The document provides information about ROTRONIC temperature measurement equipment, including Pt100 probes, transmitters, data loggers, and handheld instruments. It describes the specifications and applications of various probe types, transmitters that can be used with Pt100 probes including 2-wire and 3/4-wire models, and a wireless data logger and handheld device.