Rudyard E. Batallones Jr.
Al_Ain UAE
0528454176
RudyardBatallones@yahoo.com
SUMMARY
I have enough experience of this job. I have worked in various circumstances. My technical skills and
problem solving attitude always help me to handle any issue. I have the deep knowledge of my field and I
can use various equipments effectively.
EDUCATION
Zamboanga City Arturo Eustaquio Colleges
Bachelor ofScience in Computer Engineering ( 1997 -2003 )
PROFFESTIONAL EXPERIENCE
Esar Information System ( KSA Jubail ) June 2015 to Dec. 2015
Network and Fiber Optic Technician ( Royal Commission )
DUTIES AND RESPONSIBILITIES:
 Maintain troubleshoot and administer the use of local area networks (LAN),wide area networks
(WAN),mainframe networks, computer workstations, connections to the internet and peripheral
equipment.
 Evaluate and install computer hardware,networking software,operating system software and
software applications.
 Provide problem-solving services to network users.
 Install CCTV, BIOMETRIC,ACCESS CONTROL.
 Pulling Fiber optic Cable, Cat 6, Cat 5 and Cat 3 cable.
 Splice fiber optic cable using both manual and fusion splicing techniques.
 Installing the right device / cabinets in the building as per design regarding to the corresponding
splitters to be installed ODF 22U or 48U.
GLOBE TELECOM (Sub Contractor) Sept. 2013 – April 2015
FIBER OPTIC TECHNICIAN AND SPLICER ( FTTH )
DUTIES AND RESPONSIBILITIES:
 Work with engineers and or OSP PM’s to perform fusion splicing as directed.
 Terminates fiber optic cables including patch indoor and outdoor cables.
 Connect fiber optic cables to networking outlets and between network outlets.
 Perform fusion splicing of various types of fiber optic cables.
 Installing HSI, IPTV and DEL.
JAIDAH GROUP (BUSINESS COMMUNICATIONQATAR ) JUNE 26, 2012- AUG.2013
CONTRACTOR OF QATAR TELECOMMUNICATION
ISP, OSP TECHNICIAN AND SPLICER ( FTTH AND FTTB )
DUTIES AND RESPONSIBILITIES:
 Daily report to Site Engr. Regarding instruction updating new and finish work in site.
 Instructing cable laying teams what are the SOP handling of the fiber optic cable before laying to
subscribers premises ( ISP ).
 Working in manhole OSP,SOP shoukd be guided accordingly.
 Checking the correct site ID splicing splitter allocation details, color coding and color assignment
before opening manhole as per map design and splitter allocation.
 Troubleshooting faulty fiber optic cables using light sources, power meter and OTDR.
 Installing the right device / cabinets in the building as per design regarding to the corresponding
splitters to be installed (FAT 24, FAT 48, ODF 22U or 48U and Sub FAT).
 Ensuring the right position and location of th device / cabinets to be installed as per SOP.
 Design cable routing in the building.
 Tracking into different access point to which and where the socket for HIS, IPTV and DEL
should be installed by subcribers desired place.
 Laying and terminating CAT6, CAT5 and CAT 3to various access point.
MINDANAO CABLE CORPORATION June 2004 – March. 2012
CABLE TECHNICIANAND SPLICER
 Responsible for running new cabling in new or existing cable in house.
 Splicing fiber cable wire.
 Temination and testing of new cabling.
 Responsible for testing and troubleshooting of cable.
 Assisted senior technician in upgrading the system.
 Worked with senior technician and provided corrective measures for troubleshooting.
 Prepared reports for completion of the tasks and submitted it to supervisor.
TRAINING AND SEMINARS ATTENDED
ISP, OSP and SPLICER Training October, 2012
Huawei Qatar
AutoCAD 2006 and 2007 with color Rendering July 31 to August 15, 2006
Microcadd Technologies Corporation Inc.
ISO 14001:2004 Awareness Course May 18, 2006
SCAD Service (S) Pte, Ltd
Rudyard E

Rudyard E

  • 1.
    Rudyard E. BatallonesJr. Al_Ain UAE 0528454176 RudyardBatallones@yahoo.com SUMMARY I have enough experience of this job. I have worked in various circumstances. My technical skills and problem solving attitude always help me to handle any issue. I have the deep knowledge of my field and I can use various equipments effectively. EDUCATION Zamboanga City Arturo Eustaquio Colleges Bachelor ofScience in Computer Engineering ( 1997 -2003 ) PROFFESTIONAL EXPERIENCE Esar Information System ( KSA Jubail ) June 2015 to Dec. 2015 Network and Fiber Optic Technician ( Royal Commission ) DUTIES AND RESPONSIBILITIES:  Maintain troubleshoot and administer the use of local area networks (LAN),wide area networks (WAN),mainframe networks, computer workstations, connections to the internet and peripheral equipment.  Evaluate and install computer hardware,networking software,operating system software and software applications.  Provide problem-solving services to network users.  Install CCTV, BIOMETRIC,ACCESS CONTROL.  Pulling Fiber optic Cable, Cat 6, Cat 5 and Cat 3 cable.  Splice fiber optic cable using both manual and fusion splicing techniques.  Installing the right device / cabinets in the building as per design regarding to the corresponding splitters to be installed ODF 22U or 48U. GLOBE TELECOM (Sub Contractor) Sept. 2013 – April 2015 FIBER OPTIC TECHNICIAN AND SPLICER ( FTTH ) DUTIES AND RESPONSIBILITIES:  Work with engineers and or OSP PM’s to perform fusion splicing as directed.  Terminates fiber optic cables including patch indoor and outdoor cables.  Connect fiber optic cables to networking outlets and between network outlets.  Perform fusion splicing of various types of fiber optic cables.
  • 2.
     Installing HSI,IPTV and DEL. JAIDAH GROUP (BUSINESS COMMUNICATIONQATAR ) JUNE 26, 2012- AUG.2013 CONTRACTOR OF QATAR TELECOMMUNICATION ISP, OSP TECHNICIAN AND SPLICER ( FTTH AND FTTB ) DUTIES AND RESPONSIBILITIES:  Daily report to Site Engr. Regarding instruction updating new and finish work in site.  Instructing cable laying teams what are the SOP handling of the fiber optic cable before laying to subscribers premises ( ISP ).  Working in manhole OSP,SOP shoukd be guided accordingly.  Checking the correct site ID splicing splitter allocation details, color coding and color assignment before opening manhole as per map design and splitter allocation.  Troubleshooting faulty fiber optic cables using light sources, power meter and OTDR.  Installing the right device / cabinets in the building as per design regarding to the corresponding splitters to be installed (FAT 24, FAT 48, ODF 22U or 48U and Sub FAT).  Ensuring the right position and location of th device / cabinets to be installed as per SOP.  Design cable routing in the building.  Tracking into different access point to which and where the socket for HIS, IPTV and DEL should be installed by subcribers desired place.  Laying and terminating CAT6, CAT5 and CAT 3to various access point. MINDANAO CABLE CORPORATION June 2004 – March. 2012 CABLE TECHNICIANAND SPLICER  Responsible for running new cabling in new or existing cable in house.  Splicing fiber cable wire.  Temination and testing of new cabling.  Responsible for testing and troubleshooting of cable.  Assisted senior technician in upgrading the system.  Worked with senior technician and provided corrective measures for troubleshooting.  Prepared reports for completion of the tasks and submitted it to supervisor. TRAINING AND SEMINARS ATTENDED ISP, OSP and SPLICER Training October, 2012 Huawei Qatar AutoCAD 2006 and 2007 with color Rendering July 31 to August 15, 2006 Microcadd Technologies Corporation Inc. ISO 14001:2004 Awareness Course May 18, 2006 SCAD Service (S) Pte, Ltd