
IBM
workers may no longer be necessary, why did the organization
not
provide enough opportunities to migrate important knowledge
work-
ers to another paradigm of technical and business needs?
Widespread
worker replacements tell us that few organizational learning
infra-
structures actually exist. The question is whether technology
can pro-
vide the stimulus to prompt more organizations to commit to
creating
infrastructures that support growth and sustained operation.
Most
important is the question of how we establish infrastructures
that can
provide the impetus for initial and ongoing learning
organizations.
This question suggests that the road to working successfully
with tech-
nology will require the kind of organizational learning that is
driven
by both individual and organization-wide initiatives. This
approach
can be best explained by referring to the concept of driver and
sup-
porter functions and life cycles of technology presented in
Chapter 3.
Figure 5.1 graphically shows the relationship between
organizational
structure and organizational learning needs. We also see that
this
relationship maps onto driver and supporter functionality.
Figure 5.1 provides an operational overview of the relations
between
the three general tiers of management in most organizations.
These
levels or tiers are mapped onto organizational learning
approaches;
that is, organizational/system or individual. This mapping
follows a
general view based on what individuals at each of these tiers
view or
114 INFORMATION TECHNOLOGY
seek as their job responsibilities and what learning method best
sup-
ports their activities within their environment. For example,
execu-
tive learning focuses on system-level thinking and learning
because
executives need to view their organizations in a longer-term
way (e.g.,
return on investment), as opposed to viewing learning on an
indi-
vidual, transactional event way. Yet, executives play an integral
part in
long-term support for technology, as an accelerator. Their role
within
ROD is to provide the stimulus to support the process of
cultural
assimilation, and they are also very much a component of
strategic
integration. Executives do not require as much event-driven
reflective
change, but they need to be part of the overall “social” structure
that
paves the way for marrying the benefits of technology with
organi-
zational learning. What executives do need to see, are the
planned
measurable outcomes linked to performance from the investment
of
coupling organizational learning with technology. The lack of
execu-
tive involvement and knowledge will be detrimental to the
likelihood
of making this relationship successful.
Operations, on the other hand, are based more on individual
prac-
tices of learning. Attempting to incorporate organizational
vision
and social discourse at this level is problematic until event-
driven
learning is experienced individually to prove the benefits that
can be
derived from reflective practices. In addition, there is the
problem of
the credibility of a learning program. Workers are often wary of
new
Management/
operational
layers
Executive tier
Middle
management
tiers
Operations tier Support Event-driven
individual
Reflective practices
Organization/
system on
driver individual
on support
Communities of
practice (driver)
reflective practices
(supporter)
Driver/support
life cycle
Organizational
learning
method
Knowledge
management
Learning
approach
Organization
system
Driver/support
life cycle
involvement
Driver
Figure 5.1 Three-tier organizational structure.
115MAnAGInG orGAnIzAtIonAl leArnInG
programs designed to enhance their development and
productivity.
Many question the intentions of the organization and why it is
mak-
ing the investment, especially given what has occurred in
corporations
over the last 20 years: Layoffs and scandals have riddled
organizations
and hurt employee confidence in the credibility of employer
programs.
Ravell showed us that using reflective practices during events
pro-
duces accelerated change, driven by technological innovation,
which
in turn, supports the development of the learning organization.
It is
important at this level of operations to understand the narrow
and
pragmatic nature of the way workers think and learn. The way
opera-
tions personnel are evaluated is also a factor. Indeed, operations
per-
sonnel are evaluated based on specific performance criteria.
The most complex, yet combined, learning methods relate to the
middle management layers. Line managers, within these layers,
are
engrossed in a double-sided learning infrastructure. On one
side, they
need to communicate and share with executives what they
perceive to
be the “overall” issues of the organization. Thus, they need to
learn
using an organizational learning approach, which is less
dependent
on event-driven learning and uses reflective practice. Line
managers
must, along with their senior colleagues, be able to see the
business
from a more proactive perspective and use social-oriented
methods
if they hope to influence executives. Details of events are more
of an
assumed responsibility to them than a preferred way of
interacting. In
other words, most executives would rather interface with line
manag-
ers on how they can improve overall operations efficiently and
effec-
tively, as opposed to dealing with them on a micro, event-by-
event
basis. The assumption, then, is that line managers are expected
to deal
with the details of their operations, unless there are serious
problems
that require the attention of executives; such problems are
usually cor-
related to failures in the line manager’s operations.
On the other side are the daily relationships and responsibilities
managers face for their business units. They need to incorporate
more
individual-based learning techniques that support reflective
practices
within their operations to assist in the personal development of
their
staff. The middle management tier described in Figure 5.1 is
shown
at a summary level and needs to be further described. Figure
5.2 pro-
vides a more detailed analysis based on the three types of
middle man-
agers described. The figure shows the ratio of organizational
learning
116 INFORMATION TECHNOLOGY
to individual learning based on manager type. The more senior
the
manager, the more learning is based on systems and social
processes.
Knowledge Management
There is an increasing recognition that the competitive
advantage of
organizations depends on their “ability to create, transfer,
utilize, and
protect difficult-to-intimate knowledge assets” (Teece, 2001,
p. 125).
Indeed, according to Bertels and Savage (1998), the dominant
logic
of the industrial era requires an understanding of how to break
the
learning barrier to comprehending the information era. While
we
have developed powerful solutions to change internal processes
and
organizational structures, most organizations have failed to
address
the cultural dimensions of the information era. Organizational
knowledge creation is a result of organizational learning
through stra-
tegic processes. Nonaka and Takeuchi (1995) define
organizational
knowledge as “the capability of a company as a whole to create
new
knowledge, disseminate it throughout the organization, and
embody
it in products, services, and systems” (p. 3). Nonaka and
Takeuchi use
the steps shown in Figure 5.3 to assess the value and chain of
events
surrounding the valuation of organization knowledge.
Supervisor
High individual-
based learning
High org/system-
based learning
Individual
System
Manager Director
Figure 5.2 Organizational/system versus individual learning by
middle manager level.
Knowledge creation
Continuous innovation
Competitive advantage
Figure 5.3 Nonaka and Takeuchi steps to organizational
knowledge.
117MAnAGInG orGAnIzAtIonAl leArnInG
If we view the Figure 5.3 processes as leading to competitive
advan-
tage, we may ask how technology affects the chain of actions
that
Nonaka and Takeuchi (1995) identify. Without violating the
model,
we may insert technology and observe the effects it has on each
step,
as shown in Figure 5.4.
According to Nonaka and Takeuchi (1995), to create new
knowl-
edge means to re-create the company, and everyone in it, in an
ongo-
ing process that requires personal and organizational self-
renewal.
That is, knowledge creation is the responsibility of everyone in
the
organization. The viability of this definition, however, must be
ques-
tioned. Can organizations create personnel that will adhere to
such
parameters, and under what conditions will senior management
sup-
port such an endeavor?
Again, technology has a remarkable role to play in substantiat-
ing the need for knowledge management. First, executives are
still
challenged to understand how they need to deal with emerging
tech-
nologies as this relates to whether their organizations are
capable
of using them effectively and efficiently. Knowledge
management
provides a way for the organization to learn how technology
will be
used to support innovation and competitive advantage. Second,
IT
departments need to understand how they can best operate
within
the larger scope of the organization—they are often searching
for a
true mission that contains measurable outcomes, as defined by
the
entire organization, including senior management. Third, both
execu-
tives and IT staff agree that understanding the uses of
technology is a
continuous process that should not be utilized solely in a
reactionary
Knowledge creation: Technology provides more dynamic shifts
in knowledge,
thus accelerating the number of knowledge-creation events that
can occur.
Continuous innovation: Innovations are accelerated because of
the dynamic
nature of events and the time required to respond—therefore,
continuous
innovation procedures are more significant to have in each
department in order
to respond to technological opportunities on an ongoing basis.
Competitive advantage: Technology has generated more global
competition.
Competitive advantages that depend on technological innovation
are more common.
Figure 5.4 Nonaka and Takeuchi organizational knowledge
with technology extension.
118 INFORMATION TECHNOLOGY
and event-driven way. Finally, most employees accept the fact
that
technology is a major component of their lives at work and at
home,
that technology signifies change, and that participating in
knowledge
creation is an important role for them.
Again, we can see that technology provides the initiator for
understanding how organizational learning is important for
com-
petitive advantage. The combination of IT and other
organizational
departments, when operating within the processes outlined in
ROD,
can significantly enhance learning and competitive advantage.
To
expand on this point, I now focus on the literature specifically
relat-
ing to tacit knowledge and its important role in knowledge man-
agement. Scholars theorize knowledge management is an ability
to
transfer individual tacit knowledge into explicit knowledge.
Kulkki
and Kosonen (2001) define tacit knowledge as an experience-
based
type of knowledge and skill and as the individual capacity to
give
intuitive forms to new things; that is, to anticipate and
preconcep-
tualize the future. Technology, by its very definition and form
of
being, requires this anticipation and preconceptualization.
Indeed,
it provides the perfect educational opportunity in which to
practice
the transformation of tacit into explicit knowledge. Tacit
knowledge
is an asset, and having individual dynamic abilities to work with
such knowledge commands a “higher premium when rapid
organic
growth is enabled by technology” (Teece, 2001, p. 140). Thus,
knowledge management is likely to be greater when
technological
opportunity is richer.
Because evaluating emerging technologies requires the ability
to
look into the future, it also requires that individuals translate
valu-
able tacit knowledge, and creatively see how these opportunities
are
to be judged if implemented. Examples of applicable tacit
knowledge
in this process are here extracted from Kulkki and Kosonen
(2001):
• Cultural and social history
• Problem-solving modes
• Orientation to risks and uncertainties
• Worldview organizing principles
• Horizons of expectations
I approach each of these forms of tacit knowledge from the per-
spective of the components of ROD as shown in Table 5.1.
119MAnAGInG orGAnIzAtIonAl leArnInG
It is not my intention to suggest that all technologies should be,
or
can be, used to generate competitive advantage. To this extent,
some
technologies may indeed get rejected because they cannot assist
the
organization in terms of strategic value and competitive
advantage. As
Teece (2001) states, “Information transfer is not knowledge
transfer and
information management is not knowledge management,
although the
former can assist the latter. Individuals and organizations can
suffer
from information overload” (p. 129). While this is a significant
issue for
many firms, the ability to have an organization that can select,
interpret,
Table 5.1 Mapping Tacit Knowledge to Responsive
Organizational Dynamism
TACIT KNOWLEDGE STRATEGIC INTEGRATION
CULTURAL ASSIMILATION
Cultural and social
history
How the IT department and other
departments translate emerging
technologies into their existing processes
and organization.
Problem-solving
modes
Individual reflective practices that assist
in determining how specific technologies
can be useful and how they can be
applied.
Technology opportunities
may require organizational
and structural changes to
transfer tacit knowledge to
explicit knowledge.
Utilization of tacit knowledge
to evaluate probabilities for
success.
Orientation to risks
and uncertainties
Technology offers many risks and
uncertainties. All new technologies may
not be valid for the organization.
Tacit knowledge is a
valuable component to fully
understand realities, risks,
and uncertainties.
Worldviews Technology has global effects and changes
market boundaries that cross business
cultures. It requires tacit knowledge to
understand existing dispositions on how
others work together.
Review how technology
affects the dynamics of
operations.
Organizing
principles
How will new technologies actually be
integrated? What are the organizational
challenges to “rolling out” products and
to implementation timelines? What
positions are needed, and who in the
organization might be best qualified to
fill new responsibilities?
Identify limitations of the
organization; that is, tacit
knowledge versus explicit
knowledge realities.
Horizons of
expectations
Individual limitations in the tacit domain
that may hinder or support whether a
technology can be strategically
integrated into the organization.
120 INFORMATION TECHNOLOGY
and integrate information is a valuable part of knowledge
management.
Furthermore, advances in IT have propelled much of the
excitement
surrounding knowledge management. It is important to
recognize that
learning organizations, reflective practices, and communities of
prac-
tice all participate in creating new organizational knowledge.
This is
why knowledge management is so important. Knowledge must
be built
on its own terms, which requires intensive and laborious
interactions
among members of the organization.
Change Management
Because technology requires that organizations accelerate their
actions, it is necessary to examine how ROD corresponds to
theories
in organizational change. Burke (2002) states that most
organiza-
tional change is evolutionary; however, he defines two distinct
types
of change: planned versus unplanned and revolutionary versus
evolu-
tionary. Burke also suggests that the external environmental
changes
are more rapid today and that most organizations “are playing
catch
up.” Many rapid changes to the external environment can be
attrib-
uted to emerging technologies, which have accelerated the
divide
between what an organization does and what it needs to do to
remain
competitive. This is the situation that creates the need for ROD.
The catching-up process becomes more difficult because the
amount
of change required is only increasing given ever-newer
technologies.
Burke (2002) suggests that this catching up will likely require
planned
and revolutionary change. Such change can be mapped onto
much of
my work at Ravell. Certainly, change was required; I planned it,
and
change had to occur. However, the creation of a learning
organiza-
tion, using many of the organizational learning theories
addressed
in Chapter 4, supports the eventual establishment of an
operating
organization that can deal with unplanned and evolutionary
change.
When using technology as the reason for change, it is then
important
that the components of ROD be integrated with theories of
organi-
zational change.
History has shown that most organizational change is not
success-
ful in providing its intended outcomes, because of cultural lock-
in.
Cultural lock-in is defined by Foster and Kaplan (2001) as the
inability
of an organization to change its corporate culture even when
there
121MAnAGInG orGAnIzAtIonAl leArnInG
are clear market threats. Based on their definition, then,
technology
may not be able to change the way an organization behaves,
even
when there are obvious competitive advantages to doing so. My
con-
cern with Foster and Kaplan’s conclusion is whether individuals
truly
understand exactly how their organizations are being affected—
or are
we to assume that they do understand? In other words, is there a
pro-
cess to ensure that employees understand the impact of not
changing?
I believe that ROD provides the infrastructure required to
resolve
this dilemma by establishing the processes that can support
ongoing
unplanned and evolutionary change.
To best show the relationship of ROD to organizational change
theory, I use Burke’s (2002) six major points in assisting
change in
organizations:
1. Understanding the external environment: What are
competitors
and customers’ expectations? This is certainly an issue, specif-
ically when tracking whether expected technologies are made
available in the client– vendor relationship. But, more critical
is the process of how emerging technologies, brought about
through external channels, are evaluated and put into produc-
tion; that is, having a process in place. Strategic integration of
ROD is the infrastructure that needs to facilitate the moni-
toring and management of the external environment.
2. Evaluation of the inside of the organization: This directly
relates
to technology and how it can be best utilized to improve
internal operations. While evaluation may also relate to a
restructuring of an organization’s mission, technology is often
an important driver for why a mission needs to be changed
(e.g., expanding a market due to e-commerce capabilities).
3. Readiness of the organization: The question here is not
whether
to change but how fast the organization can change to address
technological innovations. The ROD arc provides the steps
necessary to create organizations that can sustain change as a
way of operation, blending strategic integration with cultural
assimilation. The maturation of learning: moving toward sys-
tem-based learning also supports the creation of infrastruc-
tures that are vitally prepared for changes from emerging
technologies.
122 INFORMATION TECHNOLOGY
4. Cultural change as inevitable: Cultural assimilation
essentially
demands that organizations must dynamically assimilate new
technologies and be prepared to evolve their cultures. Such
evolution must be accelerated and be systemic within business
units, to be able to respond effectively to the rate of change
created by technological innovations.
5. Making the case for change: It is often difficult to explain
why
change is inevitable. Much of the need for change can be sup-
ported using the reflective practices implemented at Ravell.
However, such acceptance is directly related to the process of
time. Major events can assist in establishing the many needs
for change, as discussed by Burke (2002).
6. Sustaining change: Perhaps the strongest part of ROD is its
ability to create a process that is evolutionary and systemic. It
focuses on driving change to every aspect of the organization
and provides organizational learning constructs to address
each level of operation. It addresses what Burke (2002) calls
the “prelaunch, launch, postlaunch, and sustaining,” in the
important sequences of organizational change (p. 286).
Another important aspect of change management is leadership.
Leadership takes many forms and has multiple definitions.
Technology
plays an interesting role in how leadership can be presented to
orga-
nizations, especially in terms of the management style of
leadership,
or what Eisenhardt and Bourgeois (1988) have coined as “power
cen-
tralization.” Their study examines high-velocity environments
in the
microcomputer industry during the late 1980s. By high velocity,
they
refer to “those environments in which there is a rapid and
discon-
tinuous change in demand, competitors, technology, or
regulation, so
that information is often inaccurate, unavailable, or obsolete”
(p. 738).
During the period of their study, the microcomputer industry
was
undergoing substantial technological change, including the
introduc-
tion of many new competitors. As it turns out, the concept of
high
velocity is becoming more the norm today given the way
organizations
find themselves needing to operate in constant fluxes of
velocity. The
term power centralization is defined as the amount of decision-
making
control wielded by the CEO. Eisenhardt and Bourgeois’s study
finds
that the more the CEO engages in power-centralized leadership,
123MAnAGInG orGAnIzAtIonAl leArnInG
the greater the degree of politics, which has a negative impact
on the
strategic performance of the firms examined. This finding
suggests
that the less democratic the leadership is in high-velocity
environ-
ments, the less productive the organization will be. Indeed, the
study
found that when individuals engaged in team learning, political
ten-
sion was reduced, and the performance of the firms improved.
The structure of ROD provides the means of avoiding the high-
velocity problems discovered by the Eisenhardt and Bourgeois
(1988)
study. This is because ROD allows for the development of more
indi-
vidual learning, as well as system thinking, across the executive
ranks
of the business. If technology is to continue to establish such
high
velocities, firms need to examine the Eisenhardt and Bourgeois
study
for its relevance to everyday operations. They also need to use
orga-
nizational learning theories as a basis for establishing
leadership that
can empower employees to operate in an accelerated and
unpredict-
able environment.
Change Management for IT Organizations
While change management theories address a broad population
in
organizations, there is a need to create a more IT-specific
approach to
address the unique needs of this group. Lientz and Rea (2004)
estab-
lish five specific goals for IT change managers:
1. Gain support for change from employees and non-IT
managers.
2. Implement change along measurements for the work so that
the results of the change are clearly determined.
3. Implement a new culture of collaboration in which
employees
share more information and work more in teams.
4. Raise the level of awareness of the technology process and
work so that there is less of a tendency for reversion.
5. Implement an ongoing measurement process for the work to
detect any problems.
Lientz and Rea’s (2004) position is that when a new culture is
instilled in IT departments, it is particularly important that it
should
not require massive management intervention. IT people need to
be
self-motivated to keep up with the myriad accelerated changes
in the
124 INFORMATION TECHNOLOGY
world of technology. These changes occur inside IT in two
critical
areas. The first relates to the technology itself. For example,
how do
IT personnel keep up with new versions of hardware and
software?
Many times, these changes come in the form of hardware (often
called system) and software upgrades from vendors who require
them to maintain support contracts. The ongoing self-
management
of how such upgrades and changes will ultimately affect the rest
of the organization is a major challenge and one that is difficult
to
manage top-down. The second area is the impact of new or
emerg-
ing technologies on business strategy. The challenge is to
develop IT
personnel who can transform their technical knowledge into
busi-
ness knowledge and, as discussed, take their tacit knowledge
and
convert it into explicit, strategic knowledge. Further
understanding
of the key risks to the components of these accelerated changes
is
provided as follows:
System and software version control: IT personnel must
continue
to track and upgrade new releases and understand the impact
of product enhancements. Some product-related enhance-
ments have no bearing on strategic use; they essentially fix
problems in the system or software. On the other hand, some
new releases offer new features and functions that need to be
communicated to both IT and business managers.
Existing legacy systems: Many of these systems cannot support
the current needs of the business. This often forces IT staff to
figure out how to create what is called “workarounds” (quick
fixes) to these systems. This can be problematic given that
workarounds might require system changes or modifications
to existing software. The risk of these changes, both short and
long term, needs to be discussed between user and IT staff
communities of practice.
Software packages (off-the-shelf software): Since the 1990s, the
use
of preprogrammed third-party software packages has become
a preferred mode of software use among users. However,
many of these packages can be inflexible and do not support
the exact processes required by business users. IT personnel
need to address users’ false expectations about what software
packages can and cannot do.
125MAnAGInG orGAnIzAtIonAl leArnInG
System or software changes: Replacement of systems or
software
applications is rarely 100% complete. Most often, remnants of
old systems will remain. IT personnel can at times be insensi-
tive to the lack of a complete replacement.
Project completion: IT personnel often misevaluate when their
involvement is finished. Projects are rarely finished when the
software is installed and training completed. IT staff tend to
move on to other projects and tasks and lose focus on the like-
lihood that there will be problems discovered or last-minute
requests made by business users.
Technical knowledge: IT staff members need to keep their
techni-
cal skills up to date. If this is not done, emerging technolo-
gies may not be evaluated properly as there may be a lack of
technical ability inside the organization to map new technical
developments onto strategic advantage.
Pleasing users : While pleasing business users appears to be a
good thing, it can also present serious problems with respect
to IT projects. What users want, and what they need, may
not be the same. IT staff members need to judge when they
might need assistance from business and IT management
because users may be unfairly requesting things that are not
feasible within the constraints of a project. Thus, IT staff must
have the ability to articulate what the system can do and what
might be advisable. These issues tend to occur when certain
business users want new systems to behave like old ones.
Documentation: This, traditionally, is prepared by IT staff and
contains jargon that can confuse business users. Furthermore,
written procedures prepared by IT staff members do not con-
sider the entire user experience and process.
Training: This is often carried out by IT staff and is restricted
to covering system issues, as opposed to the business realities
surrounding when, how, and why things are done.
These issues essentially define key risks to the success of
imple-
menting technology projects. Much of this book, thus far, has
focused
on the process of organizational learning from an infrastructure
per-
spective. However, the implementation component of
technology
possesses new risks to successfully creating an organization that
can
126 INFORMATION TECHNOLOGY
learn within the needs of ROD. These risks, from the issues
enumer-
ated, along with those discussed by Lientz and Rea (2004) are
sum-
marized as follows:
Business user involvement: Continuous involvement from busi-
ness users is necessary. Unfortunately, during the life of a proj-
ect there are so many human interfaces between IT staff and
business users that it is unrealistic to attempt to control these
communications through tight management procedures.
Requirements, definition, and scope: These relate to the process
by which IT personnel work with business users to deter-
mine exactly what software and systems need to accomplish.
Determining requirements is a process, not a predetermined
list that business users will necessarily have available to
them. The discourse that occurs in conversations is critical to
whether such communities are capable of developing require-
ments that are unambiguous in terms of expected outcomes.
Business rules: These rules have a great effect on how the
organi-
zation handles data and transactions. The difference between
requirements and business rules is subtle. Specifically, busi-
ness rules, unlike requirements, are not necessarily related to
processes or events of the business. As such, the determina-
tion of business rules cannot be made by reviewing proce-
dures; for example, all account numbers must be numeric.
Documentation and training materials: IT staff members need to
interact with business users and establish joint processes that
foster the development of documentation and training that
best fit user needs and business processes.
Data conversion: New systems and applications require that data
from legacy systems be converted into the new formats. This
process is called data mapping; IT staff and key business users
review each data field to ensure that the proper data are rep-
resented correctly in the new system. IT staff members should
not be doing this process without user involvement.
Process measurement: Organizations typically perform a post-
completion review after the system or software application
is installed. Unfortunately, this process measurement should
occur during and after project completion.
127MAnAGInG orGAnIzAtIonAl leArnInG
IT change management poses some unique challenges to imple-
menting organizational learning, mostly because managers
cannot
conceivably be available for all of the risks identified.
Furthermore,
the very nature of new technologies requires that IT staff mem-
bers develop the ability to self-manage more of their daily
functions
and interactions, particularly with other staff members outside
the
IT department. The need for self-development is even more
critical
because of the existence of technological dynamism, which
focuses
on dynamic and unpredictable transactions that often must be
han-
dled directly by IT staff members and not their managers.
Finally,
because so many risks during technology projects require
business
user interfaces, non-IT staff members also need to develop
better and
more efficient self-management than they are accustomed to
doing.
Technological dynamism, then, has established another need for
change management theory. This need relates to the
implementation
of self-development methods. Indeed, part of the reason for the
lack
of success of IT projects can be attributed to the inability of the
core
IT and business staff to perform in a more dynamic way.
Historically,
more management cannot provide the necessary learning and
reduc-
tion of risk.
The idea of self-development became popular in the early 1980s
as
an approach to the training and education of managers, and
managers
to be. Thus, the focus of management self-development is to
increase
the ability and willingness of managers to take responsibility
for
themselves, particularly for their own learning (Pedler et al.,
1988).
I believe that management self-development theory can be
applied to
nonmanagers, or to staff members, who need to practice self-
manage-
ment skills that can assist them in transitioning to operating
under
the conditions of technological dynamism.
Management self-development draws on the idea that many peo-
ple emphasize the need for learner centeredness. This is an
impor-
tant concept in that it ties self-development theory to
organizational
learning, particularly to the work of Chris Argyris and Malcolm
Knowles. The concept of learner centeredness holds that
individuals
must take prime responsibility for their own learning: when and
how
to learn. The teacher (or manager) is assigned the task of
facilitator—a
role that fosters guidance as opposed to direct initiation of
learning.
In many ways, a facilitator can be seen as a mentor whose role
it is to
128 INFORMATION TECHNOLOGY
guide an individual through various levels of learning and
individual
development.
What makes self-development techniques so attractive is that
learners work on actual tasks and then reflect on their own
efforts.
The methods of reflective practice theory, therefore, are
applicable
and can be integrated with self-development practices. Although
self-
development places the focus on the individual’s own efforts,
manag-
ers still have responsibilities to mentor, coach, and counsel
their staff.
This support network allows staff to receive appropriate
feedback and
guidance. In many ways, self-development relates to the
professional
process of apprenticeship but differs from it in that the worker
may not
aspire to become the manager but may wish simply to develop
better
management skills. Workers are expected to make mistakes and
to be
guided through a process that helps them reflect and improve.
This is
why self-development can be seen as a management issue as
opposed
to just a learning theory.
A mentor or coach can be a supervisor, line manager, director,
or
an outside consultant. The bottom line is that technological
dyna-
mism requires staff members who can provide self- management
to cope with constant project changes and risks. These individu-
als must be able to learn, be self-aware of what they do not
know,
and possess enough confidence to initiate the required learning
and assistance that they need to be successful (Pedler et al.,
1988).
Self-development methods, like other techniques, have risks.
Most notable, is the initial decrement in performance followed
by
a slow increment as workers become more comfortable with the
process and learn from their mistakes. However, staff members
must be given support and time to allow this process to occur;
self-development is a trial-and-error method founded on the
basis
of mastery learning (i.e., learning from one’s mistakes). Thus,
the
notion of self-development is both continuous and
discontinuous
and must be implemented in a series of phases, each having
unique
outcomes and maturity. The concept of self-development is also
consistent with the ROD arc, in which early phases of
maturation
require more individual learning, particularly reflective
practices.
Self-development, in effect, becomes a method of indirect man-
agement to assist in personal transformation. This personal
trans-
formation will inevitably better prepare individuals to
participate
129MAnAGInG orGAnIzAtIonAl leArnInG
in group- and organizational-level learning at later stages of
maturation.
The first phase of establishing a self-development program is to
create a “learning-to-learn” process. Teaching individuals to
learn is a
fundamental need before implementing self-development
techniques.
Mumford (1988) defines learning to learn as
1. Helping staff to understand the stages of the learning process
and the pitfalls to not learning
2. Helping staff to find their own preferences to learning
3. Assisting staff in understanding their present learning
prefer-
ences and how to deal with, and overcome, learning weaknesses
4. Helping staff to build on their learning experience and apply
it to their current challenges in their job
The first phase of self-development clearly embraces the Kolb
(1999) Learning Style Inventory and the applied individual
learn-
ing wheel that were introduced in Chapter 4. Thus, all staff
members
should be provided with both of these learning wheels, made
aware
of their natural learning strengths and weaknesses, and provided
with
exercises to help them overcome their limitations. Most
important is
that the Kolb system will make staff aware of their shortfalls
with
learning. The applied individual learning wheel will provide a
per-
spective on how individuals can link generic learning
preferences into
organizational learning needs to support ROD.
The second phase of self-development is to establish a formal
learn-
ing program in which staff members
1. Are responsible for their own learning, coordinated with a
mentor or coach
2. Have the right to determine how they will meet their own
learning needs, within available resources, time frames, and
set outcomes
3. Are responsible for evaluating and assessing their progress
with their learning
In parallel, staff coaches or mentors
1. Have the responsibility to frame the learning objectives so
that they are consistent with agreed-on individual weaknesses
130 INFORMATION TECHNOLOGY
2. Are responsible for providing access and support for staff
3. Must determine the extent of their involvement with mentor-
ing and their commitment to assisting staff members achieve
stated outcomes
4. Are ultimately responsible for the evaluation of individual’s
progress and success
This program must also have a formal process and structure.
According to Mossman and Stewart (1988), formal programs,
called
self-managed learning (SML), need the following organization
and
materials:
1. Staff members should work in groups as opposed to on their
own. This is a good opportunity to intermix IT and non-
IT staff with similar issues and objectives. The size of these
groups is (typically) from four to six members. Groups should
meet every two– three weeks, and should develop what are
known as learning contracts . Learning contracts specifically
state what the individual and management have agreed on.
Essentially, the structure of self-development allows staff
members to experience communities of practice, which by
their very nature, will also introduce them to group learning
and system-level thinking.
2. Mentors or coaches should preside over a group as opposed
to
presiding over just one individual. There are two benefits to
doing this: (1) There are simply economies of scale for which
managers cannot cover staff on an individual basis, and (2)
facilitating a group with similar objectives benefits interac-
tion among the members. Coaches obviously need to play an
important role in defining the structure of the sessions, in
offering ideas about how to begin the self-development pro-
cess, and in providing general support.
3. Staff members need to have workbooks, films, courses,
study guides, books, and specialists in the organization,
all of which learners can use to help them accomplish their
goals.
4. Typically, learning contracts will state the assessment meth-
ods. However, assessment should not be limited only to indi-
viduals but also should include group accomplishments.
131MAnAGInG orGAnIzAtIonAl leArnInG
An SML should be designed to ensure that the learning program
for staff members represents a commitment by management to a
for-
mal process, that can assist in the improvement of the project
teams.
The third phase of self-development is evaluation. This process
is a
mixture of individual and group assessments from phase II,
coupled
with assessments from actual practice results. These are results
from
proven outcomes during normal workday operations. To garner
the
appropriate practice evaluation, mentors and coaches must be
involved
in monitoring results and noting the progress on specific events
that
occur. For example, if a new version of software is
implemented, we
will want to know if IT staff and business users worked together
to
determine how and when it should be implemented. These
results
need to be formally communicated back to the learning groups.
This
process needs to be continued on an ongoing basis to sustain the
effects of change management. Figure 5.5 represents the flow
of the
three phases of the process.
The process for self-development provides an important
approach
in assisting staff to perform better under the conditions of
technologi-
cal dynamism. It is one thing to teach reflective practice; it is
another
Individual learning contracts
Learning styles inventory
Self-managed learning program
communities of
practice IT and non-IT staff
Phase 1:
Establish
learning to
learn
objectives
Phase 2:
Create formal
learning
program
Make necessary
changes to self-
development
learning
Individual and group assessment
monitor operations for
measurable outcomes
Phase 3:
Implement
evaluation
Figure 5.5 Phases of self-development.
132 INFORMATION TECHNOLOGY
to get staff members to learn how to think in a manner that
takes into
consideration the many risks that have plagued systems and
software
projects for decades. While the role of management continues to
play
a major part in getting things done within strategic objectives,
self-
development can provide a strong learning method, that can
foster
sustained bottom-up management, which is missing in most
learning
organizations.
The Ravell case study provides some concrete evidence on how
self-development techniques can indeed get results. Because of
the
time pressures at Ravell, I was not able to invest in the
learning-to-
learn component at the start of the process. However, I used
informal
methods to determine the learning preferences of the staff. This
can
be accomplished through interviews in which staff responses
can pro-
vide a qualitative basis for evaluating how specific personnel
prefer to
learn. This helped me to formulate a specific training program
that
involved group meetings with IT and non-IT-oriented groups.
In effect, phase II at Ravell had two communities. The first
com-
munity was the IT staff. We met each week to review progress
and
to set short-term objectives of what the community of IT wanted
to
accomplish. I acted as a facilitator, and although I was in a
power
position as their manager, I did not use my position unless there
were
clear signs of resistance in the team (which there were in
specific situ-
ations). The second community was formed with various line
manager
departments. This is where I formed “dotted-line” reporting
struc-
tures, which required IT staff members also to join other
commu-
nities of practice. This proved to be an invaluable strategy
because
it brought IT and business users together and formed the links
that
eventually allowed IT staff members to begin to learn and to
form
relationships with the user community, which fostered reflective
thinking and transformation.
As stated, there are setbacks at the start of any self-development
program, and the experience at Ravell was no exception.
Initially,
IT staff members had difficulty understanding what was
expected
of them; they did not immediately perceive the learning
program as
an opportunity for their professional growth. It was through
ongo-
ing, motivated discourse in and outside of the IT community
that
helped achieve measurable increments of self-developmental
growth.
Furthermore, I found it necessary to integrate individual
coaching
133MAnAGInG orGAnIzAtIonAl leArnInG
sessions with IT staff. While group sessions were useful, they
were
not a substitute for individual discussions, which at times
allowed
IT staff members to personally discuss their concerns and
learning
requirements. I found the process to be ultimately valuable, and
I
maintained the role of coach, as opposed to that of a manager
who
tells IT staff members what to do in every instance. I knew that
direct
management only would never allow for the development of
learning.
Eventually, self-development through discourse will foster
identity
development. Such was the case at Ravell, where both user and
IT
groups eventually came together to form specific and interactive
com-
munities of practice. This helped form a clearer identity for IT
staff
members, and they began to develop the ability to address the
many
project risk issues that I defined in this chapter. Most important
for
the organization was that Ravell phase I built the foundation for
later
phases that required more group and system thinking among the
IT
ranks.
Evaluation of the performance at Ravell (phase III of the self-
development process) was actually easier than expected, which
means
that if the first two phases are successful, evaluation will
naturally be
easy to determine. As reflective thinking became more evident
in the
group, it was easier to see the growth in transformative
behavior; the
IT groups became more proactive and critical by themselves,
without
necessarily needing my input. In fact, my participation fell into
more
of a supporter role; I was asked to participate more when I felt
needed
to provide a specific task for the group. Evaluation based on
perfor-
mance was also easier to determine, mainly because we had
formed
interdepartmental communities and because of the relationships
I
established with line managers.
Another important decision we made and one that nurtured our
evaluation capabilities was the fact that line managers often
joined
our IT staff meetings. So, getting feedback on actual results was
always open for discussion.
Viewing self-development in the scope of organizational
learning
and management techniques provides an important support
method
for later development in system thinking. The Ravel experience
did
just that, as the self-development process inevitably laid the
foun-
dation for more sophisticated organizational learning, required
as a
business matures under ROD.
134 INFORMATION TECHNOLOGY
Social Networks and Information Technology
The expansion of social networks, through the use of
technological
innovations, has substantially changed the way information
flows in
and out of a business community. Some companies, particularly
in the
financial services communities, have attempted to “lock out”
social
network capabilities. These attempts are ways for organizations
to
control, as opposed to change, behavior. Historically, such
controls
to enforce compliance have not worked. This is particularly
relevant
because of the emergence of a younger generation of workers
who use
social networking tools as a regular way to communicate and
carry out
discourse. Indeed, social networking has become the main
vehicle for
social discourse both inside and outside organizations. There
are those
who feel that the end of confidentiality may be on the horizon.
This
is not to suggest that technology executives give up on
security—we
all know this would be ludicrous. On the other hand, the
increasing
pressure to “open” the Web will inevitably become too
significant to
ignore. Thus, the technology executive of the future must be
prepared
to provide desired social and professional networks to their
employees
while figuring out how to minimize risk—certainly not an easy
objec-
tive. Organizations will need to provide the necessary learning
tech-
niques to help employees understand the limits of what can be
done.
We must remember that organizations, governments, and busi-
nesses have never been successful at controlling the flow of
information
to any population to or from any specific interest group—
inevitably,
information flows through. As stated by Cross and Thomas
(2009),
“The network perspective could trigger new approaches to
organiza-
tion design at a time when environmental and competitive
conditions
seem to be exhausting conventional wisdom” (p. 186). Most
important
is the understanding that multinational organizations need to
think
globally and nationally at the same time. To do this, employees
must
transform their behavior and how they interact. Controlling
access
does not address this concern; it only makes communication
more
difficult and therefore does not provide a solution. Controls
typically
manifest themselves in the form of new processes and
procedures. I
often see technology executives proclaiming the need to change
pro-
cesses in the name of security without really understanding that
they
are not providing a solution, but rather, fostering new
procedures that
135MAnAGInG orGAnIzAtIonAl leArnInG
will allow individuals to evade the new security measures. As
Cross and
Thomas (2009) point out, “Formal structures often overlook the
fact
that every formal organization has in its shadow an informal or
‘ invis-
ible’ organization” (p. 1). Instead, technology executives
concerned
with security, need to focus on new organizational design to
assist
businesses to be “social network ready.” ROD must then be
extended
to allow for the expansion of social network integration,
including,
but not limited to, such products as Linkedln, Facebook, and
Twitter.
It may also be necessary to create new internal network
infrastruc-
tures that specifically cater to social network communication.
Many software application companies have learned that compat-
ibility in an open systems environment is a key factor for
success-
ful deployment of an enterprise-wide application solution. Thus,
all
applications developed within or for an organization need to
have
compatibility with the common and popular social network
products.
This popularity is not static, but rather, a constant process of
deter-
mining which products will become important social networks
that
the company may want to leverage. We see social networks
having
such an impact within the consumer environment—or what we
can
consider to be the “market.” I explained in my definition of
ROD that
it is the acceleration of market changes—or the changing
relationship
between a buyer and seller—that dictates the successes and
failures of
businesses. That said, technology executives must focus their
attention
on how such networks will require their organizations to
embrace
them. Obviously, this change carries risks. Adapting too early
could
be overreacting to market hype, while lagging could mean late
entry.
The challenge, then, for today’s technology leaders is to create
dynamic, yet functional, social networks that allow businesses
to
compete while maintaining the controls they must have to
protect
themselves. The IT organization must concentrate on how to
provide
the infrastructure that allows these dynamic connections to be
made
without overcontrol. The first mission for the technology
executive is
to negotiate this challenge by working with the senior
management
of the organization to reach consensus on the risk factors. The
issues
typically involve the processes, behavior patterns, and risks
shown in
Figure 5.6.
Ultimately, the technology executive must provide a new road
map
that promotes interagency and cross-customer collaboration in a
way
136 INFORMATION TECHNOLOGY
that will assist the organization to attain a ROD culture. Social
net-
works are here to stay and will continue to necessitate 24/7
access for
everyone. This inevitably raises salient issues relating to the
manage-
ment structure within businesses and how best to manage them.
In Chapter 2, I defined the IT dilemma in a number of contexts.
During an interview, a chief executive raised an interesting
issue that
relates to the subject: “My direct reports have been complaining
that
because of all this technology that they cannot get away from—
that
their days never seem to end.” I responded to this CEO by
asking,
Business process
Design a social network
that allows
participants to
respond dynamically
to customer and
business needs
Aspired behavior patterns Risks
Users understand the inherent limits
to what can be communicated
outside the organization, limit
personal transactions, and use
judgment when foreign e-mails are
forwarded.
Users cannot properly
determine the ethics of
behavior and will not take
the necessary precautions
to avoid exposing the
organization to outside
security breaches.
Discern which critical
functions are required
for the social network
to work effectively and
maintain the firm's
competitive
positioning
Users are active and form strategic
groups (communities of practice)
that define needs on a regular basis
and work closely with IT and senior
management.
Users cannot keep up with
changes in social
networks, and it is
impossible to track
individual needs and
behaviors.
Provide a network
design that can be
scaled as needs
change within the
budget limitations of
the organization
�e organization must understand
that hard budgets for social
networking may not be feasible.
Rather, the network needs are
dynamic, and costs must be
assessed dynamically within the
appropriate operating teams in the
organizations.
Reality tells us that all
organizations operate
within budget limitations.
Large organizations find
it difficult to govern
dynamically, and smaller
organizations cannot
afford the personnel
necessary to manage
dynamically.
Create a social network
that “flattens” the
organization so that
all levels are
accessible
Particularly large organizations need
to have a network that allows its
people better access to its
departments, talent, and
management. In the 1980s, the
book In Search of Excellence (Peters
& Waterman, 1982) was the first
effort to present the value of a
“flatter” organizational structure.
Social networks provide the
infrastructure to make this a reality.
With access come the
challenges of responding
to all that connect to the
system. �e organization
needs to provide the
correct etiquette of how
individuals respond
dynamically without
creating anarchy.
Figure 5.6 Social network management issues.
137MAnAGInG orGAnIzAtIonAl leArnInG
“Why are they e-mailing and calling you? Is it possible that
tech-
nology has exposed a problem that has always existed?” The
CEO
seemed surprised at my response and said, “What do you
mean?”
Again, I responded by suggesting that technology allowed
access,
but perhaps, that was not really the problem. In my opinion, the
real
problem was a weakness in management or organizational
structure.
I argued that good managers build organizations that should
handle
the questions that were the subject of these executives’
complaints.
Perhaps the real problem was that the organization or
management
was not handling day-to-day issues. This case supports my
thesis that
technology dynamism requires reevaluation of how the
organization
operates and stresses the need to understand the cultural
assimilation
abilities of dealing with change.
Another interesting aspect of social networks is the emergence
of
otherwise invisible participants. Technology-driven networks
have
allowed individuals to emerge not only because of the access
determi-
nant but also because of statistics. Let me be specific. Network
traffic
can easily be tracked, as can individual access. Even with
limited his-
tory, organizations are discovering the valued members of their
com-
panies simply by seeing who is active and why. This should not
suggest
that social networks are spy networks. Indeed, organizations
need to
provide learning techniques to guide how access is tracked and
to
highlight the value that it brings to a business. As with other
issues,
the technology executive must align with other units and
individuals;
the following are some examples:
• Human resources (HR): This department has specific needs
that can align effectively with the entire social network.
Obviously, there are compliance issues that limit what can
be done over a network. Unfortunately, this is an area that
requires reassessment: In general, governance and controls do
not drive an organization to adopt ROD. There are other fac-
tors related to the HR function. First, is the assimilation of
new employees and the new talents that they might bring to
the network. Second, is the challenge of adapting to ongoing
change within the network. Third, is the knowledge lost of
those who leave the organization yet may still want to partici-
pate socially within the organization (friends of the company).
138 INFORMATION TECHNOLOGY
• Gender: Face-to-face meetings have always shown differences
in participation by gender. Men tend to dominate meetings
and the positions they hold in an organization. However, the
advent of social virtual networks has begun to show a shift
in the ways women participate and hold leadership positions
among their peers. In an article in Business Week (May 19,
2008), Auren Hoffman reports that women dominate social
network traffic. This may result in seeing more women-centric
communication. The question, then, is whether the expan-
sion of social networks will give rise to more women in senior
management positions.
• Marketing: The phenomenon of social networking has allowed
for the creation of more targeted connectivity; that is, the abil-
ity to connect with specific clients in special ways. Marketing
departments are undergoing an extraordinary transformation
in the way they target and connect with prospective custom-
ers. The technology executive is essentially at the center of
designing networks that provide customizable responses and
facilitate complex matrix structures. Having such abilities
could be the differentiator between success and failure for
many organizations.
One can see that the expansion of social networks is likely to
have
both good and bad effects. Thus far, in this section I have
discussed the
good. The bad relates to the expansion of what seems to be an
unlim-
ited network. How does one manage such expansion? The
answer lies
within the concept of alignment. Alignment has always been
critical
to attain organizational effectiveness. The heart of alignment is
deal-
ing with cultural values, goals, and processes that are key to
meet
strategic objectives (Cross & Thomas, 2009). While the social
net-
work acts to expose these issues, it does not necessarily offer
solutions
to these differences. Thus, the challenge for the technology
executive
of today is to balance the power of social networks while
providing
direction on how to deal with alignment and control—not an
easy
task but clearly an opportunity for leadership. The following
chapters
offer some methods to address the challenges discussed in this
chap-
ter, and the opportunities they provide for technology
executives.
139
6
oRganizaTional
TRansfoRmaTion anD The
balanCeD sCoReCaRD
Introduction
The purpose of this chapter is to examine the nature of
organiza-
tional transformation, how it occurs, and how it can be
measured.
Aldrich (2001) defines organizational transformation along
three
possible dimensions: changes in goals, boundaries, and
activities.
According to Aldrich, transformations “must involve a qualita-
tive break with routines and a shift to new kinds of
competencies
that challenge existing organizational knowledge” (p. 163). He
warns us that many changes in organizations disguise
themselves
as transformative but are not. Thus, focusing on the
qualifications
of authentic or substantial transformation is key to
understanding
whether it has truly occurred in an organization. Technology, as
with any independent variable, may or may not have the
capacity to
instigate organizational transformation. Therefore, it is
important
to integrate transformation theory with responsive
organizational
dynamism (ROD). In this way, the measurable outcomes of
orga-
nizational learning and technology can be assessed in
organizations
that implement ROD. Most important in this regard, is that
organi-
zational transformation, along with knowledge creation, be
directly
correlated to the results of implementing organizational
learning.
That is, the results of using organizational learning techniques
must
result in organizational transformation.
Organizational transformation is significant for three key
reasons:
1. Organizations that cannot change will fundamentally be at
risk against competitors, especially in a quickly changing
market.
140 INFORMATION TECHNOLOGY
2. If the organization cannot evolve, it will persist in its norms
and be unwilling to change unless forced to do so.
3. If the community population is forced to change and is con-
strained in its evolutionary path, it is likely that it will not be
able to transform and thus, will need to be replaced.
Aldrich (2001) establishes three dimensions of organizational
transformation. By examining them, we can apply technology-
specific changes and determine within each dimension what
consti-
tutes authentic organizational transformation.
1. Goals: There are two types of goal-related transformations:
(a)
change in the market or target population of the organiza-
tion; (b) the overall goal of the organization itself changes. I
have already observed that technology can affect the mission
of an organization, often because it establishes new market
niches (or changes them). Changed mission statements also
inevitably modify goals and objectives.
2. Boundaries: Organizational boundaries transform when there
is expansion or contraction. Technology has historically
expanded domains by opening up new markets that could
not otherwise be reached without technological innovation.
E-business is an example of a transformation brought about
by an emerging technology. Of course, business can contract
as a result of not assimilating a technology; technology also
can create organizational transformation.
3. Activity systems: Activity systems define the way things are
done. They include the processing culture, such as behav-
ioral roles. Changes in roles and responsibilities alone do
not necessarily represent organizational transformation
unless it is accompanied by cultural shifts in behavior. The
cultural assimilation component of ROD provides a method
with which to facilitate transformations that are unpredict-
able yet evolutionary. Sometimes, transformations in activ-
ity systems deriving from technological innovations can
be categorized by the depth and breadth of its impact on
other units. For example, a decision could be made to use
technology as part of a total quality management (TQM)
141orGAnIzAtIonAl trAnsForMAtIon
effort. Thus, activity transformations can be indirect and
need to be evaluated based on multiple and simultaneous
events.
Aldrich’ s (2001) concept of organizational transformation
bears
on the issue of frequency of change. In general, he concludes
that
the changes that follow a regular cycle are part of normal
evolution
and “flow of organizational life” (p. 169) and should not be
treated as
transformations. Technology, on the other hand, presents an
inter-
esting case in that it can be perceived as normal in its
persistence
and regularity of change while being unpredictable in its
dynamism.
However, Aldrich’ s definition of transformation poses an
interesting
issue for determining transformations resulting from
technological
innovations. Specifically, under what conditions is a
technological
innovation considered to have a transformative effect on the
organi-
zation? And, when is it to be considered as part of regular
change? I
refer to Figure 6.1, first presented in Chapter 3 on driver and
sup-
porter life cycles to respond to this question.
The flows in this cycle can be used as the method to determine
technological events that are normal change agents versus
transforma-
tive ones. To understand this point, one should view all driver-
related
technologies as transformational agents because they, by
definition,
affect strategic innovation and are approved based on return on
investment (ROI). Aldrich’ s (2001) “normal ebb and flows”
repre-
sent the “mini-loops” that are new enhancements or
subtechnologies,
which are part of normal everyday changes necessary to mature
a
Mini loop technology enhancementsTechnology
driver
Evaluation
cycle
Driver
maturation
Support
status
Replacement or
outsource
Economies
of scale
Figure 6.1 Driver-to-supporter life cycle.
142 INFORMATION TECHNOLOGY
technological innovation. Thus, driver variables that result from
mini-
loops, would not be considered transformational agents of
change.
It is important to recognize that Aldrich’ s (2001) definition of
organizational transformation should not be confused with
theories
of transformative learning. As West (1996) proclaims, “The
goal of
organizational learning is to transform the organization” (p. 54).
The
study of transformative learning has been relevant to adult
education,
and has focused on individual, as opposed to organizational,
devel-
opment and learning. Thus, transformative learning has been
better
integrated in individual learning and reflective practice theories
than
in organizational ones. While these modes of learning are
related to
the overall learning in organizations, they should not be
confused
with organizations that are attempting to realize their
performance
objectives.
Yorks and Marsick (2000) offer two strategies that can produce
transformative learning for individuals, groups, or
organizations:
action learning and collaborative inquiry. I covered action
science in
Chapter 4, particularly reflective practices, as key interventions
to fos-
ter both individual and group evolution of learning, specifically
in
reference to how to manage ROD. Aspects of collaborative
inquiry
are applied to later stages of maturation and to more senior
levels of
management based on systems-level learning. As Yorks and
Marsick
(2000) state, “For the most part the political dimensions of how
the
organization functions is off limits, as are discussions of larger
social
consequences” (p. 274).
Technological innovations provide acceleration factors and
foster
the need for ROD. Technology also furnishes the potential
tangible
and measurable outcomes necessary to normalize York and
Marsick’ s
(2000) framework for transformative learning theory into
organiza-
tional contexts as follows:
1. Technology, specifically e-business, has created a critical
need
for organizations to engage with clients and individuals in a
new interactive context. This kind of discourse has established
accelerated needs, such as understanding the magnitude of
alternative courses of action between customer and vendor.
The building of sophisticated intranets (internal Internets) and
their evolution to assimilate with other Internet operations
143orGAnIzAtIonAl trAnsForMAtIon
has also fueled the need for learning to occur more often than
before and at organizational level.
Because technology can produce measurable outcomes,
individuals are faced with accelerated reflections about the
cultural impact of their own behaviors. This is directly related
to the implementation of the cultural assimilation component
of ROD, by which individuals determine how their behaviors
are affected by emerging technologies.
2. Early in the process of implementing strategic integration,
reflective practices are critical for event-driven technology
projects. These practices force individuals to continually reex-
amine their existing meaning perspectives (specifically, their
views and habits of mind). Individual reflection in, on, and to
practice will evolve to system-level group and organizational
learning contexts, as shown in the ROD arc.
3. The process of moving from individual to system-level
learn-
ing during technology maturation is strengthened by the
learners’ abilities to comprehend why historical events have
influenced their existing habits of mind.
4. The combination of strategic integration and cultural assimi-
lation lays the foundation for organizational transformation
to occur. Technology provides an appropriate blend of being
both strategic and organizational in nature, thus allow-
ing learners to confront their prior actions and develop new
practices.
Aldrich (2001) also provides an interesting set of explanations
for
why it is necessary to recognize the evolutionary aspect of
organiza-
tional transformations. I have extended them to operate within
the
context of ROD, as follows:
Variation : Defined as “change from current routines and
compe-
tencies and change in organizational forms” (Aldrich, 2001,
p. 22). Technology provides perhaps the greatest amount of
variation in routines and thereby establishes the need for
something to manage it: ROD. The higher the frequency of
variation, the greater the chance that organizational transfor-
mation can occur. Variation is directly correlated to cultural
assimilation.
144 INFORMATION TECHNOLOGY
Selection : This is the process of determining whether to use a
technology variation. Selections can be affected by external
(outside the organization) and internal (inside the organi-
zation) factors, such as changes in market segments or new
business missions, respectively. The process of selection can be
related to the strategic integration component of ROD.
Retention : Selected variations are retained or preserved by the
organization. Retention is a key way of validating whether
organizational transformation has occurred. As Aldrich
states: “Transformations are completed when knowledge
required for reproducing the new form is embodied in a com-
munity of practice” (p. 171).
Because of the importance of knowledge creation as the basis of
transformation, communities of practice are the fundamental
struc-
tures of organizational learning to support organizational
transforma-
tion. Aldrich (2001) also goes beyond learning; he includes
policies,
programs, and networks as parts of the organizational
transformative
process. Figure 6.2 shows Aldrich’ s evolutionary process and
its rela-
tionship to ROD components.
Thus, we see from Figure 6.2 the relationships between the pro-
cesses of creating organizational transformation, the stages
required
to reach it, the ROD components in each stage, and the
correspond-
ing organizational learning method that is needed. Notice that
the
mapping of organizational learning methods onto Aldrich’ s
(2001)
scheme for organizational transformation can be related to the
ROD
arc. It shows us that as we get closer to retention,
organizational learn-
ing evolves from an individual technique to a
system/organizational
learning perspective. Aldrich’ s model is consistent with my
driver-
versus-supporter concept. He notes, “When the new form
becomes
a taken-for-granted aspect of every day life in the organization,
its
legitimacy is assumed” (p. 175).
Hence, the assimilation of new technologies cannot be consid-
ered transformative until it behaves as a supporter. Only then
can we
determine that the technology has changed organizational biases
and
norms. Representing the driver and supporter life cycle to
include this
important relationship is shown in Figure 6.3.
145orGAnIzAtIonAl trAnsForMAtIon
Technology
Variation
Strategic integration–
assess value of
technology
Cultural assimilation–
assess extent of what
to implement and
determine effects on
structure
Strategic integration–
determine which
technologies best fit
corporate needs and
provide highest ROI
Corresponding organizational learning methods
Individual
reflective
practices
Group-based
reflective
practices
Social discourse
using
communities
of practice
Communities of
practice and
knowledge
management
Validation of
organizational
transformation–
technology has provided
strategic outcomes and
modified structures
and processes
Selection
Retention
Figure 6.2 Stages of organizational transformation and ROD.
Individual
reflective practice
Group-based
reflective
practice
Communities
of practice
Knowledge
management
Organizational
transformation
Mini loop technology enhancementsTechnology
driver
Evaluation
cycle
Driver
maturation
Support
status
Replacement or
outsource
Economies
of scale
Figure 6.3 Organizational transformation in the driver-to-
supporter life cycle.
146 INFORMATION TECHNOLOGY
Methods of Ongoing Evaluation
If we define organizational transformation as the retention of
knowl-
edge within the body of communities of practice, the question to
be
answered is how this retention actually is determined in
practice.
The possibility often occurs that transformations are partial or
in
some phase of completion. This would mean that the
transformation
is incomplete or needs to continue along some phase of
approach.
Indeed, cultural assimilation does not occur immediately, but
rather,
over periods of transition. Much of the literature on
organizational
transformation does not address the practical aspects of
evaluation
from this perspective. This lack of information is particularly
prob-
lematic with respect to technology, since so much of how
technology
is implemented relates to phased steps that rarely happen in one
major
event. Thus, it is important to have some method of ongoing
evalua-
tion to determine the extent of transformation that has occurred
and
which organizational learning methods need to be applied to
help
continue the process toward complete transformation.
Aldrich’ s (2001) retention can also be misleading. We know
that
organizational transformation is an ongoing process, especially
as
advocated in ROD. It is probable that transformations continue
and
move from one aspect of importance to another, so a completed
trans-
formation may never exist. Another way of viewing this concept
is to
treat transformations as event milestones. Individuals and
communi-
ties of practice are able to track where they are in the learning
process.
It also fits into the phased approach of technology
implementation.
Furthermore, the notion of phases allows for integration of
organiza-
tional transformation concepts with stage and development
theories.
With the acceptance of this concept, there needs to be a method
or
model that can help organizations define and track such phases
of
transformation. Such a model would also allow for mapping
outcomes
onto targeted business strategies. Another way of understanding
the
importance of validating organizational transformation is to
recognize
its uniqueness, since most companies fail to execute their
strategies.
The method that can be applied to the validation of
organizational
transformation is a management tool called the balanced
scorecard.
The balanced scorecard was introduced by Kaplan and Norton
(2001)
in the early 1990s as a tool to solve measurement problems. The
ability
147orGAnIzAtIonAl trAnsForMAtIon
of an organization to develop and operationalize its intangible
assets
has become more and more a critical component for success. As
I
have already expressed regarding the work of Lucas (1999),
financial
measurement may not be capable of capturing all IT value. This
is
particularly true in knowledge-based theories. The balanced
score-
card can be used as a solution for measuring outcomes that are
not
always financial and tangible. Furthermore, the balanced
scorecard
is a “living” document that can be modified as certain
objectives or
measurements require change. This is a critical advantage
because, as
I have demonstrated, technology projects often change in scope
and in
objectives as a result of internal and external factions.
The ultimate value, then, of the balanced scorecard, in this con-
text, is to provide a means for evaluating transformation not
only for
measuring completion against set targets but also for defining
how
expected transformations map onto the strategic objectives of
the
organization. In effect, it is the ability of the organization to
execute
its strategy. Before explaining the details of how a balanced
scorecard
can be applied specifically to ROD, I offer Figure 6.4, which
shows
Mobilize change
through executive
leadership
Balanced
Translate the
strategy to
operational terms
Scorecard
Make strategy a
continual processStrategy
Align
organizational to
the strategy
Make strategy
everyone’s job
Figure 6.4 Balanced scorecard. (From Kaplan, R.S., & Norton,
D.P., The Strategy-Focused
Organization , Harvard University Press, Cambridge, MA,
2001.)
148 INFORMATION TECHNOLOGY
exactly where the scorecard fits into the overall picture of
transition-
ing emerging technologies into concrete strategic benefit.
The generic objectives of a balanced scorecard are designed to
cre-
ate a strategy-focused organization. Thus, all of the objectives
and
measurements should be derived from the vision and strategy of
the
organization (Kaplan & Norton, 2001). These measurements are
based on the fundamental principles of any strategically focused
orga-
nization and on alignment and focus. Kaplan and Norton define
these
principles as the core of the balanced scorecard:
1. Translate the strategy to operational terms : This principle
includes two major components that allow an organization to
define its strategy from a cause-and-effect perspective using
a strategy map and scorecard. Thus, the strategy map and its
corresponding balanced scorecard provide the basic measure-
ment system.
2. Align the organization to the strategy: Kaplan and Norton
define this principle as favoring synergies among organiza-
tional departments that allow communities of practice to have
a shared view, and common understanding of their roles.
3. Make strategy everyone’ s everyday job: This principle
supports
the notion of a learning organization that requires everyone’ s
participation, from the chief executive officer (CEO) to cleri-
cal levels. To accomplish this mission, the members of the
organization must be aware of business strategy; individuals
may need “personal” scorecards and a matching reward sys-
tem for accomplishing the strategy.
4. Make strategy a continual process: This process requires the
linking of important, yet fundamental, components, includ-
ing organizational learning, budgeting, management reviews,
and a process of adaptation. Much of this principle falls into
the areas of learning organization theories that link learning
and strategy in ongoing perpetual cycles.
5. Mobilize change through executive leadership: This
principle
stresses the need for a strategy-focused organization that
incorporates the involvement of senior management and can
mobilize the organization and provide sponsorship to the
overall process.
149orGAnIzAtIonAl trAnsForMAtIon
Using the core balanced scorecard schematic, I have modified it
to
operate with technology and ROD, as shown in Figure 6.5.
1. Evaluation of technology: The first step is to have an
infrastruc-
ture that can determine how technology fits into a specific
strategy. Once this is targeted, the evaluation team needs to
define it in operational terms. This principle requires the stra-
tegic integration component of ROD.
2. Align technology with business strategy : Once technology is
evaluated, it must be integrated into the business strategy.
This involves ascertaining whether the addition of technology
will change the current business strategy. This principle is also
connected to the strategic integration component of ROD.
3. Make technology projects part of communities of practice :
Affected
communities need to be strategically aware of the project.
Organizational structures must determine how they distrib-
ute rewards and objectives across departments. This principle
requires the cultural assimilation component of ROD.
4. Phased-in technology implementation : Short- and long-term
project objectives are based on driver and supporter life cycles.
Executive
interfaces
Balanced
Evaluation of
technology
Scorecard
Phase technology
implementation
Responsive
org
dynamism
strategy
Align
technology
with business
strategy
Make technology
project part of
communities of
practice
Figure 6.5 Balanced scorecard ROD.
150 INFORMATION TECHNOLOGY
This will allow organizational transformation phases to be
linked to implementation milestones. This principle maps
onto the cultural assimilation component of ROD.
5. Executive interface : CEO and senior managers act as
executive
sponsors and project champions. Communities of practice
and their common “threads” need to be defined, including
middle management and operations personnel, so that top-
down, middle-up-down, and bottom-up information flows
can occur.
The balanced scorecard ultimately provides a framework to
view
strategy from four different measures:
1. Financial : ROI and risk continue to be important
components
of strategic evaluation.
2. Customer : This involves the strategic part of how to create
value for the customers of the organization.
3. Internal business processes : This relates to the business pro-
cesses that provide both customer satisfaction and operational
efficiency.
4. Learning and growth : This encompasses the priorities and
infrastructure to support organizational transformation
through ROD.
The generic balanced scorecard framework needs to be extended
to
address technology and ROD. I propose the following
adjustments:
1. Financial : Requires the inclusion of indirect benefits from
technology, particularly as Lucas (1999) specifies, in nonmon-
etary methods of evaluating ROI. Risk must also be factored
in, based on specific issues for each technology project.
2. Customer : Technology-based products are integrated with
customer needs and provide direct customer package inter-
faces. Further, web systems that use the Internet are depen-
dent on consumer use. As such, technology can modify
organizational strategy because of its direct effect on the cus-
tomer interface.
3. Internal business processes : Technology requires business
pro-
cess reengineering (BPR), which is the process of reevaluat-
ing existing internal norms and behaviors before designing a
151orGAnIzAtIonAl trAnsForMAtIon
new system. This new evaluation process addresses customers,
operational efficiencies, and cost.
4. Learning and growth : Organizational learning techniques,
under the umbrella of ROD, need to be applied on an ongo-
ing and evolutionary basis. Progress needs to be linked to the
ROD arc.
The major portion of the balanced scorecard strategy is in its
initial
design; that is, in translating the strategy or, as in the ROD
scorecard,
the evaluation of technology. During this phase, a strategy map
and
actual balanced scorecards are created. This process should
begin by
designing a balanced scorecard that articulates the business
strategy.
Remember, every organization needs to build a strategy that is
unique
and based on its evaluation of the external and internal situation
(Olve
et al., 2003). To clarify the definition of this strategy, it is
easier to
consider drawing the scorecard initially in the form of a
strategy map.
A generic strategy map essentially defines the components of
each
perspective, showing specific strategies within each one, as
shown in
Figure 6.6.
Perspective:
Financial
Customer
Process
Learning and
growth
Improve
technology
Improve staff
skills
Establish new
markets
Increase
customer
service
Increase
efficiency
More satisfied
customers
Improve
profitability
Stronger
finances
Increase
customer
base
Figure 6.6 Strategy map. (From Olve, N., et al., Making
Scorecards Actionable: Balancing
Strategy and Control , Wiley, New York, 2003.)
152 INFORMATION TECHNOLOGY
We can apply the generic strategy map to an actual case study,
Ravell phase I, as shown in Figure 6.7.
Recall that Ravell phase I created a learning organization using
reflective practices and action science. Much of the
organization
transformation at Ravell was accelerated by a major event— the
relo-
cation of the company. The move was part of a strategic
decision for
the organization, specifically the economies of scale for rental
expense
and an opportunity to retire old computers and replace them
with
a much needed state-of-the-art network. Furthermore, there was
a
grave need to replace old legacy applications that were
incapable of
operating on the new equipment and were also not providing the
competitive advantage that the company sought. In using the
strategy
map, a balanced scorecard can be developed containing the
specific
outcomes to achieve the overall mission. The balanced
scorecard is
shown in Figure 6.8.
The Ravell balanced scorecard has an additional column that
defines
the expected organizational transformation from ROD. This
model
addresses the issue of whether a change is truly a
transformation. This
method also provides a systematic process to forecast,
understand, and
Perspective:
Financial
Users
Process
Learning
and growth
New technology
products
New ways of
staff interaction
Establish
new organization
structure
Improved
systems
Provide accurate
and timely
information
More satisfied
users
Improve return
on project
investments
Reduce
technology
overhead
Increase user
IT support
Figure 6.7 Technology strategy map.
153orGAnIzAtIonAl trAnsForMAtIon
present what technology initiatives will ultimately change in the
stra-
tegic integration and cultural assimilation components of ROD.
There are two other important factors embedded in this
modified
balanced scorecard technique. First, scorecards can be designed
at
varying levels of detail. Thus, two more balanced scorecards
could
Strategy map
perspective
Financial
Measureable
outcomes Strategic objectives
Organizational
transformation
Combine IT expenses with
relocation and capitalize
entire expense
Combination of expenses
requires formation of new
communities of practice,
which includes finance,
engineering, and IT
Improve
returns on
project
investments
Reduce
technology
overhead
costs
More
satisfied
users
Increase
user IT
support
Users
Process
Learning and
growth
Provide
accurate
and timely
information
Improved
systems
New
technology
products
New ways
of staff
interaction
structure
Establish
new
organization
Integrate new telephone
system with computer
network expenses
Leverage engineering
and communications
expenses with technology
Retire old equipment
from financial statements
Increase access to
central applications
Integrate IT within other
departments to improve
dynamic customer
support requirements
Provide new products to
replace old e-mail
system and make
standard applications
available to all users
Establish help desk
personnel
Process of supporting users
requires IT staff to embrace
reflective practices. User
relationship formed through
new communities of practice
and cultural assimilation
with user community
New culture at Ravell
established
Startegic integration occurs
through increased discourse
and language among
communities of practice
engaged in making
relocation successful. New
knowledge created and
needs knowledge
management
Improve decision support
for improved reporting
and strategic marketing
Upgrade new internal
systems, including
customer relationship
management (CRM),
general ledger, and
rights and royalties
Investigate new
voice-messaging
technology to improve
integration of e-mail and
telephone systems
Physically relocate IT
staff across departments
Modify IT reporting
structure with “dotted
line” to business units
IT becomes more critically
reflective, understands value
of their participation with
learning organization. IT
staff seeks to know less and
understands view of the
“other”
·
·
·
·
·
·
·
·
· ·
·
·
·
·
·
·
·
·
·
·
·
·
Figure 6.8 Ravell phase I balanced scorecard.
154 INFORMATION TECHNOLOGY
be developed that reflect the organizational transformations that
occurred in Ravell phases II and III, or the three phases could
be summarized as one large balanced scorecard or some
combina-
tion of summary and detail together. Second, the scorecard can
be modified to reflect unexpected changes during implementa-
tion of a technology. These changes could be related to a shift-
ing mission statement or to external changes in the market that
require a change in business strategy. Most important, though,
are the expected outcomes and transformations that occur during
the course of a project. Essentially, it is difficult to predict how
organizations will actually react to changes during an IT project
and transform.
The balanced scorecard provides a checklist and tracking system
that is structured and sustainable— but not perfect. Indeed,
many
of the outcomes from the three phases of Ravell were
unexpected or
certainly not exactly what I expected. The salient issue here is
that it
allows an organization to understand when such unexpected
changes
have occurred. When this does happen, organizations need to
have
an infrastructure and a structured system to examine what a
change
in their mission, strategy, or expectations means to all of the
com-
ponents of the project. This can be described as a “rippling
effect,” in
which one change can instigate others, affecting many other
parts of
the whole. Thus, the balanced scorecard, particularly using a
strat-
egy map, allows practitioners to reconcile how changes will
affect the
entire plan.
Another important component of the balanced scorecard, and
the
reason why I use it as the measurement model for outcomes, is
its
applicability to organizational learning. In particular, the
learning
and growth perspective shows how the balanced scorecard
ensures
that learning and strategy are linked in organizational
development
efforts.
Implementing balanced scorecards is another critical part of the
project— who does the work, what the roles are, and who has
the
responsibility for operating the scorecards? While many
companies
use consultants to guide them, it is important to recognize that
bal-
anced scorecards reflect the unique features and functions of the
com-
pany. As such, the rank and file need to be involved with the
design
and support of balanced scorecards.
155orGAnIzAtIonAl trAnsForMAtIon
Every business unit that has a scorecard needs to have someone
assigned to it, someone accountable for it. A special task force
may
often be required to launch the training for staff and to agree on
how
the scorecard should be designed and supported. It is advisable
that the
scorecard be implemented using some application software and
made
available on an Internet network. This provides a number of
benefits:
It reduces paper or local files that might get lost or not be
secured, allows
for easy “roll-up” of multiple scorecards, to a summary level,
and access
via the Internet (using an external secured hookup) allows the
scorecard
to be maintained from multiple locations. This is particularly
attractive
for staff members and management individuals who travel.
According to Olve et al. (2003), there are four primary
responsi-
bilities that can support balanced scorecards:
1. Business stakeholders : These are typically senior managers
who are responsible for the group that is using the score-
card. These individuals are advocates of using scorecards and
require compliance if deemed necessary. Stakeholders use
scorecards to help them manage the life cycle of a technology
implementation.
2. Scorecard designers : These individuals are responsible for
the
“look and feel” of the scorecard as well as its content. To some
extent, the designers set standards for appearance, text, and
terminology. In certain situations, the scorecard designers
have dual roles as project managers. Their use of scorecards
helps them understand how the technology will operate.
3. Information providers : These people collect, measure, and
report on the data in the balanced scorecard. This function
can be implemented with personnel on the business unit level
or from a central services department. Reporting informa-
tion often requires support from IT staff, so it makes sense to
have someone from IT handle this responsibility. Information
providers use the scorecard to perform the measurement of
project performance and the handling of data.
4. Learning pilots : These individuals link the scorecard to
organi-
zational learning. This is particularly important when measur-
ing organizational transformation and individual development.
156 INFORMATION TECHNOLOGY
The size and complexity of an organization will ultimately
deter-
mine the exact configuration of roles and responsibilities that
are
needed to implement balanced scorecards. Perhaps the most
appli-
cable variables are:
Competence : Having individuals who are knowledgeable about
the business and its processes, as well as knowledgeable
about IT.
Availability : Individuals must be made available and appropri-
ately accommodated in the budget. Balanced scorecards that
do not have sufficient staffing will fail.
Executive management support: As with most technology proj-
ects, there needs to be a project advocate at the executive level.
Enthusiasm : Implementation of balanced scorecards requires a
certain energy and excitement level from the staff and their
management. This is one of those intangible, yet invaluable,
variables.
Balanced Scorecards and Discourse
In Chapter 4, I discussed the importance of language and
discourse
in organizational learning. Balanced scorecards require ongoing
dia-
logues that need to occur at various levels and between different
com-
munities of practice. Therefore, it is important to integrate
language
and discourse and communities of practice theory with balanced
scorecard strategy. The target areas are as follows:
• Developing of strategy maps
• Validating links across balanced scorecard perspectives
• Setting milestones
• Analyzing results
• Evaluating organizational transformation
Figure 6.9 indicates a community of practice relationship that
exists at a company. Each of these three levels was connected
by a
concept I called “common threads of communication.” This
model can
be extended to include the balanced scorecard.
The first level of discourse occurs at the executive community
of practice. The executive management team needs to agree on
the
157orGAnIzAtIonAl trAnsForMAtIon
specific business strategy that will be used as the basis of the
mis-
sion statement for the balanced scorecard. This requires
conversations
and meetings that engage the CEO, executive board members
(when
deemed applicable), and executive managers, like the chief
operat-
ing officer (COO), chief financial officer (CFO), chief
information
officer (CIO), and so on. Each of these individuals needs to
represent
his or her specific area of responsibility and influence from an
execu-
tive perspective. The important concept is that the balanced
scorecard
mission and strategy should be a shared vision and
responsibility for
the executive management team as a whole. To accomplish this
task,
the executive team needs to be instructed on how the balanced
score-
card operates and on its potential for accomplishing
organizational
transformation that leads to strategic performance. Ultimately,
the
discourse must lead to a discussion of the four balanced
scorecard
perspectives: financial, customer, process, and learning and
growth.
From a middle management level, the balanced scorecard allows
for a measurable model to be used as the basis of discourse with
Executive community of practice
CEO
Americas
Executive
board Consultants
CEO
AmericasNew ideas
and
adjustments
Senior
management
Operations
Middle
management
Middle
management
Adjustments as a
result of discourse
with operations
community
Operations management community of practice
Implementation community of practice
Figure 6.9 Community of practice “threads.”
158 INFORMATION TECHNOLOGY
executives. For example, the strategy map can be the vehicle for
conducting meaningful conversations on how to transform
execu-
tive-level thinking and meaning into a more operationally
focused
strategy. Furthermore, the scorecard outlines the intended
outcomes
for strategy and organizational learning and transformation.
The concept of using the balanced scorecard as a method with
which to balance thinking and meaning across communities of
prac-
tice extends to the operational level as well. Indeed, the
challenge of
making the transition from thinking and meaning at the
executive
level of operations is complicated, especially since these
communi-
ties rarely speak the same language. The measurable outcomes
section
of the scorecard provides the concrete layer of outcomes that
opera-
tions staff tend to embrace. At the same time, this section
provides
corresponding strategic impact and organizational changes
needed to
satisfy business strategies set by management.
An alternative method of fostering the need forms of discourse
is to
create multiple-tiered balanced scorecards designed to fit the
language
of each community of practice, as shown in Figure 6.10. The
diagram
in Figure 6.10 shows that each community can maintain its own
lan-
guage and methods while establishing “common threads” to
foster a
transition of thinking and meaning between it and other
communi-
ties. The common threads from this perspective look at
communica-
tion at the organizational/group level, as opposed to the
individual
level. This relates to my discussion in Chapter 4, which
identified
individual methods of improving personal learning, and
development
within the organization. This suggests that each balanced
scorecard
must embrace language that is common to any two communities
to
establish a working and learning relationship— in fact, this
common
language is the relationship.
Knowledge Creation, Culture, and Strategy
Balanced scorecards have been used as a measurement of
knowledge
creation. Knowledge creation, especially in technology, has
signifi-
cant meaning, specifically in the relationship between data and
infor-
mation. Understanding the sequence between these two is
interesting.
We know that organizations, through their utilization of
software
applications, inevitably store data in file systems called
databases.
159orGAnIzAtIonAl trAnsForMAtIon
The information stored in these databases can be accessed by
many
different software applications across the organization.
Accessing
multiple databases and integrating them across business units
creates
further valuable information. Indeed, the definition of
information
is “organized data.” These organized data are usually stored in
data
infrastructures called data warehouses or data marts, where the
infor-
mation can be queried and reported on to assist managers in
their
decision-making processes. We see, in the Ravell balanced
scorecard,
that decision-support systems were actually one of the strategic
objec-
tives for the process perspective.
Organization-level balanced scorecard
Common
discourse threads
Executive-level
balanced scorecard
Management-level
balanced scorecard
Operational-level
balanced scorecard
Common
discourse threads
Common
discourse threads
Figure 6.10 Community of practice “common threads.”
160 INFORMATION TECHNOLOGY
Unfortunately, information does not ensure new knowledge cre-
ation. New knowledge can only be created by individuals who
evolve
in their roles and responsibilities. Individuals, by participating
in
groups and communities of practice, can foster the creation of
new
organizational knowledge. However, to change or evolve one’ s
behav-
ior, there must be individual or organizational transformation.
This
means that knowledge is linked to organizational
transformation. The
process to institutionalize organizational transformation is
dependent
on management interventions at various levels. Management
needs to
concentrate on knowledge management and change management
and
to act as a catalyst and advocate for the successful
implementation of
organizational learning techniques. These techniques are
necessary to
address the unique needs of ROD.
Ultimately, the process must be linked to business strategy.
ROD
changes the culture of an organization, through the process of
cul-
tural assimilation. Thus, there is an ongoing need to reestablish
align-
ment between culture and strategy, with culture altered to fit
new
strategy, or strategy first, then culture (Pietersen, 2002). We see
this
as a recurring theme, particularly from the case studies, that
busi-
ness strategy must drive organizational behavior, even when
technol-
ogy acts as a dynamic variable. Pietersen identifies what he
called six
myths of corporate culture:
1. Corporate culture is vague and mysterious.
2. Corporate culture and strategy are separate and distinct
things.
3. The first step in reducing our company should be defining
our
values.
4. Culture cannot be measured or rewarded.
5. Our leaders must communicate what our culture is.
6. Our culture is the one constant that never changes.
Resulting from these myths, Pietersen (2002) establishes four
basic
rules of success for creating a starting point for the balance
between
culture and strategy:
1. Company values should directly support strategic priorities.
2. They should be described as behaviors.
3. They should be simple and specific.
161orGAnIzAtIonAl trAnsForMAtIon
4. They should be arrived at through a process of enrollment
(motivation).
Once business synergy is created, sustaining the relationship
becomes an ongoing challenge. According to Pietersen (2002),
this
must be accomplished by continual alignment, measurement,
set-
ting examples, and a reward system for desired behaviors. To
lead
change, organizations must create compelling statements of the
case
for change, communicate constantly and honestly with their
employ-
ees, maximize participation, remove ongoing resistance in the
ranks,
and generate some wins. The balanced scorecard system
provides the
mechanism to address the culture– strategy relationship while
main-
taining an important link to organizational learning and ROD.
These
linkages are critical because of the behavior of technology.
Sustaining
the relationship between culture and strategy is simply more
critical
with technology as the variable of change.
Ultimately, the importance of the balanced scorecard is that it
forces an understanding that everything in an organization is
con-
nected to some form of business strategy. Strategy calls for
change,
which requires organizational transformation.
Mission : To accelerate investment in technology during the
reloca-
tion of the company for reasons of economies of scale and
competitive
advantage.
http://taylorandfrancis.com
163
7
viRTual Teams anD
ouTsouRCing
Introduction
Much has been written and published about virtual teams. Most
define virtual teams as those that are geographically dispersed,
although others state that virtual teams are those that primarily
inter-
act electronically. Technology has been the main driver of the
growth
of virtual teams. In fact, technology organizations, due mostly
to the
advent of competitive outsourcing abroad, have pushed
information
technology (IT) teams to learn how to manage across
geographical
locations, in such countries as India, China, Brazil, Ireland, and
many
others. These countries are not only physically remote but also
present
barriers of culture and language. These barriers often impede
commu-
nications about project status, and affect the likelihood of
delivering a
project on time, and within forecasted budgets.
Despite these major challenges, outsourcing remains attractive
due
to the associated cost savings and talent supply. These two
advantages
are closely associated. Consider the migration of IT talent that
began
with the growth of India in providing cheap and educated talent.
The
promise of cost savings caused many IT development
departments to
begin using more India-based firms. The ensuing decline in IT
jobs
in the United States resulted in fewer students entering IT
curricu-
lums at U.S. universities for fear that they would not be able to
find
work. Thus, began a cycle of lost jobs in the United States and
further
demand for talent abroad. Now, technology organizations are
faced
with the fact that they must learn to manage virtually because
the tal-
ent they need is far away.
From an IT perspective, successful outsourcing depends on
effec-
tive use of virtual teams. However, the converse is not true; that
is,
virtual teams do not necessarily imply outsourcing. Virtual
teams can
164 INFORMATION TECHNOLOGY
be made up of workers anywhere, even those in the United
States
who are working from a distance rather than reporting to an
office
for work. A growing number of employees in the United States
want
more personal flexibility; in response, many companies are
allow-
ing employees to work from home more often— and have found
the
experience most productive. This type of virtual team
management
generally follows a hybrid model, with employees working at
home
most of the time but reporting to the office for critical
meetings; an
arrangement that dramatically helps with communication and
allows
management to have quality checkpoints.
This chapter addresses virtual teams working both within the
United States and on an outsource basis and provides readers
with
an understanding of when and how to consider outsource
partners.
Chapter topics include management considerations, dealing with
multiple locations, contract administration, and in-house
alternatives.
Most important, this chapter examines organizational learning
as a
critical component of success in using virtual teams. Although
the
advent of virtual teams creates another level of complexity for
design-
ing and maintaining learning organizations, organizational
learning
approaches represent a formidable solution to the growing
dilemma of
how teams work, especially those that are 100% virtual.
Most failures in virtual management are caused by poor
communi-
cation. From an organizational learning perspective, we would
define
this as differences in meaning making— stemming mostly from
cul-
tural differences in the meaning of words and differing
behavioral
norms. There is also no question that time zone differences play
a role
in certain malfunctions of teams, but the core issues remain
commu-
nication related.
As stated, concerning the Ravell case study, cultural
transformation
is slow to occur and often happens in small intervals. In many
virtual
team settings, team members may never do more than
communicate
via e-mail. As an example, I had a client who was outsourcing
produc-
tion in China. One day, they received an e-mail stating, “ We
cannot
do business with you.” Of course, the management team was
confused
and worried, seeking to understand why the business
arrangement
was ending without any formal discussions of the problem. A
trans-
lator in China was hired to help clarify the dilemma. As it
turned
out, the statement was meant to suggest that the company
needed
165vIrtuAl teAMs And outsourCInG
to provide more business— more work, that is. The way the
Chinese
communicated that need was different from the Western
interpre-
tation. This is just a small example of what can happen without
a
well-thought-out organizational learning scheme. That is,
individuals
need to develop more reflective abilities to comprehend the
meaning
of words before they take action, especially in virtual
environments
across multiple cultures. The development of such abilities—
the
continual need for organizations to respond effectively to
dynamic
changes, brought about by technology, in this case, e-mail— is
consis-
tent with my theory of responsive organizational dynamism
(ROD).
The e-mail established a new dynamic of communication. Think
how
often specifications and product requirements are changing and
need
virtual teams to somehow come together and agree on how to
get the
work done— or think they agree.
Prior research and case studies provide tools and procedures as
ways
to improve productivity and quality of virtual team operations.
While
such processes and methodologies are helpful, they will not
necessar-
ily ensure the successful outcomes that IT operations seek
unless they
also change. Specifically, new processes alone are not sufficient
or a
substitute for learning how to better communicate and make
mean-
ing in a virtual context. Individuals must learn how to develop
new
behaviors when working virtually. We must also remember that
vir-
tual team operations are not limited to IT staffs. Business users
often
need to be involved as they would in any project, particularly
when
users are needed to validate requirements and test the product.
Status of Virtual Teams
The consensus tells us that virtual teams render results.
According to
Bazarova and Walther (2009), “ Virtual groups whose members
com-
municate primarily or entirely via email, computer
conferencing, chat,
or voice— have become a common feature of twenty-first
century
organizations” (p. 252). Lipnack and Stamps (2000) state that
virtual
teams will become the accepted way to work and will likely
reshape
the work world. While this prediction seems accurate, there has
also
been evidence of negative attribution or judgment about
problems that
arise in virtual team performance. Thus, it is important to
understand
how virtual teams need to be managed and how realistic
expectations
166 INFORMATION TECHNOLOGY
of such teams might be formed. So, while organizations
understand
the need for virtual teams, they are not necessarily happy with
proj-
ect results. Most of the disappointment relates to a lack of
individual
development that helps change the mindset of how people need
to
communicate, coupled with updated processes.
Management Considerations
Attribution theory “ describes how people typically generate
explana-
tions for outcomes and actions— their own and others”
(Bazarova &
Walther, 2009, p. 153). This theory explains certain behavior
patterns
that have manifested during dysfunctional problems occurring
in man-
aging virtual teams. Virtual teams are especially vulnerable to
such
problems because their limited interactions can lead to members
not
having accurate information about one another. Members of
virtual
teams can easily develop perceptions of each other’ s motives
that are
inaccurate or distorted by differing cultural norms. Research
also shows
us that virtual team members typically attribute failure to the
external
factors and successes to internal factors. Problems are blamed
on the
virtual or outside members for not being available or
accountable to the
physical community. The successes then tend to reinforce that
virtual
teams are problematic because of their very nature. This then
estab-
lishes the dilemma of the use of virtual teams and
organizations— its
use will continue to increase and dominate workplace structures
and
yet will present challenges to organizations that do not want to
change.
The lack of support to change will be substantiated during
failures in
expected outcomes. Some of the failures, however, can and
should be
attributable to distance. As Olson and Olson (2000) state: “
Distance
will persist as an important element of human experience” (p.
172). So,
despite the advent of technology, it is important not to ignore
the social
needs that teams need to have to be effective.
Dealing with Multiple Locations
Perhaps the greatest difficulty in implementing virtual teams is
the
reality that they span multiple locations. More often, these
locations
can be in different time zones and within multiple cultures. To
prop-
erly understand the complexity of interactions, it makes sense to
revisit
167vIrtuAl teAMs And outsourCInG
the organizational learning tools discussed in prior chapters.
Perhaps
another way of viewing virtual teams and their effects on
organiza-
tion learning is to perceive it as another dimension— a
dimension that
is similar to multiple layers in a spreadsheet. This notion means
that
virtual teams do not upset the prior relations between
technology as
a variable from a two-dimensional perspective, rather in the
depth
of how it affects this relationship in a third dimension. Figure
7.1
reflects how this dimension should be perceived.
In other words, the study of virtual teams should be viewed as
a subset of the study of organizations. When we talk about
work-
place activities, we need to address issues at the component
level. In
this example, the components are the physical organization and
the
Technology as an
independent
variable
Creates
Virtual organizational
dynamism dimension
Physical organizational
dynamism dimension
Virtual acceleration
dimension
Strategic
integration
Cultural
assimilation
Total
organizational
dynamism
Acceleration of events that
require different
infrastructures and
organizational processes
Virtual cultural
assimilation dimension
Virtual strategic
integration dimension
Figure 7.1 The three-dimensional ROD.
168 INFORMATION TECHNOLOGY
virtual organization. The two together make up the superset or
the
entire organization. To be fruitful, any discussion of virtual
organiza-
tions must be grounded in the context of the entire organization
and
address the complete topic of workplace learning and
transformation.
In Chapter 4, I discussed organizational learning in
communities of
practice (COP). In this section, I expand that discussion to
include
virtual organizational structures.
The growing use of virtual teams may facilitate the complete
inte-
gration of IT and non-IT workers. The ability to connect from
various
locations using technology itself has the potential to expand
COP.
But, as discussed in Chapter 4, it also presents new challenges,
most
of which relate to the transient nature of members, who tend to
par-
ticipate on more of a subject or transactional basis, rather than
being
permanent members of a group. Table 7.1 reflects some of the
key
differences between physical and virtual teams.
There has been much discussion about whether every employee
is
suited to perform effectively in a virtual community. The
consensus is
that effective virtual team members need to be self-motivated,
able to
work independently, and able to communicate clearly and in a
posi-
tive way. However, given that many workers lack some or all of
these
skills, it seems impractical to declare that workers who do not
meet
these criteria should be denied the opportunity to work in
virtual
Table 7.1 Operating Differences between Traditional and
Virtual Teams
TRADITIONAL OR PHYSICAL TEAMS VIRTUAL TEAMS
Teams tend to have fixed participation and
members.
Membership shifts based on topics and needs.
Members tend to be from the same
organization.
Team members can include people from outside
the organization (clients and collaborators).
Team members are 100% dedicated. Members are assigned to
multiple teams.
Team members are collocated geographically
and by organization.
Team members are distributed geographically and
by organization.
Teams tend to have a fixed term of
membership; that is, start and stop dates.
Teams are reconfigured dynamically and may
never terminate.
Teams tend to have one overall manager. Teams have multiple
reporting relationships with
different parts of the organization at different
times.
Teamwork is physical and practiced in
face-to-face interactions.
Teamwork is basically social.
Engagement is often during group events
and can often be hierarchical in nature.
Individual engagement is inseparable from
empowerment.
169vIrtuAl teAMs And outsourCInG
teams. A more productive approach might be to encourage
workers to
recognize that they must adapt to changing work environments
at the
risk of becoming marginal in their organizations.
To better understand this issue, I extended the COP matrix,
presented in Chapter 4, to include virtual team considerations in
Table 7.2.
Item 7 in Table 7.2 links the study of knowledge management
with
COP. Managing knowledge in virtual communities within an
orga-
nization has become associated directly with the ability of a
firm to
sustain competitive advantage. Indeed, Peddibhotla and
Subramani
(2008) state that “ virtual communities are not only recognized
as
important contributors to both the development of social
networks
among individuals but also towards individual performance and
firm
performance” (p. 229). However, technology-enabled facilities
and
support, while providing a repository for better documentation,
also
create challenges in maintaining such knowledge. The process
of how
information might become explicit has also dramatically
changed
with the advent of virtual team communications. For example,
much
technology-related documentation evolves from bottom-up
sources,
rather than the traditional top-down process. In effect, virtual
com-
munities share knowledge more on a peer-to-peer basis or
through
mutual consensus of the members. As a result, virtual
communities
have historically failed to meet expectations, particularly those
of
management, because managers tend to be uninvolved in
communi-
cation. While physical teams can meet with management more
often
before making decisions, virtual teams have no such contact
available.
To better understand the complexities of knowledge
management and
virtual teams, Sabherwal and Becerra-Fernandez (2005) expand
on
Nonaka’ s (1994) work on knowledge management, which
outlined
four modes of knowledge creation: externalization,
internalization,
combination, and socialization. Each of these modes is defined
and
discussed next.
Externalization
Externalization is the process of converting or translating tacit
knowl-
edge (undocumented knowledge) into explicit forms. The
problem with
this concept is whether individuals really understand what they
know
170 INFORMATION TECHNOLOGY
Table 7.2 Communities of Practice: Virtual Team Extensions
STEP
COMMUNITIES-OF-
PRACTICE STEP TECHNOLOGY EXTENSION VIRTUAL
EXTENSION
1 Understanding strategic
knowledge needs: What
knowledge is critical to
success.
Understanding how
technology affects
strategic knowledge and
what specific
technological knowledge
is critical to success.
Understanding how to
integrate multiple visions
of strategic knowledge and
where it can be found
across the organization.
2 Engaging practice
domains: Where people
form communities of
practice to engage in
and identify with.
Technology identifies
groups based on
business-related
benefits, requiring
domains to work together
toward measurable
results.
Virtual domains are more
dynamic and can be
formed for specific
purposes and then
reconfigured based on
practice needs of subjects
discussed.
3 Developing communities:
How to help key
communities reach their
full potential.
Technologies have life
cycles that require
communities to continue;
treats the life cycle as a
supporter for attaining
maturation and full
potential.
Communities can be
reallocated to participate
in multiple objectives.
Domains of discussion
have no limits to reach
organizational needs.
4 Working the boundaries:
How to link communities
to form broader learning
systems
Technology life cycles
require new boundaries
to be formed. This will
link other communities
that were previously
outside of discussions
and thus expand input
into technology
innovations.
Virtual abilities allow for
customer interfaces,
vendors, and other
interested parties to join
the community.
5 Fostering a sense of
belonging: How to
engage people’ s
identities and sense of
belonging.
The process of integrating
communities: IT and
other organizational
units will create new
evolving cultures that
foster belonging as well
as new social identities.
Communities establish
belonging in a virtual way.
Identities are established
more on content of
discussion than on
physical attributes of
members.
6 Running the business:
How to integrate
communities of practice
into running the
business of the
organization.
Cultural assimilation
provides new
organizational structures
that are necessary to
operate communities of
practice and to support
new technological
innovations.
The organization functions
more as a virtual
community or team, being
more agile to demands of
the business, and
interactions may not
always include all
members.
(Continued)
171vIrtuAl teAMs And outsourCInG
and how it might affect organizational knowledge. Virtual
communi-
ties have further challenges in that the repository of tacit
information
can be found in myriad storage facilities, namely, audit trails of
e-mail
communications. While Sabherwal and Becerra-Fernandez
(2005)
suggest that technology may indeed assist in providing the
infrastruc-
ture to access such information, the reality is that the challenge
is not
one of process but rather of thinking and doing. That is, it is
more a
process of unlearning existing processes of thinking and doing,
into
new modes of using knowledge that is abundantly available.
Internalization
Internalization is a reversal of externalization: It is the process
of
transferring explicit knowledge into tacit knowledge— or
individual-
ized learning. The individual thus makes the explicit process
into his
or her own stabilized thinking system so that it becomes
intuitive
in operation. The value of virtual team interactions is that they
can
provide more authentic evidence of why explicit knowledge is
valu-
able to the individual. Virtual systems simply can provide more
people
who find such knowledge useful, and such individuals, coming
from
a more peer relationship, can understand why their procedures
can be
internalized and become part of the self.
Combination
Combination allows individuals to integrate their physical
processes
with virtual requirements. The association, particularly in a
global
Table 7.2 (Continued) Communities of Practice: Virtual Team
Extensions
STEP
COMMUNITIES-OF-
PRACTICE STEP TECHNOLOGY EXTENSION VIRTUAL
EXTENSION
7 Applying, assessing,
reflecting, renewing: How
to deploy knowledge
strategy through waves
of organizational
transformation.
The active process of
dealing with multiple
new technologies that
accelerates the
deployment of knowledge
strategy. Emerging
technologies increase
the need for
organizational
transformation.
Virtual systems allow for
more knowledge strategy
because of the ability to
deploy information and
procedures. Tacit
knowledge is easier to
transform to explicit forms.
172 INFORMATION TECHNOLOGY
environment, allows virtual team members to integrate new
explicit
forms into their own, not by replacing their beliefs, but rather,
by
establishing new hybrid knowledge systems. This is particularly
advantageous across multiple cultures and business systems in
coun-
tries that hold different and, possibly complementary,
knowledge
about how things can get done. Nonaka’ s (1994) concept of
combina-
tion requires participants in the community to be at later stages
of
multiplicity— suggesting that this form can only be successful
among
certain levels or positions of learners.
Socialization
As Nonaka (1994) notes, individuals learn by observation,
imitation,
and practice. The very expansion of conversations via
technology
can provide a social network in which individuals can learn
simply
through discourse. Discourse, as I discussed in Chapter 4, is
the basis
of successful implementations of COP. The challenge in virtual
social
networks is the difficulty participants have in assessing the
authentic-
ity of the information provided by those in the community.
The four modes of knowledge management formulated by
Nonaka
(1994) need to be expanded to embrace the complexities of
virtual
team COPs. Most of the adjustments are predicated on the team’
s
ability to deal with the three fundamental factors of ROD that I
introduced in this book; that is, acceleration, dynamic, and
unpre-
dictability. The application of these three factors of ROD to
Nonaka’ s
four modes is discussed next.
Externalization Dynamism
The externalization mode must be dynamic and ongoing with
little
ability to forecast the longevity of any tacit-to-explicit
formulation.
In other words, tacit-to-explicit change may occur daily but may
only operate effectively for a shorter period due to additional
changes
brought on by technology dynamism. This means that members
in
a community must continually challenge themselves to revisit
pre-
vious tacit processes and acknowledge the need to reformulate
their
tacit systems. Thus, transformation from tacit knowledge to
explicit
knowledge can be a daily challenge for COP virtual
organizations.
173vIrtuAl teAMs And outsourCInG
Internalization Dynamism
Careful reflection on this process of internalizing explicit forms
must
be done. Given the differences in cultures and acceleration of
busi-
ness change, individualized learning creating new tacit abilities
may
not operate the same in different firm settings. It may be
necessary
to adopt multiple processes depending on the environment in
which
tacit operations are being performed. As stated, what might
work in
China may not work in Brazil, for example. Tacit behavior is
culture
oriented, so multiple and simultaneous versions must be
respected
and practiced. Further expansion of internalization is a virtual
team’ s
understanding of how such tacit behaviors change over time due
to
the acceleration of new business challenges.
Combination Dynamism
I believe the combination dynamism mode is the most important
com-
ponent of virtual team formation. Any combination or hybrid
model
requires a mature self— as specified in my maturity arcs
discussed in
Chapter 4. This means that individuals in virtual teams may
need to
be operating at a later stage of maturity to deal with the
complexities
of changing dispositions. Members of COPs must be observed,
and a
determination of readiness must be made for such new
structures to
develop in a virtual world. Thus, COP members need training;
the lack
of such training might explain why so many virtual teams have
had
disappointing results. Readiness for virtual team participation
depends
on a certain level of relativistic thinking. To be successful,
virtual team
members must be able to see themselves outside their own
world and
have the ability to understand the importance of what “ others”
need.
This position suggests that individuals need to be tested to the
extent
that they are ready for such challenges. Organizational learning
tech-
niques remain a valid method for developing workers who can
cope
with the dynamic changes that occur in virtual team
organizations.
Socialization Dynamism
Socialization challenges the virtual team members’ abilities to
understand the meaning of words and requires critical reflection
174 INFORMATION TECHNOLOGY
of its constituents. ROD requires that virtual teams be agile and,
especially, that they be responsive to the emotions of others in
the
community. This may require individuals to understand another
member’ s maturity. Thus, virtual team members need to be able
to understand why another member is behaving as he or she is
or
reacting in a dualistic manner. Assessment in a virtual
collabora-
tion becomes a necessity, especially given the unpredictability
of
technology-based projects.
In Table 5.1, I showed how tacit knowledge is mapped to ROD.
Table 7.3 further extends this mapping to include virtual teams.
The requirements support research findings that knowledge
man-
agement in a virtual context has significant factors that must be
addressed to improve its success. These factors include
management
commitment, resource availability, modification of work
practices,
marketing of the initiative, training, and facilitation of cultural
dif-
ferences (Peddibhotla & Subramani, 2008).
The following are some action steps that organizations need to
take
to address these factors:
1. The executive team needs to advocate the commitment and
support for virtual teams. The chief information officer (CIO)
and his or her counterparts need to provide teams with the
“ sponsorship” that the organization will need to endure set-
backs until the virtual organization becomes fully integrated
into the learning organization. This commitment can be
accomplished via multiple actions, including, but not limited
to, a kickoff meeting with staff, status reports to virtual teams
on successes and setbacks, e-mails and memos on new vir-
tual formations, and a general update on the effort, perhaps
on a quarterly basis. This approach allows the organization to
understand the evolution of the effort and know that virtual
teams are an important direction for the firm.
2. There should be training and practice sessions with
collocated
groups that allow teams to voice their concerns and receive
direction on how best to proceed. Practice sessions should
focus on team member responsibilities and advocating their
ownership of responsibility. These sessions should cover les-
sons learned from actual experiences, so that groups can learn
175vIrtuAl teAMs And outsourCInG
Ta
bl
e
7.
3
Ta
ci
t K
no
wl
ed
ge
a
nd
V
irt
ua
l T
ea
m
s
TA
CI
T
KN
OW
LE
DG
E
ST
RA
TE
GI
C
IN
TE
GR
AT
IO
N
ST
RA
TE
GI
C
IN
TE
GR
AT
IO
N
VI
RT
UA
L
CU
LT
UR
AL
A
SS
IM
IL
AT
IO
N
CU
LT
UR
AL
A
SS
IM
IL
AT
IO
N
VI
RT
UA
L
Cu
ltu
ra
l a
nd
s
oc
ia
l
hi
st
or
y
Ho
w
th
e
IT
d
ep
ar
tm
en
t a
nd
o
th
er
de
pa
rtm
en
ts
tr
an
sl
at
e
em
er
gi
ng
te
ch
no
lo
gi
es
in
to
th
ei
r e
xis
tin
g
pr
oc
es
se
s
an
d
or
ga
ni
za
tio
n.
Ho
w
ca
n
vi
rtu
al
a
nd
n
on
vi
rtu
al
de
pa
rtm
en
ts
tr
an
sl
at
e
em
er
gi
ng
te
ch
no
lo
gi
es
in
to
th
ei
r p
ro
je
ct
s
ac
ro
ss
m
ul
tip
le
lo
ca
tio
ns
a
nd
cu
ltu
re
s?
Pr
ob
le
m
-s
ol
vi
ng
m
od
es
In
di
vi
du
al
re
fle
ct
iv
e
pr
ac
tic
es
th
at
a
ss
is
t i
n
de
te
rm
in
in
g
ho
w
sp
ec
ifi
c
te
ch
no
lo
gi
es
c
an
b
e
us
ef
ul
a
nd
h
ow
th
ey
c
an
b
e
ap
pl
ie
d;
u
til
iza
tio
n
of
ta
ci
t
kn
ow
le
dg
e
to
e
va
lu
at
e
pr
ob
ab
ili
tie
s
fo
r s
uc
ce
ss
.
In
di
vi
du
al
re
fle
ct
iv
e
pr
ac
tic
es
an
d
in
te
rc
ul
tu
ra
l
co
m
m
un
ic
at
io
ns
n
ee
de
d
to
de
te
rm
in
e
ho
w
ta
ci
t k
no
wl
ed
ge
sh
ou
ld
b
e
ap
pl
ie
d
to
s
pe
ci
fic
gr
ou
p
an
d
pr
oj
ec
t n
ee
ds
.
Te
ch
no
lo
gy
o
pp
or
tu
ni
tie
s
m
ay
re
qu
ire
o
rg
an
iza
tio
na
l a
nd
st
ru
ct
ur
al
c
ha
ng
es
to
tr
an
sf
er
ta
ci
t k
no
wl
ed
ge
to
e
xp
lic
it
kn
ow
le
dg
e.
Te
ch
no
lo
gi
ca
l o
pp
or
tu
ni
tie
s
m
ay
re
qu
ire
c
on
fig
ur
at
io
n
of
v
irt
ua
l
co
m
m
un
iti
es
o
f p
ra
ct
ic
e
an
d
ex
pl
ic
it
kn
ow
le
dg
e.
Or
ie
nt
at
io
n
to
ri
sk
s
an
d
un
ce
rta
in
tie
s
Te
ch
no
lo
gy
o
ffe
rs
m
an
y r
is
ks
a
nd
un
ce
rta
in
tie
s.
A
ll
ne
w
te
ch
no
lo
gi
es
m
ay
n
ot
b
e
va
lid
fo
r t
he
o
rg
an
iza
tio
n.
Ta
ci
t
kn
ow
le
dg
e
is
a
v
al
ua
bl
e
co
m
po
ne
nt
to
fu
lly
u
nd
er
st
an
d
re
al
iti
es
, r
is
ks
, a
nd
un
ce
rta
in
tie
s.
Te
ch
no
lo
gy
ri
sk
s
an
d
un
ce
rta
in
tie
s
ne
ed
to
b
e
as
se
ss
ed
b
y m
ul
tip
le
v
irt
ua
l
an
d
ph
ys
ic
al
te
am
s
to
de
te
rm
in
e
ho
w
te
ch
no
lo
gi
es
wi
ll
op
er
at
e
ac
ro
ss
m
ul
tip
le
lo
ca
tio
ns
a
nd
c
ul
tu
re
s.
(C
on
tin
ue
d)
176 INFORMATION TECHNOLOGY
Ta
bl
e
7.
3
(C
on
tin
ue
d)
Ta
ci
t K
no
wl
ed
ge
a
nd
V
irt
ua
l T
ea
m
s
TA
CI
T
KN
OW
LE
DG
E
ST
RA
TE
GI
C
IN
TE
GR
AT
IO
N
ST
RA
TE
GI
C
IN
TE
GR
AT
IO
N
VI
RT
UA
L
CU
LT
UR
AL
A
SS
IM
IL
AT
IO
N
CU
LT
UR
AL
A
SS
IM
IL
AT
IO
N
VI
RT
UA
L
W
or
ld
vi
ew
s
Te
ch
no
lo
gy
h
as
g
lo
ba
l e
ffe
ct
s
an
d
ch
an
ge
s
m
ar
ke
t
bo
un
da
rie
s,
th
at
c
ro
ss
bu
si
ne
ss
c
ul
tu
re
s;
it
re
qu
ire
s
ta
ci
t k
no
wl
ed
ge
to
u
nd
er
st
an
d
ex
is
tin
g
di
sp
os
iti
on
s
on
h
ow
ot
he
rs
w
or
k
to
ge
th
er
. R
ev
ie
ws
ho
w
te
ch
no
lo
gy
a
ffe
ct
s
th
e
dy
na
m
ic
s
of
o
pe
ra
tio
ns
.
M
ar
ke
t b
ou
nd
ar
ie
s
ar
e
m
or
e
dy
na
m
ic
a
cr
os
s
vi
rtu
al
te
am
s
th
at
o
pe
ra
te
to
s
ol
ve
c
ro
ss
-
cu
ltu
ra
l a
nd
b
us
in
es
s
pr
ob
le
m
s.
W
or
ld
vi
ew
s
ar
e
m
or
e
th
e
no
rm
th
an
th
e
ex
ce
pt
io
n.
Or
ga
ni
zin
g
pr
in
ci
pl
es
Ho
w
wi
ll
ne
w
te
ch
no
lo
gi
es
ac
tu
al
ly
be
in
te
gr
at
ed
?
W
ha
t
ar
e
th
e
or
ga
ni
za
tio
na
l
ch
al
le
ng
es
to
“
ro
lli
ng
o
ut
”
pr
od
uc
ts
, a
nd
to
im
pl
em
en
ta
tio
n
tim
el
in
es
?
W
ha
t p
os
iti
on
s
ar
e
ne
ed
ed
, a
nd
wh
o
in
th
e
or
ga
ni
za
tio
n
m
ig
ht
be
b
es
t q
ua
lifi
ed
to
fi
ll
ne
w
re
sp
on
si
bi
lit
ie
s?
Id
en
tif
y
lim
ita
tio
ns
o
f t
he
o
rg
an
iza
tio
n;
th
at
is
, t
ac
it
kn
ow
le
dg
e
ve
rs
us
ex
pl
ic
it
kn
ow
le
dg
e
re
al
iti
es
.
W
ha
t a
re
th
e
dy
na
m
ic
n
ee
ds
o
f t
he
vi
rtu
al
te
am
, t
o
ha
nd
le
n
ew
te
ch
no
lo
gi
es
o
n
pr
oj
ec
ts
?
W
ha
t
ar
e
th
e
ne
w
ro
le
s
an
d
re
sp
on
si
bi
lit
ie
s
of
v
irt
ua
l t
ea
m
m
em
be
rs
?
De
te
rm
in
e
wh
at
ta
ci
t
an
d
ex
pl
ic
it
kn
ow
le
dg
e
wi
ll
be
us
ed
to
m
ak
e
de
ci
si
on
s.
Ho
riz
on
s
of
e
xp
ec
ta
tio
n
In
di
vi
du
al
li
m
ita
tio
ns
in
th
e
ta
ci
t
do
m
ai
n
th
at
m
ay
h
in
de
r o
r
su
pp
or
t w
he
th
er
a
te
ch
no
lo
gy
ca
n
be
s
tra
te
gi
ca
lly
in
te
gr
at
ed
in
to
th
e
or
ga
ni
za
tio
n.
In
di
vi
du
al
s
wi
th
in
th
e
vi
rtu
al
co
m
m
un
ity
n
ee
d
to
u
nd
er
st
an
d
th
e
lim
ita
tio
ns
o
n
st
ra
te
gi
c
us
es
o
f t
ec
hn
ol
og
y .
Th
is
m
ay
va
ry
a
cr
os
s
cu
ltu
re
s.
177vIrtuAl teAMs And outsourCInG
from others. Training should set the goals and establish the
criteria for how virtual teams interact in the firm. This should
include the application software and repositories that are in
place and the procedures for keeping information and knowl-
edge current.
3. External reminders should be practiced so that virtual teams
do not become lax and develop bad habits since no one is
monitoring or measuring success. Providing documented
processes, perhaps a balanced scorecard or International
Organization for Standardization (ISO) 9000-type proce-
dures and measurements, is a good practice for monitoring
compliance.
Dealing with Multiple Locations and Outsourcing
Virtual organizations are often a given in outsourcing
environments,
especially those that are offshore. Offshore outsourcing also
means
that communications originate in multiple locations. The first
step in
dealing with multiple locations is finding ways to deal with
different
time zones. Project management can become more complicated
when
team meetings occur at obscure times for certain members of the
community. Dealing with unanticipated problems can be more
chal-
lenging when assembling the entire team may not be feasible
because
of time differences. The second challenge in running
organizations
in multiple locations is culture. Differing cultural norms can
espe-
cially cause problems during off-hour virtual sessions. For
example,
European work culture does not often support having meetings
out-
side work hours. In some countries, work hours may be
regulated by
the government or powerful unions.
A further complication in outsourcing is that the virtual team
members may be employed by different companies. For
instance,
part of the community may include a vendor who has assigned
staff
resources to the effort. Thus, these outsourced team members
belong
to the community of the project yet also work for another
organiza-
tion. The relationship between an outside consultant and the
internal
team is not straightforward and varies among projects. For
example,
some outsourced technical resources may be permanently
assigned to
the project, so while they actually work for another firm, they
behave
178 INFORMATION TECHNOLOGY
and take daily direction as if they were an employee of the focal
busi-
ness. Yet, in other relationships, outsourced resources work
closely
under the auspices of the outsourced “ project manager,” who
acts
as a buffer between the firm and the vendor. Such COP
formations
vary. Still other outsourcing arrangements involve team
members the
firm does not actually know unless outsourced staff is called in
to
solve a problem. This situation exists when organizations
outsource
complete systems, so that the expectation is based more on the
results
than on the interaction. Notwithstanding the arrangement or
level
of integration, a COP must exist, and its behavior in all three of
these examples varies in participation, but all are driven in a
virtual
relationship more by dynamic business events than by
preplanned
activities.
If we look closely at COP approaches to operations, it is neces-
sary to create an extension of dynamism in a virtual team
commu-
nity. The extension reflects the reliance on dynamic
transactions,
which creates temporary team formations based on demographic
similarity needs. This means that virtual teams will often be
formed
based on specific interests of people within the same
departments.
Table 7.4 shows the expansion of dynamism in a virtual setting
of COPs.
Thus, the advent of modern-day IT outsourcing has complicated
the way COPs function. IT outsourcing has simultaneously
brought
attention to the importance of COP and knowledge management
in general. It also further supports the reality of technology
dyna-
mism as more of a norm in human communication in the twenty-
first century.
Revisiting Social Discourse
In Chapter 4, I covered the importance of social discourse and
the use
of language as a distinct component of how technology changes
COP.
That section introduced three components that linked talk and
action,
according to the schema of Grant et al. (1998): Identity, skills
and
emotion. Figure 7.2 shows this relationship again. The
expansion of
virtual team communications further emphasizes the importance
of
discourse and the need to rethink how these three components
relate
to each other in a virtual context.
179vIrtuAl teAMs And outsourCInG
Identity
I spoke about the “ cultures of practice” due to expansion of
contacts
from technology capacities. This certainly holds true with
virtual
teams. However, identities can be transactional— in ways such
that
an individual may be a member of multiple COP environments
and
have different identities in each. This fact emphasizes the
multitask-
ing aspect of the linear development modules discussed
throughout
this book. Ultimately, social discourse will dynamically change
based
on the COP to which an individual belongs, and that individual
needs
to be able to “ inventory” these multiple roles and
responsibilities.
Such roles and responsibilities themselves will transform, due
to the
dynamic nature of technology-driven projects. Individuals will
thus
have multiple identities and must be able to manage those
identities
across different COPs and in different contexts within those
COPs.
Table 7.4 COP Virtual Dynamism
COP PHYSICAL SOCIAL SETTINGS COP VIRTUAL
DYNAMISMS
There is shared pursuit of interest
accomplished through group meetings.
Interest in discussion is based more on dynamic
transactions and remote needs to satisfy specific
personal needs.
Creation of the “ community” is typically
established within the same, or similar,
departments.
The notion of permanency is deemphasized.
Specific objectives based on the needs of the
group will establish the community.
Demographic similarity is a strong
contributor to selection of community
members.
Demographic similarity has little to do with
community selection. Selection is based more on
subject-matter expertise.
Situated learning is often accomplished by
assisting members to help develop others.
Learning occurs within a framework of
social participation.
Situated learning to help others has less focus. It
may not be seen as the purpose or responsibility
of virtual team members. Social participation has
more concrete perspective.
Community needs to assess technology
dynamism using ROD in more physical
environments requiring a formal
infrastructure.
Community is less identifiable from a physical
perspective. ROD must be accomplished by
members who have special interests at the
subject level as opposed to the group level.
COP works well with cultural assimilation
of formal work groups where participants
are clearly identified.
Cultural assimilation in virtual settings is more
transaction-based. Assimilation can be a limited
reality during the time of the transaction to
ensure success of outcomes.
COP can be used for realignment of work
departments based on similar needs.
COP in a virtual environment creates temporary
realignments, based on similar needs during the
process.
COP supports continual learning and
dealing with unplanned action.
COPs are continually reconfigured, and do not have
permanency of group size or interest.
180 INFORMATION TECHNOLOGY
This requires individual maturities that must be able to cope
with the
“ other” and understand the relativistic nature of multiple
cultures and
the way discourse transforms into action.
Skills
I mentioned the importance of persuasion as a skill to transform
talk
into action. Having the ability to persuade others across virtual
teams
is critical. Often, skills are misrepresented as technical abilities
that
give people a right of passage. Across multiple cultures,
individuals
in teams must be able to recognize norms and understand how to
communicate with others to get tangible results on their
projects. It is
difficult to make such determinations about individuals that one
has
never met face to face. Furthermore, virtual meetings may not
pro-
vide the necessary background required to properly understand a
per-
son’ s skill sets, both “ hard” and “ soft.” The soft skills
analysis is more
important as the individual’ s technical credentials become
assumed.
We see such assumptions when individuals transition into
manage-
ment positions. Ascertaining technical knowledge at the staff
level is
easier— almost like an inventory analysis of technical
requirements.
Conversational
activity
Skills
Identity
Emotions
Action
Conversational
content
Figure 7.2 Grant’ s schema of the relationship between talk
and action.
181vIrtuAl teAMs And outsourCInG
However, assessing an individual’ s soft skills is much more
challeng-
ing. Virtual teams will need to create more complex and
broadened
inventories of their team’ s skill sets, as well as establish better
criteria
on how to measure soft skills. Soft skills will require
individuals to
have better “ multicultural” abilities, so that team members can
be
better equipped to deal with multinational and cross-cultural
issues.
Emotion
Like persuasion, emotion involves an individual’ s ability to
motivate
others and to create positive energy. Many of those who
successfully
use emotion are more likely to have done so in a physical
context than
a virtual one. Transferring positive emotion in a virtual world
can
be analogous to what organizations experienced in the e-
commerce
world, in which organizations needed to rebrand themselves
across
the Web in such a way that their image was reflected virtually
to
their customers. Marketing had to be accomplished without
exposure
to the buyer during purchase decisions. Virtual COPs are
similar:
Representation must be what the individual takes away, without
see-
ing the results physically. This certainly offers a new dimension
for
managing teams. This means that the development requirements
for
virtual members must include advanced abstract thinking so that
the
individual can better forecast virtual team reactions to what will
be
said, as opposed to reacting while the conversation is being
conducted
or thinking about what to do after virtual meetings.
In Chapter 4, I presented Marshak’ s (1998) work on types of
talk that lead to action: tool-talk, frame-talk, and mythopoetic-
talk.
Virtual teams require modification to the sequence of talk; that
is,
the use of talk is altered. Let us first look at Figure 7.3,
represent-
ing Marshak’ s model. To be effective, virtual teams must
follow this
sequence from the outside inward. That is, the virtual team must
focus
on mythopoetic-talk in the center as opposed to an outer ring.
This
means that ideogenic issues must precede interpretation in a
virtual
world. Thus, tool-talk, which in the physical world lies at the
center of
types of tools, is now moved to the outside rectangle. In other
words,
instrumental actions lag those of ideology and interpretation.
This is
restructured in Figure 7.4.
182 INFORMATION TECHNOLOGY
Mythopoetic-talk is at the foundation of grounding ideas in a
vir-
tual COP. It would only make sense that a COP-driven talk
requires
ideogenic behavior before migrating to instrumental outcomes.
Remember that ideogenic talk allows for concepts of intuition
and
ideas for concrete application especially relevant among
multiple cul-
tures and societies. So, we again see that virtual teams require
changes
in the sequence of how learning occurs. This change in
sequence
places more emphasis on the need for an individual to be more
devel-
opmentally mature— with respect to thinking, handling
differences,
and thinking abstractly. This new “ abstract individual” must
be able
to reflect before action and reflect in action to be functionally
compe-
tent in virtual team participation.
Because ROD is relevant, it is important to determine how
virtual
teams affect the ROD maturity arc first presented in Figure
4.10 and
redisplayed in Figure 7.5.
Mythopoetic-talk: Ideogenic
Frame-talk: Interpretive
Tool-talk: Instrumental
Figure 7.3 Marshak’ s types of talk.
Mythopoetic-talk: Ideogenic
Frame-talk: Interpretive
Tool-talk: Instrumental
Figure 7.4 Virtual team depiction of Marshak’ s types of talk.
183vIrtuAl teAMs And outsourCInG
St
ag
es
o
f i
nd
iv
id
ua
l a
nd
o
rg
an
iz
at
io
na
l l
ea
rn
in
g
Se
ct
or
v
ar
ia
bl
e
O
pe
ra
tio
na
l
kn
ow
le
dg
e
D
ep
ar
tm
en
t/
un
it
vi
ew
as
o
th
er
In
te
gr
at
ed
d
isp
os
iti
on
St
ab
le
o
pe
ra
tio
ns
O
rg
an
iz
at
io
na
l
le
ad
er
sh
ip
O
pe
ra
tio
ns
p
er
so
nn
el
un
de
rs
ta
nd
th
at
te
ch
no
lo
gy
h
as
a
n
im
pa
ct
o
n
st
ra
te
gi
c
de
ve
lo
pm
en
t,
pa
rt
ic
ul
ar
ly
o
n
ex
ist
in
g
pr
oc
es
se
s
In
di
vi
du
al
b
el
ie
fs
o
f
st
ra
te
gi
c
im
pa
ct
a
re
in
co
m
pl
et
e;
in
di
vi
du
al
ne
ed
s t
o
in
co
rp
or
at
e
ot
he
r v
ie
w
s w
ith
in
th
e
de
pa
rt
m
en
t o
r b
us
in
es
s
un
it
C
ha
ng
es
b
ro
ug
ht
fo
rt
h
by
te
ch
no
lo
gy
n
ee
d
to
be
a
ss
im
ila
te
d
in
to
de
pa
rt
m
en
ts
a
nd
a
re
de
pe
nd
en
t o
n
ho
w
ot
he
rs
p
ar
tic
ip
at
e
Sm
al
l-g
ro
up
b
as
ed
re
fle
ct
iv
e
pr
ac
tic
es
O
pe
ra
tio
n
an
d
m
id
dl
e
m
an
ag
em
en
t
M
id
dl
e
m
an
ag
em
en
t
In
te
ra
ct
iv
e
w
ith
b
ot
h
in
di
vi
du
al
a
nd
m
id
dl
e
m
an
ag
em
en
t u
sin
g
co
m
m
un
iti
es
o
f p
ra
ct
ic
e
U
nd
er
st
an
ds
n
ee
d
fo
r
or
ga
ni
za
tio
na
l c
ha
ng
es
;
di
ffe
re
nt
c
ul
tu
ra
l
be
ha
vi
or
n
ew
st
ru
ct
ur
es
ar
e
se
en
a
s v
ia
bl
e
so
lu
tio
ns
Re
co
gn
iti
on
th
at
in
di
vi
du
al
a
nd
de
pa
rt
m
en
t v
ie
w
s m
us
t
be
in
te
gr
at
ed
to
b
e
co
m
pl
et
e
an
d
st
ra
te
gi
ca
lly
p
ro
du
ct
iv
e
fo
r t
he
d
ep
ar
tm
en
t/
un
it
C
ha
ng
es
m
ad
e
to
p
ro
ce
ss
es
at
th
e
de
pa
rt
m
en
t/
un
it
le
ve
l f
or
m
al
ly
in
co
rp
or
at
e
em
er
gi
ng
te
ch
no
lo
gi
es
O
rg
an
iz
at
io
na
l c
ha
ng
es
ar
e
co
m
pl
et
ed
a
nd
in
op
er
at
io
n;
e
xi
st
en
ce
o
f
ne
w
o
r m
od
ifi
ed
e
m
pl
oy
ee
po
sit
io
ns
In
te
ra
ct
iv
e
be
tw
ee
n
m
id
dl
e
m
an
ag
em
en
t a
nd
ex
ec
ut
iv
es
u
sin
g
so
ci
al
di
sc
ou
rs
e
m
et
ho
ds
to
pr
om
ot
e
tr
an
sf
or
m
at
io
n
M
id
dl
e
m
an
ag
em
en
t a
nd
ex
ec
ut
iv
e
Ex
ec
ut
iv
e
O
rg
an
iz
at
io
na
l l
ea
rn
in
g
at
e
xe
cu
tiv
e
le
ve
l u
sin
g
kn
ow
le
dg
e
m
an
ag
em
en
t
D
ep
ar
tm
en
t-l
ev
el
or
ga
ni
za
tio
na
l c
ha
ng
es
an
d
cu
ltu
ra
l e
vo
lu
tio
n
ar
e
in
te
gr
at
ed
w
ith
or
ga
ni
za
tio
n-
w
id
e
fu
nc
tio
ns
a
nd
c
ul
tu
re
s
D
ep
ar
tm
en
t s
tr
at
eg
ie
s
ar
e
pr
op
ag
at
ed
a
nd
in
te
gr
at
ed
a
t
or
ga
ni
za
tio
n
le
ve
l
St
ra
te
gi
c
in
te
gr
at
io
n
C
ul
tu
ra
l a
ss
im
ila
tio
n
O
rg
an
iz
at
io
na
l
le
ar
ni
ng
c
on
st
ru
ct
s
M
an
ag
em
en
t l
ev
el
O
pe
ra
tio
ns
In
di
vi
du
al
-b
as
ed
re
fle
ct
iv
e
pr
ac
tic
e
Vi
ew
th
at
te
ch
no
lo
gy
ca
n
an
d
w
ill
a
ffe
ct
th
e
w
ay
th
e
or
ga
ni
za
tio
n
op
er
at
es
a
nd
th
at
it
ca
n
aff
ec
t r
ol
es
a
nd
re
sp
on
sib
ili
tie
s
Fi
gu
re
7
.5
R
es
po
ns
iv
e
or
ga
ni
za
tio
na
l d
yn
am
is
m
a
rc
m
od
el
.
184 INFORMATION TECHNOLOGY
C
ul
tu
ra
l
as
sim
ila
tio
n
O
rg
an
iz
at
io
na
l
le
ar
ni
ng
co
ns
tr
uc
ts
M
an
ag
em
en
t
le
ve
l
O
pe
ra
tio
ns
, m
id
dl
e m
an
ag
em
en
t,
an
d
ex
ec
ut
iv
e
M
id
dl
e m
an
ag
em
en
t a
nd
ex
ec
ut
iv
e
In
te
ra
ct
iv
e w
ith
in
di
vi
du
al
,
m
id
dl
e m
an
ag
em
en
t,
an
d
ex
ec
ut
iv
e u
sin
g v
ir
tu
al
co
m
m
un
iti
es
o
f p
ra
ct
ic
e
U
nd
er
st
an
ds
n
ee
d
fo
r
or
ga
ni
za
tio
na
l c
ha
ng
es
ac
ro
ss
m
ul
tip
le
o
rg
an
iz
at
io
ns
.
D
iff
er
en
t c
ul
tu
ra
l b
eh
av
io
rs
an
d
ne
w
st
ru
ct
ur
es
a
re
se
en
as
v
ia
bl
e s
ol
ut
io
ns
th
at
ca
n
be
p
er
m
an
en
t o
r t
em
po
ra
ry
be
ca
us
e o
f t
he
d
yn
am
ic
m
em
be
rs
hi
ps
in
C
O
P
O
rg
an
iz
at
io
na
l c
ha
ng
es
a
re
ne
ve
r c
om
pl
et
ed
a
nd
m
ay
be
in
te
m
po
ra
ry
o
pe
ra
tio
n.
Ex
ist
en
ce
o
f n
ew
o
r
m
od
ifi
ed
C
O
P
m
em
be
r
po
sit
io
ns
co
ul
d
be
pe
rm
an
en
t o
r t
ra
ns
iti
on
al
ba
se
d
on
p
ro
je
ct
n
ee
ds
D
ep
ar
tm
en
t-
le
ve
l
or
ga
ni
za
tio
na
l c
ha
ng
es
an
d
cu
ltu
ra
l e
vo
lu
tio
n
m
ay
re
m
ai
n
se
pa
ra
te
an
d
ca
se
d
ri
ve
n.
S
om
e
as
sim
ila
tio
n
m
ay
b
e
in
te
gr
at
ed
w
ith
or
ga
ni
za
io
n-
w
id
e
fu
nc
tio
ns
a
nd
cu
ltu
re
s
In
te
ra
ct
iv
e b
et
w
ee
n
m
id
dl
e
m
an
ag
em
en
t a
nd
ex
ec
ut
iv
es
u
sin
g s
oc
ia
l
di
sc
ou
rs
e m
et
ho
ds
to
pr
om
ot
e m
or
e t
ra
ns
ac
tio
na
l
be
ha
vi
or
al
tr
an
sit
io
ns
.
So
m
e t
ra
ns
iti
on
s m
ay
le
ad
to
tr
an
sfo
rm
at
io
n
O
rg
an
iz
at
io
na
l l
ea
rn
in
g
at
e
xe
cu
tiv
e l
ev
el
in
co
rp
or
at
es
v
ir
tu
al
te
am
n
ee
ds
u
sin
g m
or
e
dy
na
m
ic
C
O
P
st
ru
ct
ur
es
an
d
br
oa
de
ne
d
kn
ow
le
dg
e m
an
ag
m
en
t
th
at
is
m
or
e s
itu
at
io
na
l
M
id
dl
e m
an
ag
em
en
t a
nd
ex
ec
ut
iv
e
Ex
ec
ut
iv
e
Vi
rt
ua
l g
ro
up
-b
as
ed
re
fle
ct
iv
e
pr
ac
tic
es
a
re
n
ec
es
sa
ry
to
un
de
rs
ta
nd
h
ow
to
o
pe
ra
te
in
a
C
O
P
en
vi
ro
nm
en
t w
ith
in
di
vi
du
al
s
w
ho
h
av
e d
iff
er
en
t p
er
sp
ec
tiv
es
C
ha
ng
es
b
ro
ug
ht
fo
rt
h
by
te
ch
no
lo
gy
ne
ed
to
b
e a
ss
im
ila
te
d
in
to
de
pa
rt
m
en
ts
a
nd
a
re
d
ep
en
de
nt
o
n
ho
w
o
th
er
s p
ar
tic
ip
at
e.
A
ss
im
ila
tio
n
of
cu
ltu
ra
l n
or
m
m
ay
ha
ve
v
er
y
di
ffe
re
nt
ro
le
s a
nd
re
sp
on
sib
ili
tie
s i
n
ot
he
r c
ul
tu
re
s.
Sh
ift
in
g a
ss
im
ila
tio
n
ne
ed
s m
ay
di
ffe
r a
s d
iff
er
en
t m
em
be
rs
jo
in
o
r
le
av
e t
he
C
O
P
In
di
vi
du
al
-b
as
ed
re
fle
ct
iv
e
pr
ac
tic
e
O
pe
ra
tio
ns
Vi
ew
th
at
te
ch
no
lo
gy
ca
n
an
d
w
ill
a
ffe
ct
th
e
w
ay
th
e
or
ga
ni
za
tio
n
op
er
at
es
, a
nd
th
at
it
ca
n
aff
ec
t r
ol
es
a
nd
re
sp
on
sib
ili
tie
s
Fi
gu
re
7
.6
V
irt
ua
l t
ea
m
e
xt
en
si
on
to
th
e
RO
D
ar
c.
C
ha
ng
es
a
re
s
ho
wn
in
it
al
ic
s.
185vIrtuAl teAMs And outsourCInG
Figure 7.6 represents the virtual team extension to the ROD
arc.
The changes to the cells are shown in italics. Note that there are
no
changes to operational knowledge because this stage focuses
solely
on self-knowledge learned from authoritative sources. However,
as
the individual matures, there is greater need to deal with uncer-
tainty. This includes the uncertainty that conditions in a COP
may
be temporary, and thus knowledge may need to vary from
meeting to
meeting. Furthermore, while operational realities may be more
trans-
actional, it does not necessarily mean that adopted changes are
not
permanent. Most important is the reality that permanence in
general
may no longer be a characteristic of how the organization
operates;
this further emphasizes ROD as a way of life. As a result of this
extreme complexity in operations, there is an accelerated
requirement
for executives to become involved earlier in the development
process.
Specifically, by stage two (department/unit view of the other),
execu-
tives must be engaged in virtual team management
considerations.
Ultimately, the virtual team ROD arc demonstrates that vir-
tual teams are more complex and therefore need members who
are
more mature to ensure the success of outsourcing and other
virtual
constructs. It also explains why virtual teams have struggled,
likely
because their members are not ready for the complex
participation
necessary for adequate outcomes.
We must also remember that maturity growth is likely not
parallel
in its linear progression. This was previously shown in Figure
4.12.
This arc demonstrates the challenge managers face in gauging
the readiness of their staff to cope with virtual team
engagement.
On the other hand, the model also provides an effective
measure-
ment schema that can be used to determine where members
should
be deployed and their required roles and responsibilities.
Finally, the
model allows management to prepare staff for the training and
devel-
opment they need as part of the organizational learning
approach to
dealing with ROD.
http://taylorandfrancis.com
187
8
syneRgisTiC union of
iT anD oRganizaTional
leaRning
Introduction
This chapter presents case studies that demonstrate how
information
technology (IT) and organizational learning occur in the real
corpo-
rate world. It examines the actual processes of how
technological and
organizational learning can be implemented in an organization
and
what management perspectives can support its growth so that
forms
of responsive organizational dynamism can be formed and
developed.
I will demonstrate these important synergies through three case
stud-
ies that will show how the components of responsive
organizational
dynamism, strategic integration and cultural assimilation,
actually
operate in practice.
Siemens AG
The first case study offers a perspective from the chief informa-
tion officer (CIO). The CIO of Siemens of the Americas at the
time of this study was Dana Deasy, and his role was to
introduce
and expand the use of e-business across 20 discrete businesses.
The
Siemens Corporation worldwide network was composed of over
150
diverse sets of businesses, including transportation, healthcare,
and
telecommunications. Deasy’ s mission was to create a common
road
map across different businesses and cultures. What makes this
case
so distinct from others is that each business is highly
decentralized
under the umbrella of the Siemens Corporation. Furthermore,
each
company has its own mission; the companies have never been
asked
to come together and discuss common issues with regard to
technol-
ogy. That is, each business focused on itself as opposed to the
entire
188 InForMAtIon teChnoloGY
organization. Deasy had to deal with two sectors of scope and
hence,
two levels of learning: the Americas as a region and the global
firm
internationally.
The challenge was to introduce a new e-business strategy from
the
top-down in each business in the Americas and then to integrate
it
with the global firm. Ultimately, the mission was to review
what each
business was doing in e-business and to determine whether there
was
an opportunity to consolidate efforts into a common direction.
IT was, for the most part, viewed as a back-office operation—
handling services of the company as a support function as
opposed to
thinking about ways to drive business strategy. In terms of IT
report-
ing, most CIOs reported directly to the chief financial officer
(CFO).
While some IT executives view this as a disadvantage because
CFOs
are typically too focused on financial issues, Deasy felt that a
focus on
cost containment was fine as long as the CIO had access to the
chief
executive officer (CEO) and others who ultimately drove
business
strategy. So, the real challenge was to ensure that CIOs had
access to
the various strategic boards that existed at Siemens.
What are the challenges in transforming an organization the size
of Siemens? The most important issue was the need to educate
CIOs
on the importance of their role with respect to the business as
opposed
to the technology. As Deasy stated in an interview, “ Business
must
come first and we need to remind our CIOs that all technology
issues
must refer back to the benefits it brings to the business.” The
question
then is how to implement this kind of learning.
Perhaps the best way to understand how Siemens approached
this
dilemma is to understand Deasy’ s role as a corporate CIO. The
reality
is that there was no alternative but to create his position. What
drove
Siemens to this realization was fear that they needed someone
to drive
e-business, according to Deasy—fear of losing competitive edge
in
this area, fear that they were behind the competition and that
smaller
firms would begin to obtain more market share. Indeed, the
growth
of e-business occurred during the dot-com era, and there were
huge
pressures to respond to new business opportunities brought
about by
emerging technologies, specifically the Internet. It was,
therefore, a
lack of an internal capacity, such as responsive organizational
dyna-
mism, that stimulated the need for senior management to get
involved
and provide a catalyst for change.
189sYnerGIstIC unIon oF It
The first aspect of Siemens’ s approach can be correlated to the
strategic integration component of responsive organizational
dyna-
mism. We see that Siemens was concerned about whether
technology
was properly being integrated in strategic discussions. It
established
the Deasy role as a catalyst to begin determining the way
technol-
ogy needed to be incorporated within the strategic dimension of
the
business. This process cannot occur without executive
assistance, so
evolutionary learning must first be initiated by senior
management.
Unfortunately, Deasy realized early on that he needed a central
pro-
cess to allow over 25 CIOs in the Americas to interact
regularly. This
was important to understand the collective needs of the
community
and to pave the way for the joining of technology and strategic
inte-
gration from a more global perspective. Deasy established an
infra-
structure to support open discourse by forming CIO forums,
similar
to communities of practice, in which CIOs came together to
discuss
common challenges, share strategies, and have workshops on
the
ways technology could help the business. Most important at
these
forums was the goal of consolidating their ideas and their
common
challenges.
There are numerous discussions regarding the common problems
that organizations face regarding IT expenditures, specifically
the
approach to its valuation and return on investment (ROI). While
there are a number of paper-related formulas that financial
executives
use (e.g., percentage of gross revenues within an industry),
Deasy uti-
lized learning theories, specifically, communities of practice, to
foster
more thinking and learning about what was valuable to Siemens,
as
opposed to using formulas that might not address important
indi-
rect benefits from technology. In effect, Deasy promoted
learning
among a relatively small but important group of CIOs who
needed
to better understand the importance of strategic innovation and
the
value it could bring to the overall business mission.
Furthermore,
these forums provided a place where CIOs could develop their
own
community—a community that allowed its members to openly
par-
ticipate in strategic discourse that could help transform the
organiza-
tion. It was also a place to understand the tacit knowledge of the
CIO
organization and to use the knowledge of the CIOs to
summarize
common practices and share them among the other members of
the
community.
190 InForMAtIon teChnoloGY
Most of the CIOs at Siemens found it challenging to understand
how their jobs were to be integrated into business strategy.
Indeed,
this is not a surprise. In Chapter 1, I discuss the feedback from
my
research on CEO evaluation of technology; I found that there
were few
IT executives who were actually involved in business strategy.
Thus,
the organization sought to create an advocate in terms of a
central-
ized corporate headquarter that could provide assistance as
opposed
to forcing compliance. That is, it sought a structure with which
to
foster organizational learning concepts and develop an approach
to
create a more collective effort that would result in global
direction for
IT strategic integration.
To establish credibility among the CIO community, Deasy
needed
to ensure that the CIOs of each individual company were able to
inter-
act with board-level executives. In the case of Siemens, this
board is
called the president’ s council. The president’ s council has
regularly held
meetings in which each president attends and receives
presentations on
ideas about the regional businesses. Furthermore, there are
quarterly
CFO meetings as well, where CIOs can participate in
understand-
ing the financial implications of their IT investments. At the
same
time, these meetings provided the very exposure to the
executive team
that CIOs needed. Finally, Deasy established a CIO advisory
board
comprised of CIOs who actually vote on the common strategic
issues
and thus manage the overall direction of technology at Siemens.
Each
of these groups established different types of communities of
practice
that focused on a specific aspect of technology. The groups
were geared
to create better discourse and working relationships among
these com-
munities to, ultimately, improve Siemens’ s competitive
advantage.
The three communities of practice at work in the Siemens
model—
executive, finance, and technology—suggest that having only
one gen-
eral community of practice to address technology issues may be
too
limiting. Thus, theories related to communities of practice may
need
to be expanded to create discourse among multiple
communities. This
might be somewhat unique for IT, not in that there is a need for
mul-
tiple communities, but that the same individuals must have an
identity
in each community. This shows the complexity of the CIO role
today
in the ability to articulate technology to different types and tiers
of
management. Figure 8.1 shows the interrelationships among the
CIO
communities of practice at Siemens.
191sYnerGIstIC unIon oF It
Another way to represent these communities of practice is to
view
them as part of a process composed of three operating levels.
Each level
represents a different strategic role of management that is
responsible
for a unique component of discourse and on the authorization
for uses
of technology. Therefore, if the three different communities of
prac-
tice are viewed strategically, each component could be
constructed as
a process leading to overall organizational cooperation,
learning, and
strategic integration as follows:
Tier 1: CIO Advisory Board : This community discusses issues
of
technology standards, operations, communications, and ini-
tiatives that reflect technology-specific areas. Such issues are
seen as CIO specific and only need this community’ s agree-
ment and justification. However, issues or initiatives that
require financial approval, such as those that may not yet be
budgeted or approved, need to be discussed with group CFOs.
Proposals to executive management—that is, the President’ s
Council—also need prior approval from the CFOs.
Communities of practice consist of
presidents from each company.
Regular meetings are designed for
discussion over common issues on
business strategy. Corporate CIOs
can use this forum to present new
proposals on emerging technologies
and seek approval for their plans
and vision.
President’s council
Corporate
CIO of the
Americas
CFO quarterly
meetings
CIO advisory
board
Communities of practice consist of CIOs
from each company. Forum is designed to
openly discuss common challenges, agree
on technology initiatives, foster a more
united community and build on shared
knowledge across businesses.
Communities of practice consist of CFOs
from each company. Discussions
relate to how strategies can be
implemented with respect to ROI.
CIOs need to understand IT costs, both
direct and indirect.
Figure 8.1 Inter-relationships among CIO communities of
practice at Siemens.
192 InForMAtIon teChnoloGY
Tier 2: CFO Quarterly : CFOs discuss new emerging technolo-
gies and ascertain their related costs and benefits (ROI).
Those technologies that are already budgeted can be approved
based on agreed ROI scenarios. Proposals for new technology
projects are approved in terms of their financial viability and
are prepared for further discussion at the President’ s Council.
Tier 3: President’ s Council : Proposals for new technology
projects
and initiatives are discussed with a focus on their strategic
implications on the business and their expected outcome.
Deasy realized that he needed to create a common connection
among these three communities. While he depended on the
initia-
tives of others, he coordinated where these CIO initiatives
needed to
be presented, based on their area of responsibility.
Graphically, this can be shown as a linear progression of
commu-
nity-based discussions and approvals, as in Figure 8.2.
The common thread to all three tiers is the corporate CIO.
Deasy
was active in each community; however, his specific activities
within
each community of practice were different. CIOs needed to
estab-
lish peer relationships with other CIOs share their tacit
knowledge
and contribute ideas that could be useful to other Siemens
companies.
Thus, CIOs needed to transform their personal views of
technology
and expand them to a group-level perspective. Their challenge
was
to learn how to share concepts and how to understand new ones
that
emanated at the CIO advisory board level. From this
perspective,
they could create the link between the local strategic issues and
those
discussed at the regional and global levels, as shown in Figure
8.3.
Using this infrastructure, Siemens’ s organizational learning in
technology, occurred at two levels of knowledge management.
The
first is represented by Deasy’ s position, which effectively
represents a
top-down structure to initiate the learning process. Second, are
the
tiers of communities of practice when viewed hierarchically.
This view
reflects a more bottom-up learning strategy, with technological
oppor-
tunities initiated by a community of regional, company CIOs,
each
representing the specific interests of their companies or specific
lines
of business. This view can also be structured as an evolutionary
cycle
in which top-down management is used to initiate
organizational
learning from the bottom-up, the bottom, in this case,
represented by
193sYnerGIstIC unIon oF It
local operating company CIOs. This means that the CIO is seen
rela-
tively, in this case, as the lower of the senior management
population.
Figure 8.4 depicts the CIO as this “ senior lower level.”
From this frame of reference, the CIO represents the bottom-up
approach to the support of organizational learning by addressing
the
technology dilemma created by technological dynamism—
specifically,
in this case, e-business strategy.
The role of IT in marketing and e-business was another
important
factor in Siemens’ s model of organizational learning. The
technology
strategy at Siemens was consistent with the overall objectives of
the
organization: to create a shared environment that complements
each
Tier 3
Tier 2
Co
rpo
rat
e C
IO
ov
ers
igh
t an
d m
ana
gem
ent
Tier 1
CFO
quarterly
CIO advisory
board
President’s
council
Outcomes
Budgeted but not approved
implementations. Projects are
approved within budget
constraints
Proposals reviewed based on
strategy and corporate
direction, and approved for
implementation, including
financial commitment
Outcomes
Outcomes
Local or pre-budgeted
technology specific
implementation issues
Requires financial
approval
Requires strategic
approval
Figure 8.2 Siemens’ community-based links.
194 InForMAtIon teChnoloGY
Dana Deasy
Strategic senior
Management level
President and
executive
management
Chief financial
officer
Local CIO
Financial senior
Management level
Senior lower level
Figure 8.4 CIO as the “ senior lower level.”
Company president
CIO advisory board
Company CFO
Technology issues related to
sharing across businesses or
issues for discussion that
require consesus among CIO
population
Company-specific strategic
issues regarding how
technology affects specific
corporate goals and
objectives
Financial implications and
direct reporting at the
company level
Figure 8.3 Siemens’ local to global links.
195sYnerGIstIC unIon oF It
business by creating the opportunity to utilize resources. This
shared
environment became an opportunity for IT to lead the process
and
become the main catalyst for change. I discuss this kind of
support in
Chapter 5, in which I note that workers see technology as an
accept-
able agent of change. Essentially, the CIOs were challenged
with the
responsibility of rebranding their assets into clusters based on
their
generic business areas, such as hospitals, medical interests, and
com-
munications. The essence of this strategic driver was to use e-
business
strategy to provide multiple offerings to the same customer
base.
As with the Ravell case discussed in Chapter 1, the Siemens
case
represents an organization that was attempting to identify the
driver
component of IT. To create the driver component, it became
necessary
for executive management to establish a corporate position
(embodied
by Deasy) to lay out a plan for transformation, through learning
and
through the use of many of the organizational learning theories
pre-
sented in Chapter 4.
The Siemens challenge, then, was to transform its CIOs from
being
back-office professionals to proactive technologists focused
primarily
on learning to drive business strategy. That is not to say that
back-office
issues became less important; they became, instead,
responsibilities left
to the internal organizations of the local CIOs. However, back-
office
issues can often become strategic problems, such as with the use
of
e-mail. This is an example of a driver situation even though it
still per-
tains to a support concern. That is, back-office technologies can
indeed
be drivers, especially when new or emerging technologies are
available.
As with any transition, the transformation of the CIO role was
not
accomplished without difficulty. The ultimate message from
executive
management to the CIO community was that it should fuse the
vital
goals of the business with its technology initiatives. Siemens
asked its
CIOs to think of new ways that technology could be used to
drive
strategic innovations. It also required CIOs to change their
behavior
by asking them to think more about business strategy.
The first decision that Deasy confronted was whether to change
the reporting structure of the CIO. Most CIOs at Siemens
reported
directly to the CFO as opposed to the CEO. After careful
thought,
Deasy felt that to whom the CIO reported was less important
than
giving access and exposure to the President’ s Council
meetings. It was
Deasy’ s perspective that only through exposure and experience
could
196 InForMAtIon teChnoloGY
CIOs be able to transform from back-office managers to
strategic
planners. As such, CIO training was necessary to prepare them
for
participation in communities of practice. Eventually, Siemens
recog-
nized this need and, as a result, sponsored programs, usually
lasting
one week, in which CIOs would be introduced to new thinking
and
learning by using individual-based reflective practices. Thus,
we see
an evolutionary approach, similar to that of the responsive
organiza-
tional dynamism arc, presented in Chapter 4; that is, one that
uses
both individual and organizational learning techniques.
Deasy also understood the importance of his relationship and
role
with each of the three communities of practice. With respect to
the
CEOs of each company, Deasy certainly had the freedom to pick
up
the phone and speak with them directly. However, this was
rarely a
realistic option as Deasy knew early on that he needed the trust
and
cooperation of the local CIO to be successful. The community
with
CEOs was then broadened to include CIOs and other senior
manag-
ers. This was another way in which Deasy facilitated the
interaction
and exposure of his CIOs to the executives at Siemens.
Disagreement among the communities can and does occur.
Deasy
believed in the “ pushing-back” approach. This means that,
inevitably,
not everyone will agree to agree, and, at times, senior
executives may
need to press on important strategic issues even though they are
not
mutually in agreement with the community. However, while this
type
of decision appears to be contrary to the process of learning
embed-
ded in communities of practice learning, it can be a productive
and
acceptable part of the process. Therefore, while a democratic
process
of learning is supported and preferred, someone in the CIO
posi-
tion ultimately may need to make a decision when a community
is
deadlocked.
The most important component of executive decision making is
that trust exists within the community. In an organizational
learning
infrastructure, it is vital that senior management share in the
value
proposition of learning with members of the community. In this
way,
members feel that they are involved, and are a part of decision
mak-
ing as opposed to feeling that they are a part of a token effort
that
allows some level of participation. As Deasy stated, “ I was not
try-
ing to create a corporate bureaucracy, but rather always
representing
myself as an ambassador for their interest, however, this does
not
197sYnerGIstIC unIon oF It
guarantee that I will always agree with them.” Disagreements,
when
managed properly, require patience, which can result in
iterative dis-
cussions with members of the community before a consensus
posi-
tion may be reached, if it is at all. Only after this iterative
process is
exhausted does a senior overarching decision need to be made.
Deasy
attributed his success to his experience in field operations,
similar to
those of his constituents. As a prior business-line CIO, he
understood
the dilemma that many members of the community were facing.
Interestingly, because of his background, Deasy was able to “
qual-
ify” as a true member of the CIO community of practice. This
truth
establishes an important part of knowledge management and
change
management—senior managers who attempt to create
communities
of practice will be more effective when they share a similar
back-
ground and history with the community that they hope to
manage.
Furthermore, leaders of such communities must allow members
to
act independently and not confuse that independence with
autonomy.
Finally, managers of communities of practice are really
champions
of their group and as such must ensure that the trust among
mem-
bers remains strong. This suggests that CIO communities must
first
undergo their own cultural assimilation to be prepared to
integrate
with larger communities within the organization.
Another important part of Deasy’ s role was managing the
technol-
ogy itself. This part of his job required strategic integration in
that
his focus was more about uses of technology, as opposed to
commu-
nity behavior or cultural assimilation. Another way of looking
at this
issue is to consider the ways in which communities of practice
actually
transform tacit knowledge and present it to senior management
as
explicit knowledge. This explicit knowledge about uses of
technology
must be presented in a strategic way and show the benefits for
the
organization. The ways that technology can benefit a business
often
reside within IT as tacit knowledge. Indeed, many senior
manag-
ers often criticize IT managers for their inability to articulate
what
they know and to describe it so that managers can understand
what it
means to the business. Thus, IT managers need to practice
transform-
ing their tacit knowledge about technology and presenting it
effec-
tively, as it relates to business strategy.
Attempting to keep up with technology can be a daunting, if not
impossible, task. In some cases, Siemens allows outside
consultants
198 InForMAtIon teChnoloGY
to provide help on specific applications if there is not enough
expertise within the organization. The biggest challenge,
however,
is not necessarily in keeping up with new technologies but
rather, in
testing technologies to determine exactly the benefit they have
on
the business. To address this dilemma, Deasy established the
con-
cept of “ revalidation.” Specifically, approved technology
projects
are reviewed every 90 days to determine whether they are
indeed
providing the planned outcomes, whether new outcomes need
to be established, or whether the technology is no longer useful.
The concept of revalidation can be associated with my
discussion
in Chapter 3, which introduced the concept of “ driver” aspects
of
technology. This required that IT be given the ability to invest
and
experiment with technology to fully maximize the evaluation of
IT in strategic integration. This was particularly useful to
Deasy,
who needed to transform the culture at Siemens to one that rec-
ognized that not all approved technologies succeed. In addition,
he needed to dramatically alter the application development life
cycle and reengineer the process of how technology was
evaluated
by IT and senior management. This challenge was significant in
that it had to be accepted by over 25 autonomous presidents,
who
were more focused on short and precise outcomes from
technology
investments.
Deasy was able to address the challenges that many presidents
had in understanding IT jargon, specifically as it related to ben-
efits of using technology. He engaged in an initiative to
communi-
cate with non-IT executives by using a process called
storyboarding.
Storyboarding is the process of creating prototypes that allow
users to
actually see examples of technology and how it will look and
operate.
Storyboarding tells a story and can quickly educate executives
without
being intimidating. Deasy’ s process of revaluation had its own
unique
life cycle at Siemens:
1. Create excitement through animation. What would Siemens
be like if ... ?
2. Evaluate the way the technology would be supported.
3. Recognize implementation considerations about how the
technology as a business driver is consistent with what the
organization is doing and experiencing.
199sYnerGIstIC unIon oF It
4. Technology is reviewed every 90 days by the CIO advisory
board after experimental use with customers and presented to
the president’ s council on an as-needed basis.
5. Establish responsive organizational dynamism with cultural
assimilation; that is, recognize the instability of technol-
ogy and that there are no guarantees to planned outcomes.
Instead, promote business units to understand the concept of
“ forever prototyping.”
Thus, Siemens was faced with the challenge of cultural assimi-
lation, which required dramatic changes in thinking and
business
life cycles. This process resembles Bradley and Nolan’ s (1998)
Sense
and Respond —the ongoing sensing of technology opportunities
and
responding to them dynamically. This process disturbs
traditional and
existing organizational value chains and therefore represents the
need
for a cultural shift in thinking and doing. Deasy, using
technology as
the change variable, began the process of reinventing the
operation of
many traditional value chains.
Siemens provides us with an interesting case study for
responsive
organizational dynamism because it had so many diverse
companies
(in over 190 countries) and over 425,000 employees. As such,
Siemens
represents an excellent structure to examine the importance of
cul-
tural assimilation. Deasy, as a corporate CIO, had a counterpart
in
Asia/Australia. Both corporate CIOs reported to a global CIO in
Germany, the home office of Siemens. There was also a topic-
centered
CIO responsible for global security and application-specific
planning
software. This position also reported directly to the global CIO.
There
were regional and local CIOs who focused on specific
geographical
areas and vertical lines of business and operating company
CIOs. This
organization is shown in Figure 8.5.
Deasy’ s operation represents one portion (although the most
quickly changing and growing) of Siemens worldwide. Thus, the
issue
of globalization is critical for technologies that are scalable
beyond
regional operating domains. Standardization and evaluations of
tech-
nology often need to be ascertained at the global level and as a
result
introduce new complexities relating to cultural differences in
business
methods and general thinking processes. Specifically, what
works in
one country may not work the same way in another. Some of
these
200 InForMAtIon teChnoloGY
matters can be legally based (e.g., licensing of software or
assumptions
about whether a technology is legally justified). To a large
extent, solv-
ing legal matters relating to technology is easier than cultural
ones.
Cultural assimilation matters about technology typically occur
in global organizations with respect to acceptability of
operational
norms from one country to another. This becomes a particularly
dif-
ficult situation when international firms attempt to justify
standards.
At Siemens, Deasy introduced three “ standards” of technology
that
defined how it could be used across cultures, and communities
of
practice:
1. Corporate services : These are technologies that are required
to
be used by the business units. There are central service charges
for their use as well.
2. Mandatory services : Everyone must comply with using a
par-
ticular type of application; that is, mandatory software based
on a specific type of application. For example, if you use a
Web browser, it must be Internet Explorer.
3. Optional : These are technologies related to a specific
business
and used only within a local domain. There may be a preferred
solution, but IT is not required to use it.
This matrix of standards allows for a culture to utilize
technologies
that are specific to its business needs, when justified. Standards
at
Siemens are determined by a series of steering committees,
starting
Siemens global CIO
(Germany)
Topic centered CIO
Regional CIOs Operatingcompany CIO
Operating
company CIORegional CIOs
Corporate CIO
Asia/Australia
Corporate CIO
Americas
(deasy)
Figure 8.5 Siemens’ CIO organization.
201sYnerGIstIC unIon oF It
at the regional level, that meet two to three times annually.
Without
question, implementing standards across cultures is, as Deasy
phrased
it, “ a constant wrestling match which might need to change by
the
time a standard is actually reached.” This is why strategic
integra-
tion is so important, given the reality that technology cannot
always
be controlled or determined at senior levels. Organizations must
be
able to dynamically integrate technology changes parallel to
business
changes.
Deasy’ s longer-term mission was to provide a community of
CIOs
who could combine the business and technology challenges. It
was
his initial vision that the CIO of the future would be more
involved
than before with marketing and value chain creation. He felt
that
“ the CIO community needed to be detached from its
technology-
specific issues or they would never be a credible business
partner.”
It was his intent to establish organizational learning initiatives
that
helped CIOs “ seize and succeed,” to essentially help senior
manage-
ment by creating vision and excitement, by establishing best
practices,
and by learning better ways to communicate through open
discourse
in communities of practice.
Three years after his initial work, I reviewed the progress that
Deasy had made at Siemens. Interestingly, most of his
initiatives
had been implemented and were maturing—except for the role
of
e-business strategy. I discovered, after this period, that the
orga-
nization thought that e-business was an IT responsibility. As
such,
they expected that the CIOs had not been able to determine the
best business strategy. This was a mistake; the CIO could not
estab-
lish strategy but rather needed to react to the strategies set forth
by senior management. This means that the CIO was not able to
really establish stand-alone strategies as drivers based on
technology
alone. CIOs needed, as Deasy stated, “ to be a participant with
the
business strategist and to replace this was inappropriate.” This
raises
a number of questions:
1. Did this occur because CIOs at Siemens do not have the edu-
cation and skills to drive aspects of business strategy?
2. Did the change in economy and the downfall of the dot-coms
create a negative feeling toward technology as a business
driver?
202 InForMAtIon teChnoloGY
3. Are CEOs not cognizant enough about uses of technology,
and do they need better education and skills to better under-
stand the role of technology?
4. Is the number of communities of practice across the organi-
zation integrated enough so that IT can effectively commu-
nicate and form new cultures that can adapt to the changes
brought about by emerging technologies?
5. Is there too much impatience with the evolution of tech-
nology? Does its assimilation in an organization the size of
Siemens simply take too long to appreciate and realize the
returns from investments in technology?
I believe that all of these questions apply, to some extent, and
are
part of the challenges that lie ahead at Siemens. The company
has now
initiated a series of educational seminars designed to provide
more
business training for CIOs, which further emphasizes the
importance
of focusing on business strategy as opposed to just technology.
It could
also mean the eventual establishment of a new “ breed” of CIOs
who
are better educated in business strategy. However, it is
inappropriate
for non-IT managers to expect that the CIOs will be able to
handle
strategy by themselves; they must disconnect e-business as
solely being
about technology. The results at Siemens only serve to
strengthen the
concept that responsive organizational dynamism requires that
cul-
tural assimilation occur within all the entities of a company.
Aftermath
Dana Deasy left Siemens a few years after this case study was
com-
pleted. During that time, the executive team at Siemens realized
that
the CIO alone could not provide business strategy or react
quickly
enough to market needs. Rather, such strategy required the
integra-
tion of all aspects of the organization, with the CIO only one
part of
the team to determine strategic shifts that lead or use
components of
technology. Thus, the executives realized that they needed to
become
much better versed in technology so that they also could engage
in
strategic conversations. This does not suggest that executives
needed
technology training per se, but that they do need training that
allows
them to comment intelligently on technology issues. What is the
best
203sYnerGIstIC unIon oF It
way to accomplish this goal? The answer is through short
seminars
that can provide executives with terminology and familiarize
them
with the processes their decisions will affect. The case also
raised the
question of whether a new wave of executives would inevitably
be
required to move the organization forward to compete more
effec-
tively. While these initiatives appear to make sense, they still
need to
address the fundamental challenges posed by technology
dynamism
and the need to develop an organization that is positioned to
respond
(i.e., responsive organizational dynamism). We know from the
results
of the Ravell case that executives cannot be excluded. However,
the
case also showed that all levels of the organization need to be
involved.
Therefore, the move to responsive organizational dynamism
requires
a reinvention of the way individuals work, think, and operate
across
multiple tiers of management and organizational business units.
This
challenge will continue to be a difficult but achievable objective
of
large multinational companies.
ICAP
This second case study focuses on a financial organization
called ICAP,
a leading money and securities broker. When software
development
exceeded 40% of IT activities, ICAP knew it was time to
recognize
IT as more than just technical support. Stephen McDermott
provided
the leadership, leaving his role as CEO of the Americas at ICAP
to
become CEO of the Electronic Trading Community (ETC), a
new
entity focused solely on software development. This IT
community
needed to be integrated with a traditional business model that
was
undergoing significant change due to emerging technologies, in
this
specific case, the movement from voice to electronic trading
systems.
This case study reflects many aspects of the operation of
responsive
organizational dynamism. From the strategic integration
perspec-
tive, ICAP needed to understand the ways electronic trading
could
ultimately affect business strategy. For example, would it
replace all
voice-related business interactions, specifically voice trading?
Second,
what would be the effect on its culture, particularly with respect
to the
way the business needed to be organizationally structured? This
study
focuses on the role of the CEO as a pioneer in reexamining his
own
biases, which favored an old-line business process, and for
developing
204 InForMAtIon teChnoloGY
a realization to manage a major change in business strategy and
organizational philosophy. Indeed, as McDermott stated, “ It
was the
challenge of operating at the top, yet learning from the bottom.”
This
sentiment essentially reflects the reality of a management
dilemma.
Could a CEO who, without question, had substantial knowledge
of
securities trading, learn to lead a technology-driven operation,
for
which he had little knowledge and experience?
To better understand the impact of technology on the business
of
ICAP, it is important to have some background information.
Since
1975, the use of technology at ICAP was limited to operations
of
the back-office type. Brokers (the front-end or sales force of a
trad-
ing business), communicated with customers via telephone. As
such,
processing transactions was always limited to the time
necessary
to manually disseminate prices and trading activity over the
phone
to a securities trader. However, by 1997 a number of
technological
advancements, particularly with the proliferation of Internet-
based
communication and the increased bandwidth available, enabled
bro-
kers and dealers to communicate bidirectionally. The result was
that
every aspect of the trade process could now be streamlined,
includ-
ing the ability for the trader to enter orders directly into the
brokers’
trading systems. The technological advancements and the
availability
of capital in the mid-1990s made it difficult to invest in
computer
operations. Specifically, the barriers to investing in technology
had
been high as developing proprietary trading systems and
deploying a
private network were all costly. The market of available
products was
scarce, filled with relatively tiny competitors with little more
than a
concept, rather than an integrated product that could do what a
com-
pany like ICAP needed, in order to maintain its competitive
position.
The existing system, called the ICAP Trading Network
application
was far from a trading system that would compete against the
newer
emerging technologies. The goal was to develop a new trading
sys-
tem that would establish an electronic link between the back-
office
systems of ICAP and its clients. The system would need to be
simple
to use as the traders were not necessarily technology literate. It
would
need to be robust, include features that were specific to the
markets,
and easily installed and distributed. In addition, as ICAP
decided
to fund the entire project, it would have to be cost-effective and
not
burden the other areas of the business. As competitive systems
were
205sYnerGIstIC unIon oF It
already being introduced, the new system needed to be
operational
within three to six months for ICAP to remain competitive.
McDermott recognized that designing a new product would
require
that IT developers and business matter experts learn to work
together.
As a result of this realization, a representative from the
operation was
selected to see if a third-party developer could modify an
existing
product. After exploring and evaluating responses, the search
team
concluded that off-the-shelf solutions, prohibitive in cost, were
not
available that would meet the critical timing needs of the
business.
However, during the period when IT and the business users
worked
together, these groups came to realize that the core components
of
its own trading system could be modified and used to build the
new
system. This realization resulted from discussions between IT
and the
business users that promoted organizational learning. This
process
resembles the situation in the Ravell study, in which I
concluded that
specific events could accelerate organizational learning and
actually
provide an opportunity to embed the process in the normal
discourse
of an organization. I also concluded that such learning starts
with
individual reflective practices, and understanding how both
factions,
in this case, IT and the business community, can help each other
in a
common cause. In the case of Ravell, it was an important
relocation
of the business that promoted integration between IT and the
busi-
ness community. At ICAP, the common cause was about
maintaining
competitive advantage.
The project to develop the new electronic trading application
was
approved in August 1999, and the ETC was formed. The new
entity
included an IT staff and selected members from the business
commu-
nity, who moved over to the new group. Thus, because of
technologi-
cal dynamism, it was determined that the creation of a new
product
established the need for a new business entity that would form
its
own strategic integration and cultural assimilation. An initial
test of
the new product took place in November, and it successfully
executed
the first electronic trade via the Internet. In addition to their
design
responsibility, ETC was responsible for marketing, installing,
and
training clients on the use of the product. The product went live
in
February 2000. Since its introduction, the ETC product has been
modified to accommodate 59 different fixed-income products,
serving
more than 1,000 users worldwide in multiple languages.
206 InForMAtIon teChnoloGY
While the software launch was successful, McDermott’ s role
was
a challenge, from coordinating the short- and long-term goals of
ETC with the traditional business models of ICAP to shifting
from
management of a global financial enterprise to management of
an IT
community. The ICAP case study examines the experiences and
per-
ceptions one year after the launch of the new entity.
The first most daunting result, after a year of operations, was
the significant growth of technology uses in the business.
Initially,
McDermott noted that electronic trading was about 40% of
opera-
tions and that it had grown over 60%. He stated that ETC had
become, without question, the single most important component
of
the ICAP international business focus. The growth of electronic
trad-
ing created an accelerated need for transformation within ICAP
and
its related businesses. This transformation essentially changed
the
balance between voice or traditional trading and electronic
trading.
McDermott found himself responsible for much of this
transforma-
tion and was initially concerned whether he had the technical
exper-
tise to manage it.
McDermott admitted that as a chief executive of the traditional
ICAP business, he was conservative and questioned the
practicality
and value of many IT investments. He often turned down
requests
for more funding and looked at technology as more of a
supporter of
the business. As I explain in Chapter 3, IT as a supporter will
always
be managed, based on efficiencies and cost controls.
McDermott’ s
view was consistent with this position. In many ways, it was
ironic
that he became the CEO of the electronic component of the
business.
Like many CEOs, McDermott initially had the wrong impression
of
the Internet. Originally looking at it as a “ big threat,” he
eventually
realized from the experience that the Internet was just another
way
of communicating with his clients and that its largest
contribution
was that it could be done more cost-effectively, thus leading to
higher
profits.
One of the more difficult challenges for McDermott was
develop-
ing the mission for ETC. At the time of the launch of the new
product,
this mission was unclear. With the assistance of IT and the
business
community, the mission of ETC has been developing
dynamically;
the business is first trying to protect itself from outside
competi-
tion. Companies like IBM, Microsoft, and others, might attempt
to
207sYnerGIstIC unIon oF It
invade the business market of ICAP. Thus, it is important that
ETC
continues to produce a quality product and keep its competitive
edge
over more limited competitors that are software-based
organizations
only. The concept of a dynamic mission can be correlated to the
fun-
damental principles of responsive organizational dynamism. In
fact, it
seems rather obvious that organizations dealing with emerging
tech-
nologies might need to modify their missions to parallel the
acceler-
ated changes brought about by technological innovation. We
certainly
see this case with ICAP, for which the market conditions
became
volatile because of emerging electronic trading capacities. Why,
then,
is it so difficult for organizations to realize that changing or
modify-
ing their missions should not be considered that unusual?
Perhaps the
approach of ICAP in starting a completely separate entity was
correct.
However, it is interesting that this new organization was
operating
without a consistent and concrete mission.
Another important concept that developed at ETC was that
technology was more of a commodity and that content (i.e., the
dif-
ferent services offered to clientele) was more important. Indeed,
as
McDermott often stated, “ I assume that the technology works,
the
real issue is the way you intend to implement it; I want to see a
com-
pany’ s business plan first.” Furthermore, ETC began to
understand
that technology could be used to leverage ICAP businesses in
areas
that they had never been able to consider before the advent of
the
technology and the new product. McDermott knew that this was
a time, as Deasy often stated, to “ seize and succeed” the
moment.
McDermott also realized that organizational learning practices
were
critical for ideas to come from within the staff. He was careful
not
to require staff to immediately present a formal new initiative,
but
he allowed them to naturally develop a plan as the process
became
mature. That is one of the reasons that ETC uses the word
community
in its name. As he expressed it to me during a conversation:
Now that is not my mandate to grow into other areas of
opportunity, my
initial responsibility is always to protect our businesses.
However, I will
not let opportunities go by which can help the business grow,
especially
things that we could never do as a voice broker. It has been very
exciting
and I can see ICAP becoming a considerably larger company
than we
have been historically because of our investment in technology.
208 InForMAtIon teChnoloGY
McDermott also was challenged to learn what his role would be
as
a chief executive of a software technology organization. In the
early
stages, he was insecure about his job because for the first time
he
knew less than his workers about the business. Perhaps this
provides
organizational learning practitioners with guidance on the best
way
of getting the CEO engaged in the transformative process; that
is,
getting the CEO to understand his or her role in an area in
which,
typically, he or she does not have expertise. McDermott
represented
an executive who reached that position coming up through the
ranks.
Therefore, much of his day-to-day management was based on
his
knowledge of the business—a business that he felt he knew as
well as
anyone. With technology, and its effect as technological
dynamism,
CEOs face more challenges, not only because they need to
manage
an area they may know little about but also because of the
dynamic
aspects of technology and the way it causes unpredictable and
acceler-
ated change. McDermott realized this and focused his attention
on
discovering what his role needed to be in this new business.
There
was no question in McDermott’ s mind that he needed to know
more
about technology, although he also recognized that management
was
the fundamental responsibility he would have with this new
entity:
[Although] I was insecure at the beginning I started to realize
that it does
not take a genius to do my job. Management is management,
and whether
you manage a securities brokering firm or you manage a deli or
manage
a group of supermarkets or an IT or an electronic company, it is
really
about management, and that is what I am finding out now. So,
whether
I am the right person to bring ETC to the next level is irrelevant
at this
time. What is more important is that I have the skills that are
necessary to
manage the business issues as opposed to the technological
ones.
However, McDermott did have to make some significant
changes
to operate in a technology-based environment. ETC was now
des-
tined to become a global organization. As a result, McDermott
had
to create three senior executive positions to manage each of the
three
major geographic areas of operation: North America, Europe,
and
Asia. He went from having many indirect reports to having just
a
few. He needed four or five key managers. He needed to learn to
trust
that they were the right people, people who had the ability to
nurture
209sYnerGIstIC unIon oF It
the parts of each of their respective divisions. “ What it leaves
now is
being a true CEO,” he stated, “ and that means picking your
people,
delegating the responsibility and accepting that they know the
busi-
ness.” Thus, we see technological dynamism actually realigning
the
reporting structure, and social discourse of the company.
My presentation in previous chapters focused on helping orga-
nizations transform and change. Most important in
organizational
learning theories is the resistance to change that most workers
have,
particularly when existing cultural norms are threatened. ICAP
was
no exception to the challenges of change management. The most
sig-
nificant threat at ICAP was the fear that the traditional voice
bro-
ker was endangered. McDermott understood this fear factor and
presented electronic trading not as a replacement but rather, a
sup-
plement to the voice broker. There was no question that there
were
certain areas of the business that lent themselves more to
electronic
trading; however, there are others that will never go electronic
or at
least predominantly electronic. Principles of responsive
organizational
dynamism suggest that accelerated change becomes part of the
stra-
tegic and cultural structure of an organization. We see both of
these
components at work in this case.
Strategically, ICAP was faced with a surge in business
opportuni-
ties that were happening at an accelerated pace and were, for
the most
part, unplanned, so there was little planned activity. The
business was
feeling its way through its own development, and its CEO was
pro-
viding management guidance, as opposed to specific solutions.
ICAP
represents a high-velocity organization similar to those
researched by
Eisenhardt and Bourgeois (1988), and supports their findings
that a
democratic, less power-centralized management structure
enhances
the performance of such a firm. From a cultural assimilation
perspec-
tive, the strategic decisions are changing the culture and
requiring new
structures and alignments. Such changes are bound to cause
fears.
As a result of recognizing the inevitable changes that were
becom-
ing realities, McDermott reviewed the roles and responsibilities
of
his employees on the brokering side of the business. After
careful
analysis, he realized that he could divide the brokers into three
dif-
ferent divisions, which he branded as A, B, and C brokers. The
A
brokers were those who were fixed on the relational aspect of
their
jobs, so voice interaction was the only part of their work world.
Such
210 InForMAtIon teChnoloGY
individuals could do things in the voice world that electronic
means
could not reach. They were personal experts, if you will, who
could
deal with clients requiring a human voice. Thus, the A broker
would
exist as long as the broker wanted to work—and would always
be
needed because a population of clients wants personal support
over
the phone. This is similar to the opposition to the Internet in
which
we find that some portion of the population will never use e-
com-
merce because they prefer a live person. The B broker was
called the
hybrid broker—an individual who could use both voice and
electronic
means. Most important, these brokers were used to “ convert”
voice-
based clients into electronic ones. As McDermott explained:
Every day I see a different electronic system that someone is
trying to
sell in the marketplace. Some of these new technologies are
attempting
to solve problems that do not exist. I have found that successful
systems
address the content more than the technology. Having a
relationship for
many of our customers is more important. And we can migrate
those
relationships from voice to electronic or some sort of a hybrid
combi-
nation. The B brokers will end up with servicing some
combination of
these relationships or migrate themselves to the electronic
system. So, I
believe they have nothing to fear.
The C brokers, on the other hand, represented the more average
voice brokers who would probably not have a future within the
busi-
ness. They would be replaced by electronic trading because they
did
not bring the personal specialization of the A broker. The plight
of
the C broker did raise an important issue about change
management
and technological dynamism: Change will cause disruption,
which
can lead to the elimination of jobs. This only further supported
the
fears that workers had when faced with dynamic environments.
For
McDermott, this change would need to be openly discussed with
the
community, especially for the A and B brokers, who in essence
would
continue to play an important role in the future of the business.
C
brokers needed to be counseled so that they could appropriately
seek
alternate career plans. Thus, honesty brings forth trust, which
inevi-
tably fosters the growth of organizational learning. Another
perspec-
tive was that the A and B brokers understood the need for
change
and recognized that not everyone could adapt to new cultures
driven
211sYnerGIstIC unIon oF It
by strategic integration, so they understood why the C broker
was
eliminated.
In Chapter 2, I discussed the dilemma of IT as a “
marginalized”
component of an organization. This case study provides an
opportunity
to understand how the traditional IT staff at ICAP made the
transi-
tion into the new company—a company in which they
represented a
direct part of its success. As noted, ICAP considered the IT
depart-
ment as a back-office support function. In the new organization,
it
represented the nucleus or the base of all products and careers.
Hence,
McDermott expected ETC employees to be technology
proficient. No
longer were IT people just coders or hardware specialists—he
saw tech-
nology people as lawyers, traders, and other businesspeople. He
related
technology proficiency in a similar way to how his business
used to
view a master’ s degree in business (MBA) in the late 1980s.
This issue
provides further support for the cultural assimilation component
of
responsive organizational dynamism. We see a situation in
which the
discrepancy between who is and is not a technology person
beginning
to dwindle in importance. While there is still clear need for
expertise
and specialization, the organization as a whole has started the
process
of educating itself on the ways in which technology affects
every aspect
of its corporate mission, operations, and career development.
ICAP has not been immune to the challenges that have faced
most
technology-driven organizations. As discussed in Chapter 2, IT
proj-
ects typically face many problems in terms of their ability to
complete
projects on time and within budget. ICAP was also challenged
with
this dilemma. Indeed, ICAP had no formal process but focused
on
the criterion of meeting the delivery date as the single most
important
issue. As a result, McDermott was attempting to instill a new
culture
committed to the importance of what he called the “ real date of
deliv-
ery.” It was a challenge to change an existing culture that had
difficulty
with providing accurate dates for delivery. As McDermott
suggested:
I am learning that technology people know that there is no way
that they
can deliver an order in the time requested, but they do not want
to disap-
point us. I find that technology people are a different breed
from the peo-
ple that I normally work with. Brokers are people looking for
immediate
gratification and satisfaction. Technology people, on the other
hand, are
always dedicated to the project regardless of its time
commitment.
212 InForMAtIon teChnoloGY
McDermott was striving to attain a mix or blend of the
traditional
culture with the technology culture and create a new hybrid
organiza-
tion capable of developing realistic goals and target dates. This
process
of attainment mirrors the results from the Ravell case, which
resulted
in the formation of a new hybrid culture after IT and business
staff
members were able to assimilate one another and find common
needs
and uses for technology and the business.
McDermott also understood his role as a leader in the new orga-
nization. He realized early on that technology people are what
he
called more “ individualistic” ; that is, they seemingly were
reluctant to
take on responsibility of other people. They seemed, as
McDermott
observed, “ to have greater pleasure in designing and creating
some-
thing and they love solving problems.” This was different from
what
CEOs experienced with MBAs, who were taught more to lead a
group
as opposed to being taught to solve specific problems. Yet, the
integra-
tion of both approaches can lead to important accomplishments
that
may not be reachable while IT and non-IT are separated by
depart-
mental barriers.
Ultimately, the cultural differences and the way they are
managed
lead to issues surrounding the basis of judging new technologies
for
future marketing consideration. McDermott understood that this
was
a work in progress. He felt strongly that the issue was not
technology,
but that it was the plan for using technology competitively. In
other
words, McDermott was interested in the business model for the
tech-
nology that defined its benefits to the business strategically. As
he put
it, “ Tell me how you are going to make money, tell me what
you can
do for me to make my life easier. That is what I am looking at!”
While
McDermott felt that many people were surprised by his
response, he
believed its reality was taken too much for granted. During the
dot-
com era, too many investors and businesses assumed that
technologi-
cal innovation would somehow lead to multiples of earnings—
that
simply did not happen. Essentially, McDermott realized that
good
technology was available in many places and that the best
technology
is not necessarily the one that will provide businesses with the
highest
levels of success.
Judging new technologies based on the quality of the business
plan
is an effective method of emphasizing the importance of why
the
entire organization needs to participate and understand
technology.
213sYnerGIstIC unIon oF It
This inevitably leads to questions about the method in which
ROI is,
or should be, measured. The actual measurement of ROI for
ICAP
was remarkably simple yet effective. There were four methods
of
determining ROI. The first and most significant was whether
the
technology would increase volume of trades along the different
prod-
uct lines. The second was the amount in dollars of the securities
being
traded. That is, did technology provide a means for clients to do
larger
dollar trades? The third factor could be an increase in the actual
num-
ber of clients using the electronic system. The fourth might be
allevi-
ating existing bottlenecks in the voice trading process, whether
it was
a legal issue or the advantage provided by having electronic
means.
We see here that some of the ROI factors are direct and
monetary. As
expected methods, the first and second were very much direct
mone-
tary ways to see the return for investing in electronic trading
systems.
However, as Lucas (1999) reminds us, many benefits derived
from IT
investments are indirect, and some are impossible to measure.
We see
this with the third and fourth methods. Increasing the number of
cli-
ents indirectly suggested more revenue, but did not guarantee it.
An
even more abstract benefit was the improvement of throughput,
what
is typically known as improved efficiency in operations.
While all of the accomplishments of ICAP and McDermott seem
straightforward, they were not accomplished without
challenges;
perhaps the most significant was the approach, determination,
and
commitment that were needed by the executive team. This chal-
lenge is often neglected in the literature on organizational
learning.
Specifically, the executive board of ETC needed to understand
what
was necessary in terms of funding to appropriately invest in the
future
of technology. To do that, they needed to comprehend what e-
business
was about and why it was important for a global business to
make seri-
ous investments in it to survive. In this context, then, the
executive
board needed to learn about technology as well and found
themselves
in a rather difficult position. During this period, McDermott
called
in an outside consultant who could provide a neutral and
objective
opinion. Most important was to define the issue in lay terms so
that
board members could correlate it with their traditional business
mod-
els. Ultimately, the learning consisted of understanding that
technol-
ogy and e-commerce were about expanding into more markets,
ones
that ICAP could not reach using traditional approaches. There
was a
214 InForMAtIon teChnoloGY
realization that ICAP was too focused on its existing client
base, as
opposed to reaching out for new ones—and there was also the
reverse
reality that a competitor would figure out a strategy to reach out
to the
client base of ICAP. What is also implied in expanding one’ s
client
base is that it means going outside one’ s existing product
offerings.
This had to be carefully planned as ICAP did not want to
venture
outside what it was—an intermediary brokering service. So,
expan-
sion needed to be carefully planned and discussed first among
the
executive members, then presented as a challenge to the senior
man-
agement, and so on.
This process required some modifications to the organizational
learning process proposed by such scholars as Nonaka and
Takeuchi
(1995). Specifically, their models of knowledge management do
not
typically include the executive boards; thus, they are not
considered a
part of the learning organization. The ICAP case study exposes
the fact
that their exclusion can be a serious limitation, especially with
respect
to the creation of responsive organizational dynamism. In
previous
chapters, I presented a number of management models that
could be
used to assist in developing and sustaining organizational
learning.
They focused fundamentally on the concept of whether such
manage-
ment should be top-down, bottom-up, or, as Nonaka and
Takeuchi
suggest, “ middle-up-down.” I laid out my case for a
combination of
all of them in a specific order and process that could maximize
each
approach. However, none of these models really incorporates
the out-
side executive boards that have been challenged to truly
understand
what technology is about, their approach to management, and
what
their overall participation should be in organizational learning.
Perhaps the most significant historical involvement of executive
boards was with the Year 2000 (Y2K) event. With this event,
executive
boards mandated that their organizations address the potential
tech-
nology crisis at the turn of the century. My CEO interviews
verified
that, if anything, the Y2K crisis served to educate executive
boards by
forcing them to focus on the issue. Boards became unusually
involved
with the rest of the organization because independent
accounting firms,
as outside objective consultants, were able to expose the risks
for not
addressing the problem. The handling of e-commerce by ICAP
was
in many ways similar but also suggests that executive boards
should
not always wait for a crisis to occur before they get involved.
They also
215sYnerGIstIC unIon oF It
must be an important component of organizational learning,
particu-
larly in responsive organizational dynamism. While
organizational
learning fosters the involvement of the entire community or
workers,
it also needs advocates and supporters who control funding. In
the case
of ICAP, organizational learning processes without the
participation
of the executive board, ultimately would not have been
successful. The
experience of ICAP also suggests that this educational and
learning
process may need to come from independent and objective
sources,
which integrates another component of organizational learning
that
has not been effectively addressed: the role of outside
consultants as a
part of a community of practice. Figure 8.6 depicts the addition
of the
ICAP ETC executive board and outside consultants in the
organiza-
tional learning management process.
The sequential activities that occurred among the different
communi-
ties are shown in Table 8.1. While Table 8.1 shows the
sequential steps
necessary to complete a transformation toward strategic
integration and
cultural assimilation, the process is also very iterative.
Specifically, this
means that organizations do not seamlessly move from one
stage to
another without setbacks. Thus, transformation depends heavily
on dis-
course as the main driver for ultimate organizational evolution.
Figure 8.7 shows a somewhat messier depiction of
organizational
learning under the auspices of ROD. The changes brought on by
dynamic interactions foster top-down, middle-up-down, and
bottom-
up knowledge management techniques—all occurring simultane-
ously. This level of complex discourse creates a number of
overlapping
communities of practice that have similar, yet unique,
objectives in
learning. These communities of practice overlap at certain
levels as
shown in Figure 8.8.
As stated, organizational learning at the executive levels tends
to
be ignored in the literature. At ICAP, an important community
of
practice emerged that created a language discourse essential to
its
overall success in dealing with technological dynamism,
brought on
by technological innovation in electronic communications.
Language
was critical at this level; ICAP is a U.K.-based organization and
as
such has an international board. As McDermott explained:
As you know, from travelling anywhere around the world,
cultures are
different. And even the main office for our company, ICAP in
England,
216 InForMAtIon teChnoloGY
and even with the English, we are separated by a common
language, as
we often say. There is a very, very different culture everywhere
in the
world. I will tell you that information technology in our
company is
separated from electronic trading—there is a difference.
Thus, McDermott’ s challenge was to establish a community
that could reach consensus not only on strategic issues but also
Advisement on e-commerce
business opportunities
Overall changes to
corporate mission
financial
commitments
approve major
organizational
changes—form ETC
Discourse and
learning at the
organizational
level, non-event
specific. ICAP
board focused on
impact of
technology on
trading operations.
Senior
management
team meets and
determines
strategy and
organization for
creating new
corporate entity.
Middle managers
determine how and
when operations
will be changed.
�is includes
personnel
changes and
development of
specific
implementation
schedules through
group discourse.
Operations
personnel work
with middle
management to
determine change
in organization
structure and duties
and responsibilies of
new and old positions.
Individual reflective
practice, tacit knowledge
of how to actually
implement changes at
the individual and
group levels
Buy in
modify
implementation plans
based on discourse and
knowledge of how the
business operates
Buy in
modify strategic plans
based on discourse and
knowledge of specific
areas of the business
Specific skills in
technology strategy
objective analysis
of business
realignment
education of
executive board
Initiator of change
knowledge and
strategic management
organizational change
agent
ICAP ETC
executive board
Independent
consultants
CEO
Senior
management
Middle
management
Operations
Figure 8.6 ICAP ETC management tiers.
217sYnerGIstIC unIon oF It
Table 8.1 ICAP—Steps to Transformation
STEP LEARNING ENTITY(S) LEARNING ACTIVITY
1 CEO Americas Initiates discourse at board level on
approaches to expanding electronic trading
business
2 Executive board Decides to create separate corporate entity
ETC to allow for the establishment of a new
culture
3 Outside consultant E-commerce discourse, ways in which to
expand the domain of the business
4 Executive board Discussion of corporate realignment of
mission, goals, and objectives
5 CEO/senior management Establishes strategic direction with
senior
management
6 Senior management/middle
management
Meet to discuss and negotiate details of the
procedures to implement
7 Middle management/operations
communities
Meet with operations communities to discuss
impact on day-to-day processes and
procedures
Discourse initiated
Discourse on
“how” to
implement
Rollout of new
organization and
strategies
Interactive discussions
Questions and responsesExecutive
board
CEO
Americas
Senior
management
Middle
management
Operations
Operations adjustments
based on reflective practices
Adjustments as a result of
discourse with operations
community
New ideas and
adjustments
Objective advice
and education
Objective advice
and education
Meetings and
discussions on
day-to-day
operations
Consultants
Figure 8.7 ICAP—responsive organizational dynamism.
218 InForMAtIon teChnoloGY
on the very nomenclature applied to how technology was
defined
and procedures adopted among the international organizations
within ICAP. That is why outside consultation could be
effective
as it provided independent and objective input that could foster
the integration of culture-based concepts of technology,
strategy,
and ROI. Key to understanding the role of executive communi-
ties of practice is their overall importance to organizational
learn-
ing growth. Very often we have heard, “ Can we create
productive
discourse if the executive team cannot discuss and agree on
issues
themselves?” Effectively, ICAP created this community to
ensure
consistency among all the levels within the business. Consistent
with the responsive organizational dynamism arc, learning in
this
community was at the “ system” or organizational level, as
opposed
to being based on specific events like Y2K. These concerns had
a broader context, and they affected both short- and long-term
issues of business strategy and culture.
Another community of practice was the operations manage-
ment team, which was the community responsible for transform-
ing strategy into a realistic plan of strategic implementation.
This
team consisted of three levels (Figure 8.9). We see in this
commu-
nity of practice that the CEO was common to both this commu-
nity and the executive community of practice. His participation
in
both provided the consistency and discourse that pointed to
three
valuable components:
1. The CEO could accurately communicate decisions reached at
the board level to the operations management team.
CEO
Americas
Executive
board
Consultants
Questions and responses
Objective advice
and education
Objective advice
and education
Interactive discussions
Discourse initiated
Figure 8.8 ICAP—community of practice.
219sYnerGIstIC unIon oF It
2. The operations team could provide important input and sug-
gestions to the CEO, who could then provide this informa-
tion to the executive community.
3. The CEO interacted in different ways between the two com-
munities of practice. This was critical because the way things
were discussed, the language used, and the processes of con-
sensus were different in each community.
The operations management community was not at the detailed
level of implementation; rather, it was at the conceptual one. It
needed
to embrace the strategic and cultural outcomes discussed at the
execu-
tive community, suggest modifications if applicable, and
eventually
reach consensus within the community and with the executive
team.
The operations management community, because of its
conceptual
perspectives, used more organizational learning methods as
opposed
to individual techniques. However, because of their relationship
with operations personnel, they did participate in individual
reflec-
tive practices. Notwithstanding their conceptual nature, event-
driven
issues were important for discussion. That is why middle
management
needed to be part of this community, for without their input,
concep-
tual foundations for implementing change may very well have
flaws.
CEO
Americas
Senior
managementNew ideas and
adjustments
Middle
management
Rollout of new
organization and
strategies
Discourse on
“how” to
implement
Adjustments as a result of
discourse with operations
community
Figure 8.9 ICAP—community of practice interfaces.
220 InForMAtIon teChnoloGY
Middle management participated to represent the concrete
pieces
and the realities for modifications to conceptual arguments. As
such,
middle managers could indirectly affect the executive board
commu-
nity since their input could require change in the operations
man-
agement community, which in turn could foster the need for
change
requests back to the board. This process provides the very
essence of
why communities of practice need to work together, especially
with
the dynamic changes that can occur from technological
innovations.
The third community of practice at ICAP was at the operations
or implementation tier. It consisted of the community of staff
that
needed to transition conceptual plans into concrete realities. To
ensure
that conceptual ideas of implementation balanced with the
concrete
events that needed to occur operationally, middle managers
needed
to be part of both the operations management, and
implementation
communities, as shown in Figure 8.10.
Because of the transitory nature of this community, it was
important
that both organizational learning and individual learning
occurred
simultaneously. Thus, it was the responsibility of middle
managers
to provide the transition of organizational-based ideas to the
event
and concrete level so that individuals understood what it
ultimately
meant to the operations team. As one would expect, this level
oper-
ated on individual attainment, yet through the creation of a
commu-
nity of practice, ICAP could get its operations members to begin
to
think more at the conceptual level. This provided management
with
the opportunity to discuss conceptual and system-level ideas
with
Middle
management
Operations
Meetings and
discussions on
day-to-day
operations
Operations adjustments
based on reflective practices
Figure 8.10 Middle-management community of practice at
ICAP.
221sYnerGIstIC unIon oF It
operations personnel. Operations personnel could review them
and,
under a managed and controlled process, could reach consensus.
That
is, changes required by the implementation community could be
rep-
resented to the operations management community through
middle
management. If middle management could, through discourse
and
language, reach consensus with the operations management
commu-
nity, then the CEO could bring them forth to the executive
commu-
nity for further discussion. We can see this common thread
concept
among communities of practice as a logical process among tiers
of
operations and management and one that can foster learning
matura-
tion, as identified in the responsive organizational dynamism
arc. This
is graphically shown in Figure 8.11.
Figure 8.11 shows the relationships among the three communi-
ties of practice at ICAP and how they interacted, especially
through
upward feedback using common threads of communication.
Thus,
multiple communities needed to be linked via common individu-
als to maintain threads of communication necessary to support
Executive community of practice
Operations management community of practice
CEO
Americas
CEO
AmericasNew ideas
and
adjustments
Implementation community of practice
Senior
management
Operations
Adjustments as
a result of
discourse
with operations
community
Middle
management
Middle
management
Executive
board Consultants
Figure 8.11 ICAP—COP common threads.
222 InForMAtIon teChnoloGY
responsive organizational dynamism and learning across
organiza-
tional boundaries.
Another important observation is the absence of independent
con-
sultants from the operations management and implementation
com-
munities of practice. This does not suggest that consultants
were not
needed or used by these communities. The independent
consultant
in the executive community provides organizational-level
learning, as
opposed to the consultant who is, for example, a specialist in
database
design or training.
This case study provides an example of how an international
firm
dealt with the effects of technology on its business. The CEO,
Stephen
McDermott in this case, played an important role, using many
forms
of responsive organizational dynamism, in managing the
organiza-
tion through a transformation. His experience fostered the
realiza-
tion that CEOs and their boards need to reinvent themselves on
an
ongoing basis. Most important, this case study identified the
number
of communities of practice that needed to participate in
organiza-
tional transformation. The CEO continued to have an important
role;
in many ways, McDermott offered some interesting advice for
other
chief executives to consider:
1. The perfect time may or may not exist to deal with changes
brought on by technology. The CEO may need to just “ dive
in” and serve as a catalyst for change.
2. Stay on course with the fundamentals of business and do not
believe everything everyone tells you; make sure your busi-
ness model is solid.
3. Trust that your abilities to deal with technology issues are
no
different from managing any other business issue.
As a result of the commitment and the process for adapting
tech-
nology at ICAP, it has realized many benefits, such as the
following:
• Protection of tacit knowledge : By incorporating the existing
trading system, ICAP was able to retain the years of expe-
rience and expertise of its people. As a result, ICAP devel-
oped an electronic system that better served the needs of
broker users; this ability gave it an advantage over competitor
systems.
223sYnerGIstIC unIon oF It
• Integrated use : The combination of the new system and its
compatibility with other ICAP legacy systems enabled the
organization to continue to service the core business while
increasing access for new clients. This resulted in a reduction
of costs and an increase in its user base.
• Transformation of tacit knowledge to explicit product
knowledge :
By providing an infrastructure of learning and strategic inte-
gration, ICAP was able to bridge a wide range of its employ-
ees’ product knowledge, particularly of those outside IT with
a specific understanding of trading system design, and to
transform their tacit knowledge into explicit value that was
used to build on to the existing trading systems.
• Flexibility : Because multiple communities of practice were
formed, IT and non-IT cultures were able to assimilate. As a
result, ICAP was able to reduce its overall development time
and retain the functionality necessary for a hybrid voice and
electronic trading system.
• Expansion : Because of the assimilation of cultures, ICAP
was able to leverage its expertise so that the design of the
electronic system allowed it to be used with other third-party
trading systems. For example, it brought together another
trading system from ICAP in Europe and enabled concurrent
development in the United States and the United Kingdom.
• Evolution : By incorporating existing technology, ICAP con-
tinued to support the core business and gradually introduced
new enhancements and features to serve all of its entities.
• Knowledge creation : By developing the system internally,
ICAP was able to increase its tacit knowledge base and stay
current with new trends in the industry.
ICAP went on to evolve its organization as a result of its adop-
tion of technology and its implementation of responsive
organiza-
tional dynamism. The company reinvented itself again.
McDermott
became the chief operating officer (COO) for three business
units
in the Americas; all specific business lines, yet linked by their
inte-
grated technologies and assimilated cultures. In addition, ICAP
purchased a competitor electronic trading product and
assimilated
these combined technologies into a new organization. Business
224 InForMAtIon teChnoloGY
revenues rose at that time from $350 million to over $1 billion
four
years later. The company also had more than 2,800 staff
members
and operated from 21 offices worldwide. Much has been attrib-
uted to ICAP’ s investment in electronic trading systems and
other
emerging technologies.
Five Years Later
I returned to meet with Stephen McDermott almost five years
after
our original case study. Many of the predictions about how
technol-
ogy would affect the business had indeed become reality. In
2010,
technology at ICAP had become the dominant component of the
business. The C brokers had all but disappeared, with the
organiza-
tion now consisting of two distinct divisions: voice brokers and
elec-
tronic brokers. The company continued to expand by acquiring
other
smaller competitors in the technology space. The electronic
division
now consisted of three distinct divisions from these
acquisitions, with
ETC just one of those divisions. In effect, the expansion led to
more
specialization and leveraging of technology to capture larger
parts of
various markets.
Perhaps the unseen reality was how quickly technology became
a
commodity. As McDermott said to me, “ Everybody (our
competi-
tors) can do it; it’ s now all about your business strategy.”
While the
importance of strategy was always part of McDermott’ s
position,
the transition from product value to market strategy was much
more
transformative on the organization’ s design and how it
approached
the market. For example, the additional regulatory controls on
voice
brokering actually forced many brokers to move to an electronic
interface, which reduced liability between the buyer and the
broker.
McDermott also emphasized how “ technology has created
overnight
businesses,” forcing the organization to understand how
technology
could provide new competitive advantages that otherwise did
not
exist. Today, 50% of the trading dollars, some $2 trillion,
occurs over
electronic technology-driven platforms. Undoubtedly, these
dynamic
changes, brought on by technological dynamism, continue to
chal-
lenge ICAP on how they strategically integrate new
opportunities
and how the organization must adapt culturally with changes in
indi-
vidual roles and responsibilities.
225sYnerGIstIC unIon oF It
HTC
HTC (a pseudoacronym) is a company that provides creative
business
services and solutions. The case study involving HTC
demonstrates
that changes can occur when technology reports to the
appropriate
level in an organization. This case study offers the example of a
com-
pany with a CEO who became an important catalyst in the
successful
vitalization of IT. HTC is a company of approximately 700
employees
across 16 offices. The case involves studying the use of a new
applica-
tion that directly affected some 200 staff people.
The company was faced with the challenge of providing
accurate
billable time records to its clients. Initial client billings were
based on
project estimates, which then needed to be reconciled with
actual work
performed. This case turned out to be more complex than
expected.
Estimates typically represented the amount of work to which a
client
agreed. Underspending the budget agreed to by the client,
however,
could lead to lost revenue opportunities for the firm. For
example, if
a project was estimated at 20 hours, but the actual work took
only
15, then most clients would seek an additional five hours of
service
because they had already budgeted the total 20 hours. If the
recon-
ciliation between hours budgeted and hours worked was
significantly
delayed, clients might lose their window of opportunity to
spend the
remaining five hours (in the example situation). Thus, the
incapacity
to provide timely reporting of this information resulted in the
actual
loss of revenue, as well as upset clients. If clients did not spend
their
allocated budget, they stood to lose the amount of the unused
portion
in their future budget allocations. Furthermore, clients had
expecta-
tions that vendors were capable of providing accurate reporting,
espe-
cially given that present-day technology could automate the
recording
and reporting of this information. Finally, in times of a tight
econ-
omy, businesses tend to manage expenditures more closely and
insist
on more accurate record keeping than at other times.
The objective at HTC was to transform its services to better
meet
the evolving changes of its clients’ business requirements.
While the
requirement for a more timely and accurate billing system
seems
straightforward, it became a greater challenge to actually
implement
than it otherwise seemed.
The first obstacle for HTC to overcome was the clash between
this
new requirement and the existing ethos, or culture of the
business.
226 InForMAtIon teChnoloGY
HTC provided creative services; 200 of its staff members were
artisti-
cally oriented and were uncomfortable with focusing on time-
based
service tracking; they were typically engrossed in the creative
per-
formance required by their clients. Although it would seem a
simple
request to track time and enter it each day, this projected
change in
business norms became a significant barrier to its actual
implemen-
tation. Project managers became concerned that reporting
require-
ments would adversely affect performance, and thus, inevitably
hurt
the business. Efforts to use blunt force—do it or find another
job —
were not considered a good long-term solution. Instead, the
company
needed to seek a way to require the change while demonstrating
the
value of focusing on time management.
Many senior managers had thought of meeting with key users to
help determine a workable solution, but they were cognizant of
the
fact that such interactive processes with the staff do not always
lead to
agreement on a dependable method of handling the problem.
This is a
common concern among managers and researchers working in
orga-
nizational behavior. While organizational learning theorists
advocate
this mediating, interactive approach, it may not render the
desired
results in time and can even backfire if staff members are not
genu-
inely willing to solve the problem or if they attempt to make it
seem
too difficult or a bad idea. The intervention of the CEO of HTC,
together with the change in time reporting methods, directly
involv-
ing IT, made a significant difference in overcoming the
obstacle.
IT History at HTC
When I first interviewed the CEO, I found that she had little
direct
interaction with the activities of the IT department. IT reported
to
the CFO, as in many companies, because it was seen as an
opera-
tional support department. However, the CEO subsequently
became
aware of certain shortfalls associated with IT and with its
report-
ing structure. First, the IT department was not particularly liked
by other departments. Second, the department seemed incapable
of
implementing software solutions that could directly help the
busi-
ness. Third, the CFO did not possess the creativity beyond
account-
ing functions to provide the necessary leadership needed to
steer the
activities of IT in a more fruitful direction. As a result, the CEO
227sYnerGIstIC unIon oF It
decided that the IT department should report directly to her. She
was
also concerned that IT needed a more senior manager and hired
a new
chief technology officer (CTO).
Interactions of the CEO
My research involving 40 chief executives showed that many
execu-
tives are unsure about what role they need to take with their
chief IT
managers. However, the CEO of HTC took on the responsibility
to
provide the financial support to get the project under way. First,
the
CEO made it clear that a solution was necessary and that
appropri-
ate funds would be furnished to get the project done. Second,
the
new CTO was empowered to assess the needs of the business
and the
staff, and to present a feasible solution for both business and
cultural
adaptation needs.
The CEO was determined to help transform the creative-artistic
service business into one that would embrace the kinds of
controls that
were becoming increasingly necessary to support clients.
Addressing
the existing lag in collecting time records from employees,
which
directly affected billing revenue, seemed like the logical first
step for
engaging the IT department in the design and implementation of
new
operating procedures and cultural behavior.
Because middle managers were focused on providing services to
their clients, they were less concerned with the collection of
time
sheets. This need was a low priority of the creative workers of
the firm.
Human resources (HR) had been involved in attempting to
address
the problem, but their efforts had failed. Much of this difficulty
was
attributed to an avoidance by middle managers of giving
ultimatums
as a solution; that is, simply demanding that workers comply.
Instead,
management subsequently became interested in a middle-ground
approach that could possibly help departments realize the need
to
change and to help determine what the solution might be. The
ini-
tial thinking of the CEO was to see if specialized technology
could
be built that would (1) provide efficiency to the process of
recording
time, and (2) create a form of controls that would require some
level
of compliance.
With the involvement of the CEO, the embattled IT depart-
ment was given the authority to determine what technology
could
228 InForMAtIon teChnoloGY
be employed to help the situation. The existing application that
had
been developed by the IT department did not provide the kind of
ease
of use and access that was needed by operations. Previous
attempts
to develop a new system, without the intervention of the CEO,
had
failed for a number of reasons. Management did not envision
the
potential solution that software was capable of delivering. It
was not
motivated in getting the requisite budget support; no one was in
a
position to champion it, to allocate the needed budget.
Ultimately,
management individuals were not convinced of the importance
of
providing a better solution.
The Process
The new CTO determined that there was a technological
solution
that could provide greater application flexibility, while
maintaining its
necessary integrity, through the use of the existing e-mail
system. The
application would require staff to enter their project time spent
before
signing on to the e-mail system. While this procedure might be
seen
as a punishment, it became the middle-ground solution for
securing
compliance without dramatically dictating policy. There was
initial
rejection of the procedure by some of the line managers, but it
was
with the assistance of the CEO, who provided the necessary
support
and enforcement, that the new procedure took hold. This
enforcement
became crucial when certain groups asked to be excluded from
the
process. The CEO made it clear that all departments were
expected
to comply.
The application was developed in three months and went into
pilot
implementation. The timely delivery of the application by the
IT
department gave IT its first successful program implementation
and
helped change the general view of IT among its company
colleagues.
It was the first occasion in which IT had a leadership role in
guiding
the company to a major behavioral transformation. Another
positive
outcome that resulted from the transition occurred in the way
that
resistance to change was managed by the CTO. Simply put, the
cre-
ative staff was not open to a structured solution. The CTO’ s
response
was to implement a warning system instead of immediately
disallow-
ing e-mail access. This procedure was an important concession
as it
229sYnerGIstIC unIon oF It
allowed staff and management to deal with the transition, to
meet
them halfway.
Transformation from the Transition
After the pilot period, the application was implemented firm-
wide.
The results of this new practice have created an interesting
internal
transformation: IT is now intimately engaged in working on new
enhancements to the time-recording system. For instance, a “
digital
dashboard” is now used to measure performance against
estimates.
More important, however, are the results of the new application.
The
firm has shown substantial increases in revenue because its new
time-
recording system enabled it to discover numerous areas in
which it
was underbilling its clients. Its clients, on the other hand, are
happier
to receive billing statements that can demonstrate more
accurately
than before just how time was spent on their projects. Hence,
the
IT-implemented solution proved beneficial not only to the client
but
also to the firm.
Notwithstanding the ultimate value of utilizing appropriate
tech-
nology and producing measurable outcomes, IT has also been
able
to assist in developing and establishing a new culture in the
firm.
Staff members are now more mindful and have a greater sense
of cor-
porate-norm responsibility than they did before. They have a
clearer
understanding of the impact that recording their time will have
and of
how this step ultimately contributes to the well-being of the
business.
Furthermore, the positive results of the new system have
increased
attention on IT spending. The CEO and other managers seek
new
ways in which technology can be made to help them; this
mindset has
been stressed further down to operating departments. The
methods
of IT evaluation have also evolved. There is now a greater
clarification
of technology benefits, a better articulation of technology
problems,
less trial and error, and more time spent on understanding how
to use
the technology better.
Another important result from this project has been the cascad-
ing effect of the financial impact. The increased profits have
required
greater infrastructure capacity. A new department was created
with
five new business managers whose responsibility it is to analyze
and
interpret the time reports so that line managers, in turn, can
think of
230 InForMAtIon teChnoloGY
ways to generate greater profit through increased services. The
project,
in essence, has merged the creative performance of the firm
with new
business initiatives, resulting in a higher ROI.
In analyzing the HTC case study, we see many organizational
learning techniques that were required to form a new
community
that could assimilate multiple cultures. However, while the
organiza-
tion saw the need, it could not create a process without an
advocate.
This champion was the CEO, who had the ability to make the
salient
organizational changes and act as a catalyst for the natural
processes
that HTC hoped to achieve. This case also provides direction on
the
importance of having the right resource to lead IT. At HTC, this
person was the CTO; in actuality, this has little bearing on the
over-
all role and responsibilities that were needed at HTC. At HTC,
it
became more apparent to the CEO that she had the wrong
individual
running the technology management of her firm. Only the CEO
in
this situation was able to foster the initial steps necessary to
start what
turned out to be a more democratic evolution of using
technology in
the business.
Companies that adapt to technological dynamism find that the
existing leadership and infrastructure may need to be enhanced
or
replaced as well as reorganized, particularly in terms of
reporting
structure. This case supports the notion that strategic
integration may
indeed create the need for more cultural assimilation. One
question
to ask, is why the CEO waited so long to make the changes.
This was
not a situation of a new CTO who inherited resources. Indeed,
the
former CTO was part of her regime. We must remember that
CEOs
typically concentrate on driving revenue. They hope that what
are
considered “ back-end” support issues will be handled by other
senior
managers. Furthermore, support structures are measured
differently
and from a specific frame of reference. I have found that CEOs
inter-
vene in supporter departments only when there are major
complaints
that threaten productivity, customer support, sales, and so on.
The
other threat is cost, so CEOs will seek to make supporter
departments
more efficient. These activities are consistent with my earlier
findings
regarding the measurement and role of supporter departments.
In the case of HTC, the CEO became more involved because of
the customer service problems, which inevitably threatened
revenues.
231sYnerGIstIC unIon oF It
On her review of the situation, she recognized three major flaws
in
the operation:
• The CFO was not in a position to lead the organizational
changes necessary to assimilate a creative-based department.
• Technology established a new strategy (strategic integration),
which necessitated certain behavioral changes within the
organization (cultural assimilation). The creative department
was also key to make the organizational transition possible.
• The current CTO did not have the management and business
skills that were necessary to facilitate the integration of IT
with the rest of the organization.
HTC provides us with an interesting case of what we have
defined
as responsive organizational dynamism, and it bears some
parallels to
the Ravell study. First, like Ravell, the learning process was
triggered
by a major event. Second, the CTO did not dictate assimilation
but
rather provided facilitation and support. Unlike Ravell, the CEO
of
the organization was the critical driver to initiate the project.
Because
of the CEO’ s particular involvement, organizational learning
started
at the top and was thus system oriented. At the same time, the
CTO
understood that individual event-driven learning using
reflective
practices was critical to accomplish organizational
transformation. In
essence, the CTO was the intermediary between organizational-
level
and individual-level learning. Figure 8.12 depicts this
relationship.
Five Years Later
HTC has been challenged because of the massive changes that
adver-
tising companies have faced over this timeframe, particularly
with
the difficulty of finding new advertising revenue sources for
their
clients. The CEO has remained active in technology matters,
and
there has also been turnover in the CTO role at the company.
The
CEO has been challenged to find the right fit—a person who can
understand not only the technology but also the advertising
business.
With media companies taking over much of the advertising
space, the
CEO clearly recognizes the need to have a technology-driven
market
strategy. Most important is the dilemma of how to transform
what
232 InForMAtIon teChnoloGY
was once a “ paper” advertising business to what has become a
lower-
cost media market. “ Advertising companies need to do more
business
just to keep the same revenue stream and that is a big challenge
in
today’ s volatile market,” the CEO stated. The time-recording
system
has gone through other changes to provide what are known as
value-
added services , not necessarily tied to time effort, but rather,
the value
of the output itself.
The experience at HTC shows the importance of executive
partici-
pation, not just sponsorship. Many technology projects have
assumed
the need for executive sponsorship. It is clear to me that this
position
is obsolete. If the CEO at HTC had not become involved in the
prob-
lem five years ago, then the organization would not be in the
position
to embrace the newest technology dynamism affecting the
industry.
So, the lessons learned from this case, as well as from the
Ravell case,
are that all levels of the organization must be involved, and that
exec-
utives must not be sacred. Responsive organizational dynamism,
and
the use of organizational learning methods to develop staff,
remains
key concepts for adapting to market changes and ensuring
economic
survival.
Organizational and system
level learning
Organizational and
individual-level learning
Individual learning
Learning
facilitator
CTO
CEO
Middle
management
Creative
operations
Figure 8.12 HTC—Role of the CTO as an intermediary.
233sYnerGIstIC unIon oF It
Summary
This chapter has provided three case studies that show the ways
technology and organizational learning operate and lead to
results
through performance. The Siemens example provided us with an
opportunity to see a technology executive formulate
relationships,
form multiple communities of practice, and create an
infrastructure
to support responsive organizational dynamism. This case
provides a
method in which IT can offer a means of handling technology as
new
information and, through the formation of communities of
practice, it
can generate new knowledge that leads to organizational
transforma-
tion and performance.
The case study regarding ICAP again shows why technology, as
an
independent variable, provides an opportunity, if taken, for an
inter-
national firm to move into a new competitive space and improve
its
competitive advantage. ICAP was only successful because it
under-
stood the need for organizational learning, communities of
practice,
and the important role of the CEO in facilitating change. We
also
saw why independent consultants and executive boards need to
par-
ticipate. ICAP symbolizes the ways in which technology can
change
organizational structures and cultural formations. Such changes
are
at the very heart of why we need to understand responsive
organi-
zational dynamism. The creation of a new firm, ETC, shows us
the
importance of these changes. Finally, it provides us with an
example
of how technology can come to the forefront of an organization
and
became the major driver of performance.
HTC, on the other hand, described two additional features of
how
responsive organizational dynamism can change internal
processes
that lead to direct returns. The CEO, as in the ICAP case,
played an
important, yet different, role. This case showed that the CTO
could
also be used to facilitate organizational learning, becoming the
nego-
tiator and coordinator between the CEO, IT department, and
cre-
ative user departments.
All three of these cases reflect the importance of recognizing
that
most technology information exists outside the organization and
needs
to be integrated into existing cultures. This result is consistent
with the
findings of Probst et al. (1998), which show that long-term
sustained
competitive advantage must include the “ incorporation and
integration
234 InForMAtIon teChnoloGY
of information available outside the borders of the company”
(p. 247).
The reality is that technology, as an independent and outside
variable,
challenges organizations in their abilities to absorb external
informa-
tion, assimilate it into their cultures, and inevitably apply it to
their
commercial activities as a function of their existing knowledge
base.
These case studies show that knowledge creation most often
does
not get created solely by individuals. It is by using communities
of
practice that knowledge makes its way into the very routines of
the
organization. Indeed, organizational learning must focus on the
transformation of individual skills into organizational processes
that
generate measurable outcomes. Probst et al. (1998) also shows
that the
development of organizational knowledge is mediated via
multiple
levels. Walsh (1995) further supports Probst et al.’ s findings
that there
are three structures of knowledge development in an
organization.
The first is at the individual level; interpretation is fostered
through
reflective practices that eventually lead to personal
transformation and
increased individual knowledge. The second structure is at the
group
level; individual knowledge of the group is combined into a
consen-
sus, leading to a shared belief system. The third structure
resides at the
organizational level; knowledge emanates from the shared
beliefs and
the consensus of the groups, which creates organizational
knowledge.
It is important to recognize, however, that organizational
knowledge
is not established or created by combining individual
knowledge. This
is a common error, particularly among organizational learning
prac-
titioners. Organizational knowledge must be accomplished
through
social discourse and common language interactions so that
knowl-
edge can be a consensus among the communities of practice.
Each of the case studies supported the formation of tiers of
learning
and knowledge. The individuals in these cases all created
multiple lay-
ers that led to structures similar to those suggested by scholars.
What
makes these cases so valuable is that technology represented the
exter-
nal knowledge. Technological dynamism forced the multiple
struc-
tures from individual-based learning to organizational-level
learning,
and the unique interactions among the communities in each
example
generated knowledge leading to measurable performance
outcomes.
Thus, as Probst and Bü chel (1996, p. 245) conclude, “
Organizational
learning is an increase in organizational knowledge base, which
leads
to the enhancement of problem-solving potential of a company.”
235sYnerGIstIC unIon oF It
However, these case studies also provide important information
about the process of the interactions. Many tiered structures
tend
to be viewed as a sequential process. I have presented theories
sug-
gesting that knowledge management is conditioned either from
the
top-down, middle-up-down, or bottom-up. It has been my posi-
tion that none of these processes should be seen as set
procedures
or methodologies. In each of these cases, as well as in the
Ravell
case, the flow of knowledge occurs differently and, in some
ways,
uniquely to the culture and setting of the organization. This
suggests
that each organization must derive its own process, adhering
more to
the concept of learning, management, and outcomes, as opposed
to a
standard system of how and when they need to be applied. Table
8.2
summarizes the different approaches of organizational learning
of
the three case studies.
Such is the challenge of leaders who aspire to create the
learning
organization. Technology plays an important role because, in
reality,
it tests the very notions of organizational learning theories. It
also
creates many opportunities to measure organizational learning,
and
its impact on performance. Indeed, technology is the variable
that
provides the most opportunity to instill organizational learning,
and
knowledge management in a global community.
Table 8.2 Summary of Organizational Learning Approaches
SUBJECT SIEMENS ICAP/ETC HTC
Knowledge
management
participation
CIO as
middle-up-down
Top-down from CEO
and bottom-up
from operations
Top-down from CEO
and middle-up-down
from CTO
Community of
practices
President’ s Council
CFO
CIO advisory board
Executive Board
Operations
Management
Implementation
CEO/CTO
CTO operations
Participating entities Presidents
CFOs
Global CIO
Corporate CIOs
Regional CIOs
Operating CIOs
Central CIOs
Executive board
Outside
consultants
CEO
Senior management
Middle management
Operations
CEO
CTO
Middle management
Creative operations
Common thread Corporate CIO CEO
Senior management
Middle management
CTO
236 InForMAtIon teChnoloGY
The case studies also provided an understanding of the
transformational process and the complexities of the
relationships
between the different learning levels. It is not a single entity
that
allows a company to be competitive but the combination of
knowl-
edge at each of the different tiers. The knowledge that exists
through-
out a company is typically composed of three components:
processes,
technology, and organization (Kanevsky & Housel, 1998). I find
that,
of these three components, technology is more variable than the
oth-
ers and, as stated many times in this book, at a dynamic and
unpre-
dictable fashion (that condition, called technological
dynamism).
Furthermore, the technology component has direct effects on the
other two. What does this mean? Essentially, technology is at
the
core of organizational learning and knowledge creation.
This chapter has shown the different ways in which technology
has
been valued and how, through organizational learning, tacit
knowl-
edge is transformed into explicit knowledge, and used for
competitive
advantage. We have seen that not all of this value creation can
be
directly attributed to technology; in fact, this is rarely the case.
Most
value derived from technology is indirect, and it must be
recognized
by management as maximizing outcomes. Two of the case
studies
looked at the varying roles and responsibilities of the CEO. I
believe
their involvement was critical. Indeed, the conclusions reached
from
the Ravell case showed further support that the absence of the
CEO
will limit results. Furthermore, the CEO was crucial to
sustaining
organizational learning and the responsive organizational
dynamism
infrastructure.
Much has been written about the need to link learning to knowl-
edge and knowledge to performance. This process can
sometimes be
referred to as a value chain. Kanevsky and Housel (1998)
created what
they call a “ learning-knowledge-value spiral,” comprised of
six spe-
cific steps to creating value from learning and ultimately,
changing
product or process descriptions, as shown in Figure 8.13.
I have modified Figure 8.13 to include “ technology” ; that is,
how
technology affects learning, learning affects knowledge, and so
on.
Table 8.3 is a matrix that reflects the specific results, in each
phase,
for the three case studies.
Table 8.3 reflects the ultimate contribution that technology
made
to the learning-knowledge-value chain. I have also notated the
ROI
237sYnerGIstIC unIon oF It
Ta
bl
e
8
.3
IT
C
on
tri
bu
tio
n
to
th
e
Le
ar
ni
ng
-K
no
wl
ed
ge
-V
al
ue
C
ha
in
CO
M
PA
NY
TE
CH
NO
LO
GY
LE
AR
NI
NG
GE
NE
RA
TE
D
KN
OW
LE
DG
E
PR
OC
ES
S
PR
OD
UC
T
VA
LU
E
Si
em
en
s
E-
bu
si
ne
ss
Co
m
m
un
iti
es
o
f
pr
ac
tic
e
Co
ns
en
su
s a
cr
os
s m
ul
tip
le
co
m
m
un
iti
es
on
h
ow
to
re
la
te
ta
cit
kn
ow
led
ge
a
bo
ut
te
ch
no
log
y t
o s
tra
te
gi
c
bu
sin
es
s p
ro
ce
ss
es
.
90
-D
ay
“
re
in
ve
nt
io
n”
lif
e-
cy
cl
e
m
et
ho
d.
Co
ns
ol
id
at
ed
e-
co
m
m
er
ce
W
eb
si
te
s
pr
ov
id
in
g
co
ns
is
te
nc
y
of
p
ro
du
ct
a
nd
s
er
vi
ce
of
fe
rin
gs
.
Le
ve
ra
gi
ng
o
f s
am
e
cl
ie
nt
s;
p
ro
vi
di
ng
m
ul
tip
le
p
ro
du
ct
of
fe
rin
gs
to
s
am
e
cl
ie
nt
b
as
e.
RO
I:
In
di
re
ct
IC
AP
El
ec
tro
ni
c
tra
di
ng
CE
O/
ex
ec
ut
iv
e
co
m
m
itt
ee
Ab
ili
ty
to
p
ro
vi
de
a
nd
in
te
gr
at
e
bu
si
ne
ss
a
nd
te
ch
no
lo
gy
k
no
wl
ed
ge
to
cr
ea
te
n
ew
p
ro
du
ct
.
Es
ta
bl
is
h
ne
w
co
m
pa
ny
, E
TC
, t
o
su
pp
or
t c
ul
tu
ra
l
as
si
m
ila
tio
n
an
d
ev
ol
ut
io
n.
El
ec
tro
ni
c
tra
di
ng
.
Cr
ea
te
d
m
os
t
co
m
pe
tit
iv
e
pr
od
uc
t i
n
th
e
fin
an
ci
al
in
du
st
ry.
Le
ve
ra
gi
ng
in
de
pe
nd
en
t
co
ns
ul
ta
nt
s.
In
fil
tra
tio
n
in
to
n
ew
m
ar
ke
ts
.
Gr
ou
p
le
ar
ni
ng
.
RO
I:
Di
re
ct
.
M
ul
tip
le
c
om
m
un
iti
es
of
p
ra
ct
ic
e.
HT
C
E-
m
ai
l
CE
O
at
or
ga
ni
za
tio
na
l-l
ev
el
;
in
di
vi
du
al
le
ar
ni
ng
us
in
g
re
fle
ct
iv
e
pr
ac
tic
es
.
Un
de
rs
ta
nd
in
g
ho
w
to
in
te
gr
at
e
IT
d
ep
ar
tm
en
t
wi
th
c
re
at
iv
e
m
an
ag
em
en
t
gr
ou
p.
Es
ta
bl
is
h
ne
w
pr
oc
ed
ur
es
fo
r u
si
ng
e-
m
ai
l t
o
re
co
rd
c
lie
nt
bi
lla
bl
e
ho
ur
s.
Ne
w
cl
ie
nt
b
ill
in
g
sy
st
em
.
Cl
ie
nt
s
ha
pp
y.
M
or
e
co
m
pe
tit
iv
e.
Ad
di
tio
na
l r
ev
en
ue
s.
RO
I:
Di
re
ct
.
238 InForMAtIon teChnoloGY
generated from each investment. It is interesting that two of the
three
cases generated identifiable direct revenue streams from their
invest-
ment in technology.
This chapter has laid the foundation for Chapter 9, which
focuses
on the ways IT can maximize its relationship with the
community
and contribute to organizational learning. To accomplish this
objec-
tive, IT must begin to establish best practices.
Change in
product/process
description
Learning
Value
MarketCompetition
Product
Knowledge
Process
Figure 8.13 The learning-knowledge-value cycle. (From
Kanevsky, V., et al. (Eds.), Knowing in
Firms: Understanding, Managing and Measuring Knowledge ,
Sage, London, 1998, pp. 240– 252.)
239
9
foRming a CybeR
seCuRiTy CulTuRe
Introduction
Much has been written regarding the importance of how
companies
deal with cyber threats. While most organizations have focused
on
the technical ramifications of how to avoid being compromised,
few
have invested in how senior management needs to make security
a
priority. This chapter discusses the salient issues that
executives must
address and how to develop a strategy to deal with the various
types
of cyber attack that could devastate the reputation and revenues
of any
business or organization. The response to the cyber dilemma
requires
evolving institutional behavior patterns using organizational
learning
concepts.
History
From a historical perspective we have seen an interesting
evolution
of the types and acceleration of attacks on business entities.
Prior to
1990, few organizations were concerned with information
security
except for the government, military, banks and credit card
companies.
In 1994, with the birth of the commercial Internet, a higher
volume of
attacks occurred and in 2001 the first nation-state sponsored
attacks
emerged. These attacks resulted, in 1997, in the development of
com-
mercial firewalls and malware. By 2013, however, the increase
in
attacks reached greater complexity with the Target credit card
breach,
Home Depot’ s compromise of its payment system, and JP
Morgan’ s
exposure that affected 76 million customers and seven million
busi-
nesses. These events resulted in an escalation of fear,
particularly in
the areas of sabotage, theft of intellectual property, and stealing
of
money. Figure 9.1 shows the changing pace of cyber security
240 InForMAtIon teChnoloGY
Pr
e-
19
90
19
94
19
97
20
00
20
01
20
14
Bi
rt
h
of
co
m
m
er
ci
al
In
te
rn
et
Fi
re
w
al
ls
an
d
m
al
w
ar
e
Y2
K
In
cr
ea
se
d
nu
m
be
r o
f a
tt
ac
ks
w
it
h
gr
ea
te
r c
om
pl
ex
it
y
Fe
ar
fa
ct
or
es
ca
la
te
s.
S
ab
ot
ag
e,
th
ef
t o
f i
nt
el
le
ct
ua
l
pr
op
er
ty
a
nd
m
on
ey
be
co
m
e
a
co
ns
ta
nt
th
re
at
. D
ai
ly
h
ea
dl
in
e
ri
sk
is
a
n
ew
re
al
it
y.
C
om
m
er
ci
al
iz
ed
c
yb
er
se
cu
rit
y:
19
94
: N
et
sc
ap
e
D
ev
el
op
s s
ec
ur
e
so
ck
et
s
la
ye
r e
nc
ry
pt
io
n,
co
m
m
er
ci
al
ly
a
va
ila
bl
e
se
cu
ri
ty
so
ftw
ar
e,
to
se
cu
re
o
nl
in
e
tr
an
sa
ct
io
ns
.
Fe
w
g
ro
up
s c
on
ce
rn
ed
w
ith
in
fo
rm
at
io
n
se
cu
rit
y
ex
ce
pt
go
ve
rn
m
en
t,
m
ili
ta
ry
,
ba
nk
s a
nd
c
re
di
t c
ar
d
co
m
pa
ni
es
.
9/
11
Ev
ol
ut
io
n
of
c
yb
er
a
tt
ac
ks
:
H
ig
he
r v
ol
um
e
of
at
ta
ck
s:
20
01
:
N
at
io
n
st
at
e-
sp
on
so
re
d
at
ta
ck
s
em
er
ge
in
a
m
ea
ni
ng
fu
l w
ay
.
20
13
–2
01
4:
T
ar
ge
t h
as
7
0
m
ill
io
n
cu
st
om
er
s’
cr
ed
it
ca
rd
s b
re
ac
he
d.
20
13
: B
oo
z
A
lle
n
em
pl
oy
ee
a
nd
c
on
tr
ac
to
r
fo
r t
he
N
SA
, E
dw
ar
d
Sn
ow
de
n
st
ea
ls
an
d
le
ak
s
de
ta
ils
o
f s
ev
er
al
to
p-
se
cr
et
U
.S
. a
nd
B
rit
ish
g
ov
er
nm
en
t
m
as
s s
ur
ve
ill
an
ce
p
ro
gr
am
s
to
th
e
pr
es
s.
Ti
m
el
in
e
of
e
ve
nt
s
20
14
: H
om
e
D
ep
ot
su
ffe
rs
a
6
-m
on
th
b
re
ac
h
of
it
s
pa
ym
en
t s
ys
te
m
a
ffe
ct
in
g
m
or
e
th
an
5
3
m
ill
io
n
cr
ed
it
an
d
de
bi
t c
ar
ds
.
20
14
:
JP
M
or
ga
n
C
ha
se
su
ffe
rs
a
b
re
ac
h
aff
ec
tin
g
76
m
ill
io
n
cu
st
om
er
s a
nd
se
ve
n
m
ill
io
n
bu
sin
es
se
s.
Fi
gu
re
9
.1
T
he
c
ha
ng
in
g
pa
ce
o
f c
yb
er
s
ec
ur
ity
. (
Fr
om
R
us
se
ll
Re
yn
ol
ds
A
ss
oc
ia
te
s
20
14
p
re
se
nt
at
io
n.
)
241ForMInG A CYber seCurItY Culture
The conventional wisdom among cyber experts is that no
business
can be compromise proof from attacks. Thus, leaders need to
realize
that there must be (1) other ways beyond just developing new
anti-
software to ward off attacks, and (2) internal and external
strategies to
deal with an attack when it occurs. These challenges in cyber
security
management can be categorized into three fundamental
components:
• Learning how to educate and present to the board of directors
• Creating new and evolving security cultures
• Understanding what it means organizationally to be
compromised
Each of these components is summarized below
Talking to the Board
Board members need to understand the possible cyber attack
expo-
sures of the business. They certainly need regular
communication
from those executives responsible for protecting the
organization.
Seasoned security executives can articulate the positive
processes that
are in place, but without overstating too much confidence since
there
is always risk of being compromised. That is, while there may
be expo-
sures, C-level managers should not hit the panic button and
scare the
board. Typically, fear only instills a lack of confidence by the
board in
the organization’ s leadership. Most important is to always
relate secu-
rity to business objectives and, above all, avoid “ tech” terms
during
meetings. Another important topic of discussion is how third-
party
vendors are being managed. Indeed, so many breaches have
been
caused by a lack of oversight of legacy applications that are
controlled
by third-party vendors. Finally, managers should always
compare the
state of security with that of the company’ s competitors.
Establishing a Security Culture
The predominant exposure to a cyber attack often comes from
care-
less behaviors of the organization’ s employees. The first step
to avoid
poor employee cyber behaviors is to have regular
communication with
staff and establish a set of best practices that will clearly
protect the
business. However, mandating conformance is difficult and
research
242 InForMAtIon teChnoloGY
has consistently supported that evolutionary culture change is
best
accomplished through relationship building, leadership by
influence
(as opposed to power-centralized management), and ultimately,
a
presence at most staff meetings. Individual leadership remains
the
most important variable when transforming the behaviors and
prac-
tices of any organization.
Understanding What It Means to Be Compromised
Every organization should have a plan of what to do when
security
is breached. The first step in the plan is to develop a “ risk”
culture.
What this simply means is that an organization cannot maximize
protection of all parts of its systems equally. Therefore, some
parts of a
company’ s system might be more protected against cyber
attacks than
others. For example, organizations should maximize the
protection
of key company scientific and technical data first. Control of
network
access will likely vary depending on the type of exposure that
might
result from a breach. Another approach is to develop consistent
best
practices among all contractors and suppliers and to track the
move-
ment of these third parties (e.g., if they are merged/sold,
disrupted
in service, or even breached indirectly). Finally, technology
execu-
tives should pay close attention to Cloud computing alternatives
and
develop ongoing reviews of possible threat exposures in these
third-
party service architectures.
Cyber Security Dynamism and Responsive Organizational
Dynamism
The new events and interactions brought about by cyber security
threats can be related to the symptoms of the dynamism that has
been the basis of ROD discussed earlier in this book. Here,
however,
the digital world manifests itself in a similar dynamism that I
will
call cyber dynamism .
Managing cyber dynamism, therefore, is a way of managing the
negative effects of a particular technology threat. As in ROD,
cyber
strategic integration and cyber cultural assimilation remain as
distinct
categories, that present themselves in response to cyber
dynamism.
Figure 9.2 shows the components of cyber ROD.
243ForMInG A CYber seCurItY Culture
Cyber Strategic Integration
Cyber strategic integration is a process that firms need to use to
address
the business impact of cyber attacks on its organizational
processes.
Complications posed by cyber dynamism, via the process of
strategic
integration, occurs when several new cyber attacks overlap and
create a
myriad of problems in various phases of an organization’ s
ability to oper-
ate. Cyber attacks can also affect consumer confidence, which
in turn
hurts a business’s ability to attract new orders. Furthermore, the
problem
can be compounded by reductions in productivity, which are
complicated
to track and to represent to management. Thus, it is important
that orga-
nizations find ways to develop strategies to deal with cyber
threats such as:
1. How to reduce occurrences by instituting aggressive organi-
zation structures that review existing exposures in systems.
Cyber attacks as
an independent
variable
Organizational
dynamism
Requires
How to formulate risk-
related strategies to deal
with cyber attacks
Symptoms and
implications
Cyber
cultural
assimilation
Requires
Cyber
strategic
integration
Figure 9.2 Cyber responsive organizational dynamism. (From
Langer, A., Information Technology
and Organizational Learning: Managing Behavioral Change
through Technology and Education , CRC
Press, Boca Raton, FL, 2011.)
244 InForMAtIon teChnoloGY
2. What new threats exist, which may require ongoing research
and collaborations with third-party strategic alliances?
3. What new processes might be needed to combat new cyber
dynamisms based on new threat capabilities?
4. Creating systems architectures that can recover when a cyber
breach occurs.
In order to realize these objectives, executives must be able to
• Create dynamic internal processes that can function on a
daily basis, to deal with understanding the potential fit of new
cyber attacks and their overall impact to the local department
within the business, that is, to provide for change at the grass-
roots level of the organization.
• Monitor cyber risk investments and determine modifications
to the current life cycle of idea-to-reality.
• Address the weaknesses in the organization in terms of how
to deal with new threats, should they occur, and how to better
protect the key business operations.
• Provide a mechanism that both enables the organization to
deal with accelerated change caused by cyber threats and that
integrates them into a new cycle of processing and handling
change.
• Establish an integrated approach that ties cyber risk account-
ability to other measurable outcomes integrating acceptable
methods of the organization.
The combination of evolving cyber threats with accelerated and
changing consumer demands has also created a business
revolution that
best defines the imperative of the strategic integration
component of
cyber ROD. Without action directed toward new strategic
integration
focused on cyber security, organizations will lose competitive
advan-
tage, which will ultimately affect profits. Most experts see the
danger
of breaches from cyber attacks as the mechanism that will
ultimately
require the integrated business processes to be realigned, thus
provid-
ing value to consumers and modifying the customer- vendor
relation-
ship. The driving force behind this realignment emanates from
cyber
dynamisms, which serve as the principle accelerator of the
change in
transactions across all businesses.
245ForMInG A CYber seCurItY Culture
Cyber Cultural Assimilation
Cyber cultural assimilation is a process that addresses the
organiza-
tional aspects of how the security department is internally
organized,
its relationship with IT, and how it is integrated within the
organiza-
tion as a whole. As with technology dynamism, cyber dynamism
is
not limited only to cyber strategic issues, but cultural ones as
well. A
cyber culture is one that can respond to emerging cyber attacks,
in
an optimally informed way, and one that understands the impact
on
business performance and reputation.
The acceleration factors of cyber attacks require more dynamic
activity within and among departments, which cannot be accom-
plished through discrete communications between groups.
Instead,
the need for diverse groups to engage in more integrated
discourse
and to share varying levels of cyber security knowledge, as well
as
business-end perspectives, requires new organizational
structures that
will give birth to a new and evolving business social culture.
In order to facilitate cyber cultural assimilation, organizations
must
have their staffs be more comfortable with a digital world that
contin-
ues to be compromised by outside threats. The first question
becomes
one of finding the best structure to support a broad assimilation
of
knowledge about any given cyber threat. The second is about
how that
knowledge can best be utilized by the organization to develop
both
risk efforts and attack resilience. Business managers therefore
need
to consider cyber security and include the cyber staff in all
decision-
making processes. Specifically, cyber assimilation must become
fun-
damental to the cultural evolution.
While many scholars and managers suggest the need to have a
specific entity responsible for cyber security governance; one
that is
to be placed within the organization’ s operating structure, such
an
approach creates a fundamental problem. It does not allow staff
and
managers the opportunity to assimilate cyber security-driven
change
and understand how to design a culture that can operate under
ROD.
In other words, the issue of governance is misinterpreted as a
problem
of structural positioning or hierarchy when it is really one of
cultural
assimilation. As a result, many business solutions to cyber
security
issues often lean toward the prescriptive instead of the
analytical in
addressing the real problem.
246 InForMAtIon teChnoloGY
Summary
This section has made the argument that organizations need to
excel
in providing both strategic and cultural initiatives to reduce
exposure
to cyber threats and ultimate security breaches. Executives must
design
their workforce to meet the accelerated threats brought on by
cyber
dynamisms. Organizations today need to adapt their staff to
operate
under the auspices of ROD by creating processes that can
determine
the strategic exposure of new emerging cyber threats and by
establish-
ing a culture that is more “ defense ready.” Most executives
across indus-
tries recognize that cyber security has become one of the most
powerful
variables to maintaining and expanding company markets.
Organizational Learning and Application Development
Behavioral change, leading to a more resilient cyber culture, is
just
one of the challenges in maximizing protection in organizations.
Another important factor is how to design more resilient
applications
that are better equipped to protect against threats; that is, a
decision
that needs to address exposure coupled with risk. The general
con-
sensus is that no system can be 100% protected and that this
requires
important decisions when analysts are designing applications
and sys-
tems. Indeed, security access is not just limited to getting into
the sys-
tem, but applies to the individual application level as well. How
then
do analysts participate in the process of designing secure
applications
through good design? We know that many cyber security
architec-
tures are designed from the office of the chief information
security
officer (CISO), a new and emerging role in organizations. The
CISO
role, often independent of the chief information officer (CIO),
became
significant as a result of the early threats from the Internet, the
9/11
attacks and most recently the abundant number of system
compro-
mises experienced by companies such as JP Morgan Chase,
SONY,
Home Depot, and Target, to name just a few.
The challenge of cyber security reaches well beyond just archi-
tecture. It must address third-party vendor products that are part
of
the supply chain of automation used by firms, not to mention
access
to legacy applications that likely do not have the necessary
securities
built into the architecture of these older, less resilient
technologies. This
247ForMInG A CYber seCurItY Culture
challenge has established the need for an enterprise cyber
security solu-
tion that addresses the need of the entire organization. This
approach
would then target third- party vendor design and compliance.
Thus,
cyber security architecture requires integration with a firm’ s
Software
Development Life Cycle (SDLC), particularly within steps that
include
strategic design, engineering, and operations. The objective is
to use a
framework that works with all of these components.
Cyber Security Risk
When designing against cyber security attacks, as stated above,
there
is no 100% protection assurance. Thus, risks must be factored
into
the decision-making process. A number of security experts often
ask
business executives the question, “ How much security do you
want,
and what are you willing to spend to achieve that security?”
Certainly, we see a much higher tolerance for increased cost
given the
recent significance of companies that have been compromised.
This sec-
tion provides guidance on how to determine appropriate security
risks.
Security risk is typically discussed in the form of threats.
Threats
can be categorized as presented by Schoenfield (2015):
1. Threat agent: Where is the threat coming from, and who is
making the attack?
2. Threat goals: What does the agent hope to gain?
3. Threat capability: What threat methodology, or type of
approach is the agent possibly going to use?
4. Threat work factor: How much effort is the agent willing to
put in to get into the system?
5. Threat risk tolerance: What legal chances is the agent
willing
to take to achieve his or her goals?
Table 9.1 is shown as a guideline.
Depending on the threat and its associated risks and work
factors,
it will provide important input to the security design, especially
at the
application design level. Such application securities in design
typically
include:
1. The user interface (sign in screen, access to specific parts of
the application).
248 InForMAtIon teChnoloGY
2. Command-line interface (interactivity) in online systems.
3. Inter-application communications. How data and password
information are passed, and stored, among applications across
systems.
Risk Responsibility
Schoenfield (2015) suggests that someone in the organization is
assigned the role of the “ risk owner.” There may be many risk
owners
and, as a result, this role could have complex effects on the way
sys-
tems are designed. For example, the top risk owner in most
organiza-
tions today is associated with the CISO. However, many firms
also
employ a chief risk officer (CRO). This role’ s responsibilities
vary.
But risk analysis at the application design level requires
different
governance. Application security risk needs involvement from
the
business and the consumer and needs to be integrated within the
risk
standards of the firm. Specifically, multiple levels of security
often
require users to reenter secure information. While this may
maximize
safety, it can negatively impact the user experience and the
robust-
ness of the system interface in general. Performance can
obviously
also be sacrificed, given the multiple layers of validation. There
is no
quick answer to this dilemma other than the reality that more
secu-
rity checkpoints will reduce user and consumer satisfaction
unless
cyber security algorithms become more invisible and
sophisticated.
However, even this approach would likely reduce protection. As
with
all analyst design challenges, the IT team, business users, and
now
the consumer must all be part of the decisions on how much
security
is required.
As my colleague at Columbia University, Steven Bellovin,
states
in his new book, Thinking Security , security is about a
mindset. This
mindset to me relates to how we establish security cultures that
can
Table 9.1: Threat Analysis
THREAT AGENT GOALS RISK TOLERANCE WORK
FACTOR METHODS
Cyber criminals Financial Low Low to medium Known and
proven
Source : Schoenfield, B.S.E., Securing Systems: Applied
Security Architecture and Threat Models ,
CRC Press, Boca Raton, FL, 2015.
249ForMInG A CYber seCurItY Culture
enable the analyst to define organizational security as it relates
to new
and existing systems. If we get the analyst position to
participate in
setting security goals in our applications, some key questions
accord-
ing to Bellovin (2015) are:
1. What are the economics to protect systems?
2. What is the best protection you can get for the amount of
money you want to spend?
3. Can you save more lives by spending that money?
4. What should you protect?
5. Can you estimate what it will take to protect your assets?
6. Should you protect the network or the host?
7. Is your Cloud secure enough?
8. Do you guess at the likelihood and cost of a penetration?
9. How do you evaluate your assets?
10. Are you thinking like the enemy?
The key to analysis and design in cyber security is recognizing
that
it is dynamic; the attackers are adaptive and somewhat
unpredictable.
This dynamism requires constant architectural change,
accompanied
with increased complexity of how systems become
compromised.
Thus, analysts must be involved at the conceptual model, which
includes business definitions, business processes and enterprise
stan-
dards. However, the analysts must also be engaged with the
logical
design, which comprises two sub-models:
1. Logical architecture : Depicts the relationships of different
data
domains and functionalities required to manage each type of
information in the system.
2. Component model : Reflects each of the sub-models and
appli-
cations that provide various functions in the system. The
component model may also include third-part vendor prod-
ucts that interface with the system. The component model
coincides, in many ways, with the process of decomposition.
In summary, the ROD interface with cyber security is more
com-
plex than many managers believe. Security is relative, not
absolute,
and thus leaders must be closely aligned with how internal
cultures
must evolve with changes environments.
250 InForMAtIon teChnoloGY
Driver /Supporter Implications
Security has traditionally been viewed as a support function in
most
organizations, particularly when it is managed by IT staff.
However,
the recent developments in cyber threats suggest, as with other
aspects
of technology, that security too has a driver side.
To excel in the role of security driver, leaders must:
• Have capabilities, budgets and staffing levels, using
benchmarks.
• Align even closer with users and business partners.
• Have close relationships with third parties.
• Extend responsibilities to include the growing challenges in
the mobile workforce.
• Manage virtualized environments and third-party ecosystems.
• Find and/or develop cyber security talent and human capital.
• Have a strategy to integrate millennials with baby boomer
and Gen X managers.
251
10
DigiTal TRansfoRmaTion
anD Changes in
ConsumeR behavioR
Introduction
Digital transformation is one of the most significant activities
of the
early twenty-first century. Digital transformation is defined as “
the
changes associated with the applications of digital technology
in all
aspects of human society” (Stolterman & Fors, 2004, p. 689).
From a
business perspective, digital transformation enables
organizations to
implement new types of innovations and to rethink business
processes
that can take advantage of technology. From this perspective,
digital
transformation involves a type of reengineering, but one that is
not
limited to rethinking just how systems work together, but rather,
that
extends to the entire business itself. Some see digital
transformation
as the elimination of paper in organizations. Others see it as
revamp-
ing a business to meet the demands of a digital economy. This
chapter
provides a link between digital transformation and what I call “
digital
reengineering.” To explain this better, think of process
reengineering
as the generation that brought together systems in the way that
they
talked to one another— that is, the integration of legacy systems
with
new application that used more robust software applications.
The advent of digital transformation requires the entire
organization
to meet the digital demands of their consumers. For some
companies, the
consumer is another company (B2B, or business-to-business),
that is, the
consumer is a provider to another company that inevitably
supports a con-
sumer. For other businesses, their consumer is indeed the
ultimate buyer.
I will discuss the differences in these two types of consumer
concepts later
in this chapter. What is important from an IT perspective is that
reengi-
neering is no longer limited to just the needs of the internal
user, but rather
the needs of the businesses consumer as well. So, systems must
change,
252 InForMAtIon teChnoloGY
as necessary, with the changes in consumer behavior. The
challenge with
doing this, of course, is that consumer needs are harder to
obtain and
understand, and can differ significantly among groups,
depending on
variables, such as ethnicity, age, and gender, to name just a few.
As a result, IT managers need to interact with the consumer
more
directly and in partnership with their business colleagues. The
con-
sumer represents a new type of user for IT staff. The consumer,
in
effect, is the buyer of the organization’ s products and services.
The
challenge becomes how to get IT more engaged with the buyer
com-
munity, which could require IT to be engaged in multiple parts
of
the business that deals with the consumer. Below are six
approaches,
which are not mutually exclusive of each other:
1. Sales/Marketing : These individuals sell to the company’ s
buy-
ers. Thus, they have a good sense of what customers are look-
ing for, what things they like about the business, and what
they dislike. The power of the sales and marketing team is
their ability to drive realistic requirements that directly impact
revenue opportunities. The limitation of this resource is that
it still relies on an internal perspective of the consumer; that
is, how the sales and marketing staff perceive the consumer’ s
needs.
2. Third-party market analysis/reporting : There are outside
resources available that examine and report on market trends
within various industry sectors. Such organizations typically
have massive databases of information and, using various
search and analysis tools, can provide a better understand-
ing of the behavior patterns of an organization’ s consumers.
These third parties can also provide reports that show how the
organization stacks up against its competition and why con-
sumers may be choosing alternative products. Unfortunately,
if the data is inaccurate it likely will result in false generaliza-
tions about consumer behavior, so it is critical that IT digital
leaders ensure proper review of the data integrity.
3. Predictive analytics : This is a hot topic in today’ s
competitive
landscape for businesses. Predictive analytics is the process
of feeding off large data sets (big data) and predicting future
253dIGItAl trAnsForMAtIon
behavior patterns. Predictive analytics approaches are usually
handled internally with assistance from third-party products
or consulting services. The limitation is one of risk— the risk
that the prediction does not occur as planned.
4. Consumer support departments: Internal teams and external
vendors (outsourced managed service) have a good pulse
on consumer preferences because they interact with them.
More specifically, these department respond to questions,
hande problems and get feedback from consumers on a reg-
ular basis. These support departments typically depend on
applications to help the buyer. As a result, they are an excel-
lent resource for providing up-to-date things that the sys-
tem does not provide consumers. Unfortunately, consumer
support organizations limit their needs to what they expe-
rience as opposed to what might be future trends of their
consumers.
5. Surveys: IT and the business can design surveys (question-
naires) and send them to consumers for feedback. Using
surveys can be of significant value in that the questions can
target specific issues that the organization wants to address.
Survey design and administration can be handled by third-
party firms, which may have an advantage in that the ques-
tions are being forwarded from an independent source and
one that does not identify the interested company. On the
other hand, this might be considered a negative— it all
depends on what the organization is seeking to obtain from
the buyer.
6. Focus groups: This approach is similar to the use of a
survey.
Focus groups are commonly used to understand consumer
behavior patterns and preferences. They are often conducted
by outside firms. The differences between the focus group
and a survey are (1) surveys are very quantitative based and
use scoring mechanisms (Likert scales) to evaluate outcomes.
Consumers sometimes may misinterpret the question thus
resulting in distorted feedback, and (2) focus groups are more
qualitative and allow IT digital leaders to engage with the
consumer in two-way dialogues.
254 InForMAtIon teChnoloGY
Figure 10.1 reflects a graphic depiction of the sources for
under-
standing consumer behaviors and needs.
Table 10.1 further articulates the methods and deliverables that
IT
digital leaders should consider when developing system
strategies.
Requirements without Users and without Input
Could it be possible to develop digital strategies and
requirements for
a system without user input or even consumer opinions? Could
this be
a reality for future design of strategic systems?
Perhaps we need to take a step back historically and think about
trends that have changed the competitive landscape. Digital
trans-
formation may indeed be the most powerful agent of change in
the
history of business.
Product
requirements
Sales/marketing
Staff
competitive analysis
Surveys
Internal/external
targeted consumers
Consumer support
departments
Internal support
groups, third-party
call centers,
shared services
organization
�ird-party studies
and databases
Trends
Data analysts
Predictive analytics
Focus groups
Internal/external
consumer sessions
Figure 10.1 Sources for understanding consumer behavior.
255dIGItAl trAnsForMAtIon
We have seen large companies lose their edge. IBM’ s fall as
the
leading technology firm in the 1990s is an excellent example,
when
Microsoft overtook them. Yet Google was able to take the lead
away
from Microsoft, particularly in relation to analytical consumer
com-
puting. And what about the comeback Apple made with its new
array
Table 10.1 Langer’ s Methods and Deliverables for Assessing
Consumer Needs
ANALYST’ S
SOURCES METHODS DELIVERABLES
Sales/
Marketing
Interviews Should be conducted in a similar way to typical end
user
interviews. Work closely with senior sales staff. Set up
interviews with key business stakeholders.
Win/loss sales
reviews
Review the results of sales efforts. Many firms hold formal
win/loss review meetings that may convey important
limitations of current applications and system
capabilities.
Third-Party
Databases
Document
reports
reviews
Obtain summaries of the trends in consumer behavior and
pinpoint shortfalls that might exist in current applications
and systems.
Data analysis Perform targeted analytics on databases to
uncover trends
not readily conveyed in available reports.
Predictive
analytics
Interrogate data by using analytic formulas that may
enable predictive trends in consumer behavior.
Support
Department
Interviews Interview key support department personnel (internal
and
third party) to identify possible application deficiencies.
Data/reports Review call logs and recorded calls between
consumers
and support personnel to expose possible system
deficiencies.
Surveys Internal and
external
questionnaires
Work with internal departments to determine application
issues when they support consumers. Use similar surveys
with select populations of customers to validate and
fine-tune internal survey results.
Use similar surveys targeted to consumers who are not
customers and compare results. Differences between
existing customer base and non-customers may expose
new trends in consumer needs.
Focus Groups Hold internal
and external
sessions
Internal focus groups can be facilitated by marketing
personnel. Select survey results, that had unexpected
results or mixed feedback can be reviewed. Internal
attendees should come from operations management and
sales. External focus groups should be facilitated by a
third-party vendor and held at independent sites.
Discussions with customers should be compared with
internal focus group results. Consumer focus groups
should be facilitated by professional third-party firms.
256 InForMAtIon teChnoloGY
of smart phone-related products? The question is, Why and how
do
these shifts in competitive advantage occur so quickly?
Technology continues to generate change and that change is
typically referred to today as a “ digital disruption.” The
challenge
in disruption is the inability to predict what consumers want and
need; furthermore, the consumer may not know! The challenge,
then, is for IT digital leaders to forecast the changes that are
brought about by technology disruptions. So, digital transforma-
tion is more about predicting consumer behavior and providing
new products and services, which we hope consumers will want.
This is a significant challenge for IT leaders, of course, given
that
the profession was built on the notion that good specifications
accurately depicted what users want. Langer (1997) originally
defined this as the “ Concept of the Logical Equivalent.” So,
we
may have created an oxymoron— how do we develop systems
that
the user cannot specify? Furthermore, requirements that depict
consumer behavior are now further complicated by the
globaliza-
tion of business. Which consumer behavior are we attempting to
satisfy and across what societal cultural norms? The reality is
that
new software applications will need to be built with some
uncer-
tainty. That is, some business rules may be vague and risks will
need to be part of the process of system functionality. To see an
example of designing systems based on uncertainty, we need
only
to analyze the evolution of the electronic spreadsheet. The first
electronic spreadsheet, called VisiCalc, was introduced by a
com-
pany called VisiCorp. It was designed for the Apple II and
eventu-
ally the IBM personal computer. The electronic spreadsheet was
not designed based on consumer input per se, rather on
perceived
needs by visionary designers who saw a need for a generic
calcula-
tor and mathematical worksheet. VisiCorp took a risk by offer-
ing a product to the market that consumers would find useful.
Of
course, history shows that it was a very good risk. The
electronic
spreadsheet, which is now dominated by Microsoft’ s Excel
product
has gone through multiple product generations. The inventors of
the electronic spreadsheet had a vision and the market
responded
favorably. Although VisiCorp’ s vision of the market need was
cor-
rect, the first version was hardly 100% accurate of what
consumers
would want in a spreadsheet. For example, additional features,
such
257dIGItAl trAnsForMAtIon
as a database interface, three-dimensional spreadsheets to
support
budgeting and forward referencing, are all examples of
responses
from consumers that resulted in new product enhancements.
Allen and Morton (1994) established an excellent graphic depic-
tion of the relationship between technology advancements and
mar-
ket needs (Figure 10.2)
Figure 10.2 shows an interesting life cycle of how product
innovations
relate to the creation of new products and services. The diagram
reflects
that innovations can occur as a result of new technology
capabilities or
inventions that establish new markets— like the electronic
spreadsheet.
On the other hand, the market can demand more features and
functions
the technology organizations or developers need to respond to
that— like
the upgrades made over the years to spreadsheet applications.
Responding
to market needs are what most organizations have practiced
over the past
60 years, usually working with their end user populations (those
internal
users that supported the actual consumer). The digital
revolution; how-
ever, is placing more emphasis on “ generic” applications that
resemble the
object paradigm (one that requires applications to be able to fit
into any
business application). This trend will drive new and more
advanced object-
driven applications. These applications will reside in a more
robust object
functioning library that can dynamically link these modules
together to
form specific applications that can support mul consumer
devices (what is
now being called the “ Internet of Things” ).
Another useful approach to dealing with consumer preferences
is
Porter’ s Five Forces Framework. Porter’s framework consists
of the
following five components:
1. Competitors : What is the number of competitors in the
market
and what is the organization’ s position within the market?
Technology
Market
Innovation
Figure 10.2 Technology, innovation, and market needs.
258 InForMAtIon teChnoloGY
2. New entrants : What companies can come into the organiza-
tion’ s space and provide competition?
3. Substitutes : What products or services can replace what you
do?
4. Buyers : What alternatives do buyers have? How close and
tight is the relationship between the buyer and seller?
5. Suppliers : What is the number of suppliers that are
available,
which can affect the relationship with the buyer and also
determine price levels?
Porter’ s framework is graphically depicted in Figure 10.3.
Cadle et al. (2014) provide an approach to using Porter’ s model
as
part of the analysis and design process. Their approach is
integrated
with Langer’ s Analysis Consumer Methods in Table 10.2.
Concepts of the S-Curve and Digital
Transformation Analysis and Design
Digital transformation will also be associated with the behavior
of the
S-curve. The S-curve has been a long-standing economic graph
that
depicts the life cycle of a product or service. The S-curve is
shown in
Figure 10.4
New
entrants
Suppliers
Consumer
support dept.
Buyers
Industry
competitors
(sales and
marketing)
Substitutes
New products
or services
Sales and
marketing
Figure 10.3 Porter’ s Five Forces Framework.
259dIGItAl trAnsForMAtIon
The left and lower portion of the S-curve represents a growing
market opportunity that is likely volatile and exists where
demand
exceeds supply. As a result, the market opportunity is large and
prices
for the product are high. Thus, businesses should seek to
capture as
much of the market share at this time before competitors catch
up.
This requires the business to take more risk and assumes that
the mar-
ket will continue to demand the product. The shape of the S-
curve
suggests the life of this opportunity (the length of the x-axis
repre-
sents the lifespan of the product).
As the market approaches the middle of the center of the S-
curve,
demand begins to equal supply. Prices start to drop and the
market, in
general, becomes less volatile and more predictable. The drop in
price
reflects the presence of more competitors. As a product or
service
approaches the top of the S, supply begins to exceed demand.
Prices
begin to fall and the market is said to have reached maturity.
The
uniqueness of the product or service is now approaching
commodity.
Table 10.2 Langer’ s Analysis Consumer Methods
PORTER’ S FIVE FORCES CADEL ET AL’ S APPROACH
LANGER’ S SOURCES OF INPUT
Industry competitors How strong is your market
share?
Third-party market studies
New entrants New threats Third-party market studies
Surveys and focus groups
Suppliers Price sensitivity and closeness
of relationship.
Consumer support and end user
departments
Buyers Alternative choices and brand
equity.
Sales/marketing team
Substitutes Consumer alternatives Surveys and focus groups
Sales and marketing team
Third-party studies
Figure 10.4 The S-curve.
260 InForMAtIon teChnoloGY
Typically, suppliers will attempt to produce new features and
func-
tions to extend the life of the curve as shown in Figure 10.5
Establishing a new S-curve, then, extends the competitive life
of
the product or service. Once the top of the S-curve is reached,
the
product or service has reached the commodity level, where
supply is
much greater than demand. Here, the product or service has
likely
reached the end of its useful competitive life and should either
be
replaced with a new solution or considered for outsourcing to a
third-
party who can deliver the product at a very low price.
Langer’ s Driver/Supporter depicts the life cycle of any
application
or product as shown in Figure 10.6
Organizational Learning and the S-Curve
When designing a new application or system, the status of that
product’ s S-curve should be carefully correlated to the source
of the
Figure 10.5 Extended S-curve.
Mini loop technology enhancementsTechnology
driver
Evaluation
cycle
Driver
maturation
Support
status
Replacement or
outsource
Economies
of scale
Figure 10.6 Langer’ s drive/supporter life cycle.
261dIGItAl trAnsForMAtIon
requirements. Table 10.3 reflects the corresponding market
sources
and associated risk factors relating to the dependability of
require-
ments based on the state of the consumer’ s market. Leaders
engaged
in this process obviously need to have an abstract perspective to
sup-
port a visionary and risk-oriented strategy. Table 10.3 includes
the
associated complexity of staff needed to deal with each period
in the
S-curve.
Communities of Practice
As stated in Chapter 4, Communities of Practice (COP) have
been
traditionally used as a method of bringing together people in
orga-
nizations with similar talents, responsibilities and/or interests.
Such
communities can be effectively used to obtain valuable
information
about the way things work and what is required to run business
opera-
tions. Getting such information strongly correlates to the
challenges of
obtaining dependable information from the consumer market. I
dis-
cussed the use of surveys and focus groups earlier in this
chapter, but
COP is an alternative approach to bringing together similar
types of
consumers grouped by their interests and needs. In digital
transforma-
tion we find yet another means of obtaining requirements by
engaging
in, and contributing to, the practices of specific consumer
communities.
This means that working with COP offers another way of
developing
relations with consumers to better understand their needs. Using
this
Table 10.3 S-Curve, Application Requirement Sources, and
Risk
S-CURVE STATUS
ANALYSIS INPUT
SOURCE RISK FACTOR
Early S-curve Consumer High; market volatility and
uncertainty.
High S-curve Consumer Lower; market is less uncertain as
product becomes
more mature.
End users Medium; business users have experience with
consumers and can provide reasonable requirements.
Crest of the
S-curve
End users Low; business users have more experience as product
becomes mature.
Consumer High; might consider new features and functions to
keep product more competitive. Attempt to establish
new S-curve.
End of S-curve End user None; seek to replace product or
consider third-party
product to replace what is now a legacy application.
Also think of outsourcing application.
262 InForMAtIon teChnoloGY
approach inside an organization, as we saw in Chapter 4,
provides a
means of better learning about issues by using a sustained
method of
remaining interconnected with specific business user groups,
which can
define what the organization really knows and contributes to the
busi-
ness that is typically not documented. IT digital leaders need to
become
engaged in learning if they are to truly understand what is
needed to
develop more effective and accurate software applications.
It seems logical that COP can provide the mechanism to assist
IT
digital leaders with an understanding of how business users and
con-
sumers behave and interact. Indeed, the analyst can target the
behavior
of the community and its need to consider what new
organizational
structures can better support emerging technologies. I have, in
many
ways, already established and presented what should be called
the
“ community of IT digital leaders” and its need to understand
how to
restructure, in order to meet the needs of the digital economy.
This new
era does not lend itself to the traditional approaches to IT
strategy, but
rather to a more risk-based process that can deal with the
realignment
of business operations integrated with different consumer
relationships.
The relationship, then, between COP and digital transformation
is
significant, given that future IT applications will heavily rely
on infor-
mal inputs. While there may be attempts to computerize
knowledge
using predictive analytics software and big data, it will not be
able
to provide all of the risk-associated behaviors of users and
consum-
ers. That is, a “ structured” approach to creating predictive
behavior
reporting, is typically difficult to establish and maintain.
Ultimately,
the dynamism from digital transformations creates too many
uncer-
tainties to be handled by sophisticated automated applications
on how
organizations will react to digital change variables. So, COP,
along
with these predictive analytics applications, provides a more
thorough
umbrella of how to deal with the ongoing and unpredictable
interac-
tions established by emerging digital technologies.
The IT Leader in the Digital Transformation Era
When we discuss the digital world and its multitude of effects
on how
business is conducted, one must ask how this impacts the
profession
of IT Leader. This section attempts to address the perceived
evolution
of the role.
263dIGItAl trAnsForMAtIon
1. The IT leader must become more innovative. While the
business has the problem of keeping up with changes in
their markets, IT needs to provide more solutions. Many
of these solutions will not be absolute and likely will have
short shelf lives. Risk is fundamental. As a result, IT lead-
ers must truly become “ business” leaders by exploring new
ideas from the outside and continually considering how
to implement the needs of the company’ s consumers. As
a result, the business analyst will emerge as an idea bro-
ker (Robertson & Robertson, 2012) by constantly pursuing
external ideas and transforming them into automated and
competitive solutions. These ideas will have a failure rate,
which means that companies will need to produce more
applications than they will inevitably implement. This will
certainly require organizations to spend more on software
development.
2. Quality requirements will be even more complex. In order to
keep in equilibrium with the S-curve the balance between
quality and production will be a constant negotiation.
Because applications will have shorter life cycles and there
is pressure to provide competitive solutions, products will
need to sense market needs and respond to them quicker. As
a result, fixes and enhancements to applications will become
more inherent in the development cycle after products go
live in the market. Thus, the object paradigm will become
even more fundamental to better software development
because it provides more readily tested reusable applications
and routines.
3. Dynamic interaction among users and business teams will
require the creation of multiple layers of communities of prac-
tice. Organizations involved in this dynamic process must
have autonomy and purpose (Narayan, 2015).
4. Application analysis, design, and development must be
treated
and managed as a living process; that is, it never ends until the
product is obsolete (supporter end). So, products must con-
tinually develop to maturity.
5. Organizations should never outsource a driver technology
until it reaches supporter status.
264 InForMAtIon teChnoloGY
How Technology Disrupts Firms and Industries
The world economy is transforming rapidly from an analogue to
a
digital-based technology-driven society. This transformation
requires
businesses to move from a transactional relationship to one that
that
is “ interactional” (Ernst & Young, 2012). However, this
analogue to
digital transformation, while essential for a business to survive
in the
twenty-first century, is difficult to accomplish. Langer’ s (2011)
theory
of responsive organizational dynamism (ROD), as discussed
earlier in
this book, is modified to show that successful adaptation of new
digi-
tal technologies called Digital Dynamisms requires cultural
assimila-
tion of the people that comprise the organization.
Dynamism and Digital Disruption
The effects of digital dynamism can also be defined as a form of
disruption or what is now being referred to as digital disruption
.
Specifically, the big question facing many enterprises is around
how
they can anticipate the unexpected threats brought on by
technologi-
cal advances that can devastate their business. There are
typically two
disruption factors:
1. A new approach to providing products and services to the
consumer.
2. A strategy not previously feasible, now made possible using
new technological capabilities.
Indeed, disruption occurs when a new approach meets the right
conditions. Because technology shortens the time it takes to
reach
consumers, the changes are occurring at an accelerated and
exponen-
tial pace. As an example, the table below shows the significant
accel-
eration of the time it takes to reach 50 million consumers:
Radio 38 years
Television 13 years
Internet 4 years
Facebook 3.5 years
Twitter 9 months
Instagram 6 months
Poké mon GO 19 days
265dIGItAl trAnsForMAtIon
The speed of which we can accelerate change has an inverse
effect
on the length of time the effect lasts. We use the S-curve to
show how
digital disruption shortens the competitive life of new products
and
services. Figure 10.7 represents how the S-curve is shrinking
along
the x-axis, which measures the length or time period of the
product/
service life.
Figure 10.7 essentially reflects that the life of a product or
service is
shrinking, thus enterprises have less time to capture a market
oppor-
tunity and far less time to enjoy the length of its competitive
suc-
cess. As a result, business leaders are facing a world that is
changing
at an accelerating rate and trying to cope with understanding
how
new waves of “ disruptive” technologies will affect their
business.
Ultimately, digital disruption shifts the way competitive forces
deliver
services, requires change in the way operations are managed and
mea-
sured, and shortens the life of any given product or service
success.
Critical Components of “ Digital” Organization
A study conducted by Westerman et al. (2014), who interviewed
157
executives in fifty large companies, found four capabilities that
were
key to successful digital transformation:
1. A unified digital platform : Integration of the organization’ s
data and processes across its department silos is critical. One
reason why web-based companies gain advantage over tradi-
tional competitors is their ability to use analytics and customer
personalization from central and integrated sources. Thus,
the first step toward a successful digital transformation is for
companies to invest in establishing central repositories of data
and common applications that can access the information.
Figure 10.7 The shrinking S-curve.
266 InForMAtIon teChnoloGY
This centralization of digital data is key to competing globally
since firms must be able to move data to multiple locations
and use that data in different contexts.
2.
Solution
delivery : Many traditional IT departments are not
geared to integrating new processes into their legacy opera-
tions. A number of firms have addressed this problem by
establishing independent “ innovation centers” designed to
initiate new digital ideas that are more customer solution ori-
ented. These centers typically focus on how new mobile and
social media technologies can be launched without disturb-
ing the core technology systems that support the enterprise.
Some of these initiatives include partnerships with high-tech
vendors; however, a number of executives have shown concern
that such alliances might result in dependencies because of
the lack of knowledge inside the organization.
3. Analytics capabilities : Companies need to ensure that their
data can be used for predictive analytics purposes. Predictive
analytics provide actors with a better understanding of their
consumer’ s behaviors and allow them to formulate competi-
tive strategies over their competitors. Companies that inte-
grate data better from their transactional systems can make
more “ informed and better decisions” and formulate strate-
gies to take advantage of customer preferences and thus, turn
them into business opportunities. An example is an insurance
company initiative that concentrates on products that meet
customer trends determined by examining their historical
transactions across various divisions of the business. Analytics
also helps organizations to develop risk models that can assist
them to formulate accurate portfolios.
4. Business and IT integration : While the integration of the IT
department with the business has been discussed for decades,
few companies have achieved a desired outcome (Langer,
2016). The need for digital transformation has now made this
integration essential for success and to avoid becoming a vic-
tim of disruption. True IT and business integration means
more than just combining processes and decision making; but
rather, the actual movement of personnel into business units
so they can be culturally assimilated (Langer & Yorks, 2013).
267dIGItAl trAnsForMAtIon
Assimilating Digital Technology Operationally and Culturally
When considering how to design an organization structure that
can implement digital technologies, firms must concentrate on
how
to culturally assimilate a new architecture. The importance of
the
architecture first affects the strategic integration component of
ROD. Indeed, the actor-oriented architecture must be designed
to
be agile enough to react to increased changes in market
demands.
The consumerization of technology, defined as changes in
technol-
ogy brought on by increased consumer knowledge of how
digital
assets can reduce costs and increase competitive advantage,
have
created a continual reduction in the length of any new
competitive
products or services life. Thus, consumerization has increased
what
Eisenhardt and Bourgeouse (1988) define as “ high-velocity”
market
conditions.
This dilemma drives the challenge of how organizations will
cope
to avoid the negative effects of digital disruption. There are
four over-
all components that appear to be critical factors of autonomy
from
disruption:
1. Companies must recognize that speed and comfort of service
can be more important than just the cost: our experience is
that enterprises who offer multiple choices that allow con-
sumers to choose from varying levels of service options are
more competitive. The more personal the service option, the
higher the cost. Examples can be seen in the airline indus-
try where passengers have options for better seats at a higher
price, or a new option being offered by entertainment parks
that now provide less wait time on shorter lines, for higher
paying customers. These two examples match the price with
a desired service and firms that do not offer creative pricing
options are prime for disruption.
2. Empower your workforce to try new ideas without over con-
trols. Companies are finding that many young employees have
new service ideas but are blocked from trying them because
of the “ old guard” in their management reporting lines. Line
managers need to be educated on how to allow their staffs to
quickly enact new processes, even though some of them may
not be effective.
268 InForMAtIon teChnoloGY
3. Allow employees and customer to have choice of devices.
Traditionally IT departments desire to create environments
where employees adhere to standard hardware and software
structures. Indeed, standard structures make it easier for IT
to support internal users and provide better security across
systems. However, as technology has evolved, the relation
between hardware and software, especially in mobile devices,
has become more specialized. For example, Apple smart-
phones have proprietary hardware architectures that in many
cases require different versions of application software as well
as different security considerations than its major competi-
tor, Samsung. With the consumerization of technology, these
IT departments must now support multiple devices because
both their customers and employees are free to select them.
Therefore, it is important to allow staff to freely integrate
company applications with their personal device choices.
4. Similar to (3), organizations who force staff to adhere to
strict
processes and support structures are exposed to digital dis-
ruption. Organizational structures that rely on technological
innovation must be able to integrate new digital opportuni-
ties seamlessly into their current production and support pro-
cesses. Specifically, this means having the ability to be agile
enough to provide services using different digital capabilities
and from different geographical locations.
Conclusion
This chapter has provided a number of different and complex
aspects
of digital transformation, its effects on how organizations are
struc-
tured and how they need to compete to survive in the future.
The
technology executive is, by default, the key person to lead these
digi-
tal transformation initiatives because of the technical
requirements
that are at the center of successfully completing these projects.
As
such, these executives must also focus on their own
transformation as
leaders that allows them to help form the strategic goals to meet
the
dynamic changes in consumer behavior.
269
11
inTegRaTing geneRaTion y
employees To aCCeleRaTe
CompeTiTive aDvanTage
Introduction
This chapter focuses on Gen Y employees who are also known
as
“ digital natives” and “ millennials.” Gen Y employees possess
the
attributes to assist companies in transforming their workforce to
meet the accelerated change in the competitive landscape. Most
executives across industries recognize that digital technologies
are
the most powerful variable to maintaining and expanding
company
markets. Gen Y employees provide a natural fit for dealing with
emerging digital technologies. However, success with
integrating
Gen Y employees is contingent upon baby boomer and Gen X
man-
agement to adapt new leadership philosophies and procedures
suited
to meet the expectations and needs of these new workers.
Ignoring
the unique needs of Gen Y employees will likely result in an
incon-
gruent organization that suffers high turnover of young
employees
who will seek more entrepreneurial environments.
I established in Chapter 10 that digital transformation is at the
core of change and competitive survival in the twenty-first cen-
tury. Chapter 10 did not address the changes in personnel that
are quickly becoming major issues at today’ s global firms.
While I
offered changes to organizational structures, I did not address
the
mixture of different generations that are at the fabric of any
typical
organization. This chapter is designed to discuss how these
multiple
generations need to “ learn” how to work together to form
productive
and effective organizations that can compete in the digital
economy.
Furthermore, this chapter will address how access to human
capital
will change in the future and the different types of relationships
that individuals will have with employers. For example, the “
gig”
270 InForMAtIon teChnoloGY
economy will use non-traditional outside workers who will
provide
sources of talent for shorter-term employment needs. Indeed,
the
gig economy will require HR and IT leaders to form new and
intri-
cate employee relationships.
As discussed in Chapter 10, companies need to transform their
business from analogue to one that uses digital technologies.
Such
transformation requires moving from a transactional relation-
ship with customers to one that is more “ interactional” (Ernst
&
Young, 2012). Completing an analogue to digital
transformation,
while essential for a business to survive in the twenty-first
century,
is difficult to accomplish. Responsive organizational dynamism
(ROD) showed us that successful adaptation of new digital tech-
nologies requires strategic integration and cultural assimilation
of
the people that comprise the organization. As stated earlier,
these
components of ROD can be categorized as the essential roles
and
responsibilities of the organization that are necessary to utilize
new technological inventions that can strategically be integrated
within a business entity. The purpose here is to explore why
Gen
Y employees need to be integrated with baby boomers and Gen
X
staff to effectively enhance the success of digital transformation
initiatives.
The Employment Challenge in the Digital Era
Capgemini and MIT (2013) research shows that organizations
need
new operating models to meet the demands of a digital-driven
era.
Digital tools have provided leaders with ways to connect at an
unprec-
edented scale. Digital technology has allowed companies to
invade
other spaces previously protected by a business’ s “ asset
specificities”
(Tushman & Anderson, 1997), which are defined as advantages
enjoyed by companies because of their location, product access,
and
delivery capabilities. Digital technologies allow those
specificities to
be neutralized and thus, change the previous competitive
balances
among market players. Furthermore, digital technology acceler-
ates this process, meaning that changes in market share occur
very
quickly. The research offers five key indicators that support
successful
digital transformation in a firm:
271InteGrAtInG GenerAtIon Y
1. A company’ s strategic vision is only as effective as the
people
behind it. Thus, winning the minds of all levels of the organi-
zation is required.
2. To become digital is to be digital. Companies must have a
“ one-team culture” and raise their employees’ digital IQ.
3. A company must address the scarcity of talented resources
and look more to using Gen Y individuals because they have
a more natural adaptation to take on the challenges of digital
transformation.
4. Resistant managers are impediments to progress and can
actually stop digital transformation.
5. Digital leadership starts at the top.
As stated in Chapter 10, Eisenhardt and Bourgeouis (1988) first
defined dynamic changing markets as being “ high-velocity.”
Their
research shows that high-velocity conditions existed in the
technol-
ogy industry during the early 1980s in Silicon Valley, in the
United
States. They found that competitive advantage was highly
dependent
on the quality of people that worked at those firms.
Specifically, they
concluded that workers who were capable of dealing with
change and
less subjected to a centralized totalitarian management structure
out-
performed those that had more traditional hierarchical
organizational
structures. While “ high-velocity” during the 1980s was
unusual, dig-
ital disruption in the twenty-first century has made it a market
norm.
The combination of evolving digital business drivers with
acceler-
ated and changing customer demands has created a business
revolution
that best defines the imperative of the strategic integration
component
of ROD. The changing and accelerated way businesses deal with
their
customers and vendors requires a new strategic integration to
become
a reality, rather than remain a concept without action. Most
experts
see digital technology as the mechanism that will require
business
realignment to create new customer experiences. The driving
force
behind this realignment emanates from digital technologies,
which
serve as the principle accelerator of the change in transactions
across
all business units. The general need to optimize human
resources
forces organizations to rethink and to realign business
processes, in
order to gain access to new business markets, which are
weakening
the existing “ asset specificities” of the once dominant market
leaders.
272 InForMAtIon teChnoloGY
Gen Y Population Attributes
Gen Y or digital natives are those people who are accustomed to
the
attributes of living in a digital world and are 18– 35 years old.
Gen Y
employees are more comfortable with accelerated life changes,
par-
ticularly change brought on by new technologies. Such
individuals,
according to a number of commercial and academic research
studies
(Johnson Controls, 2010; Capgemini, 2013; Cisco, 2012; Saxena
&
Jain, 2012), have attributes and expectations in the workplace
that
support environments that are flexible, offer mobility, and
provide
collaborative and unconventional relationships. Specifically,
millen-
nial workers
• want access to dedicated team spaces where they can have
emotional engagements in a socialized atmosphere;
• require their own space; that is, are not supportive of a “
hotel-
ing” existence where they do not have a permanent office or
workspace;
• need a flexible life/work balance;
• prefer a workplace that supports formal and informal collab-
orative engagement.
Research has further confirmed that 79% of Gen Y workers pre-
fer mobile jobs, 40% want to drive to work, and female
millennials
need more flexibility at work than their male counterparts. As a
result
of this data, businesses will need to compete to recruit and
develop
skilled Gen Y workers who now represent 25% of the
workforce. In
India, while Gen Y represents more than 50% of the working
popula-
tion, the required talent needed by businesses is extremely
scarce.
Advantages of Employing Millennials to Support Digital
Transformation
As stated, Gen Y adults appear to have many identities and
capabilities
that fit well in a digital-driven business world. Indeed, Gen Y
peo-
ple are consumers, colleagues, employees, managers, and
innovators
(Johnson Controls, 2010). They possess attributes that align
with the
requirements to be an entrepreneur, a person with technology
savvy
and creativity, someone who works well in a mobile
environment, and
is non-conformant enough to drive change in an organization.
Thus,
273InteGrAtInG GenerAtIon Y
the presence of Gen Y personnel can help organizations to
restrat-
egize their competitive position and to retain key talent (Saxena
&
Jain, 2012). Furthermore, Gen Y brings a more impressive array
of
academic credentials than their predecessors.
Most important is Gen Y’ s ability to deal better with market
change— which inevitably affects organizational change. That
is, the
digital world market will constantly require changes in
organizational
structure to accommodate its consumer needs. A major reason
for Gen
Y’ s willingness to change is its natural alignment with a
company’ s
customers. Swadzba (2010) posits that we are approaching the
end of
what he called the “ work era” and moving into a new age
based on
consumption. Millennials are more apt to see the value of their
jobs
from their own consumption needs. Thus, they see employment
as
an act of consumption (Jonas & Kortenius, 2014). Gen Y
employees
therefore allow employers to acquire the necessary talent that
can lead
to better consumer reputation, reduced turnover of resources
and, ulti-
mately, increased customer satisfaction (Bakanauskiené et al.,
2011).
Yet another advantage of Gen Y employees is their ability to
transform
organizations that operate on a departmental basis into one that
is
based more on function; an essential requirement in a digital
economy.
Integration of Gen Y with Baby Boomers and Gen X
The prediction is that 76 million baby boomers (born 1946–
1964)
and Gen X workers (born 1965– 1984) will be retiring over the
next
15 years. The question for many corporate talent executives is
how to
manage the transition in a major multigenerational workforce.
Baby
boomers alone still inhabit the most powerful leadership
positions in
the world. Currently, the average age of CEOs is 56, and 65% of
all
corporate leaders are baby boomers. Essentially, corporations
need to
produce career paths that will be attractive to millennials. Thus,
the
older generation needs to
• Acknowledge some of their preconceived perceptions of cur-
rent work ethics that are simply not relevant in today’ s com-
plex environments.
• Allow Gen Y to escalate in ranks to satisfy their ambitions
and sense of entitlement.
274 InForMAtIon teChnoloGY
• Implement more flexible work schedules, offer telecommut-
ing, and develop a stronger focus on social responsibility.
• Support more advanced uses of technology, especially those
used by Gen Yers in their personal lives.
• Employ more mentors to help Gen Y employees to better
understand the reasons for existing constraints in the organi-
zations where they work.
• Provide more complex employee orientations, more timely
personnel reviews, and in general more frequent feedback
needed by Gen Y individuals.
• Establish programs that improve the verbal communications
skills of Gen Y workers that are typically more comfortable
with nonverbal text-based methods of communication.
• Implement more continual learning and rotational programs
that support a vertical growth path for younger employees.
In summary, it is up to the baby boomer and Gen X leaders to
modify their styles of management to fit the needs of their
younger
Gen Y employees. The challenge to accomplish this objective is
com-
plicated, given the wide variances on how these three
generations
think, plan, take risks, and most important, learn.
Designing the Digital Enterprise
Zogby completed an interactive poll of 4,811 people on
perceptions
of different generations. 42% of the respondents stated that
baby
boomers would be remembered for their focus on consumerism
and
self-indulgence. Gen Y, on the other hand, are considered more
self-
interested, entitled narcissists who want to spend all their time
post-
ing “ selfies” to Facebook. However, other facts offer an
expanded
perception of these two generations, as shown in Table 11.1
Research completed by Ernst and Young (2013) offers
additional
comparisons among the three generations as follows:
1. Gen Y individuals are moving into management positions
faster due to retirements, lack of corporate succession plan-
ning, and their natural ability to use technology at work.
Table 11.2 shows percentage comparisons between 2008
and 2013.
275InteGrAtInG GenerAtIon Y
The acceleration of growth to management positions among
Gen Y individuals can be further illuminated in Table 11.3 by
comparing the prior five-year period from 2003 to 2007.
2. While responders of the survey felt Gen X were better
equipped to manage than Gen Y, the number of Gen Y man-
agers is expected to double by 2020 due to continued retire-
ments. Another interesting result of the research relates to
Gen Y expectations from their employers when they become
managers. Specifically Gen Y managers expect (1) an oppor-
tunity to have a mentor, (2) to receive sponsorship, (3) to have
more career-related experiences, and (4) to receive training to
build their professional skills.
3. Seventy-five percent of respondents that identified
themselves
as managers agree that managing the multiple generations is
a significant challenge. This was attributed to different work
expectations and the lack of comfort with younger employees
managing older employees.
Table 11.4 provides additional differences among the three
generations:
Table 11.1 Baby Boomers versus Gen Y
BABY BOOMERS GEN Y
Married later and less children Not as aligned to political
parties
Spend lavishly More civically engaged
More active and selfless Socially active
Fought against social injustice, supported civil
rights, and defied the Vietnam War
Cheerfully optimistic
Had more higher education access More concerned with quality
of life than
material gain
Table 11.2 Management Roles 2008– 2013
Baby boomer (ages 49– 67) 19%
Gen X (ages 33– 48) 38%
Gen Y (18– 32) 87%
Table 11.3 Management Roles 2003– 2007
Baby boomer (ages 49– 67) 23%
Gen X (ages 33– 48) 30%
Gen Y (18– 32) 12%
276 InForMAtIon teChnoloGY
Assimilating Gen Y Talent from Underserved
and Socially Excluded Populations
The outsourcing of jobs outside of local communities to
countries with
lower employment costs has continued to grow during the early
part
of the twenty-first century. This phenomenon has led to
significant
social and economic problems, especially in the United States
and
in Western Europe as jobs continue to migrate to foreign
countries
where there are lower labor costs and education systems that
provide
Table 11.4 Baby Boomer, Gen X and Gen Y Compared
BABY BOOMERS GEN X GEN Y
Seek employment in large
established companies that
provide dependable
employment.
Established companies no
longer a guarantee for
lifetime employment. Many
jobs begin to go offshore.
Seek multiple experiences with
heavy emphasis on social
good and global experiences.
Re-evaluation of offshoring
strategies.
Process of promotion is well
defined, hierarchical and
structured, eventually leading
to promotion and higher
earnings—concept of
waiting your turn.
Process of promotion still
hierarchical, but based more
on skills and individual
accomplishments. Master’s
degree now preferred for
many promotions.
Less patience with hierarchical
promotion policies. More
reliance on predictive
analytics as the basis for
decision making.
Undergraduate degree
preferred but not mandatory.
Undergraduate degree required
for most professional job
opportunities.
More focus on specific skills.
Multiple strategies developed
on how to meet shortages of
talent. Higher education is
expensive and concerns
increase about the value of
graduate knowledge and
abilities.
Plan career preferably with one
company and retire.
Acceptance of a gradual
process of growth that was
slow to change. Successful
employees assimilated into
existing organizational
structures by following the
rules.
Employees begin to change
jobs more often, given growth
in the technology industry,
and opportunities to increase
compensation and accelerate
promotion by switching jobs.
Emergence of a “gig” economy,
and the rise of multiple
employment relationships
Entrepreneurism was seen as
an external option for those
individuals desiring wealth
and independence and
willing to take risks.
Corporate executives’
compensation dramatically
increases, no longer requiring
starting businesses as the
basis for wealth.
Entrepreneurism promoted
in Higher Education as the
basis for economic growth,
given the loss of jobs in
the U.S.
277InteGrAtInG GenerAtIon Y
more of the skills needed by corporations. Most impacted by the
loss
of jobs have been the underserved or socially excluded Gen Y
youth
populations. Indeed, the European average for young adult
unem-
ployment (aged 15– 25) in 2013 was nearly 25%, almost twice
the
rate for their adult counterparts (Dolado, 2015). Much of the
loss of
local jobs can be attributed to expansion of the globalized
economy,
which has been accelerated by continued technological
advancements
(Wabike, 2014). Thus, the effects of technology gains have
negatively
impacted efforts toward social inclusion and social equality.
Langer, in 2003, established an organization called Workforce
Opportunity Services (WOS), as a means of utilizing a form of
action
research using adult development theory to solve employment
problems
caused by outsourcing. Langer’ s approach is based on the
belief that
socially excluded youth can be trained and prepared for jobs in
areas such
as information technology that would typically be outsourced to
lower
labor markets. WOS has developed a talent-finding model that
has suc-
cessfully placed over 1400 young individuals in such jobs.
Results of over
12 years of operation and research have shown that talented
youth in
disadvantaged communities do exist and that such talent can
economi-
cally and socially contribute to companies (Langer, 2013). The
following
section describes the Langer Workforce Maturity Arc (LWMA),
pres-
ents data on its effectiveness as a transformative learning
instrument,
and discusses how the model can be used as an effective way of
recruit-
ing Gen Y talent from underserved and socially excluded
populations.
Langer Workforce Maturity Arc
The Langer Workforce Maturity Arc (LWMA) was developed to
help
evaluate socially excluded youth preparation to succeed in the
workplace.
The LWMA, initially known as the Inner-City Workplace
Literacy Arc:
charts the progression of underserved or ‘ excluded’
individuals along
defined stages of development in workplace culture and skills in
relation
to multiple dimensions of workplace literacy such as cognitive
growth
and self-reflection. When one is mapped in relation to the other
(work-
place culture in relation to stages of literacy assimilation), an
Arc is
created. LWMA traces the assimilation of workplace norms, a
form of
individual development. (Langer, 2003: 18)
278 InForMAtIon teChnoloGY
The LWMA addresses one of the major challenges confronting
an
organization’ s HR group: to find talent from diverse local
populations
that can successfully respond to evolving business norms,
especially those
related to electronic and digital technologies. The LWMA
provides a
method for measuring the assimilation of workplace cultural
norms and
thus, can be used to meet the mounting demands of an
increasingly
global, dynamic, and multicultural workplace. Furthermore, if
organi-
zations are to attain acceptable quality of work from diverse
employees,
assimilation of socially or economically excluded populations
must be
evaluated based on (1) if and how individuals adopt workplace
cultural
norms, and (2) how they become integrated into the business
(Langer,
2003). Understanding the relationship between workplace
assimila-
tion and its development can provide important information on
how
to secure the work ethic, dignity, solidarity, culture, cognition,
and
self-esteem of individuals from disadvantaged communities, and
their
salient contributions to the digital age.
Theoretical Constructs of the LWMA
The LWMA encompasses sectors of workplace literacy and
stages of lit-
eracy development , and the arc charts business acculturation
require-
ments as they pertain to disadvantaged young adult learners.
The
relationship between workplace assimilation and literacy is a
chal-
lenging subject. A specific form of literacy can be defined as a
social
practice that requires specific skills and knowledge (Rassool,
1999).
In this instance, workplace literacy addresses the effects of
workplace
practices and culture on the social experiences of people in their
work-
day, as well as their everyday lives. We need to better
understand how
individual literacy in the workplace, which subordinates
individuality
to the demands of an organization, is formulated for diverse
groups
(Newman, 1999). Most important, are the ways in which one
learns
how to behave effectively in the workplace— the knowledge,
skill, and
attitude sets required by business generally, as well as by a
specific
organization. This is particularly important in disadvantaged
commu-
nities, which are marginalized from the experiences of more
affluent
communities in terms of access to high-quality education,
informa-
tion technologies, job opportunities, and workplace
socialization. For
example, Friedman et al. (2014) postulate that the active
involvement
279InteGrAtInG GenerAtIon Y
of parents in the lives of their children greatly impacts a
student’ s
chances of success. It is the absence of this activism that
contributes
to a system of social exclusion of youth. Prior to determining
what
directions to pursue in educational pedagogies and
infrastructures, it
is necessary to understand what workplace literacy requirements
are
present and how they can be developed for disadvantaged youth
in the
absence of the active support from families and friends.
The LWMA assesses individual development in six distinct
sectors
of workplace literacy:
1. Cognition : Knowledge and skills required to learn and com-
plete job duties in the business world, including computational
skills; ability to read, comprehend, and retain written infor-
mation quickly; remembering and executing oral instructions;
and critically examining data.
2. Technology : An aptitude for operating various electronic
and
digital technologies.
3. Business culture : Knowledge and practice of proper
etiquette
in the workplace including dress codes, telephone and in-per-
son interactions, punctuality, completing work and meeting
deadlines, conflict resolution, deference and other protocols
associated with supervisors and hierarchies.
4. Socio-economic values : Ability to articulate and act upon
main-
stream business values, which shape the work ethic. Such val-
ues include independent initiative, dedication, integrity, and
personal identification with career goals. Values are associated
with a person’ s appreciation for intellectual life, cultural sen-
sitivity to others, and sensitivity for how others view their role
in the workplace. Individuals understand that they should
make decisions based on principles and evidence rather than
personal interests.
5. Community and ethnic solidarity : Commitment to the educa-
tion and professional advancement of persons in ethnic minor-
ity groups and underserved communities. Individuals can use
their ethnicity to explore the liberating capacities offered in
the workplace without sacrificing their identity (i.e., they can
assimilate workplace norms without abandoning cultural,
ethnic, or self-defining principles and beliefs).
280 InForMAtIon teChnoloGY
6. Self-esteem : The view that personal and professional
success
work in tandem, and the belief in one’ s capacity to succeed
in both arenas. This includes a devotion to learning and self-
improvement. Individuals with high self-esteem are reflective
about themselves and their potential in business. They accept
the realities of the business world in which they work and
can comfortably confirm their business disposition, indepen-
dently of others’ valuations.
Each stage in the course of an individual’ s workplace
development
reflects an underlying principle that guides the process of
adopting
workplace norms and behavior. The LWMA is a classificatory
scheme
that identifies progressive stages in the assimilated uses of
workplace
literacy. It reflects the perspective that an effective workplace
partici-
pant is able to move through increasingly complex levels of
thinking
and to develop independence of thought and judgment
(Knefelkamp,
1999). The profile of an individual who assimilates workplace
norms
can be characterized in five developmental stages:
1. Concept recognition : The first stage represents the capacity
to
learn, conceptualize, and articulate key issues related to the
six sectors of workplace literacy. Concept recognition provides
the basis for becoming adaptive to all workplace requirements.
2. Multiple workplace perspectives : This refers to the ability
to
integrate points of view from different colleagues at various
levels of the workplace hierarchy. By using multiple perspec-
tives, the individual is in a position to augment his or her
workplace literacy.
3. Comprehension of business processes : Individuals increase
their
understanding of workplace cooperation, competition, and
advancement as they build on their recognition of busi-
ness concepts and workplace perspectives. They increasingly
understand the organization as a system of interconnected
parts.
4. Workplace competence : As assimilation and competence
increase,
the individual learns not only on how to perform a particu-
lar job adequately but how to conduct oneself professionally
within the workplace and larger business environment.
281InteGrAtInG GenerAtIon Y
5. Professional independence : Individuals demonstrate the
ability
to employ all sectors of workplace literacy to compete effec-
tively in corporate labor markets. They obtain more respon-
sible jobs through successful interviewing and workplace
performance and demonstrate leadership abilities, leading to
greater independence in career pursuits. Professionally inde-
pendent individuals are motivated and can use their skills for
creative purposes (Langer, 2009).
The LWMA is a rubric that charts an individual’ s development
across the six sectors of workplace literacy. Each cell within the
matrix
represents a particular stage of development relative to that
sector of
workplace literacy, and each cell contains definitions that can
be used
to identify where a particular individual stands in his or her
develop-
ment of workplace literacy.
The LWMA and Action Research
While the LWMA serves as a framework for measuring growth,
the model also uses reflection-with-action methods, a
component
of action research theory, as the primary vehicle for assisting
young
adults to develop the necessary labor market skills to compete
for a
job and inevitably achieve some level of professional
independence
(that is, the ability to work for many employers because of
achiev-
ing required market skills). Reflection-with-action is used as a
rubric
STAGES OF WORKPLACE LITERACY
SECTORS OF
WORKPLACE
LITERACY
CONCEPT
RECOGNITION
MULTIPLE
WORKPLACE
PERSPECTIVES
COMPREHENSION
OF BUSINESS
PROCESSES
WORKPLACE
COMPETENCE
PROFESSIONAL
INDEPENDENCE
Cognition
Technology
Business
Culture
Socio-
Economic
Values
Community
and Ethnic
Solidarity
Self-Esteem
282 InForMAtIon teChnoloGY
for a variety of methods, involving reflection in relation to
learning
activities. Reflection has received a number of definitions from
differ-
ent sources in the literature. Here, “ reflection-with-action”
carries the
resonance of Schö n’ s (1983) twin constructs: “ reflection-on-
action”
and “ reflection-in-action,” which emphasize (respectively)
reflec-
tion in retrospect and reflection to determine what actions to
take in
the present or immediate future (Langer, 2003). Dewey (1933)
and
Hullfish and Smith (1978) also suggest that the use of reflection
sup-
ports an implied purpose. Their formulation suggests the
possibility
of reflection that is future oriented; what we might call “
reflection-to-
action.” These are methodological orientations covered by the
rubric.
Reflection-with-action is critical to the educational and
workplace
assimilation process of Gen Y. While many people reflect, it is
in
being reflective that people bring about “ an orientation to their
every-
day lives” (Moon, 2000). The LWMA incorporates reflection-
with-
action methods as fundamental strategies for facilitating
development
and assimilation. These methods are also implemented
interactively,
for example in mentoring, reflective learning journals, and
group dis-
cussions. Indeed, as stated by De Jong (2014), “ Social
exclusion is
multi-dimensional, ranging from unemployment, barriers to
educa-
tion and health care, and marginalized living circumstances”
(p. 94).
Ultimately, teaching socially excluded youth to reflect-with-
action is
the practice that will help them mature across the LWMA stages
and inevitably, achieve levels of inclusion in the labor market
and in
citizenship.
Implications for New Pathways for Digital Talent
The salient implications of the LWMA, as a method of discover-
ing and managing disadvantaged Gen Y youth in communities,
can be categorized across three frames: demographic shifts in
talent
resources, economic sustainability and integration and trust
among
vested local interest groups.
Demographic Shifts in Talent Resources
The LWMA can be used as a predictive analytic tool for
capturing
and cultivating the abilities in the new generation of digital
natives
283InteGrAtInG GenerAtIon Y
from disadvantaged local communities. This young talent has
the
advantage of more exposure to technologies, which senior
workers
had to learn later in their careers. This puts them ahead of the
curve
with respect to basic digital skills. Having the capacity to
employ tal-
ent locally and provide incentives for these individuals to
advance can
alleviate the significant strain placed on firms who suffer from
high
turnover in outsourced positions. Investing in viable Gen Y
under-
served youth can help firms close the skills gap that is prevalent
in the
emerging labor force.
Economic Sustainability
As globalization ebbs and flows, cities need to establish
themselves
as global centers, careful not to slip into market obsolescence,
espe-
cially when facing difficulties in labor force supply chains. In
order to
alleviate the difficulty in supplying industry-ready professionals
to a
city only recently maturing into the IT-centric business world,
firms
need to adapt to an “ on-demand” gig approach. The value
drawn from
this paradigm lies in its cyclical nature. By obtaining localized
human
capital at a lower cost, firms can generate a fundable supply
chain of
talent and diversity as markets change over time.
Integration and Trust
Porter and Kramer (2011) postulate that companies need to
formulate
a new method of integrating business profits and societal
responsi-
bilities. They state, “ the solution lies in the principle of shared
value,
which involves creating economic value in a way that also
creates value
for society by addressing its needs and challenges” (p. 64).
Porter and
Kramer suggest that companies need to alter corporate
performance
to include social progress. The LWMA provides the mechanism,
the-
ory, and measurement that is consistent with this direction and
pro-
vides the vehicle that establishes a shared partnership of trust
among
business, education, and community needs. Each of the
interested
parties experiences progress toward its financial and social
objectives.
Specifically, companies are able to attract diverse and socially
excluded
local talent, and have the constituents trained specifically for its
needs
and for an economic return that fits its corporate models. As a
result,
284 InForMAtIon teChnoloGY
the community adds jobs, which reduces crime rates and
increases tax
revenue. The funding corporation then establishes an ecosystem
that
provides a shared value of performance that underserved and
excluded
youth bring to the business.
Global Implications for Sources of Talent
The increasing social exclusion of Gen Y youth is a growing
prob-
lem in almost every country. Questions remain about how to
establish
systemic solutions that can create sustainable and scalable
programs
that provide equity in access to education for this population.
This
access to education is undoubtedly increasing employability,
which
indirectly contributes to better citizenship for underserved
youth.
Indeed, there is a widening gap between the “ haves” and the “
have-
nots” throughout the world. Firms can use tools like the LWMA
to
provide a model that can improve educational attainment of
under-
served youth by establishing skill-based certificates with
universities,
coupled with a different employment-to-hire model. The results
have
shown that students accelerate in these types of programs and
ulti-
mately, find more success in labor market assimilation. The data
sug-
gests that traditional degree programs that require full-time
study at
university as the primary preparation for labor market
employment
may not be the most appropriate approach to solving the
growing
social inequality issue among youth.
Conclusion
This chapter has made the argument that Gen Y employees are “
digi-
tal natives” who have the attributes to assist companies to
transform
their workforce and meet the accelerated change in the
competitive
landscape. Organizations today need to adapt their staff to
operate
under the auspices of ROD by creating processes that can
determine
the strategic value of new emerging technologies and establish a
cul-
ture that is more “ change ready.” Most executives across
industries
recognize that digital technologies are the most powerful
variable to
maintaining and expanding company markets.
Gen Y employees provide a natural fit for dealing with emerg-
ing digital technologies. However, success with integrating Gen
Y
285InteGrAtInG GenerAtIon Y
employees is contingent upon baby boomer and Gen X manage-
ment adapting new leadership philosophies and procedures that
are
suited to meet the expectations and needs of millennials.
Ignoring the
unique needs of Gen Y employees will likely result in an
incongruent
organization that suffers high turnover of young employees who
will
ultimately seek a more entrepreneurial environment. Firms
should
consider investing in non-traditional Gen Y youth from
underserved
and socially excluded populations as alternate sources of talent.
http://taylorandfrancis.com
287
12
TowaRD besT pRaCTiCes
Introduction
The previous chapters provided the foundation for the formation
of
“ best practices” to implement and sustain responsive
organizational
dynamism (ROD). First, it is important to define what we mean
by
best practices and specify which components comprise that
definition.
Best practices are defined as generally accepted ways of doing
spe-
cific functions or processes by a particular profession or
industry. Best
practices, in the context of ROD, are a set of processes,
behaviors, and
organizational structures that tend to provide successful
foundations
to implement and sustain organizational learning. I defined
respon-
sive organizational dynamism as the disposition of a company
to
respond at the organizational level to the volatility of advancing
tech-
nologies— ones that challenge the organization to manage a
constant
state of dynamic and unpredictable change. Second, best
practices are
those that need to be attributed to multiple communities of
practice
as well as to the different professions or disciplines within a
learning
organization.
However, these multiple tiers of best practices need to be
integrated
and to operate with one another to be considered under the
rubric.
Indeed, best practices contained solely within a discipline or
com-
munity are limited in their ability to operate on an organization-
wide
level. It is the objective of this chapter, therefore, to formulate
a set of
distinctive yet integrated best practices that can establish and
support
ROD through organizational learning. Each component of the
set of
best practices needs to be accompanied by its own maturity arc,
which
defines and describes the stages of development and the
dimensions
that comprise best practices. Each stage defines a linear path of
con-
tinued progress until a set of best practices is reached. In this
way,
organizations can assess where they are in terms of best
practices and
determine what they need to do to progress. Ultimately, each
maturity
288 InForMAtIon teChnoloGY
arc will represent a subset of the overall set of best practices for
the
organization.
The discipline that lays the foundation for ROD is information
technology (IT). Therefore, the role of the chief IT executive
needs to
be at the base of organizational best practices. As such, I start
build-
ing the organizational best practices model with the chief IT
execu-
tive at the core.
Chief IT Executive
I use the title “ chief IT executive” to name the most senior IT
indi-
vidual in an organization. Because of the lack of best practices
in this
profession, a number of different titles are used to describe this
job.
While these titles are distinct among themselves, I have found
that
they are not consistently followed in organizations. However, it
is
important to understand these titles and their distinctions,
particu-
larly because an organizational learning practitioner will
encounter
them in practice. These titles and roles are listed and discussed
next:
Chief information officer (CIO) : This individual is usually the
most
senior IT executive in an organization, although not every
organization has such a person. The CIO is not necessarily
the most technical of people or even someone who has come
through the “ ranks” of IT. Instead, this individual is consid-
ered an executive who understands how technology needs to
be integrated within the organization. CIOs typically have
other general IT executives and managers who report directly
to them. As shown in the Siemens case study, there can be a
number of alternate levels of CIOs, from corporate CIOs to
local CIOs of a company division. For the purposes of this
discussion, I look at the corporate CIO, who is considered part
of the senior executive management team. My research on
chief executive officer (CEO) perceptions of technology and
business strategy showed that only a small percentage of CIOs
report directly to the CEO of their organization, so it would
be incorrect to generalize that they report to the most senior
executive. In most cases, the CIO reports to the chief oper-
ating officer (COO) or the chief financial officer (CFO). As
289towArd best prACtICes
stated, the role of the CIO is to manage information so that it
can be used for business needs and strategy. Technology, then,
is considered a valuable part of knowledge management from a
strategic perspective as opposed to just a technical one.
Chief technology officer (CTO) : This individual, unlike the
CIO, is
very much a senior technical person. The role of the CTO is to
ensure that the organization is using the best and most cost-
effective technology to achieve its goals. One could argue that
the CTO holds more of a research-and-development type of
position. In many organizations, the CTO reports directly to the
CIO and is seen as a component of the overall IT infrastructure.
However, some companies, like Ravell and HTC, only have a
CTO and view technology more from the technical perspective.
Chief knowledge officer (CKO) and chief digital officer (CDO)
: This
role derives from library management organizations because of
the relevance of the word knowledge and/or data. It also com-
petes somewhat with the CIO’ s role when organizations view
technology from a perspective that relates more to knowledge.
In larger organizations, the CKO/CDO may report directly
to the CIO. In its purest role, the CKO/CDO is responsible
for developing an overall infrastructure for managing knowl-
edge, including intellectual capital, sharing of information,
and worker communication. Based on this description, the
CKO/CDO is not necessarily associated with technology but
is more often considered part of the technology infrastructure
due to the relevance of knowledge and data to technology.
To define best practices for this function, it is necessary to
under-
stand the current information and statistics about what these
people
do and how they do it. Most of the statistical data about the
roles and
responsibilities of chief IT executives are reported under the
auspices of
the CIO. According to an article by Jerry Gregoire in CIO
magazine in
March 2002, 63% of IT executives held the title CIO, while
13% were
CTOs; there were few to no specific statistics available on the
title of
CKO and CDO, however, the CDO role has become more
relevant
over the past five years given the importance of social media
and digital
transformations. This report further supported the claim that
there is
limited use of the CKO title and function in organizations at
this time.
290 InForMAtIon teChnoloGY
From a structural point of view, 63% of IT organizations are
cen-
trally structured, while 23% are decentralized with a central
reporting
structure. However, 14% are decentralized without any central
head-
quarters or reporting structure. From a spending perspective,
orga-
nizations spend most of their budgets on integrating technology
into
existing applications and daily processing (36% of budget).
Twenty-
six percent is related to investments in emerging or new
technologies,
24% is based on investing in e-commerce activities, and 24% is
spent
on customer relationship management (CRM), which is defined
as
applications that engage in assisting organizations to better
under-
stand and support their customer base. Twenty-five percent is
spent
on staff development and retention.
Compensation of IT chief executives still comes predominantly
from base salary, as opposed to bonus or equity positions with
the
company. This suggests that their role is not generally viewed
as top
management or partner-level in the business. This opinion was
sup-
ported by the results of my CEO study, discussed in Chapter 2.
The
issue of executive seniority can be determined by whether the
chief
IT executive is corporate driven or business unit driven. This
means
that some executives have corporate-wide responsibilities as
opposed
to a specific area or business unit. The issue of where IT depart-
ments provide value to the organization was discussed in
Chapter 3,
which showed that there are indeed different ways to manage
and
structure the role of IT. However, in general, corporate IT
execu-
tives are responsible for IT infrastructure, shared technology
services,
and global technology architecture, while business unit CIOs
con-
centrate on strategically understanding how to use applications
and
processes to support their business units. This is graphically
depicted
in Figure 12.1.
From a best practices perspective, the following list has
historically
suggested what chief IT executives should be doing. The list
empha-
sizes team building, coaching, motivating, and mentoring as
tech-
niques for implementing these best practices.
Strategic thinking : Must understand the business strategy and
competitive landscape of the company to apply technology in
the most valuable way to the organization.
291towArd best prACtICes
Industry expertise : Must have the ability to understand the
prod-
uct and services that the company produces.
Create and manage change : Must have the ability to create
change, through technology, in the operating and business
processes of the organization to gain efficiency and competi-
tive advantage.
Communications : Must have the ability to communicate ideas,
to give direction, to listen, to negotiate, to persuade, and to
resolve conflicts. Executives must also be able to translate
technical information to those who are not technologically
literate or are outside IT and need to be comfortable speaking
in public forums and in front of other executives.
Relationship building : Must have the ability to interface with
peers, superiors, and customers, by establishing and main-
taining strong rapport, bond, and trust between individuals.
Business knowledge : Must have the ability to develop strong
busi-
ness acumen and having peripheral vision across all functional
areas of the business.
Technology proficiency : Must have the knowledge to identify
appropriate technologies that are the most pragmatic for the
business, can be delivered quickly at the lowest cost, produce
an impact on the bottom line (ROI), and have longevity.
Local applications
Standard IT applications
Shared IT technology
services
Public available infrastructure
(Internet, portals, etc.)
IT infrastructure
Business level CIOs
Corporate CIOs
Figure 12.1 Business-level versus corporate-level CIOs.
292 InForMAtIon teChnoloGY
Leadership : Must be a visionary person, inspirational,
influential,
creative, fair, and open minded with individuals within and
outside the organization.
Management skills : Must have the ability to direct and
supervise
people, projects, resources, budget, and vendors.
Hiring and retention : Must have the ability to recognize, culti-
vate, and retain IT talent.
While this list is not exhaustive, it provides a general perspec-
tive, one that appears generic; that is, many management
positions
in an organization might contain similar requirements. A survey
of
500 CIOs conducted by CIO magazine (March 2002) rated the
top
three most important concerns among this community in terms
of
importance:
1. Communications: 70%
2. Business understanding: 58%
3. Strategic thinking: 46%
What is interesting about this statistic is that only 10% of CIOs
identified technical proficiency as critical for their jobs. This
find-
ing supports the notion that CIOs need to familiarize themselves
with business issues, as opposed to just technical ones.
Furthermore,
the majority of a CIO’ s time today has been recorded as spent
com-
municating with other business executives (33%) and managing
IT
staffs (28%). Other common activities reported in the survey
were as
follows:
• Operating the baseline infrastructure and applications
• Acting as technology visionary
• Implementing IT portions of new business initiatives
• Designing infrastructure and manage infrastructure projects
• Allocating technology resources
• Measuring and communicate results
• Serving as the company spokesperson on IT-related matters
• Selecting and managing product and service providers
• Recruiting, retaining, and developing IT staff
• Participating in company and business unit strategy
development
293towArd best prACtICes
These results further confirm that chief IT executives define
best
practices, based on understanding and supporting business
strategy.
This survey also reported common barriers that chief IT
executives
have to being successful. The overarching barrier that most IT
execu-
tives face is the constant struggle between the business
expectation to
drive change and improve processes, and the need to reduce
costs and
complete projects faster. The detailed list of reported problems
by rank
was as follows:
1. Lack of key staff, skill sets, and retention: 40%
2. Inadequate budgets and prioritizing: 37%
3. Shortage of time for strategic thinking: 31%
4. Volatile market conditions: 22%
5. Ineffective communications with users: 18%
6. Poor vendor support and service levels, and quality: 16%
7. Overwhelming pace of technological change: 14%
8. Disconnection with executive peers: 12%
9. Difficulty proving the value of IT: 10%
10. Counterproductive office politics: 6%
Chief IT executives also felt that their roles were ultimately
influ-
enced by two leading factors: (1) changes in the nature and
capabilities
of technology, and (2) changes in the business environment,
includ-
ing marketplace, competitive, and regulatory pressures. This
can be
graphically viewed in Figure 12.2.
Figure 12.2 has a striking similarity to Figure 3.1 outlining
ROD.
That diagram represented technology as an independent variable
cre-
ating the need for ROD, which is composed of strategic
integration
and cultural assimilation, as shown in Figure 12.3.
Figure 12.3 shows many similarities to Figure 12.2. The
difference
between these two diagrams defines what is missing from many
best
practices: the inclusion of organizational learning practices that
would
enable chief IT executives to better manage business and
technology
issues. In effect, if organizational learning techniques were
included,
they could reduce many barriers between business and IT. Thus,
the
solution to providing best practices for the IT community rests
with
the inclusion of organizational learning along the constructs of
ROD.
The inclusion of organizational learning is crucial because the
best
practices, as reported among the community of chief IT
executives, has
294 InForMAtIon teChnoloGY
Technology
drivers
Business
environment
Strategic
options
Im
po
sesInspires
Figure 12.2 Chief IT executives— factors influencing
strategic options.
Technology
creates
Symptoms and
implications
Responsive
organizational
dynamism
Acceleration of events that
require different
infrastructures and
organizational processes
Requires
Strategic
integration
Cultural
assimilation
Organization
structures
(system)
Individual
actions
Renegotiation of
relationship
Organizational learning techniques
Figure 12.3 ROD and organizational learning techniques.
295towArd best prACtICes
not produced the performance outcomes sought by chief
executives.
I refer to Chapter 2, in which I first defined the IT dilemma.
While
many IT initiatives are credible, they often fall short of
including
critical business issues. As a result, IT project goals are not
completely
attained. This suggests that the problem is more related to the
process
and details of how to better implement good ideas. As further
sup-
port for this position, the Concours Group (an international
executive
managing consulting organization) published a list of emerging
roles
and responsibilities that chief IT executives will need to
undertake as
part of their jobs in the near future (Cash & Pearlson, 2004):
Shared services leader : More companies are moving to the
shared
services model for corporate staff functions. CIOs’ experi-
ences may be invaluable in developing and managing these
organizations.
Executive account manager : More companies today are involv-
ing the CIO in the management of relationships between the
company and its customers.
Process leader : As companies move toward organizing around
major business processes, a CIO is in a good role to temporar-
ily lead this effort since applications and databases are among
the business resources that must be revamped to implement
process management.
Innovation leader : A CIO is starting to act as the innovation
leader of the corporation when a company is seeking to
achieve substantial improvements in process performance or
operational efficiencies, or to implement IT, since innovation
may center on the application of IT.
Supply chain executive: Purchasing, warehousing, and
transpor-
tation are among the most information-intensive activities
undertaken by a business. As companies look to improve these
overall processes, the CIO may become the most knowledge-
able executive about the supply chain.
Information architect : Companies are recognizing the benefit of
a consolidated view of customers, vendors, employees, and so
on. CIOs are finding themselves taking on the leadership role
of information architect by cultivating commitment and con-
sensus around this challenging task.
296 InForMAtIon teChnoloGY
Change leader : CIOs are playing an increasingly important role
in business change management. Their role is in either direct
change leadership (developing new business models) or, more
often, indirect; that is, change process is behind the scenes
(get other leaders to think about new possibilities).
Business process outsourcing leader : CIOs tend to have some
of
the most extensive experience in company outsourcing. This
makes them a logical internal consultant and management
practice leader in business process outsourcing.
These issues all suggest that the role of the chief IT executive is
growing and that the need for these executives to become better
inte-
grated with the rest of their organizations is crucial for their
success.
Much more relevant, though, is the need for ROD and the role
that
the chief IT executive has as a member of the overall
community. To
create best practices that embrace organizational learning and
foster
ROD, a chief IT executive maturity arc needs to be developed
that
includes the industry best practices presented here integrated
with
organizational learning components.
The chief IT executive best practices arc is an instrument for
assess-
ing the business maturity of chief IT executives. The arc may
evaluate
a chief IT executive’ s business leadership using a grid that
measures
competencies ranging from essential knowledge in technology
to
more complex uses of technology in critical business thinking.
Thus,
the chief IT executive best practices arc provides executives
with a
method of integrating technology knowledge and business by
present-
ing a structured approach of self-assessment and defined
milestones.
The model measures five principal facets of a technology
executive:
cognitive, organization culture, management values, business
ethics,
and executive presence. Each dimension or sector is measured
in five
stages of maturation that guide the chief IT executive’ s growth.
The
first facet calls for becoming reflectively aware about one’ s
existing knowl-
edge of technology and what it can do for the organization. The
second
calls for other centeredness , in which chief IT executives
become aware
of the multiplicity of technology perspectives available (e.g.,
other busi-
ness views of how technology can benefit the organization). The
third is
comprehension of the technology process , in which a chief IT
executive can
begin to merge technology issues with business concepts and
functions.
297towArd best prACtICes
The fourth is stable technology integration , meaning that the
chief
IT executive understands how technology can be used and is
resilient
to nonauthentic sources of business knowledge. Stage 4
represents an
ongoing implementation of both technology and business
concepts.
The fifth stage is technology leadership , in which chief IT
executives
have reached a stage at which their judgment on using
technology and
business is independent and can be used to self-educate from
within.
Thus, as chief IT executives grow in knowledge of technology
and
business, they can become increasingly more other centered,
inte-
grated, stable, and autonomous with the way they use their
business
minds and express their executive leadership and character.
Definitions of Maturity Stages and Dimension Variables
in the Chief IT Executive Best Practices Arc
Maturity Stages
1. Technology competence and recognition : This first stage
repre-
sents the chief IT executive’ s capacity to learn, conceptualize,
and articulate key issues relating to cognitive technological
skills, organization culture/etiquette, management value sys-
tems, business ethics, and executive presence needed to be a
successful chief IT executive in business.
2. Multiplicity of technology perspectives : This stage indicates
the
chief IT executive’ s ability to integrate multiple points of view
about technology from others in various levels of workplace
hierarchies. Using these new perspectives, the chief IT execu-
tive augments his or her skills with the technology necessary
for career success, expands his or her management value sys-
tem, is increasingly motivated to act ethically, and enhances
his or her executive presence.
3. Comprehension of technology process : Maturing chief IT
executives
accumulate increased understanding of workplace cooperation,
competition, and advancement as they gain new cognitive skills
about technology and a facility with business culture/etiquette,
expand their management value system, perform business/
workplace actions to improve ethics about business and technol-
ogy, and develop effective levels of executive presence.
298 InForMAtIon teChnoloGY
4. Stable technology integration : Chief IT executives achieve
inte-
gration with the business community when they have levels
of cognitive and technological ability, organization etiquette/
culture, management values, business ethics, and execu-
tive presence appropriate for performing job duties not only
adequately but also competitively with peers and even higher-
ranking executives in the workplace hierarchy.
5. Technology leadership : Leadership is attained by the chief
IT
executive when he or she can employ cognitive and tech-
nological skills, organization etiquette, management, a
sense of business ethics, and a sense of executive presence
to compete effectively for executive positions. This chief IT
executive is capable of obtaining increasingly executive-level
positions through successful communication and workplace
performance.
Performance Dimensions
1. Technology cognition : Concerns skills specifically related
to learning, applying, and creating resources in IT, which
include the necessary knowledge of complex operations. This
dimension essentially establishes the CIO as technically pro-
ficient and forms a basis for movement to more complex and
mature stages of development.
2. Organizational culture : The knowledge and practice of
proper
etiquette in organizational settings with regard to dress, tele-
phone and in-person interactions, punctuality, work comple-
tion, conflict resolution, deference, and other protocols in
workplace hierarchies.
3. Management values : Measures the individual’ s ability to
articu-
late and act on mainstream organizational values credited with
shaping the work ethic— independent initiative, dedication,
honesty, and personal identification with career goals, based
on the organization’ s philosophy of management protocol.
4. Business ethics : Reflects the individual’ s commitment to
the
education and professional advancement of other employees
in technology.
299towArd best prACtICes
5. Executive presence : Involves the chief IT executive’ s view
of
the role of an executive in business and the capacity to succeed
in tandem with other executives. Aspects include a devotion
to learning and self-improvement, self-evaluation, the ability
to acknowledge and resolve business conflicts, and resilience
when faced with personal and professional challenges.
Figure 12.4 shows a graphical view of the chief IT executive
best
practices arc. Each cell in the arc provides the condition for
assess-
ment. The complete arc is provided in Table 12.1.
Chief Executive Officer
When attempting to define CEO best practices, one is
challenged with
the myriad material that attempts to determine the broad, yet
impor-
tant, role of the CEO. As with most best practices, they are
typically
based on trends and percentages of what most CEOs do—
assuming,
of course, that the companies they work for are successful. That
is, if
their organization is successful, then their practices must be as
well.
This type of associative thinking leads to what scholars often
term
false generalizations. Indeed, these types of inadequate methods
lead
to false judgments that foster business trends, which are
misinter-
preted as best practices. Reputation is what would better define
these
trends, which usually after a period of time can become
ineffective
Developmental dimensions of maturing
Dimension skill
Technology
competence
and recognition
Multiplicity
of technology
perspectives
Comprehension
of technology
process
Stable
technology
integration
Technology
leadership
Technology
cognition
Organization
culture
Management
values
Business
ethics
Executive
presence
Figure 12. 4 Chief IT executive best practices arc - conditions
for assessment.
300 InForMAtIon teChnoloGY
Table 12.1 The Chief IT Executive Best Practices Arc
DIMENSION VARIABLE
TECHNOLOGY COMPETENCE AND
RECOGNITION
MULTIPLICITY OF TECHNOLOGY
PERSPECTIVES
Technology Cognition Understands how technology
operates in business. Has mastered
how systems are developed,
hardware interfaces, and the
software development life cycle.
Has mastery of hardware,
compilers, run-time systems. Has
core competencies in distributed
processing, database development,
object-oriented component
architecture, and project
management. Is competent with
main platform operating systems
such as UNIX, WINDOWS, and MAC.
Has the core ability to relate
technology concepts to other
business experiences. Can also
make decisions about what
technology is best suited for a
particular project and organization.
Can be taught how to expand the
use of technology and can apply it
to other business situations.
Understands that technology
can have multiple
perspectives. Able to analyze
what are valid vs. invalid
opinions about business uses
of technology. Can create
objective ideas from multiple
technology views without
getting stuck on individual
biases. An ability to identify
and draw upon multiple
perspectives available from
business sources about
technology. Developing a
discriminating ability with
respect to choices available.
Realistic and objective
judgment, as demonstrated by
the applicability of the
technology material drawn for
a particular project or task
and tied to functional/
pragmatic results.
Organization Culture Understands that technology can be
viewed by other organizations in
different ways. Uses technology as
a medium of communication.
Understands that certain
technological solutions, Web pages,
and training methods may not fit
all business needs and preferences
of the business. Has the ability to
recommend/suggest technological
solutions to suite other business
needs and preferences
Seeks to use technology as a
vehicle to learn more about
organization cultures and
mindsets. Strives to care
about what others are
communicating and embraces
these opinions. Tries to
understand and respect
technologies that differ from
own. Understands basic
technological needs of others.
(Continued)
301towArd best prACtICes
Table 12.1 (Continued) The Chief IT Executive Best Practices
Arc
COMPREHENSION OF
TECHNOLOGY PROCESS
STABLE TECHNOLOGY
INTEGRATION TECHNOLOGY LEADERSHIP
Has the ability to relate
various technical concepts
and organize them with
non-technical business
issues. Can operate with
both automated and manual
business solutions. Can use
technology to expand
reasoning, logic, and what-if
scenarios. Ability to use the
logic of computer programs
to integrate the elements of
non-technological tasks and
business problems. Ability to
discern the templates that
technology has to offer in
order to approach everyday
business problems. This
involves the hypothetical
(inductive/deductive) logical
business skill.
Knowledge of technology is
concrete, accurate, and precise,
broad and resistant to interference
from non-authentic business
sources. Ability to resist or recover
from proposed technology that is
not realistic— and can recover
resiliently.
Methods and judgment in a
multidimensional business
world is independent, critical
discernment. Knowledge of
technology and skills in
technology can be transferred
and can be used to
self-educate within and
outside of technology. Can
use technology for creative
purposes to solve business
challenges and integrate with
executive management views.
Can deal with multiple
dimensions of criticism
about technology. Can
develop relationships
(cooperative) that are
dynamic and based on
written communication and
oral discourse. Ability to
create business relations
outside of technology
departments. Has an
appreciation of cyberspace
as a communication
space— a place wide open to
dialogue (spontaneous), to
give and take, or other than
voyeuristic, one-sidedness.
Ability to produce in
teamwork situations, rather
than solely in isolation.
Loyalty and fidelity to relations in
multiple organizations.
Commitment to criticism and
acceptance of multiple levels of
distance and local business
relationships. Ability to sustain
non-traditional types of inputs
from multiple sources.
Can utilize and integrate
multidimensions of business
solutions in a self-reliant way.
Developing alone if necessary
using other technical
resources. Can dynamically
select types of interdependent
and dependent organizational
relationships. Ability to
operate within multiple
dimensions of business
cultures, which may demand
self-reliance, independence of
initiative, and interactive
communications.
(Continued)
302 InForMAtIon teChnoloGY
Table 12.1 (Continued) The Chief IT Executive Best Practices
Arc
DIMENSION VARIABLE
TECHNOLOGY COMPETENCE AND
RECOGNITION
MULTIPLICITY OF
TECHNOLOGY PERSPECTIVES
Management Values Technology and cultural sensitivity.
Global communication, education,
and workplace use of technology
can be problematic— subject to
false generalizations and
preconceived notions. Awareness
of assumptions about how
technology will be viewed by other
organizations and about biases
about types of technology (MAC vs.
PC).
Can appreciate need to obtain
multiple sources of
information and opinion. The
acceptance of multi-
dimensional values in human
character.
Business Ethics Using technology with honesty re:
privacy of access and information.
Development of ethical policies
governing business uses of the
Internet, research, intellectual
property rights and plagiarism.
The use of information in a fair
way— comparison of facts
against equal sources of
business information.
Compassion for business
information for which sources
are limited because of
inequality of technology
access. Compassion for
sharing information with
other business units from a
sense of inequality.
Executive Presence Has accurate perception of one’ s
own potential and capabilities in
relation to technology in the
business— the technologically
realizable executive self.
Understands how other
executives can view self from
virtual and multiple
perspectives. Understands or
has awareness of the
construction of self that occurs
in business. Focuses on views
of other executives in multiple
settings. Understands that the
self (through technology) is
open for more fluid
constructions, able to
incorporate diverse views in
multiple settings.
(Continued)
303towArd best prACtICes
and unpopular. We must also remember the human element of
suc-
cess; certain individuals succeed based on natural instincts and
talent,
hard work and drive, and so on. These components of success
should
not be confused with theories that are scalable and replicable to
prac-
tice; that is, what best practices need to accomplish.
This section focuses on technology best practices of the CEO.
These
best practices are based on my research as well as other
positions and
Table 12.1 (Continued) The Chief IT Executive Best Practices
Arc
COMPREHENSION OF
TECHNOLOGY PROCESS
STAB LE TECHNOLOGY
INTEGRATION TECHNOLOGY LEADERSHIP
Can operate within multiple
dimensions of value systems
and can prioritize multi-
tasking events that are
consistent with value priorities.
Ability to assign value to new
and diverse technology
alternatives—integrating
them within a system of
pre-existing business and
technology values.
Testing value systems in new ways
due to technology is integrated
with long-term values and goals
for business achievement. Some
concepts are naturally persistent
and endure despite new arenas in
the technological era.
Use of technology and business
are based on formed
principles as opposed to
dynamic influences or
impulses. Formed principles
establish the basis for
navigating through, or
negotiating the diversity of
business influences and
impulses.
Consistent values displayed on
multiple business
communications,
deliverables of content, and
dedication to authenticity.
Maintains consistency in
integrating values within
technology business issues.
Technology is a commitment in all
aspects of value systems,
including agility in managing
multiple business commitments.
Commitment to greater openness
of mind to altering traditional and
non-technological methods.
Technological creativity with
self-defined principles and
beliefs. Risk-taking in
technology-based ventures.
Utilizing technology to expand
one’ s arenas of business
freedom. Exploring the
business-liberating
capacities of technology.
Operationalizes technology to
unify multiple components of
the self and understands its
appropriate behaviors in
varying executive situations.
Has regulated an identity of self
from a multiplicity of executive
venues. Methods of business
interaction creates positive value
systems that generate confidence
about operating in multiple
business communities.
Acceptance and belief in a
multidimensional business
world of the self. Can determine
comfortably the authenticity of
other executives and their view
of the self. Can confirm
disposition independently from
others’ valuations, both
internally and from other
organization cultures. Beliefs
direct and control
multidimensional executive
growth.
304 InForMAtIon teChnoloGY
facts that provide a defendable context of how and why they
appear to be
effective. However, as with the chief IT executive model, best
practices
cannot be attained without an arc that integrates mature
organizational
learning and developmental theories. Many of the CEO best
practices
reconcile with my interviews with CEOs and, in particular, with
the two
CEO case studies (of ICAP and HTC) discussed in Chapter 8.
Other
published definitions and support are referenced in my
presentation.
In February 2002, Hackett Benchmarking, a part of Answerthink
Corporation, issued its best practices for IT. Its documentation
stated:
In compiling its 2002 best practices trend data, Hackett
evaluated the
effectiveness (quality and value) and efficiency (cost and
productivity)
of the information technology function across five performance
dimen-
sions: strategic alignment with the business; ability to partner
with
internal and external customers; use of technology;
organization; and
processes.*
The findings, as they apply to the CEO function, provide the
fol-
lowing generalizations:
• There was an 85% increase in the number of CIOs who
reported directly to the CEO. This increase would suggest
that CEOs need to directly manage the CIO function because
of its importance to business strategy.
• CEOs supporting outsourcing did not receive the cost-cut-
ting results they had hoped for. In fact, most broke even. This
suggests that CEOs should not view outsourcing as a cost-
cutting measure, but rather foster its use if there are identifi-
able business benefits.
* Hackett Benchmarking has tracked the performance of nearly
2,000 complex,
global organizations and identified key differentiators between
world-class and aver-
age companies, across a diverse set of industries. In addition to
information tech-
nology, staff functions studied include finance, human
resources, procurement, and
strategic decision making, among others. Study participants
comprised 80% of the
Dow Jones Industrials, two-thirds of the Fortune 100, and 60%
of the Dow Jones
Global Titans Index. Among the IT study participants are
Agilent Technologies,
Alcoa, Capital One Financial Corporation, Honeywell
International, Metropolitan
Life Insurance, SAP America, and TRW. (From PR Newswire,
February 2002.)
305towArd best prACtICes
• CEOs have found that IT organizations that have centralized
operations save more money, have fewer help-line calls than
decentralized organizations, and do not sacrifice service qual-
ity. This suggests that the CEOs should consider less busi-
ness-specific support structures, especially when they conduct
their business at multiple locations.
• CEOs are increasingly depending on the CIO for advice
on business improvements using technology. As a result,
their view is that IT professionals need advanced business
degrees.
• CEOs should know that consistent use of IT standards has
enabled firms to trim IT development costs by 41%, which
has reduced costs for end-user support and training opera-
tions by 17%.
• CEOs need to increase support for risk management. Only
77% of average companies maintained disaster recovery plans.
As we can see from these generalizations, they are essentially
based on what CEOs are doing, and what they have experienced.
Unfortunately, this survey addressed little about what CEOs
know
and exactly what their role should be with respect to overall
man-
agement, participation, and learning of technology. These “ best
practices” are particularly lacking in the area of organizational
learning and the abilities of the firm to respond to changing
condi-
tions as opposed to searching for general solutions. Let us look
at
each of these generalizations and discuss what they lack in
terms of
organizational learning.
CIO Direct Reporting to the CEO
The fact that more CIOs are reporting directly to the CEO
shows an
escalation of their importance. But, what is more relevant as a
best
practice is what that relationship is about. Some report about
how
often they meet. What is more important is the content of the
inter-
actions. What should the CEOs know, how should the CEOs
con-
duct themselves? What management and learning techniques do
they
apply? How do they measure results? My CEO interview
research
exposed the fact that many CEOs simply did not know what
they
306 InForMAtIon teChnoloGY
needed to do to better manage the CIO and what they needed to
know in general about technology.
Outsourcing
Outsourcing can be a tricky endeavor. In Chapter 3, I
introduced
the concept of technology as a driver and a supporter. I
presented a
model that shows how emerging technologies are initially
drivers and
need to be evaluated and measured using similar models
embraced by
marketing-oriented communities. I then showed how, through
matu-
ration, emerging technologies become supporters, behaving
more as a
commodity within the organization. I explained that only then
can a
technology be considered for outsourcing because supporter
operations
are measured by their economies of scale, reduced costs,
increased
productivity, or both (efficiency). Figure 12.5 shows that cycle.
Thus, what is missing from the survey information is the knowl-
edge of where such technologies were with respect to this
technology
life cycle. Knowing this dramatically affects what the CEO
should be
expecting and what organizational learning concepts and factors
are
needed to maximize benefit to the organization.
Centralization versus Decentralization of IT
The entire question of how IT should or should not be organized
must be based on a business that implements ROD. ROD
includes
the component called cultural assimilation, which provides a
process,
Mini loop technology enhancementsTechnology
driver
Evaluation
cycle
Driver
maturation
Support
status
Replacement or
outsource
Economies
of scale
Figure 12.5 Driver-to-supporter life cycle.
307towArd best prACtICes
using organizational learning, to help businesses determine the
best
IT structure. To simply assume that centralizing operations
saves
money is far too narrow; the organization may need to spend
more
money on a specific technology in the short term to get long-
term
benefits. Where is this included in the best practices formula?
My
research has shown that more mature uses of technology in
organiza-
tions require more decentralization of IT personnel within the
busi-
ness units. The later stages of IT organizational structure at
Ravell
supported this position.
CIO Needs Advanced Degrees
I am not sure that anyone could ever disagree with the value of
advanced degrees. Nevertheless, the survey failed to provide
content
on what type of degree would be most appropriate. It also
neglected to
address the issue of what may need to be learned at the
undergradu-
ate level. Finally, what forms of education should be provided
on the
job? What exactly are the shortfalls that CIOs need to know
about
business? And, equally important is the consideration of what
educa-
tion and learning is needed by CEOs and whether they should be
so
dependent on advice from their CIOs.
Need for Standards
The need for standards is something that most organizations
would
support. Yet, the Siemens case study showed us that too much
con-
trol and standardization can prove ineffective. The Siemens
model
allowed local organizations to use technology that was specific
to
their business as long as it could be supported locally. The real
chal-
lenge is to have CEOs who understand the complexity of IT
stan-
dards. They also need to be cognizant that standards might be
limited
to the structure of their specific organization structure, its
business,
and its geographical locations.
Risk Management
The survey suggested that CEOs need to support risk
management
because their backup recovery procedures may be inadequate.
The
308 InForMAtIon teChnoloGY
question is whether the problem stems from a lack of support or
from
a lack of knowledge about the topic. Is this something that the
chief
IT executive needs to know, or is it just about the CEO’ s
unwilling-
ness to spend enough funds? The best practices component of
risk
management must be broader and answer these questions.
By contrast to the survey, we may consider a report issued by
Darwin Research (“ A CRM Success Story,” November 1,
2002),
which cited the recommended best practices of Christopher
Milliken,
CEO of Boise Cascade Office Products. He offered the kind of
in-
depth view of best practices that I feel is needed to be
consistent with
my research on ROD. Milliken participated in the
implementation of
a large-scale CRM system needed to give his customers a good
reason
to choose Boise. The project required an investment of more
than $20
million. Its objective was to provide customers with better
service. At
the time of the investment, Milliken had no idea what his ROI
would
be, only that the project was necessary to distinguish Boise
Cascade
from myriad competitors in the same industry.
After the successful implementation of the project, Milliken was
now in a position to offer his own thoughts about technology-
related
best practices that a CEO might want to consider. He came up
with
these six:
1. The CEO must commit to a technology project : Milliken
was keen
to express the reasons why the CRM project was important;
he was intimately involved with its design, and made it clear
that he had to be consulted, should there be any delays in the
project schedule. KPMG (a major consulting firm) was also
hired as a consultant to help implement the schedule and was
held to the same level of excellence. What Milliken accom-
plished, significantly, was to show his interest in the project
and his willingness to stay involved at the executive level.
Milliken’ s best practice here lies in his commitment, which
is consistent with that of McDermott from ICAP and the
CEO from HTC. They both realized, as Milliken did, that
the CEO must have an active role in the project and not just
allow the management team to get it done. Milliken, as did
McDermott and the CEO of HTC, issued specific perfor-
mance-related requirements to his employees and consultants.
309towArd best prACtICes
His participation sent a valuable message: The CEO is part
of the supporting effort for the project and is also part of
the learning process of the organization. Indeed, the situa-
tion that Milliken faced and resolved (i.e., to jump in without
knowing the expected returns of the project) is exemplary of
the core tenets of ROD, which require the ability for an orga-
nization to operate with dynamic and unpredictable change
brought about by technology. In this case, the technology was
crucial to distinguishing Boise Cascade, in the same way that
electronic trading was for ICAP, and the billing system was
for HTC. Yet, all three of these situations required a cer-
tain behavior and practice from the company CEO. Thus,
the most important best practice lies in the commitment and
learning to the learning organization format.
2. Think business first, then technology : To understand why a
tech-
nology is needed, there must first be a supporting business
plan; that is, the business plan must drive the technology or
support its use. This best practice concept is consistent with
my research. Indeed, Dana Deasy from Siemens realized it
after a three-year investment in e-business, and McDermott
clearly advocated the importance of a business plan over
embellished technology. Another interesting and important
result of the business plan was that it called for the creation
of a centralized CRM system. Therefore, it became necessary
to consolidate the separate business units at Boise into one
corporate entity— providing central support and focus. This
is another example of how ROD operates. The CRM project,
through a validation process in a business plan, provided the
strategic integration component of ROD. The strategy then
influenced cultural assimilation and required a reorganization
to implement the strategy or the new CRM system.
Furthermore, Boise Cascade allowed its staff to experiment in
the project, to make mistakes, without criticizing them. They
were, in effect, implementing the driver-related concepts of
technology. These driver concepts must be similar to the way
organizations support their marketing activities, by which
they accept a higher error ratio than when implementing a
supporter activity. The CEO wanted everyone to give it their
310 InForMAtIon teChnoloGY
best and to learn from the experience. This position is a key
best practice for the CEO; it promotes organizational learn-
ing throughout the business.
3. Handcuff business and technology leaders to each other :
Milliken
understood that technology projects often fail because of a
lack of communication between IT and other business enti-
ties. The project represented many of the IT dilemmas that I
discussed in Chapter 2, particularly relating to the new CRM
system and its integration with existing legacy applications
and, at the same time, creating a culture that could imple-
ment the business strategy. To address this, Milliken first
appointed a new CIO to foster better communication. He
also selected a joint project leader from the business side, thus
creating a joint project leadership team. What Milliken did
was to form a new community of practice that did not exist
before the project. The project, as with Ravell, represented
an event that fostered the creation of organizational learning
opportunities. As with ICAP, Milliken’ s company enlisted
the support of executive-level consultants to help finalize the
business plan and marketing strategy, as well as assist with
change management. What exactly did Milliken do that rep-
resents a best practice? From an organizational learning per-
spective, he created communities of practice between IT and
the business. That then is a true best practice for a CEO.
4. Get the show on the road : There was a not-to-be-questioned
deadline that was instituted by Milliken. As I noted in
Chapter 4, this type of management seems undemocratic,
but it should not be confused with being nonparticipatory.
Someone had to get this going and set expectations. In this
case, both IT and business users were set to make things
happen. Senior management endorsed the project and openly
stated that it represented what could be a one-time opportu-
nity to “ do something of great magnitude” (Dragoon, 2002).
From a best practices perspective, this means that the CEO
can and should provide the leadership to get projects done
and that part of that leadership could be setting strategic
dates. However, CEOs should not confuse this leadership
with power-centralized management over IT-related projects.
311towArd best prACtICes
Communities of practice still need to be the driving force for
inevitable success in ROD. Another important factor was
Milliken’ s decision to create dual management over the proj-
ect. Thus, Milliken was able to create an environment that
required discourse between IT and the business.
5. Win over the masses for massive changes : As stated, the
business
plan called for a reorganization of other business units. This
also required executives to rethink job descriptions and titles
in relation to new processes. It also eliminated six redundant
management-level jobs. Milliken engaged employees in a
massive “ external-internal” marketing campaign. Employees
participated in ad campaigns, and brochures were created for
all staff. A video was also produced that defined the benefits
to Boise Cascade customers. In essence, Milliken was com-
mitted to communication and training. Similar to my experi-
ence at Ravell, not everyone is comfortable with change, and
resistance in the ranks is inevitable. As a result, the educa-
tion and training programs at Boise were not enough. What
was lacking was true organizational learning and knowledge
management. There are two best practices that were defined
from this experience. First, the CEO needs to engage in
actively showing the importance that technology has to the
organization, not only from an economic perspective, but also
from a staff development point of view. The second best prac-
tice comes from the example of what Boise Cascade did not
do enough of: provide organizational transformation through
knowledge management, reflective practices, and commu-
nities of practice. This suggests that CEOs need to better
understand and incorporate organizational learning concepts,
so that they can be the catalyst for change as they are in other
areas of the business. We saw support for this concept from
both ICAP and HTC, where the actions of the CEO came
from an organizational learning perspective.
6. Know that technology projects never end : ROD assumes, by
def-
inition, that technology is a variable, albeit an insistent one.
Milliken’ s experience further supported this notion, in that
he realized that Boise Cascade must continue to assess the
impact of the CRM application. Another way of saying this
312 InForMAtIon teChnoloGY
is that the technology will continue to be viewed as a means to
transform the business on an ongoing basis. Indeed, Milliken
was planning to spend another $10 million on the next phase.
So, from a best practices perspective, CEOs must recognize
that technology investment never ends, but it moves to other
phases of maturation, similar to the driver/supporter life
cycle. Finally, the buy-in to this reality ensures the recogni-
tion of organizational dynamism.
Based on the case studies and research presented thus far in this
book, I can now formulate a list of 11 key planks that represent
the
core of what constitutes a technology CEO’ s set of best
practices:
1. The chief IT executive should report directly to the CEO.
2. CEOs should be actively committed to technology on an
ongoing basis, as opposed to project-by-project involvement.
3. CEOs should be willing to be management catalysts to sup-
port new technology-driven projects. They, in effect, need to
sometimes play the role of technology champion.
4. CEOs should focus on business concepts and plans to drive
technology. In other words, technology should not drive the
business.
5. CEOs should use consultants to provide objective input to
emerging technology projects.
6. CEOs should establish organizational infrastructures that
foster the creation of communities of practice. They need
to create joint ownership of IT issues by fostering discourse
between IT, business managers, and staff.
7. CEOs may need to take control of certain aspects of tech-
nology investments, such as setting milestones and holding
management and staff to making critical project dates.
8. CEOs need to foster cultural assimilation, which may lead to
reorganization, since technology changes processes.
9. CEOs need to understand organizational learning and knowl-
edge management theories and participate in organizational
transformation.
10. CEOs need to understand how the technology life cycle
behaves, with specific attention to the transition from driver
activities to supporter functions. To that end, CEOs need to
313towArd best prACtICes
understand the short- and long-term investments that need to
be made in technology.
11. CEOs should create organizations that can effectively oper-
ate within technological dynamism. This process will educate
management and staff to handle the dynamic and unpredict-
able effects of emerging technologies. It will also foster the
development of both middle-up-down and bottom-up man-
agement of technology.
The issue is now to provide a linear development model for
CEOs
that enables them to measure where they are in relation to ROD
and
the best practices outlined.
The CEO Best Practices Technology Arc
Similar to the chief IT executive arc, the CEO best practices arc
is
an instrument for assessing the technology best practices of
CEOs.
The arc evaluates a CEO’ s strategic uses of technology and
leader-
ship by using a grid that charts competencies ranging from
conceptual
knowledge about technology to more complex uses of
technology and
business and how they are integrated in strategic business
planning.
As with all arc models, the CEO version measures five principal
stages of a CEO’ s maturity with respect to business
applications of
technology: conceptual, structural, executive values, executive
eth-
ics, and executive leadership. Each dimension or sector is
measured
in five stages of maturation that guide the CEO’ s executive
growth
managing technological dynamism. The first stage is being
reflec-
tively aware about their conceptual knowledge of technology
and
what it can do for the organization. The second is other
centered-
ness, by which CEOs become aware of the multiplicity of
business
uses of technology and the different views that can exist inside
and
outside the organization. The third is integration of business use
of
technology; a CEO can begin to combine how business plans
foster
the need for technology. The fourth is implementation of
business/
technology process, meaning that the CEO understands how
busi-
ness applications and technology are used together and is
resilient
to nonauthentic sources of emerging technologies. Stage four
rep-
resents an ongoing commitment to implementing both
technology
314 InForMAtIon teChnoloGY
and business applications. The fifth refers to strategic uses of
tech-
nology; CEOs have reached a stage at which their judgment on
using technology and business is independent and can be used to
self-educate. Thus, as CEOs grow in knowledge of business
uses
of technology, they can become increasingly more
understanding of
the multiplicity of uses, can become more integrated in how
they
conceptualize technology, can manage its implementation from
an
executive position, and can apply strategies to support new
applica-
tions of technology in the organization.
Definitions of Maturity Stages and Dimension Variables
in the CEO Technology Best Practices Arc
Maturity Stages
1. Conceptual knowledge of technology : This first stage
represents
the CEO’ s capacity to learn, conceptualize, and articulate key
issues relating to business uses of technology, organizational
structures available, executive value methods, executive ethi-
cal issues surrounding technology, and leadership alternatives
that are needed to be successful with technology applications.
2. Multiplicity of business perspectives of technology : This
stage
indicates the CEO’ s ability to integrate multiple points of
view from management, staff, and consultants about technol-
ogy applications in business. Using these new perspectives,
the CEO augments his or her conceptual skills with technol-
ogy, has an expanded view of what organizational structures
might work best, expands his or her executive values about
technology uses, is increasingly aware of the ethical dilemmas
with technology, and enhances his or her leadership abilities.
3. Integration of business uses of technology : Maturing CEOs
accu-
mulate increased understanding of how technology can sup-
port the business, provide more competitive advantage, and
have a more integrated understanding of how to use their
conceptual skills about technology, of the alternative organi-
zational structures available, of how to combine their business
executive value and ethical systems, and how to develop effec-
tive levels of executive leadership.
315towArd best prACtICes
4. Implementation of business/technology process : CEOs
achieve
integration when they can regularly apply their conceptual
knowledge of technology, organization structures, executive
values and ethics about technology, and executive leadership,
appropriate for performing their job duties, not only ade-
quately, but at a level that provides a competitive advantage
for the organization.
5. Strategic uses of technology : Leadership is attained by the
CEO when he or she can employ conceptual skills, develop
new organizational structures as necessary, establish new
values and ethics that are appropriate for the organization,
and create a sense of executive presence to lead the organiza-
tion strategically. This CEO is capable of having new vision
about how business and technology can be expanded into
new endeavors.
Performance Dimensions
1. Technology concepts : Concerns conceptual skills,
specifically
related to understanding how technology can be used in the
business. This dimension essentially establishes the CEO
as technically proficient, conceptually, and forms a basis for
movement to more complex and mature stages of business/
technology development.
2. Organizational structures : The knowledge of the alternative
organizational structures that can support the application
of emerging technology in corporate settings with regard to
roles, responsibilities, career paths, and organizational report-
ing alternatives.
3. Executive values : Measures the CEO’ s ability to articulate
and
act on mainstream technological values credited with shaping
the work ethic: independent initiative, dedication, honesty,
and personal identification with career goals, based on the
philosophy of the management protocol of the organization.
4. Executive ethics : Reflects the CEO’ s commitment to the
edu-
cation and professional advancement of the behavior of the
organization as it relates to business uses of technology.
316 InForMAtIon teChnoloGY
5. Executive leadership : Involves the CEO’ s view of the role
of
an executive in business, and the capacity to succeed in tan-
dem with his or her organizational resources. Aspects include
a devotion to organizational learning and self-improvement,
self-evaluation, the ability to acknowledge and resolve busi-
ness/technology conflicts, and resilience when faced with per-
sonal and professional challenges.
Figure 12.6 shows a graphic view of the CEO technology best
practices arc. Each cell in the arc provides the condition for
assess-
ment. The complete arc is provided in Table 12.2.
Middle Management
Middle management, which comprises a number of tiers, is
perhaps
the most challenging of best practices to define. In Chapter 3, I
strati-
fied the different types of positions that make up middle
managers
into three tiers: directors, line managers, and supervisors. What
is
most important at this point is to determine the set of
technology
best practices for managers so that they can effectively operate
under
ROD. That is, technology best practices must be designed to
contain
the insights and skills for effective management of technology.
This
must include
1. Working with IT personnel
2. Providing valuable input to the executive management team,
including the CEO
3. Participating and developing a technology strategy within
their business units
4. Effectively managing project resources, including technical
staff
5. Leading innovative groups in their departments
6. Incorporating technology into new products and services
7. Developing proactive methods of dealing with changes in
technology
8. Investigating how technology can improve competitive
advantage.
317towArd best prACtICes
D
ev
el
op
m
en
ta
l d
im
en
sio
ns
o
f m
at
ur
in
g
D
im
en
sio
n
sk
ill
C
on
ce
pt
ua
l
kn
ow
le
dg
e
of
te
ch
no
lo
gy
M
ul
tip
lic
ity
o
f
bu
sin
es
s
pe
rs
pe
ct
iv
es
o
f
te
ch
no
lo
gy
In
te
gr
at
io
n
of
bu
sin
es
s u
se
s o
f
te
ch
no
lo
gy
Im
pl
em
en
ta
tio
n
of
bu
sin
es
s/
te
ch
no
lo
gy
pr
oc
es
s
St
ra
te
gi
c
us
es
of
te
ch
no
lo
gy
Te
ch
no
lo
gy
c
og
ni
tio
n
O
rg
an
iz
at
io
na
l
st
r u
ct
ur
es
Ex
ec
ut
iv
es
v
al
ue
s
Ex
ec
ut
iv
es
e
th
ic
s
Ex
ec
ut
iv
e
le
ad
er
sh
ip
Fi
gu
re
1
2.
6
C
EO
te
ch
no
lo
gy
b
es
t p
ra
ct
ic
es
a
rc
.
318 InForMAtIon teChnoloGY
Table 12.2 CEO Technology Best Practices Arc—Detail
DIMENSION VARIABLE
CONCEPTUAL KNOWLEDGE OF
TECHNOLOGY
MULTIPLICITY OF BUSINESS
PERSPECTIVES OF
TECHNOLOGY
Technology Concept Understands concepts and
definitions about technology
and how it relates to
business. Has conceptual
knowledge of the software
development life cycle.
Understands high-level
concepts about distributed
processing, database
development, and project
management. Understands
the definition and role of
operating systems such as
UNIX, WINDOWS, and MAC.
Has the ability to relate
technology concepts to other
business experiences.
Understands that different
technology may be required
for a particular project and
organization. Can
conceptualize how to expand
the use of technology and
apply it to business
situations.
Seeks to manage by appreciating
that technology can have
multiple perspectives. Able to
manage a process that requires
validation about different
opinions about business uses of
technology. Can manage the
different objective ideas from
multiple technology views
without getting stuck on
personal biases. Has an ability
to identify and draw upon
multiple perspectives available
from business sources about
technology, particularly from
independent sources. Developing
a discriminating ability to create
an infrastructure that can
operate with multiple views.
Committed to creating an
organization that can learn
through realistic and objective
judgment, as demonstrated by
the applicability of the
technology material drawn for a
particular project or task and
tied to business outcomes.
Organizational Structures Understands that technology
can be viewed by other
organizations in different
ways and may need different
organizational structures.
Can use technology as a
medium of communication.
Understands that certain
technologies may need to be
managed differently and
need specific types of
structures and expertise. Has
the ability to comprehend
recommend/suggested
technological solutions to
suite business needs and
preferences.
Seeks to manage technology as a
vehicle to learn more about what
alternative organization
structures are available from
others. Strives to create a
learning organization that cares
about what other staff perceive
as solutions. Committed to
cultural assimilation that can
change the need to restructure
the organization. Tries to
understand and respect
technologies that differ from
what the organization is currently
using. Understands that the
organization has multiple and
different technological needs.
(Continued)
319towArd best prACtICes
Table 12.2 (Continued) CEO Technology Best Practices Arc—
Detail
INTEGRATION OF BUSINESS
USES OF TECHNOLOGY
IMPLEMENTATION OF
BUSINESS/TECHNOLOGY
PROCESS
STRATEGIC USES OF
TECHNOLOGY
Creates an organization
that has the ability to
relate various technical
concepts and organize
them with non-technical
business issues. Can
manage by operating with
both automated and
manual business
solutions. Can use
technology to expand
business reasoning, logic,
and what-if scenarios.
Establishes business
templates that allow
technology to offer
everyday business
solutions. This involves
the hypothetical
(inductive/deductive)
logical business issues.
Organization’ s use of
technology is concrete,
accurate, and precise, broad
and resistant to interference
from non-authentic
technology business sources.
Ability to resist or recover
from faulty uses of
technology that is not
realistic without a supporting
business plan.
Methods and judgment as a
multidimensional CEO is
independent, has critical
discernment. Conceptual
knowledge of technology can be
transferred and can be used to
self-educate within and outside
of technology. Can use
technology for creative
purposes to create new
business initiatives and
integrate them with short- and
long-term business goals.
Can deal with multiple
dimensions of criticism
about how technology can
be used in the
organization. Can develop
relationships (cooperative)
that are dynamic and
based on written
communication and oral
discourse about how
business can drive
technological investments.
Ability to create new
business relations using
technology with new and
existing customers. Has an
appreciation of cyberspace
as a new market— a place
wide open to dialogue
(spontaneous), to provide
new opportunities for
business growth.
Commitment to open
discussion of alternating
opinions on technology and
acceptance of varying types
of structures to accommodate
technology opportunities.
Ability to sustain dynamic
organizational structures.
Can design new structures to
integrate multidimensions of
business and technology
solutions. Can dynamically
manage different types of
interdependent and dependent
organizational relationships.
Ability to manage within
multiple dimensions of
business cultures, which may
demand self-reliance and
confidence in independence of
initiatives.
(Continued)
320 InForMAtIon teChnoloGY
Table 12.2 (Continued) CEO Technology Best Practices Arc—
Detail
DIMENSION VARIABLE
CONCEPTUAL KNOWLEDGE OF
TECHNOLOGY
MULTIPLICITY OF BUSINESS
PERSPECTIVES OF
TECHNOLOGY
Executive Values Understanding of technology
and cultural differences.
Conceptually understands
that global communication,
education, and workplace use
of technology can be
problematic— subject to
false generalizations and
preconceived notions.
Management awareness of
responsibilities to address
assumptions about how
technology will be viewed by
other departments and
customers.
Sets conditions that foster the
need to obtain multiple sources
of information and opinion
about how technology values.
The propagation
organizationally of acceptance
that there can be
multidimensional values in
human character.
Executive Ethics Understands that there is a
need to use technology with
honesty re: privacy of access
and information. Supports
the development of ethical
policies governing business
uses of the Internet, research,
intellectual property rights,
and plagiarism.
Committed to creating an
organization that uses
information in a fair
way— comparison of facts
against equal sources of
business information.
Understands and is
compassionate that business
and technology information may
have different levels of
knowledge access. Recognizes
the need for sharing information
with other business units from a
sense of inequality.
Executive Leadership Conceptualizes the need to
have a leadership role with
respect to technology in the
business— the business and
technologically realizable
executive self.
Understands how other
executives can view technology
leadership differently.
Understands or has awareness
of the construction of self that
occurs when taking on the
integration of technology in
business operations. Focuses
on views of other CEOs in
multiple settings. Understands
that the self (through
technology) is open for more
fluid constructions, able to
incorporate diverse views in
multiple technology settings.
(Continued)
321towArd best prACtICes
As with CEO research, there are myriad best practices that have
been offered as a method of dealing with the subject of
technology
management. Unfortunately, these practices usually are vague
and
intermingle management levels and departments; that is, it is
diffi-
cult to know whether the best practice is for the chief IT
executive,
Table 12.2 (Continued) CEO Technology Best Practices Arc—
Detail
INTEGRATION OF BUSINESS
USES OF TECHNOLOGY
IMPLEMENTATI ON OF
BUSINESS/TECHNOLOGY
PROCESS
STRAT EGIC USES OF
TECHNOLOGY
Can manage multiple
dimensions of value
systems and can prioritize
multi-tasking events that
are consistent with value
priorities. Ability to assign
value to new and diverse
technology business
alternatives— linking
them to legacy systems
and processes.
Managing value systems in
new ways because technology
changes long-term values
and goals for business
objectives. Recognition that
some concepts remain
unchanged despite emerging
technologies.
Management of technology and
business are based on formed
principles as opposed to
dynamic influences or
impulses. Formed executive
principles establish the basis
for navigating through or
negotiating the diversity of
business opportunities and
impulses for investment in
technologies.
Consistent management
values displayed on
multiple business goals,
mission, and dedication
to authenticity. Maintains
management consistency
in combining values
regarding technology
issues.
Business and technology are a
commitment in all aspects of
management value systems,
including agility in managing
multiple business
commitments. Commitment
to greater openness of mind
to altering traditional and
non-technological
management methods.
Technology management
creativity with self-defined
principles and beliefs.
Risk-taking in technology-
based ventures. Utilizing
technology to expand one’ s
arenas of business
development. Manages the
business liberating capacities
of technology.
Manages technology to
unify multiple parts of
the organization and
understands how the
process behaves in
different business
situations.
Has developed an executive
identity of self from a
multiplicity of management
venues. Method of
management creates positive
value systems that generate
confidence about how
multiple business
communities need to operate.
Acceptance and belief in a
multidimensional business
world of how to lead with
technology. Can determine
comfortably, authenticity of
organization’ s executives and
their view of the self. Can
confirm disposition on
technology independently from
others’ valuations, both
internally and from other
organizations. Beliefs direct
and control multi-dimensional
leadership growth.
322 InForMAtIon teChnoloGY
the CEO, or some other level of management. We know from
the
research from Bolman and Deal (1997) that middle managers
feel
torn by conflicting signals and pressures they get from both
senior
management and the operations that report to them: “ They need
to
understand the difference in taking risks and getting punished
for
mistakes” (p. 27). According to Bolman and Deal (1997), best
prac-
tices for middle managers need to cover the following areas:
1. Knowledge management
2. Alignment
3. Leadership and commitment
4. Organization
5. Human resources
6. Opportunity management
7. Leveraging
8. Performance assessment
Their study covered more than 400 companies in the eight areas
of concern. I extracted 10 middle management-related best
practices
from their study results and concluded that middle managers
need to
1. Understand how to take a strategy and implement it with
technology; that is, they need to create tactics for completing
the project.
2. Establish team-building measures for linking technology
with daily operations of the staff.
3. Foster the aggregation and collaboration of business unit
assets to form peer groups that can determine joint efforts for
implementing new technologies.
4. Stimulate their staffs using innovative strategies of value
propositions and reward systems.
5. Create multifunctional teams that can focus on particu-
lar aspects of how technology affects their specific area of
expertise.
6. Follow common project management practices so that mul-
titier and department projects can be globally reviewed by
senior management.
7. Form project teams that can respect and perform on an action
basis; that is, teams that are action oriented.
323towArd best prACtICes
8. Understand how to communicate with, and use, IT staff on
projects.
9. Have a systematic process for gathering intelligence relating
to pertinent technology developments.
10. Understand that customers are the drivers for technology
tools provided by the organization.
On reviewing the different aspects of middle manager best
practices
with technology research, it appears that there are two focal
points:
(1) those best practices that address the needs of senior
management,
the CIO, and the CEO; and (2) those that are geared toward the
management of the staffs who need to implement emerging
technol-
ogy projects.
This makes sense, given that the middle manager, notwith-
standing whether a director, line manager, or supervisor, needs
to deal with executive productivity-related issues as well as
staff
implementation ones. They are, as Bolman and Deal (1997)
state,
“ torn” by these two competing organizational requirements.
Table 12.3 represents the combined list of technology-based
best
practices organized by executive best practices and
implementation
best practices.
Table 12.3 exemplifies the challenge that middle managers
have in balancing their priorities. In accordance with the
research,
the best practices mentioned are implemented using methods of
knowledge management, alignment, leadership and commitment,
human resources, opportunity management, leveraging, and per-
formance assessment. As with the other best practices, the
middle
manager technology best practices are limited because they do
not
address the specific needs of ROD, particularly organizational
learning theories (with the exception of knowledge
management).
This shortfall is integrated into another developmental arc
model
that combines these theories with the preceding definitions of
best
practices.
The Middle Management Best Practices Technology Arc
The middle management best practices technology arc, as with
others,
can be used to evaluate a middle manager’ s strategic and
operational
324 InForMAtIon teChnoloGY
uses of technology by using a grid that measures competencies
rang-
ing from conceptual knowledge about technology to more
complex
uses of technology and business operations.
The five principal stages defined by the arc determine the
middle
manager’ s maturity with business implementations of
technology:
cognitive, organization interactions, management values,
project eth-
ics, and management presence. There are five stages of
maturation
that guide the middle manager’ s growth. The first is becoming
reflec-
tively aware about one’ s existing knowledge with business
technology
and how it can be implemented. The second is the recognition of
the
Table 12.3 Middle Manager Executive and Implementation
Best Practices
EXECUTIVE-BASED MIDDLE MANAGER BEST
PRACTICES
IMPLEMENTATION-BASED MIDDLE MANAGER BEST
PRACTICES
1. Provide valuable input to the executive
management team, including the CEO.
1. Understand how to communicate with and use
IT staff on projects.
2. Incorporate technology into new
products and services.
2. Effectively manage project resources,
including technical staff.
3. Participate in developing a technology
strategy within their business units.
3. Lead innovative groups in their departments.
4. Have proactive methods of dealing
with changes in technology.
4. Understand how to take a strategy and
implement it with technology; that is, create
tactics for completing the project.
5. Focus on how technology can improve
competitive advantage.
5. Establish team-building measures for linking
technology with staff’ s daily operations.
6. Have a systematic process for
gathering intelligence, relating to
pertinent technology developments.
6. Foster the aggregation and collaboration of
business unit assets to form peer groups that
can determine joint efforts for implementing
new technologies.
7. Understand that customers are the
drivers for technology tools provided by
the organization reward.
7. Stimulate their staffs using innovative
strategies of value propositions and systems.
8. Create multifunctional teams that can focus
on particular aspects of how technology
affects their specific area of expertise.
9. Follow common project management practices
so that multitier and department projects can
be globally reviewed by senior management.
10. Form project teams that can respect and
perform on an action basis; that is, teams
that are action oriented.
325towArd best prACtICes
multiplicity of ways that technology can be implemented on
projects
(e.g., other business views of how technology can benefit the
organiza-
tion). The third is integration of business implementation with
tech-
nology, in which a middle manager can begin to combine
technology
issues with business concepts and functions on a project basis.
The
fourth is stability of business/technology implementation, in
which
the middle manager has integrated business/technology as a
regu-
lar part of project implementations. The fifth is technology
project
leadership, in which the middle manager can use their
independent
judgment on how best to use technology and business on a
project-by-
project basis. Thus, as middle managers grow in knowledge of
tech-
nology and business projects, they can become increasingly
more open
to new methods of implementation and eventually, autonomous
with
the way they implement projects and provide leadership.
Definitions of Maturity Stages and Dimension Variables
in the Middle Manager Best Practices Arc
Maturity Stages
1. Technology implementation competence and recognition:
This
first stage represents the middle manager’ s capacity to learn,
conceptualize, and articulate key issues relating to cogni-
tive business technological skills, organizational interactions,
management value systems, project management ethics, and
management presence.
2. Multiplicity of business implementation of technology:
Indicates
the middle manager’ s ability to integrate multiple points of
view during technical project implementations. Using these
new perspectives, the middle manager augments his or her
skills with business implementation with technology career
advancement, expands his or her management value system,
is increasingly motivated to act ethically during projects, and
enhances his or her management presence.
3. Integration of business implementation of technology:
Maturing
middle managers accumulate increased understand-
ing of how business and technology operate together and
affect one another. They gain new cognitive skills about
326 InForMAtIon teChnoloGY
technology and a facility with how the organization needs
to interact, expand their management value system, perform
business/technology actions to improve ethics about busi-
ness and technology, and develop effective levels of manage-
ment presence.
4. Stability of business/technology implementation: Middle
manag-
ers achieve stable integration when they implement projects
using their cognitive and technological ability; have organi-
zation interactions with operations; have management values
with their superiors, peers, and subordinates; possess project
ethics; and have the management presence appropriate for
performing job duties, not only adequately, but also competi-
tively (with peers and higher-ranking executives in the orga-
nization hierarchy).
5. Technology project leadership: Leadership is attained by the
middle manager when he or she can employ cognitive and
technological skills, organization interactions, management, a
sense of business ethics, and a sense of management presence
to compete effectively for executive positions. This middle
manager is capable of obtaining increasingly executive-level
positions through successful interviewing and organization
performance.
Performance Dimensions
1. Business technology cognition : Pertains to skills
specifically
related to learning, applying, and creating resources in busi-
ness and technology, which include the necessary knowledge
of complex operations. This dimension essentially establishes
the middle manager as “ operationally” proficient with tech-
nology and forms a basis for movement to more complex and
mature stages of development when managing technology
projects.
2. Organizational interactions : This focuses on the middle
man-
ager’ s knowledge and practice of proper relationships and
management interactions during technology projects. This
pertains to in-person interactions, punctuality of staff, work
327towArd best prACtICes
completion, conflict resolution, deference, and other protocols
in technology projects.
3. Management values : Measures the middle manager’ s ability
to articulate and act on mainstream corporate values credited
with shaping technology project work ethic: independent ini-
tiative, dedication, honesty, and personal identification with
technology project goals, based on the philosophy of manage-
ment protocol of the organization.
4. Project ethics: Reflects the middle manager’ s commitment
to
the education and professional advancement of other persons
in technology and in other departments.
5. Management presence: Involves the middle manager’ s view
of the role of a project-based manager during a technology
project implementation and the capacity to succeed in tandem
with other projects. Aspects include a devotion to learning
and self-improvement, self-evaluation, the ability to acknowl-
edge and resolve business conflicts, and resilience when faced
with personal and professional challenges during technology
implementations.
Figure 12.7 shows a graphic view of the middle management
tech-
nology best practices arc. Each cell in the arc provides the
condi-
tion for assessment. The complete arc is provided in Table
12.4. The
challenge of the middle management best practices arc is
whether
to emphasize executive management concepts (more
organizationally
intended) or event-driven concepts (project oriented). This arc
focuses
on project implementation factors and deals with best practices
that
can balance executive pressures with implementation realities. I
sug-
gest that senior middle managers, at the director level, who do
not
participate in implementation, set their best practices, based on
the
CEO maturity arc. Indeed, creating a separate arc for upper
manage-
ment would contain too many overlapping cells.
Summary
The formation of best practices to implement and sustain ROD
is a
complex task. It involves combining traditional best practice
methods
(i.e., what seems to work for proven organizations and
individuals)
328 InForMAtIon teChnoloGY
D
ev
el
op
m
en
ta
l d
im
en
sio
ns
o
f m
at
ur
in
g
Bu
sin
es
s t
e c
hn
ol
og
y
O
rg
an
iz
at
io
na
l
M
an
ag
em
en
t v
al
ue
s
Pr
oj
ec
t e
th
ic
s
M
an
ag
em
en
t p
re
se
nc
e
D
im
en
sio
n
sk
ill
Te
ch
no
lo
gy
im
pl
em
en
ta
tio
n
M
ul
tip
lic
ity
o
f
bu
sin
es
s
In
te
gr
at
io
n
of
bu
sin
es
s
St
ab
ili
ty
o
f
bu
sin
es
s/
te
ch
no
lo
gy
Te
ch
no
lo
gy
pr
oj
ec
t
Fi
gu
re
1
2.
7
M
id
dl
e
m
an
ag
em
en
t t
ec
hn
ol
og
y b
es
t p
ra
ct
ic
es
a
rc
.
329towArd best prACtICes
Table 12.4 Middle Management Technology Best Practices
Arc—Detail
DIMENSION VARIABLE
TECHNOLOGY
IMPLEMENTATION
COMPETENCE AND
RECOGNITION
MULTIPLICITY OF BUSINESS
IMPLEMENTATION OF
TECHNOLOGY
Business Technology
Cognition
Understands how technology
operates during projects. Has
conceptual knowledge about
hardware interfaces, and the
software development life
cycle. Has the core ability to
relate technology concepts to
other business experiences.
Can also participate in the
decisions about what
technology is best suited for
a particular project. Can be
taught how to expand the use
of technology and can apply
it to other business
situations.
Understands that technology
projects can have multiple
perspectives on how to
implement them. Able to
analyze what is valid vs.
invalid opinions about
business uses of technology.
Can create objective ideas from
multiple technology views
without getting stuck on
individual biases. An ability to
identify and draw upon
multiple perspectives available
from project sources about
technology. Developing a
discriminating ability with
respect to choices available.
Realistic and objective
judgment, as demonstrated by
the applicability of the
technology material drawn for
a particular project or task and
tied to functional/pragmatic
outcomes.
Organizational Interactions Understands that technology
projects require the opinions
of other departments and
staff in multiple ways.
Understands that certain
technological solutions and
training methods may not fit
all project needs and
preferences of the business.
Has the ability to
recommend/suggest
alternative technological
solutions to suite other
business and project needs
and preferences.
Seeks to use technology projects
as a vehicle to learn more
about organization interactions
and mindsets. Strives to care
about what others are
communicating and embraces
these opinions on a project
basis. Tries to understand and
respect technologies that differ
from own. Understands basic
technological project needs of
others.
(Continued)
330 InForMAtIon teChnoloGY
Table 12.4 (Continued) Middle Management Technology Best
Practices Arc—Detail
INTEGRATION OF BUSINESS
IMPLEMENTATION OF
TECHNOLOGY
STABILITY OF BUSINESS/
TECHNOLOGY
IMPLEMENTATION
TECHNOLOGY PROJECT
LEADERSHIP
Has the ability to relate
various technical project
concepts and organize
them with non-technical
business issues. Can
operate with both
business and technical
solutions. Can use
technology to expand
reasoning, logic, and
what-if scenarios. Ability
to discern the templates
that technology has to
offer in order to approach
everyday technology
project problems. This
involves the hypothetical
(inductive/deductive)
logical business and
technology skills.
Knowledge of technology
projects are concrete,
accurate, and precise, broad
and resistant to interference
from non-authentic business
and technical project
sources. Ability to resist or
recover from proposed
technology that is not
realistic— and can recover
resiliently.
Methods and judgment in
multidimensional technology
projects are independent and
use critical discernment.
Operational knowledge of
technology and project
management skills can be
transferred and can be used to
self-educate within and
outside of technology. Can use
technology for creative
purposes to solve business and
project challenges and
integrate with executive
management views.
Can deal with multiple
dimensions of criticism
about technology-based
projects. Can develop
relationships
(cooperative) that are
dynamic and based on
discourse. Ability to create
project relations with IT,
other departments, and
customers. Has an
appreciation of project
communication— to
foster open dialogue
(spontaneous), to give
and take, or other than
voyeuristic, one-sidedness
about the project. Ability
to produce in teamwork
situations, rather than
solely in isolation.
Loyalty and fidelity to relations
in multiple organizations.
Commitment to criticism and
acceptance of multiple levels
of IT and business
relationships. Ability to
sustain non-traditional types
of inputs from multiple
sources during projects.
Can utilize and integrate
multidimensions of project
solutions in a self-reliant way.
Developing alone if necessary
using other technical and
non-technical resources. Can
dynamically select types of
interdependent and dependent
organizational relationships.
Ability to operate within
multiple dimensions of
business cultures, which may
demand self-reliance,
independence of initiative, and
interactive communications
during project
implementations.
(Continued)
331towArd best prACtICes
Table 12.4 (Continued) Middle Management Technology Best
Practices Arc—Detail
DIMENSION VARIABLE
TECHNOLOGY
IMPLEMENTATION
COMPETENCE AND
RECOGNITION
MULTIPLICITY OF BUSINESS
IMPLEMENTATION OF
TECHNOLOGY
Management Values Technology and cultural
sensitivity during project
implementations. Global
communication, education,
and project use of technology
can be problematic— subject
to false generalizations and
preconceived notions.
Awareness of assumptions
about how technology will be
viewed by other departments
and staff and about biases
about types of technology
used (MAC vs. PC).
Can appreciate need to obtain
multiple sources of information
and opinions during project
implementations. The
acceptance of
multidimensional values in
human character as value
during project design and
completion.
Project Ethics Using technology on the
project with honesty re:
privacy of access and
information. Development of
ethical policies governing
project uses of the Internet,
research, intellectual
property rights, and
plagiarism.
The use of information in a fair
way— comparison of facts
against equal sources of
project information.
Compassion for differences in
project information for which
sources are limited because of
inequality of technology
access. Compassion for
sharing information with other
business units from a sense of
inequality.
Management Presence Has accurate perception of
one’ s own potential and
capabilities in relation to
technology projects— the
technologically realizable
manager.
Understands how other
managers can view self from a
virtual and multiple
perspectives. Understands or
has awareness of the
construction of self that occurs
in projects. Understands views
of other executives and
managers in multiple project
settings. Understands that the
self (thru technology projects)
are open for more fluid
constructions, able to
incorporate diverse views in
multiple settings.
(Continued)
332 InForMAtIon teChnoloGY
with developmental theory on individual maturation. The
combina-
tion of these two components provides the missing
organizational
learning piece that supports the attainment of ROD. Another
way
of comprehending this concept is to view the ROD arc as the
over-
arching or top-level model. The other maturity arcs and best
practices
Table 12.4 (Continued) Middle Management Technology Best
Practices Arc—Detail
INTEGRATION OF BUSINESS
IMPLEMENTATION OF
TECHNOLOGY
STABILITY OF BUSINESS/
TECHNOLOGY
IMPLEMENTATION
TECHNOLOGY PROJECT
LEADERSHIP
Can operate project within
multiple dimensions of
value systems and can
prioritize multitasking
events that are consistent
with value priorities.
Ability to assign value to
new and diverse
technology project
alternatives— integrating
them within a system of
pre-existing business and
technology project
implementation values.
Testing technology value
systems in new ways during
the project implementation is
integrated with long-term
values and goals for
business achievement. Some
project concepts are naturally
persistent and endure
despite new arenas in the
technological era
Use of technology and business
during project implementation
are based on formed principles
as opposed to dynamic
influences or impulses. Formed
principles establish the basis
for navigating through, or
negotiating the diversity of
business influences and
impulses during the project.
Consistent values
displayed on multiple
project communications,
deliverables of content,
and dedication to
authenticity. Maintains
consistency in integrating
values within technology
business issues during
project implementation.
Technology is a commitment in
all aspects of value systems,
including agility in managing
multiple project
commitments. Commitment
to greater openness of mind
to altering traditional and
non-technological methods
on project implementations.
Technological project creativity
with self-defined principles
and beliefs. Risk-taking in
technology-based projects.
Utilizing technology to expand
one’ s arenas of project
freedom. Exploring the project
management liberating
capacities of technology.
Operationalizes technology
projects to unify multiple
components of the self
and understands its
appropriate behaviors in
varying management
situations.
Has regulated an identity of
self from a multiplicity of
management venues. Method
of project interaction creates
positive value systems that
generate confidence about
operating in multiple
organizational communities.
Can determine comfortably,
authenticity of other managers
and their view of the self. Can
confirm project-related
disposition independently from
others’ valuations, both
internally and from other
department cultures. Has
direct beliefs and controls
multidimensional management
growth.
333towArd best prACtICes
represent the major communities of practice that are the subsets
of
that model. This is graphically depicted in Table 12.5.
Thus, the challenge is to create and sustain each community
and, at
the same time, establish synergies that allow them to operate
together.
This is the organizational climate created at ICAP, where the
execu-
tive board, senior and middle managers, and operations
personnel all
formed their own subcommunities; at the same time, all had the
abil-
ity for both downward and upward communication. In summary,
this
particular model relies on key management interfaces that are
needed
to support ROD.
Ethics and Maturity
The word ethics is defined in many different ways. Reynolds
(2007)
defines ethics as “ a set of rules that establishes the boundaries
of gen-
erally accepted behaviour” (p. 3). Ethics can also mean
conforming to
social norms and rules, which can be challenged by deviant
behaviors
of “ others.” Still other groups construct ethics as a moral code
that a
community agrees to uphold. Ethics often map to our values—
like
integrity and loyalty to others. What is ethical for one person
may not
be ethical for another. This issue frames yet another question:
How
does ethics relate to leadership, specifically leadership in
technology?
Ethics became a heightened issue after the Enron scandal in the
United States. The scandal had a huge effect on the IT industry
because it resulted in Congress enacting the Sarbanes-Oxley
(SOX)
Act, which placed significant audit trail requirements on
document-
ing processes. Most of these processes existed in automated
applica-
tions; thus, IT was required to comply with the rules and
regulations
that the SOX Act mandated. Implementing the SOX Act became
an
immense challenge for IT organizations mostly because the
rules of
compliance were vague.
Most would agree that ethics are a critical attribute for any
leader.
The challenge is how to teach it. The SOX Act “ teaches”
ethics by
establishing governance by control— control of unethical
behavior
through catching deviants. However, history has shown us that
devi-
ants are not cured by laws and punishment; rather, they are
simply
contained. Unfortunately, containment does not eliminate or
cure
unethical behavior. Furthermore, deviants tend to find new ways
to
334 InForMAtIon teChnoloGY
Ta
bl
e
12
.5
R
OD
a
nd
B
es
t P
ra
ct
ic
es
A
rc
s
UN
DE
RL
IN
IN
G
BE
ST
P
RA
CT
IC
ES
St
ra
te
gi
c-
in
ki
ng
In
du
st
ry
e
xp
er
tis
e
Ch
an
ge
m
an
ag
em
en
t
Co
m
m
un
ic
at
io
ns
Bu
si
ne
ss
k
no
wl
ed
ge
Te
ch
no
lo
gy
p
ro
fic
ie
nc
y
Hi
rin
g
an
d
re
te
nt
io
n
In
no
va
tio
n
an
d
ou
ts
ou
rc
in
g
le
ad
er
sh
ip
In
fo
rm
at
io
n
ar
ch
ite
ct
UN
DE
RL
IN
IN
G
BE
ST
P
RA
CT
IC
ES
Co
m
m
itt
ed
to
te
ch
no
lo
gy
Te
ch
no
lo
gy
c
at
al
ys
t a
nd
c
ha
m
pi
on
Bu
si
ne
ss
fi
rs
t,
th
en
te
ch
no
lo
gy
Us
e
co
ns
ul
ta
nt
s
fo
r o
bj
ec
tiv
e
in
pu
t
Su
pp
or
t c
om
m
un
iti
es
o
f p
ra
ct
ic
e
Se
t p
ro
je
ct
m
ile
st
on
es
Fo
st
er
c
ul
tu
ra
l a
ss
im
ila
tio
n
Un
de
rs
ta
nd
o
rg
an
iza
tio
na
l l
ea
rn
in
g
Un
de
rs
ta
nd
te
ch
no
lo
gy
li
fe
c
yc
le
Ha
ve
c
hi
ef
it
e
xe
c
re
po
rt
di
re
ct
ly
Su
pp
or
t o
rg
an
iza
tio
na
l d
yn
am
is
m
UN
DE
RL
IN
IN
G
BE
ST
P
RA
CT
IC
ES
M
AN
AG
EM
EN
T-
BA
SE
D
In
te
ra
ct
w
ith
e
xe
cu
tiv
e
m
an
ag
em
en
t
In
co
rp
or
at
e
te
ch
no
lo
gy
in
to
n
ew
p
ro
du
ct
s
Us
e
te
ch
no
lo
gy
fo
r c
om
pe
tit
iv
e
ad
va
nt
ag
e
Pr
oc
es
s
fo
r e
va
lu
at
in
g
ne
w
te
ch
no
lo
gi
es
Un
de
rs
ta
nd
d
riv
er
ro
le
o
f c
us
to
m
er
s
IM
PL
EM
EN
TA
TI
ON
-B
AS
ED
Ut
ili
za
tio
n
of
it
s
ta
ff
on
p
ro
je
ct
s
Le
ad
in
g
in
no
va
tiv
e
gr
ou
ps
Ef
fe
ct
iv
el
y m
an
ag
in
g
pr
oj
ec
t r
es
ou
rc
es
St
ra
te
gi
c
us
e
of
te
ch
no
lo
gy
Es
ta
bl
is
h
te
am
-b
ui
ld
in
g
m
ea
su
re
s
Fo
st
er
a
gg
re
ga
tio
n
an
d
co
lla
bo
ra
tio
n
St
im
ul
at
e
st
af
f w
ith
v
al
ue
p
ro
po
si
tio
ns
Cr
ea
te
m
ul
ti-
fu
nc
tio
na
l t
ea
m
s
Su
pp
or
t c
om
m
on
p
ro
je
ct
m
an
ag
em
en
t p
ra
ct
ic
es
Fo
rm
a
ct
io
n-
or
ie
nt
ed
te
am
s
335towArd best prACtICes
bypass controls and get around the system in time. On the other
hand,
educators more often see the solution as transforming behavior
of the
individual; that is, ethics can only be taught if the individual
realizes
its value. Value in ethical behavior becomes a systemic
transforma-
tion when the individual believes in its self-realization. Being
ethical
is then aligned with self-actualization and adult maturity. So,
ethics
can be aligned with maturity in the same ways that the maturity
arcs
presented were mapped to leadership. Why is this so important
for
IT leaders? The SOX Act answered this question because it
clearly
identified the IT function as the most critical component of
com-
pliance. Unethical behavior in technology-based systems can
damage
the greater good, which places a big responsibility on the IT
function.
I would suggest that IT ethics and leadership are very much
linked.
It is a very important responsibility for technology executives
to pro-
vide direction to their firms on how technology and ethics are
inte-
grated and how they can transform individuals to value
conformance
without the overuse of governing controls. Firms must use
organi-
zational learning tools as the vehicle to promote such
conformance
through changes in behavior. Unfortunately, many executives,
includ-
ing those in IT, practice governance much more than influence.
I am
not suggesting the elimination of controls, but rather, that
leadership
should depend less on governance and more on effecting
behavioral
change. In other words, the key to developing strong ethics
within an
IT organization is leadership, not governance. An important
compo-
nent of leadership is the ability to influence the behaviors of
others
(without exerting control or power). The real power of
leadership is to
use influence to effect ethical behavior as opposed to
demanding it.
How do we create ethical IT organizations? Further, how can a
technology executive provide the necessary strategy and
influence to
accomplish firm-wide ethical transformation? The first strategy,
for a
number of reasons, should be to create an ethical IT
organization as
the model:
1. The technology executive has control over that organization.
2. Most IT ethical problems today emanate from technology
per-
sonnel because of their unusual access to data and information.
3. IT is positioned to lead the direction, since it is its area of
expertise.
336 InForMAtIon teChnoloGY
So, IT can set the example for technology-related ethics for the
entire organization by establishing its own level of compliance
by a
“ way of being,” as opposed to a way of being managed. Often,
this
way of being can evolve into a code of behavior that can
become the
cultural “ code” of the organization itself. This code of ethics
should
address and be limited to such IT-related issues as:
• Privacy : Because of their access to transactions over the
Internet, IT professionals must respect the privacy of infor-
mation of others. Their code of ethics should go beyond just
e-mail transactions to include access to personal data that
may be stored on desktops or data files.
• Confidentiality : This differs from privacy because the data
are
available to IT in the normal transactions of business. That
is, the data are captured or used in the development of an
application. IT personnel need to keep such information con-
fidential at all times— not only for the employees of the firm
but also for clients and vendors.
• Moral responsibility : IT needs to protect the organization
from
outside abuses or questionable transactions coming into and
leaving the company. Protection can also include blocking
access to certain websites that are dangerous or inappropriate.
This practice should not be regarded as a control, but rather,
as a moral responsibility of any employee. Of course, there
needs to be careful objectivity in how the moral code is actu-
ally executed when a problem is identified.
• Theft : Removing information that belongs to someone else
can be construed as a form of theft. Theft should always be
regarded as an offense punishable by law— that is, above and
beyond rules and regulations of the company.
These are only examples of areas in which an ethical code might
be applied. Such a code must be implemented in IT as a
framework
for how people are employed and as a basis for promotion.
Again,
governance plays an important part because unfortunately there
will
always be individuals who violate ethics. What we need are
organiza-
tions that promote and defend ethics to the greatest possible
extent.
This way of being is consistent with the core definition of a
learn-
ing organization in that ethics must inevitably be part of the
fabric
337towArd best prACtICes
of the culture and evolved within it. With IT serving as a model,
the technology executive can act as the champion for
implementation
company-wide. This chapter has shown that ethics are
intrinsically
linked to maturity. Indeed, every arc contained a dimension that
con-
tained an ethical dimension. Perhaps if such ethical practices
existed
at Enron, the “ learning organization” there could have stopped
the
abuses.
http://taylorandfrancis.com
339
13
ConClusion
Introduction
This book has explored many conceptual aspects of information
tech-
nology (IT) and organizational learning and how they can be
utilized
together to help firms compete in a rapidly changing world.
Case stud-
ies were presented to show how these concepts, and the theories
they
derive from, could be implemented into practice. It is most
important,
however, to remember that each organization is unique and that
the
implementation of organizational learning methods must
therefore
be tailored to the particular dynamics at play in a given
organiza-
tion. Hence, there can be no boilerplate methodology for the
strategic
employment of technology; such an approach could never
guarantee
maximum benefit to the organization. My position involves
employ-
ing various organizational learning methods that must be
carefully
chosen and implemented, based on the projected target audience
and
on the particular stage of growth of the organization and its
mature
use of technology.
In my study of chief executive officer (CEO) perceptions of IT,
I found that the role of IT was not generally understood in most
of the
organizations I surveyed, especially at the CEO level. There
appear
to be inconsistent reporting structures within the IT
organization,
and there is a lack of IT-related discussion at the strategic and
senior
executive levels. Furthermore, most executives are not satisfied
with
IT performance, and while most agree that technology should
play a
larger role in marketing, few have been able to accomplish this.
The
general dilemma has involved an inability to integrate
technology
effectively into the workplace.
Certainly, a principle target of this book is to answer the
question
of what chief IT executives need to do and in what directions
their
340 InForMAtIon teChnoloGY
roles need to evolve regarding IT. Other concerns center on
general
organizational issues surrounding who IT people are, where
they
report, and how they should be evaluated. IT must also provide
better
leadership with respect to guiding a company through the
challenges
of unproven technologies. While technology behaves
dynamically, we
still need processes that can validate its applicability to the
organiza-
tion. Another way of viewing this is to accept the idea that
certain
technologies need to be rejected because of their
inappropriateness to
drive strategy.
IT is unique in that it is often viewed from a project
perspective; for
instance, that which is required to deliver technology and the
cultural
impact it has on the organization, and tends to be measured by
project
deliverables due to the pressure to see measurable outcomes.
From a
project perspective, IT staff members typically take on the role
of
project managers, which requires them to communicate with
multiple
business units and management layers. They need to establish
shorter
project life cycles and respond to sudden changes to the
requirements.
No longer does a traditional project life cycle with static dates
and
deliverables work with the fast-paced businesses of today.
Rather,
these projects are living and breathing entities that must be in
balance
with what is occurring in the business at all times. Most
important is
that project measurable outcomes must be defined and seen in
balance
with expected organizational transformations.
I began my explanation of the role of technology by
establishing
it as a dynamic variable, which I termed technological
dynamism.
Responsive organizational dynamism (ROD) represents my
attempt
to think through a range of responses to the problems posed by
tech-
nological dynamism, which is an environment of dynamic and
unpre-
dictable change resulting from the advent of innovative
technologies.
This change can no longer be managed by a group of executives
or
managers; it is simply too complex, affecting every component
of a
business. A unilateral approach does not work; the problem
requires
an environmental approach. The question is how to create an
orga-
nization that can respond to the variability of technologies in
such
a way that its responses become part of its everyday language
and
discourse. This technological state of affairs is urgent for two
major
reasons. First, technology not only is an accelerator of change
but also
requires accelerated business responses. Organizations cannot
wait
341ConClusIon
for a committee to be formed or long bureaucratic processes to
act.
Second, the market is unforgiving when it comes to missing
business
opportunities. Every opportunity missed, due to lack of
responding in
a timely fashion, can cost an organization its livelihood and
future. As
stated by Johansen et al. (1995):
The global marketplace requires constant product innovation,
quick
delivery to market, and a large number of choices for the
consumer, all
of which are forcing us to rethink the way we structure our
business
organizations to compete. Indeed, many businesses are finding
their
traditional structure cumbersome— the way they work is more
of an
obstacle than help in taking advantage of global opportunities.
(p. 1)
While ROD is the overarching approach for a firm that can
perform
in a dynamic and unpredictable environment, there are two
major
components to that approach that I raised for further
consideration. I
discussed how technology, as a variable, is unique in that it
affects two
areas of any organization. The first is the technology itself and
how it
operates with business strategy. I called this the strategic
integration
component of responsive organizational dynamism. The
challenge
here is to have organizations create processes that can formally
and
informally determine the benefit of new and emerging
technologies
on an ongoing basis. The second component is cultural
assimilation,
which is about managing the cultural and structural changes that
are
required when new strategies are adopted by the organization.
Creating an environment of ROD requires processes that can
fos-
ter individual and organizational-level thinking, learning, and
trans-
formation. Organizational learning techniques best fit the need
as
they contain the core capabilities to assist organizations in
reinvent-
ing themselves as necessary, and to build an organization that
can
evolve with technology, as opposed to one that needs to be
reorga-
nized. I have presented many organizational learning concepts
and
modified them to provide specific remedies to the challenges
required
to create responsive organizational dynamism. I have also
presented
the complex vectors that determine which learning theory
should be
applied and integrated with others, so that every aspect of
individual
and organizational evolution can be supported. I chose to use
the term
vector to describe this force or influence because of the
different ways
342 InForMAtIon teChnoloGY
in which these learning methods can help in creating and
sustaining
firm-wide responses to technological dynamism.
Perhaps the most important learning process among these is that
of linear development leading to maturation. My use of maturity
arcs
permits me a framework for the development and integration of
mod-
els that can measure where individuals and organizations are in
their
trajectory toward the integration of emerging technologies in
their
business strategies. These maturity arcs provide a basis for how
to mea-
sure where the organization is, what types of organizational
learning
methods to consider, and what outcomes to expect. Indeed,
providing
measurable outcomes in the form of strategic performance is the
very
reason why executives should consider embracing this model.
I also discussed a number of methods to manage organizational
learning, modifying theories of knowledge management and
change
management, so that they specifically addressed the unique
aspects
of change brought about by new technologies. I looked at how
the
CEO needs to become more knowledgeable about technology,
and,
based on case studies and research, I provided sets of best
practices to
suggest that staff members cannot become part of a learning
organi-
zation without the participation of the CEO and his or her
executive
committees. On the other hand, I investigated the interesting
work
of Nonaka and Takeuchi (1995) and their middle-up-down
theory
of middle management. I modified Nonaka and Takeuchi’ s idea
by
complicating the strata that can be used to define the middle,
and I
established three tiers of middle management and integrated
them
into organizational learning theories. Finally, I used the Ravell
case
study to show how operations personnel continue to play an
impor-
tant role in organizational learning, and how the maturity arc
can be
used to transform individual learning practices into less event-
driven
learning at the organizational level. I formulated best practices
for
each of these three major organizational structures, along with
corre-
sponding maturity arcs to lay the foundation of what each
community
needs to do to properly participate in the transformations
indicated
for responsive organizational dynamism. To this end, I proposed
cer-
tain road maps that, if followed, could provide the mechanisms
that
lead to the kind of organizational transformation that is
empowered
to handle the challenges of new technologies. This process is
sum-
marized in Figure 13.1.
343ConClusIon
I have taken a strong position regarding the debate over whether
learning occurs best on the individual level or at the system-
orga-
nizational one, particularly as learning affects the establishing
and
sustaining of responsive organizational dynamism. My response
to
this debate is “ yes” — yes, in the sense that both are very much
needed
and part of a process that leads to a structured way of maturing
the
use of organizational learning by an organization to improve
strategic
performance. I believe the Ravell case study provides an
example of
how learning maturation operates in a dynamic environment. We
see
that operations personnel tend to rely on event-driven and
individual-
based reflective practices before being able to think at an
organiza-
tional level. My prior research (Langer, 2002) on reflective
practices
clearly shows that many adults do not necessarily know how to
reflect.
Technology
dynamism
�e
“technology”
variable
Requirements for
organizational
change
Responsive organizational
dynamism
Strategic
integration
Cultural
assimilation
Strategic
performance
Organizational
learning
Figure 13.1 Technology “ road map.”
344 InForMAtIon teChnoloGY
The important work of Argyris and Schö n (1996) on
introducing and
sustaining individual learning, specifically using double-loop
learn-
ing, should be used when implementing an organizational
learning
program. Ravell also showed us that time is an important factor
for
individual development and that political factions are part of
that pro-
cess. With patience and an ongoing program, group learning
activi-
ties can be introduced to operations personnel, thereby
supporting the
kind of system-level thinking proposed by Senge (1990).
A critical part of organizational learning, in particular the nec-
essary steps to establish a learning organization, is the
formation of
communities of practice. Communities of practice, in all of the
case
studies, were the cornerstones in the transition from individual-
based
learning to group learning. Communities of practice begin the
matu-
ration process of getting organizations to change to learning
based
on organizational goals. This is critical for ROD because
technology
requires planning and vision that are consistent with business
strat-
egy. While much of the literature integrates the notion of
communi-
ties of practice with knowledge management, I expanded its use
and
defined the community as the single most important
organizational
structure for dealing with emerging technologies. The reason for
this
is the very challenge facing IT organizations today: to be able
to inte-
grate their efforts across business units. This has been proven to
be the
most difficult challenge for the chief information officers
(CIOs) of
today. This was further supported by the Siemens AG case
study, in
which Dana Deasy, the corporate CIO of the Americas, provided
a
detailed picture of the complex world of a CIO in a global firm,
with
over 400,000 employees. Yet, it is the creation of multiple
layers of
communities of practice that enables firms to create what I call
“ com-
mon threads” of communication. Thus, the linkage across
communi-
ties of practice is a central theme of this book, providing
guidance and
education to organizations to establish processes that support
their
evolution in a responsive way.
The key word that I have used here is evolution. In the past,
infor-
mation traveled much slower, and there was more time to
interpret
its impact on the organization. Today, the travel time is
shrinking;
therefore, evolution can and should occur at a quicker pace.
Indeed,
organizational evolution is intertwined with the dynamics of
com-
munity legitimization (Aldrich, 2001). Technological
development
345ConClusIon
for a particular population has widespread consequences for the
rest
of the organization. In these cases, technological innovations
repre-
sent a form of collective learning that is different from direct
learning
from experience alone (Miner & Haunschild, 1995). There are
many
scholars who believe that change management must be
implemented
through top-down management approaches. However, I hope
this
book demonstrates that leadership through top-down
management
will never be solely sufficient to establish the organizational
struc-
ture needed to handle technological innovations properly. Many
such efforts to reorganize or reengineer organizations have had
dis-
appointing results. Many of these failures, I believe, are
attributable
to a dependence on management intervention as opposed to
strate-
gic integration and cultural assimilation. Technology only
serves to
expose problems that have existed in organizations for decades:
the
inability to drive down responsibilities to the operational levels
of the
organization.
My case studies provide, I trust, a realistic and pragmatic view
toward the attainment of responsive organizational dynamism,
assuming the appropriate roles and responsibilities are
available.
Furthermore, the case studies also reflect that progress toward
orga-
nizational learning and maturity is a gradual one. As such, I
deter-
mined that organizational transformation must be addressed
along
the same basis; that is, transformation is a gradual process as
opposed
to a planned specific outcome. I showed that organizations
could and
should look at transformation in much shorter “ chunks,” as
opposed
to long-term “ big-bang” approaches that rarely work and are
difficult
to measure. Measurement was applied to organizational
transforma-
tion via the implementation of the balanced scorecard. The
scorecard
model I modified is tied to the chunk approach.
Another important concept in this book is the reconciliation
between control and empowerment. As organizations find that
their
traditional structures are cumbersome when dealing with
emerging
technologies, they realize the need to empower employees to do
more
dynamically. With this empowerment, employees may make
more
mistakes or seem less genuine at times. When this occurs, there
may
be a need for management controls to be instituted and power-
central-
ized management styles to be incorporated. Unfortunately, too
many
controls end any hope of creating a learning organization that
can
346 InForMAtIon teChnoloGY
foster the dynamic planning and needs of responsive
organizational
dynamism. They also block the molding of communities of
practice
that require common threads of discourse and language. Indeed,
it
is communities of practice and discourse that lay the
foundations for
addressing the dilemma of employee control versus
empowerment.
We are really beginning to experience the results of emerging
tech-
nologies, particularly for products traded internationally. We
have
seen an unusual trend occur in which off shore product
development
and maintenance is at an all-time high, local employment is
down,
and corporate earnings are growing. The advent of this cycle
lays a
foundation for the new trends of global worker operations, many
of
which are shifting from a labor-intensive process to needs for
think-
ing, planning, and management.
Unskilled or less-skilled workers, partly because of new
technolog-
ical automation, are allowing organizations to displace higher-
costing
local labor to international outsourced operations. This means
an
increase in management learning related to supervision and
coordina-
tion in a technology-driven world. We must be aware of the
concern
expressed by O’ Sullivan (2001) that “ new technologies have
created
unemployed workers with no rights” (p. 159). The way
individuals
communicate, or the rules of their engagement, are quickly
chang-
ing, particularly in the need to create more research and
develop-
ment (R&D) infrastructures that can respond quicker to
innovation
opportunities brought about by emerging technologies. We saw
this
dilemma occur at Siemens, where business strategy and
technology
became a major investment, and the realization that e-business
was
more about business than just technology.
To address the lack of understanding of the technology life
cycle, I
presented my concept of driver and supporter functions and
mapped
them onto evolutionary transformation. This life cycle is one
that
ties business strategy into technology and should be used to
convey
ROD to executives. Driver functions explain why strategic
integra-
tion is so important and present a case that requires more
market-
ing-based philosophies when investing in technologies. This
means
that early adaptation of technology requires, as Bradley and
Nolan
(1998) call it, “ sense-and-respond” approaches, by which IT
organi-
zations can experiment with business units on how a technology
may
347ConClusIon
benefit the business. Siemens and ICAP provided good
examples of
different ways of creating infrastructures that can support
technology
exploration, including Deasy’ s 90-day program, by which
technol-
ogy investments were reviewed periodically to see what
adjustments
are required to maximize the investment. It also provided a way
to
cancel those investments that were not paying off as originally
fore-
cast. Understanding that changes along the way are needed, or
that
there are technologies that do not provide the intended benefits,
must
become a formal part of the process, one that CEOs must
recognize
and fund.
On the other hand, the supporter role is one that addresses the
operational side of IT, such that executives and managers
under-
stand the difference. I treated the concept of supporter as an
eventual
reality, the reality that all technologies, once adopted by
operations,
must inevitably become a commodity. This realization paves the
way
to understanding when and how technologies can be considered
for
outsourcing, based on economies of scale. The adoption of this
phi-
losophy creates a structured way of understanding the cost side
of the
IT dilemma and requires business units to integrate their own
plans
with those offered by emerging technologies. The supporter
aspect
of technology became the base of cultural assimilation because
once
a technology is adapted by operations, there must be a
correspond-
ing process that fosters its impact on organizational structures
and
cultural behaviors. It also provides the short- and long-term
expected
transformations, which ultimately link technology and strategic
performance.
The driver/supporter philosophy also shows the complexity of
the
many definitions of technology, and that executives should not
attempt
to oversimplify it. Simply put, technology must be discussed in
differ-
ent ways, and chief IT executives need to rise to the occasion to
take a
leadership role in conveying this to executives, managers, and
opera-
tions, through organizational learning techniques. Organizations
that can implement driver/supporter methods will inevitably be
better
positioned to understand why they need to invest in certain
technolo-
gies and technology projects. My initial case study at Ravell
exposed
the potential limit of only operating on the unit levels and not
getting
executives involved in the system thinking and learning phases.
348 InForMAtIon teChnoloGY
These general themes can be formulated as a marriage between
business strategy and technological innovation and can be
represented
as follows:
1. Organizations must change the business cycles of technology
investment; technology investment must become part of the
everyday or normative processes, as opposed to specific cycles
based on economic opportunities or shortfalls. Emerging
technologies tend to be implemented on a “ stop-and-go”
basis, or based on breakthroughs, followed by discontinuities
(Tushman & Anderson, 1997).
2. The previous experiences that organizations have had
with technology are not a good indicator for its future use.
Technology innovations must evolve through infrastructure,
learning, and process evaluation.
3. Technology is central to competitive strategy. Executives
need to ensure that technology opportunities are integrated
with all discussions on business strategy.
4. Research and development ( R&D) is at the center of sys-
tems/organizational-level thinking and learning. Companies
need to create R&D operations, not as separate entities, but
as part of the evaluation processes within the organizational
structure.
5. Managing technology innovations must be accomplished
through linkages. Thus, interfaces across communities of
practice via common threads are essential to have learning
improve the ability of the organization to operate within
responsive organizational dynamism.
6. Managing intellectual capital is an exercise of linking the
var-
ious networks of knowledge in the organization. Managing
this knowledge requires organizational learning, to transfer
tacit knowledge to explicit knowledge. The cultural assimi-
lation component of ROD creates complex tacit knowledge
between IT and non-IT business units.
7. There are multiple and complex levels of management that
need to be involved in responsive organizational dynamism.
Successful management utilizes organizational learning prac-
tices to develop architectures, manage change, and deal with
349ConClusIon
short- and long-term projects simultaneously. Strong leader-
ship will understand that the communities of practice among
the three primary levels (executive, middle management,
and operations) constitute the infrastructure that best sus-
tains the natural migration toward responsive organizational
dynamism.
This book looked at business strategy from yet another
perspective,
beyond its relationship with emerging technologies. Because
organi-
zational learning is required to foster responsive organizational
dyna-
mism, strategy must also be linked to learning. This linkage is
known
as strategic learning, which, if implemented, helps
organizations to
continually adapt to the changing business environment,
including
changes brought about by technology.
However, due to the radical speed, complexity, and uncertainty,
traditional ways of doing strategy and learning can no longer
ignore
the importance of technology. The old methods of determining
busi-
ness strategy were based on standard models that were linear
and
“ plug-in.” As stated, they were also very much based on
projects that
attempted to design one-time efforts with a corresponding
result. As
Pietersen (2002) explains, “ These processes usually produce
operating
plans and budgets, rather than insights and strategic
breakthroughs”
(p. 250). Technological dynamism has accelerated the need to
replace
these old traditions, and I emphasized that organizations that
practice
ROD must
• Evaluate and implement technology in an ongoing process
and embed it as part of normal practices. This requires a
change in integration and culture.
• Comprehend that the process of ROD is not about planning;
it is about adaptation and strategic innovation.
• Have a process that feeds on the creation of new knowledge
through organizational learning toward strategic organiza-
tional transformation.
Many scholars might correlate strategic success with leadership.
While leadership, in itself, is an invaluable variable, it is just
that. To
attain ongoing evolution, I believe we need to move away from
relying
on individual leadership efforts and move toward an
infrastructure
350 InForMAtIon teChnoloGY
that has fewer leaders and more normative behavior that can
support
and sustain responsive organizational dynamism. Certainly, this
fos-
ters the important roles and responsibilities of CEOs, managers,
and
boards, but to have an ongoing process that changes the
thinking and
the operational fundamentals of the way the organization
functions
is more important and more valuable than individual leadership.
That
is why I raised the issues of discourse and language as well as
self-
development. Therefore, it is the ability of an organization to
trans-
form its entire community that will bring forth long-term
strategic
performance.
What this book really commits to is the importance of lifelong
learning. The simple concept is that adults need to continually
chal-
lenge their cultural norms if they are to develop what Mezirow
(1990)
calls “ new meaning perspectives.” It is these new meaning
perspec-
tives that lay the foundation for ROD so that managers and staff
can
continually challenge themselves to determine if they are
making the
best strategic decisions. Furthermore, it prepares individuals to
deal
with uncertainty as well as the ongoing transitions in the way
they
do their jobs. It is this very process that ultimately fosters
learning in
organizations.
While on-the-job training is valuable, Ravell shows us that
move-
ment, or rotation of personnel, often supports individual
learning.
Specifically, the relocation of IT personnel to a business unit
environ-
ment during Ravell phase I served to get IT staff more
acclimated to
business issues. This relocation helped IT staff members to
begin to
reflect about their own functions and their relationship to the
over-
all mission of the organization. Ravell phase III showed yet
another
transition; taking a group of IT staff members and permanently
inte-
grating them in a non-IT business-specific department. Ravell
also
teaches us that reflection must be practiced; time must be
devoted to
its instruction, and it will not occur automatically without
interven-
tions from the executive rank. The executive must be a “
champion”
who demonstrates to staff that the process is important and
valued.
Special sessions also need to be scheduled that make the
process of
learning and reflection more formal. If this is done and nurtured
properly, it will allow communities to become serious about
best prac-
tices and new knowledge creation.
351ConClusIon
Although I used technology as the basis for the need for
responsive
organizational dynamism, the needs for its existence can be
attributed
to any variable that requires dynamic change. As such, I suggest
that
readers begin to think about the next “ technology” or variable
that
can cause the same needs to occur inside organizations. Such
accel-
erations are not necessarily limited to technology. For example,
we
are experiencing the continuation of organizational downsizing
from
acquisitions. These acquisitions present similar challenges in
that
organizations must be able to integrate new cultures and “
other” busi-
ness strategies and attempt to form new holistic directions—
direc-
tions that need to be formed quickly to survive.
The market per se also behaves in a similar way to technology.
The
ability to adjust to consumer needs and shifting market
segments is
certainly not always related to technological change. My point
is that
ROD is a concept that should be embraced notwithstanding
whether
technology seems to have slowed or to have no effect on a
specific
industry at a particular moment. Thus, I challenge the
organizations
of today to develop new strategies that embrace the need to
become
dynamic throughout all of their operations and to create
communi-
ties of practice that plan for ongoing strategic integration and
cultural
assimilation.
This book looked at the advent of technology to uncover a
dilemma
that has existed for some time. Perhaps a more general way of
defining
what ROD offers is to compare it to another historical concept:
“ self-
generating organizations.” Self-generating organizations are
known
for their promotion of autonomy with an “ underlying organic
sense
of interdependence” (Johansen et al., 1995). Based on this
definition,
a self-generating organization is like an organism that evolves
over
time. This notion is consistent with organizational learning
because
they both inherently support inner growth stemming from the
orga-
nization as opposed to its executives. The self-generating
organization
works well with ROD in the following ways:
• Traditional management control systems do not apply.
• Risks are higher, given that these organizational workers
are granted a high degree of autonomy and empowerment
that will lead to processes that break with the norms of the
business.
352 InForMAtIon teChnoloGY
• Adjustments and new processes should be expected.
• These organizations tend to transform political activity into
strong supporting networks.
• Leadership definitions do not work. You cannot lead what
you cannot control.
Self-generating organizations have scared traditional managers
in
the past, due to the fear they have of losing control. ROD
provides
a hybrid model that allows for self-generating infrastructures
while
providing certain levels of control fostered by organizational
learn-
ing. Specifically, this means that the control is not traditional
con-
trol. Responsive organizational dynamism, for example,
embraces the
breaking of rules for good reasons; it allows individuals to fail
yet to
reflect on the shortfall so that they do not repeat the same
errors. It
also allows employees to take risks that show promise and lead
to
increased critical thinking and to strategic action. Indeed,
manage-
ment and leadership become more about framing conditions for
oper-
ations, observing the results, and making adjustments that
maintain
stability. Thus, seeing ROD as a form of self-generation is the
basis
for sustaining innovative infrastructures that can respond to
dynamic
variables, like technology.
I have emphasized the need for organizational learning as the
key
variable to make ROD a reality. While I have modified many of
the
organizational learning theories to fit this need, I must
acknowledge
that a portion of the “ learning” should be considered “
organizing.”
Vince (2002) provides an analysis of how organizational
learning
could be used to sustain an “ organized” reflection. He
provides an
interesting matrix of how the two theories can be integrated.
After
reviewing many of the ways in which organizational learning
affects
responsive organizational dynamism, I have developed a
modified
chart of Vince’ s original framework, as shown in Table 13.1.
Table 13.1 shows the three kinds of reflective practices that
can
operate in an organization: individual, group, and
organizational.
I emphasized in Chapter 9 that the extent of organizational
learn-
ing maturation is directly related to the sophistication of
reflections
among the communities of practice. The more learning that
occurs,
based on individual reflection, the earlier the stage at which
organi-
zational learning maturity occurs. Thus, more mature
organizations
353ConClusIon
Ta
bl
e
13
.1
In
di
vi
du
al
, G
ro
up
, a
nd
O
rg
an
iza
tio
na
l a
nd
R
efl
ec
tiv
e
Pr
ac
tic
es
IN
DI
VI
DU
AL
R
EL
AT
IO
NS
B
ET
W
EE
N
TH
E
PE
RS
ON
, R
OL
E,
A
ND
T
HE
OR
GA
NI
ZA
TI
ON
-IN
-T
HE
-M
IN
D
GR
OU
P
RE
LA
TI
ON
S
AC
RO
SS
T
HE
IT
BO
UN
DA
RI
ES
O
F
SE
LF
O
R
OT
HE
R
AN
D
OF
S
UB
DE
PA
RT
M
EN
TS
W
IT
HI
N
IT
OR
GA
NI
ZA
TI
ON
AL
T
HE
R
EL
AT
IO
NS
BE
TW
EE
N
IT
A
ND
O
TH
ER
B
US
IN
ES
S
UN
IT
S
Pe
er
co
ns
ul
tin
g
gr
ou
ps
(n
on
m
an
ag
er
ia
l
se
lf-
go
ve
rn
in
g
IT
g
ro
up
s
of
a
t l
ea
st
th
re
e
in
di
vi
du
al
s)
M
ak
in
g
co
nn
ec
tio
ns
fo
r t
he
s
el
f:
Re
vi
ew
a
nd
re
fle
ct
io
n
wi
th
in
IT
co
m
m
un
ity
, b
y f
rie
nd
sh
ip
, a
nd
m
ut
ua
lit
y o
f i
nt
er
es
ts
a
nd
n
ee
ds
.
M
ak
in
g
co
nn
ec
tio
ns
in
s
m
al
l g
ro
up
s
wi
th
“
ot
he
rs
”
ac
ro
ss
IT
o
rg
an
iza
tio
n:
De
ve
lo
p
in
te
rp
er
so
na
l c
om
m
un
ic
at
io
n
an
d
di
al
og
ue
w
ith
in
IT
c
om
m
un
iti
es
.
M
ak
in
g
co
nn
ec
tio
ns
w
ith
th
e
en
tir
e
or
ga
ni
za
tio
n:
R
efl
ec
tio
n
on
w
ay
s
th
at
te
ch
no
lo
gy
a
ffe
ct
s
ot
he
r g
ro
up
s
in
th
e
or
ga
ni
za
tio
n.
Or
ga
ni
za
tio
na
l r
ole
a
na
lys
is
(l
in
ki
ng
in
di
vi
du
al
s
wi
th
“
ot
he
rs
”
in
si
de
th
e
IT
or
ga
ni
za
tio
n)
Or
ga
ni
za
tio
na
l r
ol
e
an
al
ys
is
:
Un
de
rs
ta
nd
in
g
th
e
co
nn
ec
tio
ns
be
tw
ee
n
th
e
pe
rs
on
, t
he
p
er
so
n
in
IT
,
an
d
hi
s
or
h
er
ro
le
in
o
rg
an
iza
tio
n.
Ro
le
a
na
lys
is
g
ro
up
s:
T
he
w
ay
s
in
wh
ic
h
te
ch
no
lo
gy
ro
le
s
an
d
th
e
un
de
rs
ta
nd
in
g
of
th
os
e
ro
le
s
in
te
rw
ea
ve
w
ith
in
a
n
IT
c
om
m
un
ity
o
r
de
pa
rtm
en
t.
Te
ch
no
lo
gy
ro
le
p
ro
vi
de
s
th
e
fra
m
ew
or
k
wi
th
in
w
hi
ch
th
e
pe
rs
on
a
nd
or
ga
ni
za
tio
n
ar
e
in
te
gr
at
ed
.
Co
m
m
un
iti
es
of
p
ra
ct
ice
(g
ro
up
s
of
in
di
vi
du
al
s
un
ite
d
in
a
ct
io
ns
th
at
co
nt
rib
ut
e
to
th
e
pr
od
uc
tio
n
of
IT
id
ea
s
in
p
ra
ct
ic
e)
In
vo
lv
em
en
t:
Pr
ov
id
in
g
pe
rs
on
al
ex
pe
rie
nc
e
as
th
e
ve
hi
cl
e
to
o
rg
an
ize
th
e
us
e
of
te
ch
no
lo
gy
.
En
ga
ge
m
en
t:
Ex
pe
rie
nc
e
us
ed
to
a
pp
ly
te
ch
no
lo
gy
a
cr
os
s
IT
o
rg
an
iza
tio
n;
un
de
rs
ta
nd
in
g
of
im
po
rta
nc
e
of
IT
in
te
rd
ep
ar
tm
en
t c
om
m
un
ic
at
io
n.
Es
ta
bl
is
hm
en
t:
Ex
pe
rie
nc
e
of
p
ow
er
re
la
tio
ns
a
s
th
ey
re
ac
t a
nd
re
sp
on
d
to
te
ch
no
lo
gy
u
se
s
am
on
g
co
m
m
un
iti
es
o
f
pr
ac
tic
e
Gr
ou
p
re
la
tio
ns
co
nf
er
en
ce
s
(re
ve
al
th
e
co
m
pl
ex
iti
es
o
f f
ee
lin
gs
, i
nt
er
ac
tio
ns
,
an
d
po
we
r r
el
at
io
ns
th
at
a
re
in
te
gr
al
to
th
e
pr
oc
es
s
of
o
rg
an
izi
ng
te
ch
no
lo
gy
im
pl
em
en
ta
tio
ns
)
Ex
pe
rie
nc
in
g
an
d
re
th
in
ki
ng
te
ch
no
lo
gy
au
th
or
ity
a
nd
th
e
m
ea
ni
ng
a
nd
co
ns
eq
ue
nc
es
o
f l
ea
de
rs
hi
p
an
d
fo
llo
we
rs
hi
p.
Ex
pe
rie
nc
in
g
de
fe
ns
iv
e
m
ec
ha
ni
sm
s
an
d
av
oi
da
nc
e
st
ra
te
gi
es
a
cr
os
s
IT
de
pa
rtm
en
ts
. E
xp
er
ie
nc
e
of
or
ga
ni
zin
g,
b
el
on
gi
ng
, a
nd
re
pr
es
en
tin
g
ac
ro
ss
IT
o
rg
an
iza
tio
ns
.
Ex
pe
rie
nc
in
g
th
e
wa
ys
in
w
hi
ch
IT
a
nd
th
e
or
ga
ni
za
tio
n
be
co
m
e
in
te
gr
at
ed
us
in
g
co
lle
ct
iv
e
em
ot
io
na
l e
xp
er
ie
nc
e,
po
lit
ic
s,
le
ad
er
sh
ip
, a
ut
ho
rit
y ,
an
d
or
ga
ni
za
tio
na
l t
ra
ns
fo
rm
at
io
n.
354 InForMAtIon teChnoloGY
reflect at the group and organizational level. Becoming more
mature
requires a structured process that creates and maintains links
between
reflection and democratic thinking. These can be mapped onto
the
ROD arc, showing how, from an “ organizing” perspective,
reflective
practice serves as a process to “ outline what is involved in the
pro-
cess of reflection for learning and change” (Vince, 2002, p.
74). Vince
does not, however, establish a structure for implementation, for
which
ROD serves that very purpose, as shown in Figure 13.2.
Figure 13.2 graphically shows how organized reflection maps
to
the linear stages of the ROD arc (the organizational-level
maturity
arc), which in turn maps onto the three best practices arcs,
discussed
in Chapter 9. Each of the management arcs represents a level of
man-
agement maturity at the organizational level, with Vince’ s
(2002)
matrix providing the overarching concepts on how to actually
orga-
nize the progression from individual-based thinking and
reflection to
a more comprehensive and systems-level thinking and learning
base.
Organizational-level
maturity arc
Chief IT executive
best practices
maturity arc
CEO technology
best practices
maturity arc
Middle
management
technology best
practices
maturity arc
Vince’s “organizing” reflection matrix
Strategic integration
Cultural assimilation
Organizational learning constructs
Varying levels of management
participation
Individual
reflection
Organizational
reflectionLinear stages learning maturation
Individual
reflection
Group
reflection
Organizational
reflection
Figure 13.2 ROD and Vince’ s reflection matrix.
355ConClusIon
The emphasis, overall, is that individual learning alone will
under-
mine collective governance. Therefore, the movement from
individual
to organizational self-management remains a critical part of
under-
standing how technology and other dynamic variables can foster
new
strategies for competitive advantage.
Perhaps the most important conclusion of this third edition is
the
impact that digital technologies are having on the acceleration
of
change being experienced throughout the world. Indeed, digital
tech-
nology has begun to change not only the business world but the
very
fabric of our lives. Particular to this change is the continual
emer-
gence of social media as a driver of new and competitive
products and
services. I also discussed the changing work philosophy and
expecta-
tions of our new generation of employees, and how they think
differ-
ently and want a more complex experience in the places in
which they
work. The Gen Y population is clearly a new breed of
employees and
the Gen Z behind them will be even more accustomed to using
digi-
tal technologies in every fabric of the ways they want to learn,
their
preferences in communicating with others, and their role in
society.
Most important are the ways that technology has changed
consumer
behavior. I truly believe that future generations will look back
on this
period and indeed say, this was truly a consumer revolution!
http://taylorandfrancis.com
357
Glossary
baby boomers: The generation of individuals who were born
between
the years of 1946 and 1964.
business process reengineering: a process that organizations
under-
take to determine how best to use technology to improve
business performance
customer relationship management (CRM): the development
and
maintenance of integrated relationships with the customer
base of an organization. CRM applications provide organiza-
tions with integrated tools that allow individuals to store and
sustain valuable information about their customers.
data mapping: the process of comparing the data fields in one
data-
base to another, or toward a new application database
decision‑support systems (DSS): systems that assist managers
to
make better decisions by providing analytical results from
stored data
digital disruption: When new digital technology advancements
impact the value of goods and services.
digital transformation: The repositioning of or a new investment
in technology and business models in efforts to compete in
a rapidly changing digital economy and create a newfound
sense of value for customers.
358 GlossArY
enterprise resource planning (ERP): a set of multimodule
applica-
tions that support an entire manufacturing and business oper-
ation, including product planning, purchasing, maintaining
inventories, interacting with suppliers, providing customer
service, accounting interfaces, and tracking order shipments.
These systems are also known as enterprise-level applications.
garbage can: an abstract concept for allowing individuals a
place to
suggest innovations, brought about by technology. The inven-
tory of technology opportunities needs regular evaluation
Gen X: The generation of individuals who were born between
the
years of 1965 and 1980.
Gen Y/Millennials: The generation of individuals who were
born
between the years of 1981 and 1992. There is disagreement
on the exact end dates of Gen Y individuals.
internet: a cooperative message-forwarding system that links
com-
puter networks all over the world.
intranet: a network confined to a single organization or unit.
ISO 9000: a set of quality assurance standards published by the
91-nation International Organization for Standardization
(ISO). ISO 9000 requires firms to define and implement
quality processes in their organization.
legacy: an existing software application or system that is
assumed to
operate. By definition, all applications in production become
legacies.
operational excellence: a philosophy of continuous
improvement
throughout an organization by enhancing efficiency and qual-
ity across operations
outsourcing: A practice utilized by corporations which involves
hav-
ing external suppliers complete internal work in efforts to
reduce costs.
storyboarding: the process of creating prototypes that allow
users to
actually see examples of technology, and how it will look and
operate. Storyboarding tells a story and can quickly educate
executives, without being intimidating.
technology definitions branding: the process of determining
how an
organization wants to be viewed by its customers. Branding
includes not only the visual view, but also the emotional,
359GlossArY
rational, and cultural image that consumers associate with an
organization, its products, and services.
user interface: the relationship with end users that facilitates
the pro-
cess of gathering and defining logical requirements
user level: the tier of computer project experience of the user.
There
are three levels: (1) knowledgeable, (2) amateur, and (3) novice
virtual teams: groups of people, geographically disbursed, and
linked
together using communication technologies
World Wide Web (web): loosely organized set of computer
sites that
publish information that anyone can read via the Internet
using mainly HTTP (Hypertext Transfer Protocol)
Year 2000 (Y2K): a monumental challenge to many
organizations
due to a fear that software applications could not handle the
turn of the century. Specifically, calculations that used the
year portion of a date would not calculate properly. As such,
there was a huge investment in reviewing legacy systems to
uncover where these flaws existed.
Organizational Learning Definitions
action science: pioneered by Argyris and Schö n (1996), action
science
was designed to promote individual self-reflection, regarding
behavior patterns and to encourage a productive exchange
among individuals. Action science encompasses a range of
methods to help individuals learn how to be reflective about
their actions. A key component of action science is the use
of reflective practices— including what is commonly known
among researchers and practitioners as reflection in action,
and reflection on action.
balanced scorecard: a means for evaluating transformation, not
only
for measuring completion against set targets, but also, for
defining how expected transformations map onto the strate-
gic objectives of the organization. In effect, it is the ability of
the organization to execute its strategy.
communities of practice: are based on the assumption that
learning
starts with engagement in social practice and that this prac-
tice is the fundamental construct by which individuals learn.
360 GlossArY
Thus, communities of practice are formed to get things done
using a shared way of pursuing interest.
cultural assimilation: a process that focuses on the
organizational
aspects of how technology is internally organized, including
the role of the IT department, and how it is assimilated within
the organization as a whole. It is an outcome of responsive
organizational dynamism.
cultural lock‑in: the inability of an organization to change its
corpo-
rate culture, even when there are clear market threats (Foster
& Kaplan, 2001)
double‑loop learning: requires individuals to reflect on a prior
action
or habit that needs to change in behavior and change to oper-
ational procedures. For example, people who engage in dou-
ble-loop learning, may need to adjust how they perform their
job as opposed to just the way they communicate with others.
drivers: those units that engage in frontline or direct revenue-
generating activities
experiential learning: a type of learning that comes from the
experi-
ences that adults have accrued over the course of their individ-
ual lives. These experiences provide rich and valuable forms of
“ literacy” that must be recognized as important components
to overall learning development.
explicit knowledge: documented knowledge found in manuals,
doc-
umentation, files, and other accessible places and sources
flame: a lengthy, often personally insulting, debate in an elec-
tronic community that provides both positive and negative
consequences
frame‑talk: focuses on interpretation to evaluate the meanings
of talk
knowledge management: the ability to transfer individual tacit
knowledge into explicit knowledge
left‑hand column: a technique by which individuals use the
right-hand
column of a piece of paper to transcribe dialogues that they feel
have not resulted in effective communication. In the left-hand
column of the same page, participants write what they were
really thinking at the time of the dialogue but did not say.
management self‑development: increases the ability and
willingness
of managers to take responsibility for themselves, particularly
for their own learning (Pedler et al., 1988)
361GlossArY
mythopoetic‑talk: communicates ideogenic ideas and images
that
can be used to communicate the nature of how to apply tool-
talk and frame-talk, within the particular culture or society.
This type of talk allows for concepts of intuition and ideas for
concrete application.
organizational knowledge: is defined as “ the capability of a
company
as a whole to create new knowledge, disseminate it through-
out the organization, and embody it in products, services, and
systems” (Nonaka & Takeuchi, 1995, p. 3)
organizational transformation: changes in goals, boundaries,
and
activities. According to Aldrich (2001), organizational trans-
formations “ must involve a qualitative break with routines
and a shift to new kinds of competencies that challenge exist-
ing organizational knowledge” (p. 163).
reflection with action: term used as a rubric for the various
methods
involving reflection in relation to activity
responsive organizational dynamism: the set of integrative
responses, by an organization, to the challenges raised by
technology dynamism. It has two component outcomes: stra-
tegic integration and cultural assimilation.
single‑loop learning: requires individuals to reflect on a prior
action
or habit that needs to be changed in the future but that does
not require individuals to change their operational procedures
with regard to values and norms
strategic integration: a process that addresses the business-
strategic
impact of technology on organizational processes. That is,
the business-strategic impact of technology requires imme-
diate organizational responses and, in some instances, zero
latency. It is an outcome of responsive organizational dyna-
mism, and it requires organizations to deal with a variable
that forces acceleration of decisions in an unpredictable
fashion.
supporters: units that do not generate obvious direct revenues
but
rather are designed to support frontline activities
tacit knowledge: an experience-based type of knowledge and
skill,
with the individual capacity to give intuitive forms to new
things; that is, to anticipate and preconceptualize the future
(Kulkki & Kosonen, 2001)
362 GlossArY
technological dynamism: characterizes the unpredictable and
accel-
erated ways in which technology, specifically, can change
strategic planning and organizational behavior/culture. This
change is based on the acceleration of events and interactions
within organizations, which in turn create the need to better
empower individuals and departments.
tool‑talk: includes instrumental communities required to
discuss,
conclude, act, and evaluate outcomes
363
References
Aldrich, H. (2001). Organizations Evolving. London: Sage.
Allen, F., & Percival, J. (2000). Financial strategies and venture
capital. In
G. S. Day & P. J. Schoemaker (Eds.), Wharton on Managing
Emerging
Technologies (pp. 289– 306). New York: Wiley.
Allen, T. J., & Morton, M. S. (1994). Information Technology
and the
Corporation. New York: Oxford University Press.
Applegate, L. M., Austin, R. D., & McFarlan, F. W. (2003).
Corporate
Information Strategy and Management (2nd edn.). New York:
McGraw-Hill.
Argyris, C. (1993). Knowledge for Action: A Guide to
Overcoming Barriers to
Organizational Change. San Francisco, CA: Jossey-Bass.
Argyris, C., & Schö n, D. A. (1996). Organizational Learning
II. Reading,
MA: Addison-Wesley.
Arnett, R. C. (1992). Dialogue Education: Conversation about
Ideas and between
Persons. Carbondale, IL: Southern Illinois University Press.
Bakanauskiené , I., BendaravicIiené , R., Krikstolaitis, R., &
Lydeka, Z.
(2011). Discovering an employer branding: Identifying
dimensions of
employers’ attractiveness in University. Management of
Organizations:
Systematic Research , 59, pp. 7– 22.
Bazarova, N. N., & Walther, J. B. (2009). Virtual groups:
(Mis)attribution
of blame in distributed work. In P. Lutgen-Sandvik & B.
Davenport
Sypher (Eds.), Destructive Organizational Communication:
Processes,
Consequences, and Constructive Ways of Organizing (pp. 252–
266). New
York: Routledge.
Bellovin. S. M. (2015). Thinking Security: Stopping Next Year’
s Hackers . Boston,
MA: Addison-Wesley.
364 reFerenCes
Bensaou, M., & Earl, M. J. (1998). The right mind-set for
managing informa-
tion technology. In J. E. Garten (Ed.), World View: Global
Strategies for
the New Economy (pp. 109– 125). Cambridge, MA: Harvard
University
Press.
Bertels, T., & Savage, C. M. (1998). Tough questions on
knowledge manage-
ment. In G. V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in
Firms:
Understanding, Managing and Measuring Knowledge (pp. 7–
25). London:
Sage.
Boland, R. J., Tenkasi, R. V., & Te’ eni, D. (1994). Designing
information
technology to support distributed cognition. Organization
Science , 5,
456– 475.
Bolman, L. G., & Deal, T. E. (1997). Reframing Organizations:
Artistry,
Choice, and Leadership (2nd edn.). San Francisco, CA: Jossey-
Bass.
Bradley, S. P., & Nolan, R. L. (1998). Sense and Respond:
Capturing Value in
the Network Era. Boston, MA: Harvard Business School Press.
Brown, J. S., & Duguid, P. (1991). Organizational learning and
communities
of practice. Organization Science , 2, 40– 57.
Burke, W. W. (2002). Organizational Change: Theory and
Practice. London:
Sage.
Cadle, J., Paul, D., & Turner, P. (2014). Business Analysis
Techniques: 99
Essential Tools for Success (2nd edn.). Swindon, UK:
Chartered Institute
for IT.
Capgemini Consulting. (2013). Being Digital: Engaging the
Organization to
Accelerate Digital Transformation [White Paper]. Retrieved
from http://
www.capgemini-consulting.com/resource-file-
access/resource/pdf/
being_digital_engaging_the_organization_to_accelerate_digital
_
transformation.pdf
Cash, J. I., & Pearlson, K. E. (2004, October 18). The future
CIO. Information
Week . Available at
http://www.informationweek.com/story/showArti-
cle.jhtml?articleID=49901186
Cassidy, A. (1998). A Practical Guide to Information Strategic
Planning. Boca
Raton, FL: St. Lucie Press.
Cisco (2012). Creating an Office from an Easy Chair [White
Paper]. Retrieved
from
http://www.cisco.com/c/en/us/solutions/collateral/enterprise/
cisco-on-cisco/Trends_in_IT_Gen_Y_Flexible_Collaborative_
Workspace.pdf
Collis, D. J. (1994). Research note: How valuable are
organizational capabili-
ties? Strategic Management Journal , 15, 143– 152.
Cross, T, & Thomas, R. J. (2009). Driving Results through
Social Networks.
How Top Organizations Leverage Networks for Performance
and Growth.
San Francisco, CA: Jossey-Bass.
Cyert, R. M., & March, J. G. (1963). The Behavioral Theory of
the Firm.
Englewood Cliffs, NJ: Prentice-Hall.
De Jong, G. 2014. Financial inclusion of youth in the Southern
provinces of
Santander: Setting up a participatory research in Columbia. In
P. Wabike
& J. van der Linden (Eds.), Education for Social Inclusion
(pp. 87– 106).
Groningen, the Netherlands: University of Groningen.
365reFerenCes
Dewey, J. (1933). How We Think. Boston, MA: Health.
Dodgson, M. (1993). Organizational learning: A review of some
literatures.
Organizational Studies , 14, 375– 394.
Dolado, J. (Ed.) (2015). No Country for Young People? Youth
Labour Market
Problems in Europe , VoxEU.org eBook, London: CEPR Press.
Dragoon, A. (2002). This changes everything. Retrieved
December 15, 2003,
from http://www.darwinmag.com
Earl, M. J. (1996a). Business processing engineering: A
phenomenon of orga-
nizational dimension. In M. J. Earl (Ed.), Information
Management: The
Organizational Dimension (pp. 53– 76). New York: Oxford
University
Press.
Earl, M. J. (1996b). Information Management: The
Organizational Dimension.
New York: Oxford University Press.
Earl, M. J., Sampler, J. L., & Short, J. E. (1995). Strategies for
business pro-
cess reengineering: Evidence from field studies. Journal of
Management
Information Systems , 12, 31– 56.
Easterby-Smith, M., Araujo, L., & Burgoyne, J. (1999).
Organizational
Learning and the Learning Organization: Developments in
Theory and
Practice. London: Sage.
Eisenhardt, K. M., & Bourgeois, L. J. (1988). Politics of
strategic decision
making in high-velocity environments: Toward a midrange
theory.
Academy of Management Journal , 31, 737– 770.
Elkjaer, B. (1999). In search of a social learning theory. In M.
Easterby-
Smith, J. Burgoyne, & L. Araujo (Eds.), Organizational
Learning and
the Learning Organization (pp. 75– 91). London: Sage.
Ernst & Young, (2012). The digitization of everything: How
organisations
must adapt to changing consumer behaviour [White Paper].
Retrieved
from http://www.ey.com/Publication/
vwLUAssets/The_digitisation_
of_everything_-
_How_organisations_must_adapt_to_changing_con-
sumer_behaviour/$FILE/ EY_Digitisation_of_everything.pdf
Fineman, S. (1996). Emotion and subtexts in corporate
greening. Organization
Studies , 17, 479– 500.
Foster, R. N., & Kaplan, S. (2001). Creative Destruction: Why
Companies
That Are Built to Last Underperform the Market: And How to
Successfully
Transform Them . New York: Currency.
Franco, V., Hu, H., Lewenstein, B. V., Piirto, R., Underwood,
R., & Vidal,
N. K. (2000). Anatomy of a flame: Conflict and community
build-
ing on the Internet. In E. L. Lesser, M. A. Fontaine, & J. A.
Slusher
(Eds.), Knowledge and Communities (pp. 209– 224). Woburn,
MA:
Butterworth-Heinemann.
Friedman, T. L. (2007). The World Is Flat. New York:
Picador/Farrar, Straus
and Giroux.
Friedman, V. J, Razer, M., Tsafrir, H., & Zorda, O. (2014). An
action science
approach to creating inclusive teacher-parent relationships. In
P. Wabike
& J. van der Linden (eds.), Education for Social Inclusion (pp.
25– 51).
Groningen, the Netherlands: University of Groningen.
366 reFerenCes
Garvin, D. A. (1993). Building a learning organization. Harvard
Business
Review , 71 (4), 78– 84.
Garvin, D. A. (2000). Learning in Action: A Guide to Putting
the Learning
Organization to Work. Boston, MA: Harvard Business School
Press.
Gephardt, M. A., & Marsick, V. J. (2003). Introduction to
special issue on
action research: Building the capacity for learning and change.
Human
Resource Planning , 26(2), 14–18.
Glasmeier, A. (1997). The Japanese small business sector (Final
report to the
Tissot Economic Foundation, Le Locle, Switzerland, Working
Paper
16). Austin: Graduate Program of Community and Regional
Planning,
University of Texas at Austin.
Grant, D., Keenoy, T., & Oswick, C. (Eds.). (1998). Discourse
and Organization.
London: Sage.
Grant, R. M. (1996). Prospering in a dynamically-competitive
environ-
ment: Organizational capability as knowledge integration.
Organization
Science , 7, 375– 387.
Gregoire, J. (2002, March 1). The state of the CIO 2002: The
CIO title,
What’ s it really mean? CIO . Available at
http://www.cio.com/arti-
cle/30904/The_State_of_the_CIO_2002_The_CIO_Title_What_s
_
It_Really_Mean_
Habermas, J. (1998). The Inclusion of the Other: Studies in
Political Theory.
Cambridge, MA: MIT Press.
Halifax, J. (1999). Learning as initiation: Not-knowing, bearing
witness,
and healing. In S. Glazier (Ed.), The Heart of Learning:
Spirituality in
Education (pp. 173– 181). New York: Penguin Putnam.
Hardy, C., Lawrence, T. B., & Philips, N. (1998). Talk and
action:
Conversations and narrative in interorganizational
collaboration. In
D. Grant, T. Keenoy, & C. Oswick (Eds.), Discourse and
Organization
(pp. 65– 83). London: Sage.
Heath, D. H. (1968). Growing Up in College: Liberal Education
and Maturity.
San Francisco, CA: Jossey-Bass.
Hoffman, A. (2008, May 19). The social media gender gap.
Business Week .
Available at http://www.businessweek.com/technology/content/
may2008/tc20080516_580743.htm
Huber, G. P. (1991). Organizational learning: The contributing
processes and
the literature. Organization Science , 2, 99– 115.
Hullfish, H. G., & Smith, P. G. (1978). Reflective Thinking:
The Method of
Education. Westport, CT: Greenwood Press.
Huysman, M. (1999). Balancing biases: A critical review of the
literature
on organizational learning. In M. Easterby-Smith, J. Burgoyne,
& L.
Araujo (Eds.), Organizational Learning and the Learning
Organization
(pp. 59– 74). London: Sage.
Johansen, R., Saveri, A., & Schmid, G. (1995). Forces for
organizational
change: 21st century organizations: Reconciling control and
empower-
ment. Institute for the Future , 6 (1), 1– 9.
367reFerenCes
Johnson Controls (2010) Generation Y and the workplace:
Annual report
2010 [White Paper]. Retrieved from
http://www.johnsoncontrols.com/
content/dam/WWW/jci/be/global_workplace_innovation/oxygen
z/
Oxygenz_Report_-_2010.pdf
Jonas, L., & Kortenius, R. (2014) Beyond a Paycheck:
Employment as an
act of consumption for Gen Y talents (Master’ s Thesis)
Retrieved from
http://lup.lub.lu.se/luur/download?func=downloadFile&recordO
Id=44
56566&fileOId=4456569
Jones, M. (1975). Organizational learning: Collective mind and
cognitiv-
ist metaphor? Accounting Management and Information
Technology , 5(1),
61– 77.
Kanevsky, V., & Housel, T. (1998). The learning-knowledge-
value cycle. In G.
V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in Firms:
Understanding,
Managing and Measuring Knowledge (pp. 240– 252). London:
Sage.
Kaplan, R. S., & Norton, D. P. (2001). The Strategy-Focused
Organization.
Cambridge, MA: Harvard University Press.
Kegan, R. (1994). In Over Our Heads: The Mental Demands of
Modern life.
Cambridge, MA: Harvard University Press.
Kegan, R. (1998, October). Adult Development and
Transformative Learning.
Lecture presented at the Workplace Learning Institute, Teachers
College, New York.
Knefelkamp, L. L. (1999). Introduction. In W. G. Perry (Ed.),
Forms of Ethical
and Intellectual Development in the College Years: A Scheme
(pp. xi–xxxvii).
San Francisco, CA: Jossey-Bass.
Koch, C. (1999, February 15). Staying alive. CIO Magazine .
38– 45.
Kolb, D. (1984a) Experiential Learning: Experience as the
Source of Learning
and Development. Englewood Cliffs, NJ: Prentice-Hall.
Kolb, D. (1984b). Experiential Learning as the Science of
Learning and
Development. Englewood Cliffs, NJ: Prentice Hall.
Kolb, D. (1999). The Kolb Learning Style Inventory. Boston,
MA: HayResources
Direct.
Kulkki, S., & Kosonen, M. (2001). How tacit knowledge
explains organiza-
tional renewal and growth: The case at Nokia. In I. Nonaka &
D. Teece
(Eds.), Managing Industrial Knowledge: Creation, Transfer and
Utilization
(pp. 244– 269). London: Sage.
Langer, A. M. (1997). The Art of Analysis. New York:
Springer-Verlag.
Langer, A. M. (2001a). Analysis and Design of Information
Systems. New York:
Springer-Verlag.
Langer, A. M. (2001b). Fixing bad habits: Integrating
technology person-
nel in the workplace using reflective practice. Reflective
Practice , 2(1),
100– 111.
Langer, A. M. (2002). Reflecting on practice: using learning
journals in higher
and continuing education. Teaching in Higher Education , 7,
337– 351.
Langer, A. M. (2003). Forms of workplace literacy using
reflection-with
action methods: A scheme for inner-city adults. Reflective
Practice , 4,
317– 336.
368 reFerenCes
Langer, A. M. (2007). Analysis and Design of Information
Systems (3rd edn.).
New York: Springer-Verlag.
Langer A. M. (2009). Measuring self-esteem through reflective
writing:
Essential factors in workforce development. Journal of
Reflective Practice ,
9(10): 45– 48.
Langer, A. (2011). Information Technology and Organizational
Learning:
Managing Behavioral Change through Technology and
Education (2nd
edn.). Boca Raton, FL: CRC Press.
Langer, A. M. (2013). Employing young talent from
underserved popula-
tions: Designing a flexible organizational process for
assimilation and
productivity. Journal of Organization Design , 2(1): 11– 26.
Langer, A. M. (2016) Guide to Software Development:
Designing and Managing
the Life Cycle (2nd edn.). New York: Springer.
Langer, A.M. & Yorks, L. 2013. Strategic IT: Best practices for
Managers and
Executives . Hoboken, NJ: Wiley.
Lesser, E. L., Fontaine, M. A., & Slusher, J. A. (Eds.). (2000).
Knowledge and
Communities. Woburn, MA: Butterworth-Heinemann.
Levine, R., Locke, C., Searls, D., & Weinberger, D. (2000). The
Cluetrain
Manifesto. Cambridge, MA: Perseus Books.
Lientz, B. P., & Rea, K. P. (2004). Breakthrough IT Change
Management:
How to Get Enduring Change Results. Burlington, MA:
Elsevier
Butterworth-Heinemann.
Lipman-Blumen, J. (1996). The Connective Edge: Leading in an
Independent
World. San Francisco, CA: Jossey-Bass.
Lipnack, J., & Stamps, J. (2000). Virtual Teams (2nd edn.).
New York: Wiley.
Lounamaa, P. H., & March, J. G. (1987). Adaptive coordination
of a learning
team. Management Science , 33, 107– 123.
Lucas, H. C. (1999). Information Technology and the
Productivity Paradox. New
York: Oxford University Press.
Mackenzie, K. D. (1994). The science of an organization. Part I:
A new model
of organizational learning. Human Systems Management , 13,
249– 258.
March, J. G. (1991). Exploration and exploitation in
organizational learning.
Organization Science , 2, 71– 87.
Marshak, R. J. (1998). A discourse on discourse: Redeeming the
meaning
of talk. In D. Grant, T Keenoy, & C. Oswick (Eds.), Discourse
and
Organization (pp. 65– 83). London: Sage.
Marsick, V. J. (1998, October). Individual strategies for
organizational learn-
ing. Lecture presented at the Workplace Learning Institute,
Teachers
College, New York.
McCarthy, B. (1999). Learning Type Measure. Wauconda, IL:
Excel.
McDermott, R. (2000). Why information technology inspired
but cannot
deliver knowledge management. In E. L. Lesser, M. A.
Fontaine, &
J. A. Slusher (Eds.), Knowledge and Communities (pp. 21– 36).
Woburn,
MA: Butterworth-Heinemann.
McGraw, K. (2009). Improving project success rates with better
leadership:
Project Smart. Available at www.projectsmart.co.uk/improving-
project-
success-rateswith-better-leadership.html
369reFerenCes
Mezirow, J. (1990). Fostering Critical Reflection in Adulthood:
A Guide to
Transformative and Emancipatory Learning. San Francisco,
CA:
Jossey-Bass.
Milliken, C. (2002). A CRM success story. Computerworld .
Available at
www.computerworld.com/s/article/75730?A_CRM_success-
story
Miner, A. S., & Haunschild, P. R. (1995). Population and
learning. In B.
Staw & L. L. Cummings (Eds.), Research in Organizational
Behavior
(pp. 115– 166). Greenwich, CT: JAI Press.
Mintzberg, H. (1987). Crafting strategy. Harvard Business
Review , 65(4), 72.
Mintzberg, H., & Waters, J. A. (1985). Of strategies, deliberate
and emer-
gent. Strategic Management Journal , 6, 257– 272.
Moon, J. A. (1999). Reflection in Learning and Professional
Development: Theory
and Practice. London: Kogan Page.
Moon, J. A. (2000). A Handbook for Academics, Students and
Professional
Development. London: Kogan Page.
Mossman, A., & Stewart, R. (1988). Self-managed learning in
organiza-
tions. In M. Pedler, J. Burgoyne, & T. Boydell (Eds.), Applying
Self-
Development in Organizations (pp. 38– 57). Englewood Cliffs,
NJ:
Prentice-Hall.
Mumford, A. (1988). Learning to learn and management self-
development. In
M. Pedler, J. Burgoyne, & T Boydell (Eds.), Applying
Self-Development
in Organizations (pp. 23– 37). Englewood Cliffs, NJ: Prentice-
Hall.
Murphy, T. (2002). Achieving Business Practice from
Technology: A Practical
Guide for Today’ s Executive. New York: Wiley.
Narayan, S. (2015). Agile IT Organization Design for Digital
Transformation
and Continuous Delivery . New York: Addison-Wesely.
Newman, K. S. 1999. No Shame in My Game: The Working
Poor in the Inner
City . New York: Vintage Books.
Nonaka, I. (1994). A dynamic theory of knowledge creation.
Organization
Science , 5(1), 14– 37.
Nonaka, I., & Takeuchi, H. (1995). The Knowledge-Creating
Company: How
Japanese Companies Create the Dynamics of Innovation. New
York: Oxford
University Press.
Olson, G. M., & Olson, J. S. (2000). Distance matters. Human–
Computer
Interactions , 15(1), 139– 178.
Olve, N., Petri, C., Roy, J., & Roy, S. (2003). Making
Scorecards Actionable:
Balancing Strategy and Control. New York: Wiley.
O’ Sullivan, E. (2001). Transformative Learning: Educational
Vision for the 21st
Century. Toronto: Zed Books.
Peddibhotla, N. B., & Subramani, M. R. (2008). Managing
knowledge in
virtual communities within organizations. In I. Becerra-
Fernandez &
D. Leidner (Eds.), Knowledge Management: An Evolutionary
View (229–
247). Armonk, NY: Sharp.
Pedler, M., Burgoyne, J., & Boydell, T. (Eds.). (1988).
Applying self-
Development in Organizations . Englewood Cliffs, NJ:
Prentice-Hall.
Peters, T. J., & Waterman, R. H. (1982). In Search of
Excellence: Lessons from
America’ s Best­Run Companies. New York: Warner Books.
370 reFerenCes
Pietersen, W. (2002). Reinventing Strategy: Using Strategic
Learning to Create
and Sustain Breakthrough Performance. New York: Wiley.
Porter, M. E., & Kramer, M. R. 2011. Creating shared value.
Harvard Business
Review , 89(1/2): 62– 77.
Prange, C. (1999). Organizational learning: Desperately seeking
theory. In M. Easterby-Smith, J. Burgoyne, & L. Araujo (Eds.),
Organizational Learning and the Learning Organization (pp.
23– 43).
London: Sage.
Probst, G., & Bü chel, B. (1996). Organizational Learning: The
Competitive
Advantage of the Future. London: Prentice-Hall.
Probst, G., Bü chel, B., & Raub, S. (1998). Knowledge as a
strategic resource.
In G. V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in Firms:
Understanding, Managing and Measuring Knowledge (pp. 240–
252).
London: Sage.
Rassool N. 1999. Literacy for Sustainable Development in the
Age of Information
(Vol. 14). Clevedon: Multilingual Matters Limited.
Reynolds, G. (2007). Ethics in Information Technology (2nd
edn.). New York:
Thomson.
Robertson, S., & Robertson, J. (2012). Mastering the
Requirements Process:
Getting Requirements Right (3rd edn.). Upper Saddle River,
NJ:
Addison-Wesley.
Sabherwal, R., & Becerra-Fernandez, I. (2005). Integrating
specific knowl-
edge: Insights from the Kennedy Space Center. IEEE
Transactions on
Engineering Management , 52, 301– 315.
Sampler, J. L. (1996). Exploring the relationship between
information tech-
nology and organizational structure. In M. J. Earl (Ed.),
Information
Management: The Organizational Dimension (pp. 5– 22). New
York:
Oxford University Press.
Saxena, P., & Jain. R. (2012) Managing career aspirations of
generation Y at
work place. International Journal of Advanced Research in
Computer Science
and Software Engineering , 2(7), 114–118..
Schein, E. H. (1992). Organizational Culture and Leadership
(2nd edn.). San
Francisco, CA: Jossey-Bass.
Schein, E. H. (1994). The role of the CEO in the management of
change: The
case of information technology. In T. J. Allen & M. S. Morton
(Eds.),
Information Technology and the Corporation (pp. 325– 345).
New York:
Oxford University Press.
Schlossberg, N. R. (1989). Marginality and mattering: Key
issues in building
community. New Directions for Student Services , 48, 5– 15.
Schoenfield, B. S. E. (2015). Securing Systems: Applied
Security Architecture and
Threat Models . Boca Raton, FL: CRC Press.
Schö n, D. (1983). The Reflective Practitioner: How
Professionals Think in Action.
New York: Basic Books.
Senge, P. M. (1990). The Fifth Discipline: The Art and Practice
of the Learning
Organization. New York: Currency Doubleday.
Siebel, T. M. (1999). Cyber Rules: Strategies for Excelling at
E-Business. New
York: Doubleday.
371reFerenCes
Stolterman, E., & Fors, A. C. (2004). Information technology
and the good
life. Information Systems Research , 143, 687– 692.
Swadzba, U. (2010). Work or consumption: Indicators of one’s
place in the
Society. In Beyond Globalisation: Exploring the Limits of
Globalisation in
the Regional Context (Conference Preceedings) (pp. 123– 129).
Ostrava:
University of Astrava Czech Republic.
Swieringa, J., & Wierdsma, A. (1992). Becoming a Learning
Organization,
beyond the Learning Curve. New York: Addison-Wesley.
Szulanski, G., & Amin, K. (2000). Disciplined imagination:
Strategy mak-
ing in uncertain environments. In G. S. Day & P.J. Schoemaker
(Eds.),
Wharton on Managing Emerging Technologies (pp. 187– 205).
New York:
Wiley.
Teece, D. J. (2001). Strategies for managing knowledge assets:
The role of
firm structure and industrial context. In I. Nonaka & D. Teece
(Eds.),
Managing Industrial Knowledge: Creation, Transfer and
Utilization
(pp. 125– 144). London: Sage.
Teigland, R. (2000). Communities of practice at an Internet
firm: Netovation
vs. in-time performance. In E. L. Lesser, M. A. Fontaine, & J.
A.
Slusher (Eds.), Knowledge and Communities (pp. 151– 178).
Woburn,
MA: Butterworth-Heinemann.
Tushman, M. L., & Anderson, P. (1986). Technological
discontinuities
and organizational environments. Administrative Science
Quarterly , 31,
439– 465.
Tushman, M. L., & Anderson, P. (1997). Managing Strategic
Innovation and
Change. New York: Oxford University Press.
Vince, R. (2002). Organizing reflection. Management Learning ,
33(1), 63– 78.
Wabike P. 2014. University-Community Engagement:
Universities at a
crossroad? In P. Wabike & J. van der Linden (eds.), Education
for Social
Inclusion (pp. 131– 149). Groningen, the Netherlands:
University of
Groningen.
Wallemacq, A., & Sims, D. (1998). The struggle with sense. In
D. Grant, T.
Keenoy, & C. Oswick (Eds.), Discourse and Organization (pp.
65– 83).
London: Sage.
Walsh, J. P. (1995). Managerial and organizational cognition:
Notes from a
trip down memory lane. Organizational Science , 6, 280– 321.
Watkins, K. E., & Marsick, V. J. (1993). Sculpting the Learning
Organization:
Lessons in the Art and Science of Systemic Change. San
Francisco, CA:
Jossey-Bass.
Watson, T. J. (1995). Rhetoric, discourse and argument in
organizational
sense making: A reflexive tale. Organization Studies , 16, 805–
821.
Wellman, B., Salaff, J., Dimitrova, D., Garton, L. Gulia, M., &
Haythornthwaite, C. (2000). Computer networks and social
networks:
Collaborative work, telework, and virtual community. In E. L.
Lesser,
M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and
Communities
(pp. 179– 208). Woburn, MA: Butterworth-Heinemann.
Wenger, E. (1998). Communities of Practice: Learning,
Meaning and Identity.
Cambridge, MA: Cambridge University Press.
372 reFerenCes
Wenger, E. (2000). Communities of practice: The key to
knowledge strategy.
In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.),
Knowledge and
Communities (pp. 3– 20). Woburn, MA: Butterworth-
Heinemann.
West, G. W. (1996). Group learning in the workplace. In S. Imel
(Ed.),
Learning in Groups: Exploring Fundamental Principles, New
Uses,
and Emerging Opportunities: New Directions for Adult and
Continuing
Education (pp. 51– 60). San Francisco, CA: Jossey-Bass.
Westerman, G., Bonnet, D., & McAfee, A. (2014). Leading
Digital: Turning
Technology into Business Transformation . Boston, MA:
Harvard Business
School Press.
Yorks, L., & Marsick, V. J. (2000). Organizational learning and
transforma-
tion. In J. Mezirow (Ed.), Learning as Transformation: Critical
Perspectives
on a Theory in Progress (pp. 253– 281). San Francisco, CA:
Jossey-Bass.
Yourdon, E. (1998). Rise and Resurrection of the American
Programmer
(pp. 253– 284). Upper Saddle River, NJ: Prentice Hall.
373
Index
A
Abstract conceptualization, as
learning preference, 84
Abstraction, leaps of, 10
Acceleration, xxi
Access control, social networking
issues, 134
Access tracking, 137
Accountability, of IT staff, 5
Accounting, IT relevance to, 24
Action, emotional components
of, 92
Action science, 3, 4, 74, 142,
152, 359
Active experimentation, as learning
preference, 84
Activity, relationship to content, 90
Activity systems, organizational
transformation of, 139–141
Adaptive organizations, 83
Administrative departments,
alignment with, 17–19
Adoptive approach, 63
Adversarial relationships, 2
Advertising business,
transformation to media
market, 231
Alignment
with administrative
departments, 17–19
to business strategy, 148
with human resources, 18
with social networks, 138
of technology with business
strategy, 149
Answerthink Corporation, 304
Applied individual learning for
technology model, 87
Architecture, 46
Assimilation, 6
cultural, 7
Assumptions, unearthing
unspoken, 9–10
Attribution theory, 166
Autonomy, 351
374 Index
B
Back office issues
at ICAP, 204
as strategic business problems, 195
Balanced scorecard, 359
availability variable, 156
business stakeholder support
for, 155
as checklist and tracking
system, 154
competence variable, 156
discourse and, 156–158
enthusiasm requirements, 156
executive management support
for, 156
implementing using application
software, 155
information provider
responsibilities, 155
learning pilots
responsibilities, 155
as living document, 147
as measurement of knowledge
creation, 158
modifications for ROD, 149
organizational transformation
and, 139–161
for Ravell phase I, 153
roles and responsibilities, 156
rules of success, 160
schematic diagram, 149
scorecard designer, 155
responsibilities, 155
Behavioral shifts, 12, 140
in CIOs, 195
Benefits realization, five pillars of,
45–46
Best practices, 37
CEO best practices technology
arc, 313–314
for chief executive officers,
299–313
chief IT executive best practices
arc, 297–299
for chief IT executives, 288–297
ethics and maturity issues,
333–337
middle management, 316–325
quest for, 287–288
unproven nature of, 56–57
Billable time records
financial returns from technology
solution, 229
limitations at HTC, 225–226
value-added services solutions, 232
Board meetings, IT issues discussed
at, 34
Boise Cascade Office Products, 308,
309, 311
Bottom-up learning, xxix, 132,
214, 235
at Siemens AG, 192, 193
Boundaries, organizational
transformation of, 139, 140
Brain hemispheres, and learning
preferences, 85
Budgetary cutbacks, 47, 293
Budgeting, IT strategies, 35
Business analysts, as
intermediaries, 22
Business ethics, 296–298, 302, 326
Business knowledge, by chief IT
executives, 291
Business plan, judging technologies
based on, 212–213
Business process, implementation
of, 314
Business process impact, 45
Business process outsourcing
leaders, 296
Business process reengineering
(BPR), 25, 47, 357
Business rules, 126
Business strategy, 31, 34–35
aligning technology with, xii, 149
375Index
articulating through balanced
scorecard, 151
balanced scorecards and, 159–160
CIO assimilation to, 195
as continual process, 148
and importance of balanced
scorecards, 161
IT role in, 21, 23–24, 26
translating to operational
terms, 148
Business technology cognition,
326, 329
Business user involvement, risks, 126
C
Case studies, xxx, 187, 233–238;
see also Ravell
Corporation case study
HTC, 225–232
ICAP, 203–224
learning-knowledge-value
cycle, 238
organizational learning
approaches summary, 235
Siemens AG, 187–203
Catch-up, playing, 120
Centralization issues, 290, 305–306
CEO best practices technology arc,
313–314
CEO roles, in HTC case study,
227–228
CEO technology best practices arc,
313–314, 317, 334
detail, 318–321
maturity stages, 314–315
performance dimensions,
315–316
CFO quarterly meetings, 193
at Siemens AG, 191, 192
Change, xxiv
evolutionary vs. revolutionary, 120
frequency of, 141
mobilizing through executive
leadership, 148
need for accelerated, 68
overwhelming pace of, 293
pace of, 18
planned vs. unplanned, 120
rejection of technology-driven, 72
unpredictability of, 77
vs. transformation, 141, 152
Change agents, 38
CEOs as, 311
IT executives as, 39
technology, 68, 195
Change leaders, 296
Change management, xxiv, 45,
120–123, 345
by chief IT executives, 291
goals for IT, 123
at ICAP, 209
for IT organizations, 123–133
Chief executive officers (CEOs),
xxix; see also Executive
perspective
advice for participation
in organizational
transformation, 222
best practices, 299–305, 312–313
business-first perspectives, 309
business uses of technology
and, 314
as change agents, 311
CIO direct reporting to,
305–306
commitment to technology
projects, 308–309
conceptual knowledge of
technology, 314
dependence on CIOs for business
advice, 305
engaging in transformation, 208
executive decision making, 311
five stages of maturity, 313
ICAP case study, 206
376 Index
intervention in supporter
departments, 230
and IT centralization/
decentralization issues,
306–307
lack of cognizance about
technology uses, 202
linear development model, 313
multiple business perspectives, 314
need for linking business and
technology leaders, 310
need for standards, 307
outsourcing responsibilities, 306
perceptions of IT, xxix, 339
recognition of never-ending
technology projects,
311–312
reluctance to implement new
technology, 25
risk management and, 307–313
role in examining own biases, 203
role in HTC transformation, 230
strategic technology uses by, 315
willingness to learn from
staff, 208
Chief financial officer (CFO) CIOs
reporting to, 188, 226, 288
lack of creativity, 226
Chief information officers (CIOs),
288–289
business-level vs.
corporate-level, 291
inability to establish corporate
strategy, 211
integrating job functions into
business strategy, 190
integration challenges, 344
interactions with board-level
executives, 190
lack of involvement in business
strategy, 190
need for advanced degrees, 307
need to educate, 188
reporting to CFOs, 188
as senior lower level, 193
training in business strategy, 202
transformation to proactive
technologists, 195
Chief IT executives
best practices, 288
best practices arc, 299, 334
business environment
influences, 293
business ethics, 298
business knowledge
competence, 291
as business process outsourcing
leaders, 296
change creation and management
roles, 291
as change leaders, 296
common barriers to success, 293
communications roles, 291
compensation methods, 290
comprehension of technology
processes, 297
detail, best practices arc, 300–303
emerging roles and
responsibilities, 295–296
as executive account managers, 295
executive presence, 299
factors influencing strategic
options, 294
hiring and retention roles, 292
implementation of business/
technology processes by, 315
industry expertise, 291
as information architects, 295
as innovation leaders, 295
lack of uniform titles, 288
leadership roles, 292
management skills, 292
management values, 298
multiplicity of technology
perspectives, 297
377Index
organizational culture
competency, 298
as process leaders, 295
relationship building role, 291
roles and responsibilities,
290–292
as shared services leaders, 295
stable technology integration, 298
strategic thinking role, 290
as supply chain executives, 295
technology cognition, 298
technology competence and
recognition, 297
technology driver influences, 294
technology leadership, 298
technology proficiency, 291
Chief knowledge officer (CKO), 289
Chief technology officer (CTO), 289
intermediary role at HTC, 232
CIO advisory board, 191, 193
need for peer relationships, 192
at Siemens, 190
Citibank, use of technology as
driver, 60
Code of ethics, 336
Cognitive schemata, 82
Collaborative inquiry, 142
Collective identity, 91
Collective knowledge, storage of, 81
Collective learning, 78, 345
Combination, and virtual teams,
171–172
Combination dynamism, 173
Commitment, raising IT levels of, 6
Commoditization, 59, 61, 62, 207,
224, 259, 260, 306, 347
Common threads of communication,
156, 158, 159, 221, 344
at Siemens, ICAP/ETC,
HTC, 233
Communications
by chief IT executives, 291
failures in virtual team efforts, 164
importance to chief IT executive
role, 291
between IT organization and
others, 49
tacit knowledge buried in, 172
in virtual teams, 168
Communities of practice, xii, xxi,
45, 75–83, 87–90, 94, 103,
130, 189, 344, 346, 351,
359–360
application to virtual teams,
168–172
blockage by organizational
controls, 346
CIO-based, 191
and consensus building, 88
disagreements within, 196
discourse as basis of successful, 172
electronic, 78
extended seven steps, 79
formation of multiple, 233
at ICAP, 218–219
incorporating technology projects
into, 149
knowledge creation through, 234
knowledge management in, 197
Milliken’s formation of, 310
and organizational learning, 144
overlapping, 215
participation at Siemens, ICAP/
ETC, HTC, 235
preparing CIOs for, 196
reliance on innovation, 78
technology as change agent
for, 178
use in ROD, 75
virtual dynamism, 179
Communities of practice common
threads, 159
Communities of practice
threads, 157
Competitive advantage, 117, 233,
236, 355
378 Index
centrality of technology to, 348
dependence on knowledge
management, 116
importance of strategic
integration to, 46
improvement at Siemens AG, 190
issues at ICAP, 205, 207
IT potential to provide, 28
loss without transformation, 139
technology as source of, 41, 72
Completion time, estimating, 56
Compliance monitoring, in virtual
teams, 177
Concrete experience, as learning
preference, 84
Confidentiality, 336
end of, 134
Consequential interoperability, 45
Consultants, use of outside, 32
Containers, 96
Content, vs. technology, 207
Content-activity relationship, 90, 91
Continual learning, in virtual
teams, 179
Continuous innovation, 117
Control
organizational fear of losing, 352
vs. empowerment, 345–346
Conversion effectiveness, 21
Coopers & Lybrand, 58
Corporate culture, six myths of, 160
Corporate services standards, at
Siemens AG, 200
Creative professionals, cultural
assimilation challenges, 225
Cross-functional synergetic teams, 9
Cultural assimilation, xvii, xxiv, 42,
48–49, 140, 187, 245, 293,
306, 341, 343, 360
between brokers and
technologists at ICAP, 212
changes caused by new
technologies, 245
and communities of practice, 77
and creation of new cultures,
50, 51
as foundation for organizational
transformation, 143
in global organizations, 200
at implementation stage, 55–57
issues at HTC, 227
and IT organization
communications with
others, 49
and movement of traditional IT
staff, 49–51
at product maturity phase, 61
in ROD, 43
at Siemens AG, 199, 202
in transition, 146
uniqueness to each
organization, 50
in virtual teams, 179
Cultural awareness, 17
Cultural change, inevitability
of, 122
Cultural differences, 181, 199
ICAP experiences, 215
regarding operational norms, 200
in virtual teams, 174, 177
Cultural history, and virtual
teams, 175
Cultural lock-in, 120, 360
Cultural transformation, 8, 16–17
limitations of power approach, 17
Customer perspective
in balanced scorecard, 150
in Ravell Phase I balanced
scorecard, 153
ROD adjustments, 150–151
Customer relationship
management (CRM), 290,
308–311, 357
Customer-vendor relationships,
technology as change agent
for, 46
379Index
D
Data mapping, 126, 357
Deasy, Dana, 67, 187–190, 192, 195–
202, 207, 309, 344, 347
Decentralization, 24, 32, 306–307
with mature uses of
technology, 307
Decision support systems (DSS),
159, 357
Democratic leadership, importance
to high-velocity
environments, 123
Department/unit view as other, in
ROD arc, 102, 103
Design/planning phase, 88
Development schedules
failures in, xxiv
shortening dynamic, 56
Direct return, 47
through technology investments,
236, 238
Disagreements, in communities of
practice, 196–197
Disciplines, 89
Discourse, xxi, 350; see also Social
discourse
balanced scorecards and,
156–158
as basis of successful COP
implementation, 172
links to organizational learning
and technology, 93
Distance workers, 81, 164; see also
Virtual teams
Documentation, 125
and training materials, 126
Dot.com phenomenon, 23, 24
fallacies of, 212
and growth of e-business, 188
loss of commitment to learning
organizations in, 112, 113
and negative perceptions of
technology as business
driver, 201
Double-loop learning, 4, 344, 360
Driver functions, 58, 113, 360
conversion to supporter
functions, 62
and high-risk operations, 59
IT-related, 59
vacuum of IT presence in, 60
Driver to supporter life cycle, 141,
306, 346–347
organizational transformation
in, 145
Dynamic, xxi
E
E-business, 140
business vs. technology
components, 346
expanding use at Siemens
AG, 187
IT role at Siemens AG, 193
perception as IT
responsibility, 201
top-down strategy
introduction, 188
transferring emotion in, 181
E-business realignment, 46, 57
Economies of scale, 34, 58, 61, 62,
130, 152, 347
in driver to supporter life cycle,
141, 145
Education
through reflection, 14
and transformation, 14
Electronic communities, 78, 79
Electronic trading, 207, 223
growth at ICAP, 206
at ICAP, 205
and need for organizational
transformation, 206
380 Index
as proportion of total trading
dollars, 224
replacement of mediocre brokers
by, 210
role in business strategy, 203
as supplement to voice broker, 209
Emerging technologies, xiii
challenges to business strategy, 28
as change agents, xxiv
communities of practice and, 344
impact on business strategy, 124
and mission modification, 207
Emotion
requirements for virtual team
members, 174
and social discourse, 92–96
in virtual teams, 181–185
Employee evaluations, 17
Employee replacement, see Staff
replacement
Empowerment, 91, 345–346
vs. control, 345–346
Enron Corporation, 333, 337
Enterprise resource planning
(ERP), 358
Ethics
and best practices, 333–337
executive, 315, 320
Event-driven education
limits of, 109
at operations tier, 114
Evolution phase, 52
in technology business cycle, 57
Evolutionary change, 120–121
at Siemens, 196
Evolutionary learning, 77, 99
initiation by senior
management, 189
in ROD, 112
Executive account managers, 295
Executive decision making, 196, 310
by Milliken, 310
Executive-driven programs, limits
of, 109
Executive ethics, 315, 320
Executive interface, 150
earlier needs in virtual COPs,
185
Executive leadership, 148, 313–316,
320
Executive learning, systems
perspective, 114
Executive participation, importance
of direct, 232
Executive perspective, 9
consequences of exclusion, 214
importance of including in
learning, 98
on IT, 29–31
lack of detail knowledge, 110
level of involvement with IT, 34
poor understanding of
competitive dynamics,
25–27
on role of IT, 32–33
and stimulus for cultural
assimilation, 114
support for virtual teams, 174
Executive presence, 61, 296–299,
302, 315
Executive sponsors, 54, 55, 150, 232
Executive tier, 114
Executive values, 313, 314
Expectations, and virtual
teams, 176
Experiential learning, xxviii, 83–88,
360
Explicit knowledge, 118, 171, 360
challenges for virtual COPs, 172
transformation to, 223
Externalization, and virtual teams,
169–171
Externalization dynamism, 172
Eye-opening events, 15
381Index
F
Facebook, 135
Facilitator role, 127
Factors of multiplicity, 44
False generalizations, 299
Feasibility phase, 52, 53, 87
Feedback, 7
negative IT responses to, 7
Financial measurements
in balanced scorecard, 150
inability to capture IT value, 147
in Ravell Phase I balanced
scorecard, 153
ROD adjustments, 150
First-line managers, 111
Flame communities, 81, 360
Frame-talk, 93, 95, 181, 361
G
Garbage can model, 27, 53, 358
of IT value, 54
Gender participation, in social
networks, 138
Generalizations, entrenched, 10
Globalization, 81, 256, 283
for scalable technologies, 199
Goals
organizational transformation of,
139, 140
working towards, 15
Governance by control, 333
Governance issues, 245
Group discussions, 84, 85, 88, 282
Group relations conferences, 353
H
Hackett Benchworking, 304
Hardware upgrades, 124
High-risk operations, 59
High-velocity environments, 122
ICAP, 209
need for democratic leadership
in, 123
HT/IT governance model, 18
HTC case study, xxx, 225–226, 308
billable time records problems, 225
cascading effect of increased
profits, 229
CEO interactions, 227–228
CTO intermediary role, 232
follow-up developments, 231–232
IT contribution to learning-
knowledge-value chain, 237
IT history, 226–227
middle-ground solution, 228
organizational transformation,
229–231
process, 228–229
similarities to Ravell, 231
Human resources (HR)
dedicated staff allocation to
IT, 19
failure to align with, 18
social networking issues, 137–138
as undisclosed enemy, 18
Hype, about IT importance, 33
I
ICAP case study, xxx, 203–224,
308, 347
B brokers, 210
broker classes, 209–210
A brokers, 209–210
C brokers, 209–210
communities of practice, 218–222
COP common threads, 221
expanding markets through
technology, 213
five-year follow-up, 224
hybrid brokers, 210
382 Index
IT contribution to
learning-knowledge-value
chain, 237
language discourse at, 215, 218
limitations of off-the-shelf
solutions, 205
middle-management COP, 220
recognition of IT as business
driver, 203
role of electronic trading in
business strategy, 203
steps to transformation, 217
Y2K event and executive
involvement, 214–215
Identity definition, 133
for IT, 10–12
Identity development, 91
in virtual teams, 179–180
Ideogenic issues, 181
in virtual teams, 182
Implementation phase, 52, 88
of technology business cycle,
55–57
Indirect returns, 27, 29, 47, 213
need for management to
recognize, 236
Individual learning, xxviii, 70, 83,
171, 344
event driven, 76
at ICAP, 205
by middle managers, 115, 116
moving to system-level learning
from, 143
personnel rotation and, 350
progression to systems thinking,
354–355
in ROD arc, 183–184
with ROD arc, 104
shift to social, 97
simultaneously with
organizational learning, 220
styles of, 69
vs. system-level, 344
Industry expertise, by chief IT
executives, 291
Inferential learning, 64
Information architects, 295
Information overload, 119
Information Technology (IT),
xxxii, 1
as agent for business
transformation, 39
best organizational structure
for, 28
and centralization/
decentralization, 24
centralization/decentralization
issues, 306–307
CEO perceptions of, 339
combining with organizational
learning, 339
contribution to
learningknowledge-value
chain, 237
defining role and mission, 30
difficulty proving value of, 293
executive knowledge and
management of, 28–29
executive views of, 29–31
extent of non-IT executive
knowledge in, 28
hype about, 33
identifying driver component at
Siemens AG, 195
identity definition at Ravell,
10–12
impacts on marketing and
productivity, 35
importance to business strategy
and organizational
structure, 21, 30
improving performance through
organizational learning, 1
integrating into organizational
processes, xix
as key to success, xx
383Index
lack of representation at strategic/
executive levels, 339
management and strategic issues,
31, 34
means of evaluation, 28
need to provide greater
leadership, 340
operation reductions, 38
perception and role, 30
potential to provide competitive
advantage, 28
potential to reinvent business, 23
project perspective, 340
relationship to organizational
structure, 28
relevance to operations,
accounting, marketing, 24
role and mission, 30
role in behavioral
transformation, 228
role in business strategy, 26–27
seamless relationship with
organizational learning, xix
social networks and, 134–138
as strategic business tool, 26
strategic importance, 32
synergistic union with
organizational learning, 187
view as cost center, 38
ways to evaluate, 27–28
Informational flows, importance
of, 33
Innovation leaders, 295
Intangible assets, 147
Integrated disposition phase, in
ROD arc, 103
Integration, see IT integration
Intellectual capital
management
Interactive culture, 48
Internal business processes
in balanced scorecard, 150
ROD adjustments, 150
Internal capacity, lack of, 188
Internal development, 32
Internalization, and virtual teams, 171
Internalization dynamism, 173
Internet, 358
as driving force for e-business
realignment, 46
impact on business strategy, 32
increasing pressure to open, 134
Internet delivery, 23
impact on business strategy, 30
Intranets, 358
and accelerated learning pace, 142
Invisible organizations, 135, 137
ISO 9000, 77, 358
use for virtual team
processes, 177
Isolation, xxvii, 10
of IT departments, 1–2, 21
physical, 2
IT departments
assimilation challenges, 21
change management for, 123–133
complex working hours, 18
concerns about elimination of
integrity, 49–50
dichotomous relationship with
communities of practice, 78
incorporating into true
organizational learning, 68
integrating into organizational
culture, 3
isolation of, 1
lack of executive presence in
management teams, 61
marginalization, xv
as nucleus of all products and
careers, 211
overhead-related functions, 59
perception as back office
operations, 188, 211
perception as support function, 188
reporting to CFOs, 226
384 Index
restructuring of, 50
shifting salary structures, 18
silo operations, 18
subjection to budgetary
cutbacks, 47
support functions, 59
view by other departments, 30
IT dilemma, xxiv, 21–39
day-to-day issues, 137
defining, 36–38
and developments in operational
excellence, 38–39
executive knowledge and
management, 28–29
executive perspective, 32–33
general results, 36
IT role in business strategy,
25–27
management and strategic
issues, 34
organizational context, 24
and organizational structure,
24–25
recent background, 23–24
IT evaluation, 27
IT integration, 3–5, 14, 23, 109
blueprint for, 5–6
enlisting support for, 6–7
executive confusion about, 36
failures in strategic
planning, 36
implementing, 12–14
progress assessment, 7
vs. outsourcing, 22
IT investment
historical phases, 44
risk identification for, 46
IT jobs, decline in U.S., 163
IT performance, measuring, 31
IT professionals
as individualists, 212
integrating with non-IT
personnel, 49
movement into other
departments, 49–51
outsider image, 22
poor interpersonal skills, 33
project management roles, 340
reluctance to take on responsibility
for others, 212
as techies, 21
IT projects, failure of completion, xxiv
IT roles and responsibilities, 60–61
IT spending needs, failure of ROI to
accommodate, 27
IT value, garbage can model, 53–54
IT virtual teams, 19
K
Knowledge creation, 53, 117,
118, 234
balanced scorecards and, 158–161
as basis of transformation, 144
and communities of practice, 169
by electronic communities, 80
structured approach
difficulties, 77
by technology, 222
Knowledge development, 64,
83, 234
Knowledge management, xii, xxi,
xxix, 45, 116–120, 360
in COPs, 197
four modes of, 172
instilling through
technology, 234
participation at Siemens, ICAP/
ETC, HTC, 236
in virtual context, 174
KPMG, 308
L
Language use, xxviii, 89–91, 350
at ICAP, 215
385Index
Latency problems, xxv
Leadership, xii
executive, 315, 320
movement away from individual,
349–350
need for greater IT, 340
vs. governance, 335
Leaps of abstraction, 10
Learner centeredness, 127
Learning
converting to strategic
benefit, 65
defining at organizational level,
14–15
double-loop, 4
single-loop, 4
situated, 75
Learning and growth perspective
in balanced scorecard, 150
in Ravell Phase I balanced
scorecard, 152, 153
ROD adjustments, 150–151
Learning and working, 75
Learning approaches, linear
development in, 96–107
Learning contracts, 130
Learning-knowledge-value
chain, 238
IT contributions to, 237
Learning maturation, 94, 96,
104, 343
phases of, 98
Ravell case study example, 100
Learning organizations, xii, xviii, 9,
45, 72–75
developing through reflective
practice, 15, 20
and fallacy of staff
replacement, 113
transitioning to through
technology acceleration, 13
Learning preferences, xxviii, 83–88
and curriculum development, 85
Learning Style Inventory (LSI),
84, 85
combined applied learning
wheel, 87
McCarthy rendition, 86
Learning Type Measure
instrument, 85
Learning wheel, 84, 86, 87, 95
Left-hand column, 9, 360
Legacy systems, xi, 124, 358
Lessons learned, Ravell Corporation
case study, 14–17
Life-cycle maturation, shortening
through strategic
integration, 44
Lifelong learning, 350
Line management, 111
BPR buy-in by, 25
defined, 111
executive and operations
perspectives, 9
as executives in training, 111
feedback from, 7
importance of support from, 6, 219
learning maturation among, 96–97
meeting attendance, 11
proximity to day-to-day activities,
110
in Ravell case study, 109, 132
role in managing organizational
learning, 109–111
role in product maturity phase, 62
strategic importance to IT
integration, 8–9
technical knowledge, 9
as technology users, 54, 55
vs. first-line managers, 111
vs. supervisors, 112
Linear development, 342
in learning approaches, 96–107
Linkages, 348
Linkedln, 135
Lost jobs cycle, 163
386 Index
M
Management presence, 324–328, 331
Management pushback, 17
Management self-development,
127, 360
Management skills, by chief IT
executives, 292
Management support, importance
of, 6
Management tiers, 113–114
Management values, 296–299, 302,
324–327, 331
Management vectors, 112–116, 341
and three-tier organizational
structure, 114
Mandatory services, at Siemens
AG, 200
Marginality, 89
Marginalization, xxvii, 2, 22, 49
of nonadaptive virtual team
members, 168
reducing, 18
Marketing
IT relevance to, 24
social networking issues, 138
Mastery learning, 128
Mature self, 182
role in virtual team success, 173
and virtual team
complexities, 185
Maturity
ethics and, 327, 334
as gradual process, 345
Maturity arcs, xxviii, 173, 332,
335, 342
Maturity stages
CEO best practices technology
arc, 314–315
in chief IT executive best
practices arc, 297–299
middle manager best practices
arc, 325–326
McDermott, Stephen, 113, 203–
216, 222–224
learning philosophy, 204
Measurable outcomes, 45, 92, 110,
142, 342
Measurement phase, 52, 88
in technology business cycle, 53
Mentorship, 127–130
in self-development process,
129, 131
Middle manager best practices arc,
323, 324
maturity stages, 325–326
performance dimensions,
326–327
Middle managers, 110–112
avoidance of worker compliance
demands, 227
balanced scorecard discourse,
157–158
best practices, 316–325
challenges of defining best
practices for, 316
community of practice at
ICAP, 221
executive-based best
practices, 324
first-line managers, 111
five stages of maturity, 323
implementation-based best
practices, 322
importance to organizational
learning, 109
issues at ICAP, 219
as key business drivers, 110
line managers, 111
multiple tiers of, 111, 113–114
organizational vs. individual
learning by, 115, 116
representing required changes
through, 220
stagnation and resistance to
change among, 110–111
387Index
supervisors, 112
three tiers of, 342
Middle-up-down approach, 110,
112, 150, 214, 215, 235,
313, 342
Milliken, Christopher, 308–312
Missed opportunities, consequences
of, 341
Mission, 36
executive perspectives, 22
identifying IT, 10
modifying based on emerging
technologies, 207
Moral responsibility, 336
Multiple locations, 166–169
for virtual teams, 178
Mythopoetic-talk, 93, 94, 181,
182, 361
N
Networked organizations, 24
New meaning perspectives, 350
Non-IT executives, extent of
technology knowledge,
28, 31
Non-sense, 93
Normative behavior, vs.
leadership, 350
Not knowing, 16
O
Off-the-shelf software, 124
limitations at ICAP, 205
Older workers, fallacy of
replacing, 113
Online banking, 60
Operational efficiencies, 150, 213
Operational excellence, 358
developments in, 39
Operational knowledge, in ROD
arc, 103, 106
Operational norms, cultural
differences regarding, 200
Operations management, at
ICAP, 219
Operations perspective, 9
IT relevance to, 24
Operations tier, 114
Operations users, 54
Opportunities matrix, 27, 29
Organizational change, 66
business case for, 122
cultural lock-in as barrier to, 120
external environment and, 121
and inevitability of cultural
change, 122
internal organization and, 121
and organizational readiness, 121
requirements for, 343
sustaining, 122
Organizational culture, 298,
300–301, 303
altering, 65–66
balanced scorecards and,
158–161
integrating IT into, 3
technology support for evolution
of, 42
transformation of, 16–17
Organizational discourse, 90
Organizational dynamism, 42–48
Organizational evolution, 94,
341, 344
Organizational interactions,
325–327, 329
Organizational knowledge creation,
64, 116, 361
steps to, 117
with technology extension, 117
Organizational leadership phase, in
ROD arc, 102104
Organizational learning, xi, xii, 1,
20, 22, 38, 293, 295, 339,
343, 348
388 Index
balanced scorecard applicability
to, 154
balancing with individual
learning, 70
CEO need to understand, 312
and communities of practice,
75–83
and dealing with change
agents, 69
defining, 14–15
evolution of, 144
at executive levels, 215
experiential learning and, 83–88
and explicit knowledge
creation, 236
fostering through trust, 210
gradual process of, 345
HR/IT integration through, 18
instilling through
technology, 234
IT department isolation from, 2
and IT role at Siemens, 193
and language use, 89–96
learning preferences and, 83–88
limitations of top-down and
bottom-up approaches,
109–110
linear development in learning
approaches, 96–107
links to transformation and
performance, 64
by middle managers, 115
need for executive involvement
in, 215
and organizational knowledge
creation, 116
ratio to individual learning by
manager type, 116
reflective organizational
dynamism arc model, 101
relationship to self-generating
organizations, 351–352
and ROD, 71, 215
ROD and, 293
in ROD arc, 183
self-development and, 133
at Siemens AG, 192
simultaneously with individual
learning, 220
and social discourse, 89–96
synergistic union with IT, 187
transformational results, 139
in virtual teams, 185
Organizational learning
management, 109
change management, 120–133
knowledge management,
116–120
management vectors and,
112–116
mapping tacit knowledge to
ROD, 119
role of line management, 109–111
social networks and IT issues,
134–138
Organizational learning theory, 73
North American vs. global
cultural norms in, 67
and technology, 64–72
Organizational memory, building, 1
Organizational readiness, 121
Organizational role analysis, 353
Organizational structure, 313–314
CEO performance dimensions, 315
IT and, 24–25
IT importance to, 21
Organizational theory, 63
Organizational transformation,
xxviii, 63, 361
balanced scorecard and, 139–144,
146–147
defined, 146
in driver to supporter life cycle,
146
as event milestones, 146
evolutionary aspect of, 143
389Index
HTC case study, 229–230
at ICAP, 217
and knowledge creation, 158–161
knowledge links to, 160
ongoing evaluation methods,
146–156
as ongoing process, 146
stages, with ROD, 145
strategic integration and cultural
assimilation as foundation
for, 143
technology as driver of, 206
three dimension of, 139–141
validation of, 147
vs. change, 152
Organizations
as goal-oriented activity
systems, 63
as interdependent members, 63–64
Organizing principles, and virtual
teams, 176
Other centeredness, 296
in chief IT executives, 296
Outsourcing, xxx, 163–165
all-time highs, 346
by CEOs, 306
cost savings benefits, 163
executive opinions, 29
failure to achieve cost-cutting
results with, 304
of IT, 178
of mature technologies, 62
perception by midsize firms, 32
talent supply benefits, 163
time zone challenges, 164
in virtual teams, 178
vs. internal development, 32
vs. IT integration, 22
P
Payback, 46
Peer consulting groups, 353
Performance
linking organizational learning
to, 64, 65
reflective reviews, 6
Performance dimensions
CEO best practices technology
arc, 315
middle manager best practices
arc, 326, 327
Performance improvement, 3
Performance measurement, 31,
35–37
Permanence, disappearance in
organizations, 185
Personal transformation, through
self-development, 128
Personnel rotation, and individual
learning, 350
Persuasion, as skill to transform talk
into action, 180–181
Pillars model, 45–48
Planning phase, 52
in technology business cycle,
54–55
Politics, xxvi
blood cholesterol analogy, 67
negative impact of power
centralization, 123
and organizational learning,
66–67
Power approach, limitations for
transformation, 13
Power centralization, 122
President’s Council, 193
CIO exposure to, 195
at Siemens AG, 191, 192
Privacy issues, 336
Problem-solving modes, in virtual
teams, 175
Process comprehension, by chief IT
executives, 297
Process leaders, 295
Process measurement, 126
390 Index
in Ravell Phase I balanced
scorecard, 153
Product maturity, 61
Productivity, lagging returns in, 44
Project completion, 125
barriers to, 69
Project ethics, 324, 326–327, 331
Project managers
broad IT responsibilities, 57
as complex managers, 56
IT staff as, 340
Q
Quality, commitment to, 15–16
R
Ravell Corporation case study, xxvi,
1–2, 51, 60, 120, 342, 347
alignment with administrative
department, 17–19
balanced scorecard, 152–153
blueprint for integration, 5–6
BPR buy-in, 25
commitment to quality, 15–16
cultural evolution, 97
culture transformation, 16–17
decision-support systems, 159
defining reflection and learning,
14–15
employee resistance, 8
enlisting support, 6–7
goal orientation, 15
implementing integration,
12–14
IT identity definition, 10–12
IT self-reflection, 9–10
key lessons, 14–17
learning maturation analysis, 96,
99, 343
line management importance,
8–9, 109
new approach to IT integration,
3–7
not knowing mindset, 16
performance evaluation, 133
phase I balanced scorecard, 153
reflective practices and
measurable outcomes, 65
and self-development results, 132
technological acceleration at, 151
virtual team aspect, 164
Real date of delivery, 211
Reflection, 10
with action, 74, 76, 361
defining on organizational level,
14–15
education through, 15
organization movement toward,
12–14
Reflection matrix, 354
Reflective observation, as learning
preference, 84
Reflective organizational dynamism
arc model, 101
Reflective practices, xxviii, 4, 19, 38,
96, 142, 143, 152, 219, 313,
343
by chief IT executives, 296
fostering organizationally, 5
at ICAP, 205
importance to ROD, 74
individual, group, and
organizational, 352, 353
by middle managers, 115
need to develop in virtual teams,
165
in Ravell case study, 65
Reflective skills development, 9–10
Relationship building, by chief IT
executives, 291
Replacement phase, in technology
business cycle, 61–62
Reporting structures, 34, 37, 312
changes in, 38
391Index
for CIOs, 288
of CIOs, 195
CIOs to CEOs, 305
CIOs to CFOs, 188
inconsistent, 339
increased reporting to
CEOs, 304
and organizational change, 225
technological dynamism effects
on, 209
Requirements definition, risks, 126
Research and development, 348
Resistance to change, 209
to integration, 8
Responsive organizational
dynamism (ROD), 42–48,
53, 70, 89, 165, 187, 340
and adaptation, 349
arc model, 102
attainment of, 345
balanced scorecard
modifications, 149
and best practices arcs, 334
best practices to implement, 287
cultural assimilation in, 48–52
dependence on organizational
learning, 72
developmental stages, 100
drivers and supporters concept,
58–59
at HTC, 230–231, 233
at ICAP, 211, 217
importance of reflective practices
to, 74
and individual learning, 123
integrating transformation theory
with, 139
and IT roles and responsibilities,
60–61
mapping tacit knowledge to, 117
in multinational companies, 203
organizational inability to
manage, 97
and organizational learning,
71, 294
relationship to self-generating
organizations, 352
replacement/outsourcing decision,
61–62
requirements, 349
role in economic survival, 232
role of social networks in, 136
at Siemens AG, 189, 199
situational and evolutionary
learning in, 112
stages of organizational
transformation with, 145
and strategic innovation, 349
and strategic integration, 43–48
and systems thinking, 123
technology as, 41
technology business cycle and,
52–57
three-dimensional, 167
and Vince’s reflection matrix, 354
as way of life, 186
Retention
evaluation methods, 145
of IT talent by chief IT
executives, 292
and organizational
transformation, 144
Return-on-investment (ROI), 114
example of direct IT
contributions to, 230
failure of traditional strategies,
27, 29
for ICAP, 213
IT expenditure issues, 189
line management responsibilities,
111
and measurement phase, 53
monetary and nonmonetary, 53
payback as basis for, 46
technology failures, 69
Revalidation, at Siemens AG, 198
392 Index
Revolutionary change, 120
Rippling effect, 154
Risk assessment, 46
in feasibility phase, 53
misunderstandings about, 48
Risk management, as CEO role,
307–313
Risk minimization, with social
networks, 134
Risk orientation, in virtual
teams, 175
ROD arc, 99, 102, 144, 334
with applied individual learning
wheel, 104
department/unit view as other
stage, 100
example, 104
integrated disposition phase, 100,
102, 103
operational knowledge stage, 100
organizational leadership
phase, 103
stable operations phase, 102, 103
stages of individual and
organizational learning,
183–184
Roles and responsibilities
varying IT, 57
of virtual team members, 179
S
Santander Bank, 60
Sarbanes-Oxley (SOX) Act, 333
Scope changes, 56
risks, 126
Selection, and organizational
transformation, 144
Self-development
evaluation phase, 131, 133
formal learning program phase,
129–132
fostering of bottom-up
management through, 132
implementation phase, 131
learning-to-learn phase, 129, 132
as management issue, 128
in organizational learning, 133
in Ravell case study, 132
setbacks to, 132
through discourse, 132
as trial-and-error method, 128
Self-generating organizations, 351,
352
Self-governance, 6
Self-managed learning, 130
Self-management, 124
developing among IT staff, 127
by non-IT staff members, 127
and reflective practice theory, 128
Self-motivation, 123–124
Self-reflection, 9, 12, 16
promotion of, 4
Senior lower level, at Siemens AG,
194
Senior management
initiation of evolutionary learning
by, 189
sharing in learning, 196
Sense and respond, 58, 59, 199, 346
and IT, 59
Sense making, 63, 94
Shared leadership, 18
Shared services leaders, 295
Siemens AG, xxviii, 68, 344, 347
case study, 187–203
CEO quarterly meetings, 191
CFO quarterly meetings, 192
CIO advisory board, 190, 191
CIOs as senior lower level, 194
competitive advantage
improvement, 190
corporate services standards, 20
five-year follow-up, 202–203
393Index
interrelationships among
CIO communities of
practice, 191
IT contribution to
learning-knowledge-value
chain, 237
local-to-global links, 194
mandatory services standards, 200
multiple levels of CIO s, 242
optional technologies
standards, 200
President’s Council, 191, 192
quarterly CFO meetings, 190
revalidation concept at, 198
storyboarding process, 198
technology standards at, 200
Silo operations, 18, 50
Single-loop learning, 4, 361
Situated learning, 75
in ROD, 112
Skills, 92
in virtual teams, 180–181
Social discourse, 89–96, 234
application to virtual teams, 178
and content-activity
relationships, 90
and emotion, 92–96, 180–182
and identity development, 91,
179–180
Marshak’s model mapped to
technology learning
wheel, 93
as “passive” activity, 90
skills and, 92, 180
technology as driver of, 209
type of talk containers, 96
Social networks, xxix
ambiguous effects, 138
attempts to lock out
capabilities, 134
gender participation issues, 138
invisible participants, 137
and IT, 134–138
management issues, 136
Socialization, in virtual teams, 172
Socialization dynamism, 173–177
Soft skills analysis, 180–181
Software packages, 124
Software upgrades, 124
Spiral conversion process, 110
Spy networks, 137
Stable operations phase, in ROD
arc, 102, 103
Stable technology integration, 297,
298, 326
Staff replacement
fallacy of, 113
vs. staff transformation, 4, 20
Standards, 307
CEO needs for, 307
lack of, 56–57
and reduced development
costs, 305
at Siemens AG, 200
Storyboarding process, 358
at Siemens, 198
Strategic advocacy, 67
Strategic alignment, 45
Strategic innovation, 349
Strategic integration, xxviii, 42–48,
82, 187, 197, 201, 293, 341,
343, 361
and communities of practice, 78
consequential interoperability
and, 45
as foundation for organizational
transformation, 143
and need for increased cultural
assimilation, 230
as outcome of ROD, 48
shortening life-cycle maturation
through, 44
Strategic learning, 65, 110, 349
Strategic performance, 342, 343
improving through organizational
learning, 63
394 Index
Strategic thinking
by chief IT executives, 290
importance to chief IT executive
role, 292
shortage of time for, 293
Strategy, see Business strategy
Strategy map, 148, 151–158
Supervisors, 112
Supply chain executives, 295
Support, enlisting, 6–7
Supporter functions, 58, 113,
312, 346
and organizational
transformation, 144
and perception of IT, 188
at product maturity, 61
SWAT teams, 13
System upgrades, 124, 125
Systems thinking, 1, 83, 89, 94,
123, 347
by executives, 114
progression to, 354–355
T
Tacit knowledge, 361
challenges for COP virtual
organizations, 172
in e-mail communications, 171
IT manager practice at
transforming, 197
mapping to ROD, 119, 174–176
protection by technology, 222
role in knowledge
management, 118
transformation to explicit product
knowledge, 223, 236
translating to explicit forms, 169
and virtual teams, 175–176
Talk, and discourse, 90
Talk-action cycles, 96
application to virtual teams, 178
role of persuasion in, 180
Teachers, as facilitators, 127
Techies, stereotyping as, 21
Technical knowledge, need for
up-to-date, 125
Technical resources, strategic
integration into core
business units, 19
Technological acceleration, xxiv, 41,
43, 66, 72, 208, 296, 307
enabling organizations to cope
with, 45
in Ravell case study, 152
Technological dynamism, xxiv,
41–42, 66, 209, 210, 340,
343, 362
as 21st-century norm, 178
self-management
requirements, 128
at Siemens AG, 193
Technological proficiency, as staff
job requirement, 211
Technology, xxxii
aligning with business
strategy, 149
basing on quality of business
plan, 212
benefits at ICAP, 222–223
centrality to competitive
strategy, 348
CEO conceptual knowledge
of, 103
challenges of strategic use, xxii
as change agent, 70, 195
commoditization of, 224
as commodity, 207
and communities-individuals
relationships, 76
and competitive advantage, 72
as component of discourse,
xxvicontribution to
learning-knowledge-value
chain, 236
as driver of business strategy, xxiii
395Index
as driver of organizational
transformation, 206
as driver of virtual team
growth, 163
effects on discourse, 94
effects on legacy systems, 47
evolution of, 223
executive need to recognize
instability of, 199
expansion benefits, 223
failure to result in improved
ROI, 69
feasibility stage, 87
flexibility benefits, 223
impact on ICAP business, 204
impatience with evolution of, 202
implementation risks, 126
impossibility of predicting impact
of, 83
increasing organizational
learning through, 68
as independent variable, 43
integration of business
implementation, 314,
325–326
as internal driver, 42
knowledge creation by, 223
learning maturation with, 100
linking to learning and
performance, 71
multiplicity of business
implementations, 325
multiplicity of business
perspectives, 314
and need for interaction, 142
need to integrate into
organizational
learning, xviiiongoing
implementation of, 349
perception as support function,
206
phased-in implementation,
149–150
role in knowledge
management, 117
strategic uses, 315–316
in TQM, 140
unpredictability of, 41
untested, 56
variability of, 236
as variable, xxvii, 41, 112, 235,
311, 340
Technology acceleration, 13, 20, 47
Technology-based organizations, xviii
Technology business cycle, 52, 63
evolution phase, 52, 57
feasibility phase, 52, 53
garbage can model of IT value, 54
implementation phase, 52, 55–57
measurement phase, 52–54
planning phase, 52, 54–55
stages of, 52
Technology business
implementations,
multiplicity of, 325
Technology cognition, 298–300
Technology competence, 300
by chief IT executives, 297
Technology concepts, 318
for CEOs, 316
Technology definitions branding,
358–359
Technology evaluation, 149
Technology for technology’s sake, 26
Technology implementation
competence for middle
managers, 325
stability of, 326
Technology implementation
competence/recognition, by
middle managers, 325
Technology investment, as
normative process, 348
Technology leadership, 298
by chief IT executives, 298
Technology life cycle, xxiv, xxvii, 346
396 Index
Technology perspectives,
multiplicity of, 297
Technology proficiency, by chief IT
executives, 291
Technology project leadership, 326
Technology projects
reasons for failure, 310
risks to success, 125
Technology road map, 342, 343
Technology strategy map, 151
Technology users, three types of,
54–55
Telephone brokers, 224
electronic trading as supplement
to, 209
at ICAP, 204
Teleworkers, 81
Theft, 336
Three-tier organizational
structure, 113
Throughput improvements, at
ICAP, 213
Time zones, virtual team
challenges, 177
Timeliness
barriers to, 69
issues with IT projects, 74
Timing, and learning
maturation, 104
Tool-talk, 93, 95, 181, 361
Top-down strategy introduction,
xxix, 214, 235, 345
at Siemens, 188, 192
Total quality management (TQM),
technology in, 140
Training
for CIOs, 202
and documentation, 126
inadequacy of, 14
limitations of IT-based, 125
for Siemens CIOs, 196
for virtual team COPs, 173, 177
Transformation, vs. change, 141
Transformative learning, 142
Trust
based on corporate honesty, 210
in communities of practice, 197
organizational movement toward,
12–14
Twitter, 135
Type of talk containers, 95, 181
virtual team applicability, 182
U
Uncertainty, in technology, 77
Unemployed workers, without
rights, 346
Unpredictability, xxi
User interface, 359
User level, 359
V
Value-added services, 232
Variation, and organizational
transformation, 143
Velocity fluxes, 122
Version control, 124
Videoconferencing, 81
Vince’s reflection matrix, 354
Virtual teams, xxx, 163, 359
combination and, 171–172
combination dynamism in, 173
communication failures in, 164
communities of practice with,
170–171
contract administration, 164
cultural and language
barriers, 163
distorted perceptions in, 166
executive support for, 174
externalization and, 169, 171
externalization dynamism in, 172
internalization and, 171
internalization dynamism in, 173
397Index
lack of individual development in,
165–166
management of, 19, 24, 164, 166
marginalization of nonadaptive
members, 169
multi-company challenges, 177
multiple identities in, 179
multiple location challenges, 164,
166–178
need for documented
processes, 177
need for individual
development, 344
need for mature individuals
in, 185
operating differences from
traditional teams, 168
outsourcing in, 177–178
quality checkpoints for, 164
readiness for participation, 173
socialization and, 172
socialization dynamism in,
173–174, 177
soft skills assessment challenges,
180–181
status, 165–166
as subset of organizations, 167
tacit knowledge and, 175–176
and three-dimensional
ROD, 167
transient nature of members, 168
W
Web, 359
Women-centric
communication, 138
Worldviews, and virtual teams, 176
Y
Y2K event, 214, 218, 359
Z
Zero latency, 43
http://taylorandfrancis.comCoverHalf TitleTitle PageCopyright
PageContentsForewordAcknowledgments Author Introduction1:
The “Ravell” CorporationIntroductionA New ApproachThe
Blueprint for IntegrationEnlisting Support Assessing
ProgressResistance in the RanksLine Management to the
RescueIT Begins to ReflectDefining an Identity for Information
TechnologyImplementing the Integration: A Move toward Trust
and ReflectionKey Lessons Defining Reflection and Learning
for an Organization Working toward a Clear Goal Commitment
to Quality Teaching Staff “Not to Know” Transformation of
Culture Alignment with Administrative
DepartmentsConclusion2: The IT DilemmaIntroductionRecent
BackgroundIT in the Organizational ContextIT and
Organizational StructureThe Role of IT in Business
StrategyWays of Evaluating ITExecutive Knowledge and
Management of ITIT: A View from the TopSection 1: Chief
Executive Perception of the Role of ITSection 2: Management
and Strategic IssuesSection 3: Measuring IT Performance and
ActivitiesGeneral ResultsDefining the IT DilemmaRecent
Developments in Operational Excellence3: Technology as a
Variable and Responsive Organizational
DynamismIntroductionTechnological DynamismResponsive
Organizational DynamismStrategic IntegrationSummaryCultural
AssimilationIT Organization Communications with
“ Others” Movement of Traditional IT StaffSummaryTechnology
Business
CycleFeasibilityMeasurementPlanningImplementationEvolution
Drivers and SupportersSantander versus Citibank Information
Technology Roles and ResponsibilitiesReplacement or
Outsource4: Organizational Learning Theories and
TechnologyIntroductionLearning OrganizationsCommunities of
PracticeLearning Preferences and Experiential LearningSocial
Discourse and the Use of LanguageIdentitySkillsEmotionLinear
Development in Learning Approaches5: Managing
Organizational Learning and TechnologyThe Role of Line
ManagementLine ManagersFirst-Line
ManagersSupervisorManagement VectorsKnowledge
ManagementChange Management Change Management for IT
OrganizationsSocial Networks and Information Technology6:
Organizational Transformation and the Balanced
ScorecardIntroductionMethods of Ongoing EvaluationBalanced
Scorecards and DiscourseKnowledge Creation, Culture, and
Strategy7: Virtual Teams and OutsourcingIntroductionStatus of
Virtual TeamsManagement ConsiderationsDealing with Multiple
LocationsExternalizationInternalizationCombinationSocializatio
nExternalization DynamismInternalization
DynamismCombination DynamismSocialization
DynamismDealing with Multiple Locations and
OutsourcingRevisiting Social DiscourseIdentitySkillsEmotion8:
Synergistic Union of IT and Organizational
LearningIntroductionSiemens AGAftermathICAPFive Years
LaterHTCIT History at HTCInteractions of the CEOThe
ProcessTransformation from the TransitionFive Years
LaterSummary9: Forming a Cyber Security
CultureIntroductionHistoryTalking to the BoardEstablishing a
Security CultureUnderstanding What It Means to Be
CompromisedCyber Security Dynamism and Responsive
Organizational DynamismCyber Strategic IntegrationCyber
Cultural AssimilationSummaryOrganizational Learning and
Application DevelopmentCyber Security RiskRisk
ResponsibilityDriver /Supporter Implications10: Digital
Transformation and Changes in Consumer
BehaviorIntroductionRequirements without Users and without
InputConcepts of the S-Curve and Digital Transformation
Analysis and Design Organizational Learning and the S-
CurveCommunities of PracticeThe IT Leader in the Digital
Transformation EraHow Technology Disrupts Firms and
IndustriesDynamism and Digital DisruptionCritical Components
of “ Digital” Organization Assimilating Digital Technology
Operationally and CulturallyConclusion11: Integrating
Generation Y Employees to Accelerate Competitive
AdvantageIntroductionThe Employment Challenge in the Digital
EraGen Y Population AttributesAdvantages of Employing
Millennials to Support Digital TransformationIntegration of Gen
Y with Baby Boomers and Gen XDesigning the Digital
EnterpriseAssimilating Gen Y Talent from Underserved and
Socially Excluded PopulationsLanger Workforce Maturity
ArcTheoretical Constructs of the LWMAThe LWMA and Action
ResearchImplications for New Pathways for Digital
TalentDemographic Shifts in Talent ResourcesEconomic
SustainabilityIntegration and TrustGlobal Implications for
Sources of TalentConclusion12: Toward Best
PracticesIntroductionChief IT ExecutiveDefinitions of Maturity
Stages and Dimension Variables in the Chief IT Executive Best
Practices ArcMaturity StagesPerformance DimensionsChief
Executive OfficerCIO Direct Reporting to the
CEOOutsourcingCentralization versus Decentralization of
ITCIO Needs Advanced DegreesNeed for StandardsRisk
ManagementThe CEO Best Practices Technology ArcDefinitions
of Maturity Stages and Dimension Variables in the CEO
Technology Best Practices ArcMaturity StagesPerformance
DimensionsMiddle ManagementThe Middle Management Best
Practices Technology ArcDefinitions of Maturity Stages and
Dimension Variables in the Middle Manager Best Practices
ArcMaturity StagesPerformance DimensionsSummaryEthics and
Maturity13: ConclusionIntroductionGlossaryOrganizational
Learning DefinitionsReferences Index
Running Head: DATA COLLECTION 1
DATA COLLECTION 7
DATA COLLECTION
Student Name:
Tanisha Hannah
Institution Affiliation:
Strayer University
Course:
Edu 571
Date:
March 8, 2020
Data collection is the process of gathering information that is
relevant to act as evidence on a research project. People use
diverse sources so that they can get enough data concerning
their research to act as authentic and reliable data for them.
There are different forms of data collection that a researcher
might implement for their research topic. This paper will focus
on discussing three sources that will be expected to be used
during the evaluation process, seven open-minded interview
queries to present to the target population, the issues that might
be encountered in data collection and recommendation on how
to maintain effective communication skills.
The evaluation process for “gender equity for girls in math”
will depend on three different data sources that incorporate the
primary, secondary and tertiary sources. Primary sources are the
documents, diary or other initial sources of information that is
created as well as serves as the original source of data for the
research topic (Schindler, 2019). Primary sources of data are
important and rely on the survey mechanism to gather
information. In this research, the primary source of data will
comprise of interviews using emails, telephones as well as face
to face communication, designed questionnaires, statistical
decretive writings, eyewitness accounts and legal documents.
All this kind of primary data are necessary in the evaluation
procedure of the research program.
The secondary sources that will be used incorporate the program
records, data collected from other researches and government
databases. The secondary sources depend on the data that is
already existing and has already been gathered and supports the
primary data. On the other hand, the tertiary sources of
information are mostly utilized in the evaluation process
because it offers information on the research topic. The tertiary
sources include textbooks, encyclopedia, dictionaries and
handbooks. These three sources of data are the best sources and
main sources to include in a research to ensure that a research
meets the requirements of a research paper. These three sources
will offer information on gender equality when it comes to math
for the girls/females.
The research will also incorporate some open-ended interview
question that will help in acquiring more information
concerning the program “gender equity for girls in math.”
Through utilization of interviews, I believe that there will be an
in-depth understanding of this issue as it has been an issue of
concern for a long period of time (Schindler, 2019). The use of
interview will assist in the process of evaluation. The questions
are formulated based on the programs need to collect relevant
information from diverse individuals. The following interview
question will be addressed:
1. What is the meaning “gender equity for girls in math”?
2. How are these programs useful in schools?
3. How can this program be implemented in most of our
schools?
4. What are the pitfalls of this program?
5. How do most of the institution perceive this program?
6. What should be done to advance this program?
7. What methods can be used to implement “gender equity for
girls in math”?
These question are important for one to realize the importance
of this program in our current curriculum or in our institution.
“Gender equity for girls in math” is an issue that need to be
addressed and the program is the best for ensuring that it has
been upheld. Not until schools understand the important of this
issue being addressed so that girls might feel comfortable and
change their perception about mathematics.
In the process of gathering data through collecting, compiling,
interpreting, and reporting the data, one might face various
challenges. “Schindler (2019) affirms that the population may
fail to participate in the questionnaire and fail to respond to the
questions in truth.” One of the reason why people might respond
with untrue information in the questionnaire is when they feel
that the question being act affect their personal lives. Due to
gender biasness people might also fail to participate on the
questionnaire or offer biased information regarding the
questions presented. Men do not like feeling inferior and if they
do not view thing with an open mind they fail to offer true
information.
There is also an issue when compiling data; one might face
some difficulty when the information offered is not enough or
might not meet the scope of discussion which might mean the
information is not reliable (Mertler, 2016). During the process
of interpreting data, there might be misunderstanding regarding
what information is true and what data to rely on. When
reporting data the information might be unreliable and the
information presented might be inaccurate. So many challenges
that an individual might face during the research, which might
make the information irrelevant or inaccurate (Quinlan et al,
2019).
Stakeholders participate in a relevant role in the process of
program evaluation through making the necessary contribution
that facilitate the process. In the process of gathering and
reporting data, it is important to communicate with the
stakeholders. “Shamseer (2015) confirms that reports can also
be presented through visual and oral form through news,
presentations, posters, and exhibit. These two methods are
useful in providing reports for the process. Even more, a
combination of both written and visual reports is essential and
will help provide sufficient information about the process
(Bryman, 2016)” These individuals need to be educated on what
is going on, incorporating sources of information and the
methods of collecting data. The education regarding data
collection will create a deeper understanding of the procedure
for collection data which the stakeholder can be incorporates in
the process of decision making. Stakeholders need to be in the
meetings as well ensure that they comprehend the things
happening and let them participate in discussions (Bell &
Harley, 2018). “Apart from that, it is vital to promote
transparency by providing regular updates to shareholders and
don’t assume that communication is fluid. This will help reduce
friction in the organization and strengthen the relationship with
stakeholders. Shamseer (2015)”
Conclusion
There are different forms of data collection that a researcher
might implement for their research topic. The evaluation
process for “gender equity for girls in math” will depend on
three different data sources that incorporate the primary,
secondary and tertiary sources. There is also an issue when
compiling data; one might face some difficulty when the
information offered is not enough or might not meet the scope
of discussion which might mean the information is not reliable.
. Due to gender biasness people might also fail to participate on
the questionnaire or offer biased information regarding the
questions presented. Stakeholders participate in a relevant role
in the process of program evaluation through making the
necessary contribution that facilitate the process. In the process
of gathering and reporting data, it is important to communicate
with the stakeholders.
References
Bell, E., Bryman, A., & Harley, B. (2018). Business research
methods. Oxford university press. Retrieved from
https://books.google.com/books?hl=en&lr=&id=J9J2DwAAQBA
J&oi=fnd&pg=PP1&dq=research+methods&ots=GLhxgiaVHK&
sig=niAHRKqByydlPm9U-nTrddGXjck
Bryman, A. (2016). Social research methods. Oxford university
press. Retrieved from
https://books.google.com/books?hl=en&lr=&id=N2zQCgAAQB
AJ&oi=fnd&pg=PP1&dq=research+methods&ots=doQuFYN9uc
&sig=7uoYc3Ycbyf15xNuPRx4sRlxtjc
Ghauri, P., Grønhaug, K., & Strange, R. (2020). Research
methods in business studies. Cambridge University Press.
Hennink, M., Hutter, I., & Bailey, A. (2020). Qualitative
research methods. SAGE Publications Limited.
Lindlof, T. R., & Taylor, B. C. (2017). Qualitative
communication research methods. Sage publications.
Mertler, C. A., (2016). Action research: Improving schools and
empowering educators. Sage Publications.
Palinkas, L. A., Horwitz, S. M., Green, C. A., Wisdom, J. P.,
Duan, N., &Hoagwood, K. (2015). Purposeful sampling for
qualitative data collection and analysis in mixed method
implementation research. Administration and Policy in Mental
Health and Mental Health Services Research, 42(5), 533-544.
Quinlan, C., Babin, B., Carr, J., & Griffin, M. (2019). Business
research methods. South Western Cengage. Retrieved from
https://books.google.com/books?hl=en&lr=&id=sPJFDwAAQB
AJ&oi=fnd&pg=PT20&dq=research+methods&ots=wloptEVyG2
&sig=WLeGnkcwc6LsYbDjRKWMrksS80k
Schindler III, A. R. (2019). System and method for managing
sample collection data and documentation. U.S. Patent
Application No. 10/198,676.
Shamseer, L., Moher, D., Clarke, M., Ghersi, D., Liberati, A.,
Petticrew, M., ... & Stewart, L. A. (2015). Preferred reporting
items for systematic review and meta-analysis protocols
(PRISMA-P) 2015: elaboration and explanation. BMJ, 349,
g7647
Running Head: EDUCATIONAL PROGRAM EVALUATION1
EDUCATIONAL PROGRAM EVALUATION5
EDUCATIONAL PROGRAM EVALUATION
Name:
Tanisha Hannah
Date:
February 12, 2020
Institution:
Strayer University
Instructor:
Dr. Jacob
Educational program evaluation
Change either as an individual or in an institution setting is not
an easy and simple thing and mostly involves numerous stages
of transition or misunderstandings prior to being fully
implemented as per the expectations. A planned approach
involves the development of a model which illustrates the stages
in the process of transition that illustrate how an institution is
anticipated to adapt to the changes that are made. The approach
is very important as one is dealing with evaluation of the
effectiveness of certain changes as it gives a clear picture of
what the real situation is and how institutions has either failed
or succeed in implementing changes through any created
program (Smith, 2017). Evaluation involves the systematic
investigation of the merit, worth or significance of a project.
The planned approach helps in ensuring that one has a step by
step process which illustrates the expectations and thereby
making the evaluation process much easier and simpler.
According to the recent research on the planned approach most
of the organizations in the world have spared millions of money
that they spend on evaluation of change projects through using
the planned approach. The technique has enabled firms to
follow up on their organizational change and to be able to
determine the capability of the corporate in adopting the
implemented changes and determining the significance of these
changes. It has allowed firms to be able to effectively solve the
challenges that arise during the transitioning process as well as
to acquire optimal benefits from their change programs
(Kerzner, 2017). The planned approach helps in guiding
organizations in the operations so as to minimize problems that
result from lack of effective communication and failure of
reinforcing the desired behaviors. In addition, the technique
helps in pointing out the expectations of the firms to employees
as well as other individuals who might be involved in the
process of transitioning. The planned approach is very simple
and mechanistic and therefore this implies that any firm be it a
small business, medium or large firms can be able to effectively
use it to achieve their desired outcomes as well as to monitor
the transition process to ensure that the outcomes gotten are the
desired ones. The planned approach is mostly applicable in
evaluation of school programs as it offers a step by step process
showing the transition and the anticipated outcomes in every
stage (Horton, 2018).
In order to conduct a need assessment, the evaluator has to find
solutions to questions such as: What are the needs of the target
population? What specific services are needed in the education
program? What are the characteristics of the target population?
What arrangements could be used to provide the needed
mechanisms? Moreover, ensuring that the developed program
addresses the current issues is important. Therefore, one has to
evaluate the program through answers questions such as: Is the
program meeting the set objectives? How does the targeted
population interact with the program? Are the services provided
by the program satisfactory to the target population? What are
the perspectives of the personnel, administration and
organization regarding the program? Finally, one evaluates the
outcomes of the program are met through answering the
questions: What benefits does the services and activities in the
program yield? Is the target population being affected by the
program in a negative way? Does the program solve the problem
which caused change to be proposed? Is the program efficient in
yielding the required outcomes? (Vedung, 2017).
In order to ensure that a program is efficient in solving the
problem which demands for change, evaluation of efficiency of
the program is very essential. Therefore, one has to understand
how the program is helping meet the needs of the targeted
population and the services which are offered by the program in
ensuring that all people are benefiting from it. One has to list
the needs of the population and match them with the services
offered by the program so as to ensure that no one is left out by
the program and to make sure that the program does not have
services which do not concern the intended population
(Beecher.et.al, 2017). The evaluation process checks how the
program is operating an also points out any negative effects
which might be caused by the program. In addition, assessment
of the outcomes helps in bringing out a clear picture of how the
program is actually ensuring that the set goals are achieved.
In evaluating the school programs, the stakeholders who are
involved are the teachers, students, parents, administrators,
staff members as well as the community members. These are the
people who are concerned with the welfare of the school and
therefore they should be involved in the development of
education programs so that to ensure that their needs and
perceptions are considered in the process of creating the
program (Gates, 2017). This ensures that all stakeholders are
able to determine what is expected of them and how the
program will help make the society better. In order to obtain
their involvement in this process, their views should be derived
in the social activities that help address the social problems in
communities.
References
Beecher, B., Arthur, L., Death, E., Dockett, S., & Farmer, S.
(2017). Programming and planning in early childhood settings.
Cengage AU.
Gates, E. F. (2017). Learning from seasoned evaluators:
Implications of systems approaches for evaluation
practice. Evaluation, 23(2), 152-171.
Horton, D. (2018). SysCom Program Evaluation 2017.
Kerzner, H. (2017). Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
Smith, R. D. (2017). Strategic planning for public relations.
Routledge.
Vedung, E. (2017). Public policy and program evaluation.
Routledge.
Running Head: PROGRAM EVALUATION 1
PROGRAM EVALUATION6
Program Evaluation
Name:
Tanisha Hannah
Institute Name:
Strayer University
Course title:
EDU 571 Evaluating School Programs
Professor:
Antony Jacob
Date of Submission:
January 26, 2020
Program Evaluation Plan
Introduction
No matter which level of education one is attaining, they are
bound to face many such issues that need proper addressing.
That is why several such programs are launched that bring
useful awareness and causes the students to come forth with
their issues and solutions. In the same spirit, an educational
program is being initiated here that is going to be very helpful
for all students regardless of their age, course, and department.
The educational program that has been picked today is for the
Masters Level students and the program name is gender equity
for girls in math. This program's all features will be discussed
underneath and one will get a complete review of what this
program is about and how it is going to occur.
Main Elements
The main element of the program "gender equity for girls in
Math" is something that needs urgent addressing. Females
students are no less intelligent than male students and they have
been excelling in every field just as any male peers. But then
why it is that not many girls are seen to be excelling in the math
field. Though, there are certain fields of science in which girls
are known to be more enthusiastic to join such as medicine. But
the purpose of this program is to evaluate why it is so that girls
are reluctant to join math when there are numerous options in
comparison to medicine is present here.
Through the following three main parts, the importance of this
educational program research will be understood.
Type – this program is ideal because the need to have female
intelligence in the math field is being felt. The program is a
student’s program, to bring awareness to them and raise self-
consciousness among students especially females. Also, the
influence and role fellow male peers can play is highlighted and
highly expected.
Department administrating – the department that will be
administrating it will be the student's council, department of
Math. It is used to the urgency of the matter that these
departments have pressed the issue to be raised and they are
more than willing to come forward to guide the female students
about the bright future opportunities they somehow lack or how
to find appealing, related to math.
Target population – the expected population target is students of
Masters Level as they are at such point of their educational
career that the majority of them tend to opt for jobs right after.
They need assurance and guidance and that is why this program
is initiated.
History
It has been observed that girls happen to be very hardworking
(more than boys) and once they set their minds on something,
nothing can beat them. Girls are loyal to their studies (at least
the majority of them) and they want to excel to prove to the
world. The main reason behind such a notion is that the world
has been unfair and cruel to females when their education or
jobs come. Workplace discrimination and academic hostility are
something everyone is fully aware of.
That is why girls have the passion to prove that they are no less
than anyone. They can do anything, at any time. But despite
such passion and hard work, not many girls are seen joining the
Math field. Whether it is due to the self-doubt or not certain
about the future options, girls have never looked at these fields
as something they want first handed. History has proven that
many females were excellent mathematicians such as Sofya
Kovalevskaya (1850 - 1891) and Emmy Noether (1882- 1935)
and many others like them.
But recently, not many females’ contribution is noted in the
field of math and it is high time to bring this to their knowledge
that girls are equally suitable for the field of math and they can
do wonders in them as well.
Purpose of the Program and Expectation
It is expected that through these programs, female students will
realize what they are missing and how they can catch up on
years of missing. The field of math is just as interesting as any
other field, maybe more, no doubt they demand more mental
strength and stability of senses but this is something females are
more aware of than any other person. Therefore, it is expected
that girls will do wonderful achievements once they join this
field and take them to new heights.
Why this program was selected
The field of math is missing the contributions of girls. When
evaluated this issue, it was found that girls are reluctant to join
them due to the uncertainty, the unseen hardship, and not
knowing whether this field is right for them or not. Through this
program, female students will realize that these two fields are
just like any other field and they can join them and perform
excellently.
Advantages of this program
Through this program, girls will realize the importance of the
math field and hopefully become eager to join it. other
advantages besides the obvious one are as under:
· Self-evaluation about strengths and weaknesses
· Mental strength and challenging qualities and abilities are
tested
· Any issue can be discussed with the students' council
· Meetings can be arranged with the math department.
· Meetings will those who are completing masters in math can
be arranged.
· A self-assurance course will be held.
Issues and solutions
Though this program is very straight forward and idealistically,
it would not face any issue but few are unavoidable. They are as
under:
· Girls would be reluctant to talk about vulnerabilities
· Awkward long silences when a discussion of why girls are not
joining is expected.
· Shyness can be observed
· Societal pressure does play its role
· The pressure on girls is more than ever as we are entering in a
new era. They need to be sure and this makes them vulnerable
and reluctant to talk about feelings
· Some strong opinions will be heard
· Harsh comments and opinions and suggestions will emerge.
To avoid such a situation, it would be better to ensure that there
is no pressure and it must all be run like any other program.
Girls should be expected to come forward and express
themselves in a friendly and cooperating environment.
References:
Fennema, E. (1979). Women and girls in mathematics—Equity
in mathematics education. Educational studies in
mathematics, 10(4), 389-401.
Meece, J. L., Parsons, J. E., Kaczala, C. M., & Goff, S. B.
(1982). Sex differences in math achievement: Toward a model
of academic choice. Psychological Bulletin, 91(2), 324.
Rees, T. (2011). The gendered construction of scientific
excellence. Interdisciplinary Science Reviews, 36(2), 133-145.
Yazilitas, D., Svensson, J., de Vries, G., & Saharso, S. (2013).
Gendered study choice: A literature review. A review of theory
and research into the unequal representation of male and female
students in mathematics, science, and technology. Educational
research and evaluation, 19(6), 525-545.

Running head PROGRAM EVALUATION PLAN1PROGRAM EVALUATION PLAN.docx

  • 1.
    Running head: PROGRAMEVALUATION PLAN1 PROGRAM EVALUATION PLAN10 Program Evaluation Plan Name: Tanisha Hannah Institution: Strayer University Professor: Dr. Jacob Course: Edu 571 Date: March 2, 2020 Program Evaluation Plan (Part 3) Goals of Evaluation Evaluation refers to the act of checking various things thoroughly in order to characterize their worth or value, with reference to a certain context. In the field of education, the
  • 2.
    amount of successin a person’s aims can only be determined through evaluation. Therefore, there is a very close relationship between various aims and evaluation. The main goals of evaluation in schools are as discussed below. The first goal of evaluation in the field of education is to create an educational program ("Evaluation in Teaching and Learning Process | Education", 2020). Through evaluation, evaluators and the school management can build a given program of learning among the students. This is after gathering and checking various factors in order to find what program will fit and make a positive impact in the school. This involves consulting all the stakeholders of the program and developing strategies that will ensure the development of a good program. The second goal of evaluation is assessing the effectiveness of the program. Evaluation ensures that the developed program is up to standards and serves the purpose that it was intended to. It helps the evaluators to check if the teaching strategies and techniques are being applied properly. The third goal of evaluation is to ensure improvement of the program. Through evaluation, evaluators can gauge the impact of the program on the school and learners. They can also identify various things that can make the program more effective. It acts as an in-built monitor in the program in order to review the progress of the program from time to time. It also gives feedback regarding the design and the implementation of a given program. Through such assessments, the school management can know where to work on, and what they need in order to enhance effective programs in teaching and learning. For instance, in our case, evaluators can comfortably tell whether or not the program is helping girls become more superior in math. If not they can suggest better or other strategies that will make positive impact. Cultural Issues Affecting the Program Culture can influence how different people view things. An individual’s culture and upbringing can affect their way of processing information. Among the cultural issues that might be
  • 3.
    faced in theevaluation plan include cultural stereotypes. Some students believe that they cannot perform as expected in school or in a particular subject due to lack of preparation from their home environment. This makes them believe they do not have enough potential to do well in a given subject when they get to school. For instance, some students may not have calculators and revision materials for mathematics at home. This makes them poor in calculations and solving complex problems due to poor practice (Gelb, 2020). As a result, some students get to school lacking various basics and lag behind due to deficiencies in their homes. This also makes them to have shortcomings in knowledge and skills that lead to poor performances. However, this can be corrected by using time wisely while in school and utilizing the resources in the school premises properly to improve their skills by doing regular practice. Another cultural issue is assumption and poor treatment of learners by teachers. Some teachers expect very less from learners from specific cultural backgrounds. When teachers have the mentality of students performing poorly for whatever reason, their teaching approaches align with their low expectation levels. This may affect the program negatively because no matter how much girls try to improve in math, their teachers have already formed a negative perspective. The teachers may not find it important to motivate the students to do well in math because they do not believe they have that potential. This can be solved by helping teachers and students change mentalities that have been developed and associated with their cultures. Different people have different capabilities and can handle things their own way if properly directed. Another issue that may affect the evaluation program is cultural differences between students. Some students believe that only people from a certain background can perform better in a certain subject. People from various cultural traditions may have different education approaches that differ from the approaches in American schools ("Current Issues in Education",
  • 4.
    2020). It isimportant for the teachers to note such things and encourage students to work hard in all areas despite their differences in cultural beliefs. Students should not feel inferior because of being associated with various cultures. They should acknowledge they have what it takes and the ability to perform better in all areas. Teachers should understand the cultures of every student, and their students at an individual level. Teachers should treat all students the same despite their gender, racial or cultural backgrounds, and have high expectations for everyone in order to enable them to strive and reach their full potential. Data Analysis and Assessment The evaluation plan will be carried out using stratified random sampling. This sampling technique involves diving the study population into meaningful similar groups based on a specific characteristic called strata. Thereafter, a random sample is selected from every group. This type of sampling ensures proper representativeness on a trait of interest in the population. Through this sampling method, a wider range of population can be well studied without a large sample size. The evaluation plan will use three methods of assessment which are formative, summative and process assessment. We will begin the program with process assessment. Process assessment identifies the milestone of the project, activities to be done, products to be expected, and the costs that are likely to be incurred in order to achieve the goals. Formative assessment is whereby the results are used to form and revise the process of an education plan. In case the plan needs any improvement or ways of strengthening it, formative assessment will help us identify that. Summative assessment helps in documenting outcomes and value judgment. Through summative assessment, we will have the necessary feedback about the quality of the plan. The initiation and implementation of the program will take three to four weeks. Evaluation will begin after three to four months through data collection and proper assessment.
  • 5.
    Tasks, Costs Personnel,and Questions Involved in the Plan TASKS COSTS QUESTIONS FOR THE INTERVIEW PERSONNEL · Data analysis costs · What were the former grades for the selected population? · Teachers · Data Analysis · Salaries for the Evaluators · What were the expected grades? · Evaluators · Presentation of the outcome · Transportation costs · What did you achieve? · Students · How was it competing with boys for the first time? · Did the program motivate you? · Do you have a different perspective on Math after the
  • 6.
    program? Evaluation Timeline Project Goal Activity Activity ExpectedCompletion Date Continue conducting process evaluation for the program on gender equity for girls in Math Monitoring the operations of the evaluation program Conduct visits to review program operations May-20 Continue conducting evaluation of the outcome Complete data collection for the group under study work with the female students for the program success May-20 Finalize collecting data procedures for the control group collect data on culture and personal perspectives Jun-20 Access the information sources for data collection follow up on the measures of outcome for the experimental groups Extract data Jun-20
  • 7.
    Sample case trackingand interviewing Extract data Jul-20 Build and implement data analysis and reporting initial plans Conduct data analysis and reports Jul-20 Release the final outcome Give a final report about the program Organize the reports for final presentation Aug-20 Expected Costs The expected costs for the project include: $ 20,000 for data collection $ 10,000 for data analysis $ 50,000 for paying evaluators $ 30, 000 for transport $ 10,000 miscellaneous The total cost of the plan will be $ 120, 000. Cost benefit analysis is a method used in comparing the total costs of a program with its benefits ("Cost Benefit Analysis: An Expert Guide | Smartsheet", 2020). It helps in the calculation of the benefit associated with the program. In this case, we might not be able to account for the benefit in terms of cash because the entire program is based on services. However, there will be cost reduction methods through assistance given by the teachers and the study population. The school will highly benefit from the program by acknowledging the importance of gender equity for girls in Math. They will realize the potential that girls have with regards to Math subject. This will help them improve their performance and start empowering fair competition among the learners.
  • 8.
    References Cost Benefit Analysis:An Expert Guide | Smartsheet. (2020). Retrieved 20 February 2020, from https://www.smartsheet.com/expert-guide-cost-benefit-analysis Current Issues in Education. (2020). Retrieved 20 February 2020, from https://www.cliffsnotes.com/study- guides/sociology/education/current-issues-in-education Evaluation in Teaching and Learning Process | Education. (2020). Retrieved 20 February 2020, from http://www.yourarticlelibrary.com/statistics-2/evaluation-in- teaching-and-learning-process-education/92476 Gelb, C. (2020). Cultural Issues in the Higher Education Classroom. Retrieved 20 February 2020, from http://www.inquiriesjournal.com/articles/661/cultural-issues-in- the-higher-education-classroom
  • 9.
    Information Technology and Organizational Learning ManagingBehavioral Change in the Digital Age Third Edition http://taylorandfrancis.com Information Technology and Organizational Learning Managing Behavioral Change in the Digital Age Third Edition Arthur M. Langer CRC Press Taylor & Francis Group 6000 Broken Sound Parkway NW, Suite 300 Boca Raton, FL 33487-2742 © 2018 by Taylor & Francis Group, LLC CRC Press is an imprint of Taylor & Francis Group, an Informa business
  • 10.
    No claim tooriginal U.S. Government works Printed on acid-free paper International Standard Book Number-13: 978-1-4987-7575-5 (Paperback) International Standard Book Number-13: 978-1-138-23858-9 (Hardback) This book contains information obtained from authentic and highly regarded sources. Reasonable efforts have been made to publish reliable data and information, but the author and publisher cannot assume responsibility for the validity of all materials or the consequences of their use. The authors and publishers have attempted to trace the copyright holders of all material reproduced in this publication and apologize to copyright holders if permission to publish in this form has not been obtained. If any copyright material has not been acknowledged please write and let us know so we may rectify in any future reprint. Except as permitted under U.S. Copyright Law, no part of this book may be reprinted, reproduced, transmitted, or utilized in any form by any electronic, mechanical, or other means, now known or hereafter invented, including photocopying, microfilming, and recording, or in any information stor- age or retrieval system, without written permission from the publishers. For permission to photocopy or use material electronically from this work, please access www.copy- right.com (http://www.copyright.com/) or contact the Copyright
  • 11.
    Clearance Center, Inc.(CCC), 222 Rosewood Drive, Danvers, MA 01923, 978-750-8400. CCC is a not-for-profit organization that provides licenses and registration for a variety of users. For organizations that have been granted a photocopy license by the CCC, a separate system of payment has been arranged. Trademark Notice: Product or corporate names may be trademarks or registered trademarks, and are used only for identification and explanation without intent to infringe. Visit the Taylor & Francis Web site at http://www.taylorandfrancis.com and the CRC Press Web site at http://www.crcpress.com v Contents Foreword xi Acknowledgments xiii Author xv IntroductIon xvii chApter 1 the “rAvell” corporAtIon 1 Introduction 1 A New Approach 3 The Blueprint for Integration 5 Enlisting Support 6
  • 12.
    Assessing Progress 7 Resistancein the Ranks 8 Line Management to the Rescue 8 IT Begins to Reflect 9 Defining an Identity for Information Technology 10 Implementing the Integration: A Move toward Trust and Reflection 12 Key Lessons 14 Defining Reflection and Learning for an Organization 14 Working toward a Clear Goal 15 Commitment to Quality 15 Teaching Staff “Not to Know” 16 Transformation of Culture 16 Alignment with Administrative Departments 17 Conclusion 19 vi Contents chApter 2 the It dIlemmA 21 Introduction 21 Recent Background 23 IT in the Organizational Context 24 IT and Organizational Structure 24 The Role of IT in Business Strategy 25 Ways of Evaluating IT 27 Executive Knowledge and Management of IT 28 IT: A View from the Top 29 Section 1: Chief Executive Perception of the Role of IT 32 Section 2: Management and Strategic Issues 34 Section 3: Measuring IT Performance and Activities 35
  • 13.
    General Results 36 Definingthe IT Dilemma 36 Recent Developments in Operational Excellence 38 chApter 3 technology As A vArIAble And responsIve orgAnIzAtIonAl dynAmIsm 41 Introduction 41 Technological Dynamism 41 Responsive Organizational Dynamism 42 Strategic Integration 43 Summary 48 Cultural Assimilation 48 IT Organization Communications with “ Others” 49 Movement of Traditional IT Staff 49 Summary 51 Technology Business Cycle 52 Feasibility 53 Measurement 53 Planning 54 Implementation 55 Evolution 57 Drivers and Supporters 58 Santander versus Citibank 60 Information Technology Roles and Responsibilities 60 Replacement or Outsource 61 chApter 4 orgAnIzAtIonAl leArnIng theorIes And technology 63 Introduction 63 Learning Organizations 72 Communities of Practice 75
  • 14.
    Learning Preferences andExperiential Learning 83 Social Discourse and the Use of Language 89 Identity 91 Skills 92 viiContents Emotion 92 Linear Development in Learning Approaches 96 chApter 5 mAnAgIng orgAnIzAtIonAl leArnIng And technology 109 The Role of Line Management 109 Line Managers 111 First-Line Managers 111 Supervisor 111 Management Vectors 112 Knowledge Management 116 Ch ange Management 120 Change Management for IT Organizations 123 Social Networks and Information Technology 134 chApter 6 orgAnIzAtIonAl trAnsFormAtIon And the bAlAnced scorecArd 139 Introduction 139 Methods of Ongoing Evaluation 146 Balanced Scorecards and Discourse 156 Knowledge Creation, Culture, and Strategy 158 chApter 7 vIrtuAl teAms And outsourcIng 163 Introduction 163
  • 15.
    Status of VirtualTeams 165 Management Considerations 166 Dealing with Multiple Locations 166 Externalization 169 Internalization 171 Combination 171 Socialization 172 Externalization Dynamism 172 Internalization Dynamism 173 Combination Dynamism 173 Socialization Dynamism 173 Dealing with Multiple Locations and Outsourcing 177 Revisiting Social Discourse 178 Identity 179 Skills 180 Emotion 181 chApter 8 synergIstIc unIon oF It And orgAnIzAtIonAl leArnIng 187 Introduction 187 Siemens AG 187 Aftermath 202 ICAP 203 viii Contents Five Years Later 224 HTC 225 IT History at HTC 226 Interactions of the CEO 227
  • 16.
    The Process 228 Transformationfrom the Transition 229 Five Years Later 231 Summary 233 chApter 9 FormIng A cyber securIty culture 239 Introduction 239 History 239 Talking to the Board 241 Establishing a Security Culture 241 Understanding What It Means to be Compromised 242 Cyber Security Dynamism and Responsive Organizational Dynamism 242 Cyber Strategic Integration 243 Cyber Cultural Assimilation 245 Summary 246 Organizational Learning and Application Development 246 Cyber Security Risk 247 Risk Responsibility 248 Driver /Supporter Implications 250 chApter 10 dIgItAl trAnsFormAtIon And chAnges In consumer behAvIor 251 Introduction 251 Requirements without Users and without Input 254 Concepts of the S-Curve and Digital Transformation Analysis and Design 258 Organizational Learning and the S-Curve 260 Communities of Practice 261 The IT Leader in the Digital Transformation Era 262 How Technology Disrupts Firms and Industries 264 Dynamism and Digital Disruption 264 Critical Components of “ Digital” Organization 265 Assimilating Digital Technology Operationally and Culturally
  • 17.
    267 Conclusion 268 chApter 11IntegrAtIng generAtIon y employees to AccelerAte competItIve AdvAntAge 269 Introduction 269 The Employment Challenge in the Digital Era 270 Gen Y Population Attributes 272 Advantages of Employing Millennials to Support Digital Transformation 272 Integration of Gen Y with Baby Boomers and Gen X 273 ixContents Designing the Digital Enterprise 274 Assimilating Gen Y Talent from Underserved and Socially Excluded Populations 276 Langer Workforce Maturity Arc 277 Theoretical Constructs of the LWMA 278 The LWMA and Action Research 281 Implications for New Pathways for Digital Talent 282 Demographic Shifts in Talent Resources 282 Economic Sustainability 283 Integration and Trust 283 Global Implications for Sources of Talent 284 Conclusion 284 chApter 12 towArd best prActIces 287 Introduction 287 Chief IT Executive 288 Definitions of Maturity Stages and Dimension Variables in
  • 18.
    the Chief ITExecutive Best Practices Arc 297 Maturity Stages 297 Performance Dimensions 298 Chief Executive Officer 299 CIO Direct Reporting to the CEO 305 Outsourcing 306 Centralization versus Decentralization of IT 306 CIO Needs Advanced Degrees 307 Need for Standards 307 Risk Management 307 The CEO Best Practices Technology Arc 313 Definitions of Maturity Stages and Dimension Variables in the CEO Technology Best Practices Arc 314 Maturity Stages 314 Performance Dimensions 315 Middle Management 316 The Middle Management Best Practices Technology Arc 323 Definitions of Maturity Stages and Dimension Variables in the Middle Manager Best Practices Arc 325 Maturity Stages 325 Performance Dimensions 326 Summary 327 Ethics and Maturity 333 chApter 13 conclusIons 339 Introduction 339 glossAry 357
  • 19.
    reFerences 363 Index 373 http://taylorandfrancis.com xi Foreword Digitaltechnologies are transforming the global economy. Increasingly, firms and other organizations are assessing their opportunities, develop- ing and delivering products and services, and interacting with custom- ers and other stakeholders digitally. Established companies recognize that digital technologies can help them operate their businesses with greater speed and lower costs and, in many cases, offer their custom- ers opportunities to co-design and co-produce products and services. Many start-up companies use digital technologies to develop new prod- ucts and business models that disrupt the present way of doing busi- ness, taking customers away from firms that cannot change and adapt. In recent years, digital technology and new business models have dis- rupted one industry after another, and these developments are rapidly
  • 20.
    transforming how peoplecommunicate, learn, and work. Against this backdrop, the third edition of Arthur Langer’ s Information Technology and Organizational Learning is most welcome. For decades, Langer has been studying how firms adapt to new or changing conditions by increasing their ability to incorporate and use advanced information technologies. Most organizations do not adopt new technology easily or readily. Organizational inertia and embed- ded legacy systems are powerful forces working against the adoption of new technology, even when the advantages of improved technology are recognized. Investing in new technology is costly, and it requires xii Foreword aligning technology with business strategies and transforming cor- porate cultures so that organization members use the technology to become more productive. Information Technology and Organizational Learning addresses these important issues— and much more. There are four features of the new edition that I would like to draw attention to that, I believe, make
  • 21.
    this a valuablebook. First, Langer adopts a behavioral perspective rather than a technical perspective. Instead of simply offering norma- tive advice about technology adoption, he shows how sound learn- ing theory and principles can be used to incorporate technology into the organization. His discussion ranges across the dynamic learning organization, knowledge management, change management, com- munities of practice, and virtual teams. Second, he shows how an organization can move beyond technology alignment to true technol- ogy integration. Part of this process involves redefining the traditional support role of the IT department to a leadership role in which IT helps to drive business strategy through a technology-based learn- ing organization. Third, the book contains case studies that make the material come alive. The book begins with a comprehensive real-life case that sets the stage for the issues to be resolved, and smaller case illustrations are sprinkled throughout the chapters, to make concepts and techniques easily understandable. Lastly, Langer has a wealth of experience that he brings to his book. He spent more than 25 years as an IT consultant and is the founder of the Center for Technology
  • 22.
    Management at ColumbiaUniversity, where he directs certificate and executive programs on various aspects of technology innovation and management. He has organized a vast professional network of tech- nology executives whose companies serve as learning laboratories for his students and research. When you read the book, the knowledge and insight gained from these experiences is readily apparent. If you are an IT professional, Information Technology and Organi- zational Learning should be required reading. However, anyone who is part of a firm or agency that wants to capitalize on the opportunities provided by digital technology will benefit from reading the book. Charles C. Snow Professor Emeritus, Penn State University Co-Editor, Journal of Organization Design xiii Acknowledgments Many colleagues and clients have provided significant support during the development of the third edition of Information Technology and
  • 23.
    Organizational Learning. I owemuch to my colleagues at Teachers College, namely, Professor Victoria Marsick and Lyle Yorks, who guided me on many of the the- ories on organizational learning, and Professor Lee Knefelkamp, for her ongoing mentorship on adult learning and developmental theo- ries. Professor David Thomas from the Harvard Business School also provided valuable direction on the complex issues surrounding diver- sity, and its importance in workforce development. I appreciate the corporate executives who agreed to participate in the studies that allowed me to apply learning theories to actual organizational practices. Stephen McDermott from ICAP provided invaluable input on how chief executive officers (CEOs) can success- fully learn to manage emerging technologies. Dana Deasy, now global chief information officer (CIO) of JP Morgan Chase, contributed enormous information on how corporate CIOs can integrate tech- nology into business strategy. Lynn O’ Connor Vos, CEO of Grey Healthcare, also showed me how technology can produce direct mon- etary returns, especially when the CEO is actively involved. And, of course, thank you to my wonderful students at
  • 24.
    Columbia University. They continueto be at the core of my inspiration and love for writing, teaching, and scholarly research. http://taylorandfrancis.com xv Author Arthur M. Langer, EdD, is professor of professional practice of management and the director of the Center for Technology Management at Columbia University. He is the academic direc- tor of the Executive Masters of Science program in Technology Management, vice chair of faculty and executive advisor to the dean at the School of Professional Studies and is on the faculty of the Department of Organization and Leadership at the Graduate School of Education (Teachers College). He has also served as a member of the Columbia University Faculty Senate. Dr. Langer is the author of Guide to Software Development: Designing & Managing the Life Cycle. 2nd Edition (2016), Strategic IT: Best Practices for Managers and Executives (2013 with Lyle Yorks), Information Technology and Organizational Learning (2011), Analysis and Design of Information Systems (2007), Applied Ecommerce (2002), and The Art of
  • 25.
    Analysis (1997), and hasnumerous published articles and papers, relating to digital transformation, service learning for underserved popula- tions, IT organizational integration, mentoring, and staff develop- ment. Dr. Langer consults with corporations and universities on information technology, cyber security, staff development, man- agement transformation, and curriculum development around the Globe. Dr. Langer is also the chairman and founder of Workforce Opportunity Services (www.wforce.org), a non-profit social venture xvi Author that provides scholarships and careers to underserved populations around the world. Dr. Langer earned a BA in computer science, an MBA in accounting/finance, and a Doctorate of Education from Columbia University. xvii Introduction Background Information technology (IT) has become a more significant part
  • 26.
    of workplace operations, andas a result, information systems person- nel are key to the success of corporate enterprises, especially with the recent effects of the digital revolution on every aspect of business and social life (Bradley & Nolan, 1998; Langer, 1997, 2011; Lipman- Blumen, 1996). This digital revolution is defined as a form of “ dis- ruption.” Indeed, the big question facing many enterprises today is, How can executives anticipate the unexpected threats brought on by technological advances that could devastate their business? This book focuses on the vital role that information and digital technology orga- nizations need to play in the course of organizational development and learning, and on the growing need to integrate technology fully into the processes of workplace organizational learning. Technology personnel have long been criticized for their inability to function as part of the business, and they are often seen as a group outside the corporate norm (Schein, 1992). This is a problem of cultural assimila- tion, and it represents one of the two major fronts that organizations now face in their efforts to gain a grip on the new, growing power of technology, and to be competitive in a global world. The other
  • 27.
    major xviii IntroduCtIon front concernsthe strategic integration of new digital technologies into business line management. Because technology continues to change at such a rapid pace, the ability of organizations to operate within a new paradigm of dynamic change emphasizes the need to employ action learning as a way to build competitive learning organizations in the twenty-first century. Information Technology and Organizational Learning integrates some of the fundamental issues bearing on IT today with concepts from organizational learning theory, providing comprehensive guidance, based on real-life business experiences and concrete research. This book also focuses on another aspect of what IT can mean to an organization. IT represents a broadening dimension of business life that affects everything we do inside an organization. This new reality is shaped by the increasing and irreversible dissemination of technology. To maximize the usefulness of its encroaching presence in everyday
  • 28.
    business affairs, organizationswill require an optimal understanding of how to integrate technology into everything they do. To this end, this book seeks to break new ground on how to approach and concep- tualize this salient issue— that is, that the optimization of information and digital technologies is best pursued with a synchronous imple- mentation of organizational learning concepts. Furthermore, these concepts cannot be implemented without utilizing theories of strategic learning. Therefore, this book takes the position that technology liter- acy requires individual and group strategic learning if it is to transform a business into a technology-based learning organization. Technology- based organizations are defined as those that have implemented a means of successfully integrating technology into their process of organiza- tional learning. Such organizations recognize and experience the real- ity of technology as part of their everyday business function. It is what many organizations are calling “ being digital.” This book will also examine some of the many existing organi- zational learning theories, and the historical problems that have occurred with companies that have used them, or that have failed to use them. Thus, the introduction of technology into organizations
  • 29.
    actually provides anopportunity to reassess and reapply many of the past concepts, theories, and practices that have been used to support the importance of organizational learning. It is important, however, not to confuse this message with a reason for promoting organizational xixIntroduCtIon learning, but rather, to understand the seamless nature of the relation- ship between IT and organizational learning. Each needs the other to succeed. Indeed, technology has only served to expose problems that have existed in organizations for decades, e.g., the inability to drive down responsibilities to the operational levels of the organization, and to be more agile with their consumers. This book is designed to help businesses and individual manag- ers understand and cope with the many issues involved in developing organizational learning programs, and in integrating an important component: their IT and digital organizations. It aims to provide a combination of research case studies, together with existing theories on organizational learning in the workplace. The goal is also to pro-
  • 30.
    vide researchers andcorporate practitioners with a book that allows them to incorporate a growing IT infrastructure with their exist- ing workforce culture. Professional organizations need to integrate IT into their organizational processes to compete effectively in the technology-driven business climate of today. This book responds to the complex and various dilemmas faced by many human resource managers and corporate executives regarding how to actually deal with many marginalized technology personnel who somehow always operate outside the normal flow of the core business. While the history of IT, as a marginalized organization, is rela- tively short, in comparison to that of other professions, the problems of IT have been consistent since its insertion into business organiza- tions in the early 1960s. Indeed, while technology has changed, the position and valuation of IT have continued to challenge how execu- tives manage it, account for it, and, most important, ultimately value its contributions to the organization. Technology personnel continue to be criticized for their inability to function as part of the business, and they are often seen as outside the business norm. IT employees are frequently stereotyped as “ techies,” and are segregated in such a
  • 31.
    way that theybecome isolated from the organization. This book pro- vides a method for integrating IT, and redefining its role in organiza- tions, especially as a partner in formulating and implementing key business strategies that are crucial for the survival of many companies in the new digital age. Rather than provide a long and extensive list of common issues, I have decided it best to uncover the challenges of IT integration and performance through the case study approach. xx IntroduCtIon IT continues to be one of the most important yet least understood departments in an organization. It has also become one of the most significant components for competing in the global markets of today. IT is now an integral part of the way companies become successful, and is now being referred to as the digital arm of the business. This is true across all industries. The role of IT has grown enormously in companies throughout the world, and it has a mission to provide stra- tegic solutions that can make companies more competitive. Indeed, the success of IT, and its ability to operate as part of the learning
  • 32.
    organization, can meanthe difference between the success and failure of entire companies. However, IT must be careful that it is not seen as just a factory of support personnel, and does not lose its justification as driving competitive advantage. We see in many organizations that other digital-based departments are being created, due to frustration with the traditional IT culture, or because they simply do not see IT as meeting the current needs for operating in a digital economy. This book provides answers to other important questions that have challenged many organizations for decades. First, how can manag- ers master emerging digital technologies, sustain a relationship with organizational learning, and link it to strategy and performance? Second, what is the process by which to determine the value of using technology, and how does it relate to traditional ways of calculating return on investment, and establishing risk models? Third, what are the cyber security implications of technology-based products and services? Fourth, what are the roles and responsibilities of the IT executive, and the department in general? To answer these questions, managers need to focus on the following objectives: • Address the operational weaknesses in organizations, in
  • 33.
    terms of howto deal with new technologies, and how to bet- ter realize business benefits. • Provide a mechanism that both enables organizations to deal with accelerated change caused by technological innovations, and integrates them into a new cycle of processing, and han- dling of change. • Provide a strategic learning framework, by which every new technology variable adds to organizational knowledge and can develop a risk and security culture. xxiIntroduCtIon • Establish an integrated approach that ties technology account- ability to other measurable outcomes, using organizational learning techniques and theories. To realize these objectives, organizations must be able to • create dynamic internal processes that can deal, on a daily basis, with understanding the potential fit of new technologies and their overall value within the structure of the business; • provide the discourse to bridge the gaps between IT- and non- IT-related investments, and uses, into one integrated system; • monitor investments and determine modifications to the life cycle; • implement various organizational learning practices, includ- ing learning organization, knowledge management, change management, and communities of practice, all of which help foster strategic thinking, and learning, and can be linked to
  • 34.
    performance (Gephardt &Marsick, 2003). The strengths of this book are that it integrates theory and practice and provides answers to the four common questions mentioned. Many of the answers provided in these pages are founded on theory and research and are supported by practical experience. Thus, evidence of the performance of the theories is presented via case studies, which are designed to assist the readers in determining how such theories and proven practices can be applied to their specific organization. A common theme in this book involves three important terms: dynamic , unpredictable , and acceleration . Dynamic is a term that rep- resents spontaneous and vibrant things— a motive force. Technology behaves with such a force and requires organizations to deal with its capabilities. Glasmeier (1997) postulates that technology evolution, innovation, and change are dynamic processes. The force then is tech- nology, and it carries many motives, as we shall see throughout this book. Unpredictable suggests that we cannot plan what will happen or will be needed. Many organizational individuals, including execu- tives, have attempted to predict when, how, or why technology will
  • 35.
    affect their organization.Throughout our recent history, especially during the “ digital disruption” era, we have found that it is difficult, if not impossible, to predict how technology will ultimately benefit or xxii IntroduCtIon hurt organizational growth and competitive advantage. I believe that technology is volatile and erratic at times. Indeed, harnessing tech- nology is not at all an exact science; certainly not in the ways in which it can and should be used in today’ s modern organization. Finally, I use the term acceleration to convey the way technology is speeding up our lives. Not only have emerging technologies created this unpre- dictable environment of change, but they also continue to change it rapidly— even from the demise of the dot-com era decades ago. Thus, what becomes important is the need to respond quickly to technology. The inability to be responsive to change brought about by technologi- cal innovations can result in significant competitive disadvantages for organizations. This new edition shows why this is a fact especially when
  • 36.
    examining the shrinking S-Curve.So, we look at these three words— dynamic, unpredictable, and acceleration— as a way to define how technology affects organizations; that is, technology is an accelerating motive force that occurs irregularly. These words name the challenges that organizations need to address if they are to manage technological innovations and integrate them with business strategy and competi- tive advantage. It only makes sense that the challenge of integrating technology into business requires us first to understand its potential impact, determine how it occurs, and see what is likely to follow. There are no quick remedies to dealing with emerging technologies, just common practices and sustained processes that must be adopted for organizations to survive in the future. I had four goals in mind in writing this book. First, I am inter- ested in writing about the challenges of using digital technologies strategically. What particularly concerns me is the lack of literature that truly addresses this issue. What is also troublesome is the lack of reliable techniques for the evaluation of IT, especially since IT is used in almost every aspect of business life. So, as we increase
  • 37.
    our use anddependency on technology, we seem to understand less about how to measure and validate its outcomes. I also want to convey my thoughts about the importance of embracing nonmon- etary methods for evaluating technology, particularly as they relate to determining return on investment. Indeed, indirect and non- monetary benefits need to be part of the process of assessing and approving IT projects. xxiiiIntroduCtIon Second, I want to apply organizational learning theory to the field of IT and use proven learning models to help transform IT staff into becoming better members of their organizations. Everyone seems to know about the inability of IT people to integrate with other depart- ments, yet no one has really created a solution to the problem. I find that organizational learning techniques are an effective way of coach- ing IT staff to operate more consistently with the goals of the busi- nesses that they support. Third, I want to present cogent theories about IT and organiza- tional learning; theories that establish new ways for organizations to adapt new technologies. I want to share my experiences and
  • 38.
    those of other professionalswho have found approaches that can provide posi- tive outcomes from technology investments. Fourth, I have decided to express my concerns about the valid- ity and reliability of organizational learning theories and practices as they apply to the field of IT. I find that most of these models need to be enhanced to better fit the unique aspects of the digital age. These modified models enable the original learning techniques to address IT-specific issues. In this way, the organization can develop a more holistic approach toward a common goal for using technology. Certainly, the balance of how technology ties in with strategy is essential. However, there has been much debate over whether tech- nology should drive business strategy or vice versa. We will find that the answer to this is “ yes.” Yes, in the sense that technology can affect the way organizations determine their missions and business strate- gies; but “ no” in that technology should not be the only component for determining mission and strategy. Many managers have realized that business is still business, meaning that technology is not a “ sil- ver bullet.” The challenge, then, is to determine how best to fit tech- nology into the process of creating and supporting business
  • 39.
    strategy. Few would doubttoday that technology is, indeed, the most signifi- cant variable affecting business strategy. However, the most viable approach is to incorporate technology into the process of determin- ing business strategy. I have found that many businesses still formu- late their strategies first, and then look at technology, as a means to efficiently implement objectives and goals. Executives need to better understand the unique and important role that technology provides us; it can drive business strategy, and support it, at the same time. xxiv IntroduCtIon Managers should not solely focus their attention on generating breakthrough innovations that will create spectacular results. Most good uses of technology are much subtler, and longer-lasting. For this reason, this book discusses and defines new technology life cycles that blend business strategy and strategic learning. Building on this theme, I introduce the idea of responsive organizational dynamism as the core theory of this book. Responsive organizational dynamism defines an environment that can respond to the three important
  • 40.
    terms (dynamic, unpredictable,and acceleration). Indeed, technology requires organizations that can sustain a system, in which individu- als can deal with dynamic, unpredictable, and accelerated change, as part of their regular process of production. The basis of this concept is that organizations must create and sustain such an environment to be competitive in a global technologically-driven economy. I further analyze responsive organizational dynamism in its two subcompo- nents: strategic integration and cultural assimilation, which address how technology needs to be measured as it relates to business strategy, and what related social– structural changes are needed, respectively. Change is an important principle of this book. I talk about the importance of how to change, how to manage such change, and why emerging technologies are a significant agent of change. I support the need for change, as an opportunity to use many of the learning theories that have been historically difficult to implement. That is, implementing change brought on by technological innovation is an opportunity to make the organization more “ change ready” or, as we define it today, more “ agile.” However, we also know that little is
  • 41.
    known about howorganizations should actually go about modifying existing processes to adapt to new technologies and become digital entities— and to be accustomed to doing this regularly. Managing through such periods of change requires that we develop a model that can deal with dynamic, unpredictable, and accelerated change. This is what responsive organizational dynamism is designed to do. We know that over 20% of IT projects still fail to be completed. Another 54% fail to meet their projected completion date. We now sit at the forefront of another technological spurt of innovations that will necessitate major renovations to existing legacy systems, requiring that they be linked to sophisticated e-business systems. These e- business systems will continue to utilize the Internet, and emerging mobile xxvIntroduCtIon technologies. While we tend to focus primarily on what technology generically does, organizations need urgently to prepare themselves for the next generation of advances, by forming structures that can deal with continued, accelerated change, as the norm of daily opera-
  • 42.
    tions. For thisedition, I have added new sections and chapters that address the digital transformation, ways of dealing with changing consumer behavior, the need to form evolving cyber security cultures, and the importance of integrating Gen Y employees to accelerate competitive advantage. This book provides answers to a number of dilemmas but ultimately offers an imbricate cure for the problem of latency in performance and quality afflicting many technologically-based projects. Traditionally, management has attempted to improve IT performance by increasing technical skills and project manager expertise through new processes. While there has been an effort to educate IT managers to become more interested and participative in business issues, their involvement continues to be based more on service than on strategy. Yet, at the heart of the issue is the entirety of the organization. It is my belief that many of the programmatic efforts conducted in traditional ways and attempting to mature and integrate IT with the rest of the organiza- tion will continue to deliver disappointing results. My personal experience goes well beyond research; it draws from
  • 43.
    living and breathingthe IT experience for the past 35 years, and from an understanding of the dynamics of what occurs inside and outside the IT department in most organizations. With such experi- ence, I can offer a path that engages the participation of the entire management team and operations staff of the organization. While my vision for this kind of digital transformation is different from other approaches, it is consistent with organizational learning theo- ries that promote the integration of individuals, communities, and senior management to participate in more democratic and vision- ary forms of thinking, reflection, and learning. It is my belief that many of the dilemmas presented by IT have existed in other parts of organizations for years, and that the Internet revolution only served to expose them. If we believe this to be true, then we must begin the process of integrating technology into strategic thinking and stop depending on IT to provide magical answers, and inappropriate expectations of performance. xxvi IntroduCtIon Technology is not the responsibility of any one person or depart-
  • 44.
    ment; rather, itis part of the responsibility of every employee. Thus, the challenge is to allow organizations to understand how to modify their processes, and the roles and responsibilities of their employees, to incorporate digital technologies as part of normal workplace activi- ties. Technology then becomes more a subject and a component of discourse. IT staff members need to emerge as specialists who par- ticipate in decision making, development, and sustained support of business evolution. There are also technology-based topics that do not require the typical expertise that IT personnel provide. This is a literacy issue that requires different ways of thinking and learning during the everyday part of operations. For example, using desktop tools, communicating via e-mail, and saving files and data, are inte- gral to everyday operations. These activities affect projects, yet they are not really part of the responsibilities of IT departments. Given the knowledge that technology is everywhere, we must change the approach that we take to be successful. Another way of looking at this phenomenon is to define technology more as a commodity, readily available to all individuals. This means that the notion of technology
  • 45.
    as organizationally segregatedinto separate cubes of expertise is prob- lematic, particularly on a global front. Thus, the overall aim of this book is to promote organizational learning that disseminates the uses of technology throughout a busi- ness, so that IT departments are a partner in its use, as opposed to being its sole owner. The cure to IT project failure, then, is to engage the business in technology decisions in such a way that individuals and business units are fundamentally involved in the process. Such processes need to be designed to dynamically respond to technology opportunities and thus should not be overly bureaucratic. There is a balance between establishing organizations that can readily deal with technology versus those that become too complex and inefficient. This balance can only be attained using organizational learning techniques as the method to grow and reach technology maturation. Overview of the Chapters Chapter 1 provides an important case study of the Ravell Corporation (a pseudonym), where I was retained for over five years. During this
  • 46.
    xxviiIntroduCtIon period, I appliednumerous organizational learning methods toward the integration of the IT department with the rest of the organiza- tion. The chapter allows readers to understand how the theories of organizational learning can be applied in actual practice, and how those theories are particularly beneficial to the IT community. The chapter also shows the practical side of how learning techniques can be linked to measurable outcomes, and ultimately related to business strategy. This concept will become the basis of integrating learning with strategy (i.e., “ strategic learning” ). The Ravell case study also sets the tone of what I call the IT dilemma, which represents the core problem faced by organizations today. Furthermore, the Ravell case study becomes the cornerstone example throughout the book and is used to relate many of the theories of learning and their practical applicability in organizations. The Ravell case has also been updated in this second edition to include recent results that support the impor- tance of alignment with the human resources department. Chapter 2 presents the details of the IT dilemma. This chapter addresses issues such as isolation of IT staff, which results in
  • 47.
    their marginalization from therest of the organization. I explain that while executives want technology to be an important part of business strat- egy, few understand how to accomplish it. In general, I show that individuals have a lack of knowledge about how technology and busi- ness strategy can, and should, be linked, to form common business objectives. The chapter provides the results of a three-year study of how chief executives link the role of technology with business strat- egy. The study captures information relating to how chief executives perceive the role of IT, how they manage it, and use it strategically, and the way they measure IT performance and activities. Chapter 3 focuses on defining how organizations need to respond to the challenges posed by technology. I analyze technological dyna- mism in its core components so that readers understand the different facets that comprise its many applications. I begin by presenting tech- nology as a dynamic variable that is capable of affecting organizations in a unique way. I specifically emphasize the unpredictability of tech- nology, and its capacity to accelerate change— ultimately concluding that technology, as an independent variable, has a dynamic
  • 48.
    effect on organizational development.This chapter also introduces my theory of responsive organizational dynamism, defined as a disposition in xxviii IntroduCtIon organizational behavior that can respond to the demands of tech- nology as a dynamic variable. I establish two core components of responsive organizational dynamism: strategic integration and cultural assimilation . Each of these components is designed to tackle a specific problem introduced by technology. Strategic integration addresses the way in which organizations determine how to use technology as part of business strategy. Cultural assimilation, on the other hand, seeks to answer how the organization, both structurally and culturally, will accommodate the actual human resources of an IT staff and depart- ment within the process of implementing new technologies. Thus, strategic integration will require organizational changes in terms of cultural assimilation. The chapter also provides a perspective of the technology life cycle so that readers can see how responsive organi-
  • 49.
    zational dynamism isapplied, on an IT project basis. Finally, I define the driver and supporter functions of IT and how these contribute to managing technology life cycles. Chapter 4 introduces theories on organizational learning, and applies them specifically to responsive organizational dynamism. I emphasize that organizational learning must result in individual, and organizational transformation, that leads to measurable performance outcomes. The chapter defines a number of organizational learning theories, such as reflective practices, learning organization, communi- ties of practice, learning preferences and experiential learning, social discourse, and the use of language. These techniques and approaches to promoting organizational learning are then configured into various models that can be used to assess individual and organizational devel- opment. Two important models are designed to be used in responsive organizational dynamism: the applied individual learning wheel and the technology maturity arc. These models lay the foundation for my position that learning maturation involves a steady linear progression from an individual focus toward a system or organizational perspec- tive. The chapter also addresses implementation issues—
  • 50.
    political challenges that canget in the way of successful application of the learning theories. Chapter 5 explores the role of management in creating and sustain- ing responsive organizational dynamism. I define the tiers of middle management in relation to various theories of management partici- pation in organizational learning. The complex issues of whether xxixIntroduCtIon organizational learning needs to be managed from the top down, bottom up, or middle-top-down are discussed and applied to a model that operates in responsive organizational dynamism. This chapter takes into account the common three-tier structure in which most organizations operate: executive, middle, and operations. The execu- tive level includes the chief executive officer (CEO), president, and senior vice presidents. The middle is the most complex, ranging from vice president/director to supervisory roles. Operations covers what is commonly known as “ staff,” including clerical functions. The knowl- edge that I convey suggests that all of these tiers need to
  • 51.
    participate in management, includingoperations personnel, via a self- development model. The chapter also presents the notion that knowledge manage- ment is necessary to optimize competitive advantage, particularly as it involves transforming tacit knowledge into explicit knowledge. I view the existing theories on knowledge management, create a hybrid model that embraces technology issues, and map them to responsive organizational dynamism. Discussions on change management are included as a method of addressing the unique ways that technol- ogy affects product development. Essentially, I tie together respon- sive organizational dynamism with organizational change theory, by offering modifications to generally accepted theories. There is also a specific model created for IT organizations, that maps onto organi- zational-level concepts. Although I have used technology as the basis for the need for responsive organizational dynamism, I show that the needs for its existence can be attributed to any variable that requires dynamic change. As such, I suggest that readers begin to think about the next “ technology” or variable that can cause the same needs to occur inside organizations. The chapter has been extended to
  • 52.
    address the impact ofsocial networking and the leadership opportunities it provides to technology executives. Chapter 6 examines how organizational transformation occurs. The primary focus of the chapter is to integrate transformation theory with responsive organizational dynamism. The position taken is that organizational learning techniques must inevitably result in orga- nizational transformation. Discussions on transformation are often addressed at organizational level, as opposed to focusing on individual development. As in other sections of the book, I extend a number of theories so that they can operate under the auspices of responsive xxx IntroduCtIon organizational dynamism, specifically, the works of Yorks and Marsick (2000) and Aldrich (2001). I expand organizational transformation to include ongoing assessment within technology deliverables. This is accomplished through the use of a modified Balanced Scorecard originally developed by Kaplan and Norton (2001). The Balanced Scorecard becomes the vehicle for establishing a strategy-
  • 53.
    focused and technology-based organization. Chapter7 deals with the many business transformation projects that require outsource arrangements and virtual team management. This chapter provides an understanding of when and how to consider outsourcing and the intricacies of considerations once operating with virtual teams. I cover such issues as management considerations and the challenges of dealing in multiple locations. The chapter extends the models discussed in previous chapters so that they can be aligned with operating in a virtual team environment. Specifically, this includes communities of practice, social discourse, self-development, knowl- edge management, and, of course, responsive organizational dyna- mism and its corresponding maturity arcs. Furthermore, I expand the conversation to include IT and non-IT personnel, and the arguments for the further support needed to integrate all functions across the organization. Chapter 8 presents updated case studies that demonstrate how my organizational learning techniques are actually applied in practice. Three case studies are presented: Siemens AG, ICAP, and HTC. Siemens AG is a diverse international company with 20 discrete
  • 54.
    businesses in over190 countries. The case study offers a perspec- tive of how a corporate chief information officer (CIO) introduced e- business strategy. ICAP is a leading international money and secu- rity broker. This case study follows the activities of the electronic trad- ing community (ETC) entity, and how the CEO transformed the organization and used organizational learning methods to improve competitive advantage. HTC (a pseudonym) provides an example of why the chief IT executive should report to the CEO, and how a CEO can champion specific projects to help transform organizational norms and behaviors. This case study also maps the transformation of the company to actual examples of strategic advantage. Chapter 9 focuses on the challenges of forming a “ cyber security” culture. The growing challenges of protecting companies from outside xxxiIntroduCtIon attacks have established the need to create a cyber security culture. This chapter addresses the ways in which information technology organizations must further integrate with business operations, so that their firms are better equipped to protect against outside
  • 55.
    threats. Since the generalconsensus is that no system can be 100% protected, and that most system compromises occur as a result of internal expo- sures, information technology leaders must educate employees on best practices to limit cyberattacks. Furthermore, while prevention is the objective, organizations must be internally prepared to deal with attacks and thus have processes in place should a system become pen- etrated by third-party agents. Chapter 10 explores the effects of the digital global economy on the ways in which organizations need to respond to the consumeriza- tion of products and services. From this perspective, digital transfor- mation involves a type of social reengineering that affects the ways in which organizations communicate internally, and how they consider restructuring departments. Digital transformation also affects the risks that organizations must take in what has become an accelerated changing consumer market. Chapter 11 provides conclusions and focuses on Gen Y employ- ees who are known as “ digital natives” and represent the new supply chain of talent. Gen Y employees possess the attributes to assist com-
  • 56.
    panies to transformtheir workforce to meet the accelerated change in the competitive landscape. Most executives across industries recog- nize that digital technologies are the most powerful variable to main- taining and expanding company markets. Gen Y employees provide a natural fit for dealing with emerging digital technologies. However, success with integrating Gen Y employees is contingent upon Baby Boomer and Gen X management adopting new leadership philoso- phies and procedures suited to meet the expectations and needs of these new workers. Ignoring the unique needs of Gen Y employees will likely result in an incongruent organization that suffers high turnover of young employees who will ultimately seek a more entre- preneurial environment. Chapter 12 seeks to define best practices to implement and sus- tain responsive organizational dynamism. The chapter sets forth a model that creates separate, yet linked, best practices and maturity arcs that can be used to assess stages of the learning development xxxii IntroduCtIon
  • 57.
    of the chiefIT executive, the CEO, and the middle management. I discuss the concept of common threads , by which each best practices arc links through common objectives and outcomes to the responsive organizational dynamism maturity arc presented in Chapter 4. Thus, these arcs represent an integrated and hierarchical view of how each component of the organization contributes to overall best practices. A new section has been added that links ethics to technology leadership and maturity. Chapter 13 summarizes the many aspects of how IT and organi- zational learning operate together to support the responsive organi- zational dynamism environment. The chapter emphasizes the specific key themes developed in the book, such as evolution versus revolu- tion; control and empowerment; driver and supporter operations; and responsive organizational dynamism and self-generating organiza- tions. Finally, I provide an overarching framework for “ organizing” reflection and integrate it with the best practices arcs. As a final note, I need to clarify my use of the words information technology, digital technology, and technology. In many parts of the book, they are used interchangeably, although there is a defined
  • 58.
    difference. Of course, notall technology is related to information or digital; some is based on machinery or the like. For the purposes of this book, the reader should assume that IT and digital technology are the primary variables that I am addressing. However, the theories and processes that I offer can be scaled to all types of technological innovation. 1 1 The “Ravell” CoRpoRaTion Introduction Launching into an explanation of information technology (IT), organizational learning, and the practical relationship into which I propose to bring them is a challenging topic to undertake. I choose, therefore, to begin this discussion by presenting an actual case study that exemplifies many key issues pertaining to organizational learn- ing, and how it can be used to improve the performance of an IT department. Specifically, this chapter summarizes a case study of the IT department at the Ravell Corporation (a pseudonym) in New York City. I was retained as a consultant at the company to
  • 59.
    improve the performance ofthe department and to solve a mounting politi- cal problem involving IT and its relation to other departments. The case offers an example of how the growth of a company as a “learn- ing organization”—one in which employees are constantly learning during the normal workday (Argyris, 1993; Watkins & Marsick, 1993)— utilized reflective practices to help it achieve the practical stra- tegic goals it sought. Individuals in learning organizations integrate processes of learning into their work. Therefore, a learning organiza- tion must advocate a system that allows its employees to interact, ask questions, and provide insight to the business. The learning organiza- tion will ultimately promote systematic thinking, and the building of organizational memory (Watkins & Marsick, 1993). A learning organization (discussed more fully in Chapter 4) is a component of the larger topic of organizational learning. The Ravell Corporation is a firm with over 500 employees who, over the years, had become dependent on the use of technology to run its business. Its IT department, like that of many other compa- nies, was isolated from the rest of the business and was regarded as a peripheral entity whose purpose was simply to provide
  • 60.
    technical support. This wasaccompanied by actual physical isolation—IT was 2 INFORMATION TECHNOLOGY placed in a contained and secure location away from mainstream operations. As a result, IT staff rarely engaged in active discourse with other staff members unless specific meetings were called relat- ing to a particular project. The Ravell IT department, therefore, was not part of the community of organizational learning—it did not have the opportunity to learn along with the rest of the organiza- tion, and it was never asked to provide guidance in matters of gen- eral relevance to the business as a whole. This marginalized status resulted in an us-versus-them attitude on the part of IT and non- IT personnel alike. Much has been written about the negative impact of marginal- ization on individuals who are part of communities. Schlossberg (1989) researched adults in various settings and how marginal- ization affected their work and self-efficacy. Her theory on mar- ginalization and mattering is applied to this case study because of its relevance and similarity to her prior research. For example, IT represents similar characteristics to a separate group on a college
  • 61.
    campus or ina workplace environment. Its physical isolation can also be related to how marginalized groups move away from the majority population and function without contact. The IT direc- tor, in particular, had cultivated an adversarial relationship with his peers. The director had shaped a department that fueled his view of separation. This had the effect of further marginalizing the posi- tion of IT within the organization. Hand in hand with this form of separatism came a sense of actual dislike on the part of IT personnel for other employees. IT staff members were quick to point fingers at others and were often noncommunicative with members of other departments within the organization. As a result of this kind of behavior, many departments lost confidence in the ability of IT to provide support; indeed, the quality of support that IT furnished had begun to deteriorate. Many departments at Ravell began to hire their own IT support personnel and were determined to create their own information systems subdepartments. This situation eventually became unacceptable to management, and the IT director was ter- minated. An initiative was begun to refocus the department and its position within the organization. I was retained to bring about this change and to act as the IT director until a structural transforma- tion of the department was complete.
  • 62.
    3the “rAvell” CorporAtIon ANew Approach My mandate at Ravell was initially unclear—I was to “fix” the problem; the specific solution was left up to me to design and imple- ment. My goal became one of finding a way to integrate IT fully into the organizational culture at Ravell. Without such integration, IT would remain isolated, and no amount of “fixing” around this issue would address the persistence of what was, as well, a cultural prob- lem. Unless IT became a true part of the organization as a whole, the entire IT staff could be replaced without any real change having occurred from the organization’s perspective. That is, just replacing the entire IT staff was an acceptable solution to senior management. The fact that this was acceptable suggested to me that the knowledge and value contained in the IT department did not exist or was mis- understood by the senior management of the firm. In my opinion, just eliminating a marginalized group was not a solution because I expected that such knowledge and value did exist, and that it needed
  • 63.
    to be investigatedproperly. Thus, I rejected management’s option and began to formulate a plan to better understand the contributions that could be made by the IT department. The challenge was threefold: to improve the work quality of the IT department (a matter of perfor- mance), to help the department begin to feel itself a part of the orga- nization as a whole and vice versa (a matter of cultural assimilation), and to persuade the rest of the organization to accept the IT staff as equals who could contribute to the overall direction and growth of the organization (a fundamental matter of strategic integration). My first step was to gather information. On my assignment to the position of IT director, I quickly arranged a meeting with the IT department to determine the status and attitudes of its personnel. The IT staff meeting included the chief financial officer (CFO), to whom IT reported. At this meeting, I explained the reasons behind the changes occurring in IT management. Few questions were asked; as a result, I immediately began scheduling individual meetings with each of the IT employees. These employees varied in terms of their position within the corporate hierarchy, in terms of salary, and in terms of technical expertise. The purpose of the private
  • 64.
    meetings was to allowIT staff members to speak openly, and to enable me to hear their concerns. I drew on the principles of action science, pioneered 4 INFORMATION TECHNOLOGY by Argyris and Schö n (1996), designed to promote individual self- reflection regarding behavior patterns, and to encourage a produc- tive exchange among individuals. Action science encompasses a range of methods to help individuals learn how to be reflective about their actions. By reflecting, individuals can better understand the outcomes of their actions and, especially, how they are seen by others. This was an important approach because I felt learning had to start at the indi- vidual level as opposed to attempting group learning activities. It was my hope that the discussions I orchestrated would lead the IT staff to a better understanding than they had previously shown, not only of the learning process itself, but also of the significance of that process. I pursued these objectives by guiding them to detect problem areas in their work and to undertake a joint effort to correct them (Argyris,
  • 65.
    1993; Arnett, 1992). Importantcomponents of reflective learning are single-loop and double-loop learning. Single-loop learning requires individuals to reflect on a prior action or habit that needs to be changed in the future but does not require individuals to change their operational proce- dures with regard to values and norms. Double-loop learning, on the other hand, does require both change in behavior and change in oper- ational procedures. For example, people who engage in double- loop learning may need to adjust how they perform their job, as opposed to just the way they communicate with others, or, as Argyris and Schö n (1996, p. 22) state, “the correction of error requires inquiry through which organizational values and norms themselves are modified.” Despite my efforts and intentions, not all of the exchanges were destined to be successful. Many of the IT staff members felt that the IT director had been forced out, and that there was consequently no support for the IT function in the organization. There was also clear evidence of internal political division within the IT department; members openly criticized each other. Still other interviews resulted in little communication. This initial response from IT staff was disap-
  • 66.
    pointing, and Imust admit I began to doubt whether these learning methods would be an antidote for the department. Replacing people began to seem more attractive, and I now understood why many man- agers prefer to replace staff, as opposed to investing in their transfor- mation. However, I also knew that learning is a gradual process and that it would take time and trust to see results. 5the “rAvell” CorporAtIon I realized that the task ahead called for nothing short of a total cul- tural transformation of the IT organization at Ravell. Members of the IT staff had to become flexible and open if they were to become more trusting of one another and more reflective as a group (Garvin, 2000; Schein, 1992). Furthermore, they had to have an awareness of their history, and they had to be willing to institute a vision of partnering with the user community. An important part of the process for me was to accept the fact that the IT staff were not habitually inclined to be reflective. My goal then was to create an environment that would foster reflective learning, which would in turn enable a change in
  • 67.
    individual and organizationalvalues and norms (Senge, 1990). The Blueprint for Integration Based on information drawn from the interviews, I developed a pre- liminary plan to begin to integrate IT into the day-to-day operations at Ravell, and to bring IT personnel into regular contact with other staff members. According to Senge (1990), the most productive learn- ing occurs when skills are combined in the activities of advocacy and inquiry. My hope was to encourage both among the staff at Ravell. The plan for integration and assimilation involved assigning IT resources to each department; that is, following the logic of the self- dissemina- tion of technology, each department would have its own dedicated IT person to support it. However, just assigning a person was not enough, so I added the commitment to actually relocate an IT person into each physical area. This way, rather than clustering together in an area of their own, IT people would be embedded throughout the organiza- tion, getting first-hand exposure to what other departments did, and learning how to make an immediate contribution to the productiv- ity of these departments. The on-site IT person in each department
  • 68.
    would have theopportunity to observe problems when they arose— and hence, to seek ways to prevent them—and, significantly, to share in the sense of accomplishment when things went well. To reinforce their commitment to their respective areas, I specified that IT person- nel were to report not only to me but also to the line manager in their respective departments. In addition, these line managers were to have input on the evaluation of IT staff. I saw that making IT staff offi- cially accountable to the departments they worked with was a tangible 6 INFORMATION TECHNOLOGY way to raise their level of commitment to the organization. I hoped that putting line managers in a supervisory position, would help build a sense of teamwork between IT and non-IT personnel. Ultimately, the focus of this approach was to foster the creation of a tolerant and supportive cultural climate for IT within the various departments; an important corollary goal here was also to allow reflective reviews of performance to flourish (Garvin, 1993). Enlisting Support
  • 69.
    Support for thisplan had to be mustered quickly if I was to create an environment of trust. I had to reestablish the need for the IT func- tion within the company, show that it was critical for the company’s business operations, and show that its integration posed a unique challenge to the company. However, it was not enough just for me to claim this. I also had to enlist key managers to claim it. Indeed, employees will cooperate only if they believe that self- assessment and critical thinking are valued by management (Garvin, 2000). I decided to embark on a process of arranging meetings with specific line man- agers in the organization. I selected individuals who would represent the day-to-day management of the key departments. If I could get their commitment to work with IT, I felt it could provide the stimulus we needed. Some line managers were initially suspicious of the effort because of their prior experiences with IT. However, they generally liked the idea of integration and assimilation that was presented to them, and agreed to support it, at least on a trial basis. Predictably, the IT staff were less enthusiastic about the idea. Many of them felt threatened, fearing that they were about to lose
  • 70.
    their independence or losethe mutual support that comes from being in a cohesive group. I had hoped that holding a series of meetings would help me gain support for the restructuring concept. I had to be care- ful to ensure that the staff members would feel that they also had an opportunity to develop a plan, that they were confident would work. During a number of group sessions, we discussed various scenarios of how such a plan might work. I emphasized the concepts of integra- tion and assimilation, and that a program of their implementation would be experimental. Without realizing it, I had engaged IT staff members in a process of self-governance. Thus, I empowered them 7the “rAvell” CorporAtIon to feel comfortable with voicing new ideas, without being concerned that they might be openly criticized by me if I did not agree. This pro- cess also encouraged individuals to begin thinking more as a group. Indeed, by directing the practice of constructive criticism among the IT staff, I had hoped to elicit a higher degree of reflective action
  • 71.
    among the groupand to show them that they had the ability to learn from one another as well as the ability to design their own roles in the organization (Argyris, 1993). Their acceptance of physical integration and, hence, cultural assimilation became a necessary condition for the ability of the IT group, to engage in greater reflective behavior (Argyris & Schö n, 1996). Assessing Progress The next issue concerned individual feedback. How was I to let each person know how he or she was doing? I decided first, to get feedback from the larger organizational community. This was accomplished by meeting with the line managers and obtaining whatever feed- back was available from them. I was surprised at the large quantity of information they were willing to offer. The line managers were not shy about participating, and their input allowed me to complete two objectives: (1) to understand how the IT staff was being perceived in its new assignment and (2) to create a social and reflective relation- ship between IT individuals and the line managers. The latter objec- tive was significant, for if we were to be successful, the line managers would have to assist us in the effort to integrate and assimilate
  • 72.
    IT functions within theircommunity. After the discussions with managers were completed, individual meetings were held with each IT staff member to discuss the feedback. I chose not to attribute the feedback to specific line managers but rather to address particular issues by conveying the general consensus about them. Mixed feelings were also disclosed by the IT staff. After convey- ing the information, I listened attentively to the responses of IT staff members. Not surprisingly, many of them responded to the feedback negatively and defensively. Some, for example, felt that many technology users were unreasonable in their expectations of IT. It was important for me as facilitator not to find blame among them, particularly if I was to be a participant in the learning organization (Argyris & Schö n, 1996). 8 INFORMATION TECHNOLOGY Resistance in the Ranks Any major organizational transformation is bound to elicit resistance from some employees. The initiative at Ravell proved to be no excep- tion. Employees are not always sincere, and some individuals
  • 73.
    will engage in politicalbehavior that can be detrimental to any organiza- tional learning effort. Simply put, they are not interested in partici- pating, or, as Marsick (1998) states, “It would be naï ve to expect that everyone is willing to play on an even field (i.e., fairly).” Early in the process, the IT department became concerned that its members spent much of their time trying to figure out how best to position themselves for the future instead of attending to matters at hand. I heard from other employees that the IT staff felt that they would live through my tenure; that is, just survive until a permanent IT director was hired. It became difficult at times to elicit the truth from some members of the IT staff. These individuals would skirt around issues and deny making statements that were reported by other employees rather than con- front problems head on. Some IT staff members would criticize me in front of other groups and use the criticism as proof that the plan for a general integration was bound to fail. I realized in a most tangible sense that pursuing change through reflective practice does not come without resistance, and that this resistance needs to be factored into the planning of any such organizationally transformative
  • 74.
    initiative. Line Management tothe Rescue At the time that we were still working through the resistance within IT, the plan to establish a relationship with line management began to work. A number of events occurred that allowed me to be directly involved in helping certain groups solve their IT problems. Word spread quickly that there was a new direction in IT that could be trusted. Line management support is critical for success in such trans- formational situations. First, line management is typically comprised of people from the ranks of supervisors and middle managers, who are responsible for the daily operations of their department. Assuming they do their jobs, senior management will cater to their needs and listen to their feedback. The line management of any organiza- tion, necessarily engaged to some degree in the process of learning 9the “rAvell” CorporAtIon (a “learning organization”), is key to its staff. Specifically, line manag- ers are responsible for operations personnel; at the same time, they must answer to senior management. Thus, they understand both
  • 75.
    exec- utive and operationsperspectives of the business (Garvin, 2000). They are often former staff members themselves and usually have a high level of technical knowledge. Upper management, while important for financial support, has little effect at the day-to-day level, yet this is the level at which the critical work of integration and the building of a single learning community must be done. Interestingly, the line management organization had previously had no shortage of IT-related problems. Many of these line managers had been committed to developing their own IT staffs; however, they quickly realized that the exercise was beyond their expertise, and that they needed guidance and leadership. Their participation in IT staff meetings had begun to foster a new trust in the IT department, and they began to see the possibilities of working closely with IT to solve their problems. Their support began to turn toward what Watkins and Marsick (1993, p. 117) call “creating alignment by placing the vision in the hands of autonomous, cross-functional synergetic teams.” The combination of IT and non-IT teams began to foster a synergy among the communities, which established new ideas about how best to use
  • 76.
    technology. IT Begins toReflect Although it was initially difficult for some staff members to accept, they soon realized that providing feedback opened the door to the process of self-reflection within IT. We undertook a number of exer- cises, to help IT personnel understand how non-IT personnel per- ceived them, and how their own behavior may have contributed to these perceptions. To foster self-reflection, I adopted a technique developed by Argyris called “the left-hand column.” In this technique, individuals use the right-hand column of a piece of paper to transcribe dialogues that they felt had not resulted in effective communication. In the left-hand column of the same page, participants are to write what they were really thinking at the time of the dialogue but did not say. This exercise is designed to reveal underlying assumptions that speakers may not be aware of during their exchanges and that may be 10 INFORMATION TECHNOLOGY impeding their communication with others by giving others a
  • 77.
    wrong impression. The exercisewas extremely useful in helping IT personnel understand how others in the organization perceived them. Most important, the development of reflective skills, according to Schö n (1983), starts with an individual’s ability to recognize “leaps of abstraction”—the unconscious and often inaccurate generalizations people make about others based on incomplete information. In the case of Ravell, such generalizations were deeply entrenched among its various personnel sectors. Managers tended to assume that IT staffers were “ just techies,” and that they therefore held fundamentally differ- ent values and had little interest in the organization as a whole. For their part, the IT personnel were quick to assume that non-IT people did not understand or appreciate the work they did. Exposing these “leaps of abstraction” was key to removing the roadblocks that pre- vented Ravell from functioning as an integrated learning organization. Defining an Identity for Information Technology It was now time to start the process of publicly defining the identity of IT. Who were we, and what was our purpose? Prior to this time,
  • 78.
    IT had noexplicit mission. Instead, its members had worked on an ad hoc basis, putting out fires and never fully feeling that their work had contributed to the growth or development of the organization as a whole. This sense of isolation made it difficult for IT members to begin to reflect on what their mission should or could be. I organized a series of meetings to begin exploring the question of a mission, and I offered support by sharing exemplary IT mission statements that were being implemented in other organizations. The focus of the meetings was not on convincing them to accept any particular idea but rather to facilitate a reflective exercise with a group that was undertaking such a task for the first time (Senge, 1990). The identity that emerged for the IT department at Ravell was dif- ferent from the one implicit in their past role. Our new mission would be to provide technical support and technical direction to the organi- zation. Of necessity, IT personnel would remain specialists, but they were to be specialists who could provide guidance to other depart- ments in addition to helping them solve and prevent problems. As they became more intimately familiar with what different departments
  • 79.
    11the “rAvell” CorporAtIon did—andhow these departments contributed to the organization as a whole—IT professionals would be able to make better informed rec- ommendations. The vision was that IT people would grow from being staff who fixed things into team members who offered their expertise to help shape the strategic direction of the organization and, in the process, participate fully in organizational growth and learning. To begin to bring this vision to life, I invited line managers to attend our meetings. I had several goals in mind with this invita- tion. Of course, I wanted to increase contact between IT and non-IT people; beyond this, I wanted to give IT staff an incentive to change by making them feel a part of the organization as a whole. I also got a commitment from IT staff that we would not cover up our prob- lems during the sessions, but would deal with all issues with trust and honesty. I also believed that the line managers would reciprocate and allow us to attend their staff meetings. A number of IT indi- viduals were concerned that my approach would only further expose our problems with regard to quality performance, but the group
  • 80.
    as a whole feltcompelled to stick with the beliefs that honesty would always prevail over politics. Having gained insight into how the rest of the organization perceived them, IT staff members had to learn how to deal with disagreement and how to build consensus to move an agenda forward. Only then could reflection and action be intimately intertwined so that after-the-fact reviews could be replaced with peri- ods of learning and doing (Garvin, 2000). The meetings were constructive, not only in terms of content issues handled in the discussions, but also in terms of the number of line managers who attended them. Their attendance sent a strong message that the IT function was important to them, and that they under- stood that they also had to participate in the new direction that IT was taking. The sessions also served as a vehicle to demonstrate how IT could become socially assimilated within all the functions of the community while maintaining its own identity. The meetings were also designed as a venue for group members to be critical of themselves. The initial meetings were not successful in this regard; at first, IT staff members spent more time blaming oth-
  • 81.
    ers than reflectingon their own behaviors and attitudes. These ses- sions were difficult in that I would have to raise unpopular questions and ask whether the staff had truly “looked in the mirror” concerning 12 INFORMATION TECHNOLOGY some of the problems at hand. For example, one IT employee found it difficult to understand why a manager from another department was angry about the time it took to get a problem resolved with his computer. The problem had been identified and fixed within an hour, a time frame that most IT professionals would consider very respon- sive. As we looked into the reasons why the manager could have been justified in his anger, it emerged that the manager had a tight deadline to meet. In this situation, being without his computer for an hour was a serious problem. Although under normal circumstances a response time of one hour is good, the IT employee had failed to ask about the manager’s par- ticular circumstance. On reflection, the IT employee realized that putting himself in the position of the people he was trying to
  • 82.
    support would enable himto do his job better. In this particular instance, had the IT employee only understood the position of the manager, there were alternative ways of resolving the problem that could have been implemented much more quickly. Implementing the Integration: A Move toward Trust and Reflection As communication became more open, a certain synergy began to develop in the IT organization. Specifically, there was a palpable rise in the level of cooperation and agreement, with regard to the over- all goals set during these meetings. This is not to suggest that there were no disagreements but rather that discussions tended to be more constructive in helping the group realize its objective of providing outstanding technology support to the organization. The IT staff also felt freer to be self-reflective by openly discussing their ideas and their mistakes. The involvement of the departmental line manag- ers also gave IT staff members the support they needed to carry out the change. Slowly, there developed a shift in behavior in which the objectives of the group sharpened its focus on the transformation of the department, on its acknowledgment of successes and
  • 83.
    failures, and on acquiringnew knowledge, to advance the integration of IT into the core business units. Around this time, an event presented itself that I felt would allow the IT department to establish its new credibility and authority to the other departments: the physical move of the organization to a 13the “rAvell” CorporAtIon new location. The move was to be a major event, not only because it represented the relocation of over 500 people and the technologi- cal infrastructure they used on a day-to-day basis, but also because the move was to include the transition of the media communications systems of the company, to digital technology. The move required tremendous technological work, and the organization decided to perform a “technology acceleration,” meaning that new technology would be introduced more quickly because of the opportunity pre- sented by the move. The entire moving process was to take a year, and I was immediately summoned to work with the other departments in determining the best plan to accomplish the transition.
  • 84.
    For me, themove became an emblematic event for the IT group at Ravell. It would provide the means by which to test the creation of, and the transitioning into, a learning organization. It was also to pro- vide a catalyst for the complete integration and assimilation of IT into the organization as a whole. The move represented the introduction of unfamiliar processes in which “conscious reflection is … necessary if lessons are to be learned” (Garvin, 2000, p. 100). I temporarily reorganized IT employees into “SWAT” teams (subgroups formed to deal with defined problems in high-pressure environments), so that they could be eminently consumed in the needs of their com- munity partners. Dealing with many crisis situations helped the IT department change the existing culture by showing users how to bet- ter deal with technology issues in their everyday work environment. Indeed, because of the importance of technology in the new location, the core business had an opportunity to embrace our knowledge and to learn from us. The move presented new challenges every day, and demanded openness and flexibility from everyone. Some problems required that
  • 85.
    IT listen intentlyto understand and meet the needs of its commu- nity partners. Other situations put IT in the role of teaching; assess- ing needs and explaining to other departments what was technically possible, and then helping them to work out compromises based on technical limitations. Suggestions for IT improvement began to come from all parts of the organization. Ideas from others were embraced by IT, demonstrating that employees throughout the organization were learning together. IT staff behaved assertively and without fear of failure, suggesting that, perhaps for the first time, their role had 14 INFORMATION TECHNOLOGY extended beyond that of fixing what was broken to one of helping to guide the organization forward into the future. Indeed, the move established the kind of “special problem” that provided an opportunity for growth in personal awareness through reflection (Moon, 1999). The move had proved an ideal laboratory for implementing the IT integration and assimilation plan. It provided real and important opportunities for IT to work hand in hand with other
  • 86.
    departments— all focusing onshared goals. The move fostered tremendous cama- raderie within the organization and became an excellent catalyst for teaching reflective behavior. It was, if you will, an ideal project in which to show how reflection in action can allow an entire organiza- tion to share in the successful attainment of a common goal. Because it was a unique event, everyone—IT and non-IT personnel alike— made mistakes, but this time, there was virtually no finger- pointing. People accepted responsibility collectively and cooperated in finding solutions. When the company recommenced operations from its new location—on time and according to schedule—no single group could claim credit for the success; it was universally recognized that success had been the result of an integrated effort. Key Lessons The experience of the reorganization of the IT department at Ravell can teach us some key lessons with respect to the cultural transforma- tion and change of marginalized technical departments, generally. Defining Reflection and Learning for an Organization
  • 87.
    IT personnel tendto view learning as a vocational event. They gener- ally look to increase their own “technical” knowledge by attending special training sessions and programs. However, as Kegan (1998) reminds us, there must be more: “Training is really insufficient as a sole diet of education—it is, in reality a subset of education.” True education involves transformation, and transformation, according to Kegan, is the willingness to take risks, to “get out of the bedroom of our comfortable world.” In my work at Ravell, I tried to augment this “diet” by embarking on a project that delivered both vocational train- ing and education through reflection. Each IT staff person was given 15the “rAvell” CorporAtIon one week of technical training per year to provide vocational develop- ment. But beyond this, I instituted weekly learning sessions in which IT personnel would meet without me and produce a weekly memo of “reflection.” The goal of this practice was to promote dialogue, in the hope that IT would develop a way to deal with its fears and mistakes on its own. Without knowing it, I had begun the process of
  • 88.
    creating a discursive communityin which social interactions could act as insti- gators of reflective behavior leading to change. Working toward a Clear Goal The presence of clearly defined, measurable, short-term objectives can greatly accelerate the process of developing a “learning organiza- tion” through reflective practice. At Ravell, the move into new physi- cal quarters provided a common organizational goal toward which all participants could work. This goal fostered cooperation among IT and non-IT employees and provided an incentive for everyone to work and, consequently, learn together. Like an athletic team before an important game, or even an army before battle, the IT staff at Ravell rallied around a cause and were able to use reflective practices to help meet their goals. The move also represented what has been termed an “eye-opening event,” one that can trigger a better understanding of a culture whose differences challenge one’s presuppositions (Mezirow, 1990). It is important to note, though, that while the move accelerated the development of the learning organization as such, the move itself would not have been enough to guarantee the successes that
  • 89.
    followed it. Simply settinga deadline is no substitute for undergoing the kind of transformation necessary for a consummately reflective process. Only as the culmination of a process of analysis, socialization, and trust building, can an event like this speed the growth of a learning organization. Commitment to Quality Apart from the social challenges it faced in merging into the core business, the IT group also had problems with the quality of its out- put. Often, work was not performed in a professional manner. IT organizations often suffer from an inability to deliver on schedule, 16 INFORMATION TECHNOLOGY and Ravell was no exception. The first step in addressing the qual- ity problem, was to develop IT’s awareness of the importance of the problem, not only in my estimation but in that of the entire company. The IT staff needed to understand how technology affected the day- to-day operations of the entire company. One way to start the dia-
  • 90.
    logue on qualityis to first initiate one about failures. If something was late, for instance, I asked why. Rather than addressing the problems from a destructive perspective (Argyris & Schö n, 1996; Schein, 1992; Senge, 1990), the focus was on encouraging IT personnel to under- stand the impact of their actions—or lack of action—on the company. Through self-reflection and recognition of their important role in the organization, the IT staff became more motivated than before to per- form higher quality work. Teaching Staff “Not to Know” One of the most important factors that developed out of the process of integrating IT was the willingness of the IT staff “not to know.” The phenomenology of “not knowing” or “knowing less” became the facilitator of listening; that is, by listening, we as individuals are better able to reflect. This sense of not knowing also “allows the individual to learn an important lesson: the acceptance of what is, without our attempts to control, manipulate, or judge” (Halifax, 1999, p. 177). The IT staff improved their learning abilities by suggesting and adopting new solutions to problems. An example of this was the creation of a
  • 91.
    two-shift help deskthat provided user support during both day and evening. The learning process allowed IT to contribute new ideas to the community. More important, their contributions did not dramat- ically change the community; instead, they created gradual adjust- ments that led to the growth of a new hybrid culture. The key to this new culture was its ability to share ideas, accept error as a reality (Marsick, 1998), and admit to knowing less (Halifax, 1999). Transformation of Culture Cultural changes are often slow to develop, and they occur in small intervals. Furthermore, small cultural changes may even go unnoticed or may be attributed to factors other than their actual causes. This 17the “rAvell” CorporAtIon raises the issue of the importance of cultural awareness and our ability to measure individual and group performance. The history of the IT problems at Ravell made it easy for me to make management aware of what we were newly attempting to accomplish and of our reasons for creating dialogues about our successes and failures. Measurement and
  • 92.
    evaluation of ITperformance are challenging because of the intrica- cies involved in determining what represents success. I feel that one form of measurement can be found in the behavioral patterns of an organization. When it came time for employee evaluations, reviews were held with each IT staff member. Discussions at evaluation reviews focused on the individuals’ perceptions of their role, and how they felt about their job as a whole. The feedback from these review meetings suggested that the IT staff had become more devoted, and more willing to reflect on their role in the organization, and, gen- erally, seemed happier at their jobs than ever before. Interestingly, and significantly, they also appeared to be having fun at their jobs. This happiness propagated into the community and influenced other supporting departments to create similar infrastructures that could reproduce our type of successes. This interest was made evident by frequent inquiries I received from other departments about how the transformation of IT was accomplished, and how it might be trans- lated to create similar changes in staff behavior elsewhere in the com- pany. I also noticed that there were fewer complaints and a renewed ability for the staff to work with our consultants.
  • 93.
    Alignment with AdministrativeDepartments Ravell provided an excellent lesson about the penalties of not align- ing properly with other strategic and operational partners in a firm. Sometimes, we become insistent on forcing change, especially when placed in positions that afford a manager power—the power to get results quickly and through force. The example of Ravell teaches us that an approach of power will not ultimately accomplish transforma- tion of the organization. While senior management can authorize and mandate change, change usually occurs much more slowly than they wish, if it occurs at all. The management ranks can still push back and cause problems, if not sooner, then later. While I aligned with the line units, I failed to align with important operational partners, 18 INFORMATION TECHNOLOGY particularly human resources (HR). HR in my mind at that time was impeding my ability to accomplish change. I was frustrated and determined to get things done by pushing my agenda. This approach worked early on, but I later discovered that the HR management
  • 94.
    was bitter and devotedto stopping my efforts. The problems I encountered at Ravell are not unusual for IT organizations. The historical issues that affect the relationship between HR and IT are as follows: • IT has unusual staff roles and job descriptions that can be inconsistent with the rest of the organization. • IT tends to have complex working hours and needs. • IT has unique career paths that do not “fit” with HR standards. • IT salary structures shift more dynamically and are very sen- sitive to market conditions. • IT tends to operate in silos. The challenge, then, to overcome these impediments requires IT to • reduce silos and IT staff marginalization • achieve better organization-wide alignment • develop shared leadership • define and create an HR/IT governance model The success of IT/HR alignment should follow practices similar to those I instituted with the line managers at Ravell, specifically the following: • Successful HR/IT integration requires organizational learn- ing techniques. • Alignment requires an understanding of the relationship between IT investments and business strategy.
  • 95.
    • An integrationof IT can create new organizational cultures and structures. • HR/IT alignment will likely continue to be dynamic in nature, and evolve at an accelerated pace. The oversight of not integrating better with HR cost IT dearly at Ravell. HR became an undisclosed enemy—that is, a negative force against the entire integration. I discovered this problem only later, and was never able to bring the HR department into the fold. Without HR being part of the learning organization, IT staff continued to 19the “rAvell” CorporAtIon struggle with aligning their professional positions with those of the other departments. Fortunately, within two years the HR vice presi- dent retired, which inevitably opened the doors for a new start. In large IT organizations, it is not unusual to have an HR member assigned to focus specifically on IT needs. Typically, it is a joint position in which the HR individual in essence works for the IT executive. This is an effective alternative in that the HR person becomes versed in IT needs and can properly represent IT in the area of head count needs and specific titles. Furthermore, the unique aspect of IT
  • 96.
    organizations is in thehybrid nature of their staff. Typically, a number of IT staff members are consultants, a situation that presents problems similar to the one I encountered at Ravell—that is, the resentment of not really being part of the organization. Another issue is that many IT staff members are outsourced across the globe, a situation that brings its own set of chal- lenges. In addition, the role of HR usually involves ensuring compliance with various regulations. For example, in many organizations, a con- sultant is permitted to work on site for only one year before U.S. gov- ernment regulations force the company to hire them as employees. The HR function must work closely with IT to enforce these regulations. Yet another important component of IT and HR collaboration is talent management. That is, HR must work closely with IT to understand new roles and responsibilities as they develop in the organization. Another challenge is the integration of technology into the day-to-day business of a company, and the question of where IT talent should be dispersed throughout the organization. Given this complex set of challenges, IT alone cannot facilitate or properly represent itself, unless it aligns with the HR departments. This becomes further complex with the
  • 97.
    prolifera- tion of ITvirtual teams across the globe that create complex structures that often have different HR ramifications, both legally and culturally. Virtual team management is discussed further in the book. Conclusion This case study shows that strategic integration of technical resources into core business units can be accomplished, by using those aspects of organizational learning that promote reflection in action. This kind of integration also requires something of a concomitant form of assimila- tion, on the cultural level (see Chapter 3). Reflective thinking fosters the 20 INFORMATION TECHNOLOGY development of a learning organization, which in turn allows for the integration of the “other” in its various organizational manifestations. The experience of this case study also shows that the success of organi- zational learning will depend on the degree of cross fertilization achiev- able in terms of individual values and on the ability of the community to combine new concepts and beliefs, to form a hybrid culture. Such a
  • 98.
    new culture prosperswith the use of organizational learning strategies to enable it to share ideas, accept mistakes, and learn to know less as a regular part their discourse and practice in their day-to-day operations. Another important conclusion from the Ravell experience is that time is an important factor to the success of organizational learning approaches. One way of dealing with the problem of time is with patience—something that many organizations do not have. Another element of success came in the acceleration of events (such as the relo- cation at Ravell), which can foster a quicker learning cycle and helps us see results faster. Unfortunately, impatience with using organiza- tional learning methods is not an acceptable approach because it will not render results that change individual and organizational behavior. Indeed, I almost changed my approach when I did not get the results I had hoped for early in the Ravell engagement. Nevertheless, my per- sistence paid off. Finally, the belief that replacing the staff, as opposed to investing in its knowledge, results from a faulty generalization. I found that most of the IT staff had much to contribute to the orga- nization and, ultimately, to help transform the culture. Subsequent
  • 99.
    chapters of thisbook build on the Ravell experience and discuss spe- cific methods for integrating organizational learning and IT in ways that can improve competitive advantage. Another recent perception, which I discuss further in Chapter 4, is the commitment to “complete” integration. Simply put, IT cannot select which departments to work with, or choose to participate only with line managers; as they say, it is “all or nothing at all.” Furthermore, as Friedman (2007, p. 8) states “The world is flat.” Certainly, part of the “flattening” of the world has been initiated by technology, but it has also created overwhelming challenges for seamless integration of technology within all operations. The flattening of the world has cre- ated yet another opportunity for IT to better integrate itself into what is now an everyday challenge for all organizations. 21 2 The iT Dilemma Introduction We have seen much discussion in recent writing about how
  • 100.
    informa- tion technology hasbecome an increasingly significant component of corporate business strategy and organizational structure (Bradley & Nolan, 1998; Levine et al., 2000; Siebel, 1999). But, do we know about the ways in which this significance takes shape? Specifically, what are the perceptions and realities regarding the importance of technology from organization leaders, business managers, and core operations personnel? Furthermore, what forms of participation should IT assume within the rest of the organization? The isolation of IT professionals within their companies often pre- vents them from becoming active participants in the organization. Technology personnel have long been criticized for their inability to function as part of the business and are often seen as a group falling outside business cultural norms (Schein, 1992). They are frequently stereotyped as “techies” and segregated into areas of the business where they become marginalized and isolated from the rest of the organization. It is my experience, based on case studies such as the one reviewed in Chapter 1 (the Ravell Corporation), that if an orga- nization wishes to absorb its IT department into its core culture, and
  • 101.
    if it wishesto do so successfully, the company as a whole must be pre- pared to consider structural changes and to seriously consider using organizational learning approaches. The assimilation of technical people into an organization presents a special challenge in the development of true organizational learning practices (developed more fully in Chapter 3). This challenge stems from the historical separation of a special group that is seen as stand- ing outside the everyday concerns of the business. IT is generally acknowledged as having a key support function in the organization as a whole. However, empirical studies have shown that it is a challenging 22 InForMAtIon teChnoloGY endeavor to successfully integrate IT personnel into the learning fold and to do so in such a way that they not only are accepted, but also understood to be an important part of the social and cultural struc- ture of the business (Allen & Morton, 1994; Cassidy, 1998; Langer, 2007; Schein, 1992; Yourdon, 1998). In his book In Over Our Heads, Kegan (1994) discusses the
  • 102.
    chal- lenges of dealingwith individual difference. IT personnel have been consistently regarded as “different” fixtures; as outsiders who do not quite fit easily into the mainstream organization. Perhaps, because of their technical practices, which may at times seem “foreign,” or because of perceived differences in their values, IT personnel can become marginalized; imagined as outside the core social structures of business. As in any social structure, marginalization can result in the withdrawal of the individual from the community (Schlossberg, 1989). As a result, many organizations are choosing to outsource their IT services rather than confront and address the issues of cultural absorption and organizational learning. The outsourcing alternative tends to further distance the IT function from the core organiza- tion, thus increasing the effects of marginalization. Not only does the outsourcing of IT personnel separate them further from their peers, but it also invariably robs the organization of a potentially important contributor to the social growth and organizational learning of the business. For example, technology personnel should be able to offer insight into how technology can support further growth and learning
  • 103.
    within the organization.In addition, IT personnel are usually trained to take a logical approach to problem solving; as a result, they should be able to offer a complementary focus on learning. Hence, the inte- gration of IT staff members into the larger business culture can offer significant benefits to an organization in terms of learning and orga- nizational growth. Some organizations have attempted to improve communications between IT and non-IT personnel through the use of an intermedi- ary who can communicate easily with both groups. This intermediary is known in many organizations as the business analyst. Typically, the business analyst will take responsibility for the interface between IT and the larger business community. Although a business analyst may help facilitate communication between IT and non-IT personnel, this arrangement cannot help but carry the implication that different 23the It dIleMMA “languages” are spoken by these two groups and, by extension, that direct communication is not possible. Therefore, the use of such an intermediary suffers the danger of failing to promote integration
  • 104.
    between IT andthe rest of the organization; in fact, it may serve to keep the two camps separate. True integration, in the form of direct contact between IT and non-IT personnel, represents a greater chal- lenge for an organization than this remedy would suggest. Recent Background Since the 1990s, IT has been seen as a kind of variable that possesses the great potential to reinvent business. Aspects of this promise affected many of the core business rules used by successful chief executives and business managers. While organizations have used IT for the process- ing of information, decision-support processing, and order processing, the impact of the Internet and e-commerce systems has initiated revolutionary responses in every business sector. This economic phe- nomenon became especially self-evident with the formation of dot-coms in the mid- and late 1990s. The advent of this phenomenon stressed the need to challenge fundamental business concepts. Many financial wizards surmised that new technologies were indeed changing the very infrastructure of business, affecting how businesses would operate and compete in the new millennium. Much of this hoopla seemed justified by the extraordinary potential that technology offered,
  • 105.
    particularly with respect tothe revolutionizing of old-line marketing principles, for it was technology that came to violate what was previously thought to be protected market conditions and sectors. Technology came to reinvent these business markets and to allow new competitors to cross market in sectors they otherwise could not have entered. With this new excitement also came fear— fear that fostered unnat- ural and accelerated entry into technology because any delay might sacrifice important new market opportunities. Violating some of their traditional principles, many firms invested in creating new organi- zations that would “incubate” and eventually, capture large market segments using the Internet as the delivery vehicle. By 2000, many of these dot-coms were in trouble, and it became clear that their notion of new business models based on the Internet contained significant flaws and shortfalls. As a result of this crisis, the role and valuation 24 InForMAtIon teChnoloGY of IT is again going through a transformation and once more we are
  • 106.
    skeptical about thevalue IT can provide a business and about the way to measure the contributions of IT. IT in the Organizational Context Technology not only plays a significant role in workplace operations, but also continues to increase its relevance among other traditional components of any business, such as operations, accounting, and marketing (Earl, 1996b; Langer, 2001a; Schein, 1992). Given this increasing relevance, IT gains significance in relation to 1. The impact it bears on organizational structure 2. The role it can assume in business strategy 3. The ways in which it can be evaluated 4. The extent to which chief executives feel the need to manage operational knowledge and thus to manage IT effectively IT and Organizational Structure Sampler’s (1996) research explores the relationship between IT and organizational structure. His study indicated that there is no clear-cut relationship that has been established between the two. However, he concluded that there are five principal positions that IT can take in this relationship: 1. IT can lead to centralization of organizational control.
  • 107.
    2. Conversely, ITcan lead to decentralization of organizational control. 3. IT can bear no impact on organizational control, its signifi- cance being based on other factors. 4. Organizations and IT can interact in an unpredictable manner. 5. IT can enable new organizational arrangements, such as net- worked or virtual organizations. According to Sampler (1996), the pursuit of explanatory models for the relationship between IT and organizational structure continues to be a challenge, especially since IT plays dual roles. On the one 25the It dIleMMA hand, it enhances and constrains the capabilities of workers within the organization, and because of this, it also possesses the ability to create a unique cultural component. While both roles are active, their impact on the organization cannot be predicted; instead, they evolve as unique social norms within the organization. Because IT has changed so dramatically over the past decades, it continues to be
  • 108.
    difficult to compareprior research on the relationship between IT and organizational structure. Earl (1996a) studied the effects of applying business process reen- gineering (BPR) to organizations. BPR is a process that organizations undertake to determine how best to use technology, to improve busi- ness performance. Earl concludes that BPR is “an unfortunate title: it does not reflect the complex nature of either the distinctive underpin- ning concept of BPR [i.e., to reevaluate methods and rules of business operations] or the essential practical challenges to make it happen [i.e., the reality of how one goes about doing that]” (p. 54). In my 2001 study of the Ravell Corporation (“Fixing Bad Habits,” Langer, 2001b), I found that BPR efforts require buy-in from business line managers, and that such efforts inevitably require the adaptation by individuals of different cultural norms and practices. Schein (1992) recognizes that IT culture represents a subculture in collision with many others within an organization. He concludes that if organizations are to be successful in using new technologies in a global context, they must cope with ceaseless flows of information to ensure
  • 109.
    organizational health andeffectiveness. His research indicates that chief executive officers (CEOs) have been reluctant to implement a new sys- tem of technology unless their organizations felt comfortable with it and were ready to use it. While many CEOs were aware of cost and effi- ciency implications in using IT, few were aware of the potential impact on organizational structure that could result from “adopting an IT view of their organizations” (p. 293). Such results suggest that CEOs need to be more active and more cognizant than they have been of potential shifts in organizational structure when adopting IT opportunities. The Role of IT in Business Strategy While many chief executives recognize the importance of IT in the day-to-day operations of their business, their experience with 26 InForMAtIon teChnoloGY attempting to utilize IT as a strategic business tool, has been frustrat- ing. Typical executive complaints about IT, according to Bensaou and Earl (1998), fall into five problem areas: 1. A lack of correspondence between IT investments and busi-
  • 110.
    ness strategy 2. Inadequatepayoff from IT investments 3. The perception of too much “technology for technology’s sake” 4. Poor relations between IT specialists and users 5. The creation of system designs that fail to incorporate users’ preferences and work habits McFarlan created a strategic grid (as presented in Applegate et al., 2003) designed to assess the impact of IT on operations and strategy. The grid shows that IT has maximum value when it affects both oper- ations and core business objectives. Based on McFarlan’s hypothesis, Applegate et al. established five key questions about IT that may be used by executives to guide strategic decision making: 1. Can IT be used to reengineer core value activities, and change the basis of competition? 2. Can IT change the nature of the relationship, and the balance of power, between buyers and sellers? 3. Can IT build or reduce barriers to entry? 4. Can IT increase or decrease switching costs? 5. Can IT add value to existing products and services, or create new ones?
  • 111.
    The research andanalysis conducted by McFarlan and Applegate, respectively, suggest that when operational strategy and its results are maximized, IT is given its highest valuation as a tool that can transform the organization. It then receives the maximum focus from senior management and board members. However, Applegate et al. (2003) also focus on the risks of using technology. These risks increase when executives have a poor understanding of competitive dynamics, when they fail to understand the long-term implications of a strategic system that they have launched, or when they fail to account for the time, effort, and cost required to ensure user adop- tion, assimilation, and effective utilization. Applegate’s conclusion 27the It dIleMMA underscores the need for IT management to educate senior man- agement, so that the latter will understand the appropriate indi- cators for what can maximize or minimize their investments in technology. Szulanski and Amin (2000) claim that while emerging technologies shrink the window in which any given strategy can be implemented, if the strategy is well thought out, it can remain viable.
  • 112.
    Mintzberg’s (1987) research suggeststhat it would be useful to think of strategy as an art, not a science. This perspective is especially true in situations of uncertainty. The rapidly changing pace of emerging technologies, we know, puts a strain on established approaches to strategy— that is to say, it becomes increasingly difficult to find comfortable implemen- tation of technological strategies in such times of fast-moving envi- ronments, requiring sophisticated organizational infrastructure and capabilities. Ways of Evaluating IT Firms have been challenged to find a way to best evaluate IT, particularly using traditional return on investment (ROI) approaches. Unfortunately, in this regard, many components of IT do not generate direct returns. Cost allocations based on overhead formulas (e.g., costs of IT as a percentage of revenues) are not applicable to most IT spend- ing needs. Lucas (1999) established nonmonetary methods for evalu- ating IT. His concept of conversion effectiveness places value on the ability of IT to complete its projects on time and within its budgets. This alone is a sufficient factor for providing ROI, assuming that the
  • 113.
    project was approvedfor valid business reasons. He called this overall process for evaluation the “garbage can” model. It allows organizations to present IT needs through a funneling pipeline of conversion effec- tiveness that filters out poor technology plans and that can determine which projects will render direct and indirect benefits to the organiza- tion. Indirect returns, according to Lucas, are those that do not pro- vide directly measurable monetary returns but do provide significant value that can be measured using his IT investment opportunities matrix. Utilizing statistical probabilities of returns, the opportunities matrix provides an effective tool for evaluating the impact of indirect returns. 28 InForMAtIon teChnoloGY Executive Knowledge and Management of IT While much literature and research have been produced on how IT needs to participate in and bring value to an organization, there has been relatively little analysis conducted on what non-IT chief execu- tives need to know about technology. Applegate et al. (2003) suggest
  • 114.
    that non-IT executivesneed to understand how to differentiate new technologies from older ones, and how to gauge the expected impact of these technologies on the businesses, in which the firm competes for market share. This is to say that technology can change the rela- tionship between customer and vendor, and thus, should be examined as a potential for providing competitive advantage. The authors state that non-IT business executives must become more comfortable with technology by actively participating in technology decisions rather than delegating them to others. They need to question experts as they would in the financial areas of their businesses. Lou Gerstner, former CEO of IBM , is a good example of a non-IT chief executive who acquired sufficient knowledge and understanding of a technology firm. He was then able to form a team of executives who better understood how to develop the products, services, and overall business strategy of the firm. Allen and Percival (2000) also investigate the importance of non- IT executive knowledge and participation with IT: “If the firm lacks the necessary vision, insights, skills, or core competencies, it may be unwise to invest in the hottest [IT] growth market” (p. 295).
  • 115.
    The authors point outthat success in using emerging technologies is dif- ferent from success in other traditional areas of business. They con- cluded that non-IT managers need to carefully consider expected synergies to determine whether an IT investment can be realized and, especially, whether it is efficient to earn cost of capital. Recent studies have focused on four important components in the linking of technology and business: its relationship to organizational structure, its role in business strategy, the means of its evaluation, and the extent of non-IT executive knowledge in technology. The chal- lenge in determining the best organizational structure for IT is posed by the accelerating technological advances since the 1970s and by the difficulty in comparing organizational models to consistent business cases. Consequently, there is no single organizational structure that has been adopted by businesses. 29the It dIleMMA While most chief executives understand the importance of using technology as part of their business strategy, they express frustra-
  • 116.
    tion in determininghow to effectively implement a technology- based strategic approach. This frustration results from difficulties in under- standing how IT investments relate to other strategic business issues, from difficulty in assessing payoff and performance of IT generally and from perceived poor relations between IT and other departments. Because most IT projects do not render direct monetary returns, exec- utives find themselves challenged to understand technology investments. They have difficulty measuring value since traditional ROI formulas are not applicable. Thus, executives would do better to focus on valuing tech- nology investments by using methods that can determine payback based on a matrix of indirect returns, which do not always include monetary sources. There is a lack of research on the question of what general knowl- edge non-IT executives need to have to effectively manage the strategic use of technology within their firms. Non-IT chief executives are often not engaged in day-to-day IT activities, and they often delegate dealing with strategic technology issues to other managers. The remainder of this chapter examines the issues raised by the IT dilemma in its various guises especially as they become relevant to, and are confronted from,
  • 117.
    the top management orchief executive point of view. IT: A View from the Top To investigate further the critical issues facing IT, I conducted a study in which I personally interviewed over 40 chief executives in vari- ous industries, including finance/investment, publishing, insurance, wholesale/retail, and hotel management. Executives interviewed were either the CEO or president of their respective corporations. I canvassed a population of New York-based midsize corporations for this interview study. Midsize firms, in our case, comprise businesses of between 200 and 500 employees. Face-to-face interviews were conducted, to allow participants the opportunity to articulate their responses, in contrast to answering printed survey questions; execu- tives were therefore allowed to expand, and clarify, their responses to questions. An interview guide (see questions in Tables 2.1 through 2.3) was designed to raise issues relevant to the challenges of using technology, as reported in the recent research literature, and to 30 InForMAtIon teChnoloGY
  • 118.
    consider significant phenomena,that could affect changes in the uses of technology, such as the Internet. The interview discussions focused on three sections: (1) chief executive perception of the role of IT, (2) management and strategic issues, and (3) measuring IT performance and activities. The results of the interviews are summarized next. Table 2.1 Perception and Role of IT QUESTION ANALYSIS 1. How do you define the role and the mission of IT in your firm? Fifty-seven percent responded that their IT organizations were reactive and did not really have a mission. Twenty-eight percent had an IT mission that was market driven; that is, their IT departments were responsible for actively participating in marketing and strategic processes. 2. What impact has the Internet had on your business strategy? Twenty-eight percent felt the impact was insignificant, while 24% felt it was critical. The remaining 48% felt that the impact of the Internet was significant to daily transactions. 3. Does the firm have its own internal software development activity? Do you develop your own in-house
  • 119.
    software or usesoftware packages? Seventy-six percent had an internal development organization. Eighty-one percent had internally developed software. 4. What is your opinion of outsourcing? Do you have the need to outsource technology? If so, how is this accomplished? Sixty-two percent had outsourced certain aspects of their technology needs. 5. Do you use consultants to help formulate the role of IT? If yes, what specific roles do they play? If not, why? Sixty-two percent of the participants used consultants to assist them in formulating the role of IT. 6. Do you feel that IT will become more important to the strategy of the business? If yes, why? Eighty-five percent felt that IT had recently become more important to the strategic planning of the business. 7. How is the IT department viewed by other departments? Is the IT department liked, or is it marginalized?
  • 120.
    Twenty-nine percent feltthat IT was still marginalized. Another 29% felt it was not very integrated. Thirty-eight percent felt IT was sufficiently integrated within the organization, but only one chief executive felt that IT was very integrated with the culture of his firm. 8. Do you feel there is too much “ hype” about the importance and role of technology? Fifty-three percent felt that there was no hype. However, 32% felt that there were levels of hype attributed to the role of technology; 10% felt it was “ all hype.” 9. Have the role and the uses of technology in the firm significantly changed over the last 5 years? If so, what are the salient changes? Fourteen percent felt little had changed, whereas 43% stated that there were moderate changes. Thirty-eight percent stated there was significant change. 31the It dIleMMA Table 2.2 Management and Strategic Issues QUESTION ANALYSIS 1. What is the most senior title held by someone in IT? Where does this person rank on the organization hierarchy?
  • 121.
    Sixty-six percent calledthe highest position chief information officer (CIO). Ten percent used managing director, while 24% used director as the highest title. 2. Does IT management ultimately report to you? Fifty percent of IT leaders reported directly to the chief executive (CEO). The other half reported to either the chief financial officer (CFO) or the chief operating officer (COO). 3. How active are you in working with IT issues? Fifty-seven percent stated that they are very active— on a weekly basis. Thirty-eight percent were less active or inconsistently involved, usually stepping in when an issue becomes problematic. 4. Do you discuss IT strategy with your peers from other firms? Eighty-one percent did not communicate with peers at all. Only 10% actively engaged in peer-to-peer communication about IT strategy. 5. Do IT issues get raised at board, marketing, and/or strategy meetings? Eighty-six percent confirmed that IT issues were regularly discussed at board meetings. However, only 57% acknowledged IT discussion during marketing meetings, and only 38% confirmed like discussions at strategic sessions.
  • 122.
    6. How criticalis IT to the day-to-day business? Eighty-two percent of the chief executives felt it was very significant or critical to the business. Table 2.3 Measuring IT Performance and Activities QUESTION ANALYSIS 1. Do you have any view of how IT should be measured and accounted for? Sixty-two percent stated that they had a view on measurement; however, there was significant variation in how executives defined measurement. 2. Are you satisfied with IT performance in the firm? There was significant variation in IT satisfaction. Only 19% were very satisfied. Thirty-three percent were satisfied, another 33% were less satisfied, and 14% were dissatisfied. 3. How do you budget IT costs? Is it based on a percentage of gross revenues? Fifty-seven percent stated that they did not use gross revenues in their budgeting methodologies. 4. To what extent do you perceive technology as a means of
  • 123.
    increasing marketing or productivityor both? Seventy-one percent felt that technology was a significant means of increasing both marketing and productivity in their firms. 5. Are Internet/Web marketing activities part of the IT function? Only 24% stated that Internet/Web marketing efforts reported directly to the IT organization. 32 InForMAtIon teChnoloGY Section 1: Chief Executive Perception of the Role of IT This section of the interview focuses on chief executive perceptions of the role of IT within the firm. For the first question, about the role and mission of IT, over half of the interviewees responded in ways that suggested their IT organizations were reactive, without a strate- gic mission. One executive admitted, “IT is not really defined. I guess its mission is to meet our strategic goals and increase profitability.” Another response betrays a narrowly construed understanding of its potential: “The mission is that things must work— zero tolerance for failure.” These two responses typify the vague and generalized
  • 124.
    percep- tion that IT“has no explicit mission” except to advance the important overall mission of the business itself. Little over a quarter of respon- dents could confirm a market-driven role for IT; that is, actively par- ticipating in marketing and strategic processes. Question 2, regarding the impact of the Internet on business strategy, drew mixed responses. Some of these revealed the deeply reflective challenges posed by the Internet: “I feel the Internet forces us to take a longer-term view and a sharper focus to our business.” Others emphasized its transformative potential: “The Internet is key to decentralization of our offices and business strategy.” Questions 3 and 4 focused on the extent to which firms have their own software development staffs, whether they use internally developed or packaged software, and whether they outsource IT services. Control over internal development of systems and applications remained important to the majority of chief executives: “I do not like outsourcing— surrender control, and it’s hard to bring back.” Almost two-thirds of the partici- pants employed consultants to assist them in formulating the role of IT within their firms but not always without reservation:
  • 125.
    “Whenever we have asignificant design issue we bring in consultants to help us— but not to do actual development work.” Only a few were downright skepti- cal: “I try to avoid consultants— what is their motivation?” The percep- tion of outsourcing is still low in midsize firms, as compared to the recent increase in IT outsourcing abroad. The lower use could be related to the initial costs and management overheads that are required to properly implement outsource operations in foreign countries. A great majority of chief executives recognized some form of the strategic importance of IT to business planning: “More of our business 33the It dIleMMA is related to technology and therefore I believe IT is more important to strategic planning.” Still, this sense of importance remained some- what intuitive: “I cannot quantify how IT will become more strategic to the business planning— but I sense that job functions will be dra- matically altered.” In terms of how IT is viewed by other departments within the firm, responses were varied. A little over a third of respon-
  • 126.
    dents felt ITwas reasonably integrated within the organization: “The IT department is vitally important— but rarely noticed.” The major- ity of respondents, however, recognized a need for greater integra- tion: “IT was marginalized— but it is changing. While IT drives the system— it needs to drive more of the business.” Some articulated clearly the perceived problems: “IT needs to be more proactive— they do not seem to have good interpersonal skills and do not understand corporate politics.” A few expressed a sense of misgiving (“IT people are strange— personality is an issue”) and even a sense of hopeless- ness: “People hate IT— particularly over the sensitivity of the data. IT sometimes is viewed as misfits and incompetent.” Question eight asked participants whether they felt there was too much “hype” attributed to the importance of technology in business. Over half responded in the negative, although not without reserva- tion: “I do not think there is too much hype— but I am disappointed. I had hoped that technology at this point would have reduced paper, decreased cost— it just has not happened.” Others felt that there is indeed some degree of sensationalism: “I definitely think there is too
  • 127.
    much hype— everyonewants the latest and greatest.” Hype in many cases can be related to a function of evaluation, as in this exclama- tion: “The hype with IT relates more to when will we actually see the value!” The last question in this section asks whether the uses of technology within the firm had significantly changed over the last five years. A majority agreed that it had: “The role of IT has changed significantly in the last five years—we need to stay up-to-date because we want to carry the image that we are ‘ on the ball’.” Many of these stressed the importance of informational flows: “I find the ‘ I’ [infor- mation] part to be more and more important and the ‘ T’ [technol- ogy] to be diminishing in importance.” Some actively downplayed the significance: “I believe in minimizing the amount of technology we use—people get carried away.” 34 InForMAtIon teChnoloGY Section 2: Management and Strategic Issues This section focuses on questions pertaining to executive and man- agement organizational concerns. The first and second questions asked executives about the most senior title held by an IT
  • 128.
    officer and about thereporting structure for IT. Two-thirds of the par- ticipants ranked their top IT officer as a chief information officer (CIO). In terms of organizational hierarchy, half of the IT leaders were at the second tier, reporting directly to the CEO or presi- dent, while the other half were at the third tier, reporting either to the chief financial officer (CFO) or to the chief operating offi- cer (COO). As one CEO stated, “Most of my activity with IT is through the COO. We have a monthly meeting, and IT is always on the agenda.” The third question asked executives to consider their level of involvement with IT matters. Over half claimed a highly active rela- tionship, engaging on a weekly basis: “I like to have IT people close and in one-on-one interactions. It is not good to have artificial barri- ers.” For some, levels of involvement may be limited: “I am active with IT issues in the sense of setting goals.” A third of participants claimed less activity, usually becoming active when difficulties arose. Question four asked whether executives spoke to their peers at other firms about technology issues. A high majority managed to skip this potential for communication with their peers. Only one in 10 actively pursued this matter of engagement. Question 5 asked about the extent to which IT issues were
  • 129.
    discussed at boardmeetings, marketing meetings, and business strategy sessions. Here, a great majority confirmed that there was regular discussion regarding IT concerns, especially at board meet- ings. A smaller majority attested to IT discussions during market- ing meetings. Over a third reported that IT issues maintained a presence at strategic sessions. The higher incidence at board meet- ings may still be attributable to the effects of Year 2000 (Y2K) preparations. The final question in this section concerned the level of criticality for IT in the day-to-day operations of the business. A high majority of executives responded affirmatively in this regard: “IT is critical to our survival, and its impact on economies of scale is significant.” 35the It dIleMMA Section 3: Measuring IT Performance and Activities This section is concerned with how chief executives measured IT per- formance and activities within their firms. The first question of this section asked whether executives had a view about how IT performance should be measured. Almost two-thirds affirmed having some formal or informal way of measuring performance: “We have no formal
  • 130.
    pro- cess of measuringIT other than predefined goals, cost constraints, and deadlines.” Their responses demonstrated great variation, sometimes leaning on cynicism: “I measure IT by the number of complaints I get.” Many were still grappling with this challenge: “Measuring IT is unqualified at this time. I have learned that hours worked is not the way to measure IT— it needs to be more goal- oriented.” Most chief execu- tives expressed some degree of quandary: “We do not feel we know enough about how IT should be measured.” Question two asked execu- tives to rate their satisfaction with IT performance. Here, also, there was significant variation. A little more than half expressed some degree of satisfaction: “Since 9/11 IT has gained a lot of credibility because of the support that was needed during a difficult time.” Slightly fewer than half revealed a degree of dissatisfaction: “We had to overhaul our IT department to make it more customer-service oriented.” Question three concerned budgeting; that is, whether or not chief executives budgeted IT costs as a percentage of gross revenues. Over half denied using gross revenues in their budgeting method: “When handling IT projects we look at it on a request-by-request
  • 131.
    basis.” The last twoquestions asked chief executives to assess the impact of technology on marketing and productivity. Almost three quarters of the participants felt that technology represented a significant means of enhancing both marketing and productivity. Some maintained a cer- tainty of objective: “We try to get IT closer to the customer— having them understand the business better.” Still, many had a less- defined sense of direction: “I have a fear of being left behind, so I do think IT will become more important to the business.” And others remained caught in uncertainty: “I do not fully understand how to use technol- ogy in marketing— but I believe it’s there.” Chief executive certainty, in this matter, also found expression in the opposite direction: “IT will become less important— it will be assumed as a capability and a service that companies provide to their customers.” Of the Internet/ 36 InForMAtIon teChnoloGY Web marketing initiatives, only one quarter of these reported directly to the IT organization: “IT does not drive the Web activities
  • 132.
    because they do notunderstand the business.” Often, these two were seen as separate or competing entities of technology: “Having Web develop- ment report to IT would hinder the Internet business’s growth poten- tial.” Yet, some might be willing to explore a synergistic potential: “We are still in the early stages of understanding how the Internet relates to our business strategy and how it will affect our product line.” General Results Section 1 revealed that the matter of defining a mission for the IT organization remains as unresolved as finding a way to reckon with the potential impact of IT on business strategy. Executives still seemed to be at a loss on the question of how to integrate IT into the workplace— a human resource as well as a strategic issue. There was uncertainty regard- ing the dependability of the technology information received. Most agreed, however, in their need for software development departments to support their internally developed software, in their need to outsource certain parts of technology, and in their use of outside consultants to help them formulate the future activities of their IT departments.
  • 133.
    Section 2 showedthat while the amount of time that executives spent on IT issues varied, there was a positive correlation between a structure in which IT managers reported directly to the chief executive and the degree of activity that executives stated they had with IT matters. Section 3 showed that chief executives understood the potential value that technol- ogy can bring to the marketing and productivity of their firms. They did not believe, however, that technology can go unmeasured; there needs to be some rationale for allotting a spending figure in the budget. For most of the firms in this study, the use of the Internet as a technological vehicle for future business was not determined by IT. This suggests that IT does not manage the marketing aspects of technology, and that it has not achieved significant integration in strategic planning. Defining the IT Dilemma The variations found in this study in terms of where IT reports, how it is measured, and how its mission is defined were consistent with 37the It dIleMMA
  • 134.
    existing research. But,the wide-ranging inconsistencies and uncer- tainties among executives described here left many of them wonder- ing whether they should be using IT as part of their business strategy and operations. While this quandary does not in itself suggest an inadequacy, it does point to an absence of a “best practices” guideline for using technology strategically. Hence, most businesses lacked a clear plan on how to evolve IT contributions toward business develop- ment. Although a majority of respondents felt that IT was critical to the survival of their businesses, the degree of IT assimilation within the core culture of organizations still varied. This suggests that the effects of cultural assimilation lag behind the actual involvement of IT in the strategic direction of the company. While Sampler (1996) attributes many operational inconsistencies to the changing landscape of technology, the findings of this study suggest that there is also a lack in professional procedures, rules, and established governance, that could support the creation of best practices for the profession. Bensaou and Earl (1998), on the one hand, have addressed this concern by taking a pro-Japanese perspective in extrapolating from
  • 135.
    five “Western” problemsfive “general” principles, presumably not cul- ture bound, and thence a set of “best principles” for managing IT. But, Earl et al. (1995), on the other hand, have sidestepped any attempt to incorporate Earl’s own inductive approach discussed here; instead, they favor a market management approach, based on a supply-and- demand model to “balance” IT management. Of course, best practices already embody the implicit notion of best principles; however, the problems confronting executives— the need for practical guidelines— remain. For instance, this study shows that IT performance is measured in many different ways. It is this type of practical inconsistency that leaves chief executives with the difficult challenge of understanding how technol- ogy decisions can be managed. On a follow-up call related to this study, for example, a CEO informed me of a practical yet significant difference she had instituted since our interview. She stated: The change in reporting has allowed IT to become part of the main- stream vision of the business. It now is a fundamental component of all discussions with human resources, sales and marketing, and accounting. The change in reporting has allowed for the creation of a
  • 136.
    critical system, 38 InForMAtIonteChnoloGY which has generated significant direct revenues for the business. I attri- bute this to my decision to move the reporting of technology directly to me and to my active participation in the uses of technology in our business. This is an example of an executive whom Schein (1994) would call a “change agent”— someone who employs “cognitive redefinition through scanning,” in this case to elicit the strategic potential of IT. We might also call this activity reflective thinking (Langer, 2001b). Schein’s change agents, however, go on to “acknowledge that future generations of CEOs will have been educated much more thoroughly in the possibilities of the computer and IT, thus enabling them to take a hands-on adopter stance” (p. 343). This insight implies a distanc- ing (“future”) of present learning responsibilities among current chief executives. The nearer future of this insight may instead be seen in the development of organizational learning.* These are two areas of contemporary research that begin to offer useful models in the
  • 137.
    pursuit of a bestpractices approach to the understanding and managing of IT. If the focus of this latter study was geared toward the evaluation of IT based on the view of the chief executive, it was, indeed, because their views necessarily shape the very direction for the organizations that they manage. Subsequent chapters of this book examine how the various dilemmas surrounding IT that I have discussed here are affecting organizations and how organizational learning practices can help answer many of the issues of today as raised by executives, man- agers, and operations personnel. Recent Developments in Operational Excellence The decline in financial markets in 2009, and the continued increase in mergers and acquisitions due to global competition have created an interesting opportunity for IT that reinforces the need for integration via organizational learning. During difficult economic periods, IT has traditionally been viewed as a cost center and had its operations * My case study “Fixing Bad Habits” (Langer, 2001b) has shown that integrating the practices of reflective thinking, to support the development
  • 138.
    of organizational learning, hasgreatly enhanced the adaptation of new technologies, their strategic valuation to the firm, and their assimilation into the social norms of the business. 39the It dIleMMA reduced (I discuss this further in Chapter 3, in which I introduce the concept of drivers and supporters). However, with the growth in the role of technology, IT management has now been asked to help improve efficiency through the use of technology across departments. That is, IT is emerging as an agent for business transformation in a much stronger capacity than ever before. This phenomenon has placed tremendous pressure on the technology executive to align with his or her fellow executives in other departments and to get them to partici- pate in cost reductions by implementing more technology. Naturally, using technology to facilitate cuts to the workforce is often unpopular, and there has been much bitter fallout from such cross- department reductions. Technology executives thus face the challenge of position- ing themselves as the agents of a necessary change. However, opera-
  • 139.
    tional excellence isbroader than just cutting costs and changing the way things operate; it is about doing things efficiently and with qual- ity measures across corporate operations. Now that technology affects every aspect of operations, it makes sense to charge technology execu- tives with a major responsibility to get it accomplished. The assimilation of technology as a core part of the entire orga- nization is now paramount for survival, and the technology execu- tive of today and certainly tomorrow will be one who understands that operational excellence through efficiency must be accomplished by educating business units in self-managing the process. The IT executive, then, supports the activity as a leader, not as a cost cut- ter who invades the business. The two approaches are very different, and adopting the former can result in significant long-term results in strategic alignment. My interviews with CEOs supported this notion: The CEO does not want to be the negotiator; change must be evolutionary within the business units themselves. While taking this kind of role in organiza- tional change presents a new dilemma for IT, it can also be an oppor- tunity for IT to position itself successfully within the organization.
  • 140.
    http://taylorandfrancis.com 41 3 TeChnology as a vaRiableanD Responsive oRganizaTional Dynamism Introduction This chapter focuses on defining the components of technology and how they affect corporate organizations. In other words, if we step back momentarily from the specific challenges that information tech- nology (IT) poses, we might ask the following: What are the generic aspects of technology that have made it an integral part of strategic and competitive advantage for many organizations? How do organizations respond to these generic aspects as catalysts of change? Furthermore, how do we objectively view the role of technology in this context, and how should organizations adjust to its short- and long-term impacts? Technological Dynamism
  • 141.
    To begin, technologycan be regarded as a variable, independent of others, that contributes to the life of a business operation. It is capable of producing an overall, totalizing, yet distinctive, effect on organizations— it has the unique capacity to create accelerations of corporate events in an unpredictable way. Technology, in its aspect of unpredictability, is necessarily a variable, and in its capacity as accel- erator— its tendency to produce change or advance— it is dynamic. My contention is that, as a dynamic kind of variable, technology, via responsive handling or management, can be tapped to play a special role in organizational development. It can be pressed into service as the dynamic catalyst that helps bring organizations to maturity in dealing not only with new technological quandaries, but also with other agents of change. Change generates new knowledge, which in turn requires a structure of learning that should, if managed properly, 42 INFORMATION TECHNOLOGY result in transformative behavior, supporting the continued evolution of organizational culture. Specifically, technology speeds up
  • 142.
    events, such as theexpectation of getting a response to an e-mail, and requires organizations to respond to them in ever-quickening time frames. Such events are not as predictable as those experienced by individuals in organizations prior to the advent of new technologies— particu- larly with the meteoric advance of the Internet. In viewing technology then as a dynamic variable, and one that requires systemic and cul- tural organizational change, we may regard it as an inherent, internal driving force— a form of technological dynamism. Dynamism is defined as a process or mechanism responsible for the development or motion of a system. Technological dynamism charac- terizes the unpredictable and accelerated ways in which technology, specifically, can change strategic planning and organizational behav- ior/culture. This change is based on the acceleration of events and interactions within organizations, which in turn create the need to better empower individuals and departments. Another way of under- standing technological dynamism is to think of it as an internal drive recognized by the symptoms it produces. The new events and interac- tions brought about by technology are symptoms of the
  • 143.
    dynamism that technology manifests.The next section discusses how organiza- tions can begin to make this inherent dynamism work in their favor on different levels. Responsive Organizational Dynamism The technological dynamism at work in organizations has the power to disrupt any antecedent sense of comfortable equilibrium or an unwelcome sense of stasis. It also upsets the balance among the vari- ous factors and relationships that pertain to the question of how we might integrate new technologies into the business— a question of what we will call strategic integration— and how we assimilate the cul- tural changes they bring about organizationally— a question of what we call cultural assimilation. Managing the dynamism, therefore, is a way of managing the effects of technology. I propose that these orga- nizational ripples, these precipitous events and interactions, can be addressed in specific ways at the organizational management level. The set of integrative responses to the challenges raised by technology 43teChnoloGY As A vArIAble And responsIve
  • 144.
    is what Iam calling responsive organizational dynamism, which will also receive further explication in the next few chapters. For now, we need to elaborate the two distinct categories that present themselves in response to technological dynamism: strategic integration and cul- tural assimilation. Figure 3.1 diagrams the relationships. Strategic Integration Strategic integration is a process that addresses the business- strategic impact of technology on organizational processes. That is, the business-strategic impact of technology requires immediate orga- nizational responses and in some instances zero latency. Strategic integration recognizes the need to scale resources across traditional business– geographic boundaries, to redefine the value chain in the life cycle of a product or service line, and generally to foster more agile business processes (Murphy, 2002). Strategic integration, then, Technology as an independent variable Creates Organizational
  • 145.
    dynamism Acceleration of eventsthat require different infrastructures and organizational processes Requires Strategic integration Cultural assimilation Symptoms and implications Figure 3.1 Responsive organizational dynamism. 44 INFORMATION TECHNOLOGY is a way to address the changing requirements of business processes caused by the sharp increases in uses of technology. Evolving tech- nologies have become catalysts for competitive initiatives that create new and different ways to determine successful business investment. Thus, there is a dynamic business variable that drives the need for
  • 146.
    technology infrastructures capableof greater flexibility and of exhib- iting greater integration with all business operations. Historically, organizational experiences with IT investment have resulted in two phases of measured returns. The first phase often shows negative or declining productivity as a result of the investment; in the second phase, we often see a lagging of, although eventual return to, productivity. The lack of returns in the first phase has been attributed to the nature of the early stages of technology exploration and experimentation, which tend to slow the process of organizational adaptation to technology. The production phase then lags behind the ability of the organization to integrate new technologies with its existing processes. Another complication posed by technological dynamism via the process of strategic integration is a phenomenon we can call factors of multiplicity — essentially, what happens when several new technology opportunities overlap and create myriad projects that are in various phases of their developmental life cycle. Furthermore, the problem is compounded by lagging returns in productivity, which are complicated to track and to represent to management. Thus, it is important that organizations find ways to shorten the period
  • 147.
    between investment and technology’s effective deployment. Murphy (2002) identifies several factors that are critical to bridging this delta: 1. Identifying the processes that can provide acceptable business returns from new technological investments 2. Establishing methodologies that can determine these processes 3. Finding ways to actually perform and realize expected benefits 4. Integrating IT projects with other projects 5. Adjusting project objectives when changes in the business require them Technology complicates these actions, making them more difficult to resolve; hence the need to manage the complications. To tackle these compounded concerns, strategic integration can shorten life cycle maturation by focusing on the following integrating factors: 45teChnoloGY As A vArIAble And responsIve • Addressing the weaknesses in management organizations in terms of how to deal with new technologies, and how to bet- ter realize business benefits • Providing a mechanism that both enables organizations to
  • 148.
    deal with acceleratedchange caused by technological innova- tions and integrates them into a new cycle of processing and handling change • Providing a strategic learning framework by which every new technology variable adds to organizational knowledge, par- ticularly using reflective practices (see Chapter 4) • Establishing an integrated approach that ties technology accountability to other measurable outcomes using organiza- tional learning techniques and theories To realize these objectives, organizations must be able to • Create dynamic internal processes that can function on a daily basis to deal with understanding the potential fit of new technologies and their overall value to the business • Provide the discourse to bridge the gaps between IT- and non-IT-related investments and uses into an integrated system • Monitor investments and determine modifications to the life cycle • Implement various organizational learning practices, includ- ing learning organization, knowledge management, change management, and communities of practice, all of which help foster strategic thinking and learning that can be linked to performance (Gephardt & Marsick, 2003) Another important aspect of strategic integration is what Murphy (2002) calls “ consequential interoperability,” in which “ the conse- quences of a business process” are understood to “ dynamically trigger
  • 149.
    integration” (p. 31).This integration occurs in what he calls the five pillars of benefits realization: 1. Strategic alignment: The alignment of IT strategically with business goals and objectives. 2. Business process impact: The impact on the need for the organi- zation to redesign business processes and integrate them with new technologies. 46 INFORMATION TECHNOLOGY 3. Architecture: The actual technological integration of appli- cations, databases, and networks to facilitate and support implementation. 4. Payback: The basis for computing return on investment (ROI) from both direct and indirect perspectives. 5. Risk: Identifying the exposure for underachievement or fail- ure in the technology investment. Murphy’ s (2002) pillars are useful in helping us understand how technology can engender the need for responsive organizational dyna- mism (ROD), especially as it bears on issues of strategic integration. They also help us understand what becomes the strategic integration component of ROD. His theory on strategic alignment and
  • 150.
    business process impact supportsthe notion that IT will increasingly serve as an undergirding force, one that will drive enterprise growth by identify- ing the initiators (such as e-business on the Internet) that best fit busi- ness goals. Many of these initiators will be accelerated by the growing use of e-business, which becomes the very driver of many new market realignments. This e-business realignment will require the ongoing involvement of executives, business managers, and IT managers. In fact, the Gartner Group forecasted that 70% of new software applica- tion investments and 5% of new infrastructure expenditures by 2005 would be driven by e-business. Indeed, this has occurred and contin- ues to expand. The combination of evolving business drivers with accelerated and changing customer demands has created a business revolution that best defines the imperative of the strategic integration component of ROD. The changing and accelerated way businesses deal with their customers and vendors requires a new strategic integration to become a reality rather than remain a concept discussed but affecting little action. Without action directed toward new strategic
  • 151.
    integration, organizations would losecompetitive advantage, which would affect profits. Most experts see e-business as the mechanism that will ulti- mately require the integrated business processes to be realigned, thus providing value to customers and modifying the customer– vendor relationship. The driving force behind this realignment emanates from the Internet, which serves as the principle accelerator of the change in transactions across all businesses. The general need to optimize 47teChnoloGY As A vArIAble And responsIve resources forces organizations to rethink and to realign business pro- cesses to gain access to new business markets. Murphy’ s (2002) pillar of architecture brings out yet another aspect of ROD. By architecture we mean the focus on the effects that technol- ogy has on existing computer applications or legacy systems (old exist- ing systems). Technology requires existing IT systems to be modified or replacement systems to be created that will mirror the new busi- ness realignments. These changes respond to the forces of strategic
  • 152.
    integration and requirebusiness process reengineering (BPR) activi- ties, which represent the reevaluation of existing systems based on changing business requirements. It is important to keep in mind the acceleration factors of technology and to recognize the amount of organizational effort and time that such projects take to complete. We must ask the following question: How might organizations respond to these continual requirements to modify existing processes? I discuss in other chapters how ROD represents the answer to this question. Murphy’ s (2002) pillar of direct return is somewhat limited and nar- row because not all IT value can be associated with direct returns, but it is important to discuss. Technology acceleration is forcing organiza- tions to deal with broader issues surrounding what represents a return from an investment. The value of strategic integration relies heavily on the ability of technology to encapsulate itself within other departments where it ultimately provides the value. We show in Chapter 4 that this issue also has significance in organizational formation. What this means is simply that value can be best determined within individual business units at the microlevel and that these appropriate-level
  • 153.
    busi- ness units alsoneed to make the case for why certain investments need to be pursued. There are also paybacks that are indirect; for example, Lucas (1999) demonstrates that many technology investments are non- monetary. The IT department (among others) becomes susceptible to great scrutiny and subject to budgetary cutbacks during economically difficult times. This does not suggest that IT “ hide” itself but rather that its investment be integrated within the unit where it provides the most benefit. Notwithstanding the challenge to map IT expenditures to their related unit, there are always expenses that are central to all departments, such as e-mail and network infrastructure. These types of expenses can rarely provide direct returns and are typically allocated across departments as a cost of doing business. 48 INFORMATION TECHNOLOGY Because of the increased number of technology opportuni- ties, Murphy’ s (2002) risk pillar must be a key part of strategic integration. The concept of risk assessment is not new to an organiza- tion; however, it is somewhat misunderstood as it relates to technology assessment. Technology assessment, because of the acceleration
  • 154.
    factor, must be embeddedwithin the strategic decision-making process. This can only be accomplished by having an understanding of how to align technology opportunities for business change and by understanding the cost of forgoing the opportunity as well as the cost of delays in delivery. Many organizations use risk assessment in an unstructured way, which does not provide a consistent framework to dynamically deal with emerging technologies. Furthermore, such assessment needs to be managed at all levels in the organization as opposed to being an event-driven activity controlled only by executives. Summary Strategic integration represents the objective of dealing with emerg- ing technologies on a regular basis. It is an outcome of ROD, and it requires organizations to deal with a variable, that forces acceleration of decisions in an unpredictable fashion. Strategic integration would require businesses to realign the ways in which they include technol- ogy in strategic decision making. Cultural Assimilation Cultural assimilation is a process that focuses on the
  • 155.
    organizational aspects of howtechnology is internally organized, including the role of the IT department, and how it is assimilated within the organiza- tion as a whole. The inherent, contemporary reality of technologi- cal dynamism requires not only strategic but also cultural change. This reality demands that IT organizations connect to all aspects of the business. Such affiliation would foster a more interactive culture rather than one that is regimented and linear, as is too often the case. An interactive culture is one that can respond to emerging technology decisions in an optimally informed way, and one that understands the impact on business performance. 49teChnoloGY As A vArIAble And responsIve The kind of cultural assimilation elicited by technological dyna- mism and formalized in ROD is divided into two subcategories: the study of how the IT organization relates and communicates with “ others,” and the actual displacement or movement of traditional IT staff from an isolated “ core” structure to a firm-wide, integrated framework. IT Organization Communications with “ Others”
  • 156.
    The Ravell casestudy shows us the limitations and consequences of an isolated IT department operating within an organization. The case study shows that the isolation of a group can lead to marginalization, which results in the kind of organization in which not all individuals can participate in decision making and implementation, even though such individuals have important knowledge and value. Technological dynamism is forcing IT departments to rethink their strategic posi- tion within the organizational structure of their firm. No longer can IT be a stand-alone unit designed just to service outside departments while maintaining its separate identity. The acceleration factors of technology require more dynamic activity within and among depart- ments, which cannot be accomplished through discrete communica- tions between groups. Instead, the need for diverse groups to engage in more integrated discourse, and to share varying levels of techno- logical knowledge, as well as business-end perspectives, requires new organizational structures that will of necessity give birth to a new and evolving business— social culture. Indeed, the need to assimilate technology creates a transformative effect on organizational
  • 157.
    cultures, the way theyare formed and re-formed, and what they will need from IT personnel. Movement of Traditional IT Staff To facilitate cultural assimilation from an IT perspective, IT must become better integrated with non-IT personnel. This form of inte- gration can require the actual movement of IT staff into other depart- ments, which begins the process of a true assimilation of resources among business units. While this may seem like the elimination of 50 INFORMATION TECHNOLOGY the integrity or identity of IT, such a loss is far from the case. The elimination of the IT department is not at all what is called for here; on the contrary, the IT department is critical to the function of cul- tural assimilation. However, the IT department may need to be struc- tured differently from the way it has been so that it can deal primarily with generic infrastructure and support issues, such as e-mail, net- work architecture, and security. IT personnel who focus on business-
  • 158.
    specific issues needto become closely aligned with the appropriate units so that ROD can be successfully implemented. Furthermore, we must acknowledge that, given the wide range of available knowledge about technology, not all technological knowl- edge emanates from the IT department. The question becomes one of finding the best structure to support a broad assimilation of knowledge about any given technology; then, we should ask how that knowledge can best be utilized by the organization. There is a pitfall in attempting to find a “ standard” IT organizational structure that will address the cultural assimilation of technology. Sampler’ s (1996) research, and my recent research with chief executives, confirms that no such standard structure exists. It is my position that organizations must find their own unique blend, using organizational learning con- structs. This simply means that the cultural assimilation of IT may be unique to the organization. What is then more important for the success of organizational development is the process of assimilation as opposed to the transplanting of the structure itself. Today, many departments still operate within “ silos” where they are unable to meet the requirements of the dynamic and
  • 159.
    unpredictable nature of technologyin the business environment. Traditional orga- nizations do not often support the necessary communications needed to implement cultural assimilation across business units. However, business managers can no longer make decisions without considering technology; they will find themselves needing to include IT staff in their decision-making processes. On the other hand, IT departments can no longer make technology-based decisions without concerted efforts toward assimilation (in contrast to occasional partnering or project-driven participation) with other business units. This assimi- lation becomes mature when new cultures evolve synergistically as opposed to just having multiple cultures that attempt to work in con- junction with each other. The important lesson from Ravell to keep 51teChnoloGY As A vArIAble And responsIve in mind here is that the process of assimilating IT can create new cultures that in turn evolve to better support the requirements estab- lished by the dynamism of technology.
  • 160.
    Eventually, these newcultural formations will not perceive them- selves as functioning within an IT or non-IT decision framework but rather as operating within a more central business operation that understands how to incorporate varying degrees of IT involvement as necessary. Thus, organizational cultures will need to fuse together to respond to new business opportunities and requirements brought about by the ongoing acceleration of technological innovation. This was also best evidenced by subsequent events at Ravell. Three years after the original case study, it became necessary at Ravell to inte- grate one of its business operations with a particular group of IT staff members. The IT personnel actually transferred to the business unit to maximize the benefits of merging both business and technical cul- tures. Interestingly, this business unit is currently undergoing cultural assimilation and is developing its own behavioral norms influenced by the new IT staff. However, technology decisions within such groups are not limited to the IT transferred personnel. IT and non-IT staff need to formulate decisions using various organizational learning techniques. These techniques are discussed in the next chapter.
  • 161.
    Summary Without appropriate culturalassimilation, organizations tend to have staff that “ take shortcuts, [then] the loudest voice will win the day, ad hoc decisions will be made, accountabilities lost, and lessons from suc- cesses and failures will not become part of ... wisdom” (Murphy, 2002, p. 152). As in the case of Ravell Corporation, it is essential, then, to provide for consistent governance that fits the profile of the existing cul- ture or can establish the need for a new culture. While many scholars and managers suggest the need to have a specific entity responsible for IT governance, one that is to be placed within the operating structure of the organization, such an approach creates a fundamental problem. It does not allow staff and managers the opportunity to assimilate tech- nologically driven change and understand how to design a culture that can operate under ROD. In other words, the issue of governance is misinterpreted as a problem of structural positioning or hierarchy when 52 INFORMATION TECHNOLOGY it is really one of cultural assimilation. As a result, many
  • 162.
    business solu- tions totechnology issues often lean toward the prescriptive, instead of the analytical, in addressing the real problem. Murphy’ s (2002) risk pillar theory offers us another important component relevant to cultural assimilation. This approach addresses the concerns that relate to the creation of risk cultures formed to deal with the impact of new systems. New technologies can actually cause changes in cultural assimilation by establishing the need to make cer- tain changes in job descriptions, power structures, career prospects, degree of job security, departmental influence, or ownership of data. Each of these potential risks needs to be factored in as an important part of considering how best to organize and assimilate technology through ROD. Technology Business Cycle To better understand technology dynamism, or how technology acts as a dynamic variable, it is necessary to define the specific steps that occur during its evolution in an organization. The evolution or business cycle depicts the sequential steps during the maturation of a new technology from feasibility to implementation and through subsequent evolution.
  • 163.
    Table 3.1 showsthe five components that comprise the cycle: feasibil- ity, measurement, planning, implementation, and evolution. Table 3.1 Technology Business Cycle CYCLE COMPONENT COMPONENT DESCRIPTION Feasibility Understanding how to view and evaluate emerging technologies, from a technical and business perspective. Measurement Dealing with both the direct monetary returns and indirect nonmonetary returns; establishing driver and support life cycles. Planning Understanding how to set up projects, establishing participation across multiple layers of management, including operations and departments. Implementation Working with the realities of project management; operating with political factions, constraints; meeting milestones; dealing with setbacks; having the ability to go live with new systems. Evolution Understanding how acceptance of new technologies affects cultural change, and how uses of technology will change as individuals and organizations become more knowledgeable about technology, and generate new ideas about how it can be used; objective is established through organizational dynamism, creating new knowledge and
  • 164.
    an evolving organization. 53teChnoloGY AsA vArIAble And responsIve Feasibility The stage of feasibility focuses on a number of issues surrounding the practicality of implementing a specific technology. Feasibility addresses the ability to deliver a product when it is needed in com- parison to the time it takes to develop it. Risk also plays a role in feasibility assessment; of specific concern is the question of whether it is possible or probable that the product will become obsolete before completion. Cost is certainly a huge factor, but viewed at a “ high level” (i.e., at a general cost range), and it is usually geared toward meeting the expected ROI of a firm. The feasibility process must be one that incorporates individuals in a way that allows them to respond to the accelerated and dynamic process brought forth by technological innovations. Measurement Measurement is the process of understanding how an investment
  • 165.
    in technology is calculated,particularly in relation to the ROI of an organization. The complication with technology and measurement is that it is simply not that easy to determine how to calculate such a return. This problem comes up in many of the issues discussed by Lucas (1999) in his book Information Technology and the Productivity Paradox. His work addresses many comprehensive issues, surround- ing both monetary and nonmonetary ROI, as well as direct ver- sus indirect allocation of IT costs. Aside from these issues, there is the fact that for many investments in technology the attempt to compute ROI may be an inappropriate approach. As stated, Lucas offered a “ garbage can” model that advocates trust in the operational management of the business and the formation of IT representatives into productive teams that can assess new technologies as a regu- lar part of business operations. The garbage can is an abstract con- cept for allowing individuals a place to suggest innovations brought about by technology. The inventory of technology opportunities needs regular evaluation. Lucas does not really offer an explana- tion of exactly how this process should work internally. ROD, how- ever, provides the strategic processes and organizational–
  • 166.
    cultural needs that canprovide the infrastructure to better understand and 54 INFORMATION TECHNOLOGY evaluate the potential benefits from technological innovations using the garbage can model. The graphic depiction of the model is shown in Figure 3.2. Planning Planning requires a defined team of user and IT representatives. This appears to be a simple task, but it is more challenging to understand how such teams should operate, from whom they need support, and what resources they require. Let me be specific. There are a number of varying types of “ users” of technology. They typically exist in three tiers: executives, business line managers, and operations users. Each of these individuals offers valuable yet different views of the benefits of technology (Langer, 2002). I define these user tiers as follows: 1. Executives: These individuals are often referred to as execu- tive sponsors. Their role is twofold. First, they provide input into the system, specifically from the perspective of pro-
  • 167.
    ductivity, ROI, andcompetitive edge. Second, and per- haps more important, their responsibility is to ensure that users are participating in the requisite manner (i.e., made Garbage can model of IT value Failed systems Direct benefits Indirect benefits User needs, etc. C on ve rs io n eff ec tiv en es s �e IT value pipeline
  • 168.
    Figure 3.2 Garbagecan model of IT value. (From Lucas, H.C., Information Technology and the Productivity Paradox. Oxford University Press, New York, 1999.) 55teChnoloGY As A vArIAble And responsIve to be available, in the right place, etc.). This area can be problematic because internal users are typically busy doing their jobs and sometimes neglect to provide input or to attend project meetings. Furthermore, executive sponsors can help control political agendas that can hurt the success of the project. 2. Business line managers: This interface provides the most information from a business unit perspective. These indi- viduals are responsible for two aspects of management. First, they are responsible for the day-to-day productivity of their unit; therefore, they understand the importance of productive teams, and how software can assist in this endeavor. Second, they are responsible for their staff. Thus, line managers need to know how software will affect their operational staff. 3. Functional users: These are the individuals in the trenches who understand exactly how processing needs to get done. While their purview of the benefits of the system is relatively nar- rower than that of the executives and managers, they provide the concrete information that is required to create the feature/ functions that make the system usable. The planning process becomes challenging when attempting to get the three user communities to integrate their needs and “
  • 169.
    agree to agree” onhow a technology project needs to be designed and managed. Implementation Implementation is the process of actually using a technology. Implementation of technology systems requires wider integration within the various departments than other systems in an organization because usually multiple business units are affected. Implementation must combine traditional methods of IT processes of development yet integrate them within the constraints, assumptions, and cultural (perhaps political) environments of different departments. Cultural assimilation is therefore required at this stage because it delves into the structure of the internal organization and requires individual participation in every phase of the development and implementation 56 INFORMATION TECHNOLOGY cycle. The following are some of the unique challenges facing the implementation of technological projects: 1. Project managers as complex managers: Technology projects require multiple interfaces that often lie outside the traditional user community. They can include interfacing with writers,
  • 170.
    editors, marketing personnel,customers, and consumers, all of whom are stakeholders in the success of the system. 2. Shorter and dynamic development schedules: Due to the dynamic nature of technology, its process of development is less lin- ear than that of others. Because there is less experience in the general user community, and there are more stakeholders, there is a tendency by those in IT, and executives, to underes- timate the time and cost to complete the project. 3. New untested technologies: There is so much new technol- ogy offered to organizations that there is a tendency by IT organizations to implement technologies that have not yet matured— that are not yet the best products they will eventu- ally be. 4. Degree of scope changes: Technology, because of its dynamic nature, tends to be prone to scope creed — the scope of the orig- inal project expanding during development. 5. Project management: Project managers need to work closely with internal users, customers, and consumers to advise them on the impact of changes to the project schedule. Unfortunately, scope changes that are influenced by changes in market trends may not be avoidable. Thus, part of a good strategy is to manage scope changes rather than attempt to stop them, which might not be realistic. 6. Estimating completion time: IT has always had difficulties in knowing how long it will take to implement a technology. Application systems are even more difficult because of the number of variables and unknowns.
  • 171.
    7. Lack ofstandards: The technology industry continues to be a profession that does not have a governing body. Thus, it is impossible to have real enforced standards that other pro- fessions enjoy. While there are suggestions for best prac- tices, many of them are unproven and not kept current with 57teChnoloGY As A vArIAble And responsIve changing developments. Because of the lack of successful application projects, there are few success stories to create new and better sets of best practices. 8. Less-specialized roles and responsibilities: The IT team tends to have staff members who have varying responsibilities. Unlike traditional new technology-driven projects, separation of roles and responsibilities is more difficult when operating in more dynamic environments. The reality is that many roles have not been formalized and integrated using something like ROD. 9. Broad project management responsibilities: Project management responsibilities need to go beyond those of the traditional IT manager. Project managers are required to provide manage- ment services outside the traditional software staff. They need to interact more with internal and external individuals, as well as with non-traditional members of the development team, such as Web text and content staff. Therefore, there are many more obstacles that can cause implementation problems. Evolution The many ways to form a technological organization with a natural
  • 172.
    capacity to evolvehave been discussed from an IT perspective in this chapter. However, another important factor is the changing nature of application systems, particularly those that involve e- businesses. E-business systems are those that utilize the Internet and engage in e-commerce activities among vendors, clients, and internal users in the organization. The ways in which e-business systems are built and deployed suggest that they are evolving systems. This means that they have a long life cycle involving ongoing maintenance and enhancement. They are, if you will, “ living systems” that evolve in a manner similar to organizational cultures. So, the traditional beginning-to-end life cycle does not apply to an e-business proj- ect that must be implemented in inherently ongoing and evolving phases. The important focus is that technology and organizational development have parallel evolutionary processes that need to be in balance with each other. This philosophy is developed further in the next chapter. 58 INFORMATION TECHNOLOGY Drivers and Supporters
  • 173.
    There are essentiallytwo types of generic functions performed by departments in organizations: driver functions and supporter func- tions. These functions relate to the essential behavior and nature of what a department contributes to the goals of the organization. I first encountered the concept of drivers and supporters at Coopers & Lybrand, which was at that time a Big 8* accounting firm. I stud- ied the formulation of driver versus supporter as it related to the role of our electronic data processing (EDP) department. The firm was attempting to categorize the EDP department as either a driver or a supporter. Drivers were defined in this instance as those units that engaged in frontline or direct revenue-generating activities. Supporters were units that did not generate obvious direct revenues but rather were designed to support frontline activities. For example, operations such as internal accounting, purchasing, or office management were all classified as supporter departments. Supporter departments, due to their nature, were evaluated on their effectiveness and efficiency or economies of scale. In contrast, driver organizations were expected to generate direct revenues and other ROI value for the firm. What
  • 174.
    was also interesting tome at the time was that drivers were expected to be more daring— since they must inevitably generate returns for the business. As such, drivers engaged in what Bradley and Nolan (1998) coined “ sense and respond” behaviors and activities. Let me explain. Marketing departments often generate new business by investing or “ sensing” an opportunity quickly because of competitive forces in the marketplace. Thus, they must sense an opportunity and be allowed to respond to it in a timely fashion. The process of sensing opportunity, and responding with competitive products or services, is a stage in the cycle that organizations need to support. Failures in the cycles of sense and respond are expected. Take, for example, the * The original “ Big 8” consisted of the eight large accounting and management con- sulting firms— Coopers & Lybrand, Arthur Anderson, Touche Ross, Deloitte Haskins & Sells, Arthur Young, Price Waterhouse, Pete Marwick Mitchell, and Ernst and Whinney— until the late 1980s, when these firms began to merge. Today, there are four: Price Waterhouse Coopers, Deloitte & Touche, Ernst & Young, and KPMG (Pete Marwick and others).
  • 175.
    59teChnoloGY As AvArIAble And responsIve launching of new fall television shows. Each of the major stations goes through a process of sensing which shows might be interesting to the viewing audience. They respond, after research and review, with a number of new shows. Inevitably, only a few of these selected shows are actually successful; some fail almost immediately. While relatively few shows succeed, the process is acceptable and is seen by manage- ment as the consequence of an appropriate set of steps for competing effectively— even though the percentage of successful new shows is low. Therefore, it is safe to say that driver organizations are expected to engage in high-risk operations, of which many will fail, for the sake of creating ultimately successful products or services. The preceding example raises two questions: (1) How does sense and respond relate to the world of IT? and (2) Why is it important? IT is unique in that it is both a driver and a supporter. The latter is the generally accepted norm in most firms. Indeed, most IT functions are established to support myriad internal functions, such as
  • 176.
    • Accounting andfinance • Data center infrastructure (e-mail, desktop, etc.) • Enterprise-level application (enterprise resource planning, ERP) • Customer support (customer relationship management, CRM) • Web and e-commerce activities As one would expect, these IT functions are viewed as overhead related, as somewhat of a commodity, and thus are constantly man- aged on an economy-of-scale basis— that is, how can we make this operation more efficient, with a particular focus on cost containment? So, what then are IT driver functions? By definition, they are those that engage in direct revenues and identifiable ROI. How do we define such functions in IT because most activities are sheltered under the umbrella of marketing organization domains? (Excluding, of course, software application development firms that engage in marketing for their actual application products.) I define IT driver functions as those projects that, if delivered, would change the relationship between the organization and its customers; that is, those activities that directly affect the classic definition of a market: forces of supply and demand, which are governed by the customer (demand) and the vendor (sup- plier) relationship. This concept can be shown in the case
  • 177.
    example that follows. 60 INFORMATIONTECHNOLOGY Santander versus Citibank Santander Bank, the major bank of Spain, had enjoyed a dominant market share in its home country. Citibank had attempted for years to penetrate Santander’ s dominance using traditional approaches (open- ing more branch offices, marketing, etc.) without success, until, that is, they tried online banking. Using technology as a driver, Citibank made significant penetration into the market share of Santander because it changed the customer– vendor relationship. Online bank- ing, in general, has had a significant impact on how the banking industry has established new markets, by changing this relationship. What is also interesting about this case is the way in which Citibank accounted for its investment in online banking; it knows little about its total investment and essentially does not care about its direct pay- back. Rather, Citibank sees its ROI in a similar way that depicts driver/marketing behavior; the payback is seen in broader terms to affect not only revenue generation, but also customer support and
  • 178.
    quality recognition. Information TechnologyRoles and Responsibilities The preceding section focuses on how IT can be divided into two dis- tinct kinds of business operations. As such, the roles and responsibili- ties within IT need to change accordingly and be designed under the auspices of driver and supporter theory. Most traditional IT depart- ments are designed to be supporters, so that they have a close- knit organization that is secure from outside intervention and geared to respond to user needs based on requests. While in many instances this type of formation is acceptable, it is limited in providing the IT department with the proper understanding of the kind of business objectives that require driver-type activities. This was certainly the experience in the Ravell case study. In that instance, I found that making the effort to get IT support personnel “ out from their com- fortable shells” made a huge difference in providing better service to the organization at large. Because more and more technology is becoming driver essential, this development will require of IT per- sonnel an increasing ability to communicate to managers and execu-
  • 179.
    tives and toassimilate within other departments. 61teChnoloGY As A vArIAble And responsIve The Ravell case, however, also brought to light the huge vacuum of IT presence in driver activities. The subsequent chief executive inter- view study also confirmed that most marketing IT-oriented activities, such as e-business, do not fall under the purview of IT in most orga- nizations. The reasons for this separation are correlated with the lack of IT executive presence within the management team. Another aspect of driver and supporter functions is the concept of a life cycle. A life cycle, in this respect, refers to the stages that occur before a product or service becomes obsolete. Technology products have a life cycle of value just as any other product or service. It is important not to confuse this life cycle with processes during devel- opment as discussed elsewhere in this chapter. Many technical products are adopted because they are able to deliver value that is typically determined based on ROI calculations. However, as products mature within an organization, they tend to become more of
  • 180.
    a commodity, andas they are normalized, they tend to become support- oriented. Once they reach the stage of support, the rules of economies of scale become more important and relevant to evaluation. As a prod- uct enters the support stage, replacement based on economies of scale can be maximized by outsourcing to an outside vendor who can provide the service cheaper. New technologies then can be expected to follow this kind of life cycle, by which their initial investment requires some level of risk to provide returns to the business. This initial investment is accomplished in ROD using strategic integration. Once the evalua- tions are completed, driver activities will prevail during the maturation process of the technology, which will also require cultural assimilation. Inevitably, technology will change organizational behavior and struc- ture. However, once the technology is assimilated and organizational behavior and structures are normalized, individuals will use it as a per- manent part of their day-to-day operations. Thus, driver activities give way to those of supporters. Senior managers become less involved, and line managers then become the more important group that completes the transition from driver to supporter.
  • 181.
    Replacement or Outsource Afterthe technology is absorbed into operations, executives will seek to maximize the benefit by increased efficiency and effectiveness. 62 INFORMATION TECHNOLOGY Certain product enhancements may be pursued during this phase; they can create “ mini-loops” of driver-to-supporter activities. Ultimately, a technology, viewed in terms of its economies of scale and longevity, is considered for replacement or outsourcing. Figure 3.3 graphically shows the cycle. The final stage of maturity of an evolving driver therefore includes becoming a supporter, at which time it becomes a commodity and, finally, an entity with potential for replacement or outsourcing. The next chapter explores how organizational learning theories can be used to address many of the issues and challenges brought forth in this chapter. Mini loop technology enhancementsTechnology driver
  • 182.
    Evaluation cycle Driver maturation Support status Replacement or outsource Economies of scale Figure3.3 Driver-to-supporter life cycle. 63 4 oRganizaTional leaRning TheoRies anD TeChnology Introduction The purpose of this chapter is to provide readers with an under- standing of organizational theory. The chapter covers some aspects of the history and context of organizational learning. It also defines and explains various learning protocols, and how they can be used to promote organizational learning. The overall objective of organiza-
  • 183.
    tional learning isto support a process that guides individuals, groups, and entire communities through transformation. Indeed, evidence of organizational transformation provides the very proof that learning has occurred, and that changes in behavior are occurring. What is important in this regard is that transformation remains internal to the organization so that it can evolve in a progressive manner while maintaining the valuable knowledge base that is contained within the personnel of an organization. Thus, the purpose of organiza- tional learning is to foster evolutionary transformation that will lead to change in behaviors and that is geared toward improving strategic performance. Approaches to organizational learning typically address how indi- viduals, groups, and organizations “notice and interpret information and use it to alter their fit with their environments” (Aldrich, 2001, p. 57). As such, however, organizational learning does not direct itself toward, and therefore has not been able to show, an inherent link to success—which is a critical concern for executive management. There are two perspectives on organizational learning theory. On the one hand, the adoptive approach, pioneered by Cyert and March
  • 184.
    (1963), treats organizations asgoal-oriented activity systems. These systems generate learning when repeating experiences that have either suc- ceeded or failed, discarding, of course, processes that have failed. 64 INFORMATION TECHNOLOGY Knowledge development, on the other hand, treats organizations as sets of interdependent members with shared patterns of cognition and belief (Argyris & Schö n, 1996). Knowledge development empha- sizes that learning is not limited to simple trial and error, or direct experience. Instead, learning is understood also to be inferential and vicarious; organizations can generate new knowledge through experi- mentation and creativity. It is the knowledge development perspec- tive that fits conceptually and empirically with work on technological evolution and organizational knowledge creation and deployment (Tushman & Anderson, 1986). There is a complication in the field of organizational learning over whether it is a technical or social process. Scholars disagree on this
  • 185.
    point. From thetechnical perspective, organizational learning is about the effective processing of, interpretation of, and response to information both inside and outside the organization. “An organiza- tion is assumed to learn if any of its units acquires knowledge that it recognizes as potentially useful to the organization” (Huber, 1991, p. 89). From the social perspective, on the other hand, comes the con- cept that learning is “something that takes place not with the heads of individuals, but in the interaction between people” (Easterby- Smith et al., 1999, p. 6). The social approach draws from the notion that patterns of behavior are developed, via patterns of socialization, by evolving tacit knowledge and skills. There is, regrettably, a lack of ongoing empirical investigation in the area of organizational learning pertaining, for example, to in-depth case studies, to micropractices within organizational settings, and to processes that lead to outcomes. Indeed, measuring learning is a difficult process, which is why there is a lack of research that focuses on outputs. As Prange (1999, p. 24) notes: “The multitude of ways in which organizational learning has been classified and used purports an ‘organizational learning jungle,’ which is becoming progressively dense and impenetrable.”
  • 186.
    Mackenzie (1994, p. 251)laments that what the “scientific community devoted to organizational learning has not produced discernable intellectual progress.” Ultimately, organizational learning must provide transformation that links to performance. Most organizations seeking improved per- formance expect changes that will support new outcomes. The study of organizational learning needs an overarching framework under which 65orGAnIzAtIonAl leArnInG theorIes an inquiry into the pivotal issues surrounding organizational change can be organized. Frameworks that support organizational learning, whether their orientation is on individuals, groups, or infrastructure, need to allow for natural evolution within acceptable time frames for the organization. This is the problem of organizational learning the- ory. It lacks a method of producing measurable results that executives can link to performance. While scholars seek outcomes through stra- tegic learning, there must be tangible evidence of individual and orga- nizational performance to ensure future investments in the
  • 187.
    concepts of learning. Technology,we should remember, represents the oppor- tunity to provide outcomes through strategic learning that addresses transitions and transformations over a specific life cycle. We saw this opportunity occur in the Ravell case study; the information technology (IT) department used organizational learn- ing. Specifically, individual reflective practices were used to provide measurable outcomes for the organization. In this case, the out- comes related to a specific event, the physical move of the business to a different location. Another lesson we can derive (with hindsight) from the Ravell experience is that learning was converted to strategic benefit for the organization. The concept of converting learning to strategic benefit was pioneered by Pietersen (2002). He established a strategic learning cycle composed of four component processes that he identified with the action verbs learn, focus, align, and execute. These are stages in the learning cycle, as follows: 1. Learn: Conduct a situation analysis to generate insights into the competitive environment and into the realities of the company. 2. Focus: Translate insights into a winning proposition that out- lines key priorities for success.
  • 188.
    3. Align: Alignthe organization and energize the people behind the new strategic focus. 4. Execute: Implement strategy and experiment with new con- cepts. Interpret results and continue the cycle. At Ravell, technology assisted in driving the learning cycle because, by its dynamic nature, it mandated the acceleration of the cycle that Pietersen (2002) describes in his stage strategy of implementation. Thus, Ravell required the process Pietersen outlined to occur within 66 INFORMATION TECHNOLOGY 6 months, and therein established the opportunity to provide outcomes. It also altered the culture of the organization (i.e., the evolution in cul- ture was tangible because the transformation was concrete). We see from the Ravell case that technology represents the best opportunity to apply organizational learning techniques because the use of it requires forms of evolutionary-related change. Organizations are continually seeking to improve their operations and competi- tive advantage through efficiency and effective processes. As I have discussed in previous chapters, today’s businesses are
  • 189.
    experiencing technological dynamism (definedas causing accelerated and dynamic transformations), and this is due to the advent of technologically driven processes. That is, organizations are experiencing more pressure to change and compete as a result of the accelerations that technology has brought about. Things happen quicker, and more unpredictably, than before. This situation requires organizations to sense the need for change and execute that change. The solution I propose is to tie orga- nizational theory to technological implementation. Another way of defining this issue is to provide an overarching framework that orga- nizes an inquiry into the issues surrounding organizational change. Another dimension of organizational learning is political. Argyris (1993) and Senge (1990) argue that politics gets “in the way of good learning.” In my view, however, the political dimension is very much part of learning. It seems naï ve to assume that politics can be elimi- nated from the daily commerce of organizational communication. Instead, it needs to be incorporated as a factor in organizational learn- ing theory rather than attempting to disavow or eliminate it, which is
  • 190.
    not realistic. Ravellalso revealed that political factors are simply part of the learning process. Recall that during my initial efforts to create a learning organization there were IT staff members who deliberately refused to cooperate, assuming that they could “outlast” me in my interim tenure as IT director. But politics, of course, is not limited to internal department negotiations; it was also a factor at Ravell with, and among, departments outside IT. These interdepartmental rela- tionships applied especially to line managers, who became essential advocates for establishing and sustaining necessary forms of learning at the organizational level. But, not all line managers responded with the same enthusiasm, and a number of them did not display a sense of authentically caring about facilitating synergies across departments. 67orGAnIzAtIonAl leArnInG theorIes The irrepressible existence of politics in social organizations, however, must not in itself deter us from implementing organizational learn- ing practices; it simply means that that we must factor it in as part of the equation. At Ravell, I had to work within the constraints
  • 191.
    of both internal andexternal politics. Nevertheless, in the end I was able to accomplish the creation of a learning organization. Another way one might look at the road bumps of politics is to assume that they will temporarily delay or slow the implementation of organizational learning initiatives. But, let us make no mistake about the potentially disruptive nature of politics because, as we know, in its extreme cases of inflexibility, it can be damaging. I have always equated politics with the dilemma of blood cholesterol. We know that there are two types of cholesterol: “good” cholesterol and “bad” cholesterol. We all know that bad cholesterol in your blood can cause heart disease, among other life-threatening conditions. However, good cholesterol is essential to the body. My point is simple; the general word politics can have damaging perceptions. When most people discuss the topic of cholesterol, they focus on the bad type, not the good. Such is the same with politics—that is, most individuals dis- cuss the bad type, which often corresponds with their personal expe- riences. My colleague Professor Lyle Yorks, at Columbia University, often lectures on the importance of politics and its positive
  • 192.
    aspects for establishing strategicadvocacy, defined as the ability to establish per- sonal and functional influence through cultivating alliances through defining opportunities for the adding value to either the top or bottom line (Langer & Yorks, 2013). Thus, politics can add value for indi- viduals by allowing them to initiate and influence relationships and conversations with other leaders. This, then, is “good” politics! North American cultural norms account for much of what goes into organizational learning theory, such as individualism, an empha- sis on rationality, and the importance of explicit, empirical informa- tion. IT, on the other hand, has a broadening, globalizing effect on organizational learning because of the sheer increase in the number of multicultural organizations created through the expansion of global firms. Thus, technology also affects the social aspects of organizational learning, particularly as it relates to the cultural evolution of commu- nities. Furthermore, technology has shown us that what works in one culture may not work in another. Dana Deasy, the former CIO of the 68 INFORMATION TECHNOLOGY
  • 193.
    Americas region/sector forSiemens AG, experienced the difficulties and challenges of introducing technology standards on a global scale. He quickly learned that what worked in North America did not oper- ate with the same expectations in Asia or South America. I discuss Siemens AG as a case study in Chapter 8. It is my contention, however, that technology can be used as an intervention that can actually increase organizational learning. In effect, the implementation of organizational learning has lacked and has needed concrete systemic processes that show results. A solution to this need can be found, as I have found it, in the incorporation of IT itself into the process of true organizational learning. The prob- lem with IT is that we keep trying to simplify it—trying to reduce its complexity. However, dealing with the what, when, and how of working with technology is complex. Organizations need a kind of mechanism that can provide a way to absorb and learn all of the com- plex pieces of technology. It is my position that organizational change often follows learn- ing, which to some extent should be expected. What controls whether change is radical or evolutionary depends on the basis on which
  • 194.
    new processes arecreated (Argyris & Schö n, 1996; Senge, 1990; Swieringa & Wierdsma, 1992). Indeed, at Ravell the learning fol- lowed the Argyris and Schö n approach: that radical change occurs when there are major events that support the need for accelerated change. In other words, critical events become catalysts that promote change, through reflection. On the other hand, there can be non- event-related learning, that is not so much radical in nature, as it is evolutionary. Thus, evolutionary learning is characterized as an ongo- ing process that slowly establishes the need for change over time. This evolutionary learning process compares to what Senge (1990, p. 15) describes as “learning in wholes as opposed to pieces.” This concept of learning is different from an event-driven perspec- tive, and it supports the natural tendency that groups and organiza- tions have to protect themselves from open confrontation and critique. However, technology provides an interesting variable in this regard. It is generally accepted as an agent of change that must be addressed by the organization. I believe that this agency can be seized as an opportunity to promote such change because it establishes a reason why organizations need to deal with the inevitable transitions
  • 195.
    brought 69orGAnIzAtIonAl leArnInG theorIes aboutby technology. Furthermore, as Huysman (1999) points out, the history of organizational learning has not often created measurable improvement, particularly because implementing the theories has not always been efficient or effective. Much of the impetus for implement- ing a new technology, however, is based on the premise that its use will result in such benefits. Therefore, technology provides compelling reasons for why organizational learning is important: to understand how to deal with agents of change, and to provide ongoing changes in the processes that improve competitive advantage. There is another intrinsic issue here. Uses of technology have not always resulted in efficient and effective outcomes, particularly as they relate to a firm’s expected ROI. In fact, IT projects often cost more than expected and tend to be delivered late. Indeed, research performed by the Gartner Group and CIO Magazine (Koch, 1999) reports that 54% of IT projects are late and that 22% are never com-
  • 196.
    pleted. In May2009, McGraw reported similar trends, so industry performance has not materially improved. This is certainly a disturb- ing statistic for a dynamic variable of change that promises outcomes of improved efficiency and effectiveness. The question then is why is this occurring? Many scholars might consider the answer to this ques- tion as complex. It is my claim, however, based on my own research, that the lack of organizational learning, both within IT and within other departments, poses, perhaps, the most significant barrier to the success of these projects in terms of timeliness and completion. Langer (2001b) suggests that the inability of IT organizations to understand how to deal with larger communities within the organization and to establish realistic and measurable outcomes are relevant both to many of the core values of organizational learning and to its importance in attaining results. What better opportunity is there to combine the strengths and weaknesses of each of IT and organizational learning? Perhaps what is most interesting—and, in many ways, lacking within the literature on organizational learning—is the actual way individuals learn. To address organizational learning, I believe it is
  • 197.
    imperative to addressthe learning styles of individuals within the organization. One fundamental consideration to take into account is that of individual turnover within departments. Thus, methods to measure or understand organizational learning must incorporate the individual; how the individual learns, and what occurs when 70 INFORMATION TECHNOLOGY individuals change positions or leave, as opposed to solely focusing on the event-driven aspect of evolutionary learning. There are two sociological positions about how individual learning occurs. The first suggests that individual action derives from determining influences in the social system, and the other suggests that it emanates from individual action. The former proposition supports the concept that learning occurs at the organizational, or group level, and the lat- ter supports it at the individual level of action and experience. The “system” argument focuses on learning within the organization as a whole and claims that individual action functions within its boundar- ies. The “individual” argument claims that learning emanates from the individual first and affects the system as a result of
  • 198.
    outcomes from individual actions.Determining a balance between individual and organizational learning is an issue debated by scholars and an impor- tant one that this book must address. Why is this issue relevant to the topic of IT and organizational learning? Simply put, understanding the nature of evolving technolo- gies requires that learning—and subsequent learning outcomes—will be heavily affected by the processes in which it is delivered. Therefore, without understanding the dynamics of how individuals and organi- zations learn, new technologies may be difficult to assimilate because of a lack of process that can determine how they can be best used in the business. What is most important to recognize is the way in which responsive organizational dynamism (ROD) needs both the system and individual approaches. Huysman (1999) suggests (and I agree) that organizational versus individual belief systems are not mutually exclusive pairs but dualities. In this way, organizational processes are not seen as just top-down or bottom-up affairs, but as accumulations of history, assimilated in organizational memory, which structures and positions the agency or capacity for learning. In a similar way,
  • 199.
    organizational learning canbe seen as occurring through the actions of individuals, even when they are constrained by institutional forces. The strategic integration component of ROD lends itself to the system model of learning to the extent that it almost mandates change— change that, if not addressed, will inevitably affect the competitive advantage of the organization. On the other hand, the cultural assim- ilation component of ROD is also involved because of its effect on individual behavior. Thus, the ROD model needs to be expanded to 71orGAnIzAtIonAl leArnInG theorIes show the relationship between individual and organizational learning as shown in Figure 4.1. An essential challenge to technology comes from the fact that organizations are not sure about how to handle its overall potential. Thus, in a paradoxical way, this quandary provides a springboard to learning by utilizing organizational learning theories and concepts to create new knowledge, by learning from experience, and ultimately by linking technology to learning and performance. This perspective can be promoted from within the organization because chief
  • 200.
    executives are generally opento investing in learning as long as core business principles are not violated. This position is supported by my research with chief executives that I discussed in Chapter 2. Organizational dynamism Acceleration of events that require different infrastructures and organizational processes Requires Strategic integration Cultural assimilation Organization structures (system) Individual actions Renegotiation of relationship Organizational learning techniques
  • 201.
    Symptoms and implications Technology Figure 4.1ROD and organizational learning. 72 INFORMATION TECHNOLOGY Organizational learning can also assist in the adoption of technologies by providing a mechanism to help individuals manage change. This notion is consistent with Aldrich (2001), who observes that many organizations reject technology-driven changes or “pio- neering ventures,” which he called competence-destroying ventures because they threaten existing norms and processes. Organizations would do well to understand the value of technology, particularly for those who adopt it early (early adopters), and how it can lead to com- petitive advantages. Thus, organizations that position themselves to evolve, to learn, and to create new knowledge are better prepared to foster the handling, absorption, and acceptance of technology- driven change than those that are not. Another way to view this ethic is to recognize that organizations need to be “ready” to deal with change—
  • 202.
    change that isaccelerated by technology innovations. Although Aldrich (2001) notes that organizational learning has not been tied to performance and success, I believe it will be the technology revolu- tion that establishes the catalyst that can tie organizational learning to performance. The following sections of this chapter expand on the core concept that the success of ROD is dependent on the uses of organizational learning techniques. In each section, I correlate this concept to many of the organizational learning theories and show how they can be tailored and used to provide important outcomes that assist the pro- motion of both technological innovation and organizational learning. Learning Organizations Business strategists have realized that the ability of an organization to learn faster, or “better,” than its competitors may indeed be the key to long-term business success (Collis, 1994; Dodgson, 1993; Grant, 1996; Jones, 1975). A learning organization is defined as a form of organization that enables, in an active sense, the learning of its mem- bers in such a way that it creates positive outcomes, such as innovation,
  • 203.
    efficiency, improved alignmentwith the environment, and competi- tive advantage. As such, a learning organization is one that acquires knowledge from within. Its evolution, then, is primarily driven by itself without the need for interference from outside forces. In this sense, it is a self-perpetuating and self-evolving system of individual 73orGAnIzAtIonAl leArnInG theorIes and organizational transformations integrated into the daily processes of the organization. It should be, in effect, a part of normal organiza- tional behavior. The focus of organizational learning is not so much on the process of learning but more on the conditions that allow suc- cessful outcomes to flourish. Learning organization literature draws from organizational learning theory, particularly as it relates to inter- ventions based on outcomes. This provides an alternative to social approaches. In reviewing these descriptions of what a learning organization does, and why it is important, we can begin to see that technology may be one of the few agents that can actually show what learning organi-
  • 204.
    zations purport todo. Indeed, Ravell created an evolving population that became capable of dealing with environmental changes brought on by technological innovation. The adaptation of these changes created those positive outcomes and improved efficiencies. Without organizational learning, specifically the creation of a learning organi- zation, many innovations brought about by technology could produce chaos and instability. Organizations generally tend to suffer from, and spend too much time reflecting on, their past dilemmas. However, given the recent phenomenon of rapid changes in technology, orga- nizations can no longer afford the luxury of claiming that there is simply too much else to do to be constantly worrying about technol- ogy. Indeed, Lounamaa and March (1987) state that organizations can no longer support the claim that too-frequent changes will inhibit learning. The fact is that such changes must be taken as evolutionary, and as a part of the daily challenges facing any organization. Because a learning organization is one that creates structure and strategies, it is positioned to facilitate the learning of all its members, during the ongoing infiltration of technology-driven agents of change. Boland et al. (1994) show that information systems based on
  • 205.
    multimedia technologies may enhancethe appreciation of diverse interpretations within organizations and, as such, support learning organizations. Since learning organizations are deliberately created to facilitate the learning of their members, understanding the urgency of technologi- cal changes can provide the stimulus to support planned learning. Many of the techniques used in the Ravell case study were based on the use of learning organizational techniques, many of which were pioneered by Argyris and Schö n (1996). Their work focuses on using 74 INFORMATION TECHNOLOGY “action science” methods to create and maintain learning organiza- tions. A key component of action science is the use of reflective prac- tices—including what is commonly known among researchers and practitioners as reflection in action and reflection on action. Reflection with action is the term I use as a rubric for these various methods, involving reflection in relation to activity. Reflection has received a number of definitions, from different sources in the literature.
  • 206.
    Depending on theemphasis, whether on theory or practice, defini- tions vary from philosophical articulation (Dewey, 1933; Habermas, 1998), to practice-based formulations, such as Kolb’s (1984b) use of reflection in the experiential learning cycle. Specifically, reflection with action carries the resonance of Schö n’s (1983) twin constructs: reflection on action and reflection in action, which emphasize reflec- tion in retrospect, and reflection to determine which actions to take in the present or immediate future, respectively. Dewey (1933) and Hullfish and Smith (1978) also suggest that the use of reflection sup- ports an implied purpose: individuals reflect for a purpose that leads to the processing of a useful outcome. This formulation suggests the possibility of reflection that is future oriented—what we might call “reflection to action.” These are methodological orientations covered by the rubric. Reflective practices are integral to ROD because so many technology-based projects are event driven and require individu- als to reflect before, during, and after actions. Most important to this process is that these reflections are individually driven and that technology projects tend to accelerate the need for rapid
  • 207.
    decisions. In other words,there are more dynamic decisions to be made in less time. Without operating in the kind of formation that is a learning organization, IT departments cannot maintain the requisite infra- structure to develop products timely on time and support business units—something that clearly is not happening if we look at the existing lateness of IT projects. With respect to the role of reflec- tion in general, the process can be individual or organizational. While groups can reflect, it is in being reflective that individuals bring about “an orientation to their everyday lives,” according to Moon (1999). “For others reflection comes about when conditions in the learning environment are appropriate” (p. 186). However, IT departments have long suffered from not having the conditions 75orGAnIzAtIonAl leArnInG theorIes to support such an individual learning environment. This is why implementing a learning organization is so appealing as a remedy for a chronic problem. Communities of Practice Communities of practice are based on the assumption that learning
  • 208.
    starts with engagementin social practice and that this practice is the fundamental construct by which individuals learn (Wenger, 1998). Thus, communities of practice are formed to get things done by using a shared way of pursuing interest. For individuals, this means that learning is a way of engaging in, and contributing to, the practices of their communities. For specific communities, on the other hand, it means that learning is a way of refining their distinctive practices and ensuring new generations of members. For entire organizations, it means that learning is an issue of sustaining interconnected com- munities of practice, which define what an organization knows and contributes to the business. The notion of communities of practice supports the idea that learning is an “inevitable part of participat- ing in social life and practice” (Elkjaer, 1999, p. 75). Communities of practice also include assisting members of the community, with the particular focus on improving their skills. This is also known as situ- ated learning. Thus, communities of practice are very much a social learning theory, as opposed to one that is based solely on the indi- vidual. Communities of practice have been called learning in working,
  • 209.
    in which learningis an inevitable part of working together in a social setting. Much of this concept implies that learning, in some form or other will occur, and that it is accomplished within a framework of social participation, not solely or simply in the individual mind. In a world that is changing significantly due to technological innovations, we should recognize the need for organizations, communities, and individuals to embrace the complexities of being interconnected at an accelerated pace. There is much that is useful in the theory of communities of practice and that justifies its use in ROD. While so much of learning technol- ogy is event driven and individually learned, it would be shortsighted to believe that it is the only way learning can occur in an organization. Furthermore, the enormity and complexity of technology requires a 76 INFORMATION TECHNOLOGY community focus. This would be especially useful within the confines of specific departments that are in need of understanding how to deal with technological dynamism. That is, preparation for using new
  • 210.
    technolo- gies cannot beaccomplished by waiting for an event to occur. Instead, preparation can be accomplished by creating a community that can assess technologies as a part of the normal activities of an organization. Specifically, this means that, through the infrastructure of a commu- nity, individuals can determine how they will organize themselves to operate with emerging technologies, what education they will need, and what potential strategic integration they will need to prepare for changes brought on by technology. Action in this context can be viewed as a continuous process, much in the same way that I have presented technol- ogy as an ongoing accelerating variable. However, Elkjaer (1999) argues that the continuous process cannot exist without individual interaction. As he states: “Both individual and collective activities are grounded in the past, the present, and the future. Actions and interactions take place between and among group members and should not be viewed merely as the actions and interactions of individuals” (p. 82). Based on this perspective, technology can be handled by the actions (community) and interactions (individuals) of the organiza- tion as shown in Figure 4.2.
  • 211.
    Communities of practice: Socialactions of how to deal with technology Allows groups to engage in discourse and examine the ongoing effects on the department/unit, including short/long-term education requirements, skills transfer and development, organizational issues, relationships with other departments and customers �e individual interacts with others and determines new methods of utilizing technology within his/her specific business objectives. Individuals use reflection as the basis of transformative learning. Event-driven individual- based learning Figure 4.2 Technology relationship between communities and individuals. 77orGAnIzAtIonAl leArnInG theorIes It seems logical that communities of practice provide the
  • 212.
    mecha- nism to assist,particularly, with the cultural assimilation component of ROD. Indeed, cultural assimilation targets the behavior of the community, and its need to consider what new organizational struc- tures can better support emerging technologies. I have, in many ways, already established and presented the challenge of what should be called the “community of IT practice” and its need to understand how to restructure to meet the needs of the organization. This is the kind of issue that does not lend itself to event-driven, individual learning, but rather to a more community-based process that can deal with the realignment of departmental relationships. Essentially, communities of IT practice must allow for the con- tinuous evolution of learning based on emergent strategies. Emergent strategies acknowledge unplanned action. Such strategies are defined as patterns that develop in the absence of intentions (Mintzberg & Waters, 1985). Emergent strategies can be used to gather groups that can focus on issues not based on previous plans. These strategies can be thought of as creative approaches to proactive actions. Indeed, a frustrating aspect of technology is its uncertainty. Ideas and concepts borrowed from communities of practice can help departments
  • 213.
    deal with the evolutionaryaspects of technological dynamism. The relationship, then, between communities of practice and tech- nology is significant. Many of the projects involving IT have been tra- ditionally based on informal processes of learning. While there have been a number of attempts to computerize knowledge using various information databases, they have had mixed results. A “structured” approach to creating knowledge reporting is typically difficult to estab- lish and maintain. Many IT departments have utilized International Organization for Standardization (ISO) 9000 concepts. The ISO is a worldwide organization that defines quality processes through for- mal structures. It attempts to take knowledge-based information and transfer it into specific and documented steps that can be evaluated as they occur. Unfortunately, the ISO 9000 approach, even if realized, is challenging when such knowledge and procedures are undergoing constant and unpredictable change. Technological dynamism cre- ates too many uncertainties to be handled by the extant discourses on how organizations have dealt with change variables. Communities of practice provide an umbrella of discourses that are necessary to
  • 214.
    deal 78 INFORMATION TECHNOLOGY withongoing and unpredictable interactions established by emerging technologies. Support for this position is found in the fact that technology requires accumulative collective learning that needs to be tied to social prac- tices; this way, project plans can be based on learning as a participatory act. One of the major advantages of communities of practice is that they can integrate key competencies into the very fabric of the organi- zation (Lesser et al., 2000). The typical disadvantage of IT is that its staff needs to serve multiple organizational structures simultaneously. This requires that priorities be set by the organization. Unfortunately, it is difficult, if not impossible, for IT departments to establish such priorities without engaging in concepts of communities of practice that allow for a more integrated process of negotiation and determination. Much of the process of communities of practice would be initiated by strategic integration and result in many cultural assimilation changes;
  • 215.
    that is, theprocess of implementing communities of practice will necessitate changes in cultural behavior and organization processes. As stated, communities-of-practice activities can be initiated via the strategic integration component of ROD. According to Lesser et al. (2000), a knowledge strategy based on communities of practice consists of seven basic steps (Table 4.1). Lesser and Wenger (2000) suggest that communities of practice are heavily reliant on innovation: “Some strategies rely more on inno- vation than others for their success. … Once dependence on innova- tion needs have been clarified, you can work to create new knowledge where innovation matters” (p. 8). Indeed, electronic communities of practice are different from physical communities. IT provides another dimension to how technology affects organizational learning. It does so by creating new ways in which communities of practice operate. In the complexity of ways that it affects us, technology has a dichoto- mous relationship with communities of practice. That is, there is a two-sided issue: (1) the need for communities of practice to imple- ment IT projects and integrate them better into learning organiza-
  • 216.
    tions, and (2)the expansion of electronic communities of practice invoked by technology, which can, in turn, assist in organizational learning, globally and culturally. The latter issue establishes the fact that a person can now readily be a member of many electronic communities, and in many different 79orGAnIzAtIonAl leArnInG theorIes capacities. Electronic communities are different, in that they can have memberships that are short-lived and transient, forming and re-forming according to interest, particular tasks, or commonality of issue. Communities of practice themselves are utilizing technologies to form multiple and simultaneous relationships. Furthermore, the growth of international communities resulting from ever- expanding global economies has created further complexities and dilemmas. Thus far, I have presented communities of practice as an infra- structure that can foster the development of organizational learn- ing to support the existence of technological dynamism. Most of what I presented has an impact on the cultural assimilation com- ponent of ROD—that is, affecting organizational structure and
  • 217.
    the Table 4.1 ExtendedSeven Steps of Community of Practice Strategy STEP COMMUNITIES-OF-PRACTICE STEP TECHNOLOGY EXTENSION 1 Understanding strategic knowledge needs: What knowledge is critical to success. Understanding how technology affects strategic knowledge, and what specific technological knowledge is critical to success. 2 Engaging practice domains: People form communities of practice to engage in and identify with. Technology identifies groups, based on business-related benefits; requires domains to work together toward measurable results. 3 Developing communities: How to help key communities reach their full potential. Technologies have life cycles that require communities to continue; treats the life cycle as a supporter for attaining maturation and full potential. 4 Working the boundaries: How to link communities to form broader learning systems.
  • 218.
    Technology life cyclesrequire new boundaries to be formed. This will link other communities that were previously outside discussions and thus, expand input into technology innovations. 5 Fostering a sense of belonging: How to engage people’s identities and sense of belonging. The process of integrating communities: IT and other organizational units will create new evolving cultures that foster belonging as well as new social identities. 6 Running the business: How to integrate communities of practice into running the business of the organization. Cultural assimilation provides new organizational structures that are necessary to operate communities of practice and to support new technological innovations. 7 Applying, assessing, reflecting, renewing: How to deploy knowledge strategy through waves of organizational transformation. The active process of dealing with multiple new technologies that accelerates the deployment of knowledge strategy. Emerging technologies increase the need for organizational transformation.
  • 219.
    80 INFORMATION TECHNOLOGY waythings need to be done. However, technology, particularly the strategic integration component of ROD, fosters a more expanded vision of what can represent a community of practice. What does this mean? Communities of practice, through the advent of strate- gic integration, have expanded to include electronic communities. While technology can provide organizations with vast electronic libraries that end up as storehouses of information, they are only valuable if they are allowed to be shared within the community. Although IT has led many companies to imagine a new world of leveraged knowledge, communities have discovered that just storing information does not provide for effective and efficient use of knowl- edge. As a result, many companies have created these “electronic” communities so that knowledge can be leveraged, especially across cultures and geographic boundaries. These electronic communities are predictably more dynamic as a result of what technology pro- vides to them. The following are examples of what these communi- ties provide to organizations:
  • 220.
    • Transcending boundariesand exchanging knowledge with internal and external communities. In this circumstance, communities are extending not only across business units, but also into communities among various clients—as we see developing in advanced e-business strategies. Using the Internet and intranets, communities can foster dynamic inte- gration of the client, an important participant in competitive advantage. However, the expansion of an external commu- nity, due to emergent electronics, creates yet another need for the implementation of ROD. • Creating “Internet” or electronic communities as sources of knowledge (Teigland, 2000), particularly for technical- oriented employees. These employees are said to form “com- munities of techies”: technical participants, composed largely of the IT staff, who have accelerated means to come into con- tact with business-related issues. In the case of Ravell, I cre- ated small communities by moving IT staff to allow them to experience the user’s need; this move is directly related to the larger, and expanded, ability of using electronic communities of practice. 81orGAnIzAtIonAl leArnInG theorIes • Connecting social and workplace communities through sophisticated networks. This issue links well to the entire expansion of issues surrounding organizational learning, in particular, learning organization formation. It enfolds both the process and the social dialectic issues so important to cre- ating well-balanced communities of practice that deal with organizational-level and individual development. • Integrating teleworkers and non-teleworkers, including the study of gender and cultural differences. The growth of dis-
  • 221.
    tance workers willmost likely increase with the maturation of technological connectivity. Videoconferencing and improved media interaction through expanded broadband will support further developments in virtual workplaces. Gender and cul- ture will continue to become important issues in the expan- sion of existing models that are currently limited to specific types of workplace issues. Thus, technology allows for the “globalization” of organizational learning needs, especially due to the effects of technological dynamism. • Assisting in computer-mediated communities. Such media- tion allows for the management of interaction among com- munities, of who mediates their communications criteria, and of who is ultimately responsible for the mediation of issues. Mature communities of practice will pursue self-mediation. • Creating “flame” communities. A flame is defined as a lengthy, often personally insulting, debate in an electronic commu- nity that provides both positive and negative consequences. Difference can be linked to strengthening the identification of common values within a community but requires organiza- tional maturation that relies more on computerized commu- nication to improve interpersonal and social factors to avoid miscommunications (Franco et al., 2000). • Storing collective knowledge in large-scale libraries and databases. As Einstein stated: “Knowledge is experience. Everything else is just information.” Repositories of informa- tion are not knowledge, and they often inhibit organizations from sharing important knowledge building blocks that affect technical, social, managerial, and personal developments that are critical for learning organizations (McDermott, 2000).
  • 222.
    82 INFORMATION TECHNOLOGY Ultimately,these communities of practice are forming new social networks, which have established the cornerstone of “global connectiv- ity, virtual communities, and computer-supported cooperative work” (Wellman et al., 2000, p. 179). These social networks are creating new cultural assimilation issues, changing the very nature of the way organizations deal with and use technology to change how knowledge develops and is used via communities of practice. It is not, therefore, that communities of practice are new infrastructure or social forces; rather, the difference is in the way they communicate. Strategic inte- gration forces new networks of communication to occur (the IT effect on communities of practice), and the cultural assimilation component requires communities of practice to focus on how emerging technolo- gies are to be adopted and used within the organization. In sum, what we are finding is that technology creates the need for new organizations that establish communities of practice. New members enter the community and help shape its cognitive schemata. Aldrich (2001) defines cognitive schemata as the “structure that repre- sents organized knowledge about persons, roles, and events”
  • 223.
    (p. 148). This isa significant construct in that it promotes the importance of a balanced evolutionary behavior among these three areas. Rapid learn- ing, or organizational knowledge, brought on by technological inno- vations can actually lessen progress because it can produce premature closure (March, 1991). Thus, members emerge out of communities of practice that develop around organizational tasks. They are driven by technological innovation and need constructs to avoid premature clo- sure, as well as ongoing evaluation of perceived versus actual realities. As Brown and Duguid (1991, p. 40) state: The complex of contradictory forces that put an organization’s assump- tions and core beliefs in direct conflict with members’ working, learn- ing, and innovating arises from a thorough misunderstanding of what working, learning, and innovating are. As a result of such misunder- standings, many modern processes and technologies, particularly those designed to downskill, threaten the robust working, learning, and inno- vating communities and practice of the workplace. This perspective can be historically justified. We have seen time and time again how a technology’s original intention is not
  • 224.
    realized 83orGAnIzAtIonAl leArnInG theorIes yetstill productive. For instance, many uses of e-mail by individuals were hard to predict. It may be indeed difficult, if not impossible, to predict the eventual impact of a technology on an organization and provide competitive advantages. However, based on evolutionary theories, it may be beneficial to allow technologies to progress from driver-to-supporter activity. Specifically, this means that communi- ties of practice can provide the infrastructure to support growth from individual-centered learning; that is, to a less event-driven process that can foster systems thinking, especially at the management levels of the organization. As organizations evolve into what Aldrich (2001) call “bounded entities,” interaction behind boundaries heightens the salience of cultural difference. Aldrich’s analysis of knowledge cre- ation is consistent with what he called an “adaptive organization”—one that is goal oriented and learns from trial and error (individual- based learning)—and a “knowledge development” organization (system-
  • 225.
    level learning). Thelatter consists of a set of interdependent members who share patterns of belief. Such an organization uses inferential and vicarious learning and generates new knowledge from both experi- mentation and creativity. Specifically, learning involves sense mak- ing and builds on the knowledge development of its members. This becomes critical to ROD, especially in dealing with change driven by technological innovations. The advantages and challenges of vir- tual teams and communities of practice are expanded in Chapter 7, in which I integrate the discussion with the complexities of outsourcing teams. Learning Preferences and Experiential Learning The previous sections of this chapter focused on organizational learn- ing, particularly two component theories and methods: learning organizations and communities of practice. Within these two meth- ods, I also addressed the approaches to learning; that is, learning that occurs on the individual and the organizational levels. I advocated the position that both system and individual learning need to be part of the equation that allows a firm to attain ROD. Notwithstanding how and when system and individual learning occurs, the
  • 226.
    investi- gation of howindividuals learn must be a fundamental part of any theory-to-practice effort, such as the present one. Indeed, whether 84 INFORMATION TECHNOLOGY one favors a view of learning as occurring on the organizational or on the individual level (and it occurs on both), we have to recog- nize that individuals are, ultimately, those who must continue to learn. Dewey (1933) first explored the concepts and values of what he called “experiential learning.” This type of learning comes from the experiences that adults have accrued over the course of their individual lives. These experiences provide rich and valuable forms of “literacy,” which must be recognized as important components to overall learning development. Kolb (1984a) furthered Dewey’s research and developed an instrument that measures individual preferences or styles in which adults learn, and how they respond to day-to-day scenarios and concepts. Kolb’s (1999) Learning Style Inventory (LSI) instrument allows adults to better understand how they learn. It helps them understand how to solve problems, work in teams, manage conflicts, make better career choices, and
  • 227.
    negotiate personal and professionalrelationships. Kolb’s research provided a basis for comprehending the different ways in which adults prefer to learn, and it elaborated the distinct advantages of becoming a bal- anced learner. The instrument schematizes learning preferences and styles into four quadrants: concrete experience , reflective observation , abstract con- ceptualization , and active experimentation . Adults who prefer to learn through concrete experience are those who need to learn through actual experience, or compare a situation with reality. In reflective observation, adults prefer to learn by observing others, the world around them, and what they read. These individuals excel in group discussions and can effectively reflect on what they see and read. Abstract conceptualization refers to learning, based on the assimila- tion of facts and information presented, and read. Those who prefer to learn by active experimentation do so through a process of evaluat- ing consequences; they learn by examining the impact of experimen- tal situations. For any individual, these learning styles often work in combinations. After classifying an individual’s responses to questions,
  • 228.
    Kolb’s instrument determinesthe nature of these combinations. For example, an individual can have a learning style in which he or she prefers to learn from concrete experiences using reflective observation as opposed to actually “doing” the activity. Figure 4.3 shows Kolb’s model in the form of a “learning wheel.” The wheel graphically shows 85orGAnIzAtIonAl leArnInG theorIes an individual’s learning style inventory, reflecting a person’s strengths and weaknesses with respect to each learning style. Kolb’s research suggests that learners who are less constrained by learning preferences within a distinct style are more balanced and are better learners because they have available to them more dimensions in which to learn. This is a significant concept; it suggests that adults who have strong preferences may not be able to learn when faced with learning environments that do not fit their specific preference. For example, an adult who prefers group discussion and enjoys reflective conversation with others may feel uncomfortable in a less interper- sonal, traditional teaching environment. The importance of
  • 229.
    Kolb’s LSI is thatit helps adults become aware that such preferences exist. McCarthy’s (1999) research furthers Kolb’s work by investigating the relationship between learning preferences and curriculum devel- opment. Her Learning Type Measure (4Mat) instrument mirrors and extends the Kolb style quadrants by expressing preferences from an individual’s perspective on how to best achieve learning. Another important contribution in McCarthy’s extension of Kolb’s work is the inclusion of brain function considerations, particularly in terms of hemisphericity. McCarthy focuses on the cognitive functions asso- ciated with the right hemisphere (perception) and left hemisphere (process) of the brain. Her 4Mat system shows how adults, in each Concrete experience Abstract conceptualization Learns from hands-on experience Observes concrete
  • 230.
    situation and reflects onits meaning Seeks to find practical uses for ideas and theories Interested in abstract ideas and concepts Active experimentation Reflective observation Figure 4.3 Kolb’s Learning Style Inventory. 86 INFORMATION TECHNOLOGY style quadrant, perceive learning with the left hemisphere of the brain and how it is related to processing in the right hemisphere. For example, for Type 1 learners (concrete experience and reflective observation), adults perceive in a concrete way and process in a reflec- tive way. In other words, these adults prefer to learn by actually
  • 231.
    doing a task andthen processing the experience by reflecting on what they experienced during the task. Type 2 learners (reflective observation and abstract conceptualization), however, perceive a task by abstract thinking and process it by developing concepts and theories from their initial ideas. Figure 4.4 shows McCarthy’s rendition of the Kolb learning wheel. The practical claim to make here is that practitioners who acquire an understanding of the concepts of the experiential learning mod- els will be better able to assist individuals in understanding how they learn, how to use their learning preferences during times of Meaning Co nc ep tsW ha t? Skills How? W
  • 232.
    hy? Ad apt ati on s If? Integrate QIV QIII QI QII Try Define Refine Examine ImageExtend Counsel Figure4.4 McCarthy rendition of the Kolb Learning Wheel. 87orGAnIzAtIonAl leArnInG theorIes transition, and the importance of developing other dimensions of
  • 233.
    learning. The lastis particularly useful in developing expertise in learning from individual reflective practices, learning as a group in communities of practice, and participating in both individual transformative learning, and organizational transformations. How, then, does experiential learning operate within the framework of organizational learning and technology? This is shown Figure 4.5 in a combined wheel, called the applied individual learning for tech- nology model, which creates a conceptual framework for linking the technology life cycle with organizational learning and experiential learning constructs. Figure 4.5 expands the wheel into two other dimensions. The first quadrant (QI) represents the feasibility stage of technology. It requires communities to work together, to ascertain why a particular technology might be attractive to the organization. This quadrant is Engaging in the technology process Co nc ep tua
  • 234.
  • 235.
    t? Exploring technology opportunities Planningand design–How? Feasibility–W hy? Im ple me nti ng te ch no log y Cr eat ion –W ha t If ?
  • 236.
    Action learning QIV QIII QI QII Knowledge management Transformative learning Communities of practice Figure 4.5Combined applied learning wheel. 88 INFORMATION TECHNOLOGY best represented by individuals who engage in group discussions to make better connections from their own experiences. The process of determining whether a technology is feasible requires integrated discourse among affected communities, who then can make better decisions, as opposed to centralized or individual and
  • 237.
    predetermined decisions on whetherto use a specific technology. During this phase, individuals need to operate in communities of practice, as the infra- structure with which to support a democratic process of consensus building. The second quadrant (QII) corresponds to measurement and analy- sis. This operation requires individuals to engage in specific details to determine and conceptualize driver and supporter life cycles ana- lytically. Individuals need to examine the specific details to under- stand “ what” the technology can do, and to reflect on what it means to them, and their business unit. This analysis is measured with respect to what the ROI will be, and which driver and supporter functions will be used. This process requires transformation theory that allows individuals to perceive and conceptualize which components of the technology can transform the organization. Quadrant 3 (QIII), design and planning, defines the “how” component of the technology life cycle. This process involves explor- ing technology opportunities after measurement and analysis have been completed. The process of determining potential uses for technology requires knowledge of the organization.
  • 238.
    Specifically, it needs theabstract concepts developed in QII to be integrated with tacit knowledge, to then determine possible applications where the technology can succeed. Thus, knowledge management becomes the predominant mechanism for translating what has been conceptual- ized into something explicit (discussed further in Chapter 5). Quadrant 4 (QIV) represents the implementation-and-creation step in the technology life cycle. It addresses the hypothetical ques- tion of “What if?” This process represents the actual implementation of the technology. Individuals need to engage in action learning tech- niques, particularly those of reflective practices. The implementation step in the technology life cycle is heavily dependent on the indi- vidual. Although there are levels of project management, the essential aspects of what goes on inside the project very much relies on the individual performances of the workers. 89orGAnIzAtIonAl leArnInG theorIes Social Discourse and the Use of Language The successful implementation of communities of practice fosters
  • 239.
    heavy dependence onsocial structures. Indeed, without understand- ing how social discourse and language behave, creating and sustaining the internal interactions within and among communities of practice are not possible. In taking individuals as the central component for continued learning and change in organizations, it becomes impor- tant to work with development theories that can measure and support individual growth and can promote maturation with the promotion of organizational/system thinking (Watkins & Marsick, 1993). Thus, the basis for establishing a technology-driven world requires the inclu- sion of linear and circular ways of promoting learning. While there is much that we will use from reflective action concepts designed by Argyris and Schö n (1996), it is also crucial to incorporate other theo- ries, such as marginality, transitions, and individual development. Senge (1990) also compares learning organizations with engineer- ing innovation; he calls these engineering innovations “technologies.” However, he also relates innovation to human behavior and distin- guishes it as a “discipline.” He defines discipline as “a body of theory and technique that must be studied and mastered to be put into
  • 240.
    prac- tice, as opposedto an enforced order or means of punishment” (p. 10). A discipline, according to Senge, is a developmental path for acquir- ing certain skills or competencies. He maintains the concept that cer- tain individuals have an innate “gift”; however, anyone can develop proficiency through practice. To practice a discipline is a lifelong learning process—in contrast to the work of a learning organization. Practicing a discipline is different from emulating a model. This book attempts to bring the arenas of discipline and technology into some form of harmony. What technology offers is a way of addressing the differences that Senge proclaims in his work. Perhaps this is what is so interesting and challenging about attempting to apply and under- stand the complexities of how technology, as an engineering innova- tion, affects the learning organization discipline—and thereby creates a new genre of practices. After all, I am not sure that one can master technology as either an engineering component, or a discipline. Technology dynamism and ROD expand the context of the glo- balizing forces that have added to the complexity of analyzing “the
  • 241.
    90 INFORMATION TECHNOLOGY languageand symbolic media we employ to describe, represent, interpret, and theorize what we take to be the facticity of organi- zational life” (Grant et al., 1998, p. 1). ROD needs to create what I call the “language of technology.” How do we then incorporate technology in the process of organizing discourse, or how has tech- nology affected that process? We know that the concept of dis- course includes language, talk, stories, and conversations, as well as the very heart of social life, in general. Organizational discourse goes beyond what is just spoken; it includes written text and other informal ways of communication. Unfortunately, the study of dis- course is seen as being less valuable than action. Indeed, discourse is seen as a passive activity, while “doing” is seen as supporting more tangible outcomes. However, technology has increased the importance of sensemaking media as a means of constructing and understanding organizational identities. In particular, technology, specifically the use of e-mail, has added to the instability of lan- guage, and the ambiguities associated with metaphorical analysis— that is, meaning making from language as it affects organizational behavior. Another way of looking at this issue is to study the
  • 242.
    meta- phor, as wellas the discourse, of technology. Technology is actually less understood today, a situation that creates even greater reason than before for understanding its metaphorical status in organiza- tional discourse—particularly with respect to how technology uses are interpreted by communities of practice. This is best shown using the schema of Grant et al. of the relationship between content and activity and how, through identity, skills, and emotion, it leads to action (Figure 4.6). To best understand Figure 4.4 and its application to technology, it is necessary to understand the links between talk and action. It is the activity and content of conversations that discursively produce identities, skills, and emotions, which in turn lead to action. Talk, in respect to conversation and content, implies both oral and writ- ten forms of communications, discourse, and language. The written aspect can obviously include technologically fostered communications over the Internet. It is then important to examine the unique condi- tions that technology brings to talk and its corresponding actions.
  • 243.
    91orGAnIzAtIonAl leArnInG theorIes Identity Individualidentities are established in collaborations on a team, or in being a member of some business committee. Much of the theory of identity development is related to how individuals see themselves, particularly within the community in which they operate. Thus, how active or inactive we are within our communities, shapes how we see ourselves and how we deal with conversational activity and content. Empowerment is also an important part of identity. Indeed, being excluded or unsupported within a community establishes a different identity from other members of the group and often leads to margin- ality (Schlossberg, 1989). Identities are not only individual but also collective, which to a large extent contributes to cultures of practice within organiza- tional factions. It is through common membership that a collec- tive identity can emerge. Identity with the group is critical during discussions regarding emerging technologies and determining how they affect the organization. The empowerment of individuals, and
  • 244.
    the creation ofa collective identity, are therefore important in fos- tering timely actions that have a consensus among the involved community. Skills Identity Emotions Action Conversational activity Conversational content Figure 4.6 Grant’s schema— relationship between content and activity. 92 INFORMATION TECHNOLOGY Skills According to Hardy et al. (1998, p. 71), conversations are “arenas in which particular skills are invested with meaning.” Watson (1995) suggests that conversations not only help individuals acquire “techni- cal skills” but also help develop other skills, such as being persuasive.
  • 245.
    Conversations that areabout technology can often be skewed toward the recognition of those individuals who are most “technologically talented.” This can be a problem when discourse is limited to who has the best “credentials” and can often lead to the undervaluing of social production of valued skills, which can affect decisions that lead to actions. Emotion Given that technology is viewed as a logical and rational field, the application of emotion is not often considered a factor of action. Fineman (1996) defines emotion as “personal displays of affected, or ‘moved’ and ‘agitated’ states—such as joy, love, fear, anger, sadness, shame, embarrassment,”—and points out that these states are socially constructed phenomena. There is a positive contribution from emo- tional energy as well as a negative one. The consideration of positive emotion in the organizational context is important because it drives action (Hardy et al., 1998). Indeed, action is more emotion than ratio- nal calculation. Unfortunately, the study of emotions often focuses on its negative aspects. Emotion, however, is an important part of how action is established and carried out, and therefore warrants
  • 246.
    attention in ROD. Identity, skills,and emotion are important factors in how talk actu- ally leads to action. Theories that foster discourse, and its use in orga- nizations, on the other hand, are built on linear paths of talk and action. That is, talk can lead to action in a number of predefined paths. Indeed, talk is typically viewed as “cheap” without action or, as is often said, “action is valued,” or “action speaks louder than words.” Talk, from this perspective, constitutes the dynamism of what must occur with action science, communities of practice, transformative learn- ing, and, eventually, knowledge creation and management. Action, by contrast, can be viewed as the measurable outcomes that have been 93orGAnIzAtIonAl leArnInG theorIes eluding organizational learning scholars. However, not all actions lead to measurable outcomes. Marshak (1998) established three types of talk that lead to action: tool-talk , frame-talk , and mythopoetic-talk : 1. Tool­talk includes “instrumental communities required to: discuss, conclude, act, and evaluate outcomes” (p. 82). What
  • 247.
    is most importantin its application is that tool-talk be used to deal with specific issues for an identified purpose. 2. Frame-talk focuses on interpretation to evaluate the mean- ings of talk. Using frame-talk results in enabling implicit and explicit assessments, which include symbolic, conscious, pre- conscious, and contextually subjective dimensions. 3. Mythopoetic-talk communicates ideogenic ideas and images (i.e., myths and cosmologies) that can be used to communicate the nature of how to apply tool-talk and frame-talk within the particular culture or society. This type of talk allows for con- cepts of intuition and ideas for concrete application. Furthermore, it has been shown that organizational members experience a difficult and ambiguous relationship, between discourse that makes sense, and non-sense—what is also known as “the struggle with sense” (Grant et al., 1998). There are two parts that comprise non-sense: The first is in the difficulties that individuals experience in understanding why things occur in organizations, particularly when their actions “make no sense.” Much of this difficulty can be cor- related with political issues that create “nonlearning” organizations. However, the second condition of non-sense is more applicable, and more important, to the study of ROD than the first—that is, non- sense associated with acceleration in the organizational change pro- cess. This area comes from the taken-for-granted assumptions
  • 248.
    about the realities ofhow the organization operates, as opposed to how it can operate. Studies performed by Wallemacq and Sims (1998) provide examples of how organizational interventions can decompose stories about non-sense and replace them with new stories that better address a new situation and can make sense of why change is needed. This phenomenon is critical to changes established, or responded to, by the advent of new technologies. Indeed, technology has many nonsensi- cal or false generalizations regarding how long it takes to implement a product, what might be the expected outcomes, and so on. Given 94 INFORMATION TECHNOLOGY the need for ROD—due to the advent of technology—there is a con- comitant need to reexamine “old stories” so that the necessary change agents can be assessed and put into practice. Ultimately, the challenge set forth by Wallemacq and Sims is especially relevant, and critical, since the very definition of ROD suggests that communities need to accelerate the creation of new stories—stories that will occur at
  • 249.
    unpredictable intervals. Thus,the link between discourse, organiza- tional learning, and technology is critical to providing ways in which to deal with individuals and organizations facing the challenge of changing and evolving. Grant’s (1996) research shows that sense making using media and stories provided effective ways of constructing and understanding organizational identities. Technology affects discourse in a similar way that it affects communities of practice; that is, it is a variable that affects the way discourse is used for organizational evolution. It also provides new vehicles on how such discourse can occur. However, it is important not to limit discourse analysis to merely being about “texts,” emotion, stories, or conversations in organizations. Discourse analysis examines “the constructing, situating, facilitating, and communicat- ing of diverse cultural, instrumental, political, and socio- economic parameters of ‘organizational being’” (Grant, 1996, p. 12). Hence, discourse is the essential component of every organizational learn- ing effort. Technology accelerates the need for such discourse, and language, in becoming a more important part of the learning matura-
  • 250.
    tion process, especiallyin relation to “system” thinking and learning. I propose then, as part of a move toward ROD, that discourse theories must be integrated with technological innovation and be part of the maturation in technology and in organizational learning. The overarching question is how to apply these theories of dis- course and language to learning within the ROD framework and par- adigm. First, let us consider the containers of types of talk discussed by Marshak (1998) as shown in Figure 4.7. These types of talk can be mapped onto the technology wheel, so that the most appropriate oral and written behaviors can be set forth within each quadrant, and development life cycle, as shown in Figure 4.8. Mythopoetic-talk is most appropriate in Quadrant 1 (QI), where the fundamental ideas and issues can be discussed in communities of practice. These technological ideas and concepts, deemed feasible, are 95orGAnIzAtIonAl leArnInG theorIes then analyzed through frame-talk, by which the technology can be evaluated in terms of how it meets the fundamental premises estab-
  • 251.
    lished in QI.Frame-talk also reinforces the conceptual legitimacy of how technology will transform the organization while provid- ing appropriate ROI. Tool-talk represents the process of identifying applications and actually implementing them. For this reason, tool- talk exists in both QIII and QIV. The former quadrant represents Mythopoetic-talk: Ideogenic Frame-talk: Interpretive Tool-talk: Instrumental Figure 4.7 Marshak’s type of talk containers. Planning and design–How? Im ple me nta tio n– W ha t If ? Tool-talk: Doing
  • 252.
  • 253.
    t a nd an aly sis –W ha t? Figure 4.8Marshak’s model mapped to the technology learning wheel. 96 INFORMATION TECHNOLOGY the discussion-to-decision portion, and the latter represents the actual doing and completion of the project itself. In QIII, table-talk requires knowledge management to transition technology concepts into real options. QIV transforms these real options into actual projects, in which, reflecting on actual practices during implementation, provides an opportunity for individual- and organizational-level learning. Marshak’s (1998) concept of containers and cycles of talk and action are adapted and integrated with cyclical and linear matu- rity models of learning. However, discourse and language must be linked to performance, which is why it needs to be part of
  • 254.
    the discourse and language-learningwheel. By integrating discourse and language into the wheel, individual and group activities can use discourse and language as part of ref lective practices to create an environment that can foster action that leads to measurable outcomes. This process, as explained throughout this book, is of paramount importance in understanding how discourse operates with ROD in the information age. Linear Development in Learning Approaches Focusing only on the role of the individual in the company is an incom- plete approach to formulating an effective learning program. There is another dimension to consider that is based on learning maturation. That is, where in the life cycle of learning are the individuals and the organization? The best explanation of this concept is the learning mat- uration experience at Ravell. During my initial consultation at Ravell, the organization was at a very early stage of organizational learning. This was evidenced by the dependence of the organization on event- driven and individual reflective practice learning. Technology acted as an accelerator of learning—it required IT to design a new network during the relocation of the company. Specifically, the acceleration, operationalized by a physical move, required IT to establish new rela-
  • 255.
    tionships with linemanagement. The initial case study concluded that there was a cultural change as a result of these new relationships— cultural assimilation started to occur using organizational learning techniques, specifically reflective practices. After I left Ravell, another phase in the evolution of the company took place. A new IT director was hired in my stead, who attempted 97orGAnIzAtIonAl leArnInG theorIes to reinstate the old culture: centralized infrastructure, stated opera- tional boundaries, and separations that mandated anti-learning orga- nizational behaviors. After six months, the line managers, faced with having to revert back to a former operating culture, revolted and demanded the removal of the IT director. This outcome, regrettable as it may be, is critical in proving the conclusion of the original study that the culture at Ravell had indeed evolved from its state, at the time of my arrival. The following are two concrete examples that support this notion: 1. The attempt of the new IT director to “roll back” the process to a former cultural state was unsuccessful, showing that a
  • 256.
    new evolving culturehad indeed occurred. 2. Line managers came together from the established learning organization to deliver a concerted message to the execu- tive team. Much of their learning had now shifted to a social organization level that was based less on events and was more holistic with respect to the goals and objectives of the organization. Thus, we see a shift from an individual-based learning process to one that is based more on the social and organizational issues to stimulate transformation. This transformation in learning method occurred within the same management team, suggesting that changes in learning do occur over time and from experience. Another way of viewing the phenomenon is to see Ravell as reaching the next level of organizational learning or maturation with learning. Consistent with the conclusion of the original study, technology served to accelerate the process of change or accelerate the maturation process of organi- zational learning. Another phase (Phase II) of Ravell transpired after I returned to the company. I determined at that time that the IT department needed to be integrated with another technology-based part of the business—the unit responsible for media and engineering services (as opposed to IT). While I had suggested this combination eight
  • 257.
    months earlier, theorganization had not reached the learning matu- ration to understand why such a combination was beneficial. Much of the reason it did not occur earlier, can also be attributed to the organization’s inability to manage ROD, which, if implemented, 98 INFORMATION TECHNOLOGY would have made the integration more obvious. The initial Ravell study served to bring forth the challenges of cultural assimilation, to the extent that the organization needed to reorganize itself and change its behavior. In phase II, the learning process matured by accelerating the need for structural change in the actual reporting processes of IT. A year later, yet another learning maturation phase (phase III) occurred. In Ravell, Phase III, the next stage of learning matura- tion, allowed the firm to better manage ROD. After completing the merger of the two technically related business units discussed (phase II), it became necessary to move a core database depart- ment completely out of the combined technology department, and to integrate it with a business unit. The reason for this change was compelling and brought to light a shortfall in my conclusions
  • 258.
    from the initial study.It appears that as organizational learning matures within ROD, there is an increasing need to educate the executive management team of the organization. This was not the case during the early stages of the case study. The limitation of my work, then, was that I predominantly interfaced with line management and neglected to include executives in the learning. During that time, results were encouraging, so there was little reason for me to include executives in event-driven issues, as discussed. Unfortunately, lack- ing their participation fostered a disconnection with the strategic integration component of ROD. Not participating in ROD created executive ignorance of the importance that IT had on the strategy of the business. Their lack of knowledge resulted in chronic problems with understanding the relationship and value of IT on the business units of the organization. This shortcoming resulted in continued conflicts over investments in the IT organization. It ultimately left IT with the inability to defend many of its cost requirements. As stated, during times of economic downturns, firms tend to reduce support organizations. In other words, executive management did not understand the driver component of IT.
  • 259.
    After the moveof the cohort of database developers to a formal business line unit, the driver components of the group provided the dialogue and support necessary to educate executives. However, this education did not occur based on events, but rather, on using the social and group dynamics of organizational learning. We see 99orGAnIzAtIonAl leArnInG theorIes here another aspect of how organizational and individual learning methods work together, but evolve in a specific way, as summarized in Table 4.2. Another way of representing the relationship between individual and organizational learning over time is to chart a “maturity” arc to illustrate the evolutionary life cycle of technology and organiza- tional learning. I call this arc the ROD arc. The arc is designed to assess individual development in four distinct sectors of ROD, each in relation to five developmental stages of organizational learning. Thus, each sector of ROD can be measured in a linear and inte- grated way. Each stage in the course of the learning development Table 4.2 Analysis of Ravell’s Maturation with Technology
  • 260.
    LEARNING PHASE IPHASE II PHASE III Type of learning Individual reflective practices used to establish operations and line management. Line managers defend new culture and participate in less event-driven learning. Movement away from holistic formation of IT, into separate driver and supporter attributes. Learning approaches are integrated using both individual and organizational methods, and are based on functionality as opposed to being organizationally specific. Learning outcomes Early stage of learning organization development. Combination of
  • 261.
    event-driven and early-stage social organizational learning formation. Movementtoward social- based organizational decision making, relative to the different uses of technology. Responsive organizational dynamism: cultural assimilation. Established new culture; no change in organizational structure. Cultural assimilation stability with existing structures; early phase of IT organizational integration with similar groups. Mature use of cultural assimilation, based on IT behaviors (drivers and supporters).
  • 262.
    Responsive organizational dynamism: Strategic integration. Limited integration due tolack of executive involvement. Early stages of value/needs based on similar strategic alignment. Social structures emphasize strategic integration based on business needs. 100 INFORMATION TECHNOLOGY of an organization reflects an underlying principle that guides the process of ROD norms and behaviors; specifically, it guides orga- nizations in how they view and use the ROD components available to them. The arc is a classificatory scheme that identifies progressive stages in the assimilated uses of ROD. It reflects the
  • 263.
    perspective— paralleling Knefelkamp’s (1999)research—that individuals in an organization are able to move through complex levels of thinking, and to develop independence of thought and judgment, as their careers progress within the management structures available to them. Indeed, assimilation to learning at specific levels of opera- tions and management are not necessarily an achievable end but one that fits into the psychological perspective of what productive employees can be taught about ROD adaptability. Figure 4.9 illus- trates the two axes of the arc. The profile of an individual who assimilates the norms of ROD can be characterized in five developmental stages (vertical axis) along four sectors of literacy (horizontal axis). The arc character- izes an individual at a specific level in the organization. At each level, the arc identifies individual maturity with ROD, specifically strategic integration, cultural assimilation, and the type of learning process (i.e., individual vs. organizational). The arc shows how each tier integrates with another, what types of organizational learning theory best apply, and who needs to be the primary driver within the organization. Thus, the arc provides an organizational schema for how each conceptual component of organizational learning applies to each sector of ROD. It also identifies and constructs a path for those individuals who want to advance in
  • 264.
    organizational rank; that is,it can be used to ascertain an individual’s ability to cope with ROD requirements as a precursor for advancement in management. Each position within a sector, or cell, represents a specific stage of development within ROD. Each cell contains spe- cific definitions that can be used to identify developmental stages of ROD and organizational learning maturation. Figure 4.10 rep- resents the ROD arc with its cell definitions. The five stages of the arc are outlined as follows: 101orGAnIzAtIonAl leArnInG theorIes St ra te gi c in te gr at io n
  • 265.
  • 266.
  • 267.
  • 268.
  • 269.
  • 270.
  • 271.
  • 272.
  • 273.
  • 274.
  • 275.
  • 276.
  • 277.
  • 278.
  • 279.
  • 280.
  • 281.
  • 282.
  • 283.
  • 284.
  • 285.
  • 286.
  • 287.
  • 288.
  • 289.
  • 290.
  • 291.
  • 292.
  • 293.
  • 294.
  • 295.
  • 296.
  • 297.
  • 298.
  • 299.
  • 300.
  • 301.
  • 302.
  • 303.
  • 304.
  • 305.
  • 306.
  • 307.
  • 308.
  • 309.
  • 310.
  • 311.
    a rc . 103orGAnIzAtIonAl leArnInG theorIes 1.Operational knowledge: Represents the capacity to learn, con- ceptualize, and articulate key issues relating to how technology can have an impact on existing processes and organizational structure. Organizational learning is accomplished through individual learning actions, particularly reflective practices. This stage typically is the focus for operations personnel, who are usually focused on their personal perspectives of how technology affects their daily activities. 2. Department/unit view as other : Indicates the ability to inte- grate points of view about using technology from diverse indi- viduals within the department or business unit. Using these new perspectives, the individual is in position to augment his or her understanding of technology and relate it to others within the unit. Operations personnel participate in small- group learning activities, using reflective practices. Lower levels of middle managers participate in organizational learn- ing that is in transition, from purely individual to group-level thinking. 3. Integrated disposition : Recognizes that individual and depart- mental views on using technology need to be integrated to form effective business unit objectives. Understanding that organizational and cultural shifts need to include all mem- ber perspectives, before formulating departmental decisions,
  • 312.
    organizational learning isintegrated with middle managers, using communities of practice at the department level. 4. Stable operations : Develops in relation to competence in sec- tors of ROD appropriate for performing job duties for emerg- ing technologies, not merely adequately, but competitively, with peers and higher-ranking employees in the organization. Organizational learning occurs at the organizational level and uses forms of social discourse to support organizational transformation. 5. Organizational leadership : Ability to apply sectors of ROD to multiple aspects of the organization. Department concepts can be propagated to organizational levels, including strate- gic and cultural shifts, relating to technology opportunities. Organizational learning occurs using methods of knowledge management with executive support. Individuals use their 104 INFORMATION TECHNOLOGY technology knowledge for creative purposes. They are will- ing to take risks using critical discernment and what Heath (1968) calls “freed” decision making. The ROD arc addresses both individual and organizational learning. There are aspects of Senge’s (1990) “organizational” approach that are important and applicable to this model. I have mentioned its appropriateness in regard to the level of the manager— suggesting that the more senior manager is better posi- tioned to deal with nonevent learning practices. However, there is
  • 313.
    yet another dimensionwithin each stage of matured learning. This dimension pertains to timing. The timing dimension focuses on a multiple-phase approach to maturing individual and organiza- tional learning approaches. The multiple phasing of this approach suggests a maturing or evolutionary learning cycle that occurs over time, in which individual learning fosters the need and the acceptance of organizational learning methods. This process can be applied within multiple tiers of management and across differ- ent business units. The ROD arc can also be integrated with the applied individual learning wheel. The combined models show the individual’s cycle of learning along a path of maturation. This can be graphically shown to reflect how the wheel turns and moves along the continuum of the arc (Figure 4.11). Figure 4.11 shows that an experienced technology learner can maximize learning by utilizing all four quadrants in each of the maturity stages. It should be clear that certain quadrants of indi- vidual learning are more important to specific stages on the arc. However, movement through the arc is usually not symmetrical; that is, individuals do not move equally from stage to stage, within the dimensions of learning (Langer, 2003). This integrated and multiphase method uses the applied individual learning wheel with the arc. At each stage of the arc, an individual will need to draw on the different types of learning that are available in the learning wheel. Figure 4.12 provides an example of this con- cept, which Knefelkamp calls “multiple and simultaneous”
  • 314.
    (1999), meaning that learningcan take on multiple meanings across dif- ferent sectors simultaneously. 105orGAnIzAtIonAl leArnInG theorIes Figure 4.12 shows that the dimension variables are not necessarily parallel in their linear maturation. This phenomenon is not unusual with linear models, and in fact, is quite normal. However, it also reflects the complexity of how variables mature, and the importance of having the capability and infrastructure to determine how to measure such levels of maturation within dimensions. There are both qualitative and quantitative approaches to this analysis. Qualitative approaches typically include interviewing, ethnographic-type experiences over Engaging in the technology process Co nc ep tua liz
  • 315.
  • 316.
    Exploring technology opportunities Planningand design–How? Feasibility–W hy? Im ple me nti ng te ch no log y Cr eat ion –W ha t If ?
  • 317.
  • 318.
  • 319.
    Figure 4.11 RODarc with applied individual learning wheel. 106 INFORMATION TECHNOLOGY D im en si on v ar ia bl e O pe ra tio na l kn ow le dg
  • 320.
  • 321.
  • 322.
  • 323.
  • 324.
    .1 2 Sa m pl e RO D ar c. 107orGAnIzAtIonAl leArnInG theorIes somepredetermined time period, individual journals or diaries, group meetings, and focus groups. Quantitative measures involve the cre- ation of survey-type measures; they are based on statistical results from answering questions that identify the level of maturation of the individual. The learning models that I elaborate in this chapter are suggestive of the rich complexities surrounding the learning process for indi- viduals, groups, and entire organizations. This chapter establishes a
  • 325.
    procedure for applyingthese learning models to technology- specific situations. It demonstrates how to use different phases of the learning process to further mature the ability of an organization to integrate technology strategically and culturally. http://taylorandfrancis.com 109 5 managing oRganizaTional leaRning anD TeChnology The Role of Line Management In Chapter 1, the results of the Ravell case study demonstrated the importance of the role that line managers have, for the success of imple- menting organizational learning, particularly in the objective of inte- grating the information technology (IT) department. There has been much debate related to the use of event-driven learning. In particular, there is Senge’s (1990) work from his book, The Fifth Discipline. While overall, I agree with his theories, I believe that there is a need to critique some of his core concepts and beliefs. That is, Senge tends to
  • 326.
    make broad generalizations aboutthe limits of event-driven education and learning in organizations. He believes that there is a limitation of learn- ing from experience because it can create limitations to learning based on actions—as he asks: “What happens when we can no longer observe the consequences of our actions?” (Senge, 1990, p. 23). My research has found that event-driven learning is essential to most workers who have yet to learn through other means. I agree with Senge that not all learning can be obtained through event- oriented thinking, but I feel that much of what occurs at this horizon pertains more to the senior levels than to what many line managers have to deal with as part of their functions in business. Senge’s concern with learn- ing methods that focus too much on the individual, perhaps, is more powerful, if we see the learning organization as starting at the top and then working its way down. The position, however, particularly with respect to the integration of technology, is that too much dependence on executive-driven programs to establish and sustain organizational learning, is dangerous. Rather, the line management—or middle managers who fundamentally run the business—is best positioned to make the difference. My hypothesis here is that both top-
  • 327.
    down and bottom-up approachesto organizational learning are riddled with 110 INFORMATION TECHNOLOGY problems, especially in their ability to sustain outcomes. We cannot be naï ve—even our senior executives must drive results to maintain their positions. As such, middle managers, as the key business drivers, must operate in an event- and results-driven world—let us not under- estimate the value of producing measurable outcomes, as part of the ongoing growth of the organizational learning practicum. To explore the role of middle managers further, I draw on the inter- esting research done by Nonaka and Takeuchi (1995). These research- ers examined how Japanese companies manage knowledge creation, by using an approach that they call “middle-up-down.” Nonaka and Takeuchi found that middle managers “best communicate the contin- uous iterative process by which knowledge is created” (p. 127). These middle managers are often seen as leaders of a team, or task, in which a “spiral conversion process” operates and that requires both executive
  • 328.
    and operations managementpersonnel. Peters and Waterman (1982), among others, often have attacked middle managers as representing a layer of management that creates communication problems and inef- ficiencies in business processes that resulted in leaving U.S. workers trailing behind their international competitors during the automobile crisis in the 1970s. They advocate a “flattening” of the never- ending levels of bureaucracy responsible for inefficient operations. However, executives often are not aware of details within their operating depart- ments and may not have the ability or time to acquire those details. Operating personnel, on the other hand, do not possess the vision and business aptitudes necessary to establish the kind of knowledge creation that fosters strategic learning. Middle managers, or what I prefer to identify as line managers (Langer, 2001b), possess an effective combination of skills that can pro- vide positive strategic learning infrastructures. Line managers under- stand the core issues of productivity in relation to competitive operations and return on investment, and they are much closer to the day- to-day activities that bring forth the realities of how, and when, new strategic processes can be effectively implemented. While many
  • 329.
    researchers, such as Petersand Waterman, find them to be synonymous with backward- ness, stagnation, and resistance to change, middle managers are the core group that can provide the basis for continuous innovation through strategic learning. It is my perspective that the difference of opinion regarding the positive or negative significance middle managers have 111MAnAGInG orGAnIzAtIonAl leArnInG in relation to organizational learning has to do with the wide- ranging variety of employees who fall into the category of “middle.” It strikes me that Peters and Waterman were somewhat on target with respect to a certain population of middle managers, although I would not char- acterize them as line managers. To justify this position, it is important to clearly establish the differences. Line managers should be defined as pre-executive employees who have reached a position of managing a business unit that contains some degree of return on investment for the business. In effect, I am suggesting that focusing on “middle” manag- ers, as an identifiable group, is too broad. Thus, there is a need to further
  • 330.
    delineate the differentlevels of what comprises middle managers, and their roles in the organization. Line Managers These individuals usually manage an entire business unit and have “return-on-investment” responsibilities. Line managers should be categorized as those who have middle managers reporting to them; they are, in effect, managers of managers, or, as in some organiza- tions, they serve a “directorial” function. Such individuals are, in many ways, considered future executives and perform many low-end executive tasks. They are, if you will, executives in training. What is significant about this managerial level is the knowledge it carries about operations. However, line managers are still involved in daily operations and maintain their own technical capabilities. First-Line Managers First-line individuals manage nonmanagers but can have supervisory employees who report to them. They do not carry the responsibility for a budget line unit but for a department within the unit. These managers have specific goals that can be tied to their performance and
  • 331.
    to the department’sproductivity. Supervisor A supervisor is the lowest-level middle manager. These individu- als manage operational personnel within the department. Their 112 INFORMATION TECHNOLOGY management activities are typically seen as “functions,” as opposed to managing an entire operation. These middle managers do not have other supervisors or management-level personnel reporting to them. We should remember that definitions typically used to character- ize the middle sectors of management, as described by researchers like Peters, Nonaka, and others, do not come from exact science. The point must be made that middle managers cannot be categorized by a single definition. The category requires distinctive definitions within each level of stratification presented. Therefore, being more specific about the level of the middle manager can help us determine the man- ager’s role in the strategic learning process. Given that Nonaka and Takeuchi (1995) provide the concept of middle-up-down as it
  • 332.
    related to knowledge management,I wish to broaden it into a larger sub- ject of strategic learning, as a method of evolving changes in culture and organizational thinking. Furthermore, responsive organizational dynamism (ROD), unlike other organizational studies, represents both situational learning and ongoing evolutionary learning require- ments. Evolutionary learning provides a difficult challenge to organi- zational learning concepts. Evolutionary learning requires significant contribution from middle managers. To understand the complexity of the middle manager, all levels of the organization must be taken into consideration. I call this process management vectors. Management Vectors Senge’s (1990) work addresses some aspects of how technology might affect organizational behavior: “The central message of the Fifth Discipline is more radical than ‘ radical organization redesign’— namely that our organizations work the way they work, ultimately because of how we think and how we interact” (p. xiv). Technology aspires to be a new variable or catalyst that can change everyday approaches to things—to be the radical change element that
  • 333.
    forces us to reexaminenorms no longer applicable to business operations. On the other hand, technology can be dangerous if perceived unre- alistically as a power that possesses new answers to organizational performance and efficiency. In the late 1990s, we experienced the “bust” of the dot-com explosion, an explosion that challenged conven- tional norms of how businesses operate. Dot-coms sold the concepts 113MAnAGInG orGAnIzAtIonAl leArnInG that brick-and-mortar operations could no longer compete with new technology-driven businesses and that “older” workers could not be transformed in time to make dot-com organizations competitive. Dot-coms allowed us to depart from our commitment to knowledge workers and learning organizations, which is still true today. For example, in 2003, IBM at its corporate office in Armonk, New York, laid off 1,000 workers who possessed skills that were no lon- ger perceived as needed or competitive. Rather than retrain work- ers, IBM determined that hiring new employees to replace them was simply more economically feasible and easier in terms of trans-
  • 334.
    forming their organizationbehaviors. However, in my interview with Stephen McDermott, chief executive officer (CEO) of ICAP Electronic Trading Community (ETC), it became apparent that many of the mystiques of managing technology were incorrect. As he stated, “Managing a technology company is no different from manag- ing other types of businesses.” While the technical skills of the IBM workers may no longer be necessary, why did the organization not provide enough opportunities to migrate important knowledge work- ers to another paradigm of technical and business needs? Widespread worker replacements tell us that few organizational learning infra- structures actually exist. The question is whether technology can pro- vide the stimulus to prompt more organizations to commit to creating infrastructures that support growth and sustained operation. Most important is the question of how we establish infrastructures that can provide the impetus for initial and ongoing learning organizations. This question suggests that the road to working successfully with tech- nology will require the kind of organizational learning that is driven by both individual and organization-wide initiatives. This approach can be best explained by referring to the concept of driver and sup-
  • 335.
    porter functions andlife cycles of technology presented in Chapter 3. Figure 5.1 graphically shows the relationship between organizational structure and organizational learning needs. We also see that this relationship maps onto driver and supporter functionality. Figure 5.1 provides an operational overview of the relations between the three general tiers of management in most organizations. These levels or tiers are mapped onto organizational learning approaches; that is, organizational/system or individual. This mapping follows a general view based on what individuals at each of these tiers view or 114 INFORMATION TECHNOLOGY seek as their job responsibilities and what learning method best sup- ports their activities within their environment. For example, execu- tive learning focuses on system-level thinking and learning because executives need to view their organizations in a longer-term way (e.g., return on investment), as opposed to viewing learning on an indi- vidual, transactional event way. Yet, executives play an integral part in long-term support for technology, as an accelerator. Their role
  • 336.
    within ROD is toprovide the stimulus to support the process of cultural assimilation, and they are also very much a component of strategic integration. Executives do not require as much event-driven reflective change, but they need to be part of the overall “social” structure that paves the way for marrying the benefits of technology with organi- zational learning. What executives do need to see, are the planned measurable outcomes linked to performance from the investment of coupling organizational learning with technology. The lack of execu- tive involvement and knowledge will be detrimental to the likelihood of making this relationship successful. Operations, on the other hand, are based more on individual prac- tices of learning. Attempting to incorporate organizational vision and social discourse at this level is problematic until event- driven learning is experienced individually to prove the benefits that can be derived from reflective practices. In addition, there is the problem of the credibility of a learning program. Workers are often wary of new Management/ operational
  • 337.
    layers Executive tier Middle management tiers Operations tierSupport Event-driven individual Reflective practices Organization/ system on driver individual on support Communities of practice (driver) reflective practices (supporter) Driver/support life cycle Organizational learning method Knowledge management
  • 338.
    Learning approach Organization system Driver/support life cycle involvement Driver Figure 5.1Three-tier organizational structure. 115MAnAGInG orGAnIzAtIonAl leArnInG programs designed to enhance their development and productivity. Many question the intentions of the organization and why it is mak- ing the investment, especially given what has occurred in corporations over the last 20 years: Layoffs and scandals have riddled organizations and hurt employee confidence in the credibility of employer programs. Ravell showed us that using reflective practices during events pro- duces accelerated change, driven by technological innovation, which in turn, supports the development of the learning organization.
  • 339.
    It is important atthis level of operations to understand the narrow and pragmatic nature of the way workers think and learn. The way opera- tions personnel are evaluated is also a factor. Indeed, operations per- sonnel are evaluated based on specific performance criteria. The most complex, yet combined, learning methods relate to the middle management layers. Line managers, within these layers, are engrossed in a double-sided learning infrastructure. On one side, they need to communicate and share with executives what they perceive to be the “overall” issues of the organization. Thus, they need to learn using an organizational learning approach, which is less dependent on event-driven learning and uses reflective practice. Line managers must, along with their senior colleagues, be able to see the business from a more proactive perspective and use social-oriented methods if they hope to influence executives. Details of events are more of an assumed responsibility to them than a preferred way of interacting. In other words, most executives would rather interface with line manag- ers on how they can improve overall operations efficiently and effec- tively, as opposed to dealing with them on a micro, event-by- event
  • 340.
    basis. The assumption,then, is that line managers are expected to deal with the details of their operations, unless there are serious problems that require the attention of executives; such problems are usually cor- related to failures in the line manager’s operations. On the other side are the daily relationships and responsibilities managers face for their business units. They need to incorporate more individual-based learning techniques that support reflective practices within their operations to assist in the personal development of their staff. The middle management tier described in Figure 5.1 is shown at a summary level and needs to be further described. Figure 5.2 pro- vides a more detailed analysis based on the three types of middle man- agers described. The figure shows the ratio of organizational learning 116 INFORMATION TECHNOLOGY to individual learning based on manager type. The more senior the manager, the more learning is based on systems and social processes. Knowledge Management There is an increasing recognition that the competitive
  • 341.
    advantage of organizations dependson their “ability to create, transfer, utilize, and protect difficult-to-intimate knowledge assets” (Teece, 2001, p. 125). Indeed, according to Bertels and Savage (1998), the dominant logic of the industrial era requires an understanding of how to break the learning barrier to comprehending the information era. While we have developed powerful solutions to change internal processes and organizational structures, most organizations have failed to address the cultural dimensions of the information era. Organizational knowledge creation is a result of organizational learning through stra- tegic processes. Nonaka and Takeuchi (1995) define organizational knowledge as “the capability of a company as a whole to create new knowledge, disseminate it throughout the organization, and embody it in products, services, and systems” (p. 3). Nonaka and Takeuchi use the steps shown in Figure 5.3 to assess the value and chain of events surrounding the valuation of organization knowledge. Supervisor High individual- based learning High org/system-
  • 342.
    based learning Individual System Manager Director Figure5.2 Organizational/system versus individual learning by middle manager level. Knowledge creation Continuous innovation Competitive advantage Figure 5.3 Nonaka and Takeuchi steps to organizational knowledge. 117MAnAGInG orGAnIzAtIonAl leArnInG If we view the Figure 5.3 processes as leading to competitive advan- tage, we may ask how technology affects the chain of actions that Nonaka and Takeuchi (1995) identify. Without violating the model, we may insert technology and observe the effects it has on each step, as shown in Figure 5.4. According to Nonaka and Takeuchi (1995), to create new knowl-
  • 343.
    edge means tore-create the company, and everyone in it, in an ongo- ing process that requires personal and organizational self- renewal. That is, knowledge creation is the responsibility of everyone in the organization. The viability of this definition, however, must be ques- tioned. Can organizations create personnel that will adhere to such parameters, and under what conditions will senior management sup- port such an endeavor? Again, technology has a remarkable role to play in substantiat- ing the need for knowledge management. First, executives are still challenged to understand how they need to deal with emerging tech- nologies as this relates to whether their organizations are capable of using them effectively and efficiently. Knowledge management provides a way for the organization to learn how technology will be used to support innovation and competitive advantage. Second, IT departments need to understand how they can best operate within the larger scope of the organization—they are often searching for a true mission that contains measurable outcomes, as defined by the entire organization, including senior management. Third, both execu- tives and IT staff agree that understanding the uses of
  • 344.
    technology is a continuousprocess that should not be utilized solely in a reactionary Knowledge creation: Technology provides more dynamic shifts in knowledge, thus accelerating the number of knowledge-creation events that can occur. Continuous innovation: Innovations are accelerated because of the dynamic nature of events and the time required to respond—therefore, continuous innovation procedures are more significant to have in each department in order to respond to technological opportunities on an ongoing basis. Competitive advantage: Technology has generated more global competition. Competitive advantages that depend on technological innovation are more common. Figure 5.4 Nonaka and Takeuchi organizational knowledge with technology extension. 118 INFORMATION TECHNOLOGY and event-driven way. Finally, most employees accept the fact that technology is a major component of their lives at work and at home, that technology signifies change, and that participating in
  • 345.
    knowledge creation is animportant role for them. Again, we can see that technology provides the initiator for understanding how organizational learning is important for com- petitive advantage. The combination of IT and other organizational departments, when operating within the processes outlined in ROD, can significantly enhance learning and competitive advantage. To expand on this point, I now focus on the literature specifically relat- ing to tacit knowledge and its important role in knowledge man- agement. Scholars theorize knowledge management is an ability to transfer individual tacit knowledge into explicit knowledge. Kulkki and Kosonen (2001) define tacit knowledge as an experience- based type of knowledge and skill and as the individual capacity to give intuitive forms to new things; that is, to anticipate and preconcep- tualize the future. Technology, by its very definition and form of being, requires this anticipation and preconceptualization. Indeed, it provides the perfect educational opportunity in which to practice the transformation of tacit into explicit knowledge. Tacit knowledge is an asset, and having individual dynamic abilities to work with such knowledge commands a “higher premium when rapid organic
  • 346.
    growth is enabledby technology” (Teece, 2001, p. 140). Thus, knowledge management is likely to be greater when technological opportunity is richer. Because evaluating emerging technologies requires the ability to look into the future, it also requires that individuals translate valu- able tacit knowledge, and creatively see how these opportunities are to be judged if implemented. Examples of applicable tacit knowledge in this process are here extracted from Kulkki and Kosonen (2001): • Cultural and social history • Problem-solving modes • Orientation to risks and uncertainties • Worldview organizing principles • Horizons of expectations I approach each of these forms of tacit knowledge from the per- spective of the components of ROD as shown in Table 5.1. 119MAnAGInG orGAnIzAtIonAl leArnInG It is not my intention to suggest that all technologies should be, or can be, used to generate competitive advantage. To this extent, some technologies may indeed get rejected because they cannot assist the organization in terms of strategic value and competitive
  • 347.
    advantage. As Teece (2001)states, “Information transfer is not knowledge transfer and information management is not knowledge management, although the former can assist the latter. Individuals and organizations can suffer from information overload” (p. 129). While this is a significant issue for many firms, the ability to have an organization that can select, interpret, Table 5.1 Mapping Tacit Knowledge to Responsive Organizational Dynamism TACIT KNOWLEDGE STRATEGIC INTEGRATION CULTURAL ASSIMILATION Cultural and social history How the IT department and other departments translate emerging technologies into their existing processes and organization. Problem-solving modes Individual reflective practices that assist in determining how specific technologies can be useful and how they can be applied. Technology opportunities may require organizational
  • 348.
    and structural changesto transfer tacit knowledge to explicit knowledge. Utilization of tacit knowledge to evaluate probabilities for success. Orientation to risks and uncertainties Technology offers many risks and uncertainties. All new technologies may not be valid for the organization. Tacit knowledge is a valuable component to fully understand realities, risks, and uncertainties. Worldviews Technology has global effects and changes market boundaries that cross business cultures. It requires tacit knowledge to understand existing dispositions on how others work together. Review how technology affects the dynamics of operations. Organizing principles How will new technologies actually be integrated? What are the organizational challenges to “rolling out” products and
  • 349.
    to implementation timelines?What positions are needed, and who in the organization might be best qualified to fill new responsibilities? Identify limitations of the organization; that is, tacit knowledge versus explicit knowledge realities. Horizons of expectations Individual limitations in the tacit domain that may hinder or support whether a technology can be strategically integrated into the organization. 120 INFORMATION TECHNOLOGY and integrate information is a valuable part of knowledge management. Furthermore, advances in IT have propelled much of the excitement surrounding knowledge management. It is important to recognize that learning organizations, reflective practices, and communities of prac- tice all participate in creating new organizational knowledge. This is why knowledge management is so important. Knowledge must be built on its own terms, which requires intensive and laborious interactions
  • 350.
    among members ofthe organization. Change Management Because technology requires that organizations accelerate their actions, it is necessary to examine how ROD corresponds to theories in organizational change. Burke (2002) states that most organiza- tional change is evolutionary; however, he defines two distinct types of change: planned versus unplanned and revolutionary versus evolu- tionary. Burke also suggests that the external environmental changes are more rapid today and that most organizations “are playing catch up.” Many rapid changes to the external environment can be attrib- uted to emerging technologies, which have accelerated the divide between what an organization does and what it needs to do to remain competitive. This is the situation that creates the need for ROD. The catching-up process becomes more difficult because the amount of change required is only increasing given ever-newer technologies. Burke (2002) suggests that this catching up will likely require planned and revolutionary change. Such change can be mapped onto much of my work at Ravell. Certainly, change was required; I planned it, and change had to occur. However, the creation of a learning
  • 351.
    organiza- tion, using manyof the organizational learning theories addressed in Chapter 4, supports the eventual establishment of an operating organization that can deal with unplanned and evolutionary change. When using technology as the reason for change, it is then important that the components of ROD be integrated with theories of organi- zational change. History has shown that most organizational change is not success- ful in providing its intended outcomes, because of cultural lock- in. Cultural lock-in is defined by Foster and Kaplan (2001) as the inability of an organization to change its corporate culture even when there 121MAnAGInG orGAnIzAtIonAl leArnInG are clear market threats. Based on their definition, then, technology may not be able to change the way an organization behaves, even when there are obvious competitive advantages to doing so. My con- cern with Foster and Kaplan’s conclusion is whether individuals truly understand exactly how their organizations are being affected— or are
  • 352.
    we to assumethat they do understand? In other words, is there a pro- cess to ensure that employees understand the impact of not changing? I believe that ROD provides the infrastructure required to resolve this dilemma by establishing the processes that can support ongoing unplanned and evolutionary change. To best show the relationship of ROD to organizational change theory, I use Burke’s (2002) six major points in assisting change in organizations: 1. Understanding the external environment: What are competitors and customers’ expectations? This is certainly an issue, specif- ically when tracking whether expected technologies are made available in the client– vendor relationship. But, more critical is the process of how emerging technologies, brought about through external channels, are evaluated and put into produc- tion; that is, having a process in place. Strategic integration of ROD is the infrastructure that needs to facilitate the moni- toring and management of the external environment. 2. Evaluation of the inside of the organization: This directly relates to technology and how it can be best utilized to improve internal operations. While evaluation may also relate to a restructuring of an organization’s mission, technology is often an important driver for why a mission needs to be changed (e.g., expanding a market due to e-commerce capabilities). 3. Readiness of the organization: The question here is not whether
  • 353.
    to change buthow fast the organization can change to address technological innovations. The ROD arc provides the steps necessary to create organizations that can sustain change as a way of operation, blending strategic integration with cultural assimilation. The maturation of learning: moving toward sys- tem-based learning also supports the creation of infrastruc- tures that are vitally prepared for changes from emerging technologies. 122 INFORMATION TECHNOLOGY 4. Cultural change as inevitable: Cultural assimilation essentially demands that organizations must dynamically assimilate new technologies and be prepared to evolve their cultures. Such evolution must be accelerated and be systemic within business units, to be able to respond effectively to the rate of change created by technological innovations. 5. Making the case for change: It is often difficult to explain why change is inevitable. Much of the need for change can be sup- ported using the reflective practices implemented at Ravell. However, such acceptance is directly related to the process of time. Major events can assist in establishing the many needs for change, as discussed by Burke (2002). 6. Sustaining change: Perhaps the strongest part of ROD is its ability to create a process that is evolutionary and systemic. It focuses on driving change to every aspect of the organization and provides organizational learning constructs to address each level of operation. It addresses what Burke (2002) calls the “prelaunch, launch, postlaunch, and sustaining,” in the important sequences of organizational change (p. 286).
  • 354.
    Another important aspectof change management is leadership. Leadership takes many forms and has multiple definitions. Technology plays an interesting role in how leadership can be presented to orga- nizations, especially in terms of the management style of leadership, or what Eisenhardt and Bourgeois (1988) have coined as “power cen- tralization.” Their study examines high-velocity environments in the microcomputer industry during the late 1980s. By high velocity, they refer to “those environments in which there is a rapid and discon- tinuous change in demand, competitors, technology, or regulation, so that information is often inaccurate, unavailable, or obsolete” (p. 738). During the period of their study, the microcomputer industry was undergoing substantial technological change, including the introduc- tion of many new competitors. As it turns out, the concept of high velocity is becoming more the norm today given the way organizations find themselves needing to operate in constant fluxes of velocity. The term power centralization is defined as the amount of decision- making control wielded by the CEO. Eisenhardt and Bourgeois’s study finds that the more the CEO engages in power-centralized leadership,
  • 355.
    123MAnAGInG orGAnIzAtIonAl leArnInG thegreater the degree of politics, which has a negative impact on the strategic performance of the firms examined. This finding suggests that the less democratic the leadership is in high-velocity environ- ments, the less productive the organization will be. Indeed, the study found that when individuals engaged in team learning, political ten- sion was reduced, and the performance of the firms improved. The structure of ROD provides the means of avoiding the high- velocity problems discovered by the Eisenhardt and Bourgeois (1988) study. This is because ROD allows for the development of more indi- vidual learning, as well as system thinking, across the executive ranks of the business. If technology is to continue to establish such high velocities, firms need to examine the Eisenhardt and Bourgeois study for its relevance to everyday operations. They also need to use orga- nizational learning theories as a basis for establishing leadership that can empower employees to operate in an accelerated and unpredict- able environment. Change Management for IT Organizations
  • 356.
    While change managementtheories address a broad population in organizations, there is a need to create a more IT-specific approach to address the unique needs of this group. Lientz and Rea (2004) estab- lish five specific goals for IT change managers: 1. Gain support for change from employees and non-IT managers. 2. Implement change along measurements for the work so that the results of the change are clearly determined. 3. Implement a new culture of collaboration in which employees share more information and work more in teams. 4. Raise the level of awareness of the technology process and work so that there is less of a tendency for reversion. 5. Implement an ongoing measurement process for the work to detect any problems. Lientz and Rea’s (2004) position is that when a new culture is instilled in IT departments, it is particularly important that it should not require massive management intervention. IT people need to be self-motivated to keep up with the myriad accelerated changes in the 124 INFORMATION TECHNOLOGY
  • 357.
    world of technology.These changes occur inside IT in two critical areas. The first relates to the technology itself. For example, how do IT personnel keep up with new versions of hardware and software? Many times, these changes come in the form of hardware (often called system) and software upgrades from vendors who require them to maintain support contracts. The ongoing self- management of how such upgrades and changes will ultimately affect the rest of the organization is a major challenge and one that is difficult to manage top-down. The second area is the impact of new or emerg- ing technologies on business strategy. The challenge is to develop IT personnel who can transform their technical knowledge into busi- ness knowledge and, as discussed, take their tacit knowledge and convert it into explicit, strategic knowledge. Further understanding of the key risks to the components of these accelerated changes is provided as follows: System and software version control: IT personnel must continue to track and upgrade new releases and understand the impact of product enhancements. Some product-related enhance- ments have no bearing on strategic use; they essentially fix problems in the system or software. On the other hand, some new releases offer new features and functions that need to be communicated to both IT and business managers.
  • 358.
    Existing legacy systems:Many of these systems cannot support the current needs of the business. This often forces IT staff to figure out how to create what is called “workarounds” (quick fixes) to these systems. This can be problematic given that workarounds might require system changes or modifications to existing software. The risk of these changes, both short and long term, needs to be discussed between user and IT staff communities of practice. Software packages (off-the-shelf software): Since the 1990s, the use of preprogrammed third-party software packages has become a preferred mode of software use among users. However, many of these packages can be inflexible and do not support the exact processes required by business users. IT personnel need to address users’ false expectations about what software packages can and cannot do. 125MAnAGInG orGAnIzAtIonAl leArnInG System or software changes: Replacement of systems or software applications is rarely 100% complete. Most often, remnants of old systems will remain. IT personnel can at times be insensi- tive to the lack of a complete replacement. Project completion: IT personnel often misevaluate when their involvement is finished. Projects are rarely finished when the software is installed and training completed. IT staff tend to move on to other projects and tasks and lose focus on the like- lihood that there will be problems discovered or last-minute requests made by business users.
  • 359.
    Technical knowledge: ITstaff members need to keep their techni- cal skills up to date. If this is not done, emerging technolo- gies may not be evaluated properly as there may be a lack of technical ability inside the organization to map new technical developments onto strategic advantage. Pleasing users : While pleasing business users appears to be a good thing, it can also present serious problems with respect to IT projects. What users want, and what they need, may not be the same. IT staff members need to judge when they might need assistance from business and IT management because users may be unfairly requesting things that are not feasible within the constraints of a project. Thus, IT staff must have the ability to articulate what the system can do and what might be advisable. These issues tend to occur when certain business users want new systems to behave like old ones. Documentation: This, traditionally, is prepared by IT staff and contains jargon that can confuse business users. Furthermore, written procedures prepared by IT staff members do not con- sider the entire user experience and process. Training: This is often carried out by IT staff and is restricted to covering system issues, as opposed to the business realities surrounding when, how, and why things are done. These issues essentially define key risks to the success of imple- menting technology projects. Much of this book, thus far, has focused on the process of organizational learning from an infrastructure per- spective. However, the implementation component of technology possesses new risks to successfully creating an organization that
  • 360.
    can 126 INFORMATION TECHNOLOGY learnwithin the needs of ROD. These risks, from the issues enumer- ated, along with those discussed by Lientz and Rea (2004) are sum- marized as follows: Business user involvement: Continuous involvement from busi- ness users is necessary. Unfortunately, during the life of a proj- ect there are so many human interfaces between IT staff and business users that it is unrealistic to attempt to control these communications through tight management procedures. Requirements, definition, and scope: These relate to the process by which IT personnel work with business users to deter- mine exactly what software and systems need to accomplish. Determining requirements is a process, not a predetermined list that business users will necessarily have available to them. The discourse that occurs in conversations is critical to whether such communities are capable of developing require- ments that are unambiguous in terms of expected outcomes. Business rules: These rules have a great effect on how the organi- zation handles data and transactions. The difference between requirements and business rules is subtle. Specifically, busi- ness rules, unlike requirements, are not necessarily related to processes or events of the business. As such, the determina- tion of business rules cannot be made by reviewing proce- dures; for example, all account numbers must be numeric.
  • 361.
    Documentation and trainingmaterials: IT staff members need to interact with business users and establish joint processes that foster the development of documentation and training that best fit user needs and business processes. Data conversion: New systems and applications require that data from legacy systems be converted into the new formats. This process is called data mapping; IT staff and key business users review each data field to ensure that the proper data are rep- resented correctly in the new system. IT staff members should not be doing this process without user involvement. Process measurement: Organizations typically perform a post- completion review after the system or software application is installed. Unfortunately, this process measurement should occur during and after project completion. 127MAnAGInG orGAnIzAtIonAl leArnInG IT change management poses some unique challenges to imple- menting organizational learning, mostly because managers cannot conceivably be available for all of the risks identified. Furthermore, the very nature of new technologies requires that IT staff mem- bers develop the ability to self-manage more of their daily functions and interactions, particularly with other staff members outside the IT department. The need for self-development is even more critical because of the existence of technological dynamism, which focuses on dynamic and unpredictable transactions that often must be
  • 362.
    han- dled directly byIT staff members and not their managers. Finally, because so many risks during technology projects require business user interfaces, non-IT staff members also need to develop better and more efficient self-management than they are accustomed to doing. Technological dynamism, then, has established another need for change management theory. This need relates to the implementation of self-development methods. Indeed, part of the reason for the lack of success of IT projects can be attributed to the inability of the core IT and business staff to perform in a more dynamic way. Historically, more management cannot provide the necessary learning and reduc- tion of risk. The idea of self-development became popular in the early 1980s as an approach to the training and education of managers, and managers to be. Thus, the focus of management self-development is to increase the ability and willingness of managers to take responsibility for themselves, particularly for their own learning (Pedler et al., 1988). I believe that management self-development theory can be applied to nonmanagers, or to staff members, who need to practice self- manage-
  • 363.
    ment skills thatcan assist them in transitioning to operating under the conditions of technological dynamism. Management self-development draws on the idea that many peo- ple emphasize the need for learner centeredness. This is an impor- tant concept in that it ties self-development theory to organizational learning, particularly to the work of Chris Argyris and Malcolm Knowles. The concept of learner centeredness holds that individuals must take prime responsibility for their own learning: when and how to learn. The teacher (or manager) is assigned the task of facilitator—a role that fosters guidance as opposed to direct initiation of learning. In many ways, a facilitator can be seen as a mentor whose role it is to 128 INFORMATION TECHNOLOGY guide an individual through various levels of learning and individual development. What makes self-development techniques so attractive is that learners work on actual tasks and then reflect on their own efforts. The methods of reflective practice theory, therefore, are applicable and can be integrated with self-development practices. Although self-
  • 364.
    development places thefocus on the individual’s own efforts, manag- ers still have responsibilities to mentor, coach, and counsel their staff. This support network allows staff to receive appropriate feedback and guidance. In many ways, self-development relates to the professional process of apprenticeship but differs from it in that the worker may not aspire to become the manager but may wish simply to develop better management skills. Workers are expected to make mistakes and to be guided through a process that helps them reflect and improve. This is why self-development can be seen as a management issue as opposed to just a learning theory. A mentor or coach can be a supervisor, line manager, director, or an outside consultant. The bottom line is that technological dyna- mism requires staff members who can provide self- management to cope with constant project changes and risks. These individu- als must be able to learn, be self-aware of what they do not know, and possess enough confidence to initiate the required learning and assistance that they need to be successful (Pedler et al., 1988). Self-development methods, like other techniques, have risks. Most notable, is the initial decrement in performance followed by a slow increment as workers become more comfortable with the process and learn from their mistakes. However, staff members
  • 365.
    must be givensupport and time to allow this process to occur; self-development is a trial-and-error method founded on the basis of mastery learning (i.e., learning from one’s mistakes). Thus, the notion of self-development is both continuous and discontinuous and must be implemented in a series of phases, each having unique outcomes and maturity. The concept of self-development is also consistent with the ROD arc, in which early phases of maturation require more individual learning, particularly reflective practices. Self-development, in effect, becomes a method of indirect man- agement to assist in personal transformation. This personal trans- formation will inevitably better prepare individuals to participate 129MAnAGInG orGAnIzAtIonAl leArnInG in group- and organizational-level learning at later stages of maturation. The first phase of establishing a self-development program is to create a “learning-to-learn” process. Teaching individuals to learn is a fundamental need before implementing self-development techniques. Mumford (1988) defines learning to learn as 1. Helping staff to understand the stages of the learning process and the pitfalls to not learning
  • 366.
    2. Helping staffto find their own preferences to learning 3. Assisting staff in understanding their present learning prefer- ences and how to deal with, and overcome, learning weaknesses 4. Helping staff to build on their learning experience and apply it to their current challenges in their job The first phase of self-development clearly embraces the Kolb (1999) Learning Style Inventory and the applied individual learn- ing wheel that were introduced in Chapter 4. Thus, all staff members should be provided with both of these learning wheels, made aware of their natural learning strengths and weaknesses, and provided with exercises to help them overcome their limitations. Most important is that the Kolb system will make staff aware of their shortfalls with learning. The applied individual learning wheel will provide a per- spective on how individuals can link generic learning preferences into organizational learning needs to support ROD. The second phase of self-development is to establish a formal learn- ing program in which staff members 1. Are responsible for their own learning, coordinated with a mentor or coach
  • 367.
    2. Have theright to determine how they will meet their own learning needs, within available resources, time frames, and set outcomes 3. Are responsible for evaluating and assessing their progress with their learning In parallel, staff coaches or mentors 1. Have the responsibility to frame the learning objectives so that they are consistent with agreed-on individual weaknesses 130 INFORMATION TECHNOLOGY 2. Are responsible for providing access and support for staff 3. Must determine the extent of their involvement with mentor- ing and their commitment to assisting staff members achieve stated outcomes 4. Are ultimately responsible for the evaluation of individual’s progress and success This program must also have a formal process and structure. According to Mossman and Stewart (1988), formal programs, called self-managed learning (SML), need the following organization and materials: 1. Staff members should work in groups as opposed to on their own. This is a good opportunity to intermix IT and non- IT staff with similar issues and objectives. The size of these groups is (typically) from four to six members. Groups should
  • 368.
    meet every two–three weeks, and should develop what are known as learning contracts . Learning contracts specifically state what the individual and management have agreed on. Essentially, the structure of self-development allows staff members to experience communities of practice, which by their very nature, will also introduce them to group learning and system-level thinking. 2. Mentors or coaches should preside over a group as opposed to presiding over just one individual. There are two benefits to doing this: (1) There are simply economies of scale for which managers cannot cover staff on an individual basis, and (2) facilitating a group with similar objectives benefits interac- tion among the members. Coaches obviously need to play an important role in defining the structure of the sessions, in offering ideas about how to begin the self-development pro- cess, and in providing general support. 3. Staff members need to have workbooks, films, courses, study guides, books, and specialists in the organization, all of which learners can use to help them accomplish their goals. 4. Typically, learning contracts will state the assessment meth- ods. However, assessment should not be limited only to indi- viduals but also should include group accomplishments. 131MAnAGInG orGAnIzAtIonAl leArnInG An SML should be designed to ensure that the learning program for staff members represents a commitment by management to a for- mal process, that can assist in the improvement of the project
  • 369.
    teams. The third phaseof self-development is evaluation. This process is a mixture of individual and group assessments from phase II, coupled with assessments from actual practice results. These are results from proven outcomes during normal workday operations. To garner the appropriate practice evaluation, mentors and coaches must be involved in monitoring results and noting the progress on specific events that occur. For example, if a new version of software is implemented, we will want to know if IT staff and business users worked together to determine how and when it should be implemented. These results need to be formally communicated back to the learning groups. This process needs to be continued on an ongoing basis to sustain the effects of change management. Figure 5.5 represents the flow of the three phases of the process. The process for self-development provides an important approach in assisting staff to perform better under the conditions of technologi- cal dynamism. It is one thing to teach reflective practice; it is another Individual learning contracts Learning styles inventory
  • 370.
    Self-managed learning program communitiesof practice IT and non-IT staff Phase 1: Establish learning to learn objectives Phase 2: Create formal learning program Make necessary changes to self- development learning Individual and group assessment monitor operations for measurable outcomes Phase 3: Implement evaluation Figure 5.5 Phases of self-development.
  • 371.
    132 INFORMATION TECHNOLOGY toget staff members to learn how to think in a manner that takes into consideration the many risks that have plagued systems and software projects for decades. While the role of management continues to play a major part in getting things done within strategic objectives, self- development can provide a strong learning method, that can foster sustained bottom-up management, which is missing in most learning organizations. The Ravell case study provides some concrete evidence on how self-development techniques can indeed get results. Because of the time pressures at Ravell, I was not able to invest in the learning-to- learn component at the start of the process. However, I used informal methods to determine the learning preferences of the staff. This can be accomplished through interviews in which staff responses can pro- vide a qualitative basis for evaluating how specific personnel prefer to learn. This helped me to formulate a specific training program that involved group meetings with IT and non-IT-oriented groups. In effect, phase II at Ravell had two communities. The first com-
  • 372.
    munity was theIT staff. We met each week to review progress and to set short-term objectives of what the community of IT wanted to accomplish. I acted as a facilitator, and although I was in a power position as their manager, I did not use my position unless there were clear signs of resistance in the team (which there were in specific situ- ations). The second community was formed with various line manager departments. This is where I formed “dotted-line” reporting struc- tures, which required IT staff members also to join other commu- nities of practice. This proved to be an invaluable strategy because it brought IT and business users together and formed the links that eventually allowed IT staff members to begin to learn and to form relationships with the user community, which fostered reflective thinking and transformation. As stated, there are setbacks at the start of any self-development program, and the experience at Ravell was no exception. Initially, IT staff members had difficulty understanding what was expected of them; they did not immediately perceive the learning program as an opportunity for their professional growth. It was through ongo- ing, motivated discourse in and outside of the IT community that
  • 373.
    helped achieve measurableincrements of self-developmental growth. Furthermore, I found it necessary to integrate individual coaching 133MAnAGInG orGAnIzAtIonAl leArnInG sessions with IT staff. While group sessions were useful, they were not a substitute for individual discussions, which at times allowed IT staff members to personally discuss their concerns and learning requirements. I found the process to be ultimately valuable, and I maintained the role of coach, as opposed to that of a manager who tells IT staff members what to do in every instance. I knew that direct management only would never allow for the development of learning. Eventually, self-development through discourse will foster identity development. Such was the case at Ravell, where both user and IT groups eventually came together to form specific and interactive com- munities of practice. This helped form a clearer identity for IT staff members, and they began to develop the ability to address the many project risk issues that I defined in this chapter. Most important for
  • 374.
    the organization wasthat Ravell phase I built the foundation for later phases that required more group and system thinking among the IT ranks. Evaluation of the performance at Ravell (phase III of the self- development process) was actually easier than expected, which means that if the first two phases are successful, evaluation will naturally be easy to determine. As reflective thinking became more evident in the group, it was easier to see the growth in transformative behavior; the IT groups became more proactive and critical by themselves, without necessarily needing my input. In fact, my participation fell into more of a supporter role; I was asked to participate more when I felt needed to provide a specific task for the group. Evaluation based on perfor- mance was also easier to determine, mainly because we had formed interdepartmental communities and because of the relationships I established with line managers. Another important decision we made and one that nurtured our evaluation capabilities was the fact that line managers often joined our IT staff meetings. So, getting feedback on actual results was always open for discussion. Viewing self-development in the scope of organizational
  • 375.
    learning and management techniquesprovides an important support method for later development in system thinking. The Ravel experience did just that, as the self-development process inevitably laid the foun- dation for more sophisticated organizational learning, required as a business matures under ROD. 134 INFORMATION TECHNOLOGY Social Networks and Information Technology The expansion of social networks, through the use of technological innovations, has substantially changed the way information flows in and out of a business community. Some companies, particularly in the financial services communities, have attempted to “lock out” social network capabilities. These attempts are ways for organizations to control, as opposed to change, behavior. Historically, such controls to enforce compliance have not worked. This is particularly relevant because of the emergence of a younger generation of workers who use social networking tools as a regular way to communicate and carry out discourse. Indeed, social networking has become the main
  • 376.
    vehicle for social discourseboth inside and outside organizations. There are those who feel that the end of confidentiality may be on the horizon. This is not to suggest that technology executives give up on security—we all know this would be ludicrous. On the other hand, the increasing pressure to “open” the Web will inevitably become too significant to ignore. Thus, the technology executive of the future must be prepared to provide desired social and professional networks to their employees while figuring out how to minimize risk—certainly not an easy objec- tive. Organizations will need to provide the necessary learning tech- niques to help employees understand the limits of what can be done. We must remember that organizations, governments, and busi- nesses have never been successful at controlling the flow of information to any population to or from any specific interest group— inevitably, information flows through. As stated by Cross and Thomas (2009), “The network perspective could trigger new approaches to organiza- tion design at a time when environmental and competitive conditions seem to be exhausting conventional wisdom” (p. 186). Most important is the understanding that multinational organizations need to
  • 377.
    think globally and nationallyat the same time. To do this, employees must transform their behavior and how they interact. Controlling access does not address this concern; it only makes communication more difficult and therefore does not provide a solution. Controls typically manifest themselves in the form of new processes and procedures. I often see technology executives proclaiming the need to change pro- cesses in the name of security without really understanding that they are not providing a solution, but rather, fostering new procedures that 135MAnAGInG orGAnIzAtIonAl leArnInG will allow individuals to evade the new security measures. As Cross and Thomas (2009) point out, “Formal structures often overlook the fact that every formal organization has in its shadow an informal or ‘ invis- ible’ organization” (p. 1). Instead, technology executives concerned with security, need to focus on new organizational design to assist businesses to be “social network ready.” ROD must then be extended to allow for the expansion of social network integration, including,
  • 378.
    but not limitedto, such products as Linkedln, Facebook, and Twitter. It may also be necessary to create new internal network infrastruc- tures that specifically cater to social network communication. Many software application companies have learned that compat- ibility in an open systems environment is a key factor for success- ful deployment of an enterprise-wide application solution. Thus, all applications developed within or for an organization need to have compatibility with the common and popular social network products. This popularity is not static, but rather, a constant process of deter- mining which products will become important social networks that the company may want to leverage. We see social networks having such an impact within the consumer environment—or what we can consider to be the “market.” I explained in my definition of ROD that it is the acceleration of market changes—or the changing relationship between a buyer and seller—that dictates the successes and failures of businesses. That said, technology executives must focus their attention on how such networks will require their organizations to embrace them. Obviously, this change carries risks. Adapting too early could be overreacting to market hype, while lagging could mean late
  • 379.
    entry. The challenge, then,for today’s technology leaders is to create dynamic, yet functional, social networks that allow businesses to compete while maintaining the controls they must have to protect themselves. The IT organization must concentrate on how to provide the infrastructure that allows these dynamic connections to be made without overcontrol. The first mission for the technology executive is to negotiate this challenge by working with the senior management of the organization to reach consensus on the risk factors. The issues typically involve the processes, behavior patterns, and risks shown in Figure 5.6. Ultimately, the technology executive must provide a new road map that promotes interagency and cross-customer collaboration in a way 136 INFORMATION TECHNOLOGY that will assist the organization to attain a ROD culture. Social net- works are here to stay and will continue to necessitate 24/7 access for everyone. This inevitably raises salient issues relating to the manage-
  • 380.
    ment structure withinbusinesses and how best to manage them. In Chapter 2, I defined the IT dilemma in a number of contexts. During an interview, a chief executive raised an interesting issue that relates to the subject: “My direct reports have been complaining that because of all this technology that they cannot get away from— that their days never seem to end.” I responded to this CEO by asking, Business process Design a social network that allows participants to respond dynamically to customer and business needs Aspired behavior patterns Risks Users understand the inherent limits to what can be communicated outside the organization, limit personal transactions, and use judgment when foreign e-mails are forwarded. Users cannot properly determine the ethics of behavior and will not take the necessary precautions to avoid exposing the organization to outside
  • 381.
    security breaches. Discern whichcritical functions are required for the social network to work effectively and maintain the firm's competitive positioning Users are active and form strategic groups (communities of practice) that define needs on a regular basis and work closely with IT and senior management. Users cannot keep up with changes in social networks, and it is impossible to track individual needs and behaviors. Provide a network design that can be scaled as needs change within the budget limitations of the organization �e organization must understand that hard budgets for social networking may not be feasible. Rather, the network needs are dynamic, and costs must be assessed dynamically within the
  • 382.
    appropriate operating teamsin the organizations. Reality tells us that all organizations operate within budget limitations. Large organizations find it difficult to govern dynamically, and smaller organizations cannot afford the personnel necessary to manage dynamically. Create a social network that “flattens” the organization so that all levels are accessible Particularly large organizations need to have a network that allows its people better access to its departments, talent, and management. In the 1980s, the book In Search of Excellence (Peters & Waterman, 1982) was the first effort to present the value of a “flatter” organizational structure. Social networks provide the infrastructure to make this a reality. With access come the challenges of responding to all that connect to the system. �e organization
  • 383.
    needs to providethe correct etiquette of how individuals respond dynamically without creating anarchy. Figure 5.6 Social network management issues. 137MAnAGInG orGAnIzAtIonAl leArnInG “Why are they e-mailing and calling you? Is it possible that tech- nology has exposed a problem that has always existed?” The CEO seemed surprised at my response and said, “What do you mean?” Again, I responded by suggesting that technology allowed access, but perhaps, that was not really the problem. In my opinion, the real problem was a weakness in management or organizational structure. I argued that good managers build organizations that should handle the questions that were the subject of these executives’ complaints. Perhaps the real problem was that the organization or management was not handling day-to-day issues. This case supports my thesis that technology dynamism requires reevaluation of how the organization operates and stresses the need to understand the cultural assimilation
  • 384.
    abilities of dealingwith change. Another interesting aspect of social networks is the emergence of otherwise invisible participants. Technology-driven networks have allowed individuals to emerge not only because of the access determi- nant but also because of statistics. Let me be specific. Network traffic can easily be tracked, as can individual access. Even with limited his- tory, organizations are discovering the valued members of their com- panies simply by seeing who is active and why. This should not suggest that social networks are spy networks. Indeed, organizations need to provide learning techniques to guide how access is tracked and to highlight the value that it brings to a business. As with other issues, the technology executive must align with other units and individuals; the following are some examples: • Human resources (HR): This department has specific needs that can align effectively with the entire social network. Obviously, there are compliance issues that limit what can be done over a network. Unfortunately, this is an area that requires reassessment: In general, governance and controls do not drive an organization to adopt ROD. There are other fac- tors related to the HR function. First, is the assimilation of new employees and the new talents that they might bring to the network. Second, is the challenge of adapting to ongoing change within the network. Third, is the knowledge lost of
  • 385.
    those who leavethe organization yet may still want to partici- pate socially within the organization (friends of the company). 138 INFORMATION TECHNOLOGY • Gender: Face-to-face meetings have always shown differences in participation by gender. Men tend to dominate meetings and the positions they hold in an organization. However, the advent of social virtual networks has begun to show a shift in the ways women participate and hold leadership positions among their peers. In an article in Business Week (May 19, 2008), Auren Hoffman reports that women dominate social network traffic. This may result in seeing more women-centric communication. The question, then, is whether the expan- sion of social networks will give rise to more women in senior management positions. • Marketing: The phenomenon of social networking has allowed for the creation of more targeted connectivity; that is, the abil- ity to connect with specific clients in special ways. Marketing departments are undergoing an extraordinary transformation in the way they target and connect with prospective custom- ers. The technology executive is essentially at the center of designing networks that provide customizable responses and facilitate complex matrix structures. Having such abilities could be the differentiator between success and failure for many organizations. One can see that the expansion of social networks is likely to have both good and bad effects. Thus far, in this section I have discussed the good. The bad relates to the expansion of what seems to be an unlim-
  • 386.
    ited network. Howdoes one manage such expansion? The answer lies within the concept of alignment. Alignment has always been critical to attain organizational effectiveness. The heart of alignment is deal- ing with cultural values, goals, and processes that are key to meet strategic objectives (Cross & Thomas, 2009). While the social net- work acts to expose these issues, it does not necessarily offer solutions to these differences. Thus, the challenge for the technology executive of today is to balance the power of social networks while providing direction on how to deal with alignment and control—not an easy task but clearly an opportunity for leadership. The following chapters offer some methods to address the challenges discussed in this chap- ter, and the opportunities they provide for technology executives. 139 6 oRganizaTional TRansfoRmaTion anD The balanCeD sCoReCaRD Introduction
  • 387.
    The purpose ofthis chapter is to examine the nature of organiza- tional transformation, how it occurs, and how it can be measured. Aldrich (2001) defines organizational transformation along three possible dimensions: changes in goals, boundaries, and activities. According to Aldrich, transformations “must involve a qualita- tive break with routines and a shift to new kinds of competencies that challenge existing organizational knowledge” (p. 163). He warns us that many changes in organizations disguise themselves as transformative but are not. Thus, focusing on the qualifications of authentic or substantial transformation is key to understanding whether it has truly occurred in an organization. Technology, as with any independent variable, may or may not have the capacity to instigate organizational transformation. Therefore, it is important to integrate transformation theory with responsive organizational dynamism (ROD). In this way, the measurable outcomes of orga- nizational learning and technology can be assessed in organizations that implement ROD. Most important in this regard, is that organi- zational transformation, along with knowledge creation, be directly correlated to the results of implementing organizational learning.
  • 388.
    That is, theresults of using organizational learning techniques must result in organizational transformation. Organizational transformation is significant for three key reasons: 1. Organizations that cannot change will fundamentally be at risk against competitors, especially in a quickly changing market. 140 INFORMATION TECHNOLOGY 2. If the organization cannot evolve, it will persist in its norms and be unwilling to change unless forced to do so. 3. If the community population is forced to change and is con- strained in its evolutionary path, it is likely that it will not be able to transform and thus, will need to be replaced. Aldrich (2001) establishes three dimensions of organizational transformation. By examining them, we can apply technology- specific changes and determine within each dimension what consti- tutes authentic organizational transformation. 1. Goals: There are two types of goal-related transformations: (a) change in the market or target population of the organiza- tion; (b) the overall goal of the organization itself changes. I have already observed that technology can affect the mission of an organization, often because it establishes new market niches (or changes them). Changed mission statements also inevitably modify goals and objectives.
  • 389.
    2. Boundaries: Organizationalboundaries transform when there is expansion or contraction. Technology has historically expanded domains by opening up new markets that could not otherwise be reached without technological innovation. E-business is an example of a transformation brought about by an emerging technology. Of course, business can contract as a result of not assimilating a technology; technology also can create organizational transformation. 3. Activity systems: Activity systems define the way things are done. They include the processing culture, such as behav- ioral roles. Changes in roles and responsibilities alone do not necessarily represent organizational transformation unless it is accompanied by cultural shifts in behavior. The cultural assimilation component of ROD provides a method with which to facilitate transformations that are unpredict- able yet evolutionary. Sometimes, transformations in activ- ity systems deriving from technological innovations can be categorized by the depth and breadth of its impact on other units. For example, a decision could be made to use technology as part of a total quality management (TQM) 141orGAnIzAtIonAl trAnsForMAtIon effort. Thus, activity transformations can be indirect and need to be evaluated based on multiple and simultaneous events. Aldrich’ s (2001) concept of organizational transformation bears on the issue of frequency of change. In general, he concludes that the changes that follow a regular cycle are part of normal
  • 390.
    evolution and “flow oforganizational life” (p. 169) and should not be treated as transformations. Technology, on the other hand, presents an inter- esting case in that it can be perceived as normal in its persistence and regularity of change while being unpredictable in its dynamism. However, Aldrich’ s definition of transformation poses an interesting issue for determining transformations resulting from technological innovations. Specifically, under what conditions is a technological innovation considered to have a transformative effect on the organi- zation? And, when is it to be considered as part of regular change? I refer to Figure 6.1, first presented in Chapter 3 on driver and sup- porter life cycles to respond to this question. The flows in this cycle can be used as the method to determine technological events that are normal change agents versus transforma- tive ones. To understand this point, one should view all driver- related technologies as transformational agents because they, by definition, affect strategic innovation and are approved based on return on investment (ROI). Aldrich’ s (2001) “normal ebb and flows” repre- sent the “mini-loops” that are new enhancements or subtechnologies, which are part of normal everyday changes necessary to mature
  • 391.
    a Mini loop technologyenhancementsTechnology driver Evaluation cycle Driver maturation Support status Replacement or outsource Economies of scale Figure 6.1 Driver-to-supporter life cycle. 142 INFORMATION TECHNOLOGY technological innovation. Thus, driver variables that result from mini- loops, would not be considered transformational agents of change. It is important to recognize that Aldrich’ s (2001) definition of organizational transformation should not be confused with theories of transformative learning. As West (1996) proclaims, “The goal of
  • 392.
    organizational learning isto transform the organization” (p. 54). The study of transformative learning has been relevant to adult education, and has focused on individual, as opposed to organizational, devel- opment and learning. Thus, transformative learning has been better integrated in individual learning and reflective practice theories than in organizational ones. While these modes of learning are related to the overall learning in organizations, they should not be confused with organizations that are attempting to realize their performance objectives. Yorks and Marsick (2000) offer two strategies that can produce transformative learning for individuals, groups, or organizations: action learning and collaborative inquiry. I covered action science in Chapter 4, particularly reflective practices, as key interventions to fos- ter both individual and group evolution of learning, specifically in reference to how to manage ROD. Aspects of collaborative inquiry are applied to later stages of maturation and to more senior levels of management based on systems-level learning. As Yorks and Marsick (2000) state, “For the most part the political dimensions of how the organization functions is off limits, as are discussions of larger
  • 393.
    social consequences” (p. 274). Technologicalinnovations provide acceleration factors and foster the need for ROD. Technology also furnishes the potential tangible and measurable outcomes necessary to normalize York and Marsick’ s (2000) framework for transformative learning theory into organiza- tional contexts as follows: 1. Technology, specifically e-business, has created a critical need for organizations to engage with clients and individuals in a new interactive context. This kind of discourse has established accelerated needs, such as understanding the magnitude of alternative courses of action between customer and vendor. The building of sophisticated intranets (internal Internets) and their evolution to assimilate with other Internet operations 143orGAnIzAtIonAl trAnsForMAtIon has also fueled the need for learning to occur more often than before and at organizational level. Because technology can produce measurable outcomes, individuals are faced with accelerated reflections about the cultural impact of their own behaviors. This is directly related to the implementation of the cultural assimilation component of ROD, by which individuals determine how their behaviors are affected by emerging technologies.
  • 394.
    2. Early inthe process of implementing strategic integration, reflective practices are critical for event-driven technology projects. These practices force individuals to continually reex- amine their existing meaning perspectives (specifically, their views and habits of mind). Individual reflection in, on, and to practice will evolve to system-level group and organizational learning contexts, as shown in the ROD arc. 3. The process of moving from individual to system-level learn- ing during technology maturation is strengthened by the learners’ abilities to comprehend why historical events have influenced their existing habits of mind. 4. The combination of strategic integration and cultural assimi- lation lays the foundation for organizational transformation to occur. Technology provides an appropriate blend of being both strategic and organizational in nature, thus allow- ing learners to confront their prior actions and develop new practices. Aldrich (2001) also provides an interesting set of explanations for why it is necessary to recognize the evolutionary aspect of organiza- tional transformations. I have extended them to operate within the context of ROD, as follows: Variation : Defined as “change from current routines and compe- tencies and change in organizational forms” (Aldrich, 2001, p. 22). Technology provides perhaps the greatest amount of variation in routines and thereby establishes the need for something to manage it: ROD. The higher the frequency of variation, the greater the chance that organizational transfor-
  • 395.
    mation can occur.Variation is directly correlated to cultural assimilation. 144 INFORMATION TECHNOLOGY Selection : This is the process of determining whether to use a technology variation. Selections can be affected by external (outside the organization) and internal (inside the organi- zation) factors, such as changes in market segments or new business missions, respectively. The process of selection can be related to the strategic integration component of ROD. Retention : Selected variations are retained or preserved by the organization. Retention is a key way of validating whether organizational transformation has occurred. As Aldrich states: “Transformations are completed when knowledge required for reproducing the new form is embodied in a com- munity of practice” (p. 171). Because of the importance of knowledge creation as the basis of transformation, communities of practice are the fundamental struc- tures of organizational learning to support organizational transforma- tion. Aldrich (2001) also goes beyond learning; he includes policies, programs, and networks as parts of the organizational transformative process. Figure 6.2 shows Aldrich’ s evolutionary process and its rela- tionship to ROD components. Thus, we see from Figure 6.2 the relationships between the pro- cesses of creating organizational transformation, the stages
  • 396.
    required to reach it,the ROD components in each stage, and the correspond- ing organizational learning method that is needed. Notice that the mapping of organizational learning methods onto Aldrich’ s (2001) scheme for organizational transformation can be related to the ROD arc. It shows us that as we get closer to retention, organizational learn- ing evolves from an individual technique to a system/organizational learning perspective. Aldrich’ s model is consistent with my driver- versus-supporter concept. He notes, “When the new form becomes a taken-for-granted aspect of every day life in the organization, its legitimacy is assumed” (p. 175). Hence, the assimilation of new technologies cannot be consid- ered transformative until it behaves as a supporter. Only then can we determine that the technology has changed organizational biases and norms. Representing the driver and supporter life cycle to include this important relationship is shown in Figure 6.3. 145orGAnIzAtIonAl trAnsForMAtIon Technology
  • 397.
    Variation Strategic integration– assess valueof technology Cultural assimilation– assess extent of what to implement and determine effects on structure Strategic integration– determine which technologies best fit corporate needs and provide highest ROI Corresponding organizational learning methods Individual reflective practices Group-based reflective practices Social discourse using communities of practice Communities of practice and knowledge
  • 398.
    management Validation of organizational transformation– technology hasprovided strategic outcomes and modified structures and processes Selection Retention Figure 6.2 Stages of organizational transformation and ROD. Individual reflective practice Group-based reflective practice Communities of practice Knowledge management Organizational transformation Mini loop technology enhancementsTechnology driver
  • 399.
    Evaluation cycle Driver maturation Support status Replacement or outsource Economies of scale Figure6.3 Organizational transformation in the driver-to- supporter life cycle. 146 INFORMATION TECHNOLOGY Methods of Ongoing Evaluation If we define organizational transformation as the retention of knowl- edge within the body of communities of practice, the question to be answered is how this retention actually is determined in practice. The possibility often occurs that transformations are partial or in some phase of completion. This would mean that the transformation is incomplete or needs to continue along some phase of approach.
  • 400.
    Indeed, cultural assimilationdoes not occur immediately, but rather, over periods of transition. Much of the literature on organizational transformation does not address the practical aspects of evaluation from this perspective. This lack of information is particularly prob- lematic with respect to technology, since so much of how technology is implemented relates to phased steps that rarely happen in one major event. Thus, it is important to have some method of ongoing evalua- tion to determine the extent of transformation that has occurred and which organizational learning methods need to be applied to help continue the process toward complete transformation. Aldrich’ s (2001) retention can also be misleading. We know that organizational transformation is an ongoing process, especially as advocated in ROD. It is probable that transformations continue and move from one aspect of importance to another, so a completed trans- formation may never exist. Another way of viewing this concept is to treat transformations as event milestones. Individuals and communi- ties of practice are able to track where they are in the learning process. It also fits into the phased approach of technology implementation.
  • 401.
    Furthermore, the notionof phases allows for integration of organiza- tional transformation concepts with stage and development theories. With the acceptance of this concept, there needs to be a method or model that can help organizations define and track such phases of transformation. Such a model would also allow for mapping outcomes onto targeted business strategies. Another way of understanding the importance of validating organizational transformation is to recognize its uniqueness, since most companies fail to execute their strategies. The method that can be applied to the validation of organizational transformation is a management tool called the balanced scorecard. The balanced scorecard was introduced by Kaplan and Norton (2001) in the early 1990s as a tool to solve measurement problems. The ability 147orGAnIzAtIonAl trAnsForMAtIon of an organization to develop and operationalize its intangible assets has become more and more a critical component for success. As I have already expressed regarding the work of Lucas (1999), financial
  • 402.
    measurement may notbe capable of capturing all IT value. This is particularly true in knowledge-based theories. The balanced score- card can be used as a solution for measuring outcomes that are not always financial and tangible. Furthermore, the balanced scorecard is a “living” document that can be modified as certain objectives or measurements require change. This is a critical advantage because, as I have demonstrated, technology projects often change in scope and in objectives as a result of internal and external factions. The ultimate value, then, of the balanced scorecard, in this con- text, is to provide a means for evaluating transformation not only for measuring completion against set targets but also for defining how expected transformations map onto the strategic objectives of the organization. In effect, it is the ability of the organization to execute its strategy. Before explaining the details of how a balanced scorecard can be applied specifically to ROD, I offer Figure 6.4, which shows Mobilize change through executive leadership Balanced
  • 403.
    Translate the strategy to operationalterms Scorecard Make strategy a continual processStrategy Align organizational to the strategy Make strategy everyone’s job Figure 6.4 Balanced scorecard. (From Kaplan, R.S., & Norton, D.P., The Strategy-Focused Organization , Harvard University Press, Cambridge, MA, 2001.) 148 INFORMATION TECHNOLOGY exactly where the scorecard fits into the overall picture of transition- ing emerging technologies into concrete strategic benefit. The generic objectives of a balanced scorecard are designed to cre- ate a strategy-focused organization. Thus, all of the objectives and
  • 404.
    measurements should bederived from the vision and strategy of the organization (Kaplan & Norton, 2001). These measurements are based on the fundamental principles of any strategically focused orga- nization and on alignment and focus. Kaplan and Norton define these principles as the core of the balanced scorecard: 1. Translate the strategy to operational terms : This principle includes two major components that allow an organization to define its strategy from a cause-and-effect perspective using a strategy map and scorecard. Thus, the strategy map and its corresponding balanced scorecard provide the basic measure- ment system. 2. Align the organization to the strategy: Kaplan and Norton define this principle as favoring synergies among organiza- tional departments that allow communities of practice to have a shared view, and common understanding of their roles. 3. Make strategy everyone’ s everyday job: This principle supports the notion of a learning organization that requires everyone’ s participation, from the chief executive officer (CEO) to cleri- cal levels. To accomplish this mission, the members of the organization must be aware of business strategy; individuals may need “personal” scorecards and a matching reward sys- tem for accomplishing the strategy. 4. Make strategy a continual process: This process requires the linking of important, yet fundamental, components, includ- ing organizational learning, budgeting, management reviews, and a process of adaptation. Much of this principle falls into the areas of learning organization theories that link learning and strategy in ongoing perpetual cycles.
  • 405.
    5. Mobilize changethrough executive leadership: This principle stresses the need for a strategy-focused organization that incorporates the involvement of senior management and can mobilize the organization and provide sponsorship to the overall process. 149orGAnIzAtIonAl trAnsForMAtIon Using the core balanced scorecard schematic, I have modified it to operate with technology and ROD, as shown in Figure 6.5. 1. Evaluation of technology: The first step is to have an infrastruc- ture that can determine how technology fits into a specific strategy. Once this is targeted, the evaluation team needs to define it in operational terms. This principle requires the stra- tegic integration component of ROD. 2. Align technology with business strategy : Once technology is evaluated, it must be integrated into the business strategy. This involves ascertaining whether the addition of technology will change the current business strategy. This principle is also connected to the strategic integration component of ROD. 3. Make technology projects part of communities of practice : Affected communities need to be strategically aware of the project. Organizational structures must determine how they distrib- ute rewards and objectives across departments. This principle requires the cultural assimilation component of ROD.
  • 406.
    4. Phased-in technologyimplementation : Short- and long-term project objectives are based on driver and supporter life cycles. Executive interfaces Balanced Evaluation of technology Scorecard Phase technology implementation Responsive org dynamism strategy Align technology with business strategy Make technology project part of communities of practice Figure 6.5 Balanced scorecard ROD.
  • 407.
    150 INFORMATION TECHNOLOGY Thiswill allow organizational transformation phases to be linked to implementation milestones. This principle maps onto the cultural assimilation component of ROD. 5. Executive interface : CEO and senior managers act as executive sponsors and project champions. Communities of practice and their common “threads” need to be defined, including middle management and operations personnel, so that top- down, middle-up-down, and bottom-up information flows can occur. The balanced scorecard ultimately provides a framework to view strategy from four different measures: 1. Financial : ROI and risk continue to be important components of strategic evaluation. 2. Customer : This involves the strategic part of how to create value for the customers of the organization. 3. Internal business processes : This relates to the business pro- cesses that provide both customer satisfaction and operational efficiency. 4. Learning and growth : This encompasses the priorities and infrastructure to support organizational transformation through ROD. The generic balanced scorecard framework needs to be extended
  • 408.
    to address technology andROD. I propose the following adjustments: 1. Financial : Requires the inclusion of indirect benefits from technology, particularly as Lucas (1999) specifies, in nonmon- etary methods of evaluating ROI. Risk must also be factored in, based on specific issues for each technology project. 2. Customer : Technology-based products are integrated with customer needs and provide direct customer package inter- faces. Further, web systems that use the Internet are depen- dent on consumer use. As such, technology can modify organizational strategy because of its direct effect on the cus- tomer interface. 3. Internal business processes : Technology requires business pro- cess reengineering (BPR), which is the process of reevaluat- ing existing internal norms and behaviors before designing a 151orGAnIzAtIonAl trAnsForMAtIon new system. This new evaluation process addresses customers, operational efficiencies, and cost. 4. Learning and growth : Organizational learning techniques, under the umbrella of ROD, need to be applied on an ongo- ing and evolutionary basis. Progress needs to be linked to the ROD arc. The major portion of the balanced scorecard strategy is in its initial design; that is, in translating the strategy or, as in the ROD
  • 409.
    scorecard, the evaluation oftechnology. During this phase, a strategy map and actual balanced scorecards are created. This process should begin by designing a balanced scorecard that articulates the business strategy. Remember, every organization needs to build a strategy that is unique and based on its evaluation of the external and internal situation (Olve et al., 2003). To clarify the definition of this strategy, it is easier to consider drawing the scorecard initially in the form of a strategy map. A generic strategy map essentially defines the components of each perspective, showing specific strategies within each one, as shown in Figure 6.6. Perspective: Financial Customer Process Learning and growth Improve technology Improve staff
  • 410.
    skills Establish new markets Increase customer service Increase efficiency More satisfied customers Improve profitability Stronger finances Increase customer base Figure6.6 Strategy map. (From Olve, N., et al., Making Scorecards Actionable: Balancing Strategy and Control , Wiley, New York, 2003.) 152 INFORMATION TECHNOLOGY We can apply the generic strategy map to an actual case study,
  • 411.
    Ravell phase I,as shown in Figure 6.7. Recall that Ravell phase I created a learning organization using reflective practices and action science. Much of the organization transformation at Ravell was accelerated by a major event— the relo- cation of the company. The move was part of a strategic decision for the organization, specifically the economies of scale for rental expense and an opportunity to retire old computers and replace them with a much needed state-of-the-art network. Furthermore, there was a grave need to replace old legacy applications that were incapable of operating on the new equipment and were also not providing the competitive advantage that the company sought. In using the strategy map, a balanced scorecard can be developed containing the specific outcomes to achieve the overall mission. The balanced scorecard is shown in Figure 6.8. The Ravell balanced scorecard has an additional column that defines the expected organizational transformation from ROD. This model addresses the issue of whether a change is truly a transformation. This method also provides a systematic process to forecast, understand, and Perspective:
  • 412.
    Financial Users Process Learning and growth New technology products Newways of staff interaction Establish new organization structure Improved systems Provide accurate and timely information More satisfied users Improve return on project investments
  • 413.
    Reduce technology overhead Increase user IT support Figure6.7 Technology strategy map. 153orGAnIzAtIonAl trAnsForMAtIon present what technology initiatives will ultimately change in the stra- tegic integration and cultural assimilation components of ROD. There are two other important factors embedded in this modified balanced scorecard technique. First, scorecards can be designed at varying levels of detail. Thus, two more balanced scorecards could Strategy map perspective Financial Measureable outcomes Strategic objectives Organizational transformation
  • 414.
    Combine IT expenseswith relocation and capitalize entire expense Combination of expenses requires formation of new communities of practice, which includes finance, engineering, and IT Improve returns on project investments Reduce technology overhead costs More satisfied users Increase user IT support Users Process Learning and growth Provide
  • 415.
    accurate and timely information Improved systems New technology products New ways ofstaff interaction structure Establish new organization Integrate new telephone system with computer network expenses Leverage engineering and communications expenses with technology Retire old equipment from financial statements Increase access to central applications Integrate IT within other departments to improve
  • 416.
    dynamic customer support requirements Providenew products to replace old e-mail system and make standard applications available to all users Establish help desk personnel Process of supporting users requires IT staff to embrace reflective practices. User relationship formed through new communities of practice and cultural assimilation with user community New culture at Ravell established Startegic integration occurs through increased discourse and language among communities of practice engaged in making relocation successful. New knowledge created and needs knowledge management Improve decision support for improved reporting and strategic marketing
  • 417.
    Upgrade new internal systems,including customer relationship management (CRM), general ledger, and rights and royalties Investigate new voice-messaging technology to improve integration of e-mail and telephone systems Physically relocate IT staff across departments Modify IT reporting structure with “dotted line” to business units IT becomes more critically reflective, understands value of their participation with learning organization. IT staff seeks to know less and understands view of the “other” · · · ·
  • 418.
  • 419.
    154 INFORMATION TECHNOLOGY bedeveloped that reflect the organizational transformations that occurred in Ravell phases II and III, or the three phases could be summarized as one large balanced scorecard or some combina- tion of summary and detail together. Second, the scorecard can be modified to reflect unexpected changes during implementa- tion of a technology. These changes could be related to a shift- ing mission statement or to external changes in the market that require a change in business strategy. Most important, though, are the expected outcomes and transformations that occur during the course of a project. Essentially, it is difficult to predict how organizations will actually react to changes during an IT project and transform. The balanced scorecard provides a checklist and tracking system that is structured and sustainable— but not perfect. Indeed, many of the outcomes from the three phases of Ravell were unexpected or certainly not exactly what I expected. The salient issue here is that it allows an organization to understand when such unexpected changes have occurred. When this does happen, organizations need to have an infrastructure and a structured system to examine what a change in their mission, strategy, or expectations means to all of the com- ponents of the project. This can be described as a “rippling effect,” in which one change can instigate others, affecting many other
  • 420.
    parts of the whole.Thus, the balanced scorecard, particularly using a strat- egy map, allows practitioners to reconcile how changes will affect the entire plan. Another important component of the balanced scorecard, and the reason why I use it as the measurement model for outcomes, is its applicability to organizational learning. In particular, the learning and growth perspective shows how the balanced scorecard ensures that learning and strategy are linked in organizational development efforts. Implementing balanced scorecards is another critical part of the project— who does the work, what the roles are, and who has the responsibility for operating the scorecards? While many companies use consultants to guide them, it is important to recognize that bal- anced scorecards reflect the unique features and functions of the com- pany. As such, the rank and file need to be involved with the design and support of balanced scorecards. 155orGAnIzAtIonAl trAnsForMAtIon
  • 421.
    Every business unitthat has a scorecard needs to have someone assigned to it, someone accountable for it. A special task force may often be required to launch the training for staff and to agree on how the scorecard should be designed and supported. It is advisable that the scorecard be implemented using some application software and made available on an Internet network. This provides a number of benefits: It reduces paper or local files that might get lost or not be secured, allows for easy “roll-up” of multiple scorecards, to a summary level, and access via the Internet (using an external secured hookup) allows the scorecard to be maintained from multiple locations. This is particularly attractive for staff members and management individuals who travel. According to Olve et al. (2003), there are four primary responsi- bilities that can support balanced scorecards: 1. Business stakeholders : These are typically senior managers who are responsible for the group that is using the score- card. These individuals are advocates of using scorecards and require compliance if deemed necessary. Stakeholders use scorecards to help them manage the life cycle of a technology implementation. 2. Scorecard designers : These individuals are responsible for the “look and feel” of the scorecard as well as its content. To some
  • 422.
    extent, the designersset standards for appearance, text, and terminology. In certain situations, the scorecard designers have dual roles as project managers. Their use of scorecards helps them understand how the technology will operate. 3. Information providers : These people collect, measure, and report on the data in the balanced scorecard. This function can be implemented with personnel on the business unit level or from a central services department. Reporting informa- tion often requires support from IT staff, so it makes sense to have someone from IT handle this responsibility. Information providers use the scorecard to perform the measurement of project performance and the handling of data. 4. Learning pilots : These individuals link the scorecard to organi- zational learning. This is particularly important when measur- ing organizational transformation and individual development. 156 INFORMATION TECHNOLOGY The size and complexity of an organization will ultimately deter- mine the exact configuration of roles and responsibilities that are needed to implement balanced scorecards. Perhaps the most appli- cable variables are: Competence : Having individuals who are knowledgeable about the business and its processes, as well as knowledgeable about IT. Availability : Individuals must be made available and appropri-
  • 423.
    ately accommodated inthe budget. Balanced scorecards that do not have sufficient staffing will fail. Executive management support: As with most technology proj- ects, there needs to be a project advocate at the executive level. Enthusiasm : Implementation of balanced scorecards requires a certain energy and excitement level from the staff and their management. This is one of those intangible, yet invaluable, variables. Balanced Scorecards and Discourse In Chapter 4, I discussed the importance of language and discourse in organizational learning. Balanced scorecards require ongoing dia- logues that need to occur at various levels and between different com- munities of practice. Therefore, it is important to integrate language and discourse and communities of practice theory with balanced scorecard strategy. The target areas are as follows: • Developing of strategy maps • Validating links across balanced scorecard perspectives • Setting milestones • Analyzing results • Evaluating organizational transformation Figure 6.9 indicates a community of practice relationship that exists at a company. Each of these three levels was connected by a concept I called “common threads of communication.” This model can be extended to include the balanced scorecard.
  • 424.
    The first levelof discourse occurs at the executive community of practice. The executive management team needs to agree on the 157orGAnIzAtIonAl trAnsForMAtIon specific business strategy that will be used as the basis of the mis- sion statement for the balanced scorecard. This requires conversations and meetings that engage the CEO, executive board members (when deemed applicable), and executive managers, like the chief operat- ing officer (COO), chief financial officer (CFO), chief information officer (CIO), and so on. Each of these individuals needs to represent his or her specific area of responsibility and influence from an execu- tive perspective. The important concept is that the balanced scorecard mission and strategy should be a shared vision and responsibility for the executive management team as a whole. To accomplish this task, the executive team needs to be instructed on how the balanced score- card operates and on its potential for accomplishing organizational transformation that leads to strategic performance. Ultimately, the discourse must lead to a discussion of the four balanced
  • 425.
    scorecard perspectives: financial, customer,process, and learning and growth. From a middle management level, the balanced scorecard allows for a measurable model to be used as the basis of discourse with Executive community of practice CEO Americas Executive board Consultants CEO AmericasNew ideas and adjustments Senior management Operations Middle management Middle management Adjustments as a result of discourse with operations community
  • 426.
    Operations management communityof practice Implementation community of practice Figure 6.9 Community of practice “threads.” 158 INFORMATION TECHNOLOGY executives. For example, the strategy map can be the vehicle for conducting meaningful conversations on how to transform execu- tive-level thinking and meaning into a more operationally focused strategy. Furthermore, the scorecard outlines the intended outcomes for strategy and organizational learning and transformation. The concept of using the balanced scorecard as a method with which to balance thinking and meaning across communities of prac- tice extends to the operational level as well. Indeed, the challenge of making the transition from thinking and meaning at the executive level of operations is complicated, especially since these communi- ties rarely speak the same language. The measurable outcomes section of the scorecard provides the concrete layer of outcomes that opera- tions staff tend to embrace. At the same time, this section provides corresponding strategic impact and organizational changes
  • 427.
    needed to satisfy businessstrategies set by management. An alternative method of fostering the need forms of discourse is to create multiple-tiered balanced scorecards designed to fit the language of each community of practice, as shown in Figure 6.10. The diagram in Figure 6.10 shows that each community can maintain its own lan- guage and methods while establishing “common threads” to foster a transition of thinking and meaning between it and other communi- ties. The common threads from this perspective look at communica- tion at the organizational/group level, as opposed to the individual level. This relates to my discussion in Chapter 4, which identified individual methods of improving personal learning, and development within the organization. This suggests that each balanced scorecard must embrace language that is common to any two communities to establish a working and learning relationship— in fact, this common language is the relationship. Knowledge Creation, Culture, and Strategy Balanced scorecards have been used as a measurement of knowledge creation. Knowledge creation, especially in technology, has
  • 428.
    signifi- cant meaning, specificallyin the relationship between data and infor- mation. Understanding the sequence between these two is interesting. We know that organizations, through their utilization of software applications, inevitably store data in file systems called databases. 159orGAnIzAtIonAl trAnsForMAtIon The information stored in these databases can be accessed by many different software applications across the organization. Accessing multiple databases and integrating them across business units creates further valuable information. Indeed, the definition of information is “organized data.” These organized data are usually stored in data infrastructures called data warehouses or data marts, where the infor- mation can be queried and reported on to assist managers in their decision-making processes. We see, in the Ravell balanced scorecard, that decision-support systems were actually one of the strategic objec- tives for the process perspective. Organization-level balanced scorecard
  • 429.
    Common discourse threads Executive-level balanced scorecard Management-level balancedscorecard Operational-level balanced scorecard Common discourse threads Common discourse threads Figure 6.10 Community of practice “common threads.” 160 INFORMATION TECHNOLOGY Unfortunately, information does not ensure new knowledge cre- ation. New knowledge can only be created by individuals who evolve in their roles and responsibilities. Individuals, by participating in groups and communities of practice, can foster the creation of new organizational knowledge. However, to change or evolve one’ s behav- ior, there must be individual or organizational transformation. This means that knowledge is linked to organizational
  • 430.
    transformation. The process toinstitutionalize organizational transformation is dependent on management interventions at various levels. Management needs to concentrate on knowledge management and change management and to act as a catalyst and advocate for the successful implementation of organizational learning techniques. These techniques are necessary to address the unique needs of ROD. Ultimately, the process must be linked to business strategy. ROD changes the culture of an organization, through the process of cul- tural assimilation. Thus, there is an ongoing need to reestablish align- ment between culture and strategy, with culture altered to fit new strategy, or strategy first, then culture (Pietersen, 2002). We see this as a recurring theme, particularly from the case studies, that busi- ness strategy must drive organizational behavior, even when technol- ogy acts as a dynamic variable. Pietersen identifies what he called six myths of corporate culture: 1. Corporate culture is vague and mysterious. 2. Corporate culture and strategy are separate and distinct things. 3. The first step in reducing our company should be defining
  • 431.
    our values. 4. Culture cannotbe measured or rewarded. 5. Our leaders must communicate what our culture is. 6. Our culture is the one constant that never changes. Resulting from these myths, Pietersen (2002) establishes four basic rules of success for creating a starting point for the balance between culture and strategy: 1. Company values should directly support strategic priorities. 2. They should be described as behaviors. 3. They should be simple and specific. 161orGAnIzAtIonAl trAnsForMAtIon 4. They should be arrived at through a process of enrollment (motivation). Once business synergy is created, sustaining the relationship becomes an ongoing challenge. According to Pietersen (2002), this must be accomplished by continual alignment, measurement, set- ting examples, and a reward system for desired behaviors. To lead change, organizations must create compelling statements of the case for change, communicate constantly and honestly with their employ- ees, maximize participation, remove ongoing resistance in the
  • 432.
    ranks, and generate somewins. The balanced scorecard system provides the mechanism to address the culture– strategy relationship while main- taining an important link to organizational learning and ROD. These linkages are critical because of the behavior of technology. Sustaining the relationship between culture and strategy is simply more critical with technology as the variable of change. Ultimately, the importance of the balanced scorecard is that it forces an understanding that everything in an organization is con- nected to some form of business strategy. Strategy calls for change, which requires organizational transformation. Mission : To accelerate investment in technology during the reloca- tion of the company for reasons of economies of scale and competitive advantage. http://taylorandfrancis.com 163 7 viRTual Teams anD
  • 433.
    ouTsouRCing Introduction Much has beenwritten and published about virtual teams. Most define virtual teams as those that are geographically dispersed, although others state that virtual teams are those that primarily inter- act electronically. Technology has been the main driver of the growth of virtual teams. In fact, technology organizations, due mostly to the advent of competitive outsourcing abroad, have pushed information technology (IT) teams to learn how to manage across geographical locations, in such countries as India, China, Brazil, Ireland, and many others. These countries are not only physically remote but also present barriers of culture and language. These barriers often impede commu- nications about project status, and affect the likelihood of delivering a project on time, and within forecasted budgets. Despite these major challenges, outsourcing remains attractive due to the associated cost savings and talent supply. These two advantages are closely associated. Consider the migration of IT talent that began with the growth of India in providing cheap and educated talent. The promise of cost savings caused many IT development departments to
  • 434.
    begin using moreIndia-based firms. The ensuing decline in IT jobs in the United States resulted in fewer students entering IT curricu- lums at U.S. universities for fear that they would not be able to find work. Thus, began a cycle of lost jobs in the United States and further demand for talent abroad. Now, technology organizations are faced with the fact that they must learn to manage virtually because the tal- ent they need is far away. From an IT perspective, successful outsourcing depends on effec- tive use of virtual teams. However, the converse is not true; that is, virtual teams do not necessarily imply outsourcing. Virtual teams can 164 INFORMATION TECHNOLOGY be made up of workers anywhere, even those in the United States who are working from a distance rather than reporting to an office for work. A growing number of employees in the United States want more personal flexibility; in response, many companies are allow- ing employees to work from home more often— and have found the experience most productive. This type of virtual team
  • 435.
    management generally follows ahybrid model, with employees working at home most of the time but reporting to the office for critical meetings; an arrangement that dramatically helps with communication and allows management to have quality checkpoints. This chapter addresses virtual teams working both within the United States and on an outsource basis and provides readers with an understanding of when and how to consider outsource partners. Chapter topics include management considerations, dealing with multiple locations, contract administration, and in-house alternatives. Most important, this chapter examines organizational learning as a critical component of success in using virtual teams. Although the advent of virtual teams creates another level of complexity for design- ing and maintaining learning organizations, organizational learning approaches represent a formidable solution to the growing dilemma of how teams work, especially those that are 100% virtual. Most failures in virtual management are caused by poor communi- cation. From an organizational learning perspective, we would define this as differences in meaning making— stemming mostly from cul- tural differences in the meaning of words and differing
  • 436.
    behavioral norms. There isalso no question that time zone differences play a role in certain malfunctions of teams, but the core issues remain commu- nication related. As stated, concerning the Ravell case study, cultural transformation is slow to occur and often happens in small intervals. In many virtual team settings, team members may never do more than communicate via e-mail. As an example, I had a client who was outsourcing produc- tion in China. One day, they received an e-mail stating, “ We cannot do business with you.” Of course, the management team was confused and worried, seeking to understand why the business arrangement was ending without any formal discussions of the problem. A trans- lator in China was hired to help clarify the dilemma. As it turned out, the statement was meant to suggest that the company needed 165vIrtuAl teAMs And outsourCInG to provide more business— more work, that is. The way the Chinese communicated that need was different from the Western interpre-
  • 437.
    tation. This isjust a small example of what can happen without a well-thought-out organizational learning scheme. That is, individuals need to develop more reflective abilities to comprehend the meaning of words before they take action, especially in virtual environments across multiple cultures. The development of such abilities— the continual need for organizations to respond effectively to dynamic changes, brought about by technology, in this case, e-mail— is consis- tent with my theory of responsive organizational dynamism (ROD). The e-mail established a new dynamic of communication. Think how often specifications and product requirements are changing and need virtual teams to somehow come together and agree on how to get the work done— or think they agree. Prior research and case studies provide tools and procedures as ways to improve productivity and quality of virtual team operations. While such processes and methodologies are helpful, they will not necessar- ily ensure the successful outcomes that IT operations seek unless they also change. Specifically, new processes alone are not sufficient or a substitute for learning how to better communicate and make mean-
  • 438.
    ing in avirtual context. Individuals must learn how to develop new behaviors when working virtually. We must also remember that vir- tual team operations are not limited to IT staffs. Business users often need to be involved as they would in any project, particularly when users are needed to validate requirements and test the product. Status of Virtual Teams The consensus tells us that virtual teams render results. According to Bazarova and Walther (2009), “ Virtual groups whose members com- municate primarily or entirely via email, computer conferencing, chat, or voice— have become a common feature of twenty-first century organizations” (p. 252). Lipnack and Stamps (2000) state that virtual teams will become the accepted way to work and will likely reshape the work world. While this prediction seems accurate, there has also been evidence of negative attribution or judgment about problems that arise in virtual team performance. Thus, it is important to understand how virtual teams need to be managed and how realistic expectations 166 INFORMATION TECHNOLOGY
  • 439.
    of such teamsmight be formed. So, while organizations understand the need for virtual teams, they are not necessarily happy with proj- ect results. Most of the disappointment relates to a lack of individual development that helps change the mindset of how people need to communicate, coupled with updated processes. Management Considerations Attribution theory “ describes how people typically generate explana- tions for outcomes and actions— their own and others” (Bazarova & Walther, 2009, p. 153). This theory explains certain behavior patterns that have manifested during dysfunctional problems occurring in man- aging virtual teams. Virtual teams are especially vulnerable to such problems because their limited interactions can lead to members not having accurate information about one another. Members of virtual teams can easily develop perceptions of each other’ s motives that are inaccurate or distorted by differing cultural norms. Research also shows us that virtual team members typically attribute failure to the external factors and successes to internal factors. Problems are blamed on the virtual or outside members for not being available or
  • 440.
    accountable to the physicalcommunity. The successes then tend to reinforce that virtual teams are problematic because of their very nature. This then estab- lishes the dilemma of the use of virtual teams and organizations— its use will continue to increase and dominate workplace structures and yet will present challenges to organizations that do not want to change. The lack of support to change will be substantiated during failures in expected outcomes. Some of the failures, however, can and should be attributable to distance. As Olson and Olson (2000) state: “ Distance will persist as an important element of human experience” (p. 172). So, despite the advent of technology, it is important not to ignore the social needs that teams need to have to be effective. Dealing with Multiple Locations Perhaps the greatest difficulty in implementing virtual teams is the reality that they span multiple locations. More often, these locations can be in different time zones and within multiple cultures. To prop- erly understand the complexity of interactions, it makes sense to revisit
  • 441.
    167vIrtuAl teAMs AndoutsourCInG the organizational learning tools discussed in prior chapters. Perhaps another way of viewing virtual teams and their effects on organiza- tion learning is to perceive it as another dimension— a dimension that is similar to multiple layers in a spreadsheet. This notion means that virtual teams do not upset the prior relations between technology as a variable from a two-dimensional perspective, rather in the depth of how it affects this relationship in a third dimension. Figure 7.1 reflects how this dimension should be perceived. In other words, the study of virtual teams should be viewed as a subset of the study of organizations. When we talk about work- place activities, we need to address issues at the component level. In this example, the components are the physical organization and the Technology as an independent variable Creates Virtual organizational dynamism dimension
  • 442.
    Physical organizational dynamism dimension Virtualacceleration dimension Strategic integration Cultural assimilation Total organizational dynamism Acceleration of events that require different infrastructures and organizational processes Virtual cultural assimilation dimension Virtual strategic integration dimension Figure 7.1 The three-dimensional ROD. 168 INFORMATION TECHNOLOGY virtual organization. The two together make up the superset or
  • 443.
    the entire organization. Tobe fruitful, any discussion of virtual organiza- tions must be grounded in the context of the entire organization and address the complete topic of workplace learning and transformation. In Chapter 4, I discussed organizational learning in communities of practice (COP). In this section, I expand that discussion to include virtual organizational structures. The growing use of virtual teams may facilitate the complete inte- gration of IT and non-IT workers. The ability to connect from various locations using technology itself has the potential to expand COP. But, as discussed in Chapter 4, it also presents new challenges, most of which relate to the transient nature of members, who tend to par- ticipate on more of a subject or transactional basis, rather than being permanent members of a group. Table 7.1 reflects some of the key differences between physical and virtual teams. There has been much discussion about whether every employee is suited to perform effectively in a virtual community. The consensus is that effective virtual team members need to be self-motivated, able to work independently, and able to communicate clearly and in a
  • 444.
    posi- tive way. However,given that many workers lack some or all of these skills, it seems impractical to declare that workers who do not meet these criteria should be denied the opportunity to work in virtual Table 7.1 Operating Differences between Traditional and Virtual Teams TRADITIONAL OR PHYSICAL TEAMS VIRTUAL TEAMS Teams tend to have fixed participation and members. Membership shifts based on topics and needs. Members tend to be from the same organization. Team members can include people from outside the organization (clients and collaborators). Team members are 100% dedicated. Members are assigned to multiple teams. Team members are collocated geographically and by organization. Team members are distributed geographically and by organization. Teams tend to have a fixed term of membership; that is, start and stop dates. Teams are reconfigured dynamically and may
  • 445.
    never terminate. Teams tendto have one overall manager. Teams have multiple reporting relationships with different parts of the organization at different times. Teamwork is physical and practiced in face-to-face interactions. Teamwork is basically social. Engagement is often during group events and can often be hierarchical in nature. Individual engagement is inseparable from empowerment. 169vIrtuAl teAMs And outsourCInG teams. A more productive approach might be to encourage workers to recognize that they must adapt to changing work environments at the risk of becoming marginal in their organizations. To better understand this issue, I extended the COP matrix, presented in Chapter 4, to include virtual team considerations in Table 7.2. Item 7 in Table 7.2 links the study of knowledge management with COP. Managing knowledge in virtual communities within an
  • 446.
    orga- nization has becomeassociated directly with the ability of a firm to sustain competitive advantage. Indeed, Peddibhotla and Subramani (2008) state that “ virtual communities are not only recognized as important contributors to both the development of social networks among individuals but also towards individual performance and firm performance” (p. 229). However, technology-enabled facilities and support, while providing a repository for better documentation, also create challenges in maintaining such knowledge. The process of how information might become explicit has also dramatically changed with the advent of virtual team communications. For example, much technology-related documentation evolves from bottom-up sources, rather than the traditional top-down process. In effect, virtual com- munities share knowledge more on a peer-to-peer basis or through mutual consensus of the members. As a result, virtual communities have historically failed to meet expectations, particularly those of management, because managers tend to be uninvolved in communi- cation. While physical teams can meet with management more often before making decisions, virtual teams have no such contact
  • 447.
    available. To better understandthe complexities of knowledge management and virtual teams, Sabherwal and Becerra-Fernandez (2005) expand on Nonaka’ s (1994) work on knowledge management, which outlined four modes of knowledge creation: externalization, internalization, combination, and socialization. Each of these modes is defined and discussed next. Externalization Externalization is the process of converting or translating tacit knowl- edge (undocumented knowledge) into explicit forms. The problem with this concept is whether individuals really understand what they know 170 INFORMATION TECHNOLOGY Table 7.2 Communities of Practice: Virtual Team Extensions STEP COMMUNITIES-OF- PRACTICE STEP TECHNOLOGY EXTENSION VIRTUAL EXTENSION 1 Understanding strategic knowledge needs: What
  • 448.
    knowledge is criticalto success. Understanding how technology affects strategic knowledge and what specific technological knowledge is critical to success. Understanding how to integrate multiple visions of strategic knowledge and where it can be found across the organization. 2 Engaging practice domains: Where people form communities of practice to engage in and identify with. Technology identifies groups based on business-related benefits, requiring domains to work together toward measurable results. Virtual domains are more dynamic and can be formed for specific purposes and then reconfigured based on practice needs of subjects
  • 449.
    discussed. 3 Developing communities: Howto help key communities reach their full potential. Technologies have life cycles that require communities to continue; treats the life cycle as a supporter for attaining maturation and full potential. Communities can be reallocated to participate in multiple objectives. Domains of discussion have no limits to reach organizational needs. 4 Working the boundaries: How to link communities to form broader learning systems Technology life cycles require new boundaries to be formed. This will link other communities that were previously outside of discussions and thus expand input into technology innovations.
  • 450.
    Virtual abilities allowfor customer interfaces, vendors, and other interested parties to join the community. 5 Fostering a sense of belonging: How to engage people’ s identities and sense of belonging. The process of integrating communities: IT and other organizational units will create new evolving cultures that foster belonging as well as new social identities. Communities establish belonging in a virtual way. Identities are established more on content of discussion than on physical attributes of members. 6 Running the business: How to integrate communities of practice into running the business of the organization.
  • 451.
    Cultural assimilation provides new organizationalstructures that are necessary to operate communities of practice and to support new technological innovations. The organization functions more as a virtual community or team, being more agile to demands of the business, and interactions may not always include all members. (Continued) 171vIrtuAl teAMs And outsourCInG and how it might affect organizational knowledge. Virtual communi- ties have further challenges in that the repository of tacit information can be found in myriad storage facilities, namely, audit trails of e-mail communications. While Sabherwal and Becerra-Fernandez (2005) suggest that technology may indeed assist in providing the infrastruc- ture to access such information, the reality is that the challenge is not
  • 452.
    one of processbut rather of thinking and doing. That is, it is more a process of unlearning existing processes of thinking and doing, into new modes of using knowledge that is abundantly available. Internalization Internalization is a reversal of externalization: It is the process of transferring explicit knowledge into tacit knowledge— or individual- ized learning. The individual thus makes the explicit process into his or her own stabilized thinking system so that it becomes intuitive in operation. The value of virtual team interactions is that they can provide more authentic evidence of why explicit knowledge is valu- able to the individual. Virtual systems simply can provide more people who find such knowledge useful, and such individuals, coming from a more peer relationship, can understand why their procedures can be internalized and become part of the self. Combination Combination allows individuals to integrate their physical processes with virtual requirements. The association, particularly in a global Table 7.2 (Continued) Communities of Practice: Virtual Team
  • 453.
    Extensions STEP COMMUNITIES-OF- PRACTICE STEP TECHNOLOGYEXTENSION VIRTUAL EXTENSION 7 Applying, assessing, reflecting, renewing: How to deploy knowledge strategy through waves of organizational transformation. The active process of dealing with multiple new technologies that accelerates the deployment of knowledge strategy. Emerging technologies increase the need for organizational transformation. Virtual systems allow for more knowledge strategy because of the ability to deploy information and procedures. Tacit knowledge is easier to transform to explicit forms.
  • 454.
    172 INFORMATION TECHNOLOGY environment,allows virtual team members to integrate new explicit forms into their own, not by replacing their beliefs, but rather, by establishing new hybrid knowledge systems. This is particularly advantageous across multiple cultures and business systems in coun- tries that hold different and, possibly complementary, knowledge about how things can get done. Nonaka’ s (1994) concept of combina- tion requires participants in the community to be at later stages of multiplicity— suggesting that this form can only be successful among certain levels or positions of learners. Socialization As Nonaka (1994) notes, individuals learn by observation, imitation, and practice. The very expansion of conversations via technology can provide a social network in which individuals can learn simply through discourse. Discourse, as I discussed in Chapter 4, is the basis of successful implementations of COP. The challenge in virtual social networks is the difficulty participants have in assessing the authentic- ity of the information provided by those in the community. The four modes of knowledge management formulated by
  • 455.
    Nonaka (1994) need tobe expanded to embrace the complexities of virtual team COPs. Most of the adjustments are predicated on the team’ s ability to deal with the three fundamental factors of ROD that I introduced in this book; that is, acceleration, dynamic, and unpre- dictability. The application of these three factors of ROD to Nonaka’ s four modes is discussed next. Externalization Dynamism The externalization mode must be dynamic and ongoing with little ability to forecast the longevity of any tacit-to-explicit formulation. In other words, tacit-to-explicit change may occur daily but may only operate effectively for a shorter period due to additional changes brought on by technology dynamism. This means that members in a community must continually challenge themselves to revisit pre- vious tacit processes and acknowledge the need to reformulate their tacit systems. Thus, transformation from tacit knowledge to explicit knowledge can be a daily challenge for COP virtual organizations. 173vIrtuAl teAMs And outsourCInG
  • 456.
    Internalization Dynamism Careful reflectionon this process of internalizing explicit forms must be done. Given the differences in cultures and acceleration of busi- ness change, individualized learning creating new tacit abilities may not operate the same in different firm settings. It may be necessary to adopt multiple processes depending on the environment in which tacit operations are being performed. As stated, what might work in China may not work in Brazil, for example. Tacit behavior is culture oriented, so multiple and simultaneous versions must be respected and practiced. Further expansion of internalization is a virtual team’ s understanding of how such tacit behaviors change over time due to the acceleration of new business challenges. Combination Dynamism I believe the combination dynamism mode is the most important com- ponent of virtual team formation. Any combination or hybrid model requires a mature self— as specified in my maturity arcs discussed in Chapter 4. This means that individuals in virtual teams may need to be operating at a later stage of maturity to deal with the complexities
  • 457.
    of changing dispositions.Members of COPs must be observed, and a determination of readiness must be made for such new structures to develop in a virtual world. Thus, COP members need training; the lack of such training might explain why so many virtual teams have had disappointing results. Readiness for virtual team participation depends on a certain level of relativistic thinking. To be successful, virtual team members must be able to see themselves outside their own world and have the ability to understand the importance of what “ others” need. This position suggests that individuals need to be tested to the extent that they are ready for such challenges. Organizational learning tech- niques remain a valid method for developing workers who can cope with the dynamic changes that occur in virtual team organizations. Socialization Dynamism Socialization challenges the virtual team members’ abilities to understand the meaning of words and requires critical reflection 174 INFORMATION TECHNOLOGY of its constituents. ROD requires that virtual teams be agile and, especially, that they be responsive to the emotions of others in
  • 458.
    the community. This mayrequire individuals to understand another member’ s maturity. Thus, virtual team members need to be able to understand why another member is behaving as he or she is or reacting in a dualistic manner. Assessment in a virtual collabora- tion becomes a necessity, especially given the unpredictability of technology-based projects. In Table 5.1, I showed how tacit knowledge is mapped to ROD. Table 7.3 further extends this mapping to include virtual teams. The requirements support research findings that knowledge man- agement in a virtual context has significant factors that must be addressed to improve its success. These factors include management commitment, resource availability, modification of work practices, marketing of the initiative, training, and facilitation of cultural dif- ferences (Peddibhotla & Subramani, 2008). The following are some action steps that organizations need to take to address these factors: 1. The executive team needs to advocate the commitment and support for virtual teams. The chief information officer (CIO) and his or her counterparts need to provide teams with the “ sponsorship” that the organization will need to endure set- backs until the virtual organization becomes fully integrated into the learning organization. This commitment can be accomplished via multiple actions, including, but not limited
  • 459.
    to, a kickoffmeeting with staff, status reports to virtual teams on successes and setbacks, e-mails and memos on new vir- tual formations, and a general update on the effort, perhaps on a quarterly basis. This approach allows the organization to understand the evolution of the effort and know that virtual teams are an important direction for the firm. 2. There should be training and practice sessions with collocated groups that allow teams to voice their concerns and receive direction on how best to proceed. Practice sessions should focus on team member responsibilities and advocating their ownership of responsibility. These sessions should cover les- sons learned from actual experiences, so that groups can learn 175vIrtuAl teAMs And outsourCInG Ta bl e 7. 3 Ta ci t K no wl ed ge
  • 460.
  • 461.
  • 462.
  • 463.
  • 464.
  • 465.
  • 466.
  • 467.
  • 468.
  • 469.
  • 470.
  • 471.
  • 472.
  • 473.
  • 474.
  • 475.
  • 476.
  • 477.
  • 478.
  • 479.
  • 480.
  • 481.
  • 482.
  • 483.
  • 484.
  • 485.
  • 486.
  • 487.
  • 488.
  • 489.
  • 490.
  • 491.
  • 492.
  • 493.
  • 494.
  • 495.
  • 496.
  • 497.
  • 498.
  • 499.
  • 500.
  • 501.
  • 502.
  • 503.
  • 504.
  • 505.
  • 506.
  • 507.
  • 508.
  • 509.
  • 510.
  • 511.
  • 512.
  • 513.
  • 514.
  • 515.
  • 516.
  • 517.
  • 518.
  • 519.
  • 520.
    177vIrtuAl teAMs AndoutsourCInG from others. Training should set the goals and establish the criteria for how virtual teams interact in the firm. This should include the application software and repositories that are in place and the procedures for keeping information and knowl- edge current. 3. External reminders should be practiced so that virtual teams do not become lax and develop bad habits since no one is monitoring or measuring success. Providing documented processes, perhaps a balanced scorecard or International Organization for Standardization (ISO) 9000-type proce- dures and measurements, is a good practice for monitoring compliance. Dealing with Multiple Locations and Outsourcing Virtual organizations are often a given in outsourcing environments, especially those that are offshore. Offshore outsourcing also means that communications originate in multiple locations. The first step in dealing with multiple locations is finding ways to deal with different time zones. Project management can become more complicated when team meetings occur at obscure times for certain members of the community. Dealing with unanticipated problems can be more chal- lenging when assembling the entire team may not be feasible because of time differences. The second challenge in running
  • 521.
    organizations in multiple locationsis culture. Differing cultural norms can espe- cially cause problems during off-hour virtual sessions. For example, European work culture does not often support having meetings out- side work hours. In some countries, work hours may be regulated by the government or powerful unions. A further complication in outsourcing is that the virtual team members may be employed by different companies. For instance, part of the community may include a vendor who has assigned staff resources to the effort. Thus, these outsourced team members belong to the community of the project yet also work for another organiza- tion. The relationship between an outside consultant and the internal team is not straightforward and varies among projects. For example, some outsourced technical resources may be permanently assigned to the project, so while they actually work for another firm, they behave 178 INFORMATION TECHNOLOGY and take daily direction as if they were an employee of the focal busi- ness. Yet, in other relationships, outsourced resources work
  • 522.
    closely under the auspicesof the outsourced “ project manager,” who acts as a buffer between the firm and the vendor. Such COP formations vary. Still other outsourcing arrangements involve team members the firm does not actually know unless outsourced staff is called in to solve a problem. This situation exists when organizations outsource complete systems, so that the expectation is based more on the results than on the interaction. Notwithstanding the arrangement or level of integration, a COP must exist, and its behavior in all three of these examples varies in participation, but all are driven in a virtual relationship more by dynamic business events than by preplanned activities. If we look closely at COP approaches to operations, it is neces- sary to create an extension of dynamism in a virtual team commu- nity. The extension reflects the reliance on dynamic transactions, which creates temporary team formations based on demographic similarity needs. This means that virtual teams will often be formed based on specific interests of people within the same departments. Table 7.4 shows the expansion of dynamism in a virtual setting of COPs. Thus, the advent of modern-day IT outsourcing has complicated
  • 523.
    the way COPsfunction. IT outsourcing has simultaneously brought attention to the importance of COP and knowledge management in general. It also further supports the reality of technology dyna- mism as more of a norm in human communication in the twenty- first century. Revisiting Social Discourse In Chapter 4, I covered the importance of social discourse and the use of language as a distinct component of how technology changes COP. That section introduced three components that linked talk and action, according to the schema of Grant et al. (1998): Identity, skills and emotion. Figure 7.2 shows this relationship again. The expansion of virtual team communications further emphasizes the importance of discourse and the need to rethink how these three components relate to each other in a virtual context. 179vIrtuAl teAMs And outsourCInG Identity I spoke about the “ cultures of practice” due to expansion of contacts from technology capacities. This certainly holds true with virtual
  • 524.
    teams. However, identitiescan be transactional— in ways such that an individual may be a member of multiple COP environments and have different identities in each. This fact emphasizes the multitask- ing aspect of the linear development modules discussed throughout this book. Ultimately, social discourse will dynamically change based on the COP to which an individual belongs, and that individual needs to be able to “ inventory” these multiple roles and responsibilities. Such roles and responsibilities themselves will transform, due to the dynamic nature of technology-driven projects. Individuals will thus have multiple identities and must be able to manage those identities across different COPs and in different contexts within those COPs. Table 7.4 COP Virtual Dynamism COP PHYSICAL SOCIAL SETTINGS COP VIRTUAL DYNAMISMS There is shared pursuit of interest accomplished through group meetings. Interest in discussion is based more on dynamic transactions and remote needs to satisfy specific personal needs. Creation of the “ community” is typically
  • 525.
    established within thesame, or similar, departments. The notion of permanency is deemphasized. Specific objectives based on the needs of the group will establish the community. Demographic similarity is a strong contributor to selection of community members. Demographic similarity has little to do with community selection. Selection is based more on subject-matter expertise. Situated learning is often accomplished by assisting members to help develop others. Learning occurs within a framework of social participation. Situated learning to help others has less focus. It may not be seen as the purpose or responsibility of virtual team members. Social participation has more concrete perspective. Community needs to assess technology dynamism using ROD in more physical environments requiring a formal infrastructure. Community is less identifiable from a physical perspective. ROD must be accomplished by members who have special interests at the subject level as opposed to the group level. COP works well with cultural assimilation
  • 526.
    of formal workgroups where participants are clearly identified. Cultural assimilation in virtual settings is more transaction-based. Assimilation can be a limited reality during the time of the transaction to ensure success of outcomes. COP can be used for realignment of work departments based on similar needs. COP in a virtual environment creates temporary realignments, based on similar needs during the process. COP supports continual learning and dealing with unplanned action. COPs are continually reconfigured, and do not have permanency of group size or interest. 180 INFORMATION TECHNOLOGY This requires individual maturities that must be able to cope with the “ other” and understand the relativistic nature of multiple cultures and the way discourse transforms into action. Skills I mentioned the importance of persuasion as a skill to transform talk into action. Having the ability to persuade others across virtual
  • 527.
    teams is critical. Often,skills are misrepresented as technical abilities that give people a right of passage. Across multiple cultures, individuals in teams must be able to recognize norms and understand how to communicate with others to get tangible results on their projects. It is difficult to make such determinations about individuals that one has never met face to face. Furthermore, virtual meetings may not pro- vide the necessary background required to properly understand a per- son’ s skill sets, both “ hard” and “ soft.” The soft skills analysis is more important as the individual’ s technical credentials become assumed. We see such assumptions when individuals transition into manage- ment positions. Ascertaining technical knowledge at the staff level is easier— almost like an inventory analysis of technical requirements. Conversational activity Skills Identity Emotions Action
  • 528.
    Conversational content Figure 7.2 Grant’s schema of the relationship between talk and action. 181vIrtuAl teAMs And outsourCInG However, assessing an individual’ s soft skills is much more challeng- ing. Virtual teams will need to create more complex and broadened inventories of their team’ s skill sets, as well as establish better criteria on how to measure soft skills. Soft skills will require individuals to have better “ multicultural” abilities, so that team members can be better equipped to deal with multinational and cross-cultural issues. Emotion Like persuasion, emotion involves an individual’ s ability to motivate others and to create positive energy. Many of those who successfully use emotion are more likely to have done so in a physical context than a virtual one. Transferring positive emotion in a virtual world can be analogous to what organizations experienced in the e- commerce world, in which organizations needed to rebrand themselves
  • 529.
    across the Web insuch a way that their image was reflected virtually to their customers. Marketing had to be accomplished without exposure to the buyer during purchase decisions. Virtual COPs are similar: Representation must be what the individual takes away, without see- ing the results physically. This certainly offers a new dimension for managing teams. This means that the development requirements for virtual members must include advanced abstract thinking so that the individual can better forecast virtual team reactions to what will be said, as opposed to reacting while the conversation is being conducted or thinking about what to do after virtual meetings. In Chapter 4, I presented Marshak’ s (1998) work on types of talk that lead to action: tool-talk, frame-talk, and mythopoetic- talk. Virtual teams require modification to the sequence of talk; that is, the use of talk is altered. Let us first look at Figure 7.3, represent- ing Marshak’ s model. To be effective, virtual teams must follow this sequence from the outside inward. That is, the virtual team must focus on mythopoetic-talk in the center as opposed to an outer ring. This means that ideogenic issues must precede interpretation in a virtual
  • 530.
    world. Thus, tool-talk,which in the physical world lies at the center of types of tools, is now moved to the outside rectangle. In other words, instrumental actions lag those of ideology and interpretation. This is restructured in Figure 7.4. 182 INFORMATION TECHNOLOGY Mythopoetic-talk is at the foundation of grounding ideas in a vir- tual COP. It would only make sense that a COP-driven talk requires ideogenic behavior before migrating to instrumental outcomes. Remember that ideogenic talk allows for concepts of intuition and ideas for concrete application especially relevant among multiple cul- tures and societies. So, we again see that virtual teams require changes in the sequence of how learning occurs. This change in sequence places more emphasis on the need for an individual to be more devel- opmentally mature— with respect to thinking, handling differences, and thinking abstractly. This new “ abstract individual” must be able to reflect before action and reflect in action to be functionally compe- tent in virtual team participation. Because ROD is relevant, it is important to determine how
  • 531.
    virtual teams affect theROD maturity arc first presented in Figure 4.10 and redisplayed in Figure 7.5. Mythopoetic-talk: Ideogenic Frame-talk: Interpretive Tool-talk: Instrumental Figure 7.3 Marshak’ s types of talk. Mythopoetic-talk: Ideogenic Frame-talk: Interpretive Tool-talk: Instrumental Figure 7.4 Virtual team depiction of Marshak’ s types of talk. 183vIrtuAl teAMs And outsourCInG St ag es o f i nd iv id
  • 532.
  • 533.
  • 534.
  • 535.
  • 536.
  • 537.
  • 538.
  • 539.
  • 540.
  • 541.
  • 542.
  • 543.
  • 544.
  • 545.
  • 546.
  • 547.
  • 548.
  • 549.
  • 550.
  • 551.
  • 552.
  • 553.
  • 554.
  • 555.
  • 556.
  • 557.
  • 558.
  • 559.
  • 560.
  • 561.
  • 562.
  • 563.
  • 564.
  • 565.
  • 566.
  • 567.
  • 568.
  • 569.
  • 570.
  • 571.
  • 572.
  • 573.
  • 574.
  • 575.
  • 576.
  • 577.
  • 578.
  • 579.
  • 580.
  • 581.
  • 582.
  • 583.
  • 584.
  • 585.
  • 586.
  • 587.
  • 588.
  • 589.
  • 590.
  • 591.
  • 592.
  • 593.
  • 594.
  • 595.
  • 596.
  • 597.
  • 598.
  • 599.
  • 600.
  • 601.
  • 602.
    im ila tio n ne ed s m ay di ffe r a sd iff er en t m em be rs jo in o r le
  • 603.
  • 604.
  • 605.
  • 606.
  • 607.
  • 608.
    ic s. 185vIrtuAl teAMs AndoutsourCInG Figure 7.6 represents the virtual team extension to the ROD arc. The changes to the cells are shown in italics. Note that there are no changes to operational knowledge because this stage focuses solely on self-knowledge learned from authoritative sources. However, as the individual matures, there is greater need to deal with uncer- tainty. This includes the uncertainty that conditions in a COP may be temporary, and thus knowledge may need to vary from meeting to meeting. Furthermore, while operational realities may be more trans- actional, it does not necessarily mean that adopted changes are not permanent. Most important is the reality that permanence in general may no longer be a characteristic of how the organization operates; this further emphasizes ROD as a way of life. As a result of this extreme complexity in operations, there is an accelerated requirement for executives to become involved earlier in the development process. Specifically, by stage two (department/unit view of the other), execu-
  • 609.
    tives must beengaged in virtual team management considerations. Ultimately, the virtual team ROD arc demonstrates that vir- tual teams are more complex and therefore need members who are more mature to ensure the success of outsourcing and other virtual constructs. It also explains why virtual teams have struggled, likely because their members are not ready for the complex participation necessary for adequate outcomes. We must also remember that maturity growth is likely not parallel in its linear progression. This was previously shown in Figure 4.12. This arc demonstrates the challenge managers face in gauging the readiness of their staff to cope with virtual team engagement. On the other hand, the model also provides an effective measure- ment schema that can be used to determine where members should be deployed and their required roles and responsibilities. Finally, the model allows management to prepare staff for the training and devel- opment they need as part of the organizational learning approach to dealing with ROD.
  • 610.
    http://taylorandfrancis.com 187 8 syneRgisTiC union of iTanD oRganizaTional leaRning Introduction This chapter presents case studies that demonstrate how information technology (IT) and organizational learning occur in the real corpo- rate world. It examines the actual processes of how technological and organizational learning can be implemented in an organization and what management perspectives can support its growth so that forms of responsive organizational dynamism can be formed and developed. I will demonstrate these important synergies through three case stud- ies that will show how the components of responsive organizational dynamism, strategic integration and cultural assimilation, actually operate in practice. Siemens AG The first case study offers a perspective from the chief informa-
  • 611.
    tion officer (CIO).The CIO of Siemens of the Americas at the time of this study was Dana Deasy, and his role was to introduce and expand the use of e-business across 20 discrete businesses. The Siemens Corporation worldwide network was composed of over 150 diverse sets of businesses, including transportation, healthcare, and telecommunications. Deasy’ s mission was to create a common road map across different businesses and cultures. What makes this case so distinct from others is that each business is highly decentralized under the umbrella of the Siemens Corporation. Furthermore, each company has its own mission; the companies have never been asked to come together and discuss common issues with regard to technol- ogy. That is, each business focused on itself as opposed to the entire 188 InForMAtIon teChnoloGY organization. Deasy had to deal with two sectors of scope and hence, two levels of learning: the Americas as a region and the global firm internationally. The challenge was to introduce a new e-business strategy from the
  • 612.
    top-down in eachbusiness in the Americas and then to integrate it with the global firm. Ultimately, the mission was to review what each business was doing in e-business and to determine whether there was an opportunity to consolidate efforts into a common direction. IT was, for the most part, viewed as a back-office operation— handling services of the company as a support function as opposed to thinking about ways to drive business strategy. In terms of IT report- ing, most CIOs reported directly to the chief financial officer (CFO). While some IT executives view this as a disadvantage because CFOs are typically too focused on financial issues, Deasy felt that a focus on cost containment was fine as long as the CIO had access to the chief executive officer (CEO) and others who ultimately drove business strategy. So, the real challenge was to ensure that CIOs had access to the various strategic boards that existed at Siemens. What are the challenges in transforming an organization the size of Siemens? The most important issue was the need to educate CIOs on the importance of their role with respect to the business as opposed to the technology. As Deasy stated in an interview, “ Business must come first and we need to remind our CIOs that all technology issues
  • 613.
    must refer backto the benefits it brings to the business.” The question then is how to implement this kind of learning. Perhaps the best way to understand how Siemens approached this dilemma is to understand Deasy’ s role as a corporate CIO. The reality is that there was no alternative but to create his position. What drove Siemens to this realization was fear that they needed someone to drive e-business, according to Deasy—fear of losing competitive edge in this area, fear that they were behind the competition and that smaller firms would begin to obtain more market share. Indeed, the growth of e-business occurred during the dot-com era, and there were huge pressures to respond to new business opportunities brought about by emerging technologies, specifically the Internet. It was, therefore, a lack of an internal capacity, such as responsive organizational dyna- mism, that stimulated the need for senior management to get involved and provide a catalyst for change. 189sYnerGIstIC unIon oF It The first aspect of Siemens’ s approach can be correlated to the strategic integration component of responsive organizational
  • 614.
    dyna- mism. We seethat Siemens was concerned about whether technology was properly being integrated in strategic discussions. It established the Deasy role as a catalyst to begin determining the way technol- ogy needed to be incorporated within the strategic dimension of the business. This process cannot occur without executive assistance, so evolutionary learning must first be initiated by senior management. Unfortunately, Deasy realized early on that he needed a central pro- cess to allow over 25 CIOs in the Americas to interact regularly. This was important to understand the collective needs of the community and to pave the way for the joining of technology and strategic inte- gration from a more global perspective. Deasy established an infra- structure to support open discourse by forming CIO forums, similar to communities of practice, in which CIOs came together to discuss common challenges, share strategies, and have workshops on the ways technology could help the business. Most important at these forums was the goal of consolidating their ideas and their common challenges. There are numerous discussions regarding the common problems
  • 615.
    that organizations faceregarding IT expenditures, specifically the approach to its valuation and return on investment (ROI). While there are a number of paper-related formulas that financial executives use (e.g., percentage of gross revenues within an industry), Deasy uti- lized learning theories, specifically, communities of practice, to foster more thinking and learning about what was valuable to Siemens, as opposed to using formulas that might not address important indi- rect benefits from technology. In effect, Deasy promoted learning among a relatively small but important group of CIOs who needed to better understand the importance of strategic innovation and the value it could bring to the overall business mission. Furthermore, these forums provided a place where CIOs could develop their own community—a community that allowed its members to openly par- ticipate in strategic discourse that could help transform the organiza- tion. It was also a place to understand the tacit knowledge of the CIO organization and to use the knowledge of the CIOs to summarize common practices and share them among the other members of the community.
  • 616.
    190 InForMAtIon teChnoloGY Mostof the CIOs at Siemens found it challenging to understand how their jobs were to be integrated into business strategy. Indeed, this is not a surprise. In Chapter 1, I discuss the feedback from my research on CEO evaluation of technology; I found that there were few IT executives who were actually involved in business strategy. Thus, the organization sought to create an advocate in terms of a central- ized corporate headquarter that could provide assistance as opposed to forcing compliance. That is, it sought a structure with which to foster organizational learning concepts and develop an approach to create a more collective effort that would result in global direction for IT strategic integration. To establish credibility among the CIO community, Deasy needed to ensure that the CIOs of each individual company were able to inter- act with board-level executives. In the case of Siemens, this board is called the president’ s council. The president’ s council has regularly held meetings in which each president attends and receives presentations on ideas about the regional businesses. Furthermore, there are quarterly
  • 617.
    CFO meetings aswell, where CIOs can participate in understand- ing the financial implications of their IT investments. At the same time, these meetings provided the very exposure to the executive team that CIOs needed. Finally, Deasy established a CIO advisory board comprised of CIOs who actually vote on the common strategic issues and thus manage the overall direction of technology at Siemens. Each of these groups established different types of communities of practice that focused on a specific aspect of technology. The groups were geared to create better discourse and working relationships among these com- munities to, ultimately, improve Siemens’ s competitive advantage. The three communities of practice at work in the Siemens model— executive, finance, and technology—suggest that having only one gen- eral community of practice to address technology issues may be too limiting. Thus, theories related to communities of practice may need to be expanded to create discourse among multiple communities. This might be somewhat unique for IT, not in that there is a need for mul- tiple communities, but that the same individuals must have an identity in each community. This shows the complexity of the CIO role today
  • 618.
    in the abilityto articulate technology to different types and tiers of management. Figure 8.1 shows the interrelationships among the CIO communities of practice at Siemens. 191sYnerGIstIC unIon oF It Another way to represent these communities of practice is to view them as part of a process composed of three operating levels. Each level represents a different strategic role of management that is responsible for a unique component of discourse and on the authorization for uses of technology. Therefore, if the three different communities of prac- tice are viewed strategically, each component could be constructed as a process leading to overall organizational cooperation, learning, and strategic integration as follows: Tier 1: CIO Advisory Board : This community discusses issues of technology standards, operations, communications, and ini- tiatives that reflect technology-specific areas. Such issues are seen as CIO specific and only need this community’ s agree- ment and justification. However, issues or initiatives that require financial approval, such as those that may not yet be budgeted or approved, need to be discussed with group CFOs. Proposals to executive management—that is, the President’ s Council—also need prior approval from the CFOs.
  • 619.
    Communities of practiceconsist of presidents from each company. Regular meetings are designed for discussion over common issues on business strategy. Corporate CIOs can use this forum to present new proposals on emerging technologies and seek approval for their plans and vision. President’s council Corporate CIO of the Americas CFO quarterly meetings CIO advisory board Communities of practice consist of CIOs from each company. Forum is designed to openly discuss common challenges, agree on technology initiatives, foster a more united community and build on shared knowledge across businesses. Communities of practice consist of CFOs from each company. Discussions relate to how strategies can be implemented with respect to ROI. CIOs need to understand IT costs, both direct and indirect.
  • 620.
    Figure 8.1 Inter-relationshipsamong CIO communities of practice at Siemens. 192 InForMAtIon teChnoloGY Tier 2: CFO Quarterly : CFOs discuss new emerging technolo- gies and ascertain their related costs and benefits (ROI). Those technologies that are already budgeted can be approved based on agreed ROI scenarios. Proposals for new technology projects are approved in terms of their financial viability and are prepared for further discussion at the President’ s Council. Tier 3: President’ s Council : Proposals for new technology projects and initiatives are discussed with a focus on their strategic implications on the business and their expected outcome. Deasy realized that he needed to create a common connection among these three communities. While he depended on the initia- tives of others, he coordinated where these CIO initiatives needed to be presented, based on their area of responsibility. Graphically, this can be shown as a linear progression of commu- nity-based discussions and approvals, as in Figure 8.2. The common thread to all three tiers is the corporate CIO. Deasy was active in each community; however, his specific activities within each community of practice were different. CIOs needed to
  • 621.
    estab- lish peer relationshipswith other CIOs share their tacit knowledge and contribute ideas that could be useful to other Siemens companies. Thus, CIOs needed to transform their personal views of technology and expand them to a group-level perspective. Their challenge was to learn how to share concepts and how to understand new ones that emanated at the CIO advisory board level. From this perspective, they could create the link between the local strategic issues and those discussed at the regional and global levels, as shown in Figure 8.3. Using this infrastructure, Siemens’ s organizational learning in technology, occurred at two levels of knowledge management. The first is represented by Deasy’ s position, which effectively represents a top-down structure to initiate the learning process. Second, are the tiers of communities of practice when viewed hierarchically. This view reflects a more bottom-up learning strategy, with technological oppor- tunities initiated by a community of regional, company CIOs, each representing the specific interests of their companies or specific lines of business. This view can also be structured as an evolutionary cycle in which top-down management is used to initiate
  • 622.
    organizational learning from thebottom-up, the bottom, in this case, represented by 193sYnerGIstIC unIon oF It local operating company CIOs. This means that the CIO is seen rela- tively, in this case, as the lower of the senior management population. Figure 8.4 depicts the CIO as this “ senior lower level.” From this frame of reference, the CIO represents the bottom-up approach to the support of organizational learning by addressing the technology dilemma created by technological dynamism— specifically, in this case, e-business strategy. The role of IT in marketing and e-business was another important factor in Siemens’ s model of organizational learning. The technology strategy at Siemens was consistent with the overall objectives of the organization: to create a shared environment that complements each Tier 3 Tier 2 Co rpo
  • 623.
    rat e C IO ov ers igh t an dm ana gem ent Tier 1 CFO quarterly CIO advisory board President’s council Outcomes Budgeted but not approved implementations. Projects are approved within budget constraints
  • 624.
    Proposals reviewed basedon strategy and corporate direction, and approved for implementation, including financial commitment Outcomes Outcomes Local or pre-budgeted technology specific implementation issues Requires financial approval Requires strategic approval Figure 8.2 Siemens’ community-based links. 194 InForMAtIon teChnoloGY Dana Deasy Strategic senior Management level President and executive
  • 625.
    management Chief financial officer Local CIO Financialsenior Management level Senior lower level Figure 8.4 CIO as the “ senior lower level.” Company president CIO advisory board Company CFO Technology issues related to sharing across businesses or issues for discussion that require consesus among CIO population Company-specific strategic issues regarding how technology affects specific corporate goals and objectives Financial implications and direct reporting at the company level
  • 626.
    Figure 8.3 Siemens’local to global links. 195sYnerGIstIC unIon oF It business by creating the opportunity to utilize resources. This shared environment became an opportunity for IT to lead the process and become the main catalyst for change. I discuss this kind of support in Chapter 5, in which I note that workers see technology as an accept- able agent of change. Essentially, the CIOs were challenged with the responsibility of rebranding their assets into clusters based on their generic business areas, such as hospitals, medical interests, and com- munications. The essence of this strategic driver was to use e- business strategy to provide multiple offerings to the same customer base. As with the Ravell case discussed in Chapter 1, the Siemens case represents an organization that was attempting to identify the driver component of IT. To create the driver component, it became necessary for executive management to establish a corporate position (embodied by Deasy) to lay out a plan for transformation, through learning and
  • 627.
    through the useof many of the organizational learning theories pre- sented in Chapter 4. The Siemens challenge, then, was to transform its CIOs from being back-office professionals to proactive technologists focused primarily on learning to drive business strategy. That is not to say that back-office issues became less important; they became, instead, responsibilities left to the internal organizations of the local CIOs. However, back- office issues can often become strategic problems, such as with the use of e-mail. This is an example of a driver situation even though it still per- tains to a support concern. That is, back-office technologies can indeed be drivers, especially when new or emerging technologies are available. As with any transition, the transformation of the CIO role was not accomplished without difficulty. The ultimate message from executive management to the CIO community was that it should fuse the vital goals of the business with its technology initiatives. Siemens asked its CIOs to think of new ways that technology could be used to drive strategic innovations. It also required CIOs to change their behavior by asking them to think more about business strategy.
  • 628.
    The first decisionthat Deasy confronted was whether to change the reporting structure of the CIO. Most CIOs at Siemens reported directly to the CFO as opposed to the CEO. After careful thought, Deasy felt that to whom the CIO reported was less important than giving access and exposure to the President’ s Council meetings. It was Deasy’ s perspective that only through exposure and experience could 196 InForMAtIon teChnoloGY CIOs be able to transform from back-office managers to strategic planners. As such, CIO training was necessary to prepare them for participation in communities of practice. Eventually, Siemens recog- nized this need and, as a result, sponsored programs, usually lasting one week, in which CIOs would be introduced to new thinking and learning by using individual-based reflective practices. Thus, we see an evolutionary approach, similar to that of the responsive organiza- tional dynamism arc, presented in Chapter 4; that is, one that uses both individual and organizational learning techniques. Deasy also understood the importance of his relationship and role
  • 629.
    with each ofthe three communities of practice. With respect to the CEOs of each company, Deasy certainly had the freedom to pick up the phone and speak with them directly. However, this was rarely a realistic option as Deasy knew early on that he needed the trust and cooperation of the local CIO to be successful. The community with CEOs was then broadened to include CIOs and other senior manag- ers. This was another way in which Deasy facilitated the interaction and exposure of his CIOs to the executives at Siemens. Disagreement among the communities can and does occur. Deasy believed in the “ pushing-back” approach. This means that, inevitably, not everyone will agree to agree, and, at times, senior executives may need to press on important strategic issues even though they are not mutually in agreement with the community. However, while this type of decision appears to be contrary to the process of learning embed- ded in communities of practice learning, it can be a productive and acceptable part of the process. Therefore, while a democratic process of learning is supported and preferred, someone in the CIO posi- tion ultimately may need to make a decision when a community is
  • 630.
    deadlocked. The most importantcomponent of executive decision making is that trust exists within the community. In an organizational learning infrastructure, it is vital that senior management share in the value proposition of learning with members of the community. In this way, members feel that they are involved, and are a part of decision mak- ing as opposed to feeling that they are a part of a token effort that allows some level of participation. As Deasy stated, “ I was not try- ing to create a corporate bureaucracy, but rather always representing myself as an ambassador for their interest, however, this does not 197sYnerGIstIC unIon oF It guarantee that I will always agree with them.” Disagreements, when managed properly, require patience, which can result in iterative dis- cussions with members of the community before a consensus posi- tion may be reached, if it is at all. Only after this iterative process is exhausted does a senior overarching decision need to be made. Deasy attributed his success to his experience in field operations, similar to
  • 631.
    those of hisconstituents. As a prior business-line CIO, he understood the dilemma that many members of the community were facing. Interestingly, because of his background, Deasy was able to “ qual- ify” as a true member of the CIO community of practice. This truth establishes an important part of knowledge management and change management—senior managers who attempt to create communities of practice will be more effective when they share a similar back- ground and history with the community that they hope to manage. Furthermore, leaders of such communities must allow members to act independently and not confuse that independence with autonomy. Finally, managers of communities of practice are really champions of their group and as such must ensure that the trust among mem- bers remains strong. This suggests that CIO communities must first undergo their own cultural assimilation to be prepared to integrate with larger communities within the organization. Another important part of Deasy’ s role was managing the technol- ogy itself. This part of his job required strategic integration in that his focus was more about uses of technology, as opposed to commu- nity behavior or cultural assimilation. Another way of looking
  • 632.
    at this issue isto consider the ways in which communities of practice actually transform tacit knowledge and present it to senior management as explicit knowledge. This explicit knowledge about uses of technology must be presented in a strategic way and show the benefits for the organization. The ways that technology can benefit a business often reside within IT as tacit knowledge. Indeed, many senior manag- ers often criticize IT managers for their inability to articulate what they know and to describe it so that managers can understand what it means to the business. Thus, IT managers need to practice transform- ing their tacit knowledge about technology and presenting it effec- tively, as it relates to business strategy. Attempting to keep up with technology can be a daunting, if not impossible, task. In some cases, Siemens allows outside consultants 198 InForMAtIon teChnoloGY to provide help on specific applications if there is not enough expertise within the organization. The biggest challenge, however, is not necessarily in keeping up with new technologies but rather, in
  • 633.
    testing technologies todetermine exactly the benefit they have on the business. To address this dilemma, Deasy established the con- cept of “ revalidation.” Specifically, approved technology projects are reviewed every 90 days to determine whether they are indeed providing the planned outcomes, whether new outcomes need to be established, or whether the technology is no longer useful. The concept of revalidation can be associated with my discussion in Chapter 3, which introduced the concept of “ driver” aspects of technology. This required that IT be given the ability to invest and experiment with technology to fully maximize the evaluation of IT in strategic integration. This was particularly useful to Deasy, who needed to transform the culture at Siemens to one that rec- ognized that not all approved technologies succeed. In addition, he needed to dramatically alter the application development life cycle and reengineer the process of how technology was evaluated by IT and senior management. This challenge was significant in that it had to be accepted by over 25 autonomous presidents, who were more focused on short and precise outcomes from technology investments. Deasy was able to address the challenges that many presidents had in understanding IT jargon, specifically as it related to ben- efits of using technology. He engaged in an initiative to communi- cate with non-IT executives by using a process called
  • 634.
    storyboarding. Storyboarding is theprocess of creating prototypes that allow users to actually see examples of technology and how it will look and operate. Storyboarding tells a story and can quickly educate executives without being intimidating. Deasy’ s process of revaluation had its own unique life cycle at Siemens: 1. Create excitement through animation. What would Siemens be like if ... ? 2. Evaluate the way the technology would be supported. 3. Recognize implementation considerations about how the technology as a business driver is consistent with what the organization is doing and experiencing. 199sYnerGIstIC unIon oF It 4. Technology is reviewed every 90 days by the CIO advisory board after experimental use with customers and presented to the president’ s council on an as-needed basis. 5. Establish responsive organizational dynamism with cultural assimilation; that is, recognize the instability of technol- ogy and that there are no guarantees to planned outcomes. Instead, promote business units to understand the concept of “ forever prototyping.” Thus, Siemens was faced with the challenge of cultural assimi- lation, which required dramatic changes in thinking and
  • 635.
    business life cycles. Thisprocess resembles Bradley and Nolan’ s (1998) Sense and Respond —the ongoing sensing of technology opportunities and responding to them dynamically. This process disturbs traditional and existing organizational value chains and therefore represents the need for a cultural shift in thinking and doing. Deasy, using technology as the change variable, began the process of reinventing the operation of many traditional value chains. Siemens provides us with an interesting case study for responsive organizational dynamism because it had so many diverse companies (in over 190 countries) and over 425,000 employees. As such, Siemens represents an excellent structure to examine the importance of cul- tural assimilation. Deasy, as a corporate CIO, had a counterpart in Asia/Australia. Both corporate CIOs reported to a global CIO in Germany, the home office of Siemens. There was also a topic- centered CIO responsible for global security and application-specific planning software. This position also reported directly to the global CIO. There were regional and local CIOs who focused on specific geographical areas and vertical lines of business and operating company CIOs. This
  • 636.
    organization is shownin Figure 8.5. Deasy’ s operation represents one portion (although the most quickly changing and growing) of Siemens worldwide. Thus, the issue of globalization is critical for technologies that are scalable beyond regional operating domains. Standardization and evaluations of tech- nology often need to be ascertained at the global level and as a result introduce new complexities relating to cultural differences in business methods and general thinking processes. Specifically, what works in one country may not work the same way in another. Some of these 200 InForMAtIon teChnoloGY matters can be legally based (e.g., licensing of software or assumptions about whether a technology is legally justified). To a large extent, solv- ing legal matters relating to technology is easier than cultural ones. Cultural assimilation matters about technology typically occur in global organizations with respect to acceptability of operational norms from one country to another. This becomes a particularly dif- ficult situation when international firms attempt to justify standards.
  • 637.
    At Siemens, Deasyintroduced three “ standards” of technology that defined how it could be used across cultures, and communities of practice: 1. Corporate services : These are technologies that are required to be used by the business units. There are central service charges for their use as well. 2. Mandatory services : Everyone must comply with using a par- ticular type of application; that is, mandatory software based on a specific type of application. For example, if you use a Web browser, it must be Internet Explorer. 3. Optional : These are technologies related to a specific business and used only within a local domain. There may be a preferred solution, but IT is not required to use it. This matrix of standards allows for a culture to utilize technologies that are specific to its business needs, when justified. Standards at Siemens are determined by a series of steering committees, starting Siemens global CIO (Germany) Topic centered CIO Regional CIOs Operatingcompany CIO Operating
  • 638.
    company CIORegional CIOs CorporateCIO Asia/Australia Corporate CIO Americas (deasy) Figure 8.5 Siemens’ CIO organization. 201sYnerGIstIC unIon oF It at the regional level, that meet two to three times annually. Without question, implementing standards across cultures is, as Deasy phrased it, “ a constant wrestling match which might need to change by the time a standard is actually reached.” This is why strategic integra- tion is so important, given the reality that technology cannot always be controlled or determined at senior levels. Organizations must be able to dynamically integrate technology changes parallel to business changes. Deasy’ s longer-term mission was to provide a community of CIOs who could combine the business and technology challenges. It
  • 639.
    was his initial visionthat the CIO of the future would be more involved than before with marketing and value chain creation. He felt that “ the CIO community needed to be detached from its technology- specific issues or they would never be a credible business partner.” It was his intent to establish organizational learning initiatives that helped CIOs “ seize and succeed,” to essentially help senior manage- ment by creating vision and excitement, by establishing best practices, and by learning better ways to communicate through open discourse in communities of practice. Three years after his initial work, I reviewed the progress that Deasy had made at Siemens. Interestingly, most of his initiatives had been implemented and were maturing—except for the role of e-business strategy. I discovered, after this period, that the orga- nization thought that e-business was an IT responsibility. As such, they expected that the CIOs had not been able to determine the best business strategy. This was a mistake; the CIO could not estab- lish strategy but rather needed to react to the strategies set forth by senior management. This means that the CIO was not able to really establish stand-alone strategies as drivers based on technology alone. CIOs needed, as Deasy stated, “ to be a participant with
  • 640.
    the business strategist andto replace this was inappropriate.” This raises a number of questions: 1. Did this occur because CIOs at Siemens do not have the edu- cation and skills to drive aspects of business strategy? 2. Did the change in economy and the downfall of the dot-coms create a negative feeling toward technology as a business driver? 202 InForMAtIon teChnoloGY 3. Are CEOs not cognizant enough about uses of technology, and do they need better education and skills to better under- stand the role of technology? 4. Is the number of communities of practice across the organi- zation integrated enough so that IT can effectively commu- nicate and form new cultures that can adapt to the changes brought about by emerging technologies? 5. Is there too much impatience with the evolution of tech- nology? Does its assimilation in an organization the size of Siemens simply take too long to appreciate and realize the returns from investments in technology? I believe that all of these questions apply, to some extent, and are part of the challenges that lie ahead at Siemens. The company has now initiated a series of educational seminars designed to provide more
  • 641.
    business training forCIOs, which further emphasizes the importance of focusing on business strategy as opposed to just technology. It could also mean the eventual establishment of a new “ breed” of CIOs who are better educated in business strategy. However, it is inappropriate for non-IT managers to expect that the CIOs will be able to handle strategy by themselves; they must disconnect e-business as solely being about technology. The results at Siemens only serve to strengthen the concept that responsive organizational dynamism requires that cul- tural assimilation occur within all the entities of a company. Aftermath Dana Deasy left Siemens a few years after this case study was com- pleted. During that time, the executive team at Siemens realized that the CIO alone could not provide business strategy or react quickly enough to market needs. Rather, such strategy required the integra- tion of all aspects of the organization, with the CIO only one part of the team to determine strategic shifts that lead or use components of technology. Thus, the executives realized that they needed to become much better versed in technology so that they also could engage in
  • 642.
    strategic conversations. Thisdoes not suggest that executives needed technology training per se, but that they do need training that allows them to comment intelligently on technology issues. What is the best 203sYnerGIstIC unIon oF It way to accomplish this goal? The answer is through short seminars that can provide executives with terminology and familiarize them with the processes their decisions will affect. The case also raised the question of whether a new wave of executives would inevitably be required to move the organization forward to compete more effec- tively. While these initiatives appear to make sense, they still need to address the fundamental challenges posed by technology dynamism and the need to develop an organization that is positioned to respond (i.e., responsive organizational dynamism). We know from the results of the Ravell case that executives cannot be excluded. However, the case also showed that all levels of the organization need to be involved. Therefore, the move to responsive organizational dynamism requires a reinvention of the way individuals work, think, and operate
  • 643.
    across multiple tiers ofmanagement and organizational business units. This challenge will continue to be a difficult but achievable objective of large multinational companies. ICAP This second case study focuses on a financial organization called ICAP, a leading money and securities broker. When software development exceeded 40% of IT activities, ICAP knew it was time to recognize IT as more than just technical support. Stephen McDermott provided the leadership, leaving his role as CEO of the Americas at ICAP to become CEO of the Electronic Trading Community (ETC), a new entity focused solely on software development. This IT community needed to be integrated with a traditional business model that was undergoing significant change due to emerging technologies, in this specific case, the movement from voice to electronic trading systems. This case study reflects many aspects of the operation of responsive organizational dynamism. From the strategic integration perspec- tive, ICAP needed to understand the ways electronic trading could
  • 644.
    ultimately affect businessstrategy. For example, would it replace all voice-related business interactions, specifically voice trading? Second, what would be the effect on its culture, particularly with respect to the way the business needed to be organizationally structured? This study focuses on the role of the CEO as a pioneer in reexamining his own biases, which favored an old-line business process, and for developing 204 InForMAtIon teChnoloGY a realization to manage a major change in business strategy and organizational philosophy. Indeed, as McDermott stated, “ It was the challenge of operating at the top, yet learning from the bottom.” This sentiment essentially reflects the reality of a management dilemma. Could a CEO who, without question, had substantial knowledge of securities trading, learn to lead a technology-driven operation, for which he had little knowledge and experience? To better understand the impact of technology on the business of ICAP, it is important to have some background information. Since 1975, the use of technology at ICAP was limited to operations of
  • 645.
    the back-office type.Brokers (the front-end or sales force of a trad- ing business), communicated with customers via telephone. As such, processing transactions was always limited to the time necessary to manually disseminate prices and trading activity over the phone to a securities trader. However, by 1997 a number of technological advancements, particularly with the proliferation of Internet- based communication and the increased bandwidth available, enabled bro- kers and dealers to communicate bidirectionally. The result was that every aspect of the trade process could now be streamlined, includ- ing the ability for the trader to enter orders directly into the brokers’ trading systems. The technological advancements and the availability of capital in the mid-1990s made it difficult to invest in computer operations. Specifically, the barriers to investing in technology had been high as developing proprietary trading systems and deploying a private network were all costly. The market of available products was scarce, filled with relatively tiny competitors with little more than a concept, rather than an integrated product that could do what a com- pany like ICAP needed, in order to maintain its competitive position.
  • 646.
    The existing system,called the ICAP Trading Network application was far from a trading system that would compete against the newer emerging technologies. The goal was to develop a new trading sys- tem that would establish an electronic link between the back- office systems of ICAP and its clients. The system would need to be simple to use as the traders were not necessarily technology literate. It would need to be robust, include features that were specific to the markets, and easily installed and distributed. In addition, as ICAP decided to fund the entire project, it would have to be cost-effective and not burden the other areas of the business. As competitive systems were 205sYnerGIstIC unIon oF It already being introduced, the new system needed to be operational within three to six months for ICAP to remain competitive. McDermott recognized that designing a new product would require that IT developers and business matter experts learn to work together. As a result of this realization, a representative from the operation was selected to see if a third-party developer could modify an
  • 647.
    existing product. After exploringand evaluating responses, the search team concluded that off-the-shelf solutions, prohibitive in cost, were not available that would meet the critical timing needs of the business. However, during the period when IT and the business users worked together, these groups came to realize that the core components of its own trading system could be modified and used to build the new system. This realization resulted from discussions between IT and the business users that promoted organizational learning. This process resembles the situation in the Ravell study, in which I concluded that specific events could accelerate organizational learning and actually provide an opportunity to embed the process in the normal discourse of an organization. I also concluded that such learning starts with individual reflective practices, and understanding how both factions, in this case, IT and the business community, can help each other in a common cause. In the case of Ravell, it was an important relocation of the business that promoted integration between IT and the busi- ness community. At ICAP, the common cause was about maintaining competitive advantage.
  • 648.
    The project todevelop the new electronic trading application was approved in August 1999, and the ETC was formed. The new entity included an IT staff and selected members from the business commu- nity, who moved over to the new group. Thus, because of technologi- cal dynamism, it was determined that the creation of a new product established the need for a new business entity that would form its own strategic integration and cultural assimilation. An initial test of the new product took place in November, and it successfully executed the first electronic trade via the Internet. In addition to their design responsibility, ETC was responsible for marketing, installing, and training clients on the use of the product. The product went live in February 2000. Since its introduction, the ETC product has been modified to accommodate 59 different fixed-income products, serving more than 1,000 users worldwide in multiple languages. 206 InForMAtIon teChnoloGY While the software launch was successful, McDermott’ s role was a challenge, from coordinating the short- and long-term goals of ETC with the traditional business models of ICAP to shifting
  • 649.
    from management of aglobal financial enterprise to management of an IT community. The ICAP case study examines the experiences and per- ceptions one year after the launch of the new entity. The first most daunting result, after a year of operations, was the significant growth of technology uses in the business. Initially, McDermott noted that electronic trading was about 40% of opera- tions and that it had grown over 60%. He stated that ETC had become, without question, the single most important component of the ICAP international business focus. The growth of electronic trad- ing created an accelerated need for transformation within ICAP and its related businesses. This transformation essentially changed the balance between voice or traditional trading and electronic trading. McDermott found himself responsible for much of this transforma- tion and was initially concerned whether he had the technical exper- tise to manage it. McDermott admitted that as a chief executive of the traditional ICAP business, he was conservative and questioned the practicality and value of many IT investments. He often turned down requests for more funding and looked at technology as more of a supporter of
  • 650.
    the business. AsI explain in Chapter 3, IT as a supporter will always be managed, based on efficiencies and cost controls. McDermott’ s view was consistent with this position. In many ways, it was ironic that he became the CEO of the electronic component of the business. Like many CEOs, McDermott initially had the wrong impression of the Internet. Originally looking at it as a “ big threat,” he eventually realized from the experience that the Internet was just another way of communicating with his clients and that its largest contribution was that it could be done more cost-effectively, thus leading to higher profits. One of the more difficult challenges for McDermott was develop- ing the mission for ETC. At the time of the launch of the new product, this mission was unclear. With the assistance of IT and the business community, the mission of ETC has been developing dynamically; the business is first trying to protect itself from outside competi- tion. Companies like IBM, Microsoft, and others, might attempt to 207sYnerGIstIC unIon oF It
  • 651.
    invade the businessmarket of ICAP. Thus, it is important that ETC continues to produce a quality product and keep its competitive edge over more limited competitors that are software-based organizations only. The concept of a dynamic mission can be correlated to the fun- damental principles of responsive organizational dynamism. In fact, it seems rather obvious that organizations dealing with emerging tech- nologies might need to modify their missions to parallel the acceler- ated changes brought about by technological innovation. We certainly see this case with ICAP, for which the market conditions became volatile because of emerging electronic trading capacities. Why, then, is it so difficult for organizations to realize that changing or modify- ing their missions should not be considered that unusual? Perhaps the approach of ICAP in starting a completely separate entity was correct. However, it is interesting that this new organization was operating without a consistent and concrete mission. Another important concept that developed at ETC was that technology was more of a commodity and that content (i.e., the dif- ferent services offered to clientele) was more important. Indeed, as
  • 652.
    McDermott often stated,“ I assume that the technology works, the real issue is the way you intend to implement it; I want to see a com- pany’ s business plan first.” Furthermore, ETC began to understand that technology could be used to leverage ICAP businesses in areas that they had never been able to consider before the advent of the technology and the new product. McDermott knew that this was a time, as Deasy often stated, to “ seize and succeed” the moment. McDermott also realized that organizational learning practices were critical for ideas to come from within the staff. He was careful not to require staff to immediately present a formal new initiative, but he allowed them to naturally develop a plan as the process became mature. That is one of the reasons that ETC uses the word community in its name. As he expressed it to me during a conversation: Now that is not my mandate to grow into other areas of opportunity, my initial responsibility is always to protect our businesses. However, I will not let opportunities go by which can help the business grow, especially things that we could never do as a voice broker. It has been very exciting and I can see ICAP becoming a considerably larger company than we have been historically because of our investment in technology.
  • 653.
    208 InForMAtIon teChnoloGY McDermottalso was challenged to learn what his role would be as a chief executive of a software technology organization. In the early stages, he was insecure about his job because for the first time he knew less than his workers about the business. Perhaps this provides organizational learning practitioners with guidance on the best way of getting the CEO engaged in the transformative process; that is, getting the CEO to understand his or her role in an area in which, typically, he or she does not have expertise. McDermott represented an executive who reached that position coming up through the ranks. Therefore, much of his day-to-day management was based on his knowledge of the business—a business that he felt he knew as well as anyone. With technology, and its effect as technological dynamism, CEOs face more challenges, not only because they need to manage an area they may know little about but also because of the dynamic aspects of technology and the way it causes unpredictable and acceler- ated change. McDermott realized this and focused his attention
  • 654.
    on discovering what hisrole needed to be in this new business. There was no question in McDermott’ s mind that he needed to know more about technology, although he also recognized that management was the fundamental responsibility he would have with this new entity: [Although] I was insecure at the beginning I started to realize that it does not take a genius to do my job. Management is management, and whether you manage a securities brokering firm or you manage a deli or manage a group of supermarkets or an IT or an electronic company, it is really about management, and that is what I am finding out now. So, whether I am the right person to bring ETC to the next level is irrelevant at this time. What is more important is that I have the skills that are necessary to manage the business issues as opposed to the technological ones. However, McDermott did have to make some significant changes to operate in a technology-based environment. ETC was now des- tined to become a global organization. As a result, McDermott had to create three senior executive positions to manage each of the three major geographic areas of operation: North America, Europe,
  • 655.
    and Asia. He wentfrom having many indirect reports to having just a few. He needed four or five key managers. He needed to learn to trust that they were the right people, people who had the ability to nurture 209sYnerGIstIC unIon oF It the parts of each of their respective divisions. “ What it leaves now is being a true CEO,” he stated, “ and that means picking your people, delegating the responsibility and accepting that they know the busi- ness.” Thus, we see technological dynamism actually realigning the reporting structure, and social discourse of the company. My presentation in previous chapters focused on helping orga- nizations transform and change. Most important in organizational learning theories is the resistance to change that most workers have, particularly when existing cultural norms are threatened. ICAP was no exception to the challenges of change management. The most sig- nificant threat at ICAP was the fear that the traditional voice bro- ker was endangered. McDermott understood this fear factor and presented electronic trading not as a replacement but rather, a sup-
  • 656.
    plement to thevoice broker. There was no question that there were certain areas of the business that lent themselves more to electronic trading; however, there are others that will never go electronic or at least predominantly electronic. Principles of responsive organizational dynamism suggest that accelerated change becomes part of the stra- tegic and cultural structure of an organization. We see both of these components at work in this case. Strategically, ICAP was faced with a surge in business opportuni- ties that were happening at an accelerated pace and were, for the most part, unplanned, so there was little planned activity. The business was feeling its way through its own development, and its CEO was pro- viding management guidance, as opposed to specific solutions. ICAP represents a high-velocity organization similar to those researched by Eisenhardt and Bourgeois (1988), and supports their findings that a democratic, less power-centralized management structure enhances the performance of such a firm. From a cultural assimilation perspec- tive, the strategic decisions are changing the culture and requiring new structures and alignments. Such changes are bound to cause fears.
  • 657.
    As a resultof recognizing the inevitable changes that were becom- ing realities, McDermott reviewed the roles and responsibilities of his employees on the brokering side of the business. After careful analysis, he realized that he could divide the brokers into three dif- ferent divisions, which he branded as A, B, and C brokers. The A brokers were those who were fixed on the relational aspect of their jobs, so voice interaction was the only part of their work world. Such 210 InForMAtIon teChnoloGY individuals could do things in the voice world that electronic means could not reach. They were personal experts, if you will, who could deal with clients requiring a human voice. Thus, the A broker would exist as long as the broker wanted to work—and would always be needed because a population of clients wants personal support over the phone. This is similar to the opposition to the Internet in which we find that some portion of the population will never use e- com- merce because they prefer a live person. The B broker was called the
  • 658.
    hybrid broker—an individualwho could use both voice and electronic means. Most important, these brokers were used to “ convert” voice- based clients into electronic ones. As McDermott explained: Every day I see a different electronic system that someone is trying to sell in the marketplace. Some of these new technologies are attempting to solve problems that do not exist. I have found that successful systems address the content more than the technology. Having a relationship for many of our customers is more important. And we can migrate those relationships from voice to electronic or some sort of a hybrid combi- nation. The B brokers will end up with servicing some combination of these relationships or migrate themselves to the electronic system. So, I believe they have nothing to fear. The C brokers, on the other hand, represented the more average voice brokers who would probably not have a future within the busi- ness. They would be replaced by electronic trading because they did not bring the personal specialization of the A broker. The plight of the C broker did raise an important issue about change management and technological dynamism: Change will cause disruption, which can lead to the elimination of jobs. This only further supported
  • 659.
    the fears that workershad when faced with dynamic environments. For McDermott, this change would need to be openly discussed with the community, especially for the A and B brokers, who in essence would continue to play an important role in the future of the business. C brokers needed to be counseled so that they could appropriately seek alternate career plans. Thus, honesty brings forth trust, which inevi- tably fosters the growth of organizational learning. Another perspec- tive was that the A and B brokers understood the need for change and recognized that not everyone could adapt to new cultures driven 211sYnerGIstIC unIon oF It by strategic integration, so they understood why the C broker was eliminated. In Chapter 2, I discussed the dilemma of IT as a “ marginalized” component of an organization. This case study provides an opportunity to understand how the traditional IT staff at ICAP made the transi- tion into the new company—a company in which they represented a
  • 660.
    direct part ofits success. As noted, ICAP considered the IT depart- ment as a back-office support function. In the new organization, it represented the nucleus or the base of all products and careers. Hence, McDermott expected ETC employees to be technology proficient. No longer were IT people just coders or hardware specialists—he saw tech- nology people as lawyers, traders, and other businesspeople. He related technology proficiency in a similar way to how his business used to view a master’ s degree in business (MBA) in the late 1980s. This issue provides further support for the cultural assimilation component of responsive organizational dynamism. We see a situation in which the discrepancy between who is and is not a technology person beginning to dwindle in importance. While there is still clear need for expertise and specialization, the organization as a whole has started the process of educating itself on the ways in which technology affects every aspect of its corporate mission, operations, and career development. ICAP has not been immune to the challenges that have faced most technology-driven organizations. As discussed in Chapter 2, IT proj- ects typically face many problems in terms of their ability to complete
  • 661.
    projects on timeand within budget. ICAP was also challenged with this dilemma. Indeed, ICAP had no formal process but focused on the criterion of meeting the delivery date as the single most important issue. As a result, McDermott was attempting to instill a new culture committed to the importance of what he called the “ real date of deliv- ery.” It was a challenge to change an existing culture that had difficulty with providing accurate dates for delivery. As McDermott suggested: I am learning that technology people know that there is no way that they can deliver an order in the time requested, but they do not want to disap- point us. I find that technology people are a different breed from the peo- ple that I normally work with. Brokers are people looking for immediate gratification and satisfaction. Technology people, on the other hand, are always dedicated to the project regardless of its time commitment. 212 InForMAtIon teChnoloGY McDermott was striving to attain a mix or blend of the traditional culture with the technology culture and create a new hybrid organiza-
  • 662.
    tion capable ofdeveloping realistic goals and target dates. This process of attainment mirrors the results from the Ravell case, which resulted in the formation of a new hybrid culture after IT and business staff members were able to assimilate one another and find common needs and uses for technology and the business. McDermott also understood his role as a leader in the new orga- nization. He realized early on that technology people are what he called more “ individualistic” ; that is, they seemingly were reluctant to take on responsibility of other people. They seemed, as McDermott observed, “ to have greater pleasure in designing and creating some- thing and they love solving problems.” This was different from what CEOs experienced with MBAs, who were taught more to lead a group as opposed to being taught to solve specific problems. Yet, the integra- tion of both approaches can lead to important accomplishments that may not be reachable while IT and non-IT are separated by depart- mental barriers. Ultimately, the cultural differences and the way they are managed lead to issues surrounding the basis of judging new technologies for future marketing consideration. McDermott understood that this
  • 663.
    was a work inprogress. He felt strongly that the issue was not technology, but that it was the plan for using technology competitively. In other words, McDermott was interested in the business model for the tech- nology that defined its benefits to the business strategically. As he put it, “ Tell me how you are going to make money, tell me what you can do for me to make my life easier. That is what I am looking at!” While McDermott felt that many people were surprised by his response, he believed its reality was taken too much for granted. During the dot- com era, too many investors and businesses assumed that technologi- cal innovation would somehow lead to multiples of earnings— that simply did not happen. Essentially, McDermott realized that good technology was available in many places and that the best technology is not necessarily the one that will provide businesses with the highest levels of success. Judging new technologies based on the quality of the business plan is an effective method of emphasizing the importance of why the entire organization needs to participate and understand technology.
  • 664.
    213sYnerGIstIC unIon oFIt This inevitably leads to questions about the method in which ROI is, or should be, measured. The actual measurement of ROI for ICAP was remarkably simple yet effective. There were four methods of determining ROI. The first and most significant was whether the technology would increase volume of trades along the different prod- uct lines. The second was the amount in dollars of the securities being traded. That is, did technology provide a means for clients to do larger dollar trades? The third factor could be an increase in the actual num- ber of clients using the electronic system. The fourth might be allevi- ating existing bottlenecks in the voice trading process, whether it was a legal issue or the advantage provided by having electronic means. We see here that some of the ROI factors are direct and monetary. As expected methods, the first and second were very much direct mone- tary ways to see the return for investing in electronic trading systems. However, as Lucas (1999) reminds us, many benefits derived from IT investments are indirect, and some are impossible to measure. We see
  • 665.
    this with thethird and fourth methods. Increasing the number of cli- ents indirectly suggested more revenue, but did not guarantee it. An even more abstract benefit was the improvement of throughput, what is typically known as improved efficiency in operations. While all of the accomplishments of ICAP and McDermott seem straightforward, they were not accomplished without challenges; perhaps the most significant was the approach, determination, and commitment that were needed by the executive team. This chal- lenge is often neglected in the literature on organizational learning. Specifically, the executive board of ETC needed to understand what was necessary in terms of funding to appropriately invest in the future of technology. To do that, they needed to comprehend what e- business was about and why it was important for a global business to make seri- ous investments in it to survive. In this context, then, the executive board needed to learn about technology as well and found themselves in a rather difficult position. During this period, McDermott called in an outside consultant who could provide a neutral and objective opinion. Most important was to define the issue in lay terms so that board members could correlate it with their traditional business mod-
  • 666.
    els. Ultimately, thelearning consisted of understanding that technol- ogy and e-commerce were about expanding into more markets, ones that ICAP could not reach using traditional approaches. There was a 214 InForMAtIon teChnoloGY realization that ICAP was too focused on its existing client base, as opposed to reaching out for new ones—and there was also the reverse reality that a competitor would figure out a strategy to reach out to the client base of ICAP. What is also implied in expanding one’ s client base is that it means going outside one’ s existing product offerings. This had to be carefully planned as ICAP did not want to venture outside what it was—an intermediary brokering service. So, expan- sion needed to be carefully planned and discussed first among the executive members, then presented as a challenge to the senior man- agement, and so on. This process required some modifications to the organizational learning process proposed by such scholars as Nonaka and Takeuchi (1995). Specifically, their models of knowledge management do not
  • 667.
    typically include theexecutive boards; thus, they are not considered a part of the learning organization. The ICAP case study exposes the fact that their exclusion can be a serious limitation, especially with respect to the creation of responsive organizational dynamism. In previous chapters, I presented a number of management models that could be used to assist in developing and sustaining organizational learning. They focused fundamentally on the concept of whether such manage- ment should be top-down, bottom-up, or, as Nonaka and Takeuchi suggest, “ middle-up-down.” I laid out my case for a combination of all of them in a specific order and process that could maximize each approach. However, none of these models really incorporates the out- side executive boards that have been challenged to truly understand what technology is about, their approach to management, and what their overall participation should be in organizational learning. Perhaps the most significant historical involvement of executive boards was with the Year 2000 (Y2K) event. With this event, executive boards mandated that their organizations address the potential tech- nology crisis at the turn of the century. My CEO interviews verified that, if anything, the Y2K crisis served to educate executive
  • 668.
    boards by forcing themto focus on the issue. Boards became unusually involved with the rest of the organization because independent accounting firms, as outside objective consultants, were able to expose the risks for not addressing the problem. The handling of e-commerce by ICAP was in many ways similar but also suggests that executive boards should not always wait for a crisis to occur before they get involved. They also 215sYnerGIstIC unIon oF It must be an important component of organizational learning, particu- larly in responsive organizational dynamism. While organizational learning fosters the involvement of the entire community or workers, it also needs advocates and supporters who control funding. In the case of ICAP, organizational learning processes without the participation of the executive board, ultimately would not have been successful. The experience of ICAP also suggests that this educational and learning process may need to come from independent and objective sources, which integrates another component of organizational learning that
  • 669.
    has not beeneffectively addressed: the role of outside consultants as a part of a community of practice. Figure 8.6 depicts the addition of the ICAP ETC executive board and outside consultants in the organiza- tional learning management process. The sequential activities that occurred among the different communi- ties are shown in Table 8.1. While Table 8.1 shows the sequential steps necessary to complete a transformation toward strategic integration and cultural assimilation, the process is also very iterative. Specifically, this means that organizations do not seamlessly move from one stage to another without setbacks. Thus, transformation depends heavily on dis- course as the main driver for ultimate organizational evolution. Figure 8.7 shows a somewhat messier depiction of organizational learning under the auspices of ROD. The changes brought on by dynamic interactions foster top-down, middle-up-down, and bottom- up knowledge management techniques—all occurring simultane- ously. This level of complex discourse creates a number of overlapping communities of practice that have similar, yet unique, objectives in learning. These communities of practice overlap at certain levels as shown in Figure 8.8.
  • 670.
    As stated, organizationallearning at the executive levels tends to be ignored in the literature. At ICAP, an important community of practice emerged that created a language discourse essential to its overall success in dealing with technological dynamism, brought on by technological innovation in electronic communications. Language was critical at this level; ICAP is a U.K.-based organization and as such has an international board. As McDermott explained: As you know, from travelling anywhere around the world, cultures are different. And even the main office for our company, ICAP in England, 216 InForMAtIon teChnoloGY and even with the English, we are separated by a common language, as we often say. There is a very, very different culture everywhere in the world. I will tell you that information technology in our company is separated from electronic trading—there is a difference. Thus, McDermott’ s challenge was to establish a community that could reach consensus not only on strategic issues but also Advisement on e-commerce business opportunities
  • 671.
    Overall changes to corporatemission financial commitments approve major organizational changes—form ETC Discourse and learning at the organizational level, non-event specific. ICAP board focused on impact of technology on trading operations. Senior management team meets and determines strategy and organization for creating new corporate entity. Middle managers determine how and when operations will be changed. �is includes personnel changes and development of
  • 672.
    specific implementation schedules through group discourse. Operations personnelwork with middle management to determine change in organization structure and duties and responsibilies of new and old positions. Individual reflective practice, tacit knowledge of how to actually implement changes at the individual and group levels Buy in modify implementation plans based on discourse and knowledge of how the business operates Buy in modify strategic plans based on discourse and knowledge of specific areas of the business Specific skills in
  • 673.
    technology strategy objective analysis ofbusiness realignment education of executive board Initiator of change knowledge and strategic management organizational change agent ICAP ETC executive board Independent consultants CEO Senior management Middle management Operations Figure 8.6 ICAP ETC management tiers. 217sYnerGIstIC unIon oF It Table 8.1 ICAP—Steps to Transformation
  • 674.
    STEP LEARNING ENTITY(S)LEARNING ACTIVITY 1 CEO Americas Initiates discourse at board level on approaches to expanding electronic trading business 2 Executive board Decides to create separate corporate entity ETC to allow for the establishment of a new culture 3 Outside consultant E-commerce discourse, ways in which to expand the domain of the business 4 Executive board Discussion of corporate realignment of mission, goals, and objectives 5 CEO/senior management Establishes strategic direction with senior management 6 Senior management/middle management Meet to discuss and negotiate details of the procedures to implement 7 Middle management/operations communities Meet with operations communities to discuss impact on day-to-day processes and procedures Discourse initiated
  • 675.
    Discourse on “how” to implement Rolloutof new organization and strategies Interactive discussions Questions and responsesExecutive board CEO Americas Senior management Middle management Operations Operations adjustments based on reflective practices Adjustments as a result of discourse with operations community New ideas and adjustments
  • 676.
    Objective advice and education Objectiveadvice and education Meetings and discussions on day-to-day operations Consultants Figure 8.7 ICAP—responsive organizational dynamism. 218 InForMAtIon teChnoloGY on the very nomenclature applied to how technology was defined and procedures adopted among the international organizations within ICAP. That is why outside consultation could be effective as it provided independent and objective input that could foster the integration of culture-based concepts of technology, strategy, and ROI. Key to understanding the role of executive communi- ties of practice is their overall importance to organizational learn- ing growth. Very often we have heard, “ Can we create productive discourse if the executive team cannot discuss and agree on issues
  • 677.
    themselves?” Effectively, ICAPcreated this community to ensure consistency among all the levels within the business. Consistent with the responsive organizational dynamism arc, learning in this community was at the “ system” or organizational level, as opposed to being based on specific events like Y2K. These concerns had a broader context, and they affected both short- and long-term issues of business strategy and culture. Another community of practice was the operations manage- ment team, which was the community responsible for transform- ing strategy into a realistic plan of strategic implementation. This team consisted of three levels (Figure 8.9). We see in this commu- nity of practice that the CEO was common to both this commu- nity and the executive community of practice. His participation in both provided the consistency and discourse that pointed to three valuable components: 1. The CEO could accurately communicate decisions reached at the board level to the operations management team. CEO Americas Executive board Consultants Questions and responses
  • 678.
    Objective advice and education Objectiveadvice and education Interactive discussions Discourse initiated Figure 8.8 ICAP—community of practice. 219sYnerGIstIC unIon oF It 2. The operations team could provide important input and sug- gestions to the CEO, who could then provide this informa- tion to the executive community. 3. The CEO interacted in different ways between the two com- munities of practice. This was critical because the way things were discussed, the language used, and the processes of con- sensus were different in each community. The operations management community was not at the detailed level of implementation; rather, it was at the conceptual one. It needed to embrace the strategic and cultural outcomes discussed at the execu- tive community, suggest modifications if applicable, and eventually reach consensus within the community and with the executive team. The operations management community, because of its
  • 679.
    conceptual perspectives, used moreorganizational learning methods as opposed to individual techniques. However, because of their relationship with operations personnel, they did participate in individual reflec- tive practices. Notwithstanding their conceptual nature, event- driven issues were important for discussion. That is why middle management needed to be part of this community, for without their input, concep- tual foundations for implementing change may very well have flaws. CEO Americas Senior managementNew ideas and adjustments Middle management Rollout of new organization and strategies Discourse on “how” to implement
  • 680.
    Adjustments as aresult of discourse with operations community Figure 8.9 ICAP—community of practice interfaces. 220 InForMAtIon teChnoloGY Middle management participated to represent the concrete pieces and the realities for modifications to conceptual arguments. As such, middle managers could indirectly affect the executive board commu- nity since their input could require change in the operations man- agement community, which in turn could foster the need for change requests back to the board. This process provides the very essence of why communities of practice need to work together, especially with the dynamic changes that can occur from technological innovations. The third community of practice at ICAP was at the operations or implementation tier. It consisted of the community of staff that needed to transition conceptual plans into concrete realities. To ensure that conceptual ideas of implementation balanced with the concrete events that needed to occur operationally, middle managers
  • 681.
    needed to be partof both the operations management, and implementation communities, as shown in Figure 8.10. Because of the transitory nature of this community, it was important that both organizational learning and individual learning occurred simultaneously. Thus, it was the responsibility of middle managers to provide the transition of organizational-based ideas to the event and concrete level so that individuals understood what it ultimately meant to the operations team. As one would expect, this level oper- ated on individual attainment, yet through the creation of a commu- nity of practice, ICAP could get its operations members to begin to think more at the conceptual level. This provided management with the opportunity to discuss conceptual and system-level ideas with Middle management Operations Meetings and discussions on day-to-day operations
  • 682.
    Operations adjustments based onreflective practices Figure 8.10 Middle-management community of practice at ICAP. 221sYnerGIstIC unIon oF It operations personnel. Operations personnel could review them and, under a managed and controlled process, could reach consensus. That is, changes required by the implementation community could be rep- resented to the operations management community through middle management. If middle management could, through discourse and language, reach consensus with the operations management commu- nity, then the CEO could bring them forth to the executive commu- nity for further discussion. We can see this common thread concept among communities of practice as a logical process among tiers of operations and management and one that can foster learning matura- tion, as identified in the responsive organizational dynamism arc. This is graphically shown in Figure 8.11. Figure 8.11 shows the relationships among the three communi-
  • 683.
    ties of practiceat ICAP and how they interacted, especially through upward feedback using common threads of communication. Thus, multiple communities needed to be linked via common individu- als to maintain threads of communication necessary to support Executive community of practice Operations management community of practice CEO Americas CEO AmericasNew ideas and adjustments Implementation community of practice Senior management Operations Adjustments as a result of discourse with operations community Middle management
  • 684.
    Middle management Executive board Consultants Figure 8.11ICAP—COP common threads. 222 InForMAtIon teChnoloGY responsive organizational dynamism and learning across organiza- tional boundaries. Another important observation is the absence of independent con- sultants from the operations management and implementation com- munities of practice. This does not suggest that consultants were not needed or used by these communities. The independent consultant in the executive community provides organizational-level learning, as opposed to the consultant who is, for example, a specialist in database design or training. This case study provides an example of how an international firm dealt with the effects of technology on its business. The CEO, Stephen McDermott in this case, played an important role, using many forms
  • 685.
    of responsive organizationaldynamism, in managing the organiza- tion through a transformation. His experience fostered the realiza- tion that CEOs and their boards need to reinvent themselves on an ongoing basis. Most important, this case study identified the number of communities of practice that needed to participate in organiza- tional transformation. The CEO continued to have an important role; in many ways, McDermott offered some interesting advice for other chief executives to consider: 1. The perfect time may or may not exist to deal with changes brought on by technology. The CEO may need to just “ dive in” and serve as a catalyst for change. 2. Stay on course with the fundamentals of business and do not believe everything everyone tells you; make sure your busi- ness model is solid. 3. Trust that your abilities to deal with technology issues are no different from managing any other business issue. As a result of the commitment and the process for adapting tech- nology at ICAP, it has realized many benefits, such as the following: • Protection of tacit knowledge : By incorporating the existing trading system, ICAP was able to retain the years of expe- rience and expertise of its people. As a result, ICAP devel-
  • 686.
    oped an electronicsystem that better served the needs of broker users; this ability gave it an advantage over competitor systems. 223sYnerGIstIC unIon oF It • Integrated use : The combination of the new system and its compatibility with other ICAP legacy systems enabled the organization to continue to service the core business while increasing access for new clients. This resulted in a reduction of costs and an increase in its user base. • Transformation of tacit knowledge to explicit product knowledge : By providing an infrastructure of learning and strategic inte- gration, ICAP was able to bridge a wide range of its employ- ees’ product knowledge, particularly of those outside IT with a specific understanding of trading system design, and to transform their tacit knowledge into explicit value that was used to build on to the existing trading systems. • Flexibility : Because multiple communities of practice were formed, IT and non-IT cultures were able to assimilate. As a result, ICAP was able to reduce its overall development time and retain the functionality necessary for a hybrid voice and electronic trading system. • Expansion : Because of the assimilation of cultures, ICAP was able to leverage its expertise so that the design of the electronic system allowed it to be used with other third-party trading systems. For example, it brought together another trading system from ICAP in Europe and enabled concurrent development in the United States and the United Kingdom.
  • 687.
    • Evolution :By incorporating existing technology, ICAP con- tinued to support the core business and gradually introduced new enhancements and features to serve all of its entities. • Knowledge creation : By developing the system internally, ICAP was able to increase its tacit knowledge base and stay current with new trends in the industry. ICAP went on to evolve its organization as a result of its adop- tion of technology and its implementation of responsive organiza- tional dynamism. The company reinvented itself again. McDermott became the chief operating officer (COO) for three business units in the Americas; all specific business lines, yet linked by their inte- grated technologies and assimilated cultures. In addition, ICAP purchased a competitor electronic trading product and assimilated these combined technologies into a new organization. Business 224 InForMAtIon teChnoloGY revenues rose at that time from $350 million to over $1 billion four years later. The company also had more than 2,800 staff members and operated from 21 offices worldwide. Much has been attrib- uted to ICAP’ s investment in electronic trading systems and other emerging technologies. Five Years Later
  • 688.
    I returned tomeet with Stephen McDermott almost five years after our original case study. Many of the predictions about how technol- ogy would affect the business had indeed become reality. In 2010, technology at ICAP had become the dominant component of the business. The C brokers had all but disappeared, with the organiza- tion now consisting of two distinct divisions: voice brokers and elec- tronic brokers. The company continued to expand by acquiring other smaller competitors in the technology space. The electronic division now consisted of three distinct divisions from these acquisitions, with ETC just one of those divisions. In effect, the expansion led to more specialization and leveraging of technology to capture larger parts of various markets. Perhaps the unseen reality was how quickly technology became a commodity. As McDermott said to me, “ Everybody (our competi- tors) can do it; it’ s now all about your business strategy.” While the importance of strategy was always part of McDermott’ s position, the transition from product value to market strategy was much more transformative on the organization’ s design and how it approached
  • 689.
    the market. Forexample, the additional regulatory controls on voice brokering actually forced many brokers to move to an electronic interface, which reduced liability between the buyer and the broker. McDermott also emphasized how “ technology has created overnight businesses,” forcing the organization to understand how technology could provide new competitive advantages that otherwise did not exist. Today, 50% of the trading dollars, some $2 trillion, occurs over electronic technology-driven platforms. Undoubtedly, these dynamic changes, brought on by technological dynamism, continue to chal- lenge ICAP on how they strategically integrate new opportunities and how the organization must adapt culturally with changes in indi- vidual roles and responsibilities. 225sYnerGIstIC unIon oF It HTC HTC (a pseudoacronym) is a company that provides creative business services and solutions. The case study involving HTC demonstrates that changes can occur when technology reports to the appropriate level in an organization. This case study offers the example of a com-
  • 690.
    pany with aCEO who became an important catalyst in the successful vitalization of IT. HTC is a company of approximately 700 employees across 16 offices. The case involves studying the use of a new applica- tion that directly affected some 200 staff people. The company was faced with the challenge of providing accurate billable time records to its clients. Initial client billings were based on project estimates, which then needed to be reconciled with actual work performed. This case turned out to be more complex than expected. Estimates typically represented the amount of work to which a client agreed. Underspending the budget agreed to by the client, however, could lead to lost revenue opportunities for the firm. For example, if a project was estimated at 20 hours, but the actual work took only 15, then most clients would seek an additional five hours of service because they had already budgeted the total 20 hours. If the recon- ciliation between hours budgeted and hours worked was significantly delayed, clients might lose their window of opportunity to spend the remaining five hours (in the example situation). Thus, the incapacity to provide timely reporting of this information resulted in the actual
  • 691.
    loss of revenue,as well as upset clients. If clients did not spend their allocated budget, they stood to lose the amount of the unused portion in their future budget allocations. Furthermore, clients had expecta- tions that vendors were capable of providing accurate reporting, espe- cially given that present-day technology could automate the recording and reporting of this information. Finally, in times of a tight econ- omy, businesses tend to manage expenditures more closely and insist on more accurate record keeping than at other times. The objective at HTC was to transform its services to better meet the evolving changes of its clients’ business requirements. While the requirement for a more timely and accurate billing system seems straightforward, it became a greater challenge to actually implement than it otherwise seemed. The first obstacle for HTC to overcome was the clash between this new requirement and the existing ethos, or culture of the business. 226 InForMAtIon teChnoloGY HTC provided creative services; 200 of its staff members were
  • 692.
    artisti- cally oriented andwere uncomfortable with focusing on time- based service tracking; they were typically engrossed in the creative per- formance required by their clients. Although it would seem a simple request to track time and enter it each day, this projected change in business norms became a significant barrier to its actual implemen- tation. Project managers became concerned that reporting require- ments would adversely affect performance, and thus, inevitably hurt the business. Efforts to use blunt force—do it or find another job — were not considered a good long-term solution. Instead, the company needed to seek a way to require the change while demonstrating the value of focusing on time management. Many senior managers had thought of meeting with key users to help determine a workable solution, but they were cognizant of the fact that such interactive processes with the staff do not always lead to agreement on a dependable method of handling the problem. This is a common concern among managers and researchers working in orga- nizational behavior. While organizational learning theorists advocate this mediating, interactive approach, it may not render the desired
  • 693.
    results in timeand can even backfire if staff members are not genu- inely willing to solve the problem or if they attempt to make it seem too difficult or a bad idea. The intervention of the CEO of HTC, together with the change in time reporting methods, directly involv- ing IT, made a significant difference in overcoming the obstacle. IT History at HTC When I first interviewed the CEO, I found that she had little direct interaction with the activities of the IT department. IT reported to the CFO, as in many companies, because it was seen as an opera- tional support department. However, the CEO subsequently became aware of certain shortfalls associated with IT and with its report- ing structure. First, the IT department was not particularly liked by other departments. Second, the department seemed incapable of implementing software solutions that could directly help the busi- ness. Third, the CFO did not possess the creativity beyond account- ing functions to provide the necessary leadership needed to steer the activities of IT in a more fruitful direction. As a result, the CEO 227sYnerGIstIC unIon oF It
  • 694.
    decided that theIT department should report directly to her. She was also concerned that IT needed a more senior manager and hired a new chief technology officer (CTO). Interactions of the CEO My research involving 40 chief executives showed that many execu- tives are unsure about what role they need to take with their chief IT managers. However, the CEO of HTC took on the responsibility to provide the financial support to get the project under way. First, the CEO made it clear that a solution was necessary and that appropri- ate funds would be furnished to get the project done. Second, the new CTO was empowered to assess the needs of the business and the staff, and to present a feasible solution for both business and cultural adaptation needs. The CEO was determined to help transform the creative-artistic service business into one that would embrace the kinds of controls that were becoming increasingly necessary to support clients. Addressing the existing lag in collecting time records from employees, which directly affected billing revenue, seemed like the logical first step for
  • 695.
    engaging the ITdepartment in the design and implementation of new operating procedures and cultural behavior. Because middle managers were focused on providing services to their clients, they were less concerned with the collection of time sheets. This need was a low priority of the creative workers of the firm. Human resources (HR) had been involved in attempting to address the problem, but their efforts had failed. Much of this difficulty was attributed to an avoidance by middle managers of giving ultimatums as a solution; that is, simply demanding that workers comply. Instead, management subsequently became interested in a middle-ground approach that could possibly help departments realize the need to change and to help determine what the solution might be. The ini- tial thinking of the CEO was to see if specialized technology could be built that would (1) provide efficiency to the process of recording time, and (2) create a form of controls that would require some level of compliance. With the involvement of the CEO, the embattled IT depart- ment was given the authority to determine what technology could
  • 696.
    228 InForMAtIon teChnoloGY beemployed to help the situation. The existing application that had been developed by the IT department did not provide the kind of ease of use and access that was needed by operations. Previous attempts to develop a new system, without the intervention of the CEO, had failed for a number of reasons. Management did not envision the potential solution that software was capable of delivering. It was not motivated in getting the requisite budget support; no one was in a position to champion it, to allocate the needed budget. Ultimately, management individuals were not convinced of the importance of providing a better solution. The Process The new CTO determined that there was a technological solution that could provide greater application flexibility, while maintaining its necessary integrity, through the use of the existing e-mail system. The application would require staff to enter their project time spent before signing on to the e-mail system. While this procedure might be seen as a punishment, it became the middle-ground solution for securing
  • 697.
    compliance without dramaticallydictating policy. There was initial rejection of the procedure by some of the line managers, but it was with the assistance of the CEO, who provided the necessary support and enforcement, that the new procedure took hold. This enforcement became crucial when certain groups asked to be excluded from the process. The CEO made it clear that all departments were expected to comply. The application was developed in three months and went into pilot implementation. The timely delivery of the application by the IT department gave IT its first successful program implementation and helped change the general view of IT among its company colleagues. It was the first occasion in which IT had a leadership role in guiding the company to a major behavioral transformation. Another positive outcome that resulted from the transition occurred in the way that resistance to change was managed by the CTO. Simply put, the cre- ative staff was not open to a structured solution. The CTO’ s response was to implement a warning system instead of immediately disallow- ing e-mail access. This procedure was an important concession as it
  • 698.
    229sYnerGIstIC unIon oFIt allowed staff and management to deal with the transition, to meet them halfway. Transformation from the Transition After the pilot period, the application was implemented firm- wide. The results of this new practice have created an interesting internal transformation: IT is now intimately engaged in working on new enhancements to the time-recording system. For instance, a “ digital dashboard” is now used to measure performance against estimates. More important, however, are the results of the new application. The firm has shown substantial increases in revenue because its new time- recording system enabled it to discover numerous areas in which it was underbilling its clients. Its clients, on the other hand, are happier to receive billing statements that can demonstrate more accurately than before just how time was spent on their projects. Hence, the IT-implemented solution proved beneficial not only to the client but also to the firm.
  • 699.
    Notwithstanding the ultimatevalue of utilizing appropriate tech- nology and producing measurable outcomes, IT has also been able to assist in developing and establishing a new culture in the firm. Staff members are now more mindful and have a greater sense of cor- porate-norm responsibility than they did before. They have a clearer understanding of the impact that recording their time will have and of how this step ultimately contributes to the well-being of the business. Furthermore, the positive results of the new system have increased attention on IT spending. The CEO and other managers seek new ways in which technology can be made to help them; this mindset has been stressed further down to operating departments. The methods of IT evaluation have also evolved. There is now a greater clarification of technology benefits, a better articulation of technology problems, less trial and error, and more time spent on understanding how to use the technology better. Another important result from this project has been the cascad- ing effect of the financial impact. The increased profits have required greater infrastructure capacity. A new department was created with five new business managers whose responsibility it is to analyze
  • 700.
    and interpret the timereports so that line managers, in turn, can think of 230 InForMAtIon teChnoloGY ways to generate greater profit through increased services. The project, in essence, has merged the creative performance of the firm with new business initiatives, resulting in a higher ROI. In analyzing the HTC case study, we see many organizational learning techniques that were required to form a new community that could assimilate multiple cultures. However, while the organiza- tion saw the need, it could not create a process without an advocate. This champion was the CEO, who had the ability to make the salient organizational changes and act as a catalyst for the natural processes that HTC hoped to achieve. This case also provides direction on the importance of having the right resource to lead IT. At HTC, this person was the CTO; in actuality, this has little bearing on the over- all role and responsibilities that were needed at HTC. At HTC, it became more apparent to the CEO that she had the wrong individual running the technology management of her firm. Only the CEO in
  • 701.
    this situation wasable to foster the initial steps necessary to start what turned out to be a more democratic evolution of using technology in the business. Companies that adapt to technological dynamism find that the existing leadership and infrastructure may need to be enhanced or replaced as well as reorganized, particularly in terms of reporting structure. This case supports the notion that strategic integration may indeed create the need for more cultural assimilation. One question to ask, is why the CEO waited so long to make the changes. This was not a situation of a new CTO who inherited resources. Indeed, the former CTO was part of her regime. We must remember that CEOs typically concentrate on driving revenue. They hope that what are considered “ back-end” support issues will be handled by other senior managers. Furthermore, support structures are measured differently and from a specific frame of reference. I have found that CEOs inter- vene in supporter departments only when there are major complaints that threaten productivity, customer support, sales, and so on. The other threat is cost, so CEOs will seek to make supporter departments more efficient. These activities are consistent with my earlier
  • 702.
    findings regarding the measurementand role of supporter departments. In the case of HTC, the CEO became more involved because of the customer service problems, which inevitably threatened revenues. 231sYnerGIstIC unIon oF It On her review of the situation, she recognized three major flaws in the operation: • The CFO was not in a position to lead the organizational changes necessary to assimilate a creative-based department. • Technology established a new strategy (strategic integration), which necessitated certain behavioral changes within the organization (cultural assimilation). The creative department was also key to make the organizational transition possible. • The current CTO did not have the management and business skills that were necessary to facilitate the integration of IT with the rest of the organization. HTC provides us with an interesting case of what we have defined as responsive organizational dynamism, and it bears some parallels to the Ravell study. First, like Ravell, the learning process was triggered by a major event. Second, the CTO did not dictate assimilation but rather provided facilitation and support. Unlike Ravell, the CEO
  • 703.
    of the organization wasthe critical driver to initiate the project. Because of the CEO’ s particular involvement, organizational learning started at the top and was thus system oriented. At the same time, the CTO understood that individual event-driven learning using reflective practices was critical to accomplish organizational transformation. In essence, the CTO was the intermediary between organizational- level and individual-level learning. Figure 8.12 depicts this relationship. Five Years Later HTC has been challenged because of the massive changes that adver- tising companies have faced over this timeframe, particularly with the difficulty of finding new advertising revenue sources for their clients. The CEO has remained active in technology matters, and there has also been turnover in the CTO role at the company. The CEO has been challenged to find the right fit—a person who can understand not only the technology but also the advertising business. With media companies taking over much of the advertising space, the CEO clearly recognizes the need to have a technology-driven market strategy. Most important is the dilemma of how to transform
  • 704.
    what 232 InForMAtIon teChnoloGY wasonce a “ paper” advertising business to what has become a lower- cost media market. “ Advertising companies need to do more business just to keep the same revenue stream and that is a big challenge in today’ s volatile market,” the CEO stated. The time-recording system has gone through other changes to provide what are known as value- added services , not necessarily tied to time effort, but rather, the value of the output itself. The experience at HTC shows the importance of executive partici- pation, not just sponsorship. Many technology projects have assumed the need for executive sponsorship. It is clear to me that this position is obsolete. If the CEO at HTC had not become involved in the prob- lem five years ago, then the organization would not be in the position to embrace the newest technology dynamism affecting the industry. So, the lessons learned from this case, as well as from the Ravell case, are that all levels of the organization must be involved, and that exec-
  • 705.
    utives must notbe sacred. Responsive organizational dynamism, and the use of organizational learning methods to develop staff, remains key concepts for adapting to market changes and ensuring economic survival. Organizational and system level learning Organizational and individual-level learning Individual learning Learning facilitator CTO CEO Middle management Creative operations Figure 8.12 HTC—Role of the CTO as an intermediary. 233sYnerGIstIC unIon oF It Summary
  • 706.
    This chapter hasprovided three case studies that show the ways technology and organizational learning operate and lead to results through performance. The Siemens example provided us with an opportunity to see a technology executive formulate relationships, form multiple communities of practice, and create an infrastructure to support responsive organizational dynamism. This case provides a method in which IT can offer a means of handling technology as new information and, through the formation of communities of practice, it can generate new knowledge that leads to organizational transforma- tion and performance. The case study regarding ICAP again shows why technology, as an independent variable, provides an opportunity, if taken, for an inter- national firm to move into a new competitive space and improve its competitive advantage. ICAP was only successful because it under- stood the need for organizational learning, communities of practice, and the important role of the CEO in facilitating change. We also saw why independent consultants and executive boards need to par- ticipate. ICAP symbolizes the ways in which technology can change organizational structures and cultural formations. Such changes
  • 707.
    are at the veryheart of why we need to understand responsive organi- zational dynamism. The creation of a new firm, ETC, shows us the importance of these changes. Finally, it provides us with an example of how technology can come to the forefront of an organization and became the major driver of performance. HTC, on the other hand, described two additional features of how responsive organizational dynamism can change internal processes that lead to direct returns. The CEO, as in the ICAP case, played an important, yet different, role. This case showed that the CTO could also be used to facilitate organizational learning, becoming the nego- tiator and coordinator between the CEO, IT department, and cre- ative user departments. All three of these cases reflect the importance of recognizing that most technology information exists outside the organization and needs to be integrated into existing cultures. This result is consistent with the findings of Probst et al. (1998), which show that long-term sustained competitive advantage must include the “ incorporation and integration
  • 708.
    234 InForMAtIon teChnoloGY ofinformation available outside the borders of the company” (p. 247). The reality is that technology, as an independent and outside variable, challenges organizations in their abilities to absorb external informa- tion, assimilate it into their cultures, and inevitably apply it to their commercial activities as a function of their existing knowledge base. These case studies show that knowledge creation most often does not get created solely by individuals. It is by using communities of practice that knowledge makes its way into the very routines of the organization. Indeed, organizational learning must focus on the transformation of individual skills into organizational processes that generate measurable outcomes. Probst et al. (1998) also shows that the development of organizational knowledge is mediated via multiple levels. Walsh (1995) further supports Probst et al.’ s findings that there are three structures of knowledge development in an organization. The first is at the individual level; interpretation is fostered through reflective practices that eventually lead to personal transformation and
  • 709.
    increased individual knowledge.The second structure is at the group level; individual knowledge of the group is combined into a consen- sus, leading to a shared belief system. The third structure resides at the organizational level; knowledge emanates from the shared beliefs and the consensus of the groups, which creates organizational knowledge. It is important to recognize, however, that organizational knowledge is not established or created by combining individual knowledge. This is a common error, particularly among organizational learning prac- titioners. Organizational knowledge must be accomplished through social discourse and common language interactions so that knowl- edge can be a consensus among the communities of practice. Each of the case studies supported the formation of tiers of learning and knowledge. The individuals in these cases all created multiple lay- ers that led to structures similar to those suggested by scholars. What makes these cases so valuable is that technology represented the exter- nal knowledge. Technological dynamism forced the multiple struc- tures from individual-based learning to organizational-level learning, and the unique interactions among the communities in each example
  • 710.
    generated knowledge leadingto measurable performance outcomes. Thus, as Probst and Bü chel (1996, p. 245) conclude, “ Organizational learning is an increase in organizational knowledge base, which leads to the enhancement of problem-solving potential of a company.” 235sYnerGIstIC unIon oF It However, these case studies also provide important information about the process of the interactions. Many tiered structures tend to be viewed as a sequential process. I have presented theories sug- gesting that knowledge management is conditioned either from the top-down, middle-up-down, or bottom-up. It has been my posi- tion that none of these processes should be seen as set procedures or methodologies. In each of these cases, as well as in the Ravell case, the flow of knowledge occurs differently and, in some ways, uniquely to the culture and setting of the organization. This suggests that each organization must derive its own process, adhering more to the concept of learning, management, and outcomes, as opposed to a standard system of how and when they need to be applied. Table 8.2 summarizes the different approaches of organizational learning of
  • 711.
    the three casestudies. Such is the challenge of leaders who aspire to create the learning organization. Technology plays an important role because, in reality, it tests the very notions of organizational learning theories. It also creates many opportunities to measure organizational learning, and its impact on performance. Indeed, technology is the variable that provides the most opportunity to instill organizational learning, and knowledge management in a global community. Table 8.2 Summary of Organizational Learning Approaches SUBJECT SIEMENS ICAP/ETC HTC Knowledge management participation CIO as middle-up-down Top-down from CEO and bottom-up from operations Top-down from CEO and middle-up-down from CTO Community of
  • 712.
    practices President’ s Council CFO CIOadvisory board Executive Board Operations Management Implementation CEO/CTO CTO operations Participating entities Presidents CFOs Global CIO Corporate CIOs Regional CIOs Operating CIOs Central CIOs Executive board Outside consultants CEO Senior management Middle management Operations CEO CTO Middle management Creative operations
  • 713.
    Common thread CorporateCIO CEO Senior management Middle management CTO 236 InForMAtIon teChnoloGY The case studies also provided an understanding of the transformational process and the complexities of the relationships between the different learning levels. It is not a single entity that allows a company to be competitive but the combination of knowl- edge at each of the different tiers. The knowledge that exists through- out a company is typically composed of three components: processes, technology, and organization (Kanevsky & Housel, 1998). I find that, of these three components, technology is more variable than the oth- ers and, as stated many times in this book, at a dynamic and unpre- dictable fashion (that condition, called technological dynamism). Furthermore, the technology component has direct effects on the other two. What does this mean? Essentially, technology is at the core of organizational learning and knowledge creation. This chapter has shown the different ways in which technology
  • 714.
    has been valued andhow, through organizational learning, tacit knowl- edge is transformed into explicit knowledge, and used for competitive advantage. We have seen that not all of this value creation can be directly attributed to technology; in fact, this is rarely the case. Most value derived from technology is indirect, and it must be recognized by management as maximizing outcomes. Two of the case studies looked at the varying roles and responsibilities of the CEO. I believe their involvement was critical. Indeed, the conclusions reached from the Ravell case showed further support that the absence of the CEO will limit results. Furthermore, the CEO was crucial to sustaining organizational learning and the responsive organizational dynamism infrastructure. Much has been written about the need to link learning to knowl- edge and knowledge to performance. This process can sometimes be referred to as a value chain. Kanevsky and Housel (1998) created what they call a “ learning-knowledge-value spiral,” comprised of six spe- cific steps to creating value from learning and ultimately, changing product or process descriptions, as shown in Figure 8.13.
  • 715.
    I have modifiedFigure 8.13 to include “ technology” ; that is, how technology affects learning, learning affects knowledge, and so on. Table 8.3 is a matrix that reflects the specific results, in each phase, for the three case studies. Table 8.3 reflects the ultimate contribution that technology made to the learning-knowledge-value chain. I have also notated the ROI 237sYnerGIstIC unIon oF It Ta bl e 8 .3 IT C on tri bu tio n
  • 716.
  • 717.
  • 718.
  • 719.
  • 720.
  • 721.
  • 722.
  • 723.
  • 724.
  • 725.
  • 726.
  • 727.
  • 728.
  • 729.
  • 730.
  • 731.
  • 732.
  • 733.
  • 734.
  • 735.
  • 736.
  • 737.
  • 738.
  • 739.
  • 740.
  • 741.
    ev en ue s. RO I: Di re ct . 238 InForMAtIon teChnoloGY generatedfrom each investment. It is interesting that two of the three cases generated identifiable direct revenue streams from their invest- ment in technology. This chapter has laid the foundation for Chapter 9, which focuses on the ways IT can maximize its relationship with the community and contribute to organizational learning. To accomplish this objec- tive, IT must begin to establish best practices. Change in product/process
  • 742.
    description Learning Value MarketCompetition Product Knowledge Process Figure 8.13 Thelearning-knowledge-value cycle. (From Kanevsky, V., et al. (Eds.), Knowing in Firms: Understanding, Managing and Measuring Knowledge , Sage, London, 1998, pp. 240– 252.) 239 9 foRming a CybeR seCuRiTy CulTuRe Introduction Much has been written regarding the importance of how companies deal with cyber threats. While most organizations have focused on the technical ramifications of how to avoid being compromised, few have invested in how senior management needs to make security
  • 743.
    a priority. This chapterdiscusses the salient issues that executives must address and how to develop a strategy to deal with the various types of cyber attack that could devastate the reputation and revenues of any business or organization. The response to the cyber dilemma requires evolving institutional behavior patterns using organizational learning concepts. History From a historical perspective we have seen an interesting evolution of the types and acceleration of attacks on business entities. Prior to 1990, few organizations were concerned with information security except for the government, military, banks and credit card companies. In 1994, with the birth of the commercial Internet, a higher volume of attacks occurred and in 2001 the first nation-state sponsored attacks emerged. These attacks resulted, in 1997, in the development of com- mercial firewalls and malware. By 2013, however, the increase in attacks reached greater complexity with the Target credit card breach, Home Depot’ s compromise of its payment system, and JP Morgan’ s exposure that affected 76 million customers and seven million
  • 744.
    busi- nesses. These eventsresulted in an escalation of fear, particularly in the areas of sabotage, theft of intellectual property, and stealing of money. Figure 9.1 shows the changing pace of cyber security 240 InForMAtIon teChnoloGY Pr e- 19 90 19 94 19 97 20 00 20 01 20 14 Bi rt h
  • 745.
  • 746.
  • 747.
  • 748.
  • 749.
  • 750.
  • 751.
  • 752.
  • 753.
  • 754.
  • 755.
  • 756.
  • 757.
  • 758.
  • 759.
  • 760.
  • 761.
  • 762.
  • 763.
  • 764.
  • 765.
  • 766.
  • 767.
  • 768.
  • 769.
  • 770.
    nt at io n. ) 241ForMInG A CYberseCurItY Culture The conventional wisdom among cyber experts is that no business can be compromise proof from attacks. Thus, leaders need to realize that there must be (1) other ways beyond just developing new anti- software to ward off attacks, and (2) internal and external strategies to deal with an attack when it occurs. These challenges in cyber security management can be categorized into three fundamental components: • Learning how to educate and present to the board of directors • Creating new and evolving security cultures • Understanding what it means organizationally to be compromised Each of these components is summarized below Talking to the Board Board members need to understand the possible cyber attack
  • 771.
    expo- sures of thebusiness. They certainly need regular communication from those executives responsible for protecting the organization. Seasoned security executives can articulate the positive processes that are in place, but without overstating too much confidence since there is always risk of being compromised. That is, while there may be expo- sures, C-level managers should not hit the panic button and scare the board. Typically, fear only instills a lack of confidence by the board in the organization’ s leadership. Most important is to always relate secu- rity to business objectives and, above all, avoid “ tech” terms during meetings. Another important topic of discussion is how third- party vendors are being managed. Indeed, so many breaches have been caused by a lack of oversight of legacy applications that are controlled by third-party vendors. Finally, managers should always compare the state of security with that of the company’ s competitors. Establishing a Security Culture The predominant exposure to a cyber attack often comes from care- less behaviors of the organization’ s employees. The first step to avoid poor employee cyber behaviors is to have regular
  • 772.
    communication with staff andestablish a set of best practices that will clearly protect the business. However, mandating conformance is difficult and research 242 InForMAtIon teChnoloGY has consistently supported that evolutionary culture change is best accomplished through relationship building, leadership by influence (as opposed to power-centralized management), and ultimately, a presence at most staff meetings. Individual leadership remains the most important variable when transforming the behaviors and prac- tices of any organization. Understanding What It Means to Be Compromised Every organization should have a plan of what to do when security is breached. The first step in the plan is to develop a “ risk” culture. What this simply means is that an organization cannot maximize protection of all parts of its systems equally. Therefore, some parts of a company’ s system might be more protected against cyber attacks than others. For example, organizations should maximize the protection of key company scientific and technical data first. Control of
  • 773.
    network access will likelyvary depending on the type of exposure that might result from a breach. Another approach is to develop consistent best practices among all contractors and suppliers and to track the move- ment of these third parties (e.g., if they are merged/sold, disrupted in service, or even breached indirectly). Finally, technology execu- tives should pay close attention to Cloud computing alternatives and develop ongoing reviews of possible threat exposures in these third- party service architectures. Cyber Security Dynamism and Responsive Organizational Dynamism The new events and interactions brought about by cyber security threats can be related to the symptoms of the dynamism that has been the basis of ROD discussed earlier in this book. Here, however, the digital world manifests itself in a similar dynamism that I will call cyber dynamism . Managing cyber dynamism, therefore, is a way of managing the negative effects of a particular technology threat. As in ROD, cyber strategic integration and cyber cultural assimilation remain as distinct categories, that present themselves in response to cyber dynamism. Figure 9.2 shows the components of cyber ROD.
  • 774.
    243ForMInG A CYberseCurItY Culture Cyber Strategic Integration Cyber strategic integration is a process that firms need to use to address the business impact of cyber attacks on its organizational processes. Complications posed by cyber dynamism, via the process of strategic integration, occurs when several new cyber attacks overlap and create a myriad of problems in various phases of an organization’ s ability to oper- ate. Cyber attacks can also affect consumer confidence, which in turn hurts a business’s ability to attract new orders. Furthermore, the problem can be compounded by reductions in productivity, which are complicated to track and to represent to management. Thus, it is important that orga- nizations find ways to develop strategies to deal with cyber threats such as: 1. How to reduce occurrences by instituting aggressive organi- zation structures that review existing exposures in systems. Cyber attacks as an independent variable
  • 775.
    Organizational dynamism Requires How to formulaterisk- related strategies to deal with cyber attacks Symptoms and implications Cyber cultural assimilation Requires Cyber strategic integration Figure 9.2 Cyber responsive organizational dynamism. (From Langer, A., Information Technology and Organizational Learning: Managing Behavioral Change through Technology and Education , CRC Press, Boca Raton, FL, 2011.) 244 InForMAtIon teChnoloGY 2. What new threats exist, which may require ongoing research
  • 776.
    and collaborations withthird-party strategic alliances? 3. What new processes might be needed to combat new cyber dynamisms based on new threat capabilities? 4. Creating systems architectures that can recover when a cyber breach occurs. In order to realize these objectives, executives must be able to • Create dynamic internal processes that can function on a daily basis, to deal with understanding the potential fit of new cyber attacks and their overall impact to the local department within the business, that is, to provide for change at the grass- roots level of the organization. • Monitor cyber risk investments and determine modifications to the current life cycle of idea-to-reality. • Address the weaknesses in the organization in terms of how to deal with new threats, should they occur, and how to better protect the key business operations. • Provide a mechanism that both enables the organization to deal with accelerated change caused by cyber threats and that integrates them into a new cycle of processing and handling change. • Establish an integrated approach that ties cyber risk account- ability to other measurable outcomes integrating acceptable methods of the organization. The combination of evolving cyber threats with accelerated and changing consumer demands has also created a business revolution that best defines the imperative of the strategic integration
  • 777.
    component of cyber ROD.Without action directed toward new strategic integration focused on cyber security, organizations will lose competitive advan- tage, which will ultimately affect profits. Most experts see the danger of breaches from cyber attacks as the mechanism that will ultimately require the integrated business processes to be realigned, thus provid- ing value to consumers and modifying the customer- vendor relation- ship. The driving force behind this realignment emanates from cyber dynamisms, which serve as the principle accelerator of the change in transactions across all businesses. 245ForMInG A CYber seCurItY Culture Cyber Cultural Assimilation Cyber cultural assimilation is a process that addresses the organiza- tional aspects of how the security department is internally organized, its relationship with IT, and how it is integrated within the organiza- tion as a whole. As with technology dynamism, cyber dynamism is not limited only to cyber strategic issues, but cultural ones as well. A cyber culture is one that can respond to emerging cyber attacks,
  • 778.
    in an optimally informedway, and one that understands the impact on business performance and reputation. The acceleration factors of cyber attacks require more dynamic activity within and among departments, which cannot be accom- plished through discrete communications between groups. Instead, the need for diverse groups to engage in more integrated discourse and to share varying levels of cyber security knowledge, as well as business-end perspectives, requires new organizational structures that will give birth to a new and evolving business social culture. In order to facilitate cyber cultural assimilation, organizations must have their staffs be more comfortable with a digital world that contin- ues to be compromised by outside threats. The first question becomes one of finding the best structure to support a broad assimilation of knowledge about any given cyber threat. The second is about how that knowledge can best be utilized by the organization to develop both risk efforts and attack resilience. Business managers therefore need to consider cyber security and include the cyber staff in all decision- making processes. Specifically, cyber assimilation must become fun- damental to the cultural evolution.
  • 779.
    While many scholarsand managers suggest the need to have a specific entity responsible for cyber security governance; one that is to be placed within the organization’ s operating structure, such an approach creates a fundamental problem. It does not allow staff and managers the opportunity to assimilate cyber security-driven change and understand how to design a culture that can operate under ROD. In other words, the issue of governance is misinterpreted as a problem of structural positioning or hierarchy when it is really one of cultural assimilation. As a result, many business solutions to cyber security issues often lean toward the prescriptive instead of the analytical in addressing the real problem. 246 InForMAtIon teChnoloGY Summary This section has made the argument that organizations need to excel in providing both strategic and cultural initiatives to reduce exposure to cyber threats and ultimate security breaches. Executives must design their workforce to meet the accelerated threats brought on by cyber
  • 780.
    dynamisms. Organizations todayneed to adapt their staff to operate under the auspices of ROD by creating processes that can determine the strategic exposure of new emerging cyber threats and by establish- ing a culture that is more “ defense ready.” Most executives across indus- tries recognize that cyber security has become one of the most powerful variables to maintaining and expanding company markets. Organizational Learning and Application Development Behavioral change, leading to a more resilient cyber culture, is just one of the challenges in maximizing protection in organizations. Another important factor is how to design more resilient applications that are better equipped to protect against threats; that is, a decision that needs to address exposure coupled with risk. The general con- sensus is that no system can be 100% protected and that this requires important decisions when analysts are designing applications and sys- tems. Indeed, security access is not just limited to getting into the sys- tem, but applies to the individual application level as well. How then do analysts participate in the process of designing secure applications through good design? We know that many cyber security architec- tures are designed from the office of the chief information
  • 781.
    security officer (CISO), anew and emerging role in organizations. The CISO role, often independent of the chief information officer (CIO), became significant as a result of the early threats from the Internet, the 9/11 attacks and most recently the abundant number of system compro- mises experienced by companies such as JP Morgan Chase, SONY, Home Depot, and Target, to name just a few. The challenge of cyber security reaches well beyond just archi- tecture. It must address third-party vendor products that are part of the supply chain of automation used by firms, not to mention access to legacy applications that likely do not have the necessary securities built into the architecture of these older, less resilient technologies. This 247ForMInG A CYber seCurItY Culture challenge has established the need for an enterprise cyber security solu- tion that addresses the need of the entire organization. This approach would then target third- party vendor design and compliance. Thus, cyber security architecture requires integration with a firm’ s Software Development Life Cycle (SDLC), particularly within steps that
  • 782.
    include strategic design, engineering,and operations. The objective is to use a framework that works with all of these components. Cyber Security Risk When designing against cyber security attacks, as stated above, there is no 100% protection assurance. Thus, risks must be factored into the decision-making process. A number of security experts often ask business executives the question, “ How much security do you want, and what are you willing to spend to achieve that security?” Certainly, we see a much higher tolerance for increased cost given the recent significance of companies that have been compromised. This sec- tion provides guidance on how to determine appropriate security risks. Security risk is typically discussed in the form of threats. Threats can be categorized as presented by Schoenfield (2015): 1. Threat agent: Where is the threat coming from, and who is making the attack? 2. Threat goals: What does the agent hope to gain? 3. Threat capability: What threat methodology, or type of approach is the agent possibly going to use? 4. Threat work factor: How much effort is the agent willing to
  • 783.
    put in toget into the system? 5. Threat risk tolerance: What legal chances is the agent willing to take to achieve his or her goals? Table 9.1 is shown as a guideline. Depending on the threat and its associated risks and work factors, it will provide important input to the security design, especially at the application design level. Such application securities in design typically include: 1. The user interface (sign in screen, access to specific parts of the application). 248 InForMAtIon teChnoloGY 2. Command-line interface (interactivity) in online systems. 3. Inter-application communications. How data and password information are passed, and stored, among applications across systems. Risk Responsibility Schoenfield (2015) suggests that someone in the organization is assigned the role of the “ risk owner.” There may be many risk owners and, as a result, this role could have complex effects on the way
  • 784.
    sys- tems are designed.For example, the top risk owner in most organiza- tions today is associated with the CISO. However, many firms also employ a chief risk officer (CRO). This role’ s responsibilities vary. But risk analysis at the application design level requires different governance. Application security risk needs involvement from the business and the consumer and needs to be integrated within the risk standards of the firm. Specifically, multiple levels of security often require users to reenter secure information. While this may maximize safety, it can negatively impact the user experience and the robust- ness of the system interface in general. Performance can obviously also be sacrificed, given the multiple layers of validation. There is no quick answer to this dilemma other than the reality that more secu- rity checkpoints will reduce user and consumer satisfaction unless cyber security algorithms become more invisible and sophisticated. However, even this approach would likely reduce protection. As with all analyst design challenges, the IT team, business users, and now the consumer must all be part of the decisions on how much security
  • 785.
    is required. As mycolleague at Columbia University, Steven Bellovin, states in his new book, Thinking Security , security is about a mindset. This mindset to me relates to how we establish security cultures that can Table 9.1: Threat Analysis THREAT AGENT GOALS RISK TOLERANCE WORK FACTOR METHODS Cyber criminals Financial Low Low to medium Known and proven Source : Schoenfield, B.S.E., Securing Systems: Applied Security Architecture and Threat Models , CRC Press, Boca Raton, FL, 2015. 249ForMInG A CYber seCurItY Culture enable the analyst to define organizational security as it relates to new and existing systems. If we get the analyst position to participate in setting security goals in our applications, some key questions accord- ing to Bellovin (2015) are: 1. What are the economics to protect systems? 2. What is the best protection you can get for the amount of
  • 786.
    money you wantto spend? 3. Can you save more lives by spending that money? 4. What should you protect? 5. Can you estimate what it will take to protect your assets? 6. Should you protect the network or the host? 7. Is your Cloud secure enough? 8. Do you guess at the likelihood and cost of a penetration? 9. How do you evaluate your assets? 10. Are you thinking like the enemy? The key to analysis and design in cyber security is recognizing that it is dynamic; the attackers are adaptive and somewhat unpredictable. This dynamism requires constant architectural change, accompanied with increased complexity of how systems become compromised. Thus, analysts must be involved at the conceptual model, which includes business definitions, business processes and enterprise stan- dards. However, the analysts must also be engaged with the logical design, which comprises two sub-models: 1. Logical architecture : Depicts the relationships of different data domains and functionalities required to manage each type of information in the system. 2. Component model : Reflects each of the sub-models and appli- cations that provide various functions in the system. The component model may also include third-part vendor prod- ucts that interface with the system. The component model coincides, in many ways, with the process of decomposition.
  • 787.
    In summary, theROD interface with cyber security is more com- plex than many managers believe. Security is relative, not absolute, and thus leaders must be closely aligned with how internal cultures must evolve with changes environments. 250 InForMAtIon teChnoloGY Driver /Supporter Implications Security has traditionally been viewed as a support function in most organizations, particularly when it is managed by IT staff. However, the recent developments in cyber threats suggest, as with other aspects of technology, that security too has a driver side. To excel in the role of security driver, leaders must: • Have capabilities, budgets and staffing levels, using benchmarks. • Align even closer with users and business partners. • Have close relationships with third parties. • Extend responsibilities to include the growing challenges in the mobile workforce. • Manage virtualized environments and third-party ecosystems. • Find and/or develop cyber security talent and human capital. • Have a strategy to integrate millennials with baby boomer
  • 788.
    and Gen Xmanagers. 251 10 DigiTal TRansfoRmaTion anD Changes in ConsumeR behavioR Introduction Digital transformation is one of the most significant activities of the early twenty-first century. Digital transformation is defined as “ the changes associated with the applications of digital technology in all aspects of human society” (Stolterman & Fors, 2004, p. 689). From a business perspective, digital transformation enables organizations to implement new types of innovations and to rethink business processes that can take advantage of technology. From this perspective, digital transformation involves a type of reengineering, but one that is not limited to rethinking just how systems work together, but rather, that extends to the entire business itself. Some see digital transformation as the elimination of paper in organizations. Others see it as
  • 789.
    revamp- ing a businessto meet the demands of a digital economy. This chapter provides a link between digital transformation and what I call “ digital reengineering.” To explain this better, think of process reengineering as the generation that brought together systems in the way that they talked to one another— that is, the integration of legacy systems with new application that used more robust software applications. The advent of digital transformation requires the entire organization to meet the digital demands of their consumers. For some companies, the consumer is another company (B2B, or business-to-business), that is, the consumer is a provider to another company that inevitably supports a con- sumer. For other businesses, their consumer is indeed the ultimate buyer. I will discuss the differences in these two types of consumer concepts later in this chapter. What is important from an IT perspective is that reengi- neering is no longer limited to just the needs of the internal user, but rather the needs of the businesses consumer as well. So, systems must change, 252 InForMAtIon teChnoloGY
  • 790.
    as necessary, withthe changes in consumer behavior. The challenge with doing this, of course, is that consumer needs are harder to obtain and understand, and can differ significantly among groups, depending on variables, such as ethnicity, age, and gender, to name just a few. As a result, IT managers need to interact with the consumer more directly and in partnership with their business colleagues. The con- sumer represents a new type of user for IT staff. The consumer, in effect, is the buyer of the organization’ s products and services. The challenge becomes how to get IT more engaged with the buyer com- munity, which could require IT to be engaged in multiple parts of the business that deals with the consumer. Below are six approaches, which are not mutually exclusive of each other: 1. Sales/Marketing : These individuals sell to the company’ s buy- ers. Thus, they have a good sense of what customers are look- ing for, what things they like about the business, and what they dislike. The power of the sales and marketing team is their ability to drive realistic requirements that directly impact revenue opportunities. The limitation of this resource is that it still relies on an internal perspective of the consumer; that is, how the sales and marketing staff perceive the consumer’ s needs. 2. Third-party market analysis/reporting : There are outside
  • 791.
    resources available thatexamine and report on market trends within various industry sectors. Such organizations typically have massive databases of information and, using various search and analysis tools, can provide a better understand- ing of the behavior patterns of an organization’ s consumers. These third parties can also provide reports that show how the organization stacks up against its competition and why con- sumers may be choosing alternative products. Unfortunately, if the data is inaccurate it likely will result in false generaliza- tions about consumer behavior, so it is critical that IT digital leaders ensure proper review of the data integrity. 3. Predictive analytics : This is a hot topic in today’ s competitive landscape for businesses. Predictive analytics is the process of feeding off large data sets (big data) and predicting future 253dIGItAl trAnsForMAtIon behavior patterns. Predictive analytics approaches are usually handled internally with assistance from third-party products or consulting services. The limitation is one of risk— the risk that the prediction does not occur as planned. 4. Consumer support departments: Internal teams and external vendors (outsourced managed service) have a good pulse on consumer preferences because they interact with them. More specifically, these department respond to questions, hande problems and get feedback from consumers on a reg- ular basis. These support departments typically depend on applications to help the buyer. As a result, they are an excel- lent resource for providing up-to-date things that the sys- tem does not provide consumers. Unfortunately, consumer support organizations limit their needs to what they expe-
  • 792.
    rience as opposedto what might be future trends of their consumers. 5. Surveys: IT and the business can design surveys (question- naires) and send them to consumers for feedback. Using surveys can be of significant value in that the questions can target specific issues that the organization wants to address. Survey design and administration can be handled by third- party firms, which may have an advantage in that the ques- tions are being forwarded from an independent source and one that does not identify the interested company. On the other hand, this might be considered a negative— it all depends on what the organization is seeking to obtain from the buyer. 6. Focus groups: This approach is similar to the use of a survey. Focus groups are commonly used to understand consumer behavior patterns and preferences. They are often conducted by outside firms. The differences between the focus group and a survey are (1) surveys are very quantitative based and use scoring mechanisms (Likert scales) to evaluate outcomes. Consumers sometimes may misinterpret the question thus resulting in distorted feedback, and (2) focus groups are more qualitative and allow IT digital leaders to engage with the consumer in two-way dialogues. 254 InForMAtIon teChnoloGY Figure 10.1 reflects a graphic depiction of the sources for under- standing consumer behaviors and needs. Table 10.1 further articulates the methods and deliverables that
  • 793.
    IT digital leaders shouldconsider when developing system strategies. Requirements without Users and without Input Could it be possible to develop digital strategies and requirements for a system without user input or even consumer opinions? Could this be a reality for future design of strategic systems? Perhaps we need to take a step back historically and think about trends that have changed the competitive landscape. Digital trans- formation may indeed be the most powerful agent of change in the history of business. Product requirements Sales/marketing Staff competitive analysis Surveys Internal/external targeted consumers Consumer support departments Internal support
  • 794.
    groups, third-party call centers, sharedservices organization �ird-party studies and databases Trends Data analysts Predictive analytics Focus groups Internal/external consumer sessions Figure 10.1 Sources for understanding consumer behavior. 255dIGItAl trAnsForMAtIon We have seen large companies lose their edge. IBM’ s fall as the leading technology firm in the 1990s is an excellent example, when Microsoft overtook them. Yet Google was able to take the lead away from Microsoft, particularly in relation to analytical consumer com- puting. And what about the comeback Apple made with its new array
  • 795.
    Table 10.1 Langer’s Methods and Deliverables for Assessing Consumer Needs ANALYST’ S SOURCES METHODS DELIVERABLES Sales/ Marketing Interviews Should be conducted in a similar way to typical end user interviews. Work closely with senior sales staff. Set up interviews with key business stakeholders. Win/loss sales reviews Review the results of sales efforts. Many firms hold formal win/loss review meetings that may convey important limitations of current applications and system capabilities. Third-Party Databases Document reports reviews Obtain summaries of the trends in consumer behavior and pinpoint shortfalls that might exist in current applications and systems. Data analysis Perform targeted analytics on databases to uncover trends
  • 796.
    not readily conveyedin available reports. Predictive analytics Interrogate data by using analytic formulas that may enable predictive trends in consumer behavior. Support Department Interviews Interview key support department personnel (internal and third party) to identify possible application deficiencies. Data/reports Review call logs and recorded calls between consumers and support personnel to expose possible system deficiencies. Surveys Internal and external questionnaires Work with internal departments to determine application issues when they support consumers. Use similar surveys with select populations of customers to validate and fine-tune internal survey results. Use similar surveys targeted to consumers who are not customers and compare results. Differences between existing customer base and non-customers may expose new trends in consumer needs. Focus Groups Hold internal and external
  • 797.
    sessions Internal focus groupscan be facilitated by marketing personnel. Select survey results, that had unexpected results or mixed feedback can be reviewed. Internal attendees should come from operations management and sales. External focus groups should be facilitated by a third-party vendor and held at independent sites. Discussions with customers should be compared with internal focus group results. Consumer focus groups should be facilitated by professional third-party firms. 256 InForMAtIon teChnoloGY of smart phone-related products? The question is, Why and how do these shifts in competitive advantage occur so quickly? Technology continues to generate change and that change is typically referred to today as a “ digital disruption.” The challenge in disruption is the inability to predict what consumers want and need; furthermore, the consumer may not know! The challenge, then, is for IT digital leaders to forecast the changes that are brought about by technology disruptions. So, digital transforma- tion is more about predicting consumer behavior and providing new products and services, which we hope consumers will want. This is a significant challenge for IT leaders, of course, given that the profession was built on the notion that good specifications accurately depicted what users want. Langer (1997) originally defined this as the “ Concept of the Logical Equivalent.” So, we may have created an oxymoron— how do we develop systems
  • 798.
    that the user cannotspecify? Furthermore, requirements that depict consumer behavior are now further complicated by the globaliza- tion of business. Which consumer behavior are we attempting to satisfy and across what societal cultural norms? The reality is that new software applications will need to be built with some uncer- tainty. That is, some business rules may be vague and risks will need to be part of the process of system functionality. To see an example of designing systems based on uncertainty, we need only to analyze the evolution of the electronic spreadsheet. The first electronic spreadsheet, called VisiCalc, was introduced by a com- pany called VisiCorp. It was designed for the Apple II and eventu- ally the IBM personal computer. The electronic spreadsheet was not designed based on consumer input per se, rather on perceived needs by visionary designers who saw a need for a generic calcula- tor and mathematical worksheet. VisiCorp took a risk by offer- ing a product to the market that consumers would find useful. Of course, history shows that it was a very good risk. The electronic spreadsheet, which is now dominated by Microsoft’ s Excel product has gone through multiple product generations. The inventors of the electronic spreadsheet had a vision and the market responded favorably. Although VisiCorp’ s vision of the market need was cor- rect, the first version was hardly 100% accurate of what
  • 799.
    consumers would want ina spreadsheet. For example, additional features, such 257dIGItAl trAnsForMAtIon as a database interface, three-dimensional spreadsheets to support budgeting and forward referencing, are all examples of responses from consumers that resulted in new product enhancements. Allen and Morton (1994) established an excellent graphic depic- tion of the relationship between technology advancements and mar- ket needs (Figure 10.2) Figure 10.2 shows an interesting life cycle of how product innovations relate to the creation of new products and services. The diagram reflects that innovations can occur as a result of new technology capabilities or inventions that establish new markets— like the electronic spreadsheet. On the other hand, the market can demand more features and functions the technology organizations or developers need to respond to that— like the upgrades made over the years to spreadsheet applications. Responding to market needs are what most organizations have practiced over the past 60 years, usually working with their end user populations (those
  • 800.
    internal users that supportedthe actual consumer). The digital revolution; how- ever, is placing more emphasis on “ generic” applications that resemble the object paradigm (one that requires applications to be able to fit into any business application). This trend will drive new and more advanced object- driven applications. These applications will reside in a more robust object functioning library that can dynamically link these modules together to form specific applications that can support mul consumer devices (what is now being called the “ Internet of Things” ). Another useful approach to dealing with consumer preferences is Porter’ s Five Forces Framework. Porter’s framework consists of the following five components: 1. Competitors : What is the number of competitors in the market and what is the organization’ s position within the market? Technology Market Innovation Figure 10.2 Technology, innovation, and market needs.
  • 801.
    258 InForMAtIon teChnoloGY 2.New entrants : What companies can come into the organiza- tion’ s space and provide competition? 3. Substitutes : What products or services can replace what you do? 4. Buyers : What alternatives do buyers have? How close and tight is the relationship between the buyer and seller? 5. Suppliers : What is the number of suppliers that are available, which can affect the relationship with the buyer and also determine price levels? Porter’ s framework is graphically depicted in Figure 10.3. Cadle et al. (2014) provide an approach to using Porter’ s model as part of the analysis and design process. Their approach is integrated with Langer’ s Analysis Consumer Methods in Table 10.2. Concepts of the S-Curve and Digital Transformation Analysis and Design Digital transformation will also be associated with the behavior of the S-curve. The S-curve has been a long-standing economic graph that depicts the life cycle of a product or service. The S-curve is shown in Figure 10.4
  • 802.
    New entrants Suppliers Consumer support dept. Buyers Industry competitors (sales and marketing) Substitutes Newproducts or services Sales and marketing Figure 10.3 Porter’ s Five Forces Framework. 259dIGItAl trAnsForMAtIon The left and lower portion of the S-curve represents a growing market opportunity that is likely volatile and exists where demand exceeds supply. As a result, the market opportunity is large and prices for the product are high. Thus, businesses should seek to
  • 803.
    capture as much ofthe market share at this time before competitors catch up. This requires the business to take more risk and assumes that the mar- ket will continue to demand the product. The shape of the S- curve suggests the life of this opportunity (the length of the x-axis repre- sents the lifespan of the product). As the market approaches the middle of the center of the S- curve, demand begins to equal supply. Prices start to drop and the market, in general, becomes less volatile and more predictable. The drop in price reflects the presence of more competitors. As a product or service approaches the top of the S, supply begins to exceed demand. Prices begin to fall and the market is said to have reached maturity. The uniqueness of the product or service is now approaching commodity. Table 10.2 Langer’ s Analysis Consumer Methods PORTER’ S FIVE FORCES CADEL ET AL’ S APPROACH LANGER’ S SOURCES OF INPUT Industry competitors How strong is your market share? Third-party market studies
  • 804.
    New entrants Newthreats Third-party market studies Surveys and focus groups Suppliers Price sensitivity and closeness of relationship. Consumer support and end user departments Buyers Alternative choices and brand equity. Sales/marketing team Substitutes Consumer alternatives Surveys and focus groups Sales and marketing team Third-party studies Figure 10.4 The S-curve. 260 InForMAtIon teChnoloGY Typically, suppliers will attempt to produce new features and func- tions to extend the life of the curve as shown in Figure 10.5 Establishing a new S-curve, then, extends the competitive life of the product or service. Once the top of the S-curve is reached, the product or service has reached the commodity level, where supply is much greater than demand. Here, the product or service has likely
  • 805.
    reached the endof its useful competitive life and should either be replaced with a new solution or considered for outsourcing to a third- party who can deliver the product at a very low price. Langer’ s Driver/Supporter depicts the life cycle of any application or product as shown in Figure 10.6 Organizational Learning and the S-Curve When designing a new application or system, the status of that product’ s S-curve should be carefully correlated to the source of the Figure 10.5 Extended S-curve. Mini loop technology enhancementsTechnology driver Evaluation cycle Driver maturation Support status Replacement or outsource Economies of scale
  • 806.
    Figure 10.6 Langer’s drive/supporter life cycle. 261dIGItAl trAnsForMAtIon requirements. Table 10.3 reflects the corresponding market sources and associated risk factors relating to the dependability of require- ments based on the state of the consumer’ s market. Leaders engaged in this process obviously need to have an abstract perspective to sup- port a visionary and risk-oriented strategy. Table 10.3 includes the associated complexity of staff needed to deal with each period in the S-curve. Communities of Practice As stated in Chapter 4, Communities of Practice (COP) have been traditionally used as a method of bringing together people in orga- nizations with similar talents, responsibilities and/or interests. Such communities can be effectively used to obtain valuable information about the way things work and what is required to run business opera- tions. Getting such information strongly correlates to the challenges of obtaining dependable information from the consumer market. I dis-
  • 807.
    cussed the useof surveys and focus groups earlier in this chapter, but COP is an alternative approach to bringing together similar types of consumers grouped by their interests and needs. In digital transforma- tion we find yet another means of obtaining requirements by engaging in, and contributing to, the practices of specific consumer communities. This means that working with COP offers another way of developing relations with consumers to better understand their needs. Using this Table 10.3 S-Curve, Application Requirement Sources, and Risk S-CURVE STATUS ANALYSIS INPUT SOURCE RISK FACTOR Early S-curve Consumer High; market volatility and uncertainty. High S-curve Consumer Lower; market is less uncertain as product becomes more mature. End users Medium; business users have experience with consumers and can provide reasonable requirements. Crest of the S-curve End users Low; business users have more experience as product
  • 808.
    becomes mature. Consumer High;might consider new features and functions to keep product more competitive. Attempt to establish new S-curve. End of S-curve End user None; seek to replace product or consider third-party product to replace what is now a legacy application. Also think of outsourcing application. 262 InForMAtIon teChnoloGY approach inside an organization, as we saw in Chapter 4, provides a means of better learning about issues by using a sustained method of remaining interconnected with specific business user groups, which can define what the organization really knows and contributes to the busi- ness that is typically not documented. IT digital leaders need to become engaged in learning if they are to truly understand what is needed to develop more effective and accurate software applications. It seems logical that COP can provide the mechanism to assist IT digital leaders with an understanding of how business users and con- sumers behave and interact. Indeed, the analyst can target the behavior
  • 809.
    of the communityand its need to consider what new organizational structures can better support emerging technologies. I have, in many ways, already established and presented what should be called the “ community of IT digital leaders” and its need to understand how to restructure, in order to meet the needs of the digital economy. This new era does not lend itself to the traditional approaches to IT strategy, but rather to a more risk-based process that can deal with the realignment of business operations integrated with different consumer relationships. The relationship, then, between COP and digital transformation is significant, given that future IT applications will heavily rely on infor- mal inputs. While there may be attempts to computerize knowledge using predictive analytics software and big data, it will not be able to provide all of the risk-associated behaviors of users and consum- ers. That is, a “ structured” approach to creating predictive behavior reporting, is typically difficult to establish and maintain. Ultimately, the dynamism from digital transformations creates too many uncer- tainties to be handled by sophisticated automated applications on how organizations will react to digital change variables. So, COP,
  • 810.
    along with these predictiveanalytics applications, provides a more thorough umbrella of how to deal with the ongoing and unpredictable interac- tions established by emerging digital technologies. The IT Leader in the Digital Transformation Era When we discuss the digital world and its multitude of effects on how business is conducted, one must ask how this impacts the profession of IT Leader. This section attempts to address the perceived evolution of the role. 263dIGItAl trAnsForMAtIon 1. The IT leader must become more innovative. While the business has the problem of keeping up with changes in their markets, IT needs to provide more solutions. Many of these solutions will not be absolute and likely will have short shelf lives. Risk is fundamental. As a result, IT lead- ers must truly become “ business” leaders by exploring new ideas from the outside and continually considering how to implement the needs of the company’ s consumers. As a result, the business analyst will emerge as an idea bro- ker (Robertson & Robertson, 2012) by constantly pursuing external ideas and transforming them into automated and competitive solutions. These ideas will have a failure rate, which means that companies will need to produce more applications than they will inevitably implement. This will certainly require organizations to spend more on software
  • 811.
    development. 2. Quality requirementswill be even more complex. In order to keep in equilibrium with the S-curve the balance between quality and production will be a constant negotiation. Because applications will have shorter life cycles and there is pressure to provide competitive solutions, products will need to sense market needs and respond to them quicker. As a result, fixes and enhancements to applications will become more inherent in the development cycle after products go live in the market. Thus, the object paradigm will become even more fundamental to better software development because it provides more readily tested reusable applications and routines. 3. Dynamic interaction among users and business teams will require the creation of multiple layers of communities of prac- tice. Organizations involved in this dynamic process must have autonomy and purpose (Narayan, 2015). 4. Application analysis, design, and development must be treated and managed as a living process; that is, it never ends until the product is obsolete (supporter end). So, products must con- tinually develop to maturity. 5. Organizations should never outsource a driver technology until it reaches supporter status. 264 InForMAtIon teChnoloGY How Technology Disrupts Firms and Industries The world economy is transforming rapidly from an analogue to
  • 812.
    a digital-based technology-driven society.This transformation requires businesses to move from a transactional relationship to one that that is “ interactional” (Ernst & Young, 2012). However, this analogue to digital transformation, while essential for a business to survive in the twenty-first century, is difficult to accomplish. Langer’ s (2011) theory of responsive organizational dynamism (ROD), as discussed earlier in this book, is modified to show that successful adaptation of new digi- tal technologies called Digital Dynamisms requires cultural assimila- tion of the people that comprise the organization. Dynamism and Digital Disruption The effects of digital dynamism can also be defined as a form of disruption or what is now being referred to as digital disruption . Specifically, the big question facing many enterprises is around how they can anticipate the unexpected threats brought on by technologi- cal advances that can devastate their business. There are typically two disruption factors: 1. A new approach to providing products and services to the consumer. 2. A strategy not previously feasible, now made possible using
  • 813.
    new technological capabilities. Indeed,disruption occurs when a new approach meets the right conditions. Because technology shortens the time it takes to reach consumers, the changes are occurring at an accelerated and exponen- tial pace. As an example, the table below shows the significant accel- eration of the time it takes to reach 50 million consumers: Radio 38 years Television 13 years Internet 4 years Facebook 3.5 years Twitter 9 months Instagram 6 months Poké mon GO 19 days 265dIGItAl trAnsForMAtIon The speed of which we can accelerate change has an inverse effect on the length of time the effect lasts. We use the S-curve to show how digital disruption shortens the competitive life of new products and services. Figure 10.7 represents how the S-curve is shrinking along the x-axis, which measures the length or time period of the product/ service life. Figure 10.7 essentially reflects that the life of a product or
  • 814.
    service is shrinking, thusenterprises have less time to capture a market oppor- tunity and far less time to enjoy the length of its competitive suc- cess. As a result, business leaders are facing a world that is changing at an accelerating rate and trying to cope with understanding how new waves of “ disruptive” technologies will affect their business. Ultimately, digital disruption shifts the way competitive forces deliver services, requires change in the way operations are managed and mea- sured, and shortens the life of any given product or service success. Critical Components of “ Digital” Organization A study conducted by Westerman et al. (2014), who interviewed 157 executives in fifty large companies, found four capabilities that were key to successful digital transformation: 1. A unified digital platform : Integration of the organization’ s data and processes across its department silos is critical. One reason why web-based companies gain advantage over tradi- tional competitors is their ability to use analytics and customer personalization from central and integrated sources. Thus, the first step toward a successful digital transformation is for companies to invest in establishing central repositories of data and common applications that can access the information. Figure 10.7 The shrinking S-curve.
  • 815.
    266 InForMAtIon teChnoloGY Thiscentralization of digital data is key to competing globally since firms must be able to move data to multiple locations and use that data in different contexts. 2. Solution delivery : Many traditional IT departments are not geared to integrating new processes into their legacy opera- tions. A number of firms have addressed this problem by establishing independent “ innovation centers” designed to initiate new digital ideas that are more customer solution ori- ented. These centers typically focus on how new mobile and social media technologies can be launched without disturb- ing the core technology systems that support the enterprise. Some of these initiatives include partnerships with high-tech vendors; however, a number of executives have shown concern that such alliances might result in dependencies because of the lack of knowledge inside the organization. 3. Analytics capabilities : Companies need to ensure that their
  • 816.
    data can beused for predictive analytics purposes. Predictive analytics provide actors with a better understanding of their consumer’ s behaviors and allow them to formulate competi- tive strategies over their competitors. Companies that inte- grate data better from their transactional systems can make more “ informed and better decisions” and formulate strate- gies to take advantage of customer preferences and thus, turn them into business opportunities. An example is an insurance company initiative that concentrates on products that meet customer trends determined by examining their historical transactions across various divisions of the business. Analytics also helps organizations to develop risk models that can assist them to formulate accurate portfolios. 4. Business and IT integration : While the integration of the IT department with the business has been discussed for decades, few companies have achieved a desired outcome (Langer, 2016). The need for digital transformation has now made this integration essential for success and to avoid becoming a vic- tim of disruption. True IT and business integration means more than just combining processes and decision making; but rather, the actual movement of personnel into business units so they can be culturally assimilated (Langer & Yorks, 2013).
  • 817.
    267dIGItAl trAnsForMAtIon Assimilating DigitalTechnology Operationally and Culturally When considering how to design an organization structure that can implement digital technologies, firms must concentrate on how to culturally assimilate a new architecture. The importance of the architecture first affects the strategic integration component of ROD. Indeed, the actor-oriented architecture must be designed to be agile enough to react to increased changes in market demands. The consumerization of technology, defined as changes in technol- ogy brought on by increased consumer knowledge of how digital assets can reduce costs and increase competitive advantage, have created a continual reduction in the length of any new competitive products or services life. Thus, consumerization has increased what
  • 818.
    Eisenhardt and Bourgeouse(1988) define as “ high-velocity” market conditions. This dilemma drives the challenge of how organizations will cope to avoid the negative effects of digital disruption. There are four over- all components that appear to be critical factors of autonomy from disruption: 1. Companies must recognize that speed and comfort of service can be more important than just the cost: our experience is that enterprises who offer multiple choices that allow con- sumers to choose from varying levels of service options are more competitive. The more personal the service option, the higher the cost. Examples can be seen in the airline indus- try where passengers have options for better seats at a higher price, or a new option being offered by entertainment parks that now provide less wait time on shorter lines, for higher paying customers. These two examples match the price with a desired service and firms that do not offer creative pricing options are prime for disruption.
  • 819.
    2. Empower yourworkforce to try new ideas without over con- trols. Companies are finding that many young employees have new service ideas but are blocked from trying them because of the “ old guard” in their management reporting lines. Line managers need to be educated on how to allow their staffs to quickly enact new processes, even though some of them may not be effective. 268 InForMAtIon teChnoloGY 3. Allow employees and customer to have choice of devices. Traditionally IT departments desire to create environments where employees adhere to standard hardware and software structures. Indeed, standard structures make it easier for IT to support internal users and provide better security across systems. However, as technology has evolved, the relation between hardware and software, especially in mobile devices, has become more specialized. For example, Apple smart- phones have proprietary hardware architectures that in many cases require different versions of application software as well as different security considerations than its major competi- tor, Samsung. With the consumerization of technology, these IT departments must now support multiple devices because
  • 820.
    both their customersand employees are free to select them. Therefore, it is important to allow staff to freely integrate company applications with their personal device choices. 4. Similar to (3), organizations who force staff to adhere to strict processes and support structures are exposed to digital dis- ruption. Organizational structures that rely on technological innovation must be able to integrate new digital opportuni- ties seamlessly into their current production and support pro- cesses. Specifically, this means having the ability to be agile enough to provide services using different digital capabilities and from different geographical locations. Conclusion This chapter has provided a number of different and complex aspects of digital transformation, its effects on how organizations are struc- tured and how they need to compete to survive in the future. The technology executive is, by default, the key person to lead these digi- tal transformation initiatives because of the technical
  • 821.
    requirements that are atthe center of successfully completing these projects. As such, these executives must also focus on their own transformation as leaders that allows them to help form the strategic goals to meet the dynamic changes in consumer behavior. 269 11 inTegRaTing geneRaTion y employees To aCCeleRaTe CompeTiTive aDvanTage Introduction This chapter focuses on Gen Y employees who are also known as “ digital natives” and “ millennials.” Gen Y employees possess the
  • 822.
    attributes to assistcompanies in transforming their workforce to meet the accelerated change in the competitive landscape. Most executives across industries recognize that digital technologies are the most powerful variable to maintaining and expanding company markets. Gen Y employees provide a natural fit for dealing with emerging digital technologies. However, success with integrating Gen Y employees is contingent upon baby boomer and Gen X man- agement to adapt new leadership philosophies and procedures suited to meet the expectations and needs of these new workers. Ignoring the unique needs of Gen Y employees will likely result in an incon- gruent organization that suffers high turnover of young employees who will seek more entrepreneurial environments. I established in Chapter 10 that digital transformation is at the core of change and competitive survival in the twenty-first cen- tury. Chapter 10 did not address the changes in personnel that are quickly becoming major issues at today’ s global firms.
  • 823.
    While I offered changesto organizational structures, I did not address the mixture of different generations that are at the fabric of any typical organization. This chapter is designed to discuss how these multiple generations need to “ learn” how to work together to form productive and effective organizations that can compete in the digital economy. Furthermore, this chapter will address how access to human capital will change in the future and the different types of relationships that individuals will have with employers. For example, the “ gig” 270 InForMAtIon teChnoloGY economy will use non-traditional outside workers who will provide sources of talent for shorter-term employment needs. Indeed, the
  • 824.
    gig economy willrequire HR and IT leaders to form new and intri- cate employee relationships. As discussed in Chapter 10, companies need to transform their business from analogue to one that uses digital technologies. Such transformation requires moving from a transactional relation- ship with customers to one that is more “ interactional” (Ernst & Young, 2012). Completing an analogue to digital transformation, while essential for a business to survive in the twenty-first century, is difficult to accomplish. Responsive organizational dynamism (ROD) showed us that successful adaptation of new digital tech- nologies requires strategic integration and cultural assimilation of the people that comprise the organization. As stated earlier, these components of ROD can be categorized as the essential roles and responsibilities of the organization that are necessary to utilize new technological inventions that can strategically be integrated within a business entity. The purpose here is to explore why
  • 825.
    Gen Y employees needto be integrated with baby boomers and Gen X staff to effectively enhance the success of digital transformation initiatives. The Employment Challenge in the Digital Era Capgemini and MIT (2013) research shows that organizations need new operating models to meet the demands of a digital-driven era. Digital tools have provided leaders with ways to connect at an unprec- edented scale. Digital technology has allowed companies to invade other spaces previously protected by a business’ s “ asset specificities” (Tushman & Anderson, 1997), which are defined as advantages enjoyed by companies because of their location, product access, and delivery capabilities. Digital technologies allow those specificities to be neutralized and thus, change the previous competitive balances
  • 826.
    among market players.Furthermore, digital technology acceler- ates this process, meaning that changes in market share occur very quickly. The research offers five key indicators that support successful digital transformation in a firm: 271InteGrAtInG GenerAtIon Y 1. A company’ s strategic vision is only as effective as the people behind it. Thus, winning the minds of all levels of the organi- zation is required. 2. To become digital is to be digital. Companies must have a “ one-team culture” and raise their employees’ digital IQ. 3. A company must address the scarcity of talented resources and look more to using Gen Y individuals because they have a more natural adaptation to take on the challenges of digital transformation. 4. Resistant managers are impediments to progress and can
  • 827.
    actually stop digitaltransformation. 5. Digital leadership starts at the top. As stated in Chapter 10, Eisenhardt and Bourgeouis (1988) first defined dynamic changing markets as being “ high-velocity.” Their research shows that high-velocity conditions existed in the technol- ogy industry during the early 1980s in Silicon Valley, in the United States. They found that competitive advantage was highly dependent on the quality of people that worked at those firms. Specifically, they concluded that workers who were capable of dealing with change and less subjected to a centralized totalitarian management structure out- performed those that had more traditional hierarchical organizational structures. While “ high-velocity” during the 1980s was unusual, dig- ital disruption in the twenty-first century has made it a market norm.
  • 828.
    The combination ofevolving digital business drivers with acceler- ated and changing customer demands has created a business revolution that best defines the imperative of the strategic integration component of ROD. The changing and accelerated way businesses deal with their customers and vendors requires a new strategic integration to become a reality, rather than remain a concept without action. Most experts see digital technology as the mechanism that will require business realignment to create new customer experiences. The driving force behind this realignment emanates from digital technologies, which serve as the principle accelerator of the change in transactions across all business units. The general need to optimize human resources forces organizations to rethink and to realign business processes, in
  • 829.
    order to gainaccess to new business markets, which are weakening the existing “ asset specificities” of the once dominant market leaders. 272 InForMAtIon teChnoloGY Gen Y Population Attributes Gen Y or digital natives are those people who are accustomed to the attributes of living in a digital world and are 18– 35 years old. Gen Y employees are more comfortable with accelerated life changes, par- ticularly change brought on by new technologies. Such individuals, according to a number of commercial and academic research studies (Johnson Controls, 2010; Capgemini, 2013; Cisco, 2012; Saxena & Jain, 2012), have attributes and expectations in the workplace that
  • 830.
    support environments thatare flexible, offer mobility, and provide collaborative and unconventional relationships. Specifically, millen- nial workers • want access to dedicated team spaces where they can have emotional engagements in a socialized atmosphere; • require their own space; that is, are not supportive of a “ hotel- ing” existence where they do not have a permanent office or workspace; • need a flexible life/work balance; • prefer a workplace that supports formal and informal collab- orative engagement. Research has further confirmed that 79% of Gen Y workers pre- fer mobile jobs, 40% want to drive to work, and female millennials need more flexibility at work than their male counterparts. As a result of this data, businesses will need to compete to recruit and
  • 831.
    develop skilled Gen Yworkers who now represent 25% of the workforce. In India, while Gen Y represents more than 50% of the working popula- tion, the required talent needed by businesses is extremely scarce. Advantages of Employing Millennials to Support Digital Transformation As stated, Gen Y adults appear to have many identities and capabilities that fit well in a digital-driven business world. Indeed, Gen Y peo- ple are consumers, colleagues, employees, managers, and innovators (Johnson Controls, 2010). They possess attributes that align with the requirements to be an entrepreneur, a person with technology savvy and creativity, someone who works well in a mobile environment, and is non-conformant enough to drive change in an organization. Thus,
  • 832.
    273InteGrAtInG GenerAtIon Y thepresence of Gen Y personnel can help organizations to restrat- egize their competitive position and to retain key talent (Saxena & Jain, 2012). Furthermore, Gen Y brings a more impressive array of academic credentials than their predecessors. Most important is Gen Y’ s ability to deal better with market change— which inevitably affects organizational change. That is, the digital world market will constantly require changes in organizational structure to accommodate its consumer needs. A major reason for Gen Y’ s willingness to change is its natural alignment with a company’ s customers. Swadzba (2010) posits that we are approaching the end of what he called the “ work era” and moving into a new age
  • 833.
    based on consumption. Millennialsare more apt to see the value of their jobs from their own consumption needs. Thus, they see employment as an act of consumption (Jonas & Kortenius, 2014). Gen Y employees therefore allow employers to acquire the necessary talent that can lead to better consumer reputation, reduced turnover of resources and, ulti- mately, increased customer satisfaction (Bakanauskiené et al., 2011). Yet another advantage of Gen Y employees is their ability to transform organizations that operate on a departmental basis into one that is based more on function; an essential requirement in a digital economy. Integration of Gen Y with Baby Boomers and Gen X The prediction is that 76 million baby boomers (born 1946– 1964) and Gen X workers (born 1965– 1984) will be retiring over the
  • 834.
    next 15 years. Thequestion for many corporate talent executives is how to manage the transition in a major multigenerational workforce. Baby boomers alone still inhabit the most powerful leadership positions in the world. Currently, the average age of CEOs is 56, and 65% of all corporate leaders are baby boomers. Essentially, corporations need to produce career paths that will be attractive to millennials. Thus, the older generation needs to • Acknowledge some of their preconceived perceptions of cur- rent work ethics that are simply not relevant in today’ s com- plex environments. • Allow Gen Y to escalate in ranks to satisfy their ambitions and sense of entitlement. 274 InForMAtIon teChnoloGY
  • 835.
    • Implement moreflexible work schedules, offer telecommut- ing, and develop a stronger focus on social responsibility. • Support more advanced uses of technology, especially those used by Gen Yers in their personal lives. • Employ more mentors to help Gen Y employees to better understand the reasons for existing constraints in the organi- zations where they work. • Provide more complex employee orientations, more timely personnel reviews, and in general more frequent feedback needed by Gen Y individuals. • Establish programs that improve the verbal communications skills of Gen Y workers that are typically more comfortable with nonverbal text-based methods of communication. • Implement more continual learning and rotational programs that support a vertical growth path for younger employees. In summary, it is up to the baby boomer and Gen X leaders to modify their styles of management to fit the needs of their younger
  • 836.
    Gen Y employees.The challenge to accomplish this objective is com- plicated, given the wide variances on how these three generations think, plan, take risks, and most important, learn. Designing the Digital Enterprise Zogby completed an interactive poll of 4,811 people on perceptions of different generations. 42% of the respondents stated that baby boomers would be remembered for their focus on consumerism and self-indulgence. Gen Y, on the other hand, are considered more self- interested, entitled narcissists who want to spend all their time post- ing “ selfies” to Facebook. However, other facts offer an expanded perception of these two generations, as shown in Table 11.1 Research completed by Ernst and Young (2013) offers additional comparisons among the three generations as follows:
  • 837.
    1. Gen Yindividuals are moving into management positions faster due to retirements, lack of corporate succession plan- ning, and their natural ability to use technology at work. Table 11.2 shows percentage comparisons between 2008 and 2013. 275InteGrAtInG GenerAtIon Y The acceleration of growth to management positions among Gen Y individuals can be further illuminated in Table 11.3 by comparing the prior five-year period from 2003 to 2007. 2. While responders of the survey felt Gen X were better equipped to manage than Gen Y, the number of Gen Y man- agers is expected to double by 2020 due to continued retire- ments. Another interesting result of the research relates to Gen Y expectations from their employers when they become managers. Specifically Gen Y managers expect (1) an oppor- tunity to have a mentor, (2) to receive sponsorship, (3) to have more career-related experiences, and (4) to receive training to build their professional skills.
  • 838.
    3. Seventy-five percentof respondents that identified themselves as managers agree that managing the multiple generations is a significant challenge. This was attributed to different work expectations and the lack of comfort with younger employees managing older employees. Table 11.4 provides additional differences among the three generations: Table 11.1 Baby Boomers versus Gen Y BABY BOOMERS GEN Y Married later and less children Not as aligned to political parties Spend lavishly More civically engaged More active and selfless Socially active Fought against social injustice, supported civil rights, and defied the Vietnam War Cheerfully optimistic Had more higher education access More concerned with quality of life than
  • 839.
    material gain Table 11.2Management Roles 2008– 2013 Baby boomer (ages 49– 67) 19% Gen X (ages 33– 48) 38% Gen Y (18– 32) 87% Table 11.3 Management Roles 2003– 2007 Baby boomer (ages 49– 67) 23% Gen X (ages 33– 48) 30% Gen Y (18– 32) 12% 276 InForMAtIon teChnoloGY Assimilating Gen Y Talent from Underserved and Socially Excluded Populations The outsourcing of jobs outside of local communities to countries with lower employment costs has continued to grow during the early part
  • 840.
    of the twenty-firstcentury. This phenomenon has led to significant social and economic problems, especially in the United States and in Western Europe as jobs continue to migrate to foreign countries where there are lower labor costs and education systems that provide Table 11.4 Baby Boomer, Gen X and Gen Y Compared BABY BOOMERS GEN X GEN Y Seek employment in large established companies that provide dependable employment. Established companies no longer a guarantee for lifetime employment. Many jobs begin to go offshore. Seek multiple experiences with heavy emphasis on social
  • 841.
    good and globalexperiences. Re-evaluation of offshoring strategies. Process of promotion is well defined, hierarchical and structured, eventually leading to promotion and higher earnings—concept of waiting your turn. Process of promotion still hierarchical, but based more on skills and individual accomplishments. Master’s degree now preferred for many promotions. Less patience with hierarchical promotion policies. More reliance on predictive analytics as the basis for decision making. Undergraduate degree
  • 842.
    preferred but notmandatory. Undergraduate degree required for most professional job opportunities. More focus on specific skills. Multiple strategies developed on how to meet shortages of talent. Higher education is expensive and concerns increase about the value of graduate knowledge and abilities. Plan career preferably with one company and retire. Acceptance of a gradual process of growth that was slow to change. Successful employees assimilated into existing organizational structures by following the rules.
  • 843.
    Employees begin tochange jobs more often, given growth in the technology industry, and opportunities to increase compensation and accelerate promotion by switching jobs. Emergence of a “gig” economy, and the rise of multiple employment relationships Entrepreneurism was seen as an external option for those individuals desiring wealth and independence and willing to take risks. Corporate executives’ compensation dramatically increases, no longer requiring starting businesses as the basis for wealth. Entrepreneurism promoted in Higher Education as the
  • 844.
    basis for economicgrowth, given the loss of jobs in the U.S. 277InteGrAtInG GenerAtIon Y more of the skills needed by corporations. Most impacted by the loss of jobs have been the underserved or socially excluded Gen Y youth populations. Indeed, the European average for young adult unem- ployment (aged 15– 25) in 2013 was nearly 25%, almost twice the rate for their adult counterparts (Dolado, 2015). Much of the loss of local jobs can be attributed to expansion of the globalized economy, which has been accelerated by continued technological advancements (Wabike, 2014). Thus, the effects of technology gains have negatively impacted efforts toward social inclusion and social equality.
  • 845.
    Langer, in 2003,established an organization called Workforce Opportunity Services (WOS), as a means of utilizing a form of action research using adult development theory to solve employment problems caused by outsourcing. Langer’ s approach is based on the belief that socially excluded youth can be trained and prepared for jobs in areas such as information technology that would typically be outsourced to lower labor markets. WOS has developed a talent-finding model that has suc- cessfully placed over 1400 young individuals in such jobs. Results of over 12 years of operation and research have shown that talented youth in disadvantaged communities do exist and that such talent can economi- cally and socially contribute to companies (Langer, 2013). The following section describes the Langer Workforce Maturity Arc (LWMA), pres- ents data on its effectiveness as a transformative learning
  • 846.
    instrument, and discusses howthe model can be used as an effective way of recruit- ing Gen Y talent from underserved and socially excluded populations. Langer Workforce Maturity Arc The Langer Workforce Maturity Arc (LWMA) was developed to help evaluate socially excluded youth preparation to succeed in the workplace. The LWMA, initially known as the Inner-City Workplace Literacy Arc: charts the progression of underserved or ‘ excluded’ individuals along defined stages of development in workplace culture and skills in relation to multiple dimensions of workplace literacy such as cognitive growth and self-reflection. When one is mapped in relation to the other (work- place culture in relation to stages of literacy assimilation), an Arc is
  • 847.
    created. LWMA tracesthe assimilation of workplace norms, a form of individual development. (Langer, 2003: 18) 278 InForMAtIon teChnoloGY The LWMA addresses one of the major challenges confronting an organization’ s HR group: to find talent from diverse local populations that can successfully respond to evolving business norms, especially those related to electronic and digital technologies. The LWMA provides a method for measuring the assimilation of workplace cultural norms and thus, can be used to meet the mounting demands of an increasingly global, dynamic, and multicultural workplace. Furthermore, if organi- zations are to attain acceptable quality of work from diverse employees, assimilation of socially or economically excluded populations
  • 848.
    must be evaluated basedon (1) if and how individuals adopt workplace cultural norms, and (2) how they become integrated into the business (Langer, 2003). Understanding the relationship between workplace assimila- tion and its development can provide important information on how to secure the work ethic, dignity, solidarity, culture, cognition, and self-esteem of individuals from disadvantaged communities, and their salient contributions to the digital age. Theoretical Constructs of the LWMA The LWMA encompasses sectors of workplace literacy and stages of lit- eracy development , and the arc charts business acculturation require- ments as they pertain to disadvantaged young adult learners. The relationship between workplace assimilation and literacy is a chal-
  • 849.
    lenging subject. Aspecific form of literacy can be defined as a social practice that requires specific skills and knowledge (Rassool, 1999). In this instance, workplace literacy addresses the effects of workplace practices and culture on the social experiences of people in their work- day, as well as their everyday lives. We need to better understand how individual literacy in the workplace, which subordinates individuality to the demands of an organization, is formulated for diverse groups (Newman, 1999). Most important, are the ways in which one learns how to behave effectively in the workplace— the knowledge, skill, and attitude sets required by business generally, as well as by a specific organization. This is particularly important in disadvantaged commu- nities, which are marginalized from the experiences of more affluent communities in terms of access to high-quality education,
  • 850.
    informa- tion technologies, jobopportunities, and workplace socialization. For example, Friedman et al. (2014) postulate that the active involvement 279InteGrAtInG GenerAtIon Y of parents in the lives of their children greatly impacts a student’ s chances of success. It is the absence of this activism that contributes to a system of social exclusion of youth. Prior to determining what directions to pursue in educational pedagogies and infrastructures, it is necessary to understand what workplace literacy requirements are present and how they can be developed for disadvantaged youth in the absence of the active support from families and friends. The LWMA assesses individual development in six distinct
  • 851.
    sectors of workplace literacy: 1.Cognition : Knowledge and skills required to learn and com- plete job duties in the business world, including computational skills; ability to read, comprehend, and retain written infor- mation quickly; remembering and executing oral instructions; and critically examining data. 2. Technology : An aptitude for operating various electronic and digital technologies. 3. Business culture : Knowledge and practice of proper etiquette in the workplace including dress codes, telephone and in-per- son interactions, punctuality, completing work and meeting deadlines, conflict resolution, deference and other protocols associated with supervisors and hierarchies. 4. Socio-economic values : Ability to articulate and act upon main- stream business values, which shape the work ethic. Such val- ues include independent initiative, dedication, integrity, and personal identification with career goals. Values are associated
  • 852.
    with a person’s appreciation for intellectual life, cultural sen- sitivity to others, and sensitivity for how others view their role in the workplace. Individuals understand that they should make decisions based on principles and evidence rather than personal interests. 5. Community and ethnic solidarity : Commitment to the educa- tion and professional advancement of persons in ethnic minor- ity groups and underserved communities. Individuals can use their ethnicity to explore the liberating capacities offered in the workplace without sacrificing their identity (i.e., they can assimilate workplace norms without abandoning cultural, ethnic, or self-defining principles and beliefs). 280 InForMAtIon teChnoloGY 6. Self-esteem : The view that personal and professional success work in tandem, and the belief in one’ s capacity to succeed in both arenas. This includes a devotion to learning and self- improvement. Individuals with high self-esteem are reflective about themselves and their potential in business. They accept the realities of the business world in which they work and
  • 853.
    can comfortably confirmtheir business disposition, indepen- dently of others’ valuations. Each stage in the course of an individual’ s workplace development reflects an underlying principle that guides the process of adopting workplace norms and behavior. The LWMA is a classificatory scheme that identifies progressive stages in the assimilated uses of workplace literacy. It reflects the perspective that an effective workplace partici- pant is able to move through increasingly complex levels of thinking and to develop independence of thought and judgment (Knefelkamp, 1999). The profile of an individual who assimilates workplace norms can be characterized in five developmental stages: 1. Concept recognition : The first stage represents the capacity to learn, conceptualize, and articulate key issues related to the six sectors of workplace literacy. Concept recognition provides
  • 854.
    the basis forbecoming adaptive to all workplace requirements. 2. Multiple workplace perspectives : This refers to the ability to integrate points of view from different colleagues at various levels of the workplace hierarchy. By using multiple perspec- tives, the individual is in a position to augment his or her workplace literacy. 3. Comprehension of business processes : Individuals increase their understanding of workplace cooperation, competition, and advancement as they build on their recognition of busi- ness concepts and workplace perspectives. They increasingly understand the organization as a system of interconnected parts. 4. Workplace competence : As assimilation and competence increase, the individual learns not only on how to perform a particu- lar job adequately but how to conduct oneself professionally within the workplace and larger business environment.
  • 855.
    281InteGrAtInG GenerAtIon Y 5.Professional independence : Individuals demonstrate the ability to employ all sectors of workplace literacy to compete effec- tively in corporate labor markets. They obtain more respon- sible jobs through successful interviewing and workplace performance and demonstrate leadership abilities, leading to greater independence in career pursuits. Professionally inde- pendent individuals are motivated and can use their skills for creative purposes (Langer, 2009). The LWMA is a rubric that charts an individual’ s development across the six sectors of workplace literacy. Each cell within the matrix represents a particular stage of development relative to that sector of workplace literacy, and each cell contains definitions that can be used to identify where a particular individual stands in his or her develop- ment of workplace literacy. The LWMA and Action Research
  • 856.
    While the LWMAserves as a framework for measuring growth, the model also uses reflection-with-action methods, a component of action research theory, as the primary vehicle for assisting young adults to develop the necessary labor market skills to compete for a job and inevitably achieve some level of professional independence (that is, the ability to work for many employers because of achiev- ing required market skills). Reflection-with-action is used as a rubric STAGES OF WORKPLACE LITERACY SECTORS OF WORKPLACE LITERACY CONCEPT RECOGNITION MULTIPLE WORKPLACE
  • 857.
  • 858.
    and Ethnic Solidarity Self-Esteem 282 InForMAtIonteChnoloGY for a variety of methods, involving reflection in relation to learning activities. Reflection has received a number of definitions from differ- ent sources in the literature. Here, “ reflection-with-action” carries the resonance of Schö n’ s (1983) twin constructs: “ reflection-on- action” and “ reflection-in-action,” which emphasize (respectively) reflec- tion in retrospect and reflection to determine what actions to take in the present or immediate future (Langer, 2003). Dewey (1933) and Hullfish and Smith (1978) also suggest that the use of reflection sup-
  • 859.
    ports an impliedpurpose. Their formulation suggests the possibility of reflection that is future oriented; what we might call “ reflection-to- action.” These are methodological orientations covered by the rubric. Reflection-with-action is critical to the educational and workplace assimilation process of Gen Y. While many people reflect, it is in being reflective that people bring about “ an orientation to their every- day lives” (Moon, 2000). The LWMA incorporates reflection- with- action methods as fundamental strategies for facilitating development and assimilation. These methods are also implemented interactively, for example in mentoring, reflective learning journals, and group dis- cussions. Indeed, as stated by De Jong (2014), “ Social exclusion is multi-dimensional, ranging from unemployment, barriers to educa-
  • 860.
    tion and healthcare, and marginalized living circumstances” (p. 94). Ultimately, teaching socially excluded youth to reflect-with- action is the practice that will help them mature across the LWMA stages and inevitably, achieve levels of inclusion in the labor market and in citizenship. Implications for New Pathways for Digital Talent The salient implications of the LWMA, as a method of discover- ing and managing disadvantaged Gen Y youth in communities, can be categorized across three frames: demographic shifts in talent resources, economic sustainability and integration and trust among vested local interest groups. Demographic Shifts in Talent Resources The LWMA can be used as a predictive analytic tool for capturing and cultivating the abilities in the new generation of digital natives
  • 861.
    283InteGrAtInG GenerAtIon Y fromdisadvantaged local communities. This young talent has the advantage of more exposure to technologies, which senior workers had to learn later in their careers. This puts them ahead of the curve with respect to basic digital skills. Having the capacity to employ tal- ent locally and provide incentives for these individuals to advance can alleviate the significant strain placed on firms who suffer from high turnover in outsourced positions. Investing in viable Gen Y under- served youth can help firms close the skills gap that is prevalent in the emerging labor force. Economic Sustainability
  • 862.
    As globalization ebbsand flows, cities need to establish themselves as global centers, careful not to slip into market obsolescence, espe- cially when facing difficulties in labor force supply chains. In order to alleviate the difficulty in supplying industry-ready professionals to a city only recently maturing into the IT-centric business world, firms need to adapt to an “ on-demand” gig approach. The value drawn from this paradigm lies in its cyclical nature. By obtaining localized human capital at a lower cost, firms can generate a fundable supply chain of talent and diversity as markets change over time. Integration and Trust Porter and Kramer (2011) postulate that companies need to formulate a new method of integrating business profits and societal responsi- bilities. They state, “ the solution lies in the principle of shared
  • 863.
    value, which involves creatingeconomic value in a way that also creates value for society by addressing its needs and challenges” (p. 64). Porter and Kramer suggest that companies need to alter corporate performance to include social progress. The LWMA provides the mechanism, the- ory, and measurement that is consistent with this direction and pro- vides the vehicle that establishes a shared partnership of trust among business, education, and community needs. Each of the interested parties experiences progress toward its financial and social objectives. Specifically, companies are able to attract diverse and socially excluded local talent, and have the constituents trained specifically for its needs and for an economic return that fits its corporate models. As a result,
  • 864.
    284 InForMAtIon teChnoloGY thecommunity adds jobs, which reduces crime rates and increases tax revenue. The funding corporation then establishes an ecosystem that provides a shared value of performance that underserved and excluded youth bring to the business. Global Implications for Sources of Talent The increasing social exclusion of Gen Y youth is a growing prob- lem in almost every country. Questions remain about how to establish systemic solutions that can create sustainable and scalable programs that provide equity in access to education for this population. This access to education is undoubtedly increasing employability, which indirectly contributes to better citizenship for underserved youth.
  • 865.
    Indeed, there isa widening gap between the “ haves” and the “ have- nots” throughout the world. Firms can use tools like the LWMA to provide a model that can improve educational attainment of under- served youth by establishing skill-based certificates with universities, coupled with a different employment-to-hire model. The results have shown that students accelerate in these types of programs and ulti- mately, find more success in labor market assimilation. The data sug- gests that traditional degree programs that require full-time study at university as the primary preparation for labor market employment may not be the most appropriate approach to solving the growing social inequality issue among youth. Conclusion This chapter has made the argument that Gen Y employees are “
  • 866.
    digi- tal natives” whohave the attributes to assist companies to transform their workforce and meet the accelerated change in the competitive landscape. Organizations today need to adapt their staff to operate under the auspices of ROD by creating processes that can determine the strategic value of new emerging technologies and establish a cul- ture that is more “ change ready.” Most executives across industries recognize that digital technologies are the most powerful variable to maintaining and expanding company markets. Gen Y employees provide a natural fit for dealing with emerg- ing digital technologies. However, success with integrating Gen Y 285InteGrAtInG GenerAtIon Y
  • 867.
    employees is contingentupon baby boomer and Gen X manage- ment adapting new leadership philosophies and procedures that are suited to meet the expectations and needs of millennials. Ignoring the unique needs of Gen Y employees will likely result in an incongruent organization that suffers high turnover of young employees who will ultimately seek a more entrepreneurial environment. Firms should consider investing in non-traditional Gen Y youth from underserved and socially excluded populations as alternate sources of talent. http://taylorandfrancis.com 287 12 TowaRD besT pRaCTiCes
  • 868.
    Introduction The previous chaptersprovided the foundation for the formation of “ best practices” to implement and sustain responsive organizational dynamism (ROD). First, it is important to define what we mean by best practices and specify which components comprise that definition. Best practices are defined as generally accepted ways of doing spe- cific functions or processes by a particular profession or industry. Best practices, in the context of ROD, are a set of processes, behaviors, and organizational structures that tend to provide successful foundations to implement and sustain organizational learning. I defined respon- sive organizational dynamism as the disposition of a company to respond at the organizational level to the volatility of advancing tech- nologies— ones that challenge the organization to manage a
  • 869.
    constant state of dynamicand unpredictable change. Second, best practices are those that need to be attributed to multiple communities of practice as well as to the different professions or disciplines within a learning organization. However, these multiple tiers of best practices need to be integrated and to operate with one another to be considered under the rubric. Indeed, best practices contained solely within a discipline or com- munity are limited in their ability to operate on an organization- wide level. It is the objective of this chapter, therefore, to formulate a set of distinctive yet integrated best practices that can establish and support ROD through organizational learning. Each component of the set of best practices needs to be accompanied by its own maturity arc, which
  • 870.
    defines and describesthe stages of development and the dimensions that comprise best practices. Each stage defines a linear path of con- tinued progress until a set of best practices is reached. In this way, organizations can assess where they are in terms of best practices and determine what they need to do to progress. Ultimately, each maturity 288 InForMAtIon teChnoloGY arc will represent a subset of the overall set of best practices for the organization. The discipline that lays the foundation for ROD is information technology (IT). Therefore, the role of the chief IT executive needs to be at the base of organizational best practices. As such, I start build- ing the organizational best practices model with the chief IT
  • 871.
    execu- tive at thecore. Chief IT Executive I use the title “ chief IT executive” to name the most senior IT indi- vidual in an organization. Because of the lack of best practices in this profession, a number of different titles are used to describe this job. While these titles are distinct among themselves, I have found that they are not consistently followed in organizations. However, it is important to understand these titles and their distinctions, particu- larly because an organizational learning practitioner will encounter them in practice. These titles and roles are listed and discussed next: Chief information officer (CIO) : This individual is usually the most senior IT executive in an organization, although not every
  • 872.
    organization has sucha person. The CIO is not necessarily the most technical of people or even someone who has come through the “ ranks” of IT. Instead, this individual is consid- ered an executive who understands how technology needs to be integrated within the organization. CIOs typically have other general IT executives and managers who report directly to them. As shown in the Siemens case study, there can be a number of alternate levels of CIOs, from corporate CIOs to local CIOs of a company division. For the purposes of this discussion, I look at the corporate CIO, who is considered part of the senior executive management team. My research on chief executive officer (CEO) perceptions of technology and business strategy showed that only a small percentage of CIOs report directly to the CEO of their organization, so it would be incorrect to generalize that they report to the most senior executive. In most cases, the CIO reports to the chief oper- ating officer (COO) or the chief financial officer (CFO). As 289towArd best prACtICes stated, the role of the CIO is to manage information so that it can be used for business needs and strategy. Technology, then, is considered a valuable part of knowledge management from a
  • 873.
    strategic perspective asopposed to just a technical one. Chief technology officer (CTO) : This individual, unlike the CIO, is very much a senior technical person. The role of the CTO is to ensure that the organization is using the best and most cost- effective technology to achieve its goals. One could argue that the CTO holds more of a research-and-development type of position. In many organizations, the CTO reports directly to the CIO and is seen as a component of the overall IT infrastructure. However, some companies, like Ravell and HTC, only have a CTO and view technology more from the technical perspective. Chief knowledge officer (CKO) and chief digital officer (CDO) : This role derives from library management organizations because of the relevance of the word knowledge and/or data. It also com- petes somewhat with the CIO’ s role when organizations view technology from a perspective that relates more to knowledge. In larger organizations, the CKO/CDO may report directly to the CIO. In its purest role, the CKO/CDO is responsible for developing an overall infrastructure for managing knowl- edge, including intellectual capital, sharing of information, and worker communication. Based on this description, the CKO/CDO is not necessarily associated with technology but
  • 874.
    is more oftenconsidered part of the technology infrastructure due to the relevance of knowledge and data to technology. To define best practices for this function, it is necessary to under- stand the current information and statistics about what these people do and how they do it. Most of the statistical data about the roles and responsibilities of chief IT executives are reported under the auspices of the CIO. According to an article by Jerry Gregoire in CIO magazine in March 2002, 63% of IT executives held the title CIO, while 13% were CTOs; there were few to no specific statistics available on the title of CKO and CDO, however, the CDO role has become more relevant over the past five years given the importance of social media and digital transformations. This report further supported the claim that there is limited use of the CKO title and function in organizations at this time.
  • 875.
    290 InForMAtIon teChnoloGY Froma structural point of view, 63% of IT organizations are cen- trally structured, while 23% are decentralized with a central reporting structure. However, 14% are decentralized without any central head- quarters or reporting structure. From a spending perspective, orga- nizations spend most of their budgets on integrating technology into existing applications and daily processing (36% of budget). Twenty- six percent is related to investments in emerging or new technologies, 24% is based on investing in e-commerce activities, and 24% is spent on customer relationship management (CRM), which is defined as applications that engage in assisting organizations to better under-
  • 876.
    stand and supporttheir customer base. Twenty-five percent is spent on staff development and retention. Compensation of IT chief executives still comes predominantly from base salary, as opposed to bonus or equity positions with the company. This suggests that their role is not generally viewed as top management or partner-level in the business. This opinion was sup- ported by the results of my CEO study, discussed in Chapter 2. The issue of executive seniority can be determined by whether the chief IT executive is corporate driven or business unit driven. This means that some executives have corporate-wide responsibilities as opposed to a specific area or business unit. The issue of where IT depart- ments provide value to the organization was discussed in Chapter 3, which showed that there are indeed different ways to manage and structure the role of IT. However, in general, corporate IT
  • 877.
    execu- tives are responsiblefor IT infrastructure, shared technology services, and global technology architecture, while business unit CIOs con- centrate on strategically understanding how to use applications and processes to support their business units. This is graphically depicted in Figure 12.1. From a best practices perspective, the following list has historically suggested what chief IT executives should be doing. The list empha- sizes team building, coaching, motivating, and mentoring as tech- niques for implementing these best practices. Strategic thinking : Must understand the business strategy and competitive landscape of the company to apply technology in the most valuable way to the organization.
  • 878.
    291towArd best prACtICes Industryexpertise : Must have the ability to understand the prod- uct and services that the company produces. Create and manage change : Must have the ability to create change, through technology, in the operating and business processes of the organization to gain efficiency and competi- tive advantage. Communications : Must have the ability to communicate ideas, to give direction, to listen, to negotiate, to persuade, and to resolve conflicts. Executives must also be able to translate technical information to those who are not technologically literate or are outside IT and need to be comfortable speaking in public forums and in front of other executives. Relationship building : Must have the ability to interface with peers, superiors, and customers, by establishing and main- taining strong rapport, bond, and trust between individuals. Business knowledge : Must have the ability to develop strong busi- ness acumen and having peripheral vision across all functional
  • 879.
    areas of thebusiness. Technology proficiency : Must have the knowledge to identify appropriate technologies that are the most pragmatic for the business, can be delivered quickly at the lowest cost, produce an impact on the bottom line (ROI), and have longevity. Local applications Standard IT applications Shared IT technology services Public available infrastructure (Internet, portals, etc.) IT infrastructure Business level CIOs Corporate CIOs Figure 12.1 Business-level versus corporate-level CIOs.
  • 880.
    292 InForMAtIon teChnoloGY Leadership: Must be a visionary person, inspirational, influential, creative, fair, and open minded with individuals within and outside the organization. Management skills : Must have the ability to direct and supervise people, projects, resources, budget, and vendors. Hiring and retention : Must have the ability to recognize, culti- vate, and retain IT talent. While this list is not exhaustive, it provides a general perspec- tive, one that appears generic; that is, many management positions in an organization might contain similar requirements. A survey of 500 CIOs conducted by CIO magazine (March 2002) rated the top three most important concerns among this community in terms of
  • 881.
    importance: 1. Communications: 70% 2.Business understanding: 58% 3. Strategic thinking: 46% What is interesting about this statistic is that only 10% of CIOs identified technical proficiency as critical for their jobs. This find- ing supports the notion that CIOs need to familiarize themselves with business issues, as opposed to just technical ones. Furthermore, the majority of a CIO’ s time today has been recorded as spent com- municating with other business executives (33%) and managing IT staffs (28%). Other common activities reported in the survey were as follows: • Operating the baseline infrastructure and applications • Acting as technology visionary • Implementing IT portions of new business initiatives • Designing infrastructure and manage infrastructure projects • Allocating technology resources
  • 882.
    • Measuring andcommunicate results • Serving as the company spokesperson on IT-related matters • Selecting and managing product and service providers • Recruiting, retaining, and developing IT staff • Participating in company and business unit strategy development 293towArd best prACtICes These results further confirm that chief IT executives define best practices, based on understanding and supporting business strategy. This survey also reported common barriers that chief IT executives have to being successful. The overarching barrier that most IT execu- tives face is the constant struggle between the business expectation to drive change and improve processes, and the need to reduce costs and
  • 883.
    complete projects faster.The detailed list of reported problems by rank was as follows: 1. Lack of key staff, skill sets, and retention: 40% 2. Inadequate budgets and prioritizing: 37% 3. Shortage of time for strategic thinking: 31% 4. Volatile market conditions: 22% 5. Ineffective communications with users: 18% 6. Poor vendor support and service levels, and quality: 16% 7. Overwhelming pace of technological change: 14% 8. Disconnection with executive peers: 12% 9. Difficulty proving the value of IT: 10% 10. Counterproductive office politics: 6% Chief IT executives also felt that their roles were ultimately influ- enced by two leading factors: (1) changes in the nature and capabilities of technology, and (2) changes in the business environment, includ- ing marketplace, competitive, and regulatory pressures. This can be graphically viewed in Figure 12.2.
  • 884.
    Figure 12.2 hasa striking similarity to Figure 3.1 outlining ROD. That diagram represented technology as an independent variable cre- ating the need for ROD, which is composed of strategic integration and cultural assimilation, as shown in Figure 12.3. Figure 12.3 shows many similarities to Figure 12.2. The difference between these two diagrams defines what is missing from many best practices: the inclusion of organizational learning practices that would enable chief IT executives to better manage business and technology issues. In effect, if organizational learning techniques were included, they could reduce many barriers between business and IT. Thus, the solution to providing best practices for the IT community rests with the inclusion of organizational learning along the constructs of ROD.
  • 885.
    The inclusion oforganizational learning is crucial because the best practices, as reported among the community of chief IT executives, has 294 InForMAtIon teChnoloGY Technology drivers Business environment Strategic options Im po sesInspires Figure 12.2 Chief IT executives— factors influencing strategic options.
  • 886.
    Technology creates Symptoms and implications Responsive organizational dynamism Acceleration ofevents that require different infrastructures and organizational processes Requires Strategic integration Cultural assimilation
  • 887.
    Organization structures (system) Individual actions Renegotiation of relationship Organizational learningtechniques Figure 12.3 ROD and organizational learning techniques. 295towArd best prACtICes not produced the performance outcomes sought by chief executives. I refer to Chapter 2, in which I first defined the IT dilemma. While many IT initiatives are credible, they often fall short of including
  • 888.
    critical business issues.As a result, IT project goals are not completely attained. This suggests that the problem is more related to the process and details of how to better implement good ideas. As further sup- port for this position, the Concours Group (an international executive managing consulting organization) published a list of emerging roles and responsibilities that chief IT executives will need to undertake as part of their jobs in the near future (Cash & Pearlson, 2004): Shared services leader : More companies are moving to the shared services model for corporate staff functions. CIOs’ experi- ences may be invaluable in developing and managing these organizations. Executive account manager : More companies today are involv- ing the CIO in the management of relationships between the company and its customers. Process leader : As companies move toward organizing around
  • 889.
    major business processes,a CIO is in a good role to temporar- ily lead this effort since applications and databases are among the business resources that must be revamped to implement process management. Innovation leader : A CIO is starting to act as the innovation leader of the corporation when a company is seeking to achieve substantial improvements in process performance or operational efficiencies, or to implement IT, since innovation may center on the application of IT. Supply chain executive: Purchasing, warehousing, and transpor- tation are among the most information-intensive activities undertaken by a business. As companies look to improve these overall processes, the CIO may become the most knowledge- able executive about the supply chain. Information architect : Companies are recognizing the benefit of a consolidated view of customers, vendors, employees, and so on. CIOs are finding themselves taking on the leadership role of information architect by cultivating commitment and con- sensus around this challenging task.
  • 890.
    296 InForMAtIon teChnoloGY Changeleader : CIOs are playing an increasingly important role in business change management. Their role is in either direct change leadership (developing new business models) or, more often, indirect; that is, change process is behind the scenes (get other leaders to think about new possibilities). Business process outsourcing leader : CIOs tend to have some of the most extensive experience in company outsourcing. This makes them a logical internal consultant and management practice leader in business process outsourcing. These issues all suggest that the role of the chief IT executive is growing and that the need for these executives to become better inte- grated with the rest of their organizations is crucial for their success. Much more relevant, though, is the need for ROD and the role that the chief IT executive has as a member of the overall community. To create best practices that embrace organizational learning and
  • 891.
    foster ROD, a chiefIT executive maturity arc needs to be developed that includes the industry best practices presented here integrated with organizational learning components. The chief IT executive best practices arc is an instrument for assess- ing the business maturity of chief IT executives. The arc may evaluate a chief IT executive’ s business leadership using a grid that measures competencies ranging from essential knowledge in technology to more complex uses of technology in critical business thinking. Thus, the chief IT executive best practices arc provides executives with a method of integrating technology knowledge and business by present- ing a structured approach of self-assessment and defined milestones. The model measures five principal facets of a technology
  • 892.
    executive: cognitive, organization culture,management values, business ethics, and executive presence. Each dimension or sector is measured in five stages of maturation that guide the chief IT executive’ s growth. The first facet calls for becoming reflectively aware about one’ s existing knowl- edge of technology and what it can do for the organization. The second calls for other centeredness , in which chief IT executives become aware of the multiplicity of technology perspectives available (e.g., other busi- ness views of how technology can benefit the organization). The third is comprehension of the technology process , in which a chief IT executive can begin to merge technology issues with business concepts and functions. 297towArd best prACtICes
  • 893.
    The fourth isstable technology integration , meaning that the chief IT executive understands how technology can be used and is resilient to nonauthentic sources of business knowledge. Stage 4 represents an ongoing implementation of both technology and business concepts. The fifth stage is technology leadership , in which chief IT executives have reached a stage at which their judgment on using technology and business is independent and can be used to self-educate from within. Thus, as chief IT executives grow in knowledge of technology and business, they can become increasingly more other centered, inte- grated, stable, and autonomous with the way they use their business minds and express their executive leadership and character. Definitions of Maturity Stages and Dimension Variables in the Chief IT Executive Best Practices Arc
  • 894.
    Maturity Stages 1. Technologycompetence and recognition : This first stage repre- sents the chief IT executive’ s capacity to learn, conceptualize, and articulate key issues relating to cognitive technological skills, organization culture/etiquette, management value sys- tems, business ethics, and executive presence needed to be a successful chief IT executive in business. 2. Multiplicity of technology perspectives : This stage indicates the chief IT executive’ s ability to integrate multiple points of view about technology from others in various levels of workplace hierarchies. Using these new perspectives, the chief IT execu- tive augments his or her skills with the technology necessary for career success, expands his or her management value sys- tem, is increasingly motivated to act ethically, and enhances his or her executive presence. 3. Comprehension of technology process : Maturing chief IT executives accumulate increased understanding of workplace cooperation, competition, and advancement as they gain new cognitive skills
  • 895.
    about technology anda facility with business culture/etiquette, expand their management value system, perform business/ workplace actions to improve ethics about business and technol- ogy, and develop effective levels of executive presence. 298 InForMAtIon teChnoloGY 4. Stable technology integration : Chief IT executives achieve inte- gration with the business community when they have levels of cognitive and technological ability, organization etiquette/ culture, management values, business ethics, and execu- tive presence appropriate for performing job duties not only adequately but also competitively with peers and even higher- ranking executives in the workplace hierarchy. 5. Technology leadership : Leadership is attained by the chief IT executive when he or she can employ cognitive and tech- nological skills, organization etiquette, management, a sense of business ethics, and a sense of executive presence to compete effectively for executive positions. This chief IT executive is capable of obtaining increasingly executive-level
  • 896.
    positions through successfulcommunication and workplace performance. Performance Dimensions 1. Technology cognition : Concerns skills specifically related to learning, applying, and creating resources in IT, which include the necessary knowledge of complex operations. This dimension essentially establishes the CIO as technically pro- ficient and forms a basis for movement to more complex and mature stages of development. 2. Organizational culture : The knowledge and practice of proper etiquette in organizational settings with regard to dress, tele- phone and in-person interactions, punctuality, work comple- tion, conflict resolution, deference, and other protocols in workplace hierarchies. 3. Management values : Measures the individual’ s ability to articu- late and act on mainstream organizational values credited with shaping the work ethic— independent initiative, dedication, honesty, and personal identification with career goals, based on the organization’ s philosophy of management protocol.
  • 897.
    4. Business ethics: Reflects the individual’ s commitment to the education and professional advancement of other employees in technology. 299towArd best prACtICes 5. Executive presence : Involves the chief IT executive’ s view of the role of an executive in business and the capacity to succeed in tandem with other executives. Aspects include a devotion to learning and self-improvement, self-evaluation, the ability to acknowledge and resolve business conflicts, and resilience when faced with personal and professional challenges. Figure 12.4 shows a graphical view of the chief IT executive best practices arc. Each cell in the arc provides the condition for assess- ment. The complete arc is provided in Table 12.1. Chief Executive Officer
  • 898.
    When attempting todefine CEO best practices, one is challenged with the myriad material that attempts to determine the broad, yet impor- tant, role of the CEO. As with most best practices, they are typically based on trends and percentages of what most CEOs do— assuming, of course, that the companies they work for are successful. That is, if their organization is successful, then their practices must be as well. This type of associative thinking leads to what scholars often term false generalizations. Indeed, these types of inadequate methods lead to false judgments that foster business trends, which are misinter- preted as best practices. Reputation is what would better define these trends, which usually after a period of time can become ineffective Developmental dimensions of maturing
  • 899.
    Dimension skill Technology competence and recognition Multiplicity oftechnology perspectives Comprehension of technology process Stable technology integration Technology leadership Technology
  • 900.
    cognition Organization culture Management values Business ethics Executive presence Figure 12. 4Chief IT executive best practices arc - conditions for assessment. 300 InForMAtIon teChnoloGY Table 12.1 The Chief IT Executive Best Practices Arc DIMENSION VARIABLE TECHNOLOGY COMPETENCE AND
  • 901.
    RECOGNITION MULTIPLICITY OF TECHNOLOGY PERSPECTIVES TechnologyCognition Understands how technology operates in business. Has mastered how systems are developed, hardware interfaces, and the software development life cycle. Has mastery of hardware, compilers, run-time systems. Has core competencies in distributed processing, database development, object-oriented component architecture, and project management. Is competent with main platform operating systems such as UNIX, WINDOWS, and MAC. Has the core ability to relate technology concepts to other business experiences. Can also make decisions about what technology is best suited for a
  • 902.
    particular project andorganization. Can be taught how to expand the use of technology and can apply it to other business situations. Understands that technology can have multiple perspectives. Able to analyze what are valid vs. invalid opinions about business uses of technology. Can create objective ideas from multiple technology views without getting stuck on individual biases. An ability to identify and draw upon multiple perspectives available from business sources about technology. Developing a discriminating ability with respect to choices available. Realistic and objective judgment, as demonstrated by the applicability of the technology material drawn for
  • 903.
    a particular projector task and tied to functional/ pragmatic results. Organization Culture Understands that technology can be viewed by other organizations in different ways. Uses technology as a medium of communication. Understands that certain technological solutions, Web pages, and training methods may not fit all business needs and preferences of the business. Has the ability to recommend/suggest technological solutions to suite other business needs and preferences Seeks to use technology as a vehicle to learn more about organization cultures and mindsets. Strives to care about what others are communicating and embraces these opinions. Tries to understand and respect
  • 904.
    technologies that differfrom own. Understands basic technological needs of others. (Continued) 301towArd best prACtICes Table 12.1 (Continued) The Chief IT Executive Best Practices Arc COMPREHENSION OF TECHNOLOGY PROCESS STABLE TECHNOLOGY INTEGRATION TECHNOLOGY LEADERSHIP Has the ability to relate various technical concepts and organize them with non-technical business issues. Can operate with both automated and manual
  • 905.
    business solutions. Canuse technology to expand reasoning, logic, and what-if scenarios. Ability to use the logic of computer programs to integrate the elements of non-technological tasks and business problems. Ability to discern the templates that technology has to offer in order to approach everyday business problems. This involves the hypothetical (inductive/deductive) logical business skill. Knowledge of technology is concrete, accurate, and precise, broad and resistant to interference from non-authentic business sources. Ability to resist or recover from proposed technology that is not realistic— and can recover resiliently.
  • 906.
    Methods and judgmentin a multidimensional business world is independent, critical discernment. Knowledge of technology and skills in technology can be transferred and can be used to self-educate within and outside of technology. Can use technology for creative purposes to solve business challenges and integrate with executive management views. Can deal with multiple dimensions of criticism about technology. Can develop relationships (cooperative) that are dynamic and based on written communication and oral discourse. Ability to create business relations outside of technology departments. Has an
  • 907.
    appreciation of cyberspace asa communication space— a place wide open to dialogue (spontaneous), to give and take, or other than voyeuristic, one-sidedness. Ability to produce in teamwork situations, rather than solely in isolation. Loyalty and fidelity to relations in multiple organizations. Commitment to criticism and acceptance of multiple levels of distance and local business relationships. Ability to sustain non-traditional types of inputs from multiple sources. Can utilize and integrate multidimensions of business solutions in a self-reliant way. Developing alone if necessary using other technical resources. Can dynamically
  • 908.
    select types ofinterdependent and dependent organizational relationships. Ability to operate within multiple dimensions of business cultures, which may demand self-reliance, independence of initiative, and interactive communications. (Continued) 302 InForMAtIon teChnoloGY Table 12.1 (Continued) The Chief IT Executive Best Practices Arc DIMENSION VARIABLE TECHNOLOGY COMPETENCE AND RECOGNITION MULTIPLICITY OF
  • 909.
    TECHNOLOGY PERSPECTIVES Management ValuesTechnology and cultural sensitivity. Global communication, education, and workplace use of technology can be problematic— subject to false generalizations and preconceived notions. Awareness of assumptions about how technology will be viewed by other organizations and about biases about types of technology (MAC vs. PC). Can appreciate need to obtain multiple sources of information and opinion. The acceptance of multi- dimensional values in human character. Business Ethics Using technology with honesty re: privacy of access and information. Development of ethical policies governing business uses of the
  • 910.
    Internet, research, intellectual propertyrights and plagiarism. The use of information in a fair way— comparison of facts against equal sources of business information. Compassion for business information for which sources are limited because of inequality of technology access. Compassion for sharing information with other business units from a sense of inequality. Executive Presence Has accurate perception of one’ s own potential and capabilities in relation to technology in the business— the technologically realizable executive self. Understands how other executives can view self from virtual and multiple
  • 911.
    perspectives. Understands or hasawareness of the construction of self that occurs in business. Focuses on views of other executives in multiple settings. Understands that the self (through technology) is open for more fluid constructions, able to incorporate diverse views in multiple settings. (Continued) 303towArd best prACtICes and unpopular. We must also remember the human element of suc- cess; certain individuals succeed based on natural instincts and talent, hard work and drive, and so on. These components of success should not be confused with theories that are scalable and replicable to
  • 912.
    prac- tice; that is,what best practices need to accomplish. This section focuses on technology best practices of the CEO. These best practices are based on my research as well as other positions and Table 12.1 (Continued) The Chief IT Executive Best Practices Arc COMPREHENSION OF TECHNOLOGY PROCESS STAB LE TECHNOLOGY INTEGRATION TECHNOLOGY LEADERSHIP Can operate within multiple dimensions of value systems and can prioritize multi- tasking events that are consistent with value priorities. Ability to assign value to new and diverse technology alternatives—integrating
  • 913.
    them within asystem of pre-existing business and technology values. Testing value systems in new ways due to technology is integrated with long-term values and goals for business achievement. Some concepts are naturally persistent and endure despite new arenas in the technological era. Use of technology and business are based on formed principles as opposed to dynamic influences or impulses. Formed principles establish the basis for navigating through, or negotiating the diversity of business influences and impulses. Consistent values displayed on multiple business
  • 914.
    communications, deliverables of content,and dedication to authenticity. Maintains consistency in integrating values within technology business issues. Technology is a commitment in all aspects of value systems, including agility in managing multiple business commitments. Commitment to greater openness of mind to altering traditional and non-technological methods. Technological creativity with self-defined principles and beliefs. Risk-taking in technology-based ventures. Utilizing technology to expand one’ s arenas of business freedom. Exploring the business-liberating capacities of technology.
  • 915.
    Operationalizes technology to unifymultiple components of the self and understands its appropriate behaviors in varying executive situations. Has regulated an identity of self from a multiplicity of executive venues. Methods of business interaction creates positive value systems that generate confidence about operating in multiple business communities. Acceptance and belief in a multidimensional business world of the self. Can determine comfortably the authenticity of other executives and their view of the self. Can confirm disposition independently from others’ valuations, both internally and from other organization cultures. Beliefs direct and control
  • 916.
    multidimensional executive growth. 304 InForMAtIonteChnoloGY facts that provide a defendable context of how and why they appear to be effective. However, as with the chief IT executive model, best practices cannot be attained without an arc that integrates mature organizational learning and developmental theories. Many of the CEO best practices reconcile with my interviews with CEOs and, in particular, with the two CEO case studies (of ICAP and HTC) discussed in Chapter 8. Other published definitions and support are referenced in my presentation. In February 2002, Hackett Benchmarking, a part of Answerthink Corporation, issued its best practices for IT. Its documentation stated:
  • 917.
    In compiling its2002 best practices trend data, Hackett evaluated the effectiveness (quality and value) and efficiency (cost and productivity) of the information technology function across five performance dimen- sions: strategic alignment with the business; ability to partner with internal and external customers; use of technology; organization; and processes.* The findings, as they apply to the CEO function, provide the fol- lowing generalizations: • There was an 85% increase in the number of CIOs who reported directly to the CEO. This increase would suggest that CEOs need to directly manage the CIO function because of its importance to business strategy. • CEOs supporting outsourcing did not receive the cost-cut- ting results they had hoped for. In fact, most broke even. This suggests that CEOs should not view outsourcing as a cost-
  • 918.
    cutting measure, butrather foster its use if there are identifi- able business benefits. * Hackett Benchmarking has tracked the performance of nearly 2,000 complex, global organizations and identified key differentiators between world-class and aver- age companies, across a diverse set of industries. In addition to information tech- nology, staff functions studied include finance, human resources, procurement, and strategic decision making, among others. Study participants comprised 80% of the Dow Jones Industrials, two-thirds of the Fortune 100, and 60% of the Dow Jones Global Titans Index. Among the IT study participants are Agilent Technologies, Alcoa, Capital One Financial Corporation, Honeywell International, Metropolitan Life Insurance, SAP America, and TRW. (From PR Newswire, February 2002.) 305towArd best prACtICes
  • 919.
    • CEOs havefound that IT organizations that have centralized operations save more money, have fewer help-line calls than decentralized organizations, and do not sacrifice service qual- ity. This suggests that the CEOs should consider less busi- ness-specific support structures, especially when they conduct their business at multiple locations. • CEOs are increasingly depending on the CIO for advice on business improvements using technology. As a result, their view is that IT professionals need advanced business degrees. • CEOs should know that consistent use of IT standards has enabled firms to trim IT development costs by 41%, which has reduced costs for end-user support and training opera- tions by 17%. • CEOs need to increase support for risk management. Only 77% of average companies maintained disaster recovery plans. As we can see from these generalizations, they are essentially based on what CEOs are doing, and what they have experienced. Unfortunately, this survey addressed little about what CEOs know
  • 920.
    and exactly whattheir role should be with respect to overall man- agement, participation, and learning of technology. These “ best practices” are particularly lacking in the area of organizational learning and the abilities of the firm to respond to changing condi- tions as opposed to searching for general solutions. Let us look at each of these generalizations and discuss what they lack in terms of organizational learning. CIO Direct Reporting to the CEO The fact that more CIOs are reporting directly to the CEO shows an escalation of their importance. But, what is more relevant as a best practice is what that relationship is about. Some report about how often they meet. What is more important is the content of the inter- actions. What should the CEOs know, how should the CEOs con- duct themselves? What management and learning techniques do
  • 921.
    they apply? How dothey measure results? My CEO interview research exposed the fact that many CEOs simply did not know what they 306 InForMAtIon teChnoloGY needed to do to better manage the CIO and what they needed to know in general about technology. Outsourcing Outsourcing can be a tricky endeavor. In Chapter 3, I introduced the concept of technology as a driver and a supporter. I presented a model that shows how emerging technologies are initially drivers and need to be evaluated and measured using similar models embraced by marketing-oriented communities. I then showed how, through matu-
  • 922.
    ration, emerging technologiesbecome supporters, behaving more as a commodity within the organization. I explained that only then can a technology be considered for outsourcing because supporter operations are measured by their economies of scale, reduced costs, increased productivity, or both (efficiency). Figure 12.5 shows that cycle. Thus, what is missing from the survey information is the knowl- edge of where such technologies were with respect to this technology life cycle. Knowing this dramatically affects what the CEO should be expecting and what organizational learning concepts and factors are needed to maximize benefit to the organization. Centralization versus Decentralization of IT The entire question of how IT should or should not be organized must be based on a business that implements ROD. ROD includes the component called cultural assimilation, which provides a
  • 923.
    process, Mini loop technologyenhancementsTechnology driver Evaluation cycle Driver maturation Support status Replacement or outsource Economies of scale Figure 12.5 Driver-to-supporter life cycle. 307towArd best prACtICes
  • 924.
    using organizational learning,to help businesses determine the best IT structure. To simply assume that centralizing operations saves money is far too narrow; the organization may need to spend more money on a specific technology in the short term to get long- term benefits. Where is this included in the best practices formula? My research has shown that more mature uses of technology in organiza- tions require more decentralization of IT personnel within the busi- ness units. The later stages of IT organizational structure at Ravell supported this position. CIO Needs Advanced Degrees I am not sure that anyone could ever disagree with the value of advanced degrees. Nevertheless, the survey failed to provide content on what type of degree would be most appropriate. It also
  • 925.
    neglected to address theissue of what may need to be learned at the undergradu- ate level. Finally, what forms of education should be provided on the job? What exactly are the shortfalls that CIOs need to know about business? And, equally important is the consideration of what educa- tion and learning is needed by CEOs and whether they should be so dependent on advice from their CIOs. Need for Standards The need for standards is something that most organizations would support. Yet, the Siemens case study showed us that too much con- trol and standardization can prove ineffective. The Siemens model allowed local organizations to use technology that was specific to their business as long as it could be supported locally. The real chal-
  • 926.
    lenge is tohave CEOs who understand the complexity of IT stan- dards. They also need to be cognizant that standards might be limited to the structure of their specific organization structure, its business, and its geographical locations. Risk Management The survey suggested that CEOs need to support risk management because their backup recovery procedures may be inadequate. The 308 InForMAtIon teChnoloGY question is whether the problem stems from a lack of support or from a lack of knowledge about the topic. Is this something that the chief IT executive needs to know, or is it just about the CEO’ s unwilling-
  • 927.
    ness to spendenough funds? The best practices component of risk management must be broader and answer these questions. By contrast to the survey, we may consider a report issued by Darwin Research (“ A CRM Success Story,” November 1, 2002), which cited the recommended best practices of Christopher Milliken, CEO of Boise Cascade Office Products. He offered the kind of in- depth view of best practices that I feel is needed to be consistent with my research on ROD. Milliken participated in the implementation of a large-scale CRM system needed to give his customers a good reason to choose Boise. The project required an investment of more than $20 million. Its objective was to provide customers with better service. At the time of the investment, Milliken had no idea what his ROI would be, only that the project was necessary to distinguish Boise Cascade
  • 928.
    from myriad competitorsin the same industry. After the successful implementation of the project, Milliken was now in a position to offer his own thoughts about technology- related best practices that a CEO might want to consider. He came up with these six: 1. The CEO must commit to a technology project : Milliken was keen to express the reasons why the CRM project was important; he was intimately involved with its design, and made it clear that he had to be consulted, should there be any delays in the project schedule. KPMG (a major consulting firm) was also hired as a consultant to help implement the schedule and was held to the same level of excellence. What Milliken accom- plished, significantly, was to show his interest in the project and his willingness to stay involved at the executive level. Milliken’ s best practice here lies in his commitment, which is consistent with that of McDermott from ICAP and the CEO from HTC. They both realized, as Milliken did, that the CEO must have an active role in the project and not just allow the management team to get it done. Milliken, as did McDermott and the CEO of HTC, issued specific perfor-
  • 929.
    mance-related requirements tohis employees and consultants. 309towArd best prACtICes His participation sent a valuable message: The CEO is part of the supporting effort for the project and is also part of the learning process of the organization. Indeed, the situa- tion that Milliken faced and resolved (i.e., to jump in without knowing the expected returns of the project) is exemplary of the core tenets of ROD, which require the ability for an orga- nization to operate with dynamic and unpredictable change brought about by technology. In this case, the technology was crucial to distinguishing Boise Cascade, in the same way that electronic trading was for ICAP, and the billing system was for HTC. Yet, all three of these situations required a cer- tain behavior and practice from the company CEO. Thus, the most important best practice lies in the commitment and learning to the learning organization format. 2. Think business first, then technology : To understand why a tech- nology is needed, there must first be a supporting business plan; that is, the business plan must drive the technology or
  • 930.
    support its use.This best practice concept is consistent with my research. Indeed, Dana Deasy from Siemens realized it after a three-year investment in e-business, and McDermott clearly advocated the importance of a business plan over embellished technology. Another interesting and important result of the business plan was that it called for the creation of a centralized CRM system. Therefore, it became necessary to consolidate the separate business units at Boise into one corporate entity— providing central support and focus. This is another example of how ROD operates. The CRM project, through a validation process in a business plan, provided the strategic integration component of ROD. The strategy then influenced cultural assimilation and required a reorganization to implement the strategy or the new CRM system. Furthermore, Boise Cascade allowed its staff to experiment in the project, to make mistakes, without criticizing them. They were, in effect, implementing the driver-related concepts of technology. These driver concepts must be similar to the way organizations support their marketing activities, by which they accept a higher error ratio than when implementing a supporter activity. The CEO wanted everyone to give it their 310 InForMAtIon teChnoloGY
  • 931.
    best and tolearn from the experience. This position is a key best practice for the CEO; it promotes organizational learn- ing throughout the business. 3. Handcuff business and technology leaders to each other : Milliken understood that technology projects often fail because of a lack of communication between IT and other business enti- ties. The project represented many of the IT dilemmas that I discussed in Chapter 2, particularly relating to the new CRM system and its integration with existing legacy applications and, at the same time, creating a culture that could imple- ment the business strategy. To address this, Milliken first appointed a new CIO to foster better communication. He also selected a joint project leader from the business side, thus creating a joint project leadership team. What Milliken did was to form a new community of practice that did not exist before the project. The project, as with Ravell, represented an event that fostered the creation of organizational learning opportunities. As with ICAP, Milliken’ s company enlisted the support of executive-level consultants to help finalize the business plan and marketing strategy, as well as assist with change management. What exactly did Milliken do that rep- resents a best practice? From an organizational learning per-
  • 932.
    spective, he createdcommunities of practice between IT and the business. That then is a true best practice for a CEO. 4. Get the show on the road : There was a not-to-be-questioned deadline that was instituted by Milliken. As I noted in Chapter 4, this type of management seems undemocratic, but it should not be confused with being nonparticipatory. Someone had to get this going and set expectations. In this case, both IT and business users were set to make things happen. Senior management endorsed the project and openly stated that it represented what could be a one-time opportu- nity to “ do something of great magnitude” (Dragoon, 2002). From a best practices perspective, this means that the CEO can and should provide the leadership to get projects done and that part of that leadership could be setting strategic dates. However, CEOs should not confuse this leadership with power-centralized management over IT-related projects. 311towArd best prACtICes Communities of practice still need to be the driving force for inevitable success in ROD. Another important factor was Milliken’ s decision to create dual management over the proj-
  • 933.
    ect. Thus, Millikenwas able to create an environment that required discourse between IT and the business. 5. Win over the masses for massive changes : As stated, the business plan called for a reorganization of other business units. This also required executives to rethink job descriptions and titles in relation to new processes. It also eliminated six redundant management-level jobs. Milliken engaged employees in a massive “ external-internal” marketing campaign. Employees participated in ad campaigns, and brochures were created for all staff. A video was also produced that defined the benefits to Boise Cascade customers. In essence, Milliken was com- mitted to communication and training. Similar to my experi- ence at Ravell, not everyone is comfortable with change, and resistance in the ranks is inevitable. As a result, the educa- tion and training programs at Boise were not enough. What was lacking was true organizational learning and knowledge management. There are two best practices that were defined from this experience. First, the CEO needs to engage in actively showing the importance that technology has to the organization, not only from an economic perspective, but also from a staff development point of view. The second best prac- tice comes from the example of what Boise Cascade did not do enough of: provide organizational transformation through
  • 934.
    knowledge management, reflectivepractices, and commu- nities of practice. This suggests that CEOs need to better understand and incorporate organizational learning concepts, so that they can be the catalyst for change as they are in other areas of the business. We saw support for this concept from both ICAP and HTC, where the actions of the CEO came from an organizational learning perspective. 6. Know that technology projects never end : ROD assumes, by def- inition, that technology is a variable, albeit an insistent one. Milliken’ s experience further supported this notion, in that he realized that Boise Cascade must continue to assess the impact of the CRM application. Another way of saying this 312 InForMAtIon teChnoloGY is that the technology will continue to be viewed as a means to transform the business on an ongoing basis. Indeed, Milliken was planning to spend another $10 million on the next phase. So, from a best practices perspective, CEOs must recognize that technology investment never ends, but it moves to other phases of maturation, similar to the driver/supporter life
  • 935.
    cycle. Finally, thebuy-in to this reality ensures the recogni- tion of organizational dynamism. Based on the case studies and research presented thus far in this book, I can now formulate a list of 11 key planks that represent the core of what constitutes a technology CEO’ s set of best practices: 1. The chief IT executive should report directly to the CEO. 2. CEOs should be actively committed to technology on an ongoing basis, as opposed to project-by-project involvement. 3. CEOs should be willing to be management catalysts to sup- port new technology-driven projects. They, in effect, need to sometimes play the role of technology champion. 4. CEOs should focus on business concepts and plans to drive technology. In other words, technology should not drive the business. 5. CEOs should use consultants to provide objective input to emerging technology projects.
  • 936.
    6. CEOs shouldestablish organizational infrastructures that foster the creation of communities of practice. They need to create joint ownership of IT issues by fostering discourse between IT, business managers, and staff. 7. CEOs may need to take control of certain aspects of tech- nology investments, such as setting milestones and holding management and staff to making critical project dates. 8. CEOs need to foster cultural assimilation, which may lead to reorganization, since technology changes processes. 9. CEOs need to understand organizational learning and knowl- edge management theories and participate in organizational transformation. 10. CEOs need to understand how the technology life cycle behaves, with specific attention to the transition from driver activities to supporter functions. To that end, CEOs need to 313towArd best prACtICes understand the short- and long-term investments that need to
  • 937.
    be made intechnology. 11. CEOs should create organizations that can effectively oper- ate within technological dynamism. This process will educate management and staff to handle the dynamic and unpredict- able effects of emerging technologies. It will also foster the development of both middle-up-down and bottom-up man- agement of technology. The issue is now to provide a linear development model for CEOs that enables them to measure where they are in relation to ROD and the best practices outlined. The CEO Best Practices Technology Arc Similar to the chief IT executive arc, the CEO best practices arc is an instrument for assessing the technology best practices of CEOs. The arc evaluates a CEO’ s strategic uses of technology and leader- ship by using a grid that charts competencies ranging from conceptual
  • 938.
    knowledge about technologyto more complex uses of technology and business and how they are integrated in strategic business planning. As with all arc models, the CEO version measures five principal stages of a CEO’ s maturity with respect to business applications of technology: conceptual, structural, executive values, executive eth- ics, and executive leadership. Each dimension or sector is measured in five stages of maturation that guide the CEO’ s executive growth managing technological dynamism. The first stage is being reflec- tively aware about their conceptual knowledge of technology and what it can do for the organization. The second is other centered- ness, by which CEOs become aware of the multiplicity of business uses of technology and the different views that can exist inside and outside the organization. The third is integration of business use
  • 939.
    of technology; a CEOcan begin to combine how business plans foster the need for technology. The fourth is implementation of business/ technology process, meaning that the CEO understands how busi- ness applications and technology are used together and is resilient to nonauthentic sources of emerging technologies. Stage four rep- resents an ongoing commitment to implementing both technology 314 InForMAtIon teChnoloGY and business applications. The fifth refers to strategic uses of tech- nology; CEOs have reached a stage at which their judgment on using technology and business is independent and can be used to self-educate. Thus, as CEOs grow in knowledge of business uses of technology, they can become increasingly more
  • 940.
    understanding of the multiplicityof uses, can become more integrated in how they conceptualize technology, can manage its implementation from an executive position, and can apply strategies to support new applica- tions of technology in the organization. Definitions of Maturity Stages and Dimension Variables in the CEO Technology Best Practices Arc Maturity Stages 1. Conceptual knowledge of technology : This first stage represents the CEO’ s capacity to learn, conceptualize, and articulate key issues relating to business uses of technology, organizational structures available, executive value methods, executive ethi- cal issues surrounding technology, and leadership alternatives that are needed to be successful with technology applications. 2. Multiplicity of business perspectives of technology : This stage indicates the CEO’ s ability to integrate multiple points of
  • 941.
    view from management,staff, and consultants about technol- ogy applications in business. Using these new perspectives, the CEO augments his or her conceptual skills with technol- ogy, has an expanded view of what organizational structures might work best, expands his or her executive values about technology uses, is increasingly aware of the ethical dilemmas with technology, and enhances his or her leadership abilities. 3. Integration of business uses of technology : Maturing CEOs accu- mulate increased understanding of how technology can sup- port the business, provide more competitive advantage, and have a more integrated understanding of how to use their conceptual skills about technology, of the alternative organi- zational structures available, of how to combine their business executive value and ethical systems, and how to develop effec- tive levels of executive leadership. 315towArd best prACtICes 4. Implementation of business/technology process : CEOs achieve integration when they can regularly apply their conceptual
  • 942.
    knowledge of technology,organization structures, executive values and ethics about technology, and executive leadership, appropriate for performing their job duties, not only ade- quately, but at a level that provides a competitive advantage for the organization. 5. Strategic uses of technology : Leadership is attained by the CEO when he or she can employ conceptual skills, develop new organizational structures as necessary, establish new values and ethics that are appropriate for the organization, and create a sense of executive presence to lead the organiza- tion strategically. This CEO is capable of having new vision about how business and technology can be expanded into new endeavors. Performance Dimensions 1. Technology concepts : Concerns conceptual skills, specifically related to understanding how technology can be used in the business. This dimension essentially establishes the CEO as technically proficient, conceptually, and forms a basis for movement to more complex and mature stages of business/ technology development.
  • 943.
    2. Organizational structures: The knowledge of the alternative organizational structures that can support the application of emerging technology in corporate settings with regard to roles, responsibilities, career paths, and organizational report- ing alternatives. 3. Executive values : Measures the CEO’ s ability to articulate and act on mainstream technological values credited with shaping the work ethic: independent initiative, dedication, honesty, and personal identification with career goals, based on the philosophy of the management protocol of the organization. 4. Executive ethics : Reflects the CEO’ s commitment to the edu- cation and professional advancement of the behavior of the organization as it relates to business uses of technology. 316 InForMAtIon teChnoloGY 5. Executive leadership : Involves the CEO’ s view of the role of an executive in business, and the capacity to succeed in tan-
  • 944.
    dem with hisor her organizational resources. Aspects include a devotion to organizational learning and self-improvement, self-evaluation, the ability to acknowledge and resolve busi- ness/technology conflicts, and resilience when faced with per- sonal and professional challenges. Figure 12.6 shows a graphic view of the CEO technology best practices arc. Each cell in the arc provides the condition for assess- ment. The complete arc is provided in Table 12.2. Middle Management Middle management, which comprises a number of tiers, is perhaps the most challenging of best practices to define. In Chapter 3, I strati- fied the different types of positions that make up middle managers into three tiers: directors, line managers, and supervisors. What is most important at this point is to determine the set of technology best practices for managers so that they can effectively operate under
  • 945.
    ROD. That is,technology best practices must be designed to contain the insights and skills for effective management of technology. This must include 1. Working with IT personnel 2. Providing valuable input to the executive management team, including the CEO 3. Participating and developing a technology strategy within their business units 4. Effectively managing project resources, including technical staff 5. Leading innovative groups in their departments 6. Incorporating technology into new products and services 7. Developing proactive methods of dealing with changes in technology 8. Investigating how technology can improve competitive advantage.
  • 946.
  • 947.
  • 948.
  • 949.
  • 950.
  • 951.
  • 952.
  • 953.
  • 954.
  • 955.
  • 956.
  • 957.
  • 958.
    ic es a rc . 318 InForMAtIon teChnoloGY Table12.2 CEO Technology Best Practices Arc—Detail DIMENSION VARIABLE CONCEPTUAL KNOWLEDGE OF TECHNOLOGY MULTIPLICITY OF BUSINESS PERSPECTIVES OF TECHNOLOGY
  • 959.
    Technology Concept Understandsconcepts and definitions about technology and how it relates to business. Has conceptual knowledge of the software development life cycle. Understands high-level concepts about distributed processing, database development, and project management. Understands the definition and role of operating systems such as UNIX, WINDOWS, and MAC. Has the ability to relate technology concepts to other business experiences. Understands that different technology may be required for a particular project and organization. Can conceptualize how to expand the use of technology and apply it to business situations.
  • 960.
    Seeks to manageby appreciating that technology can have multiple perspectives. Able to manage a process that requires validation about different opinions about business uses of technology. Can manage the different objective ideas from multiple technology views without getting stuck on personal biases. Has an ability to identify and draw upon multiple perspectives available from business sources about technology, particularly from independent sources. Developing a discriminating ability to create an infrastructure that can operate with multiple views. Committed to creating an organization that can learn through realistic and objective judgment, as demonstrated by the applicability of the
  • 961.
    technology material drawnfor a particular project or task and tied to business outcomes. Organizational Structures Understands that technology can be viewed by other organizations in different ways and may need different organizational structures. Can use technology as a medium of communication. Understands that certain technologies may need to be managed differently and need specific types of structures and expertise. Has the ability to comprehend recommend/suggested technological solutions to suite business needs and preferences. Seeks to manage technology as a vehicle to learn more about what alternative organization
  • 962.
    structures are availablefrom others. Strives to create a learning organization that cares about what other staff perceive as solutions. Committed to cultural assimilation that can change the need to restructure the organization. Tries to understand and respect technologies that differ from what the organization is currently using. Understands that the organization has multiple and different technological needs. (Continued) 319towArd best prACtICes Table 12.2 (Continued) CEO Technology Best Practices Arc— Detail INTEGRATION OF BUSINESS
  • 963.
    USES OF TECHNOLOGY IMPLEMENTATIONOF BUSINESS/TECHNOLOGY PROCESS STRATEGIC USES OF TECHNOLOGY Creates an organization that has the ability to relate various technical concepts and organize them with non-technical business issues. Can manage by operating with both automated and manual business solutions. Can use technology to expand business reasoning, logic, and what-if scenarios. Establishes business templates that allow
  • 964.
    technology to offer everydaybusiness solutions. This involves the hypothetical (inductive/deductive) logical business issues. Organization’ s use of technology is concrete, accurate, and precise, broad and resistant to interference from non-authentic technology business sources. Ability to resist or recover from faulty uses of technology that is not realistic without a supporting business plan. Methods and judgment as a multidimensional CEO is independent, has critical discernment. Conceptual knowledge of technology can be transferred and can be used to
  • 965.
    self-educate within andoutside of technology. Can use technology for creative purposes to create new business initiatives and integrate them with short- and long-term business goals. Can deal with multiple dimensions of criticism about how technology can be used in the organization. Can develop relationships (cooperative) that are dynamic and based on written communication and oral discourse about how business can drive technological investments. Ability to create new business relations using technology with new and existing customers. Has an appreciation of cyberspace
  • 966.
    as a newmarket— a place wide open to dialogue (spontaneous), to provide new opportunities for business growth. Commitment to open discussion of alternating opinions on technology and acceptance of varying types of structures to accommodate technology opportunities. Ability to sustain dynamic organizational structures. Can design new structures to integrate multidimensions of business and technology solutions. Can dynamically manage different types of interdependent and dependent organizational relationships. Ability to manage within multiple dimensions of business cultures, which may
  • 967.
    demand self-reliance and confidencein independence of initiatives. (Continued) 320 InForMAtIon teChnoloGY Table 12.2 (Continued) CEO Technology Best Practices Arc— Detail DIMENSION VARIABLE CONCEPTUAL KNOWLEDGE OF TECHNOLOGY MULTIPLICITY OF BUSINESS PERSPECTIVES OF TECHNOLOGY Executive Values Understanding of technology and cultural differences.
  • 968.
    Conceptually understands that globalcommunication, education, and workplace use of technology can be problematic— subject to false generalizations and preconceived notions. Management awareness of responsibilities to address assumptions about how technology will be viewed by other departments and customers. Sets conditions that foster the need to obtain multiple sources of information and opinion about how technology values. The propagation organizationally of acceptance that there can be multidimensional values in human character. Executive Ethics Understands that there is a
  • 969.
    need to usetechnology with honesty re: privacy of access and information. Supports the development of ethical policies governing business uses of the Internet, research, intellectual property rights, and plagiarism. Committed to creating an organization that uses information in a fair way— comparison of facts against equal sources of business information. Understands and is compassionate that business and technology information may have different levels of knowledge access. Recognizes the need for sharing information with other business units from a sense of inequality. Executive Leadership Conceptualizes the need to
  • 970.
    have a leadershiprole with respect to technology in the business— the business and technologically realizable executive self. Understands how other executives can view technology leadership differently. Understands or has awareness of the construction of self that occurs when taking on the integration of technology in business operations. Focuses on views of other CEOs in multiple settings. Understands that the self (through technology) is open for more fluid constructions, able to incorporate diverse views in multiple technology settings. (Continued)
  • 971.
    321towArd best prACtICes Aswith CEO research, there are myriad best practices that have been offered as a method of dealing with the subject of technology management. Unfortunately, these practices usually are vague and intermingle management levels and departments; that is, it is diffi- cult to know whether the best practice is for the chief IT executive, Table 12.2 (Continued) CEO Technology Best Practices Arc— Detail INTEGRATION OF BUSINESS USES OF TECHNOLOGY IMPLEMENTATI ON OF BUSINESS/TECHNOLOGY PROCESS STRAT EGIC USES OF
  • 972.
    TECHNOLOGY Can manage multiple dimensionsof value systems and can prioritize multi-tasking events that are consistent with value priorities. Ability to assign value to new and diverse technology business alternatives— linking them to legacy systems and processes. Managing value systems in new ways because technology changes long-term values and goals for business objectives. Recognition that some concepts remain unchanged despite emerging technologies. Management of technology and business are based on formed
  • 973.
    principles as opposedto dynamic influences or impulses. Formed executive principles establish the basis for navigating through or negotiating the diversity of business opportunities and impulses for investment in technologies. Consistent management values displayed on multiple business goals, mission, and dedication to authenticity. Maintains management consistency in combining values regarding technology issues. Business and technology are a commitment in all aspects of management value systems, including agility in managing multiple business
  • 974.
    commitments. Commitment to greateropenness of mind to altering traditional and non-technological management methods. Technology management creativity with self-defined principles and beliefs. Risk-taking in technology- based ventures. Utilizing technology to expand one’ s arenas of business development. Manages the business liberating capacities of technology. Manages technology to unify multiple parts of the organization and understands how the process behaves in different business situations.
  • 975.
    Has developed anexecutive identity of self from a multiplicity of management venues. Method of management creates positive value systems that generate confidence about how multiple business communities need to operate. Acceptance and belief in a multidimensional business world of how to lead with technology. Can determine comfortably, authenticity of organization’ s executives and their view of the self. Can confirm disposition on technology independently from others’ valuations, both internally and from other organizations. Beliefs direct and control multi-dimensional leadership growth.
  • 976.
    322 InForMAtIon teChnoloGY theCEO, or some other level of management. We know from the research from Bolman and Deal (1997) that middle managers feel torn by conflicting signals and pressures they get from both senior management and the operations that report to them: “ They need to understand the difference in taking risks and getting punished for mistakes” (p. 27). According to Bolman and Deal (1997), best prac- tices for middle managers need to cover the following areas: 1. Knowledge management 2. Alignment 3. Leadership and commitment 4. Organization 5. Human resources 6. Opportunity management 7. Leveraging
  • 977.
    8. Performance assessment Theirstudy covered more than 400 companies in the eight areas of concern. I extracted 10 middle management-related best practices from their study results and concluded that middle managers need to 1. Understand how to take a strategy and implement it with technology; that is, they need to create tactics for completing the project. 2. Establish team-building measures for linking technology with daily operations of the staff. 3. Foster the aggregation and collaboration of business unit assets to form peer groups that can determine joint efforts for implementing new technologies. 4. Stimulate their staffs using innovative strategies of value propositions and reward systems. 5. Create multifunctional teams that can focus on particu- lar aspects of how technology affects their specific area of expertise.
  • 978.
    6. Follow commonproject management practices so that mul- titier and department projects can be globally reviewed by senior management. 7. Form project teams that can respect and perform on an action basis; that is, teams that are action oriented. 323towArd best prACtICes 8. Understand how to communicate with, and use, IT staff on projects. 9. Have a systematic process for gathering intelligence relating to pertinent technology developments. 10. Understand that customers are the drivers for technology tools provided by the organization. On reviewing the different aspects of middle manager best practices with technology research, it appears that there are two focal points:
  • 979.
    (1) those bestpractices that address the needs of senior management, the CIO, and the CEO; and (2) those that are geared toward the management of the staffs who need to implement emerging technol- ogy projects. This makes sense, given that the middle manager, notwith- standing whether a director, line manager, or supervisor, needs to deal with executive productivity-related issues as well as staff implementation ones. They are, as Bolman and Deal (1997) state, “ torn” by these two competing organizational requirements. Table 12.3 represents the combined list of technology-based best practices organized by executive best practices and implementation best practices. Table 12.3 exemplifies the challenge that middle managers have in balancing their priorities. In accordance with the research, the best practices mentioned are implemented using methods of knowledge management, alignment, leadership and commitment,
  • 980.
    human resources, opportunitymanagement, leveraging, and per- formance assessment. As with the other best practices, the middle manager technology best practices are limited because they do not address the specific needs of ROD, particularly organizational learning theories (with the exception of knowledge management). This shortfall is integrated into another developmental arc model that combines these theories with the preceding definitions of best practices. The Middle Management Best Practices Technology Arc The middle management best practices technology arc, as with others, can be used to evaluate a middle manager’ s strategic and operational 324 InForMAtIon teChnoloGY
  • 981.
    uses of technologyby using a grid that measures competencies rang- ing from conceptual knowledge about technology to more complex uses of technology and business operations. The five principal stages defined by the arc determine the middle manager’ s maturity with business implementations of technology: cognitive, organization interactions, management values, project eth- ics, and management presence. There are five stages of maturation that guide the middle manager’ s growth. The first is becoming reflec- tively aware about one’ s existing knowledge with business technology and how it can be implemented. The second is the recognition of the Table 12.3 Middle Manager Executive and Implementation Best Practices EXECUTIVE-BASED MIDDLE MANAGER BEST
  • 982.
    PRACTICES IMPLEMENTATION-BASED MIDDLE MANAGERBEST PRACTICES 1. Provide valuable input to the executive management team, including the CEO. 1. Understand how to communicate with and use IT staff on projects. 2. Incorporate technology into new products and services. 2. Effectively manage project resources, including technical staff. 3. Participate in developing a technology strategy within their business units. 3. Lead innovative groups in their departments. 4. Have proactive methods of dealing with changes in technology.
  • 983.
    4. Understand howto take a strategy and implement it with technology; that is, create tactics for completing the project. 5. Focus on how technology can improve competitive advantage. 5. Establish team-building measures for linking technology with staff’ s daily operations. 6. Have a systematic process for gathering intelligence, relating to pertinent technology developments. 6. Foster the aggregation and collaboration of business unit assets to form peer groups that can determine joint efforts for implementing new technologies. 7. Understand that customers are the drivers for technology tools provided by the organization reward. 7. Stimulate their staffs using innovative strategies of value propositions and systems.
  • 984.
    8. Create multifunctionalteams that can focus on particular aspects of how technology affects their specific area of expertise. 9. Follow common project management practices so that multitier and department projects can be globally reviewed by senior management. 10. Form project teams that can respect and perform on an action basis; that is, teams that are action oriented. 325towArd best prACtICes multiplicity of ways that technology can be implemented on projects (e.g., other business views of how technology can benefit the organiza- tion). The third is integration of business implementation with tech- nology, in which a middle manager can begin to combine technology
  • 985.
    issues with businessconcepts and functions on a project basis. The fourth is stability of business/technology implementation, in which the middle manager has integrated business/technology as a regu- lar part of project implementations. The fifth is technology project leadership, in which the middle manager can use their independent judgment on how best to use technology and business on a project-by- project basis. Thus, as middle managers grow in knowledge of tech- nology and business projects, they can become increasingly more open to new methods of implementation and eventually, autonomous with the way they implement projects and provide leadership. Definitions of Maturity Stages and Dimension Variables in the Middle Manager Best Practices Arc Maturity Stages
  • 986.
    1. Technology implementationcompetence and recognition: This first stage represents the middle manager’ s capacity to learn, conceptualize, and articulate key issues relating to cogni- tive business technological skills, organizational interactions, management value systems, project management ethics, and management presence. 2. Multiplicity of business implementation of technology: Indicates the middle manager’ s ability to integrate multiple points of view during technical project implementations. Using these new perspectives, the middle manager augments his or her skills with business implementation with technology career advancement, expands his or her management value system, is increasingly motivated to act ethically during projects, and enhances his or her management presence. 3. Integration of business implementation of technology: Maturing middle managers accumulate increased understand- ing of how business and technology operate together and affect one another. They gain new cognitive skills about
  • 987.
    326 InForMAtIon teChnoloGY technologyand a facility with how the organization needs to interact, expand their management value system, perform business/technology actions to improve ethics about busi- ness and technology, and develop effective levels of manage- ment presence. 4. Stability of business/technology implementation: Middle manag- ers achieve stable integration when they implement projects using their cognitive and technological ability; have organi- zation interactions with operations; have management values with their superiors, peers, and subordinates; possess project ethics; and have the management presence appropriate for performing job duties, not only adequately, but also competi- tively (with peers and higher-ranking executives in the orga- nization hierarchy). 5. Technology project leadership: Leadership is attained by the middle manager when he or she can employ cognitive and technological skills, organization interactions, management, a sense of business ethics, and a sense of management presence to compete effectively for executive positions. This middle
  • 988.
    manager is capableof obtaining increasingly executive-level positions through successful interviewing and organization performance. Performance Dimensions 1. Business technology cognition : Pertains to skills specifically related to learning, applying, and creating resources in busi- ness and technology, which include the necessary knowledge of complex operations. This dimension essentially establishes the middle manager as “ operationally” proficient with tech- nology and forms a basis for movement to more complex and mature stages of development when managing technology projects. 2. Organizational interactions : This focuses on the middle man- ager’ s knowledge and practice of proper relationships and management interactions during technology projects. This pertains to in-person interactions, punctuality of staff, work 327towArd best prACtICes
  • 989.
    completion, conflict resolution,deference, and other protocols in technology projects. 3. Management values : Measures the middle manager’ s ability to articulate and act on mainstream corporate values credited with shaping technology project work ethic: independent ini- tiative, dedication, honesty, and personal identification with technology project goals, based on the philosophy of manage- ment protocol of the organization. 4. Project ethics: Reflects the middle manager’ s commitment to the education and professional advancement of other persons in technology and in other departments. 5. Management presence: Involves the middle manager’ s view of the role of a project-based manager during a technology project implementation and the capacity to succeed in tandem with other projects. Aspects include a devotion to learning and self-improvement, self-evaluation, the ability to acknowl- edge and resolve business conflicts, and resilience when faced with personal and professional challenges during technology implementations.
  • 990.
    Figure 12.7 showsa graphic view of the middle management tech- nology best practices arc. Each cell in the arc provides the condi- tion for assessment. The complete arc is provided in Table 12.4. The challenge of the middle management best practices arc is whether to emphasize executive management concepts (more organizationally intended) or event-driven concepts (project oriented). This arc focuses on project implementation factors and deals with best practices that can balance executive pressures with implementation realities. I sug- gest that senior middle managers, at the director level, who do not participate in implementation, set their best practices, based on the CEO maturity arc. Indeed, creating a separate arc for upper manage- ment would contain too many overlapping cells. Summary
  • 991.
    The formation ofbest practices to implement and sustain ROD is a complex task. It involves combining traditional best practice methods (i.e., what seems to work for proven organizations and individuals) 328 InForMAtIon teChnoloGY D ev el op m en ta l d im
  • 992.
  • 993.
  • 994.
  • 995.
  • 996.
  • 997.
  • 998.
  • 999.
  • 1000.
  • 1001.
    a rc . 329towArd best prACtICes Table12.4 Middle Management Technology Best Practices Arc—Detail DIMENSION VARIABLE TECHNOLOGY IMPLEMENTATION COMPETENCE AND RECOGNITION MULTIPLICITY OF BUSINESS IMPLEMENTATION OF TECHNOLOGY
  • 1002.
    Business Technology Cognition Understands howtechnology operates during projects. Has conceptual knowledge about hardware interfaces, and the software development life cycle. Has the core ability to relate technology concepts to other business experiences. Can also participate in the decisions about what technology is best suited for a particular project. Can be taught how to expand the use of technology and can apply it to other business situations. Understands that technology projects can have multiple perspectives on how to implement them. Able to analyze what is valid vs.
  • 1003.
    invalid opinions about businessuses of technology. Can create objective ideas from multiple technology views without getting stuck on individual biases. An ability to identify and draw upon multiple perspectives available from project sources about technology. Developing a discriminating ability with respect to choices available. Realistic and objective judgment, as demonstrated by the applicability of the technology material drawn for a particular project or task and tied to functional/pragmatic outcomes. Organizational Interactions Understands that technology projects require the opinions of other departments and staff in multiple ways. Understands that certain
  • 1004.
    technological solutions and trainingmethods may not fit all project needs and preferences of the business. Has the ability to recommend/suggest alternative technological solutions to suite other business and project needs and preferences. Seeks to use technology projects as a vehicle to learn more about organization interactions and mindsets. Strives to care about what others are communicating and embraces these opinions on a project basis. Tries to understand and respect technologies that differ from own. Understands basic technological project needs of others. (Continued)
  • 1005.
    330 InForMAtIon teChnoloGY Table12.4 (Continued) Middle Management Technology Best Practices Arc—Detail INTEGRATION OF BUSINESS IMPLEMENTATION OF TECHNOLOGY STABILITY OF BUSINESS/ TECHNOLOGY IMPLEMENTATION TECHNOLOGY PROJECT LEADERSHIP Has the ability to relate various technical project concepts and organize them with non-technical business issues. Can
  • 1006.
    operate with both businessand technical solutions. Can use technology to expand reasoning, logic, and what-if scenarios. Ability to discern the templates that technology has to offer in order to approach everyday technology project problems. This involves the hypothetical (inductive/deductive) logical business and technology skills. Knowledge of technology projects are concrete, accurate, and precise, broad and resistant to interference from non-authentic business and technical project sources. Ability to resist or recover from proposed technology that is not
  • 1007.
    realistic— and canrecover resiliently. Methods and judgment in multidimensional technology projects are independent and use critical discernment. Operational knowledge of technology and project management skills can be transferred and can be used to self-educate within and outside of technology. Can use technology for creative purposes to solve business and project challenges and integrate with executive management views. Can deal with multiple dimensions of criticism about technology-based projects. Can develop relationships (cooperative) that are
  • 1008.
    dynamic and basedon discourse. Ability to create project relations with IT, other departments, and customers. Has an appreciation of project communication— to foster open dialogue (spontaneous), to give and take, or other than voyeuristic, one-sidedness about the project. Ability to produce in teamwork situations, rather than solely in isolation. Loyalty and fidelity to relations in multiple organizations. Commitment to criticism and acceptance of multiple levels of IT and business relationships. Ability to sustain non-traditional types of inputs from multiple sources during projects.
  • 1009.
    Can utilize andintegrate multidimensions of project solutions in a self-reliant way. Developing alone if necessary using other technical and non-technical resources. Can dynamically select types of interdependent and dependent organizational relationships. Ability to operate within multiple dimensions of business cultures, which may demand self-reliance, independence of initiative, and interactive communications during project implementations. (Continued) 331towArd best prACtICes
  • 1010.
    Table 12.4 (Continued)Middle Management Technology Best Practices Arc—Detail DIMENSION VARIABLE TECHNOLOGY IMPLEMENTATION COMPETENCE AND RECOGNITION MULTIPLICITY OF BUSINESS IMPLEMENTATION OF TECHNOLOGY Management Values Technology and cultural sensitivity during project implementations. Global communication, education, and project use of technology can be problematic— subject to false generalizations and preconceived notions. Awareness of assumptions
  • 1011.
    about how technologywill be viewed by other departments and staff and about biases about types of technology used (MAC vs. PC). Can appreciate need to obtain multiple sources of information and opinions during project implementations. The acceptance of multidimensional values in human character as value during project design and completion. Project Ethics Using technology on the project with honesty re: privacy of access and information. Development of ethical policies governing project uses of the Internet, research, intellectual property rights, and plagiarism.
  • 1012.
    The use ofinformation in a fair way— comparison of facts against equal sources of project information. Compassion for differences in project information for which sources are limited because of inequality of technology access. Compassion for sharing information with other business units from a sense of inequality. Management Presence Has accurate perception of one’ s own potential and capabilities in relation to technology projects— the technologically realizable manager. Understands how other managers can view self from a virtual and multiple perspectives. Understands or
  • 1013.
    has awareness ofthe construction of self that occurs in projects. Understands views of other executives and managers in multiple project settings. Understands that the self (thru technology projects) are open for more fluid constructions, able to incorporate diverse views in multiple settings. (Continued) 332 InForMAtIon teChnoloGY with developmental theory on individual maturation. The combina- tion of these two components provides the missing organizational learning piece that supports the attainment of ROD. Another way of comprehending this concept is to view the ROD arc as the
  • 1014.
    over- arching or top-levelmodel. The other maturity arcs and best practices Table 12.4 (Continued) Middle Management Technology Best Practices Arc—Detail INTEGRATION OF BUSINESS IMPLEMENTATION OF TECHNOLOGY STABILITY OF BUSINESS/ TECHNOLOGY IMPLEMENTATION TECHNOLOGY PROJECT LEADERSHIP Can operate project within multiple dimensions of value systems and can prioritize multitasking events that are consistent with value priorities.
  • 1015.
    Ability to assignvalue to new and diverse technology project alternatives— integrating them within a system of pre-existing business and technology project implementation values. Testing technology value systems in new ways during the project implementation is integrated with long-term values and goals for business achievement. Some project concepts are naturally persistent and endure despite new arenas in the technological era Use of technology and business during project implementation are based on formed principles as opposed to dynamic influences or impulses. Formed
  • 1016.
    principles establish thebasis for navigating through, or negotiating the diversity of business influences and impulses during the project. Consistent values displayed on multiple project communications, deliverables of content, and dedication to authenticity. Maintains consistency in integrating values within technology business issues during project implementation. Technology is a commitment in all aspects of value systems, including agility in managing multiple project commitments. Commitment to greater openness of mind to altering traditional and non-technological methods
  • 1017.
    on project implementations. Technologicalproject creativity with self-defined principles and beliefs. Risk-taking in technology-based projects. Utilizing technology to expand one’ s arenas of project freedom. Exploring the project management liberating capacities of technology. Operationalizes technology projects to unify multiple components of the self and understands its appropriate behaviors in varying management situations. Has regulated an identity of self from a multiplicity of management venues. Method of project interaction creates positive value systems that
  • 1018.
    generate confidence about operatingin multiple organizational communities. Can determine comfortably, authenticity of other managers and their view of the self. Can confirm project-related disposition independently from others’ valuations, both internally and from other department cultures. Has direct beliefs and controls multidimensional management growth. 333towArd best prACtICes represent the major communities of practice that are the subsets of that model. This is graphically depicted in Table 12.5. Thus, the challenge is to create and sustain each community
  • 1019.
    and, at the sametime, establish synergies that allow them to operate together. This is the organizational climate created at ICAP, where the execu- tive board, senior and middle managers, and operations personnel all formed their own subcommunities; at the same time, all had the abil- ity for both downward and upward communication. In summary, this particular model relies on key management interfaces that are needed to support ROD. Ethics and Maturity The word ethics is defined in many different ways. Reynolds (2007) defines ethics as “ a set of rules that establishes the boundaries of gen- erally accepted behaviour” (p. 3). Ethics can also mean conforming to social norms and rules, which can be challenged by deviant behaviors
  • 1020.
    of “ others.”Still other groups construct ethics as a moral code that a community agrees to uphold. Ethics often map to our values— like integrity and loyalty to others. What is ethical for one person may not be ethical for another. This issue frames yet another question: How does ethics relate to leadership, specifically leadership in technology? Ethics became a heightened issue after the Enron scandal in the United States. The scandal had a huge effect on the IT industry because it resulted in Congress enacting the Sarbanes-Oxley (SOX) Act, which placed significant audit trail requirements on document- ing processes. Most of these processes existed in automated applica- tions; thus, IT was required to comply with the rules and regulations that the SOX Act mandated. Implementing the SOX Act became an immense challenge for IT organizations mostly because the rules of
  • 1021.
    compliance were vague. Mostwould agree that ethics are a critical attribute for any leader. The challenge is how to teach it. The SOX Act “ teaches” ethics by establishing governance by control— control of unethical behavior through catching deviants. However, history has shown us that devi- ants are not cured by laws and punishment; rather, they are simply contained. Unfortunately, containment does not eliminate or cure unethical behavior. Furthermore, deviants tend to find new ways to 334 InForMAtIon teChnoloGY Ta bl e
  • 1022.
  • 1023.
  • 1024.
  • 1025.
  • 1026.
  • 1027.
  • 1028.
  • 1029.
  • 1030.
  • 1031.
  • 1032.
  • 1033.
  • 1034.
  • 1035.
  • 1036.
  • 1037.
  • 1038.
  • 1039.
  • 1040.
  • 1041.
  • 1042.
  • 1043.
  • 1044.
  • 1045.
  • 1046.
  • 1047.
  • 1048.
  • 1049.
  • 1050.
  • 1051.
  • 1052.
  • 1053.
  • 1054.
  • 1055.
  • 1056.
    rm a ct io n- or ie nt ed te am s 335towArd best prACtICes bypasscontrols and get around the system in time. On the other hand,
  • 1057.
    educators more oftensee the solution as transforming behavior of the individual; that is, ethics can only be taught if the individual realizes its value. Value in ethical behavior becomes a systemic transforma- tion when the individual believes in its self-realization. Being ethical is then aligned with self-actualization and adult maturity. So, ethics can be aligned with maturity in the same ways that the maturity arcs presented were mapped to leadership. Why is this so important for IT leaders? The SOX Act answered this question because it clearly identified the IT function as the most critical component of com- pliance. Unethical behavior in technology-based systems can damage the greater good, which places a big responsibility on the IT function. I would suggest that IT ethics and leadership are very much linked.
  • 1058.
    It is avery important responsibility for technology executives to pro- vide direction to their firms on how technology and ethics are inte- grated and how they can transform individuals to value conformance without the overuse of governing controls. Firms must use organi- zational learning tools as the vehicle to promote such conformance through changes in behavior. Unfortunately, many executives, includ- ing those in IT, practice governance much more than influence. I am not suggesting the elimination of controls, but rather, that leadership should depend less on governance and more on effecting behavioral change. In other words, the key to developing strong ethics within an IT organization is leadership, not governance. An important compo- nent of leadership is the ability to influence the behaviors of others (without exerting control or power). The real power of
  • 1059.
    leadership is to useinfluence to effect ethical behavior as opposed to demanding it. How do we create ethical IT organizations? Further, how can a technology executive provide the necessary strategy and influence to accomplish firm-wide ethical transformation? The first strategy, for a number of reasons, should be to create an ethical IT organization as the model: 1. The technology executive has control over that organization. 2. Most IT ethical problems today emanate from technology per- sonnel because of their unusual access to data and information. 3. IT is positioned to lead the direction, since it is its area of expertise. 336 InForMAtIon teChnoloGY
  • 1060.
    So, IT canset the example for technology-related ethics for the entire organization by establishing its own level of compliance by a “ way of being,” as opposed to a way of being managed. Often, this way of being can evolve into a code of behavior that can become the cultural “ code” of the organization itself. This code of ethics should address and be limited to such IT-related issues as: • Privacy : Because of their access to transactions over the Internet, IT professionals must respect the privacy of infor- mation of others. Their code of ethics should go beyond just e-mail transactions to include access to personal data that may be stored on desktops or data files. • Confidentiality : This differs from privacy because the data are available to IT in the normal transactions of business. That is, the data are captured or used in the development of an application. IT personnel need to keep such information con- fidential at all times— not only for the employees of the firm but also for clients and vendors.
  • 1061.
    • Moral responsibility: IT needs to protect the organization from outside abuses or questionable transactions coming into and leaving the company. Protection can also include blocking access to certain websites that are dangerous or inappropriate. This practice should not be regarded as a control, but rather, as a moral responsibility of any employee. Of course, there needs to be careful objectivity in how the moral code is actu- ally executed when a problem is identified. • Theft : Removing information that belongs to someone else can be construed as a form of theft. Theft should always be regarded as an offense punishable by law— that is, above and beyond rules and regulations of the company. These are only examples of areas in which an ethical code might be applied. Such a code must be implemented in IT as a framework for how people are employed and as a basis for promotion. Again, governance plays an important part because unfortunately there will always be individuals who violate ethics. What we need are organiza-
  • 1062.
    tions that promoteand defend ethics to the greatest possible extent. This way of being is consistent with the core definition of a learn- ing organization in that ethics must inevitably be part of the fabric 337towArd best prACtICes of the culture and evolved within it. With IT serving as a model, the technology executive can act as the champion for implementation company-wide. This chapter has shown that ethics are intrinsically linked to maturity. Indeed, every arc contained a dimension that con- tained an ethical dimension. Perhaps if such ethical practices existed at Enron, the “ learning organization” there could have stopped the abuses.
  • 1063.
    http://taylorandfrancis.com 339 13 ConClusion Introduction This book hasexplored many conceptual aspects of information tech- nology (IT) and organizational learning and how they can be utilized together to help firms compete in a rapidly changing world. Case stud- ies were presented to show how these concepts, and the theories they derive from, could be implemented into practice. It is most important, however, to remember that each organization is unique and that the implementation of organizational learning methods must therefore
  • 1064.
    be tailored tothe particular dynamics at play in a given organiza- tion. Hence, there can be no boilerplate methodology for the strategic employment of technology; such an approach could never guarantee maximum benefit to the organization. My position involves employ- ing various organizational learning methods that must be carefully chosen and implemented, based on the projected target audience and on the particular stage of growth of the organization and its mature use of technology. In my study of chief executive officer (CEO) perceptions of IT, I found that the role of IT was not generally understood in most of the organizations I surveyed, especially at the CEO level. There appear to be inconsistent reporting structures within the IT organization, and there is a lack of IT-related discussion at the strategic and senior
  • 1065.
    executive levels. Furthermore,most executives are not satisfied with IT performance, and while most agree that technology should play a larger role in marketing, few have been able to accomplish this. The general dilemma has involved an inability to integrate technology effectively into the workplace. Certainly, a principle target of this book is to answer the question of what chief IT executives need to do and in what directions their 340 InForMAtIon teChnoloGY roles need to evolve regarding IT. Other concerns center on general organizational issues surrounding who IT people are, where they report, and how they should be evaluated. IT must also provide better
  • 1066.
    leadership with respectto guiding a company through the challenges of unproven technologies. While technology behaves dynamically, we still need processes that can validate its applicability to the organiza- tion. Another way of viewing this is to accept the idea that certain technologies need to be rejected because of their inappropriateness to drive strategy. IT is unique in that it is often viewed from a project perspective; for instance, that which is required to deliver technology and the cultural impact it has on the organization, and tends to be measured by project deliverables due to the pressure to see measurable outcomes. From a project perspective, IT staff members typically take on the role of project managers, which requires them to communicate with multiple business units and management layers. They need to establish
  • 1067.
    shorter project life cyclesand respond to sudden changes to the requirements. No longer does a traditional project life cycle with static dates and deliverables work with the fast-paced businesses of today. Rather, these projects are living and breathing entities that must be in balance with what is occurring in the business at all times. Most important is that project measurable outcomes must be defined and seen in balance with expected organizational transformations. I began my explanation of the role of technology by establishing it as a dynamic variable, which I termed technological dynamism. Responsive organizational dynamism (ROD) represents my attempt to think through a range of responses to the problems posed by tech- nological dynamism, which is an environment of dynamic and unpre-
  • 1068.
    dictable change resultingfrom the advent of innovative technologies. This change can no longer be managed by a group of executives or managers; it is simply too complex, affecting every component of a business. A unilateral approach does not work; the problem requires an environmental approach. The question is how to create an orga- nization that can respond to the variability of technologies in such a way that its responses become part of its everyday language and discourse. This technological state of affairs is urgent for two major reasons. First, technology not only is an accelerator of change but also requires accelerated business responses. Organizations cannot wait 341ConClusIon
  • 1069.
    for a committeeto be formed or long bureaucratic processes to act. Second, the market is unforgiving when it comes to missing business opportunities. Every opportunity missed, due to lack of responding in a timely fashion, can cost an organization its livelihood and future. As stated by Johansen et al. (1995): The global marketplace requires constant product innovation, quick delivery to market, and a large number of choices for the consumer, all of which are forcing us to rethink the way we structure our business organizations to compete. Indeed, many businesses are finding their traditional structure cumbersome— the way they work is more of an obstacle than help in taking advantage of global opportunities. (p. 1) While ROD is the overarching approach for a firm that can perform
  • 1070.
    in a dynamicand unpredictable environment, there are two major components to that approach that I raised for further consideration. I discussed how technology, as a variable, is unique in that it affects two areas of any organization. The first is the technology itself and how it operates with business strategy. I called this the strategic integration component of responsive organizational dynamism. The challenge here is to have organizations create processes that can formally and informally determine the benefit of new and emerging technologies on an ongoing basis. The second component is cultural assimilation, which is about managing the cultural and structural changes that are required when new strategies are adopted by the organization. Creating an environment of ROD requires processes that can fos- ter individual and organizational-level thinking, learning, and
  • 1071.
    trans- formation. Organizational learningtechniques best fit the need as they contain the core capabilities to assist organizations in reinvent- ing themselves as necessary, and to build an organization that can evolve with technology, as opposed to one that needs to be reorga- nized. I have presented many organizational learning concepts and modified them to provide specific remedies to the challenges required to create responsive organizational dynamism. I have also presented the complex vectors that determine which learning theory should be applied and integrated with others, so that every aspect of individual and organizational evolution can be supported. I chose to use the term vector to describe this force or influence because of the different ways
  • 1072.
    342 InForMAtIon teChnoloGY inwhich these learning methods can help in creating and sustaining firm-wide responses to technological dynamism. Perhaps the most important learning process among these is that of linear development leading to maturation. My use of maturity arcs permits me a framework for the development and integration of mod- els that can measure where individuals and organizations are in their trajectory toward the integration of emerging technologies in their business strategies. These maturity arcs provide a basis for how to mea- sure where the organization is, what types of organizational learning methods to consider, and what outcomes to expect. Indeed, providing measurable outcomes in the form of strategic performance is the very reason why executives should consider embracing this model.
  • 1073.
    I also discusseda number of methods to manage organizational learning, modifying theories of knowledge management and change management, so that they specifically addressed the unique aspects of change brought about by new technologies. I looked at how the CEO needs to become more knowledgeable about technology, and, based on case studies and research, I provided sets of best practices to suggest that staff members cannot become part of a learning organi- zation without the participation of the CEO and his or her executive committees. On the other hand, I investigated the interesting work of Nonaka and Takeuchi (1995) and their middle-up-down theory of middle management. I modified Nonaka and Takeuchi’ s idea by complicating the strata that can be used to define the middle, and I established three tiers of middle management and integrated
  • 1074.
    them into organizational learningtheories. Finally, I used the Ravell case study to show how operations personnel continue to play an impor- tant role in organizational learning, and how the maturity arc can be used to transform individual learning practices into less event- driven learning at the organizational level. I formulated best practices for each of these three major organizational structures, along with corre- sponding maturity arcs to lay the foundation of what each community needs to do to properly participate in the transformations indicated for responsive organizational dynamism. To this end, I proposed cer- tain road maps that, if followed, could provide the mechanisms that lead to the kind of organizational transformation that is empowered to handle the challenges of new technologies. This process is sum-
  • 1075.
    marized in Figure13.1. 343ConClusIon I have taken a strong position regarding the debate over whether learning occurs best on the individual level or at the system- orga- nizational one, particularly as learning affects the establishing and sustaining of responsive organizational dynamism. My response to this debate is “ yes” — yes, in the sense that both are very much needed and part of a process that leads to a structured way of maturing the use of organizational learning by an organization to improve strategic performance. I believe the Ravell case study provides an example of how learning maturation operates in a dynamic environment. We see that operations personnel tend to rely on event-driven and individual-
  • 1076.
    based reflective practicesbefore being able to think at an organiza- tional level. My prior research (Langer, 2002) on reflective practices clearly shows that many adults do not necessarily know how to reflect. Technology dynamism �e “technology” variable Requirements for organizational change Responsive organizational dynamism Strategic integration
  • 1077.
    Cultural assimilation Strategic performance Organizational learning Figure 13.1 Technology“ road map.” 344 InForMAtIon teChnoloGY The important work of Argyris and Schö n (1996) on introducing and sustaining individual learning, specifically using double-loop learn- ing, should be used when implementing an organizational learning program. Ravell also showed us that time is an important factor for individual development and that political factions are part of
  • 1078.
    that pro- cess. Withpatience and an ongoing program, group learning activi- ties can be introduced to operations personnel, thereby supporting the kind of system-level thinking proposed by Senge (1990). A critical part of organizational learning, in particular the nec- essary steps to establish a learning organization, is the formation of communities of practice. Communities of practice, in all of the case studies, were the cornerstones in the transition from individual- based learning to group learning. Communities of practice begin the matu- ration process of getting organizations to change to learning based on organizational goals. This is critical for ROD because technology requires planning and vision that are consistent with business strat- egy. While much of the literature integrates the notion of communi- ties of practice with knowledge management, I expanded its use
  • 1079.
    and defined the communityas the single most important organizational structure for dealing with emerging technologies. The reason for this is the very challenge facing IT organizations today: to be able to inte- grate their efforts across business units. This has been proven to be the most difficult challenge for the chief information officers (CIOs) of today. This was further supported by the Siemens AG case study, in which Dana Deasy, the corporate CIO of the Americas, provided a detailed picture of the complex world of a CIO in a global firm, with over 400,000 employees. Yet, it is the creation of multiple layers of communities of practice that enables firms to create what I call “ com- mon threads” of communication. Thus, the linkage across communi- ties of practice is a central theme of this book, providing guidance and
  • 1080.
    education to organizationsto establish processes that support their evolution in a responsive way. The key word that I have used here is evolution. In the past, infor- mation traveled much slower, and there was more time to interpret its impact on the organization. Today, the travel time is shrinking; therefore, evolution can and should occur at a quicker pace. Indeed, organizational evolution is intertwined with the dynamics of com- munity legitimization (Aldrich, 2001). Technological development 345ConClusIon for a particular population has widespread consequences for the rest of the organization. In these cases, technological innovations repre-
  • 1081.
    sent a formof collective learning that is different from direct learning from experience alone (Miner & Haunschild, 1995). There are many scholars who believe that change management must be implemented through top-down management approaches. However, I hope this book demonstrates that leadership through top-down management will never be solely sufficient to establish the organizational struc- ture needed to handle technological innovations properly. Many such efforts to reorganize or reengineer organizations have had dis- appointing results. Many of these failures, I believe, are attributable to a dependence on management intervention as opposed to strate- gic integration and cultural assimilation. Technology only serves to expose problems that have existed in organizations for decades: the inability to drive down responsibilities to the operational levels of the
  • 1082.
    organization. My case studiesprovide, I trust, a realistic and pragmatic view toward the attainment of responsive organizational dynamism, assuming the appropriate roles and responsibilities are available. Furthermore, the case studies also reflect that progress toward orga- nizational learning and maturity is a gradual one. As such, I deter- mined that organizational transformation must be addressed along the same basis; that is, transformation is a gradual process as opposed to a planned specific outcome. I showed that organizations could and should look at transformation in much shorter “ chunks,” as opposed to long-term “ big-bang” approaches that rarely work and are difficult to measure. Measurement was applied to organizational transforma- tion via the implementation of the balanced scorecard. The scorecard model I modified is tied to the chunk approach.
  • 1083.
    Another important conceptin this book is the reconciliation between control and empowerment. As organizations find that their traditional structures are cumbersome when dealing with emerging technologies, they realize the need to empower employees to do more dynamically. With this empowerment, employees may make more mistakes or seem less genuine at times. When this occurs, there may be a need for management controls to be instituted and power- central- ized management styles to be incorporated. Unfortunately, too many controls end any hope of creating a learning organization that can 346 InForMAtIon teChnoloGY foster the dynamic planning and needs of responsive organizational
  • 1084.
    dynamism. They alsoblock the molding of communities of practice that require common threads of discourse and language. Indeed, it is communities of practice and discourse that lay the foundations for addressing the dilemma of employee control versus empowerment. We are really beginning to experience the results of emerging tech- nologies, particularly for products traded internationally. We have seen an unusual trend occur in which off shore product development and maintenance is at an all-time high, local employment is down, and corporate earnings are growing. The advent of this cycle lays a foundation for the new trends of global worker operations, many of which are shifting from a labor-intensive process to needs for think- ing, planning, and management.
  • 1085.
    Unskilled or less-skilledworkers, partly because of new technolog- ical automation, are allowing organizations to displace higher- costing local labor to international outsourced operations. This means an increase in management learning related to supervision and coordina- tion in a technology-driven world. We must be aware of the concern expressed by O’ Sullivan (2001) that “ new technologies have created unemployed workers with no rights” (p. 159). The way individuals communicate, or the rules of their engagement, are quickly chang- ing, particularly in the need to create more research and develop- ment (R&D) infrastructures that can respond quicker to innovation opportunities brought about by emerging technologies. We saw this dilemma occur at Siemens, where business strategy and technology became a major investment, and the realization that e-business
  • 1086.
    was more about businessthan just technology. To address the lack of understanding of the technology life cycle, I presented my concept of driver and supporter functions and mapped them onto evolutionary transformation. This life cycle is one that ties business strategy into technology and should be used to convey ROD to executives. Driver functions explain why strategic integra- tion is so important and present a case that requires more market- ing-based philosophies when investing in technologies. This means that early adaptation of technology requires, as Bradley and Nolan (1998) call it, “ sense-and-respond” approaches, by which IT organi- zations can experiment with business units on how a technology may
  • 1087.
    347ConClusIon benefit the business.Siemens and ICAP provided good examples of different ways of creating infrastructures that can support technology exploration, including Deasy’ s 90-day program, by which technol- ogy investments were reviewed periodically to see what adjustments are required to maximize the investment. It also provided a way to cancel those investments that were not paying off as originally fore- cast. Understanding that changes along the way are needed, or that there are technologies that do not provide the intended benefits, must become a formal part of the process, one that CEOs must recognize and fund. On the other hand, the supporter role is one that addresses the operational side of IT, such that executives and managers
  • 1088.
    under- stand the difference.I treated the concept of supporter as an eventual reality, the reality that all technologies, once adopted by operations, must inevitably become a commodity. This realization paves the way to understanding when and how technologies can be considered for outsourcing, based on economies of scale. The adoption of this phi- losophy creates a structured way of understanding the cost side of the IT dilemma and requires business units to integrate their own plans with those offered by emerging technologies. The supporter aspect of technology became the base of cultural assimilation because once a technology is adapted by operations, there must be a correspond- ing process that fosters its impact on organizational structures and cultural behaviors. It also provides the short- and long-term expected
  • 1089.
    transformations, which ultimatelylink technology and strategic performance. The driver/supporter philosophy also shows the complexity of the many definitions of technology, and that executives should not attempt to oversimplify it. Simply put, technology must be discussed in differ- ent ways, and chief IT executives need to rise to the occasion to take a leadership role in conveying this to executives, managers, and opera- tions, through organizational learning techniques. Organizations that can implement driver/supporter methods will inevitably be better positioned to understand why they need to invest in certain technolo- gies and technology projects. My initial case study at Ravell exposed the potential limit of only operating on the unit levels and not getting executives involved in the system thinking and learning phases.
  • 1090.
    348 InForMAtIon teChnoloGY Thesegeneral themes can be formulated as a marriage between business strategy and technological innovation and can be represented as follows: 1. Organizations must change the business cycles of technology investment; technology investment must become part of the everyday or normative processes, as opposed to specific cycles based on economic opportunities or shortfalls. Emerging technologies tend to be implemented on a “ stop-and-go” basis, or based on breakthroughs, followed by discontinuities (Tushman & Anderson, 1997). 2. The previous experiences that organizations have had with technology are not a good indicator for its future use. Technology innovations must evolve through infrastructure, learning, and process evaluation. 3. Technology is central to competitive strategy. Executives need to ensure that technology opportunities are integrated with all discussions on business strategy.
  • 1091.
    4. Research anddevelopment ( R&D) is at the center of sys- tems/organizational-level thinking and learning. Companies need to create R&D operations, not as separate entities, but as part of the evaluation processes within the organizational structure. 5. Managing technology innovations must be accomplished through linkages. Thus, interfaces across communities of practice via common threads are essential to have learning improve the ability of the organization to operate within responsive organizational dynamism. 6. Managing intellectual capital is an exercise of linking the var- ious networks of knowledge in the organization. Managing this knowledge requires organizational learning, to transfer tacit knowledge to explicit knowledge. The cultural assimi- lation component of ROD creates complex tacit knowledge between IT and non-IT business units. 7. There are multiple and complex levels of management that need to be involved in responsive organizational dynamism. Successful management utilizes organizational learning prac- tices to develop architectures, manage change, and deal with
  • 1092.
    349ConClusIon short- and long-termprojects simultaneously. Strong leader- ship will understand that the communities of practice among the three primary levels (executive, middle management, and operations) constitute the infrastructure that best sus- tains the natural migration toward responsive organizational dynamism. This book looked at business strategy from yet another perspective, beyond its relationship with emerging technologies. Because organi- zational learning is required to foster responsive organizational dyna- mism, strategy must also be linked to learning. This linkage is known as strategic learning, which, if implemented, helps organizations to continually adapt to the changing business environment, including changes brought about by technology.
  • 1093.
    However, due tothe radical speed, complexity, and uncertainty, traditional ways of doing strategy and learning can no longer ignore the importance of technology. The old methods of determining busi- ness strategy were based on standard models that were linear and “ plug-in.” As stated, they were also very much based on projects that attempted to design one-time efforts with a corresponding result. As Pietersen (2002) explains, “ These processes usually produce operating plans and budgets, rather than insights and strategic breakthroughs” (p. 250). Technological dynamism has accelerated the need to replace these old traditions, and I emphasized that organizations that practice ROD must • Evaluate and implement technology in an ongoing process and embed it as part of normal practices. This requires a change in integration and culture.
  • 1094.
    • Comprehend thatthe process of ROD is not about planning; it is about adaptation and strategic innovation. • Have a process that feeds on the creation of new knowledge through organizational learning toward strategic organiza- tional transformation. Many scholars might correlate strategic success with leadership. While leadership, in itself, is an invaluable variable, it is just that. To attain ongoing evolution, I believe we need to move away from relying on individual leadership efforts and move toward an infrastructure 350 InForMAtIon teChnoloGY that has fewer leaders and more normative behavior that can support and sustain responsive organizational dynamism. Certainly, this fos- ters the important roles and responsibilities of CEOs, managers, and
  • 1095.
    boards, but tohave an ongoing process that changes the thinking and the operational fundamentals of the way the organization functions is more important and more valuable than individual leadership. That is why I raised the issues of discourse and language as well as self- development. Therefore, it is the ability of an organization to trans- form its entire community that will bring forth long-term strategic performance. What this book really commits to is the importance of lifelong learning. The simple concept is that adults need to continually chal- lenge their cultural norms if they are to develop what Mezirow (1990) calls “ new meaning perspectives.” It is these new meaning perspec- tives that lay the foundation for ROD so that managers and staff can continually challenge themselves to determine if they are making the
  • 1096.
    best strategic decisions.Furthermore, it prepares individuals to deal with uncertainty as well as the ongoing transitions in the way they do their jobs. It is this very process that ultimately fosters learning in organizations. While on-the-job training is valuable, Ravell shows us that move- ment, or rotation of personnel, often supports individual learning. Specifically, the relocation of IT personnel to a business unit environ- ment during Ravell phase I served to get IT staff more acclimated to business issues. This relocation helped IT staff members to begin to reflect about their own functions and their relationship to the over- all mission of the organization. Ravell phase III showed yet another transition; taking a group of IT staff members and permanently inte- grating them in a non-IT business-specific department. Ravell
  • 1097.
    also teaches us thatreflection must be practiced; time must be devoted to its instruction, and it will not occur automatically without interven- tions from the executive rank. The executive must be a “ champion” who demonstrates to staff that the process is important and valued. Special sessions also need to be scheduled that make the process of learning and reflection more formal. If this is done and nurtured properly, it will allow communities to become serious about best prac- tices and new knowledge creation. 351ConClusIon Although I used technology as the basis for the need for responsive organizational dynamism, the needs for its existence can be attributed to any variable that requires dynamic change. As such, I suggest
  • 1098.
    that readers begin tothink about the next “ technology” or variable that can cause the same needs to occur inside organizations. Such accel- erations are not necessarily limited to technology. For example, we are experiencing the continuation of organizational downsizing from acquisitions. These acquisitions present similar challenges in that organizations must be able to integrate new cultures and “ other” busi- ness strategies and attempt to form new holistic directions— direc- tions that need to be formed quickly to survive. The market per se also behaves in a similar way to technology. The ability to adjust to consumer needs and shifting market segments is certainly not always related to technological change. My point is that ROD is a concept that should be embraced notwithstanding whether
  • 1099.
    technology seems tohave slowed or to have no effect on a specific industry at a particular moment. Thus, I challenge the organizations of today to develop new strategies that embrace the need to become dynamic throughout all of their operations and to create communi- ties of practice that plan for ongoing strategic integration and cultural assimilation. This book looked at the advent of technology to uncover a dilemma that has existed for some time. Perhaps a more general way of defining what ROD offers is to compare it to another historical concept: “ self- generating organizations.” Self-generating organizations are known for their promotion of autonomy with an “ underlying organic sense of interdependence” (Johansen et al., 1995). Based on this definition, a self-generating organization is like an organism that evolves
  • 1100.
    over time. This notionis consistent with organizational learning because they both inherently support inner growth stemming from the orga- nization as opposed to its executives. The self-generating organization works well with ROD in the following ways: • Traditional management control systems do not apply. • Risks are higher, given that these organizational workers are granted a high degree of autonomy and empowerment that will lead to processes that break with the norms of the business. 352 InForMAtIon teChnoloGY • Adjustments and new processes should be expected. • These organizations tend to transform political activity into strong supporting networks. • Leadership definitions do not work. You cannot lead what
  • 1101.
    you cannot control. Self-generatingorganizations have scared traditional managers in the past, due to the fear they have of losing control. ROD provides a hybrid model that allows for self-generating infrastructures while providing certain levels of control fostered by organizational learn- ing. Specifically, this means that the control is not traditional con- trol. Responsive organizational dynamism, for example, embraces the breaking of rules for good reasons; it allows individuals to fail yet to reflect on the shortfall so that they do not repeat the same errors. It also allows employees to take risks that show promise and lead to increased critical thinking and to strategic action. Indeed, manage- ment and leadership become more about framing conditions for oper-
  • 1102.
    ations, observing theresults, and making adjustments that maintain stability. Thus, seeing ROD as a form of self-generation is the basis for sustaining innovative infrastructures that can respond to dynamic variables, like technology. I have emphasized the need for organizational learning as the key variable to make ROD a reality. While I have modified many of the organizational learning theories to fit this need, I must acknowledge that a portion of the “ learning” should be considered “ organizing.” Vince (2002) provides an analysis of how organizational learning could be used to sustain an “ organized” reflection. He provides an interesting matrix of how the two theories can be integrated. After reviewing many of the ways in which organizational learning affects responsive organizational dynamism, I have developed a
  • 1103.
    modified chart of Vince’s original framework, as shown in Table 13.1. Table 13.1 shows the three kinds of reflective practices that can operate in an organization: individual, group, and organizational. I emphasized in Chapter 9 that the extent of organizational learn- ing maturation is directly related to the sophistication of reflections among the communities of practice. The more learning that occurs, based on individual reflection, the earlier the stage at which organi- zational learning maturity occurs. Thus, more mature organizations 353ConClusIon Ta bl
  • 1104.
  • 1105.
  • 1106.
  • 1107.
  • 1108.
  • 1109.
  • 1110.
  • 1111.
  • 1112.
  • 1113.
  • 1114.
  • 1115.
  • 1116.
  • 1117.
  • 1118.
  • 1119.
  • 1120.
  • 1121.
  • 1122.
  • 1123.
  • 1124.
  • 1125.
  • 1126.
  • 1127.
  • 1128.
  • 1129.
  • 1130.
  • 1131.
  • 1132.
  • 1133.
  • 1134.
  • 1135.
  • 1136.
  • 1137.
  • 1138.
  • 1139.
  • 1140.
  • 1141.
  • 1142.
  • 1143.
  • 1144.
  • 1145.
  • 1146.
  • 1147.
  • 1148.
  • 1149.
  • 1150.
  • 1151.
  • 1152.
  • 1153.
  • 1154.
  • 1155.
  • 1156.
  • 1157.
  • 1158.
  • 1159.
  • 1160.
  • 1161.
  • 1162.
  • 1163.
  • 1164.
  • 1165.
  • 1166.
  • 1167.
  • 1168.
  • 1169.
  • 1170.
  • 1171.
  • 1172.
    354 InForMAtIon teChnoloGY reflectat the group and organizational level. Becoming more mature requires a structured process that creates and maintains links between reflection and democratic thinking. These can be mapped onto the ROD arc, showing how, from an “ organizing” perspective, reflective practice serves as a process to “ outline what is involved in the pro- cess of reflection for learning and change” (Vince, 2002, p. 74). Vince does not, however, establish a structure for implementation, for which ROD serves that very purpose, as shown in Figure 13.2. Figure 13.2 graphically shows how organized reflection maps to the linear stages of the ROD arc (the organizational-level maturity arc), which in turn maps onto the three best practices arcs,
  • 1173.
    discussed in Chapter 9.Each of the management arcs represents a level of man- agement maturity at the organizational level, with Vince’ s (2002) matrix providing the overarching concepts on how to actually orga- nize the progression from individual-based thinking and reflection to a more comprehensive and systems-level thinking and learning base. Organizational-level maturity arc Chief IT executive best practices maturity arc CEO technology best practices maturity arc Middle management
  • 1174.
    technology best practices maturity arc Vince’s“organizing” reflection matrix Strategic integration Cultural assimilation Organizational learning constructs Varying levels of management participation Individual reflection Organizational reflectionLinear stages learning maturation Individual reflection Group reflection
  • 1175.
    Organizational reflection Figure 13.2 RODand Vince’ s reflection matrix. 355ConClusIon The emphasis, overall, is that individual learning alone will under- mine collective governance. Therefore, the movement from individual to organizational self-management remains a critical part of under- standing how technology and other dynamic variables can foster new strategies for competitive advantage. Perhaps the most important conclusion of this third edition is the impact that digital technologies are having on the acceleration of change being experienced throughout the world. Indeed, digital
  • 1176.
    tech- nology has begunto change not only the business world but the very fabric of our lives. Particular to this change is the continual emer- gence of social media as a driver of new and competitive products and services. I also discussed the changing work philosophy and expecta- tions of our new generation of employees, and how they think differ- ently and want a more complex experience in the places in which they work. The Gen Y population is clearly a new breed of employees and the Gen Z behind them will be even more accustomed to using digi- tal technologies in every fabric of the ways they want to learn, their preferences in communicating with others, and their role in society. Most important are the ways that technology has changed consumer behavior. I truly believe that future generations will look back on this
  • 1177.
    period and indeedsay, this was truly a consumer revolution! http://taylorandfrancis.com 357 Glossary baby boomers: The generation of individuals who were born between the years of 1946 and 1964. business process reengineering: a process that organizations under- take to determine how best to use technology to improve business performance customer relationship management (CRM): the development and maintenance of integrated relationships with the customer base of an organization. CRM applications provide organiza- tions with integrated tools that allow individuals to store and
  • 1178.
    sustain valuable informationabout their customers. data mapping: the process of comparing the data fields in one data- base to another, or toward a new application database decision‑support systems (DSS): systems that assist managers to make better decisions by providing analytical results from stored data digital disruption: When new digital technology advancements impact the value of goods and services. digital transformation: The repositioning of or a new investment in technology and business models in efforts to compete in a rapidly changing digital economy and create a newfound sense of value for customers. 358 GlossArY enterprise resource planning (ERP): a set of multimodule applica-
  • 1179.
    tions that supportan entire manufacturing and business oper- ation, including product planning, purchasing, maintaining inventories, interacting with suppliers, providing customer service, accounting interfaces, and tracking order shipments. These systems are also known as enterprise-level applications. garbage can: an abstract concept for allowing individuals a place to suggest innovations, brought about by technology. The inven- tory of technology opportunities needs regular evaluation Gen X: The generation of individuals who were born between the years of 1965 and 1980. Gen Y/Millennials: The generation of individuals who were born between the years of 1981 and 1992. There is disagreement on the exact end dates of Gen Y individuals. internet: a cooperative message-forwarding system that links com- puter networks all over the world. intranet: a network confined to a single organization or unit.
  • 1180.
    ISO 9000: aset of quality assurance standards published by the 91-nation International Organization for Standardization (ISO). ISO 9000 requires firms to define and implement quality processes in their organization. legacy: an existing software application or system that is assumed to operate. By definition, all applications in production become legacies. operational excellence: a philosophy of continuous improvement throughout an organization by enhancing efficiency and qual- ity across operations outsourcing: A practice utilized by corporations which involves hav- ing external suppliers complete internal work in efforts to reduce costs. storyboarding: the process of creating prototypes that allow users to actually see examples of technology, and how it will look and operate. Storyboarding tells a story and can quickly educate
  • 1181.
    executives, without beingintimidating. technology definitions branding: the process of determining how an organization wants to be viewed by its customers. Branding includes not only the visual view, but also the emotional, 359GlossArY rational, and cultural image that consumers associate with an organization, its products, and services. user interface: the relationship with end users that facilitates the pro- cess of gathering and defining logical requirements user level: the tier of computer project experience of the user. There are three levels: (1) knowledgeable, (2) amateur, and (3) novice virtual teams: groups of people, geographically disbursed, and linked together using communication technologies
  • 1182.
    World Wide Web(web): loosely organized set of computer sites that publish information that anyone can read via the Internet using mainly HTTP (Hypertext Transfer Protocol) Year 2000 (Y2K): a monumental challenge to many organizations due to a fear that software applications could not handle the turn of the century. Specifically, calculations that used the year portion of a date would not calculate properly. As such, there was a huge investment in reviewing legacy systems to uncover where these flaws existed. Organizational Learning Definitions action science: pioneered by Argyris and Schö n (1996), action science was designed to promote individual self-reflection, regarding behavior patterns and to encourage a productive exchange among individuals. Action science encompasses a range of methods to help individuals learn how to be reflective about their actions. A key component of action science is the use of reflective practices— including what is commonly known among researchers and practitioners as reflection in action,
  • 1183.
    and reflection onaction. balanced scorecard: a means for evaluating transformation, not only for measuring completion against set targets, but also, for defining how expected transformations map onto the strate- gic objectives of the organization. In effect, it is the ability of the organization to execute its strategy. communities of practice: are based on the assumption that learning starts with engagement in social practice and that this prac- tice is the fundamental construct by which individuals learn. 360 GlossArY Thus, communities of practice are formed to get things done using a shared way of pursuing interest. cultural assimilation: a process that focuses on the organizational aspects of how technology is internally organized, including the role of the IT department, and how it is assimilated within
  • 1184.
    the organization asa whole. It is an outcome of responsive organizational dynamism. cultural lock‑in: the inability of an organization to change its corpo- rate culture, even when there are clear market threats (Foster & Kaplan, 2001) double‑loop learning: requires individuals to reflect on a prior action or habit that needs to change in behavior and change to oper- ational procedures. For example, people who engage in dou- ble-loop learning, may need to adjust how they perform their job as opposed to just the way they communicate with others. drivers: those units that engage in frontline or direct revenue- generating activities experiential learning: a type of learning that comes from the experi- ences that adults have accrued over the course of their individ- ual lives. These experiences provide rich and valuable forms of “ literacy” that must be recognized as important components to overall learning development.
  • 1185.
    explicit knowledge: documentedknowledge found in manuals, doc- umentation, files, and other accessible places and sources flame: a lengthy, often personally insulting, debate in an elec- tronic community that provides both positive and negative consequences frame‑talk: focuses on interpretation to evaluate the meanings of talk knowledge management: the ability to transfer individual tacit knowledge into explicit knowledge left‑hand column: a technique by which individuals use the right-hand column of a piece of paper to transcribe dialogues that they feel have not resulted in effective communication. In the left-hand column of the same page, participants write what they were really thinking at the time of the dialogue but did not say. management self‑development: increases the ability and willingness of managers to take responsibility for themselves, particularly for their own learning (Pedler et al., 1988)
  • 1186.
    361GlossArY mythopoetic‑talk: communicates ideogenicideas and images that can be used to communicate the nature of how to apply tool- talk and frame-talk, within the particular culture or society. This type of talk allows for concepts of intuition and ideas for concrete application. organizational knowledge: is defined as “ the capability of a company as a whole to create new knowledge, disseminate it through- out the organization, and embody it in products, services, and systems” (Nonaka & Takeuchi, 1995, p. 3) organizational transformation: changes in goals, boundaries, and activities. According to Aldrich (2001), organizational trans- formations “ must involve a qualitative break with routines and a shift to new kinds of competencies that challenge exist- ing organizational knowledge” (p. 163).
  • 1187.
    reflection with action:term used as a rubric for the various methods involving reflection in relation to activity responsive organizational dynamism: the set of integrative responses, by an organization, to the challenges raised by technology dynamism. It has two component outcomes: stra- tegic integration and cultural assimilation. single‑loop learning: requires individuals to reflect on a prior action or habit that needs to be changed in the future but that does not require individuals to change their operational procedures with regard to values and norms strategic integration: a process that addresses the business- strategic impact of technology on organizational processes. That is, the business-strategic impact of technology requires imme- diate organizational responses and, in some instances, zero latency. It is an outcome of responsive organizational dyna- mism, and it requires organizations to deal with a variable that forces acceleration of decisions in an unpredictable fashion.
  • 1188.
    supporters: units thatdo not generate obvious direct revenues but rather are designed to support frontline activities tacit knowledge: an experience-based type of knowledge and skill, with the individual capacity to give intuitive forms to new things; that is, to anticipate and preconceptualize the future (Kulkki & Kosonen, 2001) 362 GlossArY technological dynamism: characterizes the unpredictable and accel- erated ways in which technology, specifically, can change strategic planning and organizational behavior/culture. This change is based on the acceleration of events and interactions within organizations, which in turn create the need to better empower individuals and departments. tool‑talk: includes instrumental communities required to discuss, conclude, act, and evaluate outcomes
  • 1189.
    363 References Aldrich, H. (2001).Organizations Evolving. London: Sage. Allen, F., & Percival, J. (2000). Financial strategies and venture capital. In G. S. Day & P. J. Schoemaker (Eds.), Wharton on Managing Emerging Technologies (pp. 289– 306). New York: Wiley. Allen, T. J., & Morton, M. S. (1994). Information Technology and the Corporation. New York: Oxford University Press. Applegate, L. M., Austin, R. D., & McFarlan, F. W. (2003). Corporate Information Strategy and Management (2nd edn.). New York: McGraw-Hill. Argyris, C. (1993). Knowledge for Action: A Guide to
  • 1190.
    Overcoming Barriers to OrganizationalChange. San Francisco, CA: Jossey-Bass. Argyris, C., & Schö n, D. A. (1996). Organizational Learning II. Reading, MA: Addison-Wesley. Arnett, R. C. (1992). Dialogue Education: Conversation about Ideas and between Persons. Carbondale, IL: Southern Illinois University Press. Bakanauskiené , I., BendaravicIiené , R., Krikstolaitis, R., & Lydeka, Z. (2011). Discovering an employer branding: Identifying dimensions of employers’ attractiveness in University. Management of Organizations: Systematic Research , 59, pp. 7– 22. Bazarova, N. N., & Walther, J. B. (2009). Virtual groups: (Mis)attribution of blame in distributed work. In P. Lutgen-Sandvik & B. Davenport Sypher (Eds.), Destructive Organizational Communication: Processes,
  • 1191.
    Consequences, and ConstructiveWays of Organizing (pp. 252– 266). New York: Routledge. Bellovin. S. M. (2015). Thinking Security: Stopping Next Year’ s Hackers . Boston, MA: Addison-Wesley. 364 reFerenCes Bensaou, M., & Earl, M. J. (1998). The right mind-set for managing informa- tion technology. In J. E. Garten (Ed.), World View: Global Strategies for the New Economy (pp. 109– 125). Cambridge, MA: Harvard University Press. Bertels, T., & Savage, C. M. (1998). Tough questions on knowledge manage- ment. In G. V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in Firms: Understanding, Managing and Measuring Knowledge (pp. 7–
  • 1192.
    25). London: Sage. Boland, R.J., Tenkasi, R. V., & Te’ eni, D. (1994). Designing information technology to support distributed cognition. Organization Science , 5, 456– 475. Bolman, L. G., & Deal, T. E. (1997). Reframing Organizations: Artistry, Choice, and Leadership (2nd edn.). San Francisco, CA: Jossey- Bass. Bradley, S. P., & Nolan, R. L. (1998). Sense and Respond: Capturing Value in the Network Era. Boston, MA: Harvard Business School Press. Brown, J. S., & Duguid, P. (1991). Organizational learning and communities of practice. Organization Science , 2, 40– 57. Burke, W. W. (2002). Organizational Change: Theory and Practice. London: Sage.
  • 1193.
    Cadle, J., Paul,D., & Turner, P. (2014). Business Analysis Techniques: 99 Essential Tools for Success (2nd edn.). Swindon, UK: Chartered Institute for IT. Capgemini Consulting. (2013). Being Digital: Engaging the Organization to Accelerate Digital Transformation [White Paper]. Retrieved from http:// www.capgemini-consulting.com/resource-file- access/resource/pdf/ being_digital_engaging_the_organization_to_accelerate_digital _ transformation.pdf Cash, J. I., & Pearlson, K. E. (2004, October 18). The future CIO. Information Week . Available at http://www.informationweek.com/story/showArti- cle.jhtml?articleID=49901186 Cassidy, A. (1998). A Practical Guide to Information Strategic Planning. Boca
  • 1194.
    Raton, FL: St.Lucie Press. Cisco (2012). Creating an Office from an Easy Chair [White Paper]. Retrieved from http://www.cisco.com/c/en/us/solutions/collateral/enterprise/ cisco-on-cisco/Trends_in_IT_Gen_Y_Flexible_Collaborative_ Workspace.pdf Collis, D. J. (1994). Research note: How valuable are organizational capabili- ties? Strategic Management Journal , 15, 143– 152. Cross, T, & Thomas, R. J. (2009). Driving Results through Social Networks. How Top Organizations Leverage Networks for Performance and Growth. San Francisco, CA: Jossey-Bass. Cyert, R. M., & March, J. G. (1963). The Behavioral Theory of the Firm. Englewood Cliffs, NJ: Prentice-Hall. De Jong, G. 2014. Financial inclusion of youth in the Southern provinces of
  • 1195.
    Santander: Setting upa participatory research in Columbia. In P. Wabike & J. van der Linden (Eds.), Education for Social Inclusion (pp. 87– 106). Groningen, the Netherlands: University of Groningen. 365reFerenCes Dewey, J. (1933). How We Think. Boston, MA: Health. Dodgson, M. (1993). Organizational learning: A review of some literatures. Organizational Studies , 14, 375– 394. Dolado, J. (Ed.) (2015). No Country for Young People? Youth Labour Market Problems in Europe , VoxEU.org eBook, London: CEPR Press. Dragoon, A. (2002). This changes everything. Retrieved December 15, 2003, from http://www.darwinmag.com Earl, M. J. (1996a). Business processing engineering: A phenomenon of orga-
  • 1196.
    nizational dimension. InM. J. Earl (Ed.), Information Management: The Organizational Dimension (pp. 53– 76). New York: Oxford University Press. Earl, M. J. (1996b). Information Management: The Organizational Dimension. New York: Oxford University Press. Earl, M. J., Sampler, J. L., & Short, J. E. (1995). Strategies for business pro- cess reengineering: Evidence from field studies. Journal of Management Information Systems , 12, 31– 56. Easterby-Smith, M., Araujo, L., & Burgoyne, J. (1999). Organizational Learning and the Learning Organization: Developments in Theory and Practice. London: Sage. Eisenhardt, K. M., & Bourgeois, L. J. (1988). Politics of strategic decision
  • 1197.
    making in high-velocityenvironments: Toward a midrange theory. Academy of Management Journal , 31, 737– 770. Elkjaer, B. (1999). In search of a social learning theory. In M. Easterby- Smith, J. Burgoyne, & L. Araujo (Eds.), Organizational Learning and the Learning Organization (pp. 75– 91). London: Sage. Ernst & Young, (2012). The digitization of everything: How organisations must adapt to changing consumer behaviour [White Paper]. Retrieved from http://www.ey.com/Publication/ vwLUAssets/The_digitisation_ of_everything_- _How_organisations_must_adapt_to_changing_con- sumer_behaviour/$FILE/ EY_Digitisation_of_everything.pdf Fineman, S. (1996). Emotion and subtexts in corporate greening. Organization Studies , 17, 479– 500. Foster, R. N., & Kaplan, S. (2001). Creative Destruction: Why
  • 1198.
    Companies That Are Builtto Last Underperform the Market: And How to Successfully Transform Them . New York: Currency. Franco, V., Hu, H., Lewenstein, B. V., Piirto, R., Underwood, R., & Vidal, N. K. (2000). Anatomy of a flame: Conflict and community build- ing on the Internet. In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and Communities (pp. 209– 224). Woburn, MA: Butterworth-Heinemann. Friedman, T. L. (2007). The World Is Flat. New York: Picador/Farrar, Straus and Giroux. Friedman, V. J, Razer, M., Tsafrir, H., & Zorda, O. (2014). An action science approach to creating inclusive teacher-parent relationships. In P. Wabike & J. van der Linden (eds.), Education for Social Inclusion (pp. 25– 51).
  • 1199.
    Groningen, the Netherlands:University of Groningen. 366 reFerenCes Garvin, D. A. (1993). Building a learning organization. Harvard Business Review , 71 (4), 78– 84. Garvin, D. A. (2000). Learning in Action: A Guide to Putting the Learning Organization to Work. Boston, MA: Harvard Business School Press. Gephardt, M. A., & Marsick, V. J. (2003). Introduction to special issue on action research: Building the capacity for learning and change. Human Resource Planning , 26(2), 14–18. Glasmeier, A. (1997). The Japanese small business sector (Final report to the Tissot Economic Foundation, Le Locle, Switzerland, Working Paper
  • 1200.
    16). Austin: GraduateProgram of Community and Regional Planning, University of Texas at Austin. Grant, D., Keenoy, T., & Oswick, C. (Eds.). (1998). Discourse and Organization. London: Sage. Grant, R. M. (1996). Prospering in a dynamically-competitive environ- ment: Organizational capability as knowledge integration. Organization Science , 7, 375– 387. Gregoire, J. (2002, March 1). The state of the CIO 2002: The CIO title, What’ s it really mean? CIO . Available at http://www.cio.com/arti- cle/30904/The_State_of_the_CIO_2002_The_CIO_Title_What_s _ It_Really_Mean_ Habermas, J. (1998). The Inclusion of the Other: Studies in Political Theory. Cambridge, MA: MIT Press.
  • 1201.
    Halifax, J. (1999).Learning as initiation: Not-knowing, bearing witness, and healing. In S. Glazier (Ed.), The Heart of Learning: Spirituality in Education (pp. 173– 181). New York: Penguin Putnam. Hardy, C., Lawrence, T. B., & Philips, N. (1998). Talk and action: Conversations and narrative in interorganizational collaboration. In D. Grant, T. Keenoy, & C. Oswick (Eds.), Discourse and Organization (pp. 65– 83). London: Sage. Heath, D. H. (1968). Growing Up in College: Liberal Education and Maturity. San Francisco, CA: Jossey-Bass. Hoffman, A. (2008, May 19). The social media gender gap. Business Week . Available at http://www.businessweek.com/technology/content/ may2008/tc20080516_580743.htm Huber, G. P. (1991). Organizational learning: The contributing
  • 1202.
    processes and the literature.Organization Science , 2, 99– 115. Hullfish, H. G., & Smith, P. G. (1978). Reflective Thinking: The Method of Education. Westport, CT: Greenwood Press. Huysman, M. (1999). Balancing biases: A critical review of the literature on organizational learning. In M. Easterby-Smith, J. Burgoyne, & L. Araujo (Eds.), Organizational Learning and the Learning Organization (pp. 59– 74). London: Sage. Johansen, R., Saveri, A., & Schmid, G. (1995). Forces for organizational change: 21st century organizations: Reconciling control and empower- ment. Institute for the Future , 6 (1), 1– 9. 367reFerenCes
  • 1203.
    Johnson Controls (2010)Generation Y and the workplace: Annual report 2010 [White Paper]. Retrieved from http://www.johnsoncontrols.com/ content/dam/WWW/jci/be/global_workplace_innovation/oxygen z/ Oxygenz_Report_-_2010.pdf Jonas, L., & Kortenius, R. (2014) Beyond a Paycheck: Employment as an act of consumption for Gen Y talents (Master’ s Thesis) Retrieved from http://lup.lub.lu.se/luur/download?func=downloadFile&recordO Id=44 56566&fileOId=4456569 Jones, M. (1975). Organizational learning: Collective mind and cognitiv- ist metaphor? Accounting Management and Information Technology , 5(1), 61– 77. Kanevsky, V., & Housel, T. (1998). The learning-knowledge- value cycle. In G. V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in Firms:
  • 1204.
    Understanding, Managing and MeasuringKnowledge (pp. 240– 252). London: Sage. Kaplan, R. S., & Norton, D. P. (2001). The Strategy-Focused Organization. Cambridge, MA: Harvard University Press. Kegan, R. (1994). In Over Our Heads: The Mental Demands of Modern life. Cambridge, MA: Harvard University Press. Kegan, R. (1998, October). Adult Development and Transformative Learning. Lecture presented at the Workplace Learning Institute, Teachers College, New York. Knefelkamp, L. L. (1999). Introduction. In W. G. Perry (Ed.), Forms of Ethical and Intellectual Development in the College Years: A Scheme (pp. xi–xxxvii). San Francisco, CA: Jossey-Bass. Koch, C. (1999, February 15). Staying alive. CIO Magazine . 38– 45.
  • 1205.
    Kolb, D. (1984a)Experiential Learning: Experience as the Source of Learning and Development. Englewood Cliffs, NJ: Prentice-Hall. Kolb, D. (1984b). Experiential Learning as the Science of Learning and Development. Englewood Cliffs, NJ: Prentice Hall. Kolb, D. (1999). The Kolb Learning Style Inventory. Boston, MA: HayResources Direct. Kulkki, S., & Kosonen, M. (2001). How tacit knowledge explains organiza- tional renewal and growth: The case at Nokia. In I. Nonaka & D. Teece (Eds.), Managing Industrial Knowledge: Creation, Transfer and Utilization (pp. 244– 269). London: Sage. Langer, A. M. (1997). The Art of Analysis. New York: Springer-Verlag. Langer, A. M. (2001a). Analysis and Design of Information Systems. New York:
  • 1206.
    Springer-Verlag. Langer, A. M.(2001b). Fixing bad habits: Integrating technology person- nel in the workplace using reflective practice. Reflective Practice , 2(1), 100– 111. Langer, A. M. (2002). Reflecting on practice: using learning journals in higher and continuing education. Teaching in Higher Education , 7, 337– 351. Langer, A. M. (2003). Forms of workplace literacy using reflection-with action methods: A scheme for inner-city adults. Reflective Practice , 4, 317– 336. 368 reFerenCes Langer, A. M. (2007). Analysis and Design of Information
  • 1207.
    Systems (3rd edn.). NewYork: Springer-Verlag. Langer A. M. (2009). Measuring self-esteem through reflective writing: Essential factors in workforce development. Journal of Reflective Practice , 9(10): 45– 48. Langer, A. (2011). Information Technology and Organizational Learning: Managing Behavioral Change through Technology and Education (2nd edn.). Boca Raton, FL: CRC Press. Langer, A. M. (2013). Employing young talent from underserved popula- tions: Designing a flexible organizational process for assimilation and productivity. Journal of Organization Design , 2(1): 11– 26. Langer, A. M. (2016) Guide to Software Development: Designing and Managing the Life Cycle (2nd edn.). New York: Springer.
  • 1208.
    Langer, A.M. &Yorks, L. 2013. Strategic IT: Best practices for Managers and Executives . Hoboken, NJ: Wiley. Lesser, E. L., Fontaine, M. A., & Slusher, J. A. (Eds.). (2000). Knowledge and Communities. Woburn, MA: Butterworth-Heinemann. Levine, R., Locke, C., Searls, D., & Weinberger, D. (2000). The Cluetrain Manifesto. Cambridge, MA: Perseus Books. Lientz, B. P., & Rea, K. P. (2004). Breakthrough IT Change Management: How to Get Enduring Change Results. Burlington, MA: Elsevier Butterworth-Heinemann. Lipman-Blumen, J. (1996). The Connective Edge: Leading in an Independent World. San Francisco, CA: Jossey-Bass. Lipnack, J., & Stamps, J. (2000). Virtual Teams (2nd edn.). New York: Wiley. Lounamaa, P. H., & March, J. G. (1987). Adaptive coordination
  • 1209.
    of a learning team.Management Science , 33, 107– 123. Lucas, H. C. (1999). Information Technology and the Productivity Paradox. New York: Oxford University Press. Mackenzie, K. D. (1994). The science of an organization. Part I: A new model of organizational learning. Human Systems Management , 13, 249– 258. March, J. G. (1991). Exploration and exploitation in organizational learning. Organization Science , 2, 71– 87. Marshak, R. J. (1998). A discourse on discourse: Redeeming the meaning of talk. In D. Grant, T Keenoy, & C. Oswick (Eds.), Discourse and Organization (pp. 65– 83). London: Sage. Marsick, V. J. (1998, October). Individual strategies for organizational learn-
  • 1210.
    ing. Lecture presentedat the Workplace Learning Institute, Teachers College, New York. McCarthy, B. (1999). Learning Type Measure. Wauconda, IL: Excel. McDermott, R. (2000). Why information technology inspired but cannot deliver knowledge management. In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and Communities (pp. 21– 36). Woburn, MA: Butterworth-Heinemann. McGraw, K. (2009). Improving project success rates with better leadership: Project Smart. Available at www.projectsmart.co.uk/improving- project- success-rateswith-better-leadership.html 369reFerenCes
  • 1211.
    Mezirow, J. (1990).Fostering Critical Reflection in Adulthood: A Guide to Transformative and Emancipatory Learning. San Francisco, CA: Jossey-Bass. Milliken, C. (2002). A CRM success story. Computerworld . Available at www.computerworld.com/s/article/75730?A_CRM_success- story Miner, A. S., & Haunschild, P. R. (1995). Population and learning. In B. Staw & L. L. Cummings (Eds.), Research in Organizational Behavior (pp. 115– 166). Greenwich, CT: JAI Press. Mintzberg, H. (1987). Crafting strategy. Harvard Business Review , 65(4), 72. Mintzberg, H., & Waters, J. A. (1985). Of strategies, deliberate and emer- gent. Strategic Management Journal , 6, 257– 272. Moon, J. A. (1999). Reflection in Learning and Professional Development: Theory
  • 1212.
    and Practice. London:Kogan Page. Moon, J. A. (2000). A Handbook for Academics, Students and Professional Development. London: Kogan Page. Mossman, A., & Stewart, R. (1988). Self-managed learning in organiza- tions. In M. Pedler, J. Burgoyne, & T. Boydell (Eds.), Applying Self- Development in Organizations (pp. 38– 57). Englewood Cliffs, NJ: Prentice-Hall. Mumford, A. (1988). Learning to learn and management self- development. In M. Pedler, J. Burgoyne, & T Boydell (Eds.), Applying Self-Development in Organizations (pp. 23– 37). Englewood Cliffs, NJ: Prentice- Hall. Murphy, T. (2002). Achieving Business Practice from Technology: A Practical Guide for Today’ s Executive. New York: Wiley.
  • 1213.
    Narayan, S. (2015).Agile IT Organization Design for Digital Transformation and Continuous Delivery . New York: Addison-Wesely. Newman, K. S. 1999. No Shame in My Game: The Working Poor in the Inner City . New York: Vintage Books. Nonaka, I. (1994). A dynamic theory of knowledge creation. Organization Science , 5(1), 14– 37. Nonaka, I., & Takeuchi, H. (1995). The Knowledge-Creating Company: How Japanese Companies Create the Dynamics of Innovation. New York: Oxford University Press. Olson, G. M., & Olson, J. S. (2000). Distance matters. Human– Computer Interactions , 15(1), 139– 178. Olve, N., Petri, C., Roy, J., & Roy, S. (2003). Making Scorecards Actionable:
  • 1214.
    Balancing Strategy andControl. New York: Wiley. O’ Sullivan, E. (2001). Transformative Learning: Educational Vision for the 21st Century. Toronto: Zed Books. Peddibhotla, N. B., & Subramani, M. R. (2008). Managing knowledge in virtual communities within organizations. In I. Becerra- Fernandez & D. Leidner (Eds.), Knowledge Management: An Evolutionary View (229– 247). Armonk, NY: Sharp. Pedler, M., Burgoyne, J., & Boydell, T. (Eds.). (1988). Applying self- Development in Organizations . Englewood Cliffs, NJ: Prentice-Hall. Peters, T. J., & Waterman, R. H. (1982). In Search of Excellence: Lessons from America’ s Best­Run Companies. New York: Warner Books.
  • 1215.
    370 reFerenCes Pietersen, W.(2002). Reinventing Strategy: Using Strategic Learning to Create and Sustain Breakthrough Performance. New York: Wiley. Porter, M. E., & Kramer, M. R. 2011. Creating shared value. Harvard Business Review , 89(1/2): 62– 77. Prange, C. (1999). Organizational learning: Desperately seeking theory. In M. Easterby-Smith, J. Burgoyne, & L. Araujo (Eds.), Organizational Learning and the Learning Organization (pp. 23– 43). London: Sage. Probst, G., & Bü chel, B. (1996). Organizational Learning: The Competitive Advantage of the Future. London: Prentice-Hall. Probst, G., Bü chel, B., & Raub, S. (1998). Knowledge as a strategic resource. In G. V. Krogh, J. Roos, & D. Kleine (Eds.), Knowing in Firms: Understanding, Managing and Measuring Knowledge (pp. 240– 252).
  • 1216.
    London: Sage. Rassool N.1999. Literacy for Sustainable Development in the Age of Information (Vol. 14). Clevedon: Multilingual Matters Limited. Reynolds, G. (2007). Ethics in Information Technology (2nd edn.). New York: Thomson. Robertson, S., & Robertson, J. (2012). Mastering the Requirements Process: Getting Requirements Right (3rd edn.). Upper Saddle River, NJ: Addison-Wesley. Sabherwal, R., & Becerra-Fernandez, I. (2005). Integrating specific knowl- edge: Insights from the Kennedy Space Center. IEEE Transactions on Engineering Management , 52, 301– 315. Sampler, J. L. (1996). Exploring the relationship between information tech- nology and organizational structure. In M. J. Earl (Ed.),
  • 1217.
    Information Management: The OrganizationalDimension (pp. 5– 22). New York: Oxford University Press. Saxena, P., & Jain. R. (2012) Managing career aspirations of generation Y at work place. International Journal of Advanced Research in Computer Science and Software Engineering , 2(7), 114–118.. Schein, E. H. (1992). Organizational Culture and Leadership (2nd edn.). San Francisco, CA: Jossey-Bass. Schein, E. H. (1994). The role of the CEO in the management of change: The case of information technology. In T. J. Allen & M. S. Morton (Eds.), Information Technology and the Corporation (pp. 325– 345). New York: Oxford University Press. Schlossberg, N. R. (1989). Marginality and mattering: Key issues in building
  • 1218.
    community. New Directionsfor Student Services , 48, 5– 15. Schoenfield, B. S. E. (2015). Securing Systems: Applied Security Architecture and Threat Models . Boca Raton, FL: CRC Press. Schö n, D. (1983). The Reflective Practitioner: How Professionals Think in Action. New York: Basic Books. Senge, P. M. (1990). The Fifth Discipline: The Art and Practice of the Learning Organization. New York: Currency Doubleday. Siebel, T. M. (1999). Cyber Rules: Strategies for Excelling at E-Business. New York: Doubleday. 371reFerenCes Stolterman, E., & Fors, A. C. (2004). Information technology and the good life. Information Systems Research , 143, 687– 692.
  • 1219.
    Swadzba, U. (2010).Work or consumption: Indicators of one’s place in the Society. In Beyond Globalisation: Exploring the Limits of Globalisation in the Regional Context (Conference Preceedings) (pp. 123– 129). Ostrava: University of Astrava Czech Republic. Swieringa, J., & Wierdsma, A. (1992). Becoming a Learning Organization, beyond the Learning Curve. New York: Addison-Wesley. Szulanski, G., & Amin, K. (2000). Disciplined imagination: Strategy mak- ing in uncertain environments. In G. S. Day & P.J. Schoemaker (Eds.), Wharton on Managing Emerging Technologies (pp. 187– 205). New York: Wiley. Teece, D. J. (2001). Strategies for managing knowledge assets: The role of firm structure and industrial context. In I. Nonaka & D. Teece (Eds.),
  • 1220.
    Managing Industrial Knowledge:Creation, Transfer and Utilization (pp. 125– 144). London: Sage. Teigland, R. (2000). Communities of practice at an Internet firm: Netovation vs. in-time performance. In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and Communities (pp. 151– 178). Woburn, MA: Butterworth-Heinemann. Tushman, M. L., & Anderson, P. (1986). Technological discontinuities and organizational environments. Administrative Science Quarterly , 31, 439– 465. Tushman, M. L., & Anderson, P. (1997). Managing Strategic Innovation and Change. New York: Oxford University Press. Vince, R. (2002). Organizing reflection. Management Learning , 33(1), 63– 78. Wabike P. 2014. University-Community Engagement:
  • 1221.
    Universities at a crossroad?In P. Wabike & J. van der Linden (eds.), Education for Social Inclusion (pp. 131– 149). Groningen, the Netherlands: University of Groningen. Wallemacq, A., & Sims, D. (1998). The struggle with sense. In D. Grant, T. Keenoy, & C. Oswick (Eds.), Discourse and Organization (pp. 65– 83). London: Sage. Walsh, J. P. (1995). Managerial and organizational cognition: Notes from a trip down memory lane. Organizational Science , 6, 280– 321. Watkins, K. E., & Marsick, V. J. (1993). Sculpting the Learning Organization: Lessons in the Art and Science of Systemic Change. San Francisco, CA: Jossey-Bass. Watson, T. J. (1995). Rhetoric, discourse and argument in
  • 1222.
    organizational sense making: Areflexive tale. Organization Studies , 16, 805– 821. Wellman, B., Salaff, J., Dimitrova, D., Garton, L. Gulia, M., & Haythornthwaite, C. (2000). Computer networks and social networks: Collaborative work, telework, and virtual community. In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and Communities (pp. 179– 208). Woburn, MA: Butterworth-Heinemann. Wenger, E. (1998). Communities of Practice: Learning, Meaning and Identity. Cambridge, MA: Cambridge University Press. 372 reFerenCes Wenger, E. (2000). Communities of practice: The key to knowledge strategy. In E. L. Lesser, M. A. Fontaine, & J. A. Slusher (Eds.), Knowledge and
  • 1223.
    Communities (pp. 3–20). Woburn, MA: Butterworth- Heinemann. West, G. W. (1996). Group learning in the workplace. In S. Imel (Ed.), Learning in Groups: Exploring Fundamental Principles, New Uses, and Emerging Opportunities: New Directions for Adult and Continuing Education (pp. 51– 60). San Francisco, CA: Jossey-Bass. Westerman, G., Bonnet, D., & McAfee, A. (2014). Leading Digital: Turning Technology into Business Transformation . Boston, MA: Harvard Business School Press. Yorks, L., & Marsick, V. J. (2000). Organizational learning and transforma- tion. In J. Mezirow (Ed.), Learning as Transformation: Critical Perspectives on a Theory in Progress (pp. 253– 281). San Francisco, CA: Jossey-Bass. Yourdon, E. (1998). Rise and Resurrection of the American
  • 1224.
    Programmer (pp. 253– 284).Upper Saddle River, NJ: Prentice Hall. 373 Index A Abstract conceptualization, as learning preference, 84 Abstraction, leaps of, 10 Acceleration, xxi Access control, social networking issues, 134 Access tracking, 137 Accountability, of IT staff, 5 Accounting, IT relevance to, 24 Action, emotional components of, 92
  • 1225.
    Action science, 3,4, 74, 142, 152, 359 Active experimentation, as learning preference, 84 Activity, relationship to content, 90 Activity systems, organizational transformation of, 139–141 Adaptive organizations, 83 Administrative departments, alignment with, 17–19 Adoptive approach, 63 Adversarial relationships, 2 Advertising business, transformation to media market, 231 Alignment with administrative
  • 1226.
    departments, 17–19 to businessstrategy, 148 with human resources, 18 with social networks, 138 of technology with business strategy, 149 Answerthink Corporation, 304 Applied individual learning for technology model, 87 Architecture, 46 Assimilation, 6 cultural, 7 Assumptions, unearthing unspoken, 9–10 Attribution theory, 166 Autonomy, 351 374 Index
  • 1227.
    B Back office issues atICAP, 204 as strategic business problems, 195 Balanced scorecard, 359 availability variable, 156 business stakeholder support for, 155 as checklist and tracking system, 154 competence variable, 156 discourse and, 156–158 enthusiasm requirements, 156 executive management support for, 156 implementing using application software, 155 information provider
  • 1228.
    responsibilities, 155 learning pilots responsibilities,155 as living document, 147 as measurement of knowledge creation, 158 modifications for ROD, 149 organizational transformation and, 139–161 for Ravell phase I, 153 roles and responsibilities, 156 rules of success, 160 schematic diagram, 149 scorecard designer, 155 responsibilities, 155 Behavioral shifts, 12, 140 in CIOs, 195 Benefits realization, five pillars of, 45–46
  • 1229.
    Best practices, 37 CEObest practices technology arc, 313–314 for chief executive officers, 299–313 chief IT executive best practices arc, 297–299 for chief IT executives, 288–297 ethics and maturity issues, 333–337 middle management, 316–325 quest for, 287–288 unproven nature of, 56–57 Billable time records financial returns from technology solution, 229 limitations at HTC, 225–226 value-added services solutions, 232
  • 1230.
    Board meetings, ITissues discussed at, 34 Boise Cascade Office Products, 308, 309, 311 Bottom-up learning, xxix, 132, 214, 235 at Siemens AG, 192, 193 Boundaries, organizational transformation of, 139, 140 Brain hemispheres, and learning preferences, 85 Budgetary cutbacks, 47, 293 Budgeting, IT strategies, 35 Business analysts, as intermediaries, 22 Business ethics, 296–298, 302, 326 Business knowledge, by chief IT
  • 1231.
    executives, 291 Business plan,judging technologies based on, 212–213 Business process, implementation of, 314 Business process impact, 45 Business process outsourcing leaders, 296 Business process reengineering (BPR), 25, 47, 357 Business rules, 126 Business strategy, 31, 34–35 aligning technology with, xii, 149 375Index articulating through balanced scorecard, 151
  • 1232.
    balanced scorecards and,159–160 CIO assimilation to, 195 as continual process, 148 and importance of balanced scorecards, 161 IT role in, 21, 23–24, 26 translating to operational terms, 148 Business technology cognition, 326, 329 Business user involvement, risks, 126 C Case studies, xxx, 187, 233–238; see also Ravell Corporation case study HTC, 225–232 ICAP, 203–224 learning-knowledge-value
  • 1233.
    cycle, 238 organizational learning approachessummary, 235 Siemens AG, 187–203 Catch-up, playing, 120 Centralization issues, 290, 305–306 CEO best practices technology arc, 313–314 CEO roles, in HTC case study, 227–228 CEO technology best practices arc, 313–314, 317, 334 detail, 318–321 maturity stages, 314–315 performance dimensions, 315–316 CFO quarterly meetings, 193
  • 1234.
    at Siemens AG,191, 192 Change, xxiv evolutionary vs. revolutionary, 120 frequency of, 141 mobilizing through executive leadership, 148 need for accelerated, 68 overwhelming pace of, 293 pace of, 18 planned vs. unplanned, 120 rejection of technology-driven, 72 unpredictability of, 77 vs. transformation, 141, 152 Change agents, 38 CEOs as, 311 IT executives as, 39 technology, 68, 195 Change leaders, 296 Change management, xxiv, 45,
  • 1235.
    120–123, 345 by chiefIT executives, 291 goals for IT, 123 at ICAP, 209 for IT organizations, 123–133 Chief executive officers (CEOs), xxix; see also Executive perspective advice for participation in organizational transformation, 222 best practices, 299–305, 312–313 business-first perspectives, 309 business uses of technology and, 314 as change agents, 311 CIO direct reporting to, 305–306 commitment to technology
  • 1236.
    projects, 308–309 conceptual knowledgeof technology, 314 dependence on CIOs for business advice, 305 engaging in transformation, 208 executive decision making, 311 five stages of maturity, 313 ICAP case study, 206 376 Index intervention in supporter departments, 230 and IT centralization/ decentralization issues, 306–307 lack of cognizance about technology uses, 202
  • 1237.
    linear development model,313 multiple business perspectives, 314 need for linking business and technology leaders, 310 need for standards, 307 outsourcing responsibilities, 306 perceptions of IT, xxix, 339 recognition of never-ending technology projects, 311–312 reluctance to implement new technology, 25 risk management and, 307–313 role in examining own biases, 203 role in HTC transformation, 230 strategic technology uses by, 315 willingness to learn from staff, 208 Chief financial officer (CFO) CIOs
  • 1238.
    reporting to, 188,226, 288 lack of creativity, 226 Chief information officers (CIOs), 288–289 business-level vs. corporate-level, 291 inability to establish corporate strategy, 211 integrating job functions into business strategy, 190 integration challenges, 344 interactions with board-level executives, 190 lack of involvement in business strategy, 190 need for advanced degrees, 307 need to educate, 188
  • 1239.
    reporting to CFOs,188 as senior lower level, 193 training in business strategy, 202 transformation to proactive technologists, 195 Chief IT executives best practices, 288 best practices arc, 299, 334 business environment influences, 293 business ethics, 298 business knowledge competence, 291 as business process outsourcing leaders, 296 change creation and management roles, 291 as change leaders, 296
  • 1240.
    common barriers tosuccess, 293 communications roles, 291 compensation methods, 290 comprehension of technology processes, 297 detail, best practices arc, 300–303 emerging roles and responsibilities, 295–296 as executive account managers, 295 executive presence, 299 factors influencing strategic options, 294 hiring and retention roles, 292 implementation of business/ technology processes by, 315 industry expertise, 291 as information architects, 295 as innovation leaders, 295 lack of uniform titles, 288 leadership roles, 292 management skills, 292
  • 1241.
    management values, 298 multiplicityof technology perspectives, 297 377Index organizational culture competency, 298 as process leaders, 295 relationship building role, 291 roles and responsibilities, 290–292 as shared services leaders, 295 stable technology integration, 298 strategic thinking role, 290 as supply chain executives, 295 technology cognition, 298 technology competence and recognition, 297
  • 1242.
    technology driver influences,294 technology leadership, 298 technology proficiency, 291 Chief knowledge officer (CKO), 289 Chief technology officer (CTO), 289 intermediary role at HTC, 232 CIO advisory board, 191, 193 need for peer relationships, 192 at Siemens, 190 Citibank, use of technology as driver, 60 Code of ethics, 336 Cognitive schemata, 82 Collaborative inquiry, 142 Collective identity, 91 Collective knowledge, storage of, 81 Collective learning, 78, 345 Combination, and virtual teams, 171–172
  • 1243.
    Combination dynamism, 173 Commitment,raising IT levels of, 6 Commoditization, 59, 61, 62, 207, 224, 259, 260, 306, 347 Common threads of communication, 156, 158, 159, 221, 344 at Siemens, ICAP/ETC, HTC, 233 Communications by chief IT executives, 291 failures in virtual team efforts, 164 importance to chief IT executive role, 291 between IT organization and others, 49 tacit knowledge buried in, 172 in virtual teams, 168
  • 1244.
    Communities of practice,xii, xxi, 45, 75–83, 87–90, 94, 103, 130, 189, 344, 346, 351, 359–360 application to virtual teams, 168–172 blockage by organizational controls, 346 CIO-based, 191 and consensus building, 88 disagreements within, 196 discourse as basis of successful, 172 electronic, 78 extended seven steps, 79 formation of multiple, 233 at ICAP, 218–219 incorporating technology projects into, 149 knowledge creation through, 234 knowledge management in, 197 Milliken’s formation of, 310
  • 1245.
    and organizational learning,144 overlapping, 215 participation at Siemens, ICAP/ ETC, HTC, 235 preparing CIOs for, 196 reliance on innovation, 78 technology as change agent for, 178 use in ROD, 75 virtual dynamism, 179 Communities of practice common threads, 159 Communities of practice threads, 157 Competitive advantage, 117, 233, 236, 355 378 Index
  • 1246.
    centrality of technologyto, 348 dependence on knowledge management, 116 importance of strategic integration to, 46 improvement at Siemens AG, 190 issues at ICAP, 205, 207 IT potential to provide, 28 loss without transformation, 139 technology as source of, 41, 72 Completion time, estimating, 56 Compliance monitoring, in virtual teams, 177 Concrete experience, as learning preference, 84 Confidentiality, 336 end of, 134 Consequential interoperability, 45
  • 1247.
    Consultants, use ofoutside, 32 Containers, 96 Content, vs. technology, 207 Content-activity relationship, 90, 91 Continual learning, in virtual teams, 179 Continuous innovation, 117 Control organizational fear of losing, 352 vs. empowerment, 345–346 Conversion effectiveness, 21 Coopers & Lybrand, 58 Corporate culture, six myths of, 160 Corporate services standards, at Siemens AG, 200 Creative professionals, cultural assimilation challenges, 225 Cross-functional synergetic teams, 9 Cultural assimilation, xvii, xxiv, 42,
  • 1248.
    48–49, 140, 187,245, 293, 306, 341, 343, 360 between brokers and technologists at ICAP, 212 changes caused by new technologies, 245 and communities of practice, 77 and creation of new cultures, 50, 51 as foundation for organizational transformation, 143 in global organizations, 200 at implementation stage, 55–57 issues at HTC, 227 and IT organization communications with others, 49 and movement of traditional IT
  • 1249.
    staff, 49–51 at productmaturity phase, 61 in ROD, 43 at Siemens AG, 199, 202 in transition, 146 uniqueness to each organization, 50 in virtual teams, 179 Cultural awareness, 17 Cultural change, inevitability of, 122 Cultural differences, 181, 199 ICAP experiences, 215 regarding operational norms, 200 in virtual teams, 174, 177 Cultural history, and virtual teams, 175 Cultural lock-in, 120, 360
  • 1250.
    Cultural transformation, 8,16–17 limitations of power approach, 17 Customer perspective in balanced scorecard, 150 in Ravell Phase I balanced scorecard, 153 ROD adjustments, 150–151 Customer relationship management (CRM), 290, 308–311, 357 Customer-vendor relationships, technology as change agent for, 46 379Index D
  • 1251.
    Data mapping, 126,357 Deasy, Dana, 67, 187–190, 192, 195– 202, 207, 309, 344, 347 Decentralization, 24, 32, 306–307 with mature uses of technology, 307 Decision support systems (DSS), 159, 357 Democratic leadership, importance to high-velocity environments, 123 Department/unit view as other, in ROD arc, 102, 103 Design/planning phase, 88 Development schedules failures in, xxiv shortening dynamic, 56
  • 1252.
    Direct return, 47 throughtechnology investments, 236, 238 Disagreements, in communities of practice, 196–197 Disciplines, 89 Discourse, xxi, 350; see also Social discourse balanced scorecards and, 156–158 as basis of successful COP implementation, 172 links to organizational learning and technology, 93 Distance workers, 81, 164; see also Virtual teams Documentation, 125
  • 1253.
    and training materials,126 Dot.com phenomenon, 23, 24 fallacies of, 212 and growth of e-business, 188 loss of commitment to learning organizations in, 112, 113 and negative perceptions of technology as business driver, 201 Double-loop learning, 4, 344, 360 Driver functions, 58, 113, 360 conversion to supporter functions, 62 and high-risk operations, 59 IT-related, 59 vacuum of IT presence in, 60 Driver to supporter life cycle, 141, 306, 346–347
  • 1254.
    organizational transformation in, 145 Dynamic,xxi E E-business, 140 business vs. technology components, 346 expanding use at Siemens AG, 187 IT role at Siemens AG, 193 perception as IT responsibility, 201 top-down strategy introduction, 188 transferring emotion in, 181 E-business realignment, 46, 57
  • 1255.
    Economies of scale,34, 58, 61, 62, 130, 152, 347 in driver to supporter life cycle, 141, 145 Education through reflection, 14 and transformation, 14 Electronic communities, 78, 79 Electronic trading, 207, 223 growth at ICAP, 206 at ICAP, 205 and need for organizational transformation, 206 380 Index as proportion of total trading
  • 1256.
    dollars, 224 replacement ofmediocre brokers by, 210 role in business strategy, 203 as supplement to voice broker, 209 Emerging technologies, xiii challenges to business strategy, 28 as change agents, xxiv communities of practice and, 344 impact on business strategy, 124 and mission modification, 207 Emotion requirements for virtual team members, 174 and social discourse, 92–96 in virtual teams, 181–185 Employee evaluations, 17 Employee replacement, see Staff
  • 1257.
    replacement Empowerment, 91, 345–346 vs.control, 345–346 Enron Corporation, 333, 337 Enterprise resource planning (ERP), 358 Ethics and best practices, 333–337 executive, 315, 320 Event-driven education limits of, 109 at operations tier, 114 Evolution phase, 52 in technology business cycle, 57 Evolutionary change, 120–121 at Siemens, 196 Evolutionary learning, 77, 99 initiation by senior
  • 1258.
    management, 189 in ROD,112 Executive account managers, 295 Executive decision making, 196, 310 by Milliken, 310 Executive-driven programs, limits of, 109 Executive ethics, 315, 320 Executive interface, 150 earlier needs in virtual COPs, 185 Executive leadership, 148, 313–316, 320 Executive learning, systems perspective, 114 Executive participation, importance
  • 1259.
    of direct, 232 Executiveperspective, 9 consequences of exclusion, 214 importance of including in learning, 98 on IT, 29–31 lack of detail knowledge, 110 level of involvement with IT, 34 poor understanding of competitive dynamics, 25–27 on role of IT, 32–33 and stimulus for cultural assimilation, 114 support for virtual teams, 174 Executive presence, 61, 296–299, 302, 315 Executive sponsors, 54, 55, 150, 232
  • 1260.
    Executive tier, 114 Executivevalues, 313, 314 Expectations, and virtual teams, 176 Experiential learning, xxviii, 83–88, 360 Explicit knowledge, 118, 171, 360 challenges for virtual COPs, 172 transformation to, 223 Externalization, and virtual teams, 169–171 Externalization dynamism, 172 Eye-opening events, 15 381Index F
  • 1261.
    Facebook, 135 Facilitator role,127 Factors of multiplicity, 44 False generalizations, 299 Feasibility phase, 52, 53, 87 Feedback, 7 negative IT responses to, 7 Financial measurements in balanced scorecard, 150 inability to capture IT value, 147 in Ravell Phase I balanced scorecard, 153 ROD adjustments, 150 First-line managers, 111 Flame communities, 81, 360 Frame-talk, 93, 95, 181, 361 G Garbage can model, 27, 53, 358 of IT value, 54
  • 1262.
    Gender participation, insocial networks, 138 Generalizations, entrenched, 10 Globalization, 81, 256, 283 for scalable technologies, 199 Goals organizational transformation of, 139, 140 working towards, 15 Governance by control, 333 Governance issues, 245 Group discussions, 84, 85, 88, 282 Group relations conferences, 353 H Hackett Benchworking, 304 Hardware upgrades, 124 High-risk operations, 59
  • 1263.
    High-velocity environments, 122 ICAP,209 need for democratic leadership in, 123 HT/IT governance model, 18 HTC case study, xxx, 225–226, 308 billable time records problems, 225 cascading effect of increased profits, 229 CEO interactions, 227–228 CTO intermediary role, 232 follow-up developments, 231–232 IT contribution to learning- knowledge-value chain, 237 IT history, 226–227 middle-ground solution, 228 organizational transformation, 229–231 process, 228–229 similarities to Ravell, 231
  • 1264.
    Human resources (HR) dedicatedstaff allocation to IT, 19 failure to align with, 18 social networking issues, 137–138 as undisclosed enemy, 18 Hype, about IT importance, 33 I ICAP case study, xxx, 203–224, 308, 347 B brokers, 210 broker classes, 209–210 A brokers, 209–210 C brokers, 209–210 communities of practice, 218–222 COP common threads, 221 expanding markets through technology, 213
  • 1265.
    five-year follow-up, 224 hybridbrokers, 210 382 Index IT contribution to learning-knowledge-value chain, 237 language discourse at, 215, 218 limitations of off-the-shelf solutions, 205 middle-management COP, 220 recognition of IT as business driver, 203 role of electronic trading in business strategy, 203 steps to transformation, 217 Y2K event and executive
  • 1266.
    involvement, 214–215 Identity definition,133 for IT, 10–12 Identity development, 91 in virtual teams, 179–180 Ideogenic issues, 181 in virtual teams, 182 Implementation phase, 52, 88 of technology business cycle, 55–57 Indirect returns, 27, 29, 47, 213 need for management to recognize, 236 Individual learning, xxviii, 70, 83, 171, 344 event driven, 76 at ICAP, 205 by middle managers, 115, 116
  • 1267.
    moving to system-levellearning from, 143 personnel rotation and, 350 progression to systems thinking, 354–355 in ROD arc, 183–184 with ROD arc, 104 shift to social, 97 simultaneously with organizational learning, 220 styles of, 69 vs. system-level, 344 Industry expertise, by chief IT executives, 291 Inferential learning, 64 Information architects, 295 Information overload, 119 Information Technology (IT), xxxii, 1
  • 1268.
    as agent forbusiness transformation, 39 best organizational structure for, 28 and centralization/ decentralization, 24 centralization/decentralization issues, 306–307 CEO perceptions of, 339 combining with organizational learning, 339 contribution to learningknowledge-value chain, 237 defining role and mission, 30 difficulty proving value of, 293 executive knowledge and
  • 1269.
    management of, 28–29 executiveviews of, 29–31 extent of non-IT executive knowledge in, 28 hype about, 33 identifying driver component at Siemens AG, 195 identity definition at Ravell, 10–12 impacts on marketing and productivity, 35 importance to business strategy and organizational structure, 21, 30 improving performance through organizational learning, 1 integrating into organizational processes, xix
  • 1270.
    as key tosuccess, xx 383Index lack of representation at strategic/ executive levels, 339 management and strategic issues, 31, 34 means of evaluation, 28 need to provide greater leadership, 340 operation reductions, 38 perception and role, 30 potential to provide competitive advantage, 28 potential to reinvent business, 23 project perspective, 340 relationship to organizational
  • 1271.
    structure, 28 relevance tooperations, accounting, marketing, 24 role and mission, 30 role in behavioral transformation, 228 role in business strategy, 26–27 seamless relationship with organizational learning, xix social networks and, 134–138 as strategic business tool, 26 strategic importance, 32 synergistic union with organizational learning, 187 view as cost center, 38 ways to evaluate, 27–28 Informational flows, importance of, 33
  • 1272.
    Innovation leaders, 295 Intangibleassets, 147 Integrated disposition phase, in ROD arc, 103 Integration, see IT integration Intellectual capital management Interactive culture, 48 Internal business processes in balanced scorecard, 150 ROD adjustments, 150 Internal capacity, lack of, 188 Internal development, 32 Internalization, and virtual teams, 171 Internalization dynamism, 173 Internet, 358 as driving force for e-business realignment, 46
  • 1273.
    impact on businessstrategy, 32 increasing pressure to open, 134 Internet delivery, 23 impact on business strategy, 30 Intranets, 358 and accelerated learning pace, 142 Invisible organizations, 135, 137 ISO 9000, 77, 358 use for virtual team processes, 177 Isolation, xxvii, 10 of IT departments, 1–2, 21 physical, 2 IT departments assimilation challenges, 21 change management for, 123–133 complex working hours, 18 concerns about elimination of integrity, 49–50
  • 1274.
    dichotomous relationship with communitiesof practice, 78 incorporating into true organizational learning, 68 integrating into organizational culture, 3 isolation of, 1 lack of executive presence in management teams, 61 marginalization, xv as nucleus of all products and careers, 211 overhead-related functions, 59 perception as back office operations, 188, 211 perception as support function, 188 reporting to CFOs, 226
  • 1275.
    384 Index restructuring of,50 shifting salary structures, 18 silo operations, 18 subjection to budgetary cutbacks, 47 support functions, 59 view by other departments, 30 IT dilemma, xxiv, 21–39 day-to-day issues, 137 defining, 36–38 and developments in operational excellence, 38–39 executive knowledge and management, 28–29 executive perspective, 32–33 general results, 36 IT role in business strategy,
  • 1276.
    25–27 management and strategic issues,34 organizational context, 24 and organizational structure, 24–25 recent background, 23–24 IT evaluation, 27 IT integration, 3–5, 14, 23, 109 blueprint for, 5–6 enlisting support for, 6–7 executive confusion about, 36 failures in strategic planning, 36 implementing, 12–14 progress assessment, 7 vs. outsourcing, 22 IT investment historical phases, 44
  • 1277.
    risk identification for,46 IT jobs, decline in U.S., 163 IT performance, measuring, 31 IT professionals as individualists, 212 integrating with non-IT personnel, 49 movement into other departments, 49–51 outsider image, 22 poor interpersonal skills, 33 project management roles, 340 reluctance to take on responsibility for others, 212 as techies, 21 IT projects, failure of completion, xxiv IT roles and responsibilities, 60–61 IT spending needs, failure of ROI to
  • 1278.
    accommodate, 27 IT value,garbage can model, 53–54 IT virtual teams, 19 K Knowledge creation, 53, 117, 118, 234 balanced scorecards and, 158–161 as basis of transformation, 144 and communities of practice, 169 by electronic communities, 80 structured approach difficulties, 77 by technology, 222 Knowledge development, 64, 83, 234 Knowledge management, xii, xxi, xxix, 45, 116–120, 360
  • 1279.
    in COPs, 197 fourmodes of, 172 instilling through technology, 234 participation at Siemens, ICAP/ ETC, HTC, 236 in virtual context, 174 KPMG, 308 L Language use, xxviii, 89–91, 350 at ICAP, 215 385Index Latency problems, xxv Leadership, xii executive, 315, 320
  • 1280.
    movement away fromindividual, 349–350 need for greater IT, 340 vs. governance, 335 Leaps of abstraction, 10 Learner centeredness, 127 Learning converting to strategic benefit, 65 defining at organizational level, 14–15 double-loop, 4 single-loop, 4 situated, 75 Learning and growth perspective in balanced scorecard, 150 in Ravell Phase I balanced scorecard, 152, 153
  • 1281.
    ROD adjustments, 150–151 Learningand working, 75 Learning approaches, linear development in, 96–107 Learning contracts, 130 Learning-knowledge-value chain, 238 IT contributions to, 237 Learning maturation, 94, 96, 104, 343 phases of, 98 Ravell case study example, 100 Learning organizations, xii, xviii, 9, 45, 72–75 developing through reflective practice, 15, 20 and fallacy of staff
  • 1282.
    replacement, 113 transitioning tothrough technology acceleration, 13 Learning preferences, xxviii, 83–88 and curriculum development, 85 Learning Style Inventory (LSI), 84, 85 combined applied learning wheel, 87 McCarthy rendition, 86 Learning Type Measure instrument, 85 Learning wheel, 84, 86, 87, 95 Left-hand column, 9, 360 Legacy systems, xi, 124, 358 Lessons learned, Ravell Corporation case study, 14–17 Life-cycle maturation, shortening
  • 1283.
    through strategic integration, 44 Lifelonglearning, 350 Line management, 111 BPR buy-in by, 25 defined, 111 executive and operations perspectives, 9 as executives in training, 111 feedback from, 7 importance of support from, 6, 219 learning maturation among, 96–97 meeting attendance, 11 proximity to day-to-day activities, 110 in Ravell case study, 109, 132 role in managing organizational learning, 109–111 role in product maturity phase, 62
  • 1284.
    strategic importance toIT integration, 8–9 technical knowledge, 9 as technology users, 54, 55 vs. first-line managers, 111 vs. supervisors, 112 Linear development, 342 in learning approaches, 96–107 Linkages, 348 Linkedln, 135 Lost jobs cycle, 163 386 Index M Management presence, 324–328, 331 Management pushback, 17 Management self-development,
  • 1285.
    127, 360 Management skills,by chief IT executives, 292 Management support, importance of, 6 Management tiers, 113–114 Management values, 296–299, 302, 324–327, 331 Management vectors, 112–116, 341 and three-tier organizational structure, 114 Mandatory services, at Siemens AG, 200 Marginality, 89 Marginalization, xxvii, 2, 22, 49 of nonadaptive virtual team members, 168
  • 1286.
    reducing, 18 Marketing IT relevanceto, 24 social networking issues, 138 Mastery learning, 128 Mature self, 182 role in virtual team success, 173 and virtual team complexities, 185 Maturity ethics and, 327, 334 as gradual process, 345 Maturity arcs, xxviii, 173, 332, 335, 342 Maturity stages CEO best practices technology arc, 314–315
  • 1287.
    in chief ITexecutive best practices arc, 297–299 middle manager best practices arc, 325–326 McDermott, Stephen, 113, 203– 216, 222–224 learning philosophy, 204 Measurable outcomes, 45, 92, 110, 142, 342 Measurement phase, 52, 88 in technology business cycle, 53 Mentorship, 127–130 in self-development process, 129, 131 Middle manager best practices arc, 323, 324
  • 1288.
    maturity stages, 325–326 performancedimensions, 326–327 Middle managers, 110–112 avoidance of worker compliance demands, 227 balanced scorecard discourse, 157–158 best practices, 316–325 challenges of defining best practices for, 316 community of practice at ICAP, 221 executive-based best practices, 324 first-line managers, 111 five stages of maturity, 323 implementation-based best
  • 1289.
    practices, 322 importance toorganizational learning, 109 issues at ICAP, 219 as key business drivers, 110 line managers, 111 multiple tiers of, 111, 113–114 organizational vs. individual learning by, 115, 116 representing required changes through, 220 stagnation and resistance to change among, 110–111 387Index supervisors, 112 three tiers of, 342
  • 1290.
    Middle-up-down approach, 110, 112,150, 214, 215, 235, 313, 342 Milliken, Christopher, 308–312 Missed opportunities, consequences of, 341 Mission, 36 executive perspectives, 22 identifying IT, 10 modifying based on emerging technologies, 207 Moral responsibility, 336 Multiple locations, 166–169 for virtual teams, 178 Mythopoetic-talk, 93, 94, 181, 182, 361 N
  • 1291.
    Networked organizations, 24 Newmeaning perspectives, 350 Non-IT executives, extent of technology knowledge, 28, 31 Non-sense, 93 Normative behavior, vs. leadership, 350 Not knowing, 16 O Off-the-shelf software, 124 limitations at ICAP, 205 Older workers, fallacy of replacing, 113 Online banking, 60 Operational efficiencies, 150, 213 Operational excellence, 358
  • 1292.
    developments in, 39 Operationalknowledge, in ROD arc, 103, 106 Operational norms, cultural differences regarding, 200 Operations management, at ICAP, 219 Operations perspective, 9 IT relevance to, 24 Operations tier, 114 Operations users, 54 Opportunities matrix, 27, 29 Organizational change, 66 business case for, 122 cultural lock-in as barrier to, 120 external environment and, 121 and inevitability of cultural
  • 1293.
    change, 122 internal organizationand, 121 and organizational readiness, 121 requirements for, 343 sustaining, 122 Organizational culture, 298, 300–301, 303 altering, 65–66 balanced scorecards and, 158–161 integrating IT into, 3 technology support for evolution of, 42 transformation of, 16–17 Organizational discourse, 90 Organizational dynamism, 42–48 Organizational evolution, 94, 341, 344 Organizational interactions,
  • 1294.
    325–327, 329 Organizational knowledgecreation, 64, 116, 361 steps to, 117 with technology extension, 117 Organizational leadership phase, in ROD arc, 102104 Organizational learning, xi, xii, 1, 20, 22, 38, 293, 295, 339, 343, 348 388 Index balanced scorecard applicability to, 154 balancing with individual learning, 70
  • 1295.
    CEO need tounderstand, 312 and communities of practice, 75–83 and dealing with change agents, 69 defining, 14–15 evolution of, 144 at executive levels, 215 experiential learning and, 83–88 and explicit knowledge creation, 236 fostering through trust, 210 gradual process of, 345 HR/IT integration through, 18 instilling through technology, 234 IT department isolation from, 2 and IT role at Siemens, 193 and language use, 89–96 learning preferences and, 83–88 limitations of top-down and
  • 1296.
    bottom-up approaches, 109–110 linear developmentin learning approaches, 96–107 links to transformation and performance, 64 by middle managers, 115 need for executive involvement in, 215 and organizational knowledge creation, 116 ratio to individual learning by manager type, 116 reflective organizational dynamism arc model, 101 relationship to self-generating
  • 1297.
    organizations, 351–352 and ROD,71, 215 ROD and, 293 in ROD arc, 183 self-development and, 133 at Siemens AG, 192 simultaneously with individual learning, 220 and social discourse, 89–96 synergistic union with IT, 187 transformational results, 139 in virtual teams, 185 Organizational learning management, 109 change management, 120–133 knowledge management, 116–120 management vectors and, 112–116
  • 1298.
    mapping tacit knowledgeto ROD, 119 role of line management, 109–111 social networks and IT issues, 134–138 Organizational learning theory, 73 North American vs. global cultural norms in, 67 and technology, 64–72 Organizational memory, building, 1 Organizational readiness, 121 Organizational role analysis, 353 Organizational structure, 313–314 CEO performance dimensions, 315 IT and, 24–25 IT importance to, 21 Organizational theory, 63 Organizational transformation,
  • 1299.
    xxviii, 63, 361 balancedscorecard and, 139–144, 146–147 defined, 146 in driver to supporter life cycle, 146 as event milestones, 146 evolutionary aspect of, 143 389Index HTC case study, 229–230 at ICAP, 217 and knowledge creation, 158–161 knowledge links to, 160 ongoing evaluation methods, 146–156 as ongoing process, 146 stages, with ROD, 145 strategic integration and cultural
  • 1300.
    assimilation as foundation for,143 technology as driver of, 206 three dimension of, 139–141 validation of, 147 vs. change, 152 Organizations as goal-oriented activity systems, 63 as interdependent members, 63–64 Organizing principles, and virtual teams, 176 Other centeredness, 296 in chief IT executives, 296 Outsourcing, xxx, 163–165 all-time highs, 346 by CEOs, 306 cost savings benefits, 163
  • 1301.
    executive opinions, 29 failureto achieve cost-cutting results with, 304 of IT, 178 of mature technologies, 62 perception by midsize firms, 32 talent supply benefits, 163 time zone challenges, 164 in virtual teams, 178 vs. internal development, 32 vs. IT integration, 22 P Payback, 46 Peer consulting groups, 353 Performance linking organizational learning to, 64, 65 reflective reviews, 6 Performance dimensions
  • 1302.
    CEO best practicestechnology arc, 315 middle manager best practices arc, 326, 327 Performance improvement, 3 Performance measurement, 31, 35–37 Permanence, disappearance in organizations, 185 Personal transformation, through self-development, 128 Personnel rotation, and individual learning, 350 Persuasion, as skill to transform talk into action, 180–181 Pillars model, 45–48 Planning phase, 52
  • 1303.
    in technology businesscycle, 54–55 Politics, xxvi blood cholesterol analogy, 67 negative impact of power centralization, 123 and organizational learning, 66–67 Power approach, limitations for transformation, 13 Power centralization, 122 President’s Council, 193 CIO exposure to, 195 at Siemens AG, 191, 192 Privacy issues, 336 Problem-solving modes, in virtual teams, 175 Process comprehension, by chief IT
  • 1304.
    executives, 297 Process leaders,295 Process measurement, 126 390 Index in Ravell Phase I balanced scorecard, 153 Product maturity, 61 Productivity, lagging returns in, 44 Project completion, 125 barriers to, 69 Project ethics, 324, 326–327, 331 Project managers broad IT responsibilities, 57 as complex managers, 56 IT staff as, 340 Q
  • 1305.
    Quality, commitment to,15–16 R Ravell Corporation case study, xxvi, 1–2, 51, 60, 120, 342, 347 alignment with administrative department, 17–19 balanced scorecard, 152–153 blueprint for integration, 5–6 BPR buy-in, 25 commitment to quality, 15–16 cultural evolution, 97 culture transformation, 16–17 decision-support systems, 159 defining reflection and learning, 14–15 employee resistance, 8 enlisting support, 6–7 goal orientation, 15 implementing integration,
  • 1306.
    12–14 IT identity definition,10–12 IT self-reflection, 9–10 key lessons, 14–17 learning maturation analysis, 96, 99, 343 line management importance, 8–9, 109 new approach to IT integration, 3–7 not knowing mindset, 16 performance evaluation, 133 phase I balanced scorecard, 153 reflective practices and measurable outcomes, 65 and self-development results, 132 technological acceleration at, 151 virtual team aspect, 164
  • 1307.
    Real date ofdelivery, 211 Reflection, 10 with action, 74, 76, 361 defining on organizational level, 14–15 education through, 15 organization movement toward, 12–14 Reflection matrix, 354 Reflective observation, as learning preference, 84 Reflective organizational dynamism arc model, 101 Reflective practices, xxviii, 4, 19, 38, 96, 142, 143, 152, 219, 313, 343 by chief IT executives, 296 fostering organizationally, 5
  • 1308.
    at ICAP, 205 importanceto ROD, 74 individual, group, and organizational, 352, 353 by middle managers, 115 need to develop in virtual teams, 165 in Ravell case study, 65 Reflective skills development, 9–10 Relationship building, by chief IT executives, 291 Replacement phase, in technology business cycle, 61–62 Reporting structures, 34, 37, 312 changes in, 38 391Index
  • 1309.
    for CIOs, 288 ofCIOs, 195 CIOs to CEOs, 305 CIOs to CFOs, 188 inconsistent, 339 increased reporting to CEOs, 304 and organizational change, 225 technological dynamism effects on, 209 Requirements definition, risks, 126 Research and development, 348 Resistance to change, 209 to integration, 8 Responsive organizational dynamism (ROD), 42–48, 53, 70, 89, 165, 187, 340 and adaptation, 349 arc model, 102
  • 1310.
    attainment of, 345 balancedscorecard modifications, 149 and best practices arcs, 334 best practices to implement, 287 cultural assimilation in, 48–52 dependence on organizational learning, 72 developmental stages, 100 drivers and supporters concept, 58–59 at HTC, 230–231, 233 at ICAP, 211, 217 importance of reflective practices to, 74 and individual learning, 123 integrating transformation theory with, 139 and IT roles and responsibilities,
  • 1311.
    60–61 mapping tacit knowledgeto, 117 in multinational companies, 203 organizational inability to manage, 97 and organizational learning, 71, 294 relationship to self-generating organizations, 352 replacement/outsourcing decision, 61–62 requirements, 349 role in economic survival, 232 role of social networks in, 136 at Siemens AG, 189, 199 situational and evolutionary learning in, 112 stages of organizational
  • 1312.
    transformation with, 145 andstrategic innovation, 349 and strategic integration, 43–48 and systems thinking, 123 technology as, 41 technology business cycle and, 52–57 three-dimensional, 167 and Vince’s reflection matrix, 354 as way of life, 186 Retention evaluation methods, 145 of IT talent by chief IT executives, 292 and organizational transformation, 144 Return-on-investment (ROI), 114 example of direct IT contributions to, 230
  • 1313.
    failure of traditionalstrategies, 27, 29 for ICAP, 213 IT expenditure issues, 189 line management responsibilities, 111 and measurement phase, 53 monetary and nonmonetary, 53 payback as basis for, 46 technology failures, 69 Revalidation, at Siemens AG, 198 392 Index Revolutionary change, 120 Rippling effect, 154 Risk assessment, 46 in feasibility phase, 53 misunderstandings about, 48
  • 1314.
    Risk management, asCEO role, 307–313 Risk minimization, with social networks, 134 Risk orientation, in virtual teams, 175 ROD arc, 99, 102, 144, 334 with applied individual learning wheel, 104 department/unit view as other stage, 100 example, 104 integrated disposition phase, 100, 102, 103 operational knowledge stage, 100 organizational leadership phase, 103
  • 1315.
    stable operations phase,102, 103 stages of individual and organizational learning, 183–184 Roles and responsibilities varying IT, 57 of virtual team members, 179 S Santander Bank, 60 Sarbanes-Oxley (SOX) Act, 333 Scope changes, 56 risks, 126 Selection, and organizational transformation, 144 Self-development evaluation phase, 131, 133 formal learning program phase,
  • 1316.
    129–132 fostering of bottom-up managementthrough, 132 implementation phase, 131 learning-to-learn phase, 129, 132 as management issue, 128 in organizational learning, 133 in Ravell case study, 132 setbacks to, 132 through discourse, 132 as trial-and-error method, 128 Self-generating organizations, 351, 352 Self-governance, 6 Self-managed learning, 130 Self-management, 124 developing among IT staff, 127 by non-IT staff members, 127 and reflective practice theory, 128
  • 1317.
    Self-motivation, 123–124 Self-reflection, 9,12, 16 promotion of, 4 Senior lower level, at Siemens AG, 194 Senior management initiation of evolutionary learning by, 189 sharing in learning, 196 Sense and respond, 58, 59, 199, 346 and IT, 59 Sense making, 63, 94 Shared leadership, 18 Shared services leaders, 295 Siemens AG, xxviii, 68, 344, 347 case study, 187–203 CEO quarterly meetings, 191 CFO quarterly meetings, 192 CIO advisory board, 190, 191
  • 1318.
    CIOs as seniorlower level, 194 competitive advantage improvement, 190 corporate services standards, 20 five-year follow-up, 202–203 393Index interrelationships among CIO communities of practice, 191 IT contribution to learning-knowledge-value chain, 237 local-to-global links, 194 mandatory services standards, 200 multiple levels of CIO s, 242 optional technologies standards, 200
  • 1319.
    President’s Council, 191,192 quarterly CFO meetings, 190 revalidation concept at, 198 storyboarding process, 198 technology standards at, 200 Silo operations, 18, 50 Single-loop learning, 4, 361 Situated learning, 75 in ROD, 112 Skills, 92 in virtual teams, 180–181 Social discourse, 89–96, 234 application to virtual teams, 178 and content-activity relationships, 90 and emotion, 92–96, 180–182 and identity development, 91, 179–180 Marshak’s model mapped to
  • 1320.
    technology learning wheel, 93 as“passive” activity, 90 skills and, 92, 180 technology as driver of, 209 type of talk containers, 96 Social networks, xxix ambiguous effects, 138 attempts to lock out capabilities, 134 gender participation issues, 138 invisible participants, 137 and IT, 134–138 management issues, 136 Socialization, in virtual teams, 172 Socialization dynamism, 173–177 Soft skills analysis, 180–181 Software packages, 124 Software upgrades, 124 Spiral conversion process, 110
  • 1321.
    Spy networks, 137 Stableoperations phase, in ROD arc, 102, 103 Stable technology integration, 297, 298, 326 Staff replacement fallacy of, 113 vs. staff transformation, 4, 20 Standards, 307 CEO needs for, 307 lack of, 56–57 and reduced development costs, 305 at Siemens AG, 200 Storyboarding process, 358 at Siemens, 198 Strategic advocacy, 67 Strategic alignment, 45
  • 1322.
    Strategic innovation, 349 Strategicintegration, xxviii, 42–48, 82, 187, 197, 201, 293, 341, 343, 361 and communities of practice, 78 consequential interoperability and, 45 as foundation for organizational transformation, 143 and need for increased cultural assimilation, 230 as outcome of ROD, 48 shortening life-cycle maturation through, 44 Strategic learning, 65, 110, 349 Strategic performance, 342, 343 improving through organizational learning, 63
  • 1323.
    394 Index Strategic thinking bychief IT executives, 290 importance to chief IT executive role, 292 shortage of time for, 293 Strategy, see Business strategy Strategy map, 148, 151–158 Supervisors, 112 Supply chain executives, 295 Support, enlisting, 6–7 Supporter functions, 58, 113, 312, 346 and organizational transformation, 144 and perception of IT, 188 at product maturity, 61
  • 1324.
    SWAT teams, 13 Systemupgrades, 124, 125 Systems thinking, 1, 83, 89, 94, 123, 347 by executives, 114 progression to, 354–355 T Tacit knowledge, 361 challenges for COP virtual organizations, 172 in e-mail communications, 171 IT manager practice at transforming, 197 mapping to ROD, 119, 174–176 protection by technology, 222 role in knowledge management, 118
  • 1325.
    transformation to explicitproduct knowledge, 223, 236 translating to explicit forms, 169 and virtual teams, 175–176 Talk, and discourse, 90 Talk-action cycles, 96 application to virtual teams, 178 role of persuasion in, 180 Teachers, as facilitators, 127 Techies, stereotyping as, 21 Technical knowledge, need for up-to-date, 125 Technical resources, strategic integration into core business units, 19 Technological acceleration, xxiv, 41, 43, 66, 72, 208, 296, 307
  • 1326.
    enabling organizations tocope with, 45 in Ravell case study, 152 Technological dynamism, xxiv, 41–42, 66, 209, 210, 340, 343, 362 as 21st-century norm, 178 self-management requirements, 128 at Siemens AG, 193 Technological proficiency, as staff job requirement, 211 Technology, xxxii aligning with business strategy, 149 basing on quality of business plan, 212
  • 1327.
    benefits at ICAP,222–223 centrality to competitive strategy, 348 CEO conceptual knowledge of, 103 challenges of strategic use, xxii as change agent, 70, 195 commoditization of, 224 as commodity, 207 and communities-individuals relationships, 76 and competitive advantage, 72 as component of discourse, xxvicontribution to learning-knowledge-value chain, 236 as driver of business strategy, xxiii
  • 1328.
    395Index as driver oforganizational transformation, 206 as driver of virtual team growth, 163 effects on discourse, 94 effects on legacy systems, 47 evolution of, 223 executive need to recognize instability of, 199 expansion benefits, 223 failure to result in improved ROI, 69 feasibility stage, 87 flexibility benefits, 223 impact on ICAP business, 204 impatience with evolution of, 202 implementation risks, 126 impossibility of predicting impact
  • 1329.
    of, 83 increasing organizational learningthrough, 68 as independent variable, 43 integration of business implementation, 314, 325–326 as internal driver, 42 knowledge creation by, 223 learning maturation with, 100 linking to learning and performance, 71 multiplicity of business implementations, 325 multiplicity of business perspectives, 314 and need for interaction, 142 need to integrate into
  • 1330.
    organizational learning, xviiiongoing implementation of,349 perception as support function, 206 phased-in implementation, 149–150 role in knowledge management, 117 strategic uses, 315–316 in TQM, 140 unpredictability of, 41 untested, 56 variability of, 236 as variable, xxvii, 41, 112, 235, 311, 340 Technology acceleration, 13, 20, 47 Technology-based organizations, xviii Technology business cycle, 52, 63
  • 1331.
    evolution phase, 52,57 feasibility phase, 52, 53 garbage can model of IT value, 54 implementation phase, 52, 55–57 measurement phase, 52–54 planning phase, 52, 54–55 stages of, 52 Technology business implementations, multiplicity of, 325 Technology cognition, 298–300 Technology competence, 300 by chief IT executives, 297 Technology concepts, 318 for CEOs, 316 Technology definitions branding, 358–359 Technology evaluation, 149 Technology for technology’s sake, 26 Technology implementation
  • 1332.
    competence for middle managers,325 stability of, 326 Technology implementation competence/recognition, by middle managers, 325 Technology investment, as normative process, 348 Technology leadership, 298 by chief IT executives, 298 Technology life cycle, xxiv, xxvii, 346 396 Index Technology perspectives, multiplicity of, 297
  • 1333.
    Technology proficiency, bychief IT executives, 291 Technology project leadership, 326 Technology projects reasons for failure, 310 risks to success, 125 Technology road map, 342, 343 Technology strategy map, 151 Technology users, three types of, 54–55 Telephone brokers, 224 electronic trading as supplement to, 209 at ICAP, 204 Teleworkers, 81 Theft, 336 Three-tier organizational structure, 113
  • 1334.
    Throughput improvements, at ICAP,213 Time zones, virtual team challenges, 177 Timeliness barriers to, 69 issues with IT projects, 74 Timing, and learning maturation, 104 Tool-talk, 93, 95, 181, 361 Top-down strategy introduction, xxix, 214, 235, 345 at Siemens, 188, 192 Total quality management (TQM), technology in, 140 Training for CIOs, 202
  • 1335.
    and documentation, 126 inadequacyof, 14 limitations of IT-based, 125 for Siemens CIOs, 196 for virtual team COPs, 173, 177 Transformation, vs. change, 141 Transformative learning, 142 Trust based on corporate honesty, 210 in communities of practice, 197 organizational movement toward, 12–14 Twitter, 135 Type of talk containers, 95, 181 virtual team applicability, 182 U Uncertainty, in technology, 77 Unemployed workers, without
  • 1336.
    rights, 346 Unpredictability, xxi Userinterface, 359 User level, 359 V Value-added services, 232 Variation, and organizational transformation, 143 Velocity fluxes, 122 Version control, 124 Videoconferencing, 81 Vince’s reflection matrix, 354 Virtual teams, xxx, 163, 359 combination and, 171–172 combination dynamism in, 173 communication failures in, 164 communities of practice with, 170–171 contract administration, 164
  • 1337.
    cultural and language barriers,163 distorted perceptions in, 166 executive support for, 174 externalization and, 169, 171 externalization dynamism in, 172 internalization and, 171 internalization dynamism in, 173 397Index lack of individual development in, 165–166 management of, 19, 24, 164, 166 marginalization of nonadaptive members, 169 multi-company challenges, 177 multiple identities in, 179 multiple location challenges, 164,
  • 1338.
    166–178 need for documented processes,177 need for individual development, 344 need for mature individuals in, 185 operating differences from traditional teams, 168 outsourcing in, 177–178 quality checkpoints for, 164 readiness for participation, 173 socialization and, 172 socialization dynamism in, 173–174, 177 soft skills assessment challenges, 180–181 status, 165–166
  • 1339.
    as subset oforganizations, 167 tacit knowledge and, 175–176 and three-dimensional ROD, 167 transient nature of members, 168 W Web, 359 Women-centric communication, 138 Worldviews, and virtual teams, 176 Y Y2K event, 214, 218, 359 Z Zero latency, 43
  • 1340.
    http://taylorandfrancis.comCoverHalf TitleTitle PageCopyright PageContentsForewordAcknowledgmentsAuthor Introduction1: The “Ravell” CorporationIntroductionA New ApproachThe Blueprint for IntegrationEnlisting Support Assessing ProgressResistance in the RanksLine Management to the RescueIT Begins to ReflectDefining an Identity for Information TechnologyImplementing the Integration: A Move toward Trust and ReflectionKey Lessons Defining Reflection and Learning for an Organization Working toward a Clear Goal Commitment to Quality Teaching Staff “Not to Know” Transformation of Culture Alignment with Administrative DepartmentsConclusion2: The IT DilemmaIntroductionRecent BackgroundIT in the Organizational ContextIT and Organizational StructureThe Role of IT in Business StrategyWays of Evaluating ITExecutive Knowledge and Management of ITIT: A View from the TopSection 1: Chief Executive Perception of the Role of ITSection 2: Management and Strategic IssuesSection 3: Measuring IT Performance and ActivitiesGeneral ResultsDefining the IT DilemmaRecent Developments in Operational Excellence3: Technology as a Variable and Responsive Organizational DynamismIntroductionTechnological DynamismResponsive Organizational DynamismStrategic IntegrationSummaryCultural AssimilationIT Organization Communications with “ Others” Movement of Traditional IT StaffSummaryTechnology
  • 1341.
    Business CycleFeasibilityMeasurementPlanningImplementationEvolution Drivers and SupportersSantanderversus Citibank Information Technology Roles and ResponsibilitiesReplacement or Outsource4: Organizational Learning Theories and TechnologyIntroductionLearning OrganizationsCommunities of PracticeLearning Preferences and Experiential LearningSocial Discourse and the Use of LanguageIdentitySkillsEmotionLinear Development in Learning Approaches5: Managing Organizational Learning and TechnologyThe Role of Line ManagementLine ManagersFirst-Line ManagersSupervisorManagement VectorsKnowledge ManagementChange Management Change Management for IT OrganizationsSocial Networks and Information Technology6: Organizational Transformation and the Balanced ScorecardIntroductionMethods of Ongoing EvaluationBalanced Scorecards and DiscourseKnowledge Creation, Culture, and Strategy7: Virtual Teams and OutsourcingIntroductionStatus of Virtual TeamsManagement ConsiderationsDealing with Multiple LocationsExternalizationInternalizationCombinationSocializatio nExternalization DynamismInternalization DynamismCombination DynamismSocialization DynamismDealing with Multiple Locations and OutsourcingRevisiting Social DiscourseIdentitySkillsEmotion8: Synergistic Union of IT and Organizational
  • 1342.
    LearningIntroductionSiemens AGAftermathICAPFive Years LaterHTCITHistory at HTCInteractions of the CEOThe ProcessTransformation from the TransitionFive Years LaterSummary9: Forming a Cyber Security CultureIntroductionHistoryTalking to the BoardEstablishing a Security CultureUnderstanding What It Means to Be CompromisedCyber Security Dynamism and Responsive Organizational DynamismCyber Strategic IntegrationCyber Cultural AssimilationSummaryOrganizational Learning and Application DevelopmentCyber Security RiskRisk ResponsibilityDriver /Supporter Implications10: Digital Transformation and Changes in Consumer BehaviorIntroductionRequirements without Users and without InputConcepts of the S-Curve and Digital Transformation Analysis and Design Organizational Learning and the S- CurveCommunities of PracticeThe IT Leader in the Digital Transformation EraHow Technology Disrupts Firms and IndustriesDynamism and Digital DisruptionCritical Components of “ Digital” Organization Assimilating Digital Technology Operationally and CulturallyConclusion11: Integrating Generation Y Employees to Accelerate Competitive AdvantageIntroductionThe Employment Challenge in the Digital EraGen Y Population AttributesAdvantages of Employing Millennials to Support Digital TransformationIntegration of Gen Y with Baby Boomers and Gen XDesigning the Digital
  • 1343.
    EnterpriseAssimilating Gen YTalent from Underserved and Socially Excluded PopulationsLanger Workforce Maturity ArcTheoretical Constructs of the LWMAThe LWMA and Action ResearchImplications for New Pathways for Digital TalentDemographic Shifts in Talent ResourcesEconomic SustainabilityIntegration and TrustGlobal Implications for Sources of TalentConclusion12: Toward Best PracticesIntroductionChief IT ExecutiveDefinitions of Maturity Stages and Dimension Variables in the Chief IT Executive Best Practices ArcMaturity StagesPerformance DimensionsChief Executive OfficerCIO Direct Reporting to the CEOOutsourcingCentralization versus Decentralization of ITCIO Needs Advanced DegreesNeed for StandardsRisk ManagementThe CEO Best Practices Technology ArcDefinitions of Maturity Stages and Dimension Variables in the CEO Technology Best Practices ArcMaturity StagesPerformance DimensionsMiddle ManagementThe Middle Management Best Practices Technology ArcDefinitions of Maturity Stages and Dimension Variables in the Middle Manager Best Practices ArcMaturity StagesPerformance DimensionsSummaryEthics and Maturity13: ConclusionIntroductionGlossaryOrganizational Learning DefinitionsReferences Index Running Head: DATA COLLECTION 1
  • 1344.
    DATA COLLECTION 7 DATACOLLECTION Student Name: Tanisha Hannah Institution Affiliation: Strayer University Course: Edu 571 Date: March 8, 2020 Data collection is the process of gathering information that is relevant to act as evidence on a research project. People use diverse sources so that they can get enough data concerning
  • 1345.
    their research toact as authentic and reliable data for them. There are different forms of data collection that a researcher might implement for their research topic. This paper will focus on discussing three sources that will be expected to be used during the evaluation process, seven open-minded interview queries to present to the target population, the issues that might be encountered in data collection and recommendation on how to maintain effective communication skills. The evaluation process for “gender equity for girls in math” will depend on three different data sources that incorporate the primary, secondary and tertiary sources. Primary sources are the documents, diary or other initial sources of information that is created as well as serves as the original source of data for the research topic (Schindler, 2019). Primary sources of data are important and rely on the survey mechanism to gather information. In this research, the primary source of data will comprise of interviews using emails, telephones as well as face to face communication, designed questionnaires, statistical decretive writings, eyewitness accounts and legal documents. All this kind of primary data are necessary in the evaluation procedure of the research program. The secondary sources that will be used incorporate the program records, data collected from other researches and government databases. The secondary sources depend on the data that is already existing and has already been gathered and supports the
  • 1346.
    primary data. Onthe other hand, the tertiary sources of information are mostly utilized in the evaluation process because it offers information on the research topic. The tertiary sources include textbooks, encyclopedia, dictionaries and handbooks. These three sources of data are the best sources and main sources to include in a research to ensure that a research meets the requirements of a research paper. These three sources will offer information on gender equality when it comes to math for the girls/females. The research will also incorporate some open-ended interview question that will help in acquiring more information concerning the program “gender equity for girls in math.” Through utilization of interviews, I believe that there will be an in-depth understanding of this issue as it has been an issue of concern for a long period of time (Schindler, 2019). The use of interview will assist in the process of evaluation. The questions are formulated based on the programs need to collect relevant information from diverse individuals. The following interview question will be addressed: 1. What is the meaning “gender equity for girls in math”? 2. How are these programs useful in schools? 3. How can this program be implemented in most of our schools? 4. What are the pitfalls of this program? 5. How do most of the institution perceive this program?
  • 1347.
    6. What shouldbe done to advance this program? 7. What methods can be used to implement “gender equity for girls in math”? These question are important for one to realize the importance of this program in our current curriculum or in our institution. “Gender equity for girls in math” is an issue that need to be addressed and the program is the best for ensuring that it has been upheld. Not until schools understand the important of this issue being addressed so that girls might feel comfortable and change their perception about mathematics. In the process of gathering data through collecting, compiling, interpreting, and reporting the data, one might face various challenges. “Schindler (2019) affirms that the population may fail to participate in the questionnaire and fail to respond to the questions in truth.” One of the reason why people might respond with untrue information in the questionnaire is when they feel that the question being act affect their personal lives. Due to gender biasness people might also fail to participate on the questionnaire or offer biased information regarding the questions presented. Men do not like feeling inferior and if they do not view thing with an open mind they fail to offer true information. There is also an issue when compiling data; one might face some difficulty when the information offered is not enough or might not meet the scope of discussion which might mean the
  • 1348.
    information is notreliable (Mertler, 2016). During the process of interpreting data, there might be misunderstanding regarding what information is true and what data to rely on. When reporting data the information might be unreliable and the information presented might be inaccurate. So many challenges that an individual might face during the research, which might make the information irrelevant or inaccurate (Quinlan et al, 2019). Stakeholders participate in a relevant role in the process of program evaluation through making the necessary contribution that facilitate the process. In the process of gathering and reporting data, it is important to communicate with the stakeholders. “Shamseer (2015) confirms that reports can also be presented through visual and oral form through news, presentations, posters, and exhibit. These two methods are useful in providing reports for the process. Even more, a combination of both written and visual reports is essential and will help provide sufficient information about the process (Bryman, 2016)” These individuals need to be educated on what is going on, incorporating sources of information and the methods of collecting data. The education regarding data collection will create a deeper understanding of the procedure for collection data which the stakeholder can be incorporates in the process of decision making. Stakeholders need to be in the meetings as well ensure that they comprehend the things
  • 1349.
    happening and letthem participate in discussions (Bell & Harley, 2018). “Apart from that, it is vital to promote transparency by providing regular updates to shareholders and don’t assume that communication is fluid. This will help reduce friction in the organization and strengthen the relationship with stakeholders. Shamseer (2015)” Conclusion There are different forms of data collection that a researcher might implement for their research topic. The evaluation process for “gender equity for girls in math” will depend on three different data sources that incorporate the primary, secondary and tertiary sources. There is also an issue when compiling data; one might face some difficulty when the information offered is not enough or might not meet the scope of discussion which might mean the information is not reliable. . Due to gender biasness people might also fail to participate on the questionnaire or offer biased information regarding the questions presented. Stakeholders participate in a relevant role in the process of program evaluation through making the necessary contribution that facilitate the process. In the process of gathering and reporting data, it is important to communicate with the stakeholders. References Bell, E., Bryman, A., & Harley, B. (2018). Business research
  • 1350.
    methods. Oxford universitypress. Retrieved from https://books.google.com/books?hl=en&lr=&id=J9J2DwAAQBA J&oi=fnd&pg=PP1&dq=research+methods&ots=GLhxgiaVHK& sig=niAHRKqByydlPm9U-nTrddGXjck Bryman, A. (2016). Social research methods. Oxford university press. Retrieved from https://books.google.com/books?hl=en&lr=&id=N2zQCgAAQB AJ&oi=fnd&pg=PP1&dq=research+methods&ots=doQuFYN9uc &sig=7uoYc3Ycbyf15xNuPRx4sRlxtjc Ghauri, P., Grønhaug, K., & Strange, R. (2020). Research methods in business studies. Cambridge University Press. Hennink, M., Hutter, I., & Bailey, A. (2020). Qualitative research methods. SAGE Publications Limited. Lindlof, T. R., & Taylor, B. C. (2017). Qualitative communication research methods. Sage publications. Mertler, C. A., (2016). Action research: Improving schools and empowering educators. Sage Publications. Palinkas, L. A., Horwitz, S. M., Green, C. A., Wisdom, J. P., Duan, N., &Hoagwood, K. (2015). Purposeful sampling for qualitative data collection and analysis in mixed method implementation research. Administration and Policy in Mental Health and Mental Health Services Research, 42(5), 533-544. Quinlan, C., Babin, B., Carr, J., & Griffin, M. (2019). Business research methods. South Western Cengage. Retrieved from https://books.google.com/books?hl=en&lr=&id=sPJFDwAAQB
  • 1351.
    AJ&oi=fnd&pg=PT20&dq=research+methods&ots=wloptEVyG2 &sig=WLeGnkcwc6LsYbDjRKWMrksS80k Schindler III, A.R. (2019). System and method for managing sample collection data and documentation. U.S. Patent Application No. 10/198,676. Shamseer, L., Moher, D., Clarke, M., Ghersi, D., Liberati, A., Petticrew, M., ... & Stewart, L. A. (2015). Preferred reporting items for systematic review and meta-analysis protocols (PRISMA-P) 2015: elaboration and explanation. BMJ, 349, g7647 Running Head: EDUCATIONAL PROGRAM EVALUATION1 EDUCATIONAL PROGRAM EVALUATION5 EDUCATIONAL PROGRAM EVALUATION Name: Tanisha Hannah Date:
  • 1352.
    February 12, 2020 Institution: StrayerUniversity Instructor: Dr. Jacob Educational program evaluation Change either as an individual or in an institution setting is not an easy and simple thing and mostly involves numerous stages of transition or misunderstandings prior to being fully implemented as per the expectations. A planned approach involves the development of a model which illustrates the stages in the process of transition that illustrate how an institution is anticipated to adapt to the changes that are made. The approach is very important as one is dealing with evaluation of the effectiveness of certain changes as it gives a clear picture of what the real situation is and how institutions has either failed or succeed in implementing changes through any created
  • 1353.
    program (Smith, 2017).Evaluation involves the systematic investigation of the merit, worth or significance of a project. The planned approach helps in ensuring that one has a step by step process which illustrates the expectations and thereby making the evaluation process much easier and simpler. According to the recent research on the planned approach most of the organizations in the world have spared millions of money that they spend on evaluation of change projects through using the planned approach. The technique has enabled firms to follow up on their organizational change and to be able to determine the capability of the corporate in adopting the implemented changes and determining the significance of these changes. It has allowed firms to be able to effectively solve the challenges that arise during the transitioning process as well as to acquire optimal benefits from their change programs (Kerzner, 2017). The planned approach helps in guiding organizations in the operations so as to minimize problems that result from lack of effective communication and failure of reinforcing the desired behaviors. In addition, the technique helps in pointing out the expectations of the firms to employees as well as other individuals who might be involved in the process of transitioning. The planned approach is very simple and mechanistic and therefore this implies that any firm be it a small business, medium or large firms can be able to effectively use it to achieve their desired outcomes as well as to monitor
  • 1354.
    the transition processto ensure that the outcomes gotten are the desired ones. The planned approach is mostly applicable in evaluation of school programs as it offers a step by step process showing the transition and the anticipated outcomes in every stage (Horton, 2018). In order to conduct a need assessment, the evaluator has to find solutions to questions such as: What are the needs of the target population? What specific services are needed in the education program? What are the characteristics of the target population? What arrangements could be used to provide the needed mechanisms? Moreover, ensuring that the developed program addresses the current issues is important. Therefore, one has to evaluate the program through answers questions such as: Is the program meeting the set objectives? How does the targeted population interact with the program? Are the services provided by the program satisfactory to the target population? What are the perspectives of the personnel, administration and organization regarding the program? Finally, one evaluates the outcomes of the program are met through answering the questions: What benefits does the services and activities in the program yield? Is the target population being affected by the program in a negative way? Does the program solve the problem which caused change to be proposed? Is the program efficient in yielding the required outcomes? (Vedung, 2017). In order to ensure that a program is efficient in solving the
  • 1355.
    problem which demandsfor change, evaluation of efficiency of the program is very essential. Therefore, one has to understand how the program is helping meet the needs of the targeted population and the services which are offered by the program in ensuring that all people are benefiting from it. One has to list the needs of the population and match them with the services offered by the program so as to ensure that no one is left out by the program and to make sure that the program does not have services which do not concern the intended population (Beecher.et.al, 2017). The evaluation process checks how the program is operating an also points out any negative effects which might be caused by the program. In addition, assessment of the outcomes helps in bringing out a clear picture of how the program is actually ensuring that the set goals are achieved. In evaluating the school programs, the stakeholders who are involved are the teachers, students, parents, administrators, staff members as well as the community members. These are the people who are concerned with the welfare of the school and therefore they should be involved in the development of education programs so that to ensure that their needs and perceptions are considered in the process of creating the program (Gates, 2017). This ensures that all stakeholders are able to determine what is expected of them and how the program will help make the society better. In order to obtain their involvement in this process, their views should be derived
  • 1356.
    in the socialactivities that help address the social problems in communities. References Beecher, B., Arthur, L., Death, E., Dockett, S., & Farmer, S. (2017). Programming and planning in early childhood settings. Cengage AU. Gates, E. F. (2017). Learning from seasoned evaluators: Implications of systems approaches for evaluation practice. Evaluation, 23(2), 152-171. Horton, D. (2018). SysCom Program Evaluation 2017. Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Smith, R. D. (2017). Strategic planning for public relations. Routledge. Vedung, E. (2017). Public policy and program evaluation. Routledge. Running Head: PROGRAM EVALUATION 1 PROGRAM EVALUATION6
  • 1357.
    Program Evaluation Name: Tanisha Hannah InstituteName: Strayer University Course title: EDU 571 Evaluating School Programs Professor: Antony Jacob Date of Submission: January 26, 2020 Program Evaluation Plan Introduction No matter which level of education one is attaining, they are bound to face many such issues that need proper addressing.
  • 1358.
    That is whyseveral such programs are launched that bring useful awareness and causes the students to come forth with their issues and solutions. In the same spirit, an educational program is being initiated here that is going to be very helpful for all students regardless of their age, course, and department. The educational program that has been picked today is for the Masters Level students and the program name is gender equity for girls in math. This program's all features will be discussed underneath and one will get a complete review of what this program is about and how it is going to occur. Main Elements The main element of the program "gender equity for girls in Math" is something that needs urgent addressing. Females students are no less intelligent than male students and they have been excelling in every field just as any male peers. But then why it is that not many girls are seen to be excelling in the math field. Though, there are certain fields of science in which girls are known to be more enthusiastic to join such as medicine. But the purpose of this program is to evaluate why it is so that girls are reluctant to join math when there are numerous options in comparison to medicine is present here. Through the following three main parts, the importance of this educational program research will be understood. Type – this program is ideal because the need to have female intelligence in the math field is being felt. The program is a
  • 1359.
    student’s program, tobring awareness to them and raise self- consciousness among students especially females. Also, the influence and role fellow male peers can play is highlighted and highly expected. Department administrating – the department that will be administrating it will be the student's council, department of Math. It is used to the urgency of the matter that these departments have pressed the issue to be raised and they are more than willing to come forward to guide the female students about the bright future opportunities they somehow lack or how to find appealing, related to math. Target population – the expected population target is students of Masters Level as they are at such point of their educational career that the majority of them tend to opt for jobs right after. They need assurance and guidance and that is why this program is initiated. History It has been observed that girls happen to be very hardworking (more than boys) and once they set their minds on something, nothing can beat them. Girls are loyal to their studies (at least the majority of them) and they want to excel to prove to the world. The main reason behind such a notion is that the world has been unfair and cruel to females when their education or jobs come. Workplace discrimination and academic hostility are
  • 1360.
    something everyone isfully aware of. That is why girls have the passion to prove that they are no less than anyone. They can do anything, at any time. But despite such passion and hard work, not many girls are seen joining the Math field. Whether it is due to the self-doubt or not certain about the future options, girls have never looked at these fields as something they want first handed. History has proven that many females were excellent mathematicians such as Sofya Kovalevskaya (1850 - 1891) and Emmy Noether (1882- 1935) and many others like them. But recently, not many females’ contribution is noted in the field of math and it is high time to bring this to their knowledge that girls are equally suitable for the field of math and they can do wonders in them as well. Purpose of the Program and Expectation It is expected that through these programs, female students will realize what they are missing and how they can catch up on years of missing. The field of math is just as interesting as any other field, maybe more, no doubt they demand more mental strength and stability of senses but this is something females are more aware of than any other person. Therefore, it is expected that girls will do wonderful achievements once they join this field and take them to new heights. Why this program was selected The field of math is missing the contributions of girls. When
  • 1361.
    evaluated this issue,it was found that girls are reluctant to join them due to the uncertainty, the unseen hardship, and not knowing whether this field is right for them or not. Through this program, female students will realize that these two fields are just like any other field and they can join them and perform excellently. Advantages of this program Through this program, girls will realize the importance of the math field and hopefully become eager to join it. other advantages besides the obvious one are as under: · Self-evaluation about strengths and weaknesses · Mental strength and challenging qualities and abilities are tested · Any issue can be discussed with the students' council · Meetings can be arranged with the math department. · Meetings will those who are completing masters in math can be arranged. · A self-assurance course will be held. Issues and solutions Though this program is very straight forward and idealistically, it would not face any issue but few are unavoidable. They are as under: · Girls would be reluctant to talk about vulnerabilities · Awkward long silences when a discussion of why girls are not joining is expected.
  • 1362.
    · Shyness canbe observed · Societal pressure does play its role · The pressure on girls is more than ever as we are entering in a new era. They need to be sure and this makes them vulnerable and reluctant to talk about feelings · Some strong opinions will be heard · Harsh comments and opinions and suggestions will emerge. To avoid such a situation, it would be better to ensure that there is no pressure and it must all be run like any other program. Girls should be expected to come forward and express themselves in a friendly and cooperating environment. References: Fennema, E. (1979). Women and girls in mathematics—Equity in mathematics education. Educational studies in mathematics, 10(4), 389-401. Meece, J. L., Parsons, J. E., Kaczala, C. M., & Goff, S. B. (1982). Sex differences in math achievement: Toward a model of academic choice. Psychological Bulletin, 91(2), 324. Rees, T. (2011). The gendered construction of scientific excellence. Interdisciplinary Science Reviews, 36(2), 133-145. Yazilitas, D., Svensson, J., de Vries, G., & Saharso, S. (2013). Gendered study choice: A literature review. A review of theory and research into the unequal representation of male and female
  • 1363.
    students in mathematics,science, and technology. Educational research and evaluation, 19(6), 525-545.