AIR QUALITY ISSUES
        AFFECTING
ROSEMONT COPPER COMPANY

          Prepared By:

Applied Environmental Consultants,
            Inc. (AEC)
AEC RESPONSIBILITIES
§  Conduct Background Particulate and
    Meteorological Monitoring
§  Develop the Relevant Information and Conduct
    the Air Impact Analyses to Demonstrate that the
    Facility Complies with Environmental Air Quality
    Requirements
§  Prepare Application for an Air Quality Permit,
    Interface with Appropriate Agencies to Address
    Air Quality Related Issues
PM10 MONITORING SITE
SUMMARY STATISTICS
     PM10 MEASUREMENTS (micrograms/m3)
            July 2006 – Sept. 2008
              2006      2007       2008
Highest       71.3      40.3       32.6
2nd High      27.0      28.7       28.2
3rd High      26.8      27.0       25.2
4th High      24.6      26.6       24.5

Mean          16.1      10.8       12.7
METEOROLOGICAL SYSTEM
2006 Wind Rose (April 1 – Dec. 31)
        WIND ROSE PLOT:                                                                          DISPLAY:

        Rosemont Met Site                                                                        Wind Speed
        April 1, 2006 to december 31, 2006                                                       Direction (blowing from)




                                                                       NORTH




                                                                                                       20%


                                                                                                 16%


                                                                                           12%


                                                                                   8%


                                                                          4%

                    WEST                                                                                       EAST




                                                                                                                        WIND SPEED
                                                                                                                        (m/s)

                                                                                                                              >= 10.1
                                                                                                                              8.5 - 10.1
                                                                                                                              7.0 - 8.5
                                                                                                                              5.5 - 7.0
                                                                                                                              3.9 - 5.5
                                                                       SOUTH
                                                                                                                              2.4 - 3.9
                                                                                                                              1.9 - 2.4
                                                                                                                              1.4 - 1.9
                                                                                                                              1.0 - 1.4
                                                                                                                        Calms: 1.57%



                                                                               STATION NAME:

                                                                               Rosemont Project




                                                    CALM WINDS:                TOTAL COUNT:

                                                    1.57%                      6371 hrs.

                                                    AVG. WIND SPEED:

                                                    2.73 m/s

       WRPLOT View - Lakes Environmental Software
2007 Wind Rose (Jan. 1 – Dec. 31)
       WIND ROSE PLOT:                                                                          DISPLAY:

       Rosemont Met Site                                                                        Wind Speed
       April 1, 2006 to December 31, 2006                                                       Direction (blowing from)




                                                                      NORTH




                                                                                                      20%


                                                                                                16%


                                                                                          12%


                                                                                  8%


                                                                         4%

                   WEST                                                                                       EAST




                                                                                                                       WIND SPEED
                                                                                                                       (m/s)

                                                                                                                             >= 10.1
                                                                                                                             8.5 - 10.1
                                                                                                                             7.0 - 8.5
                                                                                                                             5.5 - 7.0
                                                                                                                             3.9 - 5.5
                                                                      SOUTH
                                                                                                                             2.4 - 3.9
                                                                                                                             1.9 - 2.4
                                                                                                                             1.4 - 1.9
                                                                                                                             1.0 - 1.4
                                                                                                                       Calms: 1.97%



                                                                              STATION NAME:

                                                                              Rosemont Project




                                                   CALM WINDS:                TOTAL COUNT:

                                                   1.97%                      7707 hrs.

                                                   AVG. WIND SPEED:

                                                   2.77 m/s

      WRPLOT View - Lakes Environmental Software
AIR IMPACT ANALYSES
             AFFECTED AGENCIES

§  PIMA COUNTY DEPARTMENT OF
    ENVIRONMENTAL QUALITY (PCDEQ)
    - Processes Application for an Air Quality
       Permit and Issues Permit
§  FOREST SERVICE
     - Verifies Compliance with Non-Permit Issues,
       i.e. Protection of Air Quality Related Values
CONTENT OF PCDEQ APPICATION

§  Description of Processes and Operations
§  Identification of All Emission Units
§  Identification of Maximum Process Rates and
    Pollution Controls
§  Development of Maximum Hourly, Daily, Annual
    Emission Inventories
§  Air Impact Analysis Demonstrating Protection of
    Applicable Standards
§  Demonstration of Compliance with Applicable
    Emission Standards.
POLLUTANTS OF CONCERN

§  Particulate Matter (PM, PM10, PM2.5)
§  Sulfur Dioxide (SO2)
§  Oxides of Nitrogen (NOx)
§  Carbon Monoxide (CO)
§  Volatile Organic Compounds (VOC)
§  Hazardous Air Pollutants (HAP, 187 Species)
EMISSION SOURCES
§  Mining Activities (Drilling, Blasting, Loading,
    Hauling, Unloading)
§  Ore Processing Operations (Crushing,
    Screening, Milling, Conveying, Floatation,
    Product Shipment, etc.)
§  Auxiliary Processes (Fuel Combustion Sources)
§  Fugitive Emission Sources (Unpaved Roads,
    Stockpiles, Tailings)
§  Mobile Sources (Tailpipe Emissions)
Example Process Flow Diagram
                                    w

                   Hopper /
                 Apron Feeder                       w
                                                                    Scrubber
                                                                                                                  Legend
                                              Primary
                                                                                                           i
                                              Crusher                                                          Control device i
                                                                                                           i
                                                                                                               Controlled by device i
                                             UG
                                                                                                        UG      Underground
                                               Surge
                                    UG          Bin                                                        w    Water Sprays
                    w
                                                                                                      Process Flow
                              Apron
                                                                                                      Air Flow
  w      Conveyor             Feeder
                                                                                                      Water Flow
                    w
      Conveyor
                                    w

                 Stacker
                                                            Scrubber
                                            Stockpiles
                                                                                                                           Wet
                                                                                                                         Process
                                                        1              1
                                                                                             Conveyor                  Secondary
                                        1                   Secondary                                                  Grinding Mill
                                                             Crusher
                        Vibrating Feeders                                                             Oversize          Hydrocyclone
                                                                                              Water                         Set

                                             Conveyor       Water
                                                                               Wet           Wet
                                                                             Process       Process
                                                                                                                    Sump Pump
                                                                             Primary           Vibrating
                                                                           Grinding Mill        Screen
                                                                                                                                   To Floatation
EMISSION INVENTORIES
•  Permits Are Issued Based on Max Emmis.
•  Use Max. Process Rates (tph, tpy, hp, etc.)
•  Select Representative Emission Factors or
   Rates (All Assumptions Must Be Substantiated)
  –  Regulatory Limits
  –  Manufacturer s Specifications
  –  Mass Balance
  –  Computerized EPA Software (TANKS)
  –  Emission Factors (EPA s AP-42)
•  Select Representative Control Efficiencies &
   Calculate Emissions
AIR IMPACT ANALYSES
§  Demonstrate Protection of Applicable Standards Starting
    at Process Area Boundary; Visibility at Class I Areas
§  Averaging Times of 1-hour, 8-hour, 24-hour, Annual
§  EPA Models
   –    SCREEN
   –    AERMOD
   –    VISCREEN
   –    PLUVUE
   –    CALPUFF
§  Meteorological Data Requirements: 1-5 years
§  Concurrent Upper Air Meteorological Data - NWS
§  Modeling Protocol
CURRENT STATUS
§  Continuation of Ambient Monitoring
    Programs
§  Developing Templates for Emission
    Inventories
§  Will Commence on Final Analyses Upon
    Completion of Final Mine Plan
    Specifications
QUESTIONS

More Related Content

More from Hudbay Minerals Inc.

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
Hudbay Minerals Inc.
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
Hudbay Minerals Inc.
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
Hudbay Minerals Inc.
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
Hudbay Minerals Inc.
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
Hudbay Minerals Inc.
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
Hudbay Minerals Inc.
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
Hudbay Minerals Inc.
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
Hudbay Minerals Inc.
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
Hudbay Minerals Inc.
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
Hudbay Minerals Inc.
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
Hudbay Minerals Inc.
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
Hudbay Minerals Inc.
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
Hudbay Minerals Inc.
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
Hudbay Minerals Inc.
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
Hudbay Minerals Inc.
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
Hudbay Minerals Inc.
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
Hudbay Minerals Inc.
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
Hudbay Minerals Inc.
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
Hudbay Minerals Inc.
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
Hudbay Minerals Inc.
 

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Facilities Engineering Presentation
Facilities Engineering PresentationFacilities Engineering Presentation
Facilities Engineering Presentation
 

Recently uploaded

PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
ControlCase
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
Assure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyesAssure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
DanBrown980551
 
UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..
UiPathCommunity
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
Vlad Stirbu
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
Laura Byrne
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
Globus
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 

Recently uploaded (20)

PCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase TeamPCI PIN Basics Webinar from the Controlcase Team
PCI PIN Basics Webinar from the Controlcase Team
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
Assure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyesAssure Contact Center Experiences for Your Customers With ThousandEyes
Assure Contact Center Experiences for Your Customers With ThousandEyes
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
LF Energy Webinar: Electrical Grid Modelling and Simulation Through PowSyBl -...
 
UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..UiPath Community Day Dubai: AI at Work..
UiPath Community Day Dubai: AI at Work..
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Quantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIsQuantum Computing: Current Landscape and the Future Role of APIs
Quantum Computing: Current Landscape and the Future Role of APIs
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
The Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and SalesThe Art of the Pitch: WordPress Relationships and Sales
The Art of the Pitch: WordPress Relationships and Sales
 
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdfFIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
FIDO Alliance Osaka Seminar: Passkeys at Amazon.pdf
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 

Air Quality Issues Affecting Rosemont

  • 1. AIR QUALITY ISSUES AFFECTING ROSEMONT COPPER COMPANY Prepared By: Applied Environmental Consultants, Inc. (AEC)
  • 2. AEC RESPONSIBILITIES §  Conduct Background Particulate and Meteorological Monitoring §  Develop the Relevant Information and Conduct the Air Impact Analyses to Demonstrate that the Facility Complies with Environmental Air Quality Requirements §  Prepare Application for an Air Quality Permit, Interface with Appropriate Agencies to Address Air Quality Related Issues
  • 4. SUMMARY STATISTICS PM10 MEASUREMENTS (micrograms/m3) July 2006 – Sept. 2008 2006 2007 2008 Highest 71.3 40.3 32.6 2nd High 27.0 28.7 28.2 3rd High 26.8 27.0 25.2 4th High 24.6 26.6 24.5 Mean 16.1 10.8 12.7
  • 6. 2006 Wind Rose (April 1 – Dec. 31) WIND ROSE PLOT: DISPLAY: Rosemont Met Site Wind Speed April 1, 2006 to december 31, 2006 Direction (blowing from) NORTH 20% 16% 12% 8% 4% WEST EAST WIND SPEED (m/s) >= 10.1 8.5 - 10.1 7.0 - 8.5 5.5 - 7.0 3.9 - 5.5 SOUTH 2.4 - 3.9 1.9 - 2.4 1.4 - 1.9 1.0 - 1.4 Calms: 1.57% STATION NAME: Rosemont Project CALM WINDS: TOTAL COUNT: 1.57% 6371 hrs. AVG. WIND SPEED: 2.73 m/s WRPLOT View - Lakes Environmental Software
  • 7. 2007 Wind Rose (Jan. 1 – Dec. 31) WIND ROSE PLOT: DISPLAY: Rosemont Met Site Wind Speed April 1, 2006 to December 31, 2006 Direction (blowing from) NORTH 20% 16% 12% 8% 4% WEST EAST WIND SPEED (m/s) >= 10.1 8.5 - 10.1 7.0 - 8.5 5.5 - 7.0 3.9 - 5.5 SOUTH 2.4 - 3.9 1.9 - 2.4 1.4 - 1.9 1.0 - 1.4 Calms: 1.97% STATION NAME: Rosemont Project CALM WINDS: TOTAL COUNT: 1.97% 7707 hrs. AVG. WIND SPEED: 2.77 m/s WRPLOT View - Lakes Environmental Software
  • 8. AIR IMPACT ANALYSES AFFECTED AGENCIES §  PIMA COUNTY DEPARTMENT OF ENVIRONMENTAL QUALITY (PCDEQ) - Processes Application for an Air Quality Permit and Issues Permit §  FOREST SERVICE - Verifies Compliance with Non-Permit Issues, i.e. Protection of Air Quality Related Values
  • 9. CONTENT OF PCDEQ APPICATION §  Description of Processes and Operations §  Identification of All Emission Units §  Identification of Maximum Process Rates and Pollution Controls §  Development of Maximum Hourly, Daily, Annual Emission Inventories §  Air Impact Analysis Demonstrating Protection of Applicable Standards §  Demonstration of Compliance with Applicable Emission Standards.
  • 10. POLLUTANTS OF CONCERN §  Particulate Matter (PM, PM10, PM2.5) §  Sulfur Dioxide (SO2) §  Oxides of Nitrogen (NOx) §  Carbon Monoxide (CO) §  Volatile Organic Compounds (VOC) §  Hazardous Air Pollutants (HAP, 187 Species)
  • 11. EMISSION SOURCES §  Mining Activities (Drilling, Blasting, Loading, Hauling, Unloading) §  Ore Processing Operations (Crushing, Screening, Milling, Conveying, Floatation, Product Shipment, etc.) §  Auxiliary Processes (Fuel Combustion Sources) §  Fugitive Emission Sources (Unpaved Roads, Stockpiles, Tailings) §  Mobile Sources (Tailpipe Emissions)
  • 12. Example Process Flow Diagram w Hopper / Apron Feeder w Scrubber Legend Primary i Crusher Control device i i Controlled by device i UG UG Underground Surge UG Bin w Water Sprays w Process Flow Apron Air Flow w Conveyor Feeder Water Flow w Conveyor w Stacker Scrubber Stockpiles Wet Process 1 1 Conveyor Secondary 1 Secondary Grinding Mill Crusher Vibrating Feeders Oversize Hydrocyclone Water Set Conveyor Water Wet Wet Process Process Sump Pump Primary Vibrating Grinding Mill Screen To Floatation
  • 13. EMISSION INVENTORIES •  Permits Are Issued Based on Max Emmis. •  Use Max. Process Rates (tph, tpy, hp, etc.) •  Select Representative Emission Factors or Rates (All Assumptions Must Be Substantiated) –  Regulatory Limits –  Manufacturer s Specifications –  Mass Balance –  Computerized EPA Software (TANKS) –  Emission Factors (EPA s AP-42) •  Select Representative Control Efficiencies & Calculate Emissions
  • 14. AIR IMPACT ANALYSES §  Demonstrate Protection of Applicable Standards Starting at Process Area Boundary; Visibility at Class I Areas §  Averaging Times of 1-hour, 8-hour, 24-hour, Annual §  EPA Models –  SCREEN –  AERMOD –  VISCREEN –  PLUVUE –  CALPUFF §  Meteorological Data Requirements: 1-5 years §  Concurrent Upper Air Meteorological Data - NWS §  Modeling Protocol
  • 15. CURRENT STATUS §  Continuation of Ambient Monitoring Programs §  Developing Templates for Emission Inventories §  Will Commence on Final Analyses Upon Completion of Final Mine Plan Specifications