Running head: DRAFT OF THE FINAL WRITING PROJECT DRAFT OF THE FINAL WRITING PROJECT 8 Draft of the Final Writing Project Heather Fuller LS302: Environmental Law and Policy November 08, 2015 RRE International wants to begin the construction and operation of the smelter in the City of Riverside. There is the need for the company to get permits for its operation as it intends to build and operate the smelter, construct outfalls that will discharge into the Long Trout River, and store and transport the hazardous waste. The paper will look at various issues that might come up with the building of the facility in that area. The issues include the opposition from residents living within the surrounding community who might oppose the facility from being built in that area. The other issue is the concerns of the reactions from local and state officials to locating this facility in their area. Another issue that will be discussed is the possible contamination of soil and river that will raise concern from the citizens. Another issue of concern will be the air quality of the area due to building of the facility. The paper will also look at some of the permits that will need to be pulled before the facility is set up. The environmental acts involved in the building of the facility will also be highlighted. Finally, there will be a discussion of the development and fostering of relations with government officials. Permits and needs for the permits There are several permits that RRE International will require to obtain before they begin the construction and operation of the smelter company they want to set up in the City of Riverside. One of the permits is the building and construction permit which is the formal permission to start the construction, demolition, addition or renovation of property. The other permit is the business license that is needed for entities that are carrying out business in the limits of a city. The other required permit is the certificate of disclosure of hazardous substances. This requires those businesses which handle hazardous materials to report the information to implementing agencies. The facility is also required to fill a Business Emergency/Contingency Plan so as to develop an emergency plan. Another requirement is the land use permit/zoning clearance is needed to allow specific types of development. Land use permit is required for the zoning of a site. There is also a requirement for police regulations or public safety. The city of Riverside has an ordinance that requires the facility to get a permit to have an entry alarm. The facility requires obtaining a fictitious business name since the organization’s business name does not contain the surname of its owners. Another permit required is the hazardous material/waste generation program which is to be filled if an organization ha.